Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7640480B2 - Crane Equipment - Google Patents
[go: Go Back, main page]

JP7640480B2 - Crane Equipment - Google Patents

Crane Equipment Download PDF

Info

Publication number
JP7640480B2
JP7640480B2 JP2022016123A JP2022016123A JP7640480B2 JP 7640480 B2 JP7640480 B2 JP 7640480B2 JP 2022016123 A JP2022016123 A JP 2022016123A JP 2022016123 A JP2022016123 A JP 2022016123A JP 7640480 B2 JP7640480 B2 JP 7640480B2
Authority
JP
Japan
Prior art keywords
load
earthquake
crane apparatus
control process
hoisting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022016123A
Other languages
Japanese (ja)
Other versions
JP2023114045A (en
Inventor
裕吾 及川
健二郎 藤井
康治 堀川
真弘 大槻
達也 田上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Industrial Equipment Systems Co Ltd
Original Assignee
Hitachi Industrial Equipment Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Industrial Equipment Systems Co Ltd filed Critical Hitachi Industrial Equipment Systems Co Ltd
Priority to JP2022016123A priority Critical patent/JP7640480B2/en
Publication of JP2023114045A publication Critical patent/JP2023114045A/en
Application granted granted Critical
Publication of JP7640480B2 publication Critical patent/JP7640480B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Control And Safety Of Cranes (AREA)

Description

本発明はクレーン装置に係り、特に地震通報システムと連動したクレーン装置に関するものである。 The present invention relates to a crane device, and in particular to a crane device that is linked to an earthquake reporting system.

工場等に設けられているクレーン装置を使用して、作業者が製品の吊り作業や移動作業を行う場合においては、地震が発生すると吊り作業や移動作業中の吊荷が揺れたり、落下したりする事象が発生する恐れがある。このため、クレーン装置に吊り下げられた吊荷を、地震の発生に対応して適切に取り扱うことが必要である。 When workers use a crane installed in a factory or other facility to lift or move products, there is a risk that the load being lifted or moved may swing or fall during the lifting or moving process if an earthquake occurs. For this reason, it is necessary to handle the load suspended from the crane appropriately in the event of an earthquake.

しかしながら、地震の発生の予知が難しいことから、現場では地震による揺れを予め考慮して作業を行うことはできない。このため、地震によるクレーンへの悪影響を極力少なくするための現実的な方法として、地震の発生を検出するとクレーン装置の制御を自動的に地震に対応した制御に切り換える方法が知られている。 However, because it is difficult to predict the occurrence of earthquakes, it is not possible to carry out work on site while taking into consideration the shaking caused by earthquakes in advance. For this reason, a practical method for minimizing the adverse effects of earthquakes on cranes is known, which automatically switches the control of the crane equipment to control that is appropriate for earthquakes when an earthquake is detected.

例えば、特開2013-121864号公報(特許文献1)においては、吊荷のコンテナが所定位置に着床した状態にあることを検出する着床検出部と、地震の発生を検出する地震検出部と、主巻きロープの張力を緩める張力緩和機構部と、着床検出部からの着床検出信号、及び地震検出部からの地震発生信号を共に受けた条件で張力緩和機構部の動作信号を出力する制御部とを備えたクレーン装置が示されている。 For example, JP 2013-121864 A (Patent Document 1) discloses a crane device that includes a landing detection unit that detects when a suspended container is landed at a predetermined position, an earthquake detection unit that detects the occurrence of an earthquake, a tension relief mechanism that releases the tension of the main hoisting rope, and a control unit that outputs an operation signal for the tension relief mechanism unit when both a landing detection signal from the landing detection unit and an earthquake occurrence signal from the earthquake detection unit are received.

このクレーン装置によると、コンテナ船上等に吊荷のコンテナを着床した状態の荷役中に地震が発生すると、制御部から出力される動作信号を受けて張力緩和機構部が動作し、主巻きロープに作用する張りや過大な張力を防止するようにしている。 According to this crane device, if an earthquake occurs during loading and unloading of a suspended container on a container ship or the like, the tension relief mechanism operates in response to an operating signal output from the control unit, preventing tension or excessive tension acting on the main hoisting rope.

特開2013-121864号公報JP 2013-121864 A

特許文献1に記載のようなクレーン装置は、地震の発生をクレーン装置に設置した地震計や加速度計、或いは外部から入力される地震情報の信号を利用して、クレーン装置の制御を地震に対応した制御に切り替えるものである。 The crane apparatus described in Patent Document 1 detects the occurrence of an earthquake using a seismometer or accelerometer installed on the crane apparatus, or an earthquake information signal input from outside, and switches the control of the crane apparatus to control that corresponds to the earthquake.

しかしながら、特許文献1に記載のクレーン装置においては、単にクレーン装置の制御を地震に対応した制御に切り替えるだけのものであり、工場で作業を行っている作業者に地震の発生を知らせることについては考慮されていない。特に、作業者の地震に対する対応として、実際の地震の揺れが到達するまでの時間を利用して作業者に地震に対する対応(作業の中止、避難等の注意喚起)を促すことや、この後のクレーン装置の取り扱いについては、何ら具体的な対応策が示されていない。 However, the crane apparatus described in Patent Document 1 simply switches the control of the crane apparatus to control that responds to earthquakes, and does not take into consideration notifying workers working in a factory that an earthquake has occurred. In particular, no specific measures are given for encouraging workers to respond to an earthquake (stopping work, calling attention to evacuation, etc.) by using the time until the actual earthquake shaking arrives, or for how to handle the crane apparatus after that.

したがって、地震の発生地点から実際の地震の揺れが到達するまでの時間を利用して、作業者に地震に対する対応を促すことや、この後のクレーン装置の吊荷の安全な取り扱いについての具体的な対応策が要請されている。 Therefore, there is a need to encourage workers to take action against the earthquake by utilizing the time it takes for the actual earthquake shaking to reach the area from the point where the earthquake occurs, and to come up with specific measures for the safe handling of the loads suspended by the crane equipment after this.

本発明の目的は、地震の発生地点から実際の地震の揺れが到達するまでの時間を利用して、作業者に地震に対する対応を促し、更に安全に吊荷を処理できるクレーン装置を提供することにある。 The object of the present invention is to provide a crane device that utilizes the time it takes for the actual earthquake shaking to reach the site of the earthquake to encourage workers to respond to the earthquake and that can handle suspended loads more safely.

本発明は、吊荷が掛けられるフックを巻き上げる巻上用電動機と、巻上用電動機を前後及び/又は左右に移動させる移動用電動機と、巻上用電動機、及び移動用電動機の動作を制御する制御手段を備えたクレーン装置であって、制御手段は、地震情報を受信する地震情報受信手段と、地震情報を受信して発報制御処理と吊荷制御処理を実行する制御処理部と、制御処理部によって制御され、発報制御処理の実行によって周囲に対して音響発生手段で地震が到来することを知らせる発報手段と、制御処理部によって制御され、吊荷制御処理の実行によって現在の吊荷の状況に応じて吊荷を適切な位置に移動させる吊荷制御手段を備えたクレーン装置を特徴としている。 The present invention is a crane apparatus equipped with a hoisting motor that hoists a hook on which a load is attached, a moving motor that moves the hoisting motor back and forth and/or left and right, and a control means that controls the operation of the hoisting motor and the moving motor, and the control means is characterized by the crane apparatus equipped with earthquake information receiving means that receives earthquake information, a control processing unit that receives the earthquake information and executes an alarm control process and a load control process, an alarm means that is controlled by the control processing unit and notifies the surrounding area of an impending earthquake using a sound generating means by executing the alarm control process, and a load control means that is controlled by the control processing unit and moves the load to an appropriate position according to the current load condition by executing the load control process.

本発明によれば、地震の発生から実際の地震の揺れが到達するまでの時間を利用して、作業者に地震に対する対応を促し、更に安全に吊荷を処理できるクレーン装置を提供することができる。 The present invention provides a crane device that utilizes the time between the occurrence of an earthquake and the arrival of actual earthquake shaking to encourage workers to respond to the earthquake and to handle suspended loads more safely.

クレーン装置の全体構成を示す斜視図である。FIG. 2 is a perspective view showing the overall configuration of the crane apparatus. クレーン装置の制御システムの全体構成を示す構成図である。1 is a configuration diagram showing an overall configuration of a control system for a crane apparatus. 本発明の実施形態になるクレーン装置の制御システムの構成を示すブロック図である。1 is a block diagram showing a configuration of a control system for a crane apparatus according to an embodiment of the present invention. 図3に示す制御システムの処理フローを示すフローチャートである。4 is a flowchart showing a process flow of the control system shown in FIG. 3 . 図4に示す停止動作処理後の安全処理フローを示すフローチャートである。5 is a flowchart showing a safety processing flow after the stopping operation processing shown in FIG. 4 .

以下、本発明の実施形態について図面を用いて詳細に説明するが、本発明は以下の実施形態に限定されることなく、本発明の技術的な概念の中で種々の変形例や応用例をもその範囲に含むものである。 The following describes in detail an embodiment of the present invention with reference to the drawings. However, the present invention is not limited to the following embodiment, and the scope of the present invention includes various modifications and applications within the technical concept of the present invention.

図1は本発明が適用されるクレーン装置の全体構成を示し、図2は本発明の実施形態になるクレーン装置の制御システムの全体構成を示している。 Figure 1 shows the overall configuration of a crane device to which the present invention is applied, and Figure 2 shows the overall configuration of a crane device control system according to an embodiment of the present invention.

クレーン装置は大まかには、吊荷が掛けられるクレーンフックを巻き上げ、及び巻き下げる巻上用電動機と、この巻上用電動機を前後及び/又は左右に移動させる移動用電動機と、巻上用電動機、及び移動用電動機の動作を制御する制御手段を備えている。具体的な構成は以下の通りである。 A crane device is roughly equipped with a hoisting motor that hoists and lowers the crane hook on which a load is attached, a moving motor that moves the hoisting motor back and forth and/or left and right, and a control means that controls the operation of the hoisting motor and the moving motor. The specific configuration is as follows:

図1において、クレーンフック1、ワイヤーロープ2、巻上誘導電動機3、巻上用ドラム4、横行誘導電動機5、横行用車輪6、横行用ガーダー7、走行誘導電動機8、走行用車輪9、走行用ガーダー10、巻上・横行インバータ制御装置11、ケーブルに吊り下げられた操作入力装置12、走行用インバータ制御装置13等から構成されている。また、巻上誘導電動機3、横行誘導電動機5、及び走行誘導電動機8には、誘導電動機用ブレーキ14(図2参照)が各々に内蔵されている。 In Figure 1, it is composed of a crane hook 1, a wire rope 2, a hoisting induction motor 3, a hoisting drum 4, a traverse induction motor 5, traverse wheels 6, a traverse girder 7, a traveling induction motor 8, a traveling wheel 9, a traveling girder 10, a hoisting/traverse inverter control device 11, an operation input device 12 suspended from a cable, a traveling inverter control device 13, etc. In addition, the hoisting induction motor 3, the traverse induction motor 5, and the traveling induction motor 8 each have an induction motor brake 14 (see Figure 2) built in.

ここで、巻上誘導電動機3はクレーンフック1に掛けられた吊荷を重力方向に上げ下げするものであり、横行誘導電動機5、走行誘導電動機8は、巻上誘導電動機3を前後方向、及び/又は左右方向に移動させる移動用電動機である。 Here, the hoisting induction motor 3 raises and lowers the load hung from the crane hook 1 in the direction of gravity, and the traverse induction motor 5 and the travel induction motor 8 are motors for moving the hoisting induction motor 3 in the forward/backward and/or left/right directions.

クレーン装置は、クレーンフック1に取り付けた吊荷を、巻上誘導電動機3によって回転する巻上用ドラム4により、ワイヤーロープ2を巻き上げ/巻き下げすることで重力方向(Y方向、-Y方向の矢印で示す)、即ち上下方向に吊荷を移動する。また、横行用車輪6を横行誘導電動機5が回転させ、横行用ガーダー7に沿って左右方向(X方向、-X方向の矢印で示す)に移動する。更に、走行用車輪9を走行誘導電動機8が回転させ、走行用ガーダー10に沿って前後方向(Z方向、-Z方向の矢印で示す)に移動する。 The crane device moves a load attached to a crane hook 1 in the direction of gravity (indicated by the Y direction and -Y arrows), i.e., up and down, by using a hoist drum 4 rotated by a hoist induction motor 3 to hoist and lower a wire rope 2. In addition, a traverse induction motor 5 rotates traverse wheels 6, which move left and right (indicated by the X direction and -X arrows) along a traverse girder 7. In addition, a traveling induction motor 8 rotates running wheels 9, which move forward and backward (indicated by the Z direction and -Z arrows) along a traveling girder 10.

図2に示すように、巻上・横行インバータ制御装置11には、巻上・横行インバータ制御部15、巻上用インバータ16、横行用インバータ17が内蔵されている。また、走行用インバータ制御装置13には、走行インバータ制御部18、及び走行用インバータ19が内蔵されている。また、巻上・横行インバータ制御部15と走行インバータ制御部18とは通信線20によって接続されている。 As shown in FIG. 2, the hoisting/traverse inverter control device 11 includes a hoisting/traverse inverter control unit 15, a hoisting inverter 16, and a traverse inverter 17. The traveling inverter control device 13 includes a traveling inverter control unit 18 and a traveling inverter 19. The hoisting/traverse inverter control unit 15 and the traveling inverter control unit 18 are connected by a communication line 20.

巻上誘導電動機3と横行誘導電動機5は、巻上・横行用インバータ制御装置11に格納された巻上・横行インバータ制御部15により制御される。即ち、オペレータが操作入力装置12から所定の指示を入力すると、巻上・横行インバータ制御部15は、巻上用インバータ16と横行用インバータ17を制御するため、巻上用インバータ16と横行用インバータ17に制御に必要な制御情報を与える。尚、巻上誘導電動機3には、エンコーダ21が取り付けられており、巻上誘導電動機3の回転情報を巻上・横行インバータ制御部15に入力している。 The hoisting induction motor 3 and the traverse induction motor 5 are controlled by the hoisting/traverse inverter control unit 15 stored in the hoisting/traverse inverter control device 11. That is, when the operator inputs a specific instruction from the operation input device 12, the hoisting/traverse inverter control unit 15 provides the hoisting inverter 16 and the traverse inverter 17 with control information necessary for control in order to control them. An encoder 21 is attached to the hoisting induction motor 3, and inputs the rotation information of the hoisting induction motor 3 to the hoisting/traverse inverter control unit 15.

そして、巻上用インバータ16と横行用インバータ17は、巻上誘導電動機3と横行誘導電動機5に必要な周波数、電圧、電流を加え、同時に誘導電動機用ブレーキ14を開放制御する。これによって、巻上用ドラム4の場合、クレーンフック1に取り付けられた吊荷が、落下することなくY方向に移動させられ、また、横行用車輪6の場合、横行用ガーダー7に沿って横行用車輪6をX方向に移動させる。 The hoisting inverter 16 and the traverse inverter 17 apply the necessary frequency, voltage, and current to the hoisting induction motor 3 and the traverse induction motor 5, and at the same time control the release of the induction motor brake 14. As a result, in the case of the hoisting drum 4, the load attached to the crane hook 1 is moved in the Y direction without falling, and in the case of the traverse wheels 6, the traverse wheels 6 are moved in the X direction along the traverse girder 7.

同様に走行用車輪9に取り付けてある走行誘導電動機8は、オペレータが操作入力装置12からの所定の指示を入力すると、走行用インバータ制御装置13に格納された走行インバータ制御部18が走行用インバータ19を制御し、走行用インバータ19は走行誘導電動機8に必要な周波数、電圧、電流を加え、同時に誘導電動機用ブレーキ14を開放制御することで、走行用ガーダー10に沿って走行用車輪9をZ方向に移動させる。 Similarly, when the operator inputs a specific command from the operation input device 12, the traveling induction motor 8 attached to the traveling wheel 9 is controlled by the traveling inverter control unit 18 stored in the traveling inverter control device 13, which controls the traveling inverter 19, and the traveling inverter 19 applies the necessary frequency, voltage, and current to the traveling induction motor 8, and at the same time controls the release of the induction motor brake 14, thereby moving the traveling wheel 9 in the Z direction along the traveling girder 10.

更に巻上・横行インバータ制御装置11には通信部22が設けられており、この通信部22は、通信線23によって巻上・横行インバータ制御部15と接続されている。通信部22は無線通信によって、演算機能を備えるサーバによって構成されたクラウドネットワーク(以下、クラウドと表記する)24に接続されており、このクラウド24は、通信部を備えた緊急地震通報システム25とも無線通信で接続されている。 Furthermore, the hoisting/traversing inverter control device 11 is provided with a communication unit 22, which is connected to the hoisting/traversing inverter control unit 15 by a communication line 23. The communication unit 22 is connected by wireless communication to a cloud network (hereinafter referred to as the cloud) 24 composed of a server equipped with a calculation function, and the cloud 24 is also connected by wireless communication to an emergency earthquake notification system 25 equipped with a communication unit.

したがって、クラウド24を介して、通信部22と緊急地震通報システム25は、通信可能な環境に設定されている。もちろん、有線で通信可能に接続されていても良いことはいうまでもない。 Therefore, the communication unit 22 and the emergency earthquake notification system 25 are set in an environment in which they can communicate with each other via the cloud 24. Of course, it goes without saying that they may also be connected to each other via a wired connection so that they can communicate with each other.

サーバを備えたクラウド24は、クレーン装置の製造会社や、メンテナンス会社に設置されている。また、緊急地震通報システム25は、気象庁によって運営されている「緊急地震速報システム」を使用することができる。この緊急地震速報システムは、「予報」と「警報」を発出するように決められている。 The cloud 24 equipped with a server is installed at a crane equipment manufacturing company or a maintenance company. The emergency earthquake notification system 25 can use the "Emergency Earthquake Warning System" operated by the Japan Meteorological Agency. This emergency earthquake warning system is designed to issue "forecasts" and "warnings."

例えば、「予報」は最大震度3以上、又はマグニチュード3.5以上と予想されたときに発出され、「警報」は最大震度5弱以上の揺れが予想されたときに発出される。そして、この「予報」と「警報」を選択することで、クレーン装置の制御状態を変えることができる。また、地震は最初にP波による「初期微動」が観察され、その後S波による「主要動」が観察される。 For example, a "forecast" is issued when the maximum seismic intensity is expected to be 3 or greater, or a magnitude of 3.5 or greater, and a "warning" is issued when shaking of a maximum seismic intensity of 5 or greater is expected. By selecting between "forecast" and "warning," the control state of the crane equipment can be changed. In addition, earthquakes are first observed as "initial tremors" caused by P waves, followed by "main tremors" caused by S waves.

したがって、初期微動によって「予報」が発出され、その後の主要動によって「警報」が連続して発出される場合は、これらの間には或る時間遅れが存在する。この時間遅れを利用して、クレーン装置の地震に対応する制御を実行することができる。 Therefore, when a "forecast" is issued due to initial tremors and then an "alarm" is issued in succession due to the main tremors, there is a time lag between these two. This time lag can be used to control the crane equipment in response to earthquakes.

次に、本発明の実施形態になる緊急地震通報システムと連動したクレーン装置の制御システムの構成について説明する。図3は、本実施形態になる制御システムの概略の構成を示している。 Next, we will explain the configuration of a control system for a crane device linked to an emergency earthquake notification system according to an embodiment of the present invention. Figure 3 shows the general configuration of the control system according to this embodiment.

本実施形態では、制御装置として巻上・横行インバータ制御装置11を使用しているが、種々の制御装置を使用することができるので、以下では代表して制御装置11として説明を進める。 In this embodiment, the hoisting/traversing inverter control device 11 is used as the control device, but since various control devices can be used, the following explanation will be given using the control device 11 as a representative example.

制御装置11は制御処理部30を備えており、この制御処理部30は、地震が発生した時のクレーン装置の制御処理を実行する機能を備えており、これは周知の通り、制御プログラムによって動作するマイクロコンピュータで実行される。制御処理部30には、種々のセンサから各種の情報が入力されている。本実施形態に関係する情報としては、例えば、吊荷の位置情報、吊荷の荷重情報、吊荷が位置する領域の映像情報が制御処理部30に入力されている。 The control device 11 is equipped with a control processing unit 30, which has the function of executing control processing of the crane device when an earthquake occurs, and as is well known, this is executed by a microcomputer that operates according to a control program. Various information is input to the control processing unit 30 from various sensors. Information related to this embodiment, for example, includes position information of the suspended load, load information of the suspended load, and image information of the area in which the suspended load is located, which are input to the control processing unit 30.

吊荷の位置情報は位置情報取得部31で取得される。これは、クレーンフック1の位置から求められるもので、巻上用ドラム4のワイヤーロープ2の巻き取り量から求めることができる。尚、これ以外の巻上誘導電動機3の回転からも求めることもでき、要はクレーンフック1の位置情報が得られれば良いものである。クレーンフック1の位置情報は、吊荷の位置情報として取り扱うことができる。 The position information of the suspended load is acquired by the position information acquisition unit 31. This is obtained from the position of the crane hook 1, and can be obtained from the amount of wire rope 2 wound on the hoisting drum 4. It can also be obtained from the rotation of the hoisting induction motor 3, and the point is that it is sufficient to obtain the position information of the crane hook 1. The position information of the crane hook 1 can be treated as the position information of the suspended load.

吊荷の荷重情報は荷重情報取得部32で取得される。これは、図示しない荷重計から求められるものである。尚、これ以外の巻上誘導電動機3の電流値(負荷トルク)から求めることもでき、要は吊荷の荷重情報が得られれば良いものである。 The load information of the suspended load is acquired by the load information acquisition unit 32. This is obtained from a load meter (not shown). Note that it can also be obtained from the current value (load torque) of the hoisting induction motor 3, and the point is that it is sufficient to obtain the load information of the suspended load.

吊荷が位置する領域の映像情報はカメラ映像取得部33で取得される。これは、図示しないカメラから求められるものである。尚、本実施形態では、カメラは巻上用ドラム4に設けられているが、これ以外のクレーン装置とは離れた位置にあるカメラの映像から求めることもでき、要は吊荷が位置する領域の映像情報が得られれば良いものである。 Video information of the area where the load is located is acquired by the camera image acquisition unit 33. This is obtained from a camera (not shown). In this embodiment, the camera is mounted on the hoisting drum 4, but it can also be obtained from an image from a camera located away from the crane device. The point is that video information of the area where the load is located can be obtained.

更に、制御処理部30には、通信部22から地震に関する地震情報(例えば、緊急地震速報)が入力されている。地震情報は、クラウド24を介して緊急地震通報システム25から送られてきている。 Furthermore, earthquake information (e.g., emergency earthquake alerts) relating to earthquakes is input to the control processing unit 30 from the communication unit 22. The earthquake information is sent from the emergency earthquake notification system 25 via the cloud 24.

緊急地震通報システム25は、上述したように、気象庁が運用する「緊急地震速報システム」から送られてくるものであり、地震の強度に対応して「予報」と「警報」とが送られてくる。また、P波による初期微動とS波による主要動は時間遅れを有して地震計に届くため、これに対応して「予報」と「警報」が時系列で発出される場合もある。 As mentioned above, the emergency earthquake notification system 25 receives information from the "Emergency Earthquake Warning System" operated by the Japan Meteorological Agency, and sends out "forecasts" and "warnings" according to the strength of the earthquake. In addition, since the initial tremors caused by P waves and the main tremors caused by S waves arrive at the seismometer with a time delay, "forecasts" and "warnings" may be issued in chronological order in response to this.

制御処理部30は、発報制御部34に対して「予報」と「警報」を報知するように発報情報を送信する。発報制御部34はスピーカーのような音響発生手段に対して、地震が発生したこと、地震の強度、避難の要請や避難方法等を音声によって報知する機能を備えている。 The control processing unit 30 transmits information to the alarm control unit 34 to notify it of a "forecast" and an "alert". The alarm control unit 34 has a function to notify an audio generating means such as a speaker of the occurrence of an earthquake, the strength of the earthquake, a request for evacuation, evacuation methods, etc. by voice.

したがって、クレーン装置に発報制御部34や音響発生手段を設けることによって、作業者がスマートフォン等の情報端末を携帯しなくても、円滑に地震情報に基づいた退避行動をとることができるようになる。 Therefore, by providing the crane device with an alarm control unit 34 and sound generating means, workers can smoothly take evacuation action based on earthquake information, even if they do not carry an information terminal such as a smartphone.

また、制御処理部30は、運転制御部35に対してクレーンの停止や吊荷の移動処理等を実行させる制御機能を備えている。例えば通信部22から「警報」を受信すると発報制御を行う機能や、「予報」を受信すると発報制御、クレーン装置の停止制御、及び吊荷を床に着床させる、巻き上げるといった吊荷の移動制御を実行する機能を備えている。 The control processing unit 30 also has a control function that causes the operation control unit 35 to stop the crane, move the suspended load, etc. For example, it has a function to perform alert control when it receives an "alarm" from the communication unit 22, and a function to perform alert control when it receives a "forecast," stop control of the crane device, and control the movement of the suspended load, such as landing the load on the floor and hoisting it up.

したがって、地震の強度に応じてクレーン装置の制御内容を選択しているので、地震に対応した適切なクレーン装置の制御を実行することができるようになる。 As a result, the control content of the crane equipment is selected according to the strength of the earthquake, making it possible to execute appropriate control of the crane equipment in response to the earthquake.

次に、このような制御システムにおいて地震が発生した時の具体的な処理フローを説明する。図4は、緊急地震速報を受信した時の処理フローを示している。この制御は、所定時間毎の時間割込みで起動されており、緊急地震速報を受信すると地震に対応した制御を実行するものである。 Next, we will explain the specific processing flow when an earthquake occurs in such a control system. Figure 4 shows the processing flow when an emergency earthquake warning is received. This control is started by a time interrupt at a predetermined time interval, and when an emergency earthquake warning is received, control corresponding to the earthquake is executed.

≪ステップS11≫
ステップS11においては、緊急地震速報を受信したかどうかを判断している。緊急地震速報を受信しない(No)と、エンドに抜けて次の起動タイミングの到来に待機する。一方、緊急地震速報を受信するとステップS12に移行する。
<Step S11>
In step S11, it is determined whether or not an emergency earthquake warning has been received. If an emergency earthquake warning has not been received (No), the process goes to END and waits for the next activation timing. On the other hand, if an emergency earthquake warning has been received, the process proceeds to step S12.

≪ステップS12≫
ステップS12においては、地震のレベルが「Primary」(請求項でいう第2の所定強度に対応する)かどうかを判断している。この「Primary」は、「予報」で設定されている地震の強度に対応している。そして、「Primary」では無い(No)と判断されるとステップS13に移行する。つまり、「Primary」では無い場合は、「Scondary」(請求項でいう第1の所定強度に対応する)と判断されて「警報」で設定されている地震の強度と判断されている。一方、「Primary」と判断されるとステップS14に移行する。
<Step S12>
In step S12, it is determined whether the earthquake level is "Primary" (corresponding to the second predetermined intensity in the claims). This "Primary" corresponds to the earthquake intensity set in "Forecast". If it is determined that it is not "Primary" (No), the process proceeds to step S13. In other words, if it is not "Primary", it is determined that it is "Scandary" (corresponding to the first predetermined intensity in the claims), which is the earthquake intensity set in "Warning". On the other hand, if it is determined that it is "Primary", the process proceeds to step S14.

≪ステップS13≫
ステップS12で地震のレベルが「Scondary」と判断されているので、ステップS13においては、強度が大きい地震が早期に到来すると予想されるため、先ずは作業者の安全を優先して発報処理を実行する。この場合、音響発生手段によって、ブザーを吹鳴し、音声によって強度の大きい地震が到来することを報知する。
<Step S13>
Since the earthquake level is judged to be "Scandary" in step S12, it is expected that a strong earthquake will occur soon, so in step S13, the safety of the workers is prioritized and an alarm is issued. In this case, a buzzer is sounded by the sound generating means to notify the operator by voice that a strong earthquake is coming.

つまり、地震の強度が「Scondary」(第1の所定強度以上)と判定された時は、後述する吊荷制御処理を実行せずに、発報制御処理を実行して音響発生手段によって、素早く注意を喚起する。 In other words, when the intensity of the earthquake is judged to be "Scandary" (above a first predetermined intensity), the load control process described below is not executed, but the alarm control process is executed to quickly alert the user using the sound generation means.

例えば、「震度6の地震が発生しました。急いで最寄りの安全な場所に避難して下さい。」といったアナウンスを実行する。これによって、作業者は、安全な場所に退避して自身の安全を確保する行動を素早くとることができるようになる。ステップS13の処理を実行するとエンドに抜けて、次の起動タイミングの到来に待機する。 For example, an announcement such as "An earthquake of magnitude 6 has occurred. Please evacuate immediately to the nearest safe place" is made. This allows the worker to quickly take action to evacuate to a safe place and ensure their own safety. After executing the process of step S13, the process goes to END and waits for the next activation timing to arrive.

≪ステップS14≫
ステップS12で地震のレベルが「Primary」と判断されているので、ステップS14においては、強度がさほど大きくない地震が到来すると予想されるため、先ずは作業者の安全を優先して発報処理を実行する。この場合、音響発生手段によって、ブザーを吹鳴し、音声によって強度がさほど大きくない地震が到来することを報知する。
<Step S14>
Since the earthquake level is judged to be "Primary" in step S12, it is predicted that an earthquake of a relatively low intensity will occur, and therefore, in step S14, the safety of the workers is prioritized and an alarm is issued. In this case, a buzzer is sounded by the sound generating means, and an audio message is generated to inform the operator that an earthquake of a relatively low intensity will occur.

例えば、「震度3の地震が発生しました。最寄りの安全な場所に避難して下さい。引き続き強度の大きい地震が到来する恐れがあります。」といったアナウンスを実行する。これによって、作業者は、最寄りの机の下とかに退避して自身の安全を確保する行動を素早くとることができるようになる。発報処理が完了するとステップS15に移行する。 For example, an announcement such as "An earthquake of seismic intensity 3 has occurred. Please evacuate to the nearest safe place. There is a risk of further earthquakes of greater intensity." is made. This allows workers to quickly take action to ensure their own safety, such as by taking refuge under the nearest desk. Once the alarm processing is complete, the process proceeds to step S15.

≪ステップS15≫
ステップS12においては、震度がさほど大きくない地震と見做され、しかもこれが初期微動で、この後に震度が大きい主要動が到来する恐れがあると見做される。このため、初期微動と主要動の間の時間遅れを利用して、クレーン装置の停止動作処理を実行する。
<Step S15>
In step S12, the earthquake is deemed to be of a low seismic intensity, and is deemed to be an initial tremor that may be followed by a main tremor of high seismic intensity. For this reason, the time delay between the initial tremor and the main tremor is utilized to execute the process of stopping the crane apparatus.

この場合、巻上誘導電動機3、横行誘導電動機5、及び走行誘導電動機8の動作が停止される。これによって、主要動が到来する前に、クレーン装置を停止することができる。尚、この停止動作処理の後の吊荷の安全処理(請求項でいう吊荷制御処理に対応する)の詳細は図5に示している。停止動作処理を終了するとエンドに抜けて、次の起動タイミングの到来に待機する。 In this case, the operation of the hoisting induction motor 3, traverse induction motor 5, and travel induction motor 8 is stopped. This allows the crane device to be stopped before the main motion arrives. Details of the load safety processing (corresponding to the load control processing referred to in the claims) that follows this stopping operation processing are shown in Figure 5. When the stopping operation processing is completed, it exits to the end and waits for the next start timing to arrive.

つまり、地震の強度が「Scondary」(第1の所定強度)より小さい「Primary」(第2の所定強度)以上で、「Scondary」(第1の所定強度)未満と判定された時は、発報制御処理を実行して発報手段によって注意を喚起すると共に、これに続いて安全処理(吊荷制御処理)を実行して吊荷を適切な位置に移動させるものである。 In other words, when the intensity of the earthquake is determined to be equal to or greater than "Primary" (second predetermined intensity), which is smaller than "Scondary" (first predetermined intensity), but less than "Scondary" (first predetermined intensity), an alarm control process is executed to alert the user using the alarm means, and then a safety process (load control process) is executed to move the load to an appropriate position.

次に、停止処理後の吊荷の安全処理(吊荷制御処理)について図5を基に説明する。この安全処理は、図4に示す停止動作処理が完了しないと実行されないものである。停止動作処理が完了しない間に、安全処理を実行すると吊荷が予期せぬ動きを行うことがある。これを避けるために停止動作処理が完了して安全処理を実行している。 Next, the safety processing of the suspended load after the stop processing (load control processing) will be explained with reference to Figure 5. This safety processing is not executed until the stop operation processing shown in Figure 4 is completed. If the safety processing is executed before the stop operation processing is completed, the suspended load may move unexpectedly. To avoid this, the safety processing is executed after the stop operation processing is completed.

≪ステップS21≫
ステップS21においては、緊急地震速報による停止動作が完了したかどうかを判断している。この理由は、上述した通り停止動作処理が完了しない間に、安全処理を実行すると吊荷が予期せぬ動きを行うことがあるからである。したがって、停止動作処理が完了していないと判断されるとエンドに抜けて次の起動タイミングの到来に待機する。一方、停止動作処理が完了していると判断されるとステップS22に移行する。
<Step S21>
In step S21, it is determined whether the stopping operation based on the emergency earthquake warning has been completed. The reason for this is that, as described above, if safety processing is performed before the stopping operation processing is completed, the suspended load may move unexpectedly. Therefore, if it is determined that the stopping operation processing is not completed, the system goes to the end and waits for the arrival of the next start timing. On the other hand, if it is determined that the stopping operation processing is completed, the system moves to step S22.

≪ステップS22≫
ステップS22においては、吊荷を吊り上げ中かどうかの判断が実行される。この判断には、荷重情報取得部32から得られる荷重情報が用いられる。荷重情報から吊荷が吊り上げ中ではないと判断されると、ステップS23に移行する。一方、荷重情報情報から吊荷が吊り上げ中と判断されると、ステップS24に移行する。
<Step S22>
In step S22, a determination is made as to whether or not the load is being lifted. This determination is made using the load information obtained from the load information acquisition unit 32. If it is determined from the load information that the load is not being lifted, the process proceeds to step S23. On the other hand, if it is determined from the load information that the load is being lifted, the process proceeds to step S24.

≪ステップS23≫
ステップS22で吊荷が吊り上げ中ではないと判断されているので、ステップS23においては、クレーンフック1を上限位置まで巻き上げる処理を実行する。このようにクレーンフック1を巻上げることによって、クレーンフック1が、地震の揺れによって無用に揺れるのを避けることができる。
<Step S23>
Since it is determined in step S22 that the load is not being lifted, in step S23, a process of hoisting the crane hook 1 to its upper limit position is executed. By hoisting the crane hook 1 in this manner, it is possible to prevent the crane hook 1 from swinging unnecessarily due to earthquake shaking.

上限位置までワイヤーロープ2を巻き上げる場合は、巻上用ドラム4のワイヤーロープ2の巻き取り量から上限位置を求めることができる。また、巻上誘導電動機3の回転からも求めることもできる。クレーンフック1を上限位置まで巻き上げると、エンドに抜けて次の起動タイミングの到来に待機する。 When winding up the wire rope 2 to its upper limit position, the upper limit position can be determined from the amount of wire rope 2 wound on the hoist drum 4. It can also be determined from the rotation of the hoist induction motor 3. When the crane hook 1 is wound up to its upper limit position, it comes out of the end and waits for the next start timing to arrive.

≪ステップS24≫
ステップS22で吊荷が吊り上げ中と判断されているので、ステップS24においては、吊荷を床面に着床させることができるかどうかの判断が実行される。この判断には、カメラ映像取得部33から得られる映像情報が用いられる。吊荷を着床させる空間は、画像認識機能を使用して判断することができる。
<Step S24>
Since it is determined in step S22 that the load is being lifted, a determination is made in step S24 as to whether the load can be landed on the floor. This determination is made using image information obtained from the camera image acquisition unit 33. The space in which the load is to be landed can be determined using an image recognition function.

映像情報から、吊荷を着床することができる空間が確認されれば、ステップS25に移行する。一方、吊荷を着床することができる空間が確認されなければ、ステップS26に移行する。 If the video information indicates that there is enough space to land the suspended load, the process moves to step S25. On the other hand, if there is not enough space to land the suspended load, the process moves to step S26.

≪ステップS25≫
ステップS24で、吊荷を着床することができると判断されているので、ステップS25においては、巻上誘導電動機3を動作させて、着床できる空間に吊荷を降ろす自動着床処理を実行する。吊荷を着床させると、エンドに抜けて次の起動タイミングの到来に待機する。
<Step S25>
Since it is determined in step S24 that the load can be landed, in step S25, the hoisting induction motor 3 is operated to execute an automatic landing process for lowering the load into a space where the load can be landed. Once the load has been landed, it is released to the end and waits for the next start timing.

≪ステップS26≫
ステップS24で、吊荷を着床することができないと判断されているので、ステップS26においては、吊荷を上限位置まで巻き上げる許可判断が実行される。この巻上げ許可判断は、吊り下げられている吊荷を、現在の位置に留めておくか、或いは、現在の位置に留めておかないで巻き上げるかの判断を実行する。
<Step S26>
Since it is determined in step S24 that the load cannot be landed on the floor, a permission determination is made in step S26 as to whether to allow the load to be hoisted up to the upper limit position. This hoisting permission determination determines whether the suspended load should be left in its current position or should be hoisted up without being left in its current position.

例えば、吊荷が床面に近い位置であれば、現在の位置に留めておいても吊荷の揺れの影響は少なく、逆に床面から離れて高所に位置していれば、安全面から吊荷の揺れの影響は大きく、この場合は巻上げる方が好ましい。巻上げ許可判断を実行するとステップS27に移行する。 For example, if the load is close to the floor, leaving it in its current position will have little effect on the swaying of the load, but if it is located high up and away from the floor, the swaying of the load will have a large effect on safety, and in this case it is preferable to hoist it up. Once the hoisting permission decision has been made, the process moves to step S27.

≪ステップS27≫
ステップS27においては、ステップS26の判断結果を踏まえて、吊荷を上限位置まで巻き上げることを許可するどうかの判断が実行される。そして、巻上げを許可しないと判断すると、現在の位置に吊荷を留めてエンドに抜けて次の起動タイミングの到来に待機する。
<Step S27>
In step S27, a decision is made as to whether or not to permit hoisting the load to the upper limit position, based on the decision result in step S26. If it is decided that hoisting is not permitted, the load is stopped at the current position and pulled out to the end to wait for the next start timing.

≪ステップS28≫
ステップS27で吊荷の巻上げを許可すると判断されているので、ステップS28においては、吊荷を上限位置まで巻き上げる処理を実行する。この処理で上限位置までワイヤーロープ2を巻き上げる場合は、巻上用ドラム4のワイヤーロープ2の巻き取り量から上限位置を求めることができる。また、巻上誘導電動機3の回転からも求めることもできる。吊荷を上限位置まで巻き上げると、エンドに抜けて次の起動タイミングの到来に待機する。
<Step S28>
Since it is determined in step S27 that hoisting of the load is permitted, in step S28, a process is executed to hoist the load to the upper limit position. When hoisting the wire rope 2 to the upper limit position in this process, the upper limit position can be obtained from the amount of the wire rope 2 wound on the hoist drum 4. It can also be obtained from the rotation of the hoist induction motor 3. When the load is hoisted to the upper limit position, it is released to the end and waits for the arrival of the next start timing.

上述した安全処理の実行によって、作業者が退避していても自動的に吊荷が適切な状態に維持されるので、吊り荷の揺れによる危険性が作業者に及ぶのを避けることができる。 By implementing the safety procedures described above, the suspended load is automatically maintained in an appropriate state even when the worker has evacuated, preventing the worker from being exposed to the danger of the swaying load.

このように、本発明においては、吊荷が掛けられるクレーンフックを巻き上げる巻上用電動機と、巻上用電動機を前後及び/又は左右に移動させる移動用電動機と、巻上用電動機、及び移動用電動機の動作を制御する制御手段を備えたクレーン装置であって、制御手段は、地震情報を受信する地震情報受信手段と、地震情報を受信して発報制御処理と吊荷制御処理を実行する制御処理部と、制御処理部によって制御され、発報制御処理の実行によって周囲に対して音響発生手段で地震が到来することを知らせる発報手段と、制御処理部によって制御され、吊荷制御処理の実行によって現在の吊荷の状況に応じて吊荷を適切な位置に移動させる吊荷制御手段を備えたクレーン装置を特徴としている。 In this way, the present invention is characterized by a crane apparatus equipped with a hoisting motor that hoists the crane hook on which a load is attached, a moving motor that moves the hoisting motor back and forth and/or left and right, and a control means that controls the operation of the hoisting motor and the moving motor, the control means being earthquake information receiving means that receives earthquake information, a control processing unit that receives the earthquake information and executes an alarm control process and a load control process, an alarm means that is controlled by the control processing unit and notifies the surrounding area of an impending earthquake using a sound generating means by executing the alarm control process, and a load control means that is controlled by the control processing unit and executes the load control process to move the load to an appropriate position depending on the current load condition.

これによれば、地震の発生から実際の地震の揺れが到達するまでの時間を利用して、作業者に地震に対する対応を促し、更に安全に吊荷を処理できるクレーン装置を提供することができる。 This allows the time between the occurrence of an earthquake and the arrival of actual seismic tremors to be utilized to encourage workers to respond to the earthquake, and provides a crane device that can handle suspended loads more safely.

尚、本発明は上記したいくつかの実施例に限定されるものではなく、様々な変形例が含まれる。上記の実施例は本発明を分かりやすく説明するために詳細に説明したものであり、必ずしも説明した全ての構成を備えるものに限定されるものではない。また、ある実施例の構成の一部を他の実施例の構成に置き換えることが可能であり、ある実施例の構成に他の実施例の構成を加えることも可能である。各実施例の構成について、他の構成の追加、削除、置換をすることも可能である。 The present invention is not limited to the above-mentioned embodiments, but includes various modified examples. The above-mentioned embodiments have been described in detail to clearly explain the present invention, and are not necessarily limited to those having all of the configurations described. In addition, it is possible to replace part of the configuration of one embodiment with the configuration of another embodiment, and it is also possible to add the configuration of another embodiment to the configuration of one embodiment. It is also possible to add, delete, or replace other configurations with respect to the configuration of each embodiment.

1…クレーンフック、2…ワイヤーロープ、3…巻上誘導電動機、4…巻上用ドラム、5…横行誘導電動機、6…横行用車輪、7…横行用ガーダー、8…走行誘導電動機、9…走行用車輪、10…走行用ガーダー、11…巻上・横行インバータ制御装置、12…操作入力装置、13…走行用インバータ装置、14…誘導電動機用ブレーキ、15…巻上・横行インバータ制御部、16…巻上用インバータ、17…横行用インバータ、18…走行インバータ制御部、19…走行用インバータ、20…通信線、
21…エンコーダ、22…通信部、23…通信線、24…クラウド、25…緊急地震通報システム、30…制御処理部、31…位置情報取得部、32…荷重情報取得部、33…カメラ映像取得部、34…発報制御部、35…運転制御部。
1...Crane hook, 2...Wire rope, 3...Hoisting induction motor, 4...Hoisting drum, 5...Traveling induction motor, 6...Traveling wheel, 7...Traveling girder, 8...Traveling induction motor, 9...Traveling wheel, 10...Traveling girder, 11...Hoisting/traverse inverter control device, 12...Operation input device, 13...Traveling inverter device, 14...Induction motor brake, 15...Hoisting/traverse inverter control unit, 16...Hoisting inverter, 17...Traveling inverter, 18...Traveling inverter control unit, 19...Traveling inverter, 20...Communication line,
21...Encoder, 22...Communication unit, 23...Communication line, 24...Cloud, 25...Emergency earthquake notification system, 30...Control processing unit, 31...Position information acquisition unit, 32...Load information acquisition unit, 33...Camera image acquisition unit, 34...Alarm control unit, 35...Operation control unit.

Claims (8)

吊荷が掛けられるクレーンフックを巻き上げる巻上用電動機と、前記巻上用電動機を前後及び/又は左右に移動させる移動用電動機と、前記巻上用電動機、及び前記移動用電動機の動作を制御する制御手段を備えたクレーン装置において、
前記制御手段は、
地震情報を受信する地震情報受信手段と、
前記地震情報を受信して発報制御処理と吊荷制御処理を実行する制御処理部と、
前記制御処理部によって制御され、前記発報制御処理の実行によって周囲に対して音響発生手段で地震が到来することを知らせる発報手段と、
前記制御処理部によって制御され、前記吊荷制御処理の実行によって現在の前記吊荷の状況に応じて前記吊荷を適切な位置に移動させる吊荷制御手段を備えていると共に、
前記制御処理部は、地震の強度が第1の所定強度以上と判定された時は、前記吊荷制御処理を実行せずに、前記発報制御処理を実行して前記発報手段によって作業者に注意を喚起する
ことを特徴とするクレーン装置。
A crane apparatus including a hoisting motor for hoisting a crane hook on which a load is hung, a moving motor for moving the hoisting motor back and forth and/or left and right , and a control means for controlling the operation of the hoisting motor and the moving motor,
The control means
An earthquake information receiving means for receiving earthquake information;
A control processing unit that receives the earthquake information and executes an alarm control process and a load control process;
an alarm means for notifying people in the vicinity that an earthquake is approaching by using a sound generating means, the alarm means being controlled by the control processing unit and executing the alarm control process;
A load control means is provided which is controlled by the control processing unit and which moves the load to an appropriate position according to the current load condition by executing the load control process ;
When the intensity of the earthquake is determined to be equal to or greater than a first predetermined intensity, the control processing unit does not execute the load control process, but executes the alarm control process to alert the worker by the alarm issuing means.
A crane apparatus comprising:
請求項1に記載のクレーン装置において、The crane apparatus according to claim 1,
前記地震情報受信手段はクラウドネットワークに接続され、前記クラウドネットワークは緊急地震通報システムと接続されるThe earthquake information receiving means is connected to a cloud network, and the cloud network is connected to an emergency earthquake notification system.
ことを特徴とするクレーン装置。A crane apparatus comprising:
請求項に記載のクレーン装置において、
前記制御処理部は、地震の強度が前記第1の所定強度より小さい第2の所定強度以上で、前記第1の所定強度未満と判定された時は、前記発報制御処理を実行して前記発報手段によって前記作業者に注意を喚起すると共に、これに続いて前記吊荷制御処理を実行して前記吊荷制御手段によって前記吊荷を適切な位置に移動させる
ことを特徴とするクレーン装置。
The crane apparatus according to claim 1 ,
When the intensity of an earthquake is determined to be equal to or greater than a second predetermined intensity which is smaller than the first predetermined intensity, but less than the first predetermined intensity, the control processing unit executes the alarm control process to alert the worker using the alarm means, and subsequently executes the load control process to move the load to an appropriate position using the load control means.
請求項3に記載のクレーン装置において、
前記地震情報は、気象庁が運営するシステムから得られる緊急地震速報であり、前記第1の所定強度は、前記緊急地震速報の「警報」に対応し、前記第2の所定強度は、前記緊急地震速報の「予報」に対応する
ことを特徴とするクレーン装置。
The crane apparatus according to claim 3,
The crane apparatus is characterized in that the earthquake information is an emergency earthquake warning obtained from a system operated by the Japan Meteorological Agency, the first predetermined intensity corresponds to a "warning" of the emergency earthquake warning, and the second predetermined intensity corresponds to a "forecast" of the emergency earthquake warning.
請求項4に記載のクレーン装置において、
前記吊荷制御処理は、前記巻上用電動機、及び前記移動用電動機の動作を停止した後に実行される
ことを特徴とするクレーン装置。
The crane apparatus according to claim 4,
A crane apparatus, characterized in that the load control process is executed after the operation of the hoisting motor and the moving motor is stopped.
請求項5に記載のクレーン装置において、
前記吊荷制御処理は、前記吊荷を吊り上げ中でないと判断されると、前記クレーンフックを上限位置まで巻き上げる
ことを特徴とするクレーン装置。
The crane apparatus according to claim 5,
The crane apparatus is characterized in that the load control process hoists the crane hook to an upper limit position when it is determined that the load is not being hoisted.
請求項6に記載のクレーン装置において、
前記吊荷制御処理は、前記吊荷を吊り上げ中と判断され、しかも前記吊荷を着床できると判断されると、前記吊荷を着床させる
ことを特徴とするクレーン装置。
The crane apparatus according to claim 6,
The crane apparatus is characterized in that the load control process lands the load on the floor when it is determined that the load is being hoisted and that the load can be landed on the floor.
請求項6に記載のクレーン装置において、
前記吊荷制御処理は、前記吊荷を吊り上げ中と判断され、しかも前記吊荷を着床できないと判断されると、前記吊荷を前記上限位置まで巻き上げる動作を行う
ことを特徴とするクレーン装置。
The crane apparatus according to claim 6,
The crane apparatus is characterized in that the load control process performs an operation of hoisting the load to the upper limit position when it is determined that the load is being hoisted and that the load cannot be landed on the floor.
JP2022016123A 2022-02-04 2022-02-04 Crane Equipment Active JP7640480B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022016123A JP7640480B2 (en) 2022-02-04 2022-02-04 Crane Equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022016123A JP7640480B2 (en) 2022-02-04 2022-02-04 Crane Equipment

Publications (2)

Publication Number Publication Date
JP2023114045A JP2023114045A (en) 2023-08-17
JP7640480B2 true JP7640480B2 (en) 2025-03-05

Family

ID=87568996

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022016123A Active JP7640480B2 (en) 2022-02-04 2022-02-04 Crane Equipment

Country Status (1)

Country Link
JP (1) JP7640480B2 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013086906A (en) 2011-10-17 2013-05-13 Mitsui Eng & Shipbuild Co Ltd Crane, base isolation method thereof and control method of traversing body of crane
JP2013121864A (en) 2011-12-09 2013-06-20 Mitsubishi Heavy Industries Machinery Technology Corp Crane apparatus
JP2014105082A (en) 2012-11-28 2014-06-09 Mitsubishi Heavy Industries Machinery Technology Corp Crane vibration control system and crane vibration control method
US20150203336A1 (en) 2014-01-17 2015-07-23 Taiwan Semiconductor Manufacturing Company Limited Overhead crane
JP2016130179A (en) 2016-04-22 2016-07-21 三井造船株式会社 Harbor cargo handling equipment and seismic isolation method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101863115B1 (en) * 2016-07-01 2018-05-31 오철규 Smart crane safety management system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013086906A (en) 2011-10-17 2013-05-13 Mitsui Eng & Shipbuild Co Ltd Crane, base isolation method thereof and control method of traversing body of crane
JP2013121864A (en) 2011-12-09 2013-06-20 Mitsubishi Heavy Industries Machinery Technology Corp Crane apparatus
JP2014105082A (en) 2012-11-28 2014-06-09 Mitsubishi Heavy Industries Machinery Technology Corp Crane vibration control system and crane vibration control method
US20150203336A1 (en) 2014-01-17 2015-07-23 Taiwan Semiconductor Manufacturing Company Limited Overhead crane
JP2016130179A (en) 2016-04-22 2016-07-21 三井造船株式会社 Harbor cargo handling equipment and seismic isolation method

Also Published As

Publication number Publication date
JP2023114045A (en) 2023-08-17

Similar Documents

Publication Publication Date Title
CN102259799B (en) Moment control method and device for crawler crane installation and crawler crane
JP3150636B2 (en) Crane lowering collision prevention device
CN101939242B (en) Elevator controller
JP7640480B2 (en) Crane Equipment
KR20220145902A (en) Safety lock control device and control method for tower crane
JP7808570B2 (en) Crane equipment
JPH09175784A (en) Crane hook overwinding prevention device
JP2025010341A (en) Crane control method, crane
CN113911923B (en) Control method and device for crane, controller and crane
JP2017178599A (en) Earthquake control operation system and earthquake control operation method for elevator
JP2012066893A (en) Electrically driven hoisting machine with dynamic lift off stopping mechanism
JP7402150B2 (en) hoisting machine
CN115448163B (en) Control method, controller, control device and crane for crane boom
CN105110186B (en) Crane and its major-minor hook work compound protection system and method
JP7463156B2 (en) Crane Control System
JP2025099824A (en) crane
JP2008120472A (en) Elevator apparatus and elevator control method
JP2012206825A (en) Method for controlling crane, and control device of the crane
RU2406679C2 (en) Method to rule weight swinging on flexible suspension (versions)
JP7291912B2 (en) control system and crane
CN116534745A (en) Control method, device, controller and storage medium for tower crane
JP2025150870A (en) elevator equipment
JP2749737B2 (en) Crane overload prevention device
JP6819453B2 (en) Electric winch device
CN114162721A (en) Control method for turning over heavy object under double-hook working condition of crane and crane

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240424

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250109

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250121

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250130

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250218

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250220

R150 Certificate of patent or registration of utility model

Ref document number: 7640480

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150