JP7643289B2 - Backfilling material manufacturing method, cavity backfilling method, backfilling material manufacturing device, and backfilling device - Google Patents
[go: Go Back, main page]

JP7643289B2 - Backfilling material manufacturing method, cavity backfilling method, backfilling material manufacturing device, and backfilling device - Google Patents

Backfilling material manufacturing method, cavity backfilling method, backfilling material manufacturing device, and backfilling device Download PDF

Info

Publication number
JP7643289B2
JP7643289B2 JP2021167408A JP2021167408A JP7643289B2 JP 7643289 B2 JP7643289 B2 JP 7643289B2 JP 2021167408 A JP2021167408 A JP 2021167408A JP 2021167408 A JP2021167408 A JP 2021167408A JP 7643289 B2 JP7643289 B2 JP 7643289B2
Authority
JP
Japan
Prior art keywords
backfilling
cavity
diameter
mixing
backfill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021167408A
Other languages
Japanese (ja)
Other versions
JP2023057747A (en
Inventor
拓雄 森
弘之 森野
正明 深谷
純夫 丹生屋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP2021167408A priority Critical patent/JP7643289B2/en
Publication of JP2023057747A publication Critical patent/JP2023057747A/en
Application granted granted Critical
Publication of JP7643289B2 publication Critical patent/JP7643289B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/30Landfill technologies aiming to mitigate methane emissions

Landscapes

  • Processing Of Solid Wastes (AREA)

Description

本発明は、大径粒状物と小径粒状物とを含む埋戻し材の製造方法、埋戻し材の製造方法により製造した埋戻し材で充填する空洞部の埋戻し方法、埋戻し材製造装置、及び埋戻し装置に関する。 The present invention relates to a method for manufacturing a backfilling material containing large-diameter granular materials and small-diameter granular materials, a method for backfilling a cavity by filling it with a backfilling material manufactured by the backfilling material manufacturing method, a backfilling material manufacturing device, and a backfilling device.

例えば、地下深部に計画されている高レベル放射性廃棄物の処分場は、建設や操業を目的に地上から掘削されたアクセス坑道や連絡坑道及び主要坑道などすべての空間を、処分場の閉鎖に伴って元の状態に埋め戻すことにより、浸出水の漏洩や処分場の力学的な安全性を確保することとしている。これら坑道の埋戻しに用いる材料としては、ベントナイト混合土の採用が検討されている。 For example, a proposed deep underground repository for high-level radioactive waste will have all of the spaces, such as access tunnels, connecting tunnels, and main tunnels, excavated from above ground for construction and operation purposes, backfilled to their original state upon closure of the repository, in order to prevent leakage of leachate and ensure the mechanical safety of the repository. Bentonite mixed soil is being considered as a material to be used to backfill these tunnels.

ベントナイト混合土は、一般廃棄物や汚染土等の封じ込め工事もしくは構造物の基礎地盤工事など、高い遮水性能が要求される現場で広く一般に使用されている。例えば特許文献1では、廃棄物が処分される施設底部及び施設斜面部に形成する不透水層の材料として、ベントナイト混合土が採用されている。 Bentonite-mixed soil is widely used in sites where high water-proofing performance is required, such as in containment works for general waste and contaminated soil, and in foundation ground works for structures. For example, in Patent Document 1, bentonite-mixed soil is used as the material for the impermeable layer formed at the bottom and on the slopes of a facility where waste is disposed of.

具体的には、施設斜面部には、掘削残土等の母材とベントナイトと水とを混合攪拌してベントナイト混合土を製造し、これを吹付け材料として吹き付けることにより、不透水層を形成している。一方、施設底部には、母材とベントナイトと水とを混合攪拌したのち造粒して製造した造粒物を撒き出したのち、これらを締め固めることにより不透水層を形成している。 Specifically, on the slopes of the facility, bentonite and water are mixed and stirred with excavated soil and other base materials to produce a bentonite mixture, which is then sprayed onto the ground as a spraying material to form an impermeable layer. On the other hand, on the bottom of the facility, the base material, bentonite and water are mixed and stirred, then granulated to produce a granulated material, which is then spread out and compacted to form an impermeable layer.

特開2016-87579号公報JP 2016-87579 A

特許文献1で開示されているような、ベントナイト混合土の吹付け施工やベントナイトを主材とする造粒物の撒き出し・締固め施工は、不透水層で施設斜面部や施設底部を被覆する場合に好適である。ところが、上述した坑道のような長大かつ大容量の埋戻し空間にベントナイト混合土を充填し埋戻す方法としては、いずれの施工方法も適しているとは言えない。 As disclosed in Patent Document 1, spraying of bentonite-mixed soil and spreading and compacting of granulated material mainly made of bentonite are suitable for covering the slopes and bottom of a facility with an impermeable layer. However, neither of these construction methods is suitable for filling a long, large-capacity backfill space such as the tunnel described above with bentonite-mixed soil.

このような中、例えば土圧シールドの排土装置として利用されているスクリューフィーダ(スクリューコンベヤ)を採用して、ベントナイト混合土を坑道に搬送し埋め戻す方法が考えられる。スクリューフィーダを採用すれば、大量のベントナイト混合土を連続的に搬送できるだけでなく、ベントナイト混合土を加水しない状態で取り扱うことができる。 In this situation, a method that can be considered is to use a screw feeder (screw conveyor) that is used as an earth removal device for earth pressure shields to transport the bentonite mixed soil to the tunnel and backfill it. By using a screw feeder, not only can large amounts of bentonite mixed soil be transported continuously, but the bentonite mixed soil can also be handled without adding water.

しかし、ベントナイト混合土は母材とベントナイトで粒径が大きく異なることから、乾燥状態での運搬や、スクリューフィーダによる搬送時の機械振動など、様々な事象により母材とベントナイトが分離し、品質が劣化しやすい。このような品質の劣化したベントナイト混合土を埋戻し空間に充填すると、設計時に想定した透水性能を十分発揮できない事態になりかねない。 However, because the particle size of the bentonite and the base material in bentonite mixed soil differs significantly, various factors, such as transporting in a dry state or mechanical vibrations during transport using a screw feeder, can cause the base material and bentonite to separate, leading to a deterioration in quality. If this type of degraded bentonite mixed soil is filled into the backfill space, it may not be able to fully demonstrate the permeability performance assumed at the time of design.

本発明は、かかる課題に鑑みなされたものであって、その主な目的は、乾燥状態の大径粒状物と小径粒状物とが均一に混合した埋戻し材を製造するとともに、製造した埋戻し材を利用して、空洞部を均質かつ効率よく埋め戻すことである。 The present invention has been developed in consideration of these problems, and its main objective is to produce a backfill material that is a uniform mixture of large-diameter granular material and small-diameter granular material in a dry state, and to use the produced backfill material to backfill cavities uniformly and efficiently.

かかる目的を達成するため本発明の埋戻し材の製造方法は、搬送領域と混合攪拌領域を設けたスクリューフィーダに大径粒状物及び小径粒状物を供給し、前記大径粒状物及び前記小径粒状物を搬送しながら混合撹拌して埋戻し材を製造することを特徴とする。 To achieve this objective, the method for producing backfill material of the present invention is characterized in that large-diameter granular materials and small-diameter granular materials are supplied to a screw feeder having a conveying area and a mixing and stirring area, and the large-diameter granular materials and the small-diameter granular materials are mixed and stirred while being conveyed to produce backfill material.

また、本発明の埋戻し材の製造方法は、前記埋戻し材がベントナイト混合土であり、前記大径粒状物が礫分を含み、前記小径粒状物がベントナイトを含むことを特徴とする。 The method for producing backfill material of the present invention is characterized in that the backfill material is a bentonite mixed soil, the large-diameter granules contain gravel, and the small-diameter granules contain bentonite.

本発明の埋戻し材の製造方法によれば、大径粒状物及び小径粒状物を、搬送領域と混合攪拌領域を設けたスクリューフィーダで搬送しながら混合撹拌する。これにより、スクリューフィーダから排出された際に、大径粒状物と小径粒状物とが均一に混合した状態を維持した高品質な埋戻し材を、連続的に製造することが可能となる。また、埋戻し材にベントナイト混合土を採用する際、乾燥状態で製造できるため、加水調整等の煩雑な作業を省略できるとともに、加水調整したベントナイト混合土と比較して施工時の取り扱いが容易となる。 According to the method for producing backfill material of the present invention, large-diameter granular materials and small-diameter granular materials are mixed and stirred while being transported by a screw feeder provided with a transport area and a mixing and stirring area. This makes it possible to continuously produce high-quality backfill material in which the large-diameter granular materials and small-diameter granular materials are kept uniformly mixed when discharged from the screw feeder. In addition, when using bentonite mixed soil as backfill material, it can be produced in a dry state, which eliminates the need for cumbersome work such as adjusting the amount of water added, and it is easier to handle during construction compared to bentonite mixed soil that has been adjusted by adding water.

本発明の空洞部の埋戻し方法は、本発明の埋戻し材の製造方法で製造した前記埋戻し材で地盤中の空洞部を充填する空洞部の埋戻し方法であって、前記大径粒状物と前記小径粒状物とを前記空洞部に向けて搬送しつつ混合撹拌して前記埋戻し材を製造し、前記空洞部を充填することを特徴とする The method for backfilling a cavity of the present invention is a method for backfilling a cavity in the ground with the backfilling material produced by the method for producing the backfilling material of the present invention, characterized in that the large-diameter granular material and the small-diameter granular material are mixed and stirred while being transported toward the cavity to produce the backfilling material, and the cavity is filled with the backfilling material.

本発明の空洞部の埋戻し方法は、前記スクリューフィーダの排出口を、先行して製造した前記埋戻し材に埋没させつつ前記埋戻し材を連続して製造することを特徴とする。 The method for backfilling a cavity of the present invention is characterized in that the backfilling material is continuously produced while the discharge port of the screw feeder is buried in the previously produced backfilling material.

本発明の空洞部の埋戻し方法によれば、大径粒状物と前記小径粒状物とを前記空洞部に向けて搬送しつつ混合撹拌して前記埋戻し材を製造するため、埋戻し施工の作業効率を大幅に向上することが可能となる。また、スクリューフィーダの排出口を先行して空洞部を充填する埋戻し材に埋没させることで、これらを後行して製造される埋戻し材で押圧できる。これにより、空洞部を充填する埋戻し材が締め固められるため、一般には別途実施する転圧・締め固め等の作業を省略することが可能となる。 According to the method for backfilling a cavity of the present invention, the backfilling material is produced by mixing and stirring the large-diameter granular material and the small-diameter granular material while transporting them toward the cavity, which makes it possible to significantly improve the work efficiency of the backfilling work. In addition, by immersing the discharge outlet of the screw feeder in the backfilling material that fills the cavity first, these can be compressed by the backfilling material that is produced later. As a result, the backfilling material that fills the cavity is compacted, making it possible to omit work such as rolling and compacting that is generally carried out separately.

本発明の空洞部の埋戻し方法は、前記空洞部に対する前記埋戻し材の密度を評価し、あらかじめ設定した密度に到達した時点で、前記埋戻し材の製造を停止することを特徴とする。 The method for backfilling a cavity of the present invention is characterized in that the density of the backfilling material for the cavity is evaluated, and when a preset density is reached, the production of the backfilling material is stopped.

また、本発明の空洞部の埋戻し方法は、前記空洞部が、廃棄物処分場の坑道であることを特徴とする。 The method for backfilling a cavity of the present invention is also characterized in that the cavity is a tunnel in a waste disposal site.

本発明の空洞部の埋戻し方法によれば、空洞部内の埋戻し材をあらかじめ設定した密度で締め固めることができるとともに、スクリューフィーダが過負荷状態となって故障する事態を抑制することが可能となる。また、空洞部が坑道である場合には、埋戻し材の製造を停止したのち、スクリューフィーダを後退させて埋戻し材の製造を再開する工程を繰り返せば、坑道の長手方向に一様な密度で締め固めた埋戻し材を連続させることができる。 The method for backfilling a cavity of the present invention allows the backfilling material in the cavity to be compacted to a preset density, and also makes it possible to prevent the screw feeder from being overloaded and breaking down. In addition, if the cavity is a tunnel, by repeating the process of stopping the production of backfilling material, then retracting the screw feeder and restarting the production of backfilling material, it is possible to continuously provide backfilling material compacted to a uniform density along the longitudinal direction of the tunnel.

これにより、坑道で予定する埋戻し範囲が長大な場合にも、全長に渡って均質に坑道を埋戻し材で埋め戻すことが可能となる。その一方で、坑道で予定する埋戻し範囲において、途中で周辺岩盤の性状が変化することに伴って、配合を変更して埋戻し材を製造したい場合には、スクリューフィーダへの大径粒状物と小径粒状物開閉の供給量を適宜調整することで対応できる。してみれば、埋戻し施工を中断することなく、配合変更した埋戻し材を容易に製造することができる。このように、周辺岩盤の変化に対応して埋戻し材の配合を適宜調整しつつ、連続的に坑道を埋め戻すことも可能となる。 This makes it possible to uniformly backfill the tunnel with backfill material over its entire length, even when the planned backfill range of the tunnel is long. On the other hand, if it is necessary to change the mix of backfill material to be produced in response to changes in the properties of the surrounding rock mass along the way within the planned backfill range of the tunnel, this can be done by appropriately adjusting the supply amount of large-diameter granular material and small-diameter granular material to the screw feeder. In this way, backfill material with a changed mix can be easily produced without interrupting the backfilling work. In this way, it is also possible to continuously backfill the tunnel while appropriately adjusting the mix of the backfill material in response to changes in the surrounding rock mass.

本発明の埋戻し材製造装置は、本発明の埋戻し材の製造方法に用いる埋戻し材製造装置であって、大径粒状物と小径粒状物を搬送しつつ混合攪拌し、埋戻し材を製造する埋戻し材製造装置であって、前記大径粒状物と前記小径粒状物を搬送する搬送領域と、前記大径粒状物と前記小径粒状物を混合攪拌しつつ搬送する混合攪拌領域と、を有するスクリューフィーダを備えることを特徴とする。 The backfilling material manufacturing apparatus of the present invention is a backfilling material manufacturing apparatus used in the backfilling material manufacturing method of the present invention, which is a backfilling material manufacturing apparatus that conveys and mixes and stirs large-diameter granular materials and small-diameter granular materials to manufacture backfilling material, and is characterized by having a screw feeder having a conveying area for conveying the large-diameter granular materials and the small-diameter granular materials, and a mixing and stirring area for conveying the large-diameter granular materials and the small-diameter granular materials while mixing and stirring them.

本発明の埋戻し材製造装置は、前記混合攪拌領域が、前記スクリューフィーダの排出口側に配置されていることを特徴とする。 The backfilling material manufacturing device of the present invention is characterized in that the mixing and stirring area is arranged on the discharge side of the screw feeder.

本発明の埋戻し材製造装置は、前記混合攪拌領域が、前記スクリューフィーダの供給口側に配置されていることを特徴とする。 The backfilling material manufacturing device of the present invention is characterized in that the mixing and stirring area is arranged on the supply port side of the screw feeder.

本発明の埋戻し材製造装置は、前記スクリューフィーダの供給口に、前記大径粒状物を収容する大径収容部と前記小径粒状物を収容する小径収容部とを備えるホッパーが、開閉ゲートを介して設置されていることを特徴とする。 The backfilling material manufacturing device of the present invention is characterized in that a hopper having a large diameter storage section for storing the large diameter granular material and a small diameter storage section for storing the small diameter granular material is installed at the supply port of the screw feeder via an opening and closing gate.

本発明の埋戻し材製造装置によれば、ホッパーに大径粒状物と小径粒状物が供給されると、これらを搬送しつつ混合攪拌して埋戻し材を製造し、搬送先で埋戻し材を排出することができる。このため、現場内に埋戻し材を製造するためのプラント等の設備を別途設ける必要がない。また、ホッパーが、開閉ゲートを介してスクリューフィーダに設置されていることから、大径粒状物及び小径粒状物の供給量を開閉ゲートを介して適宜変更すれば、配合の異なる埋戻し材を容易に製造することが可能となる。 According to the backfilling material manufacturing device of the present invention, when large-diameter granular materials and small-diameter granular materials are supplied to a hopper, they are transported while being mixed and stirred to produce backfilling material, and the backfilling material can be discharged at the destination. Therefore, there is no need to install a separate plant or other facility for producing backfilling material on-site. In addition, since the hopper is installed on a screw feeder via an opening and closing gate, it is possible to easily manufacture backfilling materials with different compositions by appropriately changing the supply amount of large-diameter granular materials and small-diameter granular materials via the opening and closing gate.

本発明の埋戻し装置は、地盤中の空洞部を埋戻し材で充填する空洞部の埋戻し装置であって、本発明の埋戻し材製造装置と、前記空洞部内に充填した前記埋戻し材の密度を評価する評価手段と、を備えることを特徴とする。 The backfilling device of the present invention is a cavity backfilling device that fills cavities in the ground with backfilling material, and is characterized by comprising the backfilling material manufacturing device of the present invention and an evaluation means for evaluating the density of the backfilling material filled in the cavity.

本発明の埋戻し装置によれば、埋戻し材の製造、空洞部への搬入及び充填、空洞部に充填した埋戻し材の締固め及び出来形管理に至る、埋戻し施工に係る一連の作業を、この埋戻し装置で賄うことができる。したがって、埋戻し施工の効率化を図ることができ、工費削減及び工期短縮に寄与することが可能となる。また、大径粒状物と小径粒状物を供給する設備をさらに搭載すれば、埋戻し施工の自動化を図ることも可能となる。 The backfilling device of the present invention can handle a series of tasks related to backfilling construction, including manufacturing the backfilling material, transporting and filling the cavity, compacting the backfilling material filled in the cavity, and managing the finished shape. This makes it possible to improve the efficiency of backfilling construction, contributing to reducing construction costs and shortening construction time. Furthermore, by further installing equipment for supplying large-diameter granular material and small-diameter granular material, it is possible to automate the backfilling construction.

本発明によれば、乾燥状態の大径粒状物と小径粒状物とが均一に混合した埋戻し材を製造するとともに、製造した埋戻し材を利用して、空洞部を均質かつ効率よく埋め戻すことが可能となる。 According to the present invention, it is possible to produce a backfill material that is a uniform mixture of large-diameter and small-diameter granules in a dry state, and to use the produced backfill material to backfill cavities homogeneously and efficiently.

本発明の実施形態における高レベル放射性廃棄物処分場の概略を示す図である。1 is a diagram showing an outline of a high-level radioactive waste disposal site in an embodiment of the present invention. 本発明の実施形態における埋戻し材製造装置を示す図である(その1)。FIG. 1 is a diagram showing a backfilling material manufacturing apparatus according to an embodiment of the present invention (part 1). 本発明の実施形態における埋戻し材製造装置を示す図である(その2)。FIG. 2 is a diagram showing a backfilling material manufacturing apparatus according to an embodiment of the present invention (part 2). 本発明の実施形態における埋戻し材製造装置を示す図である(その3)。FIG. 3 is a diagram showing a backfilling material manufacturing apparatus according to an embodiment of the present invention (part 3). 本発明の実施形態における埋戻し材製造装置を示す図である(その4)。FIG. 4 is a diagram showing a backfilling material manufacturing apparatus according to an embodiment of the present invention (part 4). 本発明の実施形態における埋戻し材製造装置を示す図である(その5)。FIG. 5 is a diagram showing a backfilling material manufacturing apparatus according to an embodiment of the present invention (part 5). 本発明の実施形態における埋戻し装置を示す図である。FIG. 2 is a diagram showing a backfilling device according to an embodiment of the present invention. 本発明の実施形態におけるアクセス坑道を埋め戻す手順を示す図である。FIG. 1 is a diagram showing a procedure for backfilling an access tunnel in an embodiment of the present invention. 本発明の実施形態における散乱型のRI密度計を示す図である。FIG. 1 is a diagram showing a scattering-type RI densitometer according to an embodiment of the present invention. 本発明の実施形態における埋戻し材の密度を評価する様子を示す図である。FIG. 13 is a diagram showing how to evaluate the density of a backfill material in an embodiment of the present invention.

本発明は、スクリューコンベヤを利用して乾燥状態の大径粒状物と小径粒状物を搬送しつつ混合攪拌することで、これらが均一に混合した高品質な埋戻し材を連続的にスクリューコンベヤから排出させ、空洞部を均質かつ効率よく埋め戻すものである。 The present invention uses a screw conveyor to transport and mix dry large-diameter and small-diameter granules, which are then continuously discharged from the screw conveyor as a homogeneously mixed, high-quality backfill material, to backfill cavities homogeneously and efficiently.

以下に、高レベル放射性廃棄物処分場のアクセス坑道を埋め戻す場合を事例に挙げ、図1~図10を参照しつつ、埋戻し材の製造方法、空洞部の埋戻し方法、埋戻し材製造装置、及び埋戻し装置を説明する。 Below, we will use the backfilling of an access tunnel to a high-level radioactive waste disposal site as an example, and with reference to Figures 1 to 10, we will explain the backfilling material manufacturing method, the backfilling method for a cavity, the backfilling material manufacturing device, and the backfilling device.

本実施の形態において、大径粒状物と小径粒状物は粒径2mmを閾値とし、閾値を超える粒状物を大径粒状物、閾値以下を小径粒状物に分類して取り扱うが、閾値は、粒径2mmに限定するものではなく適宜変更可能である。また、大径粒状物と小径粒状物が土質材料を含む場合に、乾燥状態とは絶乾状態だけでなく、気乾状態及び表乾状態を含むものとする。 In this embodiment, the threshold for large and small granular matter is a particle size of 2 mm, and granular matter exceeding the threshold is classified as large granular matter, while granular matter below the threshold is classified as small granular matter. However, the threshold is not limited to a particle size of 2 mm and can be changed as appropriate. In addition, when the large and small granular matter include soil material, the dry state includes not only the bone dry state, but also the air-dry state and the surface dry state.

≪≪≪高レベル放射性廃棄物処分場≫≫≫
図1(a)で示すように、地下深部に計画されている高レベル放射性廃棄物の処分場10は、地下深部に設けられる処分坑道11と、処分坑道11に連絡する連絡坑道12と、連絡坑道12から地上に延びるアクセス坑道13とを備える。操業中は、アクセス坑道13及び連絡坑道12を利用して廃棄物を処分坑道11に搬送し、廃棄物に適切な処理を行ってこの処分坑道11で処分する。
<<<<High-level radioactive waste disposal site>>>>
As shown in Fig. 1(a), a disposal site 10 for high-level radioactive waste planned deep underground comprises a disposal tunnel 11 provided deep underground, a connecting tunnel 12 connected to the disposal tunnel 11, and an access tunnel 13 extending from the connecting tunnel 12 to the ground. During operation, waste is transported to the disposal tunnel 11 using the access tunnel 13 and the connecting tunnel 12, and the waste is appropriately treated and disposed of in the disposal tunnel 11.

また、処分場10を閉鎖する場合には、処分坑道11及び連絡坑道12を充填物で充填しプラグ等で閉鎖することにより、充填物の移動や流出を抑制する。また、アクセス坑道13は、埋戻し材Mで均一に閉鎖し、掘削する前の元の状態に戻す。埋戻し材Mは、周辺岩盤と同程度の低透水性と、アクセス坑道13を均一に閉鎖し周辺岩盤となじんで間隙を生じさせない自己シール性が求められる。このため、埋戻し材Mには、ベントナイト混合土を採用している。 When closing the disposal site 10, the disposal tunnels 11 and the access tunnels 12 are filled with a filling material and closed with plugs or the like to prevent the filling material from moving or flowing out. The access tunnels 13 are closed evenly with backfill material M, returning them to their original state before excavation. The backfill material M is required to have low permeability similar to that of the surrounding rock mass, and to have self-sealing properties that allow it to close the access tunnels 13 evenly and blend in with the surrounding rock mass without creating gaps. For this reason, bentonite mixed soil is used as the backfill material M.

ベントナイト混合土は現場で製造されるもので、現地発生土を母材とし、この母材に室内試験等の結果に基づいて設計した配合量のベントナイトを混合して、所望の遮水性能を確保する。上記の高レベル放射性廃棄物の処分場10は、地下深部の安定した岩盤に設けられることから、この岩盤の掘削ずりを母材として採用する。つまり、アクセス坑道13の埋戻し材Mは、図1(b)で示すように、掘削ずりを破砕して粒度調整を行うことにより取得した礫分M1と、ベントナイトを含む細粒分M2とを混合して製造する。 The bentonite-mixed soil is produced on-site, using on-site generated soil as the base material, and mixing this base material with a mixture amount of bentonite designed based on the results of laboratory tests, etc., to ensure the desired water-proofing performance. Since the high-level radioactive waste disposal site 10 is located in stable bedrock deep underground, excavated waste from this bedrock is used as the base material. In other words, the backfill material M for the access tunnel 13 is produced by mixing gravel M1 obtained by crushing the excavated waste and adjusting its grain size with fine-grained material M2 containing bentonite, as shown in Figure 1(b).

礫分M1は、粒径が2~75mm程度に粒度調整されて、大径粒状物に分類される。細粒分M2は、ベントナイトを含み、粒径が2mm以下に粒度調整されて、小径粒状物に分類される。なお、細粒分M2は、ベントナイトのみでもよいし、2mm程度以下であれば砂分など他の土質材料が含まれてもよい。また、ベントナイト混合土は、礫分M1と細粒分M2だけでなく、粒径2mmを超えるベントナイトの造粒物を含んでもよい。この場合、礫分M1とベントナイトの造粒物が大径粒状物に分類され、細粒分M2が小径粒状物に分類される。 Gravel fraction M1 is adjusted to a particle size of about 2-75 mm and classified as large-diameter granules. Fine fraction M2 contains bentonite and is adjusted to a particle size of 2 mm or less and classified as small-diameter granules. Fine fraction M2 may be bentonite only, or may contain other soil materials such as sand as long as the particle size is about 2 mm or less. Bentonite-mixed soil may contain not only gravel fraction M1 and fine fraction M2, but also bentonite granules with a particle size exceeding 2 mm. In this case, gravel fraction M1 and bentonite granules are classified as large-diameter granules, and fine fraction M2 is classified as small-diameter granules.

上記のベントナイト混合土を製造するにあたっては、図2で示すような、混合攪拌領域20Aと搬送領域20Bとを有するスクリューフィーダ20を備えた埋戻し材製造装置MDを採用する。こうすると、大径粒状物である礫分M1と小径粒状物である細粒分M2とを搬送しながら混合攪拌できる。 When producing the bentonite soil mixture, a backfilling material production device MD is used that is equipped with a screw feeder 20 having a mixing and stirring area 20A and a conveying area 20B, as shown in Figure 2. In this way, the gravel portion M1, which is a large-diameter granular material, and the fine-grain portion M2, which is a small-diameter granular material, can be mixed and stirred while being conveyed.

このため、スクリューフィーダ20から排出した際、礫分M1と細粒分M2とが均一に混合した状態を維持した、高品質なベントナイト混合土を埋戻し材Mとして製造することができる。また、ベントナイト混合土を乾燥状態で製造できるため、加水調整などの煩雑な作業を省略できるとともに、加水調整を行う場合と比較して、ベントナイト混合土の施工時の取り扱いが容易となる。 As a result, when discharged from the screw feeder 20, a high-quality bentonite mixed soil can be produced as backfill material M, in which the gravel fraction M1 and the fine-grained fraction M2 remain uniformly mixed. In addition, because the bentonite mixed soil can be produced in a dry state, cumbersome work such as adjusting the amount of water added can be omitted, and the bentonite mixed soil can be handled more easily during construction than when adjusting the amount of water added.

以下に、埋戻し材Mを製造する埋戻し材製造装置MDについて、詳細を説明する。また、埋戻し材製造装置MDを搭載した埋戻し装置BDについても、併せて説明する。本実施の形態では、図1(b)で示すような、礫分M1と細粒分M2よりなるベントナイト混合土を埋戻し材Mの事例に挙げて説明するが、埋戻し材製造装置MDにより製造可能な埋戻し材Mは、上記のベントナイト混合土に限定されるものではない。大径粒状物と小径粒状物を混合攪拌することで製造できれば、いずれの埋戻し材Mにも採用可能である。 The backfilling material manufacturing device MD that manufactures the backfilling material M will be described in detail below. The backfilling device BD equipped with the backfilling material manufacturing device MD will also be described. In this embodiment, a bentonite mixed soil consisting of gravel M1 and fine grain M2 as shown in FIG. 1(b) will be described as an example of the backfilling material M, but the backfilling material M that can be manufactured by the backfilling material manufacturing device MD is not limited to the above-mentioned bentonite mixed soil. Any backfilling material M can be used as long as it can be manufactured by mixing and stirring large-diameter granular material and small-diameter granular material.

≪≪≪埋戻し材製造装置MD≫≫≫
埋戻し材製造装置MDは、図2(a)の断面図及び図2(b)の平面図で示すように、スクリューフィーダ20とスクリューフィーダ20各々に設置されたホッパー30とを備えている。
<<<<<Backfilling material manufacturing equipment MD>>>>
As shown in the cross-sectional view of FIG. 2( a ) and the plan view of FIG. 2( b ), the backfilling material manufacturing device MD includes a screw feeder 20 and a hopper 30 provided on each of the screw feeders 20 .

ホッパー30は、ホッパー本体31と開閉ゲート32a、32bとを備え、ホッパー本体31内には仕切り部材313が立設されている。これによりホッパー本体31の内空部が2分割され、一方側に大径収容部311が形成され、他方側に小径収容部312が形成されている。そして、ホッパー本体31とスクリューフィーダ20との接続部に、開閉ゲート32a、32bが装備されている。 The hopper 30 comprises a hopper body 31 and opening/closing gates 32a, 32b, and a partition member 313 is erected inside the hopper body 31. This divides the inner space of the hopper body 31 into two, with a large diameter storage section 311 formed on one side and a small diameter storage section 312 formed on the other side. The opening/closing gates 32a, 32b are provided at the connection between the hopper body 31 and the screw feeder 20.

開閉ゲート32a、32bは、いずれもスクリューフィーダ20との接続部を開状態とした際に、その開度を調整可能に構成されている。これにより、ホッパー本体31からスクリューフィーダ20に供給する礫分M1及び細粒分M2各々の供給量を調整自在となっている。図2では、開閉ゲート32a、32bの形状をスライド式にしたが、開度を調整できれば、その形状はいずれでもよい。 The opening and closing gates 32a and 32b are both configured so that their opening degree can be adjusted when the connection with the screw feeder 20 is in an open state. This allows the supply amount of each of the gravel fraction M1 and the fine fraction M2 supplied from the hopper body 31 to the screw feeder 20 to be freely adjusted. In FIG. 2, the opening and closing gates 32a and 32b are shaped as a sliding type, but any shape is acceptable as long as the opening degree can be adjusted.

スクリューフィーダ20は、有軸型を採用しており、軸部21と、軸部21周りに装着されたスクリュー羽根22を備えている。また、軸部21の一端側にはこれを回転するモーター23が備えられ、軸部21及びスクリュー羽根22は、トラフ24に内包されている。トラフ24は、モーター23側の一端側にホッパー30が接続された供給口242を備え、他端に埋戻し材Mを排出する排出口241が設けられている。 The screw feeder 20 is of the shafted type and includes a shaft 21 and a screw blade 22 attached around the shaft 21. A motor 23 for rotating the shaft 21 is provided on one end of the shaft 21, and the shaft 21 and the screw blade 22 are contained within a trough 24. The trough 24 includes a supply port 242 connected to a hopper 30 on one end of the motor 23 side, and a discharge port 241 for discharging the backfill material M at the other end.

≪≪混合攪拌領域20Aが排出口241側にある場合≫≫
このような構成のスクリューフィーダ20は、図2(a)で示すように、排出口241側に混合攪拌領域20Aが設定され、供給口242側に搬送領域20Bが設けられている。搬送領域20Bは、ホッパー30から供給された礫分M1と細粒分M2とを混合攪拌することなく、混合攪拌領域20Aに向けて搬送する領域である。このため、スクリュー羽根22は、一般に粒状物を搬送する際に採用される羽根ピッチで軸部21に装着されている。
<<When the mixing and stirring area 20A is located on the discharge port 241 side>>
2(a), the screw feeder 20 having such a configuration has a mixing and stirring region 20A set on the discharge port 241 side, and a conveying region 20B on the supply port 242 side. The conveying region 20B is a region that conveys the gravel fraction M1 and the fine grain fraction M2 supplied from the hopper 30 toward the mixing and stirring region 20A without mixing and stirring them. For this reason, the screw blades 22 are attached to the shaft portion 21 at a blade pitch generally adopted when conveying granular materials.

一方、混合攪拌領域20Aは、搬送領域20Bから搬送された礫分M1と細粒分M2とを混合攪拌し、埋戻し材Mを製造するとともに排出口241に向けて搬送する領域である。このため、スクリュー羽根22は、搬送領域20Bより羽根ピッチが広く形成された状態で軸部21に装着されている。このように、羽根ピッチを広く形成すると、礫分M1と細粒分M2が回転するスクリュー羽根22の間に滞留する時間を稼ぐことができる。この期間中に礫分M1と細粒分M2とは、スクリュー羽根22とともに回転することで搬送されつつ混合攪拌される。これにより埋戻し材Mが製造されるとともに、排出口241に向かって排出される。 On the other hand, the mixing and stirring area 20A is an area where the gravel portion M1 and the fine grain portion M2 transported from the transport area 20B are mixed and stirred to produce backfill material M and transport it toward the discharge port 241. For this reason, the screw blade 22 is attached to the shaft portion 21 with a blade pitch wider than that of the transport area 20B. By forming the blade pitch wider in this way, it is possible to buy time for the gravel portion M1 and the fine grain portion M2 to remain between the rotating screw blades 22. During this period, the gravel portion M1 and the fine grain portion M2 are mixed and stirred while being transported by rotating together with the screw blade 22. In this way, the backfill material M is produced and discharged toward the discharge port 241.

混合攪拌領域20Aにおいて、礫分M1と細粒分M2とを混合攪拌し埋戻し材Mを製造するための構成は、スクリュー羽根22に対する羽根ピッチの調整に限定されるものではない。 In the mixing and stirring area 20A, the configuration for mixing and stirring the gravel portion M1 and the fine grain portion M2 to produce backfill material M is not limited to adjusting the blade pitch of the screw blade 22.

図3(a)では、混合攪拌領域20Aの範囲に位置するスクリュー羽根22に対して、軸部21と平行に延在する攪拌棒25を複数設ける構成を例示している。また、図3(b)では、混合攪拌領域20Aの範囲に位置する軸部21に対して攪拌棒25を、軸部21と直交する方向に延在するようにして複数装着する構成を例示している。これにより、搬送領域20Bから搬送された礫分M1と細粒分M2とは、混合攪拌領域20A内でスクリュー羽根22により搬送されつつ、攪拌棒25により混合攪拌される。これにより、埋戻し材Mが製造され、排出口241に向かって排出される。 Figure 3(a) illustrates a configuration in which multiple stirring rods 25 extending parallel to the shaft portion 21 are provided on the screw blade 22 located within the mixing and stirring region 20A. Also, Figure 3(b) illustrates a configuration in which multiple stirring rods 25 are attached to the shaft portion 21 located within the mixing and stirring region 20A so that they extend in a direction perpendicular to the shaft portion 21. As a result, the gravel portion M1 and the fine grain portion M2 transported from the transport region 20B are mixed and stirred by the stirring rods 25 while being transported by the screw blade 22 within the mixing and stirring region 20A. As a result, backfill material M is produced and discharged toward the discharge port 241.

さらに、図4では、混合攪拌領域20Aの範囲に攪拌翼26を設ける構成を例示している。具体的には、スクリューフィーダ20の軸部21が、外軸21aとこの外軸21aを貫通する内軸21bとにより構成され、外軸21aはトラフ24より短く形成されている。また、内軸21bは排出口241に達する長さを有しているため、内軸21bが排出口241の近傍で外軸21aから露出した状態となっている。 Furthermore, FIG. 4 illustrates a configuration in which the stirring blades 26 are provided within the range of the mixing and stirring region 20A. Specifically, the shaft portion 21 of the screw feeder 20 is composed of an outer shaft 21a and an inner shaft 21b that penetrates the outer shaft 21a, and the outer shaft 21a is formed to be shorter than the trough 24. In addition, since the inner shaft 21b has a length that reaches the discharge port 241, the inner shaft 21b is exposed from the outer shaft 21a near the discharge port 241.

これを利用して、スクリューフィーダ20の供給口242から外軸21aの先端まで領域が搬送領域20Bとし、外軸21aにスクリュー羽根22を装着している。一方、外軸21aの先端からスクリューフィーダ20の排出口241までの領域を混合攪拌領域20Aとし、露出した内軸21bに攪拌翼26を設置している。 Utilizing this, the area from the supply port 242 of the screw feeder 20 to the tip of the outer shaft 21a is the conveying area 20B, and the screw blade 22 is attached to the outer shaft 21a. On the other hand, the area from the tip of the outer shaft 21a to the discharge port 241 of the screw feeder 20 is the mixing and stirring area 20A, and the stirring blade 26 is installed on the exposed inner shaft 21b.

また、外軸21aと内軸21bは各々軸回りに回転自在となっており、供給口242側に各々のモーター23a、23bが設けられている。これにより、外軸21aと内軸21bが回転すると、搬送領域20Bから搬送された礫分M1と細粒分M2とは、混合攪拌領域20Aで回転する攪拌翼26により混合攪拌されて埋戻し材Mが製造され、排出口241に向かって排出される。なお、攪拌翼26が装着された内軸21bは、外軸21aと比較して高速で回転するよう設定されている。 The outer shaft 21a and the inner shaft 21b are each rotatable about their own axis, and motors 23a and 23b are provided on the supply port 242 side. As a result, when the outer shaft 21a and the inner shaft 21b rotate, the gravel fraction M1 and the fine grain fraction M2 transported from the transport area 20B are mixed and stirred by the stirring blades 26 rotating in the mixing and stirring area 20A to produce backfill material M, which is then discharged toward the discharge port 241. The inner shaft 21b to which the stirring blades 26 are attached is set to rotate at a higher speed than the outer shaft 21a.

≪≪混合攪拌領域20Aが供給口242側にある場合≫≫≫
一方、スクリューフィーダ20は、供給口242側に混合攪拌領域20Aを設定し、排出口241側に搬送領域20Bを設定してもよい。この場合、混合攪拌領域20Aでは、ホッパー30から供給された礫分M1と細粒分M2とを混合攪拌し、埋戻し材Mを製造するとともに、搬送領域20Bに搬送する。搬送領域20Bでは、混合攪拌領域20Aで製造された埋戻し材Mを排出口241に向けて搬送し、排出する。
<<When the mixing and stirring area 20A is located on the supply port 242 side>>>
On the other hand, the screw feeder 20 may have a mixing and stirring region 20A on the supply port 242 side and a conveying region 20B on the discharge port 241 side. In this case, the mixing and stirring region 20A mixes and stirs the gravel portion M1 and the fine grain portion M2 supplied from the hopper 30 to produce backfill material M, which is then conveyed to the conveying region 20B. In the conveying region 20B, the backfill material M produced in the mixing and stirring region 20A is conveyed toward the discharge port 241 and discharged.

例えば、図5(a)では、排出口241側に位置する搬送領域20Bにおいて、軸部21にスクリュー羽根22が設置され、供給口242側に位置する混合攪拌領域20Aにおいて、軸部21とトラフ24の内周面に複数のパドル羽根27が設置されている。パドル羽根27は、粉粒体を混合する際に広く一般に使用されるパドルミキサに備えられており、軸部21の回転に伴って粉粒体を救い上げるようにして混合攪拌する。したがって、混合攪拌領域20Aでは、ホッパー30から供給された礫分M1と細粒分M2とを、回転する軸部21に装着されたパドル羽根27とトラフ24のパドル羽根27とにより混合攪拌し、埋戻し材Mを製造するとともに、搬送領域20Bに搬送できる。 For example, in FIG. 5(a), in the conveying area 20B located on the discharge port 241 side, a screw blade 22 is installed on the shaft 21, and in the mixing and stirring area 20A located on the supply port 242 side, a number of paddle blades 27 are installed on the shaft 21 and the inner circumferential surface of the trough 24. The paddle blades 27 are provided in paddle mixers that are widely and generally used when mixing powder and granular materials, and they mix and stir the powder and granular materials by lifting them up as the shaft 21 rotates. Therefore, in the mixing and stirring area 20A, the gravel portion M1 and the fine grain portion M2 supplied from the hopper 30 are mixed and stirred by the paddle blades 27 attached to the rotating shaft 21 and the paddle blades 27 of the trough 24, producing the backfill material M, and can be conveyed to the conveying area 20B.

混合攪拌領域20Aにパドル羽根27を採用する構成は、上記に限定されるものではない。図5(b)で示すように、軸部21との間に間隔を設けて追加軸部21’を並列配置してスクリューフィーダ20を2軸型とし、両者にパドル羽根27を設置する構成としてもよい。追加軸部21’も軸回りに回転可能となっており、供給口242側にモーター23cが設けられている。したがって、混合攪拌領域20Aでは、ホッパー30から供給された礫分M1と細粒分M2とを、回転する軸部21及び追加軸部21’の両者に装着されたパドル羽根27により混合攪拌し、埋戻し材Mを製造するとともに、搬送領域20Bに搬送できる。 The configuration of using the paddle blade 27 in the mixing and stirring area 20A is not limited to the above. As shown in FIG. 5(b), the screw feeder 20 may be configured as a two-shaft type by arranging the additional shaft part 21' in parallel with a gap between them and the shaft part 21, and the paddle blade 27 may be installed on both shaft parts. The additional shaft part 21' is also rotatable around its axis, and a motor 23c is provided on the supply port 242 side. Therefore, in the mixing and stirring area 20A, the gravel part M1 and the fine grain part M2 supplied from the hopper 30 are mixed and stirred by the paddle blade 27 attached to both the rotating shaft part 21 and the additional shaft part 21', and the backfill material M is produced and transported to the transport area 20B.

また、混合攪拌領域20Aに備えたスクリューフィーダ20を、軸部21とこれに平行な追加軸部21’との2軸型とする場合には、図6(a)(b)で示すように、パドル羽根27に代えてスクリュー羽根22と攪拌棒25を備える構成としてもよい。 In addition, when the screw feeder 20 provided in the mixing and stirring area 20A is a two-shaft type having a shaft portion 21 and an additional shaft portion 21' parallel to the shaft portion 21, the screw blade 22 and stirring rod 25 may be provided instead of the paddle blade 27, as shown in Figures 6(a) and 6(b).

例えば、図6(a)では複数の攪拌棒25を、スクリュー羽根22とともに、軸部21と追加軸部21’に設置している。このとき、複数の攪拌棒25は軸部21及び追加軸部21’と直交して設ける。また、図6(b)では、軸部21と追加軸部21’にスクリュー羽根22を設け、このスクリュー羽根22に攪拌棒25を設置している。スクリュー羽根22に設ける攪拌棒25は、軸部21及び追加軸部21’と平行に設ける。これにより、混合攪拌領域20Aでは、ホッパー30から供給された礫分M1と細粒分M2とを軸部21もしくはスクリュー羽根22に装着された攪拌棒25により混合攪拌し、埋戻し材Mを製造するとともに、製造した埋戻し材Mをスクリュー羽根22で搬送領域20Bに搬送できる。 For example, in FIG. 6(a), multiple stirring rods 25 are installed on the shaft 21 and the additional shaft 21' together with the screw blade 22. At this time, the multiple stirring rods 25 are installed perpendicular to the shaft 21 and the additional shaft 21'. Also, in FIG. 6(b), the screw blade 22 is installed on the shaft 21 and the additional shaft 21', and the stirring rods 25 are installed on the screw blade 22. The stirring rods 25 installed on the screw blade 22 are installed parallel to the shaft 21 and the additional shaft 21'. As a result, in the mixing and stirring area 20A, the gravel fraction M1 and the fine grain fraction M2 supplied from the hopper 30 are mixed and stirred by the stirring rods 25 attached to the shaft 21 or the screw blade 22 to produce the backfill material M, and the produced backfill material M can be transported to the transport area 20B by the screw blade 22.

≪≪埋戻し装置BD≫≫
埋戻し装置BDは、図7で示すように、上記の埋戻し材製造装置MDを搭載した走行体40と、材料供給車50と、密度評価手段60と、防塵板70と、を備えている。
<<Backfilling device BD>>
As shown in FIG. 7, the backfilling device BD includes a traveling body 40 having the backfilling material manufacturing device MD mounted thereon, a material supply vehicle 50, a density evaluation means 60, and a dustproof plate 70.

走行体40は埋戻し装置BDを支持しており、クローラー41を備えた車体42と、車体42の上面にスライド自在に積載されたスライド架台43と、スライド架台43上に設置された支持架台44と、を備える。支持架台44は、スクリューフィーダ20を支持している。また、スライド架台43の後側面と車体42の立ち上がり部との間には、反力受け部材45が介装されている。反力受け部材45は、スクリューフィーダ20がスライド架台43を介して車体42上を後退する挙動を示した際に、これを抑制する。 The running body 40 supports the backfilling device BD, and comprises a vehicle body 42 equipped with crawlers 41, a slide base 43 slidably mounted on the upper surface of the vehicle body 42, and a support base 44 installed on the slide base 43. The support base 44 supports the screw feeder 20. In addition, a reaction force receiving member 45 is interposed between the rear side of the slide base 43 and the rising portion of the vehicle body 42. The reaction force receiving member 45 suppresses the screw feeder 20 when it exhibits a behavior of retreating on the vehicle body 42 via the slide base 43.

これらスライド架台43と反力受け部材45は、アクセス坑道13内で埋戻し材Mを締め固める作業を補助する。つまり、スクリューフィーダ20の排出口241を、先行して製造した埋戻し材Mに埋没させた状態で、連続的に埋戻し材Mを製造し排出すると、アクセス坑道13内で埋戻し材Mの密度が高まり、さらに埋戻し材Mを排出し続けると、スクリューフィーダ20がスライド架台43を介して後退する挙動を示すが、反力受け部材45を介してクローラー41を備えた車体42でこれに抵抗する。これにより、新たに製造される埋戻し材Mで、アクセス坑道13内の埋戻し材Mを押圧する態様となるため、これら埋戻し材Mを締め固めることが可能となる。 The slide base 43 and the reaction force receiving member 45 assist in the compaction of the backfill material M in the access tunnel 13. In other words, when the backfill material M is continuously produced and discharged while the discharge port 241 of the screw feeder 20 is submerged in the previously produced backfill material M, the density of the backfill material M increases in the access tunnel 13, and as the backfill material M continues to be discharged, the screw feeder 20 exhibits a behavior of retreating via the slide base 43, but this is resisted by the vehicle body 42 equipped with the crawler 41 via the reaction force receiving member 45. As a result, the backfill material M in the access tunnel 13 is pressed by the newly produced backfill material M, making it possible to compact the backfill material M.

材料供給車50は、スクリューフィーダ20及び走行体40の後方に配置され、土槽51と、バケット52と、細粒分槽53とを備える。これらはいずれも走行体40とともに、アクセス坑道13内を移動自在に構成されている。 The material supply vehicle 50 is positioned behind the screw feeder 20 and the running body 40, and is equipped with a soil bin 51, a bucket 52, and a fine-grain separation bin 53. All of these, together with the running body 40, are configured to be freely movable within the access tunnel 13.

土槽51には礫分M1が収容され、バケット52の上方に移動すると、その底部から礫分M1をバケット52に向けて投下する。バケット52には、スクリューコンベヤ等の搬送装置521が設けられ、搬送装置521を介して礫分M1がホッパー30の大径収容部311に投下する。また、細粒分槽53には細粒分M2が収容されとともに、スクリューコンベヤ等の搬送装置531が設けられている。これにより、細粒分M2はこの搬送装置531を介してホッパー30の小径収容部312に投下される。 The soil tank 51 contains gravel M1, and as it moves above the bucket 52, it drops the gravel M1 from its bottom into the bucket 52. The bucket 52 is provided with a transport device 521 such as a screw conveyor, and the gravel M1 is dropped into the large diameter storage section 311 of the hopper 30 via the transport device 521. The fine particle separation tank 53 contains fine particle M2 and is provided with a transport device 531 such as a screw conveyor. As a result, the fine particle M2 is dropped into the small diameter storage section 312 of the hopper 30 via this transport device 531.

そして、密度評価手段60は、アクセス坑道13内を充填する埋戻し材Mの密度を評価するため、また、スクリューフィーダ20が過負荷状態となって故障する事態を抑制するために設ける装備である。図7では、RI密度計62をスクリューフィーダ20の排出口241近傍に設置した事例を示している。また、後述する図8では、密度評価手段60として、走行体40の反力受け部材45に圧縮型ロードセル61を設置する事例を示している。密度評価手段60の詳細については後述する。 The density evaluation means 60 is equipment provided to evaluate the density of the backfill material M filling the access tunnel 13 and to prevent the screw feeder 20 from being overloaded and breaking down. Figure 7 shows an example in which an RI density meter 62 is installed near the discharge outlet 241 of the screw feeder 20. Figure 8, which will be described later, shows an example in which a compression load cell 61 is installed on the reaction force receiving member 45 of the traveling body 40 as the density evaluation means 60. The density evaluation means 60 will be described in detail later.

このような埋戻し装置BDには、図7で示すように、走行体40にアクセス坑道13の断面を塞ぐ防塵板70が設けられており、アクセス坑道13を充填する埋戻し材Mの崩落や細粒分M2の飛散を防止している。なお、防塵板70は必ずしも設置しなくてもよい。 As shown in FIG. 7, in this type of backfilling device BD, a dustproof plate 70 that blocks the cross section of the access tunnel 13 is provided on the running body 40, preventing the backfilling material M filling the access tunnel 13 from collapsing and the fine particles M2 from scattering. Note that the dustproof plate 70 does not necessarily have to be installed.

上記の埋戻し材製造装置MDを搭載した埋戻し装置BDを用いて埋戻し施工を実施すると、埋戻し材Mの製造、アクセス坑道13への搬入及び充填、締固め、さらには出来形管理に至る、埋戻し施工に係る一連の作業を賄うことができる。以下に、上記の埋戻し装置BDを利用して、アクセス坑道13を埋め戻す手順を説明する。 When backfilling work is carried out using a backfilling device BD equipped with the above-mentioned backfilling material manufacturing device MD, a series of tasks related to backfilling work can be covered, including the production of the backfilling material M, transporting and filling it into the access tunnel 13, compaction, and even as-built management. The procedure for backfilling the access tunnel 13 using the above-mentioned backfilling device BD is described below.

≪≪≪空洞部の埋戻し方法≫≫≫
まず、図8(a)で示すように、アクセス坑道13内の所定位置に埋戻し装置BDを据え付けたのち、材料供給車50からホッパー30の大径収容部311及び小径収容部312に、礫分M1と細粒分M2を連続的もしくは断続的に供給する、また、スクリューフィーダ20を稼働させるとともに、開閉ゲート32a、32bを開状態にする。
<<<<How to backfill the cavity>>>>
First, as shown in Figure 8 (a), a backfilling device BD is installed at a predetermined position in the access tunnel 13, and then gravel M1 and fine grain M2 are continuously or intermittently supplied from the material supply vehicle 50 to the large diameter storage section 311 and small diameter storage section 312 of the hopper 30. In addition, the screw feeder 20 is operated and the opening and closing gates 32a and 32b are opened.

開閉ゲート32a、32bはあらかじめ、礫分M1と細粒分M2が設計した配合量でスクリューフィーダ20へ供給されるよう、開度などを設定しておく。すると、スクリューフィーダ20は、礫分M1と細粒分M2を搬送領域20B及び混合攪拌領域20Aを経由させることにより搬送しつつ混合攪拌し、埋戻し材Mを連続的に製造し排出口241に向けて排出する。 The opening degree of the gates 32a and 32b is set in advance so that the gravel portion M1 and the fine grain portion M2 are supplied to the screw feeder 20 in the designed mixture amount. The screw feeder 20 then conveys and mixes the gravel portion M1 and the fine grain portion M2 through the conveying area 20B and the mixing and stirring area 20A, continuously producing backfill material M and discharging it toward the discharge port 241.

アクセス坑道13で連続して埋戻し材Mが排出されると、図8(b)で示すように、スクリューフィーダ20の排出口241が埋戻し材Mに埋没する。この状態で、礫分M1及び細粒分M2の搬送を継続し、アクセス坑道13を埋戻し材Mで充填しつつ、充填した埋戻し材Mの密度を高めていく。前述したように、密度が高まると、新たに製造される埋戻し材Mで、アクセス坑道13を充填している埋戻し材Mを押圧する態様となり、徐々に締め固められていく。 When backfill material M is continuously discharged from the access tunnel 13, the discharge port 241 of the screw feeder 20 is buried in the backfill material M, as shown in FIG. 8(b). In this state, the transport of the gravel portion M1 and the fine-grained portion M2 continues, filling the access tunnel 13 with backfill material M while increasing the density of the filled backfill material M. As described above, when the density increases, the newly produced backfill material M presses against the backfill material M filling the access tunnel 13, gradually compacting it.

このように、アクセス坑道13で埋戻し材Mを製造しつつ充填する作業は、密度評価手段60で取得した出力値とあらかじめ設定した評価基準とを照らし合わせて、埋戻し材Mの密度を評価しながら実施する。評価基準は採用する密度評価手段60ごとに、所望の密度に対応させて設定し、評価基準に到達した時点で埋戻し装置BDを停止する、つまり、埋戻し材Mの製造を停止する。これにより、アクセス坑道13内の埋戻し材Mを所望の密度で締め固めることができるとともに、スクリューフィーダ20が過負荷状態となって故障する事態を抑制することが可能となる。 In this way, the work of producing and filling the backfill material M in the access tunnel 13 is carried out while evaluating the density of the backfill material M by comparing the output value acquired by the density evaluation means 60 with a preset evaluation criterion. The evaluation criterion is set for each density evaluation means 60 used in accordance with the desired density, and when the evaluation criterion is reached, the backfilling device BD is stopped, that is, the production of the backfill material M is stopped. This makes it possible to compact the backfill material M in the access tunnel 13 at the desired density, and also makes it possible to prevent the screw feeder 20 from becoming overloaded and breaking down.

こののち、図8(c)で示すように、走行体40を利用して埋戻し装置BDを所定量後退させ、埋戻し材Mからスクリューフィーダ20を引き抜く。アクセス坑道13で予定する埋戻し範囲を埋め戻すまで、上記の作業を繰り返し実施する。これにより、アクセス坑道13の長手方向に、一様な密度で締め固めた埋戻し材Mを連続させることができ、アクセス坑道13で予定する埋戻し範囲全長に渡って均質な出来形を実現できる。 After this, as shown in FIG. 8(c), the backfilling device BD is retreated a predetermined distance using the traveling body 40, and the screw feeder 20 is pulled out from the backfilling material M. The above operations are repeated until the backfilling area planned for the access tunnel 13 is backfilled. This allows the backfilling material M, compacted at a uniform density, to be continuously provided in the longitudinal direction of the access tunnel 13, and a uniform finished shape can be achieved over the entire length of the backfilling area planned for the access tunnel 13.

その一方で、アクセス坑道13に予定する埋戻し範囲の途中で、周辺岩盤の性状が変化することに伴って、礫分M1と細粒分M2の配合を変更して埋戻し材Mを製造したい場合は、開閉ゲート32a、32bの開度などを適宜変更する。これにより、埋戻し施工を中断することなく、配合変更した埋戻し材Mを容易に製造し、充填することが可能となる。 On the other hand, if it is necessary to produce backfill material M by changing the mix of gravel M1 and fine-grained M2 due to changes in the properties of the surrounding rock mass midway through the planned backfilling range of the access tunnel 13, the opening degree of the opening and closing gates 32a and 32b can be appropriately changed. This makes it possible to easily produce and fill backfill material M with a changed mix without interrupting the backfilling work.

≪≪埋戻し材Mの密度を評価する評価手段≫≫
上記の空洞部の埋戻し方法において、埋戻し材Mの密度を評価するための密度評価手段60として、図8では、走行体40の反力受け部材45に設けた圧縮型ロードセル61を、図7では、スクリューフィーダ20の排出口241近傍に設けた挿入式散乱型のRI密度計62を、また、図2では、スクリューフィーダ20に備えられ、モーター電流もしくは回転トルクが記録されるデータロガー65を、それぞれ採用している。以下に、圧縮型ロードセル61、RI密度計62、データロガー65を利用した密度の評価方法について説明する。
<<Evaluation means for evaluating density of backfill material M>>
In the above-mentioned method for backfilling a cavity, a compression type load cell 61 provided on the reaction force receiving member 45 of the traveling body 40 is used as density evaluation means 60 for evaluating the density of the backfilling material M in Fig. 8, an insertion type scattering type RI densitometer 62 provided near the discharge port 241 of the screw feeder 20 is used in Fig. 7, and a data logger 65 provided on the screw feeder 20 for recording the motor current or rotation torque is used in Fig. 2. The density evaluation method using the compression type load cell 61, the RI densitometer 62, and the data logger 65 will be described below.

≪圧縮型ロードセル(圧縮荷重)を利用する場合≫
圧縮型ロードセル61は、反力受け部材45に作用する圧縮方向の荷重を測定するものである。図8(b)で示すように、埋戻し装置BDでは、アクセス坑道13内で埋戻し材Mの密度が高まると、スクリューフィーダ20がスライド架台43を介して車体42上を後退する挙動を示す。これを、反力受け部材45を介してクローラー41を備えた車体42で抵抗する構成としている。
<When using a compression load cell (compression load)>
The compression load cell 61 measures the load in the compression direction acting on the reaction force receiving member 45. As shown in Fig. 8(b) , in the backfilling device BD, when the density of the backfilling material M increases in the access tunnel 13, the screw feeder 20 moves backward on the vehicle body 42 via the slide base 43. This is resisted by the vehicle body 42 equipped with the crawlers 41 via the reaction force receiving member 45.

そこで、反力受け部材45に圧縮型ロードセル61を設け、圧縮方向の荷重(後退力)を測定することで、アクセス坑道13を充填する埋戻し材Mの密度を評価する。その評価方法は、あらかじめ埋戻し材Mが所望の密度に到達した際の荷重を求めておき、これを評価基準として設定しておく。そのうえで、埋戻し施工中に圧縮型ロードセル61の測定値が評価基準に到達したところで、埋戻し施工を停止する。 Therefore, a compression load cell 61 is provided on the reaction force receiving member 45, and the load in the compression direction (retraction force) is measured to evaluate the density of the backfilling material M that fills the access tunnel 13. The evaluation method involves determining in advance the load when the backfilling material M reaches the desired density, and setting this as the evaluation standard. Then, when the measurement value of the compression load cell 61 during backfilling work reaches the evaluation standard, the backfilling work is stopped.

≪RI密度計(散乱γ線数)を利用する場合≫
挿入式散乱型のRI密度計62は、土の密度を測定する手段として利用されており、図7で示すように、スクリューフィーダ20の排出口241近傍など、アクセス坑道13に充填された埋戻し材Mに埋設可能な位置に装着している。
<When using an RI density meter (number of scattered gamma rays)>
The insertion type scattering type RI density meter 62 is used as a means for measuring soil density, and is mounted at a position where it can be embedded in the backfill material M filled in the access tunnel 13, such as near the discharge outlet 241 of the screw feeder 20, as shown in Figure 7.

RI密度計62は、図9で示すように、γ線を放出するセシウム137(Cs137)が装着されているγ線源部621と、検出器622とを備え、γ線源部621から放射され埋戻し材Mの中で散乱したのち、検出器622に入射した散乱γ線数を検出する装置である。γ線は通過経路の密度が大きいと吸収されることが知られている。そこで、評価方法としては、あらかじめ試験を行って埋戻し材Mが所望の充填度に到達した際の密度に対応するRI密度計62の出力値を評価基準として設定しておく。そのうえで、埋戻し施工中にRI密度計62の測定値が評価基準に到達したところで、埋戻し施工を停止する。 As shown in FIG. 9, the RI density meter 62 is equipped with a gamma ray source unit 621 equipped with cesium 137 (Cs137) that emits gamma rays, and a detector 622, and is a device that detects the number of scattered gamma rays that are emitted from the gamma ray source unit 621, scattered in the backfill material M, and then enter the detector 622. It is known that gamma rays are absorbed when the density of the passage is high. Therefore, as an evaluation method, a test is performed in advance and the output value of the RI density meter 62 corresponding to the density when the backfill material M reaches the desired filling level is set as the evaluation standard. Then, when the measurement value of the RI density meter 62 reaches the evaluation standard during backfilling work, the backfilling work is stopped.

≪データロガー(モーター電流もしくは回転トルク)を利用する場合≫
図2(a)で示すように、スクリューフィーダ20に備えたデータロガー65には、モーター23のモーター電流及び軸部21の回転トルクなどの情報を読み取り記録されている。そこで、評価方法としては、あらかじめ埋戻し材Mが所望の密度に到達した際の電流値及び回転トルクを求めておき、これを評価基準として設定しておく。そのうえで、埋戻し施工中にデータロガー65に記録された電流値もしくは回転トルクが、評価基準に到達したところで埋戻し施工を停止する。モーター23のモーター電流及び軸部21の回転トルクは両者を評価してもよいし、いずれか一方を評価してもよい。
<When using a data logger (motor current or rotational torque)>
As shown in Fig. 2(a), the data logger 65 provided in the screw feeder 20 reads and records information such as the motor current of the motor 23 and the rotational torque of the shaft portion 21. As an evaluation method, the current value and rotational torque when the backfilling material M reaches a desired density are obtained in advance and set as the evaluation standard. Then, when the current value or rotational torque recorded in the data logger 65 during the backfilling work reaches the evaluation standard, the backfilling work is stopped. Both the motor current of the motor 23 and the rotational torque of the shaft portion 21 may be evaluated, or either one of them may be evaluated.

上記の圧縮型ロードセル61、RI密度計62、及びデータロガー65を用いた評価方法はそれぞれ、埋戻し材Mの密度を直接評価する方法である。しかし、これらに限定するものではなく、間接的に評価する方法を採用してもよい。 The above-mentioned evaluation methods using the compression load cell 61, RI density meter 62, and data logger 65 are each methods for directly evaluating the density of the backfill material M. However, the present invention is not limited to these methods, and an indirect evaluation method may also be used.

≪≪荷重センサによる推定≫≫
例えば、図10(a)には、スクリューフィーダ20の排出口241近傍に、ロードセルなどの荷重センサ63を設ける場合を事例に挙げている。荷重センサ63はトラフ24の上面であって、埋戻し施工で埋戻し材Mに埋没する範囲内に設ける。その数量は何ら限定されるものではないが、スクリューフィーダ20の軸線方向に複数設置しておき、各々から出力される出力値の平均値や中間値などを採用すると、信頼性の高い出力値を取得することができる。
<<Estimation using load sensors>>
10(a) shows an example in which a load sensor 63 such as a load cell is provided near the discharge port 241 of the screw feeder 20. The load sensor 63 is provided on the upper surface of the trough 24 within a range that is buried in the backfilling material M during backfilling work. There is no limitation on the number of sensors, but by providing a plurality of sensors in the axial direction of the screw feeder 20 and using the average or median of the output values output from each sensor, a highly reliable output value can be obtained.

密度の評価方法としては、あらかじめ試験を行って埋戻し材Mの密度と荷重センサ63の出力値との関係を確認し、埋戻し材Mが所望の密度に到達した際の荷重センサ63の出力値を評価基準として設定しておく。そのうえで、埋戻し施工中に荷重センサ63の出力値が評価基準に到達したところで、埋戻し施工を停止する。 The density evaluation method involves conducting a test in advance to confirm the relationship between the density of the backfilling material M and the output value of the load sensor 63, and setting the output value of the load sensor 63 when the backfilling material M reaches the desired density as the evaluation standard. Then, when the output value of the load sensor 63 reaches the evaluation standard during the backfilling work, the backfilling work is stopped.

≪≪レーザー変位計による推定≫≫
また、図10(b)には、スクリューフィーダ20に、レーザー変位計64を設ける場合を事例に挙げている。レーザー変位計64はトラフ24の上面であって、埋戻し施工で埋戻し材Mに埋没される範囲から離間した位置に設ける。レーザー変位計64は、埋戻し材Mの表面に向けてレーザー光線を照射しするとともに、その反射光を受光することで、レーザー変位計64から埋戻し材Mの表面までの距離を非接触で測定できる。
<<Estimation using a laser displacement meter>>
10(b) shows an example in which a laser displacement meter 64 is provided on the screw feeder 20. The laser displacement meter 64 is provided on the upper surface of the trough 24, at a position separated from the area that will be buried in the backfilling material M during backfilling work. The laser displacement meter 64 irradiates a laser beam toward the surface of the backfilling material M and receives the reflected light, thereby making it possible to measure the distance from the laser displacement meter 64 to the surface of the backfilling material M in a non-contact manner.

したがって、密度の評価方法としては、あらかじめ試験を行って埋戻し材Mが所望の密度に到達した際の、レーザー変位計64から埋戻し材Mの表面までの距離を求めておき、これを評価基準として設定しておく。そのうえで、埋戻し施工中にレーザー変位計64の出力値が評価基準に到達したところで、埋戻し施工を停止する。 Therefore, the method for evaluating density involves conducting tests in advance to determine the distance from the laser displacement meter 64 to the surface of the backfilling material M when the backfilling material M reaches the desired density, and setting this as the evaluation standard. Then, when the output value of the laser displacement meter 64 reaches the evaluation standard during backfilling work, the backfilling work is stopped.

なお、荷重センサ63及びレーザー変位計64の出力値はいずれも、埋戻し材Mの密度を直接的に評価できるものではない。したがって、上記の圧縮型ロードセル61やRI密度計62、データロガー65を併用し、これらの出力値とともに密度を評価すると、より高い精度で出来形管理を行うことが可能となる。 Note that the output values of the load sensor 63 and the laser displacement meter 64 cannot directly evaluate the density of the backfill material M. Therefore, by using the compression load cell 61, RI density meter 62, and data logger 65 in combination and evaluating the density together with their output values, it becomes possible to perform as-built management with higher accuracy.

上記のとおり、空洞部の埋戻し方法によれば、乾燥状態の礫分M1と細粒分M2とが均一に混合したベントナイト混合土である埋戻し材Mを容易に製造することができる。また、製造した埋戻し材Mを利用して、アクセス坑道13を均質かつ効率よく埋め戻すことが可能となる。 As described above, the method for backfilling the cavity makes it easy to produce backfill material M, which is a bentonite mixed soil in which dry gravel M1 and fine grain M2 are uniformly mixed. In addition, the manufactured backfill material M can be used to backfill the access tunnel 13 homogeneously and efficiently.

本発明の埋戻し材の製造方法、空洞部の埋戻し方法、埋戻し材製造装置、及び埋戻し装置は、上記実施形態に限定されるものではなく、本発明の趣旨を逸脱しない範囲で種々の変更が可能である。 The backfilling material manufacturing method, cavity backfilling method, backfilling material manufacturing device, and backfilling device of the present invention are not limited to the above-described embodiments, and various modifications are possible without departing from the spirit of the present invention.

例えば、本実施の形態では、図7で示ように、埋戻し材製造装置MDにスクリューフィーダ20を1台のみ設けたが、同様のスクリューフィーダ20を複数準備し、間隔を設けて並列配置する構成としてもよい。 For example, in this embodiment, as shown in FIG. 7, only one screw feeder 20 is provided in the backfill material manufacturing device MD, but multiple similar screw feeders 20 may be prepared and arranged in parallel with intervals between them.

また、本実施の形態では、埋戻し装置BDを利用して埋戻し材Mを充填する方法を、アクセス坑道13に対して直接実施したが、必ずしもこれに限定されるものではない。例えば、加水調整などして製造したベントナイト混合土を、アクセス坑道13の壁面に吹き付けたり、底面に撒き出し・締固めしたのち、これらに囲まれた空隙を埋戻し材Mで充填し埋め戻すなど、他の工法を併用してアクセス坑道13を埋戻してもよい。 In addition, in this embodiment, the method of filling the backfilling material M using the backfilling device BD is carried out directly on the access tunnel 13, but this is not necessarily limited to this. For example, the access tunnel 13 may be backfilled using other construction methods, such as spraying bentonite mixed soil produced by adding water and adjusting it onto the wall surface of the access tunnel 13, or spreading it out on the bottom surface and compacting it, and then filling the voids surrounded by these with the backfilling material M.

また、埋戻し装置BDを利用して埋め戻す空洞部は、高レベル放射性廃棄物の処分場10におけるアクセス坑道13に限定されるものではなく、いずれの空間にも適用可能である。 In addition, the cavity that is backfilled using the backfilling device BD is not limited to the access tunnel 13 in the high-level radioactive waste disposal site 10, but can be applied to any space.

10 処分場
11 処分坑道
12 連絡坑道
13 アクセス坑道(空洞部)
20 スクリューフィーダ
21 軸部
21a 外軸
21b 内軸
22 スクリュー羽根
23 モーター
23a モーター
23b モーター
23c モーター
24 トラフ
241 排出口
242 供給口
25 攪拌棒
26 攪拌翼
27 パドル羽根
30 ホッパー
31 ホッパー本体
311 大径収容部
312 小径収容部
313 仕切り部材
32a 開閉ゲート
32b 開閉ゲート
40 走行体
41 クローラー
42 車体
43 スライド架台
44 支持架台
45 反力受け部材
50 材料供給車
51 土槽
52 バケット
521 搬送装置
53 細粒分槽
531 搬送装置
60 密度評価手段
61 圧縮型ロードセル
62 RI密度計
63 荷重センサ
64 レーザー変位計
65 データロガー
70 防塵板
M 埋戻し材
M1 礫分(大径粒状物)
M2 細粒分(小径粒状物)
MD 埋戻し材製造装置
BD 埋戻し装置
10 disposal site 11 disposal tunnel 12 connection tunnel 13 access tunnel (cavity)
20 Screw feeder 21 Shaft portion 21a Outer shaft 21b Inner shaft 22 Screw blade 23 Motor 23a Motor 23b Motor 23c Motor 24 Trough 241 Discharge port 242 Supply port 25 Stirring rod 26 Stirring blade 27 Paddle blade 30 Hopper 31 Hopper body 311 Large diameter storage section 312 Small diameter storage section 313 Partition member 32a Opening and closing gate 32b Opening and closing gate 40 Traveling body 41 Crawler 42 Vehicle body 43 Slide frame 44 Support frame 45 Reaction force receiving member 50 Material supply vehicle 51 Soil tank 52 Bucket 521 Conveying device 53 Fine grain separation tank 531 Conveying device 60 Density evaluation means 61 Compression type load cell 62 RI density meter 63 Load sensor 64 Laser displacement meter 65 Data logger 70 Dustproof plate M Backfill material M1 Gravel (large granular material)
M2 Fine particles (small diameter particles)
MD Backfilling material manufacturing equipment BD Backfilling equipment

Claims (11)

搬送領域と混合攪拌領域を設けたスクリューフィーダに大径粒状物及び小径粒状物を供給し、前記大径粒状物及び前記小径粒状物を搬送しながら混合撹拌して埋戻し材を製造することを特徴とする埋戻し材の製造方法。 A method for producing backfill material, comprising: feeding large-diameter granular materials and small-diameter granular materials to a screw feeder having a conveying region and a mixing and stirring region; and producing backfill material by mixing and stirring the large-diameter granular materials and the small-diameter granular materials while conveying them. 請求項1に記載の埋戻し材の製造方法において、
前記埋戻し材がベントナイト混合土であり、
前記大径粒状物が礫分を含み、前記小径粒状物がベントナイトを含むことを特徴とする埋戻し材の製造方法。
The method for producing a backfill material according to claim 1,
The backfill material is bentonite mixed soil,
A method for producing backfill material, characterized in that the large-diameter granules contain gravel and the small-diameter granules contain bentonite.
請求項1または2に記載の埋戻し材の製造方法で製造した前記埋戻し材で地盤中の空洞部を充填する空洞部の埋戻し方法であって、
前記大径粒状物と前記小径粒状物とを前記空洞部に向けて搬送しつつ混合撹拌して前記埋戻し材を製造し、前記空洞部を充填することを特徴とする空洞部の埋戻し方法。
A method for filling a cavity in ground with the backfilling material manufactured by the method for manufacturing a backfilling material according to claim 1 or 2, comprising the steps of:
A method for backfilling a cavity, comprising the steps of: transporting and mixing the large-diameter granules and the small-diameter granules toward the cavity to produce the backfilling material, and filling the cavity with the backfilling material.
請求項3に記載の空洞部の埋戻し方法において、
前記スクリューフィーダの排出口を、先行して製造した前記埋戻し材に埋没させつつ前記埋戻し材を連続して製造することを特徴とする空洞部の埋戻し方法。
The method for backfilling a cavity according to claim 3,
A method for backfilling a cavity, comprising the steps of: submerging a discharge port of the screw feeder in the backfilling material previously produced while continuously producing the backfilling material.
請求項3または4に記載の空洞部の埋戻し方法において、
前記空洞部に対する前記埋戻し材の密度を評価し、
あらかじめ設定した密度に到達した時点で、前記埋戻し材の製造を停止することを特徴とする空洞部の埋戻し方法。
The method for backfilling a cavity according to claim 3 or 4,
Evaluating the density of the backfill material for the cavity;
A method for backfilling a cavity, comprising the steps of: stopping production of the backfilling material when a preset density is reached.
請求項3から5のいずれか1項に記載の空洞部の埋戻し方法において、
前記空洞部が、廃棄物処分場の坑道であることを特徴とする空洞部の埋戻し方法。
The method for backfilling a cavity according to any one of claims 3 to 5,
13. A method for backfilling a cavity, wherein the cavity is a tunnel at a waste disposal site.
大径粒状物と小径粒状物を搬送しつつ混合攪拌し、埋戻し材を製造する埋戻し材製造装置であって、
前記大径粒状物と前記小径粒状物を搬送する搬送領域と、
前記大径粒状物と前記小径粒状物を混合攪拌しつつ搬送する混合攪拌領域と、を有するスクリューフィーダを備えることを特徴とする埋戻し材製造装置。
A backfilling material manufacturing apparatus for manufacturing backfilling material by conveying and mixing large-diameter granular materials and small-diameter granular materials, comprising:
a conveying region for conveying the large-diameter granular material and the small-diameter granular material;
a mixing and stirring region for mixing and stirring the large-diameter granules and the small-diameter granules while transporting them,
請求項7に記載の埋戻し材製造装置において、
前記混合攪拌領域が、前記スクリューフィーダの排出口側に配置されていることを特徴とする埋戻し材製造装置。
The backfilling material manufacturing apparatus according to claim 7,
The backfilling material manufacturing apparatus is characterized in that the mixing and stirring area is disposed on the discharge outlet side of the screw feeder.
請求項7に記載の埋戻し材製造装置において、
前記混合攪拌領域が、前記スクリューフィーダの供給口側に配置されていることを特徴とする埋戻し材製造装置。
The backfilling material manufacturing apparatus according to claim 7,
The backfilling material manufacturing apparatus is characterized in that the mixing and stirring area is disposed on the supply port side of the screw feeder.
請求項7から9のいずれか1項に記載の埋戻し材製造装置において、
前記スクリューフィーダの供給口に、前記大径粒状物を収容する収容部と前記小径粒状物を収容する収容部とを備えるホッパーが、開閉ゲートを介して設置されていることを特徴とする埋戻し材製造装置。
The backfilling material manufacturing apparatus according to any one of claims 7 to 9,
A backfill material manufacturing apparatus characterized in that a hopper having a storage section for storing the large-diameter granular material and a storage section for storing the small-diameter granular material is installed at the supply port of the screw feeder via an opening and closing gate.
地盤中の空洞部を埋戻し材で充填する空洞部の埋戻し装置であって、
請求項7から10のいずれか1項に記載の埋戻し材製造装置と、
前記空洞部内に充填した前記埋戻し材の密度を評価する評価手段と、
を備えることを特徴とする埋戻し装置。
A backfilling device for a cavity in the ground that fills the cavity with a backfilling material,
The backfilling material manufacturing apparatus according to any one of claims 7 to 10,
An evaluation means for evaluating the density of the backfilling material filled in the cavity;
A backfilling device comprising:
JP2021167408A 2021-10-12 2021-10-12 Backfilling material manufacturing method, cavity backfilling method, backfilling material manufacturing device, and backfilling device Active JP7643289B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021167408A JP7643289B2 (en) 2021-10-12 2021-10-12 Backfilling material manufacturing method, cavity backfilling method, backfilling material manufacturing device, and backfilling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021167408A JP7643289B2 (en) 2021-10-12 2021-10-12 Backfilling material manufacturing method, cavity backfilling method, backfilling material manufacturing device, and backfilling device

Publications (2)

Publication Number Publication Date
JP2023057747A JP2023057747A (en) 2023-04-24
JP7643289B2 true JP7643289B2 (en) 2025-03-11

Family

ID=86054624

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021167408A Active JP7643289B2 (en) 2021-10-12 2021-10-12 Backfilling material manufacturing method, cavity backfilling method, backfilling material manufacturing device, and backfilling device

Country Status (1)

Country Link
JP (1) JP7643289B2 (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004000839A (en) 2002-05-31 2004-01-08 Lion Engineering Co Ltd Particulate mixing apparatus
JP2004156275A (en) 2002-11-06 2004-06-03 Penta Ocean Constr Co Ltd Lightweight soil treatment method and apparatus
US20070017673A1 (en) 2005-07-22 2007-01-25 Schlumberger Technology Corporation Determining and Tracking Downhole Particulate Deposition
JP2009293306A (en) 2008-06-06 2009-12-17 Hitachi Constr Mach Co Ltd Soil improvement machine
JP2015098699A (en) 2013-11-19 2015-05-28 徳倉建設株式会社 Delay curing type fluidized soil and filling method of underground cavity
JP2016185668A (en) 2015-03-27 2016-10-27 株式会社日本製鋼所 Multi-axis kneader
JP2019152018A (en) 2018-03-02 2019-09-12 株式会社チダエンジニアリング Pipe mixer and method for producing and supplying mixture using the same
JP2020151696A (en) 2019-03-22 2020-09-24 Ac‐Labo株式会社 Construction sludge recycling treatment and sludge recycling treatment system using waste gypsum powder

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004000839A (en) 2002-05-31 2004-01-08 Lion Engineering Co Ltd Particulate mixing apparatus
JP2004156275A (en) 2002-11-06 2004-06-03 Penta Ocean Constr Co Ltd Lightweight soil treatment method and apparatus
US20070017673A1 (en) 2005-07-22 2007-01-25 Schlumberger Technology Corporation Determining and Tracking Downhole Particulate Deposition
JP2009293306A (en) 2008-06-06 2009-12-17 Hitachi Constr Mach Co Ltd Soil improvement machine
JP2015098699A (en) 2013-11-19 2015-05-28 徳倉建設株式会社 Delay curing type fluidized soil and filling method of underground cavity
JP2016185668A (en) 2015-03-27 2016-10-27 株式会社日本製鋼所 Multi-axis kneader
JP2019152018A (en) 2018-03-02 2019-09-12 株式会社チダエンジニアリング Pipe mixer and method for producing and supplying mixture using the same
JP2020151696A (en) 2019-03-22 2020-09-24 Ac‐Labo株式会社 Construction sludge recycling treatment and sludge recycling treatment system using waste gypsum powder

Also Published As

Publication number Publication date
JP2023057747A (en) 2023-04-24

Similar Documents

Publication Publication Date Title
Müller et al. Implementation of the full-scale emplacement (FE) experiment at the Mont Terri rock laboratory
KR102122387B1 (en) Improved soil manufacturing management system using rotary shredding mixing device
Mori Advancing understanding of the relationship between soil conditioning and earth pressure balance tunnel boring machine chamber and shield annulus behavior
CA2827111C (en) Submerged void filling
JP7643289B2 (en) Backfilling material manufacturing method, cavity backfilling method, backfilling material manufacturing device, and backfilling device
JP6560688B2 (en) Batch soil improvement
JP7643288B2 (en) Backfilling material manufacturing method, cavity backfilling method, backfilling material manufacturing device, and backfilling device
Dixon et al. Backfilling of deposition tunnels: Use of bentonite pellets
JP7430103B2 (en) Ground improvement method for pile extraction holes
CN107326765A (en) Handle segregated frozen ground ground lime pile and its construction method
JP4608357B2 (en) Processing material supply management method and management apparatus in medium digging excavation method
JP2002180453A (en) Mixing rate confirming method for land forming body material in soil improvement construction method
Marjavaara et al. Filling the gap between buffer and rock in the deposition hole
Masuda et al. Buffer construction technique using granular bentonite
Viyanant et al. Compaction control of crushed concrete and recycled asphalt pavement using nuclear gauge
Wimelius et al. Backfilling of KBS-3V deposition tunnels-possibilities and limitations
JP4422853B2 (en) Homogeneous improved soil manufacturing method, homogeneous improved soil and civil engineering construction method using the same
Azad Soula et al. Three-Dimensional Physical Modelling of Surface Settlement Induced by EPB-TBM Excavation in Soft Soils
JP2007162403A (en) Invert subgrade construction method
KR102877385B1 (en) SRCM Plant Systems
KR101963199B1 (en) Manufacturing device of controlled low strength flowable material and placing method using the same
KR102913541B1 (en) Backfilling device for disposal tunnel for deep disposal of spent nuclear fuel and backfilling method using the same
Sidiq et al. DETERMINATION OF DISPOSAL MATERIAL DENSITY IN OPEN-PIT COAL MINE DISPOSAL AREA
Keto et al. Backfilling of deposition tunnels, in situ alternative
JP2000104243A (en) Self-propelled soil improvement machine

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240919

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250128

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250129

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250210

R150 Certificate of patent or registration of utility model

Ref document number: 7643289

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150