Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7645105B2 - Hoop material connection device - Google Patents
[go: Go Back, main page]

JP7645105B2 - Hoop material connection device - Google Patents

Hoop material connection device Download PDF

Info

Publication number
JP7645105B2
JP7645105B2 JP2021041770A JP2021041770A JP7645105B2 JP 7645105 B2 JP7645105 B2 JP 7645105B2 JP 2021041770 A JP2021041770 A JP 2021041770A JP 2021041770 A JP2021041770 A JP 2021041770A JP 7645105 B2 JP7645105 B2 JP 7645105B2
Authority
JP
Japan
Prior art keywords
hoop material
rear end
conveying
section
hoop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021041770A
Other languages
Japanese (ja)
Other versions
JP2022141455A (en
Inventor
啓介 小林
興元 ▲ヒョウ▼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MITOMO SEMICON ENGINEERING CO., LTD.
Original Assignee
MITOMO SEMICON ENGINEERING CO., LTD.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MITOMO SEMICON ENGINEERING CO., LTD. filed Critical MITOMO SEMICON ENGINEERING CO., LTD.
Priority to JP2021041770A priority Critical patent/JP7645105B2/en
Publication of JP2022141455A publication Critical patent/JP2022141455A/en
Application granted granted Critical
Publication of JP7645105B2 publication Critical patent/JP7645105B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Replacement Of Web Rolls (AREA)

Description

本発明は、先行するフープ材の後端部と、後続のフープ材の先端部とを接続するフープ材接続装置に関するものである。 The present invention relates to a hoop material connection device that connects the rear end of a preceding hoop material to the front end of a following hoop material.

特許文献1には、加工中の第1フープ材の終端部と、次に供給する第2フープ材の始端部とを接続するフープ材接続装置が開示されている。このフープ材接続装置は、ピン材が連結するフープ材の終端部に、離脱防止凹部を有する係合形状の終端接続部を形成すると共に、終端接続部と結合できる形状の始端接続部を第2フープ材の始端部に形成し、これらの始端接続部及び終端接続部を結合させることで、第1フープ材と第2フープ材とを接続している。 Patent Document 1 discloses a hoop material connecting device that connects the end of a first hoop material being processed to the start of a second hoop material to be supplied next. This hoop material connecting device forms an engaging end connection part with a recess to prevent separation at the end of the hoop material to which the pin material is connected, and forms a start end connection part at the start end of the second hoop material that is shaped to be connected to the end connection part, and connects the first hoop material to the second hoop material by joining the start end connection part and the end connection part.

特開平4-173514号公報Japanese Unexamined Patent Publication No. 4-173514

特許文献1のフープ材接続装置のフープ材の供給先である圧入機は、第1フープ材の終端部と次に供給される第2フープ材の始端部とを接続する接続処理時には動作が停止する。 The press-fitting machine, which is the destination of the hoop material for the hoop material connection device of Patent Document 1, stops operating during the connection process that connects the end of the first hoop material to the start of the second hoop material that is to be supplied next.

しかし、フープ材接続装置のフープ材の供給先の装置は、必ずしも上述の圧入機のようにフープ材の搬送を停止可能な装置とは限らず、フープ材に並列に付設する電気部品に対してメッキ処理を行うメッキ処理装置であることもある。フープ材の供給先がメッキ処理装置の場合には、メッキ処理時のメッキの膜厚のばらつき防止のために、フープ材の搬送を停止することができないので、特許文献1のフープ材接続装置では、その供給先としてメッキ処理装置を設置することができない。 However, the device to which the hoop material is supplied by the hoop material connection device is not necessarily a device that can stop the transport of the hoop material like the above-mentioned press-fitting machine, and may be a plating processing device that performs plating processing on electrical components that are attached in parallel to the hoop material. When the hoop material is supplied to a plating processing device, the transport of the hoop material cannot be stopped to prevent variation in the plating thickness during the plating process, so the hoop material connection device of Patent Document 1 cannot have a plating processing device installed as its supply destination.

また、不具合が発生し、リール体からフープ材をカッタ等により切断し、切断後の端部に始端接続部のないフープ材については、特許文献1のフープ材接続装置では、第1フープ材と第2フープ材とを接続することができないという問題もある。 In addition, when a malfunction occurs and the hoop material is cut from the reel body with a cutter or the like, there is a problem in that the hoop material connecting device of Patent Document 1 cannot connect the first hoop material to the second hoop material when the cut end does not have a start end connection portion.

本発明の目的は、上述の課題を解決し、フープ材の供給先装置の搬送速度を変えることなく、先行するフープ材の後端部と後続のフープ材の先端部とを接続可能なフープ材接続装置を提供することにある。 The object of the present invention is to solve the above-mentioned problems and provide a hoop material connecting device that can connect the rear end of a preceding hoop material to the front end of a following hoop material without changing the conveying speed of the hoop material supply destination device.

上記目的を達成するための本発明に係るフープ材接続装置は、第1のリール体から搬出されて先行する第1のフープ材の後端部と、第2のリール体から搬出される後続の第2のフープ材の先端部とを溶着により接続し、接続したフープ材を搬送するフープ材接続装置において、前記後端部を検出する検出部と、前記検出部により前記後端部を検出した際に、前記後端部近傍を挟持して固定すると供に、固定された前記後端部の位置調整を行う保持部と、前記検出部による前記後端部の検出により、前記検出部の検出位置に移動して、前記第1のリール体から交換された前記第2のリール体の前記第2のフープ材の前記先端部と、前記保持部により固定された前記後端部を側方から撮影する撮影部と、該撮影部の撮影位置に移動して、前記後端部及び前記先端部を溶着する溶着部と、前記フープ材を搬送する第1、第2の搬送部と、前記第2の搬送部及び前記フープ材の供給先装置間に配置され、搬送方向と逆方向に摺動する摺動部と、前記第1、第2の搬送部間に配置され、前記第1のフープ材を撓ませた撓み部とを備え、前記第1、第2の搬送部は、それぞれ独立して前記フープ材の搬送速度を制御可能であり、前記第1の搬送部のみが前記第1のフープ材を搬送する方向と逆方向に搬送可能であり、前記検出部により前記後端部を検出した際に、前記第1、第2の搬送部による前記第1のフープ材の搬送を停止させ、前記第2の搬送部による搬送が停止した前記供給先装置側の前記第1のフープ材に対して、前記摺動部を逆方向に摺動させることで、前記供給先装置への搬送速度を維持すると共に、前記撮影部の画像に基づいて、前記保持部による前記第1のフープ材の前後上下の移動及び傾きの回転を行う処理、及び前記第1の搬送部のみによる前後の搬送制御処理によって前記先端部に対して前記後端部の位置合わせを行った後に、前記溶着部によって前記先端部及び前記後端部を溶着することを特徴とする。 In order to achieve the above object, the present invention provides a hoop material connecting device which connects by welding a rear end of a leading first hoop material discharged from a first reel body to a front end of a trailing second hoop material discharged from a second reel body, and transports the connected hoop material, the hoop material connecting device comprising: a detection unit which detects the rear end; a holding unit which, when the detection unit detects the rear end, clamps and fixes the vicinity of the rear end and adjusts the position of the fixed rear end; a photographing section which moves to a detection position of the photographing section upon detection of the rear end by the detection section and photographs from the side the front end of the second hoop material of the second reel body replaced from the first reel body and the rear end fixed by the holding section; a welding section which moves to a photographing position of the photographing section and welds the rear end and the front end ; first and second conveying sections which convey the hoop material; and a welding section which is disposed between the second conveying section and a supply destination device of the hoop material and which is arranged in a direction opposite to the conveying direction. and a bending portion disposed between the first and second conveying portions and bending the first hoop material. The first and second conveying portions are each capable of independently controlling the conveying speed of the hoop material, and only the first conveying portion is capable of conveying the first hoop material in a direction opposite to the direction in which it is conveyed. When the detection portion detects the rear end, the conveying of the first hoop material by the first and second conveying portions is stopped, and the sliding portion is caused to slide in the opposite direction relative to the first hoop material on the destination device side where conveying by the second conveying portion has stopped, thereby maintaining the conveying speed to the destination device. The conveying device is also characterized in that the conveying portion includes a process of moving the first hoop material forward, backward, up and down and rotating its inclination based on an image from the photographing portion, and a process of controlling forward and backward conveying only by the first conveying portion to align the rear end with respect to the front end, and then welding the front end and the rear end by the welding portion.

本発明に係るフープ材接続装置によれば、フープ材の供給先装置の搬送速度を変えることなく、先行する第1のフープ材の後端部と、後続の第2のフープ材の先端部とを接続させて1本化することが可能である。また、途中で後続のフープ材をカッタ等により切断した場合であっても、先行するフープ材に接続が可能であり、寸法の異なるフープ材同士を接続させることもできる。 The hoop material connecting device of the present invention makes it possible to connect the rear end of a leading first hoop material to the front end of a trailing second hoop material to form a single hoop without changing the conveying speed of the hoop material supply destination device. Even if the trailing hoop material is cut midway with a cutter or the like, it can still be connected to the leading hoop material, and hoop materials of different dimensions can also be connected together.

上方から見たフープ材接続装置の配置図である。FIG. 2 is a layout diagram of the hoop material connection device as seen from above. 側方から見たフープ材接続装置の配置図である。FIG. 2 is a diagram showing the layout of the hoop material connection device as seen from the side. 第1のフープ材の後端部と、後続の第2のフープ材の先端部とを接着する際のフローチャート図である。FIG. 13 is a flow chart showing the process of bonding the rear end of a first hoop material to the front end of a subsequent second hoop material. フープ材接続処理の第1段階のフープ材接続装置の説明図である。FIG. 2 is an explanatory diagram of a hoop material connecting device in the first stage of a hoop material connecting process. フープ材接続処理の第2段階のフープ材接続装置の説明図である。FIG. 13 is an explanatory diagram of the hoop material connecting device in the second stage of the hoop material connecting process. フープ材接続処理の第3段階のフープ材接続装置の説明図である。FIG. 11 is an explanatory diagram of the hoop material connecting device in the third stage of the hoop material connecting process. フープ材の接続を完了した際のフープ材接続装置の説明図である。FIG. 10 is an explanatory diagram of the hoop material connecting device when the connection of the hoop material is completed.

図1は上方から見たフープ材接続装置1の配置図であり、図2は側方から見た配置図である。フープ材接続装置1は、リール体交換装置2から搬出されたテープ状のフープ材Fを、メッキ処理装置3に搬送する装置である。このフープ材Fは、幅5mm程度のテープ材であり、上端に1mm程度の電気部品、例えば小型通信機器で使用される接続端子が連続して並列に付設されている。数100mの長さのフープ材Fが円盤状のリール体Rに巻回され、複数のリール体Rがリール体交換装置2に装填されている。 Figure 1 is a layout diagram of the hoop material connection device 1 as seen from above, and Figure 2 is a layout diagram as seen from the side. The hoop material connection device 1 is a device that transports tape-shaped hoop material F discharged from the reel body exchange device 2 to the plating processing device 3. This hoop material F is a tape material with a width of about 5 mm, and electrical components of about 1 mm, such as connection terminals used in small communication devices, are continuously attached in parallel to the upper end. Hoop material F with a length of several hundred meters is wound around a disk-shaped reel body R, and multiple reel bodies R are loaded into the reel body exchange device 2.

これらの複数のリール体Rは、上下に重ねられてリール体交換装置2に装填されており、フープ材接続装置1に対して、第1のリール体R1から第1のフープ材F1が繰り出されている。図1、図2ではメッキ処理装置3に向かう方向を、フープ材F1を搬送する搬送方向Dとして図示している。 These multiple reel bodies R are stacked one on top of the other and loaded into the reel body exchange device 2, and the first hoop material F1 is unwound from the first reel body R1 to the hoop material connection device 1. In Figures 1 and 2, the direction toward the plating processing device 3 is illustrated as the transport direction D in which the hoop material F1 is transported.

第1のフープ材F1の搬出が完了すると、第1のリール体R1が装填されている位置に、上方にセットされた第2のリール体R2が図示しないモータの駆動により移動する。装填された第2のリール体R2から第2のフープ材F2の先端部Sが前方に予め引き出され、この先端部Sが固定部2aにより固定された状態で、下方に移動される。 When the unloading of the first hoop material F1 is completed, the second reel body R2 set above moves to the position where the first reel body R1 is loaded by the drive of a motor (not shown). The tip S of the second hoop material F2 is pulled out in advance forward from the loaded second reel body R2, and is moved downward with this tip S fixed by the fixing part 2a.

フープ材Fが巻回されているリール体Rは、図2に示すように複数段、例えば3段に設置され、最上段のリール体Rに交換後は、下側に新たに装填されたリール体Rが上昇移動を開始する。このように、リール体交換装置2では定期的に新たに装填されたリール体Rが上昇、下降を繰り返すことで、空になったリール体Rからフープ材Fが巻回されているリール体Rに交換することが可能である。 The reel bodies R on which the hoop material F is wound are installed in multiple tiers, for example three tiers, as shown in FIG. 2, and after replacing the reel body R on the top tier, the newly loaded reel body R on the bottom starts to move upward. In this way, the reel body replacement device 2 periodically repeats the upward and downward movement of the newly loaded reel body R, making it possible to replace an empty reel body R with a reel body R on which the hoop material F is wound.

フープ材接続装置1は、搬送している第1のフープ材F1の後端部Eを検出する検出部1aと、このフープ材F1の後端部Eの近傍部分を挟持して固定する保持部1bと、フープ材F1を所定の速度で、例えば30m/分でメッキ処理装置3側に搬送する第1の搬送部1c及び第2の搬送部1dから成る搬送部と、搬送方向Dに対する前後方向、図1、図2においては、左右方向に摺動可能な摺動部1eとを備えている。 The hoop material connection device 1 is equipped with a detection unit 1a that detects the rear end E of the first hoop material F1 being transported, a holding unit 1b that clamps and fixes the portion near the rear end E of the hoop material F1, a transport unit consisting of a first transport unit 1c and a second transport unit 1d that transport the hoop material F1 to the plating processing device 3 at a predetermined speed, for example 30 m/min, and a sliding unit 1e that can slide in the front-rear direction relative to the transport direction D, and in the left-right direction in Figures 1 and 2.

検出部1aの搬送方向Dの下流近傍には、保持部1bが設置され、この保持部1bの更に下流側に、第1の搬送部1c、第2の搬送部1d、摺動部1eの順に配置されている。 The holding unit 1b is installed near the downstream side of the detection unit 1a in the transport direction D, and further downstream of this holding unit 1b, the first transport unit 1c, the second transport unit 1d, and the sliding unit 1e are arranged in this order.

検出部1aは例えば送光部1fと受光部1gとから構成され、フープ材F1の搬送時にはフープ材F1により遮光され、送光部1fからの光を受光部1gが受光することがない。従って、検出部1aは受光部1gが受光しない場合には、フープ材F1の後端部Eを検出していないと判定し、受光部1gが送光部1fからの光を受光した場合には、フープ材F1の後端部Eを検出したと判定する。 The detection unit 1a is composed of, for example, a light transmitting unit 1f and a light receiving unit 1g, and when the hoop material F1 is being transported, the light is blocked by the hoop material F1, and the light receiving unit 1g does not receive the light from the light transmitting unit 1f. Therefore, when the light receiving unit 1g does not receive light, the detection unit 1a determines that it has not detected the rear end E of the hoop material F1, and when the light receiving unit 1g receives light from the light transmitting unit 1f, it determines that it has detected the rear end E of the hoop material F1.

保持部1bには、フープ材F1を挟持して固定する固定機構の他に、固定したフープ材F1に対して前後上下に移動させると共に、搬送方向Dに対して傾くように回転させる位置調整機構も備えている。この位置調整機構は、例えば複数の小型モータ等の駆動制御により作動し、固定したフープ材F1の後端部Eを任意の位置に微調整することが可能である。 In addition to the fixing mechanism that clamps and fixes the hoop material F1, the holding section 1b also has a position adjustment mechanism that moves the fixed hoop material F1 back and forth and up and down, and rotates it so that it is tilted relative to the conveying direction D. This position adjustment mechanism is operated by the drive control of, for example, multiple small motors, etc., and can finely adjust the rear end E of the fixed hoop material F1 to any position.

第1、第2の搬送部1c、1dは、それぞれ一対のローラ体から構成され、これらのローラ体がフープ材F1を挟持して、ローラ体の軸部に連結するモータ部1hの駆動によって、フープ材F1が搬送方向Dに搬送される。また、これらの第1、第2の搬送部1c、1dは、それぞれ独立してフープ材F1の搬送速度を制御可能であり、第1の搬送部1cは、ローラ体を反対方向に回転させる、つまりフープ材F1を搬送方向Dの逆方向に移動させることもできる。保持部1bによるフープ材F1の位置調整に応じて、第1の搬送部1cのモータ部1hによって前後の搬送制御が行われる。 The first and second conveying units 1c and 1d each consist of a pair of roller bodies, which clamp the hoop material F1 and convey it in the conveying direction D by driving a motor unit 1h connected to the axle of the roller bodies. The first and second conveying units 1c and 1d can each independently control the conveying speed of the hoop material F1, and the first conveying unit 1c can also rotate the roller bodies in the opposite direction, i.e., move the hoop material F1 in the opposite direction to the conveying direction D. The motor unit 1h of the first conveying unit 1c controls the forward and backward conveying in accordance with the position adjustment of the hoop material F1 by the holding unit 1b.

第2の搬送部1dの下流側には、フープ材F1を周回した状態で、前後方向、つまり搬送方向D及び搬送方向Dの逆方向に摺動可能な2個の摺動部1eが配置されている。フープ材F1は2個の固定ドラム部1iと2個の摺動部1eとに交互に周回されている。このように配置することで、空間を効率的に利用することが可能であり、設置個所のスペースに応じて、摺動部1eを1個のみ又は3個以上配置するようにしてもよい。 Two sliding parts 1e are arranged downstream of the second conveying part 1d, which can slide in the forward and backward directions, that is, in the conveying direction D and the direction opposite to the conveying direction D, while wrapping around the hoop material F1. The hoop material F1 is wrapped around the two fixed drum parts 1i and the two sliding parts 1e alternately. This arrangement makes it possible to use space efficiently, and depending on the space available at the installation location, only one sliding part 1e or three or more sliding parts 1e may be arranged.

フープ材接続装置1の後続方向にはメッキ処理装置3が配置されており、フープ材接続装置1から搬送されるフープ材F1に付された電気部品に対して、メッキ槽を通過させることでメッキ処理を施す。メッキ処理装置3はメッキ処理時のメッキの膜厚のばらつき防止のために、図示しない搬送部により定速度でフープ材F1を搬送し続ける必要がある。 The plating processing device 3 is located downstream of the hoop material connection device 1, and the electrical components attached to the hoop material F1 transported from the hoop material connection device 1 are plated by passing them through a plating tank. The plating processing device 3 needs to keep transporting the hoop material F1 at a constant speed using a transport unit (not shown) to prevent variations in the plating thickness during the plating process.

図2に示すように検出部1aの直下には、フープ材F1を搬送方向Dに対して側方から撮影する撮影部1jと、この撮影部1jの直下であって、重ねられたフープ材Fを両側から挟み込むようにして、例えば超音波によって溶着する溶着部1kとが配置されている。 As shown in FIG. 2, directly below the detection unit 1a is an imaging unit 1j that images the hoop material F1 from the side relative to the conveying direction D, and directly below this imaging unit 1j is a welding unit 1k that clamps the stacked hoop material F from both sides and welds it, for example, by ultrasonic waves.

これらの検出部1a、撮影部1j及び溶着部1kは、上下方向に対して適宜に任意の順序で配置してもよく、これらの各部は制御部1lによって上下方向に移動することで、フープ材F1の側方に位置するように制御されている。制御部1lには演算処理部が内蔵されており、フープ材接続装置1の各部の各種制御を、制御線等を介して行っている。 The detection unit 1a, the photographing unit 1j, and the welding unit 1k may be arranged in any order in the vertical direction, and each of these units is controlled by the control unit 1l to move in the vertical direction so as to be positioned to the side of the hoop material F1. The control unit 1l has a built-in calculation processing unit, and performs various controls of each unit of the hoop material connection device 1 via control lines, etc.

第1の搬送部1c及び第2の搬送部1dとの間には、フープ材F1を周回する一対の固定ドラム部1iが配置され、この一対の固定ドラム部1i間にはフープ材F1を撓ませた撓み部F0が配置されている。この撓み部F0は、第1の搬送部1c及び第2の搬送部1dの速度制御により、一定の撓み状態で所定の長さが維持されている。 A pair of fixed drum parts 1i that rotate around the hoop material F1 are disposed between the first conveying part 1c and the second conveying part 1d, and a deflection part F0 in which the hoop material F1 is deflected is disposed between the pair of fixed drum parts 1i. The deflection part F0 is maintained at a certain length in a constant deflection state by controlling the speed of the first conveying part 1c and the second conveying part 1d.

図3は先行する第1のフープ材F1の後端部Eと、後続の第2のフープ材F2の先端部Sとを接着する場合の制御部1lの処理を示すフローチャート図である。図1、図2に示す第1のリール体R1から第1のフープ材F1の繰り出しが完了すると、フロー処理が開始される。ステップST1では、制御部1lにおいて検出部1aから第1のフープ材F1の後端部Eの検出信号の入力を確認する。この検出信号の入力に基づいて、ステップST2に移行する。 Figure 3 is a flow chart showing the processing of the control unit 1l when gluing the rear end E of the preceding first hoop material F1 to the tip end S of the following second hoop material F2. When the unwinding of the first hoop material F1 from the first reel body R1 shown in Figures 1 and 2 is completed, the flow processing starts. In step ST1, the control unit 1l checks the input of a detection signal of the rear end E of the first hoop material F1 from the detection unit 1a. Based on the input of this detection signal, the process proceeds to step ST2.

ステップST2では、図4に示す第1段階の途中経過のように、検出部1aにより後端部Eを検出すると同時に、第1のフープ材F1の後端部Eの近傍の第1のフープ材F1を保持部1bにより挟持して固定する。保持部1bにより第1のフープ材F1を固定すると同時に、モータ部1hを停止させて、第1のフープ材F1の第1、第2の搬送部1c、1dによる搬送を停止させる。 In step ST2, as shown in the intermediate progress of the first stage in FIG. 4, the rear end E is detected by the detection unit 1a, and at the same time, the first hoop material F1 near the rear end E of the first hoop material F1 is clamped and fixed by the holding unit 1b. At the same time that the first hoop material F1 is fixed by the holding unit 1b, the motor unit 1h is stopped, and the transportation of the first hoop material F1 by the first and second transport units 1c and 1d is stopped.

続いて、ステップST3に移行し摺動部1eを摺動させる。メッキ処理装置3に設けた図示しない搬送部により、フープ材F1の搬送速度を変えることなく、一定速度でフープ材F1を搬送させるために、2個の摺動部1eは搬送方向Dの逆方向に所定速度で移動を開始する。このように、摺動部1eの摺動速度を制御することで、メッキ処理装置3の搬送部の搬送速度を維持した状態で、メッキ処理装置3にフープ材F1の供給を継続することができる。 Next, proceed to step ST3 and slide the sliding part 1e. In order to transport the hoop material F1 at a constant speed without changing the transport speed of the hoop material F1 by a transport part (not shown) provided in the plating processing device 3, the two sliding parts 1e start moving at a predetermined speed in the opposite direction to the transport direction D. In this way, by controlling the sliding speed of the sliding parts 1e, it is possible to continue supplying the hoop material F1 to the plating processing device 3 while maintaining the transport speed of the transport part of the plating processing device 3.

ステップST4では、検出部1aによる第1のフープ材F1の後端部Eの検出に基づいて、制御部1lはリール体交換装置2に対して、第1のリール体R1から第2のリール体R2に交換させる制御信号を出力する。 In step ST4, based on detection of the rear end E of the first hoop material F1 by the detection unit 1a, the control unit 1l outputs a control signal to the reel body replacement device 2 to replace the first reel body R1 with the second reel body R2.

この制御信号に基づくリール体交換装置2の交換処理は、第2のフープ材F2の先端部Sが予め引き出された第2のリール体R2を、第1のリール体R1が配置された位置に下降移動することで完了する。これらのリール体Rの交換に併せて、フープ材接続装置1では、フープ材F1を搬送方向Dの側方から撮影可能な位置まで、撮影部1jを検出部1aの場所に上昇移動させる。 The replacement process of the reel body replacement device 2 based on this control signal is completed by lowering the second reel body R2, from which the tip portion S of the second hoop material F2 has been pulled out in advance, to the position where the first reel body R1 is located. In conjunction with the replacement of these reel bodies R, the hoop material connection device 1 moves the photographing unit 1j upward to the location of the detection unit 1a until the hoop material F1 can be photographed from the side in the transport direction D.

ステップST4において、第2のリール体R2に交換した後に、ステップST5では、図5に示す第2段階の途中経過のように、検出部1aの検出位置に上昇移動した撮影部1jによって側方から撮影された画像に基づいて、画像内の第2のフープ材F2の先端部Sに対して、第1のフープ材F1の後端部Eの位置調整を、保持部1bの位置調整機構を用いて行う。 After replacing with the second reel body R2 in step ST4, in step ST5, as shown in the intermediate progress of the second stage in FIG. 5, based on an image taken from the side by the photographing unit 1j that has been raised to the detection position of the detecting unit 1a, the position of the rear end E of the first hoop material F1 is adjusted relative to the tip end S of the second hoop material F2 in the image using the position adjustment mechanism of the holding unit 1b.

この位置調整では、撮影部1jの第2のフープ材F2の先端部Sを画像処理により認識し、先端部Sに対して第1のフープ材F1の後端部Eが平行に重なるように、保持部1bによる第1のフープ材F1の前後上下の移動及び傾きの回転を行う処理、及び第1の搬送部1cとモータ部1hとによる前後の微小距離の搬送制御処理によって、後端部Eの位置調整を行う。なお、第1の搬送部1cのモータ部1hが逆回転をしても、撓み部F0が存在するため、第1のフープ材F1が搬送方向Dの逆方向に引っ張られて切断や破損されることはない。 In this position adjustment, the tip S of the second hoop material F2 of the photographing unit 1j is recognized by image processing, and the position of the rear end E of the first hoop material F1 is adjusted by a process of moving the first hoop material F1 forward, backward, up and down and rotating the tilt by the holding unit 1b, and a process of transport control of a small distance forward and backward by the first transport unit 1c and motor unit 1h so that the rear end E is overlapped parallel to the tip S. Note that even if the motor unit 1h of the first transport unit 1c rotates in the reverse direction, the presence of the flexure F0 prevents the first hoop material F1 from being pulled in the opposite direction to the transport direction D and being cut or damaged.

このようにして、第2のフープ材F2の先端部S対して、第1のフープ材F1の後端部Eが、直線状に重なるように位置合わせが完了した後に、ステップST6に移行する。 In this way, once the rear end E of the first hoop material F1 has been aligned so that it is linearly overlapping the front end S of the second hoop material F2, the process moves to step ST6.

ステップST6では、図6に示す第3段階の途中経過のように、溶着部1kを撮影部1jの撮影位置まで上昇移動させた後に、直線状に重なるように配置されている後端部E及び先端部Sに対して、接続箇所である接続部の位置ずれが発生しないように、確実に固定した後に、超音波を用いて側方から挟むようにして溶着接続する。この超音波による溶着は、フープ材F1の幅の数分の1程度、例えば10mmの幅のフープ材F1に対して3mm程度の幅で溶着すれば十分である。 In step ST6, as shown in the middle of the third stage in Figure 6, the welded portion 1k is moved upward to the photographing position of the photographing portion 1j, and then the rear end portion E and the front end portion S, which are arranged so as to overlap in a straight line, are securely fixed to prevent misalignment of the connection portion, which is the connection point, and then ultrasonically welded and connected by clamping from the side. This ultrasonic welding is sufficient if it is about a fraction of the width of the hoop material F1, for example, about 3 mm for a hoop material F1 with a width of 10 mm.

このように、溶着部1kはフープ材Fの幅に対して数分の1程度の狭い幅のピンポイントで溶着するので、例えば第1のフープ材F1と第2のフープ材F2とが異なる電気部品のフープ材Fであり、フープ材Fの幅が異なっていても、両フープ材Fを直線状に重なるように配置させることで、フープ材Fを接続させることが可能である。 In this way, the welded portion 1k is welded at a pinpoint with a narrow width of about a fraction of the width of the hoop material F. Therefore, even if the first hoop material F1 and the second hoop material F2 are hoop materials F for different electrical components and the widths of the hoop materials F are different, it is possible to connect the hoop materials F by arranging the two hoop materials F so that they overlap in a straight line.

後端部Eと先端部Sとの溶着後にステップST7に移行し、ステップST7では、保持部1bによるフープ材F1の固定を解除する。そして、モータ部1hを駆動させて、第1、第2の搬送部1c、1dにより、接続したフープ材Fの搬送を開始する。 After the rear end E and the front end S are welded together, the process proceeds to step ST7, where the holding unit 1b releases the hoop material F1 from its fixed position. Then, the motor unit 1h is driven to start the transport of the connected hoop material F by the first and second transport units 1c and 1d.

同時に、2個の摺動部1eの搬送方向Dへの摺動を開始する。摺動部1eをステップST3以前の位置に戻すために、設定された通常時の搬送速度よりも速い搬送速度で、フープ材Fを第1、第2の搬送部1c、1dにより搬送させる。 At the same time, the two sliding parts 1e start to slide in the conveying direction D. In order to return the sliding parts 1e to the position before step ST3, the hoop material F is conveyed by the first and second conveying parts 1c and 1d at a conveying speed faster than the set normal conveying speed.

最後にステップST8では、図7に示すフープ材Fの接続が完了した際のように、摺動部1eを図1に示すステップST3以前の位置に移動させると同時に、第1、第2の搬送部1c、1dによって通常時の搬送速度でフープ材Fを搬送させる。また、第1の搬送部1cについては、より速い搬送速度から通常時の搬送速度に戻すタイミングをずらすことで、撓み部F0について第1のフープ材F1の後端部Eの位置調整する前の撓み状態の長さまで調整する。また、溶着後にフープ材Fから離間した溶着部1kを下降移動させて、第2のフープ材F2の側方に、送光部1fと受光部1gが位置するまで検出部1aが移動してから、検出部1aを起動させる。このようにして、図3に示すフロー処理が完了し、図1、図2の状態に戻ることになる。このフロー処理は、リール体Rからフープ材Fの繰り出しが完了する度に、繰り返される。 Finally, in step ST8, as shown in FIG. 7 when the connection of the hoop material F is completed, the sliding part 1e is moved to the position before step ST3 shown in FIG. 1, and the first and second conveying parts 1c and 1d are simultaneously conveyed at the normal conveying speed. In addition, the timing of returning the faster conveying speed to the normal conveying speed of the first conveying part 1c is shifted to adjust the length of the bent part F0 to the bent state before adjusting the position of the rear end part E of the first hoop material F1. In addition, the welding part 1k separated from the hoop material F after welding is moved downward, and the detection part 1a moves until the light sending part 1f and the light receiving part 1g are located to the side of the second hoop material F2, and then the detection part 1a is activated. In this way, the flow process shown in FIG. 3 is completed, and the state of FIG. 1 and FIG. 2 is returned to. This flow process is repeated every time the payout of the hoop material F from the reel body R is completed.

このようにして、フープ材接続装置1を用いることで、メッキ処理装置3等の供給先装置の搬送速度を変えることなく、先行する第1のフープ材F1の後端部Eと、後続の第2のフープ材F2の先端部Sとを接続させて1本化することが可能である。また、途中で後続の第2のフープ材F2をカッタ等により切断した場合であっても、先行する第1のフープ材F1に接続可能であり、寸法の異なるフープ材F同士を接続させることもできる。 In this way, by using the hoop material connection device 1, it is possible to connect the rear end E of the preceding first hoop material F1 and the leading end S of the following second hoop material F2 into one without changing the conveying speed of the supply destination device such as the plating processing device 3. Even if the following second hoop material F2 is cut midway with a cutter or the like, it can still be connected to the preceding first hoop material F1, and hoop materials F of different dimensions can also be connected together.

1 フープ材接続装置
1a 検出部
1b 保持部
1c 第1の搬送部
1d 第2の搬送部
1e 摺動部
1j 撮影部
1k 溶着部
2 リール体交換装置
3 メッキ処理装置
D 搬送方向
E 後端部
F フープ材
F1 第1のフープ材
F2 第2のフープ材
R リール体
R1 第1のリール体
R2 第2のリール体
S 先端部
REFERENCE SIGNS LIST 1 hoop material connection device 1a detection section 1b holding section 1c first transport section 1d second transport section 1e sliding section 1j photographing section 1k welding section 2 reel body exchange device 3 plating processing device D transport direction E rear end section F hoop material F1 first hoop material F2 second hoop material R reel body R1 first reel body R2 second reel body S front end section

Claims (6)

第1のリール体から搬出されて先行する第1のフープ材の後端部と、第2のリール体から搬出される後続の第2のフープ材の先端部とを溶着により接続し、接続したフープ材を搬送するフープ材接続装置において、
前記後端部を検出する検出部と、
前記検出部により前記後端部を検出した際に、前記後端部近傍を挟持して固定すると供に、固定された前記後端部の位置調整を行う保持部と、
前記検出部による前記後端部の検出により、前記検出部の検出位置に移動して、前記第1のリール体から交換された前記第2のリール体の前記第2のフープ材の前記先端部と、前記保持部により固定された前記後端部を側方から撮影する撮影部と、
該撮影部の撮影位置に移動して、前記後端部及び前記先端部を溶着する溶着部と
前記フープ材を搬送する第1、第2の搬送部と、
前記第2の搬送部及び前記フープ材の供給先装置間に配置され、搬送方向と逆方向に摺動する摺動部と、
前記第1、第2の搬送部間に配置され、前記第1のフープ材を撓ませた撓み部とを備え、
前記第1、第2の搬送部は、それぞれ独立して前記フープ材の搬送速度を制御可能であり、
前記第1の搬送部のみが前記第1のフープ材を搬送する方向と逆方向に搬送可能であり、
前記検出部により前記後端部を検出した際に、前記第1、第2の搬送部による前記第1のフープ材の搬送を停止させ、
前記第2の搬送部による搬送が停止した前記供給先装置側の前記第1のフープ材に対して、前記摺動部を逆方向に摺動させることで、前記供給先装置への搬送速度を維持すると共に、
前記撮影部の画像に基づいて、前記保持部による前記第1のフープ材の前後上下の移動及び傾きの回転を行う処理、及び前記第1の搬送部のみによる前後の搬送制御処理によって前記先端部に対して前記後端部の位置合わせを行った後に、前記溶着部によって前記先端部及び前記後端部を溶着することを特徴とするフープ材接続装置。
A hoop material connecting device connects a rear end of a leading first hoop material discharged from a first reel body to a front end of a trailing second hoop material discharged from a second reel body by welding, and transports the connected hoop materials,
A detection unit that detects the rear end portion;
a holding section that, when the detection section detects the rear end section, clamps and fixes the vicinity of the rear end section and adjusts the position of the fixed rear end section;
an image capturing unit that moves to a detection position of the detection unit upon detection of the rear end by the detection unit and captures an image of the front end of the second hoop material of the second reel body replaced from the first reel body and the rear end fixed by the holding unit from a side;
a welding section that moves to a photographing position of the photographing section and welds the rear end section and the front end section ;
First and second conveying units for conveying the hoop material;
A sliding part is disposed between the second conveying part and a supply destination device of the hoop material, and slides in a direction opposite to the conveying direction;
a bending section disposed between the first and second conveying sections and bending the first hoop material;
The first and second conveying sections are capable of independently controlling the conveying speed of the hoop material,
Only the first conveying section is capable of conveying the first hoop material in a direction opposite to a conveying direction of the first hoop material,
When the detection unit detects the rear end, the first and second conveying units stop conveying the first hoop material,
The sliding part is caused to slide in a reverse direction relative to the first hoop material on the side of the destination device where the conveyance by the second conveying part has stopped, thereby maintaining a conveyance speed to the destination device, and
A hoop material connecting device characterized by a process in which the holding unit moves the first hoop material back and forth and up and down and rotates its tilt based on an image from the photographing unit, and a process in which the rear end is aligned with the front end by a front and rear transport control process performed only by the first transport unit, and then the front end and the rear end are welded together by the welding unit.
前記溶着部は超音波を用いて前記後端部及び前記先端部を溶着することを特徴とする請求項1に記載のフープ材接続装置。 The hoop material connection device according to claim 1, characterized in that the welding portion uses ultrasonic waves to weld the rear end and the front end. 前記溶着部による前記後端部と前記先端部との溶着後には、前記保持部による前記第1のフープ材の固定を解除し、前記後端部を検出する前の搬送速度よりも速い搬送速度で前記搬送部により搬送させる共に、摺動した前記摺動部の位置を、前記後端部を検出する以前の位置に移動させることを特徴とする請求項1又は2に記載のフープ材接続装置。 The hoop material connecting device according to claim 1 or 2, characterized in that after the rear end and the front end are welded by the welding part, the first hoop material is released from the holding part and conveyed by the conveying part at a conveying speed faster than the conveying speed before the rear end is detected, and the position of the sliding part that has slid is moved to a position before the rear end is detected. 前記溶着部による前記後端部と前記先端部との接続後に、前記撓み部の撓んでいる長さが前記後端部を検出する以前の長さになるように、前記第1の搬送部の搬送速度を調整することを特徴とする請求項に記載のフープ材接続装置。 The hoop material connecting device according to claim 3, characterized in that the conveying speed of the first conveying section is adjusted so that after the rear end and the front end are connected by the welding section, the bent length of the bent section becomes the same length as before the rear end was detected. 前記溶着部は、前記第1、第2のフープ材の幅に対してピンポイントで溶着することを特徴とする請求項1~の何れか1項に記載のフープ材接続装置。 The hoop material connecting device according to any one of claims 1 to 4 , characterized in that the welding portion is welded at a pinpoint relative to the width of the first and second hoop materials. 前記溶着部による前記後端部と前記先端部とを溶着する際は、接続箇所である接続部に対して位置ずれが発生しないように固定した後に、溶着接続を行うことを特徴とする請求項1~の何れか1項に記載のフープ材接続装置。 A hoop material connection device as described in any one of claims 1 to 5, characterized in that when welding the rear end portion and the front end portion using the welding portion, the welding connection is performed after fixing them so that no misalignment occurs with respect to the connection portion, which is the connection point.
JP2021041770A 2021-03-15 2021-03-15 Hoop material connection device Active JP7645105B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021041770A JP7645105B2 (en) 2021-03-15 2021-03-15 Hoop material connection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021041770A JP7645105B2 (en) 2021-03-15 2021-03-15 Hoop material connection device

Publications (2)

Publication Number Publication Date
JP2022141455A JP2022141455A (en) 2022-09-29
JP7645105B2 true JP7645105B2 (en) 2025-03-13

Family

ID=83402853

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021041770A Active JP7645105B2 (en) 2021-03-15 2021-03-15 Hoop material connection device

Country Status (1)

Country Link
JP (1) JP7645105B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004189379A (en) 2002-12-10 2004-07-08 Rengo Co Ltd Web connection device
JP2016055941A (en) 2014-09-05 2016-04-21 株式会社東芝 Label mount processing device and label mount processing program
JP2016207852A (en) 2015-04-23 2016-12-08 大森機械工業株式会社 Tape splicer
JP6322776B1 (en) 2018-01-26 2018-05-09 独立行政法人国立高等専門学校機構 Hoop material automatic connection device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004189379A (en) 2002-12-10 2004-07-08 Rengo Co Ltd Web connection device
JP2016055941A (en) 2014-09-05 2016-04-21 株式会社東芝 Label mount processing device and label mount processing program
JP2016207852A (en) 2015-04-23 2016-12-08 大森機械工業株式会社 Tape splicer
JP6322776B1 (en) 2018-01-26 2018-05-09 独立行政法人国立高等専門学校機構 Hoop material automatic connection device

Also Published As

Publication number Publication date
JP2022141455A (en) 2022-09-29

Similar Documents

Publication Publication Date Title
JP5144018B2 (en) Bookbinding apparatus and image forming system using the same
KR20180102699A (en) Pre-preg sheet lamination device
CN101484375A (en) Method for supplying a new reel and splicer for carrying out this method
JP7645105B2 (en) Hoop material connection device
JP4316414B2 (en) Splicing device and splicing method
JP4174310B2 (en) Image forming apparatus
JP2018158776A (en) Recording device
JP4943048B2 (en) Sheet bundle conveying method, sheet bundle conveying apparatus, and bookbinding apparatus
CN102795495A (en) Document feeding device and image forming apparatus
WO2013094732A1 (en) Optical film cutting device, method for cutting optical film and recording medium
US5937261A (en) Image recording apparatus, and sheet conveying method thereof
JP7159706B2 (en) Relay conveying device and image forming system
JP3926757B2 (en) Image reader
CN111345123A (en) Component mounting machine, component supply tape reel driving method
JP4618114B2 (en) Image forming apparatus
US8371579B2 (en) Sheet alignment apparatus and image forming system using the same
JP2736585B2 (en) Sheet post-processing equipment
KR101753695B1 (en) Film supply apparatus for back light unit producing apparatus
CN117262875A (en) 3D printing supplies sabot system
JP4381368B2 (en) Image forming apparatus
JP2020045201A (en) Media ejection device, media processing device, and recording system
JP7230620B2 (en) image forming device
JP4333669B2 (en) Image forming apparatus
JP4229290B2 (en) Automatic document feeder and image forming apparatus having the same
JP2024044813A (en) Delivery device, conveyance device, and processing system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240313

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240910

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20241101

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250204

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250303

R150 Certificate of patent or registration of utility model

Ref document number: 7645105

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150