JP7650176B2 - Column-beam joint core - Google Patents
[go: Go Back, main page]

JP7650176B2 - Column-beam joint core - Google Patents

Column-beam joint core Download PDF

Info

Publication number
JP7650176B2
JP7650176B2 JP2021057194A JP2021057194A JP7650176B2 JP 7650176 B2 JP7650176 B2 JP 7650176B2 JP 2021057194 A JP2021057194 A JP 2021057194A JP 2021057194 A JP2021057194 A JP 2021057194A JP 7650176 B2 JP7650176 B2 JP 7650176B2
Authority
JP
Japan
Prior art keywords
steel pipe
steel
joint
side wall
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021057194A
Other languages
Japanese (ja)
Other versions
JP2022154265A (en
Inventor
洋介 川端
由悟 佐藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Metal Products Co Ltd
Original Assignee
Nippon Steel Metal Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Metal Products Co Ltd filed Critical Nippon Steel Metal Products Co Ltd
Priority to JP2021057194A priority Critical patent/JP7650176B2/en
Publication of JP2022154265A publication Critical patent/JP2022154265A/en
Application granted granted Critical
Publication of JP7650176B2 publication Critical patent/JP7650176B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Description

本発明は、柱梁接合コアに関する。 The present invention relates to a column-beam joint core.

従来の柱梁接合コアとして、特許文献1に示すような、仕口部に鋼製の四角形断面を有する仕口部鋼管を用いたノンダイアフラム工法の柱梁接合コアが知られている。柱梁接合コアは、上側の上部鋼管及び下側の下部鋼管同士を接続し、四角断面の四辺を構成する四方の側壁部を有する仕口部鋼管を備える。仕口部鋼管の肉厚は、上部鋼管及び下部鋼管の肉厚に比して大きく設定されている。 A conventional beam-column joint core is a non-diaphragm construction core that uses a steel pipe with a rectangular cross section at the joint, as shown in Patent Document 1. The beam-column joint core includes a steel pipe that connects the upper steel pipe on the upper side and the lower steel pipe on the lower side, and has four side walls that form the four sides of the rectangular cross section. The thickness of the steel pipe is set to be larger than the thicknesses of the upper steel pipe and the lower steel pipe.

特開平8-302899号公報Japanese Patent Application Publication No. 8-302899

ここで、ノンダイアフラム工法の柱梁接合構造の終局耐力は,厚肉の仕口部鋼管の面外変形全塑性耐力と根抜け破断耐力の小さい方で決定される。面外変形全塑性耐力は、仕口部鋼管の板厚の増加に伴い増加する。一方で、根抜け破断耐力は仕口部鋼管の板厚が厚くなりすぎると、板厚全厚に応力が伝わらず、板厚増肉による根抜け破壊耐力の向上が小さくなる可能性がある。 The ultimate strength of a non-diaphragm beam-column joint structure is determined by the smaller of the out-of-plane full plastic strength and root penetration fracture strength of the thick steel pipe at the connection. The out-of-plane full plastic strength increases as the plate thickness of the steel pipe at the connection increases. On the other hand, if the plate thickness of the steel pipe at the connection becomes too thick, the stress is not transmitted to the entire plate thickness, and the improvement in root penetration fracture strength due to the increase in plate thickness may be small.

一方で、面外変形降伏耐力、及び面外変形全塑性耐力は、仕口部鋼管の板厚の増加に伴い耐力が増化するため、取り付く梁が大きくなればなるほど板厚を増肉する必要がある。根抜け破壊耐力を向上させる観点では板厚の増肉以外の補強等が望ましいが、面外変形降伏耐力、及び面外変形全塑性耐力を向上させる観点では、板厚を増肉させて耐力を向上させることが効率的のため、各観点の解決方法が相反する。 On the other hand, the out-of-plane yield strength and out-of-plane full plastic strength increase with an increase in the thickness of the steel pipe at the connection, so the larger the beam to which it is attached, the more the plate thickness must be increased. From the perspective of improving the root penetration fracture strength, reinforcement other than increasing the plate thickness is desirable, but from the perspective of improving the out-of-plane yield strength and out-of-plane full plastic strength, it is efficient to increase the plate thickness to improve the strength, so the solutions from each perspective are contradictory.

本発明は、このような課題を解決するためになされたものであり、断面積の増加を抑制しつつ、且つ、製造を容易としつつ、柱梁接合構造の耐力を向上させることができる柱梁接合コアを提供することを目的とする。 The present invention was made to solve these problems, and aims to provide a column-beam joint core that can improve the strength of a column-beam joint structure while suppressing an increase in cross-sectional area and facilitating manufacturing.

本発明に係る柱梁接合コアは、仕口部に四角形断面を有する仕口部鋼管を用いたノンダイアフラム工法の柱梁接合コアであって、上側の上部鋼管及び下側の下部鋼管同士を接続し、四角断面の四辺を構成する四方の側壁部を有する仕口部鋼管を備え、仕口部鋼管の内部には、互いに隣り合う一対の側壁部の全ての組み合わせに対して固定される四つの鋼製プレートが設けられ、各鋼製プレートは、上下方向から見て、一方の端部が一方の側壁部に傾斜した状態で固定され、他方の端部が他方の側壁部に傾斜した状態で固定され、 隣り合う鋼製プレートは、同一の側壁部に対して同一の溶接部を介して固定される。 The column-beam joint core of the present invention is a column-beam joint core of the non-diaphragm construction method using a joint steel pipe with a square cross section at the joint, and is equipped with a joint steel pipe that connects the upper upper steel pipe and the lower lower steel pipe to each other and has four side walls that form the four sides of the square cross section, and inside the joint steel pipe are four steel plates that are fixed to all combinations of adjacent pairs of side walls, and each steel plate is fixed with one end inclined to one side wall and the other end inclined to the other side wall when viewed from the top-bottom direction, and adjacent steel plates are fixed to the same side wall via the same weld.

仕口部鋼管の内部には、互いに隣り合う一対の側壁部の全ての組み合わせに対して固定される四つの鋼製プレートが設けられる。各鋼製プレートは、上下方向から見て、一方の端部が一方の側壁部に傾斜した状態で固定され、他方の端部が他方の側壁部に傾斜した状態で固定される。従って、各鋼製プレートは、仕口部鋼管の四方の側壁部を内部側から補強することができる。このような鋼製プレートを設ける場合、単に仕口部鋼管の板厚を厚くするだけの場合に比して、効率よく耐力を向上できる。従って、仕口部鋼管の板厚の増加を抑制しながら耐力を向上させることができる。また、隣り合う鋼製プレートは、同一の側壁部に対して同一の溶接部を介して固定される。このような構成は、隣り合う鋼製プレートが、同一の側壁部に対して別々の溶接部を介して固定される場合に比して、溶接部の数を少なくすることができる。そのため製造を容易とすることができる。以上より、断面積の増加を抑制しつつ、且つ、製造を容易としつつ、耐力を向上させることができる。 Inside the joint steel pipe, four steel plates are provided that are fixed to all combinations of pairs of adjacent side walls. When viewed from the top and bottom, each steel plate is fixed with one end inclined to one side wall and the other end inclined to the other side wall. Therefore, each steel plate can reinforce the four side walls of the joint steel pipe from the inside. When such steel plates are provided, the strength can be improved efficiently compared to when the plate thickness of the joint steel pipe is simply increased. Therefore, the strength can be improved while suppressing the increase in the plate thickness of the joint steel pipe. In addition, adjacent steel plates are fixed to the same side wall via the same weld. This configuration can reduce the number of welds compared to when adjacent steel plates are fixed to the same side wall via separate welds. Therefore, it is easy to manufacture. As a result, it is possible to improve the strength while suppressing the increase in cross-sectional area and facilitating manufacture.

鋼製プレートは、仕口部鋼管に対し、鋼管軸方向に対して全長に取り付けられてよい。この場合、仕口部鋼管の全長にわたって、耐力向上の効果を得ることができる。 The steel plate may be attached to the entire length of the steel pipe at the connection in the axial direction of the steel pipe. In this case, the effect of improving the strength can be obtained over the entire length of the steel pipe at the connection.

鋼製プレートは、仕口部鋼管に対し、鋼管軸方向に対して一部に取り付けられてよい。この場合、仕口部鋼管のうち、特に必要な箇所に限定して、耐力向上の効果を得ることができる。 The steel plate may be attached to a portion of the steel pipe at the connection in the axial direction of the steel pipe. In this case, the effect of improving the strength can be obtained by limiting it to the particularly necessary parts of the steel pipe at the connection.

仕口部鋼管は、溝形鋼二丁合わせで構成され、四つの鋼製プレートを固定する溶接部のうちの二箇所は、溝形鋼の溶接部を兼ねてよい。この場合、柱梁接合コア全体としての溶接部の数を少なくすることができる。 The steel pipe at the connection section is made up of two channel steel pieces, and two of the welds that secure the four steel plates can also serve as welds for the channel steel pieces. In this case, the number of welds in the entire column-beam connection core can be reduced.

仕口部鋼管は、山形鋼四丁合わせで構成され、四つの鋼製プレートを固定する四箇所の溶接部は、山形鋼の溶接部を兼ねてよい。この場合、柱梁接合コア全体としての溶接部の数を少なくすることができる。 The steel pipe at the connection section is made up of four angle irons, and the four welds that secure the four steel plates can also serve as the welds for the angle irons. In this case, the number of welds in the entire column-beam connection core can be reduced.

本発明によれば、断面積の増加を抑制しつつ、且つ、製造を容易としつつ、柱梁接合構造の耐力を向上させることができる。 The present invention makes it possible to improve the strength of a column-beam joint structure while suppressing an increase in cross-sectional area and facilitating manufacturing.

図1(a)は、本発明の実施形態に係る柱梁接合コアを示す側面図であり、図1(b)は、図1(a)に示す柱梁接合コアの仕口部鋼管を上方から見た図である。FIG. 1(a) is a side view showing a column-beam joint core according to an embodiment of the present invention, and FIG. 1(b) is a view from above of the steel pipe at the joint portion of the column-beam joint core shown in FIG. 1(a). 変形例に係る柱梁接合コアを示す側面図である。FIG. 11 is a side view showing a column-beam joint core according to a modified example. 仕口部鋼管の製造例を示す図である。FIG. 13 is a diagram showing an example of manufacturing a steel pipe for a joint portion. 仕口部鋼管の溶接部と鋼製プレートの溶接部を共有化する例を示す図である。FIG. 13 is a diagram showing an example in which the welded portion of the steel pipe at the connection section and the welded portion of the steel plate are shared. 解析のための試験体について説明した図である。FIG. 1 is a diagram illustrating a test specimen for analysis. 解析モデル及び解析結果を示す図である。FIG. 1 is a diagram showing an analysis model and analysis results.

以下、本発明の好適な実施形態について、図面を参照しながら説明する。 A preferred embodiment of the present invention will be described below with reference to the drawings.

図1(a)は、本発明の実施形態に係る柱梁接合コア200を示す側面図である。図1(b)は、図1(a)に示す柱梁接合コア200の仕口部鋼管を上方から見た図である。図1(a)に示すように、柱梁接合構造100は、柱1と、当該柱1に接合された梁2A,2Bを備える。梁2A,2Bは、仕口部3にて柱1と接合される。梁2A,2Bは、断面H型の形状を有しており、上下のフランジ2a,2bと、フランジ2a,2b同士を接続するウェブ部2cと、を備える。 Figure 1(a) is a side view showing a column-beam joint core 200 according to an embodiment of the present invention. Figure 1(b) is a top view of the joint steel pipe of the column-beam joint core 200 shown in Figure 1(a). As shown in Figure 1(a), the column-beam joint structure 100 includes a column 1 and beams 2A and 2B joined to the column 1. The beams 2A and 2B are joined to the column 1 at a joint 3. The beams 2A and 2B have an H-shaped cross section and include upper and lower flanges 2a and 2b, and a web portion 2c that connects the flanges 2a and 2b together.

本実施形態では、仕口部3には、鋼製の四角形断面を有する仕口部鋼管10を備える柱梁接合コア200が用いられている。仕口部鋼管10は、上側の上部鋼管4及び下側の下部鋼管6同士を接続する。ここで、上部鋼管4と仕口部鋼管10との接続部分、下部鋼管6と仕口部鋼管10との接続部分、及び仕口部鋼管10の内部には、いずれにも柱1内部で水平に広がる隔壁であるダイヤフラムが設けられていない。このように、柱梁接合コア200は、仕口部鋼管10を用いたノンダイアフラム工法の柱梁接合コアとして構成される。 In this embodiment, a column-beam joint core 200 including a joint steel pipe 10 having a rectangular cross section made of steel is used for the joint 3. The joint steel pipe 10 connects the upper steel pipe 4 on the upper side and the lower steel pipe 6 on the lower side. Here, no diaphragm, which is a partition wall that spreads horizontally inside the column 1, is provided in the connection between the upper steel pipe 4 and the joint steel pipe 10, the connection between the lower steel pipe 6 and the joint steel pipe 10, or inside the joint steel pipe 10. In this way, the column-beam joint core 200 is configured as a column-beam joint core for a non-diaphragm construction method using the joint steel pipe 10.

図1(b)に示すように、仕口部鋼管10は、四角断面の四辺を構成する四方の側壁部11A,11B,11C,11Dを有する。側壁部11A,11Cは、互いに平行をなすように離間した状態で対向する。側壁部11B,11Dは、側壁部11A,11Cと垂直をなし、互いに平行をなすように離間した状態で対向する。側壁部11Aと側壁部11Bは互いに隣り合うように配置され、角部12Aにおいて互いに接続される。側壁部11Bと側壁部11Cは互いに隣り合うように配置され、角部12Bにおいて互いに接続される。側壁部11Cと側壁部11Dは互いに隣り合うように配置され、角部12Cにおいて互いに接続される。側壁部11Dと側壁部11Aは互いに隣り合うように配置され、角部12Dにおいて互いに接続される。仕口部鋼管10は、角部12A,12B,12C,12Dにおいて所定の曲率にて丸み付けがなされている。なお、仕口部鋼管10のサイズは特に限定されないが、一辺が150mm~1000mの範囲で設定されてよい。 As shown in FIG. 1(b), the joint steel pipe 10 has four side walls 11A, 11B, 11C, and 11D that constitute the four sides of the rectangular cross section. The side walls 11A and 11C face each other while being spaced apart so as to be parallel to each other. The side walls 11B and 11D are perpendicular to the side walls 11A and 11C and face each other while being spaced apart so as to be parallel to each other. The side walls 11A and 11B are arranged adjacent to each other and are connected to each other at the corners 12A. The side walls 11B and 11C are arranged adjacent to each other and are connected to each other at the corners 12B. The side walls 11C and 11D are arranged adjacent to each other and are connected to each other at the corners 12C. The side walls 11D and 11A are arranged adjacent to each other and are connected to each other at the corners 12D. The corners 12A, 12B, 12C, and 12D of the joint steel pipe 10 are rounded with a predetermined curvature. The size of the joint steel pipe 10 is not particularly limited, but may be set in the range of 150 mm to 1000 m on a side.

なお、仕口部鋼管10の製造時における製造方法は特に限定されない。例えば、図3(a)に示すように、仕口部鋼管10が圧延材を四角形状とすることで形成されてもよい。この場合、圧延材の端部同士が溶接部24にて固定される。または、図3(b)(c)(d)(e)に示すように、複数のボックス状の部材の端部同士を溶接部24にて固定することで、仕口部鋼管10を形成してもよい。 The manufacturing method for the joint steel pipe 10 is not particularly limited. For example, as shown in FIG. 3(a), the joint steel pipe 10 may be formed by forming a rolled material into a square shape. In this case, the ends of the rolled material are fixed together at a welded portion 24. Alternatively, as shown in FIG. 3(b), (c), (d), and (e), the joint steel pipe 10 may be formed by fixing the ends of multiple box-shaped members together at a welded portion 24.

仕口部鋼管10の内部には、互いに隣り合う一対の側壁部の全ての組み合わせに対して固定される四つの鋼製プレート13A,13B,13C,13Dが設けられる。仕口部鋼管10には、互いに隣り合う一対の側壁部11A,11Bに対して固定される鋼製プレート13Aが設けられる。仕口部鋼管10には、互いに隣り合う一対の側壁部11B,11Cに対して固定される鋼製プレート13Bが設けられる。仕口部鋼管10には、互いに隣り合う一対の側壁部11C,11Dに対して固定される鋼製プレート13Cが設けられる。仕口部鋼管10には、互いに隣り合う一対の側壁部11D,11Aに対して固定される鋼製プレート13Dが設けられる。 Four steel plates 13A, 13B, 13C, 13D are provided inside the joint steel pipe 10, which are fixed to all combinations of pairs of adjacent side walls. The joint steel pipe 10 is provided with a steel plate 13A that is fixed to a pair of adjacent side walls 11A, 11B. The joint steel pipe 10 is provided with a steel plate 13B that is fixed to a pair of adjacent side walls 11B, 11C. The joint steel pipe 10 is provided with a steel plate 13C that is fixed to a pair of adjacent side walls 11C, 11D. The joint steel pipe 10 is provided with a steel plate 13D that is fixed to a pair of adjacent side walls 11D, 11A.

鋼製プレート13は、上下方向から見て、一方の端部が一方の側壁部11に傾斜した状態で固定され、他方の端部が他方の側壁部11に傾斜した状態で固定される。具体的に、鋼製プレート13Aは、上下方向から見て、一方の端部13Aaが一方の側壁部11Aに傾斜した状態で固定され、他方の端部13Abが他方の側壁部11Bに傾斜した状態で固定される。図8Bは、上下方向から見て、一方の端部13Baが一方の側壁部11Bに傾斜した状態で固定され、他方の端部13Bbが他方の側壁部11Cに傾斜した状態で固定される。鋼製プレート13Cは、上下方向から見て、一方の端部13Caが一方の側壁部11Cに傾斜した状態で固定され、他方の端部13Cbが他方の側壁部11Dに傾斜した状態で固定される。鋼製プレート13Dは、上下方向から見て、一方の端部13Daが一方の側壁部11Dに傾斜した状態で固定され、他方の端部13Dbが他方の側壁部11Aに傾斜した状態で固定される。 When viewed from the top-bottom direction, the steel plate 13 is fixed with one end inclined to one side wall portion 11, and the other end inclined to the other side wall portion 11. Specifically, when viewed from the top-bottom direction, the steel plate 13A is fixed with one end 13Aa inclined to one side wall portion 11A, and the other end 13Ab inclined to the other side wall portion 11B. In FIG. 8B, when viewed from the top-bottom direction, one end 13Ba is fixed inclined to one side wall portion 11B, and the other end 13Bb is fixed inclined to the other side wall portion 11C. When viewed from the top-bottom direction, the steel plate 13C is fixed with one end 13Ca inclined to one side wall portion 11C, and the other end 13Cb is fixed inclined to the other side wall portion 11D. When viewed from the top and bottom, one end 13Da of the steel plate 13D is fixed at an incline to one side wall portion 11D, and the other end 13Db is fixed at an incline to the other side wall portion 11A.

本実施形態では、鋼製プレート13Aの端部13Aa及び鋼製プレート13Dの端部13Dbは、側壁部11Aの中央位置に溶接によって固定される。そのため、鋼製プレート13Aの端部13Aa及び鋼製プレート13Dの端部13Dbは、同一の溶接部14Aを介して側壁部11Aに固定される。鋼製プレート13Bの端部13Ba及び鋼製プレート13Aの端部13Abは、側壁部11Bの中央位置に溶接によって固定される。そのため、鋼製プレート13Bの端部13Ba及び鋼製プレート13Aの端部13Abは、同一の溶接部14Bを介して側壁部11Bに固定される。鋼製プレート13Cの端部13Ca及び鋼製プレート13Bの端部13Bbは、側壁部11Cの中央位置に溶接によって固定される。そのため、鋼製プレート13Cの端部13Ca及び鋼製プレート13Bの端部13Bbは、同一の溶接部14Cを介して側壁部11Cに固定される。鋼製プレート13Dの端部13Da及び鋼製プレート13Cの端部13Cbは、側壁部11Cの中央位置に溶接によって固定される。そのため、鋼製プレート13Cの端部13Ca及び鋼製プレート13Dの端部13Dbは、同一の溶接部14Dを介して側壁部11Dに固定される。 In this embodiment, the end 13Aa of the steel plate 13A and the end 13Db of the steel plate 13D are fixed to the center of the side wall 11A by welding. Therefore, the end 13Aa of the steel plate 13A and the end 13Db of the steel plate 13D are fixed to the side wall 11A via the same weld 14A. The end 13Ba of the steel plate 13B and the end 13Ab of the steel plate 13A are fixed to the center of the side wall 11B by welding. Therefore, the end 13Ba of the steel plate 13B and the end 13Ab of the steel plate 13A are fixed to the side wall 11B via the same weld 14B. The end 13Ca of the steel plate 13C and the end 13Bb of the steel plate 13B are fixed to the center of the side wall 11C by welding. Therefore, the end 13Ca of the steel plate 13C and the end 13Bb of the steel plate 13B are fixed to the side wall portion 11C via the same welded portion 14C. The end 13Da of the steel plate 13D and the end 13Cb of the steel plate 13C are fixed to the center position of the side wall portion 11C by welding. Therefore, the end 13Ca of the steel plate 13C and the end 13Db of the steel plate 13D are fixed to the side wall portion 11D via the same welded portion 14D.

なお、四つの鋼製プレート13は、隣り合うもの同士の端部が一つの溶接部14によって互いに固定されている。四つの鋼製プレート13は、溶接される前は、互いに別体の板材として構成されたものである。すなわち、本実施形態は、例えば、溶接前から四角形断面に構成された小鋼管を仕口部鋼管10に挿入して、小鋼管の角部を仕口部鋼管10の内面に溶接するものとは異なるものである。 The ends of the four steel plates 13 adjacent to each other are fixed together by a single weld 14. Before being welded, the four steel plates 13 are constructed as separate plate materials. In other words, this embodiment is different from, for example, inserting a small steel pipe with a square cross section into the joint steel pipe 10 before welding, and welding the corners of the small steel pipe to the inner surface of the joint steel pipe 10.

ここで、仕口部鋼管10の板厚tnは、上部鋼管4及び下部鋼管6の板厚tcよりも厚い。仕口部鋼管10の板厚tnは、側壁部11A,11B,11C,11Dの板厚である。特に限定されないが、板厚tnは15mm以上、好ましくは25mm以上に設定され、100mm以下、好ましくは55mm以下に設定される。上部鋼管4及び下部鋼管6の板厚tcは、上部鋼管4及び下部鋼管6の四方の側壁部の板厚である。特に限定されないが、板厚tcは、「板厚tn>板厚tc」の範囲で6mm以上、好ましくは9mm以上に設定され、60mm以下、好ましくは40mm以下に設定される。鋼製プレート13A,13B,13C,13Dの板厚tdは、仕口部鋼管10の板厚tnよりも薄い。特に限定されないが、板厚tdは、「板厚tn>板厚td」の範囲で6mm以上、好ましくは9mm以上に設定され、40mm以下、好ましくは28mm以下に設定される。 Here, the plate thickness tn of the joint steel pipe 10 is thicker than the plate thickness tc of the upper steel pipe 4 and the lower steel pipe 6. The plate thickness tn of the joint steel pipe 10 is the plate thickness of the side wall parts 11A, 11B, 11C, and 11D. Although not particularly limited, the plate thickness tn is set to 15 mm or more, preferably 25 mm or more, and 100 mm or less, preferably 55 mm or less. The plate thickness tc of the upper steel pipe 4 and the lower steel pipe 6 is the plate thickness of the four side wall parts of the upper steel pipe 4 and the lower steel pipe 6. Although not particularly limited, the plate thickness tc is set to 6 mm or more, preferably 9 mm or more, and 60 mm or less, preferably 40 mm or less, in the range of "plate thickness tn>plate thickness tc". The plate thickness td of the steel plates 13A, 13B, 13C, and 13D is thinner than the plate thickness tn of the joint steel pipe 10. Although not particularly limited, the plate thickness td is set to 6 mm or more, preferably 9 mm or more, and 40 mm or less, preferably 28 mm or less, in the range of "plate thickness tn>plate thickness td".

本実施形態において、鋼製プレート13の一方の端部の一方の側壁部11に対する角度θ、及び鋼製プレート13の他方の端部の他方の側壁部11に対する角度θは、45°である。具体的に、鋼製プレート13Aの一方の端部13Aaの一方の側壁部11Aに対する角度θ、及び鋼製プレート13の他方の端部13Abの他方の側壁部11Bに対する角度θは、45°である。鋼製プレート13Bの一方の端部13Baの一方の側壁部11Bに対する角度θ、及び鋼製プレート13の他方の端部13Bbの他方の側壁部11Cに対する角度θは、45°である。鋼製プレート13Cの一方の端部13Caの一方の側壁部11Cに対する角度θ、及び鋼製プレート13Cの他方の端部13Cbの他方の側壁部11Dに対する角度θは、45°である。鋼製プレート13Dの一方の端部13Daの一方の側壁部11Dに対する角度θ、及び鋼製プレート13Dの他方の端部13Dbの他方の側壁部11Aに対する角度θは、45°である。 In this embodiment, the angle θ of one end of the steel plate 13 relative to one side wall portion 11, and the angle θ of the other end of the steel plate 13 relative to the other side wall portion 11 are 45°. Specifically, the angle θ of one end 13Aa of the steel plate 13A relative to one side wall portion 11A, and the angle θ of the other end 13Ab of the steel plate 13 relative to the other side wall portion 11B are 45°. The angle θ of one end 13Ba of the steel plate 13B relative to one side wall portion 11B, and the angle θ of the other end 13Bb of the steel plate 13 relative to the other side wall portion 11C are 45°. The angle θ of one end 13Ca of the steel plate 13C relative to one side wall portion 11C, and the angle θ of the other end 13Cb of the steel plate 13C relative to the other side wall portion 11D are 45°. The angle θ of one end 13Da of the steel plate 13D relative to one side wall portion 11D, and the angle θ of the other end 13Db of the steel plate 13D relative to the other side wall portion 11A are 45°.

ただし、角度θは必ずしも45°に限定されず、梁2の取り付き方向や数量などに応じて、適宜変更してもよい。例えば、角度θを30°以上に設定してよく、60°以下に設定してもよい。 However, the angle θ is not necessarily limited to 45°, and may be changed as appropriate depending on the attachment direction and number of beams 2. For example, the angle θ may be set to 30° or more, or 60° or less.

仕口部鋼管10の角部12と鋼製プレート13との間には空隙16が形成される。具体的に、仕口部鋼管10の角部12Aと鋼製プレート13Aとの間には空隙16Aが形成される。仕口部鋼管10の角部12Bと鋼製プレート13Bとの間には空隙16Bが形成される。仕口部鋼管10の角部12Cと鋼製プレート13Cとの間には空隙16Cが形成される。仕口部鋼管10の角部12Dと鋼製プレート13Dとの間には空隙16Dが形成される。 A gap 16 is formed between the corner 12 of the connection steel pipe 10 and the steel plate 13. Specifically, a gap 16A is formed between the corner 12A of the connection steel pipe 10 and the steel plate 13A. A gap 16B is formed between the corner 12B of the connection steel pipe 10 and the steel plate 13B. A gap 16C is formed between the corner 12C of the connection steel pipe 10 and the steel plate 13C. A gap 16D is formed between the corner 12D of the connection steel pipe 10 and the steel plate 13D.

仕口部鋼管10の外表面と、空隙16を挟んでの鋼製プレート13の固定位置である溶接部14との距離Ldは、仕口部鋼管10の板厚tnの2倍以上である。図1(b)に示すように、側壁部11Aの外表面からの溶接部14Bの距離Ldは、当該外表面と、空隙16Aを挟んでの鋼製プレート13Aの溶接部14Bとの間の距離によって定義される。当該距離は、側壁部11Aの外表面に対する垂直方向における距離である。側壁部11Aの外表面からの溶接部14Dの距離Ldは、当該外表面と、空隙16Dを挟んでの鋼製プレート13Dの溶接部14Dとの間の距離によって定義される。側壁部11Bの外表面からの溶接部14A,14Cの距離Ldは、当該外表面と、空隙16A,16Bを挟んでの鋼製プレート13A,13Bの溶接部14A,14Cとの間の距離によって定義される。側壁部11Cの外表面からの溶接部14B,14Dの距離Ldは、当該外表面と、空隙16B,16Cを挟んでの鋼製プレート13B,13Cの溶接部14B,14Dとの間の距離によって定義される。側壁部11Dの外表面からの溶接部14C,14Aの距離Ldは、当該外表面と、空隙16C,16Dを挟んでの鋼製プレート13C,13Dの溶接部14C,14Aとの間の距離によって定義される。本実施形態では、各溶接部14A,14B,14C,14Dは、各側壁部11A,11B,11C,11Dの中央位置に設けられている。従って、距離Ldは、仕口部鋼管10の一辺あたりの寸法の約半分となる。 The distance Ld between the outer surface of the joint steel pipe 10 and the weld 14, which is the fixed position of the steel plate 13 across the gap 16, is at least twice the plate thickness tn of the joint steel pipe 10. As shown in FIG. 1(b), the distance Ld of the weld 14B from the outer surface of the side wall 11A is defined by the distance between the outer surface and the weld 14B of the steel plate 13A across the gap 16A. This distance is the distance in the vertical direction to the outer surface of the side wall 11A. The distance Ld of the weld 14D from the outer surface of the side wall 11A is defined by the distance between the outer surface and the weld 14D of the steel plate 13D across the gap 16D. The distance Ld of the welds 14A, 14C from the outer surface of the side wall 11B is defined by the distance between the outer surface and the welds 14A, 14C of the steel plates 13A, 13B across the gaps 16A, 16B. The distance Ld of the welds 14B, 14D from the outer surface of the side wall 11C is defined by the distance between the outer surface and the welds 14B, 14D of the steel plates 13B, 13C across the gaps 16B, 16C. The distance Ld of the welds 14C, 14A from the outer surface of the side wall 11D is defined by the distance between the outer surface and the welds 14C, 14A of the steel plates 13C, 13D across the gaps 16C, 16D. In this embodiment, each weld 14A, 14B, 14C, and 14D is provided at the center of each side wall 11A, 11B, 11C, and 11D. Therefore, the distance Ld is approximately half the dimension of one side of the joint steel pipe 10.

図1(a)に示すように、鋼製プレート13A,13B,13C,13Dは、仕口部鋼管10に対し、鋼管軸方向に対して全長に取り付けられる。すなわち、鋼製プレート13A,13B,13C,13Dは、仕口部鋼管10の上端10aから下端10bに至るまで鋼管軸方向(上下方向)に延びている。 As shown in FIG. 1(a), the steel plates 13A, 13B, 13C, and 13D are attached to the steel pipe 10 at the connection section over the entire length in the axial direction of the steel pipe. In other words, the steel plates 13A, 13B, 13C, and 13D extend in the axial direction of the steel pipe (up and down direction) from the upper end 10a to the lower end 10b of the steel pipe 10 at the connection section.

あるいは、図2に示すように、鋼製プレート13A,13B,13C,13Dは、仕口部鋼管10に対し、鋼管軸方向に対して一部に取り付けられてよい。具体的には、仕口部鋼管10は、上端10a側に鋼製プレート13A,13B,13C,13Dが設けれた第1の領域E1と、下端10b側に鋼製プレート13A,13B,13C,13Dが設けれた第2の領域E2と、鋼管軸方向の中途位置に鋼製プレート13A,13B,13C,13Dが設けられていない第3の領域E3と、を有する。第1の領域E1は、上端10aから梁2A,2Bの上側のフランジ2aよりも下側まで延びる。第2の領域E2は、下端10bから梁2A,2Bの下側のフランジ2bよりも上側まで延びる。 Alternatively, as shown in FIG. 2, the steel plates 13A, 13B, 13C, and 13D may be attached to a portion of the joint steel pipe 10 in the axial direction of the steel pipe. Specifically, the joint steel pipe 10 has a first region E1 where the steel plates 13A, 13B, 13C, and 13D are provided on the upper end 10a side, a second region E2 where the steel plates 13A, 13B, 13C, and 13D are provided on the lower end 10b side, and a third region E3 where the steel plates 13A, 13B, 13C, and 13D are not provided at a midpoint in the axial direction of the steel pipe. The first region E1 extends from the upper end 10a to below the upper flange 2a of the beams 2A and 2B. The second region E2 extends from the lower end 10b to above the lower flange 2b of the beams 2A and 2B.

ここで、図4(a)に示すように、仕口部鋼管10が、溝形鋼二丁合わせで構成される場合に、鋼製プレート13との溶接部を共有化してよい。具体的に、二つの溝形鋼31A,31Bは、断面コ字状の断面形状を有している。そして、二つの溝形鋼31A,31Bの端部同士が向かい合うように接合された状態で、溶接部24A,24Bを形成することによって、互いに固定される。このとき、溶接部24A,24Bは、外面溶接部24aと、内面溶接部24bと、を有する。これに対し、四つの鋼製プレート13A,13B,13C,13Dを固定する溶接部14A,14B,14C,14Dのうちの二箇所は、溝形鋼31A,31Bの溶接部24A,24Bを兼ねる。具体的には、二箇所の溶接部24A,24Bの内面溶接部24bは、それぞれ溶接部14B,14Dを兼ねている。すなわち、鋼製プレート13A,13B同士を固定する溶接部14Bが形成されると同時に、溶接部24Aの内面溶接部24bが形成される。また、鋼製プレート13C,13D同士を固定する溶接部14Dが形成されると同時に、溶接部24Bの内面溶接部24bが形成される。 Here, as shown in FIG. 4(a), when the joint steel pipe 10 is composed of two channel steels, the welds with the steel plate 13 may be shared. Specifically, the two channel steels 31A, 31B have a U-shaped cross-sectional shape. Then, the ends of the two channel steels 31A, 31B are joined so as to face each other, and the welds 24A, 24B are formed to fix them to each other. At this time, the welds 24A, 24B have an outer surface weld 24a and an inner surface weld 24b. In contrast, two of the welds 14A, 14B, 14C, 14D that fix the four steel plates 13A, 13B, 13C, 13D also serve as the welds 24A, 24B of the channel steels 31A, 31B. Specifically, the inner welds 24b of the two welds 24A and 24B also serve as welds 14B and 14D, respectively. That is, the inner welds 24b of welds 24A are formed at the same time that the welds 14B that secure the steel plates 13A and 13B are formed. Also, the inner welds 24b of welds 24B are formed at the same time that the welds 14D that secure the steel plates 13C and 13D are formed.

また、図4(b)に示すように、仕口部鋼管10が、山形鋼四丁合わせで構成される場合に、鋼製プレート13との溶接部を共有化してよい。具体的に、四つの山形鋼32A,32B,32C,32Dは、断面L字状の断面形状を有している。そして、山形鋼32A,32B,32C,32Dのうち、隣り合う端部同士が向かい合うように接合された状態で、溶接部24A,24B,24C,24Dを形成することによって、互いに固定される。これに対し、四つの鋼製プレート13A,13B,13C,13Dを固定する四箇所の溶接部14A,14B,14C,14Dは、山形鋼32A,32B,32C,32Dの溶接部24A,24B,24C,24Dを兼ねる。すなわち、鋼製プレート13D,13A同士を固定する溶接部14Aが形成されると同時に、溶接部24Aが形成される。鋼製プレート13A,13B同士を固定する溶接部14Bが形成されると同時に、溶接部24Bが形成される。鋼製プレート13B,13C同士を固定する溶接部14Cが形成されると同時に、溶接部24Cが形成される。鋼製プレート13C,13D同士を固定する溶接部14Dが形成されると同時に、溶接部24Dが形成される。 As shown in Fig. 4(b), when the joint steel pipe 10 is constructed of four angle irons, the welds with the steel plate 13 may be shared. Specifically, the four angle irons 32A, 32B, 32C, 32D have an L-shaped cross section. Then, adjacent ends of the angle irons 32A, 32B, 32C, 32D are joined facing each other, and the welds 24A, 24B, 24C, 24D are formed to fix them to each other. In contrast, the four welds 14A, 14B, 14C, 14D that fix the four steel plates 13A, 13B, 13C, 13D also serve as the welds 24A, 24B, 24C, 24D of the angle irons 32A, 32B, 32C, 32D. That is, weld 24A is formed at the same time that weld 14A is formed to secure steel plates 13D and 13A together. Weld 24B is formed at the same time that weld 14B is formed to secure steel plates 13A and 13B together. Weld 24C is formed at the same time that weld 14C is formed to secure steel plates 13B and 13C together. Weld 24D is formed at the same time that weld 14D is formed to secure steel plates 13C and 13D together.

次に、本実施形態に係る柱梁接合コア200の作用・効果について説明する。 Next, we will explain the function and effect of the column-beam joint core 200 according to this embodiment.

まず、従来のノンダイアフラム工法を用いた柱梁接合コアとして、仕口部が厚肉の仕口部鋼管のみを有し、内部に鋼製プレートが設けられていないものを挙げる。ノンダイアフラム工法の柱梁接合構造の終局耐力は,厚肉の仕口部鋼管の面外変形全塑性耐力と根抜け破断耐力の小さい方で決定される。面外変形全塑性耐力は、仕口部鋼管の板厚の増加に伴い増加する。一方で、根抜け破断耐力は仕口部鋼管の板厚が厚くなりすぎると、板厚全厚に応力が伝わらず、板厚増肉による根抜け破壊耐力の向上が小さくなる可能性がある(構造的要因)。 First, as an example of a column-beam joint core using the conventional non-diaphragm method, the joint only has a thick-walled steel pipe at the joint, and no steel plate is provided inside. The ultimate strength of a column-beam joint structure using the non-diaphragm method is determined by the smaller of the out-of-plane full plastic strength and the root penetration fracture strength of the thick-walled steel pipe at the joint. The out-of-plane full plastic strength increases as the plate thickness of the steel pipe at the joint increases. On the other hand, if the plate thickness of the steel pipe at the joint becomes too thick, the stress is not transmitted to the entire plate thickness, and the improvement in the root penetration fracture strength due to the increase in plate thickness may be small (structural factor).

その一方で、面外変形降伏耐力、及び面外変形全塑性耐力は、仕口部鋼管の板厚の増加に伴い耐力が増化するため、取り付く梁が大きくなればなるほど板厚を増肉する必要がある。根抜け破壊耐力を向上させる観点では板厚の増肉以外の補強等が望ましいが、面外変形降伏耐力、及び面外変形全塑性耐力を向上させる観点では、板厚を増肉させて耐力を向上させることが効率的のため、各観点の解決方法が相反する。このように、従来の柱梁接合コアでは、単に仕口部鋼管の板厚を増肉させるだけでは、所望の耐力を得ることが難しいという問題があった。 On the other hand, the out-of-plane yield strength and out-of-plane full plastic strength increase with an increase in the thickness of the steel pipe at the connection, so the larger the beam to which it is attached, the more the plate thickness must be increased. From the perspective of improving root penetration fracture strength, reinforcement other than increasing the plate thickness is desirable, but from the perspective of improving out-of-plane yield strength and out-of-plane full plastic strength, it is efficient to increase the plate thickness to improve strength, so the solutions from each perspective are contradictory. Thus, with conventional beam-column connection cores, there was a problem that it was difficult to obtain the desired strength by simply increasing the plate thickness of the steel pipe at the connection.

更に、建築基準法では板厚40mmを超える鋼材は、設計基準強度(F値)を低減するように定められている。そのため、板厚が40mmを超えた断面の鋼材を用いる場合、断面積の増加分がダイレクトに設計耐力に反映されない。ただし、板厚40mm以上の鋼材において、板厚40mm以下の場合と同等の性能を有しているという国土交通大臣の認定を受けた場合はその限りでない。例えば、TMCPプロセスを導入して圧延したH形鋼や鋼板で前述の認定を取得して基準強度の低減無しとして市場に流通している商品は多い。しかし、TMCPプロセスを導入することで、従来の圧延方法よりも製造コストが掛かり、結果的に商品のコストも高くなるという問題が生じる傾向にある(材料的要因)。 Furthermore, the Building Standards Act stipulates that steel materials with a thickness of over 40 mm must have a reduced design strength (F value). Therefore, when using steel materials with a cross-section that exceeds 40 mm in thickness, the increase in cross-sectional area is not directly reflected in the design strength. However, this does not apply if the Minister of Land, Infrastructure, Transport and Tourism certifies that steel materials with a thickness of 40 mm or more have the same performance as steel materials with a thickness of 40 mm or less. For example, there are many products on the market that are made of H-shaped steel or steel plates rolled using the TMCP process, have obtained the above-mentioned certification, and are sold with no reduction in standard strength. However, the introduction of the TMCP process tends to result in problems such as higher manufacturing costs than conventional rolling methods, and ultimately higher product costs (material factors).

これに対し、本実施形態に係る柱梁接合コア200では、仕口部鋼管10の板厚tnは、上部鋼管4及び下部鋼管6の板厚tcよりも厚い。従って、仕口部3の板厚tnを上部鋼管4及び下部鋼管6の板厚tcと同じにする場合に比して、仕口部鋼管10の板厚tnを厚くすることで、耐力を向上できる。これに対し、仕口部鋼管10の内部には、互いに隣り合う一対の側壁部11の全ての組み合わせに対して固定される四つの鋼製プレート13が設けられる。各鋼製プレート13は、上下方向から見て、一方の端部が一方の側壁部11に傾斜した状態で固定され、他方の端部が他方の側壁部11に傾斜した状態で固定される。従って、各鋼製プレート13は、仕口部鋼管10の四方の側壁部11を内部側から補強することができる。このような鋼製プレート13を設ける場合、単に仕口部鋼管10の板厚tnを厚くするだけの場合に比して、効率よく耐力を向上できる。 In contrast, in the column-beam joint core 200 according to this embodiment, the plate thickness tn of the joint steel pipe 10 is thicker than the plate thickness tc of the upper steel pipe 4 and the lower steel pipe 6. Therefore, compared to the case where the plate thickness tn of the joint 3 is the same as the plate thickness tc of the upper steel pipe 4 and the lower steel pipe 6, the plate thickness tn of the joint steel pipe 10 is made thicker, thereby improving the bearing strength. In contrast, four steel plates 13 are provided inside the joint steel pipe 10, which are fixed to all combinations of a pair of adjacent side wall portions 11. When viewed from the top and bottom, each steel plate 13 is fixed with one end inclined to one side wall portion 11, and the other end is fixed with an inclined state to the other side wall portion 11. Therefore, each steel plate 13 can reinforce the four side wall portions 11 of the joint steel pipe 10 from the inside. When such a steel plate 13 is provided, the strength can be improved more efficiently than when the plate thickness tn of the steel pipe 10 at the connection section is simply increased.

本実施形態に係る柱梁接合コア200では、隣り合う鋼製プレート13は、同一の側壁部11に対して同一の溶接部14を介して固定される。このような構成は、隣り合う鋼製プレート13が、同一の側壁部11に対して別々の溶接部14を介して固定される場合に比して、溶接部14の数を少なくすることができる。具体的に、隣り合う鋼製プレート13が、同一の側壁部11に対して別々の溶接部14を介して固定される場合、合計八つの溶接部14が形成される。これに対し、本実施形態では四つの溶接部14に抑制することができる。そのため製造を容易とすることができる。以上より、断面積の増加を抑制しつつ、且つ、製造を容易としつつ、柱梁接合構造100の耐力を向上させることができる。 In the column-beam joint core 200 according to this embodiment, adjacent steel plates 13 are fixed to the same side wall portion 11 via the same welded portion 14. This configuration can reduce the number of welded portions 14 compared to when adjacent steel plates 13 are fixed to the same side wall portion 11 via separate welded portions 14. Specifically, when adjacent steel plates 13 are fixed to the same side wall portion 11 via separate welded portions 14, a total of eight welded portions 14 are formed. In contrast, in this embodiment, the number of welded portions 14 can be reduced to four. This makes it easier to manufacture. As a result, the strength of the column-beam joint structure 100 can be improved while suppressing an increase in cross-sectional area and facilitating manufacture.

なお、ノンダイアフラム工法の仕口部3の耐力は、仕口部鋼管10の側壁部11の面外変形で負担する割合が高く、鋼製プレート13、及び鋼製プレート13によって面外変形を受ける側壁部11と隣り合う面に力を流して負担する割合は大きくない。すなわち、鋼製プレート13は、仕口部鋼管10の面外変形の補助的な役割を果たすものであるため、過度に増肉しても、トータルの断面積の増加に対して、得られる耐力向上効果が低い。従って、断面積の増加を抑制しつつ高い耐力向上効果を得るために、鋼製プレート13の板厚tdは、仕口部鋼管10の板厚tnよりも薄くしている。以上より、断面積の増加を抑制しつつ、耐力を向上させることができる。 The strength of the joint 3 in the non-diaphragm construction method is largely borne by the out-of-plane deformation of the side wall 11 of the joint steel pipe 10, and is not so much borne by the steel plate 13 and the surface adjacent to the side wall 11 that is subjected to out-of-plane deformation by the steel plate 13. In other words, since the steel plate 13 plays an auxiliary role in the out-of-plane deformation of the joint steel pipe 10, even if it is excessively thickened, the effect of improving the strength obtained is low relative to the increase in the total cross-sectional area. Therefore, in order to obtain a high effect of improving the strength while suppressing the increase in the cross-sectional area, the plate thickness td of the steel plate 13 is made thinner than the plate thickness tn of the joint steel pipe 10. As a result, it is possible to improve the strength while suppressing the increase in the cross-sectional area.

また、本実施形態に係る柱梁接合コア200では、仕口部鋼管10の板厚tnを必要以上に増加させる必要がないため、耐力を十分に確保した状態でも板厚tnを40mm以下に抑えることが可能となるため、前述のTMCPプロセスなどを導入して商品コストが高くなることを抑制することができる。以上より、前述の構造的要因、及び材料的要因の両問題を解決することが可能になる。 In addition, in the column-beam joint core 200 according to this embodiment, there is no need to increase the plate thickness tn of the joint steel pipe 10 more than necessary, so it is possible to keep the plate thickness tn to 40 mm or less while ensuring sufficient strength, which makes it possible to prevent the introduction of the aforementioned TMCP process or the like from increasing product costs. As a result, it becomes possible to solve both the problems of structural factors and material factors mentioned above.

鋼製プレート13は、仕口部鋼管10に対し、鋼管軸方向に対して全長に取り付けられてよい。この場合、仕口部鋼管10の全長にわたって、耐力向上の効果を得ることができる。 The steel plate 13 may be attached to the entire length of the joint steel pipe 10 in the axial direction of the steel pipe. In this case, the effect of improving the strength can be obtained over the entire length of the joint steel pipe 10.

鋼製プレート13は、仕口部鋼管10に対し、鋼管軸方向に対して一部に取り付けられてよい。この場合、仕口部鋼管10のうち、特にH形鋼の梁フランジが取り付く位置などの必要な箇所に限定して、耐力向上の効果を得ることができる。 The steel plate 13 may be attached to a portion of the connection steel pipe 10 in the axial direction of the steel pipe. In this case, the steel plate 13 can be limited to necessary locations of the connection steel pipe 10, particularly the location where the H-shaped steel beam flange is attached, to obtain the effect of improving the strength.

仕口部鋼管10は、溝形鋼二丁合わせで構成され、四つの鋼製プレート13を固定する溶接部14のうちの二箇所は、溝形鋼31の溶接部24を兼ねてよい。この場合、柱梁接合コア200全体としての溶接部の数を少なくすることができる。例えば、溝形鋼31の二つの溶接部24と、鋼製プレート13の四つの溶接部14とを別々に形成した場合、柱梁接合コア200全体として六つの溶接部が形成される。これに対し、図4(a)の柱梁接合コア200は、全体として四つの溶接部に抑えることができる。 The joint steel pipe 10 is composed of two channel steel pieces, and two of the welds 14 that secure the four steel plates 13 may also serve as the welds 24 of the channel steel 31. In this case, the number of welds in the column-beam joint core 200 as a whole can be reduced. For example, if the two welds 24 of the channel steel 31 and the four welds 14 of the steel plates 13 are formed separately, six welds are formed in the column-beam joint core 200 as a whole. In contrast, the column-beam joint core 200 in Figure 4 (a) can be limited to four welds as a whole.

仕口部鋼管10は、山形鋼四丁合わせで構成され、四つの鋼製プレート13を固定する四箇所の溶接部14は、山形鋼32の溶接部を24兼ねてよい。この場合、柱梁接合コア200全体としての溶接部の数を少なくすることができる。例えば、山形鋼32の四つの溶接部24と、鋼製プレート13の四つの溶接部14とを別々に形成した場合、柱梁接合コア200全体として八つの溶接部が形成される。これに対し、図4(b)の柱梁接合コア200は、全体として四つの溶接部に抑えることができる。 The joint steel pipe 10 is constructed of four angle irons, and the four welds 14 that secure the four steel plates 13 may also serve as the welds 24 of the angle irons 32. In this case, the number of welds in the column-beam joint core 200 as a whole can be reduced. For example, if the four welds 24 of the angle irons 32 and the four welds 14 of the steel plates 13 are formed separately, eight welds are formed in the column-beam joint core 200 as a whole. In contrast, the column-beam joint core 200 in Figure 4 (b) can be limited to four welds as a whole.

鋼製プレート13の一方の端部の一方の側壁部11に対する角度θ、及び鋼製プレート13の他方の端部の他方の側壁部11に対する角度は、45°であってよい。この場合、各鋼製プレート13の配置及び形状の対称性を確保することができる。従って、四方の側壁部11の耐力を均等に向上することができる。また、仕口部3に対して四方向から梁2が取り付く可能性があるため、上記角度θを45°とすることで、仕口部3を汎用品とすることができる。 The angle θ of one end of the steel plate 13 relative to one side wall 11, and the angle of the other end of the steel plate 13 relative to the other side wall 11, may be 45°. In this case, the symmetry of the arrangement and shape of each steel plate 13 can be ensured. Therefore, the bearing strength of the four side walls 11 can be improved evenly. In addition, since there is a possibility that the beam 2 will be attached to the joint portion 3 from all four directions, by setting the angle θ to 45°, the joint portion 3 can be made a general-purpose product.

仕口部鋼管10の角部12と鋼製プレート13との間には空隙16が形成され、仕口部鋼管10の外表面と、空隙16を挟んでの鋼製プレート13の固定位置との距離Ldは、仕口部鋼管10の板厚の2倍以上であってよい。仕口部鋼管10の形状や製造方法によっては、角部12付近に鋼製プレート13を溶接すると、施工性や構造的な性能が低下する可能性がある。そのため、仕口部鋼管10の外表面と、空隙16を挟んでの鋼製プレート13の固定位置との距離Ldは、仕口部鋼管10の板厚tcの2倍以上として、ある程度離しておくことで、施工性及び構造的な性能の低下を抑制できる。 A gap 16 is formed between the corner 12 of the joint steel pipe 10 and the steel plate 13, and the distance Ld between the outer surface of the joint steel pipe 10 and the fixed position of the steel plate 13 across the gap 16 may be at least twice the plate thickness of the joint steel pipe 10. Depending on the shape and manufacturing method of the joint steel pipe 10, welding the steel plate 13 near the corner 12 may reduce workability and structural performance. Therefore, by keeping the distance Ld between the outer surface of the joint steel pipe 10 and the fixed position of the steel plate 13 across the gap 16 at least twice the plate thickness tc of the joint steel pipe 10, the deterioration of workability and structural performance can be suppressed.

次に、本実施形態に係る柱梁接合コア200の効果を確認するための解析内容について説明する。図5(a)に示すように、ノンダイアフラム工法の仕口部3では,仕口部鋼管10の側壁部11の面外変形を介して梁2A,2Bから柱1に力を伝える。これに対し、図5(b)に示すように、面外変形による耐力を、H形鋼の梁2A,2Bのフランジ2aと仕口部鋼管10の一部を抽出した要素の試験体250の一方向引張試で検証する方法が公知となっている(日本建築学会大会梗概/日鉄住金建材、JFEスチール)。当該試験方法を模擬した図5(b)に示すモデルにおいて、仕口部鋼管10および鋼製プレート13をSN490材、梁のフランジ2aを模擬した加力板201および仕口部鋼管10と加力板201の溶接部をTMCP385材として有限要素法解析を実施し、各パラメータの「引張荷重」と鋼管壁の面外変形量を意味する「加力板と鋼管変位の相対変位」を比較した。その結果を図6(c)に示す。なお,このとき加力板の板厚は40mmの板厚にて幅を200mmとしており、加力板201と仕口部鋼管10の溶接部はK形開先として余盛高さは、片側10mmとした。 Next, the analysis content for confirming the effect of the beam-column joint core 200 according to this embodiment will be described. As shown in Fig. 5(a), in the joint 3 of the non-diaphragm construction method, force is transmitted from the beams 2A, 2B to the column 1 via out-of-plane deformation of the side wall 11 of the joint steel pipe 10. In contrast, as shown in Fig. 5(b), a method is known for verifying the strength due to out-of-plane deformation by a unidirectional tensile test of a test specimen 250 of an element extracted from the flanges 2a of the H-shaped beams 2A, 2B and a part of the joint steel pipe 10 (Abstract of the Architectural Institute of Japan Conference/Nippon Steel & Sumitomo Metal Construction Materials, JFE Steel). In the model shown in Figure 5 (b) simulating the test method, the steel pipe 10 and steel plate 13 at the joint were made of SN490 material, and the load plate 201 simulating the flange 2a of the beam and the welded part between the steel pipe 10 and the load plate 201 were made of TMCP385 material. A finite element analysis was performed, and the "tensile load" of each parameter and the "relative displacement between the load plate and the steel pipe displacement" which means the out-of-plane deformation of the steel pipe wall were compared. The results are shown in Figure 6 (c). In this case, the load plate had a thickness of 40 mm and a width of 200 mm, and the welded part between the load plate 201 and the steel pipe at the joint was a K-shaped groove with a reinforcement height of 10 mm on one side.

比較例に係る試験体として、図6(a)に示すように、仕口部鋼管10の板厚tnが41mmであり、鋼製プレート13無しのものを準備した。実施例に係る試験体として、図6(b)の仕口部鋼管10の板厚tnが35mmであり、鋼製プレート13の板厚tdが9mmのものを準備した。これらの試験体についての荷重変位関係を比較した結果、図6(c)に示すように、両者は同等の荷重変位関係であることが理解される。このとき、図6(a)及び図6(b)に示す仕口部鋼管10は断面積が同等であり、側壁部11を薄くしても、鋼製プレート13による方杖によって、耐力を確保できることが理解される。すなわち、鋼製プレート13による方杖付きのノンダイアフラム仕口部とすることで,側壁部11を薄くしながら、ノンダイアフラム工法仕口部の耐力を向上させることが可能であることが理解される。これにより、前述の構造的要因、及び材料的要因の厚肉化に関する問題を解決することができることが理解できる。なお、図6(a)(b)において、寸法線が付されると共に、当該寸法線に対して数字が付されている。これらの数字は寸法の値を示しており、単位は「mm」である。例えば、仕口部鋼管10の一辺の寸法として「402」と示されているが、これは仕口部鋼管10の一辺が「402mm」であることを意味する。 As a comparative example, a specimen was prepared in which the steel pipe 10 had a thickness tn of 41 mm and no steel plate 13 was used, as shown in FIG. 6(a). As a test specimen in the example, a specimen was prepared in which the steel pipe 10 had a thickness tn of 35 mm and the steel plate 13 had a thickness td of 9 mm, as shown in FIG. 6(b). As a result of comparing the load-displacement relationship for these test specimens, it is understood that the two have the same load-displacement relationship, as shown in FIG. 6(c). At this time, it is understood that the steel pipes 10 shown in FIG. 6(a) and FIG. 6(b) have the same cross-sectional area, and that even if the side wall portion 11 is thinned, the bearing strength can be ensured by the knee brace of the steel plate 13. In other words, it is understood that by making the non-diaphragm connection with knee brace by the steel plate 13, it is possible to improve the bearing strength of the non-diaphragm construction connection while thinning the side wall portion 11. It can be understood that this solves the problems related to the thickening of the structural and material factors mentioned above. In addition, in Figures 6(a) and (b), dimension lines are provided and numbers are provided for the dimension lines. These numbers indicate the dimensional values, and the unit is "mm." For example, "402" is shown as the dimension of one side of the joint steel pipe 10, which means that one side of the joint steel pipe 10 is "402 mm."

本発明は、上述の実施形態及び変形例に限定されるものではない。上述の実施形態で説明した寸法、角度等は一例にすぎず、本発明の趣旨を逸脱しない範囲で適宜変更してよい。また、仕口部鋼管、鋼製プレートの形状等も適宜変更してよい。 The present invention is not limited to the above-mentioned embodiment and modified examples. The dimensions, angles, etc. described in the above-mentioned embodiment are merely examples and may be modified as appropriate without departing from the spirit of the present invention. In addition, the shapes of the steel pipes and steel plates at the connection section may also be modified as appropriate.

1…柱、2…梁、3…仕口部、10…仕口部鋼管、11…側壁部、13…鋼製プレート、14…溶接部、24…溶接部、31…溝形鋼、32…山形鋼、200…柱梁接合コア。

1...column, 2...beam, 3...connection portion, 10...connection portion steel pipe, 11...side wall portion, 13...steel plate, 14...welded portion, 24...welded portion, 31...channel steel, 32...angle steel, 200...column-beam connection core.

Claims (5)

仕口部に四角形断面を有する仕口部鋼管を用いたノンダイアフラム工法の柱梁接合コアであって、
上側の上部鋼管及び下側の下部鋼管に接続され、前記四角断面の四辺を構成する四方の側壁部を有する前記仕口部鋼管を備え、
前記仕口部鋼管の内部には、互いに隣り合う一対の前記側壁部の全ての組み合わせに対して固定される四つの鋼製プレートが設けられ、
各鋼製プレートは、上下方向から見て、一方の端部が一方の前記側壁部に傾斜した状態で固定され、他方の端部が他方の前記側壁部に傾斜した状態で固定され、
隣り合う前記鋼製プレートは、同一の前記側壁部に対して同一の溶接部を介して固定され
前記仕口部鋼管の板厚は、前記上部鋼管及び前記下部鋼管の板厚よりも厚い、柱梁接合コア。
A column-beam joint core using a non-diaphragm construction method using a joint steel pipe having a square cross section at the joint,
The joint steel pipe is connected to an upper steel pipe on the upper side and a lower steel pipe on the lower side, and has four side wall portions that constitute the four sides of the rectangular cross section,
Four steel plates are provided inside the connection steel pipe and are fixed to all combinations of adjacent pairs of the side wall portions,
When viewed from the top-bottom direction, one end of each steel plate is fixed to one of the side wall portions in an inclined state, and the other end of each steel plate is fixed to the other side wall portion in an inclined state,
Adjacent steel plates are fixed to the same side wall portion via the same welded portion ,
A column-beam joint core , wherein the plate thickness of the joint steel pipe is thicker than the plate thicknesses of the upper steel pipe and the lower steel pipe .
前記鋼製プレートは、前記仕口部鋼管に対し、鋼管軸方向に対して全長に取り付けられる、請求項1に記載の柱梁接合コア。 The column-beam joint core according to claim 1, in which the steel plate is attached to the joint steel pipe over its entire length in the axial direction of the steel pipe. 前記鋼製プレートは、前記仕口部鋼管に対し、鋼管軸方向に対して一部に取り付けられる、請求項1に記載の柱梁接合コア。 The column-beam joint core according to claim 1, in which the steel plate is attached to a portion of the joint steel pipe in the axial direction of the steel pipe. 前記仕口部鋼管は、溝形鋼二丁合わせで構成され、四つの前記鋼製プレートを固定する前記溶接部のうちの二箇所は、前記溝形鋼の溶接部を兼ねる、請求項1~3の何れか一項に記載の柱梁接合コア。 The column-beam joint core according to any one of claims 1 to 3, in which the joint steel pipe is made of two channel steel pieces, and two of the welds that secure the four steel plates also serve as welds for the channel steel pieces. 前記仕口部鋼管は、山形鋼四丁合わせで構成され、四つの前記鋼製プレートを固定する四箇所の前記溶接部は、前記山形鋼の溶接部を兼ねる、請求項1~3の何れか一項に記載の柱梁接合コア。

The column-beam joint core according to any one of claims 1 to 3, wherein the joint steel pipe is composed of four angle irons, and the four welds that fix the four steel plates also serve as welds for the angle irons.

JP2021057194A 2021-03-30 2021-03-30 Column-beam joint core Active JP7650176B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021057194A JP7650176B2 (en) 2021-03-30 2021-03-30 Column-beam joint core

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021057194A JP7650176B2 (en) 2021-03-30 2021-03-30 Column-beam joint core

Publications (2)

Publication Number Publication Date
JP2022154265A JP2022154265A (en) 2022-10-13
JP7650176B2 true JP7650176B2 (en) 2025-03-24

Family

ID=83557753

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021057194A Active JP7650176B2 (en) 2021-03-30 2021-03-30 Column-beam joint core

Country Status (1)

Country Link
JP (1) JP7650176B2 (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015145589A (en) 2014-02-04 2015-08-13 ナカジマ鋼管株式会社 Junction structure of steel-pipe column and beam

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015145589A (en) 2014-02-04 2015-08-13 ナカジマ鋼管株式会社 Junction structure of steel-pipe column and beam

Also Published As

Publication number Publication date
JP2022154265A (en) 2022-10-13

Similar Documents

Publication Publication Date Title
JP5356954B2 (en) Non-bracket method of steel beam with step and column beam structure using it
JP4025708B2 (en) Square steel box column
JP4576899B2 (en) Method for manufacturing column-beam joint structure and column-beam joint structure
JP6179757B2 (en) Column-to-column connection structure for different diameter column connections in buildings
JP7650176B2 (en) Column-beam joint core
JP2886467B2 (en) Connection structure of steel column and steel beam with closed section
JP7650177B2 (en) Column-beam joint core
JP2010242321A (en) Damping reinforcement metal structure for steel beam-column joint and steel beam-damping joint structure using the vibration damping reinforcement metal
JP2024114323A (en) Non-diaphragm brace structure and design method for non-diaphragm brace structure
JP2010236206A (en) Column-beam joint part core and column-beam joint part structure using it
JP7435397B2 (en) Welded assembly box-shaped cross-section member
JP4127225B2 (en) Beam-column joint
JP6784466B1 (en) Building panel using honeycomb structure
JP3346364B2 (en) Beam-column joint structure
KR101940857B1 (en) Steel tube and composite column using the same
JPH08177165A (en) Structural member, manufacture of the structural member and use of the structural member
JP2017210785A (en) Method for evaluating beam
JP7832439B2 (en) H-shaped cross-sectional member and support structure
JP2001279819A (en) Beam-to-column joints and H-section steel for columns
JP7852425B2 (en) Beam design method
JP2002004425A (en) Column-beam joint, rolled H-section steel for column and method of manufacturing the same
JP7315320B2 (en) frame structure
JP7364510B2 (en) floor structure
JP2000027314A (en) Building unit manufacturing method
JP3252777B2 (en) Structure of the mounting part of the earthquake-resistant wall

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240112

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240828

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240903

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20241101

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250304

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250311

R150 Certificate of patent or registration of utility model

Ref document number: 7650176

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150