JP7650193B2 - Management system and management system - Google Patents
Management system and management system Download PDFInfo
- Publication number
- JP7650193B2 JP7650193B2 JP2021083536A JP2021083536A JP7650193B2 JP 7650193 B2 JP7650193 B2 JP 7650193B2 JP 2021083536 A JP2021083536 A JP 2021083536A JP 2021083536 A JP2021083536 A JP 2021083536A JP 7650193 B2 JP7650193 B2 JP 7650193B2
- Authority
- JP
- Japan
- Prior art keywords
- information
- reservation
- space
- construction site
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 claims description 181
- 238000000034 method Methods 0.000 claims description 125
- 230000008569 process Effects 0.000 claims description 121
- 238000012545 processing Methods 0.000 claims description 16
- 238000010586 diagram Methods 0.000 description 26
- 238000004891 communication Methods 0.000 description 9
- 230000010365 information processing Effects 0.000 description 9
- 238000012937 correction Methods 0.000 description 8
- 230000008859 change Effects 0.000 description 6
- 239000004567 concrete Substances 0.000 description 6
- 238000010079 rubber tapping Methods 0.000 description 6
- 230000003014 reinforcing effect Effects 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 239000011150 reinforced concrete Substances 0.000 description 2
- 230000004044 response Effects 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 230000015654 memory Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
本発明は、管理システム、及び管理システムに関する。 The present invention relates to a management system and a management system.
従来、工事現場の搬入作業のために、当該工事現場の棟又は階を予約する技術が知られていた(例えば、特許文献1参照)。 Conventionally, technology has been known for reserving a building or floor at a construction site for carrying out work at the site (see, for example, Patent Document 1).
ところで、工事現場において、工事の進捗に応じて新しい空間が生じたり、空間の形態が変化したりするような状況下でも、工事現場の空間を適切に予約するための技術が要望されていた。 However, there has been a demand for technology that allows appropriate reservation of space at a construction site, even in situations where new spaces are created or the form of the space changes as the construction progresses.
本発明は上記事実に鑑みなされたもので、工事現場の空間を適切に予約することが可能となる管理システム及び管理プログラムを提供する事を目的とする。 The present invention has been made in consideration of the above, and aims to provide a management system and management program that makes it possible to appropriately reserve space at a construction site.
上述した課題を解決し、目的を達成するために、請求項1に記載の管理システムは、工事現場の空間を予約するための管理システムであり、前記工事現場を示す図面情報であって、前記工事現場での工事の進捗に対応する前記図面情報と、前記工事現場での工事に関する工程の予定期間を示す対象期間情報とを相互に関連付けて格納する図面情報格納手段と、前記図面情報格納手段に格納されている前記図面情報に基づいて、少なくとも、前記工事現場の空間を予約するための予約処理を行う管理手段と、を備え、前記図面情報格納手段は、複数の前記図面情報と、複数の前記対象期間情報とを相互関連付けて格納しており、前記管理手段は、前記空間の予約に関する日付を示す情報が前記管理システムに入力された場合に、複数の前記図面情報の内の前記管理システムに入力された日付を示す情報に関連付けられている1個の図面情報を特定し、特定した1個の図面情報を表示する。
In order to solve the above-mentioned problems and achieve the objective, the management system described in
請求項2に記載の管理システムは、請求項1に記載の管理システムにおいて、前記管理手段は、前記管理システムのユーザの属性に基づいて、前記予約処理によって行われた前記工事現場の空間の予約の内容を示す予約内容情報に対する当該ユーザによる編集を、許可又は禁止する。
The management system described in
請求項3に記載の管理システムは、請求項1又は2に記載の管理システムにおいて、前記図面情報は、前記工事現場の所定位置を基準にして前記工事現場を所定縮尺で示しており、前記管理手段は、前記工事現場で用いられる対象物又は前記工事現場の予約された空間を示す画像情報を、前記図面情報の前記所定縮尺に対応する縮尺で前記図面情報に重畳して表示する。
The management system of claim 3 is the management system of
請求項4に記載の管理システムは、請求項3に記載の管理システムにおいて、前記管理手段は、前記図面情報に重畳して表示される前記対象物の前記画像情報を前記対象物の動線に沿って移動させた場合に、前記画像情報が移動中に前記図面情報に含まれている建物又は区画に重畳するか否かに基づいて、前記対象物が工事中の建物又は区画に接触せずに移動可能であるか否かを判定する。 The management system of claim 4 is the management system of claim 3, in which the management means determines whether the object can be moved without coming into contact with a building or section under construction based on whether the image information of the object displayed superimposed on the drawing information is superimposed on a building or section contained in the drawing information during movement when the image information of the object is moved along the movement path of the object.
請求項5に記載の管理システムは、請求項3に記載の管理システムにおいて、前記管理手段は、前記図面情報に重畳して表示される前記対象物の前記画像情報を前記対象物の動線に沿って移動させた場合において、前記画像情報が移動中に前記図面情報に含まれている建物又は区画に重畳した場合、前記図面情報に含まれている建物又は区画の内の前記画像情報が重畳した部分を修正する。 The management system of claim 5 is the management system of claim 3 , wherein the management means, when the image information of the object displayed superimposed on the drawing information is moved along the movement path of the object, and when the image information superimposes on a building or section included in the drawing information during the movement, corrects the portion of the building or section included in the drawing information on which the image information is superimposed.
請求項6に記載の管理システムは、請求項1から5の何れか一項に記載の管理システムにおいて、前記予約処理によって行われた前記工事現場の空間の予約の内容を示す予約内容情報を蓄積する予約情報格納手段、を備える。
The management system of claim 6 is a management system of any one of
請求項7に記載の管理システムは、請求項6に記載の管理システムにおいて、前記管理手段は、前記予約情報格納手段に格納されている前記予約内容情報に基づいて、前記工事現場での工事を管理するための指標となる管理指標情報を出力する。
The management system of
請求項8に記載の管理システムは、請求項1から7の何れか一項に記載の管理システムにおいて、前記管理手段は、所定の作業に関して前記工事現場の第1空間を予約する場合、前記所定の作業に関して前記第1空間と関連する1個以上の第2空間も連動して予約する。
The management system described in claim 8 is a management system described in any one of
請求項9に記載の管理システムは、請求項1から8の何れか一項に記載の管理システムにおいて、前記管理手段は、前記予約処理を行うことにより前記工事現場の空間の予約期間を定め、前記管理手段は、前記工事現場での工事に関する工程の予定期間が変更された場合、当該変更された前記予定期間に基づいて、前記予約期間を変更する。
請求項10に記載の管理プログラムは、工事現場の空間を予約するための管理プログラムであり、コンピュータを、前記工事現場を示す図面情報であって、前記工事現場での工事の進捗に対応する前記図面情報と、前記工事現場での工事に関する工程の予定期間を示す対象期間情報とを相互に関連付けて格納する図面情報格納手段に格納されている前記図面情報に基づいて、少なくとも、前記工事現場の空間を予約するための予約処理を行う管理手段、として機能させ、前記図面情報格納手段は、複数の前記図面情報と、複数の前記対象期間情報とを相互関連付けて格納しており、前記管理手段は、前記空間の予約に関する日付を示す情報が前記コンピュータに入力された場合に、複数の前記図面情報の内の前記コンピュータに入力された日付を示す情報に関連付けられている1個の図面情報を特定し、特定した1個の図面情報を表示する。
The management system of claim 9 is a management system of any one of
The management program described in claim 10 is a management program for reserving space at a construction site, and causes a computer to function as a management means that performs at least a reservation process for reserving space at the construction site based on drawing information showing the construction site, the drawing information being stored in a drawing information storage means that stores, in mutual association, the drawing information corresponding to the progress of construction at the construction site and target period information showing the planned period of the process related to the construction at the construction site, the drawing information storage means stores a plurality of the drawing information and a plurality of the target period information in mutual association, and when information showing a date related to the reservation of the space is inputted into the computer, the management means identifies one piece of drawing information from the plurality of drawing information that is associated with the information showing the date inputted into the computer, and displays the identified one piece of drawing information.
請求項1に記載の管理システム、及び請求項10に記載の管理プログラムによれば、工事現場での工事の進捗に対応する図面情報に基づいて予約処理を行うことにより、例えば、工事の進捗に応じて新しい空間が生じたり、空間の形態が変化したりするような状況下でも、工事現場の空間を適切に予約することが可能となる。
According to the management system described in
請求項2に記載の管理システムによれば、管理システムのユーザの属性に基づいて、予約内容情報に対する編集を許可又は禁止することにより、例えば、予約内容情報を適切に編集することが可能となる。
According to the management system described in
請求項3に記載の管理システムによれば、図面情報は工事現場の所定位置を基準にして工事現場を所定縮尺で示していることにより、例えば、工事の進捗に応じて新たな図面情報に変更して適用する場合であっても、当該新たな図面情報を変更前の図面情報の各位置と合致させることができ、工事現場の空間を適切に予約することが可能となる。また、工事現場で用いられる対象物又は工事現場の予約された空間を示す画像情報を、図面情報の所定縮尺に対応する縮尺で当該図面情報に重畳して表示することにより、例えば、実際の工事現場内での対象物又は予約された空間のサイズ等を把握することが可能となる。 According to the management system described in claim 3, since the drawing information shows the construction site at a specified scale based on a specified position on the construction site, even if the drawing information is changed and applied to new information according to the progress of the construction, the new drawing information can be matched with each position of the drawing information before the change, making it possible to appropriately reserve space on the construction site. In addition, by displaying image information showing objects used at the construction site or reserved spaces at the construction site superimposed on the drawing information at a scale corresponding to the specified scale of the drawing information, it becomes possible to grasp, for example, the size of the objects or reserved spaces within the actual construction site.
請求項6に記載の管理システムによれば、予約内容情報を蓄積することにより、例えば、蓄積された予約内容情報を利用して、工事現場の空間の利用効率を向上させることが可能となる。 According to the management system described in claim 6 , by accumulating reservation content information, it is possible to improve the efficiency of space utilization at a construction site, for example, by utilizing the accumulated reservation content information.
請求項7に記載の管理システムによれば、工事を管理するための指標となる管理指標情報を出力することにより、例えば、工事現場の空間の利用効率を更に向上させることが可能となる。
According to the management system described in
請求項8に記載の管理システムによれば、所定の作業に関して工事現場の第1空間を予約する場合、当該所定の作業に関して第1空間と関連する1個以上の第2空間も連動して予約することにより、例えば、第2空間を予約する手間を低減したり、あるいは、第2空間の予約漏れを防止したりすることが可能となる。 According to the management system described in claim 8 , when reserving a first space at a construction site for a specified work, one or more second spaces associated with the first space for the specified work can also be reserved in conjunction with the first space, thereby making it possible, for example, to reduce the effort required to reserve the second space or to prevent the second space from being overlooked.
請求項9に記載の管理システムによれば、工事現場での工事に関する工程の予定期間が変更された場合、当該変更された予定期間に基づいて予約期間を変更することにより、例えば、工事現場の空間の予約期間を、工事に関する工程と連動させることが可能となり、工程の予定期間の変更に応じて空間の予約期間を変更する手間を低減したり、あるいは、当該変更漏れを防止したりすることが可能となる。 According to the management system described in claim 9 , when the scheduled duration of a construction process at a construction site is changed, the reservation period can be changed based on the changed scheduled duration, making it possible, for example, to link the reservation period of a space at the construction site with the construction process, thereby reducing the effort of changing the reservation period of the space in response to a change in the scheduled duration of the process or preventing such changes from being overlooked.
以下に添付図面を参照して、この発明に係る管理システム及び管理プログラムの実施の形態を詳細に説明する。 The following describes in detail an embodiment of the management system and management program according to the present invention with reference to the attached drawings.
〔I〕実施の形態の基本的概念
まず、実施の形態の基本的概念について説明する。実施の形態は、管理システム及び管理プログラムに関する。本発明に係る管理システムは、工事現場の空間を予約するためのシステムであり、例えば、図面情報を用いて予約するシステムである。
[I] Basic Concept of the Embodiment First, the basic concept of the embodiment will be described. The embodiment relates to a management system and a management program. The management system according to the present invention is a system for reserving space at a construction site, for example, a system for reserving space using drawing information.
「図面情報」とは、工事現場を示す図面の情報であって、工事現場での工事の進捗に対応する図面の情報であり、例えば、平面図、立面図、断面図、及び斜視図等の任意の二次元図面、あるいは、三次元図面を示す情報等を含む概念である。 "Drawing information" refers to information on drawings showing a construction site, and is information on drawings that correspond to the progress of construction at the construction site, and is a concept that includes, for example, information showing any two-dimensional drawings such as floor plans, elevations, cross-sections, and perspective views, or three-dimensional drawings.
また、「図面情報」とは、例えば、紙面の図面をスキャンして取り込んだ任意の形式の画像データ(一例としては、JPEG形式、PNG形式、TIF形式等のデータ)等を含む概念であり、また、PDF形式のデータ等を含む概念であり、また、いわゆるBIM(Building Information Modeling(ビルディング インフォメーション モデリング))の技術に基づいて生成されたモデルから生成される図面等を含む概念である。 In addition, "drawing information" is a concept that includes, for example, image data of any format (examples include data in JPEG, PNG, TIF, etc.) captured by scanning a paper drawing, as well as data in PDF format, and drawings generated from a model generated based on so-called BIM (Building Information Modeling) technology.
「工事現場での工事の進捗に対応する図面」とは、例えば、工事現場での工事の各工程又は各作業に対応する図面を示す概念であるものと解釈してもよい。 "Drawings corresponding to the progress of construction work at a construction site" may be interpreted as a concept indicating drawings corresponding to each process or task of construction work at a construction site, for example.
「工程」とは、例えば、工事の過程を複数の段階に分けて分業を行う際の各段階に対応する概念であり、建築分野におけるいわゆる工程表で特定される対象を示す概念であるものと解釈してもよい。「作業」とは、例えば、各工程に属する仕事を示す概念であるものと解釈してもよい。 The term "process" may be interpreted, for example, as a concept corresponding to each stage when the construction process is divided into multiple stages and the work is divided up, and as a concept indicating an object identified in a so-called process schedule in the field of construction. The term "task" may be interpreted, for example, as a concept indicating the work belonging to each process.
そして、以下の実施の形態においては、「図面情報」として工事現場の各階に相当する平面図に対応する図面を示す情報を用いる場合について説明する。また、工事における順次行われる「工程」の予定期間(つまり、工程が予定される期間)が予め定められていることとして説明する。 In the following embodiment, a case will be described in which "drawing information" is information showing drawings corresponding to floor plans for each floor of a construction site. In addition, the explanation will be given assuming that the planned duration of the "processes" that are carried out sequentially in the construction (i.e., the period during which the process is scheduled) is determined in advance.
〔II〕実施の形態の具体的内容
次に、実施の形態の具体的内容について説明する。
[II] Specific Contents of the Embodiment Next, specific contents of the embodiment will be described.
(構成)
まず、図1は、本実施の形態に係る情報処理システムを機能概念的に示すブロック図である。情報処理システム100は、例えば、端末装置1、及びサーバ装置2を備え、これらの各装置が相互に通信可能となっている。なお、情報処理システム100においては、各種ユーザ(職長、職員等)に携帯される複数の端末装置1が含まれている。
(composition)
1 is a block diagram showing the functional concept of an information processing system according to the present embodiment. The information processing system 100 includes, for example, a
(構成‐端末装置)
図1の端末装置1は、ユーザによって携帯される装置であり、例えば、タブレット端末であり、一例としては、通信部11、タッチパッド12、ディスプレイ13、記録部14、及び制御部15を備える。
(Configuration - Terminal Device)
The
通信部11は、外部機器(例えば、サーバ装置2)との間で通信を行う通信手段である。タッチパッド12は、ユーザから各種操作入力を受け付ける操作手段である。ディスプレイ13は、各種の画像を表示する画像表示手段であり、例えば、上記のタッチパッド12と当該ディスプレイ13とがタッチパネルとして一体形成されている。記録部14は、プログラム及び各種のデータを記録する記録手段である。制御部15は、端末装置1を制御する制御手段であり、例えば、CPU、RAM、及びROM等の内部メモリ等を用いて構成されている。
The
(構成‐サーバ装置)
サーバ装置2は、前述の管理システムであり、例えば、通信部21、記録部22、及び制御部23を備える。
(Configuration - Server Device)
The
(構成‐サーバ装置‐通信部)
図1の通信部21は、外部機器(例えば、端末装置1)との間で通信を行う通信手段である。
(Configuration - Server Device - Communication Unit)
The
(構成‐情報処理システム-サーバ装置-記録部)
図1の記録部22は、サーバ装置2の動作に必要なプログラム及び各種のデータを記録する記録手段である。この記録部22は、例えば、下図関連情報データベース221(以下、データベースを「DB」と称する)、予約関連情報DB222、対象物等関連情報DB223を備える。
(Configuration - Information Processing System - Server Device - Recording Unit)
1 is a recording means for recording programs and various data necessary for the operation of the
(構成‐サーバ装置-記録部-下図関連情報DB)
図1の下図関連情報DB221は、前述の図面情報を格納する図面情報格納手段であり、下図関連情報を格納する格納手段である。
(Configuration - Server device - Recording unit - Related information DB shown below)
The drawing related
図2は、下図関連情報を例示した図である。「下図関連情報」とは、前述の図面情報及び当該図面情報に関連する情報を含む概念であり、例えば、図2に示す各項目の情報が相互に関連付けられている。 Figure 2 is a diagram showing an example of the drawing related information. "Drawing related information" is a concept that includes the above-mentioned drawing information and information related to the drawing information. For example, the information of each item shown in Figure 2 is mutually associated.
項目「下図ID」の情報は、下図情報を一意に識別するための下図識別情報(以下では、「識別情報」を「ID」とも称する)である(図2では、「ID011」等)。 The information in the "Drawing ID" item is drawing identification information (hereinafter, "identification information" is also referred to as "ID") for uniquely identifying the drawing information (e.g., "ID011" in Figure 2).
項目「下図情報」の情報は、図面情報であって、工事現場を示す図面を示す下図情報である。図3及び図4は、下図情報を例示した図である。なお、図3は、情報処理システム100が適用される工事現場における1階部分に対応する平面図が図示されており、工事現場の敷地の境界が実線で図示されており、また、工事中の各建物又は各区画が破線で図示されており、また、通り芯を示す情報(図面中の「X1」、「X2」、「Y1」、「Y2」等のテキスト情報、及び当該テキスト情報から延びている通り芯を示す直線)等が図示されている。なお、通り芯を示す情報としては、説明の便宜上、一部の情報のみが例示されている。また、図4は、情報処理システム100が適用される工事現場における2階部分に対応する平面図が図示されており、基本的には図3と同様な情報が図示されているが、2階部分には駐車場が存在しないので、当該駐車場が図示されていない状態となっている。 The information in the item "Drawing information" is drawing information, and is drawing information showing a drawing showing a construction site. Figures 3 and 4 are diagrams showing examples of drawing information. Note that Figure 3 shows a plan view corresponding to the first floor of a construction site to which the information processing system 100 is applied, the boundaries of the site of the construction site are shown with solid lines, and each building or section under construction is shown with dashed lines. Also, information showing the center line of the street (text information such as "X1", "X2", "Y1", "Y2" in the drawing, and straight lines showing the center line extending from the text information) is shown. Note that, for convenience of explanation, only a part of the information showing the center line of the street is shown as an example. Also, Figure 4 shows a plan view corresponding to the second floor of a construction site to which the information processing system 100 is applied, and basically shows the same information as Figure 3, but since there is no parking lot on the second floor, the parking lot is not shown.
本実施の形態では、工事現場を示す図面の画像情報を、図2の下図情報として用いることとし、例えば、図3及び図4の下図情報を示す「B011.jpg」及び「B021.jpg」等が格納されている。 In this embodiment, image information of a drawing showing a construction site is used as the drawing information for Figure 2, and for example, "B011.jpg" and "B021.jpg" showing the drawing information for Figures 3 and 4 are stored.
項目「階数情報」の情報は、下図情報が示す図面(つまり、「下図」)に図示されている階数を示す階数情報である(図2では、「1階」等)。項目「対象期間情報」の情報は、工事現場で行われる工事の各工程の予定期間を示す対象期間情報である(図2では、2020年1月1日から2020年2月29日までの期間を示す「2020年1月1日-2020年2月29日」等)。図2の例では、1個の工程が「2020年1月1日-2020年2月29日」に予定されており、次の工程が「2020年3月1日-2020年4月30日」に予定されていること等が示されている。 The information in the "Floor Information" item is floor information indicating the floor number shown in the drawing indicated by the drawing information (i.e., the "drawing") (e.g., "1st floor" in Fig. 2). The information in the "Target Period Information" item is target period information indicating the planned period of each process of the construction work to be carried out at the construction site (e.g., "January 1, 2020 - February 29, 2020" in Fig. 2, indicating the period from January 1, 2020 to February 29, 2020). The example in Fig. 2 shows that one process is scheduled for "January 1, 2020 - February 29, 2020", and the next process is scheduled for "March 1, 2020 - April 30, 2020", etc.
項目「下図位置基準情報」は、下図における各位置と当該下図に示されている工事現場とを相互に関連付けるための基準となる下図位置基準情報である。図2では、下図の画像上の位置(例えばピクセル(つまり、画素))と、当該位置を示す三次元座標とが相互に関連付けられた情報が格納されている。図2では、ピクセルについては、「P11」等と便宜上図示されている。ここで用いる三次元座標としては、相互に直交するX軸-Y軸-Z軸を基準とした座標系を用い、また、座標における「1」が工事現場での実際の距離ある1mmに対応するように設定されている場合について説明する。また、通り芯における「X1」通り及び「Y1」通りの交点に対応する位置(所定位置)を原点「0,0,0」に設定する場合について説明する。 The item "Drawing position reference information" is the drawing position reference information that serves as the reference for correlating each position in the drawing with the construction site shown in the drawing. In FIG. 2, information is stored that correlates a position on the image of the drawing (for example, a pixel (i.e., picture element)) with a three-dimensional coordinate that indicates the position. In FIG. 2, pixels are shown as "P11" for convenience. The three-dimensional coordinates used here are a coordinate system based on mutually orthogonal X-Y-Z axes, and a case will be described in which "1" in the coordinates is set to correspond to 1 mm, which is an actual distance at the construction site. In addition, a case will be described in which the position (predetermined position) corresponding to the intersection of "X1" street and "Y1" street in the center line is set to the origin "0,0,0".
すなわち、例えば、図2の「P11-(0,0,0),P12-(350000,0,0)」については、例えば、下図の「P11」に対応する位置が通り芯における「X1」通り及び「Y1」通りの交点に対応する位置(本実施の形態では、原点)であることが示されており、及び下図の「P12」に対応する位置が「P11」の位置(つまり、原点)を基準にして、X軸方向において「350000」mmだけ離れた位置であることが示されている。このような下図位置基準情報を適用することにより、下図に基づいて、実際の工事現場の寸法等を把握することが可能となる。 For example, for "P11-(0,0,0), P12-(350000,0,0)" in FIG. 2, it is shown that the position corresponding to "P11" in the diagram below is the position corresponding to the intersection of "X1" street and "Y1" street in the center line (the origin in this embodiment), and that the position corresponding to "P12" in the diagram below is a position "350000" mm away in the X-axis direction from the position of "P11" (i.e. the origin). By applying such diagram position reference information, it becomes possible to grasp the dimensions of the actual construction site based on the diagram below.
そして、このような図2の下図関連情報の最上段の情報については、例えば、「ID011」が識別する下図情報が図3の「B011.jpg」であり、当該「B011.jpg」は「1階」を示しており、当該下図情報が関連付けられている工程が「2020年1月1日-2020年2月29日」に予定されていること(つまり、「2020年1月1日-2020年2月29日」に予定されている工程に関連付けられている下図情報が「B011.jpg」であること)が示されており、当該下図情報の下図位置基準情報が「P11-(0,0,0),P12-(350000,0,0)」であることが示されている。 The information at the top of the bottom-drawing related information in Figure 2 indicates, for example, that the bottom-drawing information identified by "ID011" is "B011.jpg" in Figure 3, that "B011.jpg" indicates the "first floor," that the process to which the bottom-drawing information is associated is scheduled for "January 1, 2020 - February 29, 2020" (i.e., the bottom-drawing information associated with the process scheduled for "January 1, 2020 - February 29, 2020" is "B011.jpg"), and that the bottom-drawing position reference information of the bottom-drawing information is "P11-(0,0,0), P12-(350000,0,0)."
なお、この下図関連情報については、後述する下図登録処理を実行することにより格納される。 This drawing-related information is stored by executing the drawing registration process described below.
(構成‐サーバ装置-記録部-予約関連情報DB)
図1の予約関連情報DB222は、予約関連情報を格納する格納手段である。
(Configuration - Server device - Recording unit - Reservation related information DB)
The reservation-related
図5は、予約関連情報を例示した図である。「予約関連情報」とは、工事現場の空間の予約の内容を示す予約内容情報であり、例えば、図5に示す各項目の情報が相互に関連付けられている。 Figure 5 is a diagram illustrating reservation-related information. "Reservation-related information" is reservation content information that indicates the details of the reservation of the space at the construction site, and for example, the information items shown in Figure 5 are mutually associated.
項目「予約ID」の情報は、予約関連情報を一意に識別する予約IDである(図5では、「ID901」等)。項目「予約名情報」の情報は、予約を特定するための名称を示す予約名情報である(図5では、「鉄筋ヤード」等)。項目「予約会社情報」の情報は、予約したユーザ(例えば職長)が所属する会社を示す予約会社情報である(図5では、「A建設」等)。
項目「予約者情報」の情報は、予約したユーザ(例えば職長)を示す予約者情報である(図5では、氏名を示す情報が用いられるが、便宜上の記載である「AA AA」等が図示されている)。
The information in the item "Reservation ID" is a reservation ID that uniquely identifies reservation-related information (e.g., "ID901" in FIG. 5). The information in the item "Reservation Name Information" is reservation name information that indicates a name for identifying a reservation (e.g., "Rebar Yard" in FIG. 5). The information in the item "Reservation Company Information" is reservation company information that indicates the company to which the user who made the reservation (e.g., the foreman) belongs (e.g., "A Construction" in FIG. 5).
The information in the item "reservation user information" is information about the user who made the reservation (e.g., a foreman) (in FIG. 5, information indicating the name is used, but for the sake of convenience, "AA AA" or the like is shown).
項目「予約空間特定情報」の情報は、予約した空間を特定するための予約空間特定情報であり、例えば、項目「階数情報」と項目「位置特定情報」を含む。項目「階数情報」の情報は、予約した空間の階数を示す階数情報である(図5では、「1階」等)。項目「位置特定情報」の情報は、予約した空間の位置及び範囲を示す位置特定情報である。この位置特定情報としては、例えば、後述するように、図3等の下図情報において、領域(つまり、範囲)を指定することにより予約の対象とする空間を定めることを前提とし、指定した領域を示す座標の集合(例えば、矩形の領域を指定する場合は、各頂点に対応する座標の集合等)を用いることとし、図5では、便宜上「Ar1」等と図示されている。なお、予約の対象となる空間の鉛直方向の広がりについては、階数情報で特定可能である点を考慮して、ここで用いられる座標としては、前述のX軸-Y軸-Z軸を基準とした座標系における、X軸-Y軸の座標を用いてもよい。 The information in the item "reserved space specification information" is reservation space specification information for specifying the reserved space, and includes, for example, the items "floor information" and "location specification information". The information in the item "floor information" is floor information indicating the floor of the reserved space (in FIG. 5, "1st floor", etc.). The information in the item "location specification information" is location specification information indicating the location and range of the reserved space. For example, as described later, in the bottom diagram information in FIG. 3, etc., a set of coordinates indicating the specified area (for example, when a rectangular area is specified, a set of coordinates corresponding to each vertex, etc.) is used as the location specification information, assuming that the space to be reserved is determined by specifying an area (i.e., an area), and in FIG. 5, for convenience, it is illustrated as "Ar1". Note that, considering that the vertical extent of the space to be reserved can be specified by the floor information, the coordinates used here may be the X-axis-Y-axis coordinates in the coordinate system based on the X-axis-Y-axis-Z-axis described above.
項目「予約期間情報」の情報は、予約されて占有されることが予定されている期間を示す予約期間情報である(図5では、2020年1月20日から2020年2月20日までの期間を示す「2020年1月20日-2020年2月20日」等)。 The information in the "Reservation Period Information" item is reservation period information indicating the period during which the space is scheduled to be reserved and occupied (e.g., "January 20, 2020 - February 20, 2020" in FIG. 5, indicating the period from January 20, 2020 to February 20, 2020).
そして、このような図2の予約関連情報の最上段の情報については、例えば、「ID901」が識別する予約関連情報において、「A建設」の「AA AA」が「鉄筋ヤード」という予約の名称で、「1階」の「Ar1」が示す空間を、2020年1月20日から2020年2月20日までの期間予約していること等が示されている。 The information at the top of the reservation-related information in Figure 2 indicates, for example, that "AA AA" of "A Construction" has reserved the space indicated by "Ar1" on the "1st floor" with the reservation name "rebar yard" for the period from January 20, 2020 to February 20, 2020 in the reservation-related information identified by "ID901."
なお、この予約関連情報については、後述する予約処理を実行することにより格納される。 This reservation-related information is stored by executing the reservation process described below.
(構成‐サーバ装置-記録部-対象物等関連情報DB)
図1の対象物等関連情報DB223は、対象物等関連情報を格納する格納手段である。
(Configuration - Server device - Recording unit - Object related information DB)
The object related
図6は、対象物等関連情を例示した図である。「対象物等関連情報」とは、工事現場で用いられる対象物(例えば、トラック又は重機等の工事用車両、あるいは、機材等)、工事現場の各種領域又は移動路(例えば、立入禁止となっている領域、トラック又は重機等の移動路、作業員の移動路等)を示す情報であり、例えば、図6に示す各項目の情報が相互に関連付けられている。 Figure 6 is a diagram illustrating information related to objects, etc. "Information related to objects, etc." refers to information that indicates objects used at a construction site (e.g., construction vehicles such as trucks or heavy machinery, or equipment, etc.), various areas or routes at a construction site (e.g., areas that are off-limits, routes for trucks or heavy machinery, routes for workers, etc.), and for example, the information items shown in Figure 6 are mutually associated.
項目「対象物等ID」の情報は、対象物等関連情報を一意に識別する対象物等IDである(図6では、「ID501」等)。項目「種別情報」の情報は、対象物等の種類を示す種別情報である(図6では、「立入禁止領域」等)。項目「名称情報」の情報は、対象物等を特定するための名称を示す名称情報である(図6では、「立入禁止エリア」等)。項目「設置期間情報」の情報は、対象物等が設けられる期間を示す設置期間情報である(図6では、「2020年1月1日-2020年3月31日」等)。 The information in the item "Object ID" is an object ID that uniquely identifies object-related information (e.g., "ID501" in FIG. 6). The information in the item "Type information" is type information indicating the type of object (e.g., "No entry area" in FIG. 6). The information in the item "Name information" is name information indicating the name used to identify the object (e.g., "No entry area" in FIG. 6). The information in the item "Installation period information" is installation period information indicating the period during which the object is installed (e.g., "January 1, 2020 - March 31, 2020" in FIG. 6).
項目「対象物等特定情報」の情報は、対象物等を特定するための対象物等特定情報である。図6では対象物等の種類に応じた情報が対象物等特定情報として格納されている。例えば、「立入禁止領域」については、図5の階数情報及び位置特定情報と同様な情報が格納されており、すなわち、立入禁止となっている空間の階数及び位置及び範囲を示す情報が格納されている(図6では、「1階,Ar21」等)。また、「工事用車両」については、当該工事用車両(つまり、トラック又は重機等)のサイズを示す情報(図6では、縦、横、及び高さサイズを示す便宜上の記載である「S11」)、当該工事用車両の駐車位置を示す情報(図6では、「(X1,Y1,0)」)、及び当該工事用車両の正面が向けられている方向を示す情報(図6では、前述の座標系のX軸又はY軸を基準とした情報であり+Y方向を示す「+Y」)が格納されている。また、「工事用車両動線」については、工事用車両の移動路(つまり、動線)の位置を示す情報(図6では、階数及び位置を示す座標の集合である「1階,Ar31」)が格納されている。また、「作業員動線」については、作業員の移動路(つまり、動線)の位置を示す情報として、工事用車両動線と同様な情報が格納されている。 The information in the item "identification information of object, etc." is information for identifying an object, etc. In FIG. 6, information according to the type of object, etc. is stored as the identification information of object, etc. For example, for the "restricted area", information similar to the floor information and position identification information in FIG. 5 is stored, that is, information indicating the floor, position, and range of the space that is prohibited from entry is stored (in FIG. 6, "1st floor, Ar21", etc.). In addition, for the "construction vehicle", information indicating the size of the construction vehicle (i.e., truck or heavy machinery, etc.) (in FIG. 6, "S11", which is a convenient notation indicating the length, width, and height size), information indicating the parking position of the construction vehicle (in FIG. 6, "(X1, Y1, 0)"), and information indicating the direction in which the front of the construction vehicle is facing (in FIG. 6, information based on the X-axis or Y-axis of the above-mentioned coordinate system, "+Y" indicating the +Y direction) is stored. For the "construction vehicle traffic line," information indicating the location of the construction vehicle's travel path (i.e., the traffic line) is stored (in FIG. 6, "1st floor, Ar31," which is a set of coordinates indicating the floor number and location). For the "worker mobilization traffic line," information similar to the construction vehicle traffic line is stored as information indicating the location of the worker's travel path (i.e., the traffic line).
なお、この対象物等関連情報については、後述する対象物等登録処理を実行することにより格納される。 This object-related information is stored by executing the object registration process described below.
(構成‐サーバ装置-制御部)
図1の制御部23は、サーバ装置2を制御する制御手段であり、機能概念的には、例えば、管理部231を備える。管理部231とは、下図関連情報DB221に格納されている図面情報に基づいて、少なくとも、工事現場の空間を予約するための予約処理を行う管理手段である。なお、この制御部23の各部によって行われる処理については、後述する。
(Configuration - Server Device - Control Unit)
1 is a control means for controlling the
(処理)
続いて、本実施の形態に係る情報処理システム100によって実行される処理について説明する。例えば、下図登録処理、予約処理、対象物等登録処理、及び閲覧処理について説明する。
(process)
Next, a description will be given of processes executed by the information processing system 100 according to the present embodiment. For example, a drawing registration process, a reservation process, an object registration process, and a browsing process will be described.
(処理‐下図登録処理)
下図登録処理について説明する。下図登録処理とは、下図を登録する処理であり、例えば、図2の下図関連情報を格納する処理である。ここでは、図3及び図4の下図情報は、例えば、「2020年1月1日-2020年2月29日」が予定期間となっている工程の下図を示すこととし、この下図情報に関する各情報を格納する場合を例示して説明する。
(Processing - Registration process shown below)
The lower-level drawing registration process will be described. The lower-level drawing registration process is a process for registering a lower-level drawing, for example, a process for storing lower-level drawing related information in Fig. 2. Here, the lower-level drawing information in Fig. 3 and Fig. 4 indicates a lower-level drawing of a process whose planned period is, for example, "January 1, 2020 - February 29, 2020", and an example will be described in which each piece of information related to this lower-level drawing information is stored.
図7及び図8は、図面登録用画面を例示した図である。「図面登録用画面」とは、下図情報等を登録(つまり、格納)するための画面である。 Figures 7 and 8 are diagrams showing examples of drawing registration screens. A "drawing registration screen" is a screen for registering (i.e., storing) preliminary drawing information, etc.
まず、ユーザ(例えば職員)が所定の操作を行った場合に(例えば、下図情報が予めスキャンされたり、あるいは、BIMモデルから生成されたりして、所定のデータベースに格納されていることとし、当該下図情報をダウンロードして表示するための操作を行った場合に)、当該ユーザが携帯する端末装置1の制御部15は、図面登録用画面をディスプレイ13に表示する。
First, when a user (e.g., a staff member) performs a specified operation (e.g., the draft information has been scanned in advance or generated from a BIM model and stored in a specified database, and an operation is performed to download and display the draft information), the
ここでは、例えば、図3の「B011.jpg」の下図情報をダウンロードして表示するための操作を行った場合を例示して説明する。この場合、図7に示す当該「B011.jpg」の下図情報を表示する図面登録用画面を表示する。 Here, we will explain an example of a case where an operation is performed to download and display the sketch information for "B011.jpg" in Figure 3. In this case, the drawing registration screen is displayed, which shows the sketch information for "B011.jpg" as shown in Figure 7.
次に、ユーザは、タッチパッド12を介して、図7の図面登録用画面に表示されている下図情報が示す階数として「1階」を入力し、また、当該下図情報に対応する工程の予定期間として「2020年1月1日-2020年2月29日」を入力する。また、ユーザは、図8に示すように、タッチパッド12を介して、点P1(つまり、「X1」通り及び「Y1」通りの交点に対応する位置である原点)をタップして指定し、当該指定した点P1の座標として「0,0,0」を入力し、また、点P2をタップして指定し、当該指定した点P2の座標として「350000,0,0」を入力する。そして、ユーザは、当該入力等された情報をサーバ装置2に送信するための操作(例えば、不図示の「登録」ボタンをタップする操作等)を行う。
Next, the user inputs "1st floor" as the floor number indicated by the sketch information displayed on the drawing registration screen in FIG. 7 via the
この場合、端末装置1の制御部15は、図面登録用画面に表示されている下図情報である「B011.jpg」、ユーザに入力された階数を示す情報である「1階」、予定期間を示す情報である「2020年1月1日-2020年2月29日」、及びタップして指定された点P1、P2を示すピクセルを示す情報と入力された座標である「0,0,0」、「350000,0,0」をサーバ装置2に送信する。
In this case, the
一方、サーバ装置2の制御部23は、端末装置1から送信された情報を受信した上で、一意となる下図IDを生成し、生成した下図ID、及び受信した各情報に基づいて、図2の下図関連情報を格納する。ここでは、例えば、図2の最上段の情報を格納する。
Meanwhile, the
そして、上述の処理を適宜のタイミングで繰り返し行うことにより、図2の各情報が格納されることになる。これにて、下図登録処理を終了する。 Then, by repeating the above process at appropriate times, each piece of information in Figure 2 will be stored. This completes the registration process shown below.
(処理‐予約処理)
予約処理について説明する。図9は、予約処理のフローチャートである(以下の各処理の説明ではステップを「S」と略記する)。予約処理は、工事現場の空間を予約するための処理であり、例えば、サーバ装置2によって実行される処理であり、図5の予約関連情報を格納するための処理である。
(Processing - Reservation Processing)
The reservation process will now be described. Fig. 9 is a flowchart of the reservation process (in the following description of each process, steps are abbreviated as "S"). The reservation process is a process for reserving space at a construction site, and is executed by the
ここでは、例えば、ユーザ(例えば職長)が、自己の端末装置1のタッチパッド12を介して、予約処理を開始するための所定操作(例えば、予約処理を開始するためのボタンをタップする操作等)を行った場合に、端末装置1の制御部15は、予約処理開始信号をサーバ装置2に送信し、当該サーバ装置2が予約処理開始信号を受信した場合に処理を開始することして、当該処理が開始されたところから説明する。
Here, for example, when a user (e.g., a foreman) performs a predetermined operation to start the reservation process (e.g., tapping a button to start the reservation process) via the
===SA1===
図9のSA1においてサーバ装置2の管理部231は、予約入力用画面を表示する。図10~図12は、予約入力用画面の表示例である。「予約入力用画面」とは、空間を予約するための情報を入力するための画面であり、例えば、第1入力表示欄A11、及び第2入力表示欄A12を有する。第1入力表示欄A11は、各種テキスト情報を入力し、当該入力したテキスト情報が表示される欄である。第2入力表示欄A12は、下図情報が表示される欄であり、当該表示された下図情報を利用して予約の対象となる領域を示す情報を入力するための欄である。
===SA1===
At SA1 in Fig. 9, the
サーバ装置2の管理部231は、図10の予約入力用画面を表示するための画面情報を生成して端末装置1に送信することにより、当該端末装置1のディスプレイ13に、図10の予約入力用画面を表示する。
The
一方、ユーザが、タッチパッド12を介して、図11の第1入力表示欄A11に示すように、「日付」の入力欄(なお、各入力欄は、図面中では矩形で示されている欄である)に、自己が予約して占有を希望する空間である予約対象空間の予約期間に対応する日付(例えば予約開始日)として「2020年1月20日」を入力し、また、「階数」の入力欄に、予約対象空間の階数として「1階」を入力した上で、不図示の「図面表示」ボタンをタップした場合に、端末装置1は、当該入力された「2020年1月20日」及び「1階」を含む図面情報要求信号をサーバ装置2に送信する。
On the other hand, when a user inputs, via the
サーバ装置2の管理部231は、図面情報要求信号を受信した場合に、図2の下図関連情報を参照し、図面情報要求信号に含まれている各情報に関連付けられている下図情報をと特定する。ここでは、例えば、図2において、「2020年1月20日」を含む「2020年1月1日-2020年2月29日」に関連付けられており、且つ、「1階」に関連付けられている「下図情報」=「B011.jpg」を特定する。この後に、当該管理部231は、特定した「下図情報」=「B011.jpg」を端末装置1に送信することにより、図11に示すように、第2入力表示欄A12に「下図情報」=「B011.jpg」(つまり、図3の下図情報)を表示する。
When the
===SA2===
図9のSA2においてサーバ装置2の管理部231は、予約に関する各種情報を取得する。概略的には、ユーザが、タッチパッド12を介して、予約入力用画面に情報を入力した場合に、端末装置1の制御部15は、当該入力された情報をサーバ装置2に送信し、サーバ装置2の管理部231が、当該送信された情報を受信して当該受信した情報と、SA1で受信した図面情報要求信号に含まれている階数を示す情報を取得する。
===SA2===
9, the
ここでは、例えば、ユーザが、図11の予約入力用画面において、図12に示すように、第1入力表示欄A11の「予約名」、「予約会社名」、「予約者名」、「占有開始」、「占有終了」の入力欄に「鉄筋ヤード」、「A建設」、「AA AA」、「2020年1月20日」、「2020年2月20日」を入力し、また、第2入力表示欄A12の領域901を指定することにより入力した場合、入力された「鉄筋ヤード」、「A建設」、「AA AA」、「2020年1月20日」、「2020年2月20日」、領域901を示す座標の集合である「Ar1」をサーバ装置2に送信する。
Here, for example, when a user inputs "rebar yard", "A Construction", "AA AA", "January 20, 2020", and "February 20, 2020" into the input fields for "reservation name", "reservation company name", "reservation person name", "occupancy start", and "occupancy end" in the first input display field A11 as shown in FIG. 12 on the reservation input screen of FIG. 11, and also inputs by specifying the
一方、サーバ装置2の管理部231は、これらの「鉄筋ヤード」、「A建設」、「AA AA」、「2020年1月20日」、「2020年2月20日」、「Ar1」を受信して取得し、また、SA1で受信した図面情報要求信号に含まれている階数を示す情報である「1階」を取得する。
Meanwhile, the
===SA3===
図9のSA3においてサーバ装置2の管理部231は、SA2で取得した各種情報に基づいて、予約関連情報を格納する。ここでは、例えば、予約関連情報DB222で一意となる予約IDである「ID901」を生成し、生成した「ID901」、SA2で取得した「鉄筋ヤード」、「A建設」、「AA AA」、「1階」、「Ar1」を、図5の予約ID、予約名情報、予約会社情報、予約者情報、階数情報、及び位置特定情報として格納し、また、SA2で取得した「2020年1月20日」から当該取得した「2020年2月20日」までの期間を示す「2020年1月20日-2020年2月20日」を予約期間情報として格納する。これにて、予約処理を終了する。
===SA3===
In SA3 of Fig. 9, the
(処理‐対象物等登録処理)
対象物等登録処理について説明する。対象物等登録処理は、図6の対象物等関連情報を格納するための処理である。
(Processing - Registration processing of objects, etc.)
The object registration process is a process for storing object related information shown in FIG.
ユーザ(例えば職員)が自己の端末装置1を介して、図6の対象物等関連情報の内の対象物ID以外の情報を入力してサーバ装置2に送信した場合に、サーバ装置2の制御部23は、一意となる対象物等IDを生成し、生成した対象部ID、及び端末装置1から受信した情報に基づいて、対象物等特定情報を格納する。なお、ここでの具体的な処理は任意であり、例えば、図12の予約入力用画面と同様な画面を表示して、ユーザによって当該画面に入力された情報に基づいて格納するように構成してもよい。
When a user (e.g., a staff member) inputs information other than the object ID in the object-related information in FIG. 6 via his/her
(処理‐閲覧処理)
閲覧処理について説明する。閲覧処理は、図5の予約関連情報を表示するための処理であり、予約閲覧用画面を表示する処理である。図13及び図14は、予約閲覧用画面の表示例である。「予約閲覧用画面」とは、予約関連情報を表示するための画面であり、例えば、表示条件入力欄A21、及び情報表示欄A22を有する。表示条件入力欄A21は、情報表示欄A22に表示する情報を選択するための条件を入力する欄であり、図13及び図14では不図示となっているが、例えば、階数、日付、予約会社名、又は予約者名等のうちの1個以上の情報を入力することが可能となっている。情報表示欄A22は、予約関連情報を表示するための欄である。
(Processing - Viewing Processing)
The viewing process will be described. The viewing process is a process for displaying the reservation-related information in FIG. 5, and is a process for displaying a reservation viewing screen. FIGS. 13 and 14 are display examples of the reservation viewing screen. The "reservation viewing screen" is a screen for displaying reservation-related information, and has, for example, a display condition input field A21 and an information display field A22. The display condition input field A21 is a field for inputting conditions for selecting information to be displayed in the information display field A22, and although not shown in FIGS. 13 and 14, it is possible to input one or more pieces of information such as the number of floors, date, name of the reservation company, or name of the person making the reservation. The information display field A22 is a field for displaying reservation-related information.
ここでは、例えば、ユーザ(例えば職員又は職長)が、自己の端末装置1のタッチパッド12を介して、閲覧処理を開始するための所定操作(例えば、閲覧処理を開始するためのボタンをタップする操作等)を行った場合に、端末装置1の制御部15は、閲覧処理開始信号をサーバ装置2に送信し、当該サーバ装置2が閲覧処理開始信号を受信した場合に処理を開始することして、当該処理が開始されたところから説明する。
Here, for example, when a user (e.g., an employee or foreman) performs a predetermined operation to start the viewing process (e.g., tapping a button to start the viewing process) via the
サーバ装置2の制御部23は、図13の予約閲覧用画面(詳細には情報表示欄A22に何らの情報も表示されていない予約閲覧用画面)を表示するための画面情報を生成して端末装置1に送信することにより、当該端末装置1のディスプレイ13に、予約閲覧用画面を表示する。
The
ここでは、例えば、2020年2月10日の予約を閲覧する場合について説明する。この場合、ユーザが、タッチパッド12を介して、表示条件入力欄A21に、閲覧のために表示する情報の条件として「階数」=「1階」及び「日付」=「2020年2月10日」を入力し、不図示の「表示」ボタンをタップした場合に、端末装置1の制御部15は、当該「階数」=「1階」及び「日付」=「2020年2月10日」を含む表示条件通知信号をサーバ装置2に送信する。
Here, for example, a case will be described where reservations for February 10, 2020 are viewed. In this case, when the user inputs "floor" = "1st floor" and "date" = "February 10, 2020" as conditions for information to be displayed for viewing in the display condition input field A21 via the
サーバ装置2の制御部23は、表示条件通知信号を受信した場合に、当該受信した表示条件通知信号に含まれている情報に合致する情報を含む予約閲覧用画面を表示するための画面情報を生成して端末装置1に送信することにより、当該端末装置1のディスプレイ13に、予約閲覧用画面を表示する。具体的には、以下の第1処理~第4処理を実行する。
When the
===第1処理===
ここでは、例えば、「階数」=「1階」及び「日付」=「2020年2月10日」を含む表示条件通知信号を受信した場合、まず、図2の下図関連情報を参照して、前述の「階数」=「1階」と同じ階数情報が関連付けられており、且つ、前述の「日付」=「2020年2月10日」を含む対象期間情報が関連付けられている「下図情報」=「B011.jpg」を特定する(以下、「第1処理」とも称する)。
First Process
Here, for example, when a display condition notification signal including "floor" = "1st floor" and "date" = "February 10, 2020" is received, first, by referring to the lower diagram related information in Figure 2, the "lower diagram information" = "B011.jpg" which is associated with the same floor information as the aforementioned "floor" = "1st floor" and is associated with target period information including the aforementioned "date" = "February 10, 2020" is identified (hereinafter also referred to as "first process").
===第2処理===
次に、図5の予約関連情報を参照して、前述の「階数」=「1階」と同じ階数情報が関連付けられており、且つ、前述の「日付」=「2020年2月10日」を含む予約期間情報が関連付けられている「予約ID」=「ID901」及び「ID902」を特定する(以下、「第2処理」とも称する)。
Second Process
Next, by referring to the reservation-related information in Figure 5, the "reservation ID" = "ID901" and "ID902" are identified which are associated with the same floor information as the aforementioned "floor" = "1st floor" and which are associated with reservation period information including the aforementioned "date" = "February 10, 2020" (hereinafter also referred to as "second process").
===第3処理===
次に、図6の対象物等関連情報を参照して、前述の「階数」=「1階」と同じ階数を示す対象物等特定情報が関連付けられており、且つ、前述の「日付」=「2020年2月10日」を含む設置期間情報が関連付けられている対象物等IDを特定する(以下、「第3処理」とも称する)。
===Third Process===
Next, by referring to the object-related information in Figure 6, an object ID is identified that is associated with object-specific information indicating the same floor as the aforementioned "floor" = "1st floor" and is associated with installation period information including the aforementioned "date" = "February 10, 2020" (hereinafter also referred to as "third process").
なお、ここで特定する対象物等IDは、全ての種別情報に関連付けられている情報を特定するように構成してもよいし、あるいは、ユーザからの入力に基づいて予め定められた一部の種別情報に関連付けられている情報を特定するように構成してもよいが、例えば、「種別情報」=「立入禁止領域」に関連付けられている情報を特定するように構成されている場合について最初に詳細に説明し、「種別情報」=「立入禁止領域」及び「工事用車両」に関連付けられている情報を特定するように構成されている場合について次に概略のみ説明する。 The object ID specified here may be configured to specify information associated with all type information, or may be configured to specify information associated with a portion of type information that is predetermined based on input from the user. For example, a case where the object ID is configured to specify information associated with "type information" = "restricted area" will be described in detail first, and then a case where the object ID is configured to specify information associated with "type information" = "restricted area" and "construction vehicle" will be briefly described below.
「種別情報」=「立入禁止領域」に関連付けられている情報を特定するように構成されている場合、「第3処理」では、図6の「対象物等ID」=「ID501」を特定する。 When configured to identify information associated with "type information" = "restricted area", the "third process" identifies the "object ID" = "ID501" in Figure 6.
===第4処理===
次に、図5の予約関連情報を参照して、「第2処理」で特定した「予約ID」=「ID901」及び「ID902」に関連付けられている各情報を取得し、また、図6の対象物等関連情報を参照して、「第3処理」で特定した「対象物等ID」=「ID501」に関連付けられている各情報を取得した上で、「第1処理」で特定した「下図情報」=「B011.jpg」が示す下図に対して、当該取得した各情報によって特定される情報を重畳することにより、例えば図13に示す予約閲覧用画面を表示するための画面情報を生成し、当該生成した画面情報を端末装置1に送信することにより表示する(以下、「第4処理」とも称する)。
===Fourth Process===
Next, by referring to the reservation-related information in Figure 5, each piece of information associated with the "reservation ID" = "ID901" and "ID902" identified in the "second process" is obtained, and also by referring to the object-related information in Figure 6, each piece of information associated with the "object ID" = "ID501" identified in the "third process" is obtained, and by superimposing information specified by each piece of acquired information on the drawing indicated by the "drawing information" = "B011.jpg" identified in the "first process", screen information for displaying a reservation viewing screen as shown in Figure 13, for example, is generated, and the generated screen information is displayed by transmitting it to the terminal device 1 (hereinafter also referred to as "fourth process").
詳細には、図13に示すように、図5の「ID901」に関連付けられている「Ar1」が示す位置及び範囲を矩形の領域で示し、且つ、当該「ID901」に関連付けられている「鉄筋ヤード」を当該矩形の領域にテキスト情報として表示される予約空間表示用画像G901(つまり、画像情報であり、予約された空間の位置及び範囲等を示す図形の画像)、図5の「ID902」に関連付けられている「Ar2」が示す位置及び範囲を矩形の領域で示し、且つ、当該「ID902」に関連付けられている「柱地組」を当該矩形の領域にテキスト情報として表示される予約空間表示用画像G902(つまり、画像情報であり、予約された空間の位置及び範囲等を示す図形の画像)、図6の「ID501」に関連付けられている「Ar21」が示す位置を矩形で示し、且つ、当該「ID501」に関連付けられている「立入禁止エリア」を当該矩形の領域にテキスト情報として表示される対象物等関連表示用画像G903(つまり、立入禁止領域に設定されている位置及び範囲等を示す図形の画像)を、図2の「下図情報」=「B011.jpg」の下図に対して重畳して表示する予約閲覧用画面を表示するための画面情報を生成し、当該生成した画面情報を端末装置1に送信することにより表示する。
In detail, as shown in FIG. 13, reserved space display image G901 (i.e., image information, a graphic image showing the position and range of the reserved space, etc.) shows the position and range indicated by "Ar1" associated with "ID901" in FIG. 5 in a rectangular area, and the "reinforced concrete yard" associated with "ID901" is displayed as text information in the rectangular area, and reserved space display image G902 (i.e., image information, a graphic image showing the position and range of the reserved space, etc.) shows the position and range indicated by "Ar2" associated with "ID902" in FIG. 5 in a rectangular area, and the "pillar base assembly" associated with "ID902" is displayed as text information in the rectangular area. That is, image information is generated to display a reservation viewing screen that displays an object-related display image G903 (i.e., a graphic image showing the position and range, etc. of the reserved space), which shows the position indicated by "Ar21" associated with "ID501" in FIG. 6 as a rectangle, and displays the "restricted area" associated with that "ID501" as text information in the rectangular area (i.e., a graphic image showing the position and range, etc. set in the restricted area), superimposed on the lower view of "lower view information" = "B011.jpg" in FIG. 2, and the generated screen information is displayed by transmitting it to the
なお、「第3処理」において、「種別情報」=「立入禁止領域」及び「工事用車両」に関連付けられている情報を特定するように構成されている場合、当該「第3処理」では、図6の「対象物等ID」=「ID501」に加えて「ID502」も特定する。 In addition, if the "third process" is configured to identify information associated with the "type information" = "restricted area" and "construction vehicle", the "third process" also identifies "ID502" in addition to the "object ID" = "ID501" in Figure 6.
この場合の「第4処理」は前述の場合と同様であるが、図14に示すように、この「対象物等ID」=「ID502」に関しては、図6の「ID502」に関連付けられている「(X1,Y1,0)」が示す位置に、図6の「+Y」が示す向きに向けて、図6の「S11」が示すサイズにて、「下図情報」=「B011.jpg」の縮尺に対応する縮尺で重畳して表示される対象物等関連表示用画像G904(つまり、画像情報であり、駐車位置に駐車している状態のトラックを示す図形の画像)を重畳して表示する予約閲覧用画面を表示するための画面情報を生成し、当該生成した画面情報を端末装置1に送信することにより表示する。なお、図14の対象物等関連表示用画像G904については、全体形状が説明の便宜上矩形で図示されているが、トラックの平面図に対応する図形の画像であり、且つ、図14の図面上側に向けられている方向が正面側を示すものとする。
In this case, the "fourth process" is the same as the above-mentioned case, but as shown in FIG. 14, for this "object ID" = "ID502", screen information is generated for displaying a reservation viewing screen that displays an object related display image G904 (i.e., image information, a graphic image showing a truck parked in a parking position) superimposed at a scale corresponding to the scale of "bottom drawing information" = "B011.jpg" at a position indicated by "(X1, Y1, 0)" associated with "ID502" in FIG. 6, in a direction indicated by "+Y" in FIG. 6, and in a size indicated by "S11" in FIG. 6, and is displayed, and the generated screen information is displayed by transmitting it to the
なお、ここでは、前述したように、図2の下図位置基準情報において、下図上の2点にピクセルの座標として工事現場での実際の距離に対応する情報が用いられているので、図14の予約閲覧用画面の対象物等関連表示用画像G904のサイズを視認することにより、当該対象物等関連表示用画像G904が示すトラックの、周囲に対する相対的なサイズを確認することが可能となる。 As mentioned above, the position reference information in the lower diagram of Figure 2 uses information corresponding to the actual distance at the construction site as pixel coordinates for two points on the lower diagram, so by visually checking the size of the object-related display image G904 on the reservation viewing screen in Figure 14, it is possible to confirm the relative size of the truck indicated by the object-related display image G904 in relation to its surroundings.
また、ここでは、例えば、公知のマウスオーバーの如き技術を適用して、予約空間表示用画像G901、G902に対して、図5の予約関連情報における任意の情報を関連付けることにより、予約閲覧用画面における予約空間表示用画像をタップした場合に、図5の予約関連情報の内の任意情報(例えば、予約会社情報、予約者情報、予約期間情報等)が表示されるように構成してもよい。なお、対象物等関連表示用画像G903、G904についても同様に構成してもよい。 In addition, here, for example, a known technique such as mouse over may be applied to associate any information in the reservation related information in FIG. 5 with the images G901 and G902 for displaying the reserved space, so that when the image for displaying the reserved space on the reservation viewing screen is tapped, any information in the reservation related information in FIG. 5 (for example, reservation company information, reservation user information, reservation period information, etc.) is displayed. Note that the images G903 and G904 for displaying related objects, etc. may be configured in the same way.
そして、ユーザは、自己の端末装置1に表示されている図13又は図14等の予約閲覧用画面を視認することにより、「2020年2月10日」の「1階」の空間の予約状況を確認することが可能となる。これにて、閲覧処理を終了する。
Then, the user can check the reservation status of the space on the "1st floor" on "February 10, 2020" by visually checking the reservation viewing screen of FIG. 13 or FIG. 14, etc., displayed on his/her
(本実施の形態の効果)
本実施の形態によれば、工事現場での工事の進捗に対応する図面情報に基づいて予約処理を行うことにより、例えば、工事の進捗に応じて新しい空間が生じたり、空間の形態が変化したりするような状況下でも、工事現場の空間を適切に予約することが可能となる。
(Effects of this embodiment)
According to this embodiment, by performing reservation processing based on drawing information corresponding to the progress of construction work at the construction site, it becomes possible to appropriately reserve space at the construction site even in situations where, for example, new spaces are created or the form of space changes as the construction progresses.
また、図面情報は工事現場の所定位置を基準にして工事現場を所定縮尺で示していることにより、例えば、工事の進捗に応じて新たな図面情報に変更して適用する場合であっても、当該新たな図面情報を変更前の図面情報の各位置と合致させることができ、工事現場の空間を適切に予約することが可能となる。また、工事現場で用いられる対象物又は工事現場の予約された空間を示す画像情報を、図面情報の所定縮尺に対応する縮尺で当該図面情報に重畳して表示することにより、例えば、実際の工事現場内での対象物又は予約された空間のサイズ等を把握することが可能となる。 In addition, because the drawing information shows the construction site at a specified scale based on a specified position on the construction site, even if new drawing information is changed and applied according to the progress of the construction, the new drawing information can be matched with each position of the drawing information before the change, making it possible to appropriately reserve space on the construction site.In addition, by superimposing image information showing objects used at the construction site or reserved spaces at the construction site on the drawing information at a scale corresponding to the specified scale of the drawing information, it becomes possible to grasp, for example, the size of the objects or reserved spaces within the actual construction site.
〔III〕実施の形態に対する変形例
以上、本発明に係る実施の形態について説明したが、本発明の具体的な構成及び手段は、特許請求の範囲に記載した各発明の技術的思想の範囲内において、任意に改変及び改良することができる。
[III] Modifications to the embodiments The above describes the embodiments of the present invention, but the specific configurations and means of the present invention can be modified and improved as desired within the scope of the technical ideas of each invention described in the claims.
(調整について)
また、図9の予約処理において、相互に異なるユーザである各職長が、相互に重複する空間を重複する期間に予約する場合も想定されるが、このような場合は、ユーザである職員が、各予約に関する情報を確認して調整した上で、相互に重複しないように、予約関連情報を格納するように構成してもよい。なお、このような調整を、サーバ装置2の管理部231が、所定の基準(例えば、職員によって予め定められた優先順位等)に基づいて自動的に行うように構成してもよい。
(Regarding adjustments)
9, it is also assumed that foremen, who are different users, reserve overlapping spaces for overlapping periods, and in such a case, the system may be configured so that the staff, who are users, check and adjust the information on each reservation, and then store the reservation-related information so that the reservations do not overlap. Note that the
(予約関連情報の編集について)
また、図5の予約関連情報の編集に関して、以下のように構成してもよい。具体的には、サーバ装置2の管理部231が、ユーザの属性に基づいて、予約処理によって行われた工事現場の空間の予約の内容を示す予約関連情報に対する当該ユーザによる編集を、許可又は禁止するように構成してもよい。「ユーザの属性」とは、ユーザの特徴又は性質を示す概念であり、例えば、ユーザが所属する会社又は部署、当該ユーザの職種等を示す概念である。
(Editing reservation-related information)
Furthermore, editing of the reservation-related information in Fig. 5 may be configured as follows. Specifically, the
ユーザの属性が、ユーザが所属する会社である場合は、以下のように構成してもよい。例えば、建築分野における元請会社に対応する「〇〇工務店」が存在し、図5の「A建設」及び「B建設」等が当該「〇〇工務店」の下請け会社である場合について説明する。そして、図1の記録部22に対して、ユーザを示す氏名情報と、当該ユーザが所属する会社を示す会社情報とが関連付けられているユーザ情報が格納されていることとする。
When the user attribute is the company to which the user belongs, the following configuration may be used. For example, we will explain the case where there is a "XX Construction Company" that corresponds to a prime contractor in the construction field, and "A Construction" and "B Construction" in Figure 5 are subcontractors of the "XX Construction Company." Then, assume that user information is stored in the
ユーザが、自己の端末装置1に対して自己の氏名情報を入力した上でログインし、図5の予約関連情報の内の何れかの情報を選択して編集するための所定操作(例えば、図13又は図14等の予約閲覧用画面において、予約空間表示用画像をタップして選択した上で不図示の「編集」ボタンをタップする操作等)を行った場合に、端末装置1が、ログイン時に入力された氏名情報及び選択された予約空間表示用画像を示す情報を含む編集要求信号を、サーバ装置2に送信する。
When a user logs in to their
一方、サーバ装置2の管理部231は、端末装置1から編集要求信号を受信した場合に、当該受信した編集要求信号に含まれる氏名情報を取得し、記録部22に記録されているユーザ情報を参照して、当該取得した氏名情報と同じ氏名情報が関連付けられている会社情報を特定する。
On the other hand, when the
そして、特定した会社情報が「〇〇工務店」等の元請会社を示している場合、編集要求信号に含まれている予約空間表示用画像を示す情報に対応する予約関連情報が、何れの会社に所属する予約者によって予約された情報であっても(すなわち、何れの予約関連情報についても)、編集を許可する処理を行う。なお、ここでの編集を許可する処理としては、例えば、ユーザに対して編集するための情報(例えば、予約名情報又は予約期間情報等を一部変更するための情報等)を、端末装置1を介して入力させてサーバ装置2に送信されることにより、当該情報に基づいて編集する処理等を行ってもよい。
If the identified company information indicates a prime contractor such as "XX Construction Company," a process is performed to allow editing of the reservation-related information corresponding to the information indicating the reservation space display image included in the editing request signal, regardless of which company the reservation was made by (i.e., for any reservation-related information). Note that the process of allowing editing here may, for example, involve having the user input information to be edited (for example, information for partially changing reservation name information or reservation period information, etc.) via the
一方、特定した会社情報が「A建設」又は「B建設」等の下請け会社を示している場合、編集要求信号に含まれている予約空間表示用画像を示す情報に対応する予約関連情報が、当該特定した会社情報に属する予約者によって行われた情報である場合(つまり、特定した会社情報と、編集要求信号に含まれている予約空間表示用画像を示す情報に対応する予約関連情報に含まれる予約会社情報が合致する場合)に、前述と同様にして、編集を許可する処理を行い、一方、当該特定した会社情報に属する予約者によって行われた情報でない場合(つまり、特定した会社情報と、編集要求信号に含まれている予約空間表示用画像を示す情報に対応する予約関連情報に含まれる予約会社情報が合致しない場合)に、編集を禁止するための処理を行う。なお、ここでの編集を禁止するための処理としては、例えば、端末装置1に対して「他の会社の予約内容は編集できません」等のメッセージを送信して表示することにより、編集が禁止されていることを通知する処理等を行ってもよい。
On the other hand, if the specified company information indicates a subcontractor such as "A Construction" or "B Construction", and the reservation-related information corresponding to the information showing the reservation space display image included in the editing request signal is information made by a reservation holder belonging to the specified company information (i.e., the specified company information matches the reservation company information included in the reservation-related information corresponding to the information showing the reservation space display image included in the editing request signal), a process to permit editing is performed in the same manner as described above. On the other hand, if the information is not made by a reservation holder belonging to the specified company information (i.e., the specified company information does not match the reservation company information included in the reservation-related information corresponding to the information showing the reservation space display image included in the editing request signal), a process to prohibit editing is performed. Note that the process to prohibit editing here may, for example, be a process to notify that editing is prohibited by sending and displaying a message such as "You cannot edit the reservation contents of other companies" to the
このように構成することにより、ユーザの属性に基づいて、予約関連情報に対する編集を許可又は禁止することにより、例えば、予約関連情報を適切に編集することが可能となる。 By configuring it in this way, it becomes possible to, for example, appropriately edit reservation-related information by permitting or prohibiting editing of reservation-related information based on the user's attributes.
(空間の連動予約について)
また、複数の空間を連動して予約できるように構成してもよい。例えば、管理部231が、所定の作業に関して工事現場の第1空間を予約する場合、当該所定の作業に関して第1空間と関連する1個以上の第2空間も連動して予約するように構成してもよい。
(Regarding linked space reservations)
In addition, a configuration may be made such that a plurality of spaces can be reserved in a linked manner. For example, when the
図15は、他の予約関連情報を例示した図であり、図16は、他の予約入力用画面の表示例である。例えば、図15に示すように、図5の各情報に対して項目「作業情報」の情報(つまり、予約された空間で行われる作業の内容を示す作業情報)を更に関連付け、図16の第1入力表示欄A11の右下に示される「作業」の入力欄に入力された作業名に対応する情報を、図15の作業情報に格納するように構成してもよい。 Figure 15 is a diagram illustrating other reservation-related information, and Figure 16 is a display example of another reservation input screen. For example, as shown in Figure 15, information in the "Work Information" item (i.e., work information indicating the content of the work to be performed in the reserved space) may be further associated with each piece of information in Figure 5, and information corresponding to the work name entered in the "Work" input field shown in the lower right of the first input display field A11 in Figure 16 may be stored in the work information in Figure 15.
なお、この場合、図16の「作業」の入力欄には、予め定められている複数個の作業名の内の1個の作業名が入力されるように、例えば、ユーザが当該入力欄をタップした場合に、複数個の作業名をリスト表示し、当該リストの内からユーザがタップして選択した作業名が入力され、図15の作業情報として格納されるように構成してもよい。 In this case, the "Task" input field in FIG. 16 may be configured to input one of a number of predetermined task names. For example, when the user taps on the input field, a list of multiple task names is displayed, and the task name selected by the user from the list is input and stored as the task information in FIG. 15.
そして、1個の空間について作業を行う場合に、安全性確保等を含む任意の観点から他の空間も予約する必要がある所定作業として、「コンクリート打設」等が予め定められていることとする。ここでは、「コンクリート打設」については、少なくとも下の階も予約することが定められていることとする。 It is assumed that "pouring concrete" and the like are predefined as specific tasks that require the reservation of other spaces as well from any standpoint, including ensuring safety, when work is performed in one space. Here, it is assumed that for "pouring concrete," it is predefined that at least the lower floors are also reserved.
例えば、ユーザが、図16の予約入力用画面において、「階数」の入力欄に「2階」を入力し、また、「作業」の入力欄に「コンクリート打設」を入力し、又は他の入力欄に図示の情報を入力し、また、第2入力表示欄A12の領域905を指定することにより入力した場合、サーバ装置2の管理部231は、実施の形態で説明した各処理を行うことにより、図15の「ID903」に関連付けられている情報を格納する。更に、サーバ装置2の管理部231は、図16の「作業」の入力欄に入力された作業名が、前述の所定作業である「コンクリート打設」であるので、ユーザから直接の情報入力は行われていないが、図16の領域905が示す領域の直下の階の領域に対応する空間も予約するために、図15の「ID904」に関連付けられている情報(「ID904」及び「1階」以外は、「ID903」に関連付けられている情報と同じ情報)も自動的に格納する。
For example, when a user inputs "2nd floor" in the "floor number" input field, inputs "concrete pouring" in the "task" input field, or inputs the illustrated information in other input fields, and also inputs by specifying the
なお、この例では、図15の「2階」及び「Ar5」で示される空間が「第1空間」に対応し、また、「1階」及び「Ar5」で示される空間が「第2空間」に対応するものと解釈」してもよい。 In this example, the space indicated by "2nd floor" and "Ar5" in FIG. 15 may be interpreted as corresponding to the "first space," and the space indicated by "1st floor" and "Ar5" may be interpreted as corresponding to the "second space."
また、ここでは、他の空間を自動的に予約する(つまり、「ID904」に関連付けられている情報を自動的に格納する)場合について説明したが、これに限らず、例えば、図16の「作業」の入力欄に入力された作業名が、前述の所定作業である場合、他の空間(例えば、直下の階の空間、又は、直上の階の空間、あるいは、その他の予め定められて規則に従って特定される空間)を入力させるための情報を表示し、ユーザから入力された情報に基づいて、他の空間を予約するように構成してもよい。 Here, we have described a case where another space is automatically reserved (i.e., information associated with "ID904" is automatically stored), but this is not limiting. For example, if the work name entered in the "Work" input field in FIG. 16 is the above-mentioned specified work, information for inputting another space (for example, the space on the floor immediately below, or the space on the floor immediately above, or any other space specified according to a predetermined rule) may be displayed, and the other space may be reserved based on the information entered by the user.
このように構成した場合、例えば、第2空間を予約する手間を低減したり、あるいは、第2空間の予約漏れを防止したりすることが可能となる。 When configured in this way, it is possible, for example, to reduce the effort required to reserve the second space or to prevent the second space from being overlooked.
(予約期間情報の変更について)
また、図5又は図15の予約期間情報については、図2の対象期間情報(つまり、工事現場で行われる工事の各工程の予定期間を示す情報)を考慮して、ユーザが入力して格納する場合がある。このような場合、予約期間情報を工程の予定期間と関連付ける必要性が生じることが想定される。このようなこと等を想定して、管理部231が、工事現場での工事に関する工程の予定期間が変更された場合、当該変更された予定期間に基づいて、図5又は図15の予約期間情報を変更するように構成してもよい。
(Regarding changes to reservation period information)
In addition, the reservation period information in Fig. 5 or Fig. 15 may be input and stored by the user, taking into consideration the target period information in Fig. 2 (i.e., information indicating the planned period of each process of the construction work to be performed at the construction site). In such a case, it is expected that there will be a need to associate the reservation period information with the planned period of the process. In anticipation of such a case, the
例えば、工程の予定期間を示す情報が記録部22に格納されていることとし、当該情報が変更されて、工程の予定期間における予定終了日が、所定の日数分(例えば、5日分)延期された場合、管理部231は、予約期間情報の終了の日付を当該所定の日数分延期してもよい。すなわち、図5又は図15の「2020年1月20日-2020年2月20日」については、予約期間情報の終了の日付を5日分延期することにより、「2020年1月20日-2020年2月25日」に変更して当該変更した情報を格納するように構成してもよい。
For example, if information indicating the planned period of a process is stored in the
このように構成した場合、例えば、工事現場の空間の予約期間を、工事に関する工程と連動させることが可能となり、工程の予定期間の変更に応じて空間の予約期間を変更する手間を低減したり、あるいは、当該変更漏れを防止したりすることが可能となる。 When configured in this way, for example, it becomes possible to link the reservation period for a space at a construction site with the construction process, reducing the effort required to change the reservation period for the space in response to changes in the scheduled duration of the process, or preventing such changes from being overlooked.
(情報の蓄積について)
また、図5又は図15の予約関連情報を、図1の予約関連情報DB222から消去せずに蓄積し続けるように構成してもよい。なお、このように構成する場合の予約関連情報DB222が「予約情報格納手段」に対応するものと解釈してもよい。このように構成することにより、例えば、蓄積された予約関連情報を利用して、工事現場の空間の利用効率を向上させることが可能となる。
(Regarding the accumulation of information)
Also, the reservation-related information of Fig. 5 or Fig. 15 may be configured to continue to be stored without being deleted from the reservation-related
また、このように予約関連情報を蓄積した場合、過去の予約関連情報を把握することが可能となるので、管理部231が、蓄積された予約関連情報に基づいて、管理指標情報を算出し、算出した管理指標情報を出力するように構成してもよい。「管理指標情報」とは、工事現場での工事を管理するための指標となる情報あり、例えば、空間歩掛を示す情報等である。なお、「空間歩掛」とは、工事に関する単位数量(例えば、鉄筋に関する工事については、当該工事で用いられる鉄筋1トン)あたりの当該工事のために予約された領域の面積及び予約された期間(つまり、予約された日数)を示す概念であり、すなわち、単位「m2・日/ton」等が適用される概念である。
In addition, when reservation-related information is accumulated in this manner, it becomes possible to grasp past reservation-related information, so the
具体的な実装手法は任意であるが、例えば、図15の予約名情報として、予約する空間各々で行われる工事各々について予め定められた名称を格納することとし、また、作業情報において当該工事の作業で利用する資機材の量(例えば、配筋については鉄筋の総重量、コンクリート打設についてはコンクリートの総重量等)を追加で格納するように構成する。そして、管理部231は、蓄積された予約関連情報において、図15の位置特定情報に基づいて予約されている空間に対応する面積を算出し、また、予約期間情報に基づいて予約されている日数を算出した上で、(「算出した面積」×「算出した日数」)÷「作業情報に格納されている資機材の量」の演算を行い、演算結果を空間歩掛(つまり、管理指標情報)とし、当該空間歩掛を端末装置1に送信して当該端末装置1を介して表示出力したり、あるいは、他のコンピュータを介して表示出力したりしてもよい。
The specific implementation method is arbitrary, but for example, the reservation name information in FIG. 15 is configured to store a predetermined name for each construction work to be performed in each reserved space, and the amount of materials and equipment used in the construction work (for example, the total weight of rebar for reinforcement, the total weight of concrete for concrete pouring, etc.) is additionally stored in the work information. Then, the
このように構成することにより、例えば、工事現場の空間の利用効率を更に向上させることが可能となる。 By configuring it in this way, it is possible to further improve the efficiency of space utilization at construction sites, for example.
なお、「空間歩掛」については、工事に関する単位数量(例えば、鉄筋に関する工事については、当該工事で用いられる鉄筋1トン)あたりの当該工事のために予約された空間の体積及び予約された期間(つまり、予約された日数)を示す概念であり、すなわち、単位「m3・日/ton」等が適用される概念であることとしてもよい。この場合、管理部231は、蓄積された予約関連情報において、図15の位置特定情報に基づいて予約されている空間に対応する体積を算出しし、また、予約期間情報に基づいて予約されている日数を算出した上で、(「算出した体積」×「算出した日数」)÷「作業情報に格納されている資機材の量」の演算を行い、演算結果を空間歩掛(つまり、管理指標情報)として出力してもよい。
The "space unit rate" is a concept indicating the volume of the space reserved for the construction work per unit quantity (for example, for construction work related to reinforcing bars, 1 ton of reinforcing bars used in the construction work) and the reserved period (i.e., the number of days reserved), that is, a concept to which the unit " m3 ·day/ton" or the like is applied. In this case, the
また、「管理指標情報」として、空間利用率を用いてもよい。「空間利用率」とは、どれだけ空間に余裕があるかを評価するための概念であり、例えば、「予約された面積」÷「施工済み延床面積」の演算によって算出される概念等を含む。なお、この空間利用率については、例えば、階別に算出して相互に比較するように構成してもよい。この空間利用率を用いることにより、例えば、工事に関するプロジェクトが適切に遂行できる最適の空間利用率を確認することが可能となる。 Space utilization rate may also be used as "management index information." "Space utilization rate" is a concept for evaluating how much space is available, and includes, for example, a concept calculated by dividing "reserved area" by "total floor area already constructed." Note that this space utilization rate may be calculated, for example, by floor and compared with each other. By using this space utilization rate, it is possible to confirm the optimal space utilization rate for the proper execution of a construction project, for example.
なお、この概念の実装手法は任意であり、例えば、施工済み延床面積を示す情報が、適宜のタイミングでサーバ装置2の記録部22に記録されるように構成した上で、管理部231が、当該情報及び蓄積された図15の予約関連情報に基づいて空間利用率を算出して出力するように構成してもよい。
The implementation method of this concept is arbitrary. For example, the information indicating the completed floor area may be configured to be recorded in the
また、「管理指標情報」として、空間錯綜度を用いてもよい。「空間錯綜度」とは、どれだけ空間利用が錯綜しているかを評価するための概念であり、例えば、「空間の予約主体が変更した面積」÷(「施工済み延べ床面積」×「予約された日数」)の演算によって算出される概念等を含む。この空間錯綜度を用いることにより、例えば、敷地が狭い工事のプロジェクトほど空間錯綜度が上がることや、あるいは、空間錯綜度が施工効率に影響すること等の確認を行うことが可能となる。 Spatial confusion may also be used as "management index information." "Spatial confusion" is a concept for evaluating how confused space usage is, and includes, for example, a concept calculated by calculating "area changed by the space reservation entity" ÷ ("total floor area completed" × "number of reserved days"). By using this spatial confusion, it is possible to confirm, for example, that the spatial confusion increases in construction projects on smaller sites, or that spatial confusion affects construction efficiency.
なお、この概念の実装手法は任意であり、例えば、前述の空間利用率の場合と同様に構成してもよい。 The implementation method for this concept is arbitrary, and for example, it may be configured in the same way as the space utilization rate described above.
また、「管理指標情報」として、空間優先度を用いてもよい。「空間優先度」とは、前述の「(調整について)」で説明したように、予約される空間が相互に重複した場合にどの予約を優先すべきかを評価するための概念であり、例えば、「職員が変更した後の予約面積」÷「職長の予約面積」の演算によって算出される概念等を含む。この空間優先度を用いることにより、例えば、この空間優先度のデータを蓄積して、経験の比較的浅い職員に対して優先すべき空間を提示したり、自動的に空間を調整したりできる。なお、「予約面積」については、例えば、予約空間を平面視した場合の面積(つまり、予約空間を鉛直上方から下方に向かって見た場合の面積)に対応するものと解釈してもよい。 Space priority may also be used as "management index information." As explained above in "(Regarding Adjustments)," "space priority" is a concept for evaluating which reservation should take priority when reserved spaces overlap, and includes, for example, a concept calculated by dividing "reserved area after change by staff member" by "reserved area by foreman." By using this space priority, for example, data on this space priority can be accumulated to present spaces that should be prioritized to staff members with relatively little experience, or to automatically adjust spaces. Note that the "reserved area" may be interpreted as corresponding to the area of the reserved space when viewed in plan (i.e., the area of the reserved space when viewed vertically from above downwards).
また、「管理指標情報」として、空間要求実現度を用いてもよい。「空間要求実現度」とは、職長の要求の実現度合いを評価するための概念であり、例えば、「確定面積(占有日経過後の面積)」÷「予約面積」の演算によって算出される概念等を含む。この空間要求実現度を用いることにより、例えば、この空間要求実現度のデータを蓄積して、要求が通りやすい面積を提示したり、自動的に空間を調整したりできる。 The degree of realization of space requests may also be used as "management index information." "Degree of realization of space requests" is a concept for evaluating the degree of realization of the foreman's requests, and includes, for example, a concept calculated by calculating "confirmed area (area after the occupancy date has passed)" / "reserved area." By using this degree of realization of space requests, for example, data on the degree of realization of space requests can be accumulated to present areas where requests are likely to be accepted, or to automatically adjust the space.
また、蓄積された予約関連情報の利用例は、ここで説明した例に限らず、工事現場の空間の利用効率を向上させるために、他の利用例を適用してもよい。例えば、前述の「(調整について)」で説明したように、相互に重複する空間を相互に重複する期間に予約した場合の調整を自動的に行うために、蓄積された予約関連情報を用いてもよい。 In addition, examples of use of the accumulated reservation-related information are not limited to the examples described here, and other examples of use may be applied to improve the efficiency of space usage at a construction site. For example, as described above in "(Regarding Adjustments)," the accumulated reservation-related information may be used to automatically adjust when overlapping spaces are reserved for overlapping periods.
(情報の表示について(その1))
また、閲覧処理では、図13及び図14に示すように、予約空間表示用画像G901、G902に加えて、対象物等関連表示用画像G903、G904を表示するように構成したが、この構成を任意に変更してもよい。例えば、対象物等関連表示用画像G904のみを表示するように構成してもよいし、あるいは、図6の対象物等関連情報における工事用車両動線に対応する位置を示す画像を表示してもよい。
(Display of information (part 1))
In addition, in the browsing process, as shown in Fig. 13 and Fig. 14, in addition to the reserved space display images G901 and G902, the object related display images G903 and G904 are displayed, but this configuration may be changed arbitrarily. For example, it may be configured to display only the object related display image G904, or an image showing a position corresponding to the construction vehicle traffic line in the object related information in Fig. 6 may be displayed.
図17は、予約閲覧用画面の表示例である。具体的には、サーバ装置2の管理部231が、図6の対象物等関連情報に基づいて、閲覧処理で図13又は図14の対象物等関連表示用画像G903、G904を表示する場合の処理と同様の処理を行うことにより、図6の「ID503」に関連付けられているトラックAの移動路(ここでは、工事現場の敷地の境界に対する出入口である「ゲート」から駐車位置に至る移動路である動線)の位置を示す画像として、図17の対象物等関連表示用画像G905を表示するように構成してもよい。
Figure 17 is a display example of a reservation viewing screen. Specifically, the
(情報の表示について(その2))
サーバ装置2の管理部231が、以下の第1処理~第2処理を実行するように構成してもよい。図18~図20は、予約閲覧用画面の表示例である。
(Display of information (part 2))
The
===第1処理===
「第1処理」は、動線に関して確認させるための処理であり、例えば、工事用車両が動線に沿って移動した場合に、工事中の各建物又は各区画に接触せずに移動可能であるか否かを確認させるための処理である。
First Process
The "first process" is a process for checking the traffic flow, for example, a process for checking whether a construction vehicle can move along a traffic flow without coming into contact with each building or section under construction.
処理については、管理部231が、図18に示すように、対象物等関連表示用画像G904(つまり、工事用車両のサイズに対応するサイズの画像情報)を、図17の対象物等関連表示用画像G905が示す動線に沿ってゲートから駐車位置まで移動させた場合に、当該対象物等関連表示用画像G904が、移動中に下図情報において破線で示されている工事中の各建物又は各区画に重畳するか否かに基いて、工事用車両が工事中の各建物又は各区画に接触せずに移動可能であるか否かを判定するように構成してもよい。移動中に重畳する場合に、工事中の各建物又は各区画に接触せずに移動することは可能ではない(つまり、不可能である)ものと判定し、一方、移動中に重畳しない場合に、工事中の各建物又は各区画に接触せずに移動することは可能であるものと判定する。そして、これらの判定結果を予約閲覧用画面に表示して出力することにより、ユーザに確認させるように構成してもよい。
Regarding the processing, as shown in FIG. 18, when the
例えば、図18に示す場合、「駐車場」の角の部分で対象物等関連表示用画像G904が重畳することになるので、工事中の各建物又は各区画に接触せずに移動することは可能ではないものと判定し、当該重畳された「駐車場」の角の部分をハイライト表示等することにより、工事用車両が接触する可能性がある部分を当該ハイライト表示と共にメッセージにて通知してもよい。 For example, in the case shown in FIG. 18, the object related display image G904 will be superimposed on the corner of the "parking lot", so it may be determined that it is not possible to move around without coming into contact with each building or section under construction, and the corner of the superimposed "parking lot" may be highlighted, etc., to notify the user of the areas that may be contacted by a construction vehicle by a message along with the highlighting.
又は、管理部231が、前述の判定を行わずに、図18に示すように、対象物等関連表示用画像G904の移動の軌跡を示す画像を表示することにより確認させるように構成してもよい。なお、この対象物等関連表示用画像G904の移動の軌跡を示す画像としては任意の画像を用いてもよく、例えば、図19に示すように、対象物等関連表示用画像G904の最も外側の部分の軌跡を示す曲線の画像を用いてもよい。
Alternatively, the
===第2処理===
「第2処理」は、対象物の動線に関する情報を反映する処理であり、例えば、対象物の動線に関する情報に基づいて下図情報等を修正する処理である。
Second Process
The "second process" is a process that reflects information on the flow line of the object, for example, a process that modifies the preliminary map information, etc., based on the information on the flow line of the object.
処理については、前述の「第1処理」において、対象物等関連表示用画像G904が、移動中に下図情報において破線で示されている工事中の各建物又は各区画に重畳した場合に、管理部231が、当該重畳した部分を特定し、当該特定した部分が工事中の各建物又は各区画外となるように、下図情報において工事中の各建物又は各区画の外形を一部修正し、修正後の下図情報を図2の下図関連情報に格納する。
Regarding the processing, in the above-mentioned "first processing", when the object related display image G904 is superimposed on each building or each section under construction shown by a dashed line in the rough sketch information while moving, the
例えば、図18又は図19に示す場合、「駐車場」の角の部分で対象物等関連表示用画像G904が移動中に重畳することになるので、図20に示すように、当該角の部分を「駐車場」から削除する修正(つまり、角の部分を面取りする修正)を下図情報において行い、修正後の下図情報を図2の下図関連情報に格納することにより、当該下図情報を更新する。 For example, in the case shown in FIG. 18 or FIG. 19, the object related display image G904 will be superimposed on the corner of the "parking lot" while it is moving, so as shown in FIG. 20, a correction is made in the drawing information to remove the corner from "parking lot" (i.e., a correction is made to chamfer the corner), and the corrected drawing information is stored in the drawing related information in FIG. 2, thereby updating the drawing information.
(情報の表示について(その3))
また、上述の「(情報の表示について(その1))」及び「(情報の表示について(その2))」で説明した構成を任意に応用してもよい。例えば、図17の対象物等関連表示用画像G905については、ユーザが、予約閲覧用画面において動線に対応する位置を指定する操作を、タッチパッド12を介して行った場合に、サーバ装置2の管理部231が、当該指定された位置に対象物等関連表示用画像G905を表示するように構成してもよい。また、図18及び図19の対象物等関連表示用画像G904の移動の軌跡を示す画像についても同様に、ユーザが、予約閲覧用画面において対象物等関連表示用画像G904を動線に沿って移動させる操作を、タッチパッド12を介して行った場合に、サーバ装置2の管理部231が、当該操作に基づいて、軌跡を示す画像を表示するように構成してもよい。
(Display of information (part 3))
In addition, the configurations described in the above "(Regarding display of information (part 1))" and "(Regarding display of information (part 2))" may be applied arbitrarily. For example, for the object-related display image G905 of FIG. 17, when a user performs an operation to specify a position corresponding to a flow line on the reservation viewing screen via the
(情報の表示について(その4))
また、上述の「(情報の表示について(その2))」で説明した「第2処理」の構成を任意に応用してもよい。例えば、対象物等関連表示用画像G904を動線に沿って移動させる際に、予約空間表示用画像G901、G902の角の部分に重畳した場合に、図20の例の場合と同様に、当該予約空間表示用画像の当該角の部分を削除する修正(つまり、角の部分を面取りする修正)を行い、当該修正後の空間の範囲を示す情報を図5又は図15の位置特定情報として格納するように構成してもよい。なお、この場合、当該修正を行う前に、ユーザに対して修正の要否を問い合わせる処理を行い、当該問い合わせ結果に基づいて修正するように構成してもよい。
(Display of Information (Part 4))
In addition, the configuration of the "second process" described in "(Display of information (part 2))" above may be applied arbitrarily. For example, when moving an object-related display image G904 along a flow line and superimposing it on a corner of the reserved space display image G901, G902, a correction may be made to delete the corner of the reserved space display image (i.e., a correction is made to chamfer the corner), as in the example of FIG. 20, and information indicating the range of the space after the correction may be stored as the position specification information of FIG. 5 or FIG. 15. In this case, before the correction is made, a process may be performed to inquire of the user as to whether or not the correction is necessary, and the correction may be made based on the result of the inquiry.
1 端末装置
2 サーバ装置
11 通信部
12 タッチパッド
13 ディスプレイ
14 記録部
15 制御部
21 通信部
22 記録部
23 制御部
100 情報処理システム
221 下図関連情報DB
222 予約関連情報DB
223 対象物等関連情報DB
231 管理部
901 領域
905 領域
A11 第1入力表示欄
A12 第2入力表示欄
A21 表示条件入力欄
A22 情報表示欄
G901 予約空間表示用画像
G902 予約空間表示用画像
G903 対象物等関連表示用画像
G904 対象物等関連表示用画像
G905 対象物等関連表示用画像
P1 点
P2 点
222 Reservation related information DB
223 Object related information DB
231
Claims (10)
前記工事現場を示す図面情報であって、前記工事現場での工事の進捗に対応する前記図面情報と、前記工事現場での工事に関する工程の予定期間を示す対象期間情報とを相互に関連付けて格納する図面情報格納手段と、
前記図面情報格納手段に格納されている前記図面情報に基づいて、少なくとも、前記工事現場の空間を予約するための予約処理を行う管理手段と、を備え、
前記図面情報格納手段は、複数の前記図面情報と、複数の前記対象期間情報とを相互関連付けて格納しており、
前記管理手段は、前記空間の予約に関する日付を示す情報が前記管理システムに入力された場合に、複数の前記図面情報の内の前記管理システムに入力された日付を示す情報に関連付けられている1個の図面情報を特定し、特定した1個の図面情報を表示する、
管理システム。 It is a management system for reserving space on construction sites.
A drawing information storage means for storing drawing information showing the construction site, the drawing information corresponding to the progress of the construction at the construction site , and target period information showing a planned period of the process related to the construction at the construction site in a mutually associated manner ;
and a management means for performing at least a reservation process for reserving a space at the construction site based on the drawing information stored in the drawing information storage means ,
the drawing information storage means stores a plurality of pieces of drawing information and a plurality of pieces of target period information in a mutually associated manner;
When information indicating a date related to the reservation of the space is input to the management system, the management means identifies one piece of drawing information associated with the information indicating the date input to the management system among the plurality of pieces of drawing information, and displays the identified piece of drawing information.
Management system.
請求項1に記載の管理システム。 The management means permits or prohibits editing by a user of the management system of reservation content information indicating the contents of the reservation of the space of the construction site made by the reservation process, based on the attributes of the user of the management system.
The management system according to claim 1 .
前記管理手段は、前記工事現場で用いられる対象物又は前記工事現場の予約された空間を示す画像情報を、前記図面情報の前記所定縮尺に対応する縮尺で前記図面情報に重畳して表示する、
請求項1又は2に記載の管理システム。 The drawing information shows the construction site at a predetermined scale based on a predetermined position of the construction site,
The management means displays image information showing an object to be used at the construction site or a reserved space at the construction site by superimposing the image information on the drawing information at a scale corresponding to the predetermined scale of the drawing information.
The management system according to claim 1 or 2.
請求項3に記載の管理システム。 the management means determines whether the object can be moved without coming into contact with a building or section under construction based on whether or not the image information of the object displayed to be superimposed on the drawing information is superimposed on a building or section included in the drawing information during the movement of the image information when the image information of the object is moved along a line of movement of the object.
The management system according to claim 3.
請求項3に記載の管理システム。 the management means, when the image information of the object displayed by being superimposed on the drawing information is moved along the movement line of the object, and when the image information is superimposed on a building or a section included in the drawing information during the movement, corrects the portion of the building or the section included in the drawing information on which the image information is superimposed.
The management system according to claim 3.
請求項1から5の何れか一項に記載の管理システム。 A reservation information storage means for storing reservation content information indicating the contents of the reservation of the space of the construction site made by the reservation processing,
The management system according to any one of claims 1 to 5 .
請求項6に記載の管理システム。 The management means outputs management index information serving as an index for managing the construction work at the construction site based on the reservation content information stored in the reservation information storage means.
The management system according to claim 6 .
請求項1から7の何れか一項に記載の管理システム。 When reserving a first space at the construction site for a predetermined work, the management means also reserves one or more second spaces associated with the first space for the predetermined work in conjunction with the first space.
The management system according to any one of claims 1 to 7 .
前記管理手段は、前記工事現場での工事に関する工程の予定期間が変更された場合、当該変更された前記予定期間に基づいて、前記予約期間を変更する、
請求項1から8の何れか一項に記載の管理システム。 The management means performs the reservation process to determine a reservation period for the space at the construction site,
When a scheduled period for a process related to the construction at the construction site is changed, the management means changes the reservation period based on the changed scheduled period.
The management system according to any one of claims 1 to 8 .
コンピュータを、
前記工事現場を示す図面情報であって、前記工事現場での工事の進捗に対応する前記図面情報と、前記工事現場での工事に関する工程の予定期間を示す対象期間情報とを相互に関連付けて格納する図面情報格納手段に格納されている前記図面情報に基づいて、少なくとも、前記工事現場の空間を予約するための予約処理を行う管理手段、として機能させ、
前記図面情報格納手段は、複数の前記図面情報と、複数の前記対象期間情報とを相互関連付けて格納しており、
前記管理手段は、前記空間の予約に関する日付を示す情報が前記コンピュータに入力された場合に、複数の前記図面情報の内の前記コンピュータに入力された日付を示す情報に関連付けられている1個の図面情報を特定し、特定した1個の図面情報を表示する、
管理プログラム。 It is a management program for reserving space on construction sites,
Computer,
a management means for performing at least a reservation process for reserving a space at the construction site based on drawing information showing the construction site, the drawing information being stored in a drawing information storage means that stores drawing information corresponding to the progress of the construction at the construction site and target period information showing a planned period of a process related to the construction at the construction site in a mutually associated manner ;
the drawing information storage means stores a plurality of pieces of drawing information and a plurality of pieces of target period information in a mutually associated manner;
the management means, when information indicating a date related to the reservation of the space is input to the computer, identifies one piece of drawing information associated with the information indicating the date input to the computer among the plurality of pieces of drawing information, and displays the identified piece of drawing information;
Management program.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021083536A JP7650193B2 (en) | 2021-05-18 | 2021-05-18 | Management system and management system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021083536A JP7650193B2 (en) | 2021-05-18 | 2021-05-18 | Management system and management system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2022177348A JP2022177348A (en) | 2022-12-01 |
| JP7650193B2 true JP7650193B2 (en) | 2025-03-24 |
Family
ID=84237654
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2021083536A Active JP7650193B2 (en) | 2021-05-18 | 2021-05-18 | Management system and management system |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7650193B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7632445B2 (en) * | 2022-12-27 | 2025-02-19 | トヨタ自動車株式会社 | Space Management System |
Citations (18)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000202747A (en) | 1999-01-18 | 2000-07-25 | Hitachi Zosen Corp | How to manage work space |
| JP2005050098A (en) | 2003-07-28 | 2005-02-24 | Takenaka Komuten Co Ltd | Construction process visualization method |
| JP2006024073A (en) | 2004-07-09 | 2006-01-26 | Hitachi Plant Eng & Constr Co Ltd | Construction plan expression method, construction plan expression system, and object display method with shape change |
| JP2007210800A (en) | 2006-01-12 | 2007-08-23 | Hitachi Ltd | Material location system and material delivery location sorting method |
| JP2009020728A (en) | 2007-07-12 | 2009-01-29 | Toshiba Corp | Process management system and method |
| JP2010157206A (en) | 2008-12-05 | 2010-07-15 | Riraito:Kk | Progress management system |
| JP2011028597A (en) | 2009-07-28 | 2011-02-10 | Hitachi-Ge Nuclear Energy Ltd | Apparatus, method and program for supporting arrangement of work area, and recording medium |
| JP2011079661A (en) | 2009-09-10 | 2011-04-21 | Mitsubishi Heavy Ind Ltd | Material carry-in management device and method |
| JP2012208744A (en) | 2011-03-30 | 2012-10-25 | Tokyo Electric Power Co Inc:The | Process management system and process management method |
| JP2014081862A (en) | 2012-10-18 | 2014-05-08 | Hitachi-Ge Nuclear Energy Ltd | Interference adjustment system for work area |
| JP2016099744A (en) | 2014-11-19 | 2016-05-30 | 日立建機株式会社 | Operation state recording device of construction machinery |
| JP2017073086A (en) | 2015-10-09 | 2017-04-13 | 福井コンピュータホールディングス株式会社 | Mobile terminal, schedule management program, and schedule management server |
| JP2018142146A (en) | 2017-02-27 | 2018-09-13 | 株式会社東芝 | Work schedule range visualizing apparatus and work schedule range visualizing method |
| JP2019145020A (en) | 2018-02-23 | 2019-08-29 | 株式会社竹中工務店 | Management system and management program |
| JP2020077199A (en) | 2018-11-07 | 2020-05-21 | 高砂熱学工業株式会社 | Design device, design system and program using virtual display |
| JP2021012732A (en) | 2018-03-29 | 2021-02-04 | 高砂熱学工業株式会社 | Construction material and equipment reservation management system and program |
| JP2021012677A (en) | 2019-07-09 | 2021-02-04 | 株式会社竹中工務店 | Management system and management program |
| JP2021022154A (en) | 2019-07-26 | 2021-02-18 | 大成建設株式会社 | Method for guiding transporter vehicle in construction site |
-
2021
- 2021-05-18 JP JP2021083536A patent/JP7650193B2/en active Active
Patent Citations (18)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000202747A (en) | 1999-01-18 | 2000-07-25 | Hitachi Zosen Corp | How to manage work space |
| JP2005050098A (en) | 2003-07-28 | 2005-02-24 | Takenaka Komuten Co Ltd | Construction process visualization method |
| JP2006024073A (en) | 2004-07-09 | 2006-01-26 | Hitachi Plant Eng & Constr Co Ltd | Construction plan expression method, construction plan expression system, and object display method with shape change |
| JP2007210800A (en) | 2006-01-12 | 2007-08-23 | Hitachi Ltd | Material location system and material delivery location sorting method |
| JP2009020728A (en) | 2007-07-12 | 2009-01-29 | Toshiba Corp | Process management system and method |
| JP2010157206A (en) | 2008-12-05 | 2010-07-15 | Riraito:Kk | Progress management system |
| JP2011028597A (en) | 2009-07-28 | 2011-02-10 | Hitachi-Ge Nuclear Energy Ltd | Apparatus, method and program for supporting arrangement of work area, and recording medium |
| JP2011079661A (en) | 2009-09-10 | 2011-04-21 | Mitsubishi Heavy Ind Ltd | Material carry-in management device and method |
| JP2012208744A (en) | 2011-03-30 | 2012-10-25 | Tokyo Electric Power Co Inc:The | Process management system and process management method |
| JP2014081862A (en) | 2012-10-18 | 2014-05-08 | Hitachi-Ge Nuclear Energy Ltd | Interference adjustment system for work area |
| JP2016099744A (en) | 2014-11-19 | 2016-05-30 | 日立建機株式会社 | Operation state recording device of construction machinery |
| JP2017073086A (en) | 2015-10-09 | 2017-04-13 | 福井コンピュータホールディングス株式会社 | Mobile terminal, schedule management program, and schedule management server |
| JP2018142146A (en) | 2017-02-27 | 2018-09-13 | 株式会社東芝 | Work schedule range visualizing apparatus and work schedule range visualizing method |
| JP2019145020A (en) | 2018-02-23 | 2019-08-29 | 株式会社竹中工務店 | Management system and management program |
| JP2021012732A (en) | 2018-03-29 | 2021-02-04 | 高砂熱学工業株式会社 | Construction material and equipment reservation management system and program |
| JP2020077199A (en) | 2018-11-07 | 2020-05-21 | 高砂熱学工業株式会社 | Design device, design system and program using virtual display |
| JP2021012677A (en) | 2019-07-09 | 2021-02-04 | 株式会社竹中工務店 | Management system and management program |
| JP2021022154A (en) | 2019-07-26 | 2021-02-18 | 大成建設株式会社 | Method for guiding transporter vehicle in construction site |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2022177348A (en) | 2022-12-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US11900020B2 (en) | System for on-site tracking, managing, planning and staging construction projects | |
| Cheng et al. | GIS-based cost estimates integrating with material layout planning | |
| Chen et al. | Exploiting digitalization for the coordination of required changes to improve engineer-to-order materials flow management | |
| JP6626379B2 (en) | Transportation management system | |
| JP6626380B2 (en) | Transportation management system | |
| JP5418158B2 (en) | Information processing system and program | |
| CN101814163B (en) | For the method and system of adaptive construction sequencing | |
| JP2018035626A (en) | Placement management system, placement management method, and placement management program | |
| JP7650193B2 (en) | Management system and management system | |
| JP7613887B2 (en) | Information processing system and information processing program | |
| Choo et al. | Space scheduling using flow analysis | |
| JPH08115495A (en) | Automatic vehicle arranging device | |
| JP2018035628A (en) | Placing management system, placing management method, and placing management program | |
| JP2002105989A (en) | Construction site management system | |
| Salim et al. | Effects of design-integrated process planning on productivity in rebar placement | |
| JP7289473B2 (en) | Information processing equipment, programs and systems | |
| JP7454926B2 (en) | Collection and delivery business management device, collection and delivery business management method and program | |
| JP7698823B2 (en) | Reinforcing bar delivery support system and reinforcing bar delivery support method | |
| JP2008225596A (en) | Work progress confirmation support system | |
| EP1725959A1 (en) | Method and system for scheduling reinforcing bars for use in reinforced products | |
| JP5630771B2 (en) | Process management system | |
| JP2023178575A (en) | Management system and management program | |
| JP7720048B1 (en) | Performance management system, performance management method, and performance management program | |
| JP7700525B2 (en) | Information management system, information management method, and information management program | |
| JP2001123664A (en) | Preparation device for reinforcing bar machine specification |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20240321 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20241206 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20241217 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20250127 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20250304 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20250311 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7650193 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |