Power supply planning support device and power supply planning support program Download PDF

Info

Publication number
JP7653052B2
JP7653052B2 JP2021001612A JP2021001612A JP7653052B2 JP 7653052 B2 JP7653052 B2 JP 7653052B2 JP 2021001612 A JP2021001612 A JP 2021001612A JP 2021001612 A JP2021001612 A JP 2021001612A JP 7653052 B2 JP7653052 B2 JP 7653052B2
Authority
JP
Japan
Prior art keywords
power source
revenue
power
price
capacity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021001612A
Other languages
Japanese (ja)
Other versions
JP2022106535A (en
Inventor
慎介 蟻正
彰浩 勝部
暁彦 杉山
勇気 長尾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2021001612A priority Critical patent/JP7653052B2/en
Publication of JP2022106535A publication Critical patent/JP2022106535A/en
Application granted granted Critical
Publication of JP7653052B2 publication Critical patent/JP7653052B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

この発明は、電源計画策定支援装置および電源計画策定支援プログラムに関し、具体的には、収益性に基づいて電源の存続または廃止ならびに新設または中止に係る計画の策定を支援する技術に関する。 This invention relates to a power supply planning support device and a power supply planning support program, and more specifically to technology that supports the formulation of plans for the continuation or abolition of power supplies, and the establishment or cancellation of power supplies, based on profitability.

電力取引市場において取引される電力の約定価格を予測する従来の技術として、過去の気象情報を含む環境実績情報や燃料価格実績などと電力市場価格とを関連づけて記憶し、気象情報を含む環境予報情報や燃料価格などに基づいて電力市場価格を予測するシステムが知られている(特許文献1参照)。 A known conventional technology for predicting the contract price of electricity traded in the electricity trading market is a system that stores information on environmental performance, including past weather information, fuel price performance, and other information in association with electricity market prices, and predicts electricity market prices based on environmental forecast information, including weather information, and fuel prices (see Patent Document 1).

特開2019-046281号公報JP 2019-046281 A

ところで、中長期的な電源計画を策定するためには各電源の収益性を評価して既設の電源それぞれを存続または廃止したり新規の電源を新設したりした場合の収益の変化の情報が必要とされる。しかしながら、特許文献1に記載のシステムでは、既設の電源それぞれを存続または廃止したり新規の電源を新設したりした場合の収益の変化を予測することはできない。 In order to formulate a medium- to long-term power supply plan, it is necessary to evaluate the profitability of each power source and obtain information on the change in profits when each existing power source is maintained or abolished, and when a new power source is newly established. However, the system described in Patent Document 1 cannot predict the change in profits when each existing power source is maintained or abolished, and when a new power source is newly established.

そこでこの発明は、各電源の収益性を評価して既設の電源それぞれを存続または廃止したり新規の電源を新設したりした場合の収益の変化に関する情報を提供することが可能な、電源計画策定支援装置および電源計画策定支援プログラムを提供することを目的とする。 The present invention aims to provide a power supply plan formulation support device and a power supply plan formulation support program that can evaluate the profitability of each power source and provide information on changes in profits when existing power sources are maintained or abolished and when new power sources are newly established.

上記課題を解決するために、請求項1の発明は、電源の発電電力量に市場における電力量価格を乗じて前記電源の電力量収入を計算する手段と、前記電源の発電余力に市場における供給力価格を乗じて前記電源の容量収入を計算する手段と、前記電力量収入と前記容量収入との合計から前記電源の燃料費と固定費との合計を減算して前記電源の収益を計算する手段と、前記収益が所定の収益閾値以上である場合には既存の前記電源の存続と判定し、また、前記収益が当該所定の収益閾値未満である場合には当該既存の電源の廃止判定する手段と、を有する、ことを特徴とする電源計画策定支援装置である。 In order to solve the above problem, the invention of claim 1 is a power supply plan formulation support device characterized by having: means for calculating the energy volume revenue of the power supply by multiplying the amount of power generated by the power supply by the market energy price; means for calculating the capacity revenue of the power supply by multiplying the power generation capacity of the power supply by the market supply capacity price; means for calculating the revenue of the power supply by subtracting the sum of the fuel costs and fixed costs of the power supply from the sum of the energy volume revenue and the capacity revenue ; and means for determining that the existing power supply should continue to exist if the revenue is equal to or greater than a predetermined revenue threshold, and for determining that the existing power supply should be abolished if the revenue is less than the predetermined revenue threshold .

請求項2の発明は、電源の発電電力量に市場における電力量価格を乗じて前記電源の電力量収入を計算する手段と、前記電源の発電余力に市場における供給力価格を乗じて前記電源の容量収入を計算する手段と、前記電力量収入と前記容量収入との合計から前記電源の燃料費と固定費との合計を減算して前記電源の収益を計算する手段と、前記収益と前記電源の初期投資額とを用いて新規の前記電源の収益率を計算する手段と、前記収益率が所定の収益率閾値以上である場合には前記新規の電源の新設と判定し、また、前記収益率が当該所定の収益率閾値未満である場合には当該新規の電源の中止判定する手段と、を有する、ことを特徴とする電源計画策定支援装置である。 The invention of claim 2 is a power supply plan formulation support device characterized by having: means for calculating the energy revenue of the power supply by multiplying the amount of power generated by the power supply by the market energy price; means for calculating the capacity revenue of the power supply by multiplying the power generation capacity of the power supply by the market supply capacity price; means for calculating the revenue of the power supply by subtracting the sum of the fuel costs and fixed costs of the power supply from the sum of the energy revenue and the capacity revenue; means for calculating the rate of profit of the new power supply using the revenue and the initial investment amount of the power supply; and means for determining that the new power supply should be established if the rate of profit is equal to or greater than a predetermined rate of profit threshold, and for determining that the new power supply should be discontinued if the rate of profit is less than the predetermined rate of profit threshold.

請求項3の発明は、請求項1または2に記載の電源計画策定支援装置において、前記電力量価格を変動させる電力量価格要因を入力とするとともに電力量価格を出力として機械学習によって構築される予測モデルを用いて前記市場における前記電力量価格を推計する手段を有する、ことを特徴とする。 The invention of claim 3 is characterized in that, in the power supply plan formulation support device according to claim 1 or 2, it has a means for estimating the electricity price in the market by using a prediction model constructed by machine learning with an electricity price factor that fluctuates the electricity price as an input and an electricity price as an output.

請求項4の発明は、請求項2に記載の電源計画策定支援装置において、前記収益率に対する影響が有意である収益率要因を入力とするとともに収益率を出力として機械学習によって構築される予測モデルを用いて前記新規の電源の前記収益率を推計する手段を有する、ことを特徴とする。 The invention of claim 4 is characterized in that, in the power supply plan formulation support device described in claim 2, it has a means for estimating the profitability of the new power source by using a prediction model constructed by machine learning, with profitability factors having a significant effect on the profitability as input and the profitability as output.

請求項5の発明は、コンピュータを、電源の発電電力量に市場における電力量価格を乗じて前記電源の電力量収入を計算する手段、前記電源の発電余力に市場における供給力価格を乗じて前記電源の容量収入を計算する手段、前記電力量収入と前記容量収入との合計から前記電源の燃料費と固定費との合計を減算して前記電源の収益を計算する手段、および、前記収益が所定の収益閾値以上である場合には既存の前記電源の存続と判定し、また、前記収益が当該所定の収益閾値未満である場合には当該既存の電源の廃止判定する手段、として機能させる、ことを特徴とする電源計画策定支援プログラムである。 The invention of claim 5 is a power source plan formulation support program that causes a computer to function as: means for calculating the energy revenue of a power source by multiplying the amount of power generated by the power source by the market energy price; means for calculating the capacity revenue of the power source by multiplying the power generation capacity of the power source by the market supply capacity price; means for calculating the revenue of the power source by subtracting the sum of the fuel costs and fixed costs of the power source from the sum of the energy revenue and the capacity revenue; and means for determining that the existing power source should continue to exist if the revenue is equal to or greater than a predetermined revenue threshold, and for determining that the existing power source should be abolished if the revenue is less than the predetermined revenue threshold.

請求項6の発明は、コンピュータを、電源の発電電力量に市場における電力量価格を乗じて前記電源の電力量収入を計算する手段、前記電源の発電余力に市場における供給力価格を乗じて前記電源の容量収入を計算する手段、前記電力量収入と前記容量収入との合計から前記電源の燃料費と固定費との合計を減算して前記電源の収益を計算する手段、前記収益と前記電源の初期投資額とを用いて新規の前記電源の収益率を計算する手段、および、前記収益率が所定の収益率閾値以上である場合には前記新規の電源の新設と判定し、また、前記収益率が当該所定の収益率閾値未満である場合には当該新規の電源の中止判定する手段、として機能させる、ことを特徴とする電源計画策定支援プログラムである。 The invention of claim 6 is a power supply plan formulation support program that causes a computer to function as: means for calculating the energy revenue of a power supply by multiplying the amount of power generated by the power supply by the market energy price; means for calculating the capacity revenue of the power supply by multiplying the power generation capacity of the power supply by the market supply capacity price; means for calculating the revenue of the power supply by subtracting the sum of the fuel costs and fixed costs of the power supply from the sum of the energy revenue and the capacity revenue; means for calculating the rate of profit of a new power supply using the revenue and the initial investment amount of the power supply ; and means for determining that the new power supply should be established if the rate of profit is equal to or greater than a predetermined rate of profit threshold, and for determining that the new power supply should be discontinued if the rate of profit is less than the predetermined rate of profit threshold.

請求項7の発明は、請求項5または6に記載の電源計画策定支援プログラムにおいて、コンピュータを、前記電力量価格を変動させる電力量価格要因を入力とするとともに電力量価格を出力として機械学習によって構築される予測モデルを用いて前記市場における前記電力量価格を推計する手段として機能させる、ことを特徴とする。 The invention of claim 7 is characterized in that, in the power supply plan formulation support program of claim 5 or 6, a computer is caused to function as a means for estimating the electricity price in the market by using a prediction model constructed by machine learning with electricity price factors that fluctuate the electricity price as input and the electricity price as output.

請求項8の発明は、請求項6に記載の電源計画策定支援プログラムにおいて、コンピュータを、前記収益率に対する影響が有意である収益率要因を入力とするとともに収益率を出力として機械学習によって構築される予測モデルを用いて前記新規の電源の前記収益率を推計する手段として機能させる、ことを特徴とする。 The invention of claim 8 is characterized in that, in the power supply plan formulation support program of claim 6, a computer is caused to function as a means for estimating the profitability of the new power source by using a prediction model constructed by machine learning with profitability factors having a significant effect on the profitability as input and with the profitability as output.

請求項1や請求項5の発明によれば、電力量収入と容量収入との合計から電源の燃料費と固定費との合計を減算して計算される収益に基づいて既存の前記電源の存続または廃止を判定するので、収益を評価指標として用いて各電源の収益性を評価して既設の電源それぞれを存続または廃止した場合の収益の変化に関する情報を提供することが可能となる。 According to the inventions of claims 1 and 5, the decision to continue or discontinue an existing power source is made based on the revenue calculated by subtracting the sum of the fuel costs and fixed costs of the power source from the sum of the electricity volume revenue and the capacity revenue . Therefore, it is possible to evaluate the profitability of each power source using the revenue as an evaluation index and provide information regarding changes in revenue when each existing power source is continued or discontinued .

請求項2や請求項6の発明によれば、電力量収入と容量収入との合計から電源の燃料費と固定費との合計を減算して得られる収益と電源の初期投資額とを用いて計算される収益率に基づいて新規の前記電源の新設または中止を判定するので、収益率を評価指標として用いて各電源の収益性を評価して新規の電源を新設した場合の収益の変化に関する情報を提供することが可能となる。
According to the inventions of claims 2 and 6, the decision to install or cancel a new power source is made based on the rate of return calculated using the revenue obtained by subtracting the total of the fuel costs and fixed costs of the power source from the total of the electricity volume revenue and the capacity revenue and the initial investment amount of the power source. Therefore, it is possible to evaluate the profitability of each power source using the rate of return as an evaluation index and provide information on changes in profits when a new power source is installed .

請求項3や請求項7の発明によれば、電力量価格要因を入力とするとともに電力量価格を出力として機械学習によって構築される予測モデルを用いて市場における電力量価格を推計するので、過去の電力量価格に関する実績情報が反映された一層実際的な電力量価格を推計することが可能となり、延いては電源計画の策定を支援する技術としての信頼性の向上を図ることが可能となる。 According to the inventions of claims 3 and 7, the market price of electricity is estimated using a prediction model constructed by machine learning with the electricity price factors as input and the electricity price as output, so it is possible to estimate a more realistic price of electricity that reflects actual information on past electricity prices, which in turn makes it possible to improve the reliability of the technology as a support for the formulation of power supply plans.

請求項4や請求項8の発明によれば、収益率要因を入力とするとともに収益率を出力として機械学習によって構築される予測モデルを用いて電源の収益率を推計するので、過去の収益率に関する実績情報が反映された一層実際的な収益率を推計することが可能となり、延いては電源計画の策定を支援する技術としての信頼性の向上を図ることが可能となる。 According to the inventions of claims 4 and 8, the profitability of a power source is estimated using a prediction model constructed by machine learning with profitability factors as input and profitability as output, making it possible to estimate a more realistic profitability that reflects actual information on past profitability, and ultimately improving the reliability of the technology as a support for the formulation of power source plans.

この発明の実施の形態に係る電源計画策定支援装置の概略構成を示す機能ブロック図である。1 is a functional block diagram showing a schematic configuration of a power supply plan development supporting device according to an embodiment of the present invention; 図1の電源計画策定支援装置の処理結果の一例を示す図である。2 is a diagram showing an example of a processing result of the power supply plan development supporting apparatus of FIG. 1 . 実績データベースの構成の例を示す概念図である。FIG. 2 is a conceptual diagram showing an example of the configuration of a performance database.

以下、この発明を図示の実施の形態に基づいて説明する。 The present invention will be described below based on the illustrated embodiment.

この発明では、既設の電源の存続または廃止ならびに新規の電源(即ち、新設が予定されている電源や新設の計画案がある電源など)の新設または中止を所定のサイクルで判断することを「電源計画」と呼び、電源計画を策定する際のサイクルそれぞれのことを「評価期」と呼ぶ。電源計画を策定する際の1サイクル即ち評価期は、特定の時間長さに限定されるものではないものの、例えば1年,6か月,或いは3ヶ月程度に設定されることが考えられる。 In this invention, the determination of whether to continue or discontinue existing power sources and whether to establish or discontinue new power sources (i.e., power sources scheduled for establishment or power sources with proposed establishment plans, etc.) in a specified cycle is called a "power source plan," and each cycle when formulating a power source plan is called an "evaluation period." One cycle when formulating a power source plan, i.e., the evaluation period, is not limited to a specific length of time, but it can be set to, for example, one year, six months, or three months.

電源計画は過去のデータや実績などを参照しつつ策定される基本的には将来に向けての計画であり、電源計画が対象とする計画期間の長さは、特定の期間長に限定されるものではないものの、例えば今後10年間,20年間,或いは30年間程度に設定されることが考えられる。電源計画が対象とする計画期間の長さは、また、後述する期待収益率計算タスク158による、新規の電源の収益率を計算する際の評価期間の期間長が考慮されて設定されるようにしてもよい。 Power supply plans are basically plans for the future that are formulated with reference to past data and performance, and the length of the planning period covered by the power supply plan is not limited to a specific period, but may be set to, for example, 10, 20, or 30 years. The length of the planning period covered by the power supply plan may also be set taking into account the length of the evaluation period when calculating the rate of return of a new power source by the expected rate of return calculation task 158 described below.

電源は、発電設備のことであり、例えば原子力発電所,ガス/石炭/石油火力発電所,水力発電所,および再生可能エネルギー発電所(具体的には例えば、太陽光発電所,風力発電所,バイオマス発電所,地熱発電所,揚水発電所等)などを含む。 The power source refers to a power generation facility, and includes, for example, nuclear power plants, gas/coal/oil-fired power plants, hydroelectric power plants, and renewable energy power plants (specifically, for example, solar power plants, wind power plants, biomass power plants, geothermal power plants, pumped storage power plants, etc.).

電源計画は、所定の地域ごとに策定され、例えば送電・配電線網の広がり/纏まりや電源によって電力の供給が想定される地域の範囲などが考慮されるなどしたうえで設定される。電源計画を策定する際の地域の範囲それぞれのことを「計画エリア」と呼ぶ。なお、計画エリアは、日本国内の所定の地域の範囲に限定されるものではなく、外国の所定の地域の範囲であっても構わない。 Power supply plans are formulated for each designated region, taking into consideration, for example, the extent/consolidation of the power transmission and distribution network and the area to which electricity is expected to be supplied by the power source. Each area range when formulating a power supply plan is called a "planning area." Note that planning areas are not limited to designated areas within Japan, and may be designated areas in a foreign country.

図1は、この発明の実施の形態に係る電源計画策定支援装置1の概略構成を示す機能ブロック図である。図2は、電源計画策定支援装置1の処理結果の一例を示す図である。図2に示す例では、或る計画エリアについて、既設の電源として発電所A,発電所B,および発電所Cがあり、新規(新設)の電源として発電所αおよび発電所βがあるとしている。図2では、また、各評価期(即ち、1サイクル)の時間長さが1年であり、電源計画が対象とする計画期間の始まりの評価期が「20XX年」であるとともに終わりの評価期が「20YY年」であるとしている。そして、電源計画は計画エリア別に策定されるところ、下記では上記或る計画エリアを対象として電源計画策定支援装置1による処理が行われる場合を説明する。 Figure 1 is a functional block diagram showing the schematic configuration of a power supply plan development support device 1 according to an embodiment of the present invention. Figure 2 is a diagram showing an example of the processing result of the power supply plan development support device 1. In the example shown in Figure 2, for a certain planning area, there are power plants A, B, and C as existing power sources, and power plants α and β as new (newly constructed) power sources. In Figure 2, the length of each evaluation period (i.e., one cycle) is one year, and the evaluation period at the beginning of the planning period covered by the power supply plan is "20XX" and the evaluation period at the end is "20YY". Power supply plans are developed for each planning area, and the following describes a case where processing is performed by the power supply plan development support device 1 for the above-mentioned certain planning area.

電源計画策定支援装置1は、各電源の収益性を評価して既設の電源それぞれを存続または廃止したり新規の電源を新設したりした場合の収益の変化に関する情報を作成して電源計画の策定を支援するための機序であり、主として、入力部11、表示部12、記憶部13、メモリ14、メインタスク15、通信部17、およびこれらを制御などする中央処理部18を備える。 The power supply plan formulation support device 1 is a mechanism for supporting the formulation of a power supply plan by evaluating the profitability of each power source and creating information regarding changes in profits when existing power sources are maintained or abolished and new power sources are newly established, and is mainly equipped with an input unit 11, a display unit 12, a storage unit 13, a memory 14, a main task 15, a communication unit 17, and a central processing unit 18 that controls these.

電源計画策定支援装置1は、例えば、各種のコンピュータなどに、装置全体の制御プログラムや電源計画の策定の支援に纏わる各種処理を行うためのアプリケーション(電源計画策定支援プログラム19)がインストールされて実行されることによって構成される。 The power supply plan development support device 1 is configured, for example, by installing and executing an application (power supply plan development support program 19) for performing various processes related to supporting the development of a power supply plan and a control program for the entire device on various computers, etc.

入力部11は、利用者の命令などを受けて電源計画策定支援装置1へと入力する機能を備えるインターフェースであり、例えばキーボードやマウスによって構成される。 The input unit 11 is an interface that has the function of receiving commands from a user and inputting them into the power supply plan formulation support device 1, and is configured, for example, with a keyboard and mouse.

表示部12は、入力部11を介して入力される内容を表示したり、電源計画策定支援装置1としての処理結果(図2参照)を表示したりなどする機能を備え、例えば液晶ディスプレイによって構成される。 The display unit 12 has functions such as displaying the contents input via the input unit 11 and displaying the processing results of the power supply plan formulation support device 1 (see FIG. 2), and is configured, for example, by a liquid crystal display.

記憶部13は、各種の情報,プログラム,およびデータなどを記憶する機能を備える記憶領域/記憶装置であり、例えばハードディスク(HDD:Hard Disk Drive の略)によって構成される。 The storage unit 13 is a storage area/storage device that has the function of storing various information, programs, data, etc., and is composed of, for example, a hard disk (HDD: short for Hard Disk Drive).

記憶部13には、電源計画策定支援装置1全体の制御プログラムや電源計画策定支援プログラム19が格納されるとともに、電源データベース131および実績データベース132が格納される。 The memory unit 13 stores the control program for the entire power supply planning support device 1 and the power supply planning support program 19, as well as a power supply database 131 and a performance database 132.

電源データベース131は、電源それぞれの情報が記録・蓄積されているデータベースであり、電源計画策定支援装置1が電源計画の策定の支援に纏わる各種処理を行う際に電源について必要とされる情報を取得するために適宜参照される。 The power source database 131 is a database in which information about each power source is recorded and stored, and is referenced as necessary to obtain information required about the power source when the power source plan development support device 1 performs various processes related to supporting the development of a power source plan.

電源データベース131には、具体的には、各電源に関する、電力を供給する計画エリア,発電容量,燃種,熱効率,および固定費など、電源計画策定支援装置1が電源計画の策定の支援に纏わる各種処理を行う際に電源について必要とされる種々の情報が記録・蓄積される。電源データベース131には、既設の電源それぞれの情報に加えて、新規の電源それぞれの情報も記録・蓄積され、新規の電源については初期投資額(尚、後述する期待収益率計算タスク158による、新規の電源の収益率を計算する際に必要とされる初期投資額であり、言い換えると、初期の事業費である)も記録・蓄積される。 The power source database 131 specifically records and stores various information about each power source that is required when the power source plan formulation support device 1 performs various processes related to supporting the formulation of a power source plan, such as the planned area to supply power, power generation capacity, fuel type, thermal efficiency, and fixed costs for each power source. In addition to information about each existing power source, the power source database 131 also records and stores information about each new power source, and for new power sources, the initial investment amount (note that this is the initial investment amount required when calculating the rate of return of a new power source by the expected return calculation task 158 described below, in other words, the initial business cost) is also recorded and stored.

実績データベース132については後述する。 The performance database 132 will be described later.

なお、電源データベース131と実績データベース132とのうちのどちらか一方もしくは両方がサーバなどの外部記憶装置に格納されるようにしてもよく、この場合には、電源計画策定支援装置1が、通信部17を介して外部記憶装置にアクセスして各種データや情報を取得するようにしてもよく、あるいは、種々の信号回線を介して外部記憶装置との間でデータや制御指令等の信号の送受信/入出力を行うための接続インターフェースを備えるようにして当該接続インターフェースを介して外部記憶装置にアクセスして各種データや情報を取得するようにしてもよい。 Either or both of the power supply database 131 and the performance database 132 may be stored in an external storage device such as a server. In this case, the power supply plan formulation support device 1 may access the external storage device via the communication unit 17 to acquire various data and information, or may be provided with a connection interface for transmitting/receiving/inputting/outputting signals such as data and control commands to/from the external storage device via various signal lines, and may access the external storage device via the connection interface to acquire various data and information.

メモリ14は、中央処理部18が電源計画の策定の支援に纏わる演算処理を実行する際に生成されるデータや情報を一時的に記憶などするための作業領域となる機能を備える記憶領域/記憶装置であり、例えばRAM(Random Access Memory の略)によって構成される。 The memory 14 is a storage area/storage device that functions as a working area for temporarily storing data and information generated when the central processing unit 18 executes calculations related to supporting the formulation of power supply plans, and is composed of, for example, RAM (short for Random Access Memory).

メインタスク15は、記憶部13に格納されている電源計画策定支援プログラム19が実行されることによって実現される、電源計画の策定の支援に纏わる各種処理を実行するためのタスク群である。 The main task 15 is a group of tasks for executing various processes related to supporting the formulation of power plans, which are realized by executing the power plan formulation support program 19 stored in the memory unit 13.

通信部17は、例えばLAN(Local Area Network の略)やWAN(Wide Area Network の略)を含む各種の無線/有線通信回線網を介して伝送される信号・情報の送受信/入出力を行う機能を備える通信インターフェースである。 The communication unit 17 is a communication interface that has the function of transmitting/receiving/inputting/outputting signals and information transmitted via various wireless/wired communication networks, including, for example, a LAN (short for Local Area Network) and a WAN (short for Wide Area Network).

中央処理部18は、電源計画策定支援装置1を構成する各部を統制して制御などする機能を備え、例えば、中央演算処理装置(CPU:Central Processing Unit の略)を含んで構成され、記憶部13に格納されている制御プログラムや電源計画策定支援プログラム19に従って各機能を実現する。 The central processing unit 18 has the function of coordinating and controlling each component of the power supply plan formulation support device 1, and is configured to include, for example, a central processing unit (CPU: abbreviation for Central Processing Unit), and realizes each function according to the control program stored in the memory unit 13 and the power supply plan formulation support program 19.

そして、電源計画策定支援装置1は、電源の発電電力量に市場における電力量価格を乗じて電源の電力量収入を計算する手段(電力量収入計算タスク153)と、電源の発電余力に市場における供給力価格を乗じて電源の容量収入を計算する手段(容量収入想定タスク154)と、電力量収入と容量収入との合計から電源の燃料費と固定費との合計を減算して電源の収益を計算する手段(収益計算タスク157)と、収益と電源の初期投資額とを用いて電源の収益率を計算する手段(期待収益率計算タスク158)と、収益や収益率に基づいて電源の取扱いを判定する手段(判定タスク159)と、を有する、ようにしている。 The power supply plan formulation support device 1 has a means for calculating the power volume income of the power supply by multiplying the amount of power generated by the power supply by the market price of the power supply (power volume income calculation task 153), a means for calculating the capacity income of the power supply by multiplying the power generation capacity of the power supply by the market price of the supply capacity (capacity income estimation task 154), a means for calculating the revenue of the power supply by subtracting the sum of the fuel cost and fixed cost of the power supply from the sum of the power volume income and the capacity income (revenue calculation task 157), a means for calculating the rate of return of the power supply using the revenue and the initial investment amount of the power supply (expected rate of return calculation task 158), and a means for determining the handling of the power supply based on the revenue and the rate of return (determination task 159).

電源計画の策定の支援に纏わる各種処理を実行するために、記憶部13に格納されている電源計画策定支援プログラム19が実行されることにより、メインタスク15が構成される。メインタスク15は、電力量想定タスク151,価格想定タスク152,電力量収入計算タスク153,容量収入想定タスク154,燃料費想定タスク155,固定費想定タスク156,収益計算タスク157,期待収益率計算タスク158,判定タスク159,および学習タスク160を含む。 To execute various processes related to supporting the formulation of power supply plans, the power supply plan formulation support program 19 stored in the memory unit 13 is executed, thereby forming the main task 15. The main task 15 includes an energy amount estimation task 151, a price estimation task 152, an energy amount revenue calculation task 153, a capacity revenue estimation task 154, a fuel cost estimation task 155, a fixed cost estimation task 156, a revenue calculation task 157, an expected rate of return calculation task 158, a judgment task 159, and a learning task 160.

電力量想定タスク151は、評価期ごとの、電力需要〔MW〕に基づいて電源それぞれの発電電力量〔MWh〕を想定するタスクである。電力需要として、具体的には例えば毎時の電力需要が想定される。 The power amount estimation task 151 is a task that estimates the amount of power generated by each power source [MWh] based on the power demand [MW] for each evaluation period. Specifically, the power demand is estimated as, for example, the hourly power demand.

電力量想定タスク151は、具体的には、まず、評価期ごとに、例えば、過去および現在の人口や産業の立地の状況などと電力需要との間の関係に基づいて予め求められる回帰方程式に従って、今後の開発計画などもふまえて予測される将来の人口や産業の立地の状況などに基づいて将来の電力需要(「ベースの電力需要」と呼ぶ)を推計する。 Specifically, the power consumption estimation task 151 first estimates future power demand (called "base power demand") for each evaluation period based on the future population and industrial location conditions predicted in consideration of future development plans, etc., according to a regression equation that is calculated in advance based on the relationship between power demand and past and present population and industrial location conditions, etc.

電力量想定タスク151は、そのうえで、必要に応じて、ベースの電力需要を変動させる要因がある場合にはその要因に応じてベースの電力需要を補正して最終的な電力需要を推計する。すなわち、各評価期において電力需要を押し下げる要因がある場合には、その要因による電力需要への影響の程度に応じて、ベースの電力需要を下方修正する。また、各評価期において電力需要を押し上げる要因がある場合には、その要因による電力需要への影響の程度に応じて、ベースの電力需要を上方修正する。 The power amount estimation task 151 then, if necessary, corrects the base power demand in accordance with any factors that cause the base power demand to fluctuate, and estimates the final power demand. In other words, if there are factors that reduce power demand in each evaluation period, the base power demand is revised downward in accordance with the degree of impact of that factor on the power demand. Also, if there are factors that increase power demand in each evaluation period, the base power demand is revised upward in accordance with the degree of impact of that factor on the power demand.

電力需要の変動要因としては、例えば、気候や気温などの自然条件の変化や、産業構造の変化、あるいは景気の動向などが考慮され得る。 Factors that may affect electricity demand include, for example, changes in natural conditions such as climate and temperature, changes in industrial structure, and economic trends.

なお、既に推計などされている将来の電力需要のデータが用いられたり、現状のまま推移するとして現在の電力需要が将来の電力需要として用いられたりするようにしてもよい。ここで、この発明の説明における「想定」は、電源計画策定支援装置1において推計する値,既に推計などされている値,および現在の値のままの値を設定することを含む。 In addition, data on future power demand that has already been estimated may be used, or the current power demand may be used as the future power demand assuming that the current situation will continue. Here, "assuming" in the explanation of this invention includes setting a value to be estimated in the power supply plan development support device 1, a value that has already been estimated, or a value that remains the current value.

電力量想定タスク151は、さらに、上記において想定される評価期ごとの電力需要に基づいて、評価期ごとに、前記電力需要に応じて必要とされる、電源計画の対象の計画エリア内の電源それぞれの発電電力量を計算する。この際、前記電力需要を賄うために必要とされる電力量が電源計画の対象の計画エリアへと電力を供給する電源それぞれの発電電力量の合計によって供給されることおよび各電源の発電能力(発電容量)を超えないことが制約条件とされ、また、例えば、電源の長期におよぶ保全作業の予定などが考慮されるようにしてもよい。 The power amount estimation task 151 further calculates the amount of power generated by each power source in the target planning area of the power source plan that is required according to the power demand for each evaluation period based on the power demand for each evaluation period estimated above. At this time, the constraints are that the amount of power required to cover the power demand is supplied by the sum of the amounts of power generated by each power source supplying power to the target planning area of the power source plan and does not exceed the power generation capability (power generation capacity) of each power source, and it may also be possible to take into account, for example, plans for long-term maintenance work on the power sources.

電力量想定タスク151は、また、電源計画の対象の計画エリア(言い換えると、検討対象の電源が存在する計画エリア)ではない他のエリアへと電力を供給/売電する状況を考慮して、他のエリアへと供給する発電電力量を加算するようにしてもよい。この場合には、計画エリアと他のエリアとの間の連系線/送電系統の送電制約(例えば、エリア間の送電亘長,電圧,および容量など)が考慮されるようにしてもよい。 The power amount estimation task 151 may also take into account the situation of supplying/selling power to other areas that are not the planned area targeted by the power source plan (in other words, the planned area in which the power source under consideration is located), and may add the amount of generated power to be supplied to other areas. In this case, the transmission constraints of the interconnection/transmission system between the planned area and other areas (e.g., the transmission length, voltage, and capacity between areas) may be taken into account.

そして、電力量想定タスク151は、評価期ごとの、電源それぞれの発電電力量を出力する。 Then, the power amount estimation task 151 outputs the amount of power generated by each power source for each evaluation period.

価格想定タスク152は、評価期ごとの、市場における電力量価格(具体的には例えば、卸電力市場などでの電力量の取引における市場価格)〔円/MWh〕を想定するタスクである。 The price estimation task 152 is a task that estimates the market price of electricity (specifically, for example, the market price for trading electricity in the wholesale electricity market) [yen/MWh] for each evaluation period.

ここで、計画エリア間の送電ロスや送電容量を無視した、計画エリア共通の電力量の単価のことを「システム価格」と呼び、計画エリア間の送電ロスや送電容量を考慮した電力量の単価のことを「電力量価格」と呼ぶ。そして、電力量価格は、計画エリア別の電力需要の偏在性や電源構成の差異、また、計画エリア間の送電系統の制約(具体的には、送電ロス、送電容量等)などから、通常はエリア別に異なる値となる。 Here, the unit price of the amount of energy common to all planning areas, ignoring the transmission losses and capacity between planning areas, is called the "system price," while the unit price of the amount of energy that takes into account the transmission losses and capacity between planning areas is called the "energy price." Energy prices usually vary by area due to factors such as uneven distribution of electricity demand and differences in power source composition between planning areas, as well as constraints on the transmission system between planning areas (specifically, transmission losses, transmission capacity, etc.).

価格想定タスク152は、具体的には、評価期ごとに、例えば、過去から現在にかけての卸電力市場での電力量の取引における市場価格のトレンドに基づいて予め求められる回帰方程式(即ち、トレンド推計法におけるトレンド回帰式,トレンド推計式)に従って電力量価格(「ベースの電力量価格」と呼ぶ)を推計する。 Specifically, the price estimation task 152 estimates an energy price (called the "base energy price") for each evaluation period according to a regression equation (i.e., a trend regression equation or trend estimation equation in the trend estimation method) that is calculated in advance based on the market price trend in energy transactions in the wholesale electricity market from the past to the present.

価格想定タスク152は、そのうえで、必要に応じて、ベースの電力量価格を変動させる要因がある場合にはその要因に応じてベースの電力量価格を補正して最終的な電力量価格を推計する。すなわち、各評価期において電力量価格を押し下げる要因がある場合には、その要因による電力量価格への影響の程度に応じて、ベースの電力量価格を下方修正する。また、各評価期において電力量価格を押し上げる要因がある場合には、その要因による電力量価格への影響の程度に応じて、ベースの電力量価格を上方修正する。 The price estimation task 152 then, if necessary, corrects the base energy price in accordance with any factors that may cause the base energy price to fluctuate, and estimates the final energy price. In other words, if there are factors that push down the energy price in each evaluation period, the base energy price is revised downward in accordance with the degree of impact of those factors on the energy price. Also, if there are factors that push up the energy price in each evaluation period, the base energy price is revised upward in accordance with the degree of impact of those factors on the energy price.

電力量価格の変動要因としては、例えば、下記の項目が考慮され得る。
1)電力需要
ア)電力需要(即ち、計画エリア別の電力需要の合計)が大きいと、システム価格は高くなる。
Factors that may affect electricity prices include, for example, the following:
1) Electricity demand A) If the electricity demand (i.e., the total electricity demand by planning area) is large, the system price will be high.

2)エリア別の電源情報
イ)原子力の発電容量が大きいと、システム価格は安くなる。
ウ)石炭火力の発電容量が大きいと、システム価格は高くなる。
エ)再生可能エネルギーの発電容量が大きいと、システム価格は安くなる。
オ)熱効率が高いと、当該電源の発電電力量が大きくなる。
2) Power source information by area a) The larger the nuclear power generation capacity, the cheaper the system price.
C) If the coal-fired power generation capacity is large, the system price will be high.
E) If the renewable energy generating capacity is large, the system price will be lower.
E) If the thermal efficiency is high, the amount of power generated by the power source will be large.

3)計画エリア別の燃料価格
カ)計画エリア別の発電用燃料の価格が上昇すると、システム価格は高くなる。
3) Fuel prices by planning area F) If the price of fuel for power generation by planning area increases, the system price will become higher.

4)送電系統の情報
キ)送電亘長が長いと、システム価格と計画エリア別の電力量価格との差異が大きくなる(尚、計画エリア間の送電ロスが大きくなることに起因する)。
ク)送電電圧が高いと、システム価格と計画エリア別の電力量価格との差異が小さくなる(尚、計画エリア間の送電ロスが小さくなることに起因する)。
ケ)計画エリア間の送電容量が小さいと、システム価格と計画エリア別の電力量価格との差異が大きくなる(尚、送電量が送電容量に達し、経済的な発電所が稼働できなくなることに起因する)。
4) Information on the power transmission system K) If the transmission length is long, the difference between the system price and the price of electricity per planning area will become larger (this is due to the large transmission loss between planning areas).
h) When the transmission voltage is high, the difference between the system price and the electricity price for each planning area becomes smaller (this is due to smaller transmission losses between planning areas).
i) If the transmission capacity between planning areas is small, the difference between the system price and the electricity price for each planning area will be large (this is because the amount of electricity transmitted will reach the transmission capacity and economical power plants will no longer be able to operate).

5)電力需要と電源情報
コ)計画エリア別の電力需要の偏在性や計画エリア別の電源情報(具体的には例えば、発電容量,燃種,熱効率,固定費など)の差異が大きいと、システム価格と計画エリア別の電力量価格との差異が大きくなる(尚、計画エリア間の送電量が増加することによって送電ロスが増加するとともに、送電量が送電容量に達して経済的な発電所が稼働できなくなることに起因する)。
5) Electricity demand and power source information J) If there is a large difference in the uneven distribution of electricity demand by planning area or in the power source information by planning area (specifically, for example, power generation capacity, fuel type, thermal efficiency, fixed costs, etc.), the difference between the system price and the electricity price by planning area will become large (Note that this is due to the fact that an increase in the amount of electricity transmitted between planning areas increases transmission losses, and the amount of electricity transmitted reaches the transmission capacity, making it impossible to operate economical power plants).

また、価格想定タスク152は、評価期ごとに、電力量価格要因を説明変数とするとともに電力量価格を目的変数とする重回帰式に従って電力量価格を推計するようにしてもよい。この場合は、電源計画の対象の計画エリアについての過去から現在にかけての複数時点における電力量価格要因と電力量価格との実績の組み合わせデータ群が用いられて予め求められる重回帰式に従って電力量価格が推計される。 The price estimation task 152 may also estimate the energy price for each evaluation period according to a multiple regression equation with the energy price factors as explanatory variables and the energy price as the objective variable. In this case, the energy price is estimated according to a multiple regression equation that is determined in advance using a set of combined data of the energy price factors and the actual energy price at multiple points in time from the past to the present for the planning area targeted by the power source plan.

重回帰式の説明変数である電力量価格要因は、特定の項目に限定されるものではなく、電力量価格に対する影響が有意であるか否かが考慮されるなどして適宜選択されて設定される。重回帰式の説明変数である電力量価格要因として、例えば、上記ア乃至コとして挙げた電力量価格の変動要因である、電力需要,原子力の発電容量,石炭火力の発電容量,再生可能エネルギーの発電容量,熱効率,発電用燃料の価格,送電亘長,送電電圧,計画エリア間の送電容量,計画エリア別の電力需要,および計画エリア別の電源情報(言い換えると、電源構成の内容)が挙げられる。 The power price factors, which are explanatory variables in the multiple regression equation, are not limited to specific items, but are appropriately selected and set, taking into consideration whether or not the impact on the power price is significant. Examples of power price factors, which are explanatory variables in the multiple regression equation, include the fluctuation factors of power prices listed as A to J above, such as power demand, nuclear power generation capacity, coal-fired power generation capacity, renewable energy power generation capacity, thermal efficiency, price of fuel for power generation, transmission length, transmission voltage, transmission capacity between planning areas, power demand by planning area, and power source information by planning area (in other words, the contents of the power source configuration).

価格想定タスク152は、或いは、評価期ごとに、電力量価格要因を入力とするとともに電力量価格を出力とする予測モデルに従って電力量価格を推計するようにしてもよい。この場合は、電源計画の対象の計画エリアについての過去から現在にかけての複数時点における電力量価格要因と電力量価格との実績の組み合わせデータ群が用いられて機械学習によって予め構築される予測モデル(学習モデル)に従って電力量価格が推計される。 The price estimation task 152 may alternatively estimate the electricity price for each evaluation period according to a prediction model that uses electricity price factors as input and electricity prices as output. In this case, the electricity price is estimated according to a prediction model (learning model) that is constructed in advance by machine learning using a set of combined data of electricity price factors and actual electricity prices at multiple points in time from the past to the present for the planning area targeted by the power source plan.

予測モデル(学習モデル)としては、特に連続値の予測に好適な機械学習の手法が用いられることが考えられ、具体的には例えば、エクストリームラーニングマシン(ELM:Extreme Learning Machine の略),ディープニューラルネットワーク(DNN:Deep Neural Network の略),サポートベクターマシン(SVM:Support Vector Machine の略)などが用いられ得る。 As a prediction model (learning model), a machine learning method that is particularly suitable for predicting continuous values may be used. Specifically, for example, an extreme learning machine (ELM: short for Extreme Learning Machine), a deep neural network (DNN: short for Deep Neural Network), or a support vector machine (SVM: short for Support Vector Machine) may be used.

機械学習によって構築される予測モデルの入力である電力量価格要因は、特定の項目に限定されるものではなく、電力量価格に対する影響が有意であるか否かが考慮されるなどして適宜選択されて設定される。予測モデルの入力である電力量価格要因として、例えば、上記ア乃至コとして挙げた電力量価格の変動要因である、電力需要,原子力の発電容量,石炭火力の発電容量,再生可能エネルギーの発電容量,熱効率,発電用燃料の価格,送電亘長,送電電圧,計画エリア間の送電容量,計画エリア別の電力需要,および計画エリア別の電源情報(言い換えると、電源構成の内容)が挙げられる。 The power price factors that are inputs to the prediction model constructed by machine learning are not limited to specific items, but are appropriately selected and set, taking into consideration whether or not the impact on the power price is significant. Examples of power price factors that are inputs to the prediction model include the fluctuating factors of power prices listed above as A to J, such as power demand, nuclear power generation capacity, coal-fired power generation capacity, renewable energy power generation capacity, thermal efficiency, price of fuel for power generation, transmission length, transmission voltage, transmission capacity between planning areas, power demand by planning area, and power source information by planning area (in other words, the contents of the power source configuration).

なお、既に推計などされている将来の電力量価格のデータが用いられたり、現状のまま推移するとして現在の電力量価格が将来の電力量価格として用いられたりするようにしてもよい。 In addition, data on future electricity prices that have already been estimated may be used, or the current electricity price may be used as the future electricity price assuming that the current situation will remain unchanged.

そして、価格想定タスク152は、評価期ごとの、電力量価格を出力する。 Then, the price estimation task 152 outputs the electricity price for each evaluation period.

電力量収入計算タスク153は、評価期ごとの、電源それぞれの電力量収入〔円〕を計算するタスクである。 The power revenue calculation task 153 is a task that calculates the power revenue (in yen) of each power source for each evaluation period.

電力量収入計算タスク153は、具体的には、電力量想定タスク151から出力される評価期ごとの電源それぞれの発電電力量の入力を受けるとともに、価格想定タスク152から出力される評価期ごとの電力量価格の入力を受け、評価期ごとに、前記電源それぞれの発電電力量に前記電力量価格を乗じて各電源の電力量収入(尚、評価期各々の全体における積分値(別言すると、積算値)である)を計算する。 Specifically, the energy revenue calculation task 153 receives the amount of energy generated by each power source for each evaluation period output from the energy estimation task 151, and receives the energy price for each evaluation period output from the price estimation task 152, and multiplies the amount of energy generated by each of the power sources by the energy price for each evaluation period to calculate the energy revenue of each power source (which is the integral value (in other words, the accumulated value) for the entire evaluation period).

そして、電力量収入計算タスク153は、評価期ごとの、電源それぞれの電力量収入(図2におけるRe)を出力する。 Then, the energy income calculation task 153 outputs the energy income (Re in Figure 2) of each power source for each evaluation period.

なお、「評価期ごと」とは、図2に示す例のように、既設の電源(同図では、発電所A,B,C)については電源計画が対象とする計画期間の始まりの評価期(同図では、20XX年)を処理の対象として含めることであり、新規の電源(同図では、発電所α,β)については電源計画が対象とする計画期間の始まりの評価期から終わりの評価期(同図では、20YY年)までの間の各評価期を処理の対象として含めることである。 In addition, "by evaluation period" means that, as in the example shown in Figure 2, for existing power sources (power plants A, B, and C in the figure), the evaluation period at the beginning of the planning period covered by the power source plan (20XX in the figure) is included as the subject of processing, and for new power sources (power plants α and β in the figure), each evaluation period between the beginning and end of the planning period covered by the power source plan (20YY in the figure) is included as the subject of processing.

なお、図2に示す例では、既設の電源について、電源計画が対象とする計画期間の始まりの評価期(同図では、20XX年)のみを表示するようにしているが、電源計画が対象とする計画期間の始まりの評価期から終わりの評価期(同図では、20YY年)までの間の評価期についても表示するようにしてもよい。 In the example shown in FIG. 2, only the evaluation period at the beginning of the planning period covered by the power supply plan (20XX in the figure) is displayed for existing power supplies, but it is also possible to display evaluation periods between the beginning and end of the planning period covered by the power supply plan (20YY in the figure).

また、図2に示す例では、新規(新設)の電源について、電源計画が対象とする計画期間の始まりの評価期(同図では、20XX年)および終わりの評価期(同図では、20YY年)のみを表示するようにしているが、電源計画が対象とする計画期間の始まりの評価期から終わりの評価期までの間の評価期についても表示するようにしてもよい。 In the example shown in FIG. 2, for new (newly installed) power sources, only the evaluation period at the start of the planning period covered by the power source plan (in the figure, 20XX) and the evaluation period at the end of the planning period covered by the power source plan (in the figure, 20YY) are displayed, but it is also possible to display evaluation periods between the evaluation period at the start and the evaluation period at the end of the planning period covered by the power source plan.

容量収入想定タスク154は、評価期ごとの、電源それぞれの容量収入〔円〕を想定するタスクである。 The capacity revenue estimation task 154 is a task that estimates the capacity revenue (yen) of each power source for each evaluation period.

容量収入は、「発電することができる能力」(具体的には、将来必要と想定される電気の量(需要)に相当する供給力〔MW〕)を取引することによって得られる収入である。「発電することができる能力」は、日本では、電力広域的運営推進機関が市場管理者となっている容量市場において取引される。 Capacity revenue is revenue obtained by trading "power generation capacity" (specifically, supply capacity [MW] equivalent to the amount of electricity (demand) expected to be required in the future). In Japan, "power generation capacity" is traded in a capacity market where the Organization for Cross-regional Coordination of Transmission Operators (OCCO) serves as the market administrator.

容量収入想定タスク154は、具体的には、電力量想定タスク151から出力される評価期ごとの電源それぞれの発電電力量の入力を受け、評価期ごとに、各電源の発電能力(発電容量)を超えないことを制約条件として、電源それぞれの発電余力〔MW〕を計算する。 Specifically, the capacity revenue estimation task 154 receives the amount of generated power from each power source for each evaluation period output from the power amount estimation task 151, and calculates the power generation reserve [MW] of each power source for each evaluation period, with the constraint that the power generation capacity (power generation capacity) of each power source is not exceeded.

容量収入想定タスク154は、また、評価期ごとに、例えば、過去から現在にかけての容量市場での将来の供給力の取引における市場価格のトレンドに基づいて予め求められる回帰方程式(即ち、トレンド推計法におけるトレンド回帰式,トレンド推計式)に従って市場における供給力価格〔円/MW〕(「ベースの供給力価格」と呼ぶ)を推計する。 The capacity revenue estimation task 154 also estimates the supply capacity price in the market [yen/MW] (called the "base supply capacity price") for each evaluation period, for example, according to a regression equation (i.e., the trend regression equation or trend estimation equation in the trend estimation method) that is determined in advance based on the market price trend in future supply capacity transactions in the capacity market from the past to the present.

容量収入想定タスク154は、そのうえで、必要に応じて、ベースの供給力価格を変動させる要因がある場合にはその要因に応じてベースの供給力価格を補正して最終的な供給力価格を推計する。すなわち、各評価期において供給力価格を押し下げる要因がある場合には、その要因による供給力価格への影響の程度に応じて、ベースの供給力価格を下方修正する。また、各評価期において供給力価格を押し上げる要因がある場合には、その要因による供給力価格への影響の程度に応じて、ベースの供給力価格を上方修正する。 The capacity revenue estimation task 154 then, if necessary, corrects the base supply capacity price in accordance with any factors that may cause the base supply capacity price to fluctuate, and estimates the final supply capacity price. In other words, if there are factors that push down the supply capacity price in each evaluation period, the base supply capacity price is revised downward in accordance with the degree of impact of those factors on the supply capacity price. Also, if there are factors that push up the supply capacity price in each evaluation period, the base supply capacity price is revised upward in accordance with the degree of impact of those factors on the supply capacity price.

容量収入想定タスク154は、ベースの供給力価格を推計する際に、或いは、供給力価格の変動要因として、容量市場における指標価格である「Net CONE」(Net Cost Of New Entry の略)を考慮するようにしてもよい。Net CONEは、新規の電源が固定費(例えば、建設費を中心とする、複数年にわたって計上される固定的費用)を回収できる水準であり、具体的には、新規に建設される典型的な電源の1年あたりの固定費から卸電力市場などで得られる利益(即ち、卸電力収入から燃料費などの可変費を控除した後のキャッシュフロー)を差し引いた金額である。 The capacity revenue estimation task 154 may take into account "Net CONE" (short for Net Cost Of New Entry), which is an index price in the capacity market, when estimating the base supply capacity price or as a variable factor of the supply capacity price. Net CONE is the level at which a new power source can recover fixed costs (e.g., fixed costs recorded over multiple years, mainly construction costs), and specifically, it is the amount obtained by subtracting the profits obtained in the wholesale electricity market, etc. (i.e., the cash flow after deducting variable costs such as fuel costs from wholesale electricity revenue) from the fixed costs per year of a typical newly constructed power source.

なお、既に推計などされている将来の供給力価格のデータが用いられたり、現状のまま推移するとして現在の供給力価格が将来の供給力価格として用いられたりするようにしてもよい。 In addition, data on future supply capacity prices that have already been estimated may be used, or the current supply capacity price may be used as the future supply capacity price assuming that the current situation will remain unchanged.

そのうえで、容量収入想定タスク154は、評価期ごとに、上記において計算される評価期ごとの電源それぞれの発電余力に上記において想定される供給力価格を乗じて各電源の容量収入(尚、評価期各々の全体における積分値(別言すると、積算値)である)を計算する。 Then, the capacity revenue estimation task 154 calculates the capacity revenue of each power source (which is the integral value (in other words, the accumulated value) for each evaluation period) by multiplying the power generation reserve of each power source for each evaluation period calculated above by the supply capacity price assumed above.

また、容量収入想定タスク154は、評価期ごとに、容量収入要因を説明変数とするとともに容量収入を目的変数とする重回帰式に従って電源それぞれの容量収入を推計するようにしてもよい。この場合は、電源計画の対象の計画エリアについての過去から現在にかけての複数時点における容量収入要因と容量収入との実績の組み合わせデータ群が用いられて予め求められる重回帰式に従って容量収入が推計される。 The capacity revenue estimation task 154 may also estimate the capacity revenue of each power source for each evaluation period according to a multiple regression equation with the capacity revenue factors as explanatory variables and the capacity revenue as the objective variable. In this case, the capacity revenue is estimated according to a multiple regression equation that is determined in advance using a set of combined data of the capacity revenue factors and the actual capacity revenue at multiple points in time from the past to the present for the planning area targeted by the power source plan.

重回帰式の説明変数である容量収入要因は、特定の項目に限定されるものではなく、容量収入に対する影響が有意であるか否かが考慮されるなどして適宜選択されて設定される。重回帰式の説明変数である容量収入要因として、例えば、各電源の発電能力(発電容量),発電電力量,および発電余力、ならびに、容量市場での供給力の取引における市場価格,および容量市場における指標価格である「Net CONE」が挙げられる。 The capacity revenue factors, which are explanatory variables in the multiple regression equation, are not limited to specific items, but are appropriately selected and set, taking into consideration whether or not their impact on capacity revenue is significant. Examples of capacity revenue factors, which are explanatory variables in the multiple regression equation, include the power generation capacity (power generation capacity), generated energy volume, and power generation surplus of each power source, as well as the market price in the trading of supply capacity in the capacity market, and "Net CONE", which is the index price in the capacity market.

容量収入想定タスク154は、或いは、評価期ごとに、容量収入要因を入力とするとともに容量収入を出力とする予測モデルに従って電源それぞれの容量収入を推計するようにしてもよい。この場合は、電源計画の対象の計画エリアについての過去から現在にかけての複数時点における容量収入要因と容量収入との実績の組み合わせデータ群が用いられて機械学習によって予め構築される予測モデル(学習モデル)に従って容量収入が推計される。 Alternatively, the capacity revenue estimation task 154 may estimate the capacity revenue of each power source for each evaluation period according to a prediction model that uses capacity revenue factors as input and capacity revenue as output. In this case, the capacity revenue is estimated according to a prediction model (learning model) that is constructed in advance by machine learning using a set of combined data on capacity revenue factors and actual capacity revenue at multiple points in time from the past to the present for the planning area that is the target of the power source plan.

予測モデル(学習モデル)としては、特に連続値の予測に好適な機械学習の手法が用いられることが考えられ、具体的には例えば、エクストリームラーニングマシン(ELM),ディープニューラルネットワーク(DNN),サポートベクターマシン(SVM)などが用いられ得る。 As a predictive model (learning model), a machine learning method that is particularly suitable for predicting continuous values may be used. Specifically, for example, an extreme learning machine (ELM), a deep neural network (DNN), a support vector machine (SVM), etc. may be used.

機械学習によって構築される予測モデルの入力である容量収入要因は、特定の項目に限定されるものではなく、容量収入に対する影響が有意であるか否かが考慮されるなどして適宜選択されて設定される。予測モデルの入力である容量収入要因として、例えば、各電源の発電能力(発電容量),発電電力量,および発電余力、ならびに、容量市場での供給力の取引における市場価格,および容量市場における指標価格である「Net CONE」が挙げられる。 The capacity revenue factors that are inputs to the prediction model constructed by machine learning are not limited to specific items, but are appropriately selected and set, taking into consideration whether or not the impact on capacity revenue is significant. Examples of capacity revenue factors that are inputs to the prediction model include the power generation capacity (power generation capacity), generated energy amount, and power generation surplus of each power source, as well as the market price for trading supply capacity in the capacity market, and "Net CONE", which is the index price in the capacity market.

そして、容量収入想定タスク154は、評価期ごとの、電源それぞれの容量収入(図2におけるRc)を出力する。 Then, the capacity revenue estimation task 154 outputs the capacity revenue (Rc in Figure 2) of each power source for each evaluation period.

燃料費想定タスク155は、評価期ごとの、各電源の種類,仕様,および特性などに合わせた、電源それぞれの燃料費〔円〕を想定するタスクである。 The fuel cost estimation task 155 is a task that estimates the fuel cost (in yen) for each power source for each evaluation period, based on the type, specifications, and characteristics of each power source.

燃料費想定タスク155は、具体的には、評価期ごとに、例えば、各電源の燃料それぞれについて、過去から現在にかけての発電用燃料の価格(単価)のトレンドに基づいて予め求められる回帰方程式(即ち、トレンド推計法におけるトレンド回帰式,トレンド推計式)に従って発電用燃料の価格(単価;「ベースの燃料価格」と呼ぶ)を推計する。 Specifically, the fuel cost estimation task 155 estimates the price (unit price; called the "base fuel price") of the power generation fuel for each evaluation period, for example, for each fuel of each power source, according to a regression equation (i.e., the trend regression equation or trend estimation equation in the trend estimation method) that is calculated in advance based on the trend in the price (unit price) of the power generation fuel from the past to the present.

燃料費想定タスク155は、そのうえで、必要に応じて、ベースの燃料価格を変動させる要因がある場合にはその要因に応じてベースの燃料価格を補正して最終的な発電用燃料の価格を推計する。すなわち、各評価期において発電用燃料の価格を押し下げる要因がある場合には、その要因による発電用燃料の価格への影響の程度に応じて、ベースの燃料価格を下方修正する。また、各評価期において発電用燃料の価格を押し上げる要因がある場合には、その要因による発電用燃料の価格への影響の程度に応じて、ベースの燃料価格を上方修正する。 The fuel cost estimation task 155 then, if necessary, corrects the base fuel price in accordance with any factors that may cause the base fuel price to fluctuate, and estimates the final price of fuel for power generation. In other words, if there are factors that push down the price of fuel for power generation in each evaluation period, the base fuel price is revised downward in accordance with the degree of impact of those factors on the price of fuel for power generation. Also, if there are factors that push up the price of fuel for power generation in each evaluation period, the base fuel price is revised upward in accordance with the degree of impact of those factors on the price of fuel for power generation.

発電用燃料の価格の変動要因としては、例えば、ガス,石炭,および石油といった化石燃料価格の変化や、木質バイオマスなどのバイオ燃料価格の変化などが考慮され得る。 Factors that may affect the price of fuel for power generation include, for example, changes in the prices of fossil fuels such as gas, coal, and oil, and changes in the prices of biofuels such as wood biomass.

なお、既に推計などされている発電用燃料の将来の価格のデータが用いられたり、現状のまま推移するとして発電用燃料の現在の価格が将来の価格として用いられたりするようにしてもよい。 In addition, data on future prices of fuel for power generation that have already been estimated may be used, or the current price of fuel for power generation may be used as the future price assuming that the current situation will remain unchanged.

そのうえで、燃料費想定タスク155は、評価期ごとに、上記において想定される評価期ごとの発電用燃料の価格(単価)や電力量想定タスク151から出力される評価期ごとの各電源の発電電力量などに基づいて各電源の燃料費(尚、評価期各々の全体における積分値(別言すると、積算値)である)を計算する。 Then, the fuel cost estimation task 155 calculates the fuel cost of each power source (which is the integral value (in other words, the accumulated value) for each evaluation period) for each evaluation period based on the price (unit price) of the fuel for power generation for each evaluation period estimated above and the amount of power generated by each power source for each evaluation period output from the power amount estimation task 151.

また、燃料費想定タスク155は、評価期ごとに、燃料費要因を説明変数とするとともに燃料費を目的変数とする重回帰式に従って電源それぞれの燃料費を推計するようにしてもよい。この場合は、電源計画の対象の計画エリアについての過去から現在にかけての複数時点における燃料費要因と燃料費との実績の組み合わせデータ群が用いられて予め求められる重回帰式に従って燃料費が推計される。 Fuel cost estimation task 155 may also estimate the fuel cost of each power source for each evaluation period according to a multiple regression equation with fuel cost factors as explanatory variables and fuel costs as the objective variable. In this case, fuel costs are estimated according to a multiple regression equation that is determined in advance using a set of combined data on fuel cost factors and actual fuel costs at multiple points in time from the past to the present for the planning area targeted by the power source plan.

重回帰式の説明変数である燃料費要因は、特定の項目に限定されるものではなく、燃料費に対する影響が有意であるか否かが考慮されるなどして適宜選択されて設定される。重回帰式の説明変数である燃料費要因として、例えば、各電源の発電電力量、ならびに、ガス,石炭,および石油といった化石燃料価格や、木質バイオマスなどのバイオ燃料価格が挙げられる。 The fuel cost factors, which are explanatory variables in the multiple regression equation, are not limited to specific items, but are appropriately selected and set, taking into consideration whether their impact on fuel costs is significant or not. Examples of fuel cost factors, which are explanatory variables in the multiple regression equation, include the amount of power generated by each power source, as well as the prices of fossil fuels such as gas, coal, and oil, and the prices of biofuels such as woody biomass.

燃料費想定タスク155は、或いは、評価期ごとに、燃料費要因を入力とするとともに燃料費を出力とする予測モデルに従って電源それぞれの燃料費を推計するようにしてもよい。この場合は、電源計画の対象の計画エリアについての過去から現在にかけての複数時点における燃料費要因と燃料費との実績の組み合わせデータ群が用いられて機械学習によって予め構築される予測モデル(学習モデル)に従って燃料費が推計される。 The fuel cost estimation task 155 may alternatively estimate the fuel cost of each power source for each evaluation period according to a prediction model that uses fuel cost factors as input and fuel costs as output. In this case, fuel costs are estimated according to a prediction model (learning model) that is constructed in advance by machine learning using a set of combined data on fuel cost factors and actual fuel costs at multiple points in time from the past to the present for the planning area that is the target of the power source plan.

予測モデル(学習モデル)としては、特に連続値の予測に好適な機械学習の手法が用いられることが考えられ、具体的には例えば、エクストリームラーニングマシン(ELM),ディープニューラルネットワーク(DNN),サポートベクターマシン(SVM)などが用いられ得る。 As a predictive model (learning model), a machine learning method that is particularly suitable for predicting continuous values may be used. Specifically, for example, an extreme learning machine (ELM), a deep neural network (DNN), a support vector machine (SVM), etc. may be used.

機械学習によって構築される予測モデルの入力である燃料費要因は、特定の項目に限定されるものではなく、燃料費に対する影響が有意であるか否かが考慮されるなどして適宜選択されて設定される。予測モデルの入力である燃料費要因として、例えば、各電源の発電電力量、ならびに、ガス,石炭,および石油といった化石燃料価格や、木質バイオマスなどのバイオ燃料価格が挙げられる。 The fuel cost factors that are inputs to the prediction model constructed by machine learning are not limited to specific items, but are appropriately selected and set, taking into consideration whether or not their impact on fuel costs is significant. Examples of fuel cost factors that are inputs to the prediction model include the amount of power generated by each power source, as well as the prices of fossil fuels such as gas, coal, and oil, and the prices of biofuels such as woody biomass.

そして、燃料費想定タスク155は、評価期ごとの、電源それぞれの燃料費(図2におけるCf)を出力する。 Then, the fuel cost estimation task 155 outputs the fuel cost (Cf in Figure 2) for each power source for each evaluation period.

固定費想定タスク156は、評価期ごとの、電源それぞれの固定費〔円〕を想定するタスクである。 The fixed cost estimation task 156 is a task that estimates the fixed cost (in yen) of each power source for each evaluation period.

固定費想定タスク156は、具体的には、各電源の種類,仕様,および特性などをふまえつつ、各評価期において計上する固定費を想定する。なお、固定費としての例えば建設費などについては、総額が評価期あたりの金額に割り戻されて用いられる。また、電源の運用・運営の維持に必要な費用が固定費として適宜見込まれるようにしてもよい。 Specifically, the fixed cost estimation task 156 estimates the fixed costs to be recorded for each evaluation period, taking into account the type, specifications, and characteristics of each power source. Note that for fixed costs such as construction costs, the total amount is discounted to the amount per evaluation period. In addition, costs required for operating and maintaining the operation of the power source may be estimated as fixed costs as appropriate.

そして、固定費想定タスク156は、評価期ごとの、電源それぞれの固定費(図2におけるCc)を出力する。 Then, the fixed cost estimation task 156 outputs the fixed cost (Cc in Figure 2) of each power source for each evaluation period.

収益計算タスク157は、評価期ごとの、電源それぞれの収益〔円〕を計算するタスクである。 The revenue calculation task 157 is a task that calculates the revenue (in yen) of each power source for each evaluation period.

収益計算タスク157は、具体的には、電力量収入計算タスク153から出力される評価期ごとの電源それぞれの電力量収入と、容量収入想定タスク154から出力される評価期ごとの電源それぞれの容量収入と、燃料費想定タスク155から出力される評価期ごとの電源それぞれの燃料費と、固定費想定タスク156から出力される評価期ごとの電源それぞれの固定費との入力を受け、評価期ごとに、電源それぞれの前記電力量収入と前記容量収入との合計から前記燃料費と前記固定費との合計を減算して各電源の収益(尚、評価期各々の全体における積分値(別言すると、積算値)である)を計算する。 The revenue calculation task 157 specifically receives as input the energy revenue of each power source for each evaluation period output from the energy revenue calculation task 153, the capacity revenue of each power source for each evaluation period output from the capacity revenue assumption task 154, the fuel cost of each power source for each evaluation period output from the fuel cost assumption task 155, and the fixed cost of each power source for each evaluation period output from the fixed cost assumption task 156, and calculates the revenue of each power source (which is the integral value (in other words, the accumulated value) for the entire evaluation period) by subtracting the sum of the fuel cost and the fixed cost from the sum of the energy revenue and the capacity revenue of each power source for each evaluation period.

そして、収益計算タスク157は、評価期ごとの、電源それぞれの収益(図2におけるR)を出力する。 Then, the revenue calculation task 157 outputs the revenue (R in Figure 2) of each power source for each evaluation period.

期待収益率計算タスク158は、新規の電源それぞれの収益率を計算するタスクである。 Expected profitability calculation task 158 is a task that calculates the profitability of each new power source.

期待収益率計算タスク158は、具体的には、収益計算タスク157から出力される評価期ごとの新規の電源それぞれの収益の入力を受け、新規の電源それぞれについて、電源計画が対象とする計画期間の評価期ごとの前記収益(図2に示す例では、20XX年から20YY年までの間の年ごとの収益)と、当該電源の初期投資額とを用いて収益率(尚、「期待収益率」とも呼ばれる)を計算する。 Specifically, the expected return calculation task 158 receives the return of each new power source for each evaluation period output from the return calculation task 157, and calculates the return (also called the "expected return") for each new power source using the return for each evaluation period of the planning period covered by the power source plan (in the example shown in FIG. 2, the return for each year between 20XX and 20YY) and the initial investment amount for that power source.

収益率は、電源のライフサイクルが考慮されるなどしたうえで評価期間の期間長が設定されて計算される。そして、収益率を計算する際の評価期間の期間長が考慮されて電源計画が対象とする計画期間の長さが設定されるようにしてもよい。 The rate of return is calculated by setting the length of the evaluation period, taking into account the life cycle of the power source, etc. The length of the planning period covered by the power source plan may be set by taking into account the length of the evaluation period when calculating the rate of return.

期待収益率計算タスク158は、具体的には例えば、内部収益率(IRR:Internal Rate of Return の略),投資収益率,或いはプロジェクトIRR(PIRR:Project Internal Rate of Return の略)とも呼ばれる指標(単位はいずれも%)を計算するようにしてもよい。 Specifically, the expected rate of return calculation task 158 may calculate an index (all expressed in percentages) also known as the internal rate of return (IRR), investment return, or project IRR (PIRR).

そして、期待収益率計算タスク158は、新規の電源それぞれの収益率(図2におけるER)を出力する。 Then, the expected return calculation task 158 outputs the return of each new power source (ER in Figure 2).

判定タスク159は、既設の電源それぞれについて存続または廃止を判定し、また、新規の電源それぞれについて新設または中止を判定するタスクである。ここで、電源の存続や廃止ならびに新設や中止を「電源の取扱い」とも呼ぶ。 The judgment task 159 is a task that judges whether each existing power source should continue or be discontinued, and judges whether each new power source should be newly installed or discontinued. Here, the continued existence or discontinuation of a power source, as well as the establishment or discontinuation of a power source, are also referred to as "power source handling."

判定タスク159は、具体的には、既設の電源それぞれについて、収益計算タスク157から出力される既設の電源それぞれの評価期ごとの収益の入力を受け、前記収益が所定の収益閾値以上である場合には存続と判定し、また、前記収益が所定の収益閾値未満である場合には廃止と判定する。 Specifically, the judgment task 159 receives the revenue for each evaluation period of each existing power source output from the revenue calculation task 157, and judges the power source to continue if the revenue is equal to or greater than a predetermined revenue threshold, and judges the power source to be discontinued if the revenue is less than the predetermined revenue threshold.

上記の所定の収益閾値は、特定の値に限定されるものではないものの、例えば0に設定されることが考えられる。この場合はすなわち、収益が赤字でなければ当該の電源については存続と判定され、収益が赤字であれば当該の電源については廃止と判定される。 The above-mentioned predetermined revenue threshold is not limited to a specific value, but may be set to 0, for example. In this case, if the revenue is not in the red, the power source in question is determined to continue operating, and if the revenue is in the red, the power source in question is determined to be discontinued.

判定タスク159は、また、新規の電源それぞれについて、期待収益率計算タスク158から出力される新規の電源それぞれの収益率の入力を受け、前記収益率が所定の収益率閾値以上である場合には新設と判定し、また、前記収益率が所定の収益率閾値未満である場合には中止と判定する。 The judgment task 159 also receives the profitability of each new power source output from the expected profitability calculation task 158, and judges it to be a new installation if the profitability is equal to or greater than a predetermined profitability threshold, and judges it to be canceled if the profitability is less than the predetermined profitability threshold.

上記の所定の収益率閾値は、特定の値に限定されるものではなく、収益率としての指標の種類が考慮されるなどしたうえで適当な値に適宜設定され得るものの、例えば内部収益率(IRR)が用いられる場合には8%程度に設定されることが考えられる。 The above-mentioned predetermined return threshold is not limited to a specific value, and can be set to an appropriate value taking into consideration the type of indicator used as the return rate, but for example, if the internal rate of return (IRR) is used, it may be set to around 8%.

そして、判定タスク159は、既設の電源それぞれについて存続または廃止の判定結果(図2におけるJ)を出力し、また、新規の電源それぞれについて新設または中止の判定結果(図2におけるJ)を出力する。 Then, the judgment task 159 outputs the judgment result (J in FIG. 2) of whether each existing power source should be maintained or discontinued, and also outputs the judgment result (J in FIG. 2) of whether each new power source should be established or discontinued.

なお、判定タスク159から出力される、新規の電源それぞれについての新設または中止の判定結果は、例えば、独立系発電事業(Independent Power Producer の略)が整備する電源に出資するか否かの判断指標としても位置づけられる。 The results of the determination of whether to establish or cancel each new power source output from the determination task 159 can also be used as a judgment indicator for determining whether to invest in a power source developed by an independent power producer, for example.

学習タスク160は、新規の電源それぞれについて、収益率要因を入力とするとともに収益率を出力とする予測モデルに従って収益率を予測するとともに、前記収益率に基づいて電源の取扱いとして新設または中止を判定するタスクである。 Learning task 160 is a task that predicts the profitability of each new power source according to a prediction model that uses profitability factors as input and profitability as output, and determines whether to install or discontinue the power source based on the profitability.

学習タスク160は、具体的には、電源計画の対象の計画エリアについての過去から現在にかけての複数時点における収益率要因と収益率との実績の組み合わせデータ群が用いられて機械学習によって構築される予測モデル(学習モデル)に従って収益率を予測する。学習タスク160が予測する収益率は、期待収益率計算タスク158による収益率の計算処理において計算される収益率と同じ種類の収益率に設定される。 Specifically, the learning task 160 predicts the rate of return according to a prediction model (learning model) constructed by machine learning using a set of combined data of the rate of return factors and the rate of return at multiple points in time from the past to the present for the planning area targeted by the power source plan. The rate of return predicted by the learning task 160 is set to the same type of rate of return as the rate of return calculated in the rate of return calculation process by the expected rate of return calculation task 158.

予測モデル(学習モデル)としては、特に連続値の予測に好適な機械学習の手法が用いられることが考えられ、具体的には例えば、エクストリームラーニングマシン(ELM),ディープニューラルネットワーク(DNN),サポートベクターマシン(SVM)などが用いられ得る。 As a predictive model (learning model), a machine learning method that is particularly suitable for predicting continuous values may be used. Specifically, for example, an extreme learning machine (ELM), a deep neural network (DNN), a support vector machine (SVM), etc. may be used.

機械学習によって構築される予測モデルの入力である収益率要因は、特定の項目に限定されるものではなく、収益率に対する影響が有意であるか否かが考慮されるなどして適宜選択されて設定される。予測モデルの入力である収益率要因として、例えば、電源それぞれの計画エリアおよび発電の種類、また、上記のタスク151乃至157から出力される、電源それぞれの発電電力量,電力量収入,容量収入,燃料費,固定費,および収益、ならびに、当該の電源が存在する計画エリアにおける電力量価格、のうちの一部もしくは全部が、収益率に対する影響が有意であるか否かが考慮されるなどして適宜選択されて設定される。また、上記のタスク151乃至157から出力される項目以外の項目が収益率要因として設定されるようにしてもよい。 The profitability factors that are inputs to the prediction model constructed by machine learning are not limited to specific items, but are appropriately selected and set, for example, by considering whether the impact on the profitability is significant. As profitability factors that are inputs to the prediction model, for example, the planning area and type of power generation of each power source, as well as the generated power amount, power revenue, capacity revenue, fuel cost, fixed cost, and revenue of each power source output from the above tasks 151 to 157, and some or all of the power price in the planning area in which the power source is located are appropriately selected and set, for example, by considering whether the impact on the profitability is significant. In addition, items other than the items output from the above tasks 151 to 157 may be set as profitability factors.

学習タスク160は、記憶部13に格納される実績データベース132に記録・蓄積されている収益率の実績データを用いて前記収益率の実績データに対して収益率の予測にかかる学習処理を実行して、前記収益率の実績データに基づいて予測モデル(学習モデル)を構築し、所定の情報・条件が入力された場合に的確な収益率の予測結果が得られるように構成される。 The learning task 160 is configured to execute a learning process for predicting the rate of return on the actual rate of return data recorded and accumulated in the actual database 132 stored in the memory unit 13, construct a prediction model (learning model) based on the actual rate of return data, and obtain an accurate prediction result of the rate of return when specified information and conditions are input.

実績データベース132は、過去の電源整備についての収益率に関する実績情報が記録・蓄積されているデータベースであり、過去に実施された電源整備についての、発電所ごとの、収益率要因の組み合わせデータと、前記組み合わせデータのもとで計算された収益率と、実際の収益率とが対応付けられたデータが過去の実績情報として記録・蓄積されている(図3参照)。 The performance database 132 is a database in which performance information on the profitability of past power source development is recorded and accumulated, and data on combination data of profitability factors for each power plant for power source development carried out in the past, the profitability calculated based on the combination data, and the actual profitability are associated with each other as past performance information (see Figure 3).

収益率要因について、時間の経過に伴って値が変動し得る項目(言い換えると、評価期によって値が異なり得る項目;具体的には例えば、電源それぞれの発電電力量,電力量収入,容量収入,燃料費,固定費,および収益、ならびに、当該の電源が存在する計画エリアにおける電力量価格)については、電源計画が対象とする計画期間の始まりの評価期から終わりの評価期までの間の評価期ごとのデータが実績情報として記録・蓄積される。 For profitability factors whose values may vary over time (in other words, items whose values may differ depending on the evaluation period; specifically, for example, the amount of generated energy, energy revenue, capacity revenue, fuel costs, fixed costs, and revenue of each power source, as well as the energy price in the planning area in which the power source is located), data for each evaluation period from the start of the planning period covered by the power source plan to the end of the planning period is recorded and accumulated as actual information.

学習タスク160は、例えば、ニューラルネットワークを利用した機械学習を用いて、実績データベース132に記録・蓄積されている実績情報から取得したデータに基づいて、収益率要因を入力層とするとともに、収益率を出力層とする、中間層を含むニューラルネットワークを作成する。 The learning task 160 uses, for example, machine learning using a neural network to create a neural network including an intermediate layer in which the profit rate factors are the input layer and the profit rate is the output layer, based on data obtained from performance information recorded and accumulated in the performance database 132.

そして、学習タスク160は、過去に実施された電源整備についての実績としての実際の収益率を学習データ(教師データ)として用いて中間層を作成して、中間層における各種パラメータについて学習を行う。学習タスク160は、予測される収益率と、学習データ(教師データ)に含まれる実際の収益率との誤差を最小化するように、中間層における各種パラメータの学習を行う。 Then, the learning task 160 creates an intermediate layer using actual profit rates as the results of power source maintenance carried out in the past as learning data (teaching data), and learns various parameters in the intermediate layer. The learning task 160 learns various parameters in the intermediate layer so as to minimize the error between the predicted profit rate and the actual profit rate included in the learning data (teaching data).

学習タスク160は、上記のようにして構築した予測モデルに従って、新規の電源それぞれについて、上記のタスク151乃至157から出力される項目のうちの一部もしくは全部や他の項目が設定されている収益率要因から収益率を予測する。 Learning task 160 predicts the profitability of each new power source based on some or all of the items output from tasks 151 to 157 above, or profitability factors for which other items are set, in accordance with the prediction model constructed as described above.

学習タスク160は、さらに、上記のようにして予測される収益率に基づいて、新規の電源それぞれについて新設または中止を判定する。 The learning task 160 further determines whether to install or cancel each new power source based on the profitability predicted as described above.

学習タスク160は、具体的には、新規の電源それぞれについて、上記のようにして予測される収益率が、所定の収益率閾値以上である場合には新設と判定し、所定の収益率閾値未満である場合には中止と判定する。 Specifically, for each new power source, the learning task 160 determines that the project should be newly installed if the profitability predicted in the manner described above is equal to or greater than a predetermined profitability threshold, and determines that the project should be canceled if the profitability is less than the predetermined profitability threshold.

上記の所定の収益率閾値は、判定タスク159による判定処理において用いられる収益率閾値と同じ値に設定される。 The above-mentioned predetermined profitability threshold is set to the same value as the profitability threshold used in the judgment process by judgment task 159.

そして、学習タスク160は、新規の電源それぞれについて収益率(図2におけるERm)を出力するとともに新設または中止の判定結果(図2におけるJm)を出力する。 Then, the learning task 160 outputs the rate of return (ERm in FIG. 2) for each new power source, as well as the decision on whether to install or cancel (Jm in FIG. 2).

ここで、図2に示す例のように、期待収益率計算タスク158によって計算される収益率の値(同図におけるER)と学習タスク160によって予測される収益率の値(同図におけるERm)とは異なる場合もある。そして、収益率の値が異なることに伴って、判定結果(同図におけるJとJm)が異なる場合もある。 As shown in the example in FIG. 2, the rate of return calculated by the expected rate of return calculation task 158 (ER in the figure) may differ from the rate of return predicted by the learning task 160 (ERm in the figure). As the rate of return values differ, the judgment results (J and Jm in the figure) may also differ.

図2に示す例のうちの発電所αについては、期待収益率計算タスク158によって計算される収益率(ER)が9.2であるとともに学習タスク160によって予測される収益率(ERm)が8.9であり、収益率閾値を8とすると、期待収益率計算タスク158による計算結果に基づく判定タスク159による判定結果(J)と学習タスク160による予測結果に基づく判定結果(Jm)とのどちらも「新設」となる。 For power plant α in the example shown in Figure 2, the rate of return (ER) calculated by expected rate of return calculation task 158 is 9.2, and the rate of return (ERm) predicted by learning task 160 is 8.9. If the rate of return threshold is set to 8, then both the judgment result (J) by judgment task 159 based on the calculation result by expected rate of return calculation task 158 and the judgment result (Jm) based on the prediction result by learning task 160 will be "new construction."

図2に示す例のうちの発電所βについては、期待収益率計算タスク158によって計算される収益率(ER)が8.4であるとともに学習タスク160によって予測される収益率(ERm)が7.8であり、収益率閾値を8とすると、期待収益率計算タスク158による計算結果に基づく判定タスク159による判定結果(J)は「新設」となる一方で、学習タスク160による予測結果に基づく判定結果(Jm)は「中止」となる。 For power plant β in the example shown in Figure 2, the rate of return (ER) calculated by expected rate of return calculation task 158 is 8.4, and the rate of return (ERm) predicted by learning task 160 is 7.8. If the rate of return threshold is set to 8, the judgment result (J) by judgment task 159 based on the calculation result by expected rate of return calculation task 158 will be "new construction," while the judgment result (Jm) based on the prediction result by learning task 160 will be "cancelled."

このように、期待収益率計算タスク158による計算結果に基づく判定タスク159による判定結果(J)と学習タスク160による予測結果に基づく判定結果(Jm)とを提供することにより、2つの結果が相互補完的に解釈されるなどして電源計画の策定において有用な情報として利用され得る。 In this way, by providing a judgment result (J) by the judgment task 159 based on the calculation result by the expected return calculation task 158 and a judgment result (Jm) based on the prediction result by the learning task 160, the two results can be interpreted as complementary and used as useful information in formulating power supply plans.

以上のように、この電源計画策定支援装置1および電源計画策定支援プログラム19によれば、電力量収入と容量収入との合計から電源の燃料費と固定費との合計を減算して計算される収益に基づいて電源の取扱いを判定するので、収益を評価指標として用いて各電源の収益性を評価して既設の電源それぞれを存続または廃止したり新規の電源を新設したりした場合の収益の変化に関する情報を提供することが可能となる。 As described above, the power supply plan development support device 1 and the power supply plan development support program 19 determine how to handle a power supply based on the profit calculated by subtracting the total of the fuel cost and fixed cost of the power supply from the total of the power volume revenue and the capacity revenue. This makes it possible to use the profit as an evaluation index to evaluate the profitability of each power supply and provide information on the change in profit when each existing power supply is maintained or abolished, or when a new power supply is newly established.

この電源計画策定支援装置1および電源計画策定支援プログラム19によれば、また、電力量収入と容量収入との合計から電源の燃料費と固定費との合計を減算して得られる収益と電源の初期投資額とを用いて計算される収益率に基づいて電源の取扱いを判定するので、収益率を評価指標として用いて各電源の収益性を評価して既設の電源それぞれを存続または廃止したり新規の電源を新設したりした場合の収益の変化に関する情報を提供することが可能となる。 The power supply plan development support device 1 and power supply plan development support program 19 also determine how to handle a power supply based on the rate of return calculated using the revenue obtained by subtracting the total of the fuel cost and fixed cost of the power supply from the total of the power volume revenue and capacity revenue, and the initial investment amount of the power supply. This makes it possible to evaluate the profitability of each power supply using the rate of return as an evaluation index and provide information on the change in revenue when each existing power supply is maintained or abolished, or when a new power supply is newly established.

また、この電源計画策定支援装置1および電源計画策定支援プログラム19は、電力量価格要因を入力とするとともに電力量価格を出力として機械学習によって構築される予測モデルを用いて市場における電力量価格を推計するようにした場合には、過去の電力量価格に関する実績情報が反映された一層実際的な電力量価格を推計することが可能となり、延いては電源計画の策定を支援する技術としての信頼性の向上を図ることが可能となる。 In addition, when the power supply plan formulation support device 1 and the power supply plan formulation support program 19 estimate the market price of electricity using a prediction model constructed by machine learning with the power price factors as input and the power price as output, it becomes possible to estimate a more realistic price of electricity that reflects actual information on past electricity prices, which in turn makes it possible to improve the reliability of the technology for supporting the formulation of power supply plans.

また、この電源計画策定支援装置1および電源計画策定支援プログラム19は、収益率要因を入力とするとともに収益率を出力として機械学習によって構築される予測モデルを用いて電源の収益率を推計するようにした場合には、過去の収益率に関する実績情報が反映された一層実際的な収益率を推計することが可能となり、延いては電源計画の策定を支援する技術としての信頼性の向上を図ることが可能となる。 In addition, when the power supply plan formulation support device 1 and the power supply plan formulation support program 19 estimate the profitability of a power source using a prediction model constructed by machine learning with profitability factors as input and profitability as output, it becomes possible to estimate a more realistic profitability that reflects actual information on past profitability, which in turn makes it possible to improve the reliability of the technology for supporting the formulation of power supply plans.

以上、この発明の実施の形態について説明したが、具体的な構成は、上記の実施の形態に限られるものではなく、この発明の要旨を逸脱しない範囲の設計の変更等があっても、この発明に含まれる。 The above describes an embodiment of the present invention, but the specific configuration is not limited to the above embodiment, and even if there are design changes that do not deviate from the gist of the present invention, they are included in the present invention.

例えば、上記の実施の形態では既設の電源についての判定と新規の電源についての判定との両方を行うようにしているが、既設の電源についての判定と新規の電源についての判定とのうちのどちらか一方のみを行うようにしてもよい。なお、既設の電源についての判定のみを行う場合には、期待収益率計算タスク158を有しない構成となる。 For example, in the above embodiment, both judgments are made about existing power sources and judgments about new power sources, but it is also possible to make only one of judgments about existing power sources and judgments about new power sources. Note that when only judgments are made about existing power sources, the configuration does not include expected return calculation task 158.

また、上記の実施の形態では判定タスク159に加えて学習タスク160を有するようにしているが、判定タスク159と学習タスク160とのうちのどちらか一方のみを有するようにしてもよい。判定タスク159による新規の電源についての判定の結果と学習タスク160による新規の電源についての判定の結果とを相互補完的に提供することにより、電源計画の策定に纏わる想定・推計の精度が向上し、電源の収益性の評価を一層高精度に行って電源計画の策定を支援する技術としての信頼性の一層の向上を図ることが可能となるものの、判定タスク159と学習タスク160とのうちのどちらか一方の判定の結果のみを提供することによっても電源計画の策定を支援することは可能である。 In addition, in the above embodiment, in addition to the judgment task 159, the learning task 160 is included, but it is also possible to include only one of the judgment task 159 and the learning task 160. By providing the judgment results of the judgment task 159 for a new power source and the judgment results of the learning task 160 for a new power source in a mutually complementary manner, the accuracy of the assumptions and estimates related to the formulation of the power source plan is improved, and the profitability of the power source can be evaluated with a higher accuracy, thereby further improving the reliability of the technology for supporting the formulation of the power source plan. However, it is also possible to support the formulation of the power source plan by providing only the judgment results of either the judgment task 159 or the learning task 160.

1 電源計画策定支援装置
11 入力部
12 表示部
13 記憶部
131 電源データベース
132 実績データベース
14 メモリ
15 メインタスク
151 電力量想定タスク
152 価格想定タスク
153 電力量収入計算タスク
154 容量収入想定タスク
155 燃料費想定タスク
156 固定費想定タスク
157 収益計算タスク
158 期待収益率計算タスク
159 判定タスク
160 学習タスク
17 通信部
18 中央処理部
19 電源計画策定支援プログラム
REFERENCE SIGNS LIST 1 Power supply plan formulation support device 11 Input unit 12 Display unit 13 Storage unit 131 Power supply database 132 Performance database 14 Memory 15 Main task 151 Energy amount estimation task 152 Price estimation task 153 Energy amount revenue calculation task 154 Capacity revenue estimation task 155 Fuel cost estimation task 156 Fixed cost estimation task 157 Revenue calculation task 158 Expected rate of return calculation task 159 Judgment task 160 Learning task 17 Communication unit 18 Central processing unit 19 Power supply plan formulation support program

Claims (8)

電源の発電電力量に市場における電力量価格を乗じて前記電源の電力量収入を計算する手段と、
前記電源の発電余力に市場における供給力価格を乗じて前記電源の容量収入を計算する手段と、
前記電力量収入と前記容量収入との合計から前記電源の燃料費と固定費との合計を減算して前記電源の収益を計算する手段と、
前記収益が所定の収益閾値以上である場合には既存の前記電源の存続と判定し、また、前記収益が当該所定の収益閾値未満である場合には当該既存の電源の廃止判定する手段と、を有する、
ことを特徴とする電源計画策定支援装置。
A means for calculating the power revenue of a power source by multiplying the amount of power generated by the power source by a market price of the power source;
A means for calculating a capacity revenue of the power source by multiplying the power generation surplus of the power source by a supply capacity price in the market;
means for calculating revenue of the power source by subtracting a sum of fuel costs and fixed costs of the power source from a sum of the energy revenue and the capacity revenue;
and a means for determining that the existing power source should be continued if the revenue is equal to or greater than a predetermined revenue threshold , and for determining that the existing power source should be discontinued if the revenue is less than the predetermined revenue threshold .
A power supply plan formulation support device characterized by:
電源の発電電力量に市場における電力量価格を乗じて前記電源の電力量収入を計算する手段と、
前記電源の発電余力に市場における供給力価格を乗じて前記電源の容量収入を計算する手段と、
前記電力量収入と前記容量収入との合計から前記電源の燃料費と固定費との合計を減算して前記電源の収益を計算する手段と、
前記収益と前記電源の初期投資額とを用いて新規の前記電源の収益率を計算する手段と、
前記収益率が所定の収益率閾値以上である場合には前記新規の電源の新設と判定し、また、前記収益率が当該所定の収益率閾値未満である場合には当該新規の電源の中止判定する手段と、を有する、
ことを特徴とする電源計画策定支援装置。
A means for calculating the power revenue of a power source by multiplying the amount of power generated by the power source by a market price of the power source;
A means for calculating a capacity revenue of the power source by multiplying the power generation surplus of the power source by a supply capacity price in the market;
means for calculating revenue of the power source by subtracting a sum of fuel costs and fixed costs of the power source from a sum of the energy revenue and the capacity revenue;
means for calculating a rate of return for a new power source using the return and an initial investment amount of the power source;
means for determining that the new power source should be installed when the rate of return is equal to or greater than a predetermined rate of return threshold , and for determining that the new power source should be discontinued when the rate of return is less than the predetermined rate of return threshold ;
A power supply plan formulation support device characterized by:
前記電力量価格を変動させる電力量価格要因を入力とするとともに電力量価格を出力として機械学習によって構築される予測モデルを用いて前記市場における前記電力量価格を推計する手段を有する、
ことを特徴とする請求項1または2に記載の電源計画策定支援装置。
a means for estimating the electric energy price in the market using a prediction model constructed by machine learning with an electric energy price factor that fluctuates the electric energy price as an input and an electric energy price as an output;
3. The power supply plan formulation assistance device according to claim 1 or 2.
前記収益率に対する影響が有意である収益率要因を入力とするとともに収益率を出力として機械学習によって構築される予測モデルを用いて前記新規の電源の前記収益率を推計する手段を有する、
ことを特徴とする請求項2に記載の電源計画策定支援装置。
a means for estimating the rate of return of the new power source using a prediction model constructed by machine learning with a rate of return factor having a significant effect on the rate of return as an input and a rate of return as an output;
3. The power supply plan formulation assistance device according to claim 2.
コンピュータを、
電源の発電電力量に市場における電力量価格を乗じて前記電源の電力量収入を計算する手段、
前記電源の発電余力に市場における供給力価格を乗じて前記電源の容量収入を計算する手段、
前記電力量収入と前記容量収入との合計から前記電源の燃料費と固定費との合計を減算して前記電源の収益を計算する手段、および、
前記収益が所定の収益閾値以上である場合には既存の前記電源の存続と判定し、また、前記収益が当該所定の収益閾値未満である場合には当該既存の電源の廃止判定する手段、として機能させる、
ことを特徴とする電源計画策定支援プログラム。
Computer,
A means for calculating the power revenue of a power source by multiplying the amount of power generated by the power source by the power price in the market;
A means for calculating a capacity revenue of the power source by multiplying the power generation surplus of the power source by the supply capacity price in the market;
means for calculating revenue of the power source by subtracting a sum of fuel costs and fixed costs of the power source from a sum of the energy revenue and the capacity revenue; and
When the revenue is equal to or greater than a predetermined revenue threshold, the system determines that the existing power source should be continued, and when the revenue is less than the predetermined revenue threshold, the system determines that the existing power source should be discontinued.
A power supply planning support program characterized by:
コンピュータを、
電源の発電電力量に市場における電力量価格を乗じて前記電源の電力量収入を計算する手段、
前記電源の発電余力に市場における供給力価格を乗じて前記電源の容量収入を計算する手段、
前記電力量収入と前記容量収入との合計から前記電源の燃料費と固定費との合計を減算して前記電源の収益を計算する手段、
前記収益と前記電源の初期投資額とを用いて新規の前記電源の収益率を計算する手段、および、
前記収益率が所定の収益率閾値以上である場合には前記新規の電源の新設と判定し、また、前記収益率が当該所定の収益率閾値未満である場合には当該新規の電源の中止判定する手段、として機能させる、
ことを特徴とする電源計画策定支援プログラム。
Computer,
A means for calculating the power revenue of a power source by multiplying the amount of power generated by the power source by the power price in the market;
A means for calculating a capacity revenue of the power source by multiplying the power generation surplus of the power source by the supply capacity price in the market;
means for calculating revenue of the power source by subtracting a sum of fuel costs and fixed costs of the power source from a sum of the energy revenue and the capacity revenue;
means for calculating a rate of return for a new power source using the revenue and an initial investment amount for the power source; and
when the rate of return is equal to or greater than a predetermined rate of return threshold, it is determined that the new power source should be newly installed, and when the rate of return is less than the predetermined rate of return threshold, it is determined that the new power source should be discontinued.
A power supply planning support program characterized by:
コンピュータを、
前記電力量価格を変動させる電力量価格要因を入力とするとともに電力量価格を出力として機械学習によって構築される予測モデルを用いて前記市場における前記電力量価格を推計する手段として機能させる、
ことを特徴とする請求項5または6に記載の電源計画策定支援プログラム。
Computer,
and functioning as a means for estimating the electricity price in the market using a prediction model constructed by machine learning with an electricity price factor that fluctuates the electricity price as an input and an electricity price as an output.
7. The power supply plan formulation support program according to claim 5 or 6.
コンピュータを、
前記収益率に対する影響が有意である収益率要因を入力とするとともに収益率を出力として機械学習によって構築される予測モデルを用いて前記新規の電源の前記収益率を推計する手段として機能させる、
ことを特徴とする請求項6に記載の電源計画策定支援プログラム。
Computer,
a prediction model constructed by machine learning using a profit rate factor having a significant effect on the profit rate as an input and a profit rate as an output, the prediction model functioning as a means for estimating the profit rate of the new power source;
7. The power supply plan formulation support program according to claim 6.
JP2021001612A 2021-01-07 2021-01-07 Power supply planning support device and power supply planning support program Active JP7653052B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021001612A JP7653052B2 (en) 2021-01-07 2021-01-07 Power supply planning support device and power supply planning support program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021001612A JP7653052B2 (en) 2021-01-07 2021-01-07 Power supply planning support device and power supply planning support program

Publications (2)

Publication Number Publication Date
JP2022106535A JP2022106535A (en) 2022-07-20
JP7653052B2 true JP7653052B2 (en) 2025-03-28

Family

ID=82457091

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021001612A Active JP7653052B2 (en) 2021-01-07 2021-01-07 Power supply planning support device and power supply planning support program

Country Status (1)

Country Link
JP (1) JP7653052B2 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001086645A (en) 1999-09-17 2001-03-30 Mitsubishi Electric Corp Method and apparatus for calculating optimum operation plan of power generation facility
JP2007244127A (en) 2006-03-09 2007-09-20 Toshiba Corp Design evaluation method for small-scale power system
JP2016173689A (en) 2015-03-17 2016-09-29 三菱電機株式会社 Energy management system
JP2019102006A (en) 2017-12-08 2019-06-24 株式会社日立製作所 Facility planning device, method for facility planning, and facility planning program
JP2020127347A (en) 2019-02-06 2020-08-20 三菱重工業株式会社 Power generation equipment evaluation device, power generation equipment evaluation system, power generation equipment evaluation method, and program
CN111799777A (en) 2020-06-11 2020-10-20 国网山东省电力公司经济技术研究院 A comprehensive energy planning method considering the coupling of natural gas and electricity

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001086645A (en) 1999-09-17 2001-03-30 Mitsubishi Electric Corp Method and apparatus for calculating optimum operation plan of power generation facility
JP2007244127A (en) 2006-03-09 2007-09-20 Toshiba Corp Design evaluation method for small-scale power system
JP2016173689A (en) 2015-03-17 2016-09-29 三菱電機株式会社 Energy management system
JP2019102006A (en) 2017-12-08 2019-06-24 株式会社日立製作所 Facility planning device, method for facility planning, and facility planning program
JP2020127347A (en) 2019-02-06 2020-08-20 三菱重工業株式会社 Power generation equipment evaluation device, power generation equipment evaluation system, power generation equipment evaluation method, and program
CN111799777A (en) 2020-06-11 2020-10-20 国网山东省电力公司经济技术研究院 A comprehensive energy planning method considering the coupling of natural gas and electricity

Also Published As

Publication number Publication date
JP2022106535A (en) 2022-07-20

Similar Documents

Publication Publication Date Title
JP7221376B2 (en) Apparatus, method and program
Elgamal et al. Optimization of a multiple-scale renewable energy-based virtual power plant in the UK
Botterud et al. Wind power trading under uncertainty in LMP markets
Mansur Measuring welfare in restructured electricity markets
Cullen Measuring the environmental benefits of wind-generated electricity
JP6679281B2 (en) Method and system for enhancing control of a power plant power generation unit
JPWO2020179849A1 (en) Planning equipment, controls, methods, and programs
JPWO2019189501A1 (en) Design equipment, methods, programs, planning equipment, controls, and hydrogen production systems
Andrianesis et al. Recovery mechanisms in day-ahead electricity markets with non-convexities-Part I: Design and evaluation methodology
Brito-Pereira et al. Adjusting the aim of capacity mechanisms: Future-proof reliability metrics and firm supply calculations
Nojavan et al. Risk-based optimal bidding strategy of generation company in day-ahead electricity market using information gap decision theory
CN113592133A (en) Energy hub optimal configuration method and system
CN120912012B (en) A digital twin-based integrated energy and carbon management method and system
Pisciella et al. A time consistent risk averse three-stage stochastic mixed integer optimization model for power generation capacity expansion
CN112308411A (en) Stochastic planning method and system for comprehensive energy stations based on dynamic carbon trading model
Wilson et al. Strategic industries surging: driving US power demand
Delarue et al. Effect of the accuracy of price forecasting on profit in a price based unit commitment
Mujeeb et al. Optimizing virtual power plant operations in energy and frequency regulation reserve markets: A Risk‐Averse Two‐Stage Scenario‐Oriented stochastic approach
JP2016143336A (en) Method and apparatus for optimizing configuration of distributed energy system
Ersoz et al. A stochastic evaluation of investments in combined cooling, heat, and power systems
Cullen et al. Dynamic response to environmental regulation in the electricity industry
Wales et al. Combining simulation and optimization to derive operating policies for a concentrating solar power plant
JP7653052B2 (en) Power supply planning support device and power supply planning support program
Sathaye et al. Bottom-up energy modeling
Stauff et al. Daily market analysis of load following and storage impact

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240105

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240827

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240903

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20241015

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20241224

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250128

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250213

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250226

R150 Certificate of patent or registration of utility model

Ref document number: 7653052

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150