Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7653487B2 - Steel pipe column joint structure - Google Patents
[go: Go Back, main page]

JP7653487B2 - Steel pipe column joint structure - Google Patents

Steel pipe column joint structure Download PDF

Info

Publication number
JP7653487B2
JP7653487B2 JP2023175786A JP2023175786A JP7653487B2 JP 7653487 B2 JP7653487 B2 JP 7653487B2 JP 2023175786 A JP2023175786 A JP 2023175786A JP 2023175786 A JP2023175786 A JP 2023175786A JP 7653487 B2 JP7653487 B2 JP 7653487B2
Authority
JP
Japan
Prior art keywords
flange
steel pipe
hole
pipe column
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2023175786A
Other languages
Japanese (ja)
Other versions
JP2023175986A (en
Inventor
健一 田原
聡 佐々木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Corp
Original Assignee
Fujita Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Corp filed Critical Fujita Corp
Priority to JP2023175786A priority Critical patent/JP7653487B2/en
Publication of JP2023175986A publication Critical patent/JP2023175986A/en
Application granted granted Critical
Publication of JP7653487B2 publication Critical patent/JP7653487B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Description

本発明の一実施形態は、建造物に用いられる鋼管柱の継手構造に関する。 One embodiment of the present invention relates to a joint structure for steel pipe columns used in buildings.

建造物の施工現場において、鉄骨部材を接合する方法として溶接接合とボルト接合が用いられている。溶接接合は、原理的に十分な強度を確保することができる反面、高度な技能と作業時間を要し、接合強度については作業者の技量が影響を与える。これに対し、ボルト接合は、工期の短縮を図ることができ、作業者の技量の影響を受けにくく、品質管理が容易であるという利点を有する。ボルト接合の方式は様々であり、例えば、鋼管柱とH型鋼とを接合する方式、鋼管柱同士を接合する方式が開示されている(特許文献1、2参照)。 At construction sites of buildings, welding and bolting are used as methods for joining steel frame members. While welding can, in principle, ensure sufficient strength, it requires advanced skills and time, and the strength of the joint is influenced by the skill of the worker. In contrast, bolting has the advantages of being able to shorten the construction period, being less influenced by the skill of the worker, and facilitating quality control. There are various methods of bolting; for example, a method for joining a steel pipe column to an H-shaped steel and a method for joining steel pipe columns to each other have been disclosed (see Patent Documents 1 and 2).

特開平5-179702号公報(特許第3146209号)JP-A-5-179702 (Patent No. 3146209) 特開2004-293196号公報(特許第4038449号)JP 2004-293196 A (Patent No. 4038449)

鉄骨部材をボルト接合する場合、H型鋼のような解放された断面形状を有する部材であれば容易にボルト接合をすることができる。しかし、角形鋼管柱のような管状の部材をボルト接合で繋ぐ場合、閉じた断面形状を有しているため施工が容易でないという問題がある。また、ボルト接合の施工を容易にするために鋼管柱の一部を加工することも考えられるが、それによって継手部分の強度が低下することが懸念される。 When bolting steel components, components with an open cross-sectional shape, such as H-shaped steel beams, can be bolted easily. However, when connecting tubular components such as square steel pipe columns with bolts, the problem is that they have a closed cross-sectional shape and are therefore difficult to install. It is also possible to process part of the steel pipe column to make bolting easier, but this raises concerns that the strength of the joints may be reduced.

本発明の目的の一つは、このような課題を解決するための鋼管柱の継手構造を提供することにある。 One of the objectives of the present invention is to provide a joint structure for steel pipe columns that solves these problems.

本発明の一実施形態に係る鋼管柱の継手構造は、第1の鋼管柱の一端に設けられた第1のダイアフラムと、第1のダイアフラムに固定され、第1の鋼管柱の材軸方向と平行に配置され、第1の貫通孔を有する第1のフランジと、第2の鋼管柱の一端に設けられた第2のダイアフラムと、第2のダイアフラムに固定され、第2の鋼管柱の材軸方向と平行に配置され、第2の貫通孔を有する第2のフランジと、第1のダイアフラムに固定され、第1の鋼管柱の材軸方向と平行に配置され、第1のフランジに隣接する第3のフランジと、第2のダイアフラムに固定され、第2の鋼管柱の材軸方向と平行に配置され、第2のフランジに隣接する第4のフランジと、第1の添え板、及び第2の添え板と、を含む。第1の鋼管柱と第2の鋼管柱とが上下方向に配置され、第1のフランジ及び第4のフランジ、並びに第2のフランジ及び第3のフランジが、材軸方向に並置される。第1のフランジ及び第4のフランジが第1の添え板でボルト接合され、第2のフランジ及び第3のフランジが第2の添え板でボルト接合され、第1の貫通孔と第2の貫通孔とが、斜かい状に配置されている。 A joint structure for a steel pipe column according to one embodiment of the present invention includes a first diaphragm provided at one end of a first steel pipe column, a first flange fixed to the first diaphragm, arranged parallel to the material axis direction of the first steel pipe column, and having a first through hole, a second diaphragm provided at one end of a second steel pipe column, a second flange fixed to the second diaphragm, arranged parallel to the material axis direction of the second steel pipe column, and having a second through hole, a third flange fixed to the first diaphragm, arranged parallel to the material axis direction of the first steel pipe column, and adjacent to the first flange, a fourth flange fixed to the second diaphragm, arranged parallel to the material axis direction of the second steel pipe column, and adjacent to the second flange, a first support plate, and a second support plate. The first steel pipe column and the second steel pipe column are arranged vertically, and the first flange and the fourth flange, and the second flange and the third flange are arranged side by side in the material axis direction. The first flange and the fourth flange are bolted with a first splice plate, the second flange and the third flange are bolted with a second splice plate, and the first through hole and the second through hole are arranged diagonally.

本発明の一実施形態に係る鋼管の継手構造によれば、上下に配置される第1の鋼管柱と第2の鋼管柱のそれぞれにダイアフラムと、それぞれのダイアフラムに固定される貫通孔を有するフランジを複数設け、少なくとも一組の貫通孔を斜かい状に配置することで、ボルト接合の施工を容易にすると共に、継手部の強度の低下を防止することができる。 According to the steel pipe joint structure of one embodiment of the present invention, a first steel pipe column and a second steel pipe column arranged vertically are each provided with a diaphragm and a plurality of flanges having through holes fixed to each diaphragm, and at least one set of through holes is arranged diagonally, which facilitates the construction of the bolt joint and prevents a decrease in the strength of the joint.

本発明の一実施形態に係る鋼管柱の継手構造の斜視図であり、(A)は展開図を示し、(B)は2つの鋼管柱の継手構造におけるボルト接合部を示す。1A and 1B are perspective views of a joint structure of a steel pipe column according to one embodiment of the present invention, in which (A) shows an expanded view and (B) shows a bolted joint in a joint structure of two steel pipe columns. 本発明の一実施形態に係る鋼管柱の継手構造におけるボルト接合部の正面図を示す。FIG. 2 is a front view of a bolt joint in a steel pipe column joint structure according to one embodiment of the present invention. 図2に示す鋼管柱の継手構造におけるボルト接合部の断面構造を示し、(A)は第1の鋼管柱側の断面構造を、(B)は第2の鋼管柱側の断面構造を示す。3A and 3B show cross-sectional structures of a bolt joint in the joint structure of a steel pipe column shown in FIG. 2, in which (A) shows the cross-sectional structure on the first steel pipe column side, and (B) shows the cross-sectional structure on the second steel pipe column side. 本発明の一実施形態に係る鋼管柱の継手構造の斜視図であり、(A)は展開図を示し、(B)は2つの鋼管柱の継手構造におけるボルト接合部を示す。1A and 1B are perspective views of a joint structure of a steel pipe column according to one embodiment of the present invention, in which (A) shows an expanded view and (B) shows a bolted joint in a joint structure of two steel pipe columns. 本発明の一実施形態に係る鋼管柱の継手構造におけるボルト接合部の正面図を示す。FIG. 2 is a front view of a bolt joint in a steel pipe column joint structure according to one embodiment of the present invention. 図5に示す鋼管柱の継手構造におけるボルト接合部の断面構造を示し、(A)は第1の鋼管柱側の断面構造を、(B)は第2の鋼管柱側の断面構造を示す。6 shows a cross-sectional structure of a bolt joint in the steel pipe column joint structure shown in FIG. 5, where (A) shows the cross-sectional structure on the first steel pipe column side, and (B) shows the cross-sectional structure on the second steel pipe column side. 本発明の一実施形態に係る鋼管柱の継手構造の斜視図であり、(A)は展開図を示し、(B)は2つの鋼管柱の継手構造におけるボルト接合部を示す。1A and 1B are perspective views of a joint structure of a steel pipe column according to one embodiment of the present invention, in which (A) shows an expanded view and (B) shows a bolted joint in a joint structure of two steel pipe columns. 本発明の一実施形態に係る鋼管柱の継手構造の斜視図であり、2つの鋼管柱の継手構造におけるボルト接合部を示す。FIG. 1 is a perspective view of a steel pipe column joint structure according to an embodiment of the present invention, showing a bolted joint portion in a joint structure of two steel pipe columns. 図8に示す鋼管柱の継手構造におけるボルト接合部の断面構造を示し、(A)はD1線に対応する断面構造を、(B)はD2線に対応する断面構造を示す。9A and 9B show cross-sectional structures of a bolt joint in the joint structure of the steel pipe column shown in FIG. 8, in which (A) shows the cross-sectional structure corresponding to line D1, and (B) shows the cross-sectional structure corresponding to line D2. 本発明の一実施形態に係る鋼管柱の継手構造の斜視図であり、(A)は展開図を示し、(B)は2つの鋼管柱の継手構造におけるボルト接合部を示す。1A and 1B are perspective views of a joint structure of a steel pipe column according to one embodiment of the present invention, in which (A) shows an expanded view and (B) shows a bolted joint in a joint structure of two steel pipe columns. 本発明の一実施形態に係る鋼管柱の継手構造におけるボルト接合部の正面図を示す。FIG. 2 is a front view of a bolt joint in a steel pipe column joint structure according to one embodiment of the present invention. 図11に示す鋼管柱の継手構造におけるボルト接合部の断面構造を示す。12 shows a cross-sectional structure of a bolt joint in the joint structure of the steel pipe column shown in FIG. 11 . 本発明の一実施形態に係る鋼管柱の継手構造の斜視図であり、(A)は展開図を示し、(B)は2つの鋼管柱の継手構造におけるボルト接合部を示す。1A and 1B are perspective views of a joint structure of a steel pipe column according to one embodiment of the present invention, in which (A) shows an expanded view and (B) shows a bolted joint in a joint structure of two steel pipe columns. 図13に示す鋼管柱の継手構造におけるボルト接合部の断面構造を示し、(A)はD3線に対応する断面構造を、(B)はD4線に対応する断面構造を示す。14A and 14B show cross-sectional structures of a bolt joint in the joint structure of the steel pipe column shown in FIG. 13, in which (A) shows a cross-sectional structure corresponding to line D3, and (B) shows a cross-sectional structure corresponding to line D4. 本発明の一実施形態に係る鋼管柱の継手構造の斜視図であり、(A)は展開図を示し、(B)は2つの鋼管柱の継手構造におけるボルト接合部を示す。1A and 1B are perspective views of a joint structure of a steel pipe column according to one embodiment of the present invention, in which (A) shows an expanded view and (B) shows a bolted joint in a joint structure of two steel pipe columns. 図15に示す鋼管柱の継手構造におけるボルト接合部の断面構造を示し、(A)は第1の鋼管柱側の断面構造を、(B)は第2の鋼管柱側の断面構造を示す。16A and 16B show cross-sectional structures of a bolt joint in the steel pipe column joint structure shown in FIG. 15, in which (A) shows the cross-sectional structure on the first steel pipe column side, and (B) shows the cross-sectional structure on the second steel pipe column side. 本発明の一実施形態に係る鋼管柱の継手構造におけるボルト接合部の断面構造を示し、(A)は第1の鋼管柱側の断面構造を、(B)は第2の鋼管柱側の断面構造を示す。1A and 1B show cross-sectional structures of a bolt joint in a steel pipe column joint structure according to one embodiment of the present invention, in which (A) shows the cross-sectional structure on the first steel pipe column side, and (B) shows the cross-sectional structure on the second steel pipe column side.

以下、本発明の実施形態の内容を、図面等を参照しながら説明する。但し、本発明は多くの異なる態様を含み、以下に例示される実施形態の内容に限定して解釈されるものではない。図面は説明をより明確にするため、実際の態様に比べ、各部の幅、厚さ、形状等について模式的に表される場合があるが、それはあくまで一例であって、本発明の内容を限定するものではない。また、本明細書において、ある図面に記載されたある要素と、他の図面に記載されたある要素とが同一又は対応する関係にあるときは、同一の符号(又は符号として記載された数字の後にa、b等を付した符号)を付して、繰り返しの説明を適宜省略することがある。さらに各要素に対する「第1」、「第2」と付記された文字は、各要素を区別するために用いられる便宜的な標識であり、特段の説明がない限りそれ以上の意味を有しない。 The contents of the embodiment of the present invention will be described below with reference to the drawings. However, the present invention includes many different aspects, and is not to be interpreted as being limited to the contents of the embodiment exemplified below. In order to make the explanation clearer, the width, thickness, shape, etc. of each part may be shown diagrammatically compared to the actual aspect, but this is merely an example and does not limit the contents of the present invention. Furthermore, in this specification, when an element shown in one drawing and an element shown in another drawing are identical or correspond to each other, the same symbol (or a, b, etc. added to the number shown as the symbol) may be added, and repeated explanations may be omitted as appropriate. Furthermore, the letters "first" and "second" added to each element are convenient marks used to distinguish each element, and have no further meaning unless otherwise explained.

[第1の実施形態]
本発明の一実施形態に係る鋼管柱の継手構造は、第1の鋼管柱と第2の鋼管柱とがボルト接合部によって接合された構造を有する。以下、その継手構造を詳細に説明する。
[First embodiment]
The joint structure of a steel pipe pole according to one embodiment of the present invention has a structure in which a first steel pipe pole and a second steel pipe pole are joined by a bolt joint portion. Hereinafter, the joint structure will be described in detail.

図1(A)は本実施形態に係る鋼管柱の継手構造の展開図を示し、図1(B)はその斜視図を示す。なお、図1(A)において、ボルト及びナット等の締結部材は省略されている。なお、図1(A)及び(B)は、第1の鋼管柱102及び第2の鋼管柱112が角形鋼管柱である場合を示す。 Figure 1(A) shows an exploded view of the joint structure of a steel pipe column according to this embodiment, and Figure 1(B) shows a perspective view of the joint structure. Note that in Figure 1(A), fastening members such as bolts and nuts are omitted. Note that Figures 1(A) and (B) show the case where the first steel pipe column 102 and the second steel pipe column 112 are square steel pipe columns.

以下の説明では、便宜上、第1の鋼管柱102が4つの面を有し、各面を時計回りに第1面11、第2面12、第3面13、及び第4面14と符号を付けて示し、第2の鋼管柱112も同様に、各面を時計回りに第1面21、第2面22、第3面23、及び第4面24と符号を付けて示す。また、特に断りのない限り、鋼管柱を立てたとき、その材軸方向において、第1の鋼管柱102は下側に配置され、第2の鋼管柱112は上側に配置されるものとする。 In the following description, for convenience, the first steel pipe column 102 has four faces, and each face is indicated clockwise by the reference numerals 11, 12, 13, and 14, and the second steel pipe column 112 is similarly indicated clockwise by the reference numerals 21, 22, 23, and 24. In addition, unless otherwise specified, when the steel pipe column is erected, the first steel pipe column 102 is positioned on the lower side and the second steel pipe column 112 is positioned on the upper side in the material axis direction.

図1(A)に示すように、第1の鋼管柱102の一端に第1のダイアフラム104が設けられ、第2の鋼管柱112の一端に第2のダイアフラム114が設けられる。第1のダイアフラム104及び第2のダイアフラム114は、それぞれ第1の鋼管柱102及び第2の鋼管柱112に溶接される。 As shown in FIG. 1(A), a first diaphragm 104 is provided at one end of a first steel pipe column 102, and a second diaphragm 114 is provided at one end of a second steel pipe column 112. The first diaphragm 104 and the second diaphragm 114 are welded to the first steel pipe column 102 and the second steel pipe column 112, respectively.

第1のダイアフラム104には、第1のフランジ106a、106b、第3のフランジ108a、108bが取り付けられる。第1のフランジ106a、106bは略同一の形状を有し、第1のダイアフラム104に立設され、所定の間隔で対向するように配置される。第3のフランジ108a、108bは、第1のダイアフラム104に立設され、第1のフランジ106a、106bが対向する方向と交差する方向に向けられ、所定の間隔で対向するように配置される。図1(A)は、第1のフランジ106aが第11面に、第1のフランジ106bが第13面に、第3のフランジ108aが第12面に、第3のフランジ108bが第14面に対応して配置される態様を示す。このようなフランジの配置により、第1のダイアフラム104上には、第1のフランジ106a、第1のフランジ106b、第3のフランジ108a、及び第3のフランジ108bにより囲まれる領域が形成される。 The first flanges 106a, 106b and the third flanges 108a, 108b are attached to the first diaphragm 104. The first flanges 106a, 106b have approximately the same shape, are erected on the first diaphragm 104, and are arranged to face each other at a predetermined interval. The third flanges 108a, 108b are erected on the first diaphragm 104, are oriented in a direction intersecting the direction in which the first flanges 106a, 106b face each other, and are arranged to face each other at a predetermined interval. FIG. 1(A) shows an embodiment in which the first flange 106a is arranged corresponding to the 11th surface, the first flange 106b is arranged corresponding to the 13th surface, the third flange 108a is arranged corresponding to the 12th surface, and the third flange 108b is arranged corresponding to the 14th surface. With this flange arrangement, an area is formed on the first diaphragm 104 that is surrounded by the first flange 106a, the first flange 106b, the third flange 108a, and the third flange 108b.

第1のフランジ106aは平板状であり、第1の貫通孔120及び複数のボルト孔110を有している。第1のフランジ106aを縦方向に見たとき、第1の貫通孔120は第1のダイアフラム104側に配置される。すなわち、第1の貫通孔120は、第1のフランジ106aが第1のダイアフラム104と接する一辺と、複数のボルト孔110が設けられる領域との間の領域に配置される。第1のフランジ106bは、第1のフランジ106aと同じ形態を有し、複数のボルト孔に加え第3の貫通孔124が設けられる。一方、第3のフランジ108a、108bには、第1の貫通孔120及び第3の貫通孔124に相当する貫通孔は設けられず、複数のボルト孔110のみが設けられる。 The first flange 106a is flat and has a first through hole 120 and a plurality of bolt holes 110. When the first flange 106a is viewed vertically, the first through hole 120 is disposed on the first diaphragm 104 side. That is, the first through hole 120 is disposed in the region between one side where the first flange 106a contacts the first diaphragm 104 and the region where the plurality of bolt holes 110 are provided. The first flange 106b has the same shape as the first flange 106a, and in addition to the plurality of bolt holes, a third through hole 124 is provided. On the other hand, the third flanges 108a, 108b do not have through holes corresponding to the first through hole 120 and the third through hole 124, and only the plurality of bolt holes 110 are provided.

第2のダイアフラム114には、第2のフランジ116a、116b、第4のフランジ118a、118bが取り付けられる。第2のフランジ116a、116bは略同一の形状を有し、第2のダイアフラム114に立設され、所定の間隔で対向するように配置される。第4のフランジ118a、118bは、第2のダイアフラム114に立設され、第2のフランジ116a、116bが対向する方向と交差する方向に向けられ、所定の間隔で対向するように配置される。図1(A)は、第2のフランジ116aが第22面に、第2のフランジ116bが第24面に、第4のフランジ118aが第21面に、第4のフランジ118bが第23面に対応して配置される態様を示す。このようなフランジの配置により、第2のダイアフラム114上には、第2のフランジ116a、第2のフランジ116b、第4のフランジ118a、及び第4のフランジ118bにより囲まれる領域が形成される。 The second flanges 116a, 116b and the fourth flanges 118a, 118b are attached to the second diaphragm 114. The second flanges 116a, 116b have approximately the same shape, are erected on the second diaphragm 114, and are arranged to face each other at a predetermined interval. The fourth flanges 118a, 118b are erected on the second diaphragm 114, are oriented in a direction intersecting the direction in which the second flanges 116a, 116b face each other, and are arranged to face each other at a predetermined interval. Figure 1 (A) shows an embodiment in which the second flange 116a is arranged corresponding to the 22nd surface, the second flange 116b is arranged corresponding to the 24th surface, the fourth flange 118a is arranged corresponding to the 21st surface, and the fourth flange 118b is arranged corresponding to the 23rd surface. With this flange arrangement, an area is formed on the second diaphragm 114 that is surrounded by the second flange 116a, the second flange 116b, the fourth flange 118a, and the fourth flange 118b.

第2のフランジ116aは平板状であり、第2の貫通孔122及び複数のボルト孔110を有している。第2のフランジ116aを縦方向に見たとき、第2の貫通孔122は第2のダイアフラム114側に配置される。すなわち、第2の貫通孔122は、第2のフランジ116aが第2のダイアフラム114と接する一辺と、複数のボルト孔110が設けられる領域との間の領域に配置される。第2のフランジ116bは、第2のフランジ116aと同じ形態を有し、複数のボルト孔に加え図示されない第4の貫通孔126が設けられる。一方、第4のフランジ118a、118bには、第2の貫通孔122及び第4の貫通孔126に相当する貫通孔は設けられず、複数のボルト孔110のみが設けられる。 The second flange 116a is flat and has a second through hole 122 and a plurality of bolt holes 110. When the second flange 116a is viewed vertically, the second through hole 122 is disposed on the second diaphragm 114 side. That is, the second through hole 122 is disposed in the region between one side where the second flange 116a contacts the second diaphragm 114 and the region where the plurality of bolt holes 110 are provided. The second flange 116b has the same shape as the second flange 116a, and in addition to the plurality of bolt holes, a fourth through hole 126 (not shown) is provided. On the other hand, the fourth flanges 118a, 118b do not have through holes corresponding to the second through hole 122 and the fourth through hole 126, and only the plurality of bolt holes 110 are provided.

第1の貫通孔120、第2の貫通孔122、第3の貫通孔124、及び図示されない第4の貫通孔126の大きさに限定はない。これらの貫通孔はハンドホールとして用いられるため、作業者が工具等を入れてボルト接合の施工を行うことのできる孔径を有することが好ましい。これらの貫通孔の形状に限定はなく、図1(A)に示すように円形であってもよいし、楕円形、矩形、又は任意の多角形であってもよい。また、それぞれのフランジに設けられるボルト孔110は、締結具であるボルトを挿通可能な口径を有し、フランジを貫通する貫通孔であり、複数個が適宜設けられる。 There is no limit to the size of the first through hole 120, the second through hole 122, the third through hole 124, and the fourth through hole 126 (not shown). Since these through holes are used as hand holes, it is preferable that they have a hole diameter that allows an operator to insert tools and perform bolt joint construction. There is no limit to the shape of these through holes, and they may be circular as shown in FIG. 1(A), elliptical, rectangular, or any polygonal shape. In addition, the bolt holes 110 provided in each flange have a diameter that allows a bolt, which is a fastener, to be inserted, and are through holes that penetrate the flange, and multiple bolt holes are provided as appropriate.

第1の添え板130a、130bは、第1のフランジ106a、第2のフランジ116a、第3のフランジ108a、及び第4のフランジ118aの外側に配置され、第2の添え板140a、140bは、第1のフランジ106a、第2のフランジ116a、第3のフランジ108a、及び第4のフランジ118aの内側に配置される。第1の添え板130a、130b及び第2の添え板140a、140bは、各フランジ面に設けられたボルト孔110に対応するようにボルト孔111が設けられる。 The first support plates 130a, 130b are arranged on the outside of the first flange 106a, the second flange 116a, the third flange 108a, and the fourth flange 118a, and the second support plates 140a, 140b are arranged on the inside of the first flange 106a, the second flange 116a, the third flange 108a, and the fourth flange 118a. The first support plates 130a, 130b and the second support plates 140a, 140b are provided with bolt holes 111 corresponding to the bolt holes 110 provided in each flange surface.

第1のフランジ106aに対応する位置に第4のフランジ118aが配置され、第2のフランジ116aに対応する位置に第3のフランジ108aが配置される。同様に、第1のフランジ106bに対応する位置に第4のフランジ118bが配置され、第2のフランジ116bに対応する位置に第3のフランジ108bが配置される。 The fourth flange 118a is disposed at a position corresponding to the first flange 106a, and the third flange 108a is disposed at a position corresponding to the second flange 116a. Similarly, the fourth flange 118b is disposed at a position corresponding to the first flange 106b, and the third flange 108b is disposed at a position corresponding to the second flange 116b.

第1のフランジ106a、106b及び第2のフランジ116a、116bは、第3のフランジ108a、108b及び第4のフランジ118a、118bに対し、材軸方向の長さが長くなるように形成されている。別言すれば、第1のフランジ106aは、第1の貫通孔120が設けられることにより複数のボルト孔110が設けられる領域が、第3のフランジ108aにおいて複数のボルト孔110が設けられる領域よりも高いところに位置している。また、第2のフランジ116aは、第2の貫通孔122が設けられることにより複数のボルト孔110が設けられる領域が、第4のフランジ118aにおいて複数のボルト孔110が設けられる領域よりも低いところに位置している。このような位置関係は、第1のフランジ106bと第3のフランジ108bとの関係、第2のフランジ116bと第4のフランジ118bとの関係についても同様である。 The first flanges 106a, 106b and the second flanges 116a, 116b are formed so that their length in the material axis direction is longer than that of the third flanges 108a, 108b and the fourth flanges 118a, 118b. In other words, the first flange 106a has a region in which the first through hole 120 is provided to provide a plurality of bolt holes 110, which is located higher than the region in which the third flange 108a has a plurality of bolt holes 110. The second flange 116a has a region in which the second through hole 122 is provided to provide a plurality of bolt holes 110, which is located lower than the region in which the fourth flange 118a has a plurality of bolt holes 110. This positional relationship is also the same for the relationship between the first flange 106b and the third flange 108b, and the relationship between the second flange 116b and the fourth flange 118b.

図1(B)は、第1の鋼管柱102と第2の鋼管柱112が上下方向に配置されて繋ぎ合わせることによって、第1のボルト接合部100a、第2のボルト接合部100bが形成される態様を示す(図示されないが、背面側には第3のボルト接合部100c、第4のボルト接合部100dが形成される)。第1のボルト接合部100aは、第1のフランジ106aと第4のフランジ118aとが、第1の添え板130aと第2の添え板140aとによって挟まれてボルト及びナットによって締結されることで形成される。第1のボルト接合部100aでは、第1の添え板130aは第1のフランジ106a及び第4のフランジ118aの外側面と当接され、第2の添え板140aは第1のフランジ106a及び第4のフランジ118aの内側面と当接される。同様に、第2のボルト接合部100bは、第2のフランジ116aと第3のフランジ108aとが、第1の添え板130bと第2の添え板140bとによって挟まれてボルト及びナットによって締結されることで形成される。第1の添え板130bは第3のフランジ108及び第2のフランジ116の外側面に当接され、第2の添え板140bは第3のフランジ108及び第2のフランジ116の内側面に当接される。 FIG. 1(B) shows an embodiment in which a first bolt joint 100a and a second bolt joint 100b are formed by arranging a first steel pipe column 102 and a second steel pipe column 112 in the vertical direction and connecting them together (although not shown, a third bolt joint 100c and a fourth bolt joint 100d are formed on the back side). The first bolt joint 100a is formed by sandwiching a first flange 106a and a fourth flange 118a between a first support plate 130a and a second support plate 140a and fastening them with bolts and nuts. In the first bolt joint 100a, the first support plate 130a abuts against the outer surfaces of the first flange 106a and the fourth flange 118a, and the second support plate 140a abuts against the inner surfaces of the first flange 106a and the fourth flange 118a. Similarly, the second bolt joint 100b is formed by sandwiching the second flange 116a and the third flange 108a between the first splice plate 130b and the second splice plate 140b and fastening them with bolts and nuts. The first splice plate 130b abuts against the outer surfaces of the third flange 108 and the second flange 116, and the second splice plate 140b abuts against the inner surfaces of the third flange 108 and the second flange 116.

第1の鋼管柱102及び第2の鋼管柱112は鉄鋼材料で形成される。第1のダイアフラム104、第2のダイアフラム114、第1のフランジ106a、106b、第2のフランジ108a、108b、第3のフランジ108a、108b、第4のフランジ118a、118b、第1の添え板130a、130b、第2の添え板140a、140bも同様に鉄鋼材料で形成される。例えば、鉄鋼材料として構造用圧延鋼材が用いられる。なお、図1(A)は、外側に配置される第1の添え板130a、130bと、内側に配置される第2の添え板140a、140bとを示すが、ボルト接合部の強度が十分保てる場合には、内側又は外側に当接させる添え板を省略することもできる。 The first steel pipe column 102 and the second steel pipe column 112 are made of steel material. The first diaphragm 104, the second diaphragm 114, the first flanges 106a, 106b, the second flanges 108a, 108b, the third flanges 108a, 108b, the fourth flanges 118a, 118b, the first splice plates 130a, 130b, and the second splice plates 140a, 140b are also made of steel material. For example, structural rolled steel is used as the steel material. Note that, although FIG. 1(A) shows the first splice plates 130a, 130b arranged on the outside and the second splice plates 140a, 140b arranged on the inside, the splice plates abutting the inside or outside can be omitted if the strength of the bolt joint is sufficient.

図2は、本実施形態に係る鋼管柱の継手構造の正面図を示す。図2は、第1の鋼管柱102の第1面11及び第2の鋼管柱112の第1面21に第1のボルト接合部100aが形成され、同様に、第2面12及び第2面22に第2のボルト接合部100bが形成され、第4面14及び第4面24に第4のボルト接合部100dが形成されることを示す(図示されないが、第3面13及び第3面23には第3のボルト接合部100cが形成される)。第1のボルト接合部100aにおいて、第1の添え板130a及び第2の添え板(140a:図示せず)は、第1のフランジ106a及び第4のフランジ118aの両方に当接し、第1の貫通孔120を覆わない大きさを有する。このような構成は、第2のボルト接合部100b、第3のボルト接合部(100c:図示せず)、及び第4のボルト接合部100dについても同様である。 2 shows a front view of the joint structure of the steel pipe column according to this embodiment. FIG. 2 shows that the first bolt joint 100a is formed on the first surface 11 of the first steel pipe column 102 and the first surface 21 of the second steel pipe column 112, and similarly, the second bolt joint 100b is formed on the second surface 12 and the second surface 22, and the fourth bolt joint 100d is formed on the fourth surface 14 and the fourth surface 24 (not shown, but the third bolt joint 100c is formed on the third surface 13 and the third surface 23). In the first bolt joint 100a, the first splice plate 130a and the second splice plate (140a: not shown) abut against both the first flange 106a and the fourth flange 118a and have a size that does not cover the first through hole 120. This configuration also applies to the second bolt joint 100b, the third bolt joint (100c: not shown), and the fourth bolt joint 100d.

図1(A)及び(B)を参照して説明したように、第1のフランジ106aにボルト孔110が形成される領域と、第3のフランジ108aにボルト孔110が形成される領域とは高さが異なり、第2のフランジ116aにボルト孔110が形成される領域と、第4のフランジ108aにボルト孔110が形成される領域とは高さが異なる。そのため、第1のボルト接合部100a(及び図示されない第3のボルト接合部100c)と、第2のボルト接合部100b及び第4のボルト接合部100dとの高さは異なっている。そして、第1の貫通孔120は、第1のボルト接合部100aの下側に位置しており(図示されないが、第3の貫通孔124も同様)、第2の貫通孔122は第2のボルト接合部の上側に位置し、第4の貫通孔126も第4の貫通孔126は第4のボルト接合部100dの上側に位置している。 1(A) and (B), the area where the bolt holes 110 are formed in the first flange 106a is different in height from the area where the bolt holes 110 are formed in the third flange 108a, and the area where the bolt holes 110 are formed in the second flange 116a is different in height from the area where the bolt holes 110 are formed in the fourth flange 108a. Therefore, the heights of the first bolt joint 100a (and the third bolt joint 100c, not shown) are different from the heights of the second bolt joint 100b and the fourth bolt joint 100d. The first through hole 120 is located below the first bolt joint 100a (the same is true for the third through hole 124, not shown), the second through hole 122 is located above the second bolt joint, and the fourth through hole 126 is also located above the fourth bolt joint 100d.

このように、隣接する面に形成されるボルト接合部及び貫通孔の高さを異ならせ、斜かい状に配置することとで、鋼管柱の各面に配置される貫通孔の全てが同じ高さに配置されないことにより、鋼管柱に働く軸力や、剪断力や、曲げ応力に対しする耐力を高めることができる。 In this way, by varying the heights of the bolt joints and through holes formed on adjacent faces and arranging them diagonally, all of the through holes on each face of the steel pipe column are not positioned at the same height, which increases the resistance of the steel pipe column to axial force, shear force, and bending stress.

図2に示すように、例えば、第1のボルト接合部100aに対して、第1の貫通孔120が下側に配置され、第2の貫通孔122及び第4の貫通孔126が隣接する面で同じ高さに配置される。このように、一つのボルト接合部に対して、高さが異なる複数の貫通孔が配置されることにより、作業者は、第1の鋼管柱102と第2の鋼管柱112とを継ぎ合わせる作業が容易となる。すなわち、作業者は、施工をするに当たって、高さ及び向きが異なる複数の貫通孔から工具等を入れて、ボルト接合の作業を容易に行うことができる。例えば、第1のボルト接合部100aを施工する場合、作業者は、第1の貫通孔120のみならず、第2の貫通孔122及び第4の貫通孔126からも工具等を挿入して作業を行うことができる。この場合において、第1の貫通孔120に対し、第2の貫通孔122及び第4の貫通孔126は異なる高さ及び異なる向きに配置されていることにより、鋼管柱の内部に様々な角度から工具等を差し入れることが可能となり、作業の自由度を高めることができる。 2, for example, the first through hole 120 is arranged on the lower side of the first bolt joint 100a, and the second through hole 122 and the fourth through hole 126 are arranged at the same height on the adjacent surface. In this way, by arranging multiple through holes of different heights for one bolt joint, the worker can easily join the first steel pipe column 102 and the second steel pipe column 112. That is, when performing construction, the worker can insert tools, etc. through multiple through holes of different heights and directions to easily perform the bolt joint work. For example, when constructing the first bolt joint 100a, the worker can insert tools, etc. not only through the first through hole 120 but also through the second through hole 122 and the fourth through hole 126 to perform the work. In this case, the second through hole 122 and the fourth through hole 126 are arranged at different heights and in different directions relative to the first through hole 120, making it possible to insert tools, etc., into the steel pipe column from various angles, increasing the freedom of operation.

図3(A)は、図2において矢印A1、A2で挟む部位を断面視したときの断面構造を示し、図3(B)は、図2において矢印B1、B2で挟む部位を断面視したときの断面構造を示す。 Figure 3(A) shows the cross-sectional structure of the area sandwiched between the arrows A1 and A2 in Figure 2, and Figure 3(B) shows the cross-sectional structure of the area sandwiched between the arrows B1 and B2 in Figure 2.

図3(A)に示すように、第1のダイアフラム104の面上に、第1のフランジ106aと第1のフランジ106bが対向するように配置され、第3のフランジ108aと第3のフランジ108bとが対向するように配置される。このようなフランジの配置により、第1の鋼管柱102の第1面11側に第1の貫通孔120が配置され、第3面13側に第3の貫通孔124が配置される。また、第1の鋼管柱102の第2面12側に第2のボルト接合部100bが形成され、第4面14側に第4のボルト接合部100dが形成される。また、図3(B)に示すように、第2のダイアフラム114の面上に、第2のフランジ116aと第2のフランジ116bとが対向するように配置され、第4のフランジ118aと第4のフランジ118bとが対向するように配置される。このようなフランジの配置により、第2の鋼管柱112の第2面22側に第2の貫通孔122が配置され、第4面24側に第4の貫通孔126が配置される。また、第2の鋼管柱112の第1面21側に第1のボルト接合部100aが形成され、第3面23に第3のボルト接合部100cが形成される。 As shown in FIG. 3(A), the first flange 106a and the first flange 106b are arranged to face each other on the surface of the first diaphragm 104, and the third flange 108a and the third flange 108b are arranged to face each other. With such flange arrangement, the first through hole 120 is arranged on the first surface 11 side of the first steel pipe column 102, and the third through hole 124 is arranged on the third surface 13 side. In addition, the second bolt joint 100b is formed on the second surface 12 side of the first steel pipe column 102, and the fourth bolt joint 100d is formed on the fourth surface 14 side. In addition, as shown in FIG. 3(B), the second flange 116a and the second flange 116b are arranged to face each other on the surface of the second diaphragm 114, and the fourth flange 118a and the fourth flange 118b are arranged to face each other. With this flange arrangement, the second through hole 122 is arranged on the second surface 22 side of the second steel pipe column 112, and the fourth through hole 126 is arranged on the fourth surface 24 side. In addition, the first bolt joint 100a is formed on the first surface 21 side of the second steel pipe column 112, and the third bolt joint 100c is formed on the third surface 23.

図3(A)に示すように、第2のボルト接合部100bは、第1の添え板130b、と第2の添え板140bが第3のフランジ108aを挟み、ボルト孔110、111にボルト150が挿通されナット152により締結することで形成される。第3のフランジ108aは、ボルト孔110が形成されることにより、その部分の断面積が他の部分の断面積と比較して小さくなるが、第1の添え板130b、第2の添え板140bが設けられることにより、断面積の減少を補い剪断強度の低下を抑制することができる。第1の添え板130a及び第2の添え板140bの板厚は適宜設定することができる。このような構成は、第1のボルト接合部100a、第3のボルト接合部100c、第4のボルト接合部100dについても同様である。 As shown in FIG. 3A, the second bolt joint 100b is formed by sandwiching the third flange 108a between the first support plate 130b and the second support plate 140b, inserting the bolt 150 into the bolt holes 110 and 111, and fastening with the nut 152. The third flange 108a has a smaller cross-sectional area than the other parts due to the formation of the bolt hole 110, but the first support plate 130b and the second support plate 140b are provided to compensate for the reduction in cross-sectional area and suppress the reduction in shear strength. The plate thicknesses of the first support plate 130a and the second support plate 140b can be set appropriately. This configuration is the same for the first bolt joint 100a, the third bolt joint 100c, and the fourth bolt joint 100d.

図3(A)及び(B)を合わせて参照すれば明らかなように、第1の鋼管柱102と第2の鋼管柱112との継手部分には、ボルト接合部に挟まれるように4方向に貫通孔が配置される。このような継手構造において、貫通孔が設けられるフランジに対して貫通孔を設けないフランジの材軸方向の長さを異ならせ、この2種類のフランジをボルト接合することで、図1(B)及び図2に示すように、貫通孔の位置、及びボルト接合の位置を斜かい状に配置することができる。具体的には、第1の鋼管柱102の側に、材軸方向の長さの異なる第1のフランジ106a、106bと第3のフランジ108a,108bとを設け、第2の鋼管柱112の側に、材軸方向の長さが異なる第2のフランジ116a、116bと第4のフランジ118a、118bとを設け、これらのフランジを咬み合うように配置してボルト接合を形成することで、第1の貫通孔120及び第3の貫通孔124と、第2の貫通孔122及び第4の貫通孔126との高さを異ならせることができる。継手部分に設けられるフランジがこのような構成を有することにより、第1の鋼管柱102と第2の鋼管柱112と繋ぐためのボルト接合の施工性を高めることができる。 3(A) and (B) together, through holes are arranged in four directions so as to be sandwiched between the bolted joints in the joint portion between the first steel pipe column 102 and the second steel pipe column 112. In such a joint structure, by making the length in the material axis direction of the flange without through holes different from the flange with through holes, and by bolting these two types of flanges, the positions of the through holes and the bolted joints can be arranged diagonally, as shown in Figs. 1(B) and 2. Specifically, the first flanges 106a, 106b and the third flanges 108a, 108b, which have different lengths in the material axis direction, are provided on the first steel pipe column 102 side, and the second flanges 116a, 116b and the fourth flanges 118a, 118b, which have different lengths in the material axis direction, are provided on the second steel pipe column 112 side, and these flanges are arranged to interlock to form a bolt joint, so that the heights of the first through hole 120 and the third through hole 124 and the second through hole 122 and the fourth through hole 126 can be made different. By having such a configuration of the flanges provided in the joint portion, the workability of the bolt joint for connecting the first steel pipe column 102 and the second steel pipe column 112 can be improved.

本実施形態によれば、第1の貫通孔120、第2の貫通孔122、第3の貫通孔124、及び第4の貫通孔126をハンドホールとして用い、フランジが配置される継手部分の内側からボルトをセットし,ボルト締めを行うことで2つの鋼管柱を施工現場で接合することができる。ボルト接合は溶接接合より技能的に易しく、手順を守ることで品質も安定させることができる。そして、ハンドホールとして用いることのできる複数の貫通孔を(開孔の方向を異ならせて)斜かい状に配置することで、施工現場における溶接量を極力少なくし、ボルト接合の作業性を向上させ、接合部分の強度が他の部分と同等かそれ以上の強度を有する継手構造を得ることができる。 According to this embodiment, the first through hole 120, the second through hole 122, the third through hole 124, and the fourth through hole 126 are used as hand holes, and bolts are set from the inside of the joint portion where the flanges are placed, and the bolts are tightened to join two steel pipe columns at the construction site. Bolt joints are technically easier than welded joints, and quality can be stabilized by following the procedure. In addition, by arranging multiple through holes that can be used as hand holes in an oblique shape (with different opening directions), the amount of welding at the construction site can be minimized, the workability of the bolt joints can be improved, and a joint structure can be obtained in which the strength of the joint portion is equal to or greater than that of the other portions.

なお、本実施形態では、鋼管柱の各面に対応してフランジが配置される態様を示すが、フランジの配置はこれに限定されず、隣接する2つの面を架け渡すようにフランジが配置されてもよい。例えば、第1の鋼管柱102においては、第1面11と第2面12とに架け渡されるように第1のフランジ106aが配置されてもよい。このような配置は、他の実施形態においても同様である。 In this embodiment, the flanges are arranged corresponding to each face of the steel pipe column, but the arrangement of the flanges is not limited to this, and the flanges may be arranged to bridge two adjacent faces. For example, in the first steel pipe column 102, the first flange 106a may be arranged to bridge the first face 11 and the second face 12. This arrangement is similar in other embodiments.

[第2の実施形態]
本実施形態は、第1の実施形態に対し、貫通孔が設けられたフランジの配置が異なる態様を示す。以下においては、第1の実施形態と相違する部分を中心に説明する。
Second Embodiment
This embodiment is different from the first embodiment in the arrangement of the flange having the through hole, and the following description will focus on the differences from the first embodiment.

図4(A)は、本実施形態に係る鋼管柱の継手部の展開図を示し、図4(B)は鋼管柱の継手部の斜視図を示す。なお、図4(A)において、ボルト、ナット等の締結具は省略されている。 Figure 4(A) shows an exploded view of the joint of the steel pipe column according to this embodiment, and Figure 4(B) shows a perspective view of the joint of the steel pipe column. Note that fasteners such as bolts and nuts are omitted in Figure 4(A).

図4(A)に示すように、第1のダイアフラム104上に、第1面11に対応して第1の貫通孔120を有する第1のフランジ106aが設けられ、第2面12に対応して第2の貫通孔122を有する第1のフランジ106bが設けられた構造を有する。また、図4(A)には示されないが、第3面13に対応して第3のフランジ108aが設けられ、第4面14に対応して第3のフランジ108bが設けられた構造を有する。一方、第2の鋼管柱112の側では、第1面21に対応して第4のフランジ118aが設けられ、第2面22に対応して第4のフランジ118bが設けられた構造を有する。なお、第2の鋼管柱112の側には、第3面23に対応して第3の貫通孔124を有する第2のフランジ116aが設けられ、第4面24に対応して第4の貫通孔126を有する第2のフランジ116bが設けられた構造を有する。 As shown in FIG. 4(A), a first flange 106a having a first through hole 120 corresponding to the first surface 11 is provided on the first diaphragm 104, and a first flange 106b having a second through hole 122 corresponding to the second surface 12 is provided. Although not shown in FIG. 4(A), a third flange 108a is provided corresponding to the third surface 13, and a third flange 108b is provided corresponding to the fourth surface 14. On the other hand, on the side of the second steel pipe column 112, a fourth flange 118a is provided corresponding to the first surface 21, and a fourth flange 118b is provided corresponding to the second surface 22. In addition, the second steel pipe column 112 has a second flange 116a having a third through hole 124 corresponding to the third surface 23, and a second flange 116b having a fourth through hole 126 corresponding to the fourth surface 24.

すなわち、本実施形態においては、第1のフランジ106aと第1のフランジ106bとが、第1の鋼管柱102の隣接する2つの面に対応するように配置され、第2のフランジ116aと第2のフランジ116bとが、第2の鋼管柱112の隣接する2つの面に対応するように配置されている。そして、第1のフランジ106a及び第1のフランジ106bと、第2のフランジ116a及び第2のフランジ116bと、が上下に直列に重ならないように配置されている。 In other words, in this embodiment, the first flange 106a and the first flange 106b are arranged to correspond to two adjacent faces of the first steel pipe column 102, and the second flange 116a and the second flange 116b are arranged to correspond to two adjacent faces of the second steel pipe column 112. The first flange 106a and the first flange 106b, and the second flange 116a and the second flange 116b are arranged in series from top to bottom so as not to overlap.

別言すれば、第1のフランジ106a及び第1のフランジ106bと、第2のフランジ116a及び第2のフランジ116bとは、それぞれL字を形成するように配置されている。そして、図4(B)に示すように、第1の鋼管柱102と第2の鋼管柱112とを繋ぐとき、この2つのL字型の構造が咬み合うように配置される。その結果、第1面11及び第1面21の側、並びに第2面12及び第2面22の側では、同じ高さに第1のボルト接合部100a、第2のボルト接合部100bが配置され、第1の貫通孔120及び第2の貫通孔122は、これらのボルト接合部の下側に配置される。なお、図4(B)では示されないが、第3面13及び第3面23の側、並びに第4面14及び第4面24の側では、第2のフランジ116a及び第2のフランジ116bにより、図示される手前側とはボルト接合部と貫通孔の配置が、逆転した構造が形成される。 In other words, the first flange 106a and the first flange 106b, and the second flange 116a and the second flange 116b are arranged to form an L-shape. Then, as shown in FIG. 4(B), when the first steel pipe column 102 and the second steel pipe column 112 are connected, these two L-shaped structures are arranged to interlock. As a result, on the first surface 11 and the first surface 21 side and the second surface 12 and the second surface 22 side, the first bolt joint 100a and the second bolt joint 100b are arranged at the same height, and the first through hole 120 and the second through hole 122 are arranged below these bolt joints. Although not shown in FIG. 4(B), on the third surface 13 and the third surface 23 side, and on the fourth surface 14 and the fourth surface 24 side, the second flange 116a and the second flange 116b form a structure in which the arrangement of the bolt joints and through holes is reversed from that on the front side shown in the figure.

図5は、本実施形態に係る鋼管柱の継手構造の正面図を示す。鋼管柱の第1面11及び第1面21の側に第1のボルト接合部100aが形成され、第2面12及び第2面22の側に第2のボルト接合部100bが形成され、第4面14及び第4面24の側に第4のボルト接合部100dが形成される(図示されないが、第3面13及び第3面23の側には第3のボルト接合部100cが形成される)。 Figure 5 shows a front view of the joint structure of a steel pipe column according to this embodiment. A first bolt joint 100a is formed on the first surface 11 and the first surface 21 of the steel pipe column, a second bolt joint 100b is formed on the second surface 12 and the second surface 22, and a fourth bolt joint 100d is formed on the fourth surface 14 and the fourth surface 24 (although not shown, a third bolt joint 100c is formed on the third surface 13 and the third surface 23).

図5に示すように、第1の貫通孔120と第2の貫通孔122とは、隣接する2つの面に同じ高さで配置される。別言すれば、第1のボルト接合部100aの下側に第1の貫通孔120が配置され、第2のボルト接合部100bの下側に第2の貫通孔122が配置される。また、図5では明示されないが、第4の貫通孔126は、図示されない第3の貫通孔124と同じ高さで配置される。そして、第4の貫通孔126は、第4のボルト接合部100dの上側に配置される。 As shown in FIG. 5, the first through hole 120 and the second through hole 122 are disposed at the same height on two adjacent faces. In other words, the first through hole 120 is disposed below the first bolt joint 100a, and the second through hole 122 is disposed below the second bolt joint 100b. Although not shown in FIG. 5, the fourth through hole 126 is disposed at the same height as the third through hole 124, which is not shown. And the fourth through hole 126 is disposed above the fourth bolt joint 100d.

図6(A)は、図5において矢印A3、A4で挟む部位を断面視したときの断面構造を示し、図6(B)は、図5において矢印B2、B4で挟む部位を断面視したときの断面構造を示す。 Figure 6 (A) shows the cross-sectional structure of the area sandwiched between the arrows A3 and A4 in Figure 5, and Figure 6 (B) shows the cross-sectional structure of the area sandwiched between the arrows B2 and B4 in Figure 5.

図6(A)に示すように、第1のダイアフラム104の面上に、第1のフランジ106aと第1のフランジ106bがL字型に配置され、第3のフランジ108aと第3のフランジ108bとが逆L字型に配置される。このようなフランジの配置により、第1の鋼管柱102の第1面11側に第1の貫通孔120が配置され、第2面12側に第2の貫通孔122が同じ高さで配置される。また、第1の鋼管柱102の第3面13側に第3のボルト接合部100cが形成され、第4面14側に第4のボルト接合部100dが同じ高さで形成される。また、図6(B)に示すように、第2のダイアフラム114の面上に、第2のフランジ116aと第2のフランジ116bとが逆L字型に配置され、第4のフランジ118aと第4のフランジ118bとがL字型に配置される。このようなフランジの配置により、第2の鋼管柱112の第3面23側に第3の貫通孔124が配置され、第4面24側に第4の貫通孔126が同じ高さで配置される。また、第2の鋼管柱112の第1面21側に第1のボルト接合部100aが形成され、第2面22に第2のボルト接合部100bが同じ高さに形成される。図6(A)及び(B)に示すように、断面視によれば、鋼管柱の4つの面にそれぞれ貫通孔が配置され、ボルト接合部が形成される。 As shown in FIG. 6(A), the first flange 106a and the first flange 106b are arranged in an L-shape on the surface of the first diaphragm 104, and the third flange 108a and the third flange 108b are arranged in an inverted L-shape. With such an arrangement of the flanges, the first through hole 120 is arranged on the first surface 11 side of the first steel pipe column 102, and the second through hole 122 is arranged at the same height on the second surface 12 side. In addition, the third bolt joint 100c is formed on the third surface 13 side of the first steel pipe column 102, and the fourth bolt joint 100d is formed at the same height on the fourth surface 14 side. In addition, as shown in FIG. 6(B), the second flange 116a and the second flange 116b are arranged in an inverted L-shape on the surface of the second diaphragm 114, and the fourth flange 118a and the fourth flange 118b are arranged in an L-shape. With this flange arrangement, the third through hole 124 is arranged on the third surface 23 side of the second steel pipe column 112, and the fourth through hole 126 is arranged at the same height on the fourth surface 24 side. In addition, the first bolt joint 100a is formed on the first surface 21 side of the second steel pipe column 112, and the second bolt joint 100b is formed at the same height on the second surface 22. As shown in Figures 6 (A) and (B) in cross-sectional view, through holes are arranged on each of the four surfaces of the steel pipe column, and bolt joints are formed.

このように、本実施形態に係る鋼管柱の継手構造は、隣接する2つの面に同じ高さの貫通孔を設け、この隣接する2つの面に対向する他の隣接する2つの面に同じ高さの貫通孔を設け、隣接する2つの面と、他の隣接する2つの面との間で、貫通孔の高さが異なる構造を有する。このような貫通孔の配置によれば、例えば、両腕を使ってボルト接合を施工するときの作業性を向上させることができる。そして、このような一組の貫通孔を、高さを異ならせて斜かい状に配置することで、各面にボルト接合を形成するときの作業性を向上させることができ、施工現場における溶接量を極力少なくし、ボルト接合の作業性を向上させ、接合部分の強度が他の部分と同等かそれ以上の強度を有する継手構造を得ることができる。また、鋼管柱の各面に配置される貫通孔の全てが同じ高さに配置されないことにより、継手部分の強度の低下を抑制することができる。 In this way, the joint structure of the steel pipe column according to this embodiment has a structure in which through holes of the same height are provided on two adjacent faces, and through holes of the same height are provided on two other adjacent faces opposite these two adjacent faces, and the heights of the through holes are different between the two adjacent faces and the other two adjacent faces. With such an arrangement of through holes, for example, it is possible to improve the workability when constructing a bolt joint using both arms. And, by arranging such a set of through holes in an oblique shape with different heights, it is possible to improve the workability when forming a bolt joint on each face, and it is possible to obtain a joint structure in which the strength of the joint part is equal to or greater than that of other parts by minimizing the amount of welding at the construction site and improving the workability of the bolt joint. Also, by not arranging all of the through holes arranged on each face of the steel pipe column at the same height, it is possible to suppress a decrease in the strength of the joint part.

[第3の実施形態]
本実施形態は、第1の実施形態及び第2の実施形態に対し、貫通孔が設けられるフランジの構成が異なる態様を示す。以下においては、第1の実施形態と相違する部分を中心に説明する。
[Third embodiment]
This embodiment differs from the first and second embodiments in the configuration of the flange in which the through hole is provided, and the following description will focus on the differences from the first embodiment.

図7(A)は、本実施形態に係る鋼管柱の継手部の展開図を示し、図7(B)及び図8は鋼管柱の継手部の斜視図を示す。また、図7(B)及び図8に示すD1線及びD2線に対応する断面構造を図9(A)と(B)にそれぞれ示す。なお、図7(A)において、ボルト、ナット等の締結具は省略されている。 Figure 7 (A) shows an exploded view of the joint of the steel pipe column according to this embodiment, and Figures 7 (B) and 8 show perspective views of the joint of the steel pipe column. Also, Figures 9 (A) and (B) show the cross-sectional structures corresponding to lines D1 and D2 shown in Figures 7 (B) and 8, respectively. Note that fasteners such as bolts and nuts are omitted in Figure 7 (A).

図7(A)に示すように、第1の鋼管柱102の側には、第1面11に対応して第1のフランジ106aが設けられ、第12面、第13面、第14面に対応して第3のフランジ108a、108b、108cが設けられる第1のフランジ106aには第1の貫通孔120が設けられ、第3のフランジ108a、108b、108cにはボルト孔110のみが設けられ、ハンドホールを形成する貫通孔は設けられていない。第2の鋼管柱112側には、第21面に対応して第4のフランジ118aが設けられ、第22面、第23面、及び第24面に対応して第2のフランジ116a、116b、116cが設けられる。第2のフランジ116aには第2の貫通孔122が設けられ、図示しないが、第2のフランジ116bには第3の貫通孔124が設けられ、第2のフランジ116cには第4の貫通孔126が設けられる。第4のフランジ118aは、ボルト孔110のみが設けられ、ハンドホールを形成する貫通孔は設けられていない。 7(A), the first flange 106a is provided on the first steel pipe column 102 side in correspondence with the first surface 11, and the third flanges 108a, 108b, and 108c are provided in correspondence with the 12th, 13th, and 14th surfaces. The first flange 106a is provided with a first through hole 120, and the third flanges 108a, 108b, and 108c are provided with only bolt holes 110, and no through holes for forming hand holes are provided. The second steel pipe column 112 side is provided with a fourth flange 118a in correspondence with the 21st surface, and the second flanges 116a, 116b, and 116c are provided in correspondence with the 22nd, 23rd, and 24th surfaces. The second flange 116a has a second through hole 122, and although not shown, the second flange 116b has a third through hole 124, and the second flange 116c has a fourth through hole 126. The fourth flange 118a only has a bolt hole 110, and does not have a through hole that forms a hand hole.

図7(B)は、このような配置を有する第1の鋼管柱102と第2の鋼管柱112とをボルト接合で繋いだ状態を示す。図7(B)は、第1の鋼管柱102の第1面11及び第2面12、並びに第2の鋼管柱112の第1面21及び第2面22側からみた斜視図である。これに対し図8は、第1の鋼管柱102の第3面13及び第4面14、並びに第2の鋼管柱112の第3面23及び第4面24側からみた斜視図を示す。 Figure 7(B) shows the first steel pipe column 102 and the second steel pipe column 112 having such an arrangement connected by a bolt joint. Figure 7(B) is a perspective view seen from the first surface 11 and the second surface 12 of the first steel pipe column 102, and the first surface 21 and the second surface 22 of the second steel pipe column 112. In contrast, Figure 8 shows a perspective view seen from the third surface 13 and the fourth surface 14 of the first steel pipe column 102, and the third surface 23 and the fourth surface 24 of the second steel pipe column 112.

図7(B)及び図8に示すように、第1の貫通孔120は、第1の鋼管柱102に近い側に配置されるのに対し、第2の貫通孔122、第3の貫通孔124、及び第4の貫通孔126は、第2の鋼管柱112に近い側に配置される。このように、本実施形態では、第1の貫通孔120に対し、第2の貫通孔122、第3の貫通孔124、及び第4の貫通孔126が異なる高さに配置される。別言すれば、第1の貫通孔120に対し、第2の貫通孔122、第3の貫通孔124、及び第4の貫通孔126の組は斜かい状に配置される。 As shown in FIG. 7(B) and FIG. 8, the first through hole 120 is arranged on the side closer to the first steel pipe column 102, while the second through hole 122, the third through hole 124, and the fourth through hole 126 are arranged on the side closer to the second steel pipe column 112. Thus, in this embodiment, the second through hole 122, the third through hole 124, and the fourth through hole 126 are arranged at different heights relative to the first through hole 120. In other words, the set of the second through hole 122, the third through hole 124, and the fourth through hole 126 is arranged obliquely relative to the first through hole 120.

図9(A)に示すように、第1のダイアフラム104側には、第1の貫通孔120と、第2のボルト接合部100b、第3のボルト接合部100c、及び第4のボルト接合部100dとが配置される。一方、図9(B)に示すように、第2のダイアフラム114側には、第2の貫通孔122、第3の貫通孔124、及び第4の貫通孔126と、第1のボルト接合部100aとが配置される。このように、本実施形態においては、3つの面に設けられる貫通孔を同じ高さとし、他の1つの面に設けられる貫通孔の高さを異ならせた構造を有する。本実施形態におけるように、同じ高さに3つの貫通孔を配置することで、複数人で施工に当たる場合でも、互いに干渉することなく同時に作業を行うことができる。この場合において、少なくとも一つの貫通孔の高さを異ならせることで、異なる角度から工具等を挿入することができ、ボルト接合の作業性を高めることができる。第1の貫通孔120に対し、第2の貫通孔122、第3の貫通孔124、及び第4の貫通孔126はそれぞれ斜かい状に配置されることにより、各面にボルト接合を形成するときの作業性を向上させることができ、施工現場における溶接量を極力少なくし、ボルト接合の作業性を向上させ、接合部分の強度が他の部分と同等かそれ以上の強度を有する継手構造を得ることができる。また、鋼管柱の各面に配置される貫通孔の全てが同じ高さに配置されないことにより、継手部分の強度の低下を抑制することができる。 As shown in FIG. 9(A), the first through hole 120, the second bolt joint 100b, the third bolt joint 100c, and the fourth bolt joint 100d are arranged on the first diaphragm 104 side. On the other hand, as shown in FIG. 9(B), the second through hole 122, the third through hole 124, the fourth through hole 126, and the first bolt joint 100a are arranged on the second diaphragm 114 side. Thus, in this embodiment, the through holes provided on the three faces are at the same height, and the height of the through hole provided on the other face is different. By arranging the three through holes at the same height as in this embodiment, even if multiple people are working on the construction, they can work simultaneously without interfering with each other. In this case, by making the height of at least one through hole different, tools, etc. can be inserted from different angles, and the workability of the bolt joint can be improved. The second through hole 122, the third through hole 124, and the fourth through hole 126 are each arranged at an angle to the first through hole 120, which improves the workability when forming bolt joints on each surface, minimizes the amount of welding at the construction site, improves the workability of the bolt joints, and provides a joint structure in which the strength of the joints is equal to or greater than that of the other parts. Also, by not all of the through holes arranged on each surface of the steel pipe column being arranged at the same height, it is possible to suppress a decrease in the strength of the joints.

なお、本実施形態は、第1の鋼管柱102の側に第1の貫通孔120を設け、第2の鋼管柱112の側に第2の貫通孔122、第3の貫通孔124、及び第4の貫通孔126を設ける構造を示すが、このような貫通孔の配置を上下反転させた構造としても、同様の作用効果を得ることができる。 In this embodiment, the first through hole 120 is provided on the side of the first steel pipe column 102, and the second through hole 122, the third through hole 124, and the fourth through hole 126 are provided on the side of the second steel pipe column 112. However, the same effect can be obtained even if the arrangement of the through holes is inverted upside down.

[第4の実施形態]
本実施形態は、第1の実施形態で示す鋼管柱の継手構造において、さらに補強板を設けた一例を示す。以下においては、第1の実施形態と相違する部分を中心に説明する。
[Fourth embodiment]
This embodiment shows an example in which a reinforcing plate is further provided in the joint structure of the steel pipe column shown in the first embodiment. In the following, the difference from the first embodiment will be mainly described.

図10(A)は本実施形態に係る鋼管柱の継手構造における継手部分の展開図を示し、図10(B)は本実施形態に係る鋼管柱の継手構造の斜視図を示す。なお、図10(A)において、ボルト及びナット等の締結部材は省略されている。 Figure 10 (A) shows an exploded view of the joint portion of the joint structure of the steel pipe column according to this embodiment, and Figure 10 (B) shows an oblique view of the joint structure of the steel pipe column according to this embodiment. Note that in Figure 10 (A), fastening members such as bolts and nuts are omitted.

図10(A)及び(B)に示すように、第1の補強板144a(ウエブとも呼ばれる)が、第1のフランジ106a、106b、第3のフランジ108a、108bで囲まれた領域に設けられる。第1の補強板144aは、第1の鋼管柱102の材軸方向と平行な方向に立てられ、少なくとも、第1のフランジ106aと第1のフランジ106bの内側と接するように設けられる。また、第1の補強板144aは、第3のフランジ108a及び第3のフランジ108bと内接するように、平面視において十字型の形状を有していてもよい。第2の鋼管柱112の側においても、同様の構造を有する第2の補強板144bが設けられる。 As shown in Figures 10(A) and (B), a first reinforcing plate 144a (also called a web) is provided in the area surrounded by the first flanges 106a, 106b and the third flanges 108a, 108b. The first reinforcing plate 144a is erected in a direction parallel to the material axis direction of the first steel pipe column 102 and is provided so as to be in contact with at least the inside of the first flange 106a and the first flange 106b. The first reinforcing plate 144a may also have a cross shape in a plan view so as to be inscribed in the third flange 108a and the third flange 108b. A second reinforcing plate 144b having a similar structure is provided on the second steel pipe column 112 side.

なお、第1の補強版144a及び第2の補強板144bを設けることで、第2の添え板140a、140bは補強板と干渉する。そのため、本実施形態においては、第2の添え板140a、140bが補強板と重ならないように、2つに分割された構造を有する。 In addition, by providing the first reinforcing plate 144a and the second reinforcing plate 144b, the second support plates 140a and 140b interfere with the reinforcing plates. Therefore, in this embodiment, the second support plates 140a and 140b have a structure divided into two so that they do not overlap with the reinforcing plates.

図11は、本実施形態に係る鋼管柱の継手構造の正面図を示す。第1の鋼管柱102の側には、第1の貫通孔120(及び図示されない第3の貫通孔124)が設けられる部位と同じ高さに第1の補強板144aが設けられる。また、第2の鋼管柱112の側には、第2の貫通孔122及び第4の貫通孔126が設けられる部位と同じ高さに第2の補強板144bが設けられる。 Figure 11 shows a front view of the joint structure of the steel pipe column according to this embodiment. On the side of the first steel pipe column 102, a first reinforcing plate 144a is provided at the same height as the area where the first through hole 120 (and the third through hole 124, not shown) are provided. On the side of the second steel pipe column 112, a second reinforcing plate 144b is provided at the same height as the area where the second through hole 122 and the fourth through hole 126 are provided.

第1の補強板144aは、一方の端部が第1のフランジ106aの第1の貫通孔120が設けられる位置と当接するように配置される(図示されない第1のフランジ106aに対しても同様である)。また、第1の補強板144aが十字型の形状を有する場合は、第3のフランジ108a、108bとも当接するように設けられる。第2の補強板144bは、一方の端部が第2のフランジ116aの第2の貫通孔122が設けられる位置に当接し、他方の端部が第2のフランジ116bの第4の貫通孔126が設けられる位置と当接するように設けられる。また、第2の補強板144bが十字型の形状を有する場合は、第4のフランジ118a、118bとも当接するように設けられる。第1の補強板144a及び第2の補強板144bは、当接するそれぞれのフランジと溶接により固定される。 The first reinforcing plate 144a is arranged so that one end abuts against the position where the first through hole 120 of the first flange 106a is provided (the same applies to the first flange 106a not shown). In addition, when the first reinforcing plate 144a has a cross shape, it is arranged so that it also abuts against the third flanges 108a and 108b. The second reinforcing plate 144b is arranged so that one end abuts against the position where the second through hole 122 of the second flange 116a is provided, and the other end abuts against the position where the fourth through hole 126 of the second flange 116b is provided. In addition, when the second reinforcing plate 144b has a cross shape, it is arranged so that it also abuts against the fourth flanges 118a and 118b. The first reinforcing plate 144a and the second reinforcing plate 144b are fixed to the respective flanges they abut by welding.

このように、第1のフランジ106a、106bの貫通孔が設けられる位置に、第1の補強板144aを架け渡すように設けることで、その部位の強度を高めることができる。すなわち、第1のフランジ106a、106bにおいて、第1の貫通孔120、第3の貫通孔124が設けられる部位の強度を補うことができる。同様に、第2のフランジ116a、116bの貫通孔が設けられる位置に、第2の補強板144bを架け渡すように設けることで、その部位の強度を高めることができる。 In this way, by providing the first reinforcing plate 144a so as to bridge the positions where the through holes of the first flanges 106a, 106b are provided, the strength of that portion can be increased. In other words, the strength of the portions of the first flanges 106a, 106b where the first through holes 120 and the third through holes 124 are provided can be supplemented. Similarly, by providing the second reinforcing plate 144b so as to bridge the positions where the through holes of the second flanges 116a, 116b are provided, the strength of that portion can be increased.

第1の補強板144aは、第1の貫通孔120(及び図示されない第3の貫通孔124)と重なる位置に切欠き部146aが設けられていてもよく、第2の補強板144bは、第2の貫通孔122及び第4の貫通孔126と重なる位置に切欠き部146bが設けられていてもよい。切欠き部146a、146bの形状は任意であるが、例えば、それぞれの貫通孔と略同一の直径を有する半円状の形状を有していてもよい。第1の補強板144a、第2の補強板144bに切欠き部146a、146bを設けることで、それぞれの貫通孔の一部を塞がないようにすることができる。それにより、それぞれの貫通孔から工具等を挿入して作業する場合においても、補強板が邪魔をせず、作業性が低下しないようにすることができる。 The first reinforcing plate 144a may have a notch 146a at a position overlapping the first through hole 120 (and the third through hole 124, not shown), and the second reinforcing plate 144b may have a notch 146b at a position overlapping the second through hole 122 and the fourth through hole 126. The notch 146a, 146b may have any shape, but may have a semicircular shape having approximately the same diameter as each through hole. By providing the notch 146a, 146b in the first reinforcing plate 144a and the second reinforcing plate 144b, it is possible to prevent a part of each through hole from being blocked. As a result, even when inserting a tool or the like through each through hole, the reinforcing plate does not get in the way and the workability is not reduced.

図12(A)は、図11において矢印A5、A6で挟む部位を断面視したときの断面構造を示し、図12(B)は、図10において矢印B5、B6で挟む部位を断面視したときの断面構造を示す。 Figure 12(A) shows the cross-sectional structure of the area sandwiched between arrows A5 and A6 in Figure 11, and Figure 12(B) shows the cross-sectional structure of the area sandwiched between arrows B5 and B6 in Figure 10.

図12(A)に示すように、第1のフランジ106aから第1のフランジ106bの内側の側面を架け渡すように第1の補強板144aが設けられる。また、図示されるように第1の補強板144aが、平面視で十字型の形状を有する場合は、第3のフランジ108aから第3のフランジ108bの内側の側面を架け渡すように第1の補強板144aが設けられる。第1の補強板144aは、第1の貫通孔120及び第3の貫通孔124と重なる位置に設けられる。第1の補強板144aの端部には、貫通孔の一部を塞がないように切欠き部146aが設けられる。図12(B)に示す第2の補強板144bも同様の構成を有し、第2の貫通孔122及び第4の貫通孔126と重なる端部に第2の切欠き部146bが設けられる。 As shown in FIG. 12(A), a first reinforcing plate 144a is provided so as to bridge the inner side of the first flange 106a to the first flange 106b. Also, when the first reinforcing plate 144a has a cross shape in a plan view as shown in the figure, the first reinforcing plate 144a is provided so as to bridge the inner side of the third flange 108a to the third flange 108b. The first reinforcing plate 144a is provided at a position overlapping the first through hole 120 and the third through hole 124. A notch portion 146a is provided at the end of the first reinforcing plate 144a so as not to block a part of the through hole. The second reinforcing plate 144b shown in FIG. 12(B) has a similar configuration, and a second notch portion 146b is provided at the end overlapping the second through hole 122 and the fourth through hole 126.

図12(A)及び(B)に示すように、フランジが設けられる部位に補強板を設けることで、その部位の強度を高めることができる。特に、フランジに貫通孔を設ける場合において、補強板を設けることで、貫通孔を設けたことによる強度(剛性)の低下を補うことができる。本実施形態に係る鋼管柱の他の構成は、第1の実施形態に係るものと同様であり、同様の作用効果を奏することができる。なお、本実施形態は、第2乃至第3の実施形態の構成と適宜組み合わせて実施することができる。 As shown in Figures 12 (A) and (B), by providing a reinforcing plate at the location where the flange is provided, the strength of that location can be increased. In particular, when a through hole is provided in the flange, the provision of a reinforcing plate can compensate for the reduction in strength (rigidity) caused by providing the through hole. The other configurations of the steel pipe column according to this embodiment are the same as those of the first embodiment, and the same effects can be achieved. Note that this embodiment can be implemented in appropriate combination with the configurations of the second to third embodiments.

[第5の実施形態]
本実施形態は、第4の実施形態で示す補強板の構成において、さらに補強板同士を繋ぐ添え板を設けた構成を示す。以下においては、第4の実施形態と相違する部分を中心に説明する。
[Fifth embodiment]
In this embodiment, a splice plate that connects the reinforcing plates to each other is further provided in the reinforcing plate configuration shown in the fourth embodiment. The following description will focus on the differences from the fourth embodiment.

図13(A)は本実施形態に係る鋼管柱の継手構造における継手部分の展開図を示し、図13(B)は本実施形態に係る鋼管柱の継手構造の斜視図を示す。なお、図13(A)において、ボルト及びナット等の締結部材は省略されている。 Figure 13(A) shows an exploded view of the joint portion of the joint structure of the steel pipe column according to this embodiment, and Figure 13(B) shows an oblique view of the joint structure of the steel pipe column according to this embodiment. Note that in Figure 13(A), fastening members such as bolts and nuts are omitted.

図13(A)に示すように、第3の添え板132及び第4の添え板142が、第1の補助板144a及び第2の補助板144bの位置に合わせて配置される。第1の補助板144a及び第2の補助板144bに対し、第3の添え板132は一方の面に配置され、第4の添え板142は他方の面に配置される。第1の補強板144a及び第2の補強板144bと、第3の添え板132及び第4の添え板142とはボルト接合するためのボルト孔が設けられている。第3の添え板132及び第4の添え板142は、第1の補強板144aと第2の補強板144bの両方に亘る長さを有する。図13(B)は、第1の鋼管柱102と第2の鋼管柱112とをボルト接合で繋いだ状態を示す。第3の添え板132及び第4の添え板142は、フランジに囲まれた内部に配置されるため、貫通孔からは視認可能であるものの、それ以外は外観に現れない構造を有する。 As shown in FIG. 13(A), the third splice plate 132 and the fourth splice plate 142 are arranged in accordance with the positions of the first auxiliary plate 144a and the second auxiliary plate 144b. The third splice plate 132 is arranged on one side of the first auxiliary plate 144a and the second auxiliary plate 144b, and the fourth splice plate 142 is arranged on the other side. The first reinforcing plate 144a and the second reinforcing plate 144b and the third splice plate 132 and the fourth splice plate 142 have bolt holes for bolting. The third splice plate 132 and the fourth splice plate 142 have a length that spans both the first reinforcing plate 144a and the second reinforcing plate 144b. FIG. 13(B) shows the state in which the first steel pipe column 102 and the second steel pipe column 112 are connected by bolting. The third support plate 132 and the fourth support plate 142 are positioned inside the flange, and are therefore visible through the through holes, but are otherwise not visible from the outside.

図130(B)に示すD3線及びD4線に対応する断面構造を、図14(A)と(B)にそれぞれ示す。図14(A)は、第1の鋼管柱102側の構造を示し、図14(B)は、第2の鋼管柱112側の構造を示す。第1の補強板144a及び第2の補強板144bは、第3の添え板132と第4の添え板142とで挟まれてボルト締めされる。第1の補強板144a及び第2の補強板144bが、平面視で十字型の形状を有する場合、各面に対応して添え板を設け、ボルト締めで固定することができる。 The cross-sectional structures corresponding to lines D3 and D4 shown in Figure 130(B) are shown in Figures 14(A) and (B), respectively. Figure 14(A) shows the structure on the first steel pipe column 102 side, and Figure 14(B) shows the structure on the second steel pipe column 112 side. The first reinforcing plate 144a and the second reinforcing plate 144b are sandwiched between the third support plate 132 and the fourth support plate 142 and bolted. When the first reinforcing plate 144a and the second reinforcing plate 144b have a cross shape in a plan view, a support plate can be provided corresponding to each face and fixed by bolting.

本実施形態で示すように、上下に配置される補強板に添え板を当て、ボルト及びナット等の締結具で固定することで、鋼管柱の継手構造の強度を高めることができる。この場において、補強板を囲むフランジに貫通孔が設けられていることで、補強板を添え板で連結する作業を容易に行うことができる。 As shown in this embodiment, the strength of the joint structure of the steel pipe column can be increased by attaching a splice plate to the reinforcing plates arranged above and below and fixing them with fasteners such as bolts and nuts. In this case, the flange surrounding the reinforcing plate is provided with a through hole, which makes it easy to connect the reinforcing plate with the splice plate.

[第6の実施形態]
本実施形態は、第1の実施形態に対し、フランジの構成が異なる態様を示す。以下においては、第1の実施形態と相違する部分を中心に説明する。
Sixth embodiment
This embodiment shows an aspect in which the configuration of the flange is different from that of the first embodiment, and the following description will focus on the differences from the first embodiment.

図15(A)は、本実施形態に係る鋼管柱の継手部の展開図を示し、図15(B)は鋼管柱の継手部の斜視図を示す。また、図15(B)に示すD5線及びD6線に対応する断面構造を、図16(A)と(B)にそれぞれ示す。なお、図15(A)において、ボルト、ナット等の締結具は省略されている。以下の説明においては、図15(A)及び(B)、並びに図16(A)及び(B)を参照して説明するものとする。 Figure 15(A) shows an exploded view of the joint part of the steel pipe column according to this embodiment, and Figure 15(B) shows a perspective view of the joint part of the steel pipe column. In addition, the cross-sectional structures corresponding to the lines D5 and D6 shown in Figure 15(B) are shown in Figures 16(A) and (B), respectively. Note that fasteners such as bolts and nuts are omitted in Figure 15(A). The following explanation will be made with reference to Figures 15(A) and (B) and Figures 16(A) and (B).

本実施形態において、第1の貫通孔120が設けられる第1のフランジ106aは、第1の鋼管柱102の肉厚より大きな板厚を有し、第2の貫通孔122が設けられる第2のフランジ116aは、第2の鋼管柱112の肉厚より大きな板厚を有する。このように、貫通孔が設けられるフランジの板厚を、鋼管柱の肉厚より大きくすることで、貫通孔が設けられ、またボルト孔が設けられたたことによる剪断力、曲げ応力、軸応力に対する強度(剛性)の低下を補うことができる。 In this embodiment, the first flange 106a in which the first through hole 120 is provided has a plate thickness greater than the wall thickness of the first steel pipe column 102, and the second flange 116a in which the second through hole 122 is provided has a plate thickness greater than the wall thickness of the second steel pipe column 112. In this way, by making the plate thickness of the flange in which the through hole is provided greater than the wall thickness of the steel pipe column, it is possible to compensate for the decrease in strength (rigidity) against shear force, bending stress, and axial stress caused by the provision of the through hole and the provision of the bolt hole.

なお、第2のフランジ116aの板厚に対し、第3のフランジ108aの板厚は相対的に薄くなっている。第1の添え板130b及び第2の添え板140bで、第2のフランジ116aと第3のフランジ108aを挟んだとき、板厚の差によって隙間ができないように第3のフランジ108aの背面にスペーサ134bが設けられている。スペーサ134bは、第2のフランジ116aと第3のフランジ108aとの板厚の差と同程度の厚さを有し、ボルト孔が設けられており、第3のフランジ108aと第4の添え板140bとの間に挟まれて隙間が出来ないようにボルト接合を形成することができる。図16(A)及び(B)に示すように、スペーサは各ボルト接合部に設けられる(第1のボルト接合部100aにスペーサ134a、第2のボルト接合部100bにスペーサ134b、第3のボルト接合部100cにスペーサ134c、第4のボルト接合部100dにスペーサ134dが配置される)。 The thickness of the third flange 108a is relatively thin compared to the thickness of the second flange 116a. When the second flange 116a and the third flange 108a are sandwiched between the first and second support plates 130b and 140b, a spacer 134b is provided on the back surface of the third flange 108a to prevent a gap from being created due to the difference in thickness. The spacer 134b has a thickness equivalent to the difference in thickness between the second and third flanges 116a and 108a, and is provided with bolt holes. It can be sandwiched between the third flange 108a and the fourth support plate 140b to form a bolt joint so that no gap is created. As shown in Figures 16(A) and (B), spacers are provided at each bolt joint (spacer 134a is placed at the first bolt joint 100a, spacer 134b at the second bolt joint 100b, spacer 134c at the third bolt joint 100c, and spacer 134d at the fourth bolt joint 100d).

なお、貫通孔が設けられない第3のフランジ108及び第4のフランジ118についても、同様に板厚を大きくすることによってボルト孔が設けられたことによる剪断力,曲げ応力,軸応力に対する強度(剛性)の低下を補うことができる。 In addition, for the third flange 108 and the fourth flange 118, which do not have through holes, the plate thickness can be increased in a similar manner to compensate for the reduction in strength (rigidity) against shear force, bending stress, and axial stress caused by the provision of bolt holes.

本実施形態に係る鋼管柱の継手構造は、フランジの厚さが厚くなったこと以外は第1の実施形態と同様である。したがって、上記の効果に加え、第1の実施形態と同様の有利な効果を得ることができる。なお、本実施形態は、第2乃至第5の実施形態と適宜組み合わせて実施することができる。 The joint structure of the steel pipe column according to this embodiment is the same as that of the first embodiment, except that the thickness of the flange is increased. Therefore, in addition to the above effects, the same advantageous effects as those of the first embodiment can be obtained. This embodiment can be implemented in appropriate combination with the second to fifth embodiments.

[第7の実施形態]
本実施形態は、第1の実施形態に対し、ダイアフラムの構成が異なる態様について示す。以下においては、第1の実施形態と相違する部分を中心に説明する。
[Seventh embodiment]
This embodiment shows an aspect in which the configuration of the diaphragm is different from that of the first embodiment. The following description will focus on the differences from the first embodiment.

図17(A)及び(B)は、図3(A)及び(B)に対応する図面であり、角形鋼管柱のボルト接合部の断面構造を示す。本実施形態において、第1のダイアフラム104に貫通孔148aが設けられ、第2のダイアフラム114に貫通孔148bが設けられている。貫通孔148a及び貫通孔148bの大きさ及び平面視における形状は任意である。このように、第1のダイアフラム104及び第2のダイアフラム114の一方及び両方に貫通孔が設けられることで、継手部分の強度を維持しつつ、重量を低減することができる。 Figures 17 (A) and (B) are drawings corresponding to Figures 3 (A) and (B) and show the cross-sectional structure of a bolt joint of a square steel pipe column. In this embodiment, a through hole 148a is provided in the first diaphragm 104, and a through hole 148b is provided in the second diaphragm 114. The size and shape in plan view of the through holes 148a and 148b are arbitrary. In this way, by providing through holes in one or both of the first diaphragm 104 and the second diaphragm 114, it is possible to reduce the weight while maintaining the strength of the joint portion.

また、本実施の形態に示す角型鋼管柱をコンクリート充填鋼管構造(Concrete Filled Steel Tube,CFTともいう。)に応用することができる。貫通孔148a、148bを介して、繋ぎ合わされた第1の鋼管柱102及び第2の鋼管柱112の内側にコンクリートが充填される。この結果、第1の鋼管柱102及び第2の鋼管柱112の断面積を小さくしても強靱な構造を形成することができる。 The square steel pipe column shown in this embodiment can also be applied to a concrete-filled steel pipe structure (also called a CFT). Concrete is filled inside the first steel pipe column 102 and the second steel pipe column 112 that are connected together through the through holes 148a and 148b. As a result, a strong structure can be formed even if the cross-sectional area of the first steel pipe column 102 and the second steel pipe column 112 is reduced.

本実施形態に係る鋼管柱の継手構造は、ダイアフラムの構造以外は第1の実施形態と同様である。したがって、上記の効果に加え、第1の実施形態と同様の有利な効果を得ることができる。なお、本実施形態は、第2乃至第6の実施形態と適宜組み合わせて実施することができる。 The joint structure of the steel pipe column in this embodiment is the same as that of the first embodiment, except for the diaphragm structure. Therefore, in addition to the above effects, the same advantageous effects as those of the first embodiment can be obtained. This embodiment can be implemented in appropriate combination with the second to sixth embodiments.

100・・・ボルト接合部、102・・・第1の鋼管柱、104・・・第1のダイアフラム、106・・・第1のフランジ、108・・・第3のフランジ、112・・・第2の鋼管柱、114・・・第2のダイアフラム、116・・・第2のフランジ、118・・・第4のフランジ、110・・・ボルト孔、111・・・ボルト孔、120・・・第1の貫通孔、122・・・第2の貫通孔、124・・・第3の貫通孔、126・・・第4の貫通孔、130・・・第1の添え板、132・・・第3の添え板、134・・・スペーサ、140・・・第2の添え板、142・・・第4の添え板、144・・・補強板、146・・・切欠き部、148・・・貫通孔、150・・・ボルト、152・・・ナット 100: bolt joint, 102: first steel pipe column, 104: first diaphragm, 106: first flange, 108: third flange, 112: second steel pipe column, 114: second diaphragm, 116: second flange, 118: fourth flange, 110: bolt hole, 111: bolt hole, 120: first through hole, 122: second through hole, 124: third through hole, 126: fourth through hole, 130: first support plate, 132: third support plate, 134: spacer, 140: second support plate, 142: fourth support plate, 144: reinforcing plate, 146: notch, 148: through hole, 150: bolt, 152: nut

Claims (9)

第1の鋼管柱の一端に設けられた第1のダイアフラムと、前記第1のダイアフラムに固定された第1のフランジと、前記第1のダイアフラムに固定された第3のフランジと、
第2の鋼管柱の一端に設けられた第2のダイアフラムと、前記第2のダイアフラムに固定された第2のフランジと、前記第2のダイアフラムに固定された第4のフランジと、
第1の添え板と、
第2の添え板と、
を含み、
前記第1の鋼管柱と前記第2の鋼管柱とが材軸方向に沿って上下に配置され、
前記第1のフランジと前記第2のフランジとが前記第1の添え板でボルト接合され、
前記第3のフランジと前記第4のフランジとが前記第2の添え板でボルト接合され、
前記第1のフランジ及び前記第2のフランジの一方に、ハンドホールとして用いることのできる第1の貫通孔が設けられ、
前記第3のフランジ及び前記第4のフランジの一方に、ハンドホールとして用いることのできる第2の貫通孔が設けられている
鋼管柱の継手構造。
A first diaphragm provided at one end of a first steel pipe column, a first flange fixed to the first diaphragm, and a third flange fixed to the first diaphragm;
A second diaphragm provided at one end of a second steel pipe column, a second flange fixed to the second diaphragm, and a fourth flange fixed to the second diaphragm;
A first splice;
A second splice;
Including,
The first steel pipe pole and the second steel pipe pole are arranged vertically along the material axis direction,
the first flange and the second flange are bolted together with the first splice plate;
the third flange and the fourth flange are bolted together with the second splice plate,
a first through hole that can be used as a hand hole is provided in one of the first flange and the second flange ;
A second through hole that can be used as a hand hole is provided in one of the third flange and the fourth flange.
Steel pipe column joint structure.
前記第1のフランジが前記第1の鋼管柱の材軸方向と平行に配置され、前記第2のフランジが前記第2の鋼管柱の材軸方向と平行に配置されている、
請求項1に記載の鋼管柱の継手構造。
The first flange is arranged parallel to the material axis direction of the first steel pipe column, and the second flange is arranged parallel to the material axis direction of the second steel pipe column,
A joint structure for a steel pipe column according to claim 1.
前記第3のフランジが前記第1の鋼管柱の材軸方向と平行に配置され、前記第4のフランジが前記第2の鋼管柱の材軸方向と平行に配置されている、
請求項に記載の鋼管柱の継手構造。
The third flange is arranged parallel to the material axis direction of the first steel pipe column, and the fourth flange is arranged parallel to the material axis direction of the second steel pipe column.
A joint structure for a steel pipe column according to claim 1 .
前記第1の貫通孔が前記第1のフランジに設けられ、前記第2の貫通孔が前記第4のフランジに設けられ、前記第1の貫通孔と前記第2の貫通孔とは、前記材軸方向における高さが異なっている、
請求項に記載の鋼管柱の継手構造。
the first through hole is provided in the first flange, the second through hole is provided in the fourth flange, and the first through hole and the second through hole have different heights in the material axis direction;
A joint structure for a steel pipe column according to claim 1 .
前記第1の貫通孔が前記第1のフランジに設けられ、前記第2の貫通孔が前記第3のフランジに設けられ、前記第1の貫通孔と前記第2の貫通孔とは、前記材軸方向における高さが同じである、
請求項に記載の鋼管柱の継手構造。
the first through hole is provided in the first flange, the second through hole is provided in the third flange, and the first through hole and the second through hole have the same height in the material axis direction.
A joint structure for a steel pipe column according to claim 1 .
前記第1のフランジは、複数のボルト孔が設けられた第1の領域を有し、前記第1のダイアフラムに固定された一端と前記第1の領域との間に第1の貫通孔が設けられ、
前記第4のフランジは、複数のボルト孔が設けられた第2の領域を有し、前記第2のダイアフラムに固定された一端と前記第2の領域との間に前記第2の貫通孔が設けられ、
前記第1のフランジと前記第4のフランジとが隣り合う面に配置されている
請求項に記載の鋼管柱の継手構造。
the first flange has a first region in which a plurality of bolt holes are provided, and a first through hole is provided between one end fixed to the first diaphragm and the first region;
the fourth flange has a second region in which a plurality of bolt holes are provided, and the second through hole is provided between one end fixed to the second diaphragm and the second region;
The steel pipe column joint structure according to claim 1 , wherein the first flange and the fourth flange are arranged on adjacent surfaces.
前記第1のフランジは、複数のボルト孔が設けられた第1の領域を有し、前記第1のダイアフラムに固定された一端と前記第1の領域との間に前記第1の貫通孔が設けられ、
前記第3のフランジは、複数のボルト孔が設けられた第3の領域を有し、前記第1のダイアフラムに固定された一端と前記第3の領域との間に前記第2の貫通孔が設けられ、
前記第1のフランジと前記第3のフランジとが隣り合う面に配置されている
請求項に記載の鋼管柱の継手構造。
the first flange has a first region in which a plurality of bolt holes are provided, and the first through hole is provided between one end fixed to the first diaphragm and the first region;
the third flange has a third region in which a plurality of bolt holes are provided, and the second through hole is provided between one end fixed to the first diaphragm and the third region;
The steel pipe column joint structure according to claim 1 , wherein the first flange and the third flange are arranged on adjacent surfaces.
前記第1のフランジ及び前記第2のフランジにおいて、前記第1の貫通孔が設けられた一方のフランジは、前記第1の貫通孔が設けられない他方のフランジに比べて大きな板厚を有し、
前記第1の貫通孔が設けられない他方のフランジには、前記ボルト接合された領域に重なるように第1のスペーサが設けられている、
請求項1に記載の鋼管柱の継手構造。
In the first flange and the second flange, one flange in which the first through hole is provided has a plate thickness larger than that of the other flange in which the first through hole is not provided,
A first spacer is provided on the other flange in which the first through hole is not provided so as to overlap the bolted region.
A joint structure for a steel pipe column according to claim 1.
前記第3のフランジ及び前記第4のフランジにおいて、前記第2の貫通孔が設けられた一方のフランジは、前記第2の貫通孔が設けられない他方のフランジに比べて大きな板厚を有し、
前記第2の貫通孔が設けられない他方のフランジには、前記ボルト接合された領域に重なるように第2のスペーサが設けられている、
請求項に記載の鋼管柱の継手構造。
In the third flange and the fourth flange, one flange in which the second through hole is provided has a plate thickness larger than that of the other flange in which the second through hole is not provided,
A second spacer is provided on the other flange in which the second through hole is not provided so as to overlap the bolted region.
A joint structure for a steel pipe column according to claim 1 .
JP2023175786A 2019-11-08 2023-10-11 Steel pipe column joint structure Active JP7653487B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2023175786A JP7653487B2 (en) 2019-11-08 2023-10-11 Steel pipe column joint structure

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2019202948A JP7366698B2 (en) 2019-11-08 2019-11-08 Steel pipe column joint structure
JP2023175786A JP7653487B2 (en) 2019-11-08 2023-10-11 Steel pipe column joint structure

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2019202948A Division JP7366698B2 (en) 2019-11-08 2019-11-08 Steel pipe column joint structure

Publications (2)

Publication Number Publication Date
JP2023175986A JP2023175986A (en) 2023-12-12
JP7653487B2 true JP7653487B2 (en) 2025-03-28

Family

ID=75898678

Family Applications (2)

Application Number Title Priority Date Filing Date
JP2019202948A Active JP7366698B2 (en) 2019-11-08 2019-11-08 Steel pipe column joint structure
JP2023175786A Active JP7653487B2 (en) 2019-11-08 2023-10-11 Steel pipe column joint structure

Family Applications Before (1)

Application Number Title Priority Date Filing Date
JP2019202948A Active JP7366698B2 (en) 2019-11-08 2019-11-08 Steel pipe column joint structure

Country Status (1)

Country Link
JP (2) JP7366698B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002106065A (en) 2000-09-28 2002-04-10 Daiwa House Ind Co Ltd Joint structure of mutual steel framed columns having different cross-section size from each other
JP2006291531A (en) 2005-04-08 2006-10-26 Kajima Corp Column / beam joint structure
JP2011052483A (en) 2009-09-03 2011-03-17 Hitachi Metals Techno Ltd Column joint structure

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS564089Y2 (en) * 1976-07-08 1981-01-29
JPH0781314B2 (en) * 1986-12-26 1995-08-30 旭化成工業株式会社 Joint structure of upper and lower steel columns
JPH0539631A (en) * 1991-08-07 1993-02-19 Asahi Chem Ind Co Ltd Pillar connection section structure
JP3122209B2 (en) * 1991-12-28 2001-01-09 大和ハウス工業株式会社 Beam-column joint structure
FI923118A0 (en) * 1992-07-07 1992-07-07 Tuomo Juola Building framework.
JPH09195385A (en) * 1996-01-24 1997-07-29 Daiwa House Ind Co Ltd Joining structure of square steel pipe post and joining hardware
JPH10317491A (en) * 1997-05-21 1998-12-02 Kowa:Kk Column joint structure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002106065A (en) 2000-09-28 2002-04-10 Daiwa House Ind Co Ltd Joint structure of mutual steel framed columns having different cross-section size from each other
JP2006291531A (en) 2005-04-08 2006-10-26 Kajima Corp Column / beam joint structure
JP2011052483A (en) 2009-09-03 2011-03-17 Hitachi Metals Techno Ltd Column joint structure

Also Published As

Publication number Publication date
JP7366698B2 (en) 2023-10-23
JP2023175986A (en) 2023-12-12
JP2021075891A (en) 2021-05-20

Similar Documents

Publication Publication Date Title
JP6861425B2 (en) H-section steel joint structure
JP7295681B2 (en) Column-beam joint structure and construction method for building with column-beam joint structure
JP7538911B2 (en) Connection structure of square steel pipe column
JP7483401B2 (en) Building unit connection structure
JP7653487B2 (en) Steel pipe column joint structure
JP2611090B2 (en) Column base structure of square steel tubular column
JP6763653B2 (en) Unit building
JPH05346038A (en) Column leg structure
JP7641329B2 (en) Steel pipe column joint structure
JP7701426B2 (en) Joint structure of square steel pipe column
JP2672466B2 (en) Joint structure of columns and beams using shaped steel
JP2019196637A (en) Column-beam joint structure, and construction method of column-beam joint structure
JP2020133123A (en) Column-beam joint structure
JP2006152673A (en) Steel beam assembly
JP2006291531A (en) Column / beam joint structure
JP7164074B2 (en) Steel frame assembly structure without high-tensile bolts
JP6664208B2 (en) Joint structure of beam and column
JP4285427B2 (en) Seismic reinforcement structure for buildings
JP6565543B2 (en) Column and beam joint structure, building with column and beam joint structure
JP7824704B1 (en) Shell steel pipe column base structure with root-wrapped concrete and its construction method
JP7535343B1 (en) Shaft end auxiliary member and member connection structure using the same
JP7340435B2 (en) Steel pipe column joint structure
JPH07139054A (en) How to join precast concrete wall slabs
JP7410801B2 (en) Building unit joining structure and building unit joining method
JP7174576B2 (en) Column joint block and column joint structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20231011

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20241105

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20241216

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250311

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250317

R150 Certificate of patent or registration of utility model

Ref document number: 7653487

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350