JP7654953B2 - Data linking method and data linking system - Google Patents
Data linking method and data linking system Download PDFInfo
- Publication number
- JP7654953B2 JP7654953B2 JP2020177166A JP2020177166A JP7654953B2 JP 7654953 B2 JP7654953 B2 JP 7654953B2 JP 2020177166 A JP2020177166 A JP 2020177166A JP 2020177166 A JP2020177166 A JP 2020177166A JP 7654953 B2 JP7654953 B2 JP 7654953B2
- Authority
- JP
- Japan
- Prior art keywords
- data
- model
- information data
- bim
- input
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims description 29
- 238000010276 construction Methods 0.000 claims description 115
- 238000013500 data storage Methods 0.000 claims description 43
- 238000012545 processing Methods 0.000 claims description 38
- 230000002787 reinforcement Effects 0.000 claims description 38
- 238000013461 design Methods 0.000 claims description 30
- 230000003014 reinforcing effect Effects 0.000 claims description 17
- 238000004519 manufacturing process Methods 0.000 claims description 12
- 238000003860 storage Methods 0.000 claims description 11
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 239000011178 precast concrete Substances 0.000 description 66
- 238000010586 diagram Methods 0.000 description 8
- 238000005452 bending Methods 0.000 description 4
- 239000011150 reinforced concrete Substances 0.000 description 3
- 238000012800 visualization Methods 0.000 description 3
- 238000004891 communication Methods 0.000 description 2
- 239000004567 concrete Substances 0.000 description 2
- 238000007796 conventional method Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000002360 preparation method Methods 0.000 description 2
- 238000010923 batch production Methods 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
本発明は、データ連携方法、及び、データ連携システムに関する。 The present invention relates to a data linking method and a data linking system.
従来では、建物を構成する各部品を製造するために、例えば、構造設計情報のうち、建物の一般情報、材料に関する情報、部材断面情報は、入力時に例えばACCESSファイルなどの特定形式のファイルとして保管し、一方、建物形状、部材の配置に関する情報は、入力時にはCADの三次元モデルとして保持し、外部システムとの連携時に、CADデータとして保管されている情報を一括処理によって、例えばACCESSファイルなどのファイルに掃き出すことにより、構造設計情報全体を一定の形式に統一されたデータベースを形成している。 Conventionally, in order to manufacture each component that makes up a building, for example, structural design information such as general building information, information about materials, and component cross-section information is stored as a file of a specific format, such as an ACCESS file, at the time of input, while information about the building shape and component placement is held as a three-dimensional CAD model at the time of input, and when linking with an external system, the information stored as CAD data is output in a batch process to a file, such as an ACCESS file, forming a database in which all structural design information is unified into a uniform format.
上記のような従来の構造設計情報の利用方法では、一般情報、材料に関する情報、部材断面情報と、建物形状、部材の配置に関する情報とが、互いに異なる形式で別データとして保持されており、外部のシステムと連携する際に、各データの形式が統一される。このため、CADの三次元モデルを有しつつも、外部のシステムと連携するまでは、建物を施工するための各データを合成して統一された1つのデータとすることができない。例えば、躯体データベースから業務別の各市販施工用CADへの変換プログラムを作成し、各市販施工用CADにてデータを連携している。このため、各々の市販施工用CAD間では整合がとられていないので、全体として整合がとれた施工図や部品の製造図などを作図する、或いは、部品を製造するデータとしてそのまま用いることができない虞があるという課題があった。 In the conventional method of using structural design information as described above, general information, information on materials, and information on component cross-sections on the one hand, and information on the building shape and component placement on the other, are stored as separate data in different formats, and the format of each data is unified when linking with an external system. For this reason, even if a three-dimensional CAD model is held, the various data for constructing the building cannot be synthesized into a single unified data until linking with an external system. For example, a conversion program is created from the structural body database to each commercially available construction CAD for each business, and data is linked in each commercially available construction CAD. For this reason, there is a problem that, since there is no consistency between each commercially available construction CAD, there is a risk that it is not possible to create construction drawings or manufacturing drawings for parts that are consistent overall, or to use the data as is as data for manufacturing parts.
本発明は、上記のような課題に鑑みてなされたものであって、その目的は、整合性が高いモデルのデータを生成することにある。 The present invention was made in consideration of the above problems, and its purpose is to generate highly consistent model data.
かかる目的を達成するため、本発明のデータ連携方法は、ユーザの入力に基づいて、BIM処理部が、入力部から入力されたデータに基づいて、BIMソフトを実行して建物のBIMモデルを生成する建物のBIMモデル生成ステップと、前記BIMモデルの生成時に入力された構造物の部品の構造設計情報データを有するモデルのモデルデータを記憶するモデルデータ記憶ステップと、ユーザの入力に基づいて、施工情報データ記憶部が、前記部品の施工情報データを記憶する施工情報記憶ステップと、データ連携処理部が、前記モデルデータに前記施工情報データを加えて前記モデルデータと前記施工情報データとを連携させるデータ連携ステップと、を有することを特徴とする。 In order to achieve this object, the data linking method of the present invention is characterized by having a building BIM model generation step in which a BIM processing unit executes BIM software to generate a BIM model of a building based on data input from an input unit based on user input, a model data storage step in which model data having structural design information data of components of a structure input when generating the BIM model, a construction information storage step in which a construction information data storage unit stores construction information data of the components based on user input, and a data linking step in which a data linking processing unit adds the construction information data to the model data and links the model data and the construction information data.
このようなデータ連携方法によれば、コンピュータが、モデルデータに施工情報データを加えてモデルデータと施工情報データとを連携させるので、モデルに対応づけてモデルデータと施工情報データと連携することができる。このため、より整合性が高いモデルのデータを生成することができる。これにより、より整合性が高いモデルのデータを用いて、作図や部品製造の省力化及び工期の短縮を図ることができる。 According to this data linking method, the computer adds the construction information data to the model data and links the model data and the construction information data, so that the model data and the construction information data can be linked in correspondence with the model. This makes it possible to generate model data with higher consistency. As a result, it is possible to reduce the labor required for drawing and part manufacturing and shorten the construction period by using the model data with higher consistency.
また、本発明のデータ連携方法は、ユーザの入力に基づいて、BIM処理部が、入力部から入力されたデータに基づいて、BIMソフトを実行して建物のBIMモデルを生成する建物のBIMモデル生成ステップと、前記BIMモデルの生成時に入力された構造物の部品の構造設計情報データを有するモデルのモデルデータを記憶するモデルデータ記憶ステップと、ユーザの入力に基づいて、前記部品における鉄筋の配筋状態を示す配筋情報データを、該配筋情報データを記憶する施工情報データ記憶部が記憶する配筋情報記憶ステップと、データ連携処理部が、前記モデルデータに前記配筋情報データを加えて前記モデルデータと前記配筋情報データとを連携させるデータ連携ステップと、を有することを特徴とする。 Furthermore, the data linking method of the present invention is characterized by having: a building BIM model generation step in which a BIM processing unit executes BIM software to generate a BIM model of a building based on data input from an input unit based on a user's input; a model data storage step in which model data of a model having structural design information data of components of a structure input when generating the BIM model; a reinforcement information storage step in which a construction information data storage unit stores reinforcement information data indicating the reinforcement state of reinforcing bars in the components based on the user's input, the reinforcement information data being stored; and a data linking step in which a data linking processing unit adds the reinforcement information data to the model data and links the model data with the reinforcement information data.
このようなデータ連携方法によれば、コンピュータが、モデルデータに配筋情報データを加えてモデルデータと配筋情報データと連携させるので、モデルに対応づけて連携することができる。このため、より正確に鉄筋が配筋されたモデルを生成することができる。これにより、より正確に配筋されたモデルのデータを用いて、作図や部品製造の省力化を図ることができる。 According to this data linking method, the computer adds the reinforcing bar information data to the model data and links the model data with the reinforcing bar information data, so that the data can be linked in correspondence with the model. This makes it possible to generate a model in which reinforcing bars are arranged more accurately. This makes it possible to reduce the labor required for drawing and part manufacturing by using the data of a model in which reinforcing bars are arranged more accurately.
また、本発明のデータ連携方法は、ユーザの入力に基づいて、BIM処理部が、入力部から入力されたデータに基づいて、BIMソフトを実行して建物のBIMモデルを生成する建物のBIMモデル生成ステップと、前記BIMモデルの生成時に入力された構造物の部品の構造設計情報データを有するモデルのモデルデータを記憶するモデルデータ記憶ステップと、ユーザの入力に基づいて、前記モデルをPCa工法用に構成を更新するためのPCa工法化情報データを、該PCa工法化情報データを記憶する施工情報データ記憶部が記憶するPCa工法化記憶ステップと、データ連携処理部が、前記構造設計情報データに前記PCa工法化情報データを加えて前記構造設計情報データと前記PCa工法化情報データとを連携させるデータ連携ステップと、を有することを特徴とする。 In addition, the data linking method of the present invention includes a building BIM model generation step in which a BIM processing unit executes BIM software to generate a BIM model of a building based on data input from an input unit based on user input; a model data storage step in which model data of a model having structural design information data of components of a structure input when generating the BIM model; a PCa construction method storage step in which a construction information data storage unit stores PCa construction method information data for updating the configuration of the model for the PCa construction method based on user input; and a data linking step in which a data linking processing unit adds the PCa construction method information data to the structural design information data to link the structural design information data and the PCa construction method information data.
このようなデータ連携方法によれば、コンピュータが、モデルデータにPCa工法化情報データを加えてモデルデータとPCa工法化情報データとを連携させるので、モデルに対応づけて連携することができる。このため、データに含まれる各部品をPCa工法用の構成に更新したモデルのモデルデータを生成することができる。これにより、各部品をPCaにて製造される形態でデータ化することができる。 According to this data linking method, the computer adds PCa construction method information data to the model data and links the model data and PCa construction method information data, so that the model data can be linked in correspondence with the model. Therefore, it is possible to generate model data of a model in which each part included in the data has been updated to a configuration for PCa construction. This allows each part to be digitized in the form in which it is manufactured by PCa.
かかるデータ連携方法であって、前記施工情報データは、前記部品における鉄筋の配筋状態を示す配筋情報データと前記モデルをPCa工法用に構成を更新するためのPCa工法化情報データとを含むことを特徴とする。 In this data linking method, the construction information data includes rebar arrangement information data that indicates the arrangement state of rebar in the component, and PCa construction method information data for updating the configuration of the model for the PCa construction method.
このようなデータ連携方法によれば、モデルデータ、配筋情報データ及びPCa工法化情報データをモデルに対応づけて連携することにより、各部品においてPCaで製造される部位とPCaでない部位とを明確にし、かつ、各々の部位に対し、適切に鉄筋が配筋されたモデルを示すモデルデータ(連携後のモデルデータ)を生成することができる。 According to this data linking method, by linking model data, reinforcement information data, and PCa construction method information data in correspondence with a model, it is possible to clearly identify which parts of each component are manufactured using PCa and which are not, and to generate model data (linked model data) that shows a model in which rebar has been appropriately arranged for each part.
かかるデータ連携方法により前記PCa工法化情報データに基づいてPCaにて製造される前記部品のユニットの製作図を生成することを特徴とする。 This data linking method is characterized by generating a production drawing for the unit of the part to be manufactured by PCa based on the PCa construction method information data.
このようなデータ連携方法によれば、モデルデータと施工情報データとが連携されたモデルを示すモデルデータ(連携後のモデルデータ)においては、PCaで製造される部位のデータに鉄筋が適切に配筋されているので、連携後のモデルデータに基づいて容易に且つより正確な製造図を生成することができる。 According to this data linking method, in the model data (linked model data) showing a model in which the model data and the construction information data are linked, rebar is appropriately arranged in the data for the parts to be manufactured by PCa, so that manufacturing drawings can be easily and more accurately generated based on the linked model data.
また、かかる目的を達成するため本発明のデータ連携システムは、建物を構成する部品の構造設計情報データを有するモデルのデータと前記部品の施工情報データとを連携するデータ連携システムであって、ユーザの入力に基づいて、入力部から入力されたデータに基づいて、BIMソフトを実行して建物のBIMモデルを生成するBIM処理部と、前記BIMモデルの生成時に入力された前記構造設計情報データを含む前記モデルのモデルデータを記憶するモデルデータ記憶部と、ユーザの入力に基づいて、前記部品の施工情報データを記憶する前記BIM処理部と別体のコンピュータの施工情報データ記憶部と、前記モデルデータ記憶部の前記モデルデータに前記施工情報データ記憶部の前記施工情報データを加えて前記モデルデータと前記施工情報データとを連携させる処理を実行する前記BIM処理部と別体のデータ連携処理部と、を有することを特徴とする。
In addition, in order to achieve this object, the data linkage system of the present invention is a data linkage system that links model data having structural design information data of parts that constitute a building with construction information data of the parts, and is characterized in having a BIM processing unit that executes BIM software to generate a BIM model of a building based on user input and data input from an input unit, a model data storage unit that stores model data of the model including the structural design information data input when generating the BIM model, a construction information data storage unit of a computer separate from the BIM processing unit that stores construction information data of the parts based on user input, and a data linkage processing unit separate from the BIM processing unit that adds the construction information data of the construction information data storage unit to the model data of the model data storage unit and executes a process to link the model data and the construction information data.
このようなデータ連携システムによれば、データ連携処理部により、モデルデータに施工情報データを加えられることによりモデルデータと施工情報データとが連携されるので、より整合性が高いモデルを示す連携後のモデルデータが生成される。このため、より整合性が高い連携後のモデルデータを用いて、作図や部品製造の省力化及び工期の短縮を図ることができる。 According to this type of data linking system, the model data and the construction information data are linked by adding the construction information data to the model data by the data linking processing unit, and linked model data that shows a more consistent model is generated. Therefore, by using the more consistent linked model data, it is possible to reduce the labor required for drawing and part manufacturing and shorten the construction period.
本発明によれば、整合性が高いモデルのデータを生成することができる。 The present invention makes it possible to generate highly consistent model data.
以下、本発明の実施形態を図面に基づいて説明する。本実施の形態では、RC造(鉄筋コンクリート造)の構造物を対象とし、モデルとして構造設計BIMモデル(以下、BIMモデルという)を用いる例について図を参照しつつその詳細を説明する。
===BIMモデルの概要===
Hereinafter, an embodiment of the present invention will be described with reference to the drawings. In this embodiment, a structural design BIM model (hereinafter, referred to as a BIM model) is used as a model for a reinforced concrete (RC) structure. The details of the example will be described with reference to the drawings.
====BIM model overview====
はじめに、本願発明について説明する上で基本となるBIMモデルの概要について簡単に説明する。 First, we will provide a brief overview of the BIM model that is the basis for explaining the present invention.
BIM(Building Information Modeling)モデルは、コンピューター上に生成された建物の(3D)モデルであり、建物を構成する部品の集合体のモデルである。従来、三次元建物モデルとして三次元CADが用いられてきたが、三次元CADは「形状」についての情報のみしか備えていない場合が多かった。これに対して、BIMモデルは、建物を構成する部品(柱、梁など)毎に、構造設計情報データ(軸組図位置や平面図位置などの部品の位置情報、部品の断面情報など)を有している。さらにモデル全体では、部品の個数情報も算出できる。例えば、建物の「梁」について、長さ等の形状情報と、当該建物中でその梁が配置される位置の情報と、その梁の名称(型番)や仕様などの情報(属性情報)がコンピューターに登録される。このBIMモデルを用いて建物の設計などの技術的な検討を行うことができる。
===実施形態===
A BIM (Building Information Modeling) model is a (3D) model of a building generated on a computer, and is a model of an assembly of parts that make up a building. Traditionally, 3D CAD has been used as a 3D building model, but 3D CAD often only has information about the shape. In contrast, a BIM model has structural design information data (position information of parts such as frame diagram position and plan view position, cross-sectional information of parts, etc.) for each part that makes up a building (columns, beams, etc.). Furthermore, the number of parts can be calculated for the entire model. For example, for the "beam" of a building, shape information such as length, information on the position where the beam is placed in the building, and information (attribute information) such as the name (model number) and specifications of the beam are registered in the computer. This BIM model can be used to perform technical studies such as building design.
====Embodiment===
図1は、本実施形態のデータ連携システムの構成の概要を示す説明図である。 Figure 1 is an explanatory diagram showing an overview of the configuration of the data linkage system of this embodiment.
図1に示すデータ連携システム1は、BIMモデル11用のソフトウェア(以下、BIMソフトともいう)を実行するBIM処理部10、構造設計情報データ13を有するモデルとしてのBIMモデル11のデータ(以下、モデルデータともいう)12を記憶するモデルデータ記憶部20と、建物を構成する部品(柱、梁など)の施工情報データ14を記憶する施工情報データ記憶部30と、モデルデータ12に施工情報データ14を加えてモデルデータ12と施工情報データ14とを連携させる処理を実行するデータ連携処理部40と、を有している。
The data linkage system 1 shown in FIG. 1 includes a
なお、これらの各部(BIM処理部10、モデルデータ記憶部20、施工情報データ記憶部30、データ連携処理部40)は、コンピューターやサーバ装置などにより実現されている。また、図1のデータ連携システム1の全てが一つのコンピューターに設けられていてもよいし、それらの一部または各部が別々のコンピューターに設けられ、通信回線等を介して接続されていてもよい。例えば、BIM処理部10、モデルデータ記憶部20、施工情報データ記憶部30、データ連携処理部40が互いに異なるコンピュータに各々備えられて、各々離れた場所に設置されて通信回線等を介して接続されており、各々のコンピュータを互いに異なるユーザにより入力などの操作がなされる形態であっても構わない。
Each of these units (
BIM処理部10は、不図示の入力部から入力されたデータに基づいて、BIMソフトを実行して建物のBIMモデル11を生成する。このとき、生成されるモデルデータ12には、BIMモデル11自体のデータと当該BIMモデルの生成時に入力された構造設計情報データ13とが含まれている。なお、構造設計情報データ13には、建物を構成する各部品(柱、梁など)の寸法などの形状情報や各部品に配筋する鉄筋の情報(鉄筋情報)が含まれており、構造設計情報データ13はエクセル(Excel)形式などで、モデルデータ記憶部20に記憶させることができる。上記鉄筋情報は、例えば、主筋の径、数、スタラップ筋の径や形状などであり、これらの情報はBIMモデル11を生成する設計時にユーザにより入力される。構造設計情報データ13を有するモデルデータ12は、ユーザの入力に基づいてモデルデータ記憶部20に記憶される。
The
施工情報データ14は、各部品に対応づけられている鉄筋情報を有するモデルデータ12と連携させるデータであり、鉄筋の位置などを示す配筋情報データ15、及び、建物をPCa工法により構築する際にPCaの部品を製造するためのPCa(Precast Concrete)工法化情報データ16を有している。
The
配筋情報データ15には、主筋を配置する位置及び増し打ち量、また、例えば梁3などの定着種別、定着の直線部の長さ(水平投影長さ)、折り曲げ後の余長、などの複数のパラメータが含まれており、例えば図2に示すようなエクセル(Excel)形式でユーザが入力することにより定義される。配筋情報データ15は、ユーザの入力に基づいて施工情報データ記憶部30に記憶される。以下、梁3に対する施工情報データ14を例に挙げて説明する。
The
例えば、互いに間隔を隔てて隣り合う一対の柱2間に渡る梁3に、図3に示すように配筋する場合には、配筋情報データ15として、当該梁3の定着種別は折り曲げ定着であり、図3において、番号「37」が付されている定着の直線部の長さ(L1)は、図2に示すように1120mmが入力されており、番号「38」が付されている折り曲げ後の余長(L2)は、図2に示すように256mmが入力されており、図示していない、主筋同士の間隔やコンクリートの増し打ち量も入力されている。このとき、定着種別が直線定着の場合には、折り曲げ後の余長(L2)の欄には「0」が入力されている。
For example, when reinforcing a
また、入力方法としては、数値入力の他、定着の直線部の長さ(L1)、折り曲げ後の余長(L2)などが基準化されている場合には、基準値と数字や記号などとを対応づけた参照データをデータベース化し、対応づけられた数字や記号を入力したり、配筋ルールとして基準化されている余長などは、例えば「15d」(d:鉄筋径)のように、鉄筋径の倍数で入力してもよい。また、定着種別が機械式継手の場合には、継手の名称と数字や記号などとを対応づけた参照データをデータベース化し、対応づけられた数字や記号を入力してもよい。 As for input methods, in addition to inputting numerical values, if the length of the straight part of the fastening (L1) and the excess length after bending (L2) are standardized, reference data that associates standard values with numbers, symbols, etc. can be compiled into a database, and the associated numbers and symbols can be input, or excess lengths that are standardized as reinforcement rules can be input in multiples of the rebar diameter, such as "15d" (d: rebar diameter). Also, if the fastening type is a mechanical joint, reference data that associates the name of the joint with numbers, symbols, etc. can be compiled into a database, and the associated numbers and symbols can be input.
PCa工法化情報データ16は、例えば、BIMモデル11をPCa工法により構築する際に必要となる柱2や梁3の情報である。
The PCa
各梁3に対するPCa工法化情報データ16は、複数の梁3のうち、互いに間隔を隔てて隣り合う一対の柱2間に架け渡される1本の梁3に対し、当該梁3が構成される部材の数、各々の部材の種別、部材の位置(長さ)、目地幅、仕口部分からの突出長さなどの複数のパラメータが含まれており、例えば図4に示すようなエクセル(Excel)形式でユーザが入力することにより定義される。PCa工法化情報データ16は、ユーザの入力に基づいて施工情報データ記憶部30に記憶される。
The PCa
例えば、図5(a)に示すような4本の柱2A、2B、2C、2D間に3本の梁3A、3B、3Cが架け渡されている柱梁構造物を、図5(b)に示すような構成によりPCa工法化する際のPCa工法化情報データ16を例に挙げて説明する。図5(a)、図5(b)の4本の柱2A、2B、2C、2Dにおいては、左から第1柱2A、第2柱2B、第3柱2C、第4柱2Dとし、第1柱2Aと第4柱2Dの間に配置された3本の梁3A、3B、3Cにおいては、左から第1梁3A、第2梁3B、第3梁3Cとして説明する。また、各梁3A、3B、3Cにおいては、左側を始端、右側を終端とする。
For example, the PCa
PCa工法化情報データ16は、梁3A、3B、3Cごとに、図4に示すように、各パラメータを定義する情報がユーザにより入力されている。例えば、パラメータとして、始端側、中央、終端側の各梁部の種別、始端側、中央、終端側の目地の長さ、始端側、終端側の各梁部における鉄筋の突出長さ、始端側、終端側の各梁部の分割位置が定義される。
In the PCa construction
各梁部の種別としては、柱の仕口部分と一体化しない梁部(TypeA)、柱の仕口部分と一体化する梁部(TypeB)、在来工法で施工される梁部(TypeC)、及び、中央の梁部が設けられない場合(-)などがあり、設定された数字を入力することにより定義される。なお、始端側、中央、終端側の目地の長さ、始端側、終端側の各梁部における鉄筋の突出長さ、始端側及び終端側の各梁部の分割位置については、長さを数値で入力しても、また、基準化されている場合には、基準値と数字や記号などとを対応づけた参照データをデータベース化し、対応づけられた数字や記号を入力してもよい。 The types of beam sections include beam sections that are not integrated with the column joints (Type A), beam sections that are integrated with the column joints (Type B), beam sections that are constructed using conventional construction methods (Type C), and cases where there is no central beam section (-), and are defined by inputting a set number. Note that for the length of the joints at the start, center, and end, the protruding length of the rebar in each beam section at the start and end, and the division positions of each beam section at the start and end, the lengths can be input as numerical values, or, if standardized, reference data that associates standard values with numbers and symbols can be compiled into a database, and the associated numbers and symbols can be input.
例えば、図4に示すPCa工法化情報データ16には、第2梁3Bが定義されている。
図4に示すPCa工法化情報データ16では、第2梁3Bは、始端側の梁部3B-1について、始端PCa部材種別として、「TypeB」を示す数値「2」が入力されており、終端側の梁部3B-2について、終端PCa部材種別として、「TypeB」を示す数値「2」が入力されており、中央の梁部を示す中央PCa部材種別は、中央の梁部が存在しないことを示す数値「3」が入力されている。なお、本実施形態のPCa工法化情報データ16では、各柱2A、2B、2C、2Dが、仕口部分2A-1、2B-1、2C-1、2D-1間に配置される柱本体部2-2(図7)とが分割されることも定義されている。
For example, the PCa construction
In the PCa construction
また、図4に示すPCa工法化情報データ16では、始端部材分割位置(第2柱2Bからの長さ)は2000mmとし、終端部材分割位置(第3柱2Cからの長さ)は2000mmとする情報がユーザにより入力されている。これにより、第2梁3Bは、始端側の梁部3B-1と終端側の梁部3B-2とが2つに分割されており、各々仕口部分2B-1、2C-1から2000mmの長さを有していることが定義されている。
In addition, in the PCa
また、図4に示すPCa工法化情報データ16には、始端目地幅及び終端目地幅として数値「0」が入力されており、中央目地幅として数値「20」が入力されている。これにより、仕口部分2B-1と始端側の梁部3B-1との間、及び、終端側の梁部3B-2と仕口部分2C-1との間にには目地が設けられないことが定義されており、始端側の梁部3B-1と終端側の梁部3B-2との間には目地幅20mmの目地が設けられることが定義されている。
In addition, in the PCa construction
第1梁3A及び第3梁3Cについても、PCa工法化情報データ16により各々定義されている。第1梁3Aは、始端側の梁部3A-1と終端側の梁部3A-2との2つに分割されるように各々定義されており、始端側の梁部3A-1は在来工法で施工され、終端側の梁部3A-2は第2柱2Bの仕口部分2B-1と一体化してPCaで製造される梁部としてそれぞれ定義されている。これらの定義により、第2梁3Bの始端側の梁部3B-1は、第1梁3Aの終端側の梁部3A-2と共に第2柱2Bの仕口部分2B-1と一体化してPCaで製造される部材として定義される。
The first beam 3A and the third beam 3C are also each defined by the PCa
また、第3梁3Cは、始端側の梁部3C-1、終端側の梁部3C-2、及び、始端側の梁部3C-1と終端側の梁部3C-2との間に配置される中央の梁部3C-3との3つに分割されるように定義されている。始端側の梁部3C-1は、第3柱2Cの仕口部分2C-1と一体化してPCaで製造される梁部とされ、中央の梁部3C-3は在来工法で施工され、終端側の梁部3C-3は第4柱2Dの仕口部分2D-1と一体化してPCaで製造される梁部としてそれぞれ定義されている。このため、第3梁3Cの始端側の梁部3C-1は、第2梁3Bの終端側の梁部3B-2と共に第3柱2cの仕口部分2C-1と一体化してPCaで製造される部材として定義される。また、第3梁3Cの終端側の梁部3C-2は、第4梁3Dの始端端側の梁部3D-1と共に第4柱2Dの仕口部分2D-1と一体化してPCaで製造される部材として定義される。 The third beam 3C is defined as being divided into three parts: a beam section 3C-1 at the start end, a beam section 3C-2 at the end end, and a central beam section 3C-3 located between the beam sections 3C-1 at the start end and 3C-2 at the end end. The beam section 3C-1 at the start end is defined as a beam section that is integrated with the joint section 2C-1 of the third column 2C and manufactured using PCa, the central beam section 3C-3 is constructed using a conventional method, and the beam section 3C-3 at the end end is defined as a beam section that is integrated with the joint section 2D-1 of the fourth column 2D and manufactured using PCa. For this reason, the beam section 3C-1 at the start end of the third beam 3C is defined as a member that is integrated with the joint section 2C-1 of the third column 2c and manufactured using PCa together with the beam section 3B-2 at the end end of the second beam 3B. Additionally, beam section 3C-2 at the end of the third beam 3C is defined as a member manufactured by PCa, integrated with beam section 3D-1 at the beginning of the fourth beam 3D and joint section 2D-1 of the fourth column 2D.
モデルデータ記憶部20と施工情報データ記憶部30は、例えばハードディスクなどの記憶装置によって構成されており、各部の動作を実行させるプログラム(ソフトウェア)なども格納されている。なお、モデルデータ記憶部20と施工情報データ記憶部30とは単一の記憶部にて領域が分けられている形態であっても構わない。
The model
次に、データ連携方法について説明する。
データ連携方法は、まず、ユーザの入力及び操作により設計段階においてBIM処理部10により、例えば図6に示すような、施工する構造物のBIMモデル11が生成生成され、図7に示すように、BIMモデル11に各部品(柱2、梁3)の構造設計情報データ13が付与されたモデルデータ12がモデルデータ記憶部20に記憶される(モデル記憶ステップS1)。モデル記憶ステップS1では、ユーザの入力及び操作によりモデルデータ12がモデルデータ記憶部20に記憶されれば構わず、必ずしも、BIMモデル11をモデリングする処理は含まれなくとも構わない。
Next, a data linking method will be described.
In the data linking method, first, a
次に、配筋情報データ15やPCa工法化情報データ16などの施工情報データ14が、エクセル(Excel)形式で設定された入力手段から各パラメータを定義する情報がユーザにより入力されて施工情報データ記憶部30に記憶される(施工情報記憶ステップS2)。このとき、配筋情報データ15は、例えば既存のソフトであるグレートモンスターなどの自動配筋適正化システムに配筋の情報をユーザが入力することにより配筋情報データ15が生成され、施工情報データ14として施工情報データ記憶部30に記憶されることとしてもよい。
Next, the
次に、ユーザの操作によるデータの連携を実行する指令信号に基づいて、データ連携処理部40により施工情報データ14をモデルデータ12に加えて連携させる処理が実行される(データ連携ステップS3)。データ連携処理部40は必ずしもBIMモデル11を書き換えて連携後のBIMモデルをビジュアル化する必要はないが、ここでは、わかりやすくするために、データ連携処理部40により実行される処理により、連携されるモデルデータの状態を、図8~図10に示すようにビジュアル化して説明する。
Next, based on a command signal for executing data linkage by a user's operation, the data
データ連携処理部40は、まず、図6に示す柱梁構造物を、図8に示すように部品ごと、すなわち、柱2、梁30、31、32、仕口部分2-1、柱本体部2-2などに分割する(部品分割ステップS31)。このとき、PCa工法化情報データ16に基づいて、1本の梁30、31、32を複数に分割する必要がある場合には、対象となる梁30、31、32を複数の梁部30-2、31-1、31-2、32-1に分割しておく。
The data linking
次に、データ連携処理部40は、分割した梁部30-2、31-1、31-2、32-1に対し、PCa工法化情報データ16に基づいて、PCaにて製造する際に一体のPCaとする梁部30-2と梁部31-1、及び、梁部31-2と梁部32-1を特定し、図9に示すようにPCaで製造されるPCa部材300、301ごとに一体化する(一体化ステップS32)。
Next, the data linking
次に、データ連携処理部40は、構造設計情報データ13に含まれる鉄筋情報データと施工情報データ14に含まれる配筋情報データ15に基づいて、図10に示すように、鉄筋5を配筋する(配筋ステップS33)ことにより各PCa部材300、301や他の部材ごとに配筋された連携後のモデルデータが生成される。このとき、PCaで製造されるPCa部材300、301ごとに配筋され、隣接する部材の鉄筋5同士は定着種別に基づいて配筋され、必要な部位には柱2やPCa部材300、301から突出させて鉄筋5が配筋される。このとき、鉄筋5同士を定着するスリーブ6(図5(b))も配置される。
Next, the data linking
このように本実施形態のデータの連携方法及びデータの連結システム1によれば、モデルデータ12に施工情報データ14として配筋情報データ15及びPCa工法化情報データ16を加えてモデルデータ12と配筋情報データ15及びPCa工法化情報データ16とを連携させるので、BIMモデル11に対応づけてモデルデータ12と配筋情報データ15及びPCa工法化情報データ16とを連携させることができる。
In this way, according to the data linking method and data connection system 1 of this embodiment, the
このため、データが連携されたBIMモデル11は、柱2、梁3などの配筋が正確にモデル化されているので、より整合性が高い連携後のBIMモデルのモデルデータを生成することができる。これにより、より整合性が高い連携後のBIMモデルのモデルデータを用いて、作図や部品製造の省力化を図ることができる。
Because of this, the
また、データが連携されたBIMモデル11から、PCaで製造する各PCa部材300、301のデータを取り出した際には、製造するPCa部材300、301ごとに製品化される状態で配筋されている。このため、このデータが連携されたBIMモデル11のモデルデータから、各PCa部材300、301の正確な断面図や製品図を容易に生成することが可能である。
In addition, when the data for each
また、モデルデータ12と施工情報データ14とを連携することにより、必ずしもBIMモデルをビジュアル化しなくとも、製造する部材ごとに製品化される状態を表示可能な連携後のBIMモデルのデータとして生成されているので、連携後のBIMモデル11のモデルデータを、鉄筋業者、型枠製造業者、PCa工場、配筋検査システムなどと共有することにより、図面を起こすことなく製造や施工が可能となる。このとき、各業者間において、データが連携された単一のBIMモデル11のデータ(連携後のモデルデータ)から各部材が製造され、当該連携後のモデルデータに基づいて施工されるので、人が図面を生成する或いは生成した図面を突き合わせて確認するなどの作業や手間を省けるため、より正確なデータを共有することができかつ省力化を図ることが可能となる。
===その他の実施の形態===
In addition, by linking the
===Other embodiments===
上記実施形態は、本発明の理解を容易にするためのものであり、本発明を限定して解釈するためのものではない。本発明は、その趣旨を逸脱することなく、変更、改良され得ると共に、本発明にはその等価物が含まれることはいうまでもない。特に、以下に述べる実施形態であっても、本発明に含まれるものである。
上記実施形態においては鉄筋コンクリート造の構造物を例に挙げて説明したが、これに限らず、鉄骨造や鉄筋鉄骨コンクリート造の構造物であっても構わない。
The above-mentioned embodiment is for the purpose of facilitating understanding of the present invention, and is not intended to limit the present invention. The present invention may be modified or improved without departing from the spirit of the present invention, and it goes without saying that the present invention includes equivalents. In particular, the following embodiments are also included in the present invention.
In the above embodiment, a structure made of reinforced concrete has been described as an example, but the present invention is not limited to this and may be a structure made of steel frame or reinforced steel concrete.
上記実施形態においては、建物のモデルとしてBIMモデル(BIMデータ)11を用いたが、BIMモデルには限られず、例えば、CIM(Construction Information Modeling)モデルやCADモデル(2DCADを含む)等いずれのデジタルデータを用いたモデルであってもよい。 In the above embodiment, a BIM model (BIM data) 11 was used as a building model, but it is not limited to a BIM model and may be a model using any digital data, such as a CIM (Construction Information Modeling) model or a CAD model (including 2D CAD).
上記実施形態においては、ユーザの入力に基づいて記憶される構造設計情報データ13、配筋情報データ15、PCa工法化情報データ16はエクセル(Excel)形式で作成されていたが、これには限られず他の形式であってもよい。
In the above embodiment, the structural
1 データ連携システム
2 柱(2A 第1柱、2B 第2柱、2C 第3柱、2D 第4柱)、
2-1(2A-1、2B-1、2C-1、2D-1) 仕口部分、2-2 柱本体部、
3 梁(3A 第1梁、3B 第2梁、3C 第3梁)、
4 目地、5 鉄筋、6 スリーブ、10 BIM処理部、11 BIMモデル、
12 モデルデータ、13 構造設計情報データ、14 施工情報データ、
15 配筋情報データ、16 PCa工法化情報データ、20 モデルデータ記憶部、
30 施工情報データ記憶部、40 データ連携処理部、
1
2-1 (2A-1, 2B-1, 2C-1, 2D-1) Joint part, 2-2 Pillar body part,
3 beams (3A first beam, 3B second beam, 3C third beam),
4 Joint, 5 Reinforcement bar, 6 Sleeve, 10 BIM processing section, 11 BIM model,
12 model data, 13 structural design information data, 14 construction information data,
15 Reinforcement information data, 16 PCa construction method information data, 20 Model data storage unit,
30 Construction information data storage unit, 40 Data link processing unit,
Claims (6)
前記BIMモデルの生成時に入力された構造物の部品の構造設計情報データを有するモデルのモデルデータを記憶するモデルデータ記憶ステップと、
ユーザの入力に基づいて、施工情報データ記憶部が、前記部品の施工情報データを記憶する施工情報記憶ステップと、
データ連携処理部が、前記モデルデータに前記施工情報データを加えて前記モデルデータと前記施工情報データとを連携させるデータ連携ステップと、
を有することを特徴とするデータ連携方法。 a building BIM model generation step in which the BIM processing unit executes the BIM software to generate a BIM model of the building based on the user's input, based on the data input from the input unit;
A model data storage step of storing model data of a model having structural design information data of a part of a structure input when the BIM model is generated;
A construction information storage step in which a construction information data storage unit stores construction information data of the part based on an input from a user;
a data linking step in which a data linking processing unit adds the construction information data to the model data to link the model data with the construction information data;
A data linking method comprising:
前記BIMモデルの生成時に入力された構造物の部品の構造設計情報データを有するモデルのモデルデータを記憶するモデルデータ記憶ステップと、
ユーザの入力に基づいて、前記部品における鉄筋の配筋状態を示す配筋情報データを、該配筋情報データを記憶する施工情報データ記憶部が記憶する配筋情報記憶ステップと、
データ連携処理部が、前記モデルデータに前記配筋情報データを加えて前記モデルデータと前記配筋情報データとを連携させるデータ連携ステップと、
を有することを特徴とするデータ連携方法。 a building BIM model generation step in which the BIM processing unit executes the BIM software to generate a BIM model of the building based on the user's input, based on the data input from the input unit;
A model data storage step of storing model data of a model having structural design information data of a part of a structure input when the BIM model is generated;
a reinforcement information storage step in which reinforcement information data indicating a reinforcement state of the reinforcing bars in the component is stored in a construction information data storage unit that stores the reinforcement information data based on a user input;
a data linking step in which a data linking processing unit adds the reinforcement bar arrangement information data to the model data and links the model data with the reinforcement bar arrangement information data;
A data linking method comprising:
前記BIMモデルの生成時に入力された構造物の部品の構造設計情報データを有するモデルのモデルデータを記憶するモデルデータ記憶ステップと、
ユーザの入力に基づいて、前記モデルをPCa工法用に構成を更新するためのPCa工法化情報データを、該PCa工法化情報データを記憶する施工情報データ記憶部が記憶するPCa工法化記憶ステップと、
データ連携処理部が、前記構造設計情報データに前記PCa工法化情報データを加えて前記構造設計情報データと前記PCa工法化情報データとを連携させるデータ連携ステップと、
を有することを特徴とするデータ連携方法。 a building BIM model generation step in which the BIM processing unit executes the BIM software to generate a BIM model of the building based on the user's input, based on the data input from the input unit;
A model data storage step of storing model data of a model having structural design information data of a part of a structure input when the BIM model is generated;
A PCa construction method storage step in which a construction information data storage unit stores PCa construction method information data for updating the configuration of the model for the PCa construction method based on a user input;
A data linking step in which a data linking processing unit adds the PCa construction method information data to the structural design information data to link the structural design information data and the PCa construction method information data;
A data linking method comprising:
前記施工情報データは、前記部品における鉄筋の配筋状態を示す配筋情報データと前記モデルをPCa工法用に構成を更新するためのPCa工法化情報データとを含むことを特徴とするデータ連携方法。 The data linking method according to claim 1,
A data linking method characterized in that the construction information data includes reinforcement information data indicating the reinforcement state of the steel bars in the component and PCa construction method information data for updating the configuration of the model for the PCa construction method.
ユーザの入力に基づいて、入力部から入力されたデータに基づいて、BIMソフトを実行して建物のBIMモデルを生成するBIM処理部と、
前記BIMモデルの生成時に入力された前記構造設計情報データを含む前記モデルのモデルデータを記憶するモデルデータ記憶部と、
ユーザの入力に基づいて、前記部品の施工情報データを記憶する前記BIM処理部と別体のコンピュータの施工情報データ記憶部と、
前記モデルデータ記憶部の前記モデルデータに前記施工情報データ記憶部の前記施工情報データを加えて前記モデルデータと前記施工情報データとを連携させる処理を実行する前記BIM処理部と別体のデータ連携処理部と、
を有することを特徴とするデータ連携システム。 A data linking system that links data of a model having structural design information data of components constituting a building with construction information data of the components,
a BIM processing unit that executes BIM software to generate a BIM model of a building based on a user's input and on data input from the input unit;
A model data storage unit that stores model data of the model including the structural design information data input when the BIM model is generated;
A construction information data storage unit of a computer separate from the BIM processing unit that stores construction information data of the parts based on a user's input;
A data linking processing unit separate from the BIM processing unit that adds the construction information data of the construction information data storage unit to the model data of the model data storage unit and links the model data and the construction information data;
A data linkage system comprising:
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2020177166A JP7654953B2 (en) | 2020-10-22 | 2020-10-22 | Data linking method and data linking system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2020177166A JP7654953B2 (en) | 2020-10-22 | 2020-10-22 | Data linking method and data linking system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2022068473A JP2022068473A (en) | 2022-05-10 |
| JP7654953B2 true JP7654953B2 (en) | 2025-04-02 |
Family
ID=81460108
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2020177166A Active JP7654953B2 (en) | 2020-10-22 | 2020-10-22 | Data linking method and data linking system |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7654953B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7777314B1 (en) * | 2024-10-21 | 2025-11-28 | 株式会社フォトラクション | Information processing system, information processing method, and program |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000297532A (en) | 1999-04-13 | 2000-10-24 | Takenaka Komuten Co Ltd | Structure constraction method selective support device, method, and recording medium |
| JP2012068698A (en) | 2010-09-21 | 2012-04-05 | Bim Architects Inc | Architectural information integrated management system and program |
| JP2018005507A (en) | 2016-06-30 | 2018-01-11 | 株式会社竹中工務店 | Building design/construction planning method and building design/construction planning system |
| JP2019021190A (en) | 2017-07-20 | 2019-02-07 | 前田建設工業株式会社 | Construction support method and construction support system |
| JP2019027855A (en) | 2017-07-27 | 2019-02-21 | 株式会社大林組 | Inspection processing system, inspection processing method and inspection processing program |
-
2020
- 2020-10-22 JP JP2020177166A patent/JP7654953B2/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000297532A (en) | 1999-04-13 | 2000-10-24 | Takenaka Komuten Co Ltd | Structure constraction method selective support device, method, and recording medium |
| JP2012068698A (en) | 2010-09-21 | 2012-04-05 | Bim Architects Inc | Architectural information integrated management system and program |
| JP2018005507A (en) | 2016-06-30 | 2018-01-11 | 株式会社竹中工務店 | Building design/construction planning method and building design/construction planning system |
| JP2019021190A (en) | 2017-07-20 | 2019-02-07 | 前田建設工業株式会社 | Construction support method and construction support system |
| JP2019027855A (en) | 2017-07-27 | 2019-02-21 | 株式会社大林組 | Inspection processing system, inspection processing method and inspection processing program |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2022068473A (en) | 2022-05-10 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR101224627B1 (en) | Design and material calculation method of construction building using structure bim | |
| US8041744B2 (en) | Computer-aided modeling | |
| KR101607886B1 (en) | Automatic generation system of rebar shop drawing using 3D model | |
| JP6749156B2 (en) | Architectural design and construction planning method and architectural design and construction planning system | |
| JP7509120B2 (en) | Data linkage method and data linkage system | |
| KR20190099779A (en) | Method for designing a buildingstructure | |
| Singh et al. | Utilising building component data from BIM for formwork planning | |
| JP7459642B2 (en) | Design support system, design support method, and design support program | |
| CN109799793B (en) | Production planning device and production planning method | |
| KR102590167B1 (en) | Model generation method for steel structure | |
| KR100309582B1 (en) | System And Method For Estimate Bill Of Materials Using Two Dimensional CAD Interface | |
| JP7654953B2 (en) | Data linking method and data linking system | |
| JP2001325103A (en) | Simulator creation method, simulator creation device, and simulator creation support method | |
| CN113779682A (en) | Method and device for generating construction steel bar model, computer equipment and storage medium | |
| Kim et al. | Automatic estimation system of building frames with integrated structural design information (AutoES) | |
| CN111199063A (en) | Method for converting plan into template planning and building manufacturing and computer program | |
| JP2003141192A (en) | Design support method and design support system for mechanical structures | |
| JP2022003459A (en) | Reinforcement work model creation device and reinforcement work model creation method | |
| US20100274374A1 (en) | System and process for the detailed design and production of reinforcement for buildings | |
| JP7846600B2 (en) | Information processing device, information processing method, and program | |
| JP4774979B2 (en) | Sheet metal model creation system, sheet metal model creation method, and sheet metal model creation program | |
| JP2024125607A (en) | Construction drawing creation support system and construction drawing creation support method | |
| JP2020160491A (en) | Hexahedral element model generation system and hexahedral element model generation method | |
| Sampaio et al. | Analysis of BIM implementation in structural projects | |
| KR20050079497A (en) | Automatization design apparatus of precast concrete structure - design and the method thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20230915 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20240704 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20240716 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20240905 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20241217 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20250203 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20250218 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20250303 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7654953 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |