Flue sealing balloon and flue sealing method Download PDF

Info

Publication number
JP7655154B2
JP7655154B2 JP2021141872A JP2021141872A JP7655154B2 JP 7655154 B2 JP7655154 B2 JP 7655154B2 JP 2021141872 A JP2021141872 A JP 2021141872A JP 2021141872 A JP2021141872 A JP 2021141872A JP 7655154 B2 JP7655154 B2 JP 7655154B2
Authority
JP
Japan
Prior art keywords
flue
balloon
sealing
cylindrical portion
manhole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021141872A
Other languages
Japanese (ja)
Other versions
JP2023035212A (en
JP2023035212A5 (en
Inventor
真武 大野
大河 牧野
茂 佐々井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Metal Mining Co Ltd
Original Assignee
Sumitomo Metal Mining Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Metal Mining Co Ltd filed Critical Sumitomo Metal Mining Co Ltd
Priority to JP2021141872A priority Critical patent/JP7655154B2/en
Publication of JP2023035212A publication Critical patent/JP2023035212A/en
Publication of JP2023035212A5 publication Critical patent/JP2023035212A5/ja
Application granted granted Critical
Publication of JP7655154B2 publication Critical patent/JP7655154B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pipe Accessories (AREA)

Description

本発明は、銅製錬の排ガス回収工程における排ガスの煙道、より具体的には、銅製錬に伴い発生する亜硫酸(SO)ガスを硫酸ガス(SO)に転化する転化工程の近傍に配置される煙道に適用される、煙道シール用バルーンおよびこの煙道シール用バルーンを用いた煙道シール方法に関する。 The present invention relates to a flue gas flue in a flue gas recovery process of copper smelting, more specifically, to a flue located near a conversion process in which sulfurous acid (SO 2 ) gas generated in the copper smelting is converted into sulfuric acid gas (SO 3 ), and to a flue sealing method using the flue sealing balloon.

銅製錬に伴い発生する排ガスとしての亜硫酸(SO)ガスは、増湿塔、洗浄塔、ミストコットレル、および、乾燥塔から構成される、排ガス精製工程にて精製された後、煙道およびメインブロワーを介して転化器に導入される。転化器において、五酸化バナジウム触媒により、亜硫酸ガスを硫酸(SO)ガスに転化した後、吸収塔において、硫酸ガスと循環硫酸とを気液接触させることで、硫酸ガスを吸収させることにより、亜硫酸ガスは最終的に硫酸として回収される。 Sulfur dioxide ( SO2 ) gas, which is an exhaust gas generated in copper smelting, is purified in an exhaust gas purification process consisting of a humidification tower, a scrubbing tower, a mist cotter, and a drying tower, and then introduced into a converter via a flue and a main blower. In the converter, the sulfur dioxide gas is converted into sulfuric acid ( SO3 ) gas by a vanadium pentoxide catalyst, and then in an absorption tower, the sulfuric acid gas is brought into gas-liquid contact with circulating sulfuric acid to absorb the sulfuric acid gas, and the sulfur dioxide gas is finally recovered as sulfuric acid.

転化器周辺の煙道では、転化器から流れる硫酸ミストの腐食による穴あきや、設備停止時の温度変化に伴う伸縮による割れなどの損傷が発生することがある。このような穴あきや割れなどの損傷箇所が存在する状態では、煙道から亜硫酸ガスのガス漏れが生ずる可能性があるため、早期に設備を停止させて損傷箇所を補修する必要がある。このような損傷箇所の補修のほとんどは、煙道の外側からの補修が可能であるが、煙道の内部から補修した方がよい場合がある。 Damage such as holes caused by corrosion from the sulfuric acid mist flowing from the converter and cracks caused by expansion and contraction due to temperature changes when the equipment is shut down can occur in the flue around the converter. If such holes, cracks or other damage exist, there is a risk of sulfur dioxide gas leaking from the flue, so the equipment must be shut down as soon as possible and the damaged areas repaired. Most such damaged areas can be repaired from the outside of the flue, but in some cases it is better to repair from the inside of the flue.

また、長期間にわたり硫酸ミストが、転化器近傍の煙道の経路に設けられたブロワーのインペラに付着することにより、ブロワーに不具合が生じて、インペラの交換などのブロワーの整備が急務となる場合もある。 In addition, if sulfuric acid mist adheres to the impeller of a blower installed in the flue path near the converter for a long period of time, it may cause malfunctions in the blower, making it necessary to urgently maintain the blower, such as replacing the impeller.

これらの場合には、煙道の損傷箇所あるいはブロワーの不具合について、作業者が設備内部(煙道内部)から補修作業を実施することになるが、これらの補修作業を設備内部から実施するためにブロワーを停止した場合でも、転化器から白色の硫酸ガスが煙道の側へと逆流して、煙道内に充満する。このため、煙道内における視界が良好ではなく、呼吸器付きガスマスクを装着した状態での作業者による補修作業もきわめて困難となる。 In these cases, workers must carry out repair work from inside the facility (inside the flue) to fix any damaged areas in the flue or malfunctioning of the blower. However, even if the blower is stopped to carry out these repair work from inside the facility, white sulfuric acid gas will flow back from the converter into the flue, filling it. This makes it difficult to see inside the flue, and makes it extremely difficult for workers to carry out repair work while wearing a gas mask with a respirator.

このため、転化器近傍の設備内部での補修作業時には、煙道内部の硫酸ガスを除去するためにガスパージをする必要がある。しかしながら、この場合、補修後の昇温工程も含めて1週間程度にわたる長期操業停止が必要とされるため、操業上およびエネルギー上の損失がきわめて大きい。 For this reason, when repair work is carried out inside the equipment near the converter, gas purging is required to remove the sulfuric acid gas inside the flue. However, in this case, a long-term shutdown of about one week is required, including the heating process after the repair, resulting in significant operational and energy losses.

なお、管路での流体の流れを遮断するための流体遮断装置として、管路の内壁面に接触するまで膨張可能な袋状のバルーンを用いた例が、特開2006-226372号公報に開示されている。 In addition, JP 2006-226372 A discloses an example of a fluid blocking device for blocking the flow of fluid in a pipeline that uses a bag-shaped balloon that can be inflated until it comes into contact with the inner wall surface of the pipeline.

特開2006-226372号公報JP 2006-226372 A

本発明は、ガスパージなどによる長期操業停止を伴うことなく、煙道の損傷箇所あるいはブロワーのインペラなどの設備の不具合の補修作業を設備内部において、硫酸ガスを遮断して行うことを可能とする、簡便な煙道シール用バルーンおよびこの煙道シール用バルーンを用いた煙道シール方法の提供を目的とする。 The present invention aims to provide a simple flue sealing balloon and a flue sealing method using this flue sealing balloon, which allows repair work to be performed inside the equipment to repair damaged areas in the flue or malfunctions in equipment such as a blower impeller while blocking sulfuric acid gas, without requiring long-term shutdowns due to gas purging, etc.

本発明の一態様の煙道シール用バルーンは、エラストマー製で、円筒部と、該円筒部の軸方向両端部を塞ぐ側面と、該側面のうちの一方の側面に備えられた送気口と、前記円筒部の外周面の周方向1箇所で軸方向に離間した位置に備えられた持ち手とを備え、煙道内に運搬可能で、かつ、前記円筒部の外周面が、前記煙道の内壁面に接触するまで膨張可能である。 The flue sealing balloon of one embodiment of the present invention is made of an elastomer and has a cylindrical portion, side surfaces that close both axial ends of the cylindrical portion, an air supply port provided on one of the side surfaces, and a handle provided at a circumferential location on the outer circumferential surface of the cylindrical portion, the balloon being transportable into the flue and capable of expanding until the outer circumferential surface of the cylindrical portion comes into contact with the inner wall surface of the flue.

前記エラストマーは、耐酸性ゴムであることが好ましい。 The elastomer is preferably an acid-resistant rubber.

本発明の一態様の煙道シール方法は、少なくとも1箇所に内部へのアクセスを可能とするマンホールを備える煙道において、前記煙道内の補修対象を補修する際に、該煙道をシールするための方法に関する。 One aspect of the present invention relates to a flue sealing method for sealing a flue that has at least one manhole that allows access to the inside when repairing a repair target within the flue.

特に、本発明の一態様の煙道シール方法は、
本発明の煙道シール用バルーンを2個用い、
前記煙道のうちの前記マンホールおよび前記補修対象を含む区間の両側位置まで、前記マンホールを介して、前記2個の煙道シール用バルーンを運搬し、設置し、および、
前記2個の煙道シール用バルーンのそれぞれに前記送気口を介して膨張用流体を送って、前記円筒部の外周面が前記煙道の内壁面に接触するまで、該バルーンを膨張させて、前記煙道をシールする、
ことを含む。
In particular, a flue sealing method according to one aspect of the present invention comprises the steps of:
Using two flue sealing balloons of the present invention,
Transporting and installing the two flue sealing balloons through the manhole to both sides of the section of the flue that includes the manhole and the repair target, and
an inflation fluid is fed to each of the two flue-sealing balloons through the air supply port to inflate the balloons until the outer circumferential surface of the cylindrical portion comes into contact with the inner wall surface of the flue, thereby sealing the flue.
This includes:

前記煙道のシール後に、前記マンホールを介して、前記区間に存在するガスを除去することができる。 After sealing the flue, gas present in the section can be removed through the manhole.

前記マンホールが、前記煙道の経路のうち少なくとも2箇所に設置されていることが好ましい。 It is preferable that the manholes are installed in at least two locations along the flue path.

前記補修対象が、前記煙道の経路に設けられたブロワーなどの設備であって、前記2箇所が、前記煙道のうちの前記設備を挟む位置にあることが好ましい。 It is preferable that the repair target is equipment such as a blower installed in the flue path, and that the two locations are located on either side of the flue.

なお、本発明の一態様では、前記排ガスおよび前記区間に存在するガスは、硫酸ガスおよび/または亜硫酸ガスである。この場合、前記煙道は、硫酸煙道と称される。 In one embodiment of the present invention, the exhaust gas and the gas present in the section are sulfuric acid gas and/or sulfur dioxide gas. In this case, the flue is called a sulfuric acid flue.

本発明の一態様の煙道シール用バルーンおよびこのバルーンを用いた煙道シール方法を適用することにより、転化器などから硫酸ガスが煙道に逆流するまでの短時間で、簡易に煙道をシールすることができる。また、シール中に流入し、残存する少量の硫酸ガスを短時間で除去することも可能となる。このため、長期操業停止を伴うことなく、煙道の損傷箇所やブロワーなどの設備における不具合の補修を、設備内部で実施することが可能となる。このため、本発明の工業的価値はきわめて大きい。 By applying the flue sealing balloon of one embodiment of the present invention and the flue sealing method using this balloon, the flue can be easily sealed in a short time before sulfuric acid gas flows back into the flue from a converter or the like. It is also possible to quickly remove small amounts of sulfuric acid gas that flow into the seal and remain. This makes it possible to repair damaged areas of the flue and defects in equipment such as blowers within the equipment without requiring long-term operation shutdowns. For this reason, the industrial value of this invention is extremely great.

図1は、本発明の一実施形態の一例に係る、煙道シール用バルーンの斜視図である。FIG. 1 is a perspective view of a flue sealing balloon according to one embodiment of the present invention. 図2は、本発明の一実施形態の一例に係る煙道シール用バルーンを用いた、煙道の損傷箇所を補修する際の、前記バルーンの設置を説明するための概略図である。FIG. 2 is a schematic diagram for explaining the installation of a flue sealing balloon according to one embodiment of the present invention when repairing a damaged portion of a flue using the balloon. 図3は、本発明の一実施形態の一例に係る煙道シール用バルーンを用いた、煙道の経路にあるブロワーのブロワーインペラの不具合を補修する際の、前記バルーンの設置を説明するための概略図である。FIG. 3 is a schematic diagram for explaining the installation of a flue sealing balloon according to one embodiment of the present invention when repairing a malfunction of a blower impeller of a blower located in the flue path.

以下、本発明の一実施形態について、図面を適宜参照しつつ説明する。 One embodiment of the present invention will be described below with reference to the drawings as appropriate.

[煙道シール用バルーン]
図1は、本発明の一実施形態の一例に係る煙道シール用バルーン1を示している。本例の煙道シール用バルーン1は、エラストマー製で、全体として円筒形状を有する。
[Flue sealing balloons]
1 shows a flue sealing balloon 1 according to one embodiment of the present invention. The flue sealing balloon 1 of this example is made of an elastomer and has a generally cylindrical shape.

バルーン1は、円筒部2と、円筒部2の軸方向両端部を塞ぐ側面3と、両側の側面3のうちの一方の側面3に備えられた送気口4と、円筒部2の外周面の周方向1箇所で軸方向に離間した位置に備えられた持ち手5とを備える。 The balloon 1 comprises a cylindrical portion 2, side surfaces 3 that close both axial ends of the cylindrical portion 2, an air supply port 4 provided on one of the side surfaces 3, and a handle 5 provided at one circumferential location on the outer circumferential surface of the cylindrical portion 2 at a position spaced apart in the axial direction.

バルーン1の材質としては、ゴムを含むエラストマーが用いられ、弾性および膨張性の観点から、適切なエラストマーを選択することができる。ただし、エラストマーとしては、硫酸ガスおよび/または亜硫酸ガスが存在する煙道6(図2および図3参照)での使用および煙道6の内壁面との接触を考慮すると、耐酸性ゴムであることが好ましい。耐酸性ゴムとしては、クロロスルフォン化ポリエチレン、ブチルゴム、フッ素ゴム、エチレンプロピレンゴム、クロロプレンゴム、ニトリルゴムなどを挙げることができる。 The material of the balloon 1 is an elastomer containing rubber, and an appropriate elastomer can be selected from the viewpoints of elasticity and expansion. However, considering the use in the flue 6 (see Figures 2 and 3) where sulfuric acid gas and/or sulfurous acid gas is present and the contact with the inner wall surface of the flue 6, it is preferable that the elastomer be acid-resistant rubber. Examples of acid-resistant rubber include chlorosulfonated polyethylene, butyl rubber, fluororubber, ethylene propylene rubber, chloroprene rubber, and nitrile rubber.

バルーン1は、膨張状態において、全体として円筒形状を有する。通常、銅製錬の排ガス回収工程における排ガスの煙道6は、断面が円形の円筒形状であり、バルーン1が、円筒形状に膨張することにより、その外周面が煙道6の内壁面(内周面)と密着接触することが可能である。ただし、バルーン1の厚さなどを調整することにより、バルーン1を、断面が円形の円筒形状の煙道以外の煙道にも適用することは可能である。また、バルーン1は、円筒形状を有することにより、袋状のバルーンとは異なり、煙道6内で軸方向への過度な膨張を抑制した状態で、周方向への膨張が可能となるとともに、抑え板などの補強部材を必要とすることがない。このため、煙道6内の所定箇所において、適切にバルーン1を膨張させることが可能となる。 When inflated, the balloon 1 has an overall cylindrical shape. Usually, the flue gas flue 6 in the flue gas recovery process of copper smelting has a cylindrical shape with a circular cross section, and the balloon 1 expands into a cylindrical shape, so that its outer circumferential surface can come into close contact with the inner wall surface (inner circumferential surface) of the flue 6. However, by adjusting the thickness of the balloon 1, it is possible to apply the balloon 1 to flue gases other than those with a cylindrical cross section. In addition, unlike a bag-shaped balloon, the balloon 1 has a cylindrical shape, so that it can expand in the circumferential direction while suppressing excessive expansion in the axial direction in the flue 6, and does not require a reinforcing member such as a restraining plate. This makes it possible to appropriately expand the balloon 1 at a predetermined location in the flue 6.

円筒部2は、バルーン1の膨張状態で、その軸方向にわたって外径が略同一である円筒形状を有する。円筒部2の外径は、煙道6の内径よりも大きい径を有する。円筒部2の外径は、適用される煙道6の大きさによって任意に選択される。少なくとも、煙道6の内壁面に接触するまで膨張可能な外径を有すればよい。 When the balloon 1 is inflated, the cylindrical portion 2 has a cylindrical shape with an outer diameter that is approximately the same along its axial direction. The outer diameter of the cylindrical portion 2 is larger than the inner diameter of the flue 6. The outer diameter of the cylindrical portion 2 is selected arbitrarily depending on the size of the flue 6 to which it is applied. It is sufficient that the cylindrical portion 2 has an outer diameter that allows it to expand at least until it comes into contact with the inner wall surface of the flue 6.

円筒部2の軸方向長さは、バルーン1による煙道6のシール性が担保される限り、基本的には任意である。したがって、シール性が担保される限り、運搬性の観点からは、円筒部2の軸方向長さは可能な限り短いことが好ましい。円筒部2の軸方向長さは、円筒部2の外径以下であることが好ましく、円筒部2の外径の0.5倍~0.9倍であることがより好ましく、0.6倍~0.8倍であることがさらに好ましい。 The axial length of the cylindrical portion 2 is basically arbitrary, so long as the sealing of the flue 6 by the balloon 1 is ensured. Therefore, from the viewpoint of transportability, it is preferable that the axial length of the cylindrical portion 2 is as short as possible, so long as the sealing is ensured. The axial length of the cylindrical portion 2 is preferably equal to or less than the outer diameter of the cylindrical portion 2, more preferably 0.5 to 0.9 times the outer diameter of the cylindrical portion 2, and even more preferably 0.6 to 0.8 times the outer diameter of the cylindrical portion 2.

側面3は、略円板形状で、円筒部2の軸方向両端部を塞ぐように設けられている。いずれの側面3も、バルーン1の膨張状態で、円筒部2と略同一の外径を有する。側面3を設けることにより、バルーン1は、折り畳み状態から膨張状態への遷移する過程で、径方向に優先的に膨張するため、円筒形状となるように膨張することが可能となる。 The side surfaces 3 are generally disc-shaped and are provided to close both axial ends of the cylindrical portion 2. Each side surface 3 has approximately the same outer diameter as the cylindrical portion 2 when the balloon 1 is inflated. By providing the side surfaces 3, the balloon 1 is able to expand into a cylindrical shape because it preferentially expands radially during the transition from a folded state to an inflated state.

円筒部2および側面3の厚さは、エラストマーの種類、バルーン1の全体の大きさ、膨張性、収縮時の折り畳み性および運搬のしやすさなどを考慮して、適宜決定される。その厚さを例示すると、たとえば、0.3mm~3.0mmであることが好ましく、0.5mm~1.5mmであることがより好ましい。 The thickness of the cylindrical portion 2 and the side surface 3 is determined appropriately taking into consideration the type of elastomer, the overall size of the balloon 1, its inflatability, its foldability when deflated, and ease of transport. For example, the thickness is preferably 0.3 mm to 3.0 mm, and more preferably 0.5 mm to 1.5 mm.

本例のバルーン1では、円筒部2の外周面の周方向1箇所で軸方向に離間した位置に、2個の持ち手5が備えられている。持ち手5の数は、バルーン1の収縮状態でのバルーン1の運搬性を考慮すると、両手で、両方の持ち手5、あるいは、いずれかの持ち手5と円筒部2を把持して、バルーン1を容易に運搬できるようにすることを考慮すると、2個以上であることが好ましい。持ち手5の大きさおよび厚さは、バルーン1の膨張時のバルーン1のシール性を阻害しない限り、バルーン1の運搬性を考慮して任意に設定される。たとえば、それぞれの持ち手5の大きさは、200mm×200mmであることが好ましい。また、それぞれの持ち手5の厚さは、たとえば、0.3mm~3.0mmであることが好ましく、0.5mm~1.5mmであることがより好ましい。 In the present example, the balloon 1 is provided with two handles 5 at one circumferential location on the outer circumferential surface of the cylindrical portion 2, spaced apart in the axial direction. Considering the portability of the balloon 1 in its contracted state, the number of handles 5 is preferably two or more, so that the balloon 1 can be easily transported by holding both handles 5 or one of the handles 5 and the cylindrical portion 2 with both hands. The size and thickness of the handles 5 are set arbitrarily in consideration of the portability of the balloon 1, as long as they do not impede the sealing property of the balloon 1 when it is inflated. For example, the size of each handle 5 is preferably 200 mm x 200 mm. The thickness of each handle 5 is preferably, for example, 0.3 mm to 3.0 mm, and more preferably 0.5 mm to 1.5 mm.

本例のバルーン1では、両側の側面3のうちの一方の側面3に、送気口4および排気口7が備えられている。本例においては、送気口4は、側面3に設けられた開口およびこの開口に接続固定されたアタッチメントからなる。バルーン1を膨張させるときおよび使用時において、送気用ホース14の先端部に設けられたアタッチメントと接続される。この状態は、使用状態の間、継続される。これによって、使用時において、バルーン1内の内圧が、バルーン1が煙道6の内壁面と密着するように維持される。送気口4には、バルーン1内から膨張用流体である、空気あるいは窒素ガスなどの不活性ガスが、外側に流出することを阻止する弁体を設けることも可能である。 In this example, the balloon 1 is provided with an air supply port 4 and an exhaust port 7 on one of the two side surfaces 3. In this example, the air supply port 4 consists of an opening on the side surface 3 and an attachment connected and fixed to this opening. When the balloon 1 is inflated and during use, it is connected to an attachment provided at the tip of the air supply hose 14. This state continues while the balloon 1 is in use. As a result, during use, the internal pressure within the balloon 1 is maintained so that the balloon 1 is in close contact with the inner wall surface of the flue 6. The air supply port 4 can also be provided with a valve body that prevents the inflation fluid, air or an inert gas such as nitrogen gas, from flowing out from inside the balloon 1 to the outside.

本例のバルーン1では、一方の側面3の、送気口4から離間した位置に、排気口7が別途設けられている。排気口7も、側面3に設けられた開口およびこの開口に接続固定されたアタッチメントからなる。バルーン1の保管時および膨張状態では、排気口7のアタッチメントに、閉止フランジ8が取り付けられている。バルーン1を収縮させる際に、閉止フランジ8を外すことにより、バルーン1内から膨張用流体を排出させることができる。 In the balloon 1 of this example, an exhaust port 7 is provided separately on one side 3 at a position away from the air supply port 4. The exhaust port 7 also consists of an opening provided on the side 3 and an attachment connected and fixed to this opening. When the balloon 1 is in storage or in an inflated state, a closing flange 8 is attached to the attachment of the exhaust port 7. When the balloon 1 is deflated, the closing flange 8 can be removed to discharge the inflation fluid from inside the balloon 1.

送気口4、排気口7、および閉止フランジ8を構成する部材については、公知の部材から任意に選択される。 The materials constituting the air inlet 4, exhaust outlet 7, and closing flange 8 are selected from known materials.

本例のバルーン1は、適切な弾性および膨張性を有し、好ましくは耐酸性をさらに有することから、銅製錬の排ガス回収工程における排ガスの煙道6などの亜硫酸ガスおよび/または硫酸ガスが存在するような煙道6内への運搬および適用が可能である。また、持ち手5により、折り畳まれた状態のバルーン1を容易に煙道6内に搬入することが可能である。よって、煙道6の内径に応じたバルーン1を適用することにより、補強部材などを必要とすることなく、煙道6の必要箇所にバルーン1を設置し、バルーン1を煙道6の内壁面に接触するまで円筒形状に膨張させることで、煙道6を適切にシールすることが可能となる。 The balloon 1 of this example has appropriate elasticity and expandability, and preferably also has acid resistance, so it can be transported and applied to a flue 6 where sulfur dioxide gas and/or sulfuric acid gas is present, such as the flue 6 of exhaust gas in the exhaust gas recovery process of copper smelting. In addition, the handle 5 allows the balloon 1 in a folded state to be easily carried into the flue 6. Therefore, by applying the balloon 1 according to the inner diameter of the flue 6, it is possible to install the balloon 1 at a necessary location in the flue 6 without the need for reinforcing members, and by expanding the balloon 1 into a cylindrical shape until it contacts the inner wall surface of the flue 6, it is possible to properly seal the flue 6.

[煙道シール方法]
図2は、本発明の一実施形態の一例に係る煙道シール方法を概略的に示し、図3は、本発明の一実施形態の別例に係る煙道シール方法を概略的に示している。
[How to seal the flue]
FIG. 2 is a schematic diagram of a flue sealing method according to one embodiment of the present invention, and FIG. 3 is a schematic diagram of a flue sealing method according to another embodiment of the present invention.

本例の煙道シール方法は、少なくとも1箇所に内部へのアクセスを可能とするマンホール9を備える煙道6において、煙道6内の補修対象(煙道6の損傷箇所10、ブロワー11のインペラなど)を補修する際に、煙道6をシールすることが可能となる。 The flue sealing method of this example makes it possible to seal the flue 6 when repairing a repair target within the flue 6 (such as a damaged area 10 in the flue 6 or the impeller of a blower 11) in a flue 6 that has at least one manhole 9 that allows access to the inside.

特に、本例の煙道シール方法は、上記した本発明の煙道シール用バルーン1を2個用いる。そして、煙道6のうちのマンホール9および補修対象を含む区間(補修区間12)の両側位置まで、マンホール9を介して、2個の硫酸煙道シール用バルーン1を運搬し、設置する。 In particular, the flue sealing method of this example uses two of the flue sealing balloons 1 of the present invention described above. Then, the two sulfuric acid flue sealing balloons 1 are transported through the manhole 9 to both sides of the section of the flue 6 that includes the manhole 9 and the repair target (repair section 12), and then installed.

図2に示すように、銅製錬の排ガス回収工程における排ガスの煙道6には、所定間隔で作業者の出入りが可能なマンホール9が設置されている。たとえば、煙道6に損傷箇所10が生じた場合で、煙道6の内部側から損傷箇所10の補修が必要とされる場合、損傷箇所10に最も近いマンホール9を利用する。 As shown in FIG. 2, manholes 9 that allow workers to enter and exit are installed at predetermined intervals in the flue gas flue 6 in the flue gas recovery process of copper smelting. For example, if a damaged area 10 occurs in the flue 6 and repair of the damaged area 10 is required from the inside of the flue 6, the manhole 9 closest to the damaged area 10 is used.

たとえば、煙道6が亜硫酸(SO)ガスを硫酸ガス(SO)に転化する転化器(図示せず)の上流側の近傍にある場合、転化器および煙道内で排ガスを移送するためのブロワーなどの設備を停止後に、白色の硫酸ガスが煙道内に逆流して充満するまでには、1時間程度かかる。したがって、設備の停止後、ただちに、作業者が呼吸器付きガスマスクを装着した状態で、マンホール9のカバーを開いて、マンホール9を通って、折り畳まれた状態にあるバルーン1を、その持ち手5を利用しつつ、煙道6内における損傷箇所10およびマンホール9を含む補修区間12の前後2箇所まで持ち運ぶ。 For example, if the flue 6 is located near the upstream side of a converter (not shown) that converts sulfurous acid ( SO2 ) gas into sulfuric acid gas ( SO3 ), it takes about one hour for the white sulfuric acid gas to flow back into the flue and fill it after the converter and equipment such as a blower for transporting exhaust gas in the flue are stopped. Therefore, immediately after stopping the equipment, a worker wearing a gas mask with a respirator opens the cover of the manhole 9 and carries the folded balloon 1 through the manhole 9, using its handle 5, to two locations in the flue 6, one before and one after the damaged area 10 and the repair section 12 including the manhole 9.

バルーン1を設置場所まで持ち運び、かつ、作業者が煙道6から外に出た後、予め、あるいは、設置場所において送気口4に接続された送気用ホースを介して、バルーン1内に空気あるいは窒素ガスなどの不活性ガスを供給して、バルーン1を膨張させる。なお、バルーン1の膨張用流体は、用途および設置場所の条件に応じて選択される。本例の場合、膨張用流体としては、空気を利用することができる。 After the balloon 1 is carried to the installation site and the worker exits through the smoke duct 6, the balloon 1 is inflated by supplying air or an inert gas such as nitrogen gas into the balloon 1 either in advance or at the installation site via an air supply hose connected to the air supply port 4. The inflation fluid for the balloon 1 is selected according to the application and the conditions of the installation site. In this example, air can be used as the inflation fluid.

バルーン1に膨張用流体を供給すると、バルーン1は図1に示すように円筒形状に膨張し、その外周面が全体的に煙道6の内壁面に接触して、バルーン1の外周面と煙道6の内壁面が密着することにより、煙道6が設置場所の2箇所においてシールされる。これにより、マンホール9および損傷箇所10を含む補修区間12に、その両側から亜硫酸ガスおよび硫酸ガスなどのガス13が流入することが阻止される。 When inflation fluid is supplied to the balloon 1, the balloon 1 expands into a cylindrical shape as shown in FIG. 1, and its outer periphery comes into contact with the entire inner wall surface of the flue 6, and the outer periphery of the balloon 1 and the inner wall surface of the flue 6 are tightly attached, sealing the flue 6 at two points at the installation location. This prevents gases 13 such as sulfur dioxide and sulfuric acid gas from flowing into the repair section 12, which includes the manhole 9 and the damaged area 10, from both sides.

本例では、補修区間12に残留する少量のガス、具体的には、煙道6内に存在する亜硫酸ガスおよびバルーン1の設置までに流入した硫酸ガスなどの残留ガスを、マンホール9を介して、吸引および処理することで、補修区間12より除去する。これにより、補修区間12での損傷箇所10の補修工事が可能となる。なお、本例では、補修工事終了後に、バルーン1の排気口7に嵌め込まれている閉止フランジ8を取り外すことにより、バルーン1から空気を除去して、作業者が持ち手5を用いて、バルーン1を煙道6からマンホール9を介して外に持ち運ぶことにより、作業が完了する。 In this example, the small amount of gas remaining in the repair section 12, specifically the residual gas such as sulfur dioxide gas present in the flue 6 and sulfuric acid gas that flowed in before the balloon 1 was installed, is removed from the repair section 12 by sucking and processing through the manhole 9. This makes it possible to carry out repair work on the damaged area 10 in the repair section 12. In this example, after the repair work is completed, the closing flange 8 fitted into the exhaust port 7 of the balloon 1 is removed to remove the air from the balloon 1, and the worker uses the handle 5 to carry the balloon 1 from the flue 6 to the outside through the manhole 9, completing the work.

に示すように、煙道6には、少なくとも1箇所のマンホール9が設置されている場合に、マンホール9と損傷箇所10の両方を両側から挟むように2個のバルーン1を設置することにより、損傷箇所10の補修が可能に煙道6をシールすることができる。ただし、2個のバルーン1によって挟まれる補修区間12をより短くする観点から、あるいは、マンホール9の一方側にはバルーン1を設置できるが、マンホール9の他方側にバルーン1を設置する空間的な余裕がない場合などを考慮すると、煙道6には、少なくとも2箇所にマンホール9が設置されていることが好ましい。 As shown in Fig. 2 , when at least one manhole 9 is provided in the flue 6, two balloons 1 are provided to sandwich both the manhole 9 and the damaged area 10 from both sides, thereby sealing the flue 6 and enabling repair of the damaged area 10. However, from the viewpoint of shortening the repair section 12 sandwiched between the two balloons 1, or considering a case where a balloon 1 can be provided on one side of the manhole 9 but there is not enough space to provide the balloon 1 on the other side of the manhole 9, it is preferable that at least two manholes 9 are provided in the flue 6.

より具体的には、図3に示すように、煙道6の経路にブロワー11などの設備が存在し、補修対象がブロワー11のインペラなど設備内部に存在する場合、少なくとも設備の一方側(図3の例では左側)において、設備へのアクセスを可能とするため、マンホール9の両側のうち、ブロワー11から遠い側にはバルーン1を設置可能であるが、マンホール9の両側のうち、ブロワー11に近い側にはバルーン1を設置することが不可能となる。このような場合、煙道6のうち、ブロワー11など補修が必要とされる可能性がある設備の両側であって、該設備から所定間隔離れた2箇所位置に、マンホール9を設置しておく。このように、補修対象が、煙道6の経路に設けられたブロワー11などの設備である場合には、マンホールを設置する少なくとも2箇所が、煙道6のうちの当該設備を挟む位置にあることが好ましい。 More specifically, as shown in FIG. 3, when equipment such as a blower 11 is present in the path of the flue 6 and the repair target is inside the equipment, such as the impeller of the blower 11, it is possible to install a balloon 1 on one side of the manhole 9 farther from the blower 11 to enable access to the equipment on at least one side (the left side in the example of FIG. 3), but it is impossible to install a balloon 1 on the other side of the manhole 9 closer to the blower 11. In such a case, manholes 9 are installed in two positions on both sides of the equipment that may require repair, such as the blower 11, at a predetermined distance from the equipment in the flue 6. In this way, when the repair target is equipment such as the blower 11 installed in the path of the flue 6, it is preferable that at least two positions for installing manholes are located on either side of the equipment in the flue 6.

この場合、ブロワー11付近に設置された煙道6のマンホール9の2箇所から煙道6内部に入って、ブロワー11の少なくとも一方側で、煙道6のうちのブロワー11とは反対側の適切な位置に、バルーン1を設置し、膨張させる。なお、図3の例では、ブロワー11の左側からはブロワー11にアクセス可能であるが、ブロワー11の右側にはバルブ15が存在するため、ブロワー11にアクセスすることができない。このため、本例では、ブロワー11の左側において、ブロワー11とは反対側にバルーン1を設置し、逆側では、マンホール9からブロワー11およびバルブ15がある側にバルーン1を設置し、膨張させている。このようにして、可能な限り補修区間12の長さが短くなるようにバルーン1を設置して、煙道6をシールする。同様に、必要に応じて、残留ガスを補修区間12から除去した後、ブロワー11のインペラなどの設備内部の補修が可能となる。 In this case, the inside of the flue 6 is entered from two manholes 9 of the flue 6 installed near the blower 11, and the balloon 1 is installed and inflated at an appropriate position on at least one side of the blower 11, on the opposite side of the flue 6 from the blower 11. In the example of FIG. 3, the blower 11 can be accessed from the left side of the blower 11, but the blower 11 cannot be accessed because the valve 15 is present on the right side of the blower 11. For this reason, in this example, the balloon 1 is installed on the opposite side of the blower 11 on the left side of the blower 11, and on the opposite side, the balloon 1 is installed on the side of the manhole 9 where the blower 11 and the valve 15 are located, and inflated. In this way, the balloon 1 is installed so that the length of the repair section 12 is as short as possible, and the flue 6 is sealed. Similarly, if necessary, after removing residual gas from the repair section 12, it is possible to repair the inside of the equipment, such as the impeller of the blower 11.

本例の煙道シール方法により、転化器などから白色の硫酸ガスなどのガス13が煙道6に逆流するまでの短時間で、簡易に煙道6をシールすることが可能となる。よって、硫酸ガスなどのガス13がシール中に補修区間12に流入した場合でも、残存する少量のガス13を、マンホール9を介して短時間で除去することが可能である。よって、煙道6全体にわたってガスパージをした後に、補修箇所を補修する場合に比べて、設備停止時間を1週間程度短縮することが可能となる。 The flue sealing method of this example makes it possible to easily seal the flue 6 in a short time before gas 13, such as white sulfuric acid gas, flows back into the flue 6 from a converter or the like. Therefore, even if gas 13, such as sulfuric acid gas, flows into the repair section 12 during sealing, it is possible to quickly remove the small amount of remaining gas 13 through the manhole 9. Therefore, it is possible to reduce the equipment downtime by about one week compared to repairing the repair area after purging the gas over the entire flue 6.

1 バルーン
2 円筒部
3 側面
4 送気口
5 持ち手
6 煙道
7 排気口
8 閉止フランジ
9 マンホール
10 損傷箇所
11 ブロワー
12 補修区間
13 ガス
14 送気用ホース
15 バルブ


REFERENCE SIGNS LIST 1 Balloon 2 Cylindrical part 3 Side 4 Air supply port 5 Handle 6 Flue 7 Exhaust port 8 Closing flange 9 Manhole 10 Damaged area 11 Blower 12 Repaired section 13 Gas 14 Air supply hose 15 Valve


Claims (6)

筒部と、該円筒部の軸方向両端部を塞ぐ側面と、それぞれが把持可能な2個以上の持ち手とを備え、前記2個以上の持ち手は、前記円筒部の外周面の周方向1箇所のそれぞれが軸方向に離隔した位置に備えられており、前記円筒部と前記側面と前記2個以上の持ち手とはエラストマー製であり、前記側面のうちの一方の側面に、該一方の側面に設けられた開口および該開口に接続固定されたアタッチメントからなる送気口が設けられた煙道シール用バルーンであって、少なくとも1箇所に内部へのアクセスを可能とするマンホールを備え、作業者が前記内部を移動可能な煙道内に運搬可能で、かつ、前記円筒部の外周面が、前記煙道の内壁面に接触するまで膨張可能である、煙道シール用バルーン。 A flue sealing balloon comprising a cylindrical portion, side surfaces closing both axial ends of the cylindrical portion , and two or more handles each of which can be held by a hand, the two or more handles being provided at one circumferential location on the outer circumferential surface of the cylindrical portion at positions spaced apart in the axial direction, the cylindrical portion, the side surfaces, and the two or more handles being made of an elastomer, and an air supply port being provided on one of the side surfaces, the air supply port consisting of an opening provided on the one side surface and an attachment connected and fixed to the opening, the balloon having at least one manhole allowing access to the interior, the balloon being transportable into a flue through which an operator can move within , and capable of being inflated until the outer circumferential surface of the cylindrical portion comes into contact with the inner wall surface of the flue. 前記エラストマーは、耐酸性ゴムである、請求項1に記載の煙道シール用バルーン。 The flue sealing balloon of claim 1, wherein the elastomer is an acid-resistant rubber. 少なくとも1箇所に内部へのアクセスを可能とするマンホールを備え、作業者が前記内部を移動可能な煙道において、前記煙道内の補修対象を補修する際の煙道シール方法であって、
請求項1または2に記載の煙道シール用バルーンを2個用い、
前記煙道のうちの前記マンホールおよび前記補修対象を含む区間の両側位置まで、前記マンホールを介して、前記2個の煙道シール用バルーンを運搬し、設置し、および、
前記2個の煙道シール用バルーンのそれぞれに前記送気口を介して膨張用流体を送って、前記円筒部の外周面が前記煙道の内壁面に接触するまで、該バルーンを膨張させて、前記煙道をシールする、
ことを含む、煙道シール方法。
A flue sealing method for repairing a repair target in a flue having at least one manhole that allows access to the inside and in which a worker can move through the inside , comprising:
Using two flue sealing balloons according to claim 1 or 2,
Transporting and installing the two flue sealing balloons through the manhole to both sides of the section of the flue that includes the manhole and the repair target, and
an inflation fluid is fed to each of the two flue-sealing balloons through the air supply port to inflate the balloons until the outer circumferential surface of the cylindrical portion comes into contact with the inner wall surface of the flue, thereby sealing the flue.
A method of sealing a flue comprising:
前記煙道のシール後に、前記マンホールを介して、前記区間に存在するガスを除去することを含む、請求項3に記載の煙道シール方法。 The flue sealing method according to claim 3, further comprising removing gas present in the section through the manhole after sealing the flue. 前記マンホールが、前記煙道の経路のうち少なくとも2箇所に設置されている、請求項3または4に記載の煙道シール方法。 The flue sealing method according to claim 3 or 4, wherein the manholes are installed in at least two locations along the flue path. 前記補修対象が、前記煙道の経路に設けられた設備であって、前記2箇所が、前記煙道のうちの前記設備を挟む位置にある、請求項5に記載の煙道シール方法。 The flue sealing method according to claim 5, wherein the repair target is equipment installed in the flue path, and the two locations are located on either side of the flue.
JP2021141872A 2021-08-31 2021-08-31 Flue sealing balloon and flue sealing method Active JP7655154B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021141872A JP7655154B2 (en) 2021-08-31 2021-08-31 Flue sealing balloon and flue sealing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021141872A JP7655154B2 (en) 2021-08-31 2021-08-31 Flue sealing balloon and flue sealing method

Publications (3)

Publication Number Publication Date
JP2023035212A JP2023035212A (en) 2023-03-13
JP2023035212A5 JP2023035212A5 (en) 2024-03-28
JP7655154B2 true JP7655154B2 (en) 2025-04-02

Family

ID=85505260

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021141872A Active JP7655154B2 (en) 2021-08-31 2021-08-31 Flue sealing balloon and flue sealing method

Country Status (1)

Country Link
JP (1) JP7655154B2 (en)

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000185268A (en) 1998-12-24 2000-07-04 M T Syst Kk Method for peeling and cleaning contaminant in duct and system used therein
JP2006226372A (en) 2005-02-16 2006-08-31 Jfe Steel Kk Fluid shut-off device
JP2007162785A (en) 2005-12-12 2007-06-28 Tokyo Electric Power Co Inc:The Piping closing device, piping closing equipment and piping closing method
CN201431854Y (en) 2009-04-10 2010-03-31 高友利 Air bag sealing device for inspection and repair of wet desulfuration slurry pump pipeline
US20120125600A1 (en) 2010-11-24 2012-05-24 Martyn James Smith Device for blocking-off part of the interior of a pipe
CN203273183U (en) 2013-05-15 2013-11-06 沧州市精通工程检测有限公司 Pipeline leakproofness test plugging device
JP2014139503A (en) 2012-12-18 2014-07-31 Hitachi-Ge Nuclear Energy Ltd Duct closing device and duct closing method
CN204493980U (en) 2015-03-26 2015-07-22 重庆君正橡胶制品有限公司 Pipeline plugging air bag
JP2015165158A (en) 2014-02-05 2015-09-17 株式会社十川ゴム Fluid blocking bag and fluid blocking device
CN205261130U (en) 2016-01-08 2016-05-25 田雨 Pipeline blocking airbag
JP2019086117A (en) 2017-11-08 2019-06-06 クロダイト工業株式会社 Fluid shut-off air bag
CN210950413U (en) 2019-11-22 2020-07-07 深圳市共赢新材科技有限公司 PVC shutoff gasbag
CN211315494U (en) 2019-12-27 2020-08-21 海宁立潮工程咨询有限公司 Pipeline plugging air bag
CN211853178U (en) 2019-11-14 2020-11-03 湖南中铭科技有限公司 Novel many lugs spear hook shutoff gasbag
CN212718662U (en) 2020-07-29 2021-03-16 淮南矿业集团清洁能源有限责任公司 Natural gas pipeline sealing device
CN215721662U (en) 2021-08-23 2022-02-01 宁波雅可净水环保设备有限公司 Water plugging air bag
CN215950767U (en) 2021-06-30 2022-03-04 天津市水利工程有限公司 Device for blocking and intercepting water of pipeline

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000185268A (en) 1998-12-24 2000-07-04 M T Syst Kk Method for peeling and cleaning contaminant in duct and system used therein
JP2006226372A (en) 2005-02-16 2006-08-31 Jfe Steel Kk Fluid shut-off device
JP2007162785A (en) 2005-12-12 2007-06-28 Tokyo Electric Power Co Inc:The Piping closing device, piping closing equipment and piping closing method
CN201431854Y (en) 2009-04-10 2010-03-31 高友利 Air bag sealing device for inspection and repair of wet desulfuration slurry pump pipeline
US20120125600A1 (en) 2010-11-24 2012-05-24 Martyn James Smith Device for blocking-off part of the interior of a pipe
JP2014139503A (en) 2012-12-18 2014-07-31 Hitachi-Ge Nuclear Energy Ltd Duct closing device and duct closing method
CN203273183U (en) 2013-05-15 2013-11-06 沧州市精通工程检测有限公司 Pipeline leakproofness test plugging device
JP2015165158A (en) 2014-02-05 2015-09-17 株式会社十川ゴム Fluid blocking bag and fluid blocking device
CN204493980U (en) 2015-03-26 2015-07-22 重庆君正橡胶制品有限公司 Pipeline plugging air bag
CN205261130U (en) 2016-01-08 2016-05-25 田雨 Pipeline blocking airbag
JP2019086117A (en) 2017-11-08 2019-06-06 クロダイト工業株式会社 Fluid shut-off air bag
CN211853178U (en) 2019-11-14 2020-11-03 湖南中铭科技有限公司 Novel many lugs spear hook shutoff gasbag
CN210950413U (en) 2019-11-22 2020-07-07 深圳市共赢新材科技有限公司 PVC shutoff gasbag
CN211315494U (en) 2019-12-27 2020-08-21 海宁立潮工程咨询有限公司 Pipeline plugging air bag
CN212718662U (en) 2020-07-29 2021-03-16 淮南矿业集团清洁能源有限责任公司 Natural gas pipeline sealing device
CN215950767U (en) 2021-06-30 2022-03-04 天津市水利工程有限公司 Device for blocking and intercepting water of pipeline
CN215721662U (en) 2021-08-23 2022-02-01 宁波雅可净水环保设备有限公司 Water plugging air bag

Also Published As

Publication number Publication date
JP2023035212A (en) 2023-03-13

Similar Documents

Publication Publication Date Title
US11913590B2 (en) Flexible peristaltic robot with built-in bidirectional gas pump for self-regulating gas flow
CN212291344U (en) Emergency plugging device for hazardous chemicals tanker
JP7655154B2 (en) Flue sealing balloon and flue sealing method
KR20180137657A (en) Apparatus for repairing pipe
JPH10510625A (en) Nuclear power plant refrigerant pipe closing device
TWI847242B (en) Automatic liquid changing device and fluid delivery joint
US9550674B2 (en) Plant for manufacturing hydrogen sulfide gas and method for exhausting hydrogen sulfide gas
CN112078995B (en) Emergency plugging device of dangerous chemical tank truck and working method thereof
CN110686137A (en) Multipurpose pressurized plugging air bag for pipeline emergency repair and using method thereof
CN107073393A (en) The maintenance method of emission-control equipment and emission-control equipment
KR20040000159A (en) A sewer-branch-pipe repair apparatus and its method
CA2807112C (en) Apparatus and method for heat curing of pipe liners
KR20190044161A (en) Method for blocking pipes without stopping water flow of pipes by using balloon
JP4901224B2 (en) Water stop device for suction pipe
JP6879558B2 (en) How to repair fluid leaks
JP7178335B2 (en) Gas processing system
RU2730132C2 (en) Device for tight closure of internal cavity of oil product pipeline or oil pipeline
KR100271391B1 (en) Refrigerant pipe blocking device of nuclear power plant
JP2003065005A (en) Non-metal expansion joint for high temperature duct
TWI873895B (en) Water-undisrupted balloon water stopping system
US12257656B2 (en) Method for pipe purging
CN223200743U (en) Plugging device
CN222305367U (en) An emergency spray device and a flue gas desulfurization system
JPS6234073Y2 (en)
KR20260020522A (en) Gas or liquid blocking device in piping

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240319

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240319

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20241107

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20241119

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20250116

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250120

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250218

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250303

R150 Certificate of patent or registration of utility model

Ref document number: 7655154

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150