JP7655783B2 - Method and device for constructing suspended scaffolding - Google Patents
[go: Go Back, main page]

JP7655783B2 - Method and device for constructing suspended scaffolding - Google Patents

Method and device for constructing suspended scaffolding Download PDF

Info

Publication number
JP7655783B2
JP7655783B2 JP2021090204A JP2021090204A JP7655783B2 JP 7655783 B2 JP7655783 B2 JP 7655783B2 JP 2021090204 A JP2021090204 A JP 2021090204A JP 2021090204 A JP2021090204 A JP 2021090204A JP 7655783 B2 JP7655783 B2 JP 7655783B2
Authority
JP
Japan
Prior art keywords
scaffolding
board
main
sub
scaffolding board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021090204A
Other languages
Japanese (ja)
Other versions
JP2022182576A (en
Inventor
和夫 伴
咲月 美濃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Alinco Inc
Original Assignee
Alinco Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Alinco Inc filed Critical Alinco Inc
Priority to JP2021090204A priority Critical patent/JP7655783B2/en
Publication of JP2022182576A publication Critical patent/JP2022182576A/en
Application granted granted Critical
Publication of JP7655783B2 publication Critical patent/JP7655783B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Description

本発明は、吊り足場の構築方法及び該構築方法を実施するための装置に関する。 The present invention relates to a method for constructing suspended scaffolding and an apparatus for carrying out the method.

従来、高速道路や橋梁等の高架構築物その他の既設構築物は、高所における建設や改修に際し、該既設構築物に沿って延びる吊り足場が構築されている。 Traditionally, when constructing or renovating elevated structures such as highways, bridges, and other existing structures at high altitudes, suspended scaffolding is constructed that extends along the existing structure.

吊り足場を構築するための吊下げ足場板(以下、単に「足場板」という。)は、一般的に図1ないし図3に示すように構成されている。 Suspended scaffolding boards (hereinafter simply referred to as "scaffolding boards") for constructing suspended scaffolding are generally configured as shown in Figures 1 to 3.

足場板1は、離間して平行に配置された角形パイプ材等から成る第1桁側フレーム3Aと第2桁側フレーム3B(両者を区別しないときは単に「桁側フレーム3」という場合がある。)により矩形の床材2を支持するように構成されており、床材2の両側縁から突出する一対の桁側フレーム3A、3Bの両端部3a、3bには、それぞれ円形パイプ材から成る第1妻側フレーム4Aと第2妻側フレーム4B(両者を区別しないときは単に「妻側フレーム4」という場合がある。)が架設されている。 The scaffolding board 1 is configured to support a rectangular floor material 2 using a first girder side frame 3A and a second girder side frame 3B (sometimes simply referred to as "girder side frames 3" when there is no distinction between the two) made of square pipe materials arranged parallel to each other at a distance from each other, and a first girder side frame 4A and a second girder side frame 4B (sometimes simply referred to as "girder side frames 4" when there is no distinction between the two) made of circular pipe materials are erected on both ends 3a, 3b of a pair of girder side frames 3A, 3B that protrude from both side edges of the floor material 2.

更に、床材2の幅方向中央の下側には、円形パイプ材から成るセンターフレーム5が配設され、その両端部5a、5aを前記妻側フレーム4に溶接等で固着することにより連結している。 Furthermore, a center frame 5 made of a circular pipe material is arranged below the center of the width of the floor material 2, and both ends 5a, 5a are connected to the gable frame 4 by fixing them by welding or the like.

多数の足場板を順次、列設するに際して、先行側の足場板1と後続側の足場板1は、相互に桁側フレーム3A、3Bの側面を隣り合わせると共に、妻側フレーム4A、4Bに設けられた継手手段6により連結されるように構成されている。尚、継手手段6は、桁側フレーム3A、3Bに設けられる場合もあり、要するに、列設方向に関して隣り合う足場板1、1を相互に連結するように構成されている。 When multiple scaffolding boards are lined up in a row, the leading scaffolding board 1 and the trailing scaffolding board 1 are arranged so that the sides of the girder side frames 3A and 3B are adjacent to each other and connected by joint means 6 provided on the gable side frames 4A and 4B. Note that the joint means 6 may also be provided on the girder side frames 3A and 3B, and in short, the scaffolding boards 1, 1 adjacent to each other in the line-up direction are configured to be connected to each other.

図例の場合、妻側フレーム4は、両端部が第1桁側フレーム3A及び第2桁側フレーム3Bの外側面から突出しないように構成され、両端部のうち、一方の端部を第1桁側フレーム3Aの外側面に開口させることによりソケット6aを形成し、他方の端部に挿着した部材を第2桁側フレーム3Bの外側面よりも外側に突出させることによりプラグ6bを形成しており、隣り合う足場板1、1の妻側フレーム4、4の間において、プラグ6bをソケット6aに挿入して連結することにより、継手手段6を構成している。 In the illustrated example, the gable side frame 4 is configured so that both ends do not protrude from the outer surfaces of the first girder side frame 3A and the second girder side frame 3B. One of the ends is opened onto the outer surface of the first girder side frame 3A to form a socket 6a, and the other end is fitted with a member that protrudes outward beyond the outer surface of the second girder side frame 3B to form a plug 6b. The plug 6b is inserted into the socket 6a between the gable side frames 4, 4 of adjacent scaffolding boards 1, 1 to connect them, forming a joint means 6.

この際、相互に嵌合されたソケット6aとプラグ6bは、連結ピン7を貫通状態で挿着することにより抜止め保持される。 At this time, the socket 6a and plug 6b, which are fitted together, are held in place by inserting the connecting pin 7 through the socket 6a and plug 6b.

ところで、高速道路に代表されるように、高架構築物の延長方向は、必ずしも直線方向に限らず、カーブを描く曲線方向が含まれる。従って、吊り足場も、これに応じた方向に向けて構築する必要がある。このため、前記継手手段6は、ソケット6aをプラグ6bに摺動自在に挿入する構成とされている。そして、連結ピン7を挿入するプラグ6bの挿通孔を長孔8により形成し、該長孔8の範囲でプラグ6bとソケット6aの摺動を許すように構成しており、これにより、隣り合う足場板1、1の間隔が調節可能とされている。 However, as typified by expressways, the extension direction of an elevated structure is not necessarily limited to a straight line, but can also include curved lines. Therefore, the suspended scaffolding must also be constructed in a direction that corresponds to this. For this reason, the joint means 6 is configured so that the socket 6a can be slidably inserted into the plug 6b. The insertion hole of the plug 6b into which the connecting pin 7 is inserted is formed by a long hole 8, and the plug 6b and socket 6a are allowed to slide within the range of the long hole 8, making it possible to adjust the distance between adjacent scaffolding boards 1, 1.

図例の場合、連結ピン7は、紛失防止用のチェーン等の索条に繋留され、該索条は、第1桁側フレーム3Aの端部3a、3aに固設したブラケット7aに係着されている。 In the example shown in the figure, the connecting pin 7 is tethered to a rope such as a chain to prevent loss, and the rope is attached to a bracket 7a fixed to the ends 3a, 3a of the first girder side frame 3A.

吊り足場の構築に際して、足場板1は、前記ソケット6aとプラグ6bを交互に連結することにより、既設構築物に沿って列設され、チェーン等の索条9により、既設構築物の下側に吊持される。このようなチェーン等の索条9による吊持を可能にするため、前記床材2には、前記センターフレーム5に臨む窓孔10が所定間隔をあけて開設されており、前記フレーム5には、各窓孔10に臨む環状の吊下げ金具11が設けられている。従って、前記吊下げ金具11に索条9を連結することにより、該金具11を介してフレーム5を吊持するように構成されている。 When constructing a suspended scaffold, the scaffold boards 1 are lined up along the existing structure by alternately connecting the sockets 6a and plugs 6b, and are suspended from the underside of the existing structure by ropes 9 such as chains. To enable such suspension by ropes 9 such as chains, the floor material 2 has window holes 10 at predetermined intervals facing the center frame 5, and the frame 5 is provided with annular suspension fittings 11 facing each window hole 10. Therefore, by connecting the ropes 9 to the suspension fittings 11, the frame 5 is suspended via the fittings 11.

図示省略しているが、チェーン等の索条9は、1本の索条を下端で折返すことにより2条を並設したものとして垂設され、折返し部を前記吊下げ金具11に挿通することにより、該金具11を吊持する。従って、索条9は、図示のように、折返し部をセンターフレーム5の端部5aに巻回させることにより、該端部5aを吊持するためにも使用される。 Although not shown in the figure, a rope 9 such as a chain is hung by folding one rope back at the bottom end to form two parallel ropes, and the folded portion is inserted into the hanging fitting 11 to suspend the fitting 11. Therefore, as shown in the figure, the rope 9 is also used to suspend the end 5a of the center frame 5 by wrapping the folded portion around the end 5a.

特許第6366472号公報Patent No. 6366472 特許第6426917号公報Patent No. 6426917 特許第6663726号公報Patent No. 6663726

吊り足場を構築するために列設された多数の足場板は、全て、それぞれが複数本の索条9により吊持されている。 All of the numerous scaffolding boards lined up to construct the suspended scaffolding are suspended by multiple ropes 9.

上述のように、隣り合う先行側の足場板と後続側の足場板は、継手手段6により連結されているが、継手手段6は、両足場板の間隔を調節可能として連結するためのものであり、互いの荷重を支持し合う剛体構造を形成していない。従って、各々の足場板を複数本の索条9により吊持していることが必要であり、もしも、足場板から索条を取り外し除去したときは、その足場板は落下するおそれがあり、極めて危険である。 As mentioned above, adjacent leading and trailing scaffolding boards are connected by joint means 6, but joint means 6 is intended to connect the two scaffolding boards so that the distance between them can be adjusted, and does not form a rigid structure that supports each other's load. Therefore, each scaffolding board needs to be suspended by multiple ropes 9, and if the ropes are removed from a scaffolding board, there is a risk that the board will fall, which is extremely dangerous.

このため、構築された吊り足場の床面上には多数の索条9が林立した状態で張り巡らされることになる。 As a result, a large number of cables 9 are stretched across the floor of the constructed suspended scaffolding.

ところで、吊り足場は、先行設置された足場板により構築された床面に対して、順次、増設用の足場板を所定位置まで運搬することにより供給し、後続する足場板を継ぎ足しつつ増設することにより、床面を拡張する構成とされている By the way, the suspended scaffolding is designed to expand the floor surface by transporting additional scaffolding boards to a designated position in sequence to the floor surface constructed by the previously installed scaffolding boards, and then adding subsequent scaffolding boards one by one.

しかしながら、上述のように多数本の索条が張り巡らされた状況において、長尺で大型の足場板を持ち運ぶ際には、索条の干渉を回避しながら行わなければならず、運搬作業が煩雑であり、作業のための労力と時間を強いられるという問題がある。 However, in a situation where many cables are strung as described above, when transporting long, large scaffolding boards, it is necessary to avoid interference with the cables, which makes the transportation work complicated and requires a lot of effort and time.

その他、足場板の運搬に限らず、作業者が床面の上を往来する際にも、多数の索条により円滑な往来が妨げられるという問題がある。 In addition to the problem of transporting scaffolding boards, there is also the problem of workers moving around on the floor surface being hindered by the large number of cables.

そこで、本発明は、吊り足場の床面上に林立状態で張り巡らされる索条に関し、少なくとも吊り足場の構築体において直線方向に向けて列設される足場板から索条を取り外し除去するように構成することが可能なことを知見した結果、索条の本数を減少させることにより上記問題を解決した吊り足場の構築方法及び構築用装置を提供することを課題としている。 The present invention relates to the ropes that are stretched in a forest-like fashion on the floor surface of a suspended scaffold, and has discovered that it is possible to configure the ropes to be detached and removed from the scaffolding boards that are arranged in a straight line at least in the structure of the suspended scaffold. As a result, the objective of the present invention is to provide a method and device for constructing a suspended scaffold that solves the above problem by reducing the number of ropes.

そこで、本発明の吊り足場の構築方法が手段として構成したところは、既設構築物に足場板を索条により吊持すると共に、多数の足場板を順次、既設構築物の延長方向に列設することにより構築される吊り足場であり、前記足場板は、床板を支持する一対の桁側フレームと、該桁側フレームに架設された妻側フレームと、列設方向に隣り合う足場板を相互に接合する継手手段を設けており、列設方向に隣り合う先行側の足場板をメイン足場板とし、後続側の足場板をサブ足場板として、メイン足場板の妻側近傍部の下側に梁部材を取付け固定し、該梁部材に延設された支持部をサブ足場板の下側に向けて配置させる準備工程を有し、前記準備工程を経たメイン足場板とサブ足場板を索条により吊持した状態で、両足場板の桁側フレームを隣り合わせる隣接工程と、両足場板を相互に前記継手手段により接合する接合工程と、前記メイン足場板に取付け固定された梁部材の支持部の上にサブ足場板を支持させる支持工程とにより、梁部材に組付けられた複数の足場板によりユニットを形成するユニット形成方法を構成し、前記ユニット形成方法を繰返して実施することにより、順次、ユニットを列設すると共に、先行側のユニットのサブ足場板と後続側のユニットのメイン足場板の間において前記継手手段を接合することにより連結するユニット連結工程を有し、前記ユニットにおける足場板のうち、メイン足場板を索条により吊持させた状態で、サブ足場板から索条を取り外し除去する工程を有して成る点にある。 The method of constructing a suspended scaffold of the present invention is configured as a means for constructing a suspended scaffold by suspending a scaffold board from an existing structure with cables and lining up a number of scaffold boards in sequence in the extension direction of the existing structure, and the scaffold boards are provided with a pair of girder side frames supporting the floor board, a girder side frame erected on the girder side frames, and joint means for joining adjacent scaffold boards in the lining direction to each other, and includes a preparation step in which the leading scaffold board adjacent in the lining direction is the main scaffold board and the trailing scaffold board is the sub-scaffold board, a beam member is attached and fixed to the underside of the main scaffold board near the gable side, and the support part extended from the beam member is positioned toward the underside of the sub-scaffold board, and the main scaffold board and the sub-scaffold board that have undergone the preparation step are suspended by cables. The unit formation method forms a unit from multiple scaffolding boards attached to beam members by the adjacent process of arranging the girder side frames of both scaffolding boards next to each other, the joining process of joining both scaffolding boards to each other with the joint means, and the supporting process of supporting the sub-scaffolding board on the supporting part of the beam member attached and fixed to the main scaffolding board. The unit formation method is repeatedly performed to sequentially line up the units, and the unit connection process connects the sub-scaffolding board of the preceding unit and the main scaffolding board of the following unit by joining the joint means between them, and includes a process of removing the rope from the sub-scaffolding board while the main scaffolding board of the unit is suspended by the rope.

また、本発明の吊り足場の構築用装置が手段として構成したところは、前記吊り足場を構築するための足場板及び梁部材に関して、足場板は、桁側フレームと平行に延びるセンターフレームを床板の下側に配設すると共に該センターフレームの両端部を妻側フレームに固着して連結し、床板の両側縁と妻側フレームの間に形成された開口部に桁側フレームの両端部並びにセンターフレームの両端部を臨ませるように構成されており、前記梁部材は、メイン足場板の妻側近傍部の下側に取付け固定される基部と、該基部から延設された支持部を一体形成しており、前記基部は、メイン足場板の開口部に下方から挿入された状態で、桁側フレームの端部とセンターフレームの端部の少なくとも一方に取付固定される取付手段を設けて成る点にある。 In addition, the device for constructing a suspended scaffold of the present invention is configured as a means in that, with regard to the scaffolding boards and beam members for constructing the suspended scaffolding, the scaffolding boards have a center frame extending parallel to the girder side frame arranged on the underside of the floor board , and both ends of the center frame are fixedly connected to the gable side frame, so that both ends of the girder side frame and both ends of the center frame face the opening formed between both side edges of the floor board and the gable side frame, and the beam members integrally form a base that is attached and fixed to the underside of the main scaffolding board near the gable side, and a support portion extending from the base, and the base is provided with an attachment means that is attached and fixed to at least one of the ends of the girder side frame and the center frame when inserted into the opening of the main scaffolding board from below.

本発明の実施形態において、前記梁部材の基部に設けられた取付手段は、メイン足場板の開口部に下方から挿入された状態で、桁側フレームの端部の上面に係止するフック金具と、センターフレームの端部を全周から抱持する固定金具により構成されている。 In an embodiment of the present invention, the mounting means provided at the base of the beam member is composed of a hook fitting that is inserted from below into the opening of the main scaffolding board and engages with the upper surface of the end of the girder side frame, and a fixing fitting that embraces the end of the center frame from all around.

前記梁部材の支持部は、メイン足場板に継手手段を介して接合されたサブ足場板のセンターフレームの端部を下側から接支する接支台を設けている。 The support portion of the beam member is provided with a support base that supports from below the end of the center frame of the sub-scaffolding board, which is joined to the main scaffolding board via a joint means.

本発明によれば、吊り足場構築体の全体における索条の本数を減少させることができ、従来技術において床面上に多数の索条が林立した状態で張り巡らされていた環境を改善することができるという効果がある。 The present invention has the effect of reducing the number of cables in the entire suspended scaffolding structure, improving the environment in which numerous cables were stretched across the floor surface in a forested manner as in the conventional technology.

従来の吊り足場における足場板を示す斜視図である。FIG. 1 is a perspective view showing a scaffolding board in a conventional suspended scaffolding. 従来の足場板の列設方法を示す斜視図である。FIG. 1 is a perspective view showing a conventional method for arranging scaffolding boards. 従来の足場板を列設することにより構築された吊り足場の一部を示す斜視図である。FIG. 1 is a perspective view showing a portion of a suspended scaffold constructed by arranging conventional scaffolding boards in a row. 本発明の実施形態に関して、梁部材に組付けられたメイン足場板とサブ足場板により形成されたユニットを示す斜視図である。FIG. 2 is a perspective view showing a unit formed by a main scaffolding board and a sub-scaffolding board assembled to a beam member according to an embodiment of the present invention. 第1実施形態に係る梁部材に関して、梁部材とメイン足場板を分離状態で示す斜視図である。FIG. 2 is an oblique view showing a beam member according to the first embodiment in a separated state from a main scaffolding board. 梁部材の基部をメイン足場板に取付ける際の状態を示す斜視図である。13 is a perspective view showing the state when the base of the beam member is attached to the main scaffolding board. FIG. 梁部材の基部に設けられたフック金具をメイン足場板の桁側フレームの端部に係止した状態を示す斜視図である。This is an oblique view showing the state in which a hook fitting provided at the base of a beam member is engaged with the end of the girder side frame of the main scaffolding board. 梁部材の基部に設けられた固定金具をメイン足場板のセンターフレームの端部に固定することにより、準備工程を完了した状態を示す斜視図である。This is an oblique view showing the state in which the preparation process is completed by fixing the fixing brackets provided at the base of the beam members to the ends of the center frames of the main scaffolding boards. ユニット形成方法に関して、前記梁部材の支持部の上側でサブ足場板をメイン足場板に隣り合わせ、相互に継手手段を臨ませた状態を示す斜視図である。1 is a perspective view showing a state in which a sub-scaffolding board is placed adjacent to a main scaffolding board above the support portion of the beam member, with their joint means facing each other, in relation to a unit forming method. FIG. ユニット形成方法に関して、メイン足場板に対してサブ足場板を継手手段を介して接合し、サブ足場板を梁部材の支持部に支持させた状態を示す斜視図である。1 is a perspective view showing a state in which a sub-scaffolding board is joined to a main scaffolding board via a joint means and the sub-scaffolding board is supported on a support portion of a beam member, in relation to a unit forming method. FIG. 本発明の1実施形態に係る吊り足場の構築方法に関して、梁部材に組付けられるメイン足場板とサブ足場板によるユニットを形成するためのユニット形成方法の1サイクルを示しており、(A)は準備工程により梁部材が取付け固定されたメイン足場を索条により吊持した状態を示す斜視図、(B)はメイン足場板に後続側のサブ足場板を隣り合わせた隣接工程を示す斜視図、(C)はサブ足場板を継手手段によりメイン足場板に接合する接合工程と梁部材の支持部に支持させる支持工程を示す斜視図である。FIG. 1 shows one cycle of a unit formation method for forming a unit using a main scaffolding board and a sub-scaffolding board to be assembled to a beam member, for a method of constructing a suspended scaffolding according to one embodiment of the present invention, in which (A) is an oblique view showing the state in which the main scaffolding to which the beam member has been attached and fixed in the preparation process is suspended by cables, (B) is an oblique view showing the adjacent process in which the subsequent sub-scaffolding board is placed adjacent to the main scaffolding board, and (C) is an oblique view showing the joining process in which the sub-scaffolding board is joined to the main scaffolding board by a joint means, and the support process in which the sub-scaffolding board is supported on the support part of the beam member. 吊り足場の構築方法に関して、図11に示したユニットを先行側として、組付方法を繰返して実施することにより後続側のにユニットを列設する方法を示しており、(A)は先行側のユニットのメイン足場板が索条で吊持されておりサブ足場板から索条を取り外し除去する索条除去工程を実施した状態を示す斜視図、(B)はユニット連結工程に関して先行側のユニットのサブ足場板に対し後続側のユニットを形成するためのメイン足場板を隣り合わせた状態を示す斜視図、(C)は継手手段を接合することによりユニット連結工程を終えた状態を示す斜視図である。Regarding a method of constructing a suspended scaffolding, the unit shown in Figure 11 is used as the leading side, and the assembly method is repeated to line up units on the trailing side, where (A) is an oblique view showing the state in which the main scaffolding board of the leading unit is suspended by a cable and a cable removal process has been carried out in which the cable is removed from the sub-scaffolding board, (B) is an oblique view showing the state in which the main scaffolding board for forming the trailing unit is placed adjacent to the sub-scaffolding board of the leading unit in the unit connecting process, and (C) is an oblique view showing the state in which the unit connecting process has been completed by joining the joint means. 吊り足場の構築方法に関して、図12(C)の状態から、後続側においてユニット形成方法を実施している状態を示す斜視図である。This is a perspective view showing a state in which a unit formation method is being carried out on the subsequent side from the state shown in Figure 12 (C) in relation to a method of constructing a suspended scaffolding. 本発明の1実施形態に係る方法により構築された吊り足場に関して、メイン足場板とサブ足場板の2つの足場板によりユニットを形成し、ユニット毎にサブ足場板から索条を取り外し除去することにより索条除去工程を実施した状態を示す斜視図である。This is an oblique view showing a state in which a unit is formed from two scaffolding boards, a main scaffolding board and a sub-scaffolding board, for a suspended scaffolding constructed by a method according to one embodiment of the present invention, and a cable removal process is carried out by detaching and removing the cables from the sub-scaffolding board for each unit. 本発明の別の実施形態に係る吊り足場の構築方法を実施するために使用する梁部材の第2実施形態を示す斜視図である。FIG. 11 is a perspective view showing a second embodiment of a beam member used to carry out a method for constructing a suspended scaffolding according to another embodiment of the present invention. 第2実施形態に係る梁部材に関して、並設された2つのメイン足場板に対して梁部材の基部を取付け固定し、該梁部材の支持部に1つのサブ足場板を支持させることにより、合計3つの足場板によりユニットが形成された状態を示す斜視図である。This is an oblique view showing a state in which a unit is formed by attaching and fixing the base of a beam member to two main scaffolding boards arranged side by side and supporting one sub-scaffolding board on the support part of the beam member in the second embodiment, with a total of three scaffolding boards. 本発明の別の実施形態に係る方法により構築された吊り足場に関して、ユニットを形成する3つの足場板のうち、中央に位置するメイン足場板を索条により吊持させた状態で、その両側に位置するメイン足場板とサブ足場板から索条を取り外し除去することにより索条除去工程を実施した状態を示す斜視図である。This is an oblique view showing a state in which, for a suspended scaffolding constructed by a method according to another embodiment of the present invention, the main scaffolding board located in the center of the three scaffolding boards that form a unit is suspended by a rope, and the ropes are removed from the main scaffolding board and sub-scaffolding board located on both sides of it, thereby carrying out a rope removal process.

以下図面に基づいて本発明の好ましい実施形態を詳述する。 A preferred embodiment of the present invention will be described in detail below with reference to the drawings.

(吊り足場の構築方法)
図4ないし図14は、本発明に係る吊り足場の構築方法の1実施形態を示している。この際、足場板1は、図1ないし図3に基づいて上述した足場板と同様のものであり、吊り足場の構築方法は、このような足場板1を使用することにより実施され、索条9により吊持した状態で、多数の足場板1を順次、既設構築物の延長方向に列設することにより吊り足場を構築する。
(How to build a suspended scaffold)
Figures 4 to 14 show one embodiment of the method for constructing a suspended scaffold according to the present invention. In this case, the scaffold board 1 is the same as the scaffold board described above based on Figures 1 to 3, and the method for constructing a suspended scaffold is carried out by using such a scaffold board 1, and a large number of scaffold boards 1 are successively arranged in a row in the extension direction of an existing structure while being suspended by ropes 9, thereby constructing a suspended scaffold.

本発明の吊り足場の構築方法は、図4ないし図10に示すように、列設方向に隣り合う先行側の足場板1aをメイン足場板Mとし、後続側の足場板1bをサブ足場板Sとして、メイン足場板Mの妻側近傍部の下側に梁部材13の基部13aを取付け固定し、該梁部材13の基部13aから延設された支持部13bをサブ足場板Sの下側に向けて配置させる準備工程が実施される。 As shown in Figures 4 to 10, the method of constructing a suspended scaffold of the present invention involves a preparation process in which the leading scaffold board 1a adjacent to each other in the row installation direction is designated as the main scaffold board M, the trailing scaffold board 1b is designated as the sub-scaffold board S, the base 13a of the beam member 13 is attached and fixed to the underside of the main scaffold board M near the gable side, and the support part 13b extended from the base 13a of the beam member 13 is positioned toward the underside of the sub-scaffold board S.

そこで、前記準備工程を経ることにより梁部材13を取付け固定された先行側のメイン足場板1a(M)と、後続側のサブ足場板1b(S)は、それぞれ索条9a、9bにより吊持された状態で、両足場板の桁側フレーム3B、3Aを隣り合わせる隣接工程と、両足場板の相互に対向する妻側フレーム4を前記継手手段6により接合する接合工程と、前記メイン足場板1a(M)に取付け固定された梁部材13の基部13aから延設された支持部13bの上にサブ足場板1b(S)を支持させる支持工程とにより、梁部材13にメイン足場板1a(M)とサブ足場板1b(S)が組付けられたユニットUを形成するユニット形成方法が実施される。 Then, the leading main scaffolding board 1a (M) and the trailing sub-scaffolding board 1b (S), to which the beam member 13 has been attached and fixed through the preparation process, are suspended by the ropes 9a and 9b, respectively, and a unit formation method is carried out in which the girder side frames 3B and 3A of both scaffolding boards are arranged side by side, a joining process is performed in which the gable side frames 4 facing each other of both scaffolding boards are joined by the joint means 6, and a support process is performed in which the sub-scaffolding board 1b (S) is supported on the support part 13b extended from the base part 13a of the beam member 13 attached and fixed to the main scaffolding board 1a (M), thereby forming a unit U in which the main scaffolding board 1a (M) and the sub-scaffolding board 1b (S) are assembled to the beam member 13.

そして、前記ユニット形成方法を繰返して実施することにより、1番目のユニットU1から順次、ユニットU2、U3~Unが列設される。この際、先行側のユニットと後続側のユニットは、先行側のユニットのサブ足場板Sと後続側のユニットのメイン足場板Mの間において、継手手段6を接合することにより連結するユニット連結工程が実施される。 Then, by repeatedly carrying out the unit formation method, units U2, U3 to Un are lined up in sequence starting from the first unit U1. At this time, a unit connection process is carried out in which the leading unit and the trailing unit are connected by joining the joint means 6 between the sub-scaffolding board S of the leading unit and the main scaffolding board M of the trailing unit.

図4ないし図14に示す1実施形態の場合、前記ユニット形成方法が実施されたメイン足場板1a(M)とサブ足場板1b(S)の2つの足場板により1番目のユニットU1が形成されている。これにより、サブ足場板1b(S)の荷重は、メイン足場板1a(M)に取付け固定された梁部材13の支持部13bにより支持される。 In the case of one embodiment shown in Figures 4 to 14, the first unit U1 is formed by two scaffolding boards, a main scaffolding board 1a (M) and a sub-scaffolding board 1b (S), on which the unit formation method has been carried out. As a result, the load of the sub-scaffolding board 1b (S) is supported by the support part 13b of the beam member 13 attached and fixed to the main scaffolding board 1a (M).

ところで、1番目のユニットU1に引き続いて列設される2番目のユニットU2は、先ず、準備工程を経ることにより梁部材13を取付け固定したメイン足場板1c(M)が索条9cにより吊持された状態で、1番目のユニットU1のサブ足場板1b(S)に対して継手手段6により接合される。従って、2番目のユニットU2が形成される前に、ユニット連結工程が実施される。 The second unit U2, which is installed in a row following the first unit U1, first undergoes a preparation process in which the main scaffolding board 1c (M) to which the beam member 13 is attached and fixed is suspended by the ropes 9c, and then joined to the sub-scaffolding board 1b (S) of the first unit U1 by the joint means 6. Therefore, the unit connection process is carried out before the second unit U2 is formed.

その後、前記ユニット形成方法を繰返して実施することにより、2番目のユニットU2が形成される。つまり、メイン足場板1c(M)とその後続側のサブ足場板1d(S)をそれぞれ索条9c、9dにより吊持した状態で、前記隣接工程と、接合工程と、支持工程を実施し、これにより2番目のユニットU2が形成され、1番目のユニットU1に連結された状態で列設される。以後、同様にして、後続側のユニットU3~Unが列設される。 Then, the second unit U2 is formed by repeating the unit formation method. In other words, the main scaffolding board 1c (M) and its subsequent sub-scaffolding board 1d (S) are suspended by ropes 9c and 9d, respectively, and the adjoining process, joining process, and supporting process are carried out, forming the second unit U2, which is then lined up connected to the first unit U1. Thereafter, the subsequent units U3 to Un are lined up in a similar manner.

ところで、ユニットUは、メイン足場板Mに取付け固定した梁部材13の支持部13bにサブ足場板Sを支持させる構成とされているので、メイン足場板Mを索条9で吊持している限り、サブ足場板Sから索条9を取り外し除去しても、サブ足場板Sは、荷重が梁部材13により支持されているので、落下することはない。 The unit U is configured so that the sub-scaffolding board S is supported by the support portion 13b of the beam member 13 attached and fixed to the main scaffolding board M. Therefore, as long as the main scaffolding board M is suspended by the rope 9, even if the rope 9 is detached and removed from the sub-scaffolding board S, the sub-scaffolding board S will not fall because the load is supported by the beam member 13.

そこで、ユニットUが形成されたときは、それ以後は、ユニットUのメイン足場板Mだけを索条9により吊持させておき、サブ足場板Sを吊持していた索条9を取り外し除去する索条除去工程が実施される。 Therefore, when the unit U is formed, only the main scaffolding board M of the unit U is suspended by the ropes 9, and a rope removal process is carried out in which the ropes 9 that were suspending the sub-scaffolding board S are removed.

例えば、1番目のユニットU1において、サブ足場板1b(S)から索条9bを取り外し除去しても、該サブ足場板1b(S)は、落下するおそれはなく、支持状態が堅持されている。以後、ユニット連結工程を経て列設される後続側のU2、U3~Unにおいても、同様の索条除去工程が実施される。 For example, in the first unit U1, even if the cable 9b is removed from the sub-scaffolding board 1b (S), there is no risk of the sub-scaffolding board 1b (S) falling, and the support state is firmly maintained. After that, a similar cable removal process is carried out for the subsequent units U2, U3 to Un, which are lined up after the unit connection process.

ところで、索条除去工程を実施するタイミングは、必ずしも、ユニットUを形成した直後でなくても良く、ユニットUを形成した後に、随時、実施すれば良い。例えば、図12(C)に示す段階、つまり、先行側に形成されたユニットU1におけるサブ足場板1b(S)に対して、後続側で新たにユニットU2を形成するためのメイン足場板1c(M)が継手手段6を介して接合され、ユニット連結工程が実施されたときに、先行側のユニットU1におけるサブ足場板1bSを吊持していた索条9を取り外し除去する索条除去工程を実施しても良い。この場合、索条9bを取り外し除去されたサブ足場板1b(S)の荷重は、索条9aにより吊持されたメイン足場板1a(M)の梁部材13の支持部13bにより支持されている。そして、該サブ足場板1b(S)は、それぞれ継手手段6を介して、先行側では索条9aで吊持されたメイン足場板1a(M)に接合され、後続側では2番目のユニットU2を形成するために索条9cで吊持されたメイン足場板1c(M)に接合されているので、前後左右の位置ずれ移動が阻止されているので、作業者に安心感を与えることができる。 The timing of performing the cable removal process does not necessarily have to be immediately after the formation of the unit U, and it may be performed at any time after the formation of the unit U. For example, at the stage shown in FIG. 12(C), that is, when the main scaffolding board 1c(M) for forming a new unit U2 on the trailing side is joined to the sub-scaffolding board 1b(S) in the unit U1 formed on the leading side via the joint means 6 and the unit connection process is performed, the cable removal process may be performed to remove and remove the cable 9 that was suspending the sub-scaffolding board 1bS in the leading unit U1. In this case, the load of the sub-scaffolding board 1b(S) from which the cable 9b has been removed and removed is supported by the support part 13b of the beam member 13 of the main scaffolding board 1a(M) suspended by the cable 9a. The sub-scaffolding planks 1b (S) are connected via joint means 6 to the main scaffolding plank 1a (M) suspended by cables 9a on the leading side, and to the main scaffolding plank 1c (M) suspended by cables 9c on the trailing side to form the second unit U2, preventing misalignment in any direction, giving workers a sense of security.

(梁部材の第1実施形態)
図5ないし図10は、上述した構築方法の1実施形態を実施するために使用する梁部材13の第1実施形態を示している。
梁部材13は、角形パイプ材等により枠組形成された高剛性のフレーム構造を備えており、基部13aと支持部13bを一連一体に形成している。
(First embodiment of beam member)
5-10 show a first embodiment of a beam member 13 used to carry out one embodiment of the construction method described above.
The beam member 13 has a highly rigid frame structure formed by a framework of square pipe material or the like, and has a base portion 13a and a support portion 13b which are integrally formed in series.

足場板1の桁側フレーム3A、3Bの外側面の間隔寸法により規定される幅寸法Wに対して、基部13aの長さ寸法L1は、L1≦W(好ましくはL1=W)となるように形成され、支持部13bの長さ寸法L2は、L2≦W(好ましくはL2≒W)となるように形成されている。 With respect to the width dimension W, which is determined by the spacing dimension of the outer surfaces of the girder side frames 3A and 3B of the scaffolding board 1, the length dimension L1 of the base 13a is formed so that L1≦W (preferably L1=W), and the length dimension L2 of the support part 13b is formed so that L2≦W (preferably L2≒W).

前記梁部材13の基部13aは、先行側のメイン足場板1a(M)の妻側近傍部の下側に取付け固定されるように構成され、支持部13bは、後続側のサブ足場板1b(S)の妻側近傍部の下側に向けて延びるように構成されている。 The base 13a of the beam member 13 is configured to be attached and fixed to the underside of the gable side of the leading main scaffolding board 1a (M), and the support part 13b is configured to extend toward the underside of the gable side of the trailing sub-scaffolding board 1b (S).

前記基部13aの上面には、メイン足場板1a(M)の妻側に形成された開口部12に下方から挿入することにより取付け固定される取付手段14が固設されている。取付手段14は、メイン足場板1a(M)の先行側に配置される桁側フレーム3Aの端部3aに取付け固定される第1取付手段14aと、センターフレーム5の端部5aに取付け固定される第2取付手段14bにより構成することが好ましいが、堅固な取付け固定を可能とするこ構造のものであれば、第1取付手段14aと第2取付手段14bの一方だけで構成しても良い。或いは、図示していないが、更に第3取付手段を設けても良い。 A mounting means 14 is fixed to the upper surface of the base 13a, and is attached and fixed by inserting it from below into an opening 12 formed on the gable side of the main scaffolding board 1a (M). The mounting means 14 is preferably composed of a first mounting means 14a that is attached and fixed to the end 3a of the girder side frame 3A arranged on the leading side of the main scaffolding board 1a (M), and a second mounting means 14b that is attached and fixed to the end 5a of the center frame 5, but it may be composed of only one of the first mounting means 14a and the second mounting means 14b as long as the structure allows for firm attachment and fixation. Alternatively, a third mounting means (not shown) may be further provided.

図示実施形態の場合、第1取付手段14aは、メイン足場板1a(M)の先行側に配置される桁側フレーム3Aの端部3aとセンターフレーム5の端部5aとの間に形成された開口部12aに下方から挿入することにより、桁側フレーム3Aの端部3aの上面に係止するフック金具15により構成されている。この際、フック金具15は、基部13aの上面との間に溝部を形成し、該溝部に前記端部3aを嵌入するように構成されていることが好ましい。 In the illustrated embodiment, the first attachment means 14a is configured with a hook fitting 15 that engages with the upper surface of the end 3a of the girder side frame 3A by being inserted from below into an opening 12a formed between the end 3a of the girder side frame 3A arranged on the leading side of the main scaffolding board 1a (M) and the end 5a of the center frame 5. In this case, it is preferable that the hook fitting 15 is configured to form a groove between itself and the upper surface of the base 13a, and to fit the end 3a into the groove.

これに対して、第2取付手段14bは、センターフレーム5の端部5aを下から抱持する溝形部材16aと、該溝形部材16aに挿脱自在に挿着され、挿着したとき該端部5aの上面を横断して係止する係止ピン16bから成る固定金具16により構成されている。 In contrast, the second mounting means 14b is composed of a grooved member 16a that holds the end 5a of the center frame 5 from below, and a fixing bracket 16 that is removably inserted into the grooved member 16a and engages across the upper surface of the end 5a when inserted.

その一方において、前記支持部13bの上面には、後続側のサブ足場板1b(S)のセンターフレーム5の端部5aを下側から接支する接支台17が固設されている。 On the other hand, a support base 17 is fixed to the upper surface of the support portion 13b, which supports the end portion 5a of the center frame 5 of the following sub-scaffolding board 1b (S) from below.

第1実施形態に係る梁部材13をメイン足場板1a(M)に取付け固定する準備工程を図5ないし図8に示しており、その後、後続側のサブ足場板1b(S)を組付けることによりユニットU1を形成するユニット形成方法を図9及び図10に示している。 The preparation process for attaching and fixing the beam member 13 to the main scaffolding board 1a (M) according to the first embodiment is shown in Figs. 5 to 8, and then Figs. 9 and 10 show the unit formation method for forming the unit U1 by assembling the subsequent sub-scaffolding board 1b (S).

(準備工程)
梁部材13の基部13aをメイン足場板1a(M)の妻側近傍部の下側に取付け固定する際は、図6及び図7に示すように、梁部材13を傾斜姿勢として、索条9aにより吊持されたメイン足場板1a(M)の下方から、フック金具15を開口部12aに挿入し、フック金具15を桁側フレーム3Aの端部3aの上面に係止させる。この際、固定金具16は、係止ピン16bを抜いており、溝形部材16aの溝部を開放している。
(Preparation process)
When the base 13a of the beam member 13 is attached and fixed to the underside of the main scaffolding board 1a(M) near the gable side, as shown in Figures 6 and 7, the beam member 13 is tilted, and the hook fitting 15 is inserted into the opening 12a from below the main scaffolding board 1a(M) suspended by the ropes 9a, and the hook fitting 15 is engaged with the upper surface of the end 3a of the girder side frame 3A. At this time, the engaging pin 16b of the fixing fitting 16 is removed, and the groove of the channel-shaped member 16a is opened.

次いで、梁部材13を水平姿勢とするように持ち上げると、図8に示すように、固定金具16の溝形部材16aの溝部にセンターフレーム5の端部5aが嵌合されるので、溝形部材16aに係止ピン16bを挿着すると、該係止ピン16bが端部5aの上面に係止される。従って、溝形部材16aと係止ピン16bにより、端部5aを全周から抱持する。この状態において、基部13aの上面とフック金具15の間の溝部に桁側フレーム3Aの端部3aが嵌合されており、フック金具15が該端部3aの上面と内側面に係合する。 Next, when the beam member 13 is lifted to a horizontal position, the end 5a of the center frame 5 is fitted into the groove of the channel member 16a of the fixing bracket 16 as shown in FIG. 8, and when the locking pin 16b is inserted into the channel member 16a, the locking pin 16b is locked to the upper surface of the end 5a. Therefore, the channel member 16a and the locking pin 16b embrace the end 5a from all around. In this state, the end 3a of the girder side frame 3A is fitted into the groove between the upper surface of the base 13a and the hook fitting 15, and the hook fitting 15 engages with the upper surface and inner surface of the end 3a.

図示実施形態の場合、メイン足場板1a(M)を索条9aにより吊持した状態で、準備工程を実施しているが、地上等で準備工程を実施し、予め梁部材13を取付け固定したメイン足場板1a(M)を所定の高所まで引き上げ、高所においてメイン足場板1a(M)を索条9aにより吊持しても良い。 In the illustrated embodiment, the preparation process is carried out with the main scaffolding board 1a (M) suspended by the ropes 9a, but it is also possible to carry out the preparation process on the ground, etc., and then lift the main scaffolding board 1a (M) to which the beam members 13 have already been attached and fixed, up to a specified height, and then suspend the main scaffolding board 1a (M) at that height by the ropes 9a.

(ユニット形成方法)
メイン足場板1a(M)を索条9aにより吊持した状態で、梁部材13の支持部13bを利用することにより、サブ足場板1b(S)を組付けてユニットU1を形成する際は、図9に示すように、索条9bにより吊持されたサブ足場板1b(S)を傾斜姿勢として下向きとされた桁側フレーム3Bをメイン足場板1a(M)の桁側フレーム3Aに隣り合わせる(隣接工程)。両足場板の妻側フレーム4、4の継手手段6(ソケット6a及びプラグ6b)を対向させた状態で、図10に示すように、サブ足場板1b(S)を支持部13bに向けて水平姿勢となるように下降させながら、継手手段6が接合される(接合工程)。これにより、サブ足場板1b(S)におけるセンターフレーム5の端部5aの下面が支持部13bの接支台17に接支され(支持工程)、ユニットU1が形成される。
(Unit Formation Method)
When the sub-scaffolding board 1b (S) is assembled to form the unit U1 by using the support part 13b of the beam member 13 while the main scaffolding board 1a (M) is suspended by the rope 9a, the girder side frame 3B of the sub-scaffolding board 1b (S) suspended by the rope 9b is inclined and facing downward, and the girder side frame 3B is adjacent to the girder side frame 3A of the main scaffolding board 1a (M) as shown in Fig. 9 (adjacent process). With the joint means 6 (socket 6a and plug 6b) of the end frames 4, 4 of both scaffolding boards facing each other, the sub-scaffolding board 1b (S) is lowered to a horizontal position toward the support part 13b as shown in Fig. 10, and the joint means 6 is joined (joining process). As a result, the lower surface of the end 5a of the center frame 5 of the sub-scaffolding board 1b (S) is supported by the support base 17 of the support part 13b (support process), and the unit U1 is formed.

継手手段6が接合されていない状態で、サブ足場板1b(S)を傾斜姿勢から水平姿勢に向けて姿勢変更したとき、支持部13bの接支台17は、サブ足場板1b(S)におけるセンターフレーム5の端部5aに対向する位置に配設されており、前記端部5aの下面を受止める接支面17aと、前記端部5aの側面に臨む突部17bを設けている。 When the joint means 6 is not joined and the sub-scaffolding board 1b (S) is changed from an inclined position to a horizontal position, the abutment base 17 of the support part 13b is arranged in a position facing the end 5a of the center frame 5 on the sub-scaffolding board 1b (S), and is provided with a support surface 17a that receives the underside of the end 5a and a protrusion 17b that faces the side of the end 5a.

このため、前記センターフレーム5の端部5aを突部17bの内側に沿わせて接支面17aに仮置きしたとき、継手手段6のソケット6aとプラグ6bが相互に中心を同一高さとして対向させられるように構成されており、この状態から、前記端部5aを接支面17aの上で摺動させることにより、サブ足場板1b(S)をメイン足場板1a(M)に向けて移動すると、ソケット6aとプラグ6bが挿着されるように構成されている。 For this reason, when the end 5a of the center frame 5 is temporarily placed on the support surface 17a along the inside of the protrusion 17b, the socket 6a and plug 6b of the joint means 6 are configured to face each other with their centers at the same height, and from this state, when the end 5a is slid on the support surface 17a to move the sub scaffolding board 1b (S) toward the main scaffolding board 1a (M), the socket 6a and plug 6b are inserted and attached.

このように、接支台17は、接支面17aと突部17bにより、前記センターフレーム5の端部5aを受止めるための仮置き手段と、仮置きするときの位置決め手段を構成している。そして、接支面17aは、接合工程を容易に実施するために前記端部5aを摺動させる案内手段を構成している。 In this way, the support base 17, with its support surface 17a and protrusion 17b, constitutes a temporary placement means for receiving the end 5a of the center frame 5 and a positioning means for temporary placement. The support surface 17a also constitutes a guide means for sliding the end 5a to facilitate the joining process.

尚、図例の構成の場合、索条9は、足場板1の吊下げ金具に連結しているが、センターフレーム5の端部5aに連結するように構成しても良い。例えば、梁部材13の全体の厚さ寸法T(図5参照)を薄く形成しておけば、センターフレーム5の端部5aに索条9の取付け部を形成することが可能となる。 In the configuration shown in the figure, the rope 9 is connected to the hanging fitting of the scaffolding board 1, but it may be configured to be connected to the end 5a of the center frame 5. For example, if the overall thickness dimension T (see FIG. 5) of the beam member 13 is formed thin, it is possible to form an attachment portion for the rope 9 at the end 5a of the center frame 5.

(吊り足場の構築方法の1実施形態)
図11ないし図14は、本発明に係る吊り足場の構築方法の1実施形態を示しており、図11(A)ないし(C)は、列設方向に関する先行側のメイン足場板1a(M)と後続側のサブ足場板1b(S)を組付一体化してユニットUを形成するユニット形成方法の1サイクルを示している。この実施形態の場合、1つのメイン足場板Mと1つのサブ足場板SによりユニットUが構成され、ユニット毎にサブ足場板Sから索条9を取り外し除去する索条除去工程が実施される。
(One embodiment of a method for constructing a suspended scaffold)
11 to 14 show one embodiment of the method for constructing a suspended scaffold according to the present invention, and Fig. 11 (A) to (C) show one cycle of a unit formation method in which a leading main scaffold board 1a (M) and a trailing sub-scaffold board 1b (S) in the row installation direction are assembled and integrated to form a unit U. In this embodiment, a unit U is formed by one main scaffold board M and one sub-scaffold board S, and a cable removal process is carried out to remove and remove the cable 9 from the sub-scaffold board S for each unit.

図11(A)は、準備工程を経ることにより梁部材13を取付け固定したメイン足場板1a(M)が索条9aにより吊持されている状態を示しており、この状態から、サブ足場板1b(S)を索条9bにより吊持した状態で、上述のような隣接工程、接合工程、支持工程から成るユニット形成方法が実施され、図12(A)に示すように、ユニットU1が形成される。 Figure 11 (A) shows the state in which the main scaffolding board 1a (M), to which the beam member 13 has been attached and fixed through the preparation process, is suspended by the ropes 9a. From this state, the sub-scaffolding board 1b (S) is suspended by the ropes 9b, and the unit formation method consisting of the adjoining process, joining process, and support process described above is carried out, and a unit U1 is formed as shown in Figure 12 (A).

引き続き前記ユニット形成方法を繰返して実施することにより、1番目のユニットU1から順次、ユニットU2、U3~Unが列設される。 The unit formation method is then repeated to sequentially line up units U2, U3, and Un, starting with the first unit U1.

図12(A)に示すように、ユニットU1が形成されたとき、メイン足場板1a(M)だけを索条9aにより吊持させた状態で、サブ足場板1b(S)を吊持していた索条9bは取り外し除去される。つまり、索条除去工程が実施される。 As shown in FIG. 12(A), when unit U1 is formed, the rope 9b that holds the sub-scaffolding board 1b (S) is removed and removed while only the main scaffolding board 1a (M) is suspended by the rope 9a. In other words, the rope removal process is carried out.

索条9bが取り外し除去されても、サブ足場板1b(S)の荷重は、索条9aにより吊持されたメイン足場板1a(M)の梁部材13の支持部13bにより支持されている。従って、該サブ足場板1b(S)は、落下するおそれがなく、支持状態を堅持する。以後、ユニット連結工程を経て列設される後続側のU2、U3~Unにおいても、同様の索条除去工程が実施される。 Even if the cable 9b is removed, the load of the sub-scaffolding board 1b (S) is supported by the support part 13b of the beam member 13 of the main scaffolding board 1a (M) suspended by the cable 9a. Therefore, the sub-scaffolding board 1b (S) is not at risk of falling and maintains its supported state. After that, a similar cable removal process is carried out for the subsequent U2, U3 to Un, which are lined up after the unit connection process.

ところで、図11(A)ないし(C)及び図12(A)に示すユニットUを形成するための組付方法において、組付作業中にサブ足場板1b(S)を吊持する索条9bは、ユニットUを形成した後は取外し除去されるものであるから、該足場板1bの直上から垂設することは必要でない。つまり、索条は、既設構築物に列設されたU字形アンカー等の吊元を選択することにより垂設され、その際、足場板の荷重を支持するための索条は、該足場板の直上に位置する吊元から垂設する必要があるのに対して、前記足場板1bの索条9bは、組付方法を実施している間だけ足場板1bの落下を防止すれば足りるので、そのような必要はない。そこで、サブ足場板1b(S)の索条9bは、メイン足場板1a(M)の吊元の近傍に位置する吊元から垂設しても良く、これにより、作業者は、メイン足場板1a(M)の上から身を乗り出さなくてもサブ足場板1b(S)の索条9bの垂設作業を行うことができるという利点がある。 11(A) to (C) and 12(A) in the assembly method for forming the unit U, the rope 9b that suspends the sub-scaffolding board 1b (S) during the assembly work is removed and removed after the unit U is formed, so it is not necessary to install it from directly above the scaffolding board 1b. In other words, the rope is installed by selecting a suspension point of a U-shaped anchor or the like installed in a row on an existing structure, and in this case, the rope for supporting the load of the scaffolding board needs to be installed from a suspension point located directly above the scaffolding board, whereas the rope 9b of the scaffolding board 1b does not need to be installed because it is sufficient to prevent the scaffolding board 1b from falling only while the assembly method is being performed. Therefore, the ropes 9b of the sub-scaffolding board 1b (S) may be hung from a suspension point located near the suspension point of the main scaffolding board 1a (M), which has the advantage that workers can perform the work of hanging the ropes 9b of the sub-scaffolding board 1b (S) without having to lean over the main scaffolding board 1a (M).

このようにして、図14に示すように、構築後の吊り足場は、順次、構成されたユニットU1、U2、U3において、それぞれユニットUにおける1つのサブ足場板(S)から索条が除去され、吊り足場構築体の全体における索条の本数は、従来技術に比して1/2とされている。 In this way, as shown in Figure 14, in the constructed suspended scaffolding, the ropes are removed from one sub-scaffolding board (S) in each of the constructed units U1, U2, and U3, and the number of ropes in the entire suspended scaffolding structure is reduced to half compared to the conventional technology.

(吊り足場の構築方法の別の実施形態)
本発明の吊り足場の構築方法は、梁部材13を使用することにより組付けられたメイン足場板(M)とサブ足場板(S)によりユニットUを形成し、サブ足場板(S)の荷重を梁部材13に支持させることにより、該サブ足場板(S)から索条9を取り外し除去することを目的としている。
(Another embodiment of a method for constructing a suspended scaffold)
The method of constructing a suspended scaffolding of the present invention aims to form a unit U using a main scaffolding board (M) and a sub-scaffolding board (S) assembled using a beam member 13, and to detach and remove the ropes 9 from the sub-scaffolding board (S) by having the load of the sub-scaffolding board (S) supported by the beam member 13.

そこで、この点に関して、上述の実施形態においては、1つのメイン足場板(M)と1つのサブ足場板(S)による合計2つの足場板によりユニットUを形成するように構成しているが、以下に説明する別の実施形態は、ユニットUを2つのメイン足場板(M1)(M2)と1つのサブ足場板(S)により形成し、これにより中央に位置するメイン足場板(M2)を索条9で吊持させ、両側に位置する2つの足場板(M1)(S)から索条9を取り外し除去することを可能としている。 In this regard, in the above-described embodiment, the unit U is formed from a total of two scaffolding boards, one main scaffolding board (M) and one sub-scaffolding board (S), but in another embodiment described below, the unit U is formed from two main scaffolding boards (M1) (M2) and one sub-scaffolding board (S), thereby allowing the main scaffolding board (M2) located in the center to be suspended by the ropes 9 and the ropes 9 to be detached and removed from the two scaffolding boards (M1) (S) located on both sides.

このため、図15に示すような第2実施形態に係る梁部材13が使用される。この梁部材13は、並設される2つの第1メイン足場板1A(M1)及び第2メイン足場板1B(M2)の妻側近傍部の下側に取付け固定される第1基部13a1と第2基部13a2と、サブ足場板1C(S)の妻側近傍部の下側に向けて延びる支持部13bを一連に一体形成している。 For this reason, a beam member 13 according to the second embodiment as shown in Figure 15 is used. This beam member 13 is integrally formed with a first base portion 13a1 and a second base portion 13a2 that are attached and fixed to the underside of the gable side of the two juxtaposed first main scaffolding boards 1A (M1) and second main scaffolding boards 1B (M2), and a support portion 13b that extends toward the underside of the gable side of the sub-scaffolding board 1C (S).

第1基部13a1及び第2基部13a2は、それぞれメイン第1メイン足場板1A(M1)及び第2メイン足場板1B(M2)に取付け固定される取付手段14を設けており、支持部13bは、サブ足場板1C(S)のセンターフレーム5の端部5aを下側から接支する接支台17を設けている。これらの取付手段14及び接支台17は、上述の第1実施形態に係る梁部材のものと同様の構成としたものを図示しているが、これに限るものではなく、以下に述べるユニット形成方法を可能にするものであれば良い。 The first base 13a1 and the second base 13a2 are provided with mounting means 14 that are fixed to the first main scaffold board 1A (M1) and the second main scaffold board 1B (M2), respectively, and the support portion 13b is provided with a support base 17 that supports the end portion 5a of the center frame 5 of the sub scaffold board 1C (S) from below. These mounting means 14 and support base 17 are illustrated as having the same configuration as those of the beam member in the first embodiment described above, but are not limited to this and may be any that enables the unit formation method described below.

図16に示すように、相互に継手手段6により接合された第1メイン足場板1A(M1)及び第2メイン足場板1B(M2)の妻側近傍部の下側には、梁部材13の第1基部13a1及び第2基部13a2が取付け固定され、該梁部材13の支持部13bをサブ足場板1C(S)の下側に向けて配置させる準備工程が実施され、その後、支持部13bの上において、第2メイン足場板1B(M2)に対して、サブ足場板1C(S)を隣り合わせる隣接工程と、継手手段6を接合する接合工程と、該サブ足場板1C(S)を梁部材13の支持部13bに支持させる支持工程とから成るユニット形成方法が実施され、これによりユニットU1が形成される。 As shown in FIG. 16, the first base 13a1 and the second base 13a2 of the beam member 13 are attached and fixed to the underside of the gable side of the first main scaffolding board 1A (M1) and the second main scaffolding board 1B (M2), which are joined to each other by the joint means 6, and a preparation process is carried out in which the support part 13b of the beam member 13 is positioned toward the underside of the sub-scaffolding board 1C (S). Then, a unit formation method is carried out, which includes an adjoining process in which the sub-scaffolding board 1C (S) is placed adjacent to the second main scaffolding board 1B (M2) on the support part 13b, a joining process in which the joint means 6 is joined, and a support process in which the sub-scaffolding board 1C (S) is supported by the support part 13b of the beam member 13, thereby forming the unit U1.

以後は、上述の1実施形態の場合と同様のユニット連結工程を実施しながら、前記ユニット形成方法を繰返して実施することにより、図17に示すように、1番目のユニットU1から順次、ユニットU2、U3~Unが列設される。 Then, by repeating the unit formation method while carrying out the unit connection process similar to that in the first embodiment described above, units U2, U3 to Un are lined up in sequence starting from the first unit U1, as shown in Figure 17.

順次、先行側のユニットに対して後続側のユニットを形成するための第1メイン足場板M1がユニット連結工程を実施することにより連結されたとき、先行側のユニットは、第2メイン足場板M2を索条9により吊持した状態で、第1メイン足場M1及びサブ足場板Sから索条を取り外し除去する索条除去工程が実施される。或いは、各ユニットUを形成する度に、索条除去工程を実施しても良い。 When the first main scaffolding board M1 for forming the following unit is connected to the leading unit by carrying out the unit connection process, the leading unit carries out the cable removal process in which the cables are removed from the first main scaffolding M1 and the sub-scaffolding board S while the second main scaffolding board M2 is suspended by the cable 9. Alternatively, the cable removal process may be carried out each time each unit U is formed.

このようにして、構築後の吊り足場は、順次、構成されたユニットU1、U2・・・において、それぞれユニットにおける2つの足場板から索条が除去されており、吊り足場構築体の全体における索条の本数は、従来技術に比して1/3とされている。 In this way, after construction, the suspended scaffolding has the cables removed from the two scaffolding plates in each of the constructed units U1, U2, etc., and the number of cables in the entire suspended scaffolding structure is one-third of that in the conventional technology.

1 足場板
2 床材
3 桁側フレーム
3A 第1桁側フレーム
3B 第2桁側フレーム
3a、3b 端部
4 妻側フレーム
4A 第1妻側フレーム
4B 第2妻側フレーム
5 センターフレーム
5a 端部
6 継手手段
6a ソケット
6b プラグ
7 連結ピン
7a ブラケット
8 長孔
9 索条
10 窓孔
11 吊下げ金具
12a、12b 開口部
13 梁部材
13a 基部
13b 支持部
14 取付手段
14a 第1取付手段
14b 第2取付手段
15 フック金具
16 固定金具
16a 溝形部材
16b 係止ピン
17 接支台
17a 接支面
17b 突部
1 Scaffolding board 2 Floor material 3 Girder side frame 3A First girder side frame 3B Second girder side frame 3a, 3b End 4 End side frame 4A First girder side frame 4B Second girder side frame 5 Center frame 5a End 6 Joint means 6a Socket 6b Plug 7 Connecting pin 7a Bracket 8 Long hole 9 Rope 10 Window hole 11 Suspension fittings 12a, 12b Opening 13 Beam member 13a Base 13b Support part 14 Mounting means 14a First mounting means 14b Second mounting means 15 Hook fitting 16 Fixing fitting 16a Channel member 16b Locking pin 17 Support base 17a Support surface 17b Protrusion

Claims (4)

既設構築物に足場板を索条により吊持すると共に、多数の足場板を順次、既設構築物の延長方向に列設することにより構築される吊り足場であり、
前記足場板(1)は、床板(2)を支持する一対の桁側フレーム(3A)(3B)と、該桁側フレームに架設された妻側フレーム(4A)(4B)と、列設方向に隣り合う足場板を相互に接合する継手手段(6)を設けており、
列設方向に隣り合う先行側の足場板をメイン足場板(M)とし、後続側の足場板をサブ足場板(S)として、メイン足場板の妻側近傍部の下側に梁部材(13)を取付け固定し、該梁部材に延設された支持部(13b)をサブ足場板の下側に向けて配置させる準備工程を有し、
前記準備工程を経たメイン足場板とサブ足場板を索条(9)により吊持した状態で、
両足場板の桁側フレーム(3)を隣り合わせる隣接工程と、
両足場板を相互に前記継手手段(6)により接合する接合工程と、
前記メイン足場板(M)に取付け固定された梁部材の支持部(13b)の上にサブ足場板(S)を支持させる支持工程とにより、梁部材に組付けられた複数の足場板によりユニット(U)を形成するユニット形成方法を構成し、
前記ユニット形成方法を繰返して実施することにより、順次、ユニットを列設すると共に、先行側のユニットのサブ足場板(S)と後続側のユニットのメイン足場板(M)の間において前記継手手段(6)を接合することにより連結するユニット連結工程を有し、
前記ユニットにおける足場板のうち、メイン足場板(M)を索条(9)により吊持させた状態で、サブ足場板(S)から索条(9)を取り外し除去する工程を有して成ることを特徴とする吊り足場の構築方法。
A suspended scaffold is constructed by suspending a scaffolding board from an existing structure with a rope and lining up a number of scaffolding boards in the extension direction of the existing structure.
The scaffolding board (1) is provided with a pair of girder side frames (3A) and (3B) supporting a floor plate (2), end side frames (4A) and (4B) erected on the girder side frames, and joint means (6) for joining adjacent scaffolding boards in the row installation direction to each other,
a preparation step of fixing a beam member (13) to an underside of a part of the main scaffolding board adjacent to the gable side of the leading scaffolding board in the row installation direction as a main scaffolding board (M) and a trailing scaffolding board adjacent to the trailing scaffolding board (S) and arranging a support part (13b) extended from the beam member toward the underside of the sub-scaffolding board,
The main scaffolding plank and the sub scaffolding plank that have undergone the above preparation process are suspended by the ropes (9),
an adjoining process of aligning the girder side frames (3) of both scaffolding boards;
a joining step of joining both scaffolding boards to each other by the joint means (6);
and a supporting step of supporting a sub-scaffolding board (S) on the supporting portion (13b) of the beam member attached and fixed to the main scaffolding board (M). This constitutes a unit forming method for forming a unit (U) using a plurality of scaffolding boards attached to the beam member,
The method includes a unit connecting step of sequentially lining up units by repeatedly carrying out the unit forming method, and connecting the sub-scaffolding plank (S) of the preceding unit and the main scaffolding plank (M) of the succeeding unit by joining the joint means (6),
A method for constructing a suspended scaffold, comprising a step of detaching and removing the ropes (9) from the sub-scaffolding planks (S) while the main scaffolding plank (M) of the scaffolding planks in the unit is suspended by the ropes (9).
請求項1に記載の吊り足場を構築するための足場板及び梁部材に関して
足場板は、桁側フレーム(3)と平行に延びるセンターフレーム(5)を床板(2)の下側に配設すると共に該センターフレームの両端部(5a)を妻側フレーム(4)に固着して連結し、
床板(2)の両側縁と妻側フレーム(4)の間に形成された開口部(12)に桁側フレーム(3)の両端部(3a)(3b)並びにセンターフレーム(5)の両端部(5a)を臨ませるように構成され、
前記梁部材(13)は、メイン足場板(M)の妻側近傍部の下側に取付け固定される基部(13a)と、該基部から延設された支持部(13b)を一体形成しており、
前記基部(13a)は、メイン足場板(M)の開口部(12)に下方から挿入された状態で、桁側フレーム(3)の端部(3a,3b)とセンターフレーム(5)の端部(5a)の少なくとも一方に取付固定される取付手段(14)を設けて成ることを特徴とする吊り足場の構築用装置。
Regarding the scaffolding boards and beam members for constructing the suspended scaffolding according to claim 1,
The scaffolding board has a center frame (5) extending parallel to the girder side frame (3) disposed under the floor plate (2), and both ends (5a) of the center frame are fixed to the gable side frame (4) to connect them together.
The two ends (3a) and (3b) of the girder side frame (3) and the two ends (5a) of the center frame (5) are configured to face the openings (12) formed between the side edges of the floor plate (2) and the gable side frame (4).
The beam member (13) is integrally formed with a base portion (13a) that is attached and fixed to the underside of the main scaffolding board (M) near the gable side, and a support portion (13b) that extends from the base portion.
The base (13a) is inserted into the opening (12) of the main scaffolding board (M) from below and is provided with an attachment means (14) that is attached and fixed to at least one of the ends (3a, 3b) of the girder side frame (3) and the end (5a) of the center frame (5).
前記梁部材の基部(13a)に設けられた取付手段(14)は、メイン足場板(M)の開口部(12)に下方から挿入された状態で、桁側フレーム(3)の端部(3a,3b)の上面に係止するフック金具(15)と、センターフレーム(5)の端部(5a)を全周から抱持する固定金具(16)により構成されて成ることを特徴とする請求項2に記載の吊り足場の構築用装置。 The device for constructing a suspended scaffold as described in claim 2, characterized in that the mounting means (14) provided on the base (13a) of the beam member is composed of a hook fitting (15) that engages with the upper surface of the end (3a, 3b) of the girder side frame (3) when inserted from below into the opening (12) of the main scaffold board (M), and a fixing fitting (16) that embraces the end (5a) of the center frame (5) from all around. 前記梁部材の支持部(13b)は、メイン足場板(M)に継手手段(6)を介して接合されたサブ足場板(S)のセンターフレーム(5)の端部(5a)を下側から接支する接支台(17)を設けて成ることを特徴とする請求項2又は3に記載の吊り足場の構築用装置。 The device for constructing a suspended scaffold as described in claim 2 or 3, characterized in that the support portion (13b) of the beam member is provided with a support base (17) that supports from below the end portion (5a) of the center frame (5) of the sub-scaffold board (S) joined to the main scaffold board (M) via a joint means (6).
JP2021090204A 2021-05-28 2021-05-28 Method and device for constructing suspended scaffolding Active JP7655783B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021090204A JP7655783B2 (en) 2021-05-28 2021-05-28 Method and device for constructing suspended scaffolding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021090204A JP7655783B2 (en) 2021-05-28 2021-05-28 Method and device for constructing suspended scaffolding

Publications (2)

Publication Number Publication Date
JP2022182576A JP2022182576A (en) 2022-12-08
JP7655783B2 true JP7655783B2 (en) 2025-04-02

Family

ID=84329124

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021090204A Active JP7655783B2 (en) 2021-05-28 2021-05-28 Method and device for constructing suspended scaffolding

Country Status (1)

Country Link
JP (1) JP7655783B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7319447B1 (en) 2022-02-24 2023-08-01 株式会社神戸製鋼所 Aluminum alloy material and its manufacturing method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019167708A (en) 2018-03-22 2019-10-03 株式会社熊谷組 Floor material and floor structure using floor material

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019167708A (en) 2018-03-22 2019-10-03 株式会社熊谷組 Floor material and floor structure using floor material

Also Published As

Publication number Publication date
JP2022182576A (en) 2022-12-08

Similar Documents

Publication Publication Date Title
US7137478B2 (en) Ladder safety cage
JPH1113275A (en) Aerial expansion type suspended scaffold and its construction
JP7655783B2 (en) Method and device for constructing suspended scaffolding
JP3878277B2 (en) Scaffolding unit
CN213268827U (en) Operating platform is decorated to suspension type socket joint type under large-span high altitude steel construction vestibule
JP5654710B1 (en) Parent rope support
JP2015229852A (en) Side wall erection method and apparatus in suspension scaffold
JP4683595B2 (en) Mounting method of handrail on frame scaffold
JP3761800B2 (en) Scaffolding bracket, scaffolding frame and scaffold construction method
JP2010090676A (en) Ledger frame with floor, and frame scaffold
JP7655782B2 (en) Method and device for constructing suspended scaffolding
JP3043691B2 (en) Mounting device for loading stage for frame scaffold
JP7799568B2 (en) Suspended scaffolding assembly method and suspended scaffolding assembly device
CN218521619U (en) A assembled support for bridge construction
JP2664642B2 (en) Cover for covering the connecting space of hanging scaffold and connecting space covering structure using it
JP3332210B2 (en) Mounting bracket for frame scaffold
JP7524001B2 (en) Scaffolding device and method for installing scaffolding device
KR102887791B1 (en) System scaffold build method one body type precedence safety handrail
JP6929180B2 (en) Temporary construction method for work scaffolding in a boiler
JPH0874415A (en) Method for executing precut scaffold
JP2020183654A (en) Panel device and how to install the panel device
JP2026011027A (en) How to construct and remove scaffolding structures
CN114439248B (en) Steel column installation method
JP2026011026A (en) Scaffolding structure and connector for scaffolding structure
JP2026011028A (en) Frame members for scaffolding structures, scaffolding construction method, and scaffolding removal method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240501

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20241121

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20241203

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250114

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250304

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250321

R150 Certificate of patent or registration of utility model

Ref document number: 7655783

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150