Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7656819B2 - Boost connection circuit, power conversion system - Google Patents
[go: Go Back, main page]

JP7656819B2 - Boost connection circuit, power conversion system - Google Patents

Boost connection circuit, power conversion system Download PDF

Info

Publication number
JP7656819B2
JP7656819B2 JP2021122444A JP2021122444A JP7656819B2 JP 7656819 B2 JP7656819 B2 JP 7656819B2 JP 2021122444 A JP2021122444 A JP 2021122444A JP 2021122444 A JP2021122444 A JP 2021122444A JP 7656819 B2 JP7656819 B2 JP 7656819B2
Authority
JP
Japan
Prior art keywords
voltage
boost
power
output
circuit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021122444A
Other languages
Japanese (ja)
Other versions
JP2023018368A (en
Inventor
隆史 安藤
真之 石田
昂洋 吉松
正樹 神野
之広 村田
修平 西川
聖史 森田
智哉 合田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Intellectual Property Management Co Ltd
Original Assignee
Panasonic Intellectual Property Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panasonic Intellectual Property Management Co Ltd filed Critical Panasonic Intellectual Property Management Co Ltd
Priority to JP2021122444A priority Critical patent/JP7656819B2/en
Publication of JP2023018368A publication Critical patent/JP2023018368A/en
Application granted granted Critical
Publication of JP7656819B2 publication Critical patent/JP7656819B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Dc-Dc Converters (AREA)

Description

本開示は、出力電圧が異なる複数の直流電源の出力を統合するための昇圧接続回路、電力変換システムに関する。 This disclosure relates to a boost connection circuit and power conversion system for integrating the outputs of multiple DC power sources with different output voltages.

再生可能エネルギーへの注目が集まる中、太陽光発電システムの普及が拡大している。複数の太陽電池ストリングが設置される太陽光発電システムにおいて、パワーコンディショナの前段に、複数の太陽電池ストリングで発電された直流電流を統合するための接続箱が設置されることがある。 As renewable energy sources are gaining attention, the use of solar power generation systems is expanding. In solar power generation systems in which multiple solar cell strings are installed, a junction box is sometimes installed before the power conditioner to integrate the direct current generated by the multiple solar cell strings.

屋根の形状などにより、複数の太陽電池ストリングのそれぞれを構成する太陽電池モジュールの枚数を統一できない場合がある。その場合、パワーコンディショナの前段に昇圧機能付接続箱が設置される。昇圧機能付接続箱は、太陽電池モジュールの直列数が少ない太陽電池ストリングの電圧を、標準の太陽電池ストリングの電圧まで昇圧して各太陽電池ストリングの直流電流を統合する機能を有する(例えば、特許文献1、2参照)。 Due to factors such as the shape of the roof, it may not be possible to standardize the number of solar cell modules that make up each of the multiple solar cell strings. In such cases, a junction box with a boost function is installed in front of the power conditioner. The junction box with a boost function has the function of boosting the voltage of a solar cell string with a small number of solar cell modules connected in series to the voltage of a standard solar cell string and integrating the direct current of each solar cell string (see, for example, Patent Documents 1 and 2).

特開2016-10232号公報JP 2016-10232 A 特開2013-218503号公報JP 2013-218503 A

パワーコンディショナの負荷変動により、パワーコンディショナの前段に接続された昇圧機能付接続箱の出力電圧が上昇する場合がある。昇圧機能付接続箱の出力電圧が、パワーコンディショナの最大入力電圧を超えた場合、パワーコンディショナで入力過電圧エラーが発報される。また、パワーコンディショナ内で使用されている部品が耐圧超過し、部品に不具合が発生する場合がある。 Load fluctuations on the power conditioner may cause the output voltage of the boost junction box connected in front of the power conditioner to rise. If the output voltage of the boost junction box exceeds the maximum input voltage of the power conditioner, the power conditioner will issue an input overvoltage error. In addition, components used in the power conditioner may exceed their voltage resistance, causing malfunctions.

パワーコンディショナには、最大入力電圧が異なる複数の機種が存在し、接続される太陽電池ストリングの開放電圧に応じて、機種が選定される。昇圧機能付接続箱は、最大出力電圧が異なる複数の機種が用意され、接続されるパワーコンディショナの最大入力電圧に応じて機種が選定されていた。 There are multiple models of power conditioners with different maximum input voltages, and the model is selected depending on the open circuit voltage of the solar cell string to be connected. There are multiple models of junction boxes with boost function with different maximum output voltages, and the model is selected depending on the maximum input voltage of the power conditioner to be connected.

昇圧機能付接続箱として複数の機種を用意することは、製造コストの上昇に繋がる。また、人的ミスにより、施工時に誤った機種の昇圧機能付接続箱を、パワーコンディショナに接続してしまうリスクがある。 Providing multiple models of boost function junction boxes leads to higher manufacturing costs. In addition, there is a risk that human error will result in connecting the wrong model of boost function junction box to the power conditioner during installation.

本開示はこうした状況に鑑みなされたものであり、その目的は、種々の電力変換装置に接続可能な汎用性の高い昇圧接続回路、電力変換システムを提供することにある。 This disclosure has been made in light of these circumstances, and its purpose is to provide a highly versatile boost connection circuit and power conversion system that can be connected to a variety of power conversion devices.

上記課題を解決するために、本開示のある態様の昇圧接続回路は、第1の直流電源より開放電圧が低い第2の直流電源から出力される直流電力の電圧を昇圧可能な昇圧回路と、前記昇圧回路の出力配線と、前記第1の直流電源の出力配線が合流した合流出力配線と、前記昇圧回路を制御する制御部と、を備える。前記合流出力配線は、本昇圧接続回路から供給される直流電力を交流電力に変換する電力変換装置に接続され、本昇圧接続回路は、前記電力変換装置の最大入力電圧を超えないように、前記昇圧回路の最大出力電圧の設定を切替えることが可能である。 In order to solve the above problem, a boost connection circuit according to one embodiment of the present disclosure includes a boost circuit capable of boosting the voltage of DC power output from a second DC power source having a lower open circuit voltage than a first DC power source, an output wiring of the boost circuit, a junction output wiring in which the output wiring of the first DC power source is joined, and a control unit that controls the boost circuit. The junction output wiring is connected to a power conversion device that converts the DC power supplied from the boost connection circuit into AC power, and the boost connection circuit is capable of switching the setting of the maximum output voltage of the boost circuit so as not to exceed the maximum input voltage of the power conversion device.

本開示によれば、種々の電力変換装置に接続可能な汎用性の高い昇圧接続回路を実現することができる。 This disclosure makes it possible to realize a highly versatile boost connection circuit that can be connected to a variety of power conversion devices.

実施の形態に係る太陽光発電システムの構成例を示す図である。1 is a diagram illustrating a configuration example of a solar power generation system according to an embodiment. 昇圧回路の回路構成例を示す図である。FIG. 2 is a diagram illustrating an example of a circuit configuration of a boost circuit. 太陽電池モジュールの電力-電圧特性(P-V曲線)を示す図である。FIG. 1 is a diagram showing the power-voltage characteristics (PV curve) of a solar cell module. 最大出力電圧の切り替え機能を有する昇圧接続箱の操作部の一例を示す図である。1 is a diagram showing an example of an operation unit of a boost junction box having a function of switching a maximum output voltage; 最大出力電圧の切り替え機能を有する昇圧接続箱の操作部の別の例を示す図である。13 is a diagram showing another example of an operation unit of a boost junction box having a function of switching the maximum output voltage. FIG. 図5に示した操作部の使用例を説明するための図である。6 is a diagram for explaining an example of use of the operation unit shown in FIG. 5 . FIG. 昇圧機がパワコンの最大入力電圧を自動判定する際の波形推移の一例を示す図である。FIG. 13 is a diagram showing an example of a waveform transition when a booster automatically determines a maximum input voltage of a power conditioner. 昇圧機がパワコンの最大入力電圧を自動判定する際の波形推移の別の例を示す図である。FIG. 11 is a diagram showing another example of a waveform transition when the booster automatically determines the maximum input voltage of the inverter. 複数の種類の太陽電池モジュールの最大出力電力Pmax(W)、最大出力動作電圧Vpm(V)、開放電圧Voc(V)、最大出力電流Imax(A)、短絡電流Isc(A)、定数βをまとめたグラフを示す図である。FIG. 1 is a graph summarizing the maximum output power Pmax (W), maximum output operating voltage Vpm (V), open circuit voltage Voc (V), maximum output current Imax (A), short circuit current Isc (A), and constant β of multiple types of solar cell modules. 実施の形態に係る、昇圧機による最大出力電圧の切り替え処理の流れを示すフローチャートである。5 is a flowchart showing a flow of a process for switching a maximum output voltage by a booster according to an embodiment. 図10のステップS20に示したパワコンの最大入力電圧の自動判定処理のサブルーチンを示すフローチャートである。11 is a flowchart showing a subroutine of the process of automatically determining the maximum input voltage of the inverter shown in step S20 of FIG. 10 .

図1は、実施の形態に係る太陽光発電システムの構成例を示す図である。図1に示す太陽光発電システムは、複数の太陽電池ストリングPV1、PV2と電力変換システム1を備える。電力変換システム1は、昇圧機能付接続箱(以下適宜、昇圧接続箱または単に昇圧機と呼ぶ)10と電力変換装置20を備える。 Figure 1 is a diagram showing an example of the configuration of a solar power generation system according to an embodiment. The solar power generation system shown in Figure 1 includes multiple solar cell strings PV1 and PV2 and a power conversion system 1. The power conversion system 1 includes a junction box with a boost function (hereinafter, appropriately referred to as a boost junction box or simply a booster) 10 and a power conversion device 20.

第1太陽電池ストリングPV1は、直列接続された複数の太陽電池モジュール(太陽光パネル)を含む。第2太陽電池ストリングPV2は、第1太陽電池ストリングPV1より直列数が少ない太陽電池モジュールを含む。例えば、第1太陽電池ストリングPV1は5枚の太陽電池モジュールを含み、第2太陽電池ストリングPV2は3枚の太陽電池モジュールを含んでいてもよい。 The first solar cell string PV1 includes a plurality of solar cell modules (solar panels) connected in series. The second solar cell string PV2 includes solar cell modules with a smaller number of series connections than the first solar cell string PV1. For example, the first solar cell string PV1 may include five solar cell modules, and the second solar cell string PV2 may include three solar cell modules.

各太陽電池モジュールは、直列接続された複数の太陽電池セルを含む。太陽電池セルは、光起電力効果を利用し、光エネルギーを直接、直流電力に変換することができる。太陽電池セルとして、ヘテロ接合太陽電池、多結晶シリコン太陽電池、単結晶シリコン太陽電池、薄膜シリコン太陽電池、化合物系太陽電池などを使用することができる。 Each solar cell module includes multiple solar cells connected in series. The solar cells can convert light energy directly into DC power using the photovoltaic effect. The solar cells can be heterojunction solar cells, polycrystalline silicon solar cells, single crystal silicon solar cells, thin film silicon solar cells, compound solar cells, etc.

昇圧接続箱10は、昇圧回路11、制御部12、操作部13、第1入力端子IN1、第2入力端子IN2、第1開閉器RY1、第2開閉器RY2、逆流防止ダイオードD1、出力端子OUT、入力電圧センサV1、入力電流センサA1、出力電圧センサV2および出力電流センサA2を含む。 The boost connection box 10 includes a boost circuit 11, a control unit 12, an operation unit 13, a first input terminal IN1, a second input terminal IN2, a first switch RY1, a second switch RY2, a backflow prevention diode D1, an output terminal OUT, an input voltage sensor V1, an input current sensor A1, an output voltage sensor V2, and an output current sensor A2.

第2太陽電池ストリングPV2は第1太陽電池ストリングPV1より直列数が少ないため、第1太陽電池ストリングPV1より開放電圧が低い。第1太陽電池ストリングPV1は第1入力端子IN1に接続され、第1入力端子IN1に入力された電力が、出力配線W1に供給される。出力配線W1には、第1開閉器RY1と逆流防止ダイオードD1が接続される。第2太陽電池ストリングPV2は第2入力端子IN2に接続され、第2入力端子IN2に入力された電力が、第2開閉器RY2を介して出力配線W2に供給され、さらに昇圧回路11に接続される。 The second solar cell string PV2 has a lower open circuit voltage than the first solar cell string PV1 because it has a smaller number of series connections than the first solar cell string PV1. The first solar cell string PV1 is connected to the first input terminal IN1, and the power input to the first input terminal IN1 is supplied to the output wiring W1. The first switch RY1 and the backflow prevention diode D1 are connected to the output wiring W1. The second solar cell string PV2 is connected to the second input terminal IN2, and the power input to the second input terminal IN2 is supplied to the output wiring W2 via the second switch RY2, and is further connected to the boost circuit 11.

第1太陽電池ストリングPV1の出力配線W1と、昇圧回路11の出力配線Wbは端子台(不図示)で合流され、端子台と電力変換装置20の入力端子との間が合流出力配線Wmで接続される。以下、本明細書では第1太陽電池ストリングPV1と端子台との間の回路を標準回路系、第2太陽電池ストリングPV2と端子台との間の回路を昇圧回路系と呼ぶ。 The output wiring W1 of the first solar cell string PV1 and the output wiring Wb of the boost circuit 11 are joined at a terminal block (not shown), and the terminal block is connected to the input terminal of the power conversion device 20 by the joined output wiring Wm. Hereinafter, in this specification, the circuit between the first solar cell string PV1 and the terminal block is referred to as the standard circuit system, and the circuit between the second solar cell string PV2 and the terminal block is referred to as the boost circuit system.

昇圧回路11は、第2太陽電池ストリングPV2から出力される直流電力の電圧を昇圧可能なDC/DCコンバータである。昇圧回路11は、第2太陽電池ストリングPV2の出力電圧を標準回路系の電圧まで昇圧させることにより、第1太陽電池ストリングPV1の出力電力と第2太陽電池ストリングPV2の出力電力を統合して、出力端子OUTを介して電力変換装置20に供給することができる。 The boost circuit 11 is a DC/DC converter capable of boosting the voltage of the DC power output from the second solar cell string PV2. The boost circuit 11 boosts the output voltage of the second solar cell string PV2 to the voltage of the standard circuit system, thereby integrating the output power of the first solar cell string PV1 and the output power of the second solar cell string PV2 and supplying it to the power conversion device 20 via the output terminal OUT.

入力電圧センサV1は、第2太陽電池ストリングPV2の出力配線W2の電圧を検出して制御部12に出力する。入力電流センサA1は、第2太陽電池ストリングPV2の出力配線W2に流れる電流を検出して制御部12に出力する。出力電圧センサV2は、合流出力配線Wmの電圧を検出して制御部12に出力する。出力電流センサA2は、合流出力配線Wmに流れる電流を検出して制御部12に出力する。 The input voltage sensor V1 detects the voltage of the output wiring W2 of the second solar cell string PV2 and outputs it to the control unit 12. The input current sensor A1 detects the current flowing in the output wiring W2 of the second solar cell string PV2 and outputs it to the control unit 12. The output voltage sensor V2 detects the voltage of the junction output wiring Wm and outputs it to the control unit 12. The output current sensor A2 detects the current flowing in the junction output wiring Wm and outputs it to the control unit 12.

入力電圧センサV1、出力電圧センサV2は例えば、分圧抵抗と差動増幅器を含んで構成される。入力電流センサA1、出力電流センサA2は例えば、CTセンサやホールセンサを含んで構成される。 The input voltage sensor V1 and the output voltage sensor V2 are configured, for example, to include a voltage dividing resistor and a differential amplifier. The input current sensor A1 and the output current sensor A2 are configured, for example, to include a CT sensor or a Hall sensor.

操作部13は、施工者あるいはユーザの操作を受け付け、操作信号を制御部12に出力する。 The operation unit 13 accepts operations by the installer or user and outputs an operation signal to the control unit 12.

制御部12は、各センサから入力される電圧、電流をもとに昇圧回路11を制御する。制御部12は、昇圧回路11の昇圧動作を制御して、入力電圧センサV1で検出される電圧および入力電流センサA1で検出される電流を制御することで、第2太陽電池ストリングPV2の発電電力を最適化することができる(詳細は後述する)。 The control unit 12 controls the boost circuit 11 based on the voltage and current input from each sensor. The control unit 12 controls the boost operation of the boost circuit 11 to control the voltage detected by the input voltage sensor V1 and the current detected by the input current sensor A1, thereby optimizing the power generation of the second solar cell string PV2 (details will be described later).

制御部12は、ハードウェア資源とソフトウェア資源の協働、またはハードウェア資源のみにより実現できる。ハードウェア資源としてアナログ素子、マイクロコントローラ、DSP、ROM、RAM、ASIC、FPGA、その他のLSIを利用できる。ソフトウェア資源として、ファームウェアなどのプログラムを利用できる。 The control unit 12 can be realized by a combination of hardware and software resources, or by hardware resources alone. Analog elements, microcontrollers, DSPs, ROMs, RAMs, ASICs, FPGAs, and other LSIs can be used as hardware resources. Programs such as firmware can be used as software resources.

図2は、昇圧回路11の回路構成例を示す図である。図2に示す昇圧回路11は、入力コンデンサC1、リアクトルL1、ダイオードD2、スイッチング素子S1および出力コンデンサC2を含む昇圧チョッパである。 Figure 2 is a diagram showing an example of the circuit configuration of the boost circuit 11. The boost circuit 11 shown in Figure 2 is a boost chopper that includes an input capacitor C1, a reactor L1, a diode D2, a switching element S1, and an output capacitor C2.

第2太陽電池ストリングPV2の出力配線W2のプラス配線とマイナス配線間に、入力電圧センサV1と平滑用の入力コンデンサC1が接続される。第2太陽電池ストリングPV2の出力配線W2のプラス配線にリアクトルL1が挿入される。第2太陽電池ストリングPV2の出力配線W2のマイナス配線上に入力電流センサA1が設置される。なお、プラス配線上に設置されてもよい。 An input voltage sensor V1 and a smoothing input capacitor C1 are connected between the positive and negative wiring of the output wiring W2 of the second solar cell string PV2. A reactor L1 is inserted in the positive wiring of the output wiring W2 of the second solar cell string PV2. An input current sensor A1 is installed on the negative wiring of the output wiring W2 of the second solar cell string PV2. It may also be installed on the positive wiring.

昇圧回路11の出力配線Wbのプラス配線とマイナス配線間に、スイッチング素子S1と平滑用の出力コンデンサC2が接続される。昇圧回路11のスイッチング素子S1と出力コンデンサC2間のプラス配線にダイオードD2が直列に接続される。スイッチング素子S1とダイオードD2間のノードにリアクトルL1が接続される。ダイオードD2は、昇圧回路11の出力側からの電流の逆流を防止する。 A switching element S1 and a smoothing output capacitor C2 are connected between the positive and negative wiring of the output wiring Wb of the boost circuit 11. A diode D2 is connected in series to the positive wiring between the switching element S1 and the output capacitor C2 of the boost circuit 11. A reactor L1 is connected to the node between the switching element S1 and the diode D2. The diode D2 prevents reverse current flow from the output side of the boost circuit 11.

スイッチング素子S1には、IGBT(Insulated Gate Bipolar Transistor)やMOSFET(Metal-Oxide-Semiconductor Field-Effect Transistor)を使用することができる。リアクトルL1は、スイッチング素子S1のオン/オフに応じて、第2太陽電池ストリングPV2からの出力電流に基づくエネルギーの蓄積および放出を行う。 The switching element S1 can be an insulated gate bipolar transistor (IGBT) or a metal-oxide-semiconductor field-effect transistor (MOSFET). The reactor L1 stores and releases energy based on the output current from the second solar cell string PV2 depending on whether the switching element S1 is on or off.

制御部12は、スイッチング素子S1のオン/オフの比率(デューティ比)を制御することにより、昇圧比を制御することができる。制御部12は第2太陽電池ストリングPV2の出力電力(発電電力)が最大になるように昇圧回路11をMPPT(Maximum Power Point Tracking)制御することができる。 The control unit 12 can control the boost ratio by controlling the on/off ratio (duty ratio) of the switching element S1. The control unit 12 can perform MPPT (Maximum Power Point Tracking) control of the boost circuit 11 so that the output power (generated power) of the second solar cell string PV2 is maximized.

図3は、太陽電池モジュールの電力-電圧特性(P-V曲線)を示す図である。太陽電池モジュールの開放電圧Vocと、最大出力電力Pmaxで動作する最大出力動作電圧Vpmとの間の電圧範囲では、動作電圧Vを低下させるほど出力電力Pが増加する。最大出力動作電圧Vpmより下側の電圧範囲では、動作電圧Vを低下させるほど出力電力Pが低下する。MPPT制御では、最大出力電力Pmaxが維持されるように動作電圧Vが制御される。 Figure 3 shows the power-voltage characteristics (P-V curve) of a solar cell module. In the voltage range between the open circuit voltage Voc of the solar cell module and the maximum output operating voltage Vpm at which the module operates at the maximum output power Pmax, the output power P increases as the operating voltage V is lowered. In the voltage range below the maximum output operating voltage Vpm, the output power P decreases as the operating voltage V is lowered. In MPPT control, the operating voltage V is controlled so that the maximum output power Pmax is maintained.

制御部12は、入力電圧センサV1で検出された第2太陽電池ストリングPV2の出力電圧と、入力電流センサA1で検出された第2太陽電池ストリングPV2の出力電流をもとに、第2太陽電池ストリングPV2の出力電力を検出する。制御部12は、第2太陽電池ストリングPV2の出力電圧と出力電力の関係をもとに、第2太陽電池ストリングPV2の出力電力を最大にするための電圧指令値を生成する。 The control unit 12 detects the output power of the second solar cell string PV2 based on the output voltage of the second solar cell string PV2 detected by the input voltage sensor V1 and the output current of the second solar cell string PV2 detected by the input current sensor A1. The control unit 12 generates a voltage command value for maximizing the output power of the second solar cell string PV2 based on the relationship between the output voltage and output power of the second solar cell string PV2.

制御部12は例えば、山登り法にしたがい動作電圧Vを所定のステップ幅で変化させて最大出力電力Pmaxの動作点を探索する。例えば、図3の最大出力電力Pmaxの動作点の左側では、現在の動作電圧Vを右側にシフトさせるための電圧指令値を生成し、最大出力電力Pmaxの動作点の右側では、現在の動作電圧Vを左側にシフトさせるための電圧指令値を生成する。制御部12は、最大出力電力Pmaxの動作点を捉えると最大出力電力Pmaxの動作点を維持するように電圧指令値を生成する。昇圧回路11のスイッチング素子S1は、生成された電圧指令値に基づく駆動信号に応じてスイッチング動作する。 The control unit 12 searches for the operating point of the maximum output power Pmax, for example, by changing the operating voltage V in a predetermined step width according to the hill-climbing method. For example, to the left of the operating point of the maximum output power Pmax in FIG. 3, a voltage command value is generated for shifting the current operating voltage V to the right, and to the right of the operating point of the maximum output power Pmax, a voltage command value is generated for shifting the current operating voltage V to the left. When the control unit 12 captures the operating point of the maximum output power Pmax, it generates a voltage command value to maintain the operating point of the maximum output power Pmax. The switching element S1 of the boost circuit 11 performs switching operation in response to a drive signal based on the generated voltage command value.

図1に戻る。電力変換装置20は、太陽光発電システムにおいて直流電力を交流電力に変換するパワーコンディショナである。電力変換装置20は、DC/DCコンバータ21、インバータ22および制御部23を備える。 Returning to FIG. 1, the power conversion device 20 is a power conditioner that converts DC power to AC power in a solar power generation system. The power conversion device 20 includes a DC/DC converter 21, an inverter 22, and a control unit 23.

DC/DCコンバータ21は、昇圧接続箱10により統合された直流電力の電圧を調整可能なコンバータである。DC/DCコンバータ21には例えば、図2に示したような昇圧チョッパを使用することができ、このDC/DCコンバータ21はインバータ22に接続される。 The DC/DC converter 21 is a converter capable of adjusting the voltage of the DC power integrated by the boost junction box 10. For example, a boost chopper as shown in FIG. 2 can be used for the DC/DC converter 21, and this DC/DC converter 21 is connected to the inverter 22.

インバータ22は、DC/DCコンバータ21から供給される直流電力を交流電力に変換して、変換した交流電力を、分電盤(不図示)を介して商用電力系統2に出力することができる。なお、分電盤には宅内の負荷(不図示)が接続されており、インバータ22は変換した交流電力を、分電盤を介して負荷にも供給することができる。 The inverter 22 can convert the DC power supplied from the DC/DC converter 21 into AC power and output the converted AC power to the commercial power system 2 via a distribution board (not shown). Note that a load (not shown) within the home is connected to the distribution board, and the inverter 22 can also supply the converted AC power to the load via the distribution board.

制御部23は電力変換装置20全体を統括的に制御する。制御部23は、ハードウェア資源とソフトウェア資源の協働、またはハードウェア資源のみにより実現できる。ハードウェア資源としてアナログ素子、マイクロコントローラ、DSP、ROM、RAM、ASIC、FPGA、その他のLSIを利用できる。ソフトウェア資源として、ファームウェアなどのプログラムを利用できる。 The control unit 23 performs overall control of the entire power conversion device 20. The control unit 23 can be realized by a combination of hardware and software resources, or by hardware resources alone. Analog elements, microcontrollers, DSPs, ROMs, RAMs, ASICs, FPGAs, and other LSIs can be used as hardware resources. Programs such as firmware can be used as software resources.

制御部23は、DC/DCコンバータ21の入力電圧が目標値が低い場合にインバータ22の入力電圧が目標値となるように昇圧するとともに、第1太陽電池ストリングPV1と第2太陽電池ストリングPV2の統合された入力電力が最大になるようDC/DCコンバータ21をMPPT制御する。制御部23は、DC/DCコンバータ21とインバータ22間の電圧が目標値を維持するようにインバータ22を制御する。具体的には制御部23は、インバータ22の入力電圧を目標値に一致させるための電流指令値を生成する。制御部23は、インバータ22の入力電圧が目標値より高い場合はインバータ22の出力電力を増加させるための電流指令値を生成し、インバータ22の入力電圧が目標値より低い場合はインバータ22の出力電力を低下させるための電流指令値を生成する。インバータ22は、生成された電流指令値に基づく駆動信号に応じてスイッチング動作する。 When the input voltage of the DC/DC converter 21 is low, the control unit 23 boosts the input voltage of the inverter 22 to the target value, and controls the DC/DC converter 21 by MPPT so that the integrated input power of the first solar cell string PV1 and the second solar cell string PV2 is maximized. The control unit 23 controls the inverter 22 so that the voltage between the DC/DC converter 21 and the inverter 22 maintains the target value. Specifically, the control unit 23 generates a current command value for matching the input voltage of the inverter 22 to the target value. When the input voltage of the inverter 22 is higher than the target value, the control unit 23 generates a current command value for increasing the output power of the inverter 22, and when the input voltage of the inverter 22 is lower than the target value, the control unit 23 generates a current command value for decreasing the output power of the inverter 22. The inverter 22 performs switching operation in response to a drive signal based on the generated current command value.

上述した昇圧回路11には、後段の部品を保護するために出力電圧にリミッタ値が設定される。制御部12は、昇圧回路11の出力電圧がリミッタ値を超えないように制御する。具体的には制御部12は、昇圧回路11の出力電圧がリミッタ値に到達すると、スイッチング素子S1のデューティ比を低下させて出力電圧を低下させるか、スイッチング素子S1をオフして昇圧回路11の動作を停止させる。 In the above-mentioned boost circuit 11, a limiter value is set for the output voltage to protect downstream components. The control unit 12 controls the output voltage of the boost circuit 11 so that it does not exceed the limiter value. Specifically, when the output voltage of the boost circuit 11 reaches the limiter value, the control unit 12 reduces the duty ratio of the switching element S1 to reduce the output voltage, or turns off the switching element S1 to stop the operation of the boost circuit 11.

電力変換装置20(以下適宜、パワコンと呼ぶ)は、出力制御(出力抑制ともいう)や負荷変動などで出力電力が減少すると、入力電力を減少させるように制御する。この制御により、昇圧接続箱10の出力電圧が上昇することがある。 The power conversion device 20 (hereinafter referred to as the power converter) controls the input power to be reduced when the output power is reduced due to output control (also called output suppression) or load fluctuation. This control may cause the output voltage of the boost connection box 10 to increase.

上述したようにパワコンには、最大入力電圧が異なる複数の機種が存在する。例えば、最大入力電圧が450Vの機種(以下、450V入力パワコンという)、最大入力電圧が380Vの機種(以下、380V入力パワコンという)が存在する。 As mentioned above, there are multiple models of inverters with different maximum input voltages. For example, there are models with a maximum input voltage of 450V (hereafter referred to as 450V input inverters) and models with a maximum input voltage of 380V (hereafter referred to as 380V input inverters).

例えば、380V入力パワコンに、450Vまで昇圧可能な昇圧接続箱10を接続した場合、昇圧回路11の出力電圧が380V以上になると、380V入力パワコンの最大入力電圧を超えてしまう。この場合、入力過電圧エラーで380V入力パワコンが停止する。 For example, if a 380V input inverter is connected to a boost junction box 10 capable of boosting voltage up to 450V, when the output voltage of the boost circuit 11 exceeds 380V, it will exceed the maximum input voltage of the 380V input inverter. In this case, an input overvoltage error will occur and the 380V input inverter will shut down.

これに対してメーカ側は、パワコンのスペックに応じた複数の昇圧接続箱10を用意している。施工者は、使用するパワコンのスペックに適合した昇圧接続箱10を選択し、太陽光発電システムを施工している。 In response to this, manufacturers prepare multiple boost junction boxes 10 according to the specifications of the inverter. Installers select the boost junction box 10 that matches the specifications of the inverter they are using and install the solar power generation system.

しかしながら、施工者の発注ミスなどにより、パワコンと昇圧接続箱10が不適切な組み合わせで、太陽光発電システムが組まれてしまうことがあった。その場合、商品交換あるいは買い替えが必要になり、ユーザおよび施工者にとって大きな負担となる。 However, due to an ordering error by the installer, a solar power generation system could be assembled with an inappropriate combination of inverter and boost junction box 10. In such cases, a product exchange or replacement is required, which places a heavy burden on the user and the installer.

ここで、450V入力パワコン、開放電圧の範囲が380~450Vの太陽電池ストリング、最大出力電圧が380Vに設定された昇圧接続箱10(以下、380V出力昇圧機という)で太陽光発電システムが組まれた場合を考える。この場合、太陽電池モジュールの割付を見直して開放電圧が380V未満になるようにストリング構成を変更すれば、商品交換などは不要である。しかしながら、施工者の負担が大きくなる。 Let us now consider the case where a solar power generation system is assembled with a 450V input power conditioner, a solar cell string with an open-circuit voltage range of 380 to 450V, and a boost connection box 10 with a maximum output voltage set to 380V (hereafter referred to as a 380V output booster). In this case, if the solar cell module allocation is reviewed and the string configuration is changed so that the open-circuit voltage is less than 380V, there will be no need to replace the product. However, this will increase the burden on the installer.

次に、380V入力パワコン、開放電圧の範囲が380V未満の太陽電池ストリング、最大出力電圧が450Vに設定された昇圧接続箱10(以下、450V出力昇圧機という)で太陽光発電システムが組まれた場合を考える。この場合、450V出力昇圧機は38Vを超える出力電圧を許容するため、380V入力パワコンに最大入力電圧を超える電圧が入力され、380V入力パワコンがエラー発報して停止する可能性がある。また、380V入力パワコン内の部品故障に繋がる。 Next, consider a solar power generation system assembled with a 380V input inverter, a solar cell string with an open circuit voltage range of less than 380V, and a boost connection box 10 with a maximum output voltage set to 450V (hereafter referred to as a 450V output booster). In this case, since the 450V output booster allows an output voltage exceeding 38V, a voltage exceeding the maximum input voltage will be input to the 380V input inverter, which may cause the 380V input inverter to issue an error signal and shut down. This may also lead to component failure within the 380V input inverter.

昇圧機を提供するメーカ側にとって、パワコンのスペックに応じた複数の種類の商品をラインナップすることは、生産、サービス、管理面で負担がかかるものとなっている。 For manufacturers that provide step-up units, offering a lineup of multiple types of products based on the specifications of each inverter places a burden on them in terms of production, service, and management.

これに対して本実施の形態では、昇圧機自体に最大出力電圧の切り替えができる機能を搭載した昇圧機を提供する。これにより、施工者はパワコンと昇圧機の組み合わせを意識する必要がなくなり、施工者の負担が軽減される。メーカ側においても、パワコンのスペックに応じた複数の種類の商品をラインナップしておく必要がなくなり、生産、サービス、管理面の負担が軽減される。 In response to this, this embodiment provides a booster that is equipped with a function that allows the booster itself to switch the maximum output voltage. This relieves the installer from the need to be concerned about the combination of the inverter and the booster, reducing the burden on the installer. On the manufacturer's side, it is no longer necessary to have a lineup of multiple types of products according to the inverter specifications, reducing the burden on production, service, and management.

図4は、最大出力電圧の切り替え機能を有する昇圧接続箱10の操作部13の一例を示す図である。図4に示す操作部13は、第1スライドスイッチSW1と第2スライドスイッチSW2を備える。第1スライドスイッチSW1は、自動判定モードと手動設定モードを切り替えるためのスイッチである。第2スライドスイッチSW2は、昇圧機の最大出力電圧を切り替えるためのスイッチである。図4では、最大出力電圧として450Vと380Vを設定できる例を示している。第2スライドスイッチSW2による選択は、第1スライドスイッチSW1で手動設定モードが選択されている場合に有効となる。施工者は、施工時にパワコンの最大入力電圧に応じて、昇圧機の最大出力電圧を設定することができる。 Figure 4 is a diagram showing an example of the operation unit 13 of the boost connection box 10 having a maximum output voltage switching function. The operation unit 13 shown in Figure 4 includes a first slide switch SW1 and a second slide switch SW2. The first slide switch SW1 is a switch for switching between an automatic determination mode and a manual setting mode. The second slide switch SW2 is a switch for switching the maximum output voltage of the booster. Figure 4 shows an example in which the maximum output voltage can be set to 450V and 380V. Selection by the second slide switch SW2 is effective when the manual setting mode is selected by the first slide switch SW1. The installer can set the maximum output voltage of the booster during installation according to the maximum input voltage of the power conditioner.

なお、パワコンの最大入力電圧の種類が2種類以上あるときは、その種類数に応じてスライドスイッチの数やスライドスイッチの選択ポイントの数を増加させ、選択できる種類数を増加させればよい。 When there are two or more types of maximum input voltages for the inverter, the number of slide switches or the number of selection points for the slide switches can be increased accordingly to increase the number of selectable types.

図5は、最大出力電圧の切り替え機能を有する昇圧接続箱10の操作部13の別の例を示す図である。図5に示す操作部13は、7セグ表示器13a、複数のプッシュボタンB1~B4を備える。第1プッシュボタンB1は「MODE」ボタンであり、第2プッシュボタンB2は「UP」ボタンであり、第3プッシュボタンB3は「DOWN」ボタンであり、第4プッシュボタンB4は「ENTER」ボタンである。 Figure 5 is a diagram showing another example of the operation unit 13 of the boost junction box 10 that has a maximum output voltage switching function. The operation unit 13 shown in Figure 5 includes a 7-segment display 13a and multiple push buttons B1 to B4. The first push button B1 is a "MODE" button, the second push button B2 is an "UP" button, the third push button B3 is a "DOWN" button, and the fourth push button B4 is an "ENTER" button.

図6は、図5に示した操作部13の使用例を説明するための図である。施工者は「MODE」ボタンを数回押下し、最大出力電圧設定モードを選択する。選択の確定は「ENTER」ボタンの押下で行う。次に設定値を選択する。「UP」ボタン、「DOWN」ボタンを押下して目的の設定値を選択する。図6に示す例では、「AUto」(=自動判定)、「380」(最大出力電圧380V設定)、「450」(最大出力電圧450V設定)の3パターンの中から「450」を選択する例である。 Figure 6 is a diagram for explaining an example of how to use the operation unit 13 shown in Figure 5. The installer presses the "MODE" button several times to select the maximum output voltage setting mode. The selection is confirmed by pressing the "ENTER" button. Next, the setting value is selected. The desired setting value is selected by pressing the "UP" button and the "DOWN" button. In the example shown in Figure 6, "450" is selected from three patterns: "AUTO" (automatic determination), "380" (maximum output voltage setting of 380V), and "450" (maximum output voltage setting of 450V).

なお、最大出力電圧は、設定の範囲内で10V刻みで設定できてもよい。所望の電圧値を選択した状態で、「ENTER」ボタンを押下し、最大出力電圧の設定を確定する。このように図5、図6に示す例では、7セグ表示器13a、複数のプッシュボタンB1~B4を用いて、最大出力電圧の設定を切り替える。 The maximum output voltage may be set in 10 V increments within the set range. After selecting the desired voltage value, the "ENTER" button is pressed to confirm the maximum output voltage setting. In this way, in the example shown in Figures 5 and 6, the 7-segment display 13a and multiple push buttons B1 to B4 are used to switch the maximum output voltage setting.

以上のように切り替えられた設定にしたがって、昇圧機は出力電圧が、設定された最大出力電圧を超えた状態になった場合、昇圧動作を停止あるいは昇圧比を低下させて、最大出力電圧を超えないように制御する。 When the output voltage of the booster exceeds the set maximum output voltage according to the settings switched as described above, the booster stops boosting or reduces the boost ratio to control the output voltage so that it does not exceed the maximum output voltage.

次に、最大出力電圧の自動切り替え機能について説明する。太陽光発電システムで使用されるパワコンには入力電圧の制限があり、太陽電池モジュールの直列数は、太陽電池ストリングの開放電圧がパワコンの最大入力電圧を超えないように決定される。例えば、380V入力パワコンが使用されるシステムでは、太陽電池ストリングの開放電圧が380V未満になるように太陽電池モジュールの直列数が決定される。また、450V入力パワコンが使用されるシステムでは、太陽電池ストリングの開放電圧が450V未満になるように太陽電池モジュールの直列数が決定される。 Next, we will explain the automatic maximum output voltage switching function. The inverters used in photovoltaic power generation systems have input voltage limitations, and the number of solar cell modules in series is determined so that the open-circuit voltage of the solar cell string does not exceed the inverter's maximum input voltage. For example, in a system that uses a 380V input inverter, the number of solar cell modules in series is determined so that the open-circuit voltage of the solar cell string is less than 380V. Also, in a system that uses a 450V input inverter, the number of solar cell modules in series is determined so that the open-circuit voltage of the solar cell string is less than 450V.

太陽電池モジュールは、低温時に公称開放電圧より電圧が上昇する特性を有する。多くのケースでは、低温時の特性を考慮して、太陽電池ストリングの開放電圧が、パワコンの最大入力電圧近辺ではなく、パワコンの最大入力電圧より所定値以上低い電圧になるように、太陽電池モジュールの直列数が決定される。 Solar cell modules have the characteristic that their voltage rises above the nominal open circuit voltage at low temperatures. In many cases, taking into account the characteristics at low temperatures, the number of solar cell modules in series is determined so that the open circuit voltage of the solar cell string is not close to the maximum input voltage of the inverter, but is a voltage that is at least a certain value lower than the maximum input voltage of the inverter.

したがって、太陽光発電システムに使用されている太陽電池ストリングの開放電圧が380Vを超えている場合、当該太陽光発電システムでは、380V入力パワコンではなく、450V入力パワコンが使用されていると判断できる。また、太陽電池ストリングの開放電圧が380V以下の場合、380V入力パワコンが使用されていると判断できる。 Therefore, if the open circuit voltage of the solar cell string used in a solar power generation system exceeds 380V, it can be determined that the solar power generation system uses a 450V input inverter rather than a 380V input inverter. Also, if the open circuit voltage of the solar cell string is 380V or less, it can be determined that the solar power generation system uses a 380V input inverter.

450V入力パワコンが使用されている場合であっても、太陽電池ストリングの開放電圧が380V以下になっている太陽光発電システムも存在する。仮に昇圧機の自動判定機能(詳細は後述する)により、昇圧機が450V入力パワコンではなく380V入力パワコンが接続されていると判断し、最大出力電圧を380Vに制限した場合、昇圧機の出力電圧はパワコンの最大入力電圧を超えない。したがって、上述したエラー停止などの問題は発生しない。また、システム上も開放電圧以下で動作するため、発電量が低下するなどの問題も発生しない。 Even when a 450V input inverter is used, there are photovoltaic power generation systems in which the open circuit voltage of the solar cell string is 380V or less. If the automatic determination function of the booster (described in detail later) determines that a 380V input inverter is connected instead of a 450V input inverter and limits the maximum output voltage to 380V, the output voltage of the booster will not exceed the maximum input voltage of the inverter. Therefore, problems such as the error shutdown mentioned above will not occur. In addition, because the system operates below the open circuit voltage, problems such as a decrease in power generation will not occur.

このように、昇圧機に接続される太陽電池ストリングの開放電圧が分かれば、昇圧機は、接続されるパワコンの最大入力電圧に応じた最大出力電圧を自動的に判断して設定することが可能となる。 In this way, if the open circuit voltage of the solar cell string connected to the booster is known, the booster can automatically determine and set the maximum output voltage according to the maximum input voltage of the connected inverter.

また、あらかじめ接続されるパワコンの最大入力電圧が確認できる場合や、自動判定による切替が困難である場合、施工者は、手動設定に切り替えて、接続されるパワコンの最大入力電圧値に適合した最大出力電圧を昇圧機に設定することが可能である。 In addition, if the maximum input voltage of the inverter to be connected can be confirmed in advance or if automatic switching is difficult, the installer can switch to manual settings and set the maximum output voltage of the booster to match the maximum input voltage value of the inverter to be connected.

次に、昇圧機によるパワコンの最大入力電圧の自動判定方法を具体的に説明する。パワコンが停止中で、かつ昇圧機の昇圧回路11の昇圧動作が停止中の場合、昇圧機の制御部12は、接続される太陽電池ストリングの開放電圧を出力電圧センサV2で検出できる。昇圧機の制御部12は、出力電圧センサV2の検出値が判定閾値以上の場合は450V入力パワコンが接続されていると判断し、判定閾値未満の場合は380V入力パワコンが接続されていると判断する。判定閾値は、昇圧機の出力側に380V入力パワコンが接続されているか、450V入力パワコンが接続されているかを判定するための閾値であり、この例では380Vに設定される。 Next, a method for automatically determining the maximum input voltage of the inverter using the booster will be specifically described. When the inverter is stopped and the boost operation of the boost circuit 11 of the booster is stopped, the control unit 12 of the booster can detect the open circuit voltage of the connected solar cell string with the output voltage sensor V2. When the detection value of the output voltage sensor V2 is equal to or greater than the judgment threshold, the control unit 12 of the booster determines that a 450V input inverter is connected, and when it is less than the judgment threshold, determines that a 380V input inverter is connected. The judgment threshold is a threshold for determining whether a 380V input inverter or a 450V input inverter is connected to the output side of the booster, and is set to 380V in this example.

図7は、昇圧機がパワコンの最大入力電圧を自動判定する際の波形推移の一例を示す図である。図7に示す例は、開放電圧Vocが420Vの太陽電池ストリングと450V入力パワコンが使用される場合を前提としており、パワコンの動作開始前に、昇圧機がパワコンの最大入力電圧を判定する例を示している。 Figure 7 shows an example of the waveform transition when the booster automatically determines the maximum input voltage of the inverter. The example shown in Figure 7 is based on the assumption that a solar cell string with an open circuit voltage Voc of 420 V and a 450 V input inverter are used, and shows an example in which the booster determines the maximum input voltage of the inverter before the inverter starts operating.

パワコンが停止中の状態において、日射強度の増加に伴い太陽電池ストリングの出力電圧Voutが上昇する。太陽電池ストリングの出力電圧Voutは、標準回路系の第1太陽電池ストリングPV1の出力電圧である。昇圧回路11が動作開始前であるため、昇圧回路系の第2太陽電池ストリングPV2の出力電圧は、標準回路系の第1太陽電池ストリングPV1の出力電圧より低い。 When the inverter is stopped, the output voltage Vout of the solar cell string increases with increasing solar radiation intensity. The output voltage Vout of the solar cell string is the output voltage of the first solar cell string PV1 in the standard circuit system. Because the boost circuit 11 has not yet started operating, the output voltage of the second solar cell string PV2 in the boost circuit system is lower than the output voltage of the first solar cell string PV1 in the standard circuit system.

太陽電池ストリングの出力電圧Voutが判定閾値Vth(380V)を超えるまでは、制御部12は昇圧機の出力側に380V入力パワコンが接続されていると判断し、昇圧回路11の最大出力電圧を380Vに設定する。一方、太陽電池ストリングの出力電圧Voutが判定閾値Vth(380V)を超えると、制御部12は昇圧機の出力側に450V入力パワコンが接続されていると判断し、昇圧回路11の最大出力電圧を450Vに設定する。 Until the output voltage Vout of the solar cell string exceeds the judgment threshold Vth (380V), the control unit 12 determines that a 380V input power conditioner is connected to the output side of the booster, and sets the maximum output voltage of the boost circuit 11 to 380V. On the other hand, when the output voltage Vout of the solar cell string exceeds the judgment threshold Vth (380V), the control unit 12 determines that a 450V input power conditioner is connected to the output side of the booster, and sets the maximum output voltage of the boost circuit 11 to 450V.

パワコンのMPPT制御が開始されると、太陽電池ストリングの出力電圧Voutが最大動作出力電圧Vpm近辺に降下し、380Vより低下する。ただし、制御部12は、出力電圧センサV2の検出値が一旦、判定閾値Vth(380V)を超えれば、それ以降に判定閾値Vth(380V)を下回っても、昇圧回路11の最大出力電圧を450Vに維持する。 When the MPPT control of the inverter starts, the output voltage Vout of the solar cell string drops to near the maximum operating output voltage Vpm, below 380 V. However, once the detection value of the output voltage sensor V2 exceeds the judgment threshold Vth (380 V), the control unit 12 maintains the maximum output voltage of the boost circuit 11 at 450 V, even if it subsequently falls below the judgment threshold Vth (380 V).

図8は、昇圧機がパワコンの最大入力電圧を自動判定する際の波形推移の別の例を示す図である。図8に示す例も、開放電圧Vocが420Vの太陽電池ストリングと450V入力パワコンが使用される場合を前提としている。図8に示す例では、太陽電池ストリングの出力電圧Voutが開放電圧Vocに到達する前にパワコンが動作開始する場合の例を示している。 Figure 8 shows another example of the waveform transition when the booster automatically determines the maximum input voltage of the inverter. The example shown in Figure 8 also assumes that a solar cell string with an open circuit voltage Voc of 420 V and a 450 V input inverter are used. The example shown in Figure 8 shows a case where the inverter starts operating before the output voltage Vout of the solar cell string reaches the open circuit voltage Voc.

日の出直後の太陽電池ストリングの発電電力は少なく、太陽電池ストリングの出力電圧Voutが開放電圧Vocまで上昇しない状態で、パワコンが動作を開始する場合がある。また、近年のパワコンは応答性能が向上しており、太陽電池ストリングの出力電圧Voutが開放電圧Vocまで上昇する前にMPPT制御が開始され、最大動作出力電圧Vpm近辺に制御される場合もある。 Immediately after sunrise, the power generated by the solar cell string is low, and the inverter may start operating before the output voltage Vout of the solar cell string has risen to the open-circuit voltage Voc. In addition, the response performance of inverters has improved in recent years, and MPPT control may start before the output voltage Vout of the solar cell string rises to the open-circuit voltage Voc, and the output voltage may be controlled to near the maximum operating output voltage Vpm.

このように、開放電圧Vocが420Vの太陽電池ストリングであっても、太陽電池ストリングの出力電圧Voutが最大動作出力電圧Vpm(350V近辺)までしか上昇しない場合がある。図8に示す例では、太陽電池ストリングの出力電圧Voutが380V未満のときにパワコンが動作を開始し、太陽電池ストリングの出力電圧Voutが判定閾値Vth(380V)を一度も超えることがなく、判定閾値Vth(380V)以下で推移している。この場合、制御部12は昇圧機の出力側に450V入力パワコンが接続されているにも関わらず、380V入力パワコンが接続されていると誤判定する。 In this way, even if the open circuit voltage Voc of a solar cell string is 420V, the output voltage Vout of the solar cell string may only rise to the maximum operating output voltage Vpm (near 350V). In the example shown in FIG. 8, the inverter starts operating when the output voltage Vout of the solar cell string is less than 380V, and the output voltage Vout of the solar cell string never exceeds the judgment threshold Vth (380V) and remains below the judgment threshold Vth (380V). In this case, the control unit 12 erroneously determines that a 380V input inverter is connected to the output side of the booster, even though a 450V input inverter is actually connected.

以下、このような誤判定を防止するための制御について説明する。パワコンの動作中、制御部12は、出力電圧センサV2で検出される出力電圧と出力電流センサA2で検出される出力電流を乗算して昇圧機の出力電力を検出する。なお、昇圧機の出力電力は、標準回路系の入力電圧センサ(不図示)で検出される入力電圧と入力電流センサ(不図示)で検出される入力電流を乗算して得られる標準回路系の入力電力と、昇圧回路系の入力電圧センサV1で検出される入力電圧と入力電流センサA1で検出される入力電流を乗算して得られる昇圧回路系の入力電力を合算した入力電力で代用してもよい。 Below, we will explain the control to prevent such erroneous judgment. During the operation of the power conditioner, the control unit 12 detects the output power of the booster by multiplying the output voltage detected by the output voltage sensor V2 and the output current detected by the output current sensor A2. Note that the output power of the booster may be substituted by the input power obtained by multiplying the input voltage detected by the input voltage sensor (not shown) of the standard circuit system by the input current detected by the input current sensor (not shown) of the standard circuit system, and the input power of the boost circuit system obtained by multiplying the input voltage detected by the input voltage sensor V1 of the boost circuit system by the input current detected by the input current sensor A1.

制御部12は、昇圧機の出力電力が最大となるように昇圧回路11をMPPT制御する。制御部12は、昇圧機の出力電力が最大出力点を捉えているときの最大出力動作電圧に、所定の定数βを乗算して、太陽電池ストリングの推定開放電圧Voc’を算出する。定数βは、太陽電池ストリングの最大出力動作電圧Vpmに対する開放電圧Vocの比率で規定される。 The control unit 12 performs MPPT control of the boost circuit 11 so that the output power of the booster is maximized. The control unit 12 multiplies the maximum output operating voltage when the output power of the booster is at the maximum output point by a predetermined constant β to calculate the estimated open circuit voltage Voc' of the solar cell string. The constant β is defined as the ratio of the open circuit voltage Voc to the maximum output operating voltage Vpm of the solar cell string.

パワコンの動作中、制御部12は、太陽電池ストリングの推定開放電圧Voc’と判定閾値Vth(380V)を比較する。太陽電池ストリングの推定開放電圧Voc’が判定閾値Vth(380V)以上の場合、制御部12は昇圧機の出力側に450V入力パワコンが接続されていると判断し、昇圧回路11の最大出力電圧を450Vに設定する。一方、太陽電池ストリングの推定開放電圧Voc’が判定閾値Vth(380V)未満の場合、制御部12は昇圧機の出力側に380V入力パワコンが接続されていると判断し、昇圧回路11の最大出力電圧を380Vに設定する。 During operation of the inverter, the control unit 12 compares the estimated open circuit voltage Voc' of the solar cell string with the judgment threshold Vth (380V). If the estimated open circuit voltage Voc' of the solar cell string is equal to or greater than the judgment threshold Vth (380V), the control unit 12 determines that a 450V input inverter is connected to the output side of the booster, and sets the maximum output voltage of the boost circuit 11 to 450V. On the other hand, if the estimated open circuit voltage Voc' of the solar cell string is less than the judgment threshold Vth (380V), the control unit 12 determines that a 380V input inverter is connected to the output side of the booster, and sets the maximum output voltage of the boost circuit 11 to 380V.

図9は、複数の種類の太陽電池モジュールの最大出力電力Pmax(W)、最大出力動作電圧Vpm(V)、開放電圧Voc(V)、最大出力電流Imax(A)、短絡電流Isc(A)、定数βをまとめたグラフを示す図である。本発明者らの調査によると、多くの種類の太陽電池モジュールの定数(β)が1.2程度になることが分かった。以上から本実施の形態では定数βに1.2が設定される。なお、昇圧機の電力変換効率や回路定数を鑑みて、1.2を補正した値が定数βに設定されてもよい。 Figure 9 is a graph summarizing the maximum output power Pmax (W), maximum output operating voltage Vpm (V), open circuit voltage Voc (V), maximum output current Imax (A), short circuit current Isc (A), and constant β for multiple types of solar cell modules. According to the inventors' research, it was found that the constant (β) for many types of solar cell modules is about 1.2. For this reason, in this embodiment, the constant β is set to 1.2. Note that, taking into account the power conversion efficiency and circuit constants of the booster, a value corrected from 1.2 may be set as the constant β.

図10は、実施の形態に係る、昇圧機による最大出力電圧の切り替え処理の流れを示すフローチャートである。図10のフローチャートに示す例では、図4に示した操作部13が用いられることを前提とする。昇圧機の電源がオンの状態において(S10のY)、第1スライドスイッチSW1で手動が選択され、第2スライドスイッチSW2で450Vが選択されている場合(S11の手動、S12の450V)、制御部12は、昇圧回路11の最大出力電圧Vlimを450Vに設定する(S13)。第1スライドスイッチSW1で手動が選択され、第2スライドスイッチSW2で380Vが選択されている場合(S11の手動、S12の380V)、制御部12は、昇圧回路11の最大出力電圧Vlimを380Vに設定する(S14)。 Figure 10 is a flowchart showing the flow of the process of switching the maximum output voltage by the booster according to the embodiment. In the example shown in the flowchart of Figure 10, it is assumed that the operation unit 13 shown in Figure 4 is used. When the power supply of the booster is on (Y in S10), if the first slide switch SW1 selects manual and the second slide switch SW2 selects 450V (manual in S11, 450V in S12), the control unit 12 sets the maximum output voltage Vlim of the boost circuit 11 to 450V (S13). When the first slide switch SW1 selects manual and the second slide switch SW2 selects 380V (manual in S11, 380V in S12), the control unit 12 sets the maximum output voltage Vlim of the boost circuit 11 to 380V (S14).

第1スライドスイッチSW1で自動が選択されている場合(S11の自動)、制御部12は、接続されているパワコンの最大入力電圧の自動判定処理を実行する(S20)。昇圧機の電源がオフの状態になると(S10のN)、最大出力電圧の切り替え処理が終了する。 When automatic is selected with the first slide switch SW1 (automatic in S11), the control unit 12 executes an automatic process for determining the maximum input voltage of the connected inverter (S20). When the power supply of the booster is turned off (N in S10), the process for switching the maximum output voltage ends.

図11は、図10のステップS20に示したパワコンの最大入力電圧の自動判定処理のサブルーチンを示すフローチャートである。図11のフローチャートにおいて、パラメータVaは、パワコン停止中の太陽電池ストリングの出力電圧Voutの最大値を保持するためのパラメータである。パラメータVbは、パワコン動作中の太陽電池ストリングの出力電圧Voutの最大値を保持するためのパラメータである。パラメータVcは、判定閾値Vth(380V)と比較される対象電圧を保持するためのパラメータである。 Figure 11 is a flowchart showing a subroutine of the automatic determination process of the maximum input voltage of the inverter shown in step S20 of Figure 10. In the flowchart of Figure 11, parameter Va is a parameter for holding the maximum value of the output voltage Vout of the solar cell string when the inverter is stopped. Parameter Vb is a parameter for holding the maximum value of the output voltage Vout of the solar cell string when the inverter is operating. Parameter Vc is a parameter for holding the target voltage to be compared with the determination threshold value Vth (380V).

パワコンが停止中で(S21のY)、かつ昇圧回路11も停止中の場合(S22のY)、制御部12は、パラメータVaに保持されている値と、出力電圧センサV2で検出された出力電圧Voutを比較する(S23)。パラメータVaに保持されている値より出力電圧Voutが大きい場合(S23のY)、制御部12は、パラメータVaに保持されている値を、検出された出力電圧Voutの値に更新する(S24)。パラメータVaに保持されている値より出力電圧Voutが大きくない場合(S23のN)、ステップS24の処理がスキップされる。制御部12は、パラメータVaに保持されている値を、パラメータVcに代入する(S25)。 When the inverter is stopped (Y in S21) and the boost circuit 11 is also stopped (Y in S22), the control unit 12 compares the value held in the parameter Va with the output voltage Vout detected by the output voltage sensor V2 (S23). When the output voltage Vout is greater than the value held in the parameter Va (Y in S23), the control unit 12 updates the value held in the parameter Va to the value of the detected output voltage Vout (S24). When the output voltage Vout is not greater than the value held in the parameter Va (N in S23), the process of step S24 is skipped. The control unit 12 assigns the value held in the parameter Va to the parameter Vc (S25).

パワコンが動作を開始すると(S21のN)、昇圧回路11も動作を開始する。制御部12は、出力電圧センサV2で検出される出力電圧と出力電流センサA2で検出される出力電流を乗算して昇圧機の出力電力を検出する。制御部12は、昇圧機の出力電力が上昇している場合(S26のY)、パラメータVbに保持されている値を、検出された出力電力に対応する出力動作電圧Voutの値に更新する(S27)。昇圧機の出力電力が上昇していない場合(S26のN)、ステップS27の処理をスキップし、制御部12は、常に最大電力が得られる電圧値に更新する。 When the power conditioner starts operating (N in S21), the boost circuit 11 also starts operating. The control unit 12 detects the output power of the booster by multiplying the output voltage detected by the output voltage sensor V2 by the output current detected by the output current sensor A2. If the output power of the booster is increasing (Y in S26), the control unit 12 updates the value held in the parameter Vb to the value of the output operating voltage Vout corresponding to the detected output power (S27). If the output power of the booster is not increasing (N in S26), the processing of step S27 is skipped, and the control unit 12 always updates the voltage value to obtain the maximum power.

制御部12は、パラメータVaに保持されている値とパラメータVbに保持されている値を比較する(S28)。パラメータVbに保持されている値がパラメータVaに保持されている値以下の場合(S28のN)、制御部12は、パラメータVaに保持されている値を、パラメータVcに代入する(S25)。パラメータVbに保持されている値が日射の上昇に伴って、パラメータVaに保持されている値より大きくなった場合(S28のY)、制御部12は、パラメータVbに保持されている値に定数βを乗算して得られる値を、開放電圧Vocの推定値としてパラメータVcに代入する(S29)。 The control unit 12 compares the value held in parameter Va with the value held in parameter Vb (S28). If the value held in parameter Vb is equal to or less than the value held in parameter Va (N in S28), the control unit 12 assigns the value held in parameter Va to parameter Vc (S25). If the value held in parameter Vb becomes greater than the value held in parameter Va due to an increase in solar radiation (Y in S28), the control unit 12 multiplies the value held in parameter Vb by a constant β and assigns the value obtained as an estimate of the open circuit voltage Voc to parameter Vc (S29).

制御部12は、パラメータVcに保持されている値と判定閾値Vth(380V)を比較する(S210)。パラメータVcに保持されている値が判定閾値Vth(380V)より小さい場合(S210のY)、制御部12は、昇圧回路11の最大出力電圧Vlimを380Vに設定する(S211)。パラメータVcに保持されている値が判定閾値Vth(380V)以上の場合(S210のN)、制御部12は、昇圧回路11の最大出力電圧Vlimを450Vに設定する(S212)。 The control unit 12 compares the value held in the parameter Vc with the judgment threshold Vth (380V) (S210). If the value held in the parameter Vc is smaller than the judgment threshold Vth (380V) (Y in S210), the control unit 12 sets the maximum output voltage Vlim of the boost circuit 11 to 380V (S211). If the value held in the parameter Vc is equal to or greater than the judgment threshold Vth (380V) (N in S210), the control unit 12 sets the maximum output voltage Vlim of the boost circuit 11 to 450V (S212).

以上説明したように本実施の形態によれば、昇圧接続箱10に最大出力電圧を切り替えできる機能を搭載したことにより、1種類の昇圧接続箱10で、最大入力電圧が異なる複数の種類のパワコンに対応できる。このような汎用性の高い昇圧接続箱10を実現することにより、メーカと施工者の負担を軽減することができる。 As described above, according to this embodiment, the boost junction box 10 is equipped with a function that can switch the maximum output voltage, so one type of boost junction box 10 can be used with multiple types of power conditioners with different maximum input voltages. By realizing such a versatile boost junction box 10, the burden on manufacturers and installers can be reduced.

以上、本開示を実施の形態をもとに説明した。実施の形態は例示であり、それらの各構成要素や各処理プロセスの組み合わせにいろいろな変形例が可能なこと、またそうした変形例も本開示の範囲にあることは当業者に理解されるところである。 The present disclosure has been described above based on the embodiments. The embodiments are merely examples, and it will be understood by those skilled in the art that various modifications are possible in the combination of each component and each processing process, and that such modifications are also within the scope of the present disclosure.

上記実施の形態では、最大出力電圧の切り替え機能として、自動判定モードと手動設定モードが搭載された昇圧接続箱10を説明した。この点、自動判定機能のみを搭載する昇圧接続箱10あるいは手動設定機能のみを搭載する昇圧接続箱10も、本開示の範囲に含まれる。後者の場合、図4に示した第1スライドスイッチSW1は省略される。 In the above embodiment, the boost connection box 10 is described as being equipped with an automatic determination mode and a manual setting mode as a maximum output voltage switching function. In this regard, the scope of this disclosure also includes a boost connection box 10 equipped with only an automatic determination function or a boost connection box 10 equipped with only a manual setting function. In the latter case, the first slide switch SW1 shown in FIG. 4 is omitted.

また、図4に示した第1スライドスイッチSW1を設けずに、手動設定機能のみを施工者あるいはユーザに提供し、自動判定機能をバックグラウンドで動作させてもよい。施工者は、第2スライドスイッチSW2を誤って操作する可能性がある。例えば、昇圧接続箱10に380V入力パワコンが接続されているにも関わらず、施工者は誤認識や誤操作により第2スライドスイッチSW2を450V側に設定してしまうことがあり得る。この場合において、昇圧接続箱10の自動判定機能により380V入力パワコンが接続されていると判定されると、制御部12は、昇圧回路11の最大出力電圧Vlimを450Vから380Vに変更する。 Also, without providing the first slide switch SW1 shown in FIG. 4, only the manual setting function may be provided to the installer or user, and the automatic determination function may operate in the background. The installer may operate the second slide switch SW2 by mistake. For example, even if a 380V input power conditioner is connected to the boost connection box 10, the installer may set the second slide switch SW2 to the 450V side due to misrecognition or misoperation. In this case, when the automatic determination function of the boost connection box 10 determines that a 380V input power conditioner is connected, the control unit 12 changes the maximum output voltage Vlim of the boost circuit 11 from 450V to 380V.

上記実施の形態では説明を単純化するために、標準回路系に一つの第1太陽電池ストリングPV1が接続され、昇圧回路系に一つの第2太陽電池ストリングPV2が接続される例を説明した。この点、標準回路系に、複数の第1太陽電池ストリングPV1が並列に接続されてもよい。この場合、第1開閉器RY1および逆流防止ダイオードD1がそれぞれのストリングに設置される。複数の第1太陽電池ストリングPV1から合流出力配線Wmに出力される電流(電力)は、複数の第1太陽電池ストリングPV1の出力電流(出力電力)の合計となる。 In the above embodiment, in order to simplify the explanation, an example has been described in which one first solar cell string PV1 is connected to the standard circuit system and one second solar cell string PV2 is connected to the boost circuit system. In this regard, multiple first solar cell strings PV1 may be connected in parallel to the standard circuit system. In this case, a first switch RY1 and a backflow prevention diode D1 are installed in each string. The current (power) output from the multiple first solar cell strings PV1 to the junction output wiring Wm is the sum of the output currents (output power) of the multiple first solar cell strings PV1.

同様に、昇圧回路系に、複数の第2太陽電池ストリングPV2が並列に接続されてもよい。この場合、第2開閉器RY2および昇圧回路11がそれぞれのストリングに設置される。複数の昇圧回路11から合流出力配線Wmに出力される電流(電力)は、複数の第2太陽電池ストリングPV2の出力電流(出力電力)の合計となる。 Similarly, multiple second solar cell strings PV2 may be connected in parallel to the boost circuit system. In this case, a second switch RY2 and a boost circuit 11 are installed in each string. The current (power) output from the multiple boost circuits 11 to the merged output wiring Wm is the sum of the output currents (output power) of the multiple second solar cell strings PV2.

上記実施の形態では、昇圧接続箱10に、第1太陽電池ストリングPV1と、第1太陽電池ストリングPV1より開放電圧が低い第2太陽電池ストリングPV2が接続される例を説明した。この点、昇圧接続箱10には、開放電圧が異なる複数の太陽電池以外の直流電源を接続することもできる。例えば、昇圧接続箱10に、第1蓄電池パックと、第1蓄電池パックより開放電圧が低い第2蓄電池パックが接続されてもよい。第2蓄電池パックは、セルまたはモジュールの直列数が第1蓄電池パックより少ない蓄電池パックである。 In the above embodiment, an example has been described in which a first solar cell string PV1 and a second solar cell string PV2 having a lower open-circuit voltage than the first solar cell string PV1 are connected to the boost junction box 10. In this regard, a DC power source other than a plurality of solar cells having different open-circuit voltages can also be connected to the boost junction box 10. For example, a first storage battery pack and a second storage battery pack having a lower open-circuit voltage than the first storage battery pack may be connected to the boost junction box 10. The second storage battery pack is a storage battery pack in which the number of cells or modules connected in series is smaller than that of the first storage battery pack.

なお、実施の形態は、以下の項目によって特定されてもよい。 The embodiment may be specified by the following:

[項目1]
第1の直流電源(PV1)より開放電圧が低い第2の直流電源(PV2)から出力される直流電力の電圧を昇圧可能な昇圧回路(11)と、
前記昇圧回路(11)の出力配線(Wb)と、前記第1の直流電源(PV1)の出力配線(W1)が合流した合流出力配線(Wb)と、
前記昇圧回路(11)を制御する制御部(12)と、を備え、
前記合流出力配線(Wb)は、本昇圧接続回路(10)から供給される直流電力を交流電力に変換する電力変換装置(20)に接続され、
本昇圧接続回路(10)は、前記電力変換装置(20)の最大入力電圧を超えないように、前記昇圧回路(11)の最大出力電圧の設定を切替えることが可能であることを特徴とする昇圧接続回路(10)。
これによれば、汎用性の高い昇圧接続回路(10)を実現することにより、メーカと施工者の負担を軽減することができる。
[項目2]
前記合流出力配線(Wb)の電圧を検出する電圧センサ(V2)をさらに備え、
前記制御部(12)は、前記電力変換装置(20)と前記昇圧回路(11)の停止中において、前記電圧センサ(V2)で検出される電圧に応じて、前記電力変換装置(20)の最大入力電圧を推定し、推定した最大入力電圧以下の電圧値に、前記昇圧回路(11)の最大出力電圧の設定値を決定することを特徴とする項目1に記載の昇圧接続回路(10)。
これによれば、自動判定モードを搭載することにより、施工者の負担を軽減できるとともに、人的ミスを減らすことができる。
[項目3]
前記第1の直流電源(PV1)および前記第2の直流電源(PV2)は太陽電池(PV1、PV2)であり、
前記制御部(12)は、前記電力変換装置(20)が動作中で前記昇圧回路(11)の停止中において、前記電圧センサ(V2)で検出される電圧に、前記太陽電池(PV1、PV2)の最大出力点電圧に対する開放電圧の比率を掛けて得られる電圧に応じて、前記電力変換装置(20)の最大入力電圧を推定することを特徴とする項目2に記載の昇圧接続回路(10)。
これによれば、太陽電池(PV1、PV2)用の電力変換装置(20)の最大入力電圧を高精度に推定することができる。
[項目4]
前記制御部(12)は、ユーザ操作に基づき、前記昇圧回路(11)の最大出力電圧の設定値を決定することを特徴とする項目1に記載の昇圧接続回路(10)。
これによれば、最大出力電圧の切り替え機能を簡単に実装することができる。
[項目5]
前記合流出力配線(Wb)の電圧を検出する電圧センサ(V2)をさらに備え、
前記制御部(12)は、前記ユーザ操作に基づき決定された前記昇圧回路(11)の最大出力電圧の設定値が、前記電圧センサ(V2)で検出される電圧から推定される前記電力変換装置(20)の最大入力電圧を超えている場合、当該最大入力電圧以下の電圧値に、前記昇圧回路(11)の最大出力電圧の設定値を切替えることを特徴とする項目4に記載の昇圧接続回路(10)。
これによれば、手動設定による人的ミスを、自動判定機能でカバーすることができる。
[項目6]
項目1から5のいずれか1項に記載の昇圧接続回路(10)と、
前記昇圧接続回路(10)から供給される直流電力を交流電力に変換する電力変換装置(20)と、
を備えることを特徴とする電力変換システム(1)。
これによれば、汎用性の高い昇圧接続回路(10)を実現することにより、メーカと施工者の負担を軽減することができる。
[Item 1]
a boost circuit (11) capable of boosting a voltage of DC power output from a second DC power source (PV2) having an open circuit voltage lower than that of a first DC power source (PV1);
a joined output wiring (Wb) in which the output wiring (Wb) of the boost circuit (11) and the output wiring (W1) of the first DC power source (PV1) are joined;
A control unit (12) that controls the boost circuit (11),
The junction output wiring (Wb) is connected to a power conversion device (20) that converts DC power supplied from the boost connection circuit (10) into AC power,
This boost connection circuit (10) is characterized in that it is possible to switch the setting of the maximum output voltage of the boost circuit (11) so that it does not exceed the maximum input voltage of the power conversion device (20).
This makes it possible to realize a highly versatile boost connection circuit (10), thereby reducing the burden on manufacturers and installers.
[Item 2]
Further, a voltage sensor (V2) is provided to detect a voltage of the junction output wiring (Wb),
The boost connection circuit (10) described in item 1 is characterized in that, while the power conversion device (20) and the boost circuit (11) are stopped, the control unit (12) estimates a maximum input voltage of the power conversion device (20) according to the voltage detected by the voltage sensor (V2), and determines a setting value of the maximum output voltage of the boost circuit (11) to a voltage value equal to or lower than the estimated maximum input voltage.
According to this, by incorporating an automatic judgment mode, the burden on the installer can be reduced and human error can be reduced.
[Item 3]
the first DC power source (PV1) and the second DC power source (PV2) are solar cells (PV1, PV2);
The boost connection circuit (10) described in item 2 is characterized in that, when the power conversion device (20) is in operation and the boost circuit (11) is stopped, the control unit (12) estimates a maximum input voltage of the power conversion device (20) in accordance with a voltage obtained by multiplying the voltage detected by the voltage sensor (V2) by a ratio of an open circuit voltage to a maximum output point voltage of the solar cells (PV1, PV2).
This makes it possible to estimate the maximum input voltage of the power conversion device (20) for the solar cells (PV1, PV2) with high accuracy.
[Item 4]
2. The boost connection circuit (10) according to claim 1, wherein the control unit (12) determines a set value of a maximum output voltage of the boost circuit (11) based on a user operation.
This allows the maximum output voltage switching function to be easily implemented.
[Item 5]
Further, a voltage sensor (V2) is provided to detect a voltage of the junction output wiring (Wb),
5. The boost connection circuit (10) according to claim 4, characterized in that, when a setting value of a maximum output voltage of the boost circuit (11) determined based on the user operation exceeds a maximum input voltage of the power conversion device (20) estimated from a voltage detected by the voltage sensor (V2), the control unit (12) switches the setting value of the maximum output voltage of the boost circuit (11) to a voltage value equal to or lower than the maximum input voltage.
This allows the automatic determination function to compensate for human errors that may occur due to manual settings.
[Item 6]
A boost connection circuit (10) according to any one of items 1 to 5;
a power conversion device (20) that converts DC power supplied from the boost connection circuit (10) into AC power;
A power conversion system (1) comprising:
This makes it possible to realize a highly versatile boost connection circuit (10), thereby reducing the burden on manufacturers and installers.

1 電力変換システム、 2 商用電力系統、 10 昇圧接続箱、 11 昇圧回路、 12 制御部、 20 電力変換装置、 21 DC/DCコンバータ、 22 インバータ、 23 制御部、 PV1 第1太陽電池ストリング、 PV2 第2太陽電池ストリング、 RY1 第1開閉器、 RY2 第2開閉器、 D1 逆流防止ダイオード、 V1 入力電圧センサ、 V2 出力電圧センサ、 A1 入力電流センサ、 A2 出力電流センサ、 A3 標準回路出力電流センサ、 T1 温度センサ、 W1,W2,Wb 出力配線、 Wm 合流出力配線、 L1 リアクトル、 C1 入力コンデンサ、 C2 出力コンデンサ、 D2 ダイオード、 S1 スイッチング素子。 1 Power conversion system, 2 Commercial power system, 10 Boost junction box, 11 Boost circuit, 12 Control unit, 20 Power conversion device, 21 DC/DC converter, 22 Inverter, 23 Control unit, PV1 First solar cell string, PV2 Second solar cell string, RY1 First switch, RY2 Second switch, D1 Reverse current prevention diode, V1 Input voltage sensor, V2 Output voltage sensor, A1 Input current sensor, A2 Output current sensor, A3 Standard circuit output current sensor, T1 Temperature sensor, W1, W2, Wb Output wiring, Wm Joint output wiring, L1 Reactor, C1 Input capacitor, C2 Output capacitor, D2 Diode, S1 Switching element.

Claims (6)

第1の直流電源より開放電圧が低い第2の直流電源から出力される直流電力の電圧を昇圧可能な昇圧回路と、
前記昇圧回路の出力配線と、前記第1の直流電源の出力配線が合流した合流出力配線と、
前記昇圧回路を制御する制御部と、を備え、
前記合流出力配線は、本昇圧接続回路から供給される直流電力を交流電力に変換する電力変換装置に接続され、
本昇圧接続回路は、前記電力変換装置の最大入力電圧を超えないように、前記昇圧回路の上限電圧とする最大出力電圧の設定を切替えることが可能であることを特徴とする昇圧接続回路。
a boost circuit capable of boosting a voltage of DC power output from a second DC power source having an open circuit voltage lower than that of the first DC power source;
a joined output wiring in which an output wiring of the boost circuit and an output wiring of the first DC power source are joined together;
A control unit that controls the boost circuit,
the junction output wiring is connected to a power conversion device that converts the DC power supplied from the boost connection circuit into AC power;
This boost connection circuit is characterized in that it is possible to switch the setting of a maximum output voltage that serves as an upper limit voltage of the boost circuit so as not to exceed a maximum input voltage of the power conversion device.
前記合流出力配線の電圧を検出する電圧センサをさらに備え、
前記制御部は、前記電力変換装置と前記昇圧回路の停止中において、前記電圧センサで検出される電圧に応じて、前記電力変換装置の最大入力電圧を推定し、推定した最大入力電圧以下の電圧値に、前記昇圧回路の最大出力電圧の設定値を決定することを特徴とする請求項1に記載の昇圧接続回路。
A voltage sensor for detecting a voltage of the junction output wiring is further provided.
2. The boost connection circuit according to claim 1, wherein the control unit estimates a maximum input voltage of the power conversion device according to the voltage detected by the voltage sensor while the power conversion device and the boost circuit are stopped, and determines a setting value of the maximum output voltage of the boost circuit to a voltage value equal to or lower than the estimated maximum input voltage.
前記第1の直流電源および前記第2の直流電源は太陽電池であり、
前記制御部は、前記電力変換装置が動作中で前記昇圧回路の停止中において、前記電圧センサで検出される電圧に、前記太陽電池の最大出力点電圧に対する開放電圧の比率を掛けて得られる電圧に応じて、前記電力変換装置の最大入力電圧を推定することを特徴とする請求項2に記載の昇圧接続回路。
the first DC power source and the second DC power source are solar cells;
3. The boost connection circuit according to claim 2, wherein the control unit estimates a maximum input voltage of the power conversion device according to a voltage obtained by multiplying a voltage detected by the voltage sensor by a ratio of an open circuit voltage to a maximum output point voltage of the solar cell while the power conversion device is in operation and the boost circuit is stopped.
前記制御部は、ユーザ操作に基づき、前記昇圧回路の最大出力電圧の設定値を決定することを特徴とする請求項1に記載の昇圧接続回路。 The boost connection circuit according to claim 1, characterized in that the control unit determines the set value of the maximum output voltage of the boost circuit based on a user operation. 前記合流出力配線の電圧を検出する電圧センサをさらに備え、
前記制御部は、前記ユーザ操作に基づき決定された前記昇圧回路の最大出力電圧の設定値が、前記電圧センサで検出される電圧から推定される前記電力変換装置の最大入力電圧を超えている場合、当該最大入力電圧以下の電圧値に、前記昇圧回路の最大出力電圧の設定値を切替えることを特徴とする請求項4に記載の昇圧接続回路。
A voltage sensor for detecting a voltage of the junction output wiring is further provided.
5. The boost connection circuit according to claim 4, wherein when a setting value of the maximum output voltage of the boost circuit determined based on the user operation exceeds a maximum input voltage of the power conversion device estimated from a voltage detected by the voltage sensor, the control unit switches the setting value of the maximum output voltage of the boost circuit to a voltage value equal to or lower than the maximum input voltage.
請求項1から5のいずれか1項に記載の昇圧接続回路と、
前記昇圧接続回路から供給される直流電力を交流電力に変換する電力変換装置と、
を備えることを特徴とする電力変換システム。
A boost connection circuit according to any one of claims 1 to 5;
a power conversion device that converts DC power supplied from the boost connection circuit into AC power;
A power conversion system comprising:
JP2021122444A 2021-07-27 2021-07-27 Boost connection circuit, power conversion system Active JP7656819B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021122444A JP7656819B2 (en) 2021-07-27 2021-07-27 Boost connection circuit, power conversion system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021122444A JP7656819B2 (en) 2021-07-27 2021-07-27 Boost connection circuit, power conversion system

Publications (2)

Publication Number Publication Date
JP2023018368A JP2023018368A (en) 2023-02-08
JP7656819B2 true JP7656819B2 (en) 2025-04-04

Family

ID=85158324

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021122444A Active JP7656819B2 (en) 2021-07-27 2021-07-27 Boost connection circuit, power conversion system

Country Status (1)

Country Link
JP (1) JP7656819B2 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014006887A (en) 2012-05-28 2014-01-16 Kyocera Corp Voltage control unit and photovoltaic power generation system
JP2016110524A (en) 2014-12-10 2016-06-20 日立アプライアンス株式会社 Photovoltaic power generation system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014006887A (en) 2012-05-28 2014-01-16 Kyocera Corp Voltage control unit and photovoltaic power generation system
JP2016110524A (en) 2014-12-10 2016-06-20 日立アプライアンス株式会社 Photovoltaic power generation system

Also Published As

Publication number Publication date
JP2023018368A (en) 2023-02-08

Similar Documents

Publication Publication Date Title
JP6849076B2 (en) Photovoltaic system, power conditioner
US8754627B1 (en) Multi-mode power point tracking
KR100686281B1 (en) Method for operating a power supply system having an inverter connected in parallel and a power conversion system
US9583645B2 (en) Photovoltaic system
CN203586455U (en) Photovoltaic air conditioning system
CN116316795A (en) Photovoltaic inverter, its power regulation method, and photovoltaic system
JP2002010496A (en) Power conditioner in photovoltaic power generation system
WO2017163690A1 (en) Power conversion system and power conversion device
WO2008029711A1 (en) Sequence-linked inverter device
US20140246907A1 (en) Dc peak power tracking devices, methods, and systems
JP7656819B2 (en) Boost connection circuit, power conversion system
JP2004146791A (en) Solar power generator
JP3245330U (en) Charging control unit, charging system, DC power supply unit and DC power drive system
JP2020096430A (en) Power converter
JPH10289025A (en) Power conditioner in photovoltaic power generation system
KR101929562B1 (en) Photovoltaic Power Generation System
JP5922438B2 (en) Photovoltaic power generation system, control method therefor, and voltage control unit
JP7656818B2 (en) Boost connection circuit, power conversion system
JP7303721B2 (en) Power storage device and power storage system
JP7696095B2 (en) Boost connection circuit, power conversion system
WO2019127022A1 (en) Optimizer, photovoltaic power generation system and photovoltaic power generation control method
JP4119392B2 (en) Junction box and power generator
JP5837454B2 (en) Control device
JP7491270B2 (en) Power conditioner
KR20140093355A (en) Photovoltaic system that contains the string voltage booster

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240411

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20241209

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20241217

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250214

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250311

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250312

R150 Certificate of patent or registration of utility model

Ref document number: 7656819

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150