JP7657469B2 - Power Management System - Google Patents
[go: Go Back, main page]

JP7657469B2 - Power Management System - Google Patents

Power Management System Download PDF

Info

Publication number
JP7657469B2
JP7657469B2 JP2022191552A JP2022191552A JP7657469B2 JP 7657469 B2 JP7657469 B2 JP 7657469B2 JP 2022191552 A JP2022191552 A JP 2022191552A JP 2022191552 A JP2022191552 A JP 2022191552A JP 7657469 B2 JP7657469 B2 JP 7657469B2
Authority
JP
Japan
Prior art keywords
power generation
power
total
equipment
amount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022191552A
Other languages
Japanese (ja)
Other versions
JP2024078928A (en
Inventor
愛奈 小野口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anchor Inc
Original Assignee
Anchor Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anchor Inc filed Critical Anchor Inc
Priority to JP2022191552A priority Critical patent/JP7657469B2/en
Publication of JP2024078928A publication Critical patent/JP2024078928A/en
Application granted granted Critical
Publication of JP7657469B2 publication Critical patent/JP7657469B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

この発明は、太陽光発電などの再生可能エネルギー(自然エネルギー)を利用した再生可能エネルギー発電設備と蓄電池とを備えた電力管理システムに関する。 This invention relates to a power management system equipped with a renewable energy power generation facility that uses renewable energy (natural energy) such as solar power generation, and a storage battery.

太陽光発電などの再生可能エネルギー(自然エネルギー)を利用した再生可能エネルギー発電設備と蓄電池とを備えた電力管理システムについては従来から種々の手案が行われている。 There have been various proposals for power management systems that include renewable energy power generation equipment that uses renewable energy (natural energy) such as solar power generation and storage batteries.

例えば、複数の需要家に対応する電力管理システムとしてTEMS(Town Energy Management System)や、CEMS(Community Energy Management System)などと呼ばれるものが知られているが、太陽光発電設備の発電電力に対して負荷電力が小さい状況となって太陽光発電設備の発電電力に余剰電力が生じる場合、蓄電池に余剰電力を充電することで余剰電力を有効に利用可能であるが、蓄電池に充電できないときには、例えば、余剰電力を系統電源に流入できずに消失させる等により、太陽光発電設備の発電電力を有効に利用できないことになる。 For example, there are known power management systems that support multiple consumers, such as TEMS (Town Energy Management System) and CEMS (Community Energy Management System). When the load power is small compared to the power generated by the solar power generation facility, and surplus power is generated by the solar power generation facility, the surplus power can be used effectively by charging the surplus power to a storage battery. However, when the storage battery cannot be charged, for example, the surplus power cannot flow into the grid power supply and is lost, and the power generated by the solar power generation facility cannot be used effectively.

そこで、特許文献1には、再生可能エネルギーを利用した発電装置を備える需要家施設を含む複数の需要家施設を対象とする電力管理システムにおいて、発電装置による発電電力の有効利用が促進されるようにすることを目的とする電力管理システムが提案されている。 Patent Document 1 proposes a power management system that targets multiple consumer facilities, including consumer facilities equipped with power generation equipment that uses renewable energy, and aims to promote the effective use of power generated by the power generation equipment.

また、特許文献2には、再生可能エネルギーによる発電電力の予測値と電力需要の予測値との差分に基づく余剰電力の予測値に基づき電力の託送計画を策定するとともに、前記余剰電力の予測値と実際値との比較結果と、蓄電池の充電率との比較結果とに基づき、水素の製造および貯蔵量と、前記蓄電池の充電量と、燃料電池の発電量とを制御する制御部を備える電源システムが提案されている。 Patent Document 2 also proposes a power supply system that formulates a power transmission plan based on a predicted surplus power value based on the difference between a predicted value of power generation by renewable energy and a predicted value of power demand, and includes a control unit that controls the production and storage of hydrogen, the charge amount of the storage battery, and the power generation amount of the fuel cell based on a comparison result between the predicted value of the surplus power and the actual value and a comparison result with the charging rate of the storage battery.

特許第6192531号公報Patent No. 6192531 特許第7134043号公報Patent No. 7134043

今日、日本国内では、火力発電所、原子力発電所、水力発電所、揚水発電所、等の従来型発電設備と、太陽光発電、風力発電、地熱発電、等の再生可能エネルギー発電設備とが並行して稼働しており、これらの発電設備からの電力供給と、工場、会社、店舗、住宅、等で電力を使用する負荷設備での電力需要とが電力市場で調整されながら電力供給、電力使用が行われている。 Today in Japan, conventional power generation facilities such as thermal power plants, nuclear power plants, hydroelectric power plants, and pumped storage power plants operate in parallel with renewable energy power generation facilities such as solar power generation, wind power generation, and geothermal power generation. Electricity supply from these power generation facilities and the electricity demand of load facilities that use electricity, such as factories, companies, stores, and homes, are adjusted in the electricity market, and electricity supply and usage are carried out.

太陽光発電設備や、風力発電設備、等の再生可能エネルギー発電設備では発電のタイミングを自然条件に委ねることが多く、電力需要に対して再生可能エネルギー発電設備での発電が多い場合には、再生可能エネルギー発電設備の稼働を停止する、再生可能エネルギー発電設備で発電した電力を破棄する、等の対応が必要になっている。 In renewable energy power generation facilities such as solar power generation facilities and wind power generation facilities, the timing of power generation is often left to natural conditions, and when the amount of electricity generated by the renewable energy power generation facilities is greater than the electricity demand, it becomes necessary to take measures such as shutting down the operation of the renewable energy power generation facilities or discarding the electricity generated by the renewable energy power generation facilities.

そこで、蓄電池、等の蓄電設備を再生可能エネルギー発電設備に対して併設しておき、再生可能エネルギー発電設備で発電した電力を一時的に蓄電設備に蓄電し、必要に応じて、蓄電設備から放電して負荷設備での電力需要に供給する、等の取り組みが行われている。 Therefore, efforts are being made to set up storage equipment such as batteries next to renewable energy power generation facilities, temporarily store the electricity generated by the renewable energy power generation facilities in the storage equipment, and, when necessary, discharge the electricity from the storage equipment to supply it to the electricity demand of the load equipment.

日本ではこれから電気自動車が普及することが見込まれている。電気自動車には蓄電設備(蓄電池)が配備されていることから、日本でこれから電気自動車が普及するにつれて、日本国中に広く蓄電設備(蓄電池)が存在することになる。 Electric vehicles are expected to become more common in Japan in the future. Electric vehicles are equipped with storage facilities (batteries), so as electric vehicles become more common in Japan, storage facilities (batteries) will become more widespread throughout the country.

電気自動車が普及するにつれて日本国中に広く存在することになる蓄電設備(蓄電池)、すなわち、電気自動車に配備されている蓄電設備(蓄電池)を、電力市場での上述した電力供給、電力需要の調整に活用できるようになれば有利である。 As electric vehicles become more widespread, energy storage facilities (batteries) will become more widespread throughout Japan. In other words, energy storage facilities (batteries) installed in electric vehicles will be advantageously utilized to adjust the above-mentioned electricity supply and demand in the electricity market.

電気自動車を使用している者、あるいは、電気自動車の所有者は、日本国中に広く普及する電気自動車に配備されている蓄電設備(蓄電池)の使用者、所有者でもあることから、電気自動車に配備されている蓄電設備(蓄電池)が上述したように活用されることに応じて、電気自動車の使用者、所有者に何らかの経済的な利益が与えられるようになれば、電気自動車の普及にとって有利なことになると考えられる。 Since people who use or own electric vehicles are also the users and owners of the electricity storage equipment (batteries) installed in electric vehicles, which are in widespread use throughout Japan, it would be beneficial for the spread of electric vehicles if some economic benefit were to be given to users and owners of electric vehicles in exchange for utilizing the electricity storage equipment (batteries) installed in electric vehicles as described above.

そこで、本発明は、火力発電所、原子力発電所、水力発電所、揚水発電所、等の従来型発電設備による発電、電力供給及び、太陽光発電、風力発電、地熱発電、等の再生可能エネルギー発電設備よる発電、電力供給と、工場、会社、店舗、住宅、等で電力を使用する負荷設備での電力需要との間の調整に、日本国中に広く存在する蓄電設備(蓄電池)からの放電及び、前記蓄電設備(蓄電池)への充電を組み込み、更に、前記蓄電設備(蓄電池)がこのように利用されることに対して、前記蓄電設備(蓄電池)の使用者・所有者に何らかの経済的な利益が与えられる電力管理システムを提案することを目的にしている。 The present invention therefore aims to propose an electricity management system that incorporates the discharge from and charging of storage equipment (batteries) widely present throughout Japan to adjust between power generation and supply by conventional power generation facilities such as thermal power plants, nuclear power plants, hydroelectric power plants, and pumped storage power plants, and power generation and supply by renewable energy power generation facilities such as solar power generation, wind power generation, and geothermal power generation, and the power demand of load equipment that uses electricity in factories, companies, stores, homes, etc., and further provides some kind of economic benefit to the users and owners of the storage equipment (batteries) for using the storage equipment (batteries) in this way.

本発明が提案する電力管理システムは、火力発電所、原子力発電所、水力発電所、揚水発電所、等の従来型発電設備による発電、電力供給及び、太陽光発電、風力発電、地熱発電、等の再生可能エネルギー発電設備よる発電、電力供給と、工場、会社、店舗、住宅、等で電力を使用する負荷設備での電力需要との間の調整に、電気自動車に配備されている蓄電池、等、日本国中に広く存在する蓄電設備(蓄電池)からの放電及び、前記蓄電設備(蓄電池)への充電を組み込み、再生可能エネルギー発電設備よる発電での電力が余剰になったときに、これを前記蓄電設備(蓄電池)における充電可能範囲内で前記蓄電設備(蓄電池)に充電し、一方、従来型発電設備による予定していた発電による電力及び、並行して発電が行われている再生可能エネルギー発電設備よる発電での電力によっても電力需要を賄えないときに、前記蓄電設備(蓄電池)における放電可能範囲内で前記蓄電設備(蓄電池)から放電させて前記電力需要に供給することにし、更に、前記蓄電設備(蓄電池)が前述のように活用されることに対して、前記蓄電設備(蓄電池)の使用者・所有者に何らかの経済的な利益が与えられる電力管理システムである。 The power management system proposed by this invention incorporates the discharge from and charging of storage batteries (storage batteries) that are widely found throughout Japan, such as batteries installed in electric vehicles, to adjust between power generation and supply by conventional power generation facilities such as thermal power plants, nuclear power plants, hydroelectric power plants, and pumped storage power plants, and power generation and supply by renewable energy power generation facilities such as solar power generation, wind power generation, and geothermal power generation, and the power demand of load facilities that use electricity in factories, companies, stores, homes, etc. When there is surplus electricity generated by renewable energy power generation facilities, it is used as the storage battery. This is a power management system that charges the power storage equipment (storage battery) within the charging range of the equipment (storage battery), and when the power demand cannot be met by the power generated by the conventional power generation equipment as planned and the power generated by the renewable energy power generation equipment that is generating power in parallel, the power storage equipment (storage battery) is discharged within the discharging range of the power storage equipment (storage battery) to supply the power demand, and further provides some economic benefit to the user/owner of the power storage equipment (storage battery) for utilizing the power storage equipment (storage battery) as described above.

前記蓄電設備(蓄電池)が前述のように活用されることに対して、前記蓄電設備(蓄電池)の使用者・所有者に何らかの経済的な利益が与えられる形態としては、前記蓄電設備(蓄電池)への前述した充電によって前記使用者・所有者に対して課金される充電料金の単価よりも、前記蓄電設備(蓄電池)からの前述した放電によって前記使用者・所有者に対して支払われる放電料金の単価を高額にする形態を採用することができる。 As a form of providing some economic benefit to the user/owner of the storage equipment (storage battery) for utilizing the storage equipment (storage battery) as described above, a form can be adopted in which the unit price of the discharge fee paid to the user/owner for the aforementioned discharge from the storage equipment (storage battery) is made higher than the unit price of the charging fee charged to the user/owner for the aforementioned charging to the storage equipment (storage battery).

このような本願発明は以下のように例示することができる。
[1]
管理対象になっている複数の負荷設備のそれぞれにおける将来の所定の時間単位毎の電力需要である単位負荷設備電力需要予測を算出するとともに、複数の前記負荷設備の全体での将来の前記所定の時間単位毎の電力需要である負荷設備総電力需要予測を算出する電力需要予測算出手段と、
前記電力需要予測算出手段が前記単位負荷設備電力需要予測及び前記負荷設備総電力需要予測を算出した時点における、将来の前記所定の時間単位毎に、管理対象になっている複数の従来型発電設備のそれぞれで予定されている発電量である単位従来型発電設備発電量予測を算出するとともに、複数の前記従来型発電設備の全体での将来の前記所定の時間単位毎に予定されている発電量の総体である従来型発電設備総発電量予測を算出する従来型発電設備発電量予測算出手段と、
前記電力需要予測算出手段が前記単位負荷設備電力需要予測及び前記負荷設備総電力需要予測を算出した時点における、将来の前記所定の時間単位毎に管理対象になっている複数の再生可能エネルギー発電設備のそれぞれで発電される発電量である単位再生可能エネルギー発電設備発電量予測を算出するとともに、複数の前記再生可能エネルギー発電設備の全体で将来の前記所定の時間単位毎に発電される発電量の総体である再生可能エネルギー発電設備総発電量予測を算出する再生可能エネルギー発電量予測算出手段と、
前記電力需要予測算出手段が前記単位負荷設備電力需要予測及び前記負荷設備総電力需要予測を算出した時点における、管理対象になっている複数の蓄電設備それぞれにおける放電可能量及び充電可能量に関する情報に基づいて、将来の前記所定の時間単位毎における、複数の蓄電設備それぞれにおける放電可能量及び充電可能量を単位充放電可能量予測として算出するとともに、複数の前記蓄電設備の全体での放電可能量及び充電可能量を総充放電可能量予測として算出する充放電可能量算出手段と、
前記負荷設備総電力需要予測、前記従来型発電設備総発電量予測、前記再生可能エネルギー発電設備総発電量予測及び、前記総充放可能量予測に基づいて、将来の前記所定の時間単位毎に、複数の前記蓄電設備から複数の前記負荷設備に対して供給される電力量の全体である総放電量を総放電量予測として算出し、または、複数の前記再生可能エネルギー発電設備から複数の前記蓄電設備に対して供給される電力量の全体である総充電量を総充電量予測として算出する充放電量算出手段と
を備えている電力管理システム。
Such an embodiment of the present invention can be exemplified as follows.
[1]
a power demand forecast calculation means for calculating a unit load equipment power demand forecast, which is a power demand for each predetermined time unit in the future for each of a plurality of load equipments being managed, and for calculating a load equipment total power demand forecast, which is a power demand for each predetermined time unit in the future for the plurality of load equipments as a whole;
a conventional power generation facility power generation forecast calculation means for calculating a unit conventional power generation facility power generation forecast, which is the amount of power generation planned for each of a plurality of conventional power generation facilities being managed for each of the predetermined time units in the future at the time when the power demand forecast calculation means calculates the unit load facility power demand forecast and the load facility total power demand forecast, and for calculating a conventional power generation facility total power generation forecast, which is the sum of the amount of power generation planned for each of the predetermined time units in the future for the entire plurality of conventional power generation facilities;
a renewable energy power generation amount forecast calculation means for calculating a unit renewable energy power generation amount forecast, which is the amount of power generated by each of a plurality of renewable energy power generation facilities that are managed for each of the predetermined time units in the future at the time when the power demand forecast calculation means calculates the unit load equipment power demand forecast and the load equipment total power demand forecast, and for calculating a renewable energy power generation amount forecast, which is the total amount of power generated by all of the plurality of renewable energy power generation facilities for each of the predetermined time units in the future;
a chargeable/dischargeable amount calculation means for calculating a dischargeable amount and a chargeable amount of each of a plurality of power storage facilities under management as a unit chargeable/dischargeable amount prediction for each of the predetermined future time units based on information regarding a dischargeable amount and a chargeable amount of each of a plurality of power storage facilities under management at a time point when the power demand forecast calculation means calculates the unit load equipment power demand forecast and the load equipment total power demand forecast;
and a charge/discharge amount calculation means for calculating a total discharge amount, which is the entire amount of power supplied from the plurality of power storage facilities to the plurality of load facilities, for each of the specified time units in the future, based on the load equipment total power demand forecast, the conventional power generation equipment total power generation forecast, the renewable energy power generation equipment total power generation forecast, and the total chargeable/dischargeable amount forecast, or for calculating a total charge amount, which is the entire amount of power supplied from the plurality of renewable energy power generation facilities to the plurality of power storage facilities, as a total charge amount prediction.

[2]
前記総放電量に応じて複数の前記蓄電設備を所有している複数の蓄電設備所有者に対して支払われる放電料金の総額である総放電料金を算出し、または、前記総充電量に応じて複数の前記蓄電設備所有者に対して課金される充電料金の総額である総充電料金を算出する充放電料金算出手段を更に備えている[1]の電力管理システム。
[2]
The power management system of [1] further comprising a charge/discharge fee calculation means for calculating a total discharge fee which is a total amount of discharge fees to be paid to a plurality of owners of the power storage facilities who own the plurality of power storage facilities according to the total discharge amount, or for calculating a total charging fee which is a total amount of charging fees to be charged to the plurality of owners of the power storage facilities according to the total charge amount.

[3]
前記充放電量算出手段は、前記蓄電設備のそれぞれから放電される単位放電量または前記蓄電設備のそれぞれに充電される単位充電量を算出する[1]又は[2]の電力管理システム。
[3]
The power management system according to [1] or [2], wherein the charge/discharge amount calculation means calculates a unit discharge amount to be discharged from each of the power storage facilities or a unit charge amount to be charged to each of the power storage facilities.

[4]
前記充放電料金算出手段は、更に、前記単位放電量に応じて、前記単位放電量が算出された前記蓄電設備を所有している前記蓄電設備所有者に対して支払われる放電料金である単位放電料金を算出し、又は、前記単位充電量に応じて、前記単位充電量が算出された前記蓄電設備を所有している前記蓄電設備所有者に対して課金される充電料金である単位充電料金を算出する[3]の電力管理システム。
[4]
The charge/discharge fee calculation means further calculates, in accordance with the unit discharge amount, a unit discharge fee which is a discharge fee to be paid to the owner of the power storage equipment for which the unit discharge amount has been calculated, or calculates, in accordance with the unit charge amount, a unit charging fee which is a charging fee to be charged to the owner of the power storage equipment for which the unit charge amount has been calculated.

[5]
単位充電料金の単価である単位充電料金単価よりも、単位放電料金の単価である単位放電料金単価の方が高額に設定されている[4]の電力管理システム。
[5]
An energy management system in which the unit discharge fee, which is the unit price of the unit discharge fee, is set higher than the unit charging fee, which is the unit price of the unit charging fee [4].

[6]
将来の前記所定の時間単位毎に複数の前記従来型発電設備のそれぞれで許容できる発電低減量である単位従来型発電設備許容発電低減量予測を算出するとともに、複数の前記従来型発電設備の全体での将来の前記所定の時間単位毎に許容できる発電低減量の総体である従来型発電設備総許容発電低減量予測を算出する従来型発電設備許容発電低減量予測算出手段と、
将来の前記所定の時間単位毎に複数の前記従来型発電設備のそれぞれで許容できる発電増加量である単位従来型発電設備許容発電増加量予測を算出するとともに、複数の前記従来型発電設備の全体での将来の前記所定の時間単位毎に許容できる発電増加量の総体である従来型発電設備総許容発電増加量予測を算出する従来型発電設備許容発電増加量算出手段と
をさらに備えていて、
充放電量算出手段は、総放電量予測または総充電量予測の算出を行う際に、前記従来型発電設備総許容発電低減量予測及び、前記従来型発電設備総許容発電増加量予測を参照する[1]~[5]のいずれかの電力管理システム。
[6]
a conventional power generation equipment allowable power reduction prediction calculation means for calculating a unit conventional power generation equipment allowable power reduction prediction, which is an allowable power reduction amount for each of the plurality of conventional power generation equipment for each of the predetermined time units in the future, and for calculating a conventional power generation equipment total allowable power reduction prediction, which is a total of an allowable power reduction amount for each of the plurality of conventional power generation equipment for each of the predetermined time units in the future;
and a conventional power generation equipment allowable power increase calculation means for calculating a unit conventional power generation equipment allowable power increase forecast, which is an allowable power increase for each of the plurality of conventional power generation equipment for each of the predetermined time units in the future, and for calculating a conventional power generation equipment total allowable power increase forecast, which is a total of an allowable power increase for each of the plurality of conventional power generation equipment for each of the predetermined time units in the future,
The power management system according to any one of [1] to [5], wherein the charge/discharge amount calculation means refers to the conventional power generation equipment total allowable power generation reduction forecast and the conventional power generation equipment total allowable power generation increase forecast when calculating the total discharge amount forecast or the total charge amount forecast.

この発明によれば、火力発電所、原子力発電所、水力発電所、揚水発電所、等の従来型発電設備による発電、電力供給及び、太陽光発電、風力発電、地熱発電、等の再生可能エネルギー発電設備よる発電、電力供給と、工場、会社、店舗、住宅、等で電力を使用する負荷設備での電力需要との間の調整に、日本国中に広く存在する蓄電設備(蓄電池)からの放電及び、前記蓄電設備(蓄電池)への充電を組み込み、更に、前記蓄電設備(蓄電池)がこのように利用されることに対して、前記蓄電設備(蓄電池)の使用者・所有者に何らかの経済的な利益が与えられる電力管理システムを提供することができる。 According to this invention, it is possible to provide a power management system that incorporates the discharge from and charging of storage equipment (storage batteries) widely present throughout Japan to adjust between power generation and power supply by conventional power generation facilities such as thermal power plants, nuclear power plants, hydroelectric power plants, and pumped storage power plants, and power generation and power supply by renewable energy power generation facilities such as solar power generation, wind power generation, and geothermal power generation, and the power demand of load equipment that uses electricity in factories, companies, stores, homes, etc., and further provides a certain economic benefit to the users and owners of the storage equipment (storage batteries) for using the storage equipment (storage batteries) in this way.

この発明に係る電力管理システムの一実施形態の構成を説明する概念図。1 is a conceptual diagram illustrating a configuration of an embodiment of a power management system according to the present invention. この発明に係る電力管理システムの一実施形態のシステム構成の一例を説明するブロック図。1 is a block diagram illustrating an example of a system configuration of an embodiment of a power management system according to the present invention.

本発明の電力管理システムはコンピュータシステムによって構成されるもので、図1に概略構成を示した実施形態では、管理サーバ1と、複数の負荷設備端末3a、3b、3c、・・・、複数の従来型発電設備端末5a、5b、5c、・・・、複数の再生可能エネルギー発電設備端末7a、7b、7c、・・・・、複数の蓄電設備端末9a、9b、9c、・・・・とがネットワーク10を介して情報交信可能に接続されて構成される。 The power management system of the present invention is configured by a computer system, and in the embodiment shown in the schematic configuration of Figure 1, a management server 1, multiple load equipment terminals 3a, 3b, 3c, ..., multiple conventional power generation equipment terminals 5a, 5b, 5c, ..., multiple renewable energy power generation equipment terminals 7a, 7b, 7c, ..., and multiple storage equipment terminals 9a, 9b, 9c, ... are connected via a network 10 so that they can exchange information.

複数の負荷設備端末3a、3b、3c、・・・は、図1図示のように、この実施形態の電力管理システムによる管理の対象になっている複数の負荷設備2a、2b、2c、・・・のそれぞれに配備されている。 As shown in FIG. 1, multiple load equipment terminals 3a, 3b, 3c, ... are provided for each of multiple load equipment 2a, 2b, 2c, ... that are subject to management by the power management system of this embodiment.

複数の従来型発電設備端末5a、5b、5c、・・・は、図1図示のように、この実施形態の電力管理システムによる管理の対象になっている複数の従来型発電設備4a、4b、4c、・・・のそれぞれに配備されている。 As shown in FIG. 1, multiple conventional power generation equipment terminals 5a, 5b, 5c, ... are installed in each of multiple conventional power generation equipment 4a, 4b, 4c, ... that are subject to management by the power management system of this embodiment.

複数の再生可能エネルギー発電設備端末7a、7b、7c、・・・・は、図1図示のように、この実施形態の電力管理システムによる管理の対象になっている複数の再生可能エネルギー発電設備6a、6b、6c、・・・のそれぞれに配備されている。 As shown in FIG. 1, multiple renewable energy power generation equipment terminals 7a, 7b, 7c, ... are installed at each of multiple renewable energy power generation equipment 6a, 6b, 6c, ... that are subject to management by the power management system of this embodiment.

複数の蓄電設備端末9a、9b、9c、・・・・は、図1図示のように、この実施形態の電力管理システムによる管理の対象になっている複数の蓄電設備8a、8b、8c、・・・のそれぞれに配備されている。 As shown in FIG. 1, a plurality of power storage equipment terminals 9a, 9b, 9c, ... are provided for each of a plurality of power storage equipment 8a, 8b, 8c, ... that are subject to management by the power management system of this embodiment.

複数の負荷設備2a、2b、2c、・・・は、例えば、工場、会社、店舗、住宅、等で電力を使用する負荷設備である。以下、本明細書、図面において、負荷設備2a、2b、2c、・・・を総称して単に「負荷設備2」と表すことがある。 The multiple load equipment 2a, 2b, 2c, ... are load equipment that uses electricity, for example, in factories, companies, stores, homes, etc. Hereinafter, in this specification and drawings, the load equipment 2a, 2b, 2c, ... may be collectively referred to simply as "load equipment 2."

複数の従来型発電設備4a、4b、4c、・・・は、例えば、火力発電所、原子力発電所、水力発電所、揚水発電所、等の発電設備である。以下、本明細書、図面において、従来型発電設備4a、4b、4c、・・・を総称して単に「従来型発電設備4」と表すことがある。 The multiple conventional power generation facilities 4a, 4b, 4c, ... are, for example, power generation facilities such as thermal power plants, nuclear power plants, hydroelectric power plants, and pumped storage power plants. Hereinafter, in this specification and drawings, the conventional power generation facilities 4a, 4b, 4c, ... may be collectively referred to simply as "conventional power generation facilities 4."

複数の再生可能エネルギー発電設備6a、6b、6c、・・・は、例えば、太陽光発電、風力発電、地熱発電、等の発電設備である。以下、本明細書、図面において、再生可能エネルギー発電設備6a、6b、6c、・・・を総称して単に「再生可能エネルギー発電設備6」と表すことがある。 The multiple renewable energy power generation facilities 6a, 6b, 6c, ... are, for example, power generation facilities such as solar power generation, wind power generation, and geothermal power generation. Hereinafter, in this specification and drawings, the renewable energy power generation facilities 6a, 6b, 6c, ... may be collectively referred to simply as "renewable energy power generation facilities 6."

なお、水力発電所、揚水発電所を、再生可能エネルギー発電の一形態とすることもあるが、本明細書では、これらを従来型発電設備として取り扱っている。 Note that hydroelectric power plants and pumped-storage power plants are sometimes considered forms of renewable energy generation, but in this specification they are treated as conventional power generation facilities.

複数の蓄電設備8a、8b、8c、・・・は、再生可能エネルギー発電設備6に対して併設されている、等の使用形態を例示できる蓄電池、等の蓄電設備や、電気自動車に配備されている蓄電池、等の蓄電設備であって、この実施形態の電力管理システムによる管理の対象になっている蓄電設備である。これらの蓄電設備は、必要に応じて、再生可能エネルギー発電設備6で発電した電力が一時的に蓄電されたり、上述した負荷に対する一時的な電力供給、等の目的で放電が行われる、等の使われ方をする。以下、本明細書、図面において、蓄電設備8a、8b、8c、・・・を総称して単に「蓄電設備8」と表すことがある。 The multiple power storage facilities 8a, 8b, 8c, ... are power storage facilities such as storage batteries that can be used in conjunction with the renewable energy power generation facility 6, and power storage facilities such as storage batteries installed in electric vehicles, and are the power storage facilities that are the targets of management by the power management system of this embodiment. These power storage facilities are used, as necessary, to temporarily store the power generated by the renewable energy power generation facility 6, or to discharge the power for the purpose of temporarily supplying power to the above-mentioned loads, etc. Hereinafter, in this specification and drawings, the power storage facilities 8a, 8b, 8c, ... may be collectively referred to simply as "power storage facilities 8".

図1図示の実施形態では、負荷設備2a、2b、2c、従来型発電設備4a、4b、4c、再生可能エネルギー発電設備6a、6b、6c、蓄電設備8a、8b、8cのみが図示されているが、複数の負荷設備2、複数の従来型発電設備4、複数の再生可能エネルギー発電設備6、複数の蓄電設備8は、本発明の電力管理システムによって管理される地域、エリア、例えば、北海道エリア、青森・秋田・岩手・山形・宮城・福島の東北6県からなる東北エリア、東日本エリア、西日本エリアなどの管理対象エリアに存在していて、本発明の電力管理システムによって電力の需要と供給、蓄電設備への充電と、蓄電設備からの放電とが管理、調整される複数の負荷設備2、複数の従来型発電設備4、複数の再生可能エネルギー発電設備6、複数の蓄電設備8を含むものである。 In the embodiment shown in FIG. 1, only the load equipment 2a, 2b, 2c, conventional power generation equipment 4a, 4b, 4c, renewable energy power generation equipment 6a, 6b, 6c, and storage equipment 8a, 8b, 8c are shown, but the multiple load equipment 2, multiple conventional power generation equipment 4, multiple renewable energy power generation equipment 6, and multiple storage equipment 8 are present in a region or area managed by the power management system of the present invention, such as the Hokkaido area, the Tohoku area consisting of the six Tohoku prefectures of Aomori, Akita, Iwate, Yamagata, Miyagi, and Fukushima, the East Japan area, and the West Japan area, and include the multiple load equipment 2, multiple conventional power generation equipment 4, multiple renewable energy power generation equipment 6, and multiple storage equipment 8, whose demand and supply of electricity, charging to the storage equipment, and discharging from the storage equipment are managed and adjusted by the power management system of the present invention.

上述した、この実施形態の電力管理システムによる管理の対象になっている負荷設備2、この実施形態の電力管理システムによる管理の対象になっている従来型発電設備4、この実施形態の電力管理システムによる管理の対象になっている再生可能エネルギー発電設備6、この実施形態の電力管理システムによる管理の対象になっている蓄電設備8は、本発明の電力管理システムによって管理される上述の管理対象エリアに存在していて、本発明の電力管理システムによって電力の需要と供給、蓄電設備への充電と、蓄電設備からの放電とが管理、調整されるもので、本明細書において、単に「管理対象になっている負荷設備」、「管理対象になっている従来型発電設備」、「管理対象になっている再生可能エネルギー発電設備」、「管理対象になっている蓄電設備」と表すことがある。 The load equipment 2 that is the subject of management by the power management system of this embodiment, the conventional power generation equipment 4 that is the subject of management by the power management system of this embodiment, the renewable energy power generation equipment 6 that is the subject of management by the power management system of this embodiment, and the power storage equipment 8 that is the subject of management by the power management system of this embodiment are located in the above-mentioned managed area managed by the power management system of the present invention, and the power demand and supply, charging to the power storage equipment, and discharging from the power storage equipment are managed and adjusted by the power management system of the present invention, and may be referred to simply as "load equipment that is being managed," "conventional power generation equipment that is being managed," "renewable energy power generation equipment that is being managed," and "power storage equipment that is being managed" in this specification.

管理サーバ1はコンピュータから構成されており、図示していないが、オペレーティングシステムや、インストールあるいはダウンロードした所定のコンピュータプログラムなどに従って、この実施形態のシステムの各種の機能が実現されるように制御を行うCPU、オペレーティングシステムや種々のコンピュータプログラムなどを記憶し、また、CPUが各制御のための処理を実行する上で必要なデータを記憶する記憶部としてのROM、CPUが処理を実行する上で必要なデータを記憶し、CPUによって情報が適宜書き換えられるワークエリアとしても利用されるRAMやハードディスク、通信インターフェース等の情報入出力部などが備えられていて、これらが必要なバスラインで接続されている構成になる。 The management server 1 is composed of a computer, and although not shown, includes a CPU that performs control so that the various functions of the system of this embodiment are realized according to an operating system and specific computer programs that have been installed or downloaded, a ROM that stores the operating system and various computer programs and serves as a storage unit for storing data necessary for the CPU to execute processes for each control, a RAM and a hard disk that store data necessary for the CPU to execute processes and are also used as a work area where information is rewritten by the CPU as appropriate, and information input/output units such as a communication interface, all of which are connected by the necessary bus lines.

管理サーバ1は、クラウド上にサーバが構築されている形態にすることもできる。また、後述する各手段が分散配備されている複数のサーバコンピュータから構成されている形態にすることもできる。 The management server 1 can be configured as a server built on the cloud. It can also be configured as a server consisting of multiple server computers in which each of the means described below is distributed.

負荷設備端末3a、3b、3c、・・・、従来型発電設備端末5a、5b、5c、・・・、再生可能エネルギー発電設備端末7a、7b、7c、・・・・、蓄電設備端末9a、9b、9c、・・・・は、例えば、パーソナルコンピュータ、スマートフォン、タブレット型端末など、一般に広く普及している汎用デバイスからなり、インターネット、等の有線や無線のネットワーク10を介してコンピュータからなる管理サーバ1との間で情報交信可能に接続され、所定のコンピュータプログラムにより、後述する種々の処理動作を実行するものである。 The load equipment terminals 3a, 3b, 3c, ..., conventional power generation equipment terminals 5a, 5b, 5c, ..., renewable energy power generation equipment terminals 7a, 7b, 7c, ..., and storage equipment terminals 9a, 9b, 9c, ... are comprised of general-purpose devices that are widely used in the general public, such as personal computers, smartphones, and tablet terminals, and are connected to the management server 1, which is a computer, via a wired or wireless network 10 such as the Internet so that information can be exchanged, and execute various processing operations, which will be described later, using a specified computer program.

以下、本明細書、図面において、負荷設備端末3a、3b、3c、・・・、従来型発電設備端末5a、5b、5c、・・・、再生可能エネルギー発電設備端末7a、7b、7c、・・・・、蓄電設備端末9a、9b、9c、・・・・を、それぞれ、総称して、単に、「負荷設備端末3」、「従来型発電設備端末5」、「再生可能エネルギー発電設備端末7」、「蓄電設備端末9」と表すことがある。 Hereinafter, in this specification and drawings, the load equipment terminals 3a, 3b, 3c, ..., conventional power generation equipment terminals 5a, 5b, 5c, ..., renewable energy power generation equipment terminals 7a, 7b, 7c, ..., and power storage equipment terminals 9a, 9b, 9c, ... may be collectively referred to simply as "load equipment terminal 3", "conventional power generation equipment terminal 5", "renewable energy power generation equipment terminal 7", and "power storage equipment terminal 9".

図2は、この発明に係る電力管理システムの一実施形態のシステム構成の一例を説明するブロック図である。 Figure 2 is a block diagram illustrating an example of the system configuration of one embodiment of a power management system according to the present invention.

管理サーバ1は、所定のコンピュータプログラムの下で、後述する処理動作をそれぞれ実行する電力需要予測算出手段100、従来型発電設備発電量予測算出手段101、再生可能エネルギー発電量予測算出手段102、充放電可能量算出手段103、充放電量算出手段104、充放電料金算出手段105、従来型発電設備許容発電低減量予測算出手段106、従来型発電設備許容発電増加量算出手段107を備えている。 The management server 1 includes a power demand forecast calculation means 100, a conventional power generation equipment power generation forecast calculation means 101, a renewable energy power generation forecast calculation means 102, a chargeable/dischargeable amount calculation means 103, a charge/discharge amount calculation means 104, a charge/discharge fee calculation means 105, a conventional power generation equipment allowable power generation reduction forecast calculation means 106, and a conventional power generation equipment allowable power generation increase calculation means 107, which each execute the processing operations described below under a specific computer program.

管理サーバ1のデータベース200には、図示の実施形態では、負荷設備電力需要実績履歴データベース201、従来型発電設備発電実績履歴データベース202、再生可能エネルギー発電設備発電実績履歴データベース203、気候・環境条件実績履歴データベース204、イベント実績履歴データベース205、充電設備データベース206、充放電実績履歴データベース207、料金テーブルデータベース208、送配電線網データベース209、発電設備稼働計画データベース210、イベント計画データベース211、負荷設備総電力需要予測データベース212、従来型発電設備発電量予測データベース213、再生可能エネルギー発電設備発電量予測データベース214、充放電可能量予測データベース215、充放電量予測データベース216、充放電料金データベース217、従来型発電設備許容発電低減量予測データベース218、従来型発電設備許容発電増加量予測データベース219が備えられている。以下、本明細書、図面において、データベースを単に「DB」と表すことがある。 In the illustrated embodiment, the database 200 of the management server 1 includes a load equipment power demand performance history database 201, a conventional power generation equipment power generation performance history database 202, a renewable energy power generation equipment power generation performance history database 203, a climate and environmental condition performance history database 204, an event performance history database 205, a charging equipment database 206, a charge and discharge performance history database 207, a fee table database 208, a power transmission and distribution network database 209, a power generation equipment operation plan database 210, an event plan database 211, a load equipment total power demand forecast database 212, a conventional power generation equipment power generation amount forecast database 213, a renewable energy power generation equipment power generation amount forecast database 214, a charge and discharge possible amount forecast database 215, a charge and discharge amount forecast database 216, a charge and discharge fee database 217, a conventional power generation equipment allowable power reduction amount forecast database 218, and a conventional power generation equipment allowable power increase amount forecast database 219. Hereinafter, in the present specification and drawings, the database may be simply referred to as "DB".

負荷設備電力需要実績履歴DB201には、後述する電力需要予測算出手段100が単位負荷設備電力需要予測算出処理、負荷設備総電力需要予測算出処理を行う際に参照する、負荷設備電力需要実績履歴に関する情報が蓄積・格納されている。すなわち、この実施形態の電力管理システムによる管理の対象になっている複数の負荷設備2のそれぞれにおける過去の所定の時間単位(例えば、2021年11月1日(月曜日)の午後1時~午後2時)での電力需要実績が履歴情報として格納されている。複数の負荷設備2のそれぞれにおける過去の所定の時間単位での電力需要実績は、例えば、前記所定の時間単位ごとに、管理サーバ1が、各負荷設備端末3から電力需要実績に関する情報を、ネットワーク10を介する、等して取得することで、負荷設備電力需要実績履歴DB201に蓄積、格納されていく。 The load equipment power demand performance history DB201 accumulates and stores information on the load equipment power demand performance history, which is referenced by the power demand forecast calculation means 100 described later when performing the unit load equipment power demand forecast calculation process and the load equipment total power demand forecast calculation process. That is, the power demand performance for a predetermined time unit in the past (for example, 1:00 pm to 2:00 pm on Monday, November 1, 2021) for each of the multiple load equipment 2 that is the subject of management by the power management system of this embodiment is stored as history information. The power demand performance for a predetermined time unit in the past for each of the multiple load equipment 2 is accumulated and stored in the load equipment power demand performance history DB201, for example, by the management server 1 acquiring information on the power demand performance from each load equipment terminal 3 via the network 10 for each of the predetermined time units.

従来型発電設備発電実績履歴DB202には、後述する従来型発電設備発電量予測算出手段101が単位従来型発電設備発電量予測算出処理、従来型発電設備総発電量予測を算出する処理を行う際に参照する、従来型発電設備発電実績履歴に関する情報が蓄積・格納されている。すなわち、この実施形態の電力管理システムによる管理の対象になっている複数の従来型発電設備4のそれぞれにおける過去の所定の時間単位(例えば、2021年11月1日(月曜日)の午後1時~午後2時)での発電実績が履歴情報として格納されている。複数の従来型発電設備4のそれぞれにおける過去の所定の時間単位での発電実績は、例えば、前記所定の時間単位ごとに、管理サーバ1が、各従来型発電設備端末5から発電実績に関する情報を、ネットワーク10を介する、等して取得することで、従来型発電設備発電実績履歴DB202に蓄積、格納されていく。 The conventional power generation equipment power generation performance history DB 202 accumulates and stores information about the conventional power generation equipment power generation performance history, which is referenced when the conventional power generation equipment power generation forecast calculation means 101 described later performs the unit conventional power generation equipment power generation forecast calculation process and the conventional power generation equipment total power generation forecast calculation process. That is, the power generation performance in a predetermined time unit in the past (for example, 1:00 pm to 2:00 pm on Monday, November 1, 2021) for each of the multiple conventional power generation equipment 4 that are the subject of management by the power management system of this embodiment is stored as history information. The power generation performance in a predetermined time unit in the past for each of the multiple conventional power generation equipment 4 is accumulated and stored in the conventional power generation equipment power generation performance history DB 202, for example, by the management server 1 acquiring information about the power generation performance from each conventional power generation equipment terminal 5 for each of the predetermined time units via the network 10, etc.

再生可能エネルギー発電設備発電実績履歴DB203には、後述する再生可能エネルギー発電量予測算出手段102が単位再生可能エネルギー発電設備発電量予測算出処理、再生可能エネルギー発電設備総発電量予測算出処理を行う際に参照する、再生可能エネルギー発電設備発電実績履歴に関する情報が蓄積・格納されている。すなわち、この実施形態の電力管理システムによる管理の対象になっている複数の再生可能エネルギー発電設備6のそれぞれにおける過去の所定の時間単位(例えば、2021年11月1日(月曜日)の午後1時~午後2時)での発電実績が履歴情報として格納されている。複数の再生可能エネルギー発電設備6のそれぞれにおける過去の所定の時間単位での発電実績は、例えば、前記所定の時間単位ごとに、管理サーバ1が、各再生可能エネルギー発電設備端末7から発電実績に関する情報を、ネットワーク10を介する、等して取得することで、再生可能エネルギー発電設備発電実績履歴DB203に蓄積、格納されていく。 The renewable energy power generation equipment power generation performance history DB203 accumulates and stores information on the renewable energy power generation equipment power generation performance history, which is referenced by the renewable energy power generation amount prediction calculation means 102 described later when performing the unit renewable energy power generation equipment power generation amount prediction calculation process and the renewable energy power generation equipment total power generation amount prediction calculation process. That is, the power generation performance in a predetermined time unit in the past (for example, 1:00 pm to 2:00 pm on Monday, November 1, 2021) in each of the multiple renewable energy power generation equipment 6 that are the subject of management by the power management system of this embodiment is stored as history information. The power generation performance in a predetermined time unit in the past in each of the multiple renewable energy power generation equipment 6 is accumulated and stored in the renewable energy power generation equipment power generation performance history DB203, for example, by the management server 1 acquiring information on the power generation performance from each renewable energy power generation equipment terminal 7 for each of the predetermined time units via the network 10, etc.

気候・環境条件実績履歴DB204には、後述する従来型発電設備発電量予測算出手段101が単位従来型発電設備発電量予測算出処理、従来型発電設備総発電量予測を算出処理を行う際及び、後述する再生可能エネルギー発電量予測算出手段102が単位再生可能エネルギー発電設備発電量予測算出処理、再生可能エネルギー発電設備総発電量予測算出処理を行う際に参照する気候・環境条件データが蓄積・格納されている。例えば、この実施形態の電力管理システムによる管理の対象になっている複数の負荷設備2の電力需要に対して影響を与える、複数の負荷設備2それぞれが所在している地域における過去の気候・環境条件実績履歴情報及び将来の気候・環境条件予測、並びに、この実施形態の電力管理システムによる管理の対象になっている複数の再生可能エネルギー発電設備6による発電量に対して影響を与える複数の再生可能エネルギー発電設備6それぞれが所在している地域における過去の気候・環境条件実績履歴情報及び将来の気候・環境条件予測が格納されている。 The climate and environmental condition performance history DB 204 accumulates and stores climate and environmental condition data that is referenced when the conventional power generation equipment power generation forecast calculation means 101 described later performs the unit conventional power generation equipment power generation forecast calculation process and the conventional power generation equipment total power generation forecast calculation process, and when the renewable energy power generation forecast calculation means 102 described later performs the unit renewable energy power generation equipment power generation forecast calculation process and the renewable energy power generation equipment total power generation forecast calculation process. For example, past climate and environmental condition performance history information and future climate and environmental condition forecasts in the area where each of the multiple load equipment 2 that is the object of management by the power management system of this embodiment is located, which affects the power demand of the multiple load equipment 2, and past climate and environmental condition performance history information and future climate and environmental condition forecasts in the area where each of the multiple renewable energy power generation equipment 6 that is the object of management by the power management system of this embodiment is located are stored.

気候・環境条件実績履歴DB204に格納されているこれらの気候・環境条件に関するデータは、これらを提供する商用ウェブサイトなどから管理サーバ1が取得する、等して気候・環境条件実績履歴DB204に蓄積、格納されていく。 The data on these climate and environmental conditions stored in the climate and environmental condition performance history DB204 is acquired by the management server 1 from commercial websites that provide such data, and is then accumulated and stored in the climate and environmental condition performance history DB204.

イベント実績履歴DB205には、後述する電力需要予測算出手段100が単位負荷設備電力需要予測算出処理、負荷設備総電力需要予測算出処理を行う際に参照する、イベント実績履歴に関する情報が蓄積・格納されている。すなわち、この実施形態の電力管理システムによる管理の対象になっている複数の負荷設備2が所在している地域におけるイベント(例えば、休日、お祭り、コンサート、等)の開催履歴と、当該イベントの際の該当する負荷設備2における電力需要実績に関する情報が格納されている。イベント実績履歴DB205に格納されるこのような情報は、管理サーバ1が取得した各種イベントの開催履歴情報と、負荷設備電力需要実績履歴DB201に蓄積、格納されている上述した情報とを参照して、管理サーバ1の所定の処理動作部が作成してイベント実績履歴DB205に格納、蓄積する。 The event performance history DB205 accumulates and stores information related to the event performance history, which is referenced by the power demand forecast calculation means 100 described later when performing the unit load equipment power demand forecast calculation process and the load equipment total power demand forecast calculation process. That is, the event performance history (e.g., holidays, festivals, concerts, etc.) history in the area where the multiple load equipment 2 that are the subject of management by the power management system of this embodiment are located, and information related to the actual power demand of the corresponding load equipment 2 during the event are stored. Such information stored in the event performance history DB205 is created by a specific processing operation unit of the management server 1 by referring to the event performance history information of various events acquired by the management server 1 and the above-mentioned information accumulated and stored in the load equipment power demand performance history DB201, and is stored in the event performance history DB205.

充電設備DB206には、この実施形態の電力管理システムによる管理の対象になっている複数の蓄電設備8に関するデータが格納されている。蓄電設備8に関するデータとしては、蓄電設備8が設置されている場所、蓄電設備8が電気自動車に配備されている蓄電池である場合は当該蓄電池への充電及び当該蓄電池からの放電が行われる場所に関する情報、蓄電設備8の所有者に関する情報(例えば、この実施形態の電力管理システムの管理の下で、蓄電設備8から放電が行われたり、蓄電設備8への充電が行われる際に、放電量に応じてこの実施形態の電力管理システムの管理・運営者から支払いが行われる放電料金の支払先及び、充電量に応じてこの実施形態の電力管理システムの管理・運営者から課金が行われる充電料金の課金先になる蓄電設備8の所有者に関する情報)、各蓄電設備8における放電可能量及び充電可能量に関する情報などがある。 The charging equipment DB 206 stores data on a plurality of storage equipment 8 that are the subject of management by the power management system of this embodiment. The data on the storage equipment 8 includes information on the location where the storage equipment 8 is installed, information on the location where the storage battery is charged and discharged if the storage battery 8 is a storage battery installed in an electric vehicle, information on the owner of the storage equipment 8 (for example, information on the payee of the discharge fee paid by the manager/operator of the power management system of this embodiment according to the amount of discharge when the storage equipment 8 is discharged or charged under the management of the power management system of this embodiment, and information on the owner of the storage equipment 8 who is the payee of the charge fee charged by the manager/operator of the power management system of this embodiment according to the amount of charge), information on the dischargeable amount and chargeable amount of each storage equipment 8, etc.

蓄電設備8が設置されている場所、蓄電設備8が電気自動車に配備されている蓄電池である場合は当該蓄電池への充電及び当該蓄電池からの放電が行われる場所に関する情報、蓄電設備8の所有者に関する情報などは、各蓄電設備8がこの実施形態の電力管理システムによる管理の対象となって登録される際に管理サーバ1が取得して充電設備DB206に格納、蓄積される。 When each power storage facility 8 is registered as a target for management by the power management system of this embodiment, information regarding the location where the power storage facility 8 is installed, the location where the battery is charged and discharged if the power storage facility 8 is a battery installed in an electric vehicle, and information regarding the owner of the power storage facility 8 are acquired by the management server 1 and stored and accumulated in the charging facility DB 206.

各蓄電設備8における放電可能量及び充電可能量に関する情報は、管理サーバ1が、各蓄電設備端末9から、この情報を、ネットワーク10を介する、等して取得することで、充電設備DB206に蓄積、格納されていく。この情報取得、蓄積、格納は、例えば、上述した所定の時間単位に対応させて、各蓄電設備端末9が1時間間隔、等の時間間隔で、ネットワーク10を介して管理サーバ1へ送出される形態にすることができる。 Information regarding the dischargeable amount and chargeable amount of each power storage facility 8 is accumulated and stored in the charging facility DB 206 by the management server 1 acquiring this information from each power storage facility terminal 9 via the network 10, etc. This information acquisition, accumulation, and storage can be in the form of each power storage facility terminal 9 sending the information to the management server 1 via the network 10 at time intervals such as one hour, corresponding to the above-mentioned predetermined time unit.

各蓄電設備8における放電可能量及び充電可能量に関する情報は、後述する充放電可能量算出手段103が行う単位充放電可能量予測算出処理、総充放電可能量予測算出処理の際に参照される。 The information regarding the dischargeable amount and chargeable amount of each power storage device 8 is referenced during the unit chargeable/dischargeable amount prediction calculation process and the total chargeable/dischargeable amount prediction calculation process performed by the chargeable/dischargeable amount calculation means 103 described below.

充放電実績履歴DB207には、この実施形態の電力管理システムによる管理の対象になっている複数の蓄電設備8のそれぞれにおいて、この実施形態の電力管理システムの管理の下で各蓄電設備8から放電が行われた際の放電量に関する情報、この実施形態の電力管理システムの管理の下で各蓄電設備8に充電が行われた際の充電量に関する情報が蓄積、格納されている。これらの情報は、後述する充放電可能量算出手段103が行う単位充放電可能量予測算出処理、総充放電可能量予測算出処理の際に参照される。また、これらの情報は、管理サーバ1が、各蓄電設備端末9からこれらの情報を、ネットワーク10を介する、等して取得することで、充放電実績履歴DB207に蓄積、格納されていく。 In the charge/discharge performance history DB207, for each of the multiple storage equipment 8 that are the subject of management by the power management system of this embodiment, information on the amount of discharge when each storage equipment 8 is discharged under the management of the power management system of this embodiment, and information on the amount of charge when each storage equipment 8 is charged under the management of the power management system of this embodiment are accumulated and stored. This information is referenced during the unit chargeable/dischargeable amount forecast calculation process and the total chargeable/dischargeable amount forecast calculation process performed by the chargeable/dischargeable amount calculation means 103 described later. In addition, this information is accumulated and stored in the charge/discharge performance history DB207 by the management server 1 acquiring this information from each storage equipment terminal 9 via the network 10, etc.

料金テーブルDB208には、将来の所定の時間単位毎に複数の蓄電設備8から複数の負荷設備2に対して供給される電力量の全体である総放電量に応じて複数の蓄電設備8を所有している複数の蓄電設備所有者に対して支払われる放電料金の総額である総放電料金を算出するために必要な放電料金の単価、複数の再生可能エネルギー発電設備4から複数の蓄電設備8に対して供給される電力量の全体である総充電量に応じて複数の蓄電設備所有者に対して課金される充電料金の総額である総充電料金を算出するために必要な充電料金の単価などに関する情報が格納されている。これらの情報は、後述する充放電料金算出手段105が行う算出処理の際に参照される。 The fee table DB208 stores information such as the unit price of the discharge fee required to calculate the total discharge fee, which is the total amount of discharge fees paid to the owners of the multiple energy storage facilities 8 who own the multiple energy storage facilities 8, according to the total discharge amount, which is the total amount of power supplied from the multiple energy storage facilities 8 to the multiple load facilities 2 for each specified time unit in the future, and the unit price of the charging fee required to calculate the total charging fee, which is the total amount of charging fees charged to the owners of the multiple energy storage facilities 8, according to the total charging amount, which is the total amount of power supplied from the multiple renewable energy power generation facilities 4 to the multiple energy storage facilities 8. This information is referenced during the calculation process performed by the charging/discharging fee calculation means 105 described later.

送配電線網DB209には、負荷設備2、従来型発電設備4、再生可能エネルギー発電設備6、蓄電設備8の間での送電用に配備されている送配電線網に関する情報が蓄積、格納されている。例えば、負荷設備2と、従来型発電設備4、再生可能エネルギー発電設備6、蓄電設備8との間の距離、各送電線により送電が行われる際の送電ロスに関する情報などが蓄積、格納されている。 In the power transmission and distribution network DB209, information about the power transmission and distribution network deployed for transmitting electricity between the load equipment 2, the conventional power generation equipment 4, the renewable energy power generation equipment 6, and the power storage equipment 8 is accumulated and stored. For example, information about the distance between the load equipment 2 and the conventional power generation equipment 4, the renewable energy power generation equipment 6, and the power storage equipment 8, and information about the transmission loss when electricity is transmitted through each transmission line is accumulated and stored.

発電設備稼働計画DB210には、各従来型発電設備4及び、各再生可能エネルギー発電設備6における稼働計画、すなわち、将来に予定している発電計画に関する情報が蓄積、格納されている。管理サーバ1が、各従来型発電設備端末5及び、各再生可能エネルギー発電設備端末7からこれらの情報を、ネットワーク10を介する、等して取得することで、発電設備稼働計画データベース210に蓄積、格納されていく。 The power generation equipment operation plan DB 210 accumulates and stores information on operation plans for each conventional power generation equipment 4 and each renewable energy power generation equipment 6, i.e., power generation plans planned for the future. The management server 1 acquires this information from each conventional power generation equipment terminal 5 and each renewable energy power generation equipment terminal 7 via the network 10, etc., and the information is accumulated and stored in the power generation equipment operation plan database 210.

各従来型発電設備4及び、各再生可能エネルギー発電設備6における稼働計画に変更が生じた場合には、その情報を、管理サーバ1が、各従来型発電設備端末5及び、各再生可能エネルギー発電設備端末7から、ネットワーク10を介する、等して取得することで、発電設備稼働計画DB210にて更新していく。 If there are any changes in the operation plans of each conventional power generation facility 4 and each renewable energy power generation facility 6, the management server 1 obtains the information from each conventional power generation facility terminal 5 and each renewable energy power generation facility terminal 7 via the network 10, etc., and updates the information in the power generation facility operation plan DB 210.

イベント計画DB211には、負荷設備2が所在している地域において、電力需要に変動を生じさせる可能性が予想されるイベントの予定に関する情報が蓄積、格納されている。 The event plan DB211 accumulates and stores information about scheduled events that are expected to cause fluctuations in electricity demand in the area where the load equipment 2 is located.

負荷設備総電力需要予測DB212には、後述する電力需要予測算出手段100によって算出された負荷設備総電力需要予測が蓄積、格納されている。 The load equipment total power demand forecast DB212 accumulates and stores the load equipment total power demand forecast calculated by the power demand forecast calculation means 100 described below.

従来型発電設備発電量予測DB213には、後述する従来型発電設備発電量予測算出手段101によって算出された単位従来型発電設備発電量予測及び、従来型発電設備総発電量予測が蓄積、格納される。 The conventional power generation equipment power generation forecast DB213 accumulates and stores the unit conventional power generation equipment power generation forecast and the conventional power generation equipment total power generation forecast calculated by the conventional power generation equipment power generation forecast calculation means 101 described below.

再生可能エネルギー発電設備発電量予測DB214には、後述する再生可能エネルギー発電量予測算出手段102によって算出された単位再生可能エネルギー発電設備発電量予測及び、再生可能エネルギー発電設備総発電量予測が蓄積、格納される。 The renewable energy power generation facility power generation forecast DB214 accumulates and stores the unit renewable energy power generation facility power generation forecast and the total renewable energy power generation facility power generation forecast calculated by the renewable energy power generation forecast calculation means 102 described below.

充放電可能量予測DB215には、後述する充放電可能量算出手段103によって算出された単位充放電可能量予測及び、総充放電可能量予測が蓄積、格納される。 The chargeable/dischargeable amount prediction DB215 accumulates and stores the unit chargeable/dischargeable amount prediction and the total chargeable/dischargeable amount prediction calculated by the chargeable/dischargeable amount calculation means 103 described below.

充放電量予測DB216には、後述する充放電量算出手段104が算出した総放電量予測または、総充電量予測が蓄積、格納される。また、後述する充放電量算出手段104が算出した単位放電量または単位充電量が蓄積、格納される。 The charge/discharge amount prediction DB216 accumulates and stores the total discharge amount prediction or the total charge amount prediction calculated by the charge/discharge amount calculation means 104 described later. In addition, the unit discharge amount or unit charge amount calculated by the charge/discharge amount calculation means 104 described later is accumulated and stored.

充放電料金DB217には、後述する充放電料金算出手段105が算出した総放電料金または、総充電料金が蓄積、格納される。また、後述する充放電料金算出手段105が算出した単位放電料金または、単位充電料金が蓄積、格納される。 The charge/discharge fee DB217 accumulates and stores the total discharge fee or the total charging fee calculated by the charge/discharge fee calculation means 105 described below. It also accumulates and stores the unit discharge fee or the unit charging fee calculated by the charge/discharge fee calculation means 105 described below.

従来型発電設備許容発電低減量予測DB218には、後述する従来型発電設備許容発電低減量予測算出手段107が算出した単位従来型発電設備許容発電低減量予測及び、従来型発電設備総許容発電低減量予測が蓄積、格納される。 The conventional power generation equipment allowable power reduction forecast DB218 accumulates and stores the unit conventional power generation equipment allowable power reduction forecast calculated by the conventional power generation equipment allowable power reduction forecast calculation means 107 described below and the conventional power generation equipment total allowable power reduction forecast.

従来型発電設備許容発電増加量予測DB219には、後述する従来型発電設備許容発電増加量算出手段108が算出した単位従来型発電設備許容発電増加量予測及び、従来型発電設備総許容発電増加量予測が蓄積、格納される。 The conventional power generation equipment allowable power generation increase forecast DB219 accumulates and stores the unit conventional power generation equipment allowable power generation increase forecast calculated by the conventional power generation equipment allowable power generation increase calculation means 108 described below and the conventional power generation equipment total allowable power generation increase forecast.

電力需要予測算出手段100は、管理対象になっている複数の負荷設備2のそれぞれにおける将来の所定の時間単位(例えば、2022年12月1日 午後1時~午後2時)毎の電力需要である単位負荷設備電力需要予測を算出するとともに、複数の負荷設備2の全体での将来の前記所定の時間単位(すなわち、2022年12月1日 午後1時~午後2時)毎の電力需要である負荷設備総電力需要予測を算出する処理を行う。算出された負荷設備総電力需要予測は、電力需要予測算出手段100が前記単位負荷設備電力需要予測及び前記負荷設備総電力需要予測を算出した時間情報(例えば、前記の場合であれば、将来の所定の時間単位(例えば、2022年12月1日 午後1時~午後2時)の前日である2022年11月30日 午後1時)に関連付けられて負荷設備総電力需要予測DB212に蓄積、格納される。 The power demand forecast calculation means 100 calculates a unit load equipment power demand forecast, which is the power demand for each future predetermined time unit (e.g., 1:00 PM to 2:00 PM on December 1, 2022) for each of the multiple load equipment 2 being managed, and calculates a load equipment total power demand forecast, which is the power demand for each future predetermined time unit (i.e., 1:00 PM to 2:00 PM on December 1, 2022) for the entire multiple load equipment 2. The calculated load equipment total power demand forecast is associated with the time information (e.g., 1:00 PM on November 30, 2022, the day before the future predetermined time unit (e.g., 1:00 PM to 2:00 PM on December 1, 2022) at which the power demand forecast calculation means 100 calculated the unit load equipment power demand forecast and the load equipment total power demand forecast in the above case) and is accumulated and stored in the load equipment total power demand forecast DB 212.

従来型発電設備発電量予測算出手段101は、電力需要予測算出手段100が前記単位負荷設備電力需要予測及び前記負荷設備総電力需要予測を算出した時点(前記の場合は、2022年11月30日 午後1時)における、将来の前記所定の時間単位(すなわち、2022年12月1日 午後1時~午後2時)毎に、管理対象になっている複数の従来型発電設備4のそれぞれで予定されている発電量である単位従来型発電設備発電量予測を算出するとともに、複数の従来型発電設備4の全体での将来の前記所定の時間単位すなわち、2022年12月1日 午後1時~午後2時)毎に予定されている発電量の総体である従来型発電設備総発電量予測を算出する処理を行う。算出された単位従来型発電設備発電量予測及び、従来型発電設備総発電量予測は、電力需要予測算出手段100が前記単位負荷設備電力需要予測及び前記負荷設備総電力需要予測を算出した時間情報(すなわち、2022年11月30日 午後1時)に関連付けられて従来型発電設備発電量予測DB213に蓄積、格納される。 The conventional power generation equipment power generation forecast calculation means 101 calculates a unit conventional power generation equipment power generation forecast, which is the planned power generation of each of the multiple conventional power generation equipment 4 under management, for each of the predetermined future time units (i.e., from 1:00 pm to 2:00 pm on December 1, 2022) at the time when the power demand forecast calculation means 100 calculates the unit load equipment power demand forecast and the load equipment total power demand forecast (in the above case, 1:00 pm on November 30, 2022), and also performs processing to calculate a conventional power generation equipment total power generation forecast, which is the sum of the planned power generation of the multiple conventional power generation equipment 4 as a whole for each of the predetermined future time units (i.e., from 1:00 pm to 2:00 pm on December 1, 2022). The calculated unit conventional power generation equipment power generation forecast and conventional power generation equipment total power generation forecast are associated with the time information (i.e., 1:00 p.m. on November 30, 2022) at which the power demand forecast calculation means 100 calculated the unit load equipment power demand forecast and the load equipment total power demand forecast, and are accumulated and stored in the conventional power generation equipment power generation forecast DB 213.

再生可能エネルギー発電予測算出手段102は、電力需要予測算出手段100が前記単位負荷設備電力需要予測及び前記負荷設備総電力需要予測を算出した時点(前記の場合は、2022年11月30日 午後1時)における、将来の前記所定の時間単位(すなわち、2022年12月1日 午後1時~午後2時)毎に管理対象になっている複数の再生可能エネルギー発電設備6のそれぞれで発電される発電量である単位再生可能エネルギー発電設備発電量予測を算出するとともに、複数の再生可能エネルギー発電設備6の全体で将来の前記所定の時間単位(すなわち、2022年12月1日 午後1時~午後2時)毎に発電される発電量の総体である再生可能エネルギー発電設備総発電量予測を算出する処理を行う。算出された単位再生可能エネルギー発電設備発電量予測及び、再生可能エネルギー発電設備総発電量予測は、電力需要予測算出手段100が前記単位負荷設備電力需要予測及び前記負荷設備総電力需要予測を算出した時間情報(すなわち、2022年11月30日 午後1時)に関連付けられて再生可能エネルギー発電設備発電量予測DB214に蓄積、格納される。 The renewable energy power generation forecast calculation means 102 calculates a unit renewable energy power generation forecast, which is the amount of power generated by each of the multiple renewable energy power generation facilities 6 that are managed for each of the predetermined future time units (i.e., 1:00 PM on December 1, 2022) at the time when the power demand forecast calculation means 100 calculates the unit load equipment power demand forecast and the load equipment total power demand forecast (in the above case, 1:00 PM on November 30, 2022), and also calculates a total renewable energy power generation forecast, which is the sum of the amount of power generated by the multiple renewable energy power generation facilities 6 as a whole for each of the predetermined future time units (i.e., 1:00 PM on December 1, 2022). The calculated unit renewable energy power generation facility power generation forecast and the total renewable energy power generation facility power generation forecast are associated with the time information (i.e., 1:00 p.m. on November 30, 2022) at which the power demand forecast calculation means 100 calculated the unit load facility power demand forecast and the load facility total power demand forecast, and are accumulated and stored in the renewable energy power generation facility power generation forecast DB 214.

充放電可能量算出手段103は、電力需要予測算出手段100が前記単位負荷設備電力需要予測及び前記負荷設備総電力需要予測を算出した時点(前記の場合は、2022年11月30日 午後1時)における、管理対象になっている複数の蓄電設備8それぞれにおける放電可能量及び充電可能量に関する情報に基づいて、将来の前記所定の時間単位(すなわち、2022年12月1日 午後1時~午後2時)毎における、複数の蓄電設備8それぞれにおける放電可能量及び充電可能量を単位充放電可能量予測として算出するとともに、複数の蓄電設備8の全体での放電可能量及び充電可能量を総充放電可能量予測として算出する処理を行う。算出された単位充放電可能量予測及び、総充放電可能量予測は、電力需要予測算出手段100が前記単位負荷設備電力需要予測及び前記負荷設備総電力需要予測を算出した時間情報(すなわち、2022年11月30日 午後1時)に関連付けられて充放電可能量予測DB215に蓄積、格納される。 The chargeable/dischargeable capacity calculation means 103 calculates the dischargeable capacity and chargeable capacity of each of the multiple storage facilities 8 under management for each of the predetermined future time units (i.e., 1:00 pm to 2:00 pm on December 1, 2022) as a unit chargeable/dischargeable capacity prediction, based on information regarding the dischargeable capacity and chargeable capacity of each of the multiple storage facilities 8 under management at the time when the power demand forecast calculation means 100 calculates the unit load equipment power demand forecast and the load equipment total power demand forecast (in the above case, 1:00 pm on November 30, 2022), and performs a process of calculating the dischargeable capacity and chargeable capacity of the multiple storage facilities 8 as a total chargeable/dischargeable capacity prediction. The calculated unit chargeable/dischargeable capacity forecast and total chargeable/dischargeable capacity forecast are associated with the time information (i.e., 1:00 p.m. on November 30, 2022) at which the power demand forecast calculation means 100 calculated the unit load equipment power demand forecast and the load equipment total power demand forecast, and are accumulated and stored in the chargeable/dischargeable capacity forecast DB 215.

充放電量算出手段104は、前記負荷設備総電力需要予測、前記従来型発電設備総発電量予測、前記再生可能エネルギー発電設備総発電量予測及び、前記総充放可能量予測に基づいて、将来の前記所定の時間単位(すなわち、2022年12月1日 午後1時~午後2時)毎に、複数の蓄電設備8から複数の負荷設備2に対して供給される電力量の全体である総放電量を総放電量予測として算出し、または、複数の再生可能エネルギー発電設備6から複数の前記蓄電設備8に対して供給される電力量の全体である総充電量を総充電量予測として算出する処理を行う。算出された総放電量予測または、総充電量予測は、電力需要予測算出手段100が前記単位負荷設備電力需要予測及び前記負荷設備総電力需要予測を算出した時間情報(すなわち、2022年11月30日 午後1時)に関連付けられて充放電量予測DB216に蓄積、格納される。 The charge/discharge amount calculation means 104 performs a process of calculating a total discharge amount, which is the total amount of power supplied from the multiple storage facilities 8 to the multiple load facilities 2, as a total discharge amount prediction, for each of the predetermined future time units (i.e., 1:00 PM to 2:00 PM on December 1, 2022) based on the load facility total power demand prediction, the conventional power generation facility total power generation prediction, the renewable energy power generation facility total power generation prediction, and the total chargeable/dischargeable amount prediction, or calculating a total charge amount, which is the total amount of power supplied from the multiple renewable energy power generation facilities 6 to the multiple storage facilities 8, as a total charge amount prediction. The calculated total discharge amount prediction or total charge amount prediction is associated with the time information (i.e., 1:00 PM on November 30, 2022) at which the power demand prediction calculation means 100 calculated the unit load facility power demand prediction and the load facility total power demand prediction, and is accumulated and stored in the charge/discharge amount prediction DB 216.

充放電料金算出手段105は、前記総放電量に応じて複数の蓄電設備8を所有している複数の蓄電設備所有者に対して支払われる放電料金の総額である総放電料金を算出し、または、前記総充電量に応じて複数の前記蓄電設備所有者に対して課金される充電料金の総額である総充電料金を算出する処理を行う。算出された総放電料金、または、算出された総充電料金は、電力需要予測算出手段100が前記単位負荷設備電力需要予測及び前記負荷設備総電力需要予測を算出した時間情報に関連付けられて充放電料金DB217に蓄積、格納される。 The charge/discharge fee calculation means 105 performs a process of calculating a total discharge fee, which is the total amount of discharge fees to be paid to the owners of the multiple storage facilities 8 according to the total discharge amount, or calculating a total charge fee, which is the total amount of charge fees to be charged to the owners of the multiple storage facilities according to the total charge amount. The calculated total discharge fee or the calculated total charge fee is associated with the time information when the power demand forecast calculation means 100 calculated the unit load equipment power demand forecast and the load equipment total power demand forecast, and is accumulated and stored in the charge/discharge fee DB 217.

充放電量算出手段104は、更に、前記蓄電設備8のそれぞれから放電される単位放電量または前記蓄電設備8のそれぞれに充電される単位充電量を算出する処理を行う。算出された単位放電量、または、算出された単位充電量は、電力需要予測算出手段100が前記単位負荷設備電力需要予測及び前記負荷設備総電力需要予測を算出した時間情報に関連付けられて充放電量予測DB216に蓄積、格納される。 The charge/discharge amount calculation means 104 further performs a process of calculating a unit discharge amount discharged from each of the power storage facilities 8 or a unit charge amount charged to each of the power storage facilities 8. The calculated unit discharge amount or the calculated unit charge amount is associated with time information at which the power demand forecast calculation means 100 calculated the unit load equipment power demand forecast and the load equipment total power demand forecast, and is accumulated and stored in the charge/discharge amount prediction DB 216.

充放電料金算出手段105は、更に、前記単位放電量に応じて、前記単位放電量が算出された前記蓄電設備8を所有している前記蓄電設備所有者に対して支払われる放電料金である単位放電料金を算出し、又は、前記単位充電量に応じて、前記単位充電量が算出された前記蓄電設備8を所有している前記蓄電設備所有者に対して支払われる充電料金である単位充電料金を算出する処理を行う。 The charge/discharge fee calculation means 105 further performs a process of calculating a unit discharge fee, which is a discharge fee to be paid to the owner of the power storage equipment 8 for which the unit discharge amount has been calculated, according to the unit discharge amount, or calculating a unit charging fee, which is a charging fee to be paid to the owner of the power storage equipment 8 for which the unit charge amount has been calculated, according to the unit charging amount.

算出された単位放電料金、又は、算出された単位充電料金は、電力需要予測算出手段100が前記単位負荷設備電力需要予測及び前記負荷設備総電力需要予測を算出した時間情報に関連付けられて充放電料金DB217に蓄積、格納される。 The calculated unit discharge fee or the calculated unit charging fee is associated with the time information when the power demand forecast calculation means 100 calculated the unit load equipment power demand forecast and the load equipment total power demand forecast, and is accumulated and stored in the charging and discharging fee DB 217.

単位充電料金の単価である単位充電料金単価よりも、単位放電料金の単価である単位放電料金単価の方が高額に設定されている形態にすることができる。 It is possible to set the unit discharge fee, which is the unit price of the unit discharge fee, to a higher value than the unit charging fee, which is the unit price of the unit charging fee.

この実施形態では、本発明の電力管理システムによって管理される地域、エリア、例えば、北海道エリア、青森・秋田・岩手・山形・宮城・福島の東北6県からなる東北エリア、東日本エリア、西日本エリアなどの管理対象エリアに存在している複数の負荷設備2、複数の従来型発電設備4、複数の再生可能エネルギー発電設備6、複数の蓄電設備8の間で、蓄電設備への充電と蓄電設備からの放電とを伴った、電力の需要と供給の調整を行っている。 In this embodiment, the demand and supply of electricity is adjusted by charging the storage equipment and discharging the storage equipment among a plurality of load equipment 2, a plurality of conventional power generation equipment 4, a plurality of renewable energy power generation equipment 6, and a plurality of storage equipment 8 that exist in the regions and areas managed by the power management system of the present invention, such as the Hokkaido area, the Tohoku area consisting of the six Tohoku prefectures of Aomori, Akita, Iwate, Yamagata, Miyagi, and Fukushima, the East Japan area, and the West Japan area.

複数の負荷設備2からの電力需要、複数の従来型発電設備4による発電、複数の再生可能エネルギー発電設備6による発電は非常に大規模なものになり、蓄電設備8も、電気自動車に配備されている蓄電池をも蓄電設備としていることから非常に大規模なものになる。 The power demand from the multiple load facilities 2, the power generation by the multiple conventional power generation facilities 4, and the power generation by the multiple renewable energy power generation facilities 6 will be very large, and the power storage facility 8 will also be very large because it uses storage batteries installed in electric vehicles as power storage facilities.

そこで、例えば、24時間前に、24時間後における管理対象エリアでの総電力需要、管理対象エリアでの総発電量、管理対象エリアに存在している蓄電設備からの総放電可能量、総充電可能量を、上述した種々のDBに格納されている情報を参照して算出、予測し、再生可能エネルギー発電設備6よる発電での電力が余剰になったときに、これを蓄電設備8における充電可能範囲内で蓄電設備8に充電し、一方、従来型発電設備4による予定していた発電による電力及び、並行して発電が行われている再生可能エネルギー発電設備6よる発電での電力によっても電力需要を賄えないときに、蓄電設備8における放電可能範囲内で蓄電設備8から放電させて電力需要に供給することが可能になる。 Therefore, for example, the total power demand in the managed area 24 hours in advance, the total power generation in the managed area, and the total dischargeable and chargeable amounts from the storage equipment in the managed area are calculated and predicted by referring to the information stored in the various DBs mentioned above. When there is surplus power generated by the renewable energy power generation equipment 6, this is charged into the storage equipment 8 within the chargeable range of the storage equipment 8. On the other hand, when the power demand cannot be met by the power generated as planned by the conventional power generation equipment 4 and the power generated by the renewable energy power generation equipment 6 that is generating power in parallel, it is possible to discharge the power from the storage equipment 8 within the dischargeable range of the storage equipment 8 to supply the power demand.

この際、蓄電設備8が前述のように活用されることに対して、蓄電設備8の使用者・所有者に何らかの経済的な利益が与えられるようにしている。 At this time, some economic benefit is given to the user/owner of the power storage facility 8 for utilizing the facility as described above.

蓄電設備8が前述のように活用されることに対して、蓄電設備8の使用者・所有者に何らかの経済的な利益が与えられる形態としては、蓄電設備8への前述した充電によって前記使用者・所有者に対して課金される充電料金の単価よりも、蓄電設備8からの前述した放電によって前記使用者・所有者に対して支払われる放電料金の単価を高額にする形態を採用しているものである。 In order to provide some economic benefit to the user/owner of the power storage facility 8 for the aforementioned use of the power storage facility 8, the unit price of the discharge fee paid to the user/owner for the aforementioned discharge from the power storage facility 8 is set higher than the unit price of the charging fee charged to the user/owner for the aforementioned charging to the power storage facility 8.

例えば、充電料金の単価を1kWh=30円、放電料金の単価を1kWh=50円とすることで、蓄電設備8の使用者・所有者は、自己が使用・所有している蓄電設備8が本発明の電力管理システムに組み込まれることで、経済的な利益を得ることを期待できるようになる。 For example, by setting the unit price of charging at 30 yen per kWh and the unit price of discharging at 50 yen per kWh, users and owners of the energy storage equipment 8 can expect to gain economic benefits by incorporating the energy storage equipment 8 they use and own into the power management system of the present invention.

従来型発電設備許容発電低減量予測算出手段107は、将来の前記所定の時間単位毎に複数の前記従来型発電設備4のそれぞれで許容できる発電低減量である単位従来型発電設備許容発電低減量予測を算出するとともに、複数の前記従来型発電設備4の全体での将来の前記所定の時間単位毎に許容できる発電低減量の総体である従来型発電設備総許容発電低減量予測を算出する処理を行う。 The conventional power generation equipment allowable power reduction prediction calculation means 107 calculates a unit conventional power generation equipment allowable power reduction prediction, which is the amount of power generation reduction that can be tolerated by each of the multiple conventional power generation equipment 4 for each of the specified time units in the future, and also performs processing to calculate a conventional power generation equipment total allowable power reduction prediction, which is the total amount of power generation reduction that can be tolerated for each of the specified time units in the future for the multiple conventional power generation equipment 4 as a whole.

算出された単位従来型発電設備許容発電低減量予測及び、算出された従来型発電設備総許容発電低減量予測は、電力需要予測算出手段100が前記単位負荷設備電力需要予測及び前記負荷設備総電力需要予測を算出した時間情報に関連付けられて従来型発電設備許容発電低減量予測DB218に蓄積、格納される。 The calculated unit conventional power generation equipment allowable power reduction forecast and the calculated conventional power generation equipment total allowable power reduction forecast are associated with the time information at which the power demand forecast calculation means 100 calculated the unit load equipment power demand forecast and the load equipment total power demand forecast, and are accumulated and stored in the conventional power generation equipment allowable power reduction forecast DB 218.

従来型発電設備許容発電増加量算出手段108は、将来の前記所定の時間単位毎に複数の前記従来型発電設備4のそれぞれで許容できる発電増加量である単位従来型発電設備許容発電増加量予測を算出するとともに、複数の前記従来型発電設備4の全体での将来の前記所定の時間単位毎に許容できる発電増加量の総体である従来型発電設備総許容発電増加量予測を算出する処理を行う。 The conventional power generation equipment allowable power generation increase calculation means 108 calculates a unit conventional power generation equipment allowable power generation increase forecast, which is the allowable power generation increase for each of the plurality of conventional power generation equipment 4 for each of the predetermined time units in the future, and also calculates a conventional power generation equipment total allowable power generation increase forecast, which is the total allowable power generation increase for each of the plurality of conventional power generation equipment 4 for each of the predetermined time units in the future.

算出された単位従来型発電設備許容発電増加量予測及び、算出された従来型発電設備総許容発電増加量予測は、電力需要予測算出手段100が前記単位負荷設備電力需要予測及び前記負荷設備総電力需要予測を算出した時間情報に関連付けられて従来型発電設備許容発電増加量予測DB219に蓄積、格納される。 The calculated unit conventional power generation equipment allowable power increase forecast and the calculated conventional power generation equipment total allowable power increase forecast are associated with the time information at which the power demand forecast calculation means 100 calculated the unit load equipment power demand forecast and the load equipment total power demand forecast, and are accumulated and stored in the conventional power generation equipment allowable power increase forecast DB 219.

上述した充放電量算出手段104は、上述した総放電量予測または総充電量予測の算出を行う際に、前記従来型発電設備総許容発電低減量予測及び、前記従来型発電設備総許容発電増加量予測を参照する形態にすることができる。 The above-mentioned charge/discharge amount calculation means 104 can be configured to refer to the conventional power generation equipment total allowable power generation reduction forecast and the conventional power generation equipment total allowable power generation increase forecast when calculating the above-mentioned total discharge amount forecast or total charge amount forecast.

以上、本発明の実施形態を説明したが本発明は上述した実施形態に限られるものではなく、特許請求の範囲の記載から把握される技術的範囲において種々に変更可能である。 Although the embodiments of the present invention have been described above, the present invention is not limited to the above-mentioned embodiments, and various modifications are possible within the technical scope as understood from the description of the claims.

Claims (6)

管理対象になっている複数の負荷設備のそれぞれにおける将来の所定の時間単位毎の電力需要である単位負荷設備電力需要予測を算出するとともに、複数の前記負荷設備の全体での将来の前記所定の時間単位毎の電力需要である負荷設備総電力需要予測を算出する電力需要予測算出手段と、
前記電力需要予測算出手段が前記単位負荷設備電力需要予測及び前記負荷設備総電力需要予測を算出した時点における、将来の前記所定の時間単位毎に、管理対象になっている複数の従来型発電設備のそれぞれで予定されている発電量である単位従来型発電設備発電量予測を算出するとともに、複数の前記従来型発電設備の全体での将来の前記所定の時間単位毎に予定されている発電量の総体である従来型発電設備総発電量予測を算出する従来型発電設備発電量予測算出手段と、
前記電力需要予測算出手段が前記単位負荷設備電力需要予測及び前記負荷設備総電力需要予測を算出した時点における、将来の前記所定の時間単位毎に管理対象になっている複数の再生可能エネルギー発電設備のそれぞれで発電される発電量である単位再生可能エネルギー発電設備発電量予測を算出するとともに、複数の前記再生可能エネルギー発電設備の全体で将来の前記所定の時間単位毎に発電される発電量の総体である再生可能エネルギー発電設備総発電量予測を算出する再生可能エネルギー発電予測算出手段と、
前記電力需要予測算出手段が前記単位負荷設備電力需要予測及び前記負荷設備総電力需要予測を算出した時点における、管理対象になっている複数の蓄電設備それぞれにおける放電可能量及び充電可能量に関する情報に基づいて、将来の前記所定の時間単位毎における、複数の蓄電設備それぞれにおける放電可能量及び充電可能量を単位充放電可能量予測として算出するとともに、複数の前記蓄電設備の全体での放電可能量及び充電可能量を総充放電可能量予測として算出する充放電可能量算出手段と、
前記負荷設備総電力需要予測、前記従来型発電設備総発電量予測、前記再生可能エネルギー発電設備総発電量予測及び、前記総充放可能量予測に基づいて、将来の前記所定の時間単位毎に、複数の前記蓄電設備から複数の前記負荷設備に対して供給される電力量の全体である総放電量を総放電量予測として算出し、または、複数の前記再生可能エネルギー発電設備から複数の前記蓄電設備に対して供給される電力量の全体である総充電量を総充電量予測として算出する充放電量算出手段と
を備えている電力管理システム。
a power demand forecast calculation means for calculating a unit load equipment power demand forecast, which is a power demand for each predetermined time unit in the future for each of a plurality of load equipments being managed, and for calculating a load equipment total power demand forecast, which is a power demand for each predetermined time unit in the future for the plurality of load equipments as a whole;
a conventional power generation facility power generation forecast calculation means for calculating a unit conventional power generation facility power generation forecast, which is the amount of power generation planned for each of a plurality of conventional power generation facilities being managed for each of the predetermined time units in the future at the time when the power demand forecast calculation means calculates the unit load facility power demand forecast and the load facility total power demand forecast, and for calculating a conventional power generation facility total power generation forecast, which is the sum of the amount of power generation planned for each of the predetermined time units in the future for the entire plurality of conventional power generation facilities;
a renewable energy power generation forecast calculation means for calculating a unit renewable energy power generation facility power generation forecast, which is the amount of power generated by each of a plurality of renewable energy power generation facilities that are managed for each of the predetermined time units in the future at the time when the power demand forecast calculation means calculates the unit load facility power demand forecast and the load facility total power demand forecast, and for calculating a renewable energy power generation facility total power generation forecast, which is the total amount of power generated by all of the plurality of renewable energy power generation facilities for each of the predetermined time units in the future;
a chargeable/dischargeable amount calculation means for calculating a dischargeable amount and a chargeable amount of each of a plurality of power storage facilities under management as a unit chargeable/dischargeable amount prediction for each of the predetermined future time units based on information regarding a dischargeable amount and a chargeable amount of each of a plurality of power storage facilities under management at a time point when the power demand forecast calculation means calculates the unit load equipment power demand forecast and the load equipment total power demand forecast;
and a charge/discharge amount calculation means for calculating a total discharge amount, which is the entire amount of power supplied from the plurality of power storage facilities to the plurality of load facilities, for each of the specified time units in the future, based on the load equipment total power demand forecast, the conventional power generation equipment total power generation forecast, the renewable energy power generation equipment total power generation forecast, and the total chargeable/dischargeable amount forecast, or for calculating a total charge amount, which is the entire amount of power supplied from the plurality of renewable energy power generation facilities to the plurality of power storage facilities, as a total charge amount prediction.
前記総放電量に応じて複数の前記蓄電設備を所有している複数の蓄電設備所有者に対して支払われる放電料金の総額である総放電料金を算出し、または、前記総充電量に応じて複数の前記蓄電設備所有者に対して課金される充電料金の総額である総充電料金を算出する充放電料金算出手段を更に備えている
請求項1記載の電力管理システム。
2. The power management system according to claim 1, further comprising: a charge/discharge fee calculation means for calculating a total discharge fee which is a total of discharge fees to be paid to a plurality of owners of the power storage facilities who own the plurality of power storage facilities according to the total discharge amount, or for calculating a total charging fee which is a total of charging fees to be charged to the plurality of owners of the power storage facilities according to the total charging amount.
前記充放電量算出手段は、更に、前記蓄電設備のそれぞれから放電される単位放電量または前記蓄電設備のそれぞれに充電される単位充電量を算出する請求項2記載の電力管理システム。 The power management system according to claim 2, wherein the charge/discharge amount calculation means further calculates a unit discharge amount discharged from each of the power storage facilities or a unit charge amount charged to each of the power storage facilities. 前記充放電料金算出手段は、更に、前記単位放電量に応じて、前記単位放電量が算出された前記蓄電設備を所有している前記蓄電設備所有者に対して支払われる放電料金である単位放電料金を算出し、又は、前記単位充電量に応じて、前記単位充電量が算出された前記蓄電設備を所有している前記蓄電設備所有者に対して課金される充電料金である単位充電料金を算出する
請求項3記載の電力管理システム。
4. The power management system according to claim 3, wherein the charge/discharge fee calculation means further calculates, in accordance with the unit discharge amount, a unit discharge fee which is a discharge fee to be paid to the owner of the power storage equipment who owns the power storage equipment for which the unit discharge amount has been calculated, or calculates, in accordance with the unit charge amount, a unit charging fee which is a charging fee to be charged to the owner of the power storage equipment who owns the power storage equipment for which the unit charge amount has been calculated.
単位充電料金の単価である単位充電料金単価よりも、単位放電料金の単価である単位放電料金単価の方が高額に設定されている請求項4記載の電力管理システム。 The power management system of claim 4, in which the unit discharge charge unit price, which is the unit price of the unit discharge charge, is set higher than the unit charge charge unit price, which is the unit price of the unit charge charge. 将来の前記所定の時間単位毎に複数の前記従来型発電設備のそれぞれで許容できる発電低減量である単位従来型発電設備許容発電低減量予測を算出するとともに、複数の前記従来型発電設備の全体での将来の前記所定の時間単位毎に許容できる発電低減量の総体である従来型発電設備総許容発電低減量予測を算出する従来型発電設備許容発電低減量予測算出手段と、
将来の前記所定の時間単位毎に複数の前記従来型発電設備のそれぞれで許容できる発電増加量である単位従来型発電設備許容発電増加量予測を算出するとともに、複数の前記従来型発電設備の全体での将来の前記所定の時間単位毎に許容できる発電増加量の総体である従来型発電設備総許容発電増加量予測を算出する従来型発電設備許容発電増加量算出手段と
をさらに備えていて、
充放電量算出手段は、総放電量予測または総充電量予測の算出を行う際に、前記従来型発電設備総許容発電低減量予測及び、前記従来型発電設備総許容発電増加量予測を参照する
請求項1記載の電力管理システム。
a conventional power generation equipment allowable power reduction prediction calculation means for calculating a unit conventional power generation equipment allowable power reduction prediction, which is an allowable power reduction amount for each of the plurality of conventional power generation equipment for each of the predetermined time units in the future, and for calculating a conventional power generation equipment total allowable power reduction prediction, which is a total of an allowable power reduction amount for each of the plurality of conventional power generation equipment for each of the predetermined time units in the future;
and a conventional power generation equipment allowable power increase calculation means for calculating a unit conventional power generation equipment allowable power increase forecast, which is an allowable power increase for each of the plurality of conventional power generation equipment for each of the predetermined time units in the future, and for calculating a conventional power generation equipment total allowable power increase forecast, which is a total of an allowable power increase for each of the plurality of conventional power generation equipment for each of the predetermined time units in the future,
The power management system according to claim 1 , wherein the charge/discharge amount calculation means refers to the conventional power generation equipment total allowable power generation reduction prediction and the conventional power generation equipment total allowable power generation increase prediction when calculating the total discharge amount prediction or the total charge amount prediction.
JP2022191552A 2022-11-30 2022-11-30 Power Management System Active JP7657469B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022191552A JP7657469B2 (en) 2022-11-30 2022-11-30 Power Management System

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022191552A JP7657469B2 (en) 2022-11-30 2022-11-30 Power Management System

Publications (2)

Publication Number Publication Date
JP2024078928A JP2024078928A (en) 2024-06-11
JP7657469B2 true JP7657469B2 (en) 2025-04-07

Family

ID=91391370

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022191552A Active JP7657469B2 (en) 2022-11-30 2022-11-30 Power Management System

Country Status (1)

Country Link
JP (1) JP7657469B2 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012131867A1 (en) 2011-03-28 2012-10-04 株式会社日立製作所 Demand/supply schedule control system for low-voltage grid, and demand/supply schedule control method for low-voltage grid
JP2015202044A (en) 2013-09-12 2015-11-12 日本電気株式会社 Controller, power storage device, battery control system, battery controller, control method, battery control method and recording medium
JP2017093249A (en) 2015-11-16 2017-05-25 株式会社電力システムズ・インスティテュート Power system control method and control system including solar power generation device
JP2018014775A (en) 2016-07-19 2018-01-25 住友電気工業株式会社 Integrated controller, integrated control system, integrated control method and integrated control program
JP2021019455A (en) 2019-07-22 2021-02-15 いすゞ自動車株式会社 Power management device and power management system
JP2021193861A (en) 2020-06-08 2021-12-23 三菱重工業株式会社 Energy management system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012131867A1 (en) 2011-03-28 2012-10-04 株式会社日立製作所 Demand/supply schedule control system for low-voltage grid, and demand/supply schedule control method for low-voltage grid
JP2015202044A (en) 2013-09-12 2015-11-12 日本電気株式会社 Controller, power storage device, battery control system, battery controller, control method, battery control method and recording medium
JP2017093249A (en) 2015-11-16 2017-05-25 株式会社電力システムズ・インスティテュート Power system control method and control system including solar power generation device
JP2018014775A (en) 2016-07-19 2018-01-25 住友電気工業株式会社 Integrated controller, integrated control system, integrated control method and integrated control program
JP2021019455A (en) 2019-07-22 2021-02-15 いすゞ自動車株式会社 Power management device and power management system
JP2021193861A (en) 2020-06-08 2021-12-23 三菱重工業株式会社 Energy management system

Also Published As

Publication number Publication date
JP2024078928A (en) 2024-06-11

Similar Documents

Publication Publication Date Title
US12039558B2 (en) Distributed energy control
Ghofrani et al. A framework for optimal placement of energy storage units within a power system with high wind penetration
Awad et al. Impact of energy storage systems on electricity market equilibrium
Farzin et al. Reliability studies of modern distribution systems integrated with renewable generation and parking lots
Thatte et al. Towards a unified operational value index of energy storage in smart grid environment
US8930035B2 (en) Procedure for supply control and storage of power provided by a renewable energy generation plant
US11101691B2 (en) Method for coordinating an exchange of power between a plurality of technical small units and an electrical transmission network
Alimisis et al. Evaluation of a hybrid power plant comprising used EV-batteries to complement wind power
CN117767359A (en) Energy storage dispatching method, device, storage medium and computer equipment for optical storage charging station
HK1243558A1 (en) Power grid system and method of consolidating power injection and consumption in a power grid system
US20140297567A1 (en) Power demand plan adjusting device, power demand plan adjusting method and program
JP7254737B2 (en) POWER CONTROL DEVICE, POWER CONTROL SYSTEM, POWER CONTROL METHOD, AND PROGRAM
Xu et al. Multi-objective chance-constrained optimal day-ahead scheduling considering BESS degradation
Thornburg et al. Smart microgrid operation simulator for management and electrification planning
Alharbi et al. Flexibility provisions from a fast charging facility equipped with DERs for wind integrated grids
JP7001732B2 (en) How to adjust the power supply and demand balance
CN110998643B (en) Systems, devices, and methods for pattern-based energy storage management
EP2541720B1 (en) Procedure for supply control and storage of power provided by a renewable energy generation plant
CN111903027A (en) Power information management system, power information management method, program, power information management server, communication terminal, and power system
JP7108524B2 (en) Charge/discharge control device and charge/discharge control method
Chandio et al. Gridpeaks: Employing distributed energy storage for grid peak reduction
JP7657469B2 (en) Power Management System
KR101983836B1 (en) Energy management system based on virtual power plant platform and management method therefor
JP6507666B2 (en) Power failure time period prediction device, power failure time period prediction method, program
Steber Integration of decentralized battery energy storage systems into the german electrical power system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20241119

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20241119

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250204

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250204

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250218

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250318

R150 Certificate of patent or registration of utility model

Ref document number: 7657469

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150