Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7658308B2 - Charge/discharge management device, charge/discharge device, vehicle, and charge/discharge management method - Google Patents
[go: Go Back, main page]

JP7658308B2 - Charge/discharge management device, charge/discharge device, vehicle, and charge/discharge management method - Google Patents

Charge/discharge management device, charge/discharge device, vehicle, and charge/discharge management method Download PDF

Info

Publication number
JP7658308B2
JP7658308B2 JP2022039520A JP2022039520A JP7658308B2 JP 7658308 B2 JP7658308 B2 JP 7658308B2 JP 2022039520 A JP2022039520 A JP 2022039520A JP 2022039520 A JP2022039520 A JP 2022039520A JP 7658308 B2 JP7658308 B2 JP 7658308B2
Authority
JP
Japan
Prior art keywords
charge
discharge
vehicle
charging
control mode
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022039520A
Other languages
Japanese (ja)
Other versions
JP2023134156A (en
Inventor
大介 堤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Motor Corp
Original Assignee
Toyota Motor Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyota Motor Corp filed Critical Toyota Motor Corp
Priority to JP2022039520A priority Critical patent/JP7658308B2/en
Publication of JP2023134156A publication Critical patent/JP2023134156A/en
Application granted granted Critical
Publication of JP7658308B2 publication Critical patent/JP7658308B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Description

本開示は、充放電管理装置、充放電装置、車両、及び充放電管理方法に関する。 This disclosure relates to a charge/discharge management device, a charge/discharge device, a vehicle, and a charge/discharge management method.

特許文献1は、商用電源に接続され、車載蓄電池の充放電を制御する充放電装置を開示している。この充放電装置は、商用電源からの電力が第1の範囲内、且つ、車載蓄電池の充電率が第2の範囲内に維持されるように、車載蓄電池からの充放電を制御するように構成されている。 Patent Document 1 discloses a charging/discharging device that is connected to a commercial power source and controls charging/discharging of an on-board storage battery. This charging/discharging device is configured to control charging/discharging from the on-board storage battery so that the power from the commercial power source is maintained within a first range and the charging rate of the on-board storage battery is maintained within a second range.

また、特許文献2は、複数の充放電拠点に配置された充放電設備と、充放電拠点間を移動中の複数の電気自動車との電力管理を行う充放電管理計画システムを開示している。この充放電管理計画システムは、管理対象となる各電気自動車の移動計画を示すルート情報を取得し、当該ルート情報を利用して複数の充放電拠点の各充放電設備における充放電の計画を示す設備利用計画を生成する。 Patent Document 2 also discloses a charge/discharge management planning system that performs power management for charge/discharge equipment installed at multiple charge/discharge bases and multiple electric vehicles moving between the charge/discharge bases. This charge/discharge management planning system acquires route information indicating the movement plan of each electric vehicle to be managed, and uses the route information to generate an equipment usage plan indicating the charging/discharging plan for each charge/discharge equipment at the multiple charge/discharge bases.

特開2021-097588号公報JP 2021-097588 A 特開2014-103780号公報JP 2014-103780 A

特許文献1に記載の技術によれば、車両に搭載されたバッテリの充放電制御は、充放電装置(すなわち、インフラ側)による充放電計画(デマンドレスポンス計画)に基づいて実行される。このことは、特許文献2に記載の技術も同様である。このような充放電制御によれば、当該制御の内容次第では、車両のユーザが予定している出発時刻(車両の使用開始時刻)において車両走行に必要なバッテリの充電状態(SOC)を適切に確保できない事態が生じ得る。 According to the technology described in Patent Document 1, the charge and discharge control of the battery installed in the vehicle is executed based on a charge and discharge plan (demand response plan) by the charge and discharge device (i.e., the infrastructure side). This is also true of the technology described in Patent Document 2. With such charge and discharge control, depending on the content of the control, a situation may arise in which the battery's state of charge (SOC) required for vehicle operation cannot be properly secured at the vehicle user's planned departure time (the time the vehicle begins to be used).

本開示は、上述のような課題に鑑みてなされたものであり、デマンドレスポンス計画に沿ったインフラ側からの要求と、車両のユーザの行動計画に沿った移動の要求とを両立可能な充放電を実現する充放電管理装置、充放電装置、車両、及び充放電管理方法を提供することを目的とする。 This disclosure has been made in consideration of the above-mentioned problems, and aims to provide a charge/discharge management device, a charge/discharge device, a vehicle, and a charge/discharge management method that realizes charging and discharging that can balance requests from the infrastructure side in accordance with a demand response plan and requests for movement in accordance with the vehicle user's action plan.

本開示の第1の態様に係る充放電管理装置は、商用電源に接続された充放電器と車両に搭載されたバッテリとの間での充放電を管理する。充放電管理装置は、1又は複数のプロセッサを備える。上記充放電の制御モードは、デマンドレスポンス計画を車両のユーザの行動計画より優先しつつ充放電を制御する第1の制御モードと、行動計画をデマンドレスポンス計画より優先しつつ充放電を制御する第2の制御モードと、を含む。1又は複数のプロセッサは、行動計画が設定されていない場合には、第1の制御モードを選択し、行動計画が設定されている場合、車両の出発までの残り時間がバッテリの目標充電状態への充電所要時間より長ければ第1の制御モードを選択し、残り時間が充電所要時間以下であれば第2の制御モードを選択する。 The charge/discharge management device according to the first aspect of the present disclosure manages charging and discharging between a charger/discharger connected to a commercial power source and a battery mounted on a vehicle. The charge/discharge management device includes one or more processors. The charge/discharge control modes include a first control mode in which charging and discharging are controlled while giving priority to a demand response plan over an action plan of a user of the vehicle, and a second control mode in which charging and discharging are controlled while giving priority to an action plan over the demand response plan. The one or more processors select the first control mode when an action plan is not set, and when an action plan is set, select the first control mode if the remaining time until the departure of the vehicle is longer than the required charging time for the battery to reach a target state of charge, and select the second control mode if the remaining time is equal to or shorter than the required charging time.

本開示の第2の態様に係る充放電装置は、商用電源に接続された充放電器と、車両に搭載されたバッテリと充放電器との間での充放電を制御する1又は複数のプロセッサと、を備える。上記充放電の制御モードは、デマンドレスポンス計画を車両のユーザの行動計画より優先しつつ充放電を制御する第1の制御モードと、行動計画をデマンドレスポンス計画より優先しつつ充放電を制御する第2の制御モードと、を含む。1又は複数のプロセッサは、行動計画が設定されていない場合には、第1の制御モードを選択し、行動計画が設定されている場合、車両の出発までの残り時間がバッテリの目標充電状態への充電所要時間より長ければ第1の制御モードを選択し、残り時間が充電所要時間以下であれば第2の制御モードを選択する。 The charging/discharging device according to the second aspect of the present disclosure includes a charger/discharger connected to a commercial power source, and one or more processors that control charging/discharging between a battery mounted on a vehicle and the charger/discharger. The charge/discharge control modes include a first control mode that controls charging/discharging while prioritizing a demand response plan over an action plan of a user of the vehicle, and a second control mode that controls charging/discharging while prioritizing an action plan over the demand response plan. The one or more processors select the first control mode when an action plan is not set, and when an action plan is set, select the first control mode if the remaining time until the departure of the vehicle is longer than the required charging time for the battery to reach a target state of charge, and select the second control mode if the remaining time is equal to or shorter than the required charging time.

本開示の第3の態様に係る車両は、バッテリと、商用電源に接続された充放電器とバッテリとの間での充放電を制御する1又は複数のプロセッサと、を備える。上記充放電の制御モードは、デマンドレスポンス計画を車両のユーザの行動計画より優先しつつ充放電を制御する第1の制御モードと、行動計画をデマンドレスポンス計画より優先しつつ充放電を制御する第2の制御モードと、を含む。1又は複数のプロセッサは、行動計画が設定されていない場合には、第1の制御モードを選択し、行動計画が設定されている場合、車両の出発までの残り時間がバッテリの目標充電状態への充電所要時間より長ければ第1の制御モードを選択し、残り時間が充電所要時間以下であれば第2の制御モードを選択する。 A vehicle according to a third aspect of the present disclosure includes a battery, and one or more processors that control charging and discharging between the battery and a charger/discharger connected to a commercial power source. The charge/discharge control modes include a first control mode that controls charging and discharging while prioritizing a demand response plan over an action plan of a user of the vehicle, and a second control mode that controls charging and discharging while prioritizing an action plan over the demand response plan. The one or more processors select the first control mode when an action plan is not set, and when an action plan is set, select the first control mode if the remaining time until the departure of the vehicle is longer than the required charging time for the battery to reach a target state of charge, and select the second control mode if the remaining time is equal to or shorter than the required charging time.

本開示の第4の態様に係る充放電管理方法は、商用電源に接続された充放電器と車両に搭載されたバッテリとの間での充放電を管理する。上記充放電の制御モードは、デマンドレスポンス計画を車両のユーザの行動計画より優先しつつ充放電を制御する第1の制御モードと、行動計画をデマンドレスポンス計画より優先しつつ充放電を制御する第2の制御モードと、を含む。充放電管理方法は、行動計画が設定されていない場合には、第1の制御モードを選択することと、行動計画が設定されている場合、車両の出発までの残り時間がバッテリの目標充電状態への充電所要時間より長ければ第1の制御モードを選択し、残り時間が充電所要時間以下であれば第2の制御モードを選択することと、を含む。 The charge/discharge management method according to the fourth aspect of the present disclosure manages charging/discharging between a charger/discharger connected to a commercial power source and a battery mounted on a vehicle. The charge/discharge control modes include a first control mode that controls charging/discharging while prioritizing a demand response plan over an action plan of a user of the vehicle, and a second control mode that controls charging/discharging while prioritizing the action plan over the demand response plan. The charge/discharge management method includes selecting the first control mode when an action plan is not set, and selecting the first control mode when an action plan is set if the remaining time until the departure of the vehicle is longer than the required charging time for the battery to reach a target state of charge, and selecting the second control mode if the remaining time is equal to or shorter than the required charging time.

本開示によれば、ユーザの行動計画の設定があっても、車両の出発までの残り時間を目標充電状態への充電所要時間より長く確保できない場合を除き、デマンドレスポンス計画が優先される第1の制御モードが選択される。そして、残り時間を充電所要時間より長く確保できない場合には、行動計画が優先される第2の制御モードが選択される。このような制御モードの選択手法によれば、デマンドレスポンス計画に沿ったインフラ側からの要求と、行動計画に沿ったユーザの移動の要求とを両立可能な充放電を実現することができる。 According to the present disclosure, even if a user's action plan is set, a first control mode in which the demand response plan is prioritized is selected, except when the remaining time until the vehicle departs cannot be secured to be longer than the time required for charging to the target charge state. Then, when the remaining time cannot be secured to be longer than the time required for charging, a second control mode in which the action plan is prioritized is selected. This method of selecting a control mode makes it possible to realize charging and discharging that can satisfy both the demands from the infrastructure side in accordance with the demand response plan and the user's request for movement in accordance with the action plan.

本開示に係る充放電管理システムの全体構成を概略的に示す図である。1 is a diagram illustrating an overall configuration of a charge/discharge management system according to the present disclosure. ユーザの行動計画の設定を受け付けるユーザ端末の画面の一例を示す図である。FIG. 13 is a diagram showing an example of a screen of a user terminal that accepts settings of a user's action plan. 本開示に係る充放電制御に関する処理を示すフローチャートである。4 is a flowchart showing a process related to charge/discharge control according to the present disclosure. V2Gの実行中の充放電制御の動作を説明するためのタイムチャートである。10 is a time chart for explaining the operation of charge/discharge control during execution of V2G.

以下に説明される各実施の形態において各要素の個数、数量、量、範囲等の数に言及した場合、特に明示した場合や原理的に明らかにその数に特定される場合を除いて、その言及した数に、本開示に係る技術思想が限定されるものではない。なお、各実施の形態において、各図において共通する要素には、同一の符号を付して重複する説明を省略又は簡略する。 When the number, quantity, amount, range, etc. of each element is mentioned in each embodiment described below, the technical idea of this disclosure is not limited to the mentioned number, unless otherwise specified or clearly specified in principle. In each embodiment, elements that are common to each figure are given the same reference numerals, and duplicate explanations are omitted or simplified.

1.実施の形態1
1-1.充放電管理システムの構成例
図1は、本開示に係る充放電管理システム1の全体構成を概略的に示す図である。充放電管理システム1は、車載バッテリに蓄えられた電力を車両の駆動だけでなく電力網に供給可能とするV2G(Vehicle to Grid)を実現するエネルギマネジメントシステムである。充放電管理システム1は、車両10と、充放電装置20と、充放電管理装置30と、ユーザ端末50と、を備える。
1. First embodiment
1-1. Example of the configuration of a charge/discharge management system Fig. 1 is a diagram showing an outline of the overall configuration of a charge/discharge management system 1 according to the present disclosure. The charge/discharge management system 1 is an energy management system that realizes V2G (Vehicle to Grid) that enables power stored in an on-board battery to be supplied not only to the driving of a vehicle but also to a power grid. The charge/discharge management system 1 includes a vehicle 10, a charge/discharge device 20, a charge/discharge management device 30, and a user terminal 50.

1-1-1.車両
車両10は、V2Gに参加する車両である。図1では、1台の車両10のみが例示されているが、V2Gに参加する車両の数は、基本的には複数である。車両10は、外部充給電が可能な電気自動車等の電動車であり、車両走行に用いられるバッテリ(高圧バッテリ)12を搭載している。車両10は、例えば、バッテリ電気自動車(BEV)、プラグインハイブリッド電気自動車(PHEV)、又は燃料電池電気自動車(FCEV)である。
1-1-1. Vehicle The vehicle 10 is a vehicle participating in V2G. Although only one vehicle 10 is illustrated in FIG. 1, the number of vehicles participating in V2G is basically multiple. The vehicle 10 is an electric vehicle such as an electric vehicle that can be charged externally, and is equipped with a battery (high-voltage battery) 12 used for vehicle running. The vehicle 10 is, for example, a battery electric vehicle (BEV), a plug-in hybrid electric vehicle (PHEV), or a fuel cell electric vehicle (FCEV).

車両10は、通信装置14と、車両電子制御ユニット(車両ECU)16と、タッチパネル等のHMI(Human Machine Interface)機器18と、SOCセンサ19と、を備える。通信装置14は、プロセッサを含み、通信ネットワークを介して充放電装置20、及び充放電管理装置30のそれぞれと通信を行う。通信装置14は、ユーザ端末50と直接的に通信可能であってもよい。SOCセンサ19は、バッテリ12の充電状態(SOC)を検出する。 The vehicle 10 includes a communication device 14, a vehicle electronic control unit (vehicle ECU) 16, an HMI (Human Machine Interface) device 18 such as a touch panel, and an SOC sensor 19. The communication device 14 includes a processor and communicates with each of the charge/discharge device 20 and the charge/discharge management device 30 via a communication network. The communication device 14 may be capable of communicating directly with a user terminal 50. The SOC sensor 19 detects the state of charge (SOC) of the battery 12.

車両ECU16は、車両10を制御するコンピュータである。具体的には、車両ECU16は、プロセッサ16aと記憶装置16bとを備えている。プロセッサ16aは、各種処理を実行する。各種処理は、バッテリ12の充放電に関する処理を含む。記憶装置16bは、当該各種処理に関するプログラム等の各種情報を格納している。車両ECU16は、SOCセンサ19等の各種センサから、SOC情報等のバッテリ12の充放電に関係する情報を取得する。車両ECU16(プロセッサ16a)が各種プログラムを実行することにより、車両ECU16による各種処理が実現される。なお、車両ECU16(プロセッサ16a及び記憶装置16b)は複数であってもよい。 The vehicle ECU 16 is a computer that controls the vehicle 10. Specifically, the vehicle ECU 16 includes a processor 16a and a storage device 16b. The processor 16a executes various processes, including processes related to charging and discharging the battery 12. The storage device 16b stores various information, such as programs, related to the various processes. The vehicle ECU 16 acquires information related to charging and discharging the battery 12, such as SOC information, from various sensors, such as the SOC sensor 19. The vehicle ECU 16 (processor 16a) executes various programs to realize various processes by the vehicle ECU 16. Note that there may be multiple vehicle ECUs 16 (processors 16a and storage devices 16b).

1-1-2.充放電装置
充放電装置20は、通信装置22と、充放電器24と、充放電ECU26と、を備える。通信装置22は、プロセッサを含み、通信ネットワークを介して車両10、及び充放電管理装置30のそれぞれと通信を行う。通信装置22は、ユーザ端末50と直接的に通信可能であってもよい。
The charging/discharging device 20 includes a communication device 22, a charger/discharger 24, and a charging/discharging ECU 26. The communication device 22 includes a processor and communicates with the vehicle 10 and the charging/discharging management device 30 via a communication network. The communication device 22 may be capable of directly communicating with a user terminal 50.

充放電器24は、電力線を介して商用電源に接続されている。車両10は、電力線を介してバッテリ12に接続された車両インレットを備える。充放電器24は、充放電ケーブルと、充放電回路と、を備える。充放電ケーブルは、当該車両インレットに接続される充放電コネクタを有する。充放電回路は、双方向インバータ、及び各種リレー等の様々な回路素子を含む。付け加えると、充放電装置20は、バッテリ12の充電方式として例えばCCS(Combined Charging System)方式を用いて、交流を利用した普通充電と直流を利用した急速充電とを行うことができる。 The charger/discharger 24 is connected to a commercial power source via a power line. The vehicle 10 has a vehicle inlet connected to the battery 12 via a power line. The charger/discharger 24 has a charge/discharge cable and a charge/discharge circuit. The charge/discharge cable has a charge/discharge connector connected to the vehicle inlet. The charge/discharge circuit includes various circuit elements such as a bidirectional inverter and various relays. In addition, the charge/discharge device 20 can perform normal charging using AC and rapid charging using DC by using, for example, a CCS (Combined Charging System) method as a charging method for the battery 12.

充放電ECU26は、充放電器24の充放電回路を制御することによって充放電装置20と車両10(バッテリ12)との間での充放電を制御するコンピュータである。具体的には、充放電ECU26は、プロセッサ26aと記憶装置26bとを備えている。プロセッサ26aは、各種処理を実行する。各種処理は、充放電装置20と車両10との間での充放電に関する処理を含む。記憶装置26bは、当該各種処理に関するプログラム等の各種情報を格納している。充放電ECU26(プロセッサ26a)が各種プログラムを実行することにより、充放電ECU26による各種処理が実現される。なお、充放電ECU26(プロセッサ26a及び記憶装置26b)は複数であってもよい。 The charge/discharge ECU 26 is a computer that controls charging and discharging between the charge/discharge device 20 and the vehicle 10 (battery 12) by controlling the charge/discharge circuit of the charger/discharger 24. Specifically, the charge/discharge ECU 26 includes a processor 26a and a storage device 26b. The processor 26a executes various processes. The various processes include processes related to charging and discharging between the charge/discharge device 20 and the vehicle 10. The storage device 26b stores various information such as programs related to the various processes. The charge/discharge ECU 26 (processor 26a) executes the various programs to realize the various processes by the charge/discharge ECU 26. Note that there may be multiple charge/discharge ECUs 26 (processors 26a and storage devices 26b).

なお、図1では、1台の充放電装置20のみが例示されているが、充放電管理システム1に含まれる充放電装置は、次のように設置されていてもよい。すなわち、例えば、1つの充放電施設において、図1に示すような充放電装置20が複数台設置されていてもよい。また、1台の充放電装置が複数の充放電器24を備えてもよい。この例では、1台の充放電装置は、複数の充放電器24のそれぞれに対して個別に充放電ECU26を備えていてもよいし、複数の充放電器24を制御する機能を有する1つの充放電ECUを備えていてもよい。 Note that, although only one charging/discharging device 20 is illustrated in FIG. 1, the charging/discharging devices included in the charging/discharging management system 1 may be installed as follows. That is, for example, in one charging/discharging facility, multiple charging/discharging devices 20 as shown in FIG. 1 may be installed. Also, one charging/discharging device may include multiple chargers/dischargers 24. In this example, one charging/discharging device may include individual charging/discharging ECUs 26 for each of the multiple chargers/dischargers 24, or may include one charging/discharging ECU that has the function of controlling the multiple chargers/dischargers 24.

1-1-3.充放電管理装置
充放電管理装置30は、例えば、リソースアグリゲータによって所有される。リソースアグリゲータは、車両10のユーザ等の需要家とVPP(Virtual Power Plant)サービス契約を締結し、車両10に搭載されたバッテリ12等の分散エネルギリソース(DER)の管理を行う事業者である。
The charge/discharge management device 30 is owned by, for example, a resource aggregator. The resource aggregator is a business operator that concludes a Virtual Power Plant (VPP) service contract with consumers such as users of the vehicles 10 and manages distributed energy resources (DERs) such as the batteries 12 mounted on the vehicles 10.

充放電管理システム1は、充放電装置20と車両10との間での充放電(エネルギマネジメント)の制御モードとして、ダイナミックコントロールモード(DCモード(Dynamic Control Mode))と、スケジュールドコントロールモード(SCモード(Scheduled Control Mode))と、を含む。これらのDCモード及びSCモードは、充放電の規格であるISO15118-20にて規定されたモードである。 The charge/discharge management system 1 includes a dynamic control mode (DC mode) and a scheduled control mode (SC mode) as control modes for charge/discharge (energy management) between the charge/discharge device 20 and the vehicle 10. These DC mode and SC mode are modes specified in ISO15118-20, the charge/discharge standard.

DCモードは、送配電事業者及び小売電気事業者等の電気事業者100からのデマンドレスポンス計画(DR計画)をユーザの行動計画より優先しつつ充放電を制御するモードであり、本開示に係る「第1の制御モード」の一例に相当する。一方、SCモードは、行動計画をDR計画より優先しつつ充放電を制御するモードであり、本開示に係る「第2の制御モード」の一例に相当する。 The DC mode is a mode in which charging and discharging are controlled while prioritizing a demand response plan (DR plan) from an electric power utility 100, such as a power transmission and distribution utility or a retail electric power utility, over a user's action plan, and corresponds to an example of a "first control mode" according to the present disclosure. On the other hand, the SC mode is a mode in which charging and discharging are controlled while prioritizing an action plan over a DR plan, and corresponds to an example of a "second control mode" according to the present disclosure.

充放電管理装置30は、通信装置32と、サーバ34と、を備える。通信装置32は、プロセッサを含み、通信ネットワークを介して車両10、充放電装置20、ユーザ端末50、及び電気事業者100の装置のそれぞれと通信を行う。 The charge/discharge management device 30 includes a communication device 32 and a server 34. The communication device 32 includes a processor and communicates with the vehicle 10, the charge/discharge device 20, the user terminal 50, and the device of the electric utility company 100 via a communication network.

サーバ34は、上述のDER(バッテリ12等)の管理を行うコンピュータである。具体的には、サーバ34は、プロセッサ34aと記憶装置34bとを備えている。プロセッサ34aは、各種処理を実行する。各種処理は、車両10のバッテリ12の充放電の管理に関する処理を含む。記憶装置34bは、当該各種処理に関するプログラム、並びに後述のユーザ情報UI(ユーザによって設定される情報)及び車両情報VI等の各種情報を格納している。サーバ34(プロセッサ34a)が各種プログラムを実行することにより、サーバ34による各種処理が実現される。なお、サーバ34(プロセッサ34a及び記憶装置34b)は複数であってもよい。 The server 34 is a computer that manages the above-mentioned DER (battery 12, etc.). Specifically, the server 34 includes a processor 34a and a storage device 34b. The processor 34a executes various processes. The various processes include processes related to management of charging and discharging the battery 12 of the vehicle 10. The storage device 34b stores programs related to the various processes, as well as various information such as user information UI (information set by the user) and vehicle information VI, which will be described later. The server 34 (processor 34a) executes the various programs to realize the various processes by the server 34. Note that there may be multiple servers 34 (processors 34a and storage devices 34b).

サーバ34は、リソース管理部36、EMS(エネルギマネジメントシステム)管理部38、及び電動車管理部40を含む。これらは、記憶装置34bに格納されたプログラムがプロセッサ34aによって実行されたときに実現される。 The server 34 includes a resource management unit 36, an EMS (energy management system) management unit 38, and an electric vehicle management unit 40. These are realized when the programs stored in the storage device 34b are executed by the processor 34a.

リソース管理部36は、通信装置32を介して電気事業者100からDR計画を受け取る。具体的には、電気事業者100は、例えば、電力の需要(消費)と供給(発電)のバランスをとるために、DR計画を策定する。例えば、電力不足が想定される場合には、DR計画は、DER側からの電力の融通(バッテリ12としては放電)を依頼する情報を含む。また、例えば、供給電力が過剰となることが想定される場合には、DR計画は、DER側への余剰電力の供給(バッテリ12としては充電)を依頼する情報を含む。 The resource management unit 36 receives the DR plan from the electric utility 100 via the communication device 32. Specifically, the electric utility 100 formulates a DR plan, for example, to balance the demand (consumption) and supply (generation) of electricity. For example, when a power shortage is expected, the DR plan includes information requesting the exchange of electricity from the DER side (discharging of the battery 12). Also, for example, when an excess of electricity supply is expected, the DR plan includes information requesting the supply of surplus electricity to the DER side (charging of the battery 12).

リソース管理部36は、V2Gに参加している複数の車両(車両10を含む)の数をリアルタイムで把握しており、したがって、充放電管理システム1が有する複数のDERの全体をリアルタイムで把握している。例えば、DER側からの電力の融通(不足電力量の供給)を依頼するDR計画を受け取ったとき、リソース管理部36は、当該不足電力量の供給が可能であるか否かを判断する。また、例えば、DER側への電力の供給(余剰電力量を引き受け)を依頼するDR計画を受け取ったとき、リソース管理部36は、当該余剰電力量の引き受けが可能であるか否かを判断する。そして、電力量の供給又は引き受けが可能な場合、リソース管理部36は、車両10を含む個々のDERが供給又は引き受ける電力量に関する演算を行う。当該演算の結果は、DR計画とともにEMS管理部38又は電動車管理部40に送信される。 The resource management unit 36 grasps the number of multiple vehicles (including vehicle 10) participating in V2G in real time, and therefore grasps the entire number of multiple DERs owned by the charge/discharge management system 1 in real time. For example, when a DR plan is received that requests the exchange of power from the DER side (supply of a power shortage), the resource management unit 36 judges whether or not the power shortage can be supplied. Also, for example, when a DR plan is received that requests the supply of power to the DER side (acceptance of surplus power), the resource management unit 36 judges whether or not the surplus power can be accepted. Then, if the amount of power can be supplied or accepted, the resource management unit 36 performs a calculation regarding the amount of power that each DER, including vehicle 10, will supply or accept. The result of the calculation is transmitted to the EMS management unit 38 or the electric vehicle management unit 40 together with the DR plan.

EMS管理部38は、上述のDCモードが選択されている場合に、当該DCモードに従ってバッテリ12の充放電の管理(エネルギマネジメント)を行う。EMS管理部38は、主にDR計画及びユーザ情報UIに基づいて充放電管理を行う。EMS管理部38が参照するユーザ情報UIは、例えば、EMS管理部38によって管理されるバッテリ12のSOCの上限及び下限を示す情報である。なお、DCモードでは、ユーザ情報UIは、例えば、ユーザ端末50から電動車管理部40、車両10、及び充放電装置20を介してEMS管理部38に伝達される。 When the above-mentioned DC mode is selected, the EMS management unit 38 manages the charging and discharging of the battery 12 (energy management) in accordance with the DC mode. The EMS management unit 38 performs charging and discharging management mainly based on the DR plan and the user information UI. The user information UI referred to by the EMS management unit 38 is, for example, information indicating the upper and lower limits of the SOC of the battery 12 managed by the EMS management unit 38. Note that in the DC mode, the user information UI is transmitted to the EMS management unit 38 from the user terminal 50 via the electric vehicle management unit 40, the vehicle 10, and the charging and discharging device 20, for example.

車両10からの電力の融通(不足電力量の供給)を求めるDR計画を受け取った場合には、EMS管理部38は、車両10が供給する電力量(すなわち、車両10に対する要求放電量)を決定する。車両10が余剰電力量を引き受けることを求めるDR計画を受け取った場合には、EMS管理部38は、車両10が引き受ける電力量(すなわち、車両10に対する要求充電量)を決定する。リソース管理部36から上述の演算の結果を受け取った場合には、EMS管理部38は、リソース管理部36によって演算された要求放電量又は要求充電量を用いる。 When the EMS management unit 38 receives a DR plan that requests the transfer of power from the vehicle 10 (supply of the power shortage amount), the EMS management unit 38 determines the amount of power that the vehicle 10 will supply (i.e., the required discharge amount for the vehicle 10). When the EMS management unit 38 receives a DR plan that requests the vehicle 10 to take on surplus power amount, the EMS management unit 38 determines the amount of power that the vehicle 10 will take on (i.e., the required charge amount for the vehicle 10). When the EMS management unit 38 receives the result of the above calculation from the resource management unit 36, the EMS management unit 38 uses the required discharge amount or required charge amount calculated by the resource management unit 36.

そのうえで、EMS管理部38は、要求放電量又は要求充電量が満たされるように充放電を管理する。具体的には、EMS管理部38は、DCモードに従うバッテリ12の充放電に関する指令を充放電装置20に送る。当該指令は、上記要求放電量又は要求充電量を含む。充放電装置20の充放電ECU26は、当該指令に基づくバッテリ12の充放電が実現されるように充放電器24の充放電回路を制御する。 The EMS management unit 38 then manages charging and discharging so that the required discharge amount or the required charge amount is met. Specifically, the EMS management unit 38 sends a command to the charging/discharging device 20 regarding charging and discharging of the battery 12 in accordance with the DC mode. The command includes the above-mentioned required discharge amount or required charge amount. The charging/discharging ECU 26 of the charging/discharging device 20 controls the charging/discharging circuit of the charger/discharger 24 so that charging and discharging of the battery 12 based on the command is realized.

電動車管理部40は、上述のSCモードが選択されている場合に、当該SCモードに従ってバッテリ12の充放電の管理(エネルギマネジメント)を行う。電動車管理部40は、主に、DR計画及びユーザ情報UIとともに車両情報VIに基づいて充放電管理を行う。電動車管理部40が参照するユーザ情報UIは、主にユーザの行動計画に関する情報(例えば、後述の図2(A)参照)である。車両情報VIは、車両10から受信する情報であり、実SOC及び温度等のバッテリ12に関する情報を含む。なお、SCモードでは、ユーザ情報UIは、例えば、ユーザ端末50から電動車管理部40に伝達される。 When the above-mentioned SC mode is selected, the electric vehicle management unit 40 manages the charging and discharging of the battery 12 (energy management) in accordance with the SC mode. The electric vehicle management unit 40 mainly manages the charging and discharging based on the vehicle information VI together with the DR plan and the user information UI. The user information UI referred to by the electric vehicle management unit 40 is mainly information related to the user's action plan (for example, see FIG. 2(A) described later). The vehicle information VI is information received from the vehicle 10, and includes information related to the battery 12 such as the actual SOC and temperature. Note that in the SC mode, the user information UI is transmitted to the electric vehicle management unit 40 from the user terminal 50, for example.

電動車管理部40は、EMS管理部38と同様に、要求放電量又は要求充電量の決定のためにDR計画を参照する。しかしながら、SCモードに従う電動車管理部40は、DR計画を満たすことよりユーザ情報UIに含まれるユーザの行動計画を満たすことを優先しつつ、要求放電量又は要求充電量を決定するように構成されている。付け加えると、電動車管理部40は、要求放電量又は要求充電量を決定するために、車両情報VIを考慮する。車両情報VIは、上述のように、実SOC等のバッテリ12に関する情報を含む。このため、車両情報VIを参照することで、電動車管理部40は、ユーザの行動計画(要求)をより適切に満たせるように要求放電量又は要求充電量を決定できる。 The electric vehicle management unit 40, like the EMS management unit 38, refers to the DR plan to determine the required discharge amount or the required charge amount. However, the electric vehicle management unit 40 according to the SC mode is configured to determine the required discharge amount or the required charge amount while prioritizing satisfying the user's action plan included in the user information UI over satisfying the DR plan. In addition, the electric vehicle management unit 40 takes into account the vehicle information VI to determine the required discharge amount or the required charge amount. As described above, the vehicle information VI includes information about the battery 12, such as the actual SOC. Therefore, by referring to the vehicle information VI, the electric vehicle management unit 40 can determine the required discharge amount or the required charge amount so as to more appropriately satisfy the user's action plan (request).

そのうえで、電動車管理部40は、要求放電量又は要求充電量が満たされるように充放電を管理する。具体的には、電動車管理部40は、SCモードに従うバッテリ12の充放電に関する指令を車両10に送る。当該指令は、上記要求放電量又は要求充電量を含み、車両10から充放電装置20に伝達される。車両ECU16は、当該指令に基づくバッテリ12の充放電に関係する処理を実行する。充放電装置20の充放電ECU26は、当該指令に基づくバッテリ12の充放電が実現されるように充放電器24の充放電回路を制御する。 The electric vehicle management unit 40 then manages charging and discharging so that the required discharge amount or the required charge amount is met. Specifically, the electric vehicle management unit 40 sends a command to the vehicle 10 regarding charging and discharging of the battery 12 in accordance with the SC mode. The command includes the required discharge amount or the required charge amount, and is transmitted from the vehicle 10 to the charging and discharging device 20. The vehicle ECU 16 executes processing related to charging and discharging of the battery 12 based on the command. The charging and discharging ECU 26 of the charging and discharging device 20 controls the charging and discharging circuit of the charger and discharger 24 so that charging and discharging of the battery 12 based on the command is realized.

1-1-4.ユーザ端末
ユーザ端末50は、車両10のユーザによって操作される。ユーザ端末50は、プロセッサ、記憶装置、及び通信装置を含む。ユーザ端末50は、例えば、スマートフォン又はタブレットPC等の携帯端末である。ユーザ端末50から送信されるユーザ情報UIは、ID情報とともに、行動計画情報を含む。ID情報は、ユーザ及び車両10を識別するための情報である。行動計画情報は、ユーザの行動計画を示す情報である。
1-1-4. User Terminal The user terminal 50 is operated by the user of the vehicle 10. The user terminal 50 includes a processor, a storage device, and a communication device. The user terminal 50 is, for example, a mobile terminal such as a smartphone or a tablet PC. The user information UI transmitted from the user terminal 50 includes action plan information as well as ID information. The ID information is information for identifying the user and the vehicle 10. The action plan information is information indicating the user's action plan.

行動計画は、ユーザ端末50を操作するユーザによって設定される。図2(A)及び図2(B)は、ユーザの行動計画の設定を受け付けるユーザ端末50の画面の一例を示す図である。 The action plan is set by the user operating the user terminal 50. Figures 2(A) and 2(B) show examples of screens of the user terminal 50 that accept the setting of the user's action plan.

図2(A)に示す画面は、ユーザが新しい行動計画を設定する際に用いられる。図2(A)に例示されるように、行動計画情報は、ユーザの出発時刻(すなわち、移動のための車両10の利用開始時刻)と目標SOCとを含む。目標SOCは、当該出発の際のSOCの目標値である。画面の下側にある決定ボタンがユーザによって押されると、行動計画の設定が終了する。なお、図2(A)に示す例における画面は、行動計画が適用される曜日、充電時のSOCの上限、及び給電のための放電時のSOCの下限の設定を受け付けるように構成されている。 The screen shown in FIG. 2(A) is used when the user sets a new action plan. As illustrated in FIG. 2(A), the action plan information includes the user's departure time (i.e., the start time of using the vehicle 10 for travel) and a target SOC. The target SOC is the target value of the SOC at the time of departure. When the user presses the confirm button at the bottom of the screen, setting of the action plan is completed. Note that the screen in the example shown in FIG. 2(A) is configured to accept settings for the days of the week to which the action plan applies, the upper limit of the SOC during charging, and the lower limit of the SOC during discharging for power supply.

行動計画の設定に用いられる「出発時刻情報」は、図2(A)に示す例のような出発時刻そのものに限られない。すなわち、例えば、充放電(充給電)の開始時刻及び終了時刻の設定を受け付ける画面の例では、設定された充放電の終了時刻が「出発時刻」としてみなされて(用いられて)もよい。また、例えば、V2Gによるバッテリ12の充放電を禁止する動作禁止時間の設定を受け付ける画面の例では、設定された動作禁止時間の始まりの時刻が「出発時刻」としてみなされて(用いられて)もよい。 The "departure time information" used to set the action plan is not limited to the departure time itself as in the example shown in FIG. 2(A). That is, for example, in an example of a screen that accepts the setting of the start and end times of charging/discharging (charging and supplying power), the set end time of charging/discharging may be regarded (used) as the "departure time". Also, for example, in an example of a screen that accepts the setting of an operation prohibition time that prohibits charging/discharging of the battery 12 by V2G, the start time of the set operation prohibition time may be regarded (used) as the "departure time".

また、行動計画の設定に用いられる「目標SOC情報」は、図2(A)に示す例のような目標SOCそのもの(より詳細には、目標充電率(%)又は目標充電量(Ah))に限られない。すなわち、例えば、ユーザの計画している走行距離の設定を受け付ける画面の例では、設定された走行距離が「目標SOC情報」として用いられてもよい。この例では、ユーザ端末50、又はユーザ情報UIを利用するサーバ34は、走行距離をSOCに換算して目標SOCを取得する。 The "target SOC information" used to set the action plan is not limited to the target SOC itself (more specifically, the target charge rate (%) or the target charge amount (Ah)) as in the example shown in FIG. 2(A). That is, for example, in an example screen that accepts the setting of the user's planned driving distance, the set driving distance may be used as the "target SOC information." In this example, the user terminal 50 or the server 34 that uses the user information UI converts the driving distance into SOC to obtain the target SOC.

図2(B)に示す画面は、一度設定した行動計画をユーザが変更する際に用いられる。図2(B)に例示される画面には、現在のSOC(実SOC)、現在の動作状態、並びに、目標SOC及び目標SOCへの到達時刻とともに、「今すぐ充電」又は「今すぐ充電の停止」を受け付けるボタンが表示されている。ユーザは、例えば行動計画が突発的に変更となり、目標SOCを早急に確保する必要が生じた際に、「今すぐ充電」のボタンを押す。このような操作により、ユーザは、行動計画を変更して、速やかに目標SOCに到達するように充電が行われることを要求することができる。また、図2(B)に示す例では、ユーザは、一度設定した「今すぐ充電」を停止することもできる。 The screen shown in FIG. 2(B) is used when the user changes an action plan that has already been set. The screen shown in FIG. 2(B) displays the current SOC (actual SOC), the current operating state, the target SOC, and the time to reach the target SOC, as well as buttons for accepting "charge now" or "stop charging now." The user presses the "charge now" button, for example, when the action plan is suddenly changed and it becomes necessary to quickly secure the target SOC. By performing such an operation, the user can change the action plan and request that charging be performed so as to quickly reach the target SOC. In the example shown in FIG. 2(B), the user can also stop the "charge now" that was once set.

付け加えると、図2(A)及び図2(B)を参照して例示された行動計画の設定は、車両10に搭載されたHMI機器18を用いて行われてもよい。 In addition, the setting of the action plan illustrated with reference to Figures 2(A) and 2(B) may be performed using the HMI device 18 installed in the vehicle 10.

1-2.充放電制御
上述のように、充放電管理システム1は、充放電装置20と車両10との間での充放電(エネルギマネジメント)の制御モードとして、DCモードとSCモードとを含む。V2Gを実施する際には、電気事業者100の側(インフラ側)からのデマンドレスポンス計画に沿った要求(DR要求)の充足と、ユーザの行動計画に沿った移動の要求の充足とを両立することが重要である。前者の要求を満たすには、DCモードが適切であり、後者の要求を満たすにはSCモードが適切である。
1-2. Charge/Discharge Control As described above, the charge/discharge management system 1 includes a DC mode and an SC mode as control modes for charge/discharge (energy management) between the charge/discharge device 20 and the vehicle 10. When implementing V2G, it is important to simultaneously satisfy a request (DR request) according to a demand response plan from the electric utility 100 (infrastructure side) and a request for movement according to a user's action plan. The DC mode is appropriate for satisfying the former request, and the SC mode is appropriate for satisfying the latter request.

実施の形態1では、制御モードの選択は、充放電管理装置30のサーバ34のプロセッサ34aによって行われる。具体的には、ユーザの行動計画が設定されていない場合、プロセッサ34aはDCモード(第1の制御モード)を選択する。一方、行動計画が設定されている場合、プロセッサ34aは、車両10の出発までの残り時間Xがバッテリ12の目標SOCへの充電所要時間Yより長ければDCモードを選択し、残り時間Xが充電所要時間Y以下であればSCモード(第2の制御モード)を選択する。なお、実施の形態1では、充放電管理装置30に含まれるプロセッサ34aが本開示の第1の態様に係る「1又は複数のプロセッサ」の一例に相当する。 In the first embodiment, the control mode is selected by the processor 34a of the server 34 of the charge/discharge management device 30. Specifically, if the user's action plan is not set, the processor 34a selects the DC mode (first control mode). On the other hand, if the action plan is set, the processor 34a selects the DC mode if the remaining time X until the departure of the vehicle 10 is longer than the required charging time Y of the battery 12 to the target SOC, and selects the SC mode (second control mode) if the remaining time X is equal to or shorter than the required charging time Y. In the first embodiment, the processor 34a included in the charge/discharge management device 30 corresponds to an example of "one or more processors" according to the first aspect of the present disclosure.

図3は、本開示に係る充放電制御に関する処理を示すフローチャートである。実施の形態1では、このフローチャートの処理は、車両10がV2Gに参加している時(車両10が充放電器24に接続されている時)に、充放電管理装置30のサーバ34(プロセッサ34a)によって繰り返し実行される。 Figure 3 is a flowchart showing the process related to the charge/discharge control according to the present disclosure. In the first embodiment, the process of this flowchart is repeatedly executed by the server 34 (processor 34a) of the charge/discharge management device 30 when the vehicle 10 is participating in V2G (when the vehicle 10 is connected to the charger/discharger 24).

ステップS100において、サーバ34(プロセッサ34a)は、「今すぐ充電(図2(B)参照)」が設定されているか否かを判定する。この判定は、例えば、サーバ34が受け取るユーザ情報UIに「今すぐ充電」の設定が含まれているか否かに基づいて行うことができる。 In step S100, the server 34 (processor 34a) determines whether "Charge now (see FIG. 2B)" is set. This determination can be made, for example, based on whether the user information UI received by the server 34 includes the setting for "Charge now."

「今すぐ充電」の設定がない場合(ステップS100;No)には、処理はステップS102に進む。ステップS102において、サーバ34は、ユーザの行動計画の設定があるか否かを判定する。この判定は、例えば、サーバ34が受け取るユーザ情報UIに、出発時刻情報と目標SOC情報を含む行動計画情報(図2(A)参照)が含まれているか否かに基づいて行うことができる。 If "charge now" is not set (step S100; No), the process proceeds to step S102. In step S102, the server 34 determines whether or not the user has set an action plan. This determination can be made, for example, based on whether or not the user information UI received by the server 34 includes action plan information (see FIG. 2(A)) including departure time information and target SOC information.

ユーザの行動計画の設定がない場合(ステップS102;No)、ステップS104において、サーバ34は、DCモードを選択する。その結果、サーバ34(EMS管理部38)が主たるコントローラとなってDCモードが実行される。すなわち、インフラ側の装置(サーバ34における充放電装置20に近い側のEMS管理部38)が主たるコントローラとなってDCモードが実行される。なお、DCモードを実行するためのEMS管理部38の機能は、サーバ34ではなく、充放電装置20の充放電ECU26が備えていてもよい。すなわち、DCモードは、サーバ34に代え、充放電ECU26が主たるコントローラとなって実行されてもよい。 If the user's action plan has not been set (step S102; No), in step S104, the server 34 selects the DC mode. As a result, the server 34 (EMS management unit 38) becomes the main controller and the DC mode is executed. That is, the infrastructure side device (the EMS management unit 38 on the side of the server 34 closer to the charging/discharging device 20) becomes the main controller and the DC mode is executed. Note that the function of the EMS management unit 38 for executing the DC mode may be provided by the charging/discharging ECU 26 of the charging/discharging device 20, rather than the server 34. That is, the DC mode may be executed by the charging/discharging ECU 26 instead of the server 34 becoming the main controller.

「今すぐ充電」の設定がある場合(ステップS100;Yes)には、ステップS106において、サーバ34は、SCモードを選択する。その結果、サーバ34(電動車管理部40)が主たるコントローラとなってSCモードが実行される。すなわち、車両側の装置(サーバ34における車両10に近い側の電動車管理部40)が主たるコントローラとなってSCモードが実行される。その結果、車両走行に必要な目標SOCを確実に確保できるようになる。なお、SCモードを実行するための電動車管理部40の機能は、サーバ34ではなく、車両ECU16が備えていてもよい。すなわち、SCモードは、サーバ34に代え、車両ECU16が主たるコントローラとなって実行されてもよい。 If "charge now" is set (step S100; Yes), in step S106, the server 34 selects the SC mode. As a result, the server 34 (electric vehicle management unit 40) becomes the main controller and the SC mode is executed. That is, the device on the vehicle side (the electric vehicle management unit 40 on the side of the server 34 closer to the vehicle 10) becomes the main controller and the SC mode is executed. As a result, the target SOC required for vehicle running can be reliably secured. Note that the function of the electric vehicle management unit 40 for executing the SC mode may be provided in the vehicle ECU 16 instead of the server 34. That is, the SC mode may be executed with the vehicle ECU 16 becoming the main controller instead of the server 34.

ユーザの行動計画の設定がある場合(ステップS102;Yes)には、処理はステップS108に進む。ステップS108において、サーバ34は、ユーザ情報UIに含まれる出発時刻情報に基づいて、現時刻からユーザの出発(移動のための車両10の利用開始)までの残り時間Xを算出する。 If the user's action plan has been set (step S102; Yes), the process proceeds to step S108. In step S108, the server 34 calculates the remaining time X from the current time until the user's departure (start of use of the vehicle 10 for travel) based on the departure time information included in the user information UI.

次いで、ステップS110において、サーバ34は、ユーザ情報UIに含まれる目標SOC情報に基づいて、目標SOCへの充電所要時間Y(すなわち、現在の実SOCから目標SOCにまでバッテリ12を充電するために必要な時間)を算出する。充電所要時間Yの算出は、例えば、目標SOCとともにバッテリ12の容量、充電電流、及び充電電圧等のパラメータに基づいて行うことができる。 Next, in step S110, the server 34 calculates the charging time Y to the target SOC (i.e., the time required to charge the battery 12 from the current actual SOC to the target SOC) based on the target SOC information included in the user information UI. The charging time Y can be calculated based on, for example, the target SOC as well as parameters such as the capacity, charging current, and charging voltage of the battery 12.

次いで、ステップS112において、サーバ34は、ステップS108及びS110の算出結果に基づいて、残り時間Xが充電所要時間Yより長いか否かを判定する。その結果、この判定結果がYesの場合(すなわち、目標SOCに向けた充電を直ちに開始しなくてもユーザの行動計画を達成可能と判断できる場合)には、処理はステップS104に進む。その結果、DCモードが選択される。 Next, in step S112, the server 34 determines whether the remaining time X is longer than the required charging time Y based on the calculation results of steps S108 and S110. If the result of this determination is Yes (i.e., if it is determined that the user's action plan can be achieved without immediately starting charging toward the target SOC), the process proceeds to step S104. As a result, the DC mode is selected.

一方、ステップS112の判定結果がNoの場合(すなわち、DCモードを継続したとしたらユーザの行動計画を達成できないと判断できる場合)には、処理はステップS106に進む。その結果、SCモードが選択される。 On the other hand, if the result of the determination in step S112 is No (i.e., if it is determined that the user's action plan would not be achieved if the DC mode were continued), the process proceeds to step S106. As a result, the SC mode is selected.

図4は、V2Gの実行中の充放電制御の動作を説明するためのタイムチャートである。上述の図3に示すフローチャートの処理によれば、「今すぐ充電」の設定(すなわち、バッテリ12の放電禁止を求めるユーザの意思表示)がなく、ユーザの行動計画の設定もなければ、V2GはDCモードを用いて開始される。また、「今すぐ充電」の設定がない場合において、ユーザの行動計画があっても、図4に示すように当該行動計画を満たせる期間Z内(残り時間X>充電所要時間Y)においては、DCモードが選択される。 Figure 4 is a time chart for explaining the operation of charge/discharge control during execution of V2G. According to the processing of the flowchart shown in Figure 3 described above, if there is no "charge now" setting (i.e., an indication of the user's intention to prohibit discharging of battery 12) and no user action plan is set, V2G is started using DC mode. Also, when there is no "charge now" setting and even if there is a user action plan, DC mode is selected within period Z in which the action plan can be satisfied (remaining time X > required charging time Y) as shown in Figure 4.

DCモードの実行中のバッテリ12の充電又は放電は、ユーザの行動計画が考慮されることなく、DR計画(インフラ側の要望)に応じて実行される。その結果として、図4に例示されるように、実SOCが増減(変動)する。 When the DC mode is in operation, charging or discharging of the battery 12 is performed according to the DR plan (requests from the infrastructure side) without taking into account the user's action plan. As a result, the actual SOC increases or decreases (fluctuations), as illustrated in Figure 4.

図4は、DR計画及び行動計画の少なくとも一方の内容に起因して、DCモードの実行中にユーザの行動計画を満たせなくなるタイミングTが到来する例を示している。当該タイミングTは、DCモードの実行中に残り時間Xと充電所要時間Yとの差が減少してゼロになった時点に相当する。 Figure 4 shows an example in which a time T arrives when the user's action plan cannot be met during execution of DC mode due to the contents of at least one of the DR plan and the action plan. The time T corresponds to the point in time when the difference between the remaining time X and the required charging time Y decreases to zero during execution of DC mode.

図3に示すフローチャートの処理によれば、図4に示す例のようにDCモードを用いたV2Gの継続中にユーザの行動計画を満たせなくなったタイミングTが到来する際に、DCモードからSCモードに切り替えられる。より詳細には、例えば、DCモードの実行中にバッテリ12から電気事業者100に対して融通(供給)される電力量が多かったために行動計画を満たせなくなった際に、SCモードへの切り替えが行われる。SCモードによれば、ユーザの行動計画(移動の要求)がDR計画に対して優先される。このため、タイミングTが到来した際に、インフラ側の計画に関わらず、「目標SOCを満たすための充電」を開始することができる。 According to the processing of the flowchart shown in FIG. 3, when a time T arrives when the user's action plan cannot be satisfied during V2G using DC mode as in the example shown in FIG. 4, the mode is switched from DC mode to SC mode. More specifically, for example, when the amount of power lent (supplied) from the battery 12 to the electric utility 100 during execution of DC mode is too large to satisfy the action plan, the mode is switched to SC mode. According to the SC mode, the user's action plan (request for movement) is given priority over the DR plan. Therefore, when the time T arrives, "charging to satisfy the target SOC" can be started regardless of the infrastructure's plan.

1-3.効果
以上説明したように、実施の形態1に係る充放電制御によれば、「今すぐ充電」の設定がない通常の状況下では、ユーザの行動計画の設定があっても、充電所要時間Yより長い残り時間Xを確保できない場合を除き、DCモードが選択される。その結果、DR計画(インフラ側の要望)を満たすように充放電が制御される。そして、充電所要時間Yより長い残り時間Xを確保できない場合には、SCモードが選択される。その結果、目標SOCを満たすための充電を確実に行えるようになる。このような制御モードの選択手法によれば、DR計画に沿ったインフラ側からの要求と、車両10のユーザの行動計画に沿った移動の要求とを両立可能な充放電を実現することができる。すなわち、2つの制御モードを的確に切り替えて、最適なエネルギマネジメントを実現できる。
1-3. Effects As described above, according to the charge/discharge control of the first embodiment, under normal circumstances where "charge now" is not set, even if the user's action plan is set, the DC mode is selected except when the remaining time X longer than the required charging time Y cannot be secured. As a result, the charge/discharge is controlled to satisfy the DR plan (request from the infrastructure side). Then, when the remaining time X longer than the required charging time Y cannot be secured, the SC mode is selected. As a result, charging to satisfy the target SOC can be reliably performed. According to such a control mode selection method, it is possible to realize charge/discharge that can satisfy both the request from the infrastructure side according to the DR plan and the request for movement according to the action plan of the user of the vehicle 10. That is, the two control modes can be appropriately switched to realize optimal energy management.

2.実施の形態2
実施の形態2は、制御モード(DCモード及びSCモード)の選択の実行主体において、上述した実施の形態1と相違している。
2. Second embodiment
The second embodiment differs from the first embodiment in the entity that selects the control mode (DC mode and SC mode).

具体的には、実施の形態1においては、制御モードの選択は、充放電管理装置30のサーバ34のプロセッサ34aによって行われる。これに対し、実施の形態2においては、当該制御モードの選択は、充放電装置20の充放電ECU26のプロセッサ26aによって行われる。したがって、実施の形態2に係る制御モードの選択は、サーバ34(プロセッサ34a)に代え、充放電ECU26(プロセッサ26a)が図3に示すフローチャートの処理を同様に実行することにより実現される。付け加えると、充放電装置20は、残り時間X及び充電所要時間Yの算出に必要な行動計画情報を、サーバ34から取得してもよいし、ユーザ端末50から直接取得してもよい。なお、実施の形態2では、充放電装置20に含まれるプロセッサ26aが本開示の第2の態様に係る「1又は複数のプロセッサ」の一例に相当する。 Specifically, in the first embodiment, the control mode is selected by the processor 34a of the server 34 of the charge/discharge management device 30. In contrast, in the second embodiment, the control mode is selected by the processor 26a of the charge/discharge ECU 26 of the charge/discharge device 20. Therefore, the selection of the control mode according to the second embodiment is realized by the charge/discharge ECU 26 (processor 26a) executing the process of the flowchart shown in FIG. 3 in place of the server 34 (processor 34a). In addition, the charge/discharge device 20 may obtain the action plan information required for calculating the remaining time X and the required charging time Y from the server 34 or directly from the user terminal 50. In the second embodiment, the processor 26a included in the charge/discharge device 20 corresponds to an example of "one or more processors" according to the second aspect of the present disclosure.

3.実施の形態3
実施の形態3は、制御モード(DCモード及びSCモード)の選択の実行主体において、上述した実施の形態1と相違している。
3. Third embodiment
The third embodiment differs from the first embodiment in the entity that selects the control mode (DC mode and SC mode).

具体的には、実施の形態1においては、制御モードの選択は、充放電管理装置30のサーバ34のプロセッサ34aによって行われる。これに対し、実施の形態3においては、当該制御モードの選択は、車両10の車両ECU16のプロセッサ16aによって行われる。したがって、実施の形態3に係る制御モードの選択は、サーバ34(プロセッサ34a)に代え、車両ECU16(プロセッサ16a)が図3に示すフローチャートの処理を同様に実行することにより実現される。付け加えると、残り時間X及び充電所要時間Yの算出に必要な行動計画情報をユーザ端末50から取得する例では、車両10は、当該行動計画情報をサーバ34から取得してもよいし、ユーザ端末50から直接取得してもよい。なお、実施の形態3では、車両10に含まれるプロセッサ16aが本開示の第3の態様に係る「1又は複数のプロセッサ」の一例に相当する。 Specifically, in the first embodiment, the control mode is selected by the processor 34a of the server 34 of the charge/discharge management device 30. In contrast, in the third embodiment, the control mode is selected by the processor 16a of the vehicle ECU 16 of the vehicle 10. Therefore, the selection of the control mode according to the third embodiment is realized by the vehicle ECU 16 (processor 16a) executing the process of the flowchart shown in FIG. 3 in place of the server 34 (processor 34a). In addition, in an example in which the action plan information required for calculating the remaining time X and the required charging time Y is obtained from the user terminal 50, the vehicle 10 may obtain the action plan information from the server 34 or directly from the user terminal 50. In the third embodiment, the processor 16a included in the vehicle 10 corresponds to an example of "one or more processors" according to the third aspect of the present disclosure.

1 充放電管理システム
10 車両
12 バッテリ
14、22、32 通信装置
16 車両ECU
16a、26a、34a プロセッサ
18 HMI(Human Machine Interface)機器
19 SOCセンサ
20 充放電装置
24 充放電器
26 充放電ECU
30 充放電管理装置
34 サーバ
36 リソース管理部
38 EMS管理部
40 電動車管理部
50 ユーザ端末
Reference Signs List 1: Charge/discharge management system 10: Vehicle 12: Battery 14, 22, 32: Communication device 16: Vehicle ECU
16a, 26a, 34a Processor 18 HMI (Human Machine Interface) device 19 SOC sensor 20 Charge/discharge device 24 Charge/discharge device 26 Charge/discharge ECU
30 Charge/discharge management device 34 Server 36 Resource management unit 38 EMS management unit 40 Electric vehicle management unit 50 User terminal

Claims (4)

商用電源に接続された充放電器と車両に搭載されたバッテリとの間での充放電を管理する充放電管理装置であって、1又は複数のプロセッサを備え、
前記充放電の制御モードは、デマンドレスポンス計画を前記車両のユーザの行動計画より優先しつつ前記充放電を制御する第1の制御モードと、前記行動計画を前記デマンドレスポンス計画より優先しつつ前記充放電を制御する第2の制御モードと、を含み、
前記1又は複数のプロセッサは、
前記行動計画が設定されていない場合には、前記第1の制御モードを選択し、
前記行動計画が設定されている場合、前記車両の出発までの残り時間が前記バッテリの目標充電状態への充電所要時間より長ければ前記第1の制御モードを選択し、前記残り時間が前記充電所要時間以下であれば前記第2の制御モードを選択する
充放電管理装置。
A charge/discharge management device that manages charging/discharging between a charger/discharger connected to a commercial power source and a battery mounted on a vehicle, the charge/discharge management device comprising one or more processors,
the charge/discharge control modes include a first control mode in which the charge/discharge is controlled while giving a demand response plan priority over an action plan of a user of the vehicle, and a second control mode in which the charge/discharge is controlled while giving the action plan priority over the demand response plan,
The one or more processors:
If the action plan is not set, the first control mode is selected;
When the action plan is set, the charge/discharge management device selects the first control mode if the remaining time until departure of the vehicle is longer than a required charging time for the battery to reach a target state of charge, and selects the second control mode if the remaining time is equal to or shorter than the required charging time.
商用電源に接続された充放電器と、
車両に搭載されたバッテリと前記充放電器との間での充放電を制御する1又は複数のプロセッサと、
を備える充放電装置であって、
前記充放電の制御モードは、デマンドレスポンス計画を前記車両のユーザの行動計画より優先しつつ前記充放電を制御する第1の制御モードと、前記行動計画を前記デマンドレスポンス計画より優先しつつ前記充放電を制御する第2の制御モードと、を含み、
前記1又は複数のプロセッサは、
前記行動計画が設定されていない場合には、前記第1の制御モードを選択し、
前記行動計画が設定されている場合、前記車両の出発までの残り時間が前記バッテリの目標充電状態への充電所要時間より長ければ前記第1の制御モードを選択し、前記残り時間が前記充電所要時間以下であれば前記第2の制御モードを選択する
充放電装置。
A charger/discharger connected to a commercial power source;
One or more processors that control charging and discharging between a battery mounted in a vehicle and the charger/discharger;
A charging/discharging device comprising:
the charge/discharge control modes include a first control mode in which the charge/discharge is controlled while giving a demand response plan priority over an action plan of a user of the vehicle, and a second control mode in which the charge/discharge is controlled while giving the action plan priority over the demand response plan,
The one or more processors:
If the action plan is not set, the first control mode is selected;
When the action plan is set, the charging/discharging device selects the first control mode if the remaining time until departure of the vehicle is longer than a required charging time for the battery to reach a target state of charge, and selects the second control mode if the remaining time is equal to or shorter than the required charging time.
バッテリと、
商用電源に接続された充放電器と前記バッテリとの間での充放電を制御する1又は複数のプロセッサと、
を備える車両であって、
前記充放電の制御モードは、デマンドレスポンス計画を前記車両のユーザの行動計画より優先しつつ前記充放電を制御する第1の制御モードと、前記行動計画を前記デマンドレスポンス計画より優先しつつ前記充放電を制御する第2の制御モードと、を含み、
前記1又は複数のプロセッサは、
前記行動計画が設定されていない場合には、前記第1の制御モードを選択し、
前記行動計画が設定されている場合、前記車両の出発までの残り時間が前記バッテリの目標充電状態への充電所要時間より長ければ前記第1の制御モードを選択し、前記残り時間が前記充電所要時間以下であれば前記第2の制御モードを選択する
車両。
A battery;
One or more processors that control charging and discharging between a charger/discharger connected to a commercial power source and the battery;
A vehicle comprising:
the charge/discharge control modes include a first control mode in which the charge/discharge is controlled while giving a demand response plan priority over an action plan of a user of the vehicle, and a second control mode in which the charge/discharge is controlled while giving the action plan priority over the demand response plan,
The one or more processors:
If the action plan is not set, the first control mode is selected;
When the action plan is set, the first control mode is selected if the remaining time until departure of the vehicle is longer than a required charging time for the battery to reach a target state of charge, and the second control mode is selected if the remaining time is equal to or shorter than the required charging time.
商用電源に接続された充放電器と車両に搭載されたバッテリとの間での充放電を管理する充放電管理方法であって、
前記充放電の制御モードは、デマンドレスポンス計画を前記車両のユーザの行動計画より優先しつつ前記充放電を制御する第1の制御モードと、前記行動計画を前記デマンドレスポンス計画より優先しつつ前記充放電を制御する第2の制御モードと、を含み、
前記充放電管理方法は、
前記行動計画が設定されていない場合には、前記第1の制御モードを選択することと、
前記行動計画が設定されている場合、前記車両の出発までの残り時間が前記バッテリの目標充電状態への充電所要時間より長ければ前記第1の制御モードを選択し、前記残り時間が前記充電所要時間以下であれば前記第2の制御モードを選択することと、
を含む
充放電管理方法。
A charge/discharge management method for managing charging/discharging between a charger/discharger connected to a commercial power source and a battery mounted on a vehicle, comprising:
the charge/discharge control modes include a first control mode in which the charge/discharge is controlled while giving a demand response plan priority over an action plan of a user of the vehicle, and a second control mode in which the charge/discharge is controlled while giving the action plan priority over the demand response plan,
The charge/discharge management method includes:
selecting the first control mode if the action plan is not set;
when the action plan is set, if the remaining time until departure of the vehicle is longer than a required charging time for the battery to reach a target state of charge, selecting the first control mode, and if the remaining time is equal to or shorter than the required charging time, selecting the second control mode;
A charge and discharge management method.
JP2022039520A 2022-03-14 2022-03-14 Charge/discharge management device, charge/discharge device, vehicle, and charge/discharge management method Active JP7658308B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022039520A JP7658308B2 (en) 2022-03-14 2022-03-14 Charge/discharge management device, charge/discharge device, vehicle, and charge/discharge management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022039520A JP7658308B2 (en) 2022-03-14 2022-03-14 Charge/discharge management device, charge/discharge device, vehicle, and charge/discharge management method

Publications (2)

Publication Number Publication Date
JP2023134156A JP2023134156A (en) 2023-09-27
JP7658308B2 true JP7658308B2 (en) 2025-04-08

Family

ID=88143683

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022039520A Active JP7658308B2 (en) 2022-03-14 2022-03-14 Charge/discharge management device, charge/discharge device, vehicle, and charge/discharge management method

Country Status (1)

Country Link
JP (1) JP7658308B2 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018084152A1 (en) 2016-11-01 2018-05-11 本田技研工業株式会社 Power storage device, transportation apparatus, and control method
JP2021177697A (en) 2017-11-24 2021-11-11 トヨタ自動車株式会社 Control device for vehicle and power control system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018084152A1 (en) 2016-11-01 2018-05-11 本田技研工業株式会社 Power storage device, transportation apparatus, and control method
JP2021177697A (en) 2017-11-24 2021-11-11 トヨタ自動車株式会社 Control device for vehicle and power control system

Also Published As

Publication number Publication date
JP2023134156A (en) 2023-09-27

Similar Documents

Publication Publication Date Title
JP5647057B2 (en) Charging apparatus, charging control unit, and charging control method
US20220289060A1 (en) Control system and energy management method
JP7111078B2 (en) electric vehicle
EP3815957A1 (en) Notification controller, mobile body, electric power system, and notification method
JP2015073431A (en) Charging device, charge control unit, and charge control method
CN112671015A (en) Power supply system
CN114665464B (en) Server, power management methods
CN115123016A (en) Control system and display device
WO2012118184A1 (en) Charging power control system
US20230013438A1 (en) Electric power management system, electric power management server, and electric power management method
US20230014362A1 (en) Electric power management system, electric power management server, and electric power management method
CN114665461B (en) Server, power management methods
EP4239824A1 (en) Power management system
CN116890682A (en) Electric power system, electric power control device and electric power control method
JP7658308B2 (en) Charge/discharge management device, charge/discharge device, vehicle, and charge/discharge management method
JP2023136062A (en) Vehicle and communication control method of the same
JP2022039338A (en) Management device
US20240051419A1 (en) Energy management method, storage medium storing program, and computer device
JP2023022668A (en) Charging method, charger, and charging system
JP7643365B2 (en) Electric vehicle management device
JP7708023B2 (en) Power transfer system
JP2026023291A (en) Charging/discharging system, charging/discharging control method, and computer program
JP2025066316A (en) Electric vehicles
CN117360325A (en) A vehicle discharge control method, device, electronic equipment and storage medium

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240320

TRDD Decision of grant or rejection written
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250205

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250225

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250310

R150 Certificate of patent or registration of utility model

Ref document number: 7658308

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150