JP7660494B2 - Power management device, power management system, and power management program - Google Patents
[go: Go Back, main page]

JP7660494B2 - Power management device, power management system, and power management program - Google Patents

Power management device, power management system, and power management program Download PDF

Info

Publication number
JP7660494B2
JP7660494B2 JP2021207885A JP2021207885A JP7660494B2 JP 7660494 B2 JP7660494 B2 JP 7660494B2 JP 2021207885 A JP2021207885 A JP 2021207885A JP 2021207885 A JP2021207885 A JP 2021207885A JP 7660494 B2 JP7660494 B2 JP 7660494B2
Authority
JP
Japan
Prior art keywords
consumer
imbalance
unit
power
price
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021207885A
Other languages
Japanese (ja)
Other versions
JP2023092709A (en
Inventor
祐太 相原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2021207885A priority Critical patent/JP7660494B2/en
Publication of JP2023092709A publication Critical patent/JP2023092709A/en
Application granted granted Critical
Publication of JP7660494B2 publication Critical patent/JP7660494B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本開示は、需要家の電力を管理する電力管理装置、電力管理システムおよび電力管理プログラムに関する。 This disclosure relates to a power management device, a power management system, and a power management program that manage power for consumers.

電気料金の抑制、自然エネルギーの蓄電、非常用電源の確保などのための蓄電池を所有する需要家が増加しており、蓄電池を備える電気自動車(EV:Electric Vehicle)を所有する需要家も増加している。蓄電池を有効活用する技術が特許文献1に開示されている。特許文献1に記載の技術では、ビルに設置された蓄電池に関して、実績値に基づいてビル内の需要家の電力消費量を予測し、予測結果と、時間帯別の電気料金単価、電力の市場価格などの電力の価格に関する情報とをもとに、コストを最適化するように蓄電池の充放電計画を作成する。 The number of consumers who own storage batteries to reduce electricity bills, store natural energy, and secure emergency power sources is increasing, as is the number of consumers who own electric vehicles (EVs) equipped with storage batteries. Patent Document 1 discloses a technology for making effective use of storage batteries. In the technology described in Patent Document 1, for a storage battery installed in a building, the amount of power consumption by consumers in the building is predicted based on actual values, and a charging and discharging plan for the storage battery is created to optimize costs based on the prediction results and information on the price of electricity, such as the unit price of electricity by time period and the market price of electricity.

特開2019-33566号公報JP 2019-33566 A

一方、近年、電力市場の取引商品増加に伴い、小売事業者が電力や調整力取引を行う機会が増加している。小売事業者は計画された需要カーブと実績値との差が生じるとインバランス料金を支払う必要があり、インバランス料金の単価であるインバランス料金単価は市場価格に応じて変動するため、これに伴い、不足インバランス発生による小売事業者の損失額、および余剰インバランスの発生時の余剰電力の売電価格が変動する。需要家が所有する蓄電池の充放電の調整、電力を消費する負荷設備の調整などによって、インバランスを解消することが検討されているが、需要家にとってもインセンティブがなければ、需要家はインバランス回避のための調整に協力的とはならない。特許文献1に記載の技術では、小売事業者のインバランス回避に需要家が協力することを想定しておらず、特許文献1に記載の技術を用いても、小売事業者のインバランス回避に対する需要家の協力を促進することはできない。需要家のインバランス回避への協力を促進することが望まれている。 On the other hand, in recent years, with the increase in trading products in the electricity market, opportunities for retail businesses to trade electricity and adjustment capacity are increasing. Retail businesses are required to pay an imbalance fee when a difference occurs between the planned demand curve and the actual value, and the unit price of the imbalance fee, which is the unit price of the imbalance fee, fluctuates according to the market price, so the amount of loss of retail businesses due to the occurrence of a shortage imbalance and the selling price of surplus electricity when an excess imbalance occurs fluctuate accordingly. It has been considered to eliminate the imbalance by adjusting the charging and discharging of storage batteries owned by consumers and adjusting load equipment that consumes electricity, but consumers will not cooperate with adjustments to avoid imbalances unless they have an incentive. The technology described in Patent Document 1 does not assume that consumers will cooperate with retail businesses in avoiding imbalances, and even if the technology described in Patent Document 1 is used, it is not possible to promote consumers' cooperation in retail businesses' avoiding imbalances. It is desired to promote consumers' cooperation in avoiding imbalances.

本開示は、上記に鑑みてなされたものであって、需要家のインバランス回避への協力を促進することができる電力管理装置を得ることを目的とする。 The present disclosure has been made in consideration of the above, and aims to provide a power management device that can encourage consumers to cooperate in avoiding imbalances.

上述した課題を解決し、目的を達成するために、本開示にかかる電力管理装置は、インバランス料金単価に基づいて決定される情報であって需要家の電力リソースを用いてインバランス回避が行われた場合の需要家の利益の単価時間帯ごとに示した情報であるプライスシグナル、を取得するインバランス情報取得部と、需要家の電力需要の実績値を用いて、一定期間の需要家の電力需要を予測する需要予測部と、を備える。電力管理装置は、さらに、需要家ごとに、需要家の料金プランに応じた時間帯別の電気料金の単価である契約単価と、プライスシグナルと、需要予測部による予測結果とを用いて、一定期間において需要家がインバランス回避に対応する電力リソースの運転を行う場合の利益に関する指標を算出し、指標を用いて一定期間において需要家がインバランス回避を行うか否かを判定し、この判定の結果に基づいて需要家の電力リソースの一定期間における需要家ごとの運転計画を作成する運転計画作成部と、を備える。 In order to solve the above-mentioned problems and achieve the object, the power management device according to the present disclosure includes an imbalance information acquisition unit that acquires a price signal, which is information determined based on an imbalance charge unit price and indicates the unit price of a consumer's profit for each time period when imbalance avoidance is performed using the consumer's power resources, and a demand forecasting unit that forecasts the consumer's power demand for a certain period using actual values of the consumer's power demand. The power management device further includes an operation plan creation unit that calculates, for each consumer, an index related to a profit when the consumer operates a power resource corresponding to imbalance avoidance for the certain period using a contract unit price, which is the unit price of electricity for each time period according to the consumer's rate plan, the price signal, and the prediction result by the demand forecasting unit, determines whether the consumer will perform imbalance avoidance for the certain period using the index, and creates an operation plan for the consumer's power resources for the certain period based on the result of this determination.

本開示にかかる電力管理装置は、需要家のインバランス回避への協力を促進することができるという効果を奏する。 The power management device disclosed herein has the effect of encouraging consumers to cooperate in avoiding imbalances.

実施の形態にかかる電力管理システムの構成例を示す図FIG. 1 is a diagram showing a configuration example of a power management system according to an embodiment; 実施の形態の電力管理装置における運転計画作成処理手順の一例を示すフローチャート1 is a flowchart illustrating an example of an operation plan creation process in a power management apparatus according to an embodiment. 実施の形態の第2リソース運転計画を説明するための図FIG. 1 is a diagram for explaining a second resource operation plan according to an embodiment. 余剰インバランスの回避を行う場合の第2リソース運転計画の一例を示す図FIG. 13 is a diagram showing an example of a second resource operation plan in a case where surplus imbalance is avoided; 実施の形態の電力管理装置を実現するコンピュータシステムの構成例を示す図FIG. 1 is a diagram showing an example of the configuration of a computer system that realizes a power management apparatus according to an embodiment.

以下に、実施の形態にかかる電力管理装置、電力管理システムおよび電力管理プログラムを図面に基づいて詳細に説明する。 The power management device, power management system, and power management program according to the embodiments are described in detail below with reference to the drawings.

実施の形態.
図1は、実施の形態にかかる電力管理システムの構成例を示す図である。本実施の形態の電力管理システム4は、電力管理装置1および小売事業者装置2を備える。小売事業者装置2は、電力の小売事業者によって管理および運用される装置である。電力管理装置1は、例えば、複数の需要家の電力を束ねて管理するアグリゲータと呼ばれる事業者によって管理される装置である。なお、図1では、需要家の設備である需要家設備3を1つ図示しているが、一般には、電力管理装置1は、複数の需要家のそれぞれの需要家設備3の電力を管理する。
Embodiment
FIG. 1 is a diagram showing an example of the configuration of a power management system according to an embodiment. A power management system 4 according to the present embodiment includes a power management device 1 and a retailer device 2. The retailer device 2 is a device managed and operated by a power retailer. The power management device 1 is, for example, a device managed by a business called an aggregator that aggregates and manages the power of multiple consumers. Note that while FIG. 1 shows one consumer facility 3 that is a consumer facility, the power management device 1 generally manages the power of each of the consumer facilities 3 of multiple consumers.

需要家設備3は、電力を消費する負荷設備、蓄電池、太陽光発電設備などを含む。需要家によって、需要家設備3を構成する設備は異なっていてもよい。需要家設備3には、図示を省略したスマートメータと呼ばれる電力量の計量装置が設けられており、計量装置は計測した電力量を電力管理装置1へ送信する。また、需要家設備3が、蓄電池を備えている場合、蓄電池を制御するパワーコンディショナが、蓄電池の充放電電力の計測値を電力管理装置1へ送信してもよい。需要家設備3が、太陽光発電設備を備えている場合、太陽光発電設備を構成するパワーコンディショナが、発電電力の計測値を電力管理装置1へ送信してもよい。 The consumer equipment 3 includes load equipment that consumes electricity, storage batteries, solar power generation equipment, etc. The equipment that constitutes the consumer equipment 3 may differ depending on the consumer. The consumer equipment 3 is provided with an electric power metering device called a smart meter (not shown), and the metering device transmits the measured amount of electric power to the power management device 1. In addition, if the consumer equipment 3 is equipped with a storage battery, a power conditioner that controls the storage battery may transmit the measured value of the charging and discharging power of the storage battery to the power management device 1. In the case where the consumer equipment 3 is equipped with solar power generation equipment, the power conditioner that constitutes the solar power generation equipment may transmit the measured value of the generated power to the power management device 1.

小売事業者には、計画値において発電と需要とが一致することが要求される。計画値と実績値とに差が生じ、実績において需要が発電を上回る不足インバランスが発生すると、小売事業者は送配電事業者に(不足)インバランス料金を支払うことになる。また、計画値と実績値とに差が生じ、実績において発電が需要を上回る余剰インバランスが発生すると、小売事業者は送配電事業者に(余剰)インバランス料金で買電することになる。不足インバランス、余剰インバランスのそれぞれのインバランス料金の単価であるインバランス料金単価は、電力の市場価格に基づいて決定されるため、電力の市場価格の変動に伴ってインバランス料金単価は変動する。小売事業者は、インバランス料金単価が高いときには、不足インバランスをなるべく回避することが望ましい。また、インバランス料金単価が低いときには、余剰インバランスの発生をなるべく回避することが望ましい。 Retail businesses are required to ensure that power generation and demand match in the planned values. When a difference occurs between the planned values and the actual values, and a shortage imbalance occurs in which demand exceeds power generation in the actual values, the retail business will pay a (shortage) imbalance fee to the electricity transmission and distribution business. When a difference occurs between the planned values and the actual values, and a surplus imbalance occurs in which power generation exceeds demand in the actual values, the retail business will purchase electricity from the electricity transmission and distribution business at a (surplus) imbalance fee. The imbalance fee unit price, which is the unit price of the imbalance fee for each shortage imbalance and surplus imbalance, is determined based on the market price of electricity, so the imbalance fee unit price fluctuates in accordance with fluctuations in the market price of electricity. It is desirable for retail businesses to avoid shortage imbalances as much as possible when the imbalance fee unit price is high. It is also desirable for retail businesses to avoid surplus imbalances as much as possible when the imbalance fee unit price is low.

本実施の形態では、小売事業者は、インバランス料金単価に基づいて決定される情報であって需要家の電力リソースを用いてインバランス回避が行われた場合の需要家の利益を示す情報であるプライスシグナルを電力管理装置1へ送信する。プライスシグナルは、例えば、需要家がインバランスの回避に協力したときに需要家へ支払う料金の単価(以下、需要家インバランス単価と呼ぶ)を時間帯ごとに示した情報である。例えば、小売事業者は、自身の管理対象の電力の需給計画に基づいてインバランスの発生する時間帯を予測し、この予測結果と、電力の市場価格に基づくインバランス料金単価(インバランス料金価格の予測値)とを用いてプライスシグナルを決定する。なお、図示を省略しているが、小売事業者は、図1に示した電力管理装置1を管理するアグリゲータの配下の需要家以外の需要家や発電設備などを管理しており、上述した需給計画はこれらの自身の管理対象全体の需給計画である。小売事業者は、例えば、インバランスが発生しないと予測される時間帯についてはインバランス料金単価に基づいて需要家インバランス単価を決定し、決定した需要家インバランス単価をプライスシグナルとする。例えば、小売事業者は、インバランス料金単価の50%を需要家インバランス単価とするといったように、インバランス料金単価に定められた比率を乗じることで需要家インバランス単価を決定してもよいし、インバランス料金単価から一定額を減算した価格を需要家インバランス単価としてもよく、これら以外の方法で需要家インバランス単価を決定してもよい。また、小売事業者は、インバランスが発生しないと予測される時間帯についてはプライスシグナルを設定しないようにしてもよい。すなわち、例えば、小売事業者は、インバランスが発生しないと予測される時間帯についてはプライスシグナルを0円としてもよい。 In this embodiment, the retail business operator transmits a price signal to the power management device 1, which is information determined based on the imbalance charge unit price and indicates the consumer's profit when imbalance avoidance is performed using the consumer's power resources. The price signal is, for example, information indicating the unit price of the charge paid to the consumer when the consumer cooperates in avoiding the imbalance (hereinafter referred to as the consumer imbalance unit price) for each time period. For example, the retail business operator predicts the time period in which imbalance will occur based on the supply and demand plan of the electricity managed by the retail business operator, and determines the price signal using this prediction result and the imbalance charge unit price (predicted value of the imbalance charge price) based on the market price of electricity. Although not shown in the figure, the retail business operator manages consumers and power generation facilities other than the consumers under the aggregator that manages the power management device 1 shown in FIG. 1, and the above-mentioned supply and demand plan is a supply and demand plan for the entire managed area of the retail business operator. For example, for the time period in which imbalance is predicted not to occur, the retail business operator determines the consumer imbalance unit price based on the imbalance charge unit price, and sets the determined consumer imbalance unit price as the price signal. For example, a retailer may determine the consumer imbalance unit price by multiplying the imbalance charge unit price by a set ratio, such as setting the consumer imbalance unit price at 50% of the imbalance charge unit price, or may set the consumer imbalance unit price at a price obtained by subtracting a fixed amount from the imbalance charge unit price, or may determine the consumer imbalance unit price by a method other than these. In addition, a retailer may not set a price signal for time periods when no imbalance is predicted to occur. That is, for example, a retailer may set the price signal to 0 yen for time periods when no imbalance is predicted to occur.

また、小売事業者におけるプライスシグナルの決定方法は、上述した例に限定されず、「インバランス回避に必要な調整要発電機の発電単価(単価)」>「アグリゲータが管理する需要家の発電単価」となるように、プライスシグナルが決定されてもよい。なお、アグリゲータが管理する需要家の発電単価は、発電機によって発電される場合の単価だけでなく、需要を抑制することによるみかけ上の発電の単価も含む。例えば、小売事業者は、「アグリゲータが管理する需要家の発電単価」を、複数パターン、プライスシグナルとして電力管理装置1へ送信し、電力管理装置1は、複数パターンのプライスシグナルを用いて需要家の発電設備の発電計画を作成する。小売事業者は、電力管理装置1から受信した発電計画と、調整要発電機の発電計画とを比較し、コストの安い方の発電計画を採用する。 In addition, the method of determining the price signal at the retailer is not limited to the above example, and the price signal may be determined so that the "power generation unit price (unit price) of the adjustment-required generator necessary to avoid imbalance" is greater than the "power generation unit price of the consumer managed by the aggregator." The power generation unit price of the consumer managed by the aggregator includes not only the unit price when power is generated by a generator, but also the apparent unit price of power generation by suppressing demand. For example, the retailer transmits the "power generation unit price of the consumer managed by the aggregator" to the power management device 1 as multiple patterns of price signals, and the power management device 1 creates a power generation plan for the consumer's power generation equipment using the multiple patterns of price signals. The retailer compares the power generation plan received from the power management device 1 with the power generation plan of the adjustment-required generator, and adopts the power generation plan with the lower cost.

電力管理装置1は、プライスシグナルを用いて、電力の需要量または供給量を調整可能な需要家の負担するコストを抑制するように需要家設備3の運転計画を作成する。例えば、電力管理装置1は、需要家設備3の計量装置、パワーコンディショナなどから受信した計測値を実績値として取得し、取得した実績値を用いて発電量および電力消費量を予測し、予測結果と電力の料金に関する情報とを用いて、需要家設備3の運転計画を作成する。電力の料金に関する情報は、各需要家の契約している料金プランに応じた時間帯別の電気料金の単価と、小売事業者装置2から取得するプライスシグナルとを含む。電力管理装置1は、需要家ごとの運転計画と当該運転計画に対応する料金情報とを小売事業者装置2へ送信する。電力管理装置1が送信する料金情報は、各需要家の電気料金の精算の条件を示す情報である。 The power management device 1 uses the price signal to create an operation plan for the consumer equipment 3 so as to suppress the costs borne by consumers who can adjust the amount of electricity demand or supply. For example, the power management device 1 acquires measurement values received from the metering device, power conditioner, etc. of the consumer equipment 3 as actual values, predicts the amount of electricity generated and consumed using the acquired actual values, and creates an operation plan for the consumer equipment 3 using the prediction results and information on electricity rates. The information on electricity rates includes the unit price of electricity by time period according to the rate plan subscribed to by each consumer, and the price signal acquired from the retailer device 2. The power management device 1 transmits the operation plan for each consumer and the rate information corresponding to the operation plan to the retailer device 2. The rate information transmitted by the power management device 1 is information indicating the conditions for settling the electricity rate for each consumer.

本実施の形態では、このように、電力管理装置1が、小売事業者から提示されたプライスシグナルを用いて需要家の負担するコストを抑制するように運転計画を作成するため、需要家のメリットを考慮しつつインバランスの発生を抑制する運転計画を作成することができる。これにより、需要家のインバランス回避への協力を促進することができる。 In this embodiment, the power management device 1 creates an operation plan using the price signal presented by the retailer to reduce the costs borne by consumers, so that an operation plan can be created that reduces the occurrence of imbalances while taking into account the benefits to consumers. This can encourage consumers to cooperate in avoiding imbalances.

図1に示すように、本実施の形態の電力管理装置1は、需要家情報記憶部11、設備情報記憶部12、インバランス情報取得部13、計画作成部14、計画決定部15、計画記憶部16、制御実行部17、実績値取得部18、需要実績値記憶部19、需要予測部20および計画情報送信部21を備える。 As shown in FIG. 1, the power management device 1 of this embodiment includes a consumer information storage unit 11, a facility information storage unit 12, an imbalance information acquisition unit 13, a plan creation unit 14, a plan determination unit 15, a plan storage unit 16, a control execution unit 17, an actual value acquisition unit 18, a demand actual value storage unit 19, a demand forecasting unit 20, and a plan information transmission unit 21.

需要家情報記憶部11は、需要家ごとの料金に関する情報である需要家情報を記憶する。需要家情報は、契約内容に応じた時間帯別の電気料金の単価を示す情報を含む。需要家情報は、インバランスの回避への協力に関する許容条件を示す許容情報を含んでいてもよい。許容条件を定めていない需要家、すなわちどのようなインバランスの回避にも応じる需要家については許容情報として制約無であることを示す情報が格納される。また、インバランスの回避に応じない需要家については、許容情報としてインバランスの回避に応じないことを示す情報が格納される。需要家設備3が複数の設備を含む場合には設備ごとに許容条件が定められてもよい。時間帯別の電気料金の単価を示す情報は、需要家に対応する料金プランを示す情報であってもよいし、時間帯別の電気料金の単価そのものを示す情報であってもよい。前者の場合には、需要家情報記憶部11は、料金プランごとの時間帯別の電気料金の単価を示す料金プラン情報を記憶する。また、アグリゲータが管理する全需要家が同一の料金プランである場合には、当該料金プランの時間帯別の電気料金の単価を示す料金プラン情報が需要家情報記憶部11に格納されればよく、需要家料金情報は許容情報だけを含んでいてもよいし、需要家料金情報自体が用いられなくてもよい。需要家料金情報は、オペレータによって図示しない入力手段を用いて入力されることで需要家情報記憶部11に格納されてもよいし、他の装置から送信され需要家情報記憶部11に格納されてもよい。 The consumer information storage unit 11 stores consumer information, which is information regarding charges for each consumer. The consumer information includes information indicating the unit price of electricity by time period according to the contract contents. The consumer information may include tolerance information indicating tolerance conditions for cooperation in avoiding imbalance. For consumers who do not specify tolerance conditions, that is, consumers who agree to avoid any imbalance, information indicating no restrictions is stored as tolerance information. For consumers who do not agree to avoid imbalance, information indicating that they do not agree to avoid imbalance is stored as tolerance information. When the consumer equipment 3 includes multiple facilities, tolerance conditions may be set for each facility. The information indicating the unit price of electricity by time period may be information indicating a rate plan corresponding to the consumer, or may be information indicating the unit price of electricity by time period itself. In the former case, the consumer information storage unit 11 stores rate plan information indicating the unit price of electricity by time period for each rate plan. Furthermore, if all consumers managed by the aggregator are on the same rate plan, rate plan information indicating the unit price of electricity for each time period for that rate plan needs to be stored in the consumer information storage unit 11, and the consumer rate information may include only tolerance information, or the consumer rate information itself may not be used. The consumer rate information may be stored in the consumer information storage unit 11 by being input by an operator using an input means (not shown), or may be transmitted from another device and stored in the consumer information storage unit 11.

設備情報記憶部12は、需要家ごとの需要家設備3に関する情報である設備情報を記憶する。設備情報には、例えば、蓄電池を所有する需要家に関しては、蓄電池の容量、SOC(State Of Charge:充電状態)の上下限値、蓄電池を制御するパワーコンディショナの定格値などを含み、太陽光発電設備を所有する需要家に関しては太陽光発電設備の定格値などを含む。設備情報は、オペレータによって図示しない入力手段を用いて入力されることで設備情報記憶部12に格納されてもよいし、他の装置から送信され設備情報記憶部12に格納されてもよい。 The equipment information storage unit 12 stores equipment information, which is information about the consumer equipment 3 for each consumer. For example, for a consumer who owns a storage battery, the equipment information includes the capacity of the storage battery, upper and lower limits of the SOC (State Of Charge), and the rated value of the power conditioner that controls the storage battery, and for a consumer who owns a solar power generation facility, the equipment information includes the rated value of the solar power generation facility. The equipment information may be stored in the equipment information storage unit 12 by being input by an operator using an input means (not shown), or may be transmitted from another device and stored in the equipment information storage unit 12.

インバランス情報取得部13は、小売事業者装置2からプライスシグナルを受信し、受信したプライスシグナルを計画作成部14へ出力する。 The imbalance information acquisition unit 13 receives a price signal from the retailer device 2 and outputs the received price signal to the plan creation unit 14.

計画作成部14と計画決定部15とは運転計画作成部22を構成する。運転計画作成部22は、需要家の料金プランに応じた時間帯別の電気料金の単価である契約単価と、プライスシグナルと、需要予測部20による予測結果とを用いて、一定期間において需要家がインバランス回避に対応する電力リソースの運転を行う場合の利益に関する指標を算出する。運転計画作成部22は、指標を用いて一定期間において需要家がインバランス回避を行うか否かを判定し、この判定の結果に基づいて需要家の電力リソースの運転計画を作成する。具体的には、運転計画作成部22は、指標に基づいて、インバランス回避を行うことで需要家が利益を得られる場合、需要家がインバランス回避に対応する運転が反映された運転計画を作成する。なお、図1に示した例では、計画作成部14と計画決定部15とを分けているが計画決定部15と計画作成部14とを一体化させた運転計画作成部22を備えてもよい。 The plan creation unit 14 and the plan determination unit 15 constitute the operation plan creation unit 22. The operation plan creation unit 22 calculates an index related to the profit when the consumer operates the power resource corresponding to the imbalance avoidance in a certain period of time using the contract unit price, which is the unit price of the electricity rate by time period according to the consumer's rate plan, the price signal, and the prediction result by the demand prediction unit 20. The operation plan creation unit 22 uses the index to determine whether the consumer will avoid the imbalance in a certain period of time, and creates an operation plan for the consumer's power resource based on the result of this determination. Specifically, the operation plan creation unit 22 creates an operation plan that reflects the consumer's operation corresponding to the imbalance avoidance based on the index when the consumer can obtain a profit by avoiding the imbalance. Note that in the example shown in FIG. 1, the plan creation unit 14 and the plan determination unit 15 are separate, but the operation plan creation unit 22 may be provided with an operation plan that integrates the plan determination unit 15 and the plan creation unit 14.

計画作成部14は、需要予測部20による予測結果を示す予測情報と、需要家情報記憶部11に記憶されている需要家情報と、設備情報記憶部12に記憶されている設備情報と、インバランス情報取得部13から受け取ったプライスシグナルとを用いて、需要家ごとに、需要家設備3のうちの電力リソースの一定期間の運転計画を作成する。電力リソースは、電力の調整が可能な設備であり、例えば蓄電池、発電設備を含むが、負荷設備の電力を調整可能な場合には負荷設備であってもよい。一定期間は、例えば、翌日1日分であるがこれに限定されず、2日分であってもよいし、1週間分であってもよい。以下では、一定期間は、翌日1日分であるとして説明する。 The plan creation unit 14 uses the forecast information indicating the forecast results by the demand forecast unit 20, the consumer information stored in the consumer information storage unit 11, the equipment information stored in the equipment information storage unit 12, and the price signal received from the imbalance information acquisition unit 13 to create an operation plan for a certain period of time for the power resources of the consumer equipment 3 for each consumer. The power resources are equipment capable of adjusting power, and include, for example, storage batteries and power generation equipment, but may also be load equipment if the power of the load equipment is adjustable. The certain period is, for example, one day until the next day, but is not limited to this, and may be two days or one week. In the following description, the certain period is one day until the next day.

具体的には、計画作成部14は、インバランス回避を行わない場合の需要家設備3の運転計画である第1リソース運転計画と、インバランス回避を行った場合の需要家設備3の運転計画である第2リソース運転計画とを作成し、計画記憶部16に格納する。第1リソース運転計画および第2リソース運転計画は、例えば、需要家の利益を最適化するように作成される。需要家の利益の最適化とは、例えば、需要家が負担する費用の最小化である。計画作成部14は、第1リソース運転計画に対応する需要家のコスト(費用)と、第2リソース運転計画に対応する需要家のコストとも計画作成部14に格納する。また、計画作成部14は、第2リソース運転計画の作成においてインバランスの回避に協力する前提でコストを計算した時間帯であるインバランス回避時間帯を示す情報についても第2リソース運転計画と対応付けて計画記憶部16に格納する。インバランス回避時間帯を示す情報は、時間帯ごとに、不足インバランスの回避、余剰インバランスの回避のどちらに対応した協力であるかを示す情報を含む。または、不足インバランスの回避と、余剰インバランスの回避とのそれぞれについて、インバランス回避時間帯を示す情報が作成されてもよい。また、計画作成部14は、計画決定部15による決定結果に基づいて需要家の需給計画を作成し、需給計画を計画記憶部16へ格納する。 Specifically, the plan creation unit 14 creates a first resource operation plan, which is an operation plan for the consumer equipment 3 when imbalance avoidance is not performed, and a second resource operation plan, which is an operation plan for the consumer equipment 3 when imbalance avoidance is performed, and stores them in the plan storage unit 16. The first resource operation plan and the second resource operation plan are created, for example, to optimize the consumer's profits. Optimizing the consumer's profits means, for example, minimizing the costs borne by the consumer. The plan creation unit 14 also stores the consumer's costs (expenses) corresponding to the first resource operation plan and the consumer's costs corresponding to the second resource operation plan in the plan creation unit 14. The plan creation unit 14 also stores information indicating the imbalance avoidance time period, which is a time period in which costs are calculated on the premise of cooperation in imbalance avoidance in the creation of the second resource operation plan, in the plan storage unit 16 in association with the second resource operation plan. The information indicating the imbalance avoidance time period includes information indicating whether the cooperation corresponds to the avoidance of a shortage imbalance or the avoidance of a surplus imbalance for each time period. Alternatively, information indicating the imbalance avoidance time period may be created for each of the avoidance of shortage imbalance and the avoidance of surplus imbalance. In addition, the plan creation unit 14 creates a supply and demand plan for the consumer based on the determination result by the plan determination unit 15, and stores the supply and demand plan in the plan storage unit 16.

計画決定部15は、需要家ごとに、第1リソース運転計画および第2リソース運転計画のそれぞれのコストを用いて、第1リソース運転計画と第2リソース運転計画とのうちいずれを用いるかを決定し、決定結果を計画作成部14へ通知する。詳細には、第1リソース運転計画に対応するコストと、第2リソース運転計画に対応するコストとの差である指標を用いて、需要家がインバランス回避を行うか否かを判定し、この判定結果に基づいて需要家の電力リソースの運転計画を決定する。この指標は、一定期間において需要家がインバランス回避に対応する電力リソースの運転を行う場合の利益に関する指標であり、具体的には、例えば、上述したコストの差である。計画決定部15は、第1リソース運転計画および第2リソース運転計画のうち、決定した運転計画を計画記憶部16に残し、他方の運転計画を削除する。 The plan determination unit 15 uses the respective costs of the first resource operation plan and the second resource operation plan to determine, for each consumer, whether to use the first resource operation plan or the second resource operation plan, and notifies the plan creation unit 14 of the determination result. In detail, the plan determination unit 15 uses an index that is the difference between the cost corresponding to the first resource operation plan and the cost corresponding to the second resource operation plan to determine whether the consumer will avoid imbalance, and determines the operation plan of the consumer's power resources based on this determination result. This index is an index related to the profit when the consumer operates power resources corresponding to imbalance avoidance for a certain period of time, and specifically, for example, is the above-mentioned cost difference. The plan determination unit 15 leaves the determined operation plan of the first resource operation plan or the second resource operation plan in the plan storage unit 16, and deletes the other operation plan.

制御実行部17は、計画記憶部16に格納されている運転計画に基づいて、電力リソースである需要家設備3を制御する。図1に示すように、制御実行部17は、指令値作成部171と、指令値送信部172とを備える。指令値作成部171は、例えば、需要家設備3のうち蓄電池に関しては、制御周期ごとに、蓄電池を制御するパワーコンディショナから実績値取得部18が取得した充放電電力の実績値である計測値と、計画記憶部16に格納されている運転計画とに基づいてフィードバック制御を行うことで蓄電池の充放電の指令値を作成する。指令値は、充電電力または放電電力自体であってもよいし、充電電力を増加させる量または放電電力を増加させる量であってもよい。指令値送信部172は、指令値作成部171が作成した指令値を需要家設備3へ送信する。制御周期は、例えば、1分であり計測値も1分ごとに取得されるが、制御周期はこの例に限定されない。また、需要家設備3の制御方法はこの例に限定されない。 The control execution unit 17 controls the consumer equipment 3, which is a power resource, based on the operation plan stored in the plan storage unit 16. As shown in FIG. 1, the control execution unit 17 includes a command value creation unit 171 and a command value transmission unit 172. For example, for a storage battery among the consumer equipment 3, the command value creation unit 171 creates a command value for charging and discharging the storage battery by performing feedback control for each control period based on the measurement value, which is the actual value of the charging and discharging power acquired by the actual value acquisition unit 18 from the power conditioner that controls the storage battery, and the operation plan stored in the plan storage unit 16. The command value may be the charging power or the discharging power itself, or may be the amount by which the charging power is increased or the amount by which the discharging power is increased. The command value transmission unit 172 transmits the command value created by the command value creation unit 171 to the consumer equipment 3. The control period is, for example, one minute, and the measurement value is also acquired every minute, but the control period is not limited to this example. In addition, the control method of the consumer equipment 3 is not limited to this example.

実績値取得部18は、需要家設備3の計量装置から、電力量の計測値を取得し、電力量計測値として需要実績値記憶部19に格納する。また、実績値取得部18は、需要家設備3から発電量の計測値を取得し、取得した計測値を発電量計測値として需要実績値記憶部19に格納する。発電量の計測値は、発電量だけを計測している計量装置によって取得されたものであってもよいし、太陽光発電設備におけるパワーコンディショナの計測値などのように発電設備が計測した計測値であってもよい。さらに、実績値取得部18は、制御実行部17による制御対象となる需要家設備3に関する計測値を需要家設備3から取得し、当該計測値を制御実行部17へ出力する。例えば、実績値取得部18は、需要家設備3のうち蓄電池の充放電電力の計測値を取得し、取得した計測値を制御実行部17へ出力する。 The actual value acquisition unit 18 acquires the measured value of the amount of power from the metering device of the consumer equipment 3 and stores the measured value of the amount of power in the demand actual value storage unit 19. The actual value acquisition unit 18 also acquires the measured value of the amount of power generated from the consumer equipment 3 and stores the acquired measured value in the demand actual value storage unit 19 as the measured value of the amount of power generated. The measured value of the amount of power generated may be acquired by a metering device that measures only the amount of power generated, or may be a measured value measured by a power generation facility such as a measured value of a power conditioner in a solar power generation facility. Furthermore, the actual value acquisition unit 18 acquires a measured value related to the consumer equipment 3 that is to be controlled by the control execution unit 17 from the consumer equipment 3 and outputs the measured value to the control execution unit 17. For example, the actual value acquisition unit 18 acquires a measured value of the charging and discharging power of a storage battery in the consumer equipment 3 and outputs the acquired measured value to the control execution unit 17.

需要予測部20は、需要家の電力需要の実績値を用いて、運転計画の作成対象の期間である一定期間の需要家の電力需要を予測する。需要実績値記憶部19に格納されている電力量計測値および発電量計測値を用いて、需要および発電量を予測する。需要予測部20は、図1に示すように、発電量予測部201と、需要カーブ作成部202とを備える。発電量予測部201は、需要実績値記憶部19に格納されている発電量計測値を用いて、運転計画の作成対象の一定期間における時間帯ごとの発電量を予測し、予測した発電量を予測情報として計画作成部14へ出力する。なお、発電量の予測には、図示しない気象情報提供装置などから取得された天気、日射量などの予報情報が用いられてもよい。需要カーブ作成部202は、需要実績値記憶部19に格納されている電力量計測値を用いて一定期間における時間帯ごとの消費電力である需要カーブを予測し、予測した需要カーブを予測情報として計画作成部14へ出力する。需要カーブ作成部202は、例えば、曜日ごと、または平日と土日および祝日との区分ごとに、時間帯ごとに算出した平均値を需要カーブとしてもよいし、さらに、気温ごとに区分した時間帯ごとに算出した平均値を需要カーブとしてもよい。発電量の予測方法、および需要カーブの予測方法は、上述した例に限定されず、どのような方法が用いられてもよい。なお、需要家設備3に発電設備が含まれていない需要家に関しては、需要予測部20は、需要カーブを予測すればよい。 The demand forecasting unit 20 uses the actual value of the power demand of the consumer to predict the power demand of the consumer for a certain period of time, which is the period for which the operation plan is to be created. The demand and power generation are predicted using the power amount measurement value and the power generation amount measurement value stored in the demand actual value storage unit 19. As shown in FIG. 1, the demand forecasting unit 20 includes a power generation amount prediction unit 201 and a demand curve creation unit 202. The power generation amount prediction unit 201 predicts the power generation amount for each time period for the certain period for which the operation plan is to be created using the power generation amount measurement value stored in the demand actual value storage unit 19, and outputs the predicted power generation amount to the plan creation unit 14 as prediction information. Note that, forecast information such as weather and solar radiation amount acquired from a weather information providing device (not shown) may be used to predict the power generation amount. The demand curve creation unit 202 predicts a demand curve, which is the power consumption for each time period for a certain period of time, using the power amount measurement value stored in the demand actual value storage unit 19, and outputs the predicted demand curve to the plan creation unit 14 as prediction information. The demand curve creation unit 202 may, for example, take the average value calculated for each time period for each day of the week, or for each division between weekdays, Saturdays, Sundays, and holidays, as the demand curve, or may take the average value calculated for each time period divided by temperature as the demand curve. The method of predicting the amount of power generation and the method of predicting the demand curve are not limited to the above-mentioned examples, and any method may be used. Note that for consumers whose consumer facilities 3 do not include power generation facilities, the demand prediction unit 20 may predict the demand curve.

計画情報送信部21は、計画記憶部16に格納されている需要家ごとの運転計画(上述した第1リソース運転計画または第2リソース運転計画)と需給計画とを計画情報として小売事業者装置2へ送信する。このとき、計画情報送信部21は、計画記憶部16に格納されている運転計画と対応付けられたインバランス回避時間帯を示す情報が格納されている場合、すなわち計画記憶部16に格納されている運転計画が第2リソース運転計画である場合、インバランス回避時間帯を示す情報を料金情報として運転計画とともに小売事業者装置2へ送信する。また、計画情報送信部21は、計画記憶部16に格納されている運転計画がインバランス回避時間帯を示す情報と対応付けられていない場合、すなわち計画記憶部16に格納されている運転計画が第1リソース運転計画である場合、インバランス回避時間帯がないことを示す情報を料金情報として運転計画とともに小売事業者装置2へ送信する。 The plan information transmission unit 21 transmits the operation plan (the first resource operation plan or the second resource operation plan described above) and the supply and demand plan for each consumer stored in the plan storage unit 16 as plan information to the retail business device 2. At this time, if information indicating the imbalance avoidance time period associated with the operation plan stored in the plan storage unit 16 is stored, that is, if the operation plan stored in the plan storage unit 16 is the second resource operation plan, the plan information transmission unit 21 transmits the information indicating the imbalance avoidance time period as fee information together with the operation plan to the retail business device 2. Also, if the operation plan stored in the plan storage unit 16 is not associated with information indicating the imbalance avoidance time period, that is, if the operation plan stored in the plan storage unit 16 is the first resource operation plan, the plan information transmission unit 21 transmits information indicating that there is no imbalance avoidance time period as fee information together with the operation plan to the retail business device 2.

小売事業者装置2は、電力管理装置1から受信した料金情報に基づいて各需要家の電気料金を精算する。すなわち、インバランス回避に協力した時間帯がある需要家に関しては、当該時間帯の不足インバランスまたは余剰インバランスの需要家インバランス単価にしたがって精算を行う。本実施の形態では、このように、電力管理装置1が需要家インバランス単価を用いて需要家にメリットがある場合にはインバランスを回避する運転計画を作成する。これにより、小売事業者装置2は、インバランスを回避できる可能性が高くなる。したがって、不足インバランスの発生時のインバランス料金を支払うことによる損失または余剰インバランスの発生時の電力の調達価格と買取価格との差による損失とを抑制することができるとともに、需要家も利益を得ることができる。 The retail business device 2 settles the electricity charges of each consumer based on the fee information received from the power management device 1. That is, for a consumer who cooperated in imbalance avoidance during a time period, the settlement is made according to the consumer imbalance unit price for the shortage imbalance or surplus imbalance during that time period. In this embodiment, the power management device 1 uses the consumer imbalance unit price to create an operation plan that avoids imbalance when there is an advantage for the consumer. This increases the likelihood that the retail business device 2 can avoid imbalance. Therefore, it is possible to reduce losses due to paying an imbalance fee when a shortage imbalance occurs or losses due to the difference between the procurement price and the purchase price of electricity when a surplus imbalance occurs, and the consumer can also obtain a profit.

なお、図1では、電力管理装置1はアグリゲータが管理する装置である。小売事業者とアグリゲータが同一の場合は、小売事業者装置2と電力管理装置1とが一体化されていてもよい。すなわち、図1に示した電力管理装置1が、市場価格に基づくインバランス料金単価の予測値と需給計画とに基づいてプライスシグナルを設定する料金設定部を備えてもよい。この場合、インバランス情報取得部13は、料金設定部からプライスシグナルを取得する。また、電力管理装置1は、高圧需要家などの大口需要家が管理する装置であってもよい。 In FIG. 1, the power management device 1 is a device managed by the aggregator. When the retailer and the aggregator are the same, the retailer device 2 and the power management device 1 may be integrated. That is, the power management device 1 shown in FIG. 1 may include a fee setting unit that sets a price signal based on a predicted value of the imbalance fee unit price based on the market price and a supply and demand plan. In this case, the imbalance information acquisition unit 13 acquires the price signal from the fee setting unit. The power management device 1 may also be a device managed by a large consumer such as a high-voltage consumer.

次に、本実施の形態の動作について説明する。図2は、本実施の形態の電力管理装置1における運転計画作成処理手順の一例を示すフローチャートである。以下では、電力リソースが蓄電池であるとし、蓄電池の充放電計画を運転計画として作成する例を説明する。電力管理装置1の計画作成部14は、計画の作成対象の需要家を設定する(ステップS1)。例えば、計画作成部14は、あらかじめ各需要家に運転計画の作成の順序を付与しておいてもよいし、需要家の識別情報の順に運転計画を作成してもよい。ステップS1では、最初に運転計画を作成する需要家を計画の作成対象の需要家に設定する。 Next, the operation of this embodiment will be described. FIG. 2 is a flowchart showing an example of an operation plan creation process procedure in the power management device 1 of this embodiment. In the following, an example will be described in which the power resource is a storage battery, and a charge/discharge plan for the storage battery is created as an operation plan. The plan creation unit 14 of the power management device 1 sets the consumers for which the plan is to be created (step S1). For example, the plan creation unit 14 may assign an order for creating operation plans to each consumer in advance, or may create operation plans in the order of the consumer identification information. In step S1, the consumer for which an operation plan is to be created first is set as the consumer for which the plan is to be created.

次に、電力管理装置1の計画作成部14は、予測情報、設備情報および時間帯別電気料金を用いて一定期間における第1リソース運転計画を作成する(ステップS2)。詳細には、計画作成部14は、需要予測部20から受け取った予測情報と、需要家情報記憶部11に記憶されている需要家情報に含まれる計画の作成対象の需要家の料金プランに対応する時間帯別の電気料金と、設備情報記憶部12に記憶されている設備情報とを用いて、計画の作成対象の需要家の第1リソース運転計画を作成し、計画記憶部16に格納する。一定期間は、ここでは上述したように翌日の1日分であり、第1リソース運転計画は例えば30分を1コマとして48コマ分の電力リソースである蓄電池の充放電量を決定する。 Next, the plan creation unit 14 of the power management device 1 creates a first resource operation plan for a certain period of time using the forecast information, facility information, and time-of-day electricity rates (step S2). In detail, the plan creation unit 14 creates a first resource operation plan for the consumer for whom the plan is to be created, using the forecast information received from the demand forecast unit 20, the time-of-day electricity rates corresponding to the rate plan of the consumer for whom the plan is to be created, which are included in the consumer information stored in the consumer information storage unit 11, and the facility information stored in the facility information storage unit 12, and stores the plan in the plan storage unit 16. Here, the certain period is one day until the next day, as described above, and the first resource operation plan determines the charge and discharge amount of the storage battery, which is the power resource, for 48 frames, each of which is 30 minutes.

計画作成部14は、例えば、需要家の負担するコストを目的関数とし、設備情報などを制約条件として目的関数を最小化するように各時間帯の充放電量を決定することで充放電計画を作成する。目的関数は、例えば、一定期間内におけるt(tは1から48までの整数)番目の時間帯とし、需要家の料金プランにおけるt番目の時間帯の電気料金の単価をC(t)とし、需要カーブをP(t)とし、充放電量をB(t)とすると、次の式(1)のようにあらわすことができる。B(t)は充電の場合に正の値であるとし、放電の場合に負の値であるとする。なお、式(1)は太陽光発電設備などの発電設備を所有しない需要家を仮定しているが、発電設備を所有する需要家については目的関数において発電量も考慮される。目的関数は、式(1)に限定されず、他の料金なども含まれていてもよい。なお、式(1)におけるΣは1から48までの総和を示す。
目的関数=Σ{(P(t)+B(t))×C(t)} …(1)
The plan creation unit 14 creates a charge/discharge plan by determining the charge/discharge amount for each time period so as to minimize the objective function, for example, with the cost borne by the consumer as an objective function and facility information as a constraint. The objective function can be expressed as the following formula (1), for example, assuming that the t-th (t is an integer from 1 to 48) time period in a certain period, the unit price of electricity in the t-th time period in the consumer's rate plan is C(t), the demand curve is P(t), and the charge/discharge amount is B(t). B(t) is assumed to be a positive value in the case of charging and a negative value in the case of discharging. Note that formula (1) assumes a consumer who does not own a power generation facility such as a solar power generation facility, but for a consumer who owns a power generation facility, the power generation amount is also taken into account in the objective function. The objective function is not limited to formula (1) and may include other charges. Note that Σ in formula (1) indicates the sum of 1 to 48.
Objective function=Σ{(P(t)+B(t))×C(t)}...(1)

計画作成部14は、上記の目的関数を最小化するように、または上記の目的関数の値が定められた値以下となるように、各時間帯のB(t)を算出する。これにより、例えば、需要家の料金プランが昼間より夜間の方が電気料金の単価が低いプランである場合、昼間に需要家が消費する電力の一部を夜間に充電することで需要家が負担する費用を抑制することができる。なお、ここでは、目的関数を用いる例を説明するが、これに限らず、ピークシフト、ピークカットと呼ばれる制御を行うようにあらかじめ定められた規則に従って充放電計画を作成してもよい。この規則は、例えば、電気料金の高い定められた時間帯に、蓄電池を放電させ、電気料金の低い定められた時間帯に蓄電池を充電するといった規則であるが、この例に限定されない。 The plan creation unit 14 calculates B(t) for each time period so as to minimize the objective function or so as to make the value of the objective function equal to or less than a predetermined value. As a result, for example, if a consumer's rate plan has a lower unit price for electricity at night than during the day, the consumer's expenses can be reduced by charging at night some of the electricity consumed by the consumer during the day. Note that, although an example using an objective function is described here, this is not limited to this, and a charge/discharge plan may be created according to a predetermined rule to perform control called peak shifting or peak cutting. For example, this rule is a rule to discharge the storage battery during a specified time period when electricity rates are high and charge the storage battery during a specified time period when electricity rates are low, but is not limited to this example.

次に、電力管理装置1の計画作成部14は、予測情報、設備情報、時間帯別電気料金、許容条件およびプライスシグナルを用いて一定期間における第2リソース運転計画を作成する(ステップS3)。詳細には、計画作成部14は、需要予測部20から受け取った予測情報と、需要家情報記憶部11に記憶されている需要家情報に含まれる計画の作成対象の需要家の料金プランに対応する時間帯別の電気料金と、需要家情報記憶部11に記憶されている需要家情報に含まれる許容情報が示す許容条件と、設備情報記憶部12に記憶されている設備情報とを用いて、計画の作成対象の需要家の第2リソース運転計画を作成し、計画記憶部16に格納する。 Next, the plan creation unit 14 of the power management device 1 creates a second resource operation plan for a certain period of time using the forecast information, facility information, time-of-day electricity rates, tolerance conditions, and price signals (step S3). In detail, the plan creation unit 14 creates a second resource operation plan for the consumer for which the plan is to be created, using the forecast information received from the demand forecast unit 20, the time-of-day electricity rates corresponding to the rate plan of the consumer for which the plan is to be created, which are included in the consumer information stored in the consumer information storage unit 11, the tolerance conditions indicated by the tolerance information included in the consumer information stored in the consumer information storage unit 11, and the facility information stored in the facility information storage unit 12, and stores the second resource operation plan in the plan storage unit 16.

計画作成部14は、例えば、一定期間内で最も不足インバランスの需要家インバランス単価が高い時間帯に放電を行うように、放電する時間帯をずらすことで第2リソース運転計画を作成する。図3は、本実施の形態の第2リソース運転計画を説明するための図である。図3の上段には、需要家の料金プランに対応して時間帯別の電気料金の単価である契約単価51と、不足インバランスの需要家インバランス単価52とを示している。図3の上段では、横軸は時間であり、縦軸は単価である。図3の下段には、需要家の時間帯別の消費電力である需要カーブ53と、第1リソース運転計画における充電時間帯54と放電時間帯55とを示している。図3に示すように、第1リソース運転計画では、需要カーブ53のうち電気料金の単価の低い時間帯で蓄電池を充電し、需要カーブ53のうち電気料金の単価の高い時間帯で放電を行うことで需要家の負担する費用を抑制している。一方、図3に示す例では、不足インバランスの需要家インバランス単価は時刻tmからの時間帯が最も高くなっている。このため、計画作成部14は、例えば、蓄電池の放電の時間帯を、第1リソース運転計画における放電時間帯55から時刻tm以降の放電時間帯56にずらすことで第2リソース運転計画を作成する。 The plan creation unit 14 creates the second resource operation plan by shifting the time period for discharging, for example, so that discharging is performed during the time period when the consumer imbalance unit price of the shortage imbalance is the highest within a certain period. FIG. 3 is a diagram for explaining the second resource operation plan of this embodiment. The upper part of FIG. 3 shows a contract unit price 51, which is the unit price of electricity by time period corresponding to the consumer's rate plan, and a consumer imbalance unit price 52 of the shortage imbalance. In the upper part of FIG. 3, the horizontal axis is time, and the vertical axis is unit price. The lower part of FIG. 3 shows a demand curve 53, which is the consumer's power consumption by time period, and a charging time period 54 and a discharging time period 55 in the first resource operation plan. As shown in FIG. 3, in the first resource operation plan, the storage battery is charged during the time period when the unit price of the electricity rate is low on the demand curve 53, and discharged during the time period when the unit price of the electricity rate is high on the demand curve 53, thereby suppressing the cost borne by the consumer. On the other hand, in the example shown in FIG. 3, the consumer imbalance unit price of the shortage imbalance is highest in the time period from time tm. Therefore, the plan creation unit 14 creates the second resource operation plan, for example, by shifting the time period for discharging the storage battery from the discharging time period 55 in the first resource operation plan to the discharging time period 56 after time tm.

なお、ここでは、第1リソース運転計画から、インバランス回避のための変更を行った場合に、需要家インバランス単価にインバランス回避のための電力量の変更量(以下、インバランス回避変更量という)を乗じた値が小売事業者に支払われるとする。図3に示した例では、放電時間帯55と放電時間帯56とに重複があるため、放電時間帯56のうち重複する時間帯を除いた時間帯がインバランス回避時間帯であり、インバランス回避時間帯に放電される電力量が、インバランス回避変更量である。図3に示した例では、契約単価51が高い時間帯において需要家が小売事業者から買電する電力量の総量は変化しないため料金プランに基づく電気料金は第1リソース運転計画と同じであり、不足インバランスの需要家インバランス単価にインバランス回避変更量を乗算した値が利益になる。したがって、需要家が負担するコストは、料金プランに基づく電気料金から不足インバランスの需要家インバランス単価にインバランス回避変更量を乗算した値を減じた値となる。 Here, when a change is made from the first resource operation plan to avoid imbalance, the value obtained by multiplying the consumer imbalance unit price by the change in the amount of power to avoid imbalance (hereinafter referred to as the imbalance avoidance change amount) is paid to the retailer. In the example shown in FIG. 3, since there is an overlap between the discharge time period 55 and the discharge time period 56, the time period excluding the overlapping time period in the discharge time period 56 is the imbalance avoidance time period, and the amount of power discharged during the imbalance avoidance time period is the imbalance avoidance change amount. In the example shown in FIG. 3, since the total amount of power purchased by the consumer from the retailer during the time period when the contract unit price 51 is high does not change, the electricity rate based on the rate plan is the same as the first resource operation plan, and the profit is the value obtained by multiplying the consumer imbalance unit price of the shortage imbalance by the imbalance avoidance change amount. Therefore, the cost borne by the consumer is the value obtained by subtracting the value obtained by multiplying the consumer imbalance unit price of the shortage imbalance by the imbalance avoidance change amount from the electricity rate based on the rate plan.

図3に示した例では、契約単価51が高い時間帯において、不足インバランスの需要家インバランス単価が最高となっていたが、契約単価51が高い時間帯において不足インバランスの需要家インバランス単価が最高となる場合もある。このような場合には、契約単価51が低い時間帯に蓄電池の放電を行ってしまうと契約単価51が高い時間帯に放電を行うことができなくなってしまう。したがって、計画作成部14は、第1リソース運転計画で放電を行う予定であった時間帯の電気料金の単価が、不足インバランスの需要家インバランス単価より低い場合に放電時間を変更し、第1リソース運転計画で放電を行う予定であった時間帯の電気料金の単価が、不足インバランスの需要家インバランス単価以上である場合には、放電時間の変更は行わない。第1リソース運転計画で放電を行う予定であった時間帯の電気料金の単価が、不足インバランスの需要家インバランス単価以上である場合、計画作成部14は、例えば、第1リソース運転計画で放電を行う時間帯と契約単価51が同じ時間帯のなかで不足インバランスの需要家インバランス単価が最高となる時間帯に放電時間をずらすように第2リソース運転計画を作成してもよい。 In the example shown in FIG. 3, the consumer imbalance price for shortage imbalance was highest during the time period when the contract unit price 51 was high, but there are also cases where the consumer imbalance price for shortage imbalance was highest during the time period when the contract unit price 51 was high. In such a case, discharging the storage battery during the time period when the contract unit price 51 was low would make it impossible to discharge during the time period when the contract unit price 51 was high. Therefore, the plan creation unit 14 changes the discharge time when the unit price of electricity for the time period when discharge was scheduled to occur in the first resource operation plan is lower than the consumer imbalance price for shortage imbalance, and does not change the discharge time when the unit price of electricity for the time period when discharge was scheduled to occur in the first resource operation plan is equal to or higher than the consumer imbalance price for shortage imbalance. If the unit price of electricity for the time period during which discharge was scheduled to occur in the first resource operation plan is equal to or higher than the consumer imbalance unit price of the shortage imbalance, the plan creation unit 14 may create a second resource operation plan to shift the discharge time to a time period during which the consumer imbalance unit price of the shortage imbalance is the highest within the time period during which discharge is scheduled to occur in the first resource operation plan and the contract unit price 51 is the same.

また、第1リソース運転計画において、放電時間帯55において放電を行った後も、蓄電池に電力が蓄電されている場合には、放電時間帯を延長させることで第2リソース運転計画を作成してもよい。 In addition, in the first resource operation plan, if power remains stored in the storage battery even after discharging during the discharge time period 55, the second resource operation plan may be created by extending the discharge time period.

余剰インバランスに関しても、同様に、計画作成部14は、例えば、契約単価51が低い時間帯のなかで余剰インバランスのインバランス料金単価が最高となる時間帯に充電時間帯を変更することで第2リソース運転計画を作成することができる。また、計画作成部14は、第1リソース運転計画で放電を行う時間帯において余剰インバランスのインバランス料金単価が0円より大きい場合には、当該時間帯で放電を行わないように第2リソース運転計画を作成することができる。 Similarly, for the surplus imbalance, the plan creation unit 14 can create a second resource operation plan by, for example, changing the charging time period to a time period in which the imbalance fee unit price for the surplus imbalance is the highest among the time periods in which the contract unit price 51 is low. In addition, if the imbalance fee unit price for the surplus imbalance is greater than 0 yen in a time period in which discharging is performed in the first resource operation plan, the plan creation unit 14 can create a second resource operation plan in such a way that discharging is not performed in that time period.

図2の説明に戻る。計画決定部15は、第1リソース運転計画に対応するコスト(需要家が負担する費用)から第2リソース運転計画に対応するコストを減算した値がしきい値より大きいか否かを判断する(ステップS4)。しきい値は0以上の値に設定されればよい。上述したように、計画記憶部16には、第1リソース運転計画と第2リソース運転計画とがそれぞれに対応するコストとともに記憶されており、計画決定部15は、計画記憶部16を参照して、ステップS4の判定を行う。 Returning to the explanation of FIG. 2, the plan determination unit 15 judges whether the value obtained by subtracting the cost corresponding to the second resource operation plan from the cost corresponding to the first resource operation plan (cost borne by the consumer) is greater than a threshold value (step S4). The threshold value may be set to a value equal to or greater than 0. As described above, the plan memory unit 16 stores the first resource operation plan and the second resource operation plan together with their corresponding costs, and the plan determination unit 15 makes the judgment of step S4 by referring to the plan memory unit 16.

ステップS4でYesの場合、計画決定部15は、第2リソース運転計画を選択し(ステップS5)、全需要家の計算が終了したか否かを判断し(ステップS7)、全需要家の計算が終了した場合(ステップS7 Yes)、運転計画の作成処理を終了する。ステップS5では、詳細には、計画作成部14は、第2リソース運転計画を需要家の運転計画として用いると決定し、第1リソース運転計画を計画記憶部16から削除する。 If step S4 is Yes, the plan determination unit 15 selects the second resource operation plan (step S5), determines whether calculations for all consumers have been completed (step S7), and if calculations for all consumers have been completed (step S7 Yes), ends the operation plan creation process. In detail, in step S5, the plan creation unit 14 decides to use the second resource operation plan as the consumer operation plan, and deletes the first resource operation plan from the plan memory unit 16.

ステップS4でNoの場合、計画決定部15は、第1リソース運転計画を選択し(ステップS6)、処理をステップS7へ進める。ステップS6では、詳細には、計画作成部14は、第1リソース運転計画を需要家の運転計画として用いると決定し、第2リソース運転計画を計画記憶部16から削除する。 If the answer is No in step S4, the plan determination unit 15 selects the first resource operation plan (step S6) and proceeds to step S7. In detail, in step S6, the plan creation unit 14 determines to use the first resource operation plan as the consumer's operation plan and deletes the second resource operation plan from the plan memory unit 16.

ステップS7でNoの場合、計画の作成対象の需要家を変更し(ステップS8)、ステップS2からの処理が繰り返される。詳細には、計画決定部15は、計画の作成対象の需要家の変更を計画作成部14へ指示し、計画作成部14が計画の作成対象の需要家を変更する。 If the answer is No in step S7, the consumer for which the plan is to be created is changed (step S8), and the process is repeated from step S2. In detail, the plan determination unit 15 instructs the plan creation unit 14 to change the consumer for which the plan is to be created, and the plan creation unit 14 changes the consumer for which the plan is to be created.

以上の処理により、需要家の電力リソースの運転計画が作成される。なお、上述した例では、蓄電池の充放電によってインバランス回避を行う例を説明したが、需要家の消費電力すなわち需要を調整可能な場合には、消費電力を変更することで、インバランス回避を行ってもよい。この場合には、需要家が消費電力を変更可能な条件を需要家情報における許容情報として定めておく。例えば、昼間の消費電力を一定量までは一定時間ずらすことが可能な需要家の場合、この一定量と一定時間とを許容情報に含めておく。これにより、計画決定部15は、需要家が対応可能な範囲でインバランス回避を反映した第2リソース運転計画を作成することができる。なお、この場合、電力管理装置1が直接需要家の負荷を制御することができないことがあるため、需要家に第2リソース運転計画に基づいて需要家設備3の調整を行ってもよい。 The above process creates an operation plan for the consumer's power resources. In the above example, the imbalance is avoided by charging and discharging the storage battery. However, if the consumer's power consumption, i.e., demand, can be adjusted, the imbalance may be avoided by changing the power consumption. In this case, the conditions under which the consumer can change the power consumption are defined as allowable information in the consumer information. For example, in the case of a consumer that can shift the daytime power consumption up to a certain amount for a certain period of time, this certain amount and the certain period of time are included in the allowable information. This allows the plan determination unit 15 to create a second resource operation plan that reflects the imbalance avoidance to the extent that the consumer can handle. In this case, since the power management device 1 may not be able to directly control the consumer's load, the consumer may adjust the consumer equipment 3 based on the second resource operation plan.

また、例えば、蓄電池を有する需要家では、各需要家の契約している料金プランに応じた時間帯別の電気料金の単価が切り替わる時刻から充電を開始するように運転スケジュールが定められることがあるが、計画作成部14は、蓄電池の容量などの制約条件を満たす範囲で蓄電池の充電を開始する時刻を後ろにずらすことで、第2リソース運転計画を作成してもよい。 For example, in a consumer with a storage battery, an operation schedule may be set so that charging starts from the time when the unit price of electricity varies by time period according to the rate plan subscribed to by each consumer. The plan creation unit 14 may create a second resource operation plan by shifting the time when charging of the storage battery starts to a later time within a range that satisfies constraints such as the capacity of the storage battery.

なお、プライスシグナルは、時間帯別電気料金の単価として与えられてもよい。この場合、トータルの支払額が、インバランスの回避に協力した方がインバランスの回避に協力しない場合より多くならないように、プライスシグナルが設定される。例えば、通常の契約で定められた単価が、昼間が25円であり、夜間が10円である場合に、プライスシグナルとして、昼間が40円、夜間が20円といったように設定すると、プライスシグナルを採用するとピークシフトによる利益は、通常の電気料金を採用した場合より多くなるが、トータルの電気料金はプライスシグナルを採用しない場合より増えてしまうため、このように設定はしない。なお、プライスシグナルの定義およびプライスシグナルを用いた料金の計算方法は上述した例に限定されず、計画作成部14は、小売事業者によって設定されたプライスシグナルの定義およびプライスシグナルを用いた料金の計算方法に応じて、第2リソース運転計画に対応するコストを計算すればよい。 The price signal may be given as a unit price of electricity charges by time period. In this case, the price signal is set so that the total payment amount for those who cooperate in avoiding the imbalance is not higher than those who do not cooperate in avoiding the imbalance. For example, if the unit price set in the normal contract is 25 yen during the day and 10 yen at night, and the price signal is set to 40 yen during the day and 20 yen at night, the profit from peak shifting will be higher when the price signal is adopted than when the normal electricity rate is adopted, but the total electricity rate will be higher than when the price signal is not adopted, so this setting is not used. The definition of the price signal and the method of calculating the fee using the price signal are not limited to the above example, and the plan creation unit 14 may calculate the cost corresponding to the second resource operation plan according to the definition of the price signal set by the retailer and the method of calculating the fee using the price signal.

図4は、余剰インバランスの回避を行う場合の第2リソース運転計画の一例を示す図である。図4に示した例では、上段に余剰インバランスの需要家インバランス単価57を示している。図4の下段には、第1リソース運転計画58と第2リソース運転計画59とを示している。この場合、計画決定部15は、需要家インバランス単価57が設定されている時間帯で需要家の消費電力を増加させその分に別の時間帯で消費電力を低下させている。これにより、需要家は余剰インバランスの需要家インバランス単価に応じた利益を得ることができる。 Figure 4 is a diagram showing an example of a second resource operation plan when avoiding excess imbalance. In the example shown in Figure 4, the upper part shows the consumer imbalance unit price 57 of the excess imbalance. The lower part of Figure 4 shows a first resource operation plan 58 and a second resource operation plan 59. In this case, the plan determination unit 15 increases the consumer's power consumption during the time period in which the consumer imbalance unit price 57 is set, and reduces the power consumption by that amount during another time period. This allows the consumer to obtain a profit according to the consumer imbalance unit price of the excess imbalance.

次に、本実施の形態の電力管理装置1のハードウェア構成について説明する。本実施の形態の電力管理装置1は、コンピュータシステム上で、電力管理装置1における処理が記述されたコンピュータプログラムであるプログラムが実行されることにより、コンピュータシステムが電力管理装置1として機能する。図5は、本実施の形態の電力管理装置1を実現するコンピュータシステムの構成例を示す図である。図5に示すように、このコンピュータシステムは、制御部101と入力部102と記憶部103と表示部104と通信部105と出力部106とを備え、これらはシステムバス107を介して接続されている。 Next, the hardware configuration of the power management device 1 of this embodiment will be described. In this embodiment, the power management device 1 functions as the power management device 1 by executing a computer program on the computer system, which is a computer program that describes the processing in the power management device 1. FIG. 5 is a diagram showing an example of the configuration of a computer system that realizes the power management device 1 of this embodiment. As shown in FIG. 5, this computer system includes a control unit 101, an input unit 102, a memory unit 103, a display unit 104, a communication unit 105, and an output unit 106, which are connected via a system bus 107.

図5において、制御部101は、例えば、CPU(Central Processing Unit)等のプロセッサであり、本実施の形態の電力管理装置1における処理が記述されたプログラムを実行する。入力部102は、たとえばキーボード、マウスなどで構成され、コンピュータシステムの使用者が、各種情報の入力を行うために使用する。記憶部103は、RAM(Random Access Memory),ROM(Read Only Memory)などの各種メモリおよびハードディスクなどのストレージデバイスを含み、上記制御部101が実行すべきプログラム、処理の過程で得られた必要なデータ、などを記憶する。また、記憶部103は、プログラムの一時的な記憶領域としても使用される。表示部104は、ディスプレイ、LCD(液晶表示パネル)などで構成され、コンピュータシステムの使用者に対して各種画面を表示する。通信部105は、通信処理を実施する受信機および送信機である。出力部106は、プリンタ、スピーカなどである。なお、図5は、一例であり、コンピュータシステムの構成は図5の例に限定されない。 In FIG. 5, the control unit 101 is a processor such as a CPU (Central Processing Unit), and executes a program in which the processing in the power management device 1 of this embodiment is described. The input unit 102 is composed of, for example, a keyboard, a mouse, and the like, and is used by the user of the computer system to input various information. The storage unit 103 includes various memories such as a RAM (Random Access Memory) and a ROM (Read Only Memory), and a storage device such as a hard disk, and stores the program to be executed by the control unit 101, necessary data obtained in the process of processing, and the like. The storage unit 103 is also used as a temporary storage area for the program. The display unit 104 is composed of a display, an LCD (Liquid Crystal Display Panel), and the like, and displays various screens to the user of the computer system. The communication unit 105 is a receiver and a transmitter that perform communication processing. The output unit 106 is a printer, a speaker, and the like. Note that FIG. 5 is an example, and the configuration of the computer system is not limited to the example of FIG. 5.

ここで、本実施の形態のプログラムが実行可能な状態になるまでのコンピュータシステムの動作例について説明する。上述した構成をとるコンピュータシステムには、たとえば、図示しないCD(Compact Disc)-ROMドライブまたはDVD(Digital Versatile Disc)-ROMドライブにセットされたCD-ROMまたはDVD-ROMから、コンピュータプログラムが記憶部103にインストールされる。そして、プログラムの実行時に、記憶部103から読み出されたプログラムが記憶部103の主記憶領域に格納される。この状態で、制御部101は、記憶部103に格納されたプログラムに従って、本実施の形態の電力管理装置1としての処理を実行する。 Here, an example of the operation of the computer system until the program of this embodiment is in a state where it can be executed will be described. In the computer system having the above-mentioned configuration, for example, a computer program is installed in the storage unit 103 from a CD-ROM or DVD-ROM set in a CD (Compact Disc)-ROM drive or DVD (Digital Versatile Disc)-ROM drive (not shown). Then, when the program is executed, the program read from the storage unit 103 is stored in the main memory area of the storage unit 103. In this state, the control unit 101 executes the processing as the power management device 1 of this embodiment according to the program stored in the storage unit 103.

なお、上記の説明においては、CD-ROMまたはDVD-ROMを記録媒体として、電力管理装置1における処理を記述したプログラムを提供しているが、これに限らず、コンピュータシステムの構成、提供するプログラムの容量などに応じて、たとえば、通信部105を経由してインターネットなどの伝送媒体により提供されたプログラムを用いることとしてもよい。 In the above description, a program describing the processing in the power management device 1 is provided on a CD-ROM or DVD-ROM as a recording medium. However, this is not limiting, and depending on the configuration of the computer system and the capacity of the program provided, for example, a program provided over a transmission medium such as the Internet via the communication unit 105 may be used.

本実施の形態の電力管理プログラムは、例えば、コンピュータシステムに、プライスシグナルを取得するステップと、需要家の電力需要の実績値を用いて、一定期間の需要家の電力需要を予測するステップと、をコンピュータシステムに実行させる。本実施の形態の電力管理プログラムは、さらに、需要家の料金プランに応じた時間帯別の電気料金の単価である契約単価と、プライスシグナルと、電力需要の予測結果とを用いて、一定期間において需要家がインバランス回避に対応する電力リソースの運転を行う場合の利益に関する指標を算出し、指標を用いて一定期間において需要家がインバランス回避を行うか否かを判定し、この判定の結果に基づいて需要家の電力リソースの運転計画を作成するステップ、をコンピュータシステムに実行させる。 The power management program of this embodiment causes the computer system to execute, for example, the steps of acquiring a price signal and predicting the power demand of a consumer for a certain period of time using the actual value of the consumer's power demand. The power management program of this embodiment further causes the computer system to execute the steps of calculating an index relating to the profit when the consumer operates power resources corresponding to imbalance avoidance during a certain period of time using a contract unit price, which is the unit price of electricity by time period according to the consumer's rate plan, the price signal, and the predicted result of power demand, determining whether the consumer will avoid imbalance during the certain period of time using the index, and creating an operation plan for the consumer's power resources based on the result of this determination.

図1に示した計画作成部14、計画決定部15、制御実行部17および需要予測部20は、図5に示した記憶部103に記憶されたコンピュータプログラムが図5に示した制御部101により実行されることにより実現される。図1に示した計画作成部14、計画決定部15、制御実行部17および需要予測部20の実現には、図5に示した記憶部103も用いられる。図1に示した需要家情報記憶部11、設備情報記憶部12、計画記憶部16および需要実績値記憶部19は、図5に示した記憶部103の一部である。図1に示したインバランス情報取得部13、実績値取得部18および計画情報送信部21は、図5に示した通信部105により実現される。また、電力管理装置1は複数のコンピュータシステムにより実現されてもよい。例えば、電力管理装置1は、クラウドコンピュータシステムにより実現されてもよい。 The plan creation unit 14, the plan determination unit 15, the control execution unit 17, and the demand forecast unit 20 shown in FIG. 1 are realized by executing the computer program stored in the storage unit 103 shown in FIG. 5 by the control unit 101 shown in FIG. 5. The storage unit 103 shown in FIG. 5 is also used to realize the plan creation unit 14, the plan determination unit 15, the control execution unit 17, and the demand forecast unit 20 shown in FIG. 1. The consumer information storage unit 11, the equipment information storage unit 12, the plan storage unit 16, and the demand actual value storage unit 19 shown in FIG. 1 are part of the storage unit 103 shown in FIG. 5. The imbalance information acquisition unit 13, the actual value acquisition unit 18, and the plan information transmission unit 21 shown in FIG. 1 are realized by the communication unit 105 shown in FIG. 5. The power management device 1 may also be realized by multiple computer systems. For example, the power management device 1 may be realized by a cloud computer system.

以上述べたように、本実施の形態では、電力管理装置1が、小売事業者から提示されたプライスシグナルを用いて需要家の負担するコストを抑制するように需要家の電力リソースの運転計画を作成する。このため、需要家のメリットを考慮しつつインバランスの発生を抑制することができ、これにより、需要家のインバランス回避への協力を促進することができる。 As described above, in this embodiment, the power management device 1 creates an operation plan for the consumer's power resources using the price signal presented by the retailer to reduce the costs borne by the consumer. This makes it possible to reduce the occurrence of imbalances while taking into account the consumer's benefits, thereby encouraging consumers to cooperate in avoiding imbalances.

以上の実施の形態に示した構成は、一例を示すものであり、別の公知の技術と組み合わせることも可能であるし、実施の形態同士を組み合わせることも可能であるし、要旨を逸脱しない範囲で、構成の一部を省略、変更することも可能である。 The configurations shown in the above embodiments are merely examples, and may be combined with other known technologies, or the embodiments may be combined with each other. In addition, parts of the configurations may be omitted or modified without departing from the spirit of the invention.

1 電力管理装置、2 小売事業者装置、3 需要家設備、4 電力管理システム、11 需要家情報記憶部、12 設備情報記憶部、13 インバランス情報取得部、14 計画作成部、15 計画決定部、16 計画記憶部、17 制御実行部、18 実績値取得部、19 需要実績値記憶部、20 需要予測部、21 計画情報送信部、22 運転計画作成部、171 指令値作成部、172 指令値送信部、201 発電量予測部、202 需要カーブ作成部。 1 Power management device, 2 Retail business device, 3 Customer equipment, 4 Power management system, 11 Customer information storage unit, 12 Equipment information storage unit, 13 Imbalance information acquisition unit, 14 Plan creation unit, 15 Plan decision unit, 16 Plan storage unit, 17 Control execution unit, 18 Actual value acquisition unit, 19 Demand actual value storage unit, 20 Demand forecast unit, 21 Plan information transmission unit, 22 Operation plan creation unit, 171 Command value creation unit, 172 Command value transmission unit, 201 Power generation forecast unit, 202 Demand curve creation unit.

Claims (10)

インバランス料金単価に基づいて決定される情報であって需要家の電力リソースを用いてインバランス回避が行われた場合の需要家の利益の単価時間帯ごとに示した情報であるプライスシグナル、を取得するインバランス情報取得部と、
前記需要家の電力需要の実績値を用いて、一定期間の前記需要家の電力需要を予測する需要予測部と、
前記需要家ごとに、前記需要家の料金プランに応じた時間帯別の電気料金の単価である契約単価と、前記プライスシグナルと、前記需要予測部による予測結果とを用いて、前記一定期間において前記需要家がインバランス回避に対応する前記電力リソースの運転を行う場合の利益に関する指標を算出し、前記指標を用いて前記一定期間において前記需要家がインバランス回避を行うか否かを判定し、この判定の結果に基づいて前記需要家の電力リソースの前記一定期間における前記需要家ごとの運転計画を作成する運転計画作成部と、
を備えることを特徴とする電力管理装置。
an imbalance information acquisition unit that acquires a price signal, which is information determined based on the imbalance charge unit price and indicates the unit price of a consumer's profit for each time period when imbalance avoidance is performed using the consumer's power resources;
A demand forecasting unit that forecasts the electric power demand of the consumer for a certain period of time using an actual value of the electric power demand of the consumer;
an operation plan creation unit that calculates , for each consumer, an index related to a profit when the consumer operates the power resource corresponding to imbalance avoidance during the certain period using a contract unit price, which is a unit price of electricity by time period according to the consumer's rate plan, the price signal, and a prediction result by the demand prediction unit, determines whether the consumer will avoid imbalance during the certain period using the index, and creates an operation plan for the consumer's power resource during the certain period based on the result of this determination;
A power management device comprising:
前記電力リソースは、蓄電池を含むことを特徴とする請求項1に記載の電力管理装置。 The power management device according to claim 1, characterized in that the power resource includes a storage battery. 前記指標は、インバランス回避に対応する前記電力リソースの運転を行わない場合とインバランス回避に対応する前記電力リソースの運転を行う場合との前記需要家が負担するコストの差であることを特徴とする請求項1または2に記載の電力管理装置。 The power management device according to claim 1 or 2, characterized in that the index is the difference in cost borne by the consumer between a case where the power resource corresponding to the imbalance avoidance is not operated and a case where the power resource corresponding to the imbalance avoidance is operated. 前記運転計画作成部は、前記指標に基づいて、前記インバランス回避を行うことで前記需要家が利益を得られる場合、前記需要家がインバランス回避に対応する運転が反映された前記運転計画を作成することを特徴とする請求項1から3のいずれか1つに記載の電力管理装置。 The power management device according to any one of claims 1 to 3, characterized in that the operation plan creation unit creates the operation plan that reflects the operation of the consumer to avoid the imbalance when the consumer can benefit from avoiding the imbalance based on the index. 前記インバランス料金単価に基づいて、前記プライスシグナルを決定する料金設定部、
を備えることを特徴とする請求項1から4のいずれか1つに記載の電力管理装置。
a fee setting unit that determines the price signal based on the imbalance fee unit price;
5. The power management device according to claim 1, further comprising:
前記運転計画に基づいて、前記電力リソースを制御する制御実行部、
を備えることを特徴とする請求項1から5のいずれか1つに記載の電力管理装置。
a control execution unit that controls the power resources based on the operation plan;
6. The power management device according to claim 1, further comprising:
前記一定期間は、翌日の一日であることを特徴とする請求項1から6のいずれか1つに記載の電力管理装置。7. The power management device according to claim 1, wherein the certain period is a day from the next day. 前記プライスシグナルは、前記インバランス料金単価に定められた比率を乗じることにより決定されることを特徴とする請求項1から7のいずれか1つに記載の電力管理装置。8. The power management device according to claim 1, wherein the price signal is determined by multiplying the imbalance fee unit price by a predetermined ratio. インバランス料金単価に基づいて決定される情報であって需要家の電力リソースを用いてインバランス回避が行われた場合の需要家の利益の単価時間帯ごとに示した情報であるプライスシグナル、を決定する小売事業者装置と、
前記需要家の前記電力リソースの運転計画を作成する電力管理装置と、
を備え、
前記電力管理装置は、
前記プライスシグナルを前記小売事業者装置から取得するインバランス情報取得部と、
前記需要家の電力需要の実績値を用いて、一定期間の前記需要家の電力需要を予測する需要予測部と、
前記需要家ごとに、前記需要家の料金プランに応じた時間帯別の電気料金の単価である契約単価と、前記プライスシグナルと、前記需要予測部による予測結果とを用いて、前記一定期間において前記需要家がインバランス回避に対応する前記電力リソースの運転を行う場合の利益に関する指標を算出し、前記指標を用いて前記一定期間において前記需要家がインバランス回避を行うか否かを判定し、この判定の結果に基づいて前記需要家の電力リソースの前記一定期間における前記需要家ごとの運転計画を作成する運転計画作成部と、
を備えることを特徴とする電力管理システム。
a retailer device that determines a price signal, which is information determined based on an imbalance charge unit price and indicates a unit price of a consumer's profit for each time period when imbalance avoidance is performed using the consumer's power resources;
A power management device that creates an operation plan for the power resource of the consumer;
Equipped with
The power management device includes:
an imbalance information acquisition unit that acquires the price signal from the retailer device;
A demand forecasting unit that forecasts the electric power demand of the consumer for a certain period of time using an actual value of the electric power demand of the consumer;
an operation plan creation unit that calculates , for each consumer, an index related to a profit when the consumer operates the power resource corresponding to imbalance avoidance during the certain period using a contract unit price, which is a unit price of electricity by time period according to the consumer's rate plan, the price signal, and a prediction result by the demand prediction unit, determines whether the consumer will avoid imbalance during the certain period using the index, and creates an operation plan for the consumer's power resource during the certain period based on the result of this determination;
A power management system comprising:
コンピュータシステムに、
インバランス料金単価に基づいて決定される情報であって需要家の電力リソースを用いてインバランス回避が行われた場合の需要家の利益の単価時間帯ごとに示した情報であるプライスシグナル、を取得するステップと、
前記需要家の電力需要の実績値を用いて、一定期間の前記需要家の電力需要を予測するステップと、
前記需要家ごとに、前記需要家の料金プランに応じた時間帯別の電気料金の単価である契約単価と、前記プライスシグナルと、前記電力需要の予測結果とを用いて、前記一定期間において前記需要家がインバランス回避に対応する前記電力リソースの運転を行う場合の利益に関する指標を算出し、前記指標を用いて前記一定期間において前記需要家がインバランス回避を行うか否かを判定し、この判定の結果に基づいて前記需要家の電力リソースの前記一定期間における前記需要家ごとの運転計画を作成するステップと、
を実行させることを特徴とする電力管理プログラム。
In the computer system,
A step of acquiring a price signal, which is information determined based on the imbalance charge unit price and indicates the unit price of a consumer's profit for each time period when imbalance avoidance is performed using the consumer's power resources;
forecasting the power demand of the consumer for a certain period of time using an actual value of the power demand of the consumer;
a step of calculating, for each consumer, an index relating to the profit when the consumer operates the power resource corresponding to imbalance avoidance during the certain period using a contract unit price, which is a unit price of electricity by time period according to the consumer's rate plan, the price signal, and the forecast result of the power demand, determining whether the consumer will avoid imbalance during the certain period using the index, and creating an operation plan for the consumer's power resource during the certain period based on the result of this determination;
A power management program that causes a power management system to execute the above steps.
JP2021207885A 2021-12-22 2021-12-22 Power management device, power management system, and power management program Active JP7660494B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021207885A JP7660494B2 (en) 2021-12-22 2021-12-22 Power management device, power management system, and power management program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021207885A JP7660494B2 (en) 2021-12-22 2021-12-22 Power management device, power management system, and power management program

Publications (2)

Publication Number Publication Date
JP2023092709A JP2023092709A (en) 2023-07-04
JP7660494B2 true JP7660494B2 (en) 2025-04-11

Family

ID=87000659

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021207885A Active JP7660494B2 (en) 2021-12-22 2021-12-22 Power management device, power management system, and power management program

Country Status (1)

Country Link
JP (1) JP7660494B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004007856A (en) 2002-04-08 2004-01-08 Enesaabu Kk Power supply system and method
JP2018205871A (en) 2017-05-31 2018-12-27 三菱重工業株式会社 ADJUSTMENT METHOD, CONTROL DEVICE, POWER ADJUSTMENT SYSTEM, AND PROGRAM
JP2019033566A (en) 2017-08-04 2019-02-28 日本電信電話株式会社 Power control system, supply source power system, control device, and power control method
JP2021128711A (en) 2020-02-17 2021-09-02 株式会社東芝 Electric power processing system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004007856A (en) 2002-04-08 2004-01-08 Enesaabu Kk Power supply system and method
JP2018205871A (en) 2017-05-31 2018-12-27 三菱重工業株式会社 ADJUSTMENT METHOD, CONTROL DEVICE, POWER ADJUSTMENT SYSTEM, AND PROGRAM
JP2019033566A (en) 2017-08-04 2019-02-28 日本電信電話株式会社 Power control system, supply source power system, control device, and power control method
JP2021128711A (en) 2020-02-17 2021-09-02 株式会社東芝 Electric power processing system

Also Published As

Publication number Publication date
JP2023092709A (en) 2023-07-04

Similar Documents

Publication Publication Date Title
Aghajani et al. Operational scheduling of electric vehicles parking lot integrated with renewable generation based on bilevel programming approach
JP6838792B2 (en) Control device, control system, control device operation method and program
US11196263B2 (en) Systems and methods for managing energy storing resources of an electrical power grid
US20160125339A1 (en) Demand-supply planning device, demand-supply planning method, demand-supply planning program, and recording medium
Giordano et al. Comprehensive aggregator methodology for evs in v2g operations and electricity markets
CN110503309B (en) Electric vehicle charging scheduling method based on active demand response
JP7289810B2 (en) Power trading support device, power trading support method and program
EP4037144A1 (en) Regional energy management device and regional energy management method
KR102364812B1 (en) Method of optimum power demand management using electric car and System thereof
JP2023504564A (en) Systems and devices for aggregating distributed energy resources
JP6996494B2 (en) Power controllers, power control methods, and programs
TWI769074B (en) A method of managing electric vehicle charging based on blockchain
JP2017199273A (en) Supply-demand planning device, supply-demand planning method and program
US12288988B2 (en) Method and apparatus for controlling power grid member behavior
Kanwhen et al. Energy storage systems for commercial buildings in dense urban regions: NYC case study
JPWO2017094138A1 (en) Power management apparatus, power management system, evaluation method, and program
JP7660494B2 (en) Power management device, power management system, and power management program
JP7756691B2 (en) Power Distribution System
Saha et al. Profit Maximization of Distribution Network Stakeholders Facilitating EV Demands With Adaptive Demand Side Management Policies
KR102840407B1 (en) System for Transacting P2P Energy to Minimize Uncertainty Cost and Energy Cost
Bjørndal et al. End-User Flexibility in the Local Electricity Grid–Blurring the Vertical Separation of Market and Monopoly?
Eltwam et al. Optimizing Industrial Energy Costs with V2G and EV Infrastructure: A Case Study in Russia
Anggraini et al. Monte Carlo Simulation of Electric Vehicle Charging Schemes for an Ev Aggregator Offering Ancillary Services Under Grid Limitations
TWI824957B (en) Power management method for grid-connected microgrid
JP7329993B2 (en) power management device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20231201

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240821

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240903

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20241031

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20241107

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250304

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250401

R150 Certificate of patent or registration of utility model

Ref document number: 7660494

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150