JP7669249B2 - Precast prestressed concrete deck structure and construction method - Google Patents
[go: Go Back, main page]

JP7669249B2 - Precast prestressed concrete deck structure and construction method - Google Patents

Precast prestressed concrete deck structure and construction method Download PDF

Info

Publication number
JP7669249B2
JP7669249B2 JP2021179574A JP2021179574A JP7669249B2 JP 7669249 B2 JP7669249 B2 JP 7669249B2 JP 2021179574 A JP2021179574 A JP 2021179574A JP 2021179574 A JP2021179574 A JP 2021179574A JP 7669249 B2 JP7669249 B2 JP 7669249B2
Authority
JP
Japan
Prior art keywords
members
precast concrete
precast
pca
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021179574A
Other languages
Japanese (ja)
Other versions
JP2023068444A (en
Inventor
健一 中積
一博 西村
博胤 谷口
誠孝 中村
大樹 中島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Mitsui Construction Co Ltd
Original Assignee
Sumitomo Mitsui Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Mitsui Construction Co Ltd filed Critical Sumitomo Mitsui Construction Co Ltd
Priority to JP2021179574A priority Critical patent/JP7669249B2/en
Publication of JP2023068444A publication Critical patent/JP2023068444A/en
Application granted granted Critical
Publication of JP7669249B2 publication Critical patent/JP7669249B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Bridges Or Land Bridges (AREA)

Description

本発明は、橋軸方向に対して斜角を有する橋台の端支点付近に配置されたプレキャストプレストレストコンクリート床版構造に関する。 The present invention relates to a precast prestressed concrete deck structure arranged near the end supports of an abutment that is at an oblique angle to the bridge axis direction.

コンクリート床版を構築する際に、工期の短縮や品質の安定のためにプレキャストコンクリート(以下、「PCa」と記す)部材が用いられる場合がある。また、鉄筋コンクリート構造は、引張力を鉄筋で負担するため、コンクリート表面に細かいひび割れが生じる。ひび割れから橋面の凍結融解剤の塩分が浸透し、鉄筋に腐食が生じる懸念がある。そこで、引張力によってコンクリートにひび割れが生じることを防ぐために、床版構造のPCa部材にプレストレスを与える場合がある(例えば、非特許文献1~3)。 When constructing a concrete deck, precast concrete (hereinafter referred to as "PCa") members are sometimes used to shorten construction time and stabilize quality. In addition, in reinforced concrete structures, the tensile force is borne by the reinforcing bars, which causes fine cracks to form on the concrete surface. There is a concern that salt from the freeze-thaw agent on the bridge surface will seep through the cracks and cause corrosion of the reinforcing bars. Therefore, in order to prevent cracks from forming in the concrete due to tensile forces, prestress is sometimes applied to the PCa members of the deck structure (for example, non-patent documents 1 to 3).

非特許文献1~3に記載の床版構造は、橋台部で斜角を有している。このため、非特許文献1及び2に記載の床版構造では、伸縮装置に隣接する箇所の一部が、現場打ちの鉄筋コンクリートによって構成されている。非特許文献3に記載の床版構造では、斜め方向に延在するPCaを端部に配置し、標準部との間を場所打ちコンクリートとしている。 The deck structures described in Non-Patent Documents 1 to 3 have an oblique angle at the abutment. For this reason, in the deck structures described in Non-Patent Documents 1 and 2, a portion of the area adjacent to the expansion device is constructed from cast-in-place reinforced concrete. In the deck structure described in Non-Patent Document 3, PCa extending diagonally is placed at the end, and the area between it and the standard section is made of cast-in-place concrete.

IHI技法、Vol.56、No.1(2016年)、pp.56-64IHI Technique, Vol. 56, No. 1 (2016), pp. 56-64 プレストレストコンクリート工学会 第29回シンポジウム論文集(2020年)、pp.577-580Proceedings of the 29th Symposium of the Japan Society of Prestressed Concrete Engineering (2020), pp. 577-580 プレストレストコンクリート工学会 第29回シンポジウム論文集(2020年)、pp.573-576Proceedings of the 29th Symposium of the Japan Society of Prestressed Concrete Engineering (2020), pp. 573-576

非特許文献1及び2に記載の床版構造は、現場打ちの鉄筋コンクリート部に、耐久性等の品質の劣る部分が生じるおそれや、ひび割れが生じて鉄筋に腐食が生じるおそれがあった。 The deck structures described in Non-Patent Documents 1 and 2 had the risk of the cast-in-place reinforced concrete sections having poor quality, such as poor durability, or of cracks causing corrosion of the reinforcing bars.

非特許文献3に記載の斜め方向に延在するPCa部材は、床版を主桁に支持された版として主桁直交方向に設計を行う本来の設計方法に適合しない。また、PCa部材を斜め方向に設計すると、プレキャストプレストレストコンクリート床版に配置する緊張材の効率が下がる、仮置き時や吊り上げ時にねじりが生じる、1枚当たりのPCa部材の長さが長くなるので運搬が困難になる、等の問題があった。 The diagonally extending PCa members described in Non-Patent Document 3 do not conform to the original design method of designing the deck as a deck supported by the main girder in a direction perpendicular to the main girder. In addition, designing the PCa members diagonally reduces the efficiency of the tension members placed in the precast prestressed concrete deck, causes twisting when temporarily placed or lifted, and makes transportation difficult because each PCa member is longer.

本発明は、以上の背景に鑑み、橋軸方向に対して斜角を有する橋台の端支点付近に配置されたプレキャストプレストレストコンクリート床版構造及びその構築方法において、斜め方向に延在するPCa部材を使用せず、伸縮装置の近傍のコンクリート部分にひび割れが生じることを抑制できる床版構造及びその構築方法を提供することを課題とする。 In view of the above background, the present invention aims to provide a precast prestressed concrete deck structure and a construction method thereof that is arranged near the end support of an abutment that has an oblique angle with respect to the bridge axis direction, and that can suppress the occurrence of cracks in the concrete portion near the expansion joint without using PCa members that extend diagonally.

上記課題を解決するために本発明のある態様は、橋軸方向に対して斜角を有する橋台に設置された伸縮装置(3)に隣接して配置されたプレキャストプレストレストコンクリート床版構造(1,31)であって、橋幅方向又は前記橋軸方向に延在する複数の傾斜部プレキャストコンクリート部材(6,32)であって、平面視で前記伸縮装置(3)の近傍で前記伸縮装置(3)の延在方向に沿って延在する斜辺(11)を有し、互いに隣接する前記傾斜部プレキャストコンクリート部材(6,32)と、前記伸縮装置(3)の延在方向に延在し、前記伸縮装置(3)の近傍で前記傾斜部プレキャストコンクリート部材(6,32)の全てに挿入された斜め方向緊張材(7)とを備える。 In order to solve the above problem, one aspect of the present invention is a precast prestressed concrete deck structure (1, 31) arranged adjacent to an expansion device (3) installed on an abutment having an oblique angle with respect to the bridge axis direction, and includes a plurality of inclined precast concrete members (6, 32) extending in the bridge width direction or the bridge axis direction, the inclined precast concrete members (6, 32) adjacent to each other and having oblique sides (11) extending along the extension direction of the expansion device (3) near the expansion device (3) in a plan view, and diagonal tension members (7) extending in the extension direction of the expansion device (3) and inserted into all of the inclined precast concrete members (6, 32) near the expansion device (3).

この態様によれば、斜辺を有する傾斜部プレキャストコンクリート部材を用いることにより、橋幅方向に傾斜して延在するPCa部材を用いる必要がなくなる。また、斜辺を有する傾斜部プレキャストコンクリート部材に斜め方向緊張材によってプレストレスが導入されているため、伸縮装置の近傍において、床版構造のコンクリート部分にひび割れが生じることや、このひび割れに起因する鉄筋の腐食を抑制することができる。 According to this aspect, by using a precast concrete member with an inclined side, it is not necessary to use a PCa member that extends at an angle in the width direction of the bridge. In addition, because prestress is introduced into the precast concrete member with an inclined side by a diagonal tension member, it is possible to suppress cracks occurring in the concrete part of the deck structure near the expansion joint and corrosion of the reinforcing bars caused by these cracks.

上記の態様のプレキャストプレストレストコンクリート床版構造(1)において、複数の前記傾斜部プレキャストコンクリート部材(6)は、前記橋幅方向に延在し、前記橋軸方向に互いに隣接しても良い。 In the precast prestressed concrete deck structure (1) of the above embodiment, the multiple inclined precast concrete members (6) may extend in the bridge width direction and be adjacent to each other in the bridge axis direction.

この態様によれば、傾斜部プレキャストコンクリート部材の延在方向長さによって、各々の傾斜部プレキャストコンクリート部材の架設位置を容易に把握でき、施工管理が容易となる。 According to this aspect, the installation position of each inclined precast concrete member can be easily determined based on the extension length of the inclined precast concrete member, making construction management easier.

上記の態様のプレキャストプレストレストコンクリート床版構造(1)において、前記傾斜部プレキャストコンクリート部材(6)は、前記橋軸方向における最も前記伸縮装置側に配置され、平面視で概ね三角形形状をなす最端部プレキャストコンクリート部材(12)と、前記最端部プレキャストコンクリート部材(12)よりも前記橋軸方向の中央に配置された、平面視で概ね台形形状をなす中間部プレキャストコンクリート部材(13)とを含み、前記中間部プレキャストコンクリート部材(13)の各々は、前記橋幅方向に延在する橋幅方向緊張材(10)を含む。 In the precast prestressed concrete deck structure (1) of the above embodiment, the inclined precast concrete members (6) include end precast concrete members (12) that are positioned closest to the expansion device in the bridge axis direction and have a roughly triangular shape in plan view, and intermediate precast concrete members (13) that are positioned more centrally in the bridge axis direction than the end precast concrete members (12) and have a roughly trapezoidal shape in plan view, and each of the intermediate precast concrete members (13) includes a bridge width direction tension member (10) that extends in the bridge width direction.

この態様によれば、橋幅方向緊張材によって、クレーンによる中間部プレキャストコンクリート部材の架設時に、中間部プレキャストコンクリート部材のコンクリート部分にひび割れが生じることを抑制できる。 According to this aspect, the bridge width direction tendons can prevent cracks from occurring in the concrete portion of the intermediate precast concrete member when the intermediate precast concrete member is erected by a crane.

上記の態様のプレキャストプレストレストコンクリート床版構造(1)において、前記最端部プレキャストコンクリート部材(12)及び前記中間部プレキャストコンクリート部材(13)の、平面視で前記斜辺(11)と前記橋幅方向に延在する辺とによって形成される隅部において、該両辺の延長線が鋭角に交わる箇所は、前記橋幅方向に交差する面で面取りされた形状の面取り部(15)をなし、前記斜め方向緊張材(7)の1本は、前記面取り部(15)を通っても良い。 In the precast prestressed concrete deck structure (1) of the above embodiment, in the corners of the end precast concrete member (12) and the intermediate precast concrete member (13) formed by the oblique side (11) and the side extending in the bridge width direction in a plan view, the points where the extension lines of both sides intersect at an acute angle form chamfered portions (15) that are chamfered at the surface that intersects in the bridge width direction, and one of the diagonal tension members (7) may pass through the chamfered portion (15).

この態様によれば、面取り部を設けることにより、斜め方向緊張材を傾斜部プレキャストコンクリート部材における伸縮装置に近い位置に配置でき、斜め方向緊張材及び鉄筋を均等に配置することができる。 According to this aspect, by providing a chamfered portion, the diagonal tension member can be positioned close to the expansion device in the inclined precast concrete member, and the diagonal tension member and reinforcing bar can be evenly positioned.

上記の態様のプレキャストプレストレストコンクリート床版構造(31)において、複数の前記傾斜部プレキャストコンクリート部材(32)は、前記橋軸方向に延在し、主桁上で前記橋幅方向に互いに隣接しても良い。 In the precast prestressed concrete deck structure (31) of the above embodiment, the multiple inclined precast concrete members (32) may extend in the bridge axis direction and be adjacent to each other in the bridge width direction on the main girder.

この態様によれば、傾斜部プレキャストコンクリート部材が、上述の最端部プレキャストコンクリート部材に比べて大きくできるため、施工効率が良い。 According to this aspect, the inclined precast concrete member can be made larger than the end-most precast concrete member described above, which improves construction efficiency.

上記の態様のプレキャストプレストレストコンクリート床版構造(31)において、前記傾斜部プレキャストコンクリート部材(32)の各々は、前記橋軸方向に延在する橋軸方向緊張材(35)を含んでも良い。 In the precast prestressed concrete deck structure (31) of the above embodiment, each of the inclined precast concrete members (32) may include a bridge axis direction tension member (35) extending in the bridge axis direction.

この態様によれば、橋軸方向緊張材によってプレストレスが導入されているため、クレーンによる架設時に、傾斜部プレキャストコンクリート部材にひび割れが生じることが抑制される。 According to this aspect, prestress is introduced by the bridge axial tension members, which prevents cracks from occurring in the inclined precast concrete members during erection by a crane.

上記の態様のプレキャストプレストレストコンクリート床版構造(31)において、前記橋軸方向において前記斜め方向緊張材(7)とは反対側に配置され、前記橋幅方向に平行に延在し、前記傾斜部プレキャストコンクリート部材の全てに挿入された横方向緊張材(33)と、前記橋軸方向における前記斜め方向緊張材(7)と前記横方向緊張材(33)との間に配置され、前記橋幅方向に対して、前記斜め方向緊張材(7)よりも小さな角度で傾いた中間部緊張材(34)とを更に備えても良い。 The precast prestressed concrete deck structure (31) of the above embodiment may further include a lateral tension member (33) that is arranged on the opposite side of the diagonal tension member (7) in the bridge axis direction, extends parallel to the bridge width direction, and is inserted into all of the inclined precast concrete members, and an intermediate tension member (34) that is arranged between the diagonal tension member (7) and the lateral tension member (33) in the bridge axis direction and is inclined at an angle smaller than the diagonal tension member (7) with respect to the bridge width direction.

この態様によれば、横方向緊張材及び中間部緊張材を用いてプレストレスを導入することにより、伸縮装置3から離れた部分のコンクリートのひび割れとひび割れに起因する鉄筋の腐食とが抑制される。 According to this embodiment, by introducing prestress using the lateral tendons and intermediate tendons, cracking of the concrete in the area away from the expansion device 3 and corrosion of the reinforcing bars caused by the cracking are suppressed.

上記の態様のプレキャストプレストレストコンクリート床版構造(31)において、複数の前記傾斜部プレキャストコンクリート部材は、複数の第1傾斜部プレキャストコンクリート部材と、延在方向の長さが前記第1傾斜部プレキャストコンクリート部材の延在方向長さよりも短い第2傾斜部プレキャストコンクリート部材とを含み、前記中間部緊張材(34)は、前記傾斜部プレキャストコンクリート部材(32)の全てに挿入された第1中間部緊張材(34a)と2以上の前記第1傾斜部プレキャストコンクリート部材(32)に挿入され、前記第2傾斜部プレキャストコンクリート部材(32)には挿入されない第2中間部緊張材(34b)とを含んでもよい。 In the precast prestressed concrete deck structure (31) of the above-mentioned aspect, the multiple inclined portion precast concrete members include multiple first inclined portion precast concrete members and second inclined portion precast concrete members whose length in the extension direction is shorter than the length in the extension direction of the first inclined portion precast concrete members, and the intermediate tension members (34) may include a first intermediate tension member (34a) inserted into all of the inclined portion precast concrete members (32) , and a second intermediate tension member (34b) inserted into two or more of the first inclined portion precast concrete members (32) and not inserted into the second inclined portion precast concrete members (32).

この態様によれば、中間部緊張材の設置間隔を所定の範囲に収めることができる。 This allows the installation interval of the intermediate tension members to be kept within a specified range.

本発明のある態様は、橋軸方向に対して斜角を有する橋台に設置された伸縮装置(3)に隣接して配置されたプレキャストプレストレストコンクリート床版構造(1,31)の構築方法であって、橋幅方向又は前記橋軸方向に延在する複数の傾斜部プレキャストコンクリート(PCa)部材(6,32)であって、平面視で前記伸縮装置(3)の近傍で前記伸縮装置(3)の延在方向に沿って延在する斜辺(11)を有する前記傾斜部プレキャストコンクリート部材(6,32)を、互いに隣接するように主桁(2)上に配置するステップと、前記伸縮装置(3)の延在方向に平行に延在し、かつ前記傾斜部プレキャストコンクリート部材(6,32)の全てを通るように、前記傾斜部プレキャストコンクリート部材(6,32)における前記伸縮装置(3)の近傍に斜め方向緊張材(7)を挿入するステップと、前記斜め方向緊張材(7)を緊張するステップとを備える。 One aspect of the present invention is a method for constructing a precast prestressed concrete deck structure (1, 31) adjacent to an expansion device (3) installed on an abutment having an oblique angle with respect to the bridge axis direction, comprising the steps of: arranging a plurality of inclined precast concrete (PCa) members (6, 32) extending in the bridge width direction or the bridge axis direction, the inclined precast concrete members (6, 32) having oblique sides (11) extending along the extension direction of the expansion device (3) in the vicinity of the expansion device (3) in a plan view, adjacent to each other on the main girder (2); inserting diagonal tension members (7) in the vicinity of the expansion device (3) in the inclined precast concrete members (6, 32) so that the diagonal tension members (7) extend parallel to the extension direction of the expansion device (3) and pass through all of the inclined precast concrete members (6, 32); and tensioning the diagonal tension members (7).

この態様によれば、斜辺を有する傾斜部プレキャストコンクリート部材を用いることにより、橋幅方向に傾斜して延在するPCa部材を用いる必要がなくなる。また、斜辺を有する傾斜部プレキャストコンクリート部材に斜め方向緊張材によってプレストレスが導入されるため、伸縮装置の近傍において、床版構造のコンクリート部分にひび割れが生じることや、このひび割れに起因する鉄筋の腐食を抑制することができる。 According to this aspect, by using a precast concrete member with an inclined side, it is not necessary to use a PCa member that extends at an angle in the width direction of the bridge. In addition, because prestress is introduced into the precast concrete member with an inclined side by a diagonal tension member, it is possible to suppress cracks occurring in the concrete part of the deck structure near the expansion joint and corrosion of the reinforcing bars caused by these cracks.

上記の態様のプレキャストプレストレストコンクリート床版構造(1)の構築方法において、複数の前記傾斜部プレキャストコンクリート部材(6)は、前記橋幅方向に延在し、かつ前記橋軸方向に互いに隣接し、前記傾斜部プレキャストコンクリート部材(6)は、前記橋軸方向における最も前記伸縮装置(3)側に配置されて1本の前記主桁(2)上に配置される最端部プレキャストコンクリート部材(12)と、2本以上の前記主桁(2)上に配置される中間部プレキャストコンクリート部材(13)とを含み、前記配置するステップは、建設現場に運搬後に、前記最端部プレキャストコンクリート部材(12)と、前記最端部プレキャストコンクリート部材(12)に隣接する1つの前記中間部プレキャストコンクリート部材(13)とを、互いに連結してから前記主桁(2)上に配置することを含んでも良い。 In the method for constructing the precast prestressed concrete deck structure (1) of the above aspect, the plurality of inclined precast concrete members (6) extend in the bridge width direction and are adjacent to each other in the bridge axis direction, and the inclined precast concrete members (6) include an end precast concrete member (12) that is disposed closest to the expansion joint (3) in the bridge axis direction and disposed on one of the main girders (2), and an intermediate precast concrete member (13) that is disposed on two or more of the main girders (2), and the disposing step may include, after transportation to the construction site, connecting the end precast concrete member (12) and one of the intermediate precast concrete members (13) adjacent to the end precast concrete member (12) to each other and then disposing them on the main girders (2).

この態様によれば、単独では主桁上で安定し難い最端部プレキャストコンクリート部材を中間部プレキャストコンクリート部材に連結してから架設することにより、床版構造の構築途中においても、最端部プレキャストコンクリート部材が主桁上で安定する。 According to this aspect, the end-most precast concrete member, which is difficult to stabilize on the main girder by itself, is connected to the middle precast concrete member before erection, so that the end-most precast concrete member is stable on the main girder even during construction of the deck structure.

上記の態様のプレキャストプレストレストコンクリート床版構造(1)の構築方法において、複数の前記傾斜部プレキャストコンクリート部材(6)は、前記橋幅方向に延在し、かつ前記橋軸方向に互いに隣接し、前記傾斜部プレキャストコンクリート部材(6)は、2本以上の前記主桁(2)上に配置され、前記配置するステップと前記挿入するステップの間に行われる、前記伸縮装置(3)に隣接し、かつ1本の前記主桁(2)上に配置される現場打ちコンクリート部(12')を構築するステップを更に含み、前記挿入するステップにおいて、前記斜め方向緊張材(7)は、前記現場打ちコンクリート部(12')にも挿入されても良い。 In the method for constructing the precast prestressed concrete deck structure (1) of the above aspect, the plurality of inclined precast concrete members (6) extend in the bridge width direction and are adjacent to each other in the bridge axis direction, the inclined precast concrete members (6) are placed on two or more of the main girders (2), and the method further includes a step of constructing a cast-in-place concrete section (12') adjacent to the expansion device (3) and placed on one of the main girders (2) between the placing step and the inserting step, and in the inserting step, the diagonal tendons (7) may also be inserted into the cast-in-place concrete section (12').

この態様によれば、現場打ちコンクリート部を支保工等によって主桁2上で安定させることができるとともに、現場打ちコンクリート部にプレストレスを導入してひび割れや鉄筋の腐食を抑制することができる。 According to this embodiment, the cast-in-place concrete section can be stabilized on the main girder 2 by using shoring or the like, and prestress can be introduced into the cast-in-place concrete section to suppress cracks and corrosion of the reinforcing bars.

上記の態様のプレキャストプレストレストコンクリート床版構造(1,31)の構築方法において、前記緊張するステップの前に行われる、複数の前記傾斜部プレキャストコンクリート部材(6,32)の間にPCa部材間間詰コンクリート(19)を打設するステップを更に備え、前記主桁(2)は、前記PCa部材間間詰コンクリート(19)に埋設されるずれ止め部材を含んでも良い。 The method for constructing the precast prestressed concrete deck structure (1, 31) of the above aspect further includes a step of pouring PCa member inter-part concrete (19) between the plurality of inclined precast concrete members (6, 32) prior to the tensioning step, and the main girder (2) may include a slip-stop member embedded in the PCa member inter-part concrete (19).

この態様によれば、PCa部材間間詰コンクリートを打設してから斜め方向緊張材を緊張するため、ずれ止め部材がPCa部材間間詰コンクリートに埋設される位置にあっても施工可能である。 According to this embodiment, the diagonal tensioning member is tensioned after pouring the filler concrete between the PCa members, so construction is possible even if the anti-slip member is located in a position where it is embedded in the filler concrete between the PCa members.

上記の態様のプレキャストプレストレストコンクリート床版構造(1,31)の構築方法において、前記緊張するステップの後に行われる、複数の前記傾斜部プレキャストコンクリート部材(6,32)の間にPCa部材間間詰コンクリート(19)を打設するステップを更に備え、前記主桁は、前記PCa部材間間詰コンクリート(19)に埋設されるずれ止め部材を含まなくても良い。 The method for constructing the precast prestressed concrete deck structure (1, 31) of the above aspect further includes a step of pouring PCa member inter-part concrete (19) between the plurality of inclined precast concrete members (6, 32) after the tensioning step, and the main girder does not need to include a slip stopper member embedded in the PCa member inter-part concrete (19).

この態様によれば、斜め方向緊張材を緊張した後に、PCa部材間間詰コンクリートを打設するため、斜め方向緊張材を緊張する際に、床版構造は主桁から拘束力を受けない。 According to this embodiment, the filler concrete is poured between the PCa members after the diagonal tendons are tensioned, so the deck structure is not subjected to a restraining force from the main girder when the diagonal tendons are tensioned.

以上の態様によれば、橋幅方向に対して傾斜して延在する伸縮装置に隣接して配置されたプレキャストプレストレストコンクリート床版構造及びその構築方法において、斜め方向に延在するPCa部材を使用せず、伸縮装置の近傍のコンクリート部分にひび割れが生じることを抑制できる床版構造及びその構築方法を提供することができる。 According to the above aspects, in a precast prestressed concrete deck structure arranged adjacent to an expansion joint that extends at an angle relative to the width direction of the bridge, and a method for constructing the same, it is possible to provide a deck structure and a method for constructing the same that can suppress the occurrence of cracks in the concrete portion near the expansion joint without using PCa members that extend diagonally.

第1実施形態に係る床版構造の平面図Plan view of the deck structure according to the first embodiment 図1におけるII-II断面の配筋図Reinforcement diagram of II-II section in Figure 1 第2実施形態に係る床版構造の平面図Plan view of the deck structure according to the second embodiment

以下、図面を参照して、本発明の実施形態について説明する。図1及び図2は、第1実施形態に係るプレキャストプレストレストコンクリート床版構造(以下、「床版構造」と記す)1を示す。 Hereinafter, an embodiment of the present invention will be described with reference to the drawings. Figures 1 and 2 show a precast prestressed concrete slab structure (hereinafter, referred to as "slab structure") 1 according to the first embodiment.

床版構造1は、主桁2上に配置され、橋軸方向に対して斜角を有する橋台(図示せず)に設置された伸縮装置3に隣接している。主桁2は、例えば、橋軸方向に延在して、橋幅方向に互いに離間した複数の鋼桁によって構成される。主桁2は、その上面から上方に向かって突出した頭付きスタッド等のずれ止め部材(図示せず)を有し、床版構造1は、ずれ止め部材を埋設する合成床版であっても良い。伸縮装置3は、橋台(図示せず)と床版構造1との間に設置され、その延在方向は、平面視で橋幅方向に対して傾斜している。ここで、「橋幅方向」は、床版構造1の上面に平行であり、かつ橋軸方向に直交する方向である。 The deck structure 1 is disposed on the main girder 2 and is adjacent to an expansion device 3 installed on an abutment (not shown) that is at an oblique angle to the bridge axis direction. The main girder 2 is, for example, composed of multiple steel girders extending in the bridge axis direction and spaced apart from each other in the bridge width direction. The main girder 2 has a slip prevention member (not shown) such as a headed stud protruding upward from its upper surface, and the deck structure 1 may be a composite deck in which the slip prevention member is embedded. The expansion device 3 is installed between the abutment (not shown) and the deck structure 1, and its extension direction is inclined to the bridge width direction in a plan view. Here, the "bridge width direction" is a direction parallel to the upper surface of the deck structure 1 and perpendicular to the bridge axis direction.

床版構造1は、平面視で矩形をなす複数の通常部PCa部材5と、伸縮装置3及び通常部PCa部材5の間に配置されるとともに、伸縮装置3に隣接して配置された複数の傾斜部PCa部材6と、伸縮装置3の延在方向に沿って配置された斜め方向緊張材7と、間詰コンクリート8とを備える。複数の通常部PCa部材5の内、傾斜部PCa部材6に隣接する通常部PCa部材5の橋軸方向の中間部よりも伸縮装置3側が、打ち下ろし(床版の下面の増厚部)となっている。 The deck structure 1 comprises a plurality of regular PCa members 5 that are rectangular in plan view, a plurality of inclined PCa members 6 that are arranged between the expansion device 3 and the regular PCa members 5 and adjacent to the expansion device 3, diagonal tension members 7 arranged along the extension direction of the expansion device 3, and infill concrete 8. Of the multiple regular PCa members 5, the regular PCa members 5 adjacent to the inclined PCa members 6 are downcast (thickened part of the underside of the deck) on the expansion device 3 side from the middle part in the bridge axis direction.

通常部PCa部材5は、橋軸方向及び橋幅方向に延在するように上下2段に配置された鉄筋9と、橋幅方向に延在するように上下2段に配置された橋幅方向緊張材10とを含む。橋幅方向緊張材10は、通常部PCa部材5の橋幅方向の全長に渡って延在し、緊張した状態で通常部PCa部材5のコンクリート部分に定着している。 The normal PCa member 5 includes reinforcing bars 9 arranged in two tiers, one above the other, so as to extend in the bridge axis direction and the bridge width direction, and bridge width direction tension members 10 arranged in two tiers, one above the other, so as to extend in the bridge width direction. The bridge width direction tension members 10 extend over the entire length of the normal PCa member 5 in the bridge width direction, and are fixed in a tensioned state to the concrete portion of the normal PCa member 5.

傾斜部PCa部材6の各々は、伸縮装置3の近傍において平面視で伸縮装置3の延在方向に沿って延在する斜辺11を有する。傾斜部PCa部材6は、橋軸方向における最も伸縮装置3側に配置されて斜め方向緊張材7の一端部が定着される1つの最端部PCa部材12と、橋軸方向において最端部PCa部材12よりも中央に配置された1つ又は複数の中間部PCa部材13と、傾斜部PCa部材6の中で橋軸方向の最も中央側に配置され、斜め方向緊張材7の他端部が定着される定着用PCa部材14とを含む。 Each of the inclined PCa members 6 has a hypotenuse 11 that extends in the extension direction of the expansion device 3 in a plan view near the expansion device 3. The inclined PCa members 6 include one end PCa member 12 that is arranged closest to the expansion device 3 in the bridge axis direction and to which one end of the diagonal tension member 7 is fixed, one or more intermediate PCa members 13 that are arranged more centrally than the end PCa member 12 in the bridge axis direction, and a fixing PCa member 14 that is arranged most centrally in the bridge axis direction among the inclined PCa members 6 and to which the other end of the diagonal tension member 7 is fixed.

最端部PCa部材12は、平面視で概ね三角形形状をなす。この三角形形状は、床版構造1の一方の側縁(図1の下辺)に沿った1つの辺と、橋幅方向に延在する1つの辺と、1つの斜辺11とによって構成される。最端部PCa部材12は、橋軸方向及び橋幅方向に延在する鉄筋9を含むが、工場製作時には緊張材は設置されない。なお、最端部PCa部材12の部材寸法によっては、工場製作時に、最端部PCa部材12に橋幅方向緊張材10を設置しても良い。 The endmost PCa member 12 has a roughly triangular shape in plan view. This triangular shape is composed of one side along one side edge (the bottom side in Figure 1) of the deck structure 1, one side extending in the bridge width direction, and one oblique side 11. The endmost PCa member 12 includes reinforcing bars 9 extending in the bridge axis direction and the bridge width direction, but no tension members are installed during factory fabrication. Depending on the dimensions of the endmost PCa member 12, bridge width direction tension members 10 may be installed in the endmost PCa member 12 during factory fabrication.

中間部PCa部材13は、平面視で概ね台形形状をなす。この台形形状は、床版構造1の一方の側縁(図1の下辺)に沿った1つ辺と、橋幅方向に延在する2つの辺と、斜辺11とによって構成される。中間部PCa部材13は、通常部PCa部材5と同様に、橋軸方向及び橋幅方向に延在するように上下2段に配置された鉄筋9と、橋幅方向に延在するように上下2段に配置された橋幅方向緊張材10とを含む。最端部PCa12部材及び中間部PCa部材13の平面視で斜辺11と橋幅方向に延在する辺とによって形成される隅部において、該両辺の延長線が鋭角に交わる箇所は、橋幅方向に直交する面で面取りされた形状の面取り部15をなしている。 The intermediate PCa member 13 is generally trapezoidal in plan view. This trapezoidal shape is composed of one side along one side edge (the lower side in Fig. 1) of the deck structure 1, two sides extending in the bridge width direction, and an oblique side 11. As with the normal PCa member 5, the intermediate PCa member 13 includes reinforcing bars 9 arranged in two tiers, one above the other, so as to extend in the bridge axis direction and the bridge width direction, and bridge width direction tension members 10 arranged in two tiers, one above the other, so as to extend in the bridge width direction. In the corners formed by the oblique side 11 and the side extending in the bridge width direction in plan view of the end PCa 12 member and the intermediate PCa member 13, the points where the extensions of both sides intersect at an acute angle form chamfered portions 15 that are chamfered on a surface perpendicular to the bridge width direction.

定着用PCa部材14は、通常部PCa部材5に隣接しており、平面視で概ね五角形形状をなす。この五角形形状は、床版構造1の両側縁に沿った2つの辺と、橋幅方向に延在する2つの辺と、1つの斜辺11とによって構成される。鉄筋9及び橋幅方向緊張材10は、通常部PCa部材5及び中間部PCa部材13と同様に配置される。 The fixing PCa member 14 is adjacent to the normal PCa member 5 and has a generally pentagonal shape in plan view. This pentagonal shape is composed of two sides along both side edges of the deck structure 1, two sides extending in the bridge width direction, and one oblique side 11. The reinforcing bars 9 and bridge width direction tension members 10 are arranged in the same manner as the normal PCa member 5 and the intermediate PCa member 13.

通常部PCa部材5及び傾斜部PCa部材6(以下、通常部PCa部材5及び傾斜部PCa部材6の双方を指す時は「PCa部材5,6」と記す)の橋軸方向に延在する鉄筋9は、PCa部材5,6のコンクリート部分の橋軸方向の端面からループ状に突出し、橋軸方向に隣接する他のPCa部材5,6の鉄筋9とループ継手を形成する。PCa部材5,6には、上下方向に貫通する箱抜き孔4が設けられている。箱抜き孔4は、ずれ止め部材を受容し、コンクリートが充填されている。 The reinforcing bars 9 extending in the bridge axis direction of the normal PCa member 5 and the inclined PCa member 6 (hereinafter referred to as "PCa members 5, 6" when referring to both the normal PCa member 5 and the inclined PCa member 6) protrude in a loop shape from the end face of the concrete part of the PCa members 5, 6 in the bridge axis direction, and form a loop joint with the reinforcing bars 9 of the other PCa members 5, 6 adjacent in the bridge axis direction. The PCa members 5, 6 have box-punch holes 4 that penetrate in the vertical direction. The box-punch holes 4 receive anti-slip members and are filled with concrete.

斜め方向緊張材7は、伸縮装置3の延在方向に沿って、橋幅方向の略全長に渡るように配置される。図示する例では、3本の互いに平行な斜め方向緊張材7が用いられている。最も伸縮装置3の近くに配置された斜め方向緊張材7は、最端部PCa部材12及び中間部PCa部材13の面取り部15を通っている。斜め方向緊張材7は、最端部PCa部材12において斜め方向緊張材7に直交する方向に略均等に配置されることが好ましい。斜め方向緊張材7の一端部は、最端部PCa部材12に定着具(図示せず)を介して定着し、他端部は、定着用PCa部材14に定着具(図示せず)を介して定着している。最端部PCa部材12及び定着用PCa部材14における斜め方向緊張材7を定着させる面は、斜め方向緊張材7に直交するように切り欠かれた切り欠き部16によって構成される。 The diagonal tension members 7 are arranged along the extension direction of the expansion device 3 so as to span almost the entire length in the bridge width direction. In the illustrated example, three parallel diagonal tension members 7 are used. The diagonal tension member 7 arranged closest to the expansion device 3 passes through the chamfered portion 15 of the end PCa member 12 and the middle PCa member 13. It is preferable that the diagonal tension members 7 are arranged approximately evenly in the direction perpendicular to the diagonal tension members 7 in the end PCa member 12. One end of the diagonal tension member 7 is fixed to the end PCa member 12 via a fixing device (not shown), and the other end is fixed to the fixing PCa member 14 via a fixing device (not shown). The surfaces on the end PCa member 12 and the fixing PCa member 14 where the diagonal tension members 7 are fixed are constituted by the cutout portion 16 cut perpendicular to the diagonal tension members 7.

斜め方向緊張材7は、シース17内に配置される。シース17は、傾斜部PCa部材6内に埋設されている部分と、間詰コンクリート8に埋設されている部分とを含む。傾斜部PCa部材6内に埋設されているシース17は、上部に配置された鉄筋9及び橋幅方向緊張材10と、下部に配置された鉄筋9及び橋幅方向緊張材10との間に配置される。斜め方向緊張材7及び橋幅方向緊張材10は、PC鋼棒、PC鋼線、PC鋼より線、又は、炭素繊維若しくはアラミド繊維等の繊維強化プラスチックによって構成される。 The diagonal tension members 7 are arranged in the sheath 17. The sheath 17 includes a portion embedded in the inclined PCa member 6 and a portion embedded in the filling concrete 8. The sheath 17 embedded in the inclined PCa member 6 is arranged between the reinforcing bars 9 and the bridge width direction tension members 10 arranged at the top and the reinforcing bars 9 and the bridge width direction tension members 10 arranged at the bottom. The diagonal tension members 7 and the bridge width direction tension members 10 are made of PC steel bars, PC steel wires, PC steel strands, or fiber-reinforced plastics such as carbon fiber or aramid fiber.

間詰コンクリート8は、伸縮装置3と傾斜部PCa部材6との間に現場で打設される端部間詰コンクリート18と、PCa部材5,6間に現場で打設されるPCa部材間間詰コンクリート19とを含む。 The filler concrete 8 includes end filler concrete 18 that is poured on-site between the expansion device 3 and the inclined PCa member 6, and PCa member filler concrete 19 that is poured on-site between the PCa members 5 and 6.

床版構造1の構築方法について説明する。構築方法は、PCa部材5,6の工場での製作と、PCa部材5,6の建設現場までの運搬と、PCa部材5,6の主桁2上への配置と、斜め方向緊張材7の配置及び緊張と、間詰コンクリート8の打設とを備える。 The construction method of the deck structure 1 will be described. The construction method includes manufacturing the PCa members 5, 6 at a factory, transporting the PCa members 5, 6 to the construction site, placing the PCa members 5, 6 on the main girders 2, placing and tensioning the diagonal tension members 7, and pouring the interfacial concrete 8.

PCa部材5,6は、工場で製作される。作業員は、鉄筋9を組み立て、橋幅方向緊張材10を配置し、型枠(図示せず)を設置し、橋幅方向緊張材10に引張力を与えた状態で型枠内にコンクリートを打設し、コンクリートの硬化後に型枠を取り外す。傾斜部PCa部材6については、作業員は、コンクリートの打設前に、シース17の内の傾斜部PCa部材内に埋設されるべき部分を所定の位置に配置する。面取り部15は、対応する型枠を配置することによって形成される。橋幅方向緊張材10の緊張は、プレテンション方式に代えて、ポストテンション方式で行っても良い。養生後、PCa部材5,6は、建設現場に運搬される。 The PCa members 5 and 6 are manufactured in a factory. Workers assemble the rebars 9, place the bridge width direction tension members 10, install formwork (not shown), pour concrete into the formwork while applying tension to the bridge width direction tension members 10, and remove the formwork after the concrete has hardened. For the inclined PCa member 6, workers place the portion of the sheath 17 to be embedded in the inclined PCa member in a specified position before pouring the concrete. The chamfered portion 15 is formed by placing a corresponding formwork. The tension of the bridge width direction tension members 10 may be performed by a post-tensioning method instead of a pre-tensioning method. After curing, the PCa members 5 and 6 are transported to the construction site.

建設現場において、作業員は、クレーン等を使用して、PCa部材5,6を主桁2上に配置する。その後、作業員は、箱抜き孔4内にて、ずれ止め部材を主桁2の上面に溶接する。 At the construction site, workers use a crane or similar to place the PCa members 5 and 6 on the main girder 2. After that, workers weld the anti-slip member to the top surface of the main girder 2 within the box-punch hole 4.

なお、最端部PCa部材12を支持する主桁2が1つの場合、最端部PCa部材12は主桁2上で安定しないおそれがある。この場合、作業員は、最端部PCa部材12を、これに隣接して配置されるべき1つの中間部PCa部材13と建設現場の地上で連結してから、クレーン等を用いて主桁2上に配置しても良い。また、最端部PCa部材12を使用することに代えて、最端部PCa部材12に相当する構成が、現場で鉄筋を組み立ててコンクリート打設することによって構築されても良い(現場打ちコンクリート部12')。 When there is only one main girder 2 supporting the end-most PCa member 12, the end-most PCa member 12 may not be stable on the main girder 2. In this case, workers may connect the end-most PCa member 12 to one intermediate PCa member 13 to be placed adjacent to it on the ground at the construction site, and then place it on the main girder 2 using a crane or the like. Also, instead of using the end-most PCa member 12, a structure equivalent to the end-most PCa member 12 may be constructed on-site by assembling rebar and pouring concrete (cast-in-place concrete section 12').

次に、作業員は、シース17の内のPCa部材間間詰コンクリート19に埋設されるべき部分を、傾斜部PCa部材6間の所定の位置に設置する。 Next, the worker places the portion of the sheath 17 that is to be embedded in the filling concrete 19 between the PCa members in the designated position between the inclined PCa members 6.

次に、作業員は、PCa部材5,6の箱抜き孔4にコンクリートを充填するとともに、PCa部材間間詰コンクリート19を打設する。これにより、ずれ止め部材が箱抜き孔4内のコンクリート及びPCa部材間間詰コンクリート19に埋設される。PCa部材間間詰コンクリート19の硬化後、作業員は、シース17内に斜め方向緊張材7を挿入し、斜め方向緊張材7を緊張する。なお、ずれ止め部材がPCa部材間間詰コンクリート19が打設されるべき位置にない場合は、斜め方向緊張材7を緊張した後に、箱抜き孔4にコンクリートを充填するとともに、PCa部材間間詰コンクリート19を打設することが好ましい。 Next, the worker fills the box-punched holes 4 of the PCa members 5 and 6 with concrete and pours the filler concrete 19 between the PCa members. This embeds the anti-slip member in the concrete in the box-punched holes 4 and in the filler concrete 19 between the PCa members. After the filler concrete 19 between the PCa members hardens, the worker inserts the diagonal tension member 7 into the sheath 17 and tensions the diagonal tension member 7. If the anti-slip member is not in the position where the filler concrete 19 between the PCa members should be poured, it is preferable to fill the box-punched holes 4 with concrete and pour the filler concrete 19 between the PCa members after tensioning the diagonal tension member 7.

次に、作業員は、傾斜部PCa部材6の斜辺11と伸縮装置3との間に、端部間詰コンクリート18を打設する。 Next, the worker pours end filler concrete 18 between the oblique side 11 of the inclined PCa member 6 and the expansion device 3.

床版構造1の作用効果について説明する。 The effects of deck structure 1 are explained below.

斜辺11を有し、橋幅方向に延在する複数の傾斜部PCa部材6を使用することにより、斜め方向に延在するPCaの部材を使用せずに、斜め方向に延在する伸縮装置3に隣接する部分にPCaの部材を配置することができる。また、傾斜部PCa部材6の延在方向長さによって、各々の傾斜部PCa部材6の架設位置を容易に把握でき、施工管理が容易である。 By using multiple inclined PCa members 6 that have oblique sides 11 and extend in the width direction of the bridge, it is possible to place PCa members adjacent to the expansion device 3 that extends diagonally without using PCa members that extend diagonally. In addition, the installation position of each inclined PCa member 6 can be easily grasped based on the extension length of the inclined PCa members 6, making construction management easy.

斜め方向緊張材7を用いることにより、伸縮装置3に隣接する部分の全体にプレストレスを導入でき、これにより、コンクリートのひび割れとひび割れに起因する鉄筋9の腐食とが抑制される。 By using the diagonal tendons 7, prestress can be introduced throughout the entire area adjacent to the expansion device 3, thereby suppressing cracking of the concrete and corrosion of the reinforcing bars 9 caused by the cracking.

最端部PCa部材12と比較して延在方向長さが長い通常部PCa部材5、中間部PCa部材13及び定着用PCa部材14に対して、その延在方向に橋幅方向緊張材10によってプレストレスが導入されている。このため、クレーンによる架設時に、通常部PCa部材5、中間部PCa部材13及び定着用PCa部材14にひび割れが生じることが抑制される。また、斜め方向緊張材7から離れた位置であっても、橋幅方向緊張材10が存在するため、完成後の床版構造1において、通常部PCa部材5、中間部PCa部材13及び定着用PCa部材14にひび割れが生じることやひび割れに起因する鉄筋9の腐食が抑制される。 Prestress is introduced in the extension direction of the normal PCa member 5, intermediate PCa member 13, and anchoring PCa member 14, which have a longer extension length than the end PCa member 12, by the bridge width direction tension members 10. This prevents cracks from occurring in the normal PCa member 5, intermediate PCa member 13, and anchoring PCa member 14 during erection by a crane. In addition, because the bridge width direction tension members 10 are present even at positions away from the diagonal tension members 7, the occurrence of cracks in the normal PCa member 5, intermediate PCa member 13, and anchoring PCa member 14 and corrosion of the reinforcing bars 9 due to cracks are prevented in the completed deck structure 1.

最端部PCa部材12及び中間部PCa部材13に面取り部15を設けることにより、斜め方向緊張材7を傾斜部PCa部材6における伸縮装置3に近い位置に配置でき、斜め方向緊張材7及び鉄筋9を略均等に配置することができる。 By providing chamfered portions 15 on the end PCa member 12 and the middle PCa member 13, the diagonal tension members 7 can be positioned close to the expansion device 3 in the inclined PCa member 6, and the diagonal tension members 7 and reinforcing bars 9 can be positioned approximately evenly.

最端部PCa部材12を支持する主桁2が1本のみの場合、最端部PCa部材12をこれに隣接する中間部PCa部材13に連結してから主桁2上に架設するため、架設直後であっても最端部PCa部材12は主桁2上で安定する。最端部PCa部材12に代えて、現場打ちコンクリート部12'を主桁2上に構築する場合は、現場打ちコンクリート部12'は、中間部PCa部材13に連結するまでは、支保工等によって主桁2上で安定している。 When there is only one main girder 2 supporting the end-most PCa member 12, the end-most PCa member 12 is connected to the adjacent intermediate PCa member 13 before being erected on the main girder 2, so that the end-most PCa member 12 is stable on the main girder 2 even immediately after erection. When a cast-in-place concrete section 12' is constructed on the main girder 2 instead of the end-most PCa member 12, the cast-in-place concrete section 12' is stabilized on the main girder 2 by shoring or the like until it is connected to the intermediate PCa member 13.

箱抜き孔4にコンクリートを充填し、PCa部材間間詰コンクリート19を打設してから斜め方向緊張材7を緊張する場合、ずれ止め部材がPCa部材間間詰コンクリート19に埋設される位置にあっても施工可能である。 When concrete is filled into the box-punched holes 4, and the filler concrete 19 is poured between the PCa members before tensioning the diagonal tension member 7, construction is possible even if the anti-slip member is in a position where it is embedded in the filler concrete 19 between the PCa members.

ずれ止め部材がPCa部材間間詰コンクリート19に埋設される位置にない場合、斜め方向緊張材7を緊張した後に、箱抜き孔4にコンクリートを充填してPCa部材間間詰コンクリート19を打設する。このため、斜め方向緊張材7を緊張する際に、床版構造1は主桁2から拘束力を受けない。 If the anti-slip member is not located in a position where it can be embedded in the filling concrete 19 between the PCa members, after tensioning the diagonal tension member 7, concrete is filled into the box-punched holes 4 and the filling concrete 19 between the PCa members is poured. Therefore, when tensioning the diagonal tension member 7, the deck structure 1 does not receive a restraining force from the main girder 2.

図3を参照して第2実施形態に係る床版構造31について説明する。説明に当たって、第1実施形態と共通する構成は、その説明を省略し同一の符号を付す。床版構造31は、主桁2上に配置され、橋軸方向に対して斜角を有する橋台に設置された伸縮装置3に隣接している。 The deck structure 31 according to the second embodiment will be described with reference to Figure 3. In the description, components common to the first embodiment will be given the same reference numerals and will not be described. The deck structure 31 is disposed on the main girder 2 and is adjacent to an expansion device 3 installed on an abutment that has an oblique angle with respect to the bridge axis direction.

床版構造31は、平面視で矩形をなす複数の通常部PCa部材5と、伸縮装置3及び通常部PCa部材5の間に配置されるとともに、伸縮装置3に隣接して配置された複数の傾斜部PCa部材32と、伸縮装置3の近傍で伸縮装置3の延在方向に沿って延在する斜め方向緊張材7と、複数の傾斜部PCa部材32における伸縮装置3とは反対側に橋幅方向に平行に挿入された横方向緊張材33と、橋軸方向における斜め方向緊張材7と横方向緊張材33との間に配置され、橋幅方向に対して、斜め方向緊張材7よりも小さな角度で傾いた中間部緊張材34とを備える。 The deck structure 31 comprises a plurality of normal PCa members 5 each having a rectangular shape in plan view, a plurality of inclined PCa members 32 arranged between the expansion device 3 and the normal PCa members 5 and adjacent to the expansion device 3, a diagonal tension member 7 extending along the extension direction of the expansion device 3 in the vicinity of the expansion device 3, a lateral tension member 33 inserted parallel to the bridge width direction on the opposite side of the expansion device 3 in the plurality of inclined PCa members 32, and an intermediate tension member 34 arranged between the diagonal tension member 7 and the lateral tension member 33 in the bridge axis direction and inclined at an angle smaller than the diagonal tension member 7 with respect to the bridge width direction.

傾斜部PCa部材32の各々は、橋軸方向に延在し、平面視で橋軸方向の一方の端縁が、伸縮装置3の延在方向に平行な斜辺11を構成している。傾斜部PCa部材32の各々の橋軸方向の他方の端縁は、橋幅方向において互いに整合して、通常部PCa部材5に隣接している。傾斜部PCa部材32は、橋幅方向の一方(図3の紙面下方)の側に配置されたものほど延在方向の長さが短く、他方(図3の紙面上方)の側に配置されたものほど延在方向の長さが長い。傾斜部PCa部材32は、橋軸方向及び概ね橋幅方向(橋幅方向に対して伸縮装置3と同程度まで傾いた方向を含む)に上下2段に延在する鉄筋9(図2参照)と、橋軸方向に上下2段に延在する橋軸方向緊張材35とを含む。 Each of the inclined PCa members 32 extends in the bridge axis direction, and one end edge in the bridge axis direction in plan view forms a hypotenuse 11 parallel to the extension direction of the expansion device 3. The other end edges of each of the inclined PCa members 32 in the bridge axis direction are aligned with each other in the bridge width direction and adjacent to the normal PCa member 5. The inclined PCa members 32 arranged on one side of the bridge width direction (lower on the paper in FIG. 3) have a shorter length in the extension direction, and the inclined PCa members 32 arranged on the other side (upper on the paper in FIG. 3) have a longer length in the extension direction. The inclined PCa members 32 include reinforcing bars 9 (see FIG. 2) that extend in two stages, up and down, in the bridge axis direction and approximately in the bridge width direction (including a direction inclined to the same extent as the expansion device 3 with respect to the bridge width direction), and bridge axis direction tension members 35 that extend in two stages, up and down, in the bridge axis direction.

傾斜部PCa部材32の各々の橋軸方向の伸縮装置3側の端部には、肩面36が設けられており、伸縮装置3は部分的に肩面36に支持されている。伸縮装置3と複数の傾斜部PCa部材32との間に、モルタルや端部間詰コンクリート18(図1参照)が設けられても良い。傾斜部PCa部材32に肩面36を設けなくても良い。 A shoulder surface 36 is provided at the end of each of the inclined PCa members 32 on the side of the expansion device 3 in the bridge axis direction, and the expansion device 3 is partially supported by the shoulder surface 36. Mortar or end filler concrete 18 (see Figure 1) may be provided between the expansion device 3 and the multiple inclined PCa members 32. It is not necessary to provide a shoulder surface 36 on the inclined PCa members 32.

斜め方向緊張材7の各々は、伸縮装置3の延在方向に沿って、橋幅方向の略全長に渡るようにすべての傾斜部PCa部材32に挿入されている。最も伸縮装置3の近くに配置された斜め方向緊張材7は、肩面36の下を通っている。図示する例では4本の斜め方向緊張材7が配置され、これらの斜め方向緊張材7間の間隔は、略均等であることが好ましい。 Each diagonal tension member 7 is inserted into all the inclined PCa members 32 along the extension direction of the expansion device 3 so as to span almost the entire length in the bridge width direction. The diagonal tension member 7 located closest to the expansion device 3 passes under the shoulder surface 36. In the illustrated example, four diagonal tension members 7 are arranged, and it is preferable that the spacing between these diagonal tension members 7 is approximately equal.

横方向緊張材33の各々は、橋幅方向と平行に、橋幅方向の略全長に渡るようにすべての傾斜部PCa部材32に挿入されている。図示する例では3本の横方向緊張材33が配置され、これらの横方向緊張材33間の間隔は、略均等であることが好ましい。 Each of the lateral tension members 33 is inserted into all of the inclined PCa members 32 so as to be parallel to the bridge width direction and extend over approximately the entire length of the bridge width direction. In the illustrated example, three lateral tension members 33 are arranged, and it is preferable that the spacing between these lateral tension members 33 is approximately equal.

中間部緊張材34は、各々が橋幅方向の略全長に渡るようにすべての傾斜部PCa部材32を通る複数の第1中間部緊張材34aと、各々が、延在方向長さが長い側の2つ以上(図示する例では、図の紙面の上側の2つ)の傾斜部PCa部材32に挿入された複数の第2中間部緊張材34bとを含む。第1中間部緊張材34aと第2中間部緊張材34bとは交互に配置される。中間部緊張材34間の間隔が広くなりすぎるのを防止するために、第2中間部緊張材34bが設けられる。図示する例では4本の第1中間部緊張材34aと5本の第2中間部緊張材34bとが配置され、これらの中間部緊張材34間の間隔は、略均等であることが好ましい。 The intermediate tension members 34 include a plurality of first intermediate tension members 34a that pass through all the inclined PCa members 32 so as to extend over substantially the entire length of the bridge width direction, and a plurality of second intermediate tension members 34b that are inserted into two or more inclined PCa members 32 on the side with the longer extension length (in the illustrated example, the two on the upper side of the paper in the figure). The first intermediate tension members 34a and the second intermediate tension members 34b are arranged alternately. The second intermediate tension members 34b are provided to prevent the spacing between the intermediate tension members 34 from becoming too wide. In the illustrated example, four first intermediate tension members 34a and five second intermediate tension members 34b are arranged, and it is preferable that the spacing between these intermediate tension members 34 is substantially uniform.

傾斜部PCa部材32における、斜め方向緊張材7、横方向緊張材33及び中間部緊張材34が定着する側面には、各緊張材7,33,34の延在方向に直交して定着具(図示せず)が固定される面を有する切り欠き部37が設けられている。床版構造31の橋幅方向の中間部で第2中間部緊張材34bが定着する部分は、箱抜き部38となっている。また、ずれ止め部材を受容する部分にも箱抜き部39が形成されている。 The sides of the inclined PCa member 32 to which the diagonal tension members 7, lateral tension members 33 and intermediate tension members 34 are fixed have cutout portions 37 having surfaces to which fixing devices (not shown) are fixed perpendicular to the extension direction of each tension member 7, 33 and 34. The portion of the deck structure 31 in the middle in the bridge width direction to which the second intermediate tension member 34b is fixed is a box cutout portion 38. A box cutout portion 39 is also formed in the portion that receives the anti-slip member.

傾斜部PCa部材32の側面は、上下方向に平行であり、概ね橋軸方向延在する。しかし、互いに隣接する傾斜部PCa部材32における互いに当接する側面の橋軸方向の端部側は、階段状に形成されている。このため、斜め方向緊張材7と、中間部緊張材34の内の伸縮装置3側に配置された中間部緊張材34(橋幅方向に対して比較的大きな角度で傾斜しているもの)とが通過する周辺領域が、これらの斜め方向緊張材7及び中間部緊張材34の延在方向に直交する面で互いに当接する。互いに隣接する傾斜部PCa部材32の間には、モルタル(図示せず)やPCa部材間間詰コンクリート19が設けられても良い The sides of the inclined PCa members 32 are parallel to each other in the vertical direction and extend generally in the bridge axis direction. However, the end sides of the bridge axis direction of the abutting sides of the adjacent inclined PCa members 32 are formed in a stepped shape. Therefore, the peripheral area through which the diagonal tension members 7 and the intermediate tension members 34 (which are inclined at a relatively large angle to the bridge width direction) arranged on the expansion device 3 side of the intermediate tension members 34 pass, abut against each other on a surface perpendicular to the extension direction of the diagonal tension members 7 and the intermediate tension members 34. Mortar (not shown) or PCa member inter-part concrete 19 may be provided between the adjacent inclined PCa members 32.

斜め方向緊張材7、横方向緊張材33、中間部緊張材34及び橋軸方向緊張材35は、PC鋼棒、PC鋼線、PC鋼より線、又は、炭素繊維若しくはアラミド繊維等の繊維強化プラスチックによって構成される。 The diagonal tendons 7, lateral tendons 33, intermediate tendons 34 and bridge axial tendons 35 are made of PC steel bars, PC steel wires, PC steel strands, or fiber-reinforced plastics such as carbon fiber or aramid fiber.

床版構造31の構築方法について説明する。構築方法は、通常部PCa部材5及び傾斜部PCa部材32(以下、通常部PCa部材5及び傾斜部PCa部材32の双方を指す時は、「PCa部材5,32」と記す)を工場での製作と、PCa部材5,32の建設現場までの運搬と、PCa部材5,32の主桁2上への配置と、斜め方向緊張材7、横方向緊張材33及び中間部緊張材34の配置及び緊張とを含む。 The construction method of the deck structure 31 will be described. The construction method includes manufacturing the normal PCa member 5 and the inclined PCa member 32 (hereinafter, when referring to both the normal PCa member 5 and the inclined PCa member 32, they will be referred to as "PCa members 5, 32") at a factory, transporting the PCa members 5, 32 to the construction site, placing the PCa members 5, 32 on the main girder 2, and placing and tensioning the diagonal tension members 7, lateral tension members 33, and intermediate tension members 34.

PCa部材5,32は、工場で製作される。通常部PCa部材5の製作は、第1実施形態と同様である。傾斜部PCa部材32については、作業員は、鉄筋9を組み立て、橋軸方向緊張材35を配置し、斜め方向緊張材7、横方向緊張材33及び中間部緊張材34用のシース17(図2参照)を配置し、型枠(図示せず)を設置し、橋軸方向緊張材35に引張力を与えた状態で型枠内にコンクリートを打設し、コンクリートの硬化後に型枠を取り外す。橋軸方向緊張材35の緊張は、プレテンション方式に代えて、ポストテンション方式で導入しても良い。養生後、PCa部材5,32は、建設現場に運搬される。 The PCa members 5 and 32 are manufactured in a factory. The manufacturing process of the normal PCa member 5 is the same as that of the first embodiment. For the inclined PCa member 32, workers assemble the reinforcing bars 9, place the bridge axis direction tension members 35, place the diagonal direction tension members 7, the lateral direction tension members 33, and the sheaths 17 (see FIG. 2) for the intermediate tension members 34, install a formwork (not shown), pour concrete into the formwork while applying tension to the bridge axis direction tension members 35, and remove the formwork after the concrete hardens. The tension of the bridge axis direction tension members 35 may be introduced by a post-tensioning method instead of a pre-tensioning method. After curing, the PCa members 5 and 32 are transported to the construction site.

建設現場において、作業員は、クレーン等を使用して、PCa部材5,32を、主桁2上に配置し、斜め方向緊張材7、横方向緊張材33及び中間部緊張材34をシース17に挿入し、斜め方向緊張材7、横方向緊張材33及び中間部緊張材34を緊張する。 At the construction site, workers use a crane or similar to place the PCa members 5, 32 on the main girder 2, insert the diagonal tendons 7, lateral tendons 33 and intermediate tendons 34 into the sheath 17, and tension the diagonal tendons 7, lateral tendons 33 and intermediate tendons 34.

床版構造31の作用効果について説明する。 The effects of the deck structure 31 are explained below.

斜辺11を有し、橋軸方向に延在する複数の傾斜部PCa部材32を使用することにより、斜め方向に延在するPCaの部材を使用せずに、斜め方向に延在する伸縮装置3に隣接する部分にPCaの部材を配置することができる。また、第1実施形態の最端部PCa部材12(図1参照)のように比較的小さなPCaの部材を設ける必要がなく、施工効率が良い。 By using multiple inclined PCa members 32 that have oblique sides 11 and extend in the bridge axis direction, it is possible to place PCa members in the area adjacent to the expansion device 3 that extends in the diagonal direction without using PCa members that extend in the diagonal direction. In addition, there is no need to provide a relatively small PCa member like the end-most PCa member 12 in the first embodiment (see Figure 1), which improves construction efficiency.

斜め方向緊張材7を用いて伸縮装置3に隣接する部分の全体にプレストレスを導入することにより、伸縮装置3の近傍のコンクリートのひび割れとひび割れに起因する鉄筋9の腐食とが抑制される。更に、横方向緊張材33及び中間部緊張材34を用いて伸縮装置3から離れた部分にプレストレスを導入することにより、伸縮装置3から離れた部分のコンクリートのひび割れとひび割れに起因する鉄筋9の腐食とが抑制される。 By using the diagonal tendons 7 to introduce prestress to the entire area adjacent to the expansion device 3, cracking of the concrete near the expansion device 3 and corrosion of the reinforcing bars 9 caused by the cracking are suppressed. Furthermore, by using the lateral tendons 33 and intermediate tendons 34 to introduce prestress to the area away from the expansion device 3, cracking of the concrete in the area away from the expansion device 3 and corrosion of the reinforcing bars 9 caused by the cracking are suppressed.

傾斜部PCa部材32の延在方向に橋軸方向緊張材35によってプレストレスが導入されているため、クレーンによる架設時に、傾斜部PCa部材32にひび割れが生じることが抑制される。 Prestress is introduced by the bridge axial tension members 35 in the extension direction of the inclined PCa member 32, which prevents cracks from occurring in the inclined PCa member 32 during erection by a crane.

傾斜部PCa部材32の互いに当接する側面が部分的に階段状になっていることにより、斜め方向緊張材7及び橋幅方向からの傾斜が比較的大きい中間部緊張材34によるプレストレスが効率的に傾斜部PCa部材32間に伝達される。 The sides of the inclined PCa members 32 that come into contact with each other are partially stepped, so that the prestress from the diagonal tension members 7 and the intermediate tension members 34, which have a relatively large inclination from the bridge width direction, is efficiently transmitted between the inclined PCa members 32.

以上で具体的な実施形態の説明を終えるが、本発明は上記実施形態や変形例に限定されることなく、幅広く変形実施することができる。斜め方向緊張材7、横方向緊張材33及び中間部緊張材34の数は変更しても良い。面取り部15は、橋軸方向に対して直交以外の角度で交差していても良い。 This concludes the explanation of the specific embodiment, but the present invention is not limited to the above embodiment or modified example, and can be modified in a wide range of ways. The number of diagonal tendons 7, lateral tendons 33, and intermediate tendons 34 may be changed. The chamfered portion 15 may intersect with the bridge axis direction at an angle other than perpendicular.

1,31:プレキャストプレストレストコンクリート床版構造
2 :主桁
3 :伸縮装置
6,32:傾斜部PCa部材
7 :斜め方向緊張材
10 :橋幅方向緊張材
11 :斜辺
12 :最端部PCa部材
12' :現場打ちコンクリート部
13 :中間部PCa部材
14 :定着用PCa部材
15 :面取り部
19 :PCa部材間間詰コンクリート
33 :横方向緊張材
34 :中間部緊張材
35 :橋軸方向緊張材
Reference Signs List 1, 31: Precast prestressed concrete deck structure 2: Main girder 3: Expansion device 6, 32: Inclined PCa member 7: Diagonal tension member 10: Bridge width direction tension member 11: Hypothetical side 12: Endmost PCa member 12': Cast-in-place concrete portion 13: Intermediate PCa member 14: Anchoring PCa member 15: Chamfered portion 19: Filling concrete between PCa members 33: Lateral tension member 34: Intermediate tension member 35: Bridge axis direction tension member

Claims (13)

橋軸方向に対して斜角を有する橋台に設置された伸縮装置に隣接して配置されたプレキャストプレストレストコンクリート床版構造であって、
橋幅方向又は前記橋軸方向に延在する複数の傾斜部プレキャストコンクリート部材であって、平面視で前記伸縮装置の近傍で前記伸縮装置の延在方向に沿って延在する斜辺を有し、互いに隣接する前記傾斜部プレキャストコンクリート部材と、
前記伸縮装置の延在方向に延在し、前記伸縮装置の近傍で前記傾斜部プレキャストコンクリート部材の全てに挿入された斜め方向緊張材と
を備える、プレキャストプレストレストコンクリート床版構造。
A precast prestressed concrete deck structure arranged adjacent to an expansion joint installed on an abutment having an oblique angle with respect to the bridge axis direction,
A plurality of inclined precast concrete members extending in the bridge width direction or the bridge axis direction, the inclined precast concrete members having oblique sides extending along the extension direction of the expansion device in the vicinity of the expansion device in a plan view and adjacent to each other;
a diagonal tension member extending in the extension direction of the expansion device and inserted into all of the inclined portion precast concrete members in the vicinity of the expansion device, the diagonal tension member being inserted into all of the inclined portion precast concrete members in the extension direction of the expansion device, the diagonal tension member being inserted into all of the inclined portion precast concrete members in the vicinity of the expansion device, the diagonal tension member being inserted into all of the inclined portion precast concrete members in the extension direction of the expansion device, the diagonal
複数の前記傾斜部プレキャストコンクリート部材は、前記橋幅方向に延在し、前記橋軸方向に互いに隣接する、請求項1に記載のプレキャストプレストレストコンクリート床版構造。 The precast prestressed concrete deck structure according to claim 1, wherein the plurality of inclined precast concrete members extend in the bridge width direction and are adjacent to each other in the bridge axis direction. 前記傾斜部プレキャストコンクリート部材は、前記橋軸方向における最も前記伸縮装置側に配置され、平面視で概ね三角形形状をなす最端部プレキャストコンクリート部材と、前記最端部プレキャストコンクリート部材よりも前記橋軸方向の中央に配置された、平面視で概ね台形形状をなす中間部プレキャストコンクリート部材とを含み、
前記中間部プレキャストコンクリート部材の各々は、前記橋幅方向に延在する橋幅方向緊張材を含む、請求項2に記載のプレキャストプレストレストコンクリート床版構造。
The inclined portion precast concrete member includes an end portion precast concrete member arranged closest to the expansion device in the bridge axis direction and having a generally triangular shape in a plan view, and an intermediate portion precast concrete member arranged in the center in the bridge axis direction relative to the end portion precast concrete member and having a generally trapezoidal shape in a plan view,
3. The precast prestressed concrete deck structure according to claim 2, wherein each of the intermediate precast concrete members includes a bridge width direction tendon extending in the bridge width direction.
前記最端部プレキャストコンクリート部材及び前記中間部プレキャストコンクリート部材の、平面視で前記斜辺と前記橋幅方向に延在する辺とによって形成される隅部において、該両辺の延長線が鋭角に交わる箇所は、前記橋幅方向に交差する面で面取りされた形状の面取り部をなし、前記斜め方向緊張材の1本は、前記面取り部を通る、請求項3に記載のプレキャストプレストレストコンクリート床版構造。 The precast prestressed concrete deck structure according to claim 3, wherein the corners of the end precast concrete member and the intermediate precast concrete member formed by the oblique side and the side extending in the bridge width direction in plan view, where the extension lines of both sides intersect at an acute angle, form a chamfered portion with a chamfered shape at a surface intersecting the bridge width direction, and one of the diagonal tension members passes through the chamfered portion. 複数の前記傾斜部プレキャストコンクリート部材は、前記橋軸方向に延在し、主桁上で前記橋幅方向に互いに隣接する、請求項1に記載のプレキャストプレストレストコンクリート床版構造。 The precast prestressed concrete deck structure according to claim 1, wherein the plurality of inclined precast concrete members extend in the bridge axis direction and are adjacent to each other in the bridge width direction on the main girder. 前記傾斜部プレキャストコンクリート部材の各々は、前記橋軸方向に延在する橋軸方向緊張材を含む、請求項5に記載のプレキャストプレストレストコンクリート床版構造。 The precast prestressed concrete deck structure according to claim 5, wherein each of the inclined precast concrete members includes a bridge axial direction tension member extending in the bridge axial direction. 前記橋軸方向において前記斜め方向緊張材とは反対側に配置され、前記橋幅方向に平行に延在し、前記傾斜部プレキャストコンクリート部材の全てに挿入された横方向緊張材と、
前記橋軸方向における前記斜め方向緊張材と前記横方向緊張材との間に配置され、前記橋幅方向に対して、前記斜め方向緊張材よりも小さな角度で傾いた中間部緊張材と
を更に備える、請求項5又は6に記載のプレキャストプレストレストコンクリート床版構造。
A lateral tendon is disposed on the opposite side of the diagonal tendon in the bridge axis direction, extends parallel to the bridge width direction, and is inserted into all of the inclined portion precast concrete members;
7. The precast prestressed concrete deck structure according to claim 5 or 6, further comprising an intermediate tension member arranged between the diagonal tension member and the lateral tension member in the bridge axis direction and inclined at an angle smaller than that of the diagonal tension member with respect to the bridge width direction.
複数の前記傾斜部プレキャストコンクリート部材は、複数の第1傾斜部プレキャストコンクリート部材と、延在方向長さが前記第1傾斜部プレキャストコンクリート部材の延在方向長さよりも短い第2傾斜部プレキャストコンクリート部材とを含み、
前記中間部緊張材は、前記傾斜部プレキャストコンクリート部材の全てに挿入された第1中間部緊張材と2以上の前記第1傾斜部プレキャストコンクリート部材に挿入され、前記第2傾斜部プレキャストコンクリート部材には挿入されない第2中間部緊張材とを含む、請求項7に記載のプレキャストプレストレストコンクリート床版構造。
The plurality of inclined portion precast concrete members include a plurality of first inclined portion precast concrete members and a second inclined portion precast concrete member having an extension direction length shorter than the extension direction length of the first inclined portion precast concrete members,
8. The precast prestressed concrete deck structure according to claim 7, wherein the intermediate tendons include a first intermediate tendon inserted into all of the inclined precast concrete members , and a second intermediate tendon inserted into two or more of the first inclined precast concrete members and not inserted into the second inclined precast concrete members.
橋軸方向に対して斜角を有する橋台に設置された伸縮装置に隣接して配置されたプレキャストプレストレストコンクリート床版構造の構築方法であって、
橋幅方向又は前記橋軸方向に延在する複数の傾斜部プレキャストコンクリート(PCa)部材であって、平面視で前記伸縮装置の近傍で前記伸縮装置の延在方向に沿って延在する斜辺を有する前記傾斜部プレキャストコンクリート部材を、互いに隣接するように主桁上に配置するステップと、
前記伸縮装置の延在方向に平行に延在し、かつ前記傾斜部プレキャストコンクリート部材の全てを通るように、前記傾斜部プレキャストコンクリート部材における前記伸縮装置の近傍に斜め方向緊張材を挿入するステップと、
前記斜め方向緊張材を緊張するステップと
を備える方法。
A method for constructing a precast prestressed concrete deck structure adjacent to an expansion joint installed on an abutment having an oblique angle with respect to the bridge axis direction, comprising:
A step of arranging a plurality of inclined precast concrete (PCa) members extending in the bridge width direction or the bridge axis direction, the inclined precast concrete members having oblique sides extending along the extension direction of the expansion device in the vicinity of the expansion device in a plan view, adjacent to each other on the main girder;
inserting a diagonal tendon in the vicinity of the expansion device in the precast concrete section of the inclined portion so as to extend parallel to the extension direction of the expansion device and pass through all of the precast concrete section of the inclined portion;
and tensioning the diagonal tendons.
複数の前記傾斜部プレキャストコンクリート部材は、前記橋幅方向に延在し、かつ前記橋軸方向に互いに隣接し、
前記傾斜部プレキャストコンクリート部材は、前記橋軸方向における最も前記伸縮装置側に配置されて1本の前記主桁上に配置される最端部プレキャストコンクリート部材と、2本以上の前記主桁上に配置される中間部プレキャストコンクリート部材とを含み、
前記配置するステップは、建設現場に運搬後に、前記最端部プレキャストコンクリート部材と、前記最端部プレキャストコンクリート部材に隣接する1つの前記中間部プレキャストコンクリート部材とを、互いに連結してから前記主桁上に配置することを含む、請求項9に記載の方法。
The plurality of inclined precast concrete members extend in the bridge width direction and are adjacent to each other in the bridge axis direction,
The inclined portion precast concrete member includes an end portion precast concrete member disposed closest to the expansion device in the bridge axis direction and disposed on one of the main girders, and an intermediate portion precast concrete member disposed on two or more of the main girders,
10. The method of claim 9, wherein the placing step includes connecting the endmost precast concrete members and one of the intermediate precast concrete members adjacent to the endmost precast concrete members to each other after transportation to a construction site and then placing the endmost precast concrete members on the main girder.
複数の前記傾斜部プレキャストコンクリート部材は、前記橋幅方向に延在し、かつ前記橋軸方向に互いに隣接し、
前記傾斜部プレキャストコンクリート部材は、2本以上の前記主桁上に配置され、
前記配置するステップと前記挿入するステップの間に行われる、前記伸縮装置に隣接し、かつ1本の前記主桁上に配置される現場打ちコンクリート部を構築するステップを更に含み、
前記挿入するステップにおいて、前記斜め方向緊張材は、前記現場打ちコンクリート部にも挿入される、請求項9に記載の方法。
The plurality of inclined precast concrete members extend in the bridge width direction and are adjacent to each other in the bridge axis direction,
The inclined portion precast concrete member is disposed on two or more of the main girders,
The method further includes the step of constructing a poured concrete section adjacent to the expansion joint and disposed on one of the girder, the poured concrete section being disposed between the placing step and the inserting step;
10. The method of claim 9, wherein in the inserting step, the diagonal tendons are also inserted into the poured concrete section.
前記緊張するステップの前に行われる、複数の前記傾斜部プレキャストコンクリート部材の間にPCa部材間間詰コンクリートを打設するステップを更に備え、
前記主桁は、前記PCa部材間間詰コンクリートに埋設されるずれ止め部材を含む、請求項9~11の何れか1項に記載の方法。
The step of pouring concrete between the precast concrete members in the inclined portion between the plurality of precast concrete members in the inclined portion before the tensioning step is further provided;
The method according to any one of claims 9 to 11, wherein the main girder includes a stopper member embedded in the filling concrete between the PCa members.
前記緊張するステップの後に行われる、複数の前記傾斜部プレキャストコンクリート部材の間にPCa部材間間詰コンクリートを打設するステップを更に備え、
前記主桁は、前記PCa部材間間詰コンクリートに埋設されるずれ止め部材を含まない、請求項9~11の何れか1項に記載の方法。
The step of pouring concrete between the plurality of inclined portion precast concrete members after the tensioning step is further provided;
The method according to any one of claims 9 to 11, wherein the main girder does not include a stopper member embedded in the filling concrete between the PCa members.
JP2021179574A 2021-11-02 2021-11-02 Precast prestressed concrete deck structure and construction method Active JP7669249B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021179574A JP7669249B2 (en) 2021-11-02 2021-11-02 Precast prestressed concrete deck structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021179574A JP7669249B2 (en) 2021-11-02 2021-11-02 Precast prestressed concrete deck structure and construction method

Publications (2)

Publication Number Publication Date
JP2023068444A JP2023068444A (en) 2023-05-17
JP7669249B2 true JP7669249B2 (en) 2025-04-28

Family

ID=86327046

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021179574A Active JP7669249B2 (en) 2021-11-02 2021-11-02 Precast prestressed concrete deck structure and construction method

Country Status (1)

Country Link
JP (1) JP7669249B2 (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006219848A (en) 2005-02-09 2006-08-24 Ps Mitsubishi Construction Co Ltd Precast pc rigid-frame bridge
JP2007239301A (en) 2006-03-08 2007-09-20 Ps Mitsubishi Construction Co Ltd Method of integrating precast concrete members interposed by filling concrete
US20130061406A1 (en) 2011-09-14 2013-03-14 Allied Steel Modular Bridge
JP2013127200A (en) 2013-03-13 2013-06-27 Yamau Co Ltd Concrete prefabricated structure and construction method of the same
JP2014062403A (en) 2012-09-21 2014-04-10 Kitagawa Kogyo Co Ltd Bridge girder and construction method of bridge girder
JP2015183404A (en) 2014-03-24 2015-10-22 横河工事株式会社 Expansion device replacement method and temporary lining plate structure
JP2019023381A (en) 2017-07-21 2019-02-14 大成建設株式会社 Precast concrete member, manufacturing method for the same, and road bridge

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60258309A (en) * 1984-05-31 1985-12-20 株式会社巴組鐵工所 Road bridge
JP2872346B2 (en) * 1990-05-18 1999-03-17 横河工事株式会社 Prefab slab installation method
JP2964395B2 (en) * 1996-08-09 1999-10-18 株式会社ワン・エイティ Plate with joint structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006219848A (en) 2005-02-09 2006-08-24 Ps Mitsubishi Construction Co Ltd Precast pc rigid-frame bridge
JP2007239301A (en) 2006-03-08 2007-09-20 Ps Mitsubishi Construction Co Ltd Method of integrating precast concrete members interposed by filling concrete
US20130061406A1 (en) 2011-09-14 2013-03-14 Allied Steel Modular Bridge
JP2014062403A (en) 2012-09-21 2014-04-10 Kitagawa Kogyo Co Ltd Bridge girder and construction method of bridge girder
JP2013127200A (en) 2013-03-13 2013-06-27 Yamau Co Ltd Concrete prefabricated structure and construction method of the same
JP2015183404A (en) 2014-03-24 2015-10-22 横河工事株式会社 Expansion device replacement method and temporary lining plate structure
JP2019023381A (en) 2017-07-21 2019-02-14 大成建設株式会社 Precast concrete member, manufacturing method for the same, and road bridge

Also Published As

Publication number Publication date
JP2023068444A (en) 2023-05-17

Similar Documents

Publication Publication Date Title
US9404254B2 (en) Post-tension concrete leave out splicing system and method
KR20190010357A (en) Precast PSC beam girder that can be made long-term by step construction
JP3877995B2 (en) How to build a string string bridge
KR20060041078A (en) Steel casting continuous composite bridge with precast concrete deck and construction method
JP7669249B2 (en) Precast prestressed concrete deck structure and construction method
KR100785634B1 (en) Continuous Structure of Prestressed Concrete Composite Beam Bridge and Its Method
KR101339367B1 (en) Fabrication and reinforcing method for pre-flex girder
KR100899713B1 (en) Steel composite girder bridge structure using precast arch-deck and construction method
KR102618251B1 (en) Bridge Deck Replacement Construction Method
JP7479547B1 (en) Concrete Structures
US20150176276A1 (en) Post-tension concrete leave out splicing system and method
KR100492885B1 (en) Precast Concrete Deck Being Connected by Connecting Bar and Roof Steel and Constructing Method of Such Precast Concrete Deck
JP2024059394A (en) Precast and prestressed concrete structures
JPH0426483Y2 (en)
JP7667112B2 (en) Joining method and deck structure
KR102856997B1 (en) Precast Full Depth deck for bridge and method of construction thereof
KR102551807B1 (en) Construction method of post-tensioned PC beam system
KR200345787Y1 (en) Precast Concrete Deck Being Connected by Connecting Bar and Roof Steel
KR200375130Y1 (en) Precast Prestressed reinforced concrete bottom plate, and bridge having the same
KR102232907B1 (en) A bridge structure with prestressed concrete beam integrated slab
JP2025025764A (en) Joint structure of precast concrete members and joining method of precast concrete members
JP7778649B2 (en) Connection structure between corrugated steel web and sub-deck slab in corrugated steel web bridges
JP7822739B2 (en) Joining method for concrete structures
JP7578232B1 (en) Pier PC beam end joint structure and joint method
JP7835393B2 (en) Rigid connection structure for upper and lower joints, bridge pier, method for constructing a rigid connection structure for upper and lower joints

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240524

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250127

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250204

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250304

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250408

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250416

R150 Certificate of patent or registration of utility model

Ref document number: 7669249

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150