Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7670636B2 - Work management method and work management system - Google Patents
[go: Go Back, main page]

JP7670636B2 - Work management method and work management system - Google Patents

Work management method and work management system Download PDF

Info

Publication number
JP7670636B2
JP7670636B2 JP2022027891A JP2022027891A JP7670636B2 JP 7670636 B2 JP7670636 B2 JP 7670636B2 JP 2022027891 A JP2022027891 A JP 2022027891A JP 2022027891 A JP2022027891 A JP 2022027891A JP 7670636 B2 JP7670636 B2 JP 7670636B2
Authority
JP
Japan
Prior art keywords
work
task
type
field
determination unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022027891A
Other languages
Japanese (ja)
Other versions
JP2023124242A (en
Inventor
右資 小島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yanmar Holdings Co Ltd
Original Assignee
Yanmar Holdings Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yanmar Holdings Co Ltd filed Critical Yanmar Holdings Co Ltd
Priority to JP2022027891A priority Critical patent/JP7670636B2/en
Priority to KR1020230002811A priority patent/KR20230127870A/en
Priority to CN202310071357.8A priority patent/CN116649076A/en
Publication of JP2023124242A publication Critical patent/JP2023124242A/en
Application granted granted Critical
Publication of JP7670636B2 publication Critical patent/JP7670636B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01DHARVESTING; MOWING
    • A01D34/00Mowers; Mowing apparatus of harvesters
    • A01D34/006Control or measuring arrangements
    • A01D34/008Control or measuring arrangements for automated or remotely controlled operation
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60YINDEXING SCHEME RELATING TO ASPECTS CROSS-CUTTING VEHICLE TECHNOLOGY
    • B60Y2200/00Type of vehicle
    • B60Y2200/20Off-Road Vehicles
    • B60Y2200/22Agricultural vehicles

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Development Economics (AREA)
  • Operations Research (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Game Theory and Decision Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)
  • Stored Programmes (AREA)

Description

本発明は、作業管理方法、作業管理システム、及び作業管理プログラムに関するものである。 The present invention relates to a work management method, a work management system, and a work management program.

圃場で同じ作業、例えば収穫が行われていても、圃場で行われた作業の内容に応じて、次に行われる作業が異なる場合がある。 Even if the same work is being done in the field, such as harvesting, the next work to be done may differ depending on the work that was done in the field.

例えば、特許文献1には、穀物、例えばイネを収穫した後に、藁からサイレージを製造する技術が開示されている。この技術は、籾を分離した藁を圃場の上に短時間静置して吸湿させ、嫌気発酵させることで、サイレージを製造する。 For example, Patent Document 1 discloses a technique for producing silage from straw after harvesting grains, such as rice. This technique produces silage by leaving the straw, from which the husks have been separated, on the farm for a short period of time to absorb moisture and then subjecting it to anaerobic fermentation.

また、特許文献2には、穀物を収穫した後に、藁をすき込みにより、圃場に腹側する窒素源を補うことが記載されている。この場合、特許文献2に記載されているように、藁は、コンバインにより裁断されて、圃場に排出される。 Patent Document 2 also describes how, after harvesting grains, straw is tilled into the field to supplement the nitrogen source present in the field. In this case, as described in Patent Document 2, the straw is chopped by a combine harvester and discharged into the field.

特開2010-081933号公報JP 2010-081933 A 特開2012-147727号公報JP 2012-147727 A

このように、同じ穀物を収穫した後でも、次に行われる作業が異なる場合がある。特に、多数の圃場を有している場合、各々の圃場に対して、次に行われる作業を確認しつつ、次作業の準備を行う必要がある。また、1つの圃場であっても、圃場から離れた場所で次作業の準備が行われる場合、予定の作業と異なる作業の準備が行われる場合がある。 In this way, even after the same grains have been harvested, the next work to be done may be different. In particular, when there are multiple fields, it is necessary to check the next work to be done for each field while preparing for the next work. Even in the case of a single field, if preparations for the next work are made in a location away from the field, preparations for a different work than was planned may be made.

上記の状況に鑑み、本開示は、圃場で作業を行う作業装置の稼働情報に基づき、ユーザに次作業に関する情報を報知することで、ユーザの支援を行うことを目的の1つとする。他の目的については、以下の記載及び実施の形態の説明から理解することができる。 In view of the above situation, one of the objectives of the present disclosure is to support the user by notifying the user of information regarding the next task based on the operation information of the work device performing work in the field. Other objectives can be understood from the following description and explanation of the embodiment.

以下に、発明を実施するための形態で使用される番号・符号を用いて、課題を解決するための手段を説明する。これらの番号・符号は、特許請求の範囲の記載と発明を実施するための形態との対応関係の一例を示すために、参考として、括弧付きで付加されたものである。よって、括弧付きの記載により、特許請求の範囲は、限定的に解釈されるべきではない。 The means for solving the problems will be explained below using the numbers and symbols used in the description of the embodiment of the invention. These numbers and symbols are added in parentheses for reference purposes to show an example of the correspondence between the description of the claims and the description of the embodiment of the invention. Therefore, the description in parentheses should not be interpreted as limiting the scope of the claims.

上記目的を達成するための一実施の形態による作業管理方法は、圃場(400)で第1作業を行っている第1作業装置(30)の状態を表す稼働情報と予め記憶された条件との比較に基づき、第1作業装置(30)による第1作業の次に行われる第2作業の第2作業種別を判定することを含む。また、作業管理方法は、第2作業に関する第2作業情報を出力することを含む。 A work management method according to one embodiment for achieving the above object includes determining a second work type of a second work performed by a first work device (30) following a first work performed by the first work device (30) based on a comparison between operation information representing a state of the first work device (30) performing a first work in a farm field (400) and pre-stored conditions. The work management method also includes outputting second work information related to the second work.

上記目的を達成するための一実施の形態による作業管理システム(1000)は、次作業判定部(170)と、次作業出力部(180)とを備える。次作業判定部(170)は、圃場(400)で第1作業を行っている第1作業装置(30)の状態を表す稼働情報と予め記憶された条件との比較に基づき、第1作業装置(30)による第1作業の次に行われる第2作業の第2作業種別を判定する。次作業出力部(180)は、第2作業に関する第2作業情報を出力する。 The work management system (1000) according to one embodiment for achieving the above object includes a next work determination unit (170) and a next work output unit (180). The next work determination unit (170) determines a second work type of a second work to be performed after the first work by the first work device (30) based on a comparison between operation information representing the state of the first work device (30) performing the first work in the field (400) and pre-stored conditions. The next work output unit (180) outputs second work information related to the second work.

上記目的を達成するための一実施の形態による作業管理プログラム(320)は、圃場(400)で第1作業を行っている第1作業装置(30)の状態を表す稼働情報と予め記憶された条件との比較に基づき、第1作業装置(30)による第1作業の次に行われる第2作業の第2作業種別を判定することを演算装置(120、220)に実行させる。また、作業管理プログラム(320)は、第2作業に関する第2作業情報を出力することを演算装置(120、220)に実行させる。 The work management program (320) according to one embodiment for achieving the above object causes the calculation device (120, 220) to determine a second work type of a second work performed after a first work by the first work device (30) based on a comparison between operation information representing the state of the first work device (30) performing a first work in a farm field (400) and pre-stored conditions. The work management program (320) also causes the calculation device (120, 220) to output second work information related to the second work.

上記の形態によれば、ユーザは、圃場において次に行われる作業を容易に確認することができる。 According to the above embodiment, the user can easily check the next work to be done in the field.

一実施の形態における作業管理システムの概略図である。1 is a schematic diagram of a work management system according to one embodiment; 一実施の形態における作業管理装置の構成図である。1 is a configuration diagram of a work management device according to an embodiment; 一実施の形態における作業データの構成を表す図である。FIG. 4 is a diagram illustrating a configuration of task data according to an embodiment. 一実施の形態における圃場データの構成を表す図である。FIG. 2 is a diagram illustrating a configuration of farm field data according to an embodiment. 一実施の形態における作業管理システムが実行する機能ブロックを表す図である。FIG. 2 is a diagram illustrating functional blocks executed by the work management system according to an embodiment. 一実施の形態における端末の構成図である。FIG. 2 is a configuration diagram of a terminal according to an embodiment. 一実施の形態における作業管理システムによる処理を表すフローチャートである。1 is a flowchart illustrating a process performed by a work management system according to an embodiment. 一実施の形態において、作業装置により測定される位置情報のうち、藁を裁断しているときの位置情報を説明するための図である。11 is a diagram for explaining position information measured by a working device when cutting straw in one embodiment. FIG. 一実施の形態において、藁を裁断しているときの作業装置の移動軌跡を説明するための図である。11A and 11B are diagrams for explaining a movement trajectory of a working device when cutting straw in one embodiment.

(実施の形態1)
本発明の本実施の形態による作業管理システム1000を、図面を参照して説明する。本実施の形態において、図1に示すように、作業管理システム1000は、作業管理装置100と、1つ以上の端末200、例えば第1端末200-1と、第2端末200-2とを備える。作業管理装置100は、ネットワーク20、例えばインターネットを介して、端末200と、1つ以上の作業装置30と通信可能に接続されている。
(Embodiment 1)
A work management system 1000 according to this embodiment of the present invention will be described with reference to the drawings. In this embodiment, as shown in Fig. 1, the work management system 1000 includes a work management device 100 and one or more terminals 200, for example, a first terminal 200-1 and a second terminal 200-2. The work management device 100 is communicatively connected to the terminal 200 and one or more work devices 30 via a network 20, for example, the Internet.

作業装置30は、例えば作物を収穫する収穫機を含み、圃場内を移動して作業を行う。作業装置30は、作業を行う作業機械を牽引する車両、例えばトラクターでもよい。作業装置30は、種苗の移植作業を行う車両、例えば田植機や移植機でもよい。作業装置30は、資材を散布する車両、例えばスプレーヤ(農薬散布機)や施肥機でもよい。 The working device 30 includes, for example, a harvester that harvests crops, and moves within a farm field to perform work. The working device 30 may be a vehicle that pulls a work machine that performs work, such as a tractor. The working device 30 may be a vehicle that performs seedling transplant work, such as a rice transplanter or transplanter. The working device 30 may be a vehicle that sprays materials, such as a sprayer (pesticide sprayer) or a fertilizer applicator.

作業装置30は、圃場400内を移動して作業を行っているときに、作業装置30の状態を表す稼働情報を取得する。取得された稼働情報は、作業管理装置100に出力される。稼働情報は、作業装置30の各時刻における状態を表し、例えば作業装置30の速度、操舵角、エンジン回転数、各種クラッチのON/OFF状況などを表す。また、作業装置30が作業機械を牽引する車両であるとき、稼働情報は、作業機械に動力を伝達するときのPTO(power take-off)回転数、作業機械の姿勢を示すヒッチ高さやリフトアーム角度などの情報を含んでもよい。また、作業装置30が穀物を収穫する収穫機であるとき、稼働情報は、各種クラッチのON/OFFの状態により、籾が分離された後の穀稈(藁)を裁断するか否かを表す情報を含んでもよい。 When the working device 30 moves and works within the field 400, it acquires operation information that indicates the state of the working device 30. The acquired operation information is output to the work management device 100. The operation information indicates the state of the working device 30 at each time, and indicates, for example, the speed, steering angle, engine speed, and ON/OFF status of various clutches of the working device 30. Furthermore, when the working device 30 is a vehicle that tows a working machine, the operation information may include information such as the PTO (power take-off) speed when transmitting power to the working machine, and the hitch height and lift arm angle that indicate the attitude of the working machine. Furthermore, when the working device 30 is a harvester that harvests grains, the operation information may include information indicating whether or not the stalks (straw) after the rice grains are separated are cut, depending on the ON/OFF status of various clutches.

また、作業装置30は、測位装置、例えばGNSS(Global Navigation Satellite System)の受信機を備え、作業装置30が移動した各時刻の位置を表す位置情報を取得する。取得された位置情報は、稼働情報に含まれる。 The work device 30 also includes a positioning device, such as a GNSS (Global Navigation Satellite System) receiver, and acquires location information indicating the location of the work device 30 at each time it moves. The acquired location information is included in the operation information.

作業管理装置100は、作業装置30から取得した稼働情報に基づき、圃場400において次に行われる作業の作業種別を表す次作業種別を判定する。ここで、作業種別は、作業の種類、例えば収穫、すき込み、藁の反転、播種などを表す。例えば、作業装置30が藁を裁断して排出しているとき、作業管理装置100は、次作業種別が「すき込み」であると判定する。また、作業装置30が藁を裁断せずに排出しているとき、作業管理装置100は、次作業種別が「藁の反転」であると判定する。作業管理装置100は、次作業に関する情報を表す次作業情報を端末200に出力する。 The work management device 100 determines the next work type, which indicates the work type of the work to be performed next in the field 400, based on the operation information acquired from the work device 30. Here, the work type indicates the type of work, such as harvesting, plowing, turning over straw, sowing, etc. For example, when the work device 30 is cutting and discharging straw, the work management device 100 determines that the next work type is "plowing over." Also, when the work device 30 is discharging straw without cutting it, the work management device 100 determines that the next work type is "turning over straw." The work management device 100 outputs next work information, which indicates information related to the next work, to the terminal 200.

端末200は、作業管理装置100から取得する次作業情報をユーザに報知する。例えば、第1端末200-1は、圃場400における作業を管理するユーザ、例えば管理者、圃場400の所有者などに次作業情報を報知する。これにより、管理者は、圃場400における作業の状況を把握することができる。また、第2端末200-2は、次の作業に使用される次作業装置40の作業者に次作業情報を報知する。作業者は、次作業情報に基づき、次作業装置40の準備を行うことができる。例えば、次に行われる作業を表す次作業に関する情報に応じて、作業者は、次作業装置40、例えばトラクターに接続する作業機械を確認することができる。例えば、次作業が「藁の反転」であるとき、作業者は、次作業装置40のトラクターに「テッダー・レーキ」を接続する。また、次作業が「すき込み」であるとき、作業者は、次作業装置40のトラクターに「ロータリー耕耘機」を接続する。 The terminal 200 notifies the user of the next work information acquired from the work management device 100. For example, the first terminal 200-1 notifies the user who manages the work in the field 400, such as the manager or the owner of the field 400, of the next work information. This allows the manager to understand the status of the work in the field 400. In addition, the second terminal 200-2 notifies the worker of the next work device 40 to be used for the next work of the next work information. The worker can prepare the next work device 40 based on the next work information. For example, the worker can confirm the work machine to be connected to the next work device 40, for example, a tractor, depending on the information on the next work that indicates the work to be performed next. For example, when the next work is "straw turning", the worker connects a "tedder rake" to the tractor of the next work device 40. Also, when the next work is "plowing", the worker connects a "rotary tiller" to the tractor of the next work device 40.

このように、作業管理システム1000は、圃場400における次作業に関する次作業情報をユーザに報知することで、ユーザによる圃場400での作業を支援する。ユーザ、例えば作業者は、次作業に関する次作業情報を確認することで、圃場400における作業の間違えを低減することができる。また、ユーザ、例えば管理者は、作業管理システム1000が作業装置30から取得された稼働情報に基づき次作業に関する情報を出力するため、作業者の報告を待たずに作業状況を把握することができる。 In this way, the work management system 1000 supports the user in working in the field 400 by notifying the user of next work information related to the next work in the field 400. The user, for example, a worker, can reduce work errors in the field 400 by checking the next work information related to the next work. In addition, the user, for example, a manager, can understand the work status without waiting for a report from the worker, because the work management system 1000 outputs information related to the next work based on the operation information acquired from the work device 30.

なお、稼働情報は、さらに、作業装置30により行われた作業量を含んでもよい。例えば、作業装置30が収穫を行う車両であるとき、稼働情報は、収穫量を表す情報を含んでもよい。また、作業装置30が移植や資材散布をする車両であるとき、稼働情報は、植え付け量、散布量(ノズル開度やシャッタ開度)などの情報を含んでもよい。 The operation information may further include the amount of work performed by the work device 30. For example, when the work device 30 is a vehicle that harvests, the operation information may include information that indicates the harvest amount. Furthermore, when the work device 30 is a vehicle that transplants or sprays materials, the operation information may include information such as the planting amount and the spraying amount (nozzle opening and shutter opening).

(作業管理システムの構成)
図1に示す作業管理システム1000に含まれる作業管理装置100の構成を説明する。作業管理装置100は、図2に示すように、入出力装置110と、演算装置120と、通信装置130と、記憶装置140とを備える。作業管理装置100は、例えば、コンピュータである。入出力装置110には、演算装置120が処理を実行するための情報が入力される。また、入出力装置110は、演算装置120が処理を実行した結果を出力する。入出力装置110は、様々な入力装置と出力装置とを含み、例えば、キーボード、マウス、マイク、ディスプレイ、スピーカー、タッチパネルなどを含む。入出力装置110は省略されてもよい。
(Configuration of Work Management System)
The configuration of a work management device 100 included in the work management system 1000 shown in Fig. 1 will be described. As shown in Fig. 2, the work management device 100 includes an input/output device 110, a calculation device 120, a communication device 130, and a storage device 140. The work management device 100 is, for example, a computer. Information for the calculation device 120 to execute processing is input to the input/output device 110. The input/output device 110 outputs the results of the processing executed by the calculation device 120. The input/output device 110 includes various input devices and output devices, for example, a keyboard, a mouse, a microphone, a display, a speaker, a touch panel, and the like. The input/output device 110 may be omitted.

通信装置130は、ネットワーク20に電気的に接続され、ネットワーク20を介して各々の装置と通信を行う。例えば、通信装置130は、作業装置30から取得する稼働情報を演算装置120に転送する。また、演算装置120が生成した信号を端末200に転送する。通信装置130は、例えば、NIC(Network Interface Card)、USB(Universal Serial Bus)などの種々のインタフェースを含む。 The communication device 130 is electrically connected to the network 20 and communicates with each device via the network 20. For example, the communication device 130 transfers operation information acquired from the operation device 30 to the calculation device 120. The communication device 130 also transfers signals generated by the calculation device 120 to the terminal 200. The communication device 130 includes various interfaces, such as a network interface card (NIC) and a universal serial bus (USB).

記憶装置140は、圃場400において次に行われる次作業の作業種別を判定するための様々なデータ、例えば作業データ300と、圃場データ310と、作業管理プログラム320とを格納する。記憶装置140は、作業管理プログラム320を記憶する非一時的記憶媒体(non-transitory tangible storage medium)として用いられる。作業管理プログラム320は、コンピュータ読み取り可能な記憶媒体1に記録されたコンピュータプログラム製品(computer program product)として提供されてもよく、または、サーバからダウンロード可能なコンピュータプログラム製品として提供されてもよい。 The storage device 140 stores various data for determining the type of work to be performed next in the field 400, such as work data 300, field data 310, and work management program 320. The storage device 140 is used as a non-transitory tangible storage medium for storing the work management program 320. The work management program 320 may be provided as a computer program product recorded on a computer-readable storage medium 1, or may be provided as a computer program product downloadable from a server.

作業データ300は、圃場400で行われている作業の作業種別と、使用されている作業装置30の種類とに応じて、次作業の作業種別を判定するための条件を表す。例えば、作業データ300は、図3に示すように、作業種別と、作業装置30の種類と、条件と、次作業種別とを関連付けた情報を格納する。作業種別は、圃場400に行われている作業の種類、例えば収穫、藁の反転、すき込み、藁圧縮・梱包などを表す。作業装置30の種類は、圃場400において行われている作業に使用されている作業装置30の種類を表す。条件は、次に行われる次作業の作業種別を判定するために使用される。次作業種別は、次に行われる作業の種類を表す。作業データ300に表された条件を満たすとき、その条件に対応する次作業種別の作業が、次に行われることを表す。 The work data 300 represents conditions for determining the work type of the next work depending on the work type of the work being performed in the field 400 and the type of work equipment 30 being used. For example, as shown in FIG. 3, the work data 300 stores information that associates the work type, the type of work equipment 30, conditions, and the next work type. The work type represents the type of work being performed in the field 400, such as harvesting, turning over straw, plowing, straw compression and packaging, etc. The type of work equipment 30 represents the type of work equipment 30 being used for the work being performed in the field 400. The conditions are used to determine the work type of the next work to be performed. The next work type represents the type of work to be performed next. When the conditions represented in the work data 300 are met, the work of the next work type corresponding to the conditions will be performed next.

例えば、圃場400において「コンバイン」による「収穫」が行われているとき、コンバインにより藁を裁断した作業の割合が閾値以上であるという条件を満たすと、作業管理装置100は、次に「すき込み」が行われると判定する。また、圃場400において「コンバイン」による「収穫」が行われているとき、コンバインにより藁を裁断した作業の割合が閾値未満であるという条件を満たすと、作業管理装置100は、次に「藁の反転」が行われると判定する。また、判定するための条件なしで次作業の作業種別が判定される場合がある。図3に示す例において、圃場400において「テッダー・レーキ」による「藁の反転」が行われているとき、無条件で、作業管理装置100は、次に「藁圧縮・梱包」が行われると判定する。 For example, when "harvesting" is being performed by a "combine" in the field 400, if the condition that the proportion of work in which the combine cuts the straw is equal to or greater than a threshold is satisfied, the work management device 100 determines that "plowing" will be performed next. Also, when "harvesting" is being performed by a "combine" in the field 400, if the condition that the proportion of work in which the combine cuts the straw is less than a threshold is satisfied, the work management device 100 determines that "straw turning" will be performed next. Also, the work type of the next work may be determined without any conditions for determination. In the example shown in FIG. 3, when "straw turning" is being performed by a "tedder/rake" in the field 400, the work management device 100 unconditionally determines that "straw compression/packaging" will be performed next.

図4に示す圃場データ310は、各圃場400において行われる作業の作業種別と、その作業を行う作業者と、その作業に使用される作業装置30の種類とを関連付けた情報を格納する。例えば、圃場データ310は、圃場名と、圃場領域と、作業種別と、作業者と、使用作業装置の種類とを関連付けて表す情報を格納する。圃場名は、作業が行われる圃場400を表す。圃場領域は、圃場400の領域、例えば位置と形状とを表す。作業種別は、圃場400において行われる作業の種類を表す。作業者は、圃場400において対応する作業を行う作業者を表す。使用作業装置の種類は、対応する作業を対応する作業者が行うときに使用される作業装置30の種類を表す。 The field data 310 shown in FIG. 4 stores information associating the type of work performed in each field 400, the worker performing the work, and the type of work equipment 30 used for the work. For example, the field data 310 stores information that associates the field name, field area, work type, worker, and type of work equipment used. The field name represents the field 400 where work is performed. The field area represents the area of the field 400, for example the position and shape. The work type represents the type of work performed in the field 400. The worker represents the worker performing the corresponding work in the field 400. The type of work equipment used represents the type of work equipment 30 used when the corresponding worker performs the corresponding work.

図4に示す例は、「圃場A」において「収穫」が「作業者A」により「コンバイン」を用いて行われることを表す。また、「圃場A」において「藁の反転」が「作業者B」により「テッダー・レーキ」を用いて行われることを表す。また、「圃場B」において「収穫」が「作業者E」により「コンバイン」を用いて行われることを表す。 The example shown in Figure 4 shows that "harvesting" in "field A" is performed by "worker A" using a "combine harvester." It also shows that "straw turning" in "field A" is performed by "worker B" using a "tedder rake." It also shows that "harvesting" in "field B" is performed by "worker E" using a "combine harvester."

図2に示す演算装置120は、作業管理プログラム320を実行して、圃場400において次に行われる次作業の作業種別を判定するための様々なデータ処理に使用される。例えば、演算装置120は、中央演算処理装置(CPU;Central Processing Unit)などを含む。 The arithmetic device 120 shown in FIG. 2 executes the work management program 320 and is used for various data processing to determine the work type of the next work to be performed in the field 400. For example, the arithmetic device 120 includes a central processing unit (CPU) and the like.

演算装置120は、作業管理プログラム320を読み出し実行することで、図5に示すように、データ記憶部150と、作業状況判定部160と、次作業判定部170と、次作業出力部180とを実現する。データ記憶部150は、作業データ300と、圃場データ310とを記憶する。作業状況判定部160は、作業装置30から取得する稼働情報に基づき、圃場400で行われている作業状況を判定する。例えば、作業状況判定部160は、作業装置30により作業が行われている圃場400の特定と、作業の進捗量の決定とを行う。次作業判定部170は、作業装置30から取得する稼働情報に基づき、圃場400において次に行われる次作業の次作業種別を判定する。次作業出力部180は、次作業に関する次作業情報を端末200に出力する。 The computing device 120 reads and executes the work management program 320 to realize a data storage unit 150, a work status determination unit 160, a next work determination unit 170, and a next work output unit 180, as shown in FIG. 5. The data storage unit 150 stores work data 300 and field data 310. The work status determination unit 160 determines the work status being performed in the field 400 based on the operation information acquired from the work device 30. For example, the work status determination unit 160 identifies the field 400 where the work is being performed by the work device 30 and determines the progress of the work. The next work determination unit 170 determines the next work type of the next work to be performed next in the field 400 based on the operation information acquired from the work device 30. The next work output unit 180 outputs the next work information related to the next work to the terminal 200.

次に、端末200の構成を説明する。端末200は、図6に示すように、入出力装置210と、演算装置220と、通信装置230と、記憶装置240とを備える。端末200は、例えば、コンピュータ、タブレット、携帯電話などを含む。入出力装置210には、演算装置220が処理を実行するための情報が入力される。また、入出力装置210は、演算装置220が処理を実行した結果を出力する。入出力装置210は、様々な入力装置と出力装置とを含み、例えば、キーボード、マウス、マイク、ディスプレイ、スピーカー、タッチパネルなどを含む。 Next, the configuration of the terminal 200 will be described. As shown in FIG. 6, the terminal 200 includes an input/output device 210, a computing device 220, a communication device 230, and a storage device 240. The terminal 200 includes, for example, a computer, a tablet, a mobile phone, and the like. Information for the computing device 220 to execute processing is input to the input/output device 210. The input/output device 210 also outputs the results of the processing executed by the computing device 220. The input/output device 210 includes various input devices and output devices, and includes, for example, a keyboard, a mouse, a microphone, a display, a speaker, a touch panel, and the like.

通信装置230は、ネットワーク20に電気的に接続され、ネットワーク20を介して各々の装置と通信を行う。例えば、通信装置230は、作業管理装置100から取得する情報を演算装置220に転送する。また、演算装置220が生成した信号を作業管理装置100に転送する。通信装置230は、例えば、無線LAN(Local Area Network)やセルラーネットワークなどの無線通信に用いられる送受信機、NIC(Network Interface Card)、USB(Universal Serial Bus)などの種々のインタフェースを含む。 The communication device 230 is electrically connected to the network 20 and communicates with each device via the network 20. For example, the communication device 230 transfers information acquired from the work management device 100 to the calculation device 220. The communication device 230 also transfers signals generated by the calculation device 220 to the work management device 100. The communication device 230 includes various interfaces such as a transceiver used for wireless communication such as a wireless LAN (Local Area Network) or a cellular network, a NIC (Network Interface Card), and a USB (Universal Serial Bus).

記憶装置240は、次作業情報をユーザに報知するための様々なデータ、例えば報知プログラム330を格納する。記憶装置240は、報知プログラム330を記憶する非一時的記憶媒体(non-transitory tangible storage medium)として用いられる。報知プログラム330は、コンピュータ読み取り可能な記憶媒体2に記録されたコンピュータプログラム製品(computer program product)として提供されてもよく、または、サーバからダウンロード可能なコンピュータプログラム製品として提供されてもよい。 The storage device 240 stores various data for notifying the user of the next task information, such as the notification program 330. The storage device 240 is used as a non-transitory tangible storage medium for storing the notification program 330. The notification program 330 may be provided as a computer program product recorded on a computer-readable storage medium 2, or may be provided as a computer program product downloadable from a server.

演算装置220は、報知プログラム330を読み出し実行することで、入出力装置210と協働して、図5に示すように、報知部250を実現する。報知部250は、次作業に関する次作業情報を作業管理装置100から取得して、取得された次作業情報をユーザに報知する。例えば、報知部250は、入出力装置210に次作業情報を表示する。 The computing device 220 reads and executes the notification program 330, and cooperates with the input/output device 210 to realize the notification unit 250 as shown in FIG. 5. The notification unit 250 acquires next task information related to the next task from the task management device 100, and notifies the user of the acquired next task information. For example, the notification unit 250 displays the next task information on the input/output device 210.

(作業管理装置の動作)
作業管理装置100の演算装置120は、作業装置30から稼働情報を受信すると、作業管理プログラム320を読み出し実行する。作業管理プログラム320を実行することで、演算装置120は、作業管理方法である図7に示す処理を実行する。
(Operation of the work management device)
When the arithmetic device 120 of the work management apparatus 100 receives operation information from the work apparatus 30, it reads and executes the work management program 320. By executing the work management program 320, the arithmetic device 120 executes the process shown in Fig. 7, which is a work management method.

ステップS110において、演算装置120により実現される作業状況判定部160は、作業装置30から取得される稼働情報に基づき、作業が行われている圃場400を特定する。例えば、作業状況判定部160は、稼働情報に含まれる作業装置30の位置情報に基づき、作業装置30により作業が行われている圃場400を特定する。作業状況判定部160は、圃場データ310から、作業装置30の位置情報に表される位置を含む圃場領域を有する圃場400を検索する。作業状況判定部160は、検索された圃場400を作業が行われている圃場400として特定する。 In step S110, the work status determination unit 160 realized by the calculation device 120 identifies the field 400 where work is being performed based on the operation information acquired from the work device 30. For example, the work status determination unit 160 identifies the field 400 where work is being performed by the work device 30 based on the position information of the work device 30 included in the operation information. The work status determination unit 160 searches the field data 310 for a field 400 having a field area that includes the position represented in the position information of the work device 30. The work status determination unit 160 identifies the searched field 400 as the field 400 where work is being performed.

ステップS120において、作業状況判定部160は、作業装置30の稼働情報に基づき、圃場400における作業の進捗量、例えば進捗率を決定する。例えば、作業状況判定部160は、圃場400の面積に対する作業装置30が作業を行った面積の割合を進捗量として決定する。例えば、作業状況判定部160は、作業装置30の位置情報に表された測位位置を含む凸包を作業装置30が作業を行った完了領域として決定する。凸包は、すべての測位位置を含む最小の領域を表す。また、完了領域は、凸包の輪郭を作業装置30の作業幅だけ外方に広げた領域を表してもよい。作業状況判定部160は、完了領域の面積を作業装置30が作業を行った面積として決定する。作業状況判定部160は、作業を行っている圃場400の面積を完了領域の面積で除算することで、進捗量を決定する。 In step S120, the work status determination unit 160 determines the progress amount, for example the progress rate, of the work in the field 400 based on the operation information of the work device 30. For example, the work status determination unit 160 determines the ratio of the area where the work device 30 has performed work to the area of the field 400 as the progress amount. For example, the work status determination unit 160 determines the convex hull including the positioning positions indicated in the position information of the work device 30 as the completed area where the work device 30 has performed work. The convex hull represents the smallest area including all the positioning positions. The completed area may also represent the area obtained by expanding the outline of the convex hull outward by the work width of the work device 30. The work status determination unit 160 determines the area of the completed area as the area where the work device 30 has performed work. The work status determination unit 160 determines the progress amount by dividing the area of the field 400 where work is being performed by the area of the completed area.

ここで、作業装置30の作業幅は、作業装置30により予め登録されている。例えば、作業幅は、作業装置30の幅方向において、作業装置30に設けられた測位装置の位置から作業装置30が作業を行う領域の端までの距離を表す。作業幅は、トラクターが農機を牽引するとき、作業装置30の幅方向において、作業装置30に設けられた測位装置の位置から農機が作業を行う領域の端までの距離を表す。 Here, the working width of the working device 30 is registered in advance by the working device 30. For example, the working width represents the distance in the width direction of the working device 30 from the position of the positioning device provided on the working device 30 to the edge of the area in which the working device 30 works. When a tractor pulls an agricultural machine, the working width represents the distance in the width direction of the working device 30 from the position of the positioning device provided on the working device 30 to the edge of the area in which the agricultural machine works.

ステップS130において、作業状況判定部160は、決定された進捗量と閾値とを比較する。進捗量が閾値未満であるとき、処理はステップS120に戻り、新たに受信する稼働情報に基づき、進捗量が決定される。進捗量が閾値以上であるとき、処理はステップS140に移行する。例えば、閾値は、圃場400における作業装置30による作業がもう少しで終了することを判定できるように設定される。例えば、閾値は、80%以上に設定されてもよく、90%以上に設定されてもよく、100%に設定されてもよい。 In step S130, the work status determination unit 160 compares the determined progress amount with a threshold value. When the progress amount is less than the threshold value, the process returns to step S120, where the progress amount is determined based on newly received operation information. When the progress amount is equal to or greater than the threshold value, the process proceeds to step S140. For example, the threshold value is set so that it can be determined that the work by the work device 30 in the field 400 is about to be completed. For example, the threshold value may be set to 80% or more, 90% or more, or 100%.

ステップS140において、次作業判定部170は、作業装置30から取得される稼働情報と、作業データ300に記憶された条件とを比較する。例えば、最初に、次作業判定部170は、作業データ300から、圃場400で行われている作業の作業種別と、作業を行っている作業装置30とに対応する条件を取得する。圃場400で行われている作業の作業種別と、作業を行っている作業装置30の種類とは、予め作業管理装置100に登録されている。図3に示す例において、圃場400で「コンバイン」により「収穫」が行われているとき、次作業判定部170は、対応する条件として、「藁を裁断した作業の割合が閾値以上」であることと、「藁を裁断した作業の割合が閾値未満」であることとを取得する。 In step S140, the next work determination unit 170 compares the operation information acquired from the work device 30 with the conditions stored in the work data 300. For example, the next work determination unit 170 first acquires from the work data 300 the work type of the work being performed in the field 400 and the conditions corresponding to the work device 30 performing the work. The work type of the work being performed in the field 400 and the type of work device 30 performing the work are registered in advance in the work management device 100. In the example shown in FIG. 3, when "harvesting" is being performed by a "combine" in the field 400, the next work determination unit 170 acquires the corresponding conditions that "the proportion of work in which straw is cut is equal to or greater than a threshold value" and "the proportion of work in which straw is cut is less than a threshold value."

次に、次作業判定部170は、取得された条件のうち、稼働情報が満たす条件を判定する。例えば、圃場400において「コンバイン」により「収穫」が行われているとき、次作業判定部170は、圃場400における作業に対して、作業装置30(コンバイン)が藁を裁断した作業の割合を決定する。例えば、次作業判定部170は、圃場400の面積に対して、作業装置30が藁を裁断して作業を行った裁断作業面積の割合を、作業装置30が藁を裁断した割合として決定する。 Next, the next work determination unit 170 determines which of the acquired conditions are satisfied by the operation information. For example, when "harvesting" is being performed by a "combine" in the field 400, the next work determination unit 170 determines the proportion of work in the field 400 in which the work device 30 (combine) cut straw. For example, the next work determination unit 170 determines the proportion of the cutting work area in which the work device 30 cut straw to the area of the field 400 as the proportion of the straw cut by the work device 30.

裁断作業面積は、例えば、作業装置30が藁を裁断して排出していた位置に基づき決定されてもよい。次作業判定部170は、稼働情報に含まれる位置情報から、藁が裁断されていたことを表す稼働情報が測定された時刻に対応する裁断作業位置情報を抽出する。 The cutting work area may be determined, for example, based on the position where the work device 30 was cutting and discharging the straw. The next work determination unit 170 extracts cutting work position information corresponding to the time when the operation information indicating that the straw was being cut was measured from the position information included in the operation information.

例えば、図8に示すように、作業装置30の測位装置は、第1測位位置500-1から第9測位位置500-9の順番に作業装置30の位置を測定したとする。このとき、作業装置30は、第1測位位置500-1から第3測位位置500-3まで移動するときと、第7測位位置500-7から第9測位位置500-9まで移動するときとに、藁を裁断していたとする。また、作業装置30は、第4測位位置500-4から第6測位位置500-6まで移動するときに、藁を裁断していなかったとする。この場合、第1測位位置500-1と、第2測位位置500-2と、第3測位位置500-3と、第7測位位置500-7と、第8測位位置500-8と、第9測位位置500-9とに対応する各稼働情報は、作業装置30が藁を裁断していたことを表す。また、第4測位位置500-4と、第5測位位置500-5と、第6測位位置500-6とに対応する各稼働情報は、作業装置30が藁を裁断していないことを表す。このため、次作業判定部170は、測位位置500を表す位置情報のうち、藁を裁断していたときの位置を表す裁断作業位置550を表す裁断作業位置情報を抽出する。 For example, as shown in Figure 8, the positioning device of the working device 30 measures the position of the working device 30 in the order of the first positioning position 500-1 to the ninth positioning position 500-9. At this time, it is assumed that the working device 30 cuts straw when it moves from the first positioning position 500-1 to the third positioning position 500-3 and when it moves from the seventh positioning position 500-7 to the ninth positioning position 500-9. It is also assumed that the working device 30 does not cut straw when it moves from the fourth positioning position 500-4 to the sixth positioning position 500-6. In this case, the operation information corresponding to the first positioning position 500-1, the second positioning position 500-2, the third positioning position 500-3, the seventh positioning position 500-7, the eighth positioning position 500-8, and the ninth positioning position 500-9 indicates that the working device 30 was cutting straw. Also, the operation information corresponding to the fourth positioning position 500-4, the fifth positioning position 500-5, and the sixth positioning position 500-6 indicates that the working device 30 is not cutting straw. Therefore, the next task determination unit 170 extracts cutting task position information representing the cutting task position 550, which represents the position when the straw was being cut, from the position information representing the positioning position 500.

次作業判定部170は、抽出された裁断作業位置情報の裁断作業位置550を含む凸包の面積を裁断作業面積として決定する。また、裁断作業面積は、凸包の輪郭を作業装置30の作業幅だけ外方に広げた領域の面積を表してもよい。 The next operation determination unit 170 determines the area of the convex hull including the cutting operation position 550 of the extracted cutting operation position information as the cutting operation area. The cutting operation area may also represent the area of the region obtained by expanding the outline of the convex hull outward by the operation width of the operation device 30.

次作業判定部170は、裁断作業面積を、作業装置30により作業が行われている圃場400の面積で除算することで、圃場400における作業のうち、藁を裁断した作業の作業割合を決定する。次作業判定部170は、決定された作業割合と、作業データ300に記憶された閾値とを比較して、稼働情報が満たす条件を判定する。 The next task determination unit 170 determines the task proportion of straw cutting among the tasks in the field 400 by dividing the cutting task area by the area of the field 400 where the task is being performed by the task device 30. The next task determination unit 170 compares the determined task proportion with a threshold value stored in the task data 300 to determine the conditions that are satisfied by the operation information.

図7に示すステップS150において、次作業判定部170は、作業データ300において、稼働情報が満たす条件に対応する次作業種別を次作業の作業種別として判定する。図3に示すように、圃場400において「コンバイン」により「収穫」が行われている状況において、次作業判定部170は、藁を裁断する作業の作業割合が閾値以上であるとき、次に行われる作業が「すき込み」であると判定する。また、藁を裁断する作業割合が閾値未満であるとき、次に行われる作業が「藁の反転」であると判定する。 In step S150 shown in FIG. 7, the next work determination unit 170 determines the next work type in the work data 300 that corresponds to the conditions satisfied by the operation information as the work type of the next work. As shown in FIG. 3, in a situation where "harvesting" is being performed by a "combine" in a farm field 400, when the work ratio of the work of cutting straw is equal to or greater than a threshold value, the next work determination unit 170 determines that the next work to be performed is "plowing in." Also, when the work ratio of the work of cutting straw is less than the threshold value, it determines that the next work to be performed is "straw turning."

図7に示すステップS160において、次作業出力部180は、判定された次作業に関する次作業情報を端末200に出力する。次作業出力部180は、判定された次作業の次作業種別と、圃場データ310とに基づき、次作業を行う作業者と、次作業で使用される次作業装置40の種類とを決定する。次作業出力部180は、次作業に関する次作業情報、例えば作業を行う圃場400と、次作業で使用される次作業装置40の種類などを、次作業を行う作業者の端末200に出力する。また、次作業出力部180は、他のユーザ、例えば作業の管理者、圃場400の所有者などの端末200にも次作業情報を出力してもよい。 In step S160 shown in FIG. 7, the next work output unit 180 outputs next work information related to the determined next work to the terminal 200. The next work output unit 180 determines the worker who will perform the next work and the type of next work device 40 to be used in the next work based on the determined next work type of the next work and the field data 310. The next work output unit 180 outputs next work information related to the next work, such as the field 400 where the work will be performed and the type of next work device 40 to be used in the next work, to the terminal 200 of the worker who will perform the next work. The next work output unit 180 may also output next work information to the terminal 200 of other users, such as the work manager or the owner of the field 400.

例えば、図4に示す圃場データ310に基づき、作業が行われている圃場400が「圃場A」であり、かつ、次作業種別が「藁の反転」を表すとき、次作業出力部180は、次作業を行う作業者が「作業者B」であり、かつ、次作業に使用される次作業装置40の種類が「テッダー・レーキ」であることを決定する。次作業出力部180は、「作業者B」の端末200に、次作業に関する情報、例えば「圃場A」において「藁の反転」を「テッダー・レーキ」を用いて行うことを表す情報を出力する。 For example, based on the field data 310 shown in FIG. 4, when the field 400 where work is being performed is "Field A" and the next work type indicates "straw inversion", the next work output unit 180 determines that the worker performing the next work is "Worker B" and that the type of next work device 40 to be used for the next work is a "tedder rake". The next work output unit 180 outputs information about the next work to the terminal 200 of "Worker B", for example, information indicating that "straw inversion" will be performed using a "tedder rake" in "Field A".

作業が行われている圃場400が「圃場A」であり、かつ、次作業種別が「すき込み」を表すとき、次作業出力部180は、次作業を行う作業者が「作業者D」であり、かつ、次作業に使用される次作業装置40の種類が「ロータリー耕耘機」であることを決定する。次作業出力部180は、「作業者D」の端末200に、次作業に関する情報、例えば「圃場A」において「すき込み」を「ロータリー耕耘機」を用いて行うことを表す情報を出力する。 When the field 400 in which work is being performed is "Field A" and the next work type indicates "plowing in", the next work output unit 180 determines that the worker performing the next work is "Worker D" and that the type of next work device 40 to be used for the next work is a "rotary tiller". The next work output unit 180 outputs information about the next work to the terminal 200 of "Worker D", for example, information indicating that "plowing in" will be performed in "Field A" using a "rotary tiller".

図7に示すステップS170において、端末200の報知部250は、取得された次作業情報をユーザに報知する。例えば、報知部250は、次作業を行う圃場400と、圃場400で行う次作業種別と、次作業で使用する次作業装置40の種類とを表す次作業情報を入出力装置210に表示する。例えば、報知部250は、地図上に次作業を行う圃場400の領域を表した画像を表示する。また、報知部250は、音声で作業者に次作業情報を報知してもよい。ユーザ、例えば次作業を行う作業者は、次作業情報を確認して、次作業装置40の準備を行い、次作業を行う圃場400に移動する。このように、ユーザは、作業を行う圃場400と、作業で使用する作業装置30とを確認して準備を行うことができる。 In step S170 shown in FIG. 7, the notification unit 250 of the terminal 200 notifies the user of the acquired next work information. For example, the notification unit 250 displays on the input/output device 210 the next work information indicating the field 400 in which the next work is to be performed, the type of the next work to be performed in the field 400, and the type of the next work device 40 to be used in the next work. For example, the notification unit 250 displays an image showing the area of the field 400 in which the next work is to be performed on a map. The notification unit 250 may also notify the worker of the next work information by voice. The user, for example, the worker performing the next work, checks the next work information, prepares the next work device 40, and moves to the field 400 in which the next work is to be performed. In this way, the user can check the field 400 in which the work is to be performed and the work device 30 to be used in the work and make preparations.

また、報知部250は、次作業情報に加えて、作業状況として、圃場400で行われている作業の進捗量をユーザ、例えば作業の管理者、圃場400の所有者に報知してもよい。ユーザは、作業の進捗量を確認することで、圃場400における作業状況を把握することができる。この場合、作業管理装置100の次作業出力部180は、次作業情報に加えて、作業の進捗量を表す情報を端末200に出力してもよい。 The notification unit 250 may also notify a user, such as a work manager or the owner of the field 400, of the progress of the work being performed in the field 400 as the work status, in addition to the next work information. The user can grasp the work status in the field 400 by checking the progress of the work. In this case, the next work output unit 180 of the work management device 100 may output information indicating the progress of the work to the terminal 200, in addition to the next work information.

次作業情報を報知されたユーザ、例えば次作業を行う作業者が次作業装置40を用いて作業を行うとき、次作業装置40は、次作業装置40の状態を表す稼働情報を取得して、取得された稼働情報を作業管理装置100に出力する。作業管理装置100の演算装置120は、次作業装置40から稼働情報を受信すると、図7に示す処理を実行する。作業管理装置100の作業状況判定部160は、ステップS110において、次作業装置40の稼働情報に基づき、次作業装置40が作業を行っている圃場400を特定する。ここで、次作業装置40は、前回の作業が行われた圃場400を、作業が行われている圃場400として特定してもよい。次に、作業状況判定部160は、ステップS120において、作業の進捗量を決定する。 When a user who has been notified of the next task information, for example a worker performing the next task, performs the task using the next task device 40, the next task device 40 acquires operation information indicating the state of the next task device 40 and outputs the acquired operation information to the task management device 100. When the calculation device 120 of the task management device 100 receives the operation information from the next task device 40, it executes the process shown in FIG. 7. In step S110, the task status determination unit 160 of the task management device 100 identifies the field 400 in which the next task device 40 is performing the task based on the operation information of the next task device 40. Here, the next task device 40 may identify the field 400 in which the previous task was performed as the field 400 in which the task is being performed. Next, in step S120, the task status determination unit 160 determines the progress of the task.

決定された進捗量が閾値以上であるとき、次作業判定部170は、ステップS140において、次作業装置40から取得された稼働情報と、作業データ300に記憶された条件とを比較する。また、ステップS150において、次作業判定部170は、稼働情報が満たす条件に対応する次作業種別を、次に行われる作業として判定する。ここで、次作業判定部170は、圃場400で行われた前回の作業に対して判定された次作業を、次作業装置40により行われている作業として判定してもよい。また、次作業判定部170は、圃場400で作業を行っている次作業装置40の種類を、圃場400で行われた前回の作業に対して決定された次作業装置40の種類として決定してもよい。 When the determined progress amount is equal to or greater than the threshold, the next work determination unit 170 compares the operation information acquired from the next work device 40 with the conditions stored in the work data 300 in step S140. In addition, in step S150, the next work determination unit 170 determines the next work type corresponding to the conditions satisfied by the operation information as the work to be performed next. Here, the next work determination unit 170 may determine the next work determined for the previous work performed in the field 400 as the work being performed by the next work device 40. In addition, the next work determination unit 170 may determine the type of the next work device 40 performing work in the field 400 as the type of the next work device 40 determined for the previous work performed in the field 400.

例えば、圃場400において、「収穫」が行われ、かつ、次作業判定部170により次作業が「藁の反転」であると判定されているとき、次作業判定部170は、次作業装置40が「藁の反転」を行っていると判定してもよい。また、圃場400において、「収穫」が行われ、かつ、次作業出力部180により「テッダー・レーキ」を使用することが決定されているとき、次作業判定部170は、圃場400において使用されている作業装置の種類が「テッダー・レーキ」であると判定してもよい。この場合、次作業判定部170は、図3に示す作業データ300に基づき、「テッダー・レーキ」により「藁の反転」が行われているため、条件がなく、次に「藁圧縮・梱包」が行われると判定する。 For example, when "harvesting" is performed in the field 400 and the next work determination unit 170 determines that the next work is "straw inversion", the next work determination unit 170 may determine that the next work device 40 is performing "straw inversion". Also, when "harvesting" is performed in the field 400 and the next work output unit 180 determines that a "tedder/rake" is to be used, the next work determination unit 170 may determine that the type of work device used in the field 400 is a "tedder/rake". In this case, based on the work data 300 shown in FIG. 3, the next work determination unit 170 determines that there is no condition and that "straw compression/packaging" will be performed next because "straw inversion" is being performed by a "tedder/rake".

次作業出力部180は、ステップS160において、判定された次作業、例えば「藁圧縮・梱包」に関する次作業情報を端末200に出力する。端末200の報知部250は、ステップS170において、次作業情報をユーザに報知する。 In step S160, the next task output unit 180 outputs next task information relating to the determined next task, for example, "straw compression and packaging," to the terminal 200. In step S170, the notification unit 250 of the terminal 200 notifies the user of the next task information.

このように、作業管理システム1000は、次に行われる作業がなくなるまで、図7に示す処理を繰り返し実行することができる。 In this way, the work management system 1000 can repeatedly execute the process shown in FIG. 7 until there is no more work to be done.

(変形例)
実施の形態において説明した構成は一例であり、機能を阻害しない範囲で構成を変更することができる。例えば、図7に示すステップS140の処理において使用される作業種別、具体的には、圃場400において行われている作業の作業種別が予め作業管理装置100に登録されている例を示したが、これに限定されず、任意の方法で作業種別が決定されてもよい。作業種別は、作業状況判定部160により、作業装置30の稼働情報に基づき、推定されてもよい。
(Modification)
The configuration described in the embodiment is an example, and the configuration can be changed to the extent that the function is not impaired. For example, an example has been shown in which the task type used in the processing of step S140 shown in Fig. 7, specifically, the task type of the task being performed in the field 400, is registered in advance in the task management apparatus 100, but this is not limiting, and the task type may be determined by any method. The task type may be estimated by the task status determination unit 160 based on the operation information of the task device 30.

また、ステップS140の処理において使用される作業装置30の種類、具体的には、圃場400において作業を行っている作業装置30の種類が予め作業管理装置100に登録されている例を示したが、これに限定されず、任意の方法で作業装置30の種類が決定されてもよい。例えば、作業状況判定部160は、作業装置30から取得する稼働情報に含まれる送信元の情報に基づき、作業装置30の種類を決定してもよい。 In addition, an example has been shown in which the type of work device 30 used in the processing of step S140, specifically the type of work device 30 performing work in the field 400, is registered in advance in the work management device 100, but this is not limited thereto, and the type of work device 30 may be determined by any method. For example, the work status determination unit 160 may determine the type of work device 30 based on information on the sender included in the operation information acquired from the work device 30.

ステップS120において、作業状況判定部160は、作業装置30の位置情報に表された測位位置を含む凸包を作業装置30により作業が行われた完了領域として決定する例を示したが、これに限定されず、任意の方法で完了領域を決定してもよい。例えば、作業状況判定部160は、作業装置30が移動した移動軌跡に基づき、完了領域を決定してもよい。例えば、作業状況判定部160は、位置情報に表された測位位置を測位された時刻の順番に線、例えば直線状の線分で接続した移動軌跡を決定する。作業状況判定部160は、移動軌跡からの距離が作業装置30の作業幅以内である領域を完了領域として決定する。 In step S120, the work status determination unit 160 has determined a convex hull including the positioning position indicated in the position information of the work device 30 as the completed area where the work has been performed by the work device 30, but this is not limited to the above, and the completed area may be determined by any method. For example, the work status determination unit 160 may determine the completed area based on the movement trajectory of the work device 30. For example, the work status determination unit 160 determines a movement trajectory that connects the positioning positions indicated in the position information in the order of the time of positioning with a line, for example a straight line segment. The work status determination unit 160 determines an area whose distance from the movement trajectory is within the work width of the work device 30 as the completed area.

また、ステップS120において、作業状況判定部160は、任意の方法で進捗量を決定してもよい。例えば、作業状況判定部160は、圃場400で行われる作業量に対して、作業装置30により行われた作業量の割合を、進捗量として決定してもよい。例えば、作業装置30が農薬を散布するとき、作業状況判定部160は、圃場400に散布する農薬の散布量に対して、作業装置30により散布された農薬の散布量の割合を進捗量として決定してもよい。 In addition, in step S120, the work status determination unit 160 may determine the amount of progress using any method. For example, the work status determination unit 160 may determine the amount of progress as the ratio of the amount of work performed by the work device 30 to the amount of work performed in the field 400. For example, when the work device 30 sprays pesticide, the work status determination unit 160 may determine the amount of progress as the ratio of the amount of pesticide sprayed by the work device 30 to the amount of pesticide sprayed in the field 400.

ステップS140において、次作業判定部170は、裁断作業位置550を含む凸包の面積を、藁を裁断して作業を行った裁断作業面積として決定する例を示したが、これに限定されず、任意の方法で裁断作業面積を決定してもよい。例えば、次作業判定部170は、作業装置30が藁を裁断して移動した軌跡を表す裁断移動軌跡に基づき、裁断作業面積を決定してもよい。例えば、次作業判定部170は、図9に示すように、稼働情報に基づき、測定された作業装置30の測位位置500のうち、作業装置30が藁を裁断していた裁断作業位置550を抽出する。次作業判定部170は、測位位置500の測定された時間の順番において、互いに隣接する2つの裁断作業位置550を線、例えば直線状の線分で接続した裁断移動軌跡560を決定する。 In step S140, the next work determination unit 170 determines the area of the convex hull including the cutting work position 550 as the cutting work area where the straw was cut, but the cutting work area may be determined by any method without being limited to this. For example, the next work determination unit 170 may determine the cutting work area based on a cutting movement trajectory that represents the trajectory along which the working device 30 moved while cutting the straw. For example, as shown in FIG. 9, the next work determination unit 170 extracts the cutting work position 550 where the working device 30 cut the straw from the measured positioning positions 500 of the working device 30 based on the operation information. The next work determination unit 170 determines a cutting movement trajectory 560 that connects two adjacent cutting work positions 550 in the order of the measured time of the positioning positions 500 with a line, for example, a straight line segment.

例えば、第1測位位置500-1と、第2測位位置500-2とは、測位位置500の測定された時間の順番において、互いに隣接するため、次作業判定部170は、第1測位位置500-1と、第2測位位置500-2とを結んだ線分を第1裁断移動軌跡560-1の一部として決定する。同様に、次作業判定部170は、第2測位位置500-2と第3測位位置500-3とを結んだ線分を第1裁断移動軌跡560-1の一部として決定する。ここで、第3測位位置500-3と、第7測位位置500-7とは、測位位置500の測定された時間の順番において、第4測位位置500-4から第6測位位置500-6を挟むため、互いに隣接しない。次作業判定部170は、第7測位位置500-7と第8測位位置500-8とが互いに隣接するため、第7測位位置500-7と第8測位位置500-8とを結んだ線分を第2裁断移動軌跡560-2の一部として決定する。同様に、次作業判定部170は、第8測位位置500-8と第9測位位置500-9とを結んだ線分を第2裁断移動軌跡560-2の一部として決定する。このように、次作業判定部170は、裁断移動軌跡560を決定する。 For example, the first positioning position 500-1 and the second positioning position 500-2 are adjacent to each other in the order of time when the positioning positions 500 were measured, so the next work determination unit 170 determines the line segment connecting the first positioning position 500-1 and the second positioning position 500-2 as part of the first cutting movement trajectory 560-1. Similarly, the next work determination unit 170 determines the line segment connecting the second positioning position 500-2 and the third positioning position 500-3 as part of the first cutting movement trajectory 560-1. Here, the third positioning position 500-3 and the seventh positioning position 500-7 are not adjacent to each other because they sandwich the fourth positioning position 500-4 to the sixth positioning position 500-6 in between in the order of time when the positioning positions 500 were measured. Because the seventh positioning position 500-7 and the eighth positioning position 500-8 are adjacent to each other, the next task determination unit 170 determines the line segment connecting the seventh positioning position 500-7 and the eighth positioning position 500-8 as part of the second cutting movement trajectory 560-2. Similarly, the next task determination unit 170 determines the line segment connecting the eighth positioning position 500-8 and the ninth positioning position 500-9 as part of the second cutting movement trajectory 560-2. In this way, the next task determination unit 170 determines the cutting movement trajectory 560.

次作業判定部170は、決定された裁断移動軌跡560の距離が作業装置30の作業幅以内である領域の面積を裁断作業面積として決定する。 The next work determination unit 170 determines the area of the region in which the distance of the determined cutting movement trajectory 560 is within the working width of the working device 30 as the cutting work area.

また、図7に示すステップS140において、次作業判定部170は、圃場400における作業に対して、作業装置30が藁を裁断した作業の割合を表す作業割合を任意の方法で決定してもよい。例えば、作業装置30が圃場400における作業が終了した後に稼働情報を出力するとき、次作業判定部170は、刈り取った藁の量、例えば重量に対する裁断した藁の量、例えば重量の割合を、藁を裁断した作業の作業割合として決定してもよい。 In addition, in step S140 shown in FIG. 7, the next work determination unit 170 may use any method to determine the work ratio that represents the ratio of work in which the work device 30 cuts straw to the work in the field 400. For example, when the work device 30 outputs operation information after the work in the field 400 is completed, the next work determination unit 170 may determine the amount of cut straw, for example the weight ratio, to the amount of cut straw, for example the weight, of the harvested straw as the work ratio of the work in which straw is cut.

図3に示す作業データ300は、作業種別と、作業を行う作業装置30とに対応して条件を記憶する例を示したが、これに限定されない。例えば、作業データ300は、作業種別のみに対応する条件を記憶してもよい。また、作業データ300は、作業装置30に対応して条件を記憶してもよい。 The work data 300 shown in FIG. 3 is an example in which conditions are stored corresponding to the work type and the work device 30 that performs the work, but is not limited to this. For example, the work data 300 may store conditions corresponding only to the work type. Furthermore, the work data 300 may store conditions corresponding to the work device 30.

また、図4に示す圃場データ310は、圃場400で行われる作業の作業種別と、作業を行う作業者と、作業に使用される使用作業装置の種類とを関連付けた情報を格納する例を示したが、これに限定されない。次の作業を行う作業者と、作業者が使用する次作業装置40とを特定できれば、圃場データ310は、任意の構成を有してもよい。例えば、圃場データ310は、圃場400に関係なく、作業種別と、作業者と、使用作業装置の種類とを関連付けた情報を格納してもよい。この場合、図7に示すステップS160において、次作業出力部180は、圃場データ310から判定された次作業種別に対応する作業者と、使用作業装置の種類とを検索する。検索された作業者の1名の端末200に、次作業出力部180は、次作業情報を出力する。 The field data 310 shown in FIG. 4 stores information that associates the type of work performed in the field 400, the worker performing the work, and the type of work equipment used for the work, but is not limited to this. The field data 310 may have any configuration as long as it can identify the worker performing the next work and the next work equipment 40 used by the worker. For example, the field data 310 may store information that associates the work type, the worker, and the type of work equipment used, regardless of the field 400. In this case, in step S160 shown in FIG. 7, the next work output unit 180 searches for the worker corresponding to the next work type determined from the field data 310 and the type of work equipment used. The next work output unit 180 outputs the next work information to the terminal 200 of one of the searched workers.

以上において説明した実施の形態および変形例は一例であり、各実施の形態および変形例で説明した構成は、機能を阻害しない範囲で、任意に変更してもよく、または/および、任意に組み合わせてもよい。さらに、必要となる機能を実現できれば、実施の形態および変形例で説明した一部の機能を省略してもよい。例えば、作業管理装置100の一部、または、すべての処理を端末200が実行してもよい。また、端末200の一部、または、すべての処理を作業管理装置100が実行してもよい。作業管理プログラム320は、報知プログラム330を含んでもよい。また、作業管理システム1000は、端末200を含まず、作業管理システム1000に含まれない外部端末に次作業情報を出力してもよい。この場合、外部端末は次作業情報をユーザに報知する。 The above-described embodiments and modifications are merely examples, and the configurations described in each embodiment and modification may be modified and/or combined as desired without impairing the functions. Furthermore, some of the functions described in the embodiments and modifications may be omitted as long as the necessary functions can be realized. For example, some or all of the processing of the work management device 100 may be executed by the terminal 200. Also, some or all of the processing of the terminal 200 may be executed by the work management device 100. The work management program 320 may include a notification program 330. Also, the work management system 1000 may not include the terminal 200, and may output the next work information to an external terminal not included in the work management system 1000. In this case, the external terminal notifies the user of the next work information.

また、図7に示すフローチャートの順番は、機能を阻害しない範囲で入れ替えてもよい。例えば、作業管理装置100は、ステップS130の処理をステップS150の処理の後に実行してもよい。また、作業が行われる圃場400を表す情報が予め作業管理装置100に登録されているとき、ステップS110の処理は省略されてもよい。 The order of the flowchart shown in FIG. 7 may be changed as long as it does not impair functionality. For example, the work management device 100 may execute the process of step S130 after the process of step S150. When information representing the field 400 in which work is to be performed is registered in advance in the work management device 100, the process of step S110 may be omitted.

図7に示すステップS160において、次作業出力部180は、次作業に関する次作業情報として、圃場を特定する情報と、次作業種別の名称と、次作業で使用される作業装置30の種類とを出力する例を示したが、これらの一部の情報のみを出力してもよい。例えば、次作業出力部180は、次作業種別の名称のみを表す次作業情報を出力してもよい。ユーザ、例えば作業者は、次作業種別の名称に基づき、次作業で使用される作業装置30の種類を確認する。また、次作業出力部180は、次作業で使用される作業装置30の種類のみを表す次作業情報を出力してもよい。この場合、ユーザ、例えば作業者は、作業装置30の種類に基づき、次作業の作業種別を確認する。 In step S160 shown in FIG. 7, the next work output unit 180 outputs information identifying the field, the name of the next work type, and the type of work equipment 30 to be used in the next work as next work information related to the next work. However, only some of this information may be output. For example, the next work output unit 180 may output next work information indicating only the name of the next work type. A user, for example, a worker, checks the type of work equipment 30 to be used in the next work based on the name of the next work type. The next work output unit 180 may also output next work information indicating only the type of work equipment 30 to be used in the next work. In this case, a user, for example, a worker, checks the work type of the next work based on the type of work equipment 30.

1、2 :記憶媒体
20 :ネットワーク
30 :作業装置
40 :次作業装置
100 :作業管理装置
110 :入出力装置
120 :演算装置
130 :通信装置
140 :記憶装置
150 :データ記憶部
160 :作業状況判定部
170 :次作業判定部
180 :次作業出力部
200 :端末
210 :入出力装置
220 :演算装置
230 :通信装置
240 :記憶装置
250 :報知部
300 :作業データ
310 :圃場データ
320 :作業管理プログラム
330 :報知プログラム
400 :圃場
500 :測位位置
550 :裁断作業位置
560 :裁断移動軌跡
1000 :作業管理システム
1, 2: Storage medium 20: Network 30: Work device 40: Next work device 100: Work management device 110: Input/output device 120: Calculation device 130: Communication device 140: Storage device 150: Data storage unit 160: Work status determination unit 170: Next work determination unit 180: Next work output unit 200: Terminal 210: Input/output device 220: Calculation device 230: Communication device 240: Storage device 250: Notification unit 300: Work data 310: Field data 320: Work management program 330: Notification program 400: Field 500: Positioning position 550: Cutting work position 560: Cutting movement trajectory 1000: Work management system

Claims (9)

圃場で第1作業を行っている第1作業装置の状態を表す稼働情報と予め記憶された1つ以上の条件との比較に基づき、前記第1作業装置による前記第1作業の次に行われる第2作業の第2作業種別を判定することを次作業判定部により実行することと、
前記第2作業に関する第2作業情報を出力することを次作業出力部により実行することと、
を含み、
前記1つ以上の条件は、前記第1作業の第1作業種別に応じて予め記憶され、
前記第2作業種別を判定することは、
前記1つ以上の条件から、前記第1作業種別に応じた第1条件を取得することと、
前記稼働情報が満たす前第1条件に対応する作業種別を前記第2作業種別として判定すること
を含む作業管理方法。
determining, by a next work determination unit, a second work type of a second work to be performed next to the first work by the first work device, based on a comparison between operation information indicating a state of the first work device performing the first work in the farm field and one or more conditions stored in advance;
outputting second work information related to the second work by a next work output unit;
Including,
The one or more conditions are stored in advance according to a first work type of the first work,
Determining the second work type includes:
Obtaining a first condition corresponding to the first work type from the one or more conditions;
determining, as the second work type, a work type corresponding to the first condition satisfied by the operation information.
前記第1作業種別は穀物を収穫することを表し、
前記第2作業種別を判定することは、
前記圃場における作業のうち、前記穀物の籾を分離した藁を裁断する作業の割合に応じて、前記第2作業種別を決定すること
を含む請求項に記載の作業管理方法。
the first work type represents harvesting grain;
Determining the second work type includes:
The work management method according to claim 1 , further comprising: determining the second work type in accordance with a proportion of work in the field that is a work of cutting straw from which husks have been separated.
前記第2作業を判定することは、
前記圃場における作業のうち、前記藁を裁断する作業の割合が閾値以上であるとき、前記第2作業種別をすき込みと判定し、
前記圃場における作業のうち、前記藁を裁断する作業の割合が閾値未満であるとき、前記第2作業を藁の反転と判定する
請求項に記載の作業管理方法。
Determining the second task includes:
When a ratio of the work of cutting the straw among the works in the field is equal to or greater than a threshold value, the second work type is determined to be plowing;
The work management method according to claim 2 , wherein when a ratio of work of cutting the straw among the works in the field is less than a threshold value, the second work is determined to be turning over straw.
前記第2作業情報を出力することは、
前記第2作業種別に基づき、前記第2作業で使用される第2作業装置を決定すること
を含み、
前記第2作業情報は、前記第2作業装置を表す情報を含む
請求項1からのいずれか1項に記載の作業管理方法。
Outputting the second work information includes:
determining a second work device to be used in the second work based on the second work type;
The work management method according to claim 1 , wherein the second work information includes information representing the second work device.
圃場で第1作業を行っている第1作業装置の状態を表す稼働情報と予め記憶された条件との比較に基づき、前記第1作業装置による前記第1作業の次に行われる第2作業の第2作業種別を判定することを次作業判定部により実行することと、
前記第2作業に関する第2作業情報を出力することを次作業出力部により実行することと、
を含み、
前記条件は、前記第1作業装置の種類に応じて予め記憶され、
前記第2作業種別を判定することは、
前記稼働情報が満たす前記第1作業装置に応じた前記条件に対応する作業種別を前記第2作業種別として判定すること
を含む作業管理方法。
determining, by a next work determination unit, a second work type of a second work to be performed next to the first work by the first work device, based on a comparison between operation information indicating a state of the first work device performing the first work in the field and pre-stored conditions;
outputting second work information related to the second work by a next work output unit;
Including,
The conditions are stored in advance according to the type of the first working device,
Determining the second work type includes:
determining, as the second work type, a work type corresponding to the condition according to the first work device satisfied by the operation information.
圃場で第1作業を行っている第1作業装置の状態を表す稼働情報と予め記憶された条件との比較に基づき、前記第1作業装置による前記第1作業の次に行われる第2作業の第2作業種別を判定することを次作業判定部により実行することと、
前記稼働情報に基づき、前記圃場における前記第1作業の進捗量を決定することを作業状況判定部により実行することと、
前記第2作業に関する第2作業情報を出力することを次作業出力部により実行することと、
含み、
前記第2作業情報は、前記進捗量を表す情報を含む
業管理方法。
determining, by a next work determination unit, a second work type of a second work to be performed next to the first work by the first work device, based on a comparison between operation information indicating a state of the first work device performing the first work in the field and pre-stored conditions;
determining a progress amount of the first work in the field based on the operation information by a work status determination unit;
outputting second work information related to the second work by a next work output unit;
Including ,
The second task information includes information representing the progress amount.
Work management methods.
圃場で第1作業を行っている第1作業装置の状態を表す稼働情報と予め記憶された1つ以上の条件との比較に基づき、前記第1作業装置による前記第1作業の次に行われる第2作業の第2作業種別を判定する次作業判定部と、
前記第2作業に関する第2作業情報を出力する次作業出力部と、
を備え
前記1つ以上の条件は、前記第1作業の第1作業種別に応じて予め記憶され、
前記次作業判定部は、
前記1つ以上の条件から、前記第1作業種別に応じた第1条件を取得し、
前記稼働情報が満たす前記第1条件に対応する作業種別を前記第2作業種別として判定する
作業管理システム。
a next task determination unit that determines a second task type of a second task to be performed by a first task device subsequent to the first task on the basis of a comparison between operation information indicating a state of the first task device performing the first task in a farm field and one or more conditions stored in advance;
a next work output unit that outputs second work information related to the second work;
Equipped with
The one or more conditions are stored in advance according to a first work type of the first work,
The next task determination unit,
Acquire a first condition corresponding to the first work type from the one or more conditions;
A task type corresponding to the first condition satisfied by the operation information is determined as the second task type.
Work management system.
圃場で第1作業を行っている第1作業装置の状態を表す稼働情報と予め記憶された条件との比較に基づき、前記第1作業装置による前記第1作業の次に行われる第2作業の第2作業種別を判定する次作業判定部と、
前記第2作業に関する第2作業情報を出力する次作業出力部と、
を備え
前記条件は、前記第1作業装置の種類に応じて予め記憶され、
前記次作業判定部は、
前記稼働情報が満たす前記第1作業装置に応じた前記条件に対応する作業種別を前記第2作業種別として判定する
作業管理システム。
a next task determination unit that determines a second task type of a second task to be performed by a first task device subsequent to the first task device, based on a comparison between operation information indicating a state of the first task device performing the first task in a farm field and pre-stored conditions;
a next work output unit that outputs second work information related to the second work;
Equipped with
The conditions are stored in advance according to the type of the first working device,
The next task determination unit,
A task type corresponding to the condition according to the first task device satisfied by the operation information is determined as the second task type.
Work management system.
圃場で第1作業を行っている第1作業装置の状態を表す稼働情報と予め記憶された条件との比較に基づき、前記第1作業装置による前記第1作業の次に行われる第2作業の第2作業種別を判定する次作業判定部と、
前記稼働情報に基づき、前記圃場における前記第1作業の進捗量を決定する作業状況判定部と、
前記第2作業に関する第2作業情報を出力する次作業出力部と、
を備え
前記第2作業情報は、前記進捗量を表す情報を含む
作業管理システム。
a next task determination unit that determines a second task type of a second task to be performed by a first task device subsequent to the first task device, based on a comparison between operation information indicating a state of the first task device performing the first task in a farm field and pre-stored conditions;
a work status determination unit that determines a progress amount of the first work in the field based on the operation information;
a next work output unit that outputs second work information related to the second work;
Equipped with
The second task information includes information representing the progress amount.
Work management system.
JP2022027891A 2022-02-25 2022-02-25 Work management method and work management system Active JP7670636B2 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2022027891A JP7670636B2 (en) 2022-02-25 2022-02-25 Work management method and work management system
KR1020230002811A KR20230127870A (en) 2022-02-25 2023-01-09 Work management method, work management system, and work management program
CN202310071357.8A CN116649076A (en) 2022-02-25 2023-02-07 Job management method, job management system, and job management program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022027891A JP7670636B2 (en) 2022-02-25 2022-02-25 Work management method and work management system

Publications (2)

Publication Number Publication Date
JP2023124242A JP2023124242A (en) 2023-09-06
JP7670636B2 true JP7670636B2 (en) 2025-04-30

Family

ID=87708534

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022027891A Active JP7670636B2 (en) 2022-02-25 2022-02-25 Work management method and work management system

Country Status (3)

Country Link
JP (1) JP7670636B2 (en)
KR (1) KR20230127870A (en)
CN (1) CN116649076A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017068533A (en) 2015-09-30 2017-04-06 株式会社クボタ Field management system
WO2020054876A1 (en) 2018-09-14 2020-03-19 株式会社ナイルワークス Work management system, work management device, work management method, and work management program
JP2020177294A (en) 2019-04-15 2020-10-29 国立大学法人 鹿児島大学 Agricultural work progress management device, agricultural work progress management system, agricultural work progress management method, and agricultural work progress management program
JP2021089477A (en) 2019-12-02 2021-06-10 ヤンマーパワーテクノロジー株式会社 Work type estimation device

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010081933A (en) 2008-09-03 2010-04-15 Hidemoto Miyamoto Method for producing rice straw silage
JP2012147727A (en) 2011-01-19 2012-08-09 Iseki & Co Ltd Waste straw processor for combine harvester

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017068533A (en) 2015-09-30 2017-04-06 株式会社クボタ Field management system
WO2020054876A1 (en) 2018-09-14 2020-03-19 株式会社ナイルワークス Work management system, work management device, work management method, and work management program
JP2020177294A (en) 2019-04-15 2020-10-29 国立大学法人 鹿児島大学 Agricultural work progress management device, agricultural work progress management system, agricultural work progress management method, and agricultural work progress management program
JP2021089477A (en) 2019-12-02 2021-06-10 ヤンマーパワーテクノロジー株式会社 Work type estimation device

Also Published As

Publication number Publication date
CN116649076A (en) 2023-08-29
KR20230127870A (en) 2023-09-01
JP2023124242A (en) 2023-09-06

Similar Documents

Publication Publication Date Title
US12150406B2 (en) Methods and imaging systems for harvesting
EP3510851B1 (en) Systems and methods for customizing scale and corresponding views of data displays
US10383275B2 (en) Systems and method for monitoring, controlling, and displaying field operations
WO2014050525A1 (en) Ground work vehicle, ground work vehicle management system, and ground work information display method
JP5912827B2 (en) Fertilizer setting method, fertilizer setting device, fertilizer setting program, fertilizer setting system
JP2022141070A (en) HARVEST CONTROL METHOD, HARVEST CONTROL SYSTEM, VEHICLE, AND HARVEST CONTROL PROGRAM
JP7636956B2 (en) Work management method, work management system, and work management program
JP7670636B2 (en) Work management method and work management system
CN111108517A (en) System and method for crop protection optimization
JP2024138022A (en) Work management method
JP2023182936A (en) Maintenance management method, maintenance management system, and maintenance management program
JP7670633B2 (en) Work management method, work management system, and work management program
JP7670553B2 (en) Harvest management method, harvest management system, and harvest management program
JP2024114141A (en) Work management method, work management system, and work management program
JP7620532B2 (en) Field management method, field management system, and field management program
JP7510305B2 (en) Work management system, work management method, and work management program
JP7660490B2 (en) Operation information management method, operation information management system, and operation information management program
JP2025040482A (en) Work management method, work management system, and work management program
JP7598342B2 (en) Area management method, area management system, and area management program
JP2025035609A (en) Field management method, field management system, and field management program
JP7693322B2 (en) Agricultural information management system, program, and agricultural information management method
JP2024061105A (en) Work management method, work management system, and work management program
JP2023084773A (en) Pest Control Support Method, Pest Control Support System, and Pest Control Support Program
JP2025098323A (en) Ridge management method, ridge management system, and ridge management program
JP7431771B2 (en) Area management method, area management device, and area management program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240222

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20241126

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250107

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250307

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250401

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250417

R150 Certificate of patent or registration of utility model

Ref document number: 7670636

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150