Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7680223B2 - Steel plate concrete structure - Google Patents
[go: Go Back, main page]

JP7680223B2 - Steel plate concrete structure - Google Patents

Steel plate concrete structure Download PDF

Info

Publication number
JP7680223B2
JP7680223B2 JP2021030093A JP2021030093A JP7680223B2 JP 7680223 B2 JP7680223 B2 JP 7680223B2 JP 2021030093 A JP2021030093 A JP 2021030093A JP 2021030093 A JP2021030093 A JP 2021030093A JP 7680223 B2 JP7680223 B2 JP 7680223B2
Authority
JP
Japan
Prior art keywords
steel plate
plate
surface steel
portions
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021030093A
Other languages
Japanese (ja)
Other versions
JP2022131243A (en
Inventor
智弘 小林
耕一 籔内
祥平 澤田
雄大 古野
雄二 安藤
洋介 河野
健士朗 石木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2021030093A priority Critical patent/JP7680223B2/en
Publication of JP2022131243A publication Critical patent/JP2022131243A/en
Priority to JP2024177041A priority patent/JP2024177535A/en
Application granted granted Critical
Publication of JP7680223B2 publication Critical patent/JP7680223B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)
  • Joining Of Building Structures In Genera (AREA)
  • Bridges Or Land Bridges (AREA)

Description

本発明は、鋼板コンクリート構造に関するものである。 The present invention relates to a steel plate concrete structure .

従来、このような分野の技術として、下記特許文献1に記載の鋼板コンクリート壁の施工方法が知られている。この施工方法で用いられる鋼板ブロックは、表面鋼板の一部をなす表裏一対の鋼板部と鋼板部同士を連結する隔壁部とを一体化したものである。この鋼板ブロックを積み上げるとともに各鋼板ブロックの内部にコンクリートを充填し、鋼板ブロックの外壁面端部同士を接合することで、鋼板コンクリート壁が構築される。 A conventional technique in this field is the construction method for steel plate concrete walls described in Patent Document 1 below. The steel plate blocks used in this construction method are integrated with a pair of front and back steel plate sections that form part of the surface steel plate and a partition section that connects the steel plate sections together. The steel plate blocks are stacked up, concrete is filled inside each steel plate block, and the ends of the outer wall surfaces of the steel plate blocks are joined together to construct a steel plate concrete wall.

特開昭61-261550号公報Japanese Patent Application Publication No. 61-261550

しかしながら、特許文献1の施工方法で使用される鋼板ブロックは、中空構造ではあるものの構築される鋼板コンクリート壁の壁厚に相当する厚みをもち、嵩が大きいものである。このように使用する部品の嵩が大きい場合には、工場から施工現場までの部品の運搬の効率が低下し、施工現場での部品の取り回しや保管のスペースも大きくする必要がある、といったように、部品の取扱いに関する負担が大きくなる。 However, the steel plate blocks used in the construction method of Patent Document 1, although hollow, have a thickness equivalent to the wall thickness of the steel plate concrete wall to be constructed, and are bulky. When the parts used are bulky in this way, the efficiency of transporting the parts from the factory to the construction site decreases, and more space is required to handle and store the parts at the construction site, resulting in a heavy burden in handling the parts.

そこで、本発明は、施工に係る部品の取扱いの負担を軽減する鋼板コンクリート構造を提供することを目的とする。 Therefore, an object of the present invention is to provide a steel plate concrete structure that reduces the burden of handling parts involved in construction.

本発明の鋼板コンクリート構造は、一対の表面鋼板と、表面鋼板同士の間の空間に打設されたコンクリートからなるコンクリート部と、表面鋼板同士を接続するとともにコンクリート部に埋込まれた隔壁部と、を備え、隔壁部は、各々の表面鋼板から面外方向に立ち上がるように設けられた板状の鋼製の立設板部と、立設板部同士を連結する立設板連結部と、を有する。 The steel plate concrete structure of the present invention comprises a pair of surface steel plates, a concrete section made of concrete poured into the space between the surface steel plates, and a partition section that connects the surface steel plates and is embedded in the concrete section. The partition section has a steel upright plate section that is shaped like a plate and rises from each surface steel plate in the out-of-plane direction, and an upright plate connecting section that connects the upright plate sections together.

立設板連結部は、立ち上がり方向に互いに間隔をあけて配置された立設板部同士の間に架け渡すように配置され立設板部同士の連結に介在する複数の添接板を有し、添接板同士が互いに間隔をあけて配置され当該添接板同士の間且つ立設板部同士の間に隔壁部を貫通する開口が形成されている、こととしてもよい。 The vertical plate connecting portion may have a plurality of splice plates arranged to bridge between the vertical plate portions arranged at intervals in the rising direction and intervene in the connection between the vertical plate portions, and the splice plates may be arranged at intervals from each other, and openings penetrating the partition portion may be formed between the splice plates and between the vertical plate portions.

表面鋼板は面内方向に連結された複数の鋼製の表面鋼板部品を有しており、一方の表面鋼板における表面鋼板部品同士の連結部と、他方の表面鋼板における表面鋼板部品同士の連結部と、が互いに面内方向にずれて位置している、こととしてもよい。 The surface steel plate may have multiple steel surface steel plate parts connected in the in-plane direction, and the connection parts between the surface steel plate parts on one surface steel plate and the connection parts between the surface steel plate parts on the other surface steel plate may be positioned offset from each other in the in-plane direction.

本発明の鋼板コンクリート構造の施工方法は、一対の表面鋼板と、表面鋼板同士の間の空間に打設されたコンクリートからなるコンクリート部と、表面鋼板同士を接続するとともにコンクリート部に埋込まれた隔壁部と、を備える鋼板コンクリート構造の施工方法であって、表面鋼板の少なくとも一部をなす鋼製の表面鋼板部品と、表面鋼板部品から面外方向に立ち上がるように設けられた板状の鋼製の立設板部と、を有する鋼板ユニットの立設板部を他の鋼板ユニットの立設板部に連結して一対の立設板部を含む隔壁部を形成する隔壁部形成工程を備える。 The construction method of the steel plate concrete structure of the present invention is a construction method of a steel plate concrete structure comprising a pair of surface steel plates, a concrete section made of concrete poured into the space between the surface steel plates, and a partition section connecting the surface steel plates and embedded in the concrete section, and comprises a partition section forming process of connecting the upright plate section of a steel plate unit having a steel surface steel plate part that forms at least a part of the surface steel plate and a plate-shaped steel upright plate section that is provided to rise from the surface steel plate part in an out-of-plane direction to the upright plate section of another steel plate unit to form a partition section including a pair of upright plate sections.

鋼板コンクリート構造の施工方法は、隔壁部形成工程を含み一対の表面鋼板と隔壁部とを有する鋼殻体を形成する鋼殻体形成工程と、鋼殻体の内部にコンクリートを打設してコンクリート部を形成するコンクリート打設工程と、を備える、こととしてもよい。 The construction method for a steel plate concrete structure may include a steel shell formation process that includes a partition wall formation process and forms a steel shell having a pair of surface steel plates and a partition wall, and a concrete pouring process that pours concrete into the steel shell to form a concrete section.

隔壁部形成工程では、立ち上がり方向に互いに間隔をあけて配置された立設板部同士の間に架け渡すように配置された複数の添接板を介して立設板部同士が連結され、添接板同士が間隔をあけて配置され当該添接板同士の間且つ立設板部同士の間に隔壁部を貫通する開口が形成される、こととしてもよい。 In the partition wall forming process, the standing plate parts are connected to each other via a plurality of splice plates arranged to bridge between the standing plate parts arranged at intervals in the rising direction, and the splice plates are arranged at intervals to form openings penetrating the partition wall between the splice plates and between the standing plate parts.

鋼板コンクリート構造の施工方法は、上記開口が施工作業者の移動用通路として利用されて実行される、こととしてもよい。 The method for constructing a steel plate concrete structure may be carried out by using the opening as a passageway for construction workers.

本発明によれば、施工に係る部品の取扱いの負担を軽減する鋼板コンクリート構造を提供することができる。 According to the present invention, it is possible to provide a steel plate concrete structure that reduces the burden of handling parts involved in construction.

本実施形態に係る鋼板コンクリート構造壁の一部を破断して示す斜視図である。FIG. 2 is a perspective view showing a part of a steel plate concrete structural wall according to the present embodiment in a cutaway view. (a)は、鋼殻体の平面図であり、(b)は、鋼殻体の側面図である。FIG. 2A is a plan view of the steel hull, and FIG. 2B is a side view of the steel hull. (a)は、リブ部の形成方法を示す斜視図であり、(b)は、リブ部材の平面図である。5A is a perspective view showing a method for forming a rib portion, and FIG. 5B is a plan view of a rib member. (a)はチャンネル材の平面図、(b)はその側面図であり、(c)は、二分割したチャンネル材を示す斜視図である。FIG. 1A is a plan view of a channel material, FIG. 1B is a side view thereof, and FIG. 1C is a perspective view showing a channel material divided into two. (a)~(c)は、鋼殻体の構築方法を順次示す図である。4(a) to 4(c) are diagrams sequentially showing a method for constructing a steel hull. (a)~(c)は、図5に続いて鋼殻体の構築方法を順次示す図である。6(a) to 6(c) are diagrams sequentially showing the method of constructing the steel shell following FIG. 5. (a)は、鋼板ユニットを車両に搭載した状態を示す図であり、(b)は、鋼板ユニットを車両に搭載した他の状態を示す図であり、(c)はH鋼の平面図、(d)はその側面図である。1A is a diagram showing the state in which the steel plate unit is mounted on a vehicle, FIG. 1B is a diagram showing another state in which the steel plate unit is mounted on a vehicle, FIG. 1C is a plan view of the H-beam, and FIG. 1D is a side view thereof. (a),(b)は、SC構造壁に貫通孔を形成する方法を説明する側面図であり、(c),(d)は、SC構造壁に通路用開口を形成する方法を説明する側面図である。1A and 1B are side views illustrating a method for forming a through hole in an SC structural wall, and FIG. 1C and 1D are side views illustrating a method for forming a passage opening in an SC structural wall. (a)~(e)は、チャンネル材の二分割の各変形例を示す図である。13A to 13E are diagrams showing modified examples of dividing a channel material into two parts.

以下、図面を参照しながら本発明に係る鋼板コンクリート構造及びその施工方法の一実施形態について詳細に説明する。図1は、本実施形態に係る鋼板コンクリート構造壁1(以下「SC構造壁1」という)の一部を破断して示す斜視図である。SC構造壁1は、例えば原子力発電所の原子炉建屋の壁に適用される耐震構造や航空機防護構造の鉛直な壁である。以下では、図に示すようにSC構造壁1の高さ方向をZ方向、SC構造壁1の壁厚方向をX方向、SC構造壁1が水平に延在する方向をY方向とし、SC構造壁1の各部の位置関係やSC構造壁1の部品の各部の位置関係の説明にX,Y,Zを用いる場合がある。 An embodiment of a steel plate concrete structure and its construction method according to the present invention will be described in detail below with reference to the drawings. FIG. 1 is a perspective view showing a part of a steel plate concrete structural wall 1 (hereinafter referred to as "SC structural wall 1") according to this embodiment, with a broken part. The SC structural wall 1 is a vertical wall of an earthquake-resistant structure or an aircraft protection structure applied to, for example, the walls of a reactor building in a nuclear power plant. In the following, as shown in the figure, the height direction of the SC structural wall 1 is the Z direction, the wall thickness direction of the SC structural wall 1 is the X direction, and the direction in which the SC structural wall 1 extends horizontally is the Y direction, and X, Y, and Z may be used to explain the positional relationship of each part of the SC structural wall 1 and the positional relationship of each part of the SC structural wall 1.

SC構造壁1は、壁の表裏両面に配置される一対の表面鋼板3と、当該表面鋼板3同士に挟まれたコンクリート部5とを備えている。コンクリート部5は、表面鋼板3同士の間の空間に打設され充填されたコンクリートからなる。このSC構造壁1は、主に鋼板で構成される中空の鋼殻体7が構築され、この鋼殻体7の内部空間にコンクリートが打設されることで構築される。図2(a)は鋼殻体7の平面図であり、図2(b)は鋼殻体7の側面図である。図1及び図2に示されるように、鋼殻体7は、上記の一対の鉛直な表面鋼板3と、表面鋼板3同士を壁厚方向に連結するように等間隔に配置された鉛直な隔壁部9と、を有するものである。ここでは一例として、SC構造壁1の高さが約6m、壁厚が約2m、隔壁部9同士の間隔が約2.4mであり、表面鋼板3の厚さは約20mmである。SC構造壁1には、配管等を挿通するための貫通孔51やドアが設置され通路として利用される通路用開口53が、当該SC構造壁1をX方向に貫通するように適宜設けられてもよい。 The SC structural wall 1 comprises a pair of surface steel plates 3 arranged on both the front and back sides of the wall, and a concrete section 5 sandwiched between the surface steel plates 3. The concrete section 5 is made of concrete poured and filled in the space between the surface steel plates 3. The SC structural wall 1 is constructed by constructing a hollow steel shell 7 mainly composed of steel plates, and pouring concrete into the internal space of the steel shell 7. Figure 2 (a) is a plan view of the steel shell 7, and Figure 2 (b) is a side view of the steel shell 7. As shown in Figures 1 and 2, the steel shell 7 has the above-mentioned pair of vertical surface steel plates 3 and vertical partition sections 9 arranged at equal intervals to connect the surface steel plates 3 to each other in the wall thickness direction. Here, as an example, the height of the SC structural wall 1 is about 6 m, the wall thickness is about 2 m, the interval between the partition sections 9 is about 2.4 m, and the thickness of the surface steel plates 3 is about 20 mm. The SC structural wall 1 may be provided with a through hole 51 for inserting piping, etc., or a passage opening 53 for a door to be used as a passageway, which may be provided as appropriate to penetrate the SC structural wall 1 in the X direction.

表面鋼板3は、Y方向に連結された複数の表面鋼板部品13で構成されている。表面鋼板部品13のZ方向の寸法はSC構造壁1の高さと同じく約6mであり、表面鋼板部品13のY方向の寸法は、隔壁部9同士の間隔と同じく約2.4mである。このような表面鋼板部品13が添接板(「スプライスプレート」とも呼ばれる)15を介したボルト止めによって面内方向(Y方向)に複数連結されて表面鋼板3が構成されている。 The surface steel plate 3 is composed of multiple surface steel plate parts 13 connected in the Y direction. The dimension of the surface steel plate parts 13 in the Z direction is approximately 6 m, the same as the height of the SC structural wall 1, and the dimension of the surface steel plate parts 13 in the Y direction is approximately 2.4 m, the same as the distance between the partition sections 9. The surface steel plate 3 is composed of multiple such surface steel plate parts 13 connected in the in-plane direction (Y direction) by bolting via splice plates (also called "splice plates") 15.

ここでは、隣接する2つの表面鋼板部品13同士が端面を突き合わせ、表面鋼板部品13同士の境界を跨ぐ添接板15が、表面鋼板部品13を表裏からX方向に挟むように一対設置される。そして、表面鋼板部品13及び表裏一対の添接板15を挿通する複数のボルトが締め付けられることにより、上記2つの表面鋼板部品13同士が面内方向に連結される。なお、図面の煩雑化を避けるために、図2では添接板15上のボルトの図示が省略されている。ここでは、一方の表面鋼板3における表面鋼板部品13同士の連結部(以下「表面連結部13a」という)と、他方の表面鋼板3における表面鋼板部品13同士の表面連結部13aと、が互いにY方向にずれて位置している。すなわち、SC構造壁1の表裏の表面鋼板3において、表面連結部13aは千鳥配置されている。 Here, two adjacent surface steel plate components 13 are butted against each other at their end faces, and a pair of splice plates 15 that straddle the boundary between the surface steel plate components 13 are installed so as to sandwich the surface steel plate components 13 from the front and back in the X direction. Then, a number of bolts that pass through the surface steel plate components 13 and the pair of splice plates 15 on the front and back are tightened to connect the two surface steel plate components 13 in the in-plane direction. Note that in order to avoid complicating the drawing, the bolts on the splice plates 15 are omitted from FIG. 2. Here, the connection portion between the surface steel plate components 13 on one surface steel plate 3 (hereinafter referred to as the "surface connection portion 13a") and the surface connection portion 13a between the surface steel plate components 13 on the other surface steel plate 3 are positioned offset from each other in the Y direction. That is, the surface connection portions 13a are staggered in the surface steel plates 3 on the front and back of the SC structural wall 1.

各表面鋼板3の内壁面3b(コンクリート打設側の面)には、それぞれ対面する位置において、板状の立設板部17が、他方の表面鋼板3側に向けて垂直に立ち上がるように、SC構造壁1の全高に亘って設けられている。立設板部17は、Y方向に直交する姿勢で表面鋼板3の内壁面3bに溶接されている。立設板部17は表面鋼板3と同程度の板厚の鋼板からなる。内壁面3bからのX方向への立設板部17の立ち上がり高さはSC構造壁1の壁厚の約1/3程度である。そして、対向する立設板部17同士はX方向にSC構造壁1の壁厚の約1/3程度の間隔をあけて配置されている。 On the inner wall surface 3b (the surface on the side where concrete is poured) of each surface steel plate 3, a plate-shaped upright plate portion 17 is provided at a position facing each other across the entire height of the SC structural wall 1 so as to rise vertically toward the other surface steel plate 3. The upright plate portion 17 is welded to the inner wall surface 3b of the surface steel plate 3 in a position perpendicular to the Y direction. The upright plate portion 17 is made of a steel plate with a plate thickness similar to that of the surface steel plate 3. The rise height of the upright plate portion 17 from the inner wall surface 3b in the X direction is about 1/3 of the wall thickness of the SC structural wall 1. The opposing upright plate portions 17 are arranged at a distance in the X direction of about 1/3 of the wall thickness of the SC structural wall 1.

これらの立設板部17同士を添接板19を介して連結する立設板連結部21が設けられている。立設板連結部21の具体的な構成として、立設板連結部21は、対向する立設板部17同士の間に架け渡された一対の添接板19を有している。添接板19同士はX方向の両端部に各立設板部17を挟み込んでY方向に対向している。2枚の添接板19とその間に挟まれた立設板部17の一部位とに挿通された複数のボルトが締め付けられることで、2枚の添接板19の一端が一方の立設板部17に連結される。更に、同様にして2枚の添接板19の他端が他方の立設板部17に連結されることで、対向する立設板部17同士が2枚の添接板19を介して連結された状態となる。 A standing plate connecting portion 21 is provided that connects these standing plate portions 17 to each other via splice plates 19. As a specific configuration of the standing plate connecting portion 21, the standing plate connecting portion 21 has a pair of splice plates 19 that are bridged between the opposing standing plate portions 17. The splice plates 19 face each other in the Y direction, sandwiching each standing plate portion 17 at both ends in the X direction. By tightening a plurality of bolts inserted into the two splice plates 19 and a portion of the standing plate portion 17 sandwiched between them, one end of the two splice plates 19 is connected to one of the standing plate portions 17. Furthermore, by similarly connecting the other ends of the two splice plates 19 to the other standing plate portion 17, the opposing standing plate portions 17 are connected to each other via the two splice plates 19.

上記のような立設板連結部21が一対の立設板部17に対して3箇所設けられており、3箇所の添接板19は、図1及び図2(b)に示されるように、互いにZ方向に離れて配置されている。最上部の立設板連結部21はSC構造壁1の上端に沿って位置し、最下部の立設板連結部21はSC構造壁1の下端に沿って位置している。そして、それら2つの立設板連結部21の略中央に中間の立設板連結部21が位置している。以上のような一対の立設板部17と、添接板19を含む3箇所の立設板連結部21(立設板連結部)と、によって前述の隔壁部9が構成されている。このような隔壁部9の構造によれば、添接板19同士の間且つ立設板部17同士の間に、隔壁部9をY方向に貫通する矩形の開口23がほぼ同じ大きさで2箇所形成される。開口23のX方向の幅は約600mm程度でZ方向の高さは約2000mm程度であり、開口23は施工作業者が通過可能な大きさである。 The above-mentioned vertical plate connecting portion 21 is provided at three locations for a pair of vertical plate portions 17, and the three splice plates 19 are arranged apart from each other in the Z direction as shown in Figures 1 and 2 (b). The uppermost vertical plate connecting portion 21 is located along the upper end of the SC structural wall 1, and the lowermost vertical plate connecting portion 21 is located along the lower end of the SC structural wall 1. The middle vertical plate connecting portion 21 is located approximately in the center of the two vertical plate connecting portions 21. The above-mentioned pair of vertical plate portions 17 and the three vertical plate connecting portions 21 (vertical plate connecting portions) including the splice plate 19 constitute the above-mentioned partition portion 9. According to such a structure of the partition portion 9, two rectangular openings 23 of approximately the same size that penetrate the partition portion 9 in the Y direction are formed between the splice plates 19 and between the vertical plate portions 17. The width of the opening 23 in the X direction is approximately 600 mm, and the height in the Z direction is approximately 2000 mm, so the opening 23 is large enough for construction workers to pass through.

なお、一つの立設板連結部21においては、上記のとおり立設板部17をY方向に挟む一対の添接板19が用いられている。この一対の添接板19同士の狭い間隙には、コンクリートが十分に充填されない可能性があるので、この対策として、当該間隙には予め充填物が充填されてもよい。この充填物としては、立設板部17と同程度の厚さの鋼板が使用されてもよい。また、上記のような間隙が形成されないように、一つの立設板連結部21に対して添接板19を一枚のみ用いて立設板部17同士が連結されるようにしてもよい。 In addition, in one vertical plate connecting portion 21, a pair of splice plates 19 are used to sandwich the vertical plate portion 17 in the Y direction as described above. Since there is a possibility that the narrow gap between the pair of splice plates 19 will not be filled sufficiently with concrete, as a countermeasure, the gap may be filled with a filler in advance. As the filler, a steel plate of approximately the same thickness as the vertical plate portion 17 may be used. Also, to prevent the formation of the above-mentioned gap, the vertical plate portions 17 may be connected to each other using only one splice plate 19 for one vertical plate connecting portion 21.

各表面鋼板3の内壁面3bには、Y方向に延在する長尺状の水平リブ部27が例えば1m程度の間隔で平行に複数設けられている。図3(a)に示されるように、水平リブ部27は、長尺の鋼製のリブ部材28が水平の姿勢で内壁面3bに溶接されることで形成されている。水平リブ部27は、鉛直な内壁面3bから水平に立ち上がるとともに先端側が鉛直上方に折曲げられて、全体として断面L字の形状をなしている。 On the inner wall surface 3b of each surface steel plate 3, multiple long horizontal rib portions 27 extending in the Y direction are provided in parallel at intervals of, for example, about 1 m. As shown in FIG. 3(a), the horizontal rib portions 27 are formed by welding long steel rib members 28 to the inner wall surface 3b in a horizontal position. The horizontal rib portions 27 rise horizontally from the vertical inner wall surface 3b and have their tips bent vertically upward, forming an L-shaped cross section overall.

図3(a)及び図3(b)に示されるように、このリブ部材28では、表面鋼板3に溶接される側の縁部28eの輪郭形状が凹凸形状をなしている。すなわち、リブ部材28は、上記縁部28eにおいて長手方向(Y方向)に交互に形成された複数の凸部28a及び凹部28bを有している。縁部28eは、凸部28aの輪郭形状と凹部28bの輪郭形状とが互いに略等しくなるように形成されている。 As shown in Figures 3(a) and 3(b), the contour shape of the edge 28e of this rib member 28 on the side that is welded to the surface steel plate 3 is uneven. That is, the rib member 28 has multiple protrusions 28a and recesses 28b formed alternately in the longitudinal direction (Y direction) on the edge 28e. The edge 28e is formed so that the contour shape of the protrusions 28a and the contour shape of the recesses 28b are approximately equal to each other.

本実施形態では、凸部28aの先端部28hの輪郭線は、リブ部材28の長手方向に延在する直線をなしている。また、凸部28aは溶接される側の縁部28eに近づくほど長手方向の幅が狭くなり、これと対称に、凹部28bは溶接される側の縁部28eに近づくほど長手方向の幅が広くなっている。更に詳細な形状として、凸部28aの輪郭形状はY方向に延在する一辺を含む正六角形H1の一部をなしており、上記一辺が凸部28aの先端部28hの輪郭線に対応している。また、凹部28bの輪郭形状はY方向に延在する一辺を含む上記と同サイズの正六角形H2の一部をなしており、上記一辺が凹部28bの底部の輪郭線に対応している。そして、リブ部材28は、各凸部28aの先端部28hにおいて、表面鋼板3に溶接されている。 In this embodiment, the contour line of the tip 28h of the protrusion 28a is a straight line extending in the longitudinal direction of the rib member 28. The protrusion 28a has a narrower longitudinal width as it approaches the edge 28e on the side to be welded, and symmetrically, the recess 28b has a wider longitudinal width as it approaches the edge 28e on the side to be welded. In more detail, the contour shape of the protrusion 28a is a part of a regular hexagon H1 including one side extending in the Y direction, and the side corresponds to the contour line of the tip 28h of the protrusion 28a. The contour shape of the recess 28b is a part of a regular hexagon H2 of the same size as the above, including one side extending in the Y direction, and the side corresponds to the contour line of the bottom of the recess 28b. The rib member 28 is welded to the surface steel plate 3 at the tip 28h of each protrusion 28a.

また、図1及び図2に示されるように、各表面鋼板3の内壁面3bには、上記水平リブ部27と同様にして、Z方向に延在する長尺状の鋼製の鉛直リブ部29が例えば1m程度の間隔で平行に複数設けられている。鉛直リブ部29は上記リブ部材28が鉛直の姿勢で内壁面3bに溶接されることにより形成されている。水平リブ部27、鉛直リブ部29、及び立設板部17の各交差箇所では適宜スカラップが形成される。鉛直リブ部29の構成は、その延在方向が鉛直方向であることを除いて水平リブ部27と同じであるので、更なる重複する説明を省略する。なお、図面の煩雑化を避けるために、図2では、水平リブ部27及び鉛直リブ部29の縁部28eの凹凸形状が省略されている。 As shown in Figs. 1 and 2, the inner wall surface 3b of each surface steel plate 3 is provided with a plurality of elongated steel vertical rib portions 29 extending in the Z direction, in parallel with each other at intervals of, for example, about 1 m, in the same manner as the horizontal rib portion 27. The vertical rib portions 29 are formed by welding the rib member 28 to the inner wall surface 3b in a vertical position. Appropriate scallops are formed at each intersection of the horizontal rib portion 27, the vertical rib portion 29, and the standing plate portion 17. The configuration of the vertical rib portion 29 is the same as that of the horizontal rib portion 27, except that the extension direction is vertical, so further redundant explanations will be omitted. Note that in order to avoid complicating the drawing, the uneven shapes of the edges 28e of the horizontal rib portion 27 and the vertical rib portion 29 are omitted in Fig. 2.

上記のように、表面鋼板3と、この表面鋼板3の内壁面3bに設けられた水平リブ部27及び鉛直リブ部29と、を有するリブ付き表面鋼板6が、SC構造壁1の両表面に配置されている。この水平リブ部27及び鉛直リブ部29の存在により、表面鋼板3の座屈が回避され、建方時の表面鋼板3の成型が保持され、鋼殻体7の内部空間へのコンクリート打設時における表面鋼板3のハラミが回避され、また、コンクリート部5と表面鋼板3との一体化が図られる。表面鋼板3の内壁面3bにスタッドやタイバーが設けられてもよいが、スタッドやタイバーは省略することも可能である。また、内壁面3bに水平リブ部27及び鉛直リブ部29が設けられることに代えて、内壁面3bにスタッドが設けられてもよい。 As described above, the surface steel plate 3 and the ribbed surface steel plate 6 having the horizontal rib portion 27 and the vertical rib portion 29 provided on the inner wall surface 3b of the surface steel plate 3 are arranged on both surfaces of the SC structural wall 1. The presence of the horizontal rib portion 27 and the vertical rib portion 29 prevents the surface steel plate 3 from buckling, maintains the shape of the surface steel plate 3 during construction, prevents the surface steel plate 3 from becoming flaky when concrete is poured into the internal space of the steel shell 7, and integrates the concrete portion 5 with the surface steel plate 3. Studs and tie bars may be provided on the inner wall surface 3b of the surface steel plate 3, but the studs and tie bars may be omitted. Also, instead of providing the horizontal rib portion 27 and the vertical rib portion 29 on the inner wall surface 3b, studs may be provided on the inner wall surface 3b.

水平リブ部27及び鉛直リブ部29を構成する上記のリブ部材28は、例えば次のように製作される。まず図4(a),(b)に示されるような、長尺のチャンネル材31(鋼製部材)を準備する。このチャンネル材31を、ウエブ部の中央において上記の凸部28a及び凹部28bの輪郭形状に対応する切断線31cでジグザグに切断し、短手方向に二分割する。そうすると、図4(c)に示されるように断面L字のリブ部材28が2本製作される(リブ部材製作工程)。 The rib members 28 constituting the horizontal rib portion 27 and the vertical rib portion 29 are manufactured, for example, as follows. First, a long channel member 31 (steel member) is prepared as shown in Figures 4(a) and (b). This channel member 31 is cut in a zigzag pattern in the center of the web portion along a cutting line 31c that corresponds to the contour shape of the convex portion 28a and the concave portion 28b, and divided into two in the short direction. This results in two rib members 28 with an L-shaped cross section as shown in Figure 4(c) (rib member manufacturing process).

前述したように、凸部28aの輪郭形状と凹部28bの輪郭形状とが互いに略等しいので、2本のリブ部材28の縁部28eは、一方のリブ部材28の凸部28aと他方のリブ部材28の凹部28bとが互いに嵌まり合う形状であり、二分割の切断に起因するチャンネル材31の切れ端も発生しない。なお、凸部28aの輪郭形状と凹部28bの輪郭形状とが互いに「略等しい」とは、例えば、チャンネル材31切断の切断幅に起因して凸部28aの寸法が凹部28bの寸法よりも僅かに小さくなる場合なども含む概念である。 As described above, the contour shapes of the convex portions 28a and the concave portions 28b are substantially the same, so that the edges 28e of the two rib members 28 are shaped so that the convex portions 28a of one rib member 28 and the concave portions 28b of the other rib member 28 fit together, and no scraps of the channel material 31 are generated due to the cutting into two pieces. Note that the concept of the contour shapes of the convex portions 28a and the concave portions 28b being "substantially the same" also includes, for example, cases where the dimensions of the convex portions 28a are slightly smaller than the dimensions of the concave portions 28b due to the cutting width of the channel material 31.

続いて、SC構造壁1の施工方法の一例について説明する。図5(a)に示されるように、鋼板から所定寸法の表面鋼板部品13が切り出される。次に、図5(b)に示されるように、別途準備された所定寸法の鋼板が表面鋼板部品13の内壁面3bに対し垂直な姿勢で溶接され立設板部17が形成される。立設板部17は表面鋼板部品13の幅方向の中央位置に設置されてもよいが、本実施形態においては、立設板部17は、表面鋼板部品13の中央位置から、当該表面鋼板部品13の幅方向(Y方向)にずれた位置に設置される。また、図4で説明したように、所定の長さのチャンネル材31が短手方向に二分割されリブ部材28が製作される(リブ部材製作工程)。そして、作製された所定の数量のリブ部材28が、凸部28aの先端部28hで表面鋼板部品13の内壁面3bの所定の位置に溶接され、水平リブ部27と鉛直リブ部29とが形成される(リブ形成工程)。前述したように、内壁面3bにはスタッドを形成する必要がないので、ここでは、スタッド溶植のための設備(例えば、全面アースが取れる大型金属定盤等)は不要である。 Next, an example of a method for constructing the SC structural wall 1 will be described. As shown in FIG. 5(a), a surface steel plate component 13 of a predetermined size is cut out from a steel plate. Next, as shown in FIG. 5(b), a separately prepared steel plate of a predetermined size is welded in a perpendicular position to the inner wall surface 3b of the surface steel plate component 13 to form a standing plate portion 17. The standing plate portion 17 may be installed at the center position in the width direction of the surface steel plate component 13, but in this embodiment, the standing plate portion 17 is installed at a position shifted in the width direction (Y direction) of the surface steel plate component 13 from the center position of the surface steel plate component 13. Also, as described in FIG. 4, a channel material 31 of a predetermined length is divided into two in the short direction to produce a rib member 28 (rib member production process). Then, the tip 28h of the protrusion 28a of the rib member 28 of a predetermined number is welded to a predetermined position on the inner wall surface 3b of the surface steel plate component 13 to form the horizontal rib portion 27 and the vertical rib portion 29 (rib forming process). As mentioned above, there is no need to form studs on the inner wall surface 3b, so there is no need for equipment for stud welding (for example, a large metal surface plate that can be grounded on the entire surface).

更に、図5(c)に示されるように、表面鋼板部品13の外壁面3aに、所定の埋込金物35が溶接によって設置される。埋込金物35は、完成後のSC構造壁1の外壁に設置される配管やケーブル等の設備の取付座として機能するものである。埋込金物35は、当該埋込金物35のアンカー(図示せず)が表面鋼板部品13を貫通して内壁面3b側に突出するように設置される。 Furthermore, as shown in FIG. 5(c), a specified embedded metal fitting 35 is installed by welding on the outer wall surface 3a of the surface steel plate component 13. The embedded metal fitting 35 functions as a mounting base for equipment such as pipes and cables that will be installed on the outer wall of the completed SC structural wall 1. The embedded metal fitting 35 is installed so that its anchor (not shown) penetrates the surface steel plate component 13 and protrudes toward the inner wall surface 3b.

ここまでの工程は、SC構造壁1の施工現場とは別の工場で行われる。すなわち、表面鋼板部品13、立設板部17、水平リブ部27、鉛直リブ部29、及び埋込金物35が一体となった部品が、鋼殻体7の部品の一単位として上記のように工場で作製される。以下では、1枚の表面鋼板部品13、1枚の立設板部17、水平リブ部27、鉛直リブ部29、及び埋込金物35が一体となった上記の一単位の部品を、「鋼板ユニット37」と呼ぶ。鋼板ユニット37は、工場で作製された後、トラック又はトレーラー等によりSC構造壁1の施工現場に運搬される。図7(a)は、鋼板ユニット37を工場から施工現場まで運搬するトラック41の一例を車両後方から見た図である。この例では、トラック41の荷台には表面鋼板部品13のY方向を略鉛直に立てるようにした姿勢で鋼板ユニット37が積載される。図7(b)は、鋼板ユニット37を工場から施工現場まで運搬するトラック41の他の例を車両後方から見た図である。この例では、トラック41の荷台には表面鋼板部品13のY方向を略水平にした姿勢で鋼板ユニット37が積載される。 The process up to this point is carried out in a factory separate from the construction site of the SC structural wall 1. That is, a part in which the surface steel plate part 13, the standing plate part 17, the horizontal rib part 27, the vertical rib part 29, and the embedded metal part 35 are integrated is manufactured in the factory as one unit of the steel shell 7 parts as described above. Hereinafter, the above-mentioned one unit part in which one surface steel plate part 13, one standing plate part 17, the horizontal rib part 27, the vertical rib part 29, and the embedded metal part 35 are integrated is called a "steel plate unit 37". After being manufactured in the factory, the steel plate unit 37 is transported to the construction site of the SC structural wall 1 by a truck or trailer or the like. FIG. 7(a) is a view of an example of a truck 41 that transports the steel plate unit 37 from the factory to the construction site, seen from the rear of the vehicle. In this example, the steel plate unit 37 is loaded on the bed of the truck 41 in a position in which the Y direction of the surface steel plate part 13 is approximately vertical. FIG. 7(b) is a view from the rear of the vehicle of another example of a truck 41 that transports the steel plate unit 37 from the factory to the construction site. In this example, the steel plate unit 37 is loaded onto the bed of the truck 41 with the Y direction of the surface steel plate component 13 in a substantially horizontal position.

上記トラック41の鋼板ユニット37は施工現場の地組ヤードで荷下ろしされる。地組ヤードでは、複数の鋼板ユニット37を組み合わせてなる鋼板組立体39が組立てられる。具体例として、まず、図6(a)に示されるように、3つの鋼板ユニット37の表面鋼板部品13同士が前述の添接板15を用いたボルト止めにより面内方向(Y方向)に連結される。そして、このような3連の鋼板ユニット37が2つ準備され、図6(b)に示されるように3組の立設板部17同士が対向される。そして、上記3組の立設板部17同士の間に架け渡された添接板19を介在させて立設板部17同士が連結され隔壁部9が形成される(隔壁部形成工程)。これにより、合計6つの鋼板ユニット37を組み合わせてなる箱型の鋼板組立体39が組立てられる。なお、SC構造壁1に設置される機電配管の搬入作業や現地施工作業を軽減するために、ここでは、機電の埋設配管等が予め鋼板組立体39に組付けられていてもよい。 The steel plate units 37 of the truck 41 are unloaded at the construction site's ground assembly yard. At the ground assembly yard, a steel plate assembly 39 is assembled by combining multiple steel plate units 37. As a specific example, first, as shown in FIG. 6(a), the surface steel plate parts 13 of the three steel plate units 37 are connected in the in-plane direction (Y direction) by bolting using the above-mentioned splice plate 15. Then, two such triple steel plate units 37 are prepared, and three sets of standing plate parts 17 are opposed to each other as shown in FIG. 6(b). Then, the standing plate parts 17 are connected to each other through the splice plate 19 bridged between the three sets of standing plate parts 17 to form a partition wall part 9 (partition wall part formation process). As a result, a box-shaped steel plate assembly 39 is assembled by combining a total of six steel plate units 37. In addition, in order to reduce the work of transporting and installing the electrical and mechanical piping to be installed in the SC structural wall 1, buried electrical and mechanical piping, etc. may be pre-assembled to the steel plate assembly 39.

続いて、図6(c)に示されるように、上記の鋼板組立体39が大型揚重機で吊り込まれてSC構造壁1の施工予定位置に搬入される。そして、建入れ精度の確認しながら既設の鋼板組立体39に対して仮組みが行われ、前述のように各鋼板組立体39の表面鋼板部品13同士が前述の添接板15を介してボルト止めされることで、鋼板組立体39が組付けられる。このような鋼板組立体39の搬入・組付けが繰り返されることにより、鋼殻体7が完成する。その後、鋼殻体7の内部空間にコンクリートが打設されてコンクリート部5が形成される(コンクリート打設工程)。ここでは、コンクリートの充填性を高めるために高流動コンクリートが使用されてもよい。その後、必要な仕上げ・塗装等が行われて、SC構造壁1が完成する。 Next, as shown in FIG. 6(c), the above-mentioned steel plate assembly 39 is hoisted by a large lifting machine and transported to the planned construction position of the SC structural wall 1. Then, while checking the plumbing accuracy, a temporary assembly is performed on the existing steel plate assembly 39, and the surface steel plate parts 13 of each steel plate assembly 39 are bolted together via the above-mentioned splice plate 15, as described above, to assemble the steel plate assembly 39. By repeating this transport and assembly of the steel plate assemblies 39, the steel shell 7 is completed. After that, concrete is poured into the internal space of the steel shell 7 to form the concrete part 5 (concrete pouring process). Here, high-flow concrete may be used to improve the filling property of the concrete. After that, the necessary finishing, painting, etc. are performed, and the SC structural wall 1 is completed.

上記のような鋼殻体7の組立て、コンクリート打設前の鋼殻体7の検査、コンクリート打設工程等の際には、施工作業者が鋼殻体7の内部空間に入って作業を行う場合がある。例えば、コンクリート打設工程では、コンクリート締固めのために、鋼殻体7の内部空間で施工作業者がバイブレータを操作する場合がある。このとき施工作業者は、図1及び図2(b)に示されるような隔壁部9の開口23を通過して鋼殻体7の内部空間をY方向に移動しながら上記のような作業を行うことができる。また、このような施工作業者の移動の便のために、各隔壁部9同士の間に開口23を挿通する踏み板が架け渡されてもよい。 During the assembly of the steel shell 7, the inspection of the steel shell 7 before concrete is poured, the concrete pouring process, and the like, a construction worker may enter the internal space of the steel shell 7 to perform work. For example, during the concrete pouring process, a construction worker may operate a vibrator in the internal space of the steel shell 7 to compact the concrete. At this time, the construction worker can perform the above-mentioned work while moving in the Y direction in the internal space of the steel shell 7 through the openings 23 of the bulkheads 9 as shown in Figures 1 and 2(b). In addition, to facilitate the movement of such construction workers, a step plate that passes through the openings 23 may be provided between the partitions 9.

前述のとおり、1つの鋼板ユニット37においては、図5(b)に示されているように、立設板部17が表面鋼板部品13の中央位置から幅方向(Y方向)にずれた位置に設置される。このような構成の同じ鋼板ユニット37が多数組み合わされ鋼殻体7が形成されることにより、SC構造壁1においては、一方の表面鋼板3における表面連結部13a(図1及び図2(b)参照)と、他方の表面鋼板3における表面連結部13aと、が互いにY方向にずれて位置する、といった前述の構成が実現されている。 As mentioned above, in one steel plate unit 37, as shown in FIG. 5(b), the upright plate portion 17 is installed at a position shifted in the width direction (Y direction) from the center position of the surface steel plate component 13. By combining a large number of the same steel plate units 37 having such a configuration to form a steel shell 7, the above-mentioned configuration is realized in the SC structural wall 1, in which the surface connecting portion 13a (see FIG. 1 and FIG. 2(b)) of one surface steel plate 3 and the surface connecting portion 13a of the other surface steel plate 3 are positioned offset from each other in the Y direction.

ここで、SC構造壁1に形成される前述の貫通孔51及び通路用開口53(図1参照)の形成方法について説明する。図8(a)に示されるように、貫通孔51の形成位置に対応する一対の鋼板ユニット37の表面鋼板部品13には、それぞれ、円形の開口が形成されている。そして、当該開口の縁部から垂直に立ち上がるように内壁面3bに貫通孔51の小口部近傍を構成する円筒状の小口スリーブ52aが溶接されている。小口スリーブ52aの立ち上がり高さは立設板部17の立ち上がり高さよりも低いので、当該小口スリーブ52aの存在によって鋼板ユニット37の嵩が極端に増加することはない。上記のような表面鋼板部品13の開口加工及び小口スリーブ52aの溶接は、例えば、鋼板ユニット37が工場で製作されるときに行われる。 Here, the method of forming the aforementioned through hole 51 and passage opening 53 (see FIG. 1) formed in the SC structural wall 1 will be described. As shown in FIG. 8(a), a circular opening is formed in each of the surface steel plate parts 13 of a pair of steel plate units 37 corresponding to the formation position of the through hole 51. Then, a cylindrical end sleeve 52a constituting the vicinity of the end part of the through hole 51 is welded to the inner wall surface 3b so as to rise vertically from the edge of the opening. Since the rise height of the end sleeve 52a is lower than the rise height of the erected plate part 17, the presence of the end sleeve 52a does not excessively increase the bulk of the steel plate unit 37. The opening processing of the surface steel plate part 13 and the welding of the end sleeve 52a as described above are performed, for example, when the steel plate unit 37 is manufactured in a factory.

その後、施工現場では、図8(b)に示されるように、立設板部17同士が立設板連結部21で連結され隔壁部9が形成された後、小口スリーブ52a同士の間に小口スリーブ52aと略同径の円筒状の中間スリーブ52bが挿入される。そして、当該中間スリーブ52bの両端面が、それぞれ、対向する小口スリーブ52aの端面に突合わせ溶接されることで、表面鋼板部品13同士を接続する貫通孔51が形成される。上記のような中間スリーブ52bの溶接は、組立てられた鋼板組立体39に対して地組ヤードで行われてもよく、SC構造壁1の施工予定位置に吊り込まれた鋼板組立体39に対して行われてもよい。 After that, at the construction site, as shown in FIG. 8(b), the vertical plate sections 17 are connected to each other by the vertical plate connecting sections 21 to form the partition section 9, and then a cylindrical intermediate sleeve 52b of approximately the same diameter as the end sleeve 52a is inserted between the end sleeves 52a. Then, both end faces of the intermediate sleeve 52b are butt-welded to the end faces of the opposing end sleeves 52a, respectively, to form a through hole 51 connecting the surface steel plate parts 13 to each other. The welding of the intermediate sleeve 52b as described above may be performed in the ground assembly yard on the assembled steel plate assembly 39, or may be performed on the steel plate assembly 39 suspended at the planned construction position of the SC structural wall 1.

同様にして、図8(c)に示されるように、通路用開口53の形成位置に対応する一対の鋼板ユニット37の表面鋼板部品13の一端部には、それぞれ、矩形の開口が形成されている。そして、当該開口の縁部から垂直に立ち上がるように内壁面3bに通路用開口53の小口部近傍を構成する断面コ字状の通路壁小口部54aが溶接されている。通路壁小口部54aの立ち上がり高さは立設板部17の立ち上がり高さよりも低いので、当該通路壁小口部54aの存在によって鋼板ユニット37の嵩が極端に増加することはない。上記のような表面鋼板部品13の開口加工及び通路壁小口部54aの溶接は、例えば、鋼板ユニット37が工場で製作されるときに行われる。 Similarly, as shown in FIG. 8(c), a rectangular opening is formed at one end of the surface steel plate parts 13 of the pair of steel plate units 37 corresponding to the formation position of the passage opening 53. A passage wall end 54a having a U-shaped cross section and constituting the vicinity of the end of the passage opening 53 is welded to the inner wall surface 3b so as to rise vertically from the edge of the opening. Since the rise height of the passage wall end 54a is lower than the rise height of the erect plate part 17, the presence of the passage wall end 54a does not excessively increase the bulk of the steel plate unit 37. The above-mentioned opening processing of the surface steel plate parts 13 and welding of the passage wall end 54a are performed, for example, when the steel plate units 37 are manufactured in a factory.

その後、施工現場では、図8(d)に示されるように、立設板部17同士が立設板連結部21で連結され隔壁部9が形成された後、通路壁小口部54a同士の間に断面コ字状の通路壁中間部54bが挿入される。そして、当該通路壁中間部54bの両端部が、それぞれ、対向する通路壁小口部54aの端部に溶接されることで、表面鋼板部品13同士を接続する通路用開口53が形成される。上記のような通路壁中間部54bの溶接は、組立てられた鋼板組立体39に対して地組ヤードで行われてもよく、SC構造壁1の施工予定位置に吊り込まれた鋼板組立体39に対して行われてもよい。例えばここでは、通路壁小口部54aよりもやや大きいサイズの通路壁中間部54bの両端を、それぞれ通路壁小口部54aの外側に重ねるように設置して通路壁小口部54aと通路壁中間部54bとの溶接を行ってもよい。あるいは、同サイズの通路壁小口部54aと通路壁中間部54bとが、突き合わせ溶接されてもよい。 After that, at the construction site, as shown in FIG. 8(d), the vertical plate parts 17 are connected to each other by the vertical plate connecting parts 21 to form the partition wall part 9, and then the passage wall intermediate part 54b having a U-shaped cross section is inserted between the passage wall end parts 54a. Then, both ends of the passage wall intermediate part 54b are welded to the ends of the opposing passage wall end parts 54a, respectively, to form the passage opening 53 connecting the surface steel plate parts 13 to each other. The above-mentioned welding of the passage wall intermediate part 54b may be performed on the assembled steel plate assembly 39 at the ground assembly yard, or may be performed on the steel plate assembly 39 hung at the planned construction position of the SC structural wall 1. For example, here, the passage wall intermediate part 54b, which is slightly larger in size than the passage wall end part 54a, may be installed so that both ends overlap the outside of the passage wall end part 54a, and the passage wall end part 54a and the passage wall intermediate part 54b may be welded. Alternatively, the passage wall end portion 54a and the passage wall middle portion 54b, which are of the same size, may be butt welded together.

続いて、以上説明したSC構造壁1及びその施工方法による作用効果について説明する。 Next, we will explain the effects of the SC structural wall 1 and its construction method described above.

SC構造壁1における鋼殻体7の隔壁部9は、各表面鋼板3から立ち上がる立設板部17と立設板部17同士を連結する立設板連結部21とを有している。そして、隔壁部9を形成する隔壁部形成工程では、上記立設板部17同士が立設板連結部21で連結されて一対の上記立設板部17と立設板連結部21とを含む隔壁部9が形成される。この構成により、立設板連結部21による連結の前においては、隔壁部9を構成する各立設板部17同士が、SC構造壁1の壁厚方向(X方向)に分離されている。従って、SC構造壁1の部品としては、一方の立設板部17を有する一方の表面鋼板3側の部品と、他方の立設板部17を有する他方の表面鋼板3側の部品と、に分離することができる。これらの部品(本実施形態では鋼板ユニット37)のX方向の寸法は、SC構造壁1の壁厚よりも小さく抑えられる。その結果、SC構造壁1の部品の嵩を小さく抑えることができ、施工に係る部品の取扱いの負担が軽減される。そして、部品の嵩が小さいことにより、工場から施工現場までの部品の運搬の効率が向上し、また、施工現場での部品の取り回しや保管に必要なスペースも小さく抑えられる。また、これらの部品が工場で製作される場合には、嵩が小さいことにより、工場での部品の取り回し等も容易であり部品製作の効率が向上する。 The bulkhead portion 9 of the steel shell 7 in the SC structural wall 1 has a vertical plate portion 17 rising from each surface steel plate 3 and a vertical plate connecting portion 21 connecting the vertical plate portions 17 to each other. In the bulkhead forming process for forming the bulkhead portion 9, the vertical plate portions 17 are connected to each other by the vertical plate connecting portion 21 to form the bulkhead portion 9 including a pair of the vertical plate portions 17 and the vertical plate connecting portion 21. With this configuration, before being connected by the vertical plate connecting portion 21, the vertical plate portions 17 constituting the bulkhead portion 9 are separated in the wall thickness direction (X direction) of the SC structural wall 1. Therefore, the parts of the SC structural wall 1 can be separated into a part on one surface steel plate 3 side having one vertical plate portion 17 and a part on the other surface steel plate 3 side having the other vertical plate portion 17. The dimensions in the X direction of these parts (steel plate unit 37 in this embodiment) are kept smaller than the wall thickness of the SC structural wall 1. As a result, the bulk of the SC structural wall 1 components can be kept small, reducing the burden of handling the components involved in construction. Furthermore, the small bulk of the components improves the efficiency of transporting the components from the factory to the construction site, and also reduces the space required for handling and storing the components at the construction site. Furthermore, when these components are manufactured in a factory, their small bulk makes it easy to handle the components at the factory, improving the efficiency of component manufacturing.

特に、隔壁部9は、X方向に間隔をあけた立設板部17同士の間に添接板19を架け渡して両者を連結する構造であるので、立設板部17のX方向の寸法が更に小さく抑えられる。その結果、SC構造壁1の部品である鋼板ユニット37の嵩は特に小さく抑えられ、鋼板ユニット37の取扱いの負担は特に軽減されている。例えば、鋼板ユニット37のX方向の寸法は、およそ、内壁面3bからの立設板部17の立ち上がり高さに相当し、すなわち、前述したようにSC構造壁1の壁厚の約1/3程度に抑えられる。例えば、SC構造壁1の壁厚が約2mであれば、鋼板ユニット37のX方向の寸法は、約0.7m程度である。なお、鋼板ユニット37のZ方向の寸法は表面鋼板部品13のZ方向の寸法に相当し約6mであり、Y方向の寸法は表面鋼板部品13のY方向の寸法に相当し約2.4mである。 In particular, the partition wall 9 has a structure in which the vertical plate portions 17 spaced apart in the X direction are connected to each other by a splice plate 19, so that the dimension of the vertical plate portion 17 in the X direction is further reduced. As a result, the bulk of the steel plate unit 37, which is a part of the SC structural wall 1, is particularly reduced, and the burden of handling the steel plate unit 37 is particularly reduced. For example, the dimension of the steel plate unit 37 in the X direction is approximately equivalent to the rise height of the vertical plate portion 17 from the inner wall surface 3b, that is, as described above, is reduced to about 1/3 of the wall thickness of the SC structural wall 1. For example, if the wall thickness of the SC structural wall 1 is about 2 m, the dimension of the steel plate unit 37 in the X direction is about 0.7 m. The dimension of the steel plate unit 37 in the Z direction corresponds to the dimension of the surface steel plate part 13 in the Z direction, which is about 6 m, and the dimension in the Y direction corresponds to the dimension of the surface steel plate part 13 in the Y direction, which is about 2.4 m.

また、図2(b)に示されるように、隔壁部9においては、立設板部17同士がX方向に離れており、上記添接板19同士もZ方向に間隔をあけて配置されているので、前述したとおり隔壁部9を貫通する開口23が形成される。そして、この開口23は作業時における施工作業者の移動用通路として利用可能であり、施工作業者は開口23を利用して効率良く安全にY方向に移動しながら作業を行うことができるので、作業の効率と安全性の向上が図られる。仮に開口23がない場合には、施工作業者が隔壁部9を越えてY方向に移動するときに、例えば鋼殻体7の上端まで一旦戻る必要があり効率が悪い。また、この開口23は、コンクリート打設工程においてコンクリートをY方向に流動させるための流動路としても機能し、コンクリート部5と鋼殻体7との一体性向上にも寄与する。 2(b), in the partition 9, the vertical plate portions 17 are spaced apart in the X direction, and the splice plates 19 are also spaced apart in the Z direction, so that an opening 23 is formed through the partition 9 as described above. The opening 23 can be used as a passageway for workers to move around during work, and the workers can use the opening 23 to move efficiently and safely in the Y direction while working, improving work efficiency and safety. If the opening 23 did not exist, the workers would have to return to the top of the steel shell 7, for example, when moving in the Y direction beyond the partition 9, which would be inefficient. The opening 23 also functions as a flow path for the concrete to flow in the Y direction during the concrete pouring process, and contributes to improving the integrity of the concrete portion 5 and the steel shell 7.

また、SC構造壁1の一対の表面鋼板3は各々、複数の表面鋼板部品13がY方向に連結されて形成されている。そして、一方の表面鋼板3における表面連結部13aと、他方の表面鋼板3における表面連結部13aと、が互いにY方向にずれて位置している。このように表面連結部13aが千鳥配置されることにより、弱点になり得る表面連結部13aがSC構造壁1の表裏でY方向に分散される。 Each of the pair of surface steel plates 3 of the SC structural wall 1 is formed by connecting multiple surface steel plate parts 13 in the Y direction. The surface connecting parts 13a of one surface steel plate 3 and the surface connecting parts 13a of the other surface steel plate 3 are positioned offset from each other in the Y direction. By staggering the surface connecting parts 13a in this way, the surface connecting parts 13a that could become weak points are distributed in the Y direction on the front and back of the SC structural wall 1.

表面鋼板部品13同士のY方向への連結には、ボルト止めが採用されている。また、隔壁部9を形成する際において添接板19を介した立設板部17同士の連結にもボルト止めが採用されている。従って、施工現場では鋼板ユニット37同士をボルト止めで組み合わせることで鋼殻体7を形成することができ、施工現場においては鋼板を溶接する作業が削減される。施工現場で溶接による鋼板の接合を行う場合には、ボルト止めに比較して、溶接作業や溶接検査に時間がかかる場合が多く、また天候に左右される場合もあり、溶接工程がクリティカルパスになり得る。従って、施工現場での溶接作業が削減されることで、工期短縮を図ることができる。また、溶接技術者の確保の負担も低減される。 Bolt fastening is used to connect the surface steel plate components 13 in the Y direction. In addition, bolt fastening is also used to connect the upright plate sections 17 via the splice plate 19 when forming the bulkhead section 9. Therefore, the steel shell 7 can be formed at the construction site by combining the steel plate units 37 with bolt fastening, and the work of welding steel plates at the construction site is reduced. When joining steel plates by welding at the construction site, the welding work and welding inspection often take longer than with bolt fastening, and may also be affected by weather, so the welding process may become a critical path. Therefore, by reducing the welding work at the construction site, the construction period can be shortened. In addition, the burden of securing welding engineers is also reduced.

一般的に、車両による運搬対象は幅を約2.4m以下に抑えることが求められるので、この制限に合わせて鋼板ユニット37のY方向の寸法(表面鋼板部品13のY方向の寸法)を2.4m以下に設定するといったことも考えられる。これに対して、前述した図7(a)の運搬方法を採用した場合には、鋼板ユニット37のY方向の寸法が増加しても車幅方向にはほぼ影響はない。従って、鋼板ユニット37の表面鋼板部品13のY方向の寸法を(例えば2.4m以上まで)拡大できる場合もある。そして、表面鋼板部品13のY方向の寸法を拡大すれば、鋼殻体7における表面連結部13aの数が減少するので、表面鋼板部品13同士の連結作業が減少する。 Generally, the width of objects to be transported by vehicle is required to be kept to approximately 2.4 m or less, so it is conceivable to set the Y-direction dimension of the steel plate unit 37 (the Y-direction dimension of the surface steel plate component 13) to 2.4 m or less to meet this restriction. In contrast, if the transportation method shown in Figure 7 (a) described above is adopted, even if the Y-direction dimension of the steel plate unit 37 increases, there is almost no effect on the vehicle width direction. Therefore, it may be possible to expand the Y-direction dimension of the surface steel plate component 13 of the steel plate unit 37 (for example, to 2.4 m or more). Furthermore, if the Y-direction dimension of the surface steel plate component 13 is expanded, the number of surface connecting parts 13a in the steel shell 7 will decrease, and the work of connecting the surface steel plate components 13 to each other will be reduced.

また、SC構造壁1のリブ付き表面鋼板6では、表面鋼板3の内壁面3bに長尺のリブ部材28が溶接されて水平リブ部27及び鉛直リブ部29が形成されている。このリブ部材28は、表面鋼板3側の縁部28eにおいて長手方向に交互に形成された複数の凸部28a及び凹部28bを有しており、各凸部28aの先端部28hにおいて内壁面3bに溶接されている。この構成によれば、表面鋼板3に対するリブ部材28の溶接箇所は長手方向に断続的に存在することになり、また全長に亘ってリブ部材を溶接する場合に比較して、溶接箇所の長さも短い。従って、リブ部材28の溶接に起因して表面鋼板3に生じる溶接歪みが低減される。 In addition, in the ribbed surface steel plate 6 of the SC structural wall 1, a long rib member 28 is welded to the inner wall surface 3b of the surface steel plate 3 to form a horizontal rib portion 27 and a vertical rib portion 29. This rib member 28 has multiple convex portions 28a and concave portions 28b formed alternately in the longitudinal direction at the edge portion 28e on the surface steel plate 3 side, and the tip portion 28h of each convex portion 28a is welded to the inner wall surface 3b. With this configuration, the welded portions of the rib member 28 to the surface steel plate 3 are intermittent in the longitudinal direction, and the length of the welded portion is shorter than when the rib member is welded over the entire length. Therefore, welding distortion caused in the surface steel plate 3 due to welding of the rib member 28 is reduced.

また、水平リブ部27においては、各凹部28bと内壁面3bとで囲まれる領域に貫通孔が形成される。コンクリート打設工程においては、上記貫通孔が、空気抜き孔として機能するので、水平リブ部27の下面側に気泡が残留する可能性が低減される。従って、水平リブ部27に起因するコンクリート充填性の低下が抑えられる。なお、コンクリート打設工程においては、水平リブ部27、鉛直リブ部29、及び立設板部17の各交差箇所に適宜形成されたスカラップも空気抜き孔として機能する。 In addition, in the horizontal rib portion 27, through holes are formed in the area surrounded by each recess 28b and the inner wall surface 3b. In the concrete pouring process, the through holes function as air vent holes, reducing the possibility of air bubbles remaining on the underside of the horizontal rib portion 27. This prevents the deterioration of concrete filling properties caused by the horizontal rib portion 27. In the concrete pouring process, the scallops appropriately formed at the intersections of the horizontal rib portion 27, the vertical rib portion 29, and the standing plate portion 17 also function as air vent holes.

また、リブ部材28においては、凸部28aと凹部28bとが互いに略等しい輪郭形状をなしている。この構成によれば、2本のリブ部材28を向かい合わせたときに、一方のリブ部材28の凸部28aと他方のリブ部材28の凹部28bとが互いに嵌まり合う形状である。従って、リブ部材28を製作する際には、図4に示されるとおり、1本のチャンネル材31を凸部28a及び凹部28bの輪郭形状に対応する切断線31cでジグザグに切断し短手方向に二分割することにより、同じ構成のリブ部材28を2本製作することができる。そしてこの場合、切断に起因するチャンネル材31の切れ端も発生しないので、材料の無駄を抑えることができる。 In addition, in the rib member 28, the convex portion 28a and the concave portion 28b have approximately the same contour shape. With this configuration, when the two rib members 28 are placed face to face, the convex portion 28a of one rib member 28 and the concave portion 28b of the other rib member 28 are shaped to fit together. Therefore, when manufacturing the rib member 28, as shown in FIG. 4, one channel material 31 is cut in a zigzag pattern along a cutting line 31c that corresponds to the contour shapes of the convex portion 28a and the concave portion 28b, and divided into two in the short direction, so that two rib members 28 of the same configuration can be manufactured. In this case, no offcuts of the channel material 31 due to cutting are generated, so that material waste can be reduced.

リブ部材28の凹凸形状としては、本実施形態における図3及び図4の形状には限定されず、例えば、図9(a)~(e)に示されるような形状も考えられる。図9(a)の凸部81a及び凹部81bの輪郭線は、矩形をなしている。図9(b)の凸部82aは溶接される側に向かって長手方向に拡大しており、凹部82bは溶接される側に向かって長手方向に縮小している。図9(c)の凸部83a及び凹部83bの輪郭線は、円弧の一部をなしている。図9(d)の凸部84a及び凹部84bの輪郭線は、長手方向に長軸をもつ楕円の一部をなしている。図9(e)の凸部85a及び凹部85bは、直線的な輪郭線をもつ山形をなしている。 The uneven shape of the rib member 28 is not limited to the shape shown in Figs. 3 and 4 in this embodiment, and may be any of the shapes shown in Figs. 9(a) to 9(e). The contours of the convex portion 81a and the concave portion 81b in Fig. 9(a) are rectangular. The convex portion 82a in Fig. 9(b) expands in the longitudinal direction toward the side to be welded, and the concave portion 82b contracts in the longitudinal direction toward the side to be welded. The contours of the convex portion 83a and the concave portion 83b in Fig. 9(c) are part of an arc. The contours of the convex portion 84a and the concave portion 84b in Fig. 9(d) are part of an ellipse with a major axis in the longitudinal direction. The convex portion 85a and the concave portion 85b in Fig. 9(e) are mountain-shaped with a straight contour.

また、一例として説明した前述の凸部28a及び凹部28bの輪郭形状は、図3(b)で説明したとおり、それぞれ長手方向に延在する一辺を含む正六角形H1,H2の一部をなしている。この構成によれば、切断線31cが短く、直線で構成されるのでチャンネル材31の切断加工が比較的容易である。また、凸部28aの先端部28hの輪郭線がリブ部材28の長手方向に延在する直線をなす構成であるので、凸部28aの先端部28hを内壁面3bに対して面接触させて溶接することができる。 The contour shapes of the protrusions 28a and recesses 28b described above as an example form parts of regular hexagons H1 and H2, each including one side extending in the longitudinal direction, as described in FIG. 3(b). With this configuration, the cutting line 31c is short and formed as a straight line, so that cutting of the channel material 31 is relatively easy. Also, since the contour line of the tip 28h of the protrusion 28a is formed as a straight line extending in the longitudinal direction of the rib member 28, the tip 28h of the protrusion 28a can be welded in surface contact with the inner wall surface 3b.

本発明は、上述した実施形態を始めとして、当業者の知識に基づいて種々の変更、改良を施した様々な形態で実施することができる。また、上述した実施形態に記載されている技術的事項を利用して、実施例の変形例を構成することも可能である。各実施形態等の構成を適宜組み合わせて使用してもよい。 The present invention can be implemented in various forms, including the above-described embodiment, with various modifications and improvements based on the knowledge of those skilled in the art. It is also possible to configure modified examples by utilizing the technical matters described in the above-described embodiment. The configurations of each embodiment, etc. may be used in appropriate combination.

例えば、表面鋼板部品13同士のY方向の連結方法としては、ボルト止めに限られず、溶接であってもよく、ボルト接合と溶接接合とのハイブリッド接合としてもよい。また、立設板部17と添接板19との接合方法はボルト止めに限られず、溶接であってもよく、ボルト接合と溶接接合とのハイブリッド接合としてもよい。上記ハイブリッド接合としては、地組ヤードにおいて溶接が行われ、現場組立てにおいてボルト接合が行われてもよい。またこの場合、地組ヤードに余裕がある場合には、表面鋼板部品13を平置き(表面鋼板部品13のX方向を上下方向にする姿勢)にし、下向き溶接で溶接が行われてもよい。 For example, the method of connecting the surface steel plate parts 13 in the Y direction is not limited to bolting, but may be welding, or a hybrid joint of bolting and welding. The method of connecting the standing plate part 17 and the splice plate 19 is not limited to bolting, but may be welding, or a hybrid joint of bolting and welding. As for the above hybrid joint, welding may be performed in the base assembly yard and bolting may be performed during on-site assembly. In this case, if there is room in the base assembly yard, the surface steel plate parts 13 may be laid flat (in a position where the X direction of the surface steel plate parts 13 is the up-down direction) and welding may be performed by downward welding.

また、本実施形態では、図6(b)及び図6(c)に示されるように、SC構造壁1の施工予定位置に吊り込むための鋼板組立体39は、6つの鋼板ユニット37を組み合わせて箱型に構成されているが、この鋼板組立体39は図6(b)及び図6(c)に示される構造には限定されない。例えば、SC構造壁1の隔壁部9の施工予定位置の直上に梁などの障害物が存在する場合には、隔壁部9を含まない鋼板組立体39を構成することで、上記障害物に干渉しないように吊り込むようにしてもよい。隔壁部9を含まない鋼板組立体39として、例えば、図6(a)に示されているような、複数の鋼板ユニット37がY方向に連結された状態で吊り込むようにしてもよい。また、例えば、鋼板組立体39を吊り込むための大型揚重機の能力に応じて、揚重可能な範囲で鋼板組立体39に含まれる鋼板ユニット37の個数を決定してもよい。また、複数の鋼板ユニット37を組み合わせた鋼板組立体39を吊り込むようにすることも必須ではなく、鋼板ユニット37を1つずつ吊り込むようにしてもよい。 In this embodiment, as shown in Fig. 6(b) and Fig. 6(c), the steel plate assembly 39 for suspending the SC structural wall 1 at the planned construction position is configured as a box by combining six steel plate units 37, but this steel plate assembly 39 is not limited to the structure shown in Fig. 6(b) and Fig. 6(c). For example, if there is an obstacle such as a beam directly above the planned construction position of the bulkhead portion 9 of the SC structural wall 1, the steel plate assembly 39 may be configured not to include the bulkhead portion 9 so as to suspend the assembly without interfering with the obstacle. As the steel plate assembly 39 without the bulkhead portion 9, for example, as shown in Fig. 6(a), multiple steel plate units 37 may be suspended in a state connected in the Y direction. Also, for example, the number of steel plate units 37 included in the steel plate assembly 39 may be determined within the range that can be lifted depending on the capacity of a large lifting machine for suspending the steel plate assembly 39. Also, it is not necessary to suspend the steel plate assembly 39, which is a combination of multiple steel plate units 37; the steel plate units 37 may be suspended one by one.

また、水平リブ部27及び鉛直リブ部29の形状はL字断面には限られず、例えばT字断面であってもよい。この場合、図7(c)及び図7(d)に示されるように、チャンネル材31に代えて、H鋼32を短手方向にジグザグに切断してリブ部材28を製作すればよい。また、水平リブ部27及び鉛直リブ部29は平板形状であってもよい。この場合、長尺の平板を短手方向にジグザグに切断してリブ部材28を製作すればよい。 The shapes of the horizontal rib portion 27 and the vertical rib portion 29 are not limited to an L-shaped cross section, and may be, for example, a T-shaped cross section. In this case, as shown in Figures 7(c) and 7(d), instead of the channel material 31, the rib member 28 may be manufactured by cutting an H-shaped steel 32 in a zigzag pattern in the short direction. The horizontal rib portion 27 and the vertical rib portion 29 may also be in the shape of a flat plate. In this case, the rib member 28 may be manufactured by cutting a long flat plate in a zigzag pattern in the short direction.

また、実施形態では、本発明をSC構造壁1に適用する例を説明したが、本発明は、SC構造床への適用も可能である。この場合、SC構造床は、前述のSC構造壁1をY軸周りに90°回転させた構造とすればよい。またこの場合、SC構造床の上面に該当する表面鋼板3には、コンクリート打設用の打設孔が設けられてもよい。この場合、事前に当該打設孔の周囲の補強等がなされることにより、コンクリート打設後においてこの打設孔が塞がれなくてもよい。 In the embodiment, an example of applying the present invention to an SC structural wall 1 has been described, but the present invention can also be applied to an SC structural floor. In this case, the SC structural floor may have a structure in which the above-mentioned SC structural wall 1 is rotated 90° around the Y axis. In this case, a pouring hole for pouring concrete may be provided in the surface steel plate 3 corresponding to the upper surface of the SC structural floor. In this case, by reinforcing the area around the pouring hole in advance, the pouring hole does not need to be blocked after pouring the concrete.

1…SC構造壁(鋼板コンクリート構造)、3…表面鋼板、5…コンクリート部、7…鋼殻体、9…隔壁部、13…表面鋼板部品、13a…表面連結部、17…立設板部、19…添接板、21…立設板連結部、23…開口、37…鋼板ユニット。 1...SC structural wall (steel plate concrete structure), 3...surface steel plate, 5...concrete section, 7...steel shell, 9...partition wall section, 13...surface steel plate part, 13a...surface connecting section, 17...standing plate section, 19...splicing plate, 21...standing plate connecting section, 23...opening, 37...steel plate unit.

Claims (3)

一対の表面鋼板と、
前記表面鋼板同士の間の空間に打設されたコンクリートからなるコンクリート部と、
前記表面鋼板同士を接続するとともに前記コンクリート部に埋込まれた隔壁部と、
前記表面鋼板のコンクリート打設側の面に設けられ前記コンクリート部に埋込まれたリブ部と、を備え、
前記隔壁部は、各々の前記表面鋼板から面外方向に立ち上がるように設けられ前記リブ部に交差し立ち上がり方向に互いに間隔をあけて配置される一対の板状の鋼製の立設板部と、各前記立設板部を厚み方向に挟む一対の添接板と当該添接板同士の間隙に充填された充填物とを含み前記立設板部同士を連結する立設板連結部と、を有し、
前記立設板部は、前記リブ部よりも大きい立ち上がり高さで前記表面鋼板から立ち上がっており、
高さ方向に互いに間隔をあけて配置された複数の前記添接板が、立ち上がり方向の両端部の位置を高さ方向で揃えて、前記立設板部にボルト止めされており、
少なくとも一部の前記立設板連結部の前記添接板が、前記立設板部のうち、当該立設板部の立ち上がり方向において前記リブ部を超えて突出している部分に対してボルト止めされている、鋼板コンクリート構造。
A pair of surface steel plates;
A concrete portion made of concrete poured in the space between the surface steel plates;
A partition wall portion that connects the surface steel plates to each other and is embedded in the concrete portion;
A rib portion is provided on the surface of the surface steel plate on the side where concrete is poured and embedded in the concrete portion,
The partition wall portion has a pair of plate-shaped steel upright plate portions that are provided so as to rise from each of the surface steel plates in an out-of-plane direction and intersect with the rib portion and are arranged at intervals from each other in the rising direction, and a pair of splice plates that sandwich each of the upright plate portions in the thickness direction and a filler filled in the gap between the splice plates, and a upright plate connecting portion that connects the upright plate portions to each other,
The upright plate portion rises from the surface steel plate at a rising height greater than that of the rib portion,
The plurality of splice plates arranged at intervals in the height direction are bolted to the upright plate portion with both ends in the rising direction aligned in the height direction,
A steel plate concrete structure, in which the splice plates of at least some of the upright plate connection portions are bolted to portions of the upright plate portions that protrude beyond the rib portions in the rise direction of the upright plate portions.
高さ方向に互いに間隔をあけて配置された前記添接板同士の間且つ前記立設板部同士の間に前記隔壁部を貫通する開口が形成されている、請求項1に記載の鋼板コンクリート構造。 2. The steel plate concrete structure according to claim 1, wherein openings penetrating the partition wall are formed between the adjacent splice plates and between the adjacent upright plate portions arranged at intervals in the height direction . 前記表面鋼板は面内方向に連結された複数の鋼製の表面鋼板部品を有しており、
一方の前記表面鋼板における前記表面鋼板部品同士の連結部と、他方の前記表面鋼板における前記表面鋼板部品同士の連結部と、が互いに前記面内方向にずれて位置している、請求項1又は2に記載の鋼板コンクリート構造。
The surface steel plate has a plurality of steel surface steel plate parts connected in an in-plane direction,
A steel plate concrete structure as described in claim 1 or 2, wherein the connection portions between the surface steel plate components in one of the surface steel plates and the connection portions between the surface steel plate components in the other surface steel plate are positioned offset from each other in the in-plane direction.
JP2021030093A 2021-02-26 2021-02-26 Steel plate concrete structure Active JP7680223B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2021030093A JP7680223B2 (en) 2021-02-26 2021-02-26 Steel plate concrete structure
JP2024177041A JP2024177535A (en) 2021-02-26 2024-10-09 Construction method of steel plate concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021030093A JP7680223B2 (en) 2021-02-26 2021-02-26 Steel plate concrete structure

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2024177041A Division JP2024177535A (en) 2021-02-26 2024-10-09 Construction method of steel plate concrete structure

Publications (2)

Publication Number Publication Date
JP2022131243A JP2022131243A (en) 2022-09-07
JP7680223B2 true JP7680223B2 (en) 2025-05-20

Family

ID=83153027

Family Applications (2)

Application Number Title Priority Date Filing Date
JP2021030093A Active JP7680223B2 (en) 2021-02-26 2021-02-26 Steel plate concrete structure
JP2024177041A Pending JP2024177535A (en) 2021-02-26 2024-10-09 Construction method of steel plate concrete structure

Family Applications After (1)

Application Number Title Priority Date Filing Date
JP2024177041A Pending JP2024177535A (en) 2021-02-26 2024-10-09 Construction method of steel plate concrete structure

Country Status (1)

Country Link
JP (2) JP7680223B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000186383A (en) 1998-12-21 2000-07-04 Kajima Corp Core walls and core columns of a control system with controlled bending deformation
JP2003049489A (en) 2001-08-07 2003-02-21 Kajima Corp Joint structure of steel plate concrete structure
JP2007063954A (en) 2005-09-02 2007-03-15 Takenaka Komuten Co Ltd Method of forming steel plate concrete
CN109707074A (en) 2017-10-26 2019-05-03 孙阳 The casting method of the formwork for placing and tower that are poured for tower

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS59116090A (en) * 1982-12-23 1984-07-04 清水建設株式会社 Wall structure in reactor building and the like
JPH04309638A (en) * 1991-04-08 1992-11-02 Aoki Corp Joining structure of corrugated steel plate concrete wall board
JPH07268998A (en) * 1994-02-14 1995-10-17 Nisso Giken:Kk Construction method of wall surface of concrete building, and form member

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000186383A (en) 1998-12-21 2000-07-04 Kajima Corp Core walls and core columns of a control system with controlled bending deformation
JP2003049489A (en) 2001-08-07 2003-02-21 Kajima Corp Joint structure of steel plate concrete structure
JP2007063954A (en) 2005-09-02 2007-03-15 Takenaka Komuten Co Ltd Method of forming steel plate concrete
CN109707074A (en) 2017-10-26 2019-05-03 孙阳 The casting method of the formwork for placing and tower that are poured for tower

Also Published As

Publication number Publication date
JP2022131243A (en) 2022-09-07
JP2024177535A (en) 2024-12-19

Similar Documents

Publication Publication Date Title
JP7158231B2 (en) Composite column, bridge pier using same, construction method
JP2020165132A (en) Construction method of a building with a beam-column joint structure and a beam-column joint structure
KR101998579B1 (en) Steel Built Up Beam And Column-Beam Joint Construction Method Using Thereof
US11708679B2 (en) CLT structure
JP7070890B2 (en) Joint structure
WO2019138233A1 (en) Structural components
JP7680223B2 (en) Steel plate concrete structure
KR101129502B1 (en) Synthetic girder of i type
JP7095836B2 (en) Building structure
JP7569241B2 (en) Method for constructing ribbed surface steel plate and ribbed surface steel plate
JP7011490B2 (en) Reinforcing structure of beam-column joint
JP7118507B2 (en) Steel reinforced concrete wall pillar building structure
JP2006183286A (en) Connection structure of corrugated steel web for corrugated steel web u-shaped component bridge
JP7605723B2 (en) Steel plate fixing method and steel plate fixing structure
JP2006183320A (en) Reinforcing structure and reinforcing method of corner part of existing steel pier
JP7219529B2 (en) Combination structure of steel materials, shoring structure and construction method
JP4285427B2 (en) Seismic reinforcement structure for buildings
JP2018087465A (en) Facility structure unit and floor construction method
WO2021016672A1 (en) "a method and apparatus for stiffening a framework module for use in modular building construction"
JP7265343B2 (en) steel building
JP7851098B2 (en) Structures and construction methods for structures
KR102766540B1 (en) Steel column with internal diaphragm and Connecting Structure of steel column
JP7854907B2 (en) Earth retaining panels, earth retaining structures, and construction methods for earth retaining structures
JPH09279721A (en) Method for constructing wall type precast reinforced concrete structure
JP7410774B2 (en) Earthquake reinforcement structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230726

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240311

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240319

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240514

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240820

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20241009

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250121

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250212

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250430

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250508

R150 Certificate of patent or registration of utility model

Ref document number: 7680223

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150