JP7688540B2 - Power control device, power control system, and panel - Google Patents
[go: Go Back, main page]

JP7688540B2 - Power control device, power control system, and panel - Google Patents

Power control device, power control system, and panel Download PDF

Info

Publication number
JP7688540B2
JP7688540B2 JP2021130283A JP2021130283A JP7688540B2 JP 7688540 B2 JP7688540 B2 JP 7688540B2 JP 2021130283 A JP2021130283 A JP 2021130283A JP 2021130283 A JP2021130283 A JP 2021130283A JP 7688540 B2 JP7688540 B2 JP 7688540B2
Authority
JP
Japan
Prior art keywords
power
inverter
load
node
gateway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021130283A
Other languages
Japanese (ja)
Other versions
JP2023024161A (en
Inventor
一生 鈴木
和明 東
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kyocera Corp
Original Assignee
Kyocera Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kyocera Corp filed Critical Kyocera Corp
Priority to JP2021130283A priority Critical patent/JP7688540B2/en
Publication of JP2023024161A publication Critical patent/JP2023024161A/en
Priority to JP2025086219A priority patent/JP2025114871A/en
Application granted granted Critical
Publication of JP7688540B2 publication Critical patent/JP7688540B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Description

本開示は、電力制御装置、電力制御システム、及び盤に関する。 This disclosure relates to a power control device, a power control system, and a panel.

従来、太陽電池モジュールをマイクロインバータで制御する構成が知られている(例えば特許文献1参照)。 Conventionally, a configuration in which a solar cell module is controlled by a microinverter is known (see, for example, Patent Document 1).

特開2016-171654号公報JP 2016-171654 A

インバータの利便性の向上が求められる。 There is a demand for improved convenience of inverters.

本開示の目的は、インバータの利便性を向上できる電力制御装置、電力制御システム、及び盤を提供することにある。 The objective of this disclosure is to provide a power control device, a power control system, and a panel that can improve the convenience of inverters.

本開示の一実施形態に係る電力制御装置は、再生可能エネルギー発電装置から出力される電力を変換するインバータと、前記インバータと電力線通信を実行可能に接続されるゲートウェイとを備える。前記インバータは、電力網と前記電力網から電力を受ける負荷との間に位置する節点に接続される。前記ゲートウェイは、前記インバータと前記節点との間に接続される。 A power control device according to an embodiment of the present disclosure includes an inverter that converts power output from a renewable energy power generation device, and a gateway that is connected to the inverter so as to be able to perform power line communication. The inverter is connected to a node located between a power grid and a load that receives power from the power grid. The gateway is connected between the inverter and the node.

本開示の一実施形態に係る電力制御システムは、前記電力制御装置と前記負荷とを備える。 The power control system according to one embodiment of the present disclosure includes the power control device and the load.

本開示の一実施形態に係る盤は、節点とゲートウェイとを収容する。前記節点は、電力網と前記電力網から電力を受ける負荷との間に位置する。前記ゲートウェイは、再生可能エネルギー発電装置から出力される電力を変換するインバータと電力線通信を実行可能に接続される。前記ゲートウェイは、前記インバータと前記節点との間に接続される。 A panel according to one embodiment of the present disclosure houses a node and a gateway. The node is located between a power grid and a load that receives power from the power grid. The gateway is connected to an inverter that converts power output from a renewable energy power generation device so as to be able to perform power line communication. The gateway is connected between the inverter and the node.

本開示の一実施形態に係る電力制御装置、電力制御システム、及び盤によれば、インバータの利便性が向上される。 The power control device, power control system, and panel according to one embodiment of the present disclosure improve the convenience of the inverter.

一実施形態に係る電力制御システムの概略構成例を示すブロック図である。1 is a block diagram showing a schematic configuration example of a power control system according to an embodiment; 比較例に係る電力制御システムの概略構成例を示すブロック図である。1 is a block diagram showing a schematic configuration example of a power control system according to a comparative example; 集合住宅に設定されている負荷の構成例を示すブロック図である。FIG. 2 is a block diagram showing an example of the configuration of loads set in an apartment building. 制御分電盤を備える電力制御装置の構成例を示すブロック図である。1 is a block diagram showing a configuration example of a power control device including a control distribution board; 他の実施形態に係る電力制御システムの概略構成例を示すブロック図である。FIG. 13 is a block diagram showing a schematic configuration example of a power control system according to another embodiment. ゲートウェイの構成例を示す図である。FIG. 2 is a diagram illustrating an example of the configuration of a gateway. 1つのインバータに1つの再生可能エネルギー発電装置が接続される構成例を示す図である。FIG. 1 is a diagram showing a configuration example in which one renewable energy power generation device is connected to one inverter. 1つのインバータに複数の再生可能エネルギー発電装置が接続される構成例を示す図である。FIG. 1 is a diagram showing a configuration example in which a plurality of renewable energy power generation devices are connected to one inverter.

(電力制御システム1の構成例)
図1に示されるように、一実施形態に係る電力制御システム1は、電力制御装置10と、負荷40と、再生可能エネルギー発電装置60とを備える。電力制御システム1は、電力を供給する電力網50と、負荷40とに接続される。
(Configuration example of power control system 1)
1 , a power control system 1 according to one embodiment includes a power control device 10, a load 40, and a renewable energy power generation device 60. The power control system 1 is connected to a power grid 50 that supplies power, and the load 40.

再生可能エネルギー発電装置60は、太陽光発電装置(以下、PVとも称する)を含んでよい。再生可能エネルギー発電装置60は、風力発電装置等の他の再生可能エネルギーを利用する装置を含んでもよい。本実施形態において、再生可能エネルギー発電装置60は、PVであるとする。マイクロインバータ12は、PVから出力される直流電力を交流電力に変換する等によって、PVから出力される電力を制御する。マイクロインバータ12は、インバータ又はコンバータ等を含んでよい。再生可能エネルギー発電装置60は、蓄電池又は燃料電池で置き換えられてもよいし蓄電池又は燃料電池を含んでもよい。再生可能エネルギー発電装置60及びマイクロインバータ12の数は、1つに限られず、2つ以上あってもよい。 The renewable energy power generation device 60 may include a solar power generation device (hereinafter also referred to as PV). The renewable energy power generation device 60 may also include a device that utilizes other renewable energy, such as a wind power generation device. In this embodiment, the renewable energy power generation device 60 is a PV. The microinverter 12 controls the power output from the PV by, for example, converting the DC power output from the PV into AC power. The microinverter 12 may include an inverter, a converter, or the like. The renewable energy power generation device 60 may be replaced with a storage battery or a fuel cell, or may include a storage battery or a fuel cell. The number of renewable energy power generation devices 60 and microinverters 12 is not limited to one, and may be two or more.

電力制御装置10は、マイクロインバータ12と、ゲートウェイ14とを備える。マイクロインバータ12は、再生可能エネルギー発電装置60に接続され、再生可能エネルギー発電装置60が発電した電力を変換して負荷40に供給したり電力網50に逆潮流したりする。再生可能エネルギー発電装置60が直流電力を出力する場合、マイクロインバータ12は、再生可能エネルギー発電装置60の直流電力を、電力網50に合わせた交流電力に変換するように構成される。再生可能エネルギー発電装置60が交流電力を出力する場合、マイクロインバータ12は、再生可能エネルギー発電装置60の交流電力を、電力網50に合わせた交流電力に変換するように構成される。マイクロインバータ12は、電力網50からの電力で動作してもよいし、再生可能エネルギー発電装置60からの電力で動作してもよい。 The power control device 10 includes a microinverter 12 and a gateway 14. The microinverter 12 is connected to a renewable energy power generation device 60, and converts the power generated by the renewable energy power generation device 60 to supply it to a load 40 or to flow it back to the power grid 50. When the renewable energy power generation device 60 outputs DC power, the microinverter 12 is configured to convert the DC power of the renewable energy power generation device 60 into AC power that matches the power grid 50. When the renewable energy power generation device 60 outputs AC power, the microinverter 12 is configured to convert the AC power of the renewable energy power generation device 60 into AC power that matches the power grid 50. The microinverter 12 may operate with power from the power grid 50 or may operate with power from the renewable energy power generation device 60.

ゲートウェイ14は、マイクロインバータ12に接続される。ゲートウェイ14は、マイクロインバータ12から、再生可能エネルギー発電装置60の運転状態に関する情報、又は、マイクロインバータ12の運転状態に関する情報等の種々の情報を取得してよい。運転状態に関する情報は、例えば遮断装置の開閉状態に関する情報を含んでよい。ゲートウェイ14は、マイクロインバータ12から取得した情報を、画像若しくは文字等の視覚情報、又は、音声等の聴覚情報等の種々の態様で出力可能に構成されてよい。ゲートウェイ14は、電力網50からの電力で動作してもよいし、再生可能エネルギー発電装置60からの電力で動作してもよい。 The gateway 14 is connected to the microinverter 12. The gateway 14 may acquire various information from the microinverter 12, such as information about the operating state of the renewable energy power generation device 60 or information about the operating state of the microinverter 12. The information about the operating state may include, for example, information about the open/close state of the cutoff device. The gateway 14 may be configured to be able to output the information acquired from the microinverter 12 in various forms, such as visual information such as images or characters, or auditory information such as voice. The gateway 14 may operate on power from the power grid 50 or on power from the renewable energy power generation device 60.

マイクロインバータ12又はゲートウェイ14は、種々の機能を実行するための制御及び処理能力を提供するために、少なくとも1つのプロセッサを含んで構成されてよい。プロセッサは、マイクロインバータ12又はゲートウェイ14の種々の機能を実現するプログラムを実行しうる。プロセッサは、単一の集積回路として実現されてよい。集積回路は、IC(Integrated Circuit)とも称される。プロセッサは、複数の通信可能に接続された集積回路及びディスクリート回路として実現されてよい。プロセッサは、他の種々の既知の技術に基づいて実現されてよい。 The microinverter 12 or gateway 14 may be configured to include at least one processor to provide control and processing power for performing various functions. The processor may execute programs that implement various functions of the microinverter 12 or gateway 14. The processor may be implemented as a single integrated circuit. An integrated circuit is also referred to as an IC (Integrated Circuit). The processor may be implemented as multiple communicatively connected integrated circuits and discrete circuits. The processor may be implemented based on various other known technologies.

マイクロインバータ12又はゲートウェイ14は、記憶部を備えてよい。記憶部は、磁気ディスク等の電磁記憶媒体を含んでよいし、半導体メモリ又は磁気メモリ等のメモリを含んでもよい。記憶部は、各種情報及びマイクロインバータ12又はゲートウェイ14で実行されるプログラム等を格納する。記憶部は、非一時的な読み取り可能媒体として構成されてもよい。記憶部は、マイクロインバータ12又はゲートウェイ14のワークメモリとして機能してよい。記憶部の少なくとも一部は、マイクロインバータ12又はゲートウェイ14とは別体として構成されてもよい。 The microinverter 12 or the gateway 14 may include a memory unit. The memory unit may include an electromagnetic storage medium such as a magnetic disk, or may include a memory such as a semiconductor memory or a magnetic memory. The memory unit stores various information and programs executed by the microinverter 12 or the gateway 14. The memory unit may be configured as a non-transitory readable medium. The memory unit may function as a work memory for the microinverter 12 or the gateway 14. At least a part of the memory unit may be configured as a separate entity from the microinverter 12 or the gateway 14.

電力制御装置10は、必須ではないが電力網50に接続される取引メータ45を更に備える。電力制御システム1は、取引メータ45を介して電力網50に接続される。取引メータ45は、電力制御システム1が電力網50から受電する電力量を測定する。取引メータ45は、電力制御システム1から電力網50に逆潮流する電力量を測定してもよい。 The power control device 10 further includes a master meter 45 connected to the power grid 50, although this is not essential. The power control system 1 is connected to the power grid 50 via the master meter 45. The master meter 45 measures the amount of power that the power control system 1 receives from the power grid 50. The master meter 45 may also measure the amount of power that flows back from the power control system 1 to the power grid 50.

電力制御装置10は、必須ではないがコイル30を更に備える。電力制御装置10は、コイル30を介して、負荷分電盤20又は負荷40に接続される。コイル30は、配線に流れるノイズを低減するように構成される。コイル30は、ブロッキングコイルとも称される。 The power control device 10 further includes a coil 30, although this is not essential. The power control device 10 is connected to the load distribution board 20 or the load 40 via the coil 30. The coil 30 is configured to reduce noise flowing in the wiring. The coil 30 is also called a blocking coil.

電力制御システム1において、電力は、電力網50から負荷40に供給される。また、電力は、再生可能エネルギー発電装置60の発電電力を変換するマイクロインバータ12からも負荷40に供給される。マイクロインバータ12は、電力網50から負荷40までを接続する配線に対して、電力網50と負荷40との間に位置する節点71で接続される。ゲートウェイ14は、マイクロインバータ12から節点71までを接続する配線に対して、マイクロインバータ12と節点71との間に位置する節点72で接続される。 In the power control system 1, power is supplied from the power grid 50 to the load 40. Power is also supplied to the load 40 from a microinverter 12 that converts the power generated by a renewable energy power generation device 60. The microinverter 12 is connected to a wiring that connects the power grid 50 to the load 40 at a node 71 located between the power grid 50 and the load 40. The gateway 14 is connected to a wiring that connects the microinverter 12 to the node 71 at a node 72 located between the microinverter 12 and the node 71.

ゲートウェイ14は、ゲートウェイ14とマイクロインバータ12とを接続する配線を介した電力線通信によってマイクロインバータ12から情報を取得する。つまり、ゲートウェイ14は、マイクロインバータ12と電力線通信を実行可能に接続される。ゲートウェイ14がマイクロインバータ12から電力線通信で情報を取得できることによって、専用の通信線が必要とされない。専用の通信線が不要であることによってマイクロインバータ12が設置されやすくなる。その結果、マイクロインバータ12の利便性が向上する。 The gateway 14 acquires information from the microinverter 12 by power line communication via wiring connecting the gateway 14 and the microinverter 12. That is, the gateway 14 is connected to the microinverter 12 so that power line communication can be performed. Because the gateway 14 can acquire information from the microinverter 12 by power line communication, a dedicated communication line is not required. The absence of a dedicated communication line makes it easier to install the microinverter 12. As a result, the convenience of the microinverter 12 is improved.

また、ゲートウェイ14とマイクロインバータ12との間の電力線通信は、電力網50と負荷40とを接続する配線を通らずに実行される。 In addition, power line communication between the gateway 14 and the microinverter 12 is performed without passing through the wiring connecting the power grid 50 and the load 40.

比較例として図2に示される電力制御システム9において、ゲートウェイ14は、負荷40と並列に負荷分電盤20に接続される。比較例の構成は、ゲートウェイ14を住宅内に設置する場合、住宅内に設置される負荷分電盤20にゲートウェイ14を接続する構成に対応する。比較例において、ゲートウェイ14は、電力網50と負荷40とを接続する配線を通ってマイクロインバータ12に接続される。つまり、ゲートウェイ14とマイクロインバータ12とを接続する配線の一部は、負荷40に電力を供給する配線と共通する。この場合、ゲートウェイ14とマイクロインバータ12との間の電力線通信は、負荷40のノイズの影響を受けやすい。 In the power control system 9 shown in FIG. 2 as a comparative example, the gateway 14 is connected to the load distribution board 20 in parallel with the load 40. The configuration of the comparative example corresponds to a configuration in which the gateway 14 is connected to the load distribution board 20 installed in a house when the gateway 14 is installed in the house. In the comparative example, the gateway 14 is connected to the microinverter 12 through a wiring that connects the power grid 50 and the load 40. In other words, a part of the wiring that connects the gateway 14 and the microinverter 12 is common to the wiring that supplies power to the load 40. In this case, the power line communication between the gateway 14 and the microinverter 12 is easily affected by noise from the load 40.

本実施形態に係る電力制御システム1におけるゲートウェイ14とマイクロインバータ12との間の電力線通信は、比較例と異なり、電力網50と負荷40とを接続する配線を通らずに実行される。負荷40に接続される配線を通らない電力線通信は、負荷40のノイズの影響を受けにくい。また、マイクロインバータ12及びゲートウェイ14が接続される節点71と負荷40との間に負荷40のノイズを低減するコイル30が設けられることによって、電力線通信に対する負荷40のノイズの影響が低減され得る。 In the power control system 1 according to this embodiment, the power line communication between the gateway 14 and the microinverter 12 is performed without passing through the wiring connecting the power grid 50 and the load 40, unlike the comparative example. Power line communication that does not pass through the wiring connected to the load 40 is less susceptible to the noise of the load 40. In addition, by providing a coil 30 that reduces the noise of the load 40 between the node 71 to which the microinverter 12 and the gateway 14 are connected and the load 40, the effect of the noise of the load 40 on the power line communication can be reduced.

また、取引メータ45から節点71までの配線は、節点71から負荷40までの配線よりも短くされてよい。このようにすることでマイクロインバータ12とゲートウェイ14とを接続する配線から負荷40までの距離が長くなる。その結果、負荷40のノイズの影響がより一層低減され得る。 The wiring from the transaction meter 45 to the node 71 may be shorter than the wiring from the node 71 to the load 40. In this way, the distance from the wiring connecting the microinverter 12 and the gateway 14 to the load 40 is longer. As a result, the effect of noise on the load 40 can be further reduced.

(負荷40を備える集合住宅4の構成例)
負荷40は、複数の需要家施設を含む複合需要家施設に設置されてよい。図3に示されるように、複合需要家施設は、集合住宅4であってよい。複合需要家施設が集合住宅4である場合、複合需要家施設は、需要家施設として、集合住宅4の複数の住戸2それぞれを含んでもよいし、集合住宅4の共用部3を含んでもよい。複合需要家施設は、需要家施設として店舗を含む商業施設であってもよい。以下、複合需要家施設が集合住宅4であるとして実施形態の一例が説明される。
(Example of configuration of apartment building 4 equipped with load 40)
The load 40 may be installed in a complex consumer facility including multiple consumer facilities. As shown in FIG. 3 , the complex consumer facility may be an apartment building 4. When the complex consumer facility is an apartment building 4, the complex consumer facility may include, as consumer facilities, each of the multiple dwelling units 2 of the apartment building 4, or may include a common area 3 of the apartment building 4. The complex consumer facility may be a commercial facility including a store as a consumer facility. An example of an embodiment will be described below assuming that the complex consumer facility is an apartment building 4.

集合住宅4は、マンション、アパート、又はメゾネット等の種々の形態であってよい。集合住宅4は、管理主体によって管理されてよい。集合住宅4の管理主体は、集合住宅4のオーナー又は集合住宅4を管理する事業者等であってよい。集合住宅4の管理主体は、各住戸2の居住者と個別に入居契約を結んでよい。 The apartment complex 4 may be in various forms, such as a condominium, an apartment, or a maisonette. The apartment complex 4 may be managed by a management entity. The management entity of the apartment complex 4 may be the owner of the apartment complex 4 or a business operator that manages the apartment complex 4. The management entity of the apartment complex 4 may enter into individual occupancy contracts with the residents of each dwelling unit 2.

集合住宅4において、負荷40は、共用部3に設置されている共用負荷41と、住戸2に設置されている住戸負荷42とを含む。集合住宅4において、必須ではないが共用メータ47が更に設置される。共用メータ47は、共用部3に設置されている共用負荷41に供給される電力量を測定する。集合住宅4において、住戸メータ46が更に設置される。住戸メータ46は、住戸2に設置されている住戸負荷42に供給される電力量を測定する。 In the apartment building 4, the load 40 includes a shared load 41 installed in the common area 3 and a dwelling load 42 installed in the dwelling unit 2. In the apartment building 4, a shared meter 47 is further installed, although this is not essential. The shared meter 47 measures the amount of electricity supplied to the shared load 41 installed in the common area 3. In the apartment building 4, a dwelling unit meter 46 is further installed. The dwelling unit meter 46 measures the amount of electricity supplied to the dwelling unit load 42 installed in the dwelling unit 2.

共用負荷41は、集合住宅4の共用部3に設けられている負荷40である。共用部3は、例えば、集合住宅4の廊下又は階段等であってよい。共用負荷41は、共用部3に設けられている機器、例えば、外灯等の照明器具、浄化槽ブロア電源、火災報知機等の非常用設備及び空調機器等の他の機器を含んでよい。住戸負荷42は、集合住宅4の各住戸2に設けられている負荷40であり、例えば、各住戸2で使用される照明器具、冷蔵庫、テレビ、又はエアコンディショナ等の電気機器であってよい。集合住宅4は、複数の住戸2を含む。各住戸2は、住戸負荷42を備えるとする。つまり、集合住宅4は、複数の住戸負荷42を備えるとする。 The shared load 41 is a load 40 provided in the common area 3 of the apartment building 4. The common area 3 may be, for example, a corridor or stairs of the apartment building 4. The shared load 41 may include equipment provided in the common area 3, such as lighting fixtures such as outdoor lights, septic tank blower power supplies, emergency equipment such as fire alarms, and other equipment such as air conditioning equipment. The dwelling unit load 42 is a load 40 provided in each dwelling unit 2 of the apartment building 4, and may be, for example, electrical equipment such as lighting fixtures, refrigerators, televisions, or air conditioners used in each dwelling unit 2. The apartment building 4 includes multiple dwelling units 2. Each dwelling unit 2 is provided with a dwelling unit load 42. In other words, the apartment building 4 is provided with multiple dwelling unit loads 42.

集合住宅4において、再生可能エネルギー発電装置60としてのPVは、例えば、集合住宅4の屋根、集合住宅4の駐車場の屋根、又は、集合住宅4の敷地内等に分割して設けられてよい。 In an apartment building 4, the PV as the renewable energy power generation device 60 may be installed separately, for example, on the roof of the apartment building 4, on the roof of the parking lot of the apartment building 4, or within the grounds of the apartment building 4.

(制御分電盤80を備える構成例)
図4に示されるように、電力制御装置10は、制御分電盤80を備えてよい。制御分電盤80は、ゲートウェイ14とコイル30と節点71と節点72とを収容する。制御分電盤80は、端子81、端子82及び端子83を備える。制御分電盤80は、端子81で負荷40又は負荷分電盤20に接続される。つまり、端子81は、負荷40に接続可能に構成される。制御分電盤80は、端子82でマイクロインバータ12に接続される。つまり、端子82は、マイクロインバータ12に接続可能に構成される。制御分電盤80は、端子83で電力網50又は取引メータ45に接続される。つまり、端子83は、電力網50に接続可能に構成される。取引メータ45は、端子83と節点71との間に設置されてよい。取引メータ45は、制御分電盤80に設置されてもよい。制御分電盤80は、単に、盤とも称される。制御分電盤80は、引込盤又は分電盤等として構成されてよい。電力網50から負荷40に電力を供給する配線から分岐してマイクロインバータ12に接続する配線を含む回路が盤として構成されることによって、本実施形態に係る電力制御装置10が既存施設、例えば既存の集合住宅4等に導入されやすくなる。また、制御分電盤80は、集合住宅4の外壁に設置されてもよい。このようにすることで、本実施形態に係る電力制御装置10が既存の集合住宅4に導入されやすくなる。
(Example of configuration including a control distribution board 80)
As shown in FIG. 4 , the power control device 10 may include a control distribution board 80. The control distribution board 80 accommodates the gateway 14, the coil 30, the node 71, and the node 72. The control distribution board 80 includes a terminal 81, a terminal 82, and a terminal 83. The control distribution board 80 is connected to the load 40 or the load distribution board 20 at the terminal 81. That is, the terminal 81 is configured to be connectable to the load 40. The control distribution board 80 is connected to the microinverter 12 at the terminal 82. That is, the terminal 82 is configured to be connectable to the microinverter 12. The control distribution board 80 is connected to the power grid 50 or the master meter 45 at the terminal 83. That is, the terminal 83 is configured to be connectable to the power grid 50. The master meter 45 may be installed between the terminal 83 and the node 71. The master meter 45 may be installed in the control distribution board 80. The control distribution board 80 may also be simply referred to as a board. The control distribution board 80 may be configured as an inlet board, a distribution board, or the like. By configuring a circuit including wiring that branches off from the wiring that supplies power from the power grid 50 to the load 40 and connects to the microinverter 12 as a board, the power control device 10 according to the present embodiment can be easily introduced into an existing facility, for example, an existing apartment building 4. The control distribution board 80 may also be installed on the outer wall of the apartment building 4. In this way, the power control device 10 according to the present embodiment can be easily introduced into an existing apartment building 4.

制御分電盤80において、負荷40に接続される端子81は、節点71から見てコイル30よりも負荷40に近い側に位置する。このようにすることで、負荷40のノイズが節点71に接続される配線で実行される電力線通信に対して影響を及ぼしにくくなる。 In the control distribution board 80, the terminal 81 connected to the load 40 is located closer to the load 40 than the coil 30 is to the node 71. This makes it less likely that noise from the load 40 will affect the power line communication carried out through the wiring connected to the node 71.

(電力網50から複数の負荷40に分岐する構成例)
図5に示されるように、電力制御システム1は、電力網50からの電力を負荷40A及び負荷40Bに分岐して供給するように構成されてもよい。電力制御システム1は、分岐点52を有する。電力網50からの電力は、分岐点52で分岐されて2つの需要家施設又は複合需要家施設に供給されるともいえる。本実施形態において、分岐点52で分岐された配線は、第1施設と第2施設に接続されるとする。
(Example of a configuration in which the power grid 50 is branched to a plurality of loads 40)
5, the power control system 1 may be configured to branch and supply power from a power grid 50 to a load 40A and a load 40B. The power control system 1 has a branch point 52. It can also be said that the power from the power grid 50 is branched at the branch point 52 and supplied to two consumer facilities or a complex consumer facility. In this embodiment, the wiring branched at the branch point 52 is connected to a first facility and a second facility.

第1施設は、ゲートウェイ14を備える制御分電盤80Aと、再生可能エネルギー発電装置60Aと、マイクロインバータ12Aと、取引メータ45Aと、負荷40Aとを備える。制御分電盤80Aは、第1の盤とも称される。制御分電盤80Aは、ゲートウェイ14の他に、コイル30Aと、節点71Aと、節点72Aと、端子81Aと、端子82Aと、端子83Aとを備える。制御分電盤80Aは、端子81Aで負荷40Aに接続される。制御分電盤80Aは、端子82Aでマイクロインバータ12Aに接続される。制御分電盤80Aは、端子83Aで取引メータ45A又は分岐点52に接続される。 The first facility includes a control distribution board 80A with a gateway 14, a renewable energy power generation device 60A, a microinverter 12A, a master meter 45A, and a load 40A. The control distribution board 80A is also referred to as the first board. In addition to the gateway 14, the control distribution board 80A includes a coil 30A, a node 71A, a node 72A, a terminal 81A, a terminal 82A, and a terminal 83A. The control distribution board 80A is connected to the load 40A at the terminal 81A. The control distribution board 80A is connected to the microinverter 12A at the terminal 82A. The control distribution board 80A is connected to the master meter 45A or the branch point 52 at the terminal 83A.

第2施設は、ゲートウェイ14を備えない制御分電盤80Bと、再生可能エネルギー発電装置60Bと、マイクロインバータ12Bと、取引メータ45Bと、負荷40Bとを備える。制御分電盤80Bは、第2の盤とも称される。制御分電盤80Bは、コイル30Bと、節点71Bと、節点72Bと、端子81Bと、端子82Bと、端子83Bとを備える。制御分電盤80Bは、端子81Bで負荷40Bに接続される。制御分電盤80Bは、端子82Bでマイクロインバータ12Bに接続される。制御分電盤80Bは、端子83Bで取引メータ45B又は分岐点52に接続される。 The second facility includes a control distribution board 80B without a gateway 14, a renewable energy power generation device 60B, a microinverter 12B, a master meter 45B, and a load 40B. The control distribution board 80B is also referred to as a second board. The control distribution board 80B includes a coil 30B, a node 71B, a node 72B, a terminal 81B, a terminal 82B, and a terminal 83B. The control distribution board 80B is connected to the load 40B at the terminal 81B. The control distribution board 80B is connected to the microinverter 12B at the terminal 82B. The control distribution board 80B is connected to the master meter 45B or the branch point 52 at the terminal 83B.

図5の構成において、電力制御装置10は、第1施設に設けられているマイクロインバータ12Aと、第2施設に設けられているマイクロインバータ12Bと、ゲートウェイ14とを備えるとする。第1施設に設けられているマイクロインバータ12Aは、第1インバータとも称される。第2施設に設けられているマイクロインバータ12Bは、第2インバータとも称される。ゲートウェイ14は、第1施設内に設けられるマイクロインバータ12と第1施設内の配線を通じて電力線通信を実行する。つまり、ゲートウェイ14は、分岐点52を通さずにマイクロインバータ12Aと通信可能に接続される。また、ゲートウェイ14は、第2施設内に設けられるマイクロインバータ12Bと分岐点52を含む配線を通じて電力線通信を実行する。つまり、ゲートウェイ14は、分岐点52を通してマイクロインバータ12Bと通信可能に接続される。このようにすることで、1台のゲートウェイ14によって、分岐点52を介して接続されている複数の需要家施設それぞれに設けられているマイクロインバータ12からの情報が取得され得る。 In the configuration of FIG. 5, the power control device 10 includes a microinverter 12A provided in a first facility, a microinverter 12B provided in a second facility, and a gateway 14. The microinverter 12A provided in the first facility is also referred to as a first inverter. The microinverter 12B provided in the second facility is also referred to as a second inverter. The gateway 14 performs power line communication with the microinverter 12 provided in the first facility through wiring within the first facility. That is, the gateway 14 is communicatively connected to the microinverter 12A without passing through the branch point 52. The gateway 14 also performs power line communication with the microinverter 12B provided in the second facility through wiring including the branch point 52. That is, the gateway 14 is communicatively connected to the microinverter 12B through the branch point 52. In this way, one gateway 14 can acquire information from the microinverters 12 provided in each of the multiple consumer facilities connected via the branch point 52.

また、電力制御システム1は、必須ではないが電力網50と分岐点52との間にコイル54を備える。コイル54によって電力網50からのノイズが電力線通信に及ぼす影響が低減され得る。また、コイル30Aが節点71Aよりも負荷40Aの側に接続され、かつ、コイル30Bが節点71Bよりも負荷40Bの側に接続されることによって、負荷40A及び40Bからのノイズが電力線通信に及ぼす影響が低減され得る。 The power control system 1 also includes a coil 54 between the power grid 50 and the branch point 52, although this is not essential. The coil 54 can reduce the effect of noise from the power grid 50 on the power line communication. Also, by connecting the coil 30A closer to the load 40A than the node 71A and connecting the coil 30B closer to the load 40B than the node 71B, the effect of noise from the loads 40A and 40B on the power line communication can be reduced.

制御分電盤80Aは、必須ではないがブレーカ84Aと、ブレーカ85Aとを更に備える。ブレーカ84Aは、マイクロインバータ12Aと節点72Aとの間に接続され、オンの状態でマイクロインバータ12Aを負荷40A又は電力網50と導通させ、オフの状態でマイクロインバータ12Aを負荷40A又は電力網50から遮断する。ブレーカ85Aは、ゲートウェイ14と節点72Aとの間に接続され、オンの状態でゲートウェイ14をマイクロインバータ12A又はマイクロインバータ12Bと電力線通信を実行可能にし、オフの状態でゲートウェイ14をマイクロインバータ12A又はマイクロインバータ12Bから遮断する。仮にブレーカ84Aとブレーカ85Aがなく、節点72Aと節点71Aの間にブレーカがあった場合、マイクロインバータ12Aが故障した際は、そのブレーカをオフにすることでマイクロインバータ12Aだけでなくゲートウェイ14も停止する。一方で、ブレーカ84A及び85Aが接続されていることによって、仮にマイクロインバータ12Aが故障したとしても、ブレーカ84Aだけがオフになれば、ゲートウェイ14は、第2施設のマイクロインバータ12Bとの電力線通信を継続できる。 The control distribution board 80A further includes a breaker 84A and a breaker 85A, although these are not essential. The breaker 84A is connected between the microinverter 12A and the node 72A, and when it is on, it connects the microinverter 12A to the load 40A or the power grid 50, and when it is off, it disconnects the microinverter 12A from the load 40A or the power grid 50. The breaker 85A is connected between the gateway 14 and the node 72A, and when it is on, it enables the gateway 14 to perform power line communication with the microinverter 12A or the microinverter 12B, and when it is off, it disconnects the gateway 14 from the microinverter 12A or the microinverter 12B. If the breakers 84A and 85A were not present and a breaker was present between the node 72A and the node 71A, when the microinverter 12A fails, not only the microinverter 12A but also the gateway 14 would be stopped by turning off the breaker. On the other hand, because breakers 84A and 85A are connected, even if microinverter 12A fails, if only breaker 84A is turned off, gateway 14 can continue power line communication with microinverter 12B in the second facility.

制御分電盤80Bは、必須ではないがブレーカ84Bを更に備える。ブレーカ84Bは、マイクロインバータ12Bと節点72Bとの間に接続され、オンの状態でマイクロインバータ12Bを負荷40B又は電力網50と導通させ、オフの状態でマイクロインバータ12Bを負荷40B又は電力網50から遮断する。 The control distribution board 80B further includes a breaker 84B, although this is not essential. The breaker 84B is connected between the microinverter 12B and the node 72B, and when in the ON state, the breaker 84B connects the microinverter 12B to the load 40B or the power grid 50, and when in the OFF state, the breaker 84B disconnects the microinverter 12B from the load 40B or the power grid 50.

制御分電盤80Bは、必須ではないが、ゲートウェイ14を備えない場合であってもゲートウェイ14を設置可能な空き領域86を備える。制御分電盤80Bは、空き領域86にゲートウェイ14を設置した場合に節点72B又はマイクロインバータ12Bに接続可能に構成される端子を備えてもよい。また、制御分電盤80Bは、必須ではないがブレーカ85Bを更に備える。ブレーカ85Bは、ゲートウェイ14が空き領域86に設置された場合に、ゲートウェイ14と節点71Bとの間に接続される。この場合、ブレーカ85Bは、オンの状態でゲートウェイ14をマイクロインバータ12A又はマイクロインバータ12Bと電力線通信を実行可能にし、オフの状態でゲートウェイ14をマイクロインバータ12A又はマイクロインバータ12Bから遮断する。また、ゲートウェイ14が空き領域86に追加で設置された場合、ゲートウェイ14が複数設置されることによって、1つのゲートウェイ14が故障した場合の代替として他のゲートウェイ14が継続して使用され得る。 Although not essential, the control distribution board 80B includes an empty area 86 in which the gateway 14 can be installed even if the gateway 14 is not provided. The control distribution board 80B may include a terminal configured to be connectable to the node 72B or the microinverter 12B when the gateway 14 is installed in the empty area 86. The control distribution board 80B also includes a breaker 85B, although not essential. When the gateway 14 is installed in the empty area 86, the breaker 85B is connected between the gateway 14 and the node 71B. In this case, when the breaker 85B is turned on, the gateway 14 can perform power line communication with the microinverter 12A or the microinverter 12B, and when the breaker 85B is turned off, the gateway 14 is disconnected from the microinverter 12A or the microinverter 12B. When the gateway 14 is additionally installed in the empty area 86, by installing multiple gateways 14, the other gateways 14 can be continuously used as a replacement when one gateway 14 breaks down.

電力制御システム1は、コイル54と分岐点52との間に取引メータ45を備えてもよい。第1施設と第2施設とを分岐点52を介して接続することによって、マイクロインバータ12Aの電力が負荷40Bに供給され得る。また、マイクロインバータ12Bの電力が負荷40Aに供給され得る。このようにすることで、再生可能エネルギー発電装置60で発電した電力の地産地消又は自家消費が促進される。地産地消は、再生可能エネルギー発電装置60Aで発電した電力が取引メータ45よりも電力網50の側に一旦流れた後ですぐに戻ってきて負荷40Bで消費されることを意味する。自家消費は、再生可能エネルギー発電装置60Aで発電した電力が取引メータ45よりも電力網50の側に流れることなく負荷40Bで消費されることを意味する。 The power control system 1 may include a master meter 45 between the coil 54 and the branch point 52. By connecting the first facility and the second facility via the branch point 52, the power of the microinverter 12A can be supplied to the load 40B. Also, the power of the microinverter 12B can be supplied to the load 40A. In this way, local production and consumption or self-consumption of the power generated by the renewable energy power generation device 60 is promoted. Local production and consumption means that the power generated by the renewable energy power generation device 60A flows once to the power grid 50 side of the master meter 45, then immediately returns and is consumed by the load 40B. Self-consumption means that the power generated by the renewable energy power generation device 60A is consumed by the load 40B without flowing to the power grid 50 side of the master meter 45.

電力制御システム1において、コイル54と分岐点52の間に取引メータ45を備える場合、負荷40Aと負荷40Bを備える集合住宅4において一括受電が実現される。取引メータ45Aは端子83Aと節点71Aの間に備えてよいし、節点71Aとコイル30Aの間に備えてもよい。取引メータ45Bは端子83Bと節点71Bの間に備えてよいし、節点71Bとコイル30Bの間に備えてもよい。制御分電盤80Aと制御分電盤80Bは1つの制御分電盤80であってもよい。 In the power control system 1, when a master meter 45 is provided between the coil 54 and the branch point 52, a collective power reception is realized in the apartment building 4 having the loads 40A and 40B. The master meter 45A may be provided between the terminal 83A and the node 71A, or between the node 71A and the coil 30A. The master meter 45B may be provided between the terminal 83B and the node 71B, or between the node 71B and the coil 30B. The control distribution board 80A and the control distribution board 80B may be a single control distribution board 80.

集合住宅4の管理主体は、電力網50から電力を供給する電力事業者との間で一括受電契約を結ぶとする。電力事業者は、一括受電契約に基づいて電力網50から集合住宅4に電力を供給する。集合住宅4に含まれる負荷40は、一括受電した電力を消費する。取引メータ45は、電力網50から集合住宅4に供給される電力量を測定する。取引メータ45は、検定メータであるとする。電力事業者は、取引メータ45を管理し、取引メータ45から測定結果を取得する。電力事業者は、取引メータ45の測定結果に基づいて集合住宅4全体の消費電力量に対応する電気料金を算出する。電力事業者は、取引メータ45の測定結果に基づいて算出された電気料金を、集合住宅4の管理主体に請求する。集合住宅4の管理主体は、住戸メータ46による各住戸負荷42の消費電力量の測定結果に基づいて各住戸2の居住者に電気料金を請求してよいし、他の基準に沿って各住戸2の居住者に電気料金を請求してよい。 The management entity of the apartment complex 4 concludes a lump-sum power receiving contract with an electric power supplier that supplies power from the power grid 50. The electric power supplier supplies power from the power grid 50 to the apartment complex 4 based on the lump-sum power receiving contract. The load 40 included in the apartment complex 4 consumes the lump-sum power received. The master meter 45 measures the amount of power supplied from the power grid 50 to the apartment complex 4. The master meter 45 is a certified meter. The electric power supplier manages the master meter 45 and obtains the measurement results from the master meter 45. The electric power supplier calculates an electricity fee corresponding to the total power consumption of the apartment complex 4 based on the measurement results of the master meter 45. The electric power supplier bills the management entity of the apartment complex 4 for the electricity fee calculated based on the measurement results of the master meter 45. The management entity of the apartment complex 4 may bill the residents of each dwelling unit 2 for electricity based on the measurement results of the power consumption of each dwelling unit load 42 by the dwelling unit meter 46, or may bill the residents of each dwelling unit 2 for electricity based on other standards.

集合住宅4の管理主体が一括受電契約を結ぶ場合、高圧一括受電契約及び低圧一括受電契約のいずれかが選択される。高圧一括受電契約は、所定値以上の電気容量で一括受電する契約である。低圧一括受電契約は、所定値未満の電気容量で一括受電する契約である。所定値は、電力会社によって適宜定められる。所定値は、例えば50kW等であってよい。集合住宅4の管理主体は、集合住宅4の住戸2の数に基づいて、高圧一括受電契約及び低圧一括受電契約のいずれかを結んでよい。高圧一括受電契約及び低圧一括受電契約のいずれが結ばれていても、集合住宅4全体として消費電力が平準化されることによる消費電力のピークカットが実現されうる。その結果、集合住宅4の管理主体は、消費電力のピークカットによる電気料金の単価の低減のメリットを享受しうる。集合住宅4の管理主体が一括受電契約を結ぶことによって、各住戸2の居住者が受電契約を結ぶ手間が省ける。集合住宅4が再生可能エネルギー発電装置60を備える場合、集合住宅4の負荷40は全体として、再生可能エネルギー発電装置60から電力を受電する。消費電力の平準化によって、集合住宅4の負荷40は、再生可能エネルギー発電装置60からの電力をコンスタントに消費しうる。その結果、地産地消又は自家消費が促進されうる。 When the management entity of the apartment building 4 enters into a lump-sum power receiving contract, either a high-voltage lump-sum power receiving contract or a low-voltage lump-sum power receiving contract is selected. A high-voltage lump-sum power receiving contract is a contract for receiving electricity collectively with an electrical capacity equal to or greater than a predetermined value. A low-voltage lump-sum power receiving contract is a contract for receiving electricity collectively with an electrical capacity less than a predetermined value. The predetermined value is determined appropriately by the electric power company. The predetermined value may be, for example, 50 kW. The management entity of the apartment building 4 may enter into either a high-voltage lump-sum power receiving contract or a low-voltage lump-sum power receiving contract based on the number of dwelling units 2 of the apartment building 4. Regardless of whether a high-voltage lump-sum power receiving contract or a low-voltage lump-sum power receiving contract is entered into, peak power consumption can be cut by leveling out the power consumption of the entire apartment building 4. As a result, the management entity of the apartment building 4 can enjoy the benefit of a reduction in the unit price of electricity due to peak power consumption cuts. By the management entity of the apartment building 4 entering into a lump-sum power receiving contract, the residents of each dwelling unit 2 do not have to go through the trouble of entering into a power receiving contract. When the apartment building 4 is equipped with a renewable energy power generation device 60, the loads 40 of the apartment building 4 as a whole receive power from the renewable energy power generation device 60. By leveling out the power consumption, the loads 40 of the apartment building 4 can constantly consume power from the renewable energy power generation device 60. As a result, local production and consumption or self-consumption can be promoted.

図6に示されるように、ゲートウェイ14は、表示部141を備えてよい。表示部141は、ゲートウェイ14がマイクロインバータ12から取得した情報を表示する。表示部141は、例えば、画像又は文字若しくは図形等の視覚情報を出力する表示デバイスを含んで構成される。表示デバイスは、例えば、LCD(Liquid Crystal Display)、有機EL(Electro-Luminescence)ディスプレイ若しくは無機ELディスプレイ、又は、PDP(Plasma Display Panel)等を含んで構成されてよい。表示デバイスは、これらのディスプレイに限られず、他の種々の方式のディスプレイを含んで構成されてよい。表示デバイスは、LED(Light Emission Diode)又はLD(Laser Diode)等の発光デバイスを含んで構成されてよい。表示デバイスは、他の種々のデバイスを含んで構成されてよい。 As shown in FIG. 6, the gateway 14 may include a display unit 141. The display unit 141 displays information acquired by the gateway 14 from the microinverter 12. The display unit 141 includes a display device that outputs visual information such as an image, text, or a figure. The display device may include, for example, an LCD (Liquid Crystal Display), an organic EL (Electro-Luminescence) display, an inorganic EL display, or a PDP (Plasma Display Panel). The display device is not limited to these displays and may include displays of various other types. The display device may include a light-emitting device such as an LED (Light Emission Diode) or an LD (Laser Diode). The display device may include various other devices.

マイクロインバータ12は、マイクロインバータ12を含むインバータに置き換えられてよい。インバータは、マイクロインバータ12の他に種々のインバータを含んでよい。 The microinverter 12 may be replaced with an inverter that includes the microinverter 12. The inverter may include various inverters in addition to the microinverter 12.

マイクロインバータ12は、各再生可能エネルギー発電装置60(例えば太陽光パネル等を含む。)に、図7に例示されるように1つずつ取り付けられていてもよい。つまり、1つのマイクロインバータ12は、1つの再生可能エネルギー発電装置60に接続されていてもよい。また、マイクロインバータ12は、図8に例示されるように、複数の再生可能エネルギー発電装置60(例えば太陽光パネル等を含む。)に接続されていてもよい。 The microinverters 12 may be attached to each renewable energy power generation device 60 (including, for example, solar panels, etc.) one by one, as illustrated in FIG. 7. In other words, one microinverter 12 may be connected to one renewable energy power generation device 60. Also, the microinverters 12 may be connected to multiple renewable energy power generation devices 60 (including, for example, solar panels, etc.), as illustrated in FIG. 8.

比較例として、複数の再生可能エネルギー発電装置60(例えば太陽光パネル等を含む。)を直列に接続した構成に1つのインバータを接続して集中的に制御するシステムが考えられる。比較例において、いずれか1つの再生可能エネルギー発電装置60、再生可能エネルギー発電装置60同士を接続するいずれか1つの配線、又は、いずれか1つのインバータの少なくとも1つにおいて不具合が生じた場合、その不具合の影響は、システム全体に及んでいた。一方、本実施形態に係る電力制御システム1によれば、複数のインバータで分散的に制御することによって、いずれか1つの再生可能エネルギー発電装置60、いずれか1つの配線、又は、いずれか1つのインバータで不具合が生じた場合においても、他のインバータ、又は、他の再生可能エネルギー発電装置60に対して不具合の影響が及ぶことが防がれ得る。その結果、不具合の影響が及ぶ範囲は、電力制御システム1の一部に留められ得る。 As a comparative example, a system in which a single inverter is connected to a configuration in which multiple renewable energy power generation devices 60 (including, for example, solar panels, etc.) are connected in series and controlled centrally is considered. In the comparative example, if a malfunction occurs in at least one of the renewable energy power generation devices 60, any one of the wiring connecting the renewable energy power generation devices 60, or any one of the inverters, the influence of the malfunction extends to the entire system. On the other hand, according to the power control system 1 of this embodiment, by controlling in a distributed manner using multiple inverters, even if a malfunction occurs in any one of the renewable energy power generation devices 60, any one of the wiring, or any one of the inverters, the influence of the malfunction can be prevented from extending to other inverters or other renewable energy power generation devices 60. As a result, the range of the influence of the malfunction can be limited to a part of the power control system 1.

また、再生可能エネルギー発電装置60の出力規模が比較例に係るシステムにおいて集中管理するように動作するインバータの出力よりも小さい場合、インバータのスペックが過剰なスペックとなってしまう。再生可能エネルギー発電装置60の出力に基づくスペックを有するインバータを用いることによって、インバータに対して求められるスペックと実際のインバータのスペックとの差が低減され得る。ただし、インバータは、ゲートウェイ14と電力線通信を行う場合、負荷40からのノイズの影響を受けやすい。したがって、インバータは、電力線通信において負荷40からのノイズの影響を受けにくいように構成される必要がある。 In addition, if the output scale of the renewable energy power generation device 60 is smaller than the output of the inverter that operates to be centrally managed in the system according to the comparative example, the inverter specifications will be excessive. By using an inverter having specifications based on the output of the renewable energy power generation device 60, the difference between the specifications required for the inverter and the actual inverter specifications can be reduced. However, when the inverter communicates with the gateway 14 over a power line, it is susceptible to noise from the load 40. Therefore, the inverter needs to be configured so as to be less susceptible to noise from the load 40 during power line communication.

本開示に係る実施形態について説明する図は模式的なものである。図面上の寸法比率等は、現実のものとは必ずしも一致していない。 The figures illustrating the embodiments of the present disclosure are schematic. The dimensional ratios and other details in the drawings do not necessarily correspond to the actual ones.

本開示に係る実施形態について、諸図面及び実施例に基づき説明してきたが、当業者であれば本開示に基づき種々の変形又は改変を行うことが可能であることに注意されたい。従って、これらの変形又は改変は本開示の範囲に含まれることに留意されたい。例えば、各構成部などに含まれる機能などは論理的に矛盾しないように再配置可能であり、複数の構成部などを1つに組み合わせたり、或いは分割したりすることが可能である。 Although the embodiments of the present disclosure have been described based on the drawings and examples, it should be noted that a person skilled in the art would be able to make various modifications or alterations based on the present disclosure. Therefore, it should be noted that these modifications or alterations are included in the scope of the present disclosure. For example, the functions included in each component can be rearranged so as not to cause logical inconsistencies, and multiple components can be combined into one or divided.

本開示において「第1」及び「第2」等の記載は、当該構成を区別するための識別子である。本開示における「第1」及び「第2」等の記載で区別された構成は、当該構成における番号を交換することができる。例えば、第1設備は、第2設備と識別子である「第1」と「第2」とを交換することができる。識別子の交換は同時に行われる。識別子の交換後も当該構成は区別される。識別子は削除してよい。識別子を削除した構成は、符号で区別される。本開示における「第1」及び「第2」等の識別子の記載のみに基づいて、当該構成の順序の解釈、小さい番号の識別子が存在することの根拠に利用してはならない。 In this disclosure, descriptions such as "first" and "second" are identifiers for distinguishing the configuration. Configurations distinguished by descriptions such as "first" and "second" in this disclosure can exchange numbers in the configuration. For example, the first equipment can exchange identifiers "first" and "second" with the second equipment. The exchange of identifiers is performed simultaneously. The configurations remain distinguished even after the exchange of identifiers. Identifiers may be deleted. A configuration from which an identifier has been deleted is distinguished by a code. Descriptions of identifiers such as "first" and "second" in this disclosure should not be used solely to interpret the order of the configuration or to justify the existence of an identifier with a smaller number.

1 電力制御システム
4 集合住宅(2:住戸、3:共用部)
10 電力制御装置
12(12A、12B) マイクロインバータ
14 ゲートウェイ(141:表示部)
20 負荷分電盤
30(30A、30B) コイル
40(40A、40B) 負荷(41:共用負荷、42:住戸負荷)
45(45A、45B) 取引メータ
46 住戸メータ
47 共用メータ
50 電力網
52 分岐点
54 コイル
60(60A、60B) 再生可能エネルギー発電装置
71(71A、71B)、72(72A、72B) 節点
80(80A、80B) 制御分電盤
81(81A、81B)、82(82A、82B)、83(83A、83B) 端子
84A、84B、85A、85B ブレーカ
86 空き領域
1 Power control system 4 Apartment building (2: dwelling unit, 3: common area)
10 Power control device 12 (12A, 12B) Micro inverter 14 Gateway (141: display unit)
20 Load distribution board 30 (30A, 30B) Coil 40 (40A, 40B) Load (41: common load, 42: dwelling load)
45 (45A, 45B) Master meter 46 Residential meter 47 Shared meter 50 Power grid 52 Branch point 54 Coil 60 (60A, 60B) Renewable energy power generation device 71 (71A, 71B), 72 (72A, 72B) Node 80 (80A, 80B) Control distribution board 81 (81A, 81B), 82 (82A, 82B), 83 (83A, 83B) Terminal 84A, 84B, 85A, 85B Breaker 86 Free space

Claims (17)

再生可能エネルギー発電装置から出力される電力を変換するインバータと、
前記インバータと電力線通信を実行可能に接続されるゲートウェイと
を備え、
前記インバータは、電力網から電力を受ける負荷と前記電力網との間に位置する負荷分電盤、前記電力網との間に位置する節点に接続され、
前記ゲートウェイは、前記インバータと前記節点との間に接続され、前記インバータから、前記再生可能エネルギー発電装置又は前記インバータの運転状態に関する情報を取得する、
電力制御装置。
an inverter that converts power output from a renewable energy power generation device;
A gateway is connected to the inverter so as to be able to perform power line communication,
the inverter is connected to a load distribution board located between a load receiving power from a power grid and the power grid, and a node located between the power grid ,
The gateway is connected between the inverter and the node , and acquires information regarding an operating state of the renewable energy power generation device or the inverter from the inverter .
Power control device.
前記負荷と前記節点との間に接続されるブロッキングコイルを更に備える、請求項1に記載の電力制御装置。 The power control device of claim 1, further comprising a blocking coil connected between the load and the node. 前記電力網と前記節点との間に接続される取引メータを更に備え、
前記取引メータから前記節点までの配線は、前記節点から前記負荷までの配線よりも短い、請求項1又は2に記載の電力制御装置。
a meter connected between the power grid and the node;
3. The power control device according to claim 1, wherein a wiring from the master meter to the node is shorter than a wiring from the node to the load.
前記節点と前記ゲートウェイとを収容する盤を更に備える、請求項1から3までのいずれか一項に記載の電力制御装置。 The power control device according to any one of claims 1 to 3, further comprising a panel that houses the node and the gateway. 前記盤は、前記負荷と前記節点との間に接続されるブロッキングコイルを収容し、前記ブロッキングコイルを介して前記負荷に接続可能に構成される端子を備える、請求項4に記載の電力制御装置。 The power control device according to claim 4, wherein the board contains a blocking coil connected between the load and the node, and includes a terminal configured to be connectable to the load via the blocking coil. 前記再生可能エネルギー発電装置が住戸に設置される場合、前記盤が前記住戸の外壁に設置されるように構成される、請求項4又は5に記載の電力制御装置。 The power control device according to claim 4 or 5, wherein when the renewable energy power generation device is installed in a dwelling, the panel is configured to be installed on an exterior wall of the dwelling. 前記再生可能エネルギー発電装置が住戸に設置される場合、前記節点が前記住戸の外壁に設置されるように構成される、請求項1から6までのいずれか一項に記載の電力制御装置。 The power control device according to any one of claims 1 to 6, wherein when the renewable energy power generation device is installed in a dwelling, the node is configured to be installed on an exterior wall of the dwelling. 前記ゲートウェイは、前記インバータから取得した情報を表示する表示部を備える、請求項1から7までのいずれか一項に記載の電力制御装置。 The power control device according to any one of claims 1 to 7, wherein the gateway is provided with a display unit that displays information acquired from the inverter. 前記インバータとして、前記電力網に分岐点を介して接続される第1インバータ及び第2インバータを備える、請求項1から8までのいずれか一項に記載の電力制御装置。 The power control device according to any one of claims 1 to 8, comprising a first inverter and a second inverter connected to the power grid via a branch point as the inverter. 前記ゲートウェイは、前記第1インバータと前記分岐点を通さずに通信可能に接続され、前記第2インバータと前記分岐点を通して通信可能に接続される、請求項9に記載の電力制御装置。 The power control device according to claim 9, wherein the gateway is communicatively connected to the first inverter without passing through the branch point, and communicatively connected to the second inverter through the branch point. 前記分岐点と前記電力網との間に接続されるブロッキングコイルを更に備える、請求項9又は10に記載の電力制御装置。 The power control device according to claim 9 or 10, further comprising a blocking coil connected between the branch point and the power grid. 前記第1インバータ、前記第2インバータ、及び前記ゲートウェイはそれぞれ、配線にブレーカを介して接続され
前記第1インバータが故障した場合に、前記ゲートウェイのブレーカがオンの状態のままで前記第1インバータのブレーカだけがオフの状態になる、請求項9から11までのいずれか一項に記載の電力制御装置。
The first inverter, the second inverter, and the gateway are each connected to a wiring via a breaker ;
The power control device according to any one of claims 9 to 11 , wherein, when the first inverter fails, a breaker of the first inverter is turned off while a breaker of the gateway remains on .
前記第1インバータは、前記第2インバータに接続される負荷に前記分岐点を介して電力を供給し、
前記第2インバータは、前記第1インバータに接続される負荷に前記分岐点を介して電力を供給する、請求項9から12までのいずれか一項に記載の電力制御装置。
The first inverter supplies power to a load connected to the second inverter via the branch point;
The power control device according to claim 9 , wherein the second inverter supplies power to a load connected to the first inverter via the branch point.
前記第1インバータに接続される節点と前記ゲートウェイとを収容する第1の盤と、前記第2インバータに接続される節点を収容する第2の盤とを更に備え、
前記第2の盤は、前記ゲートウェイを接続可能に構成される端子を備える、請求項9から13までのいずれか一項に記載の電力制御装置。
Further comprising a first board that houses a node connected to the first inverter and the gateway, and a second board that houses a node connected to the second inverter,
The power control device according to claim 9 , wherein the second board includes a terminal configured to be connectable to the gateway.
請求項1から14までのいずれか一項に記載の電力制御装置と、前記負荷とを備える、電力制御システム。 A power control system comprising the power control device according to any one of claims 1 to 14 and the load. 力網から電力を受ける負荷と前記電力網との間に位置する負荷分電盤、前記電力網との間に位置する節点と、再生可能エネルギー発電装置から出力される電力を変換するインバータと電力線通信を実行可能に接続され、かつ、前記インバータと前記節点との間に接続され、前記インバータから、前記再生可能エネルギー発電装置又は前記インバータの運転状態に関する情報を取得するゲートウェイとを収容する、盤。 A board housing a load distribution board located between a load receiving power from a power grid and the power grid , a node located between the power grid , and a gateway connected to an inverter that converts power output from a renewable energy power generation device so as to be able to perform power line communication, and connected between the inverter and the node, for obtaining information from the inverter regarding the operating state of the renewable energy power generation device or the inverter . 前記負荷と前記節点との間に接続されるブロッキングコイルを更に収容し、前記ブロッキングコイルを介して前記負荷に接続可能に構成される端子を備える、請求項16に記載の盤。 The panel of claim 16, further comprising a blocking coil connected between the load and the node, and a terminal configured to be connectable to the load via the blocking coil.
JP2021130283A 2021-08-06 2021-08-06 Power control device, power control system, and panel Active JP7688540B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2021130283A JP7688540B2 (en) 2021-08-06 2021-08-06 Power control device, power control system, and panel
JP2025086219A JP2025114871A (en) 2021-08-06 2025-05-23 Power control devices, power control systems, and panels

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021130283A JP7688540B2 (en) 2021-08-06 2021-08-06 Power control device, power control system, and panel

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2025086219A Division JP2025114871A (en) 2021-08-06 2025-05-23 Power control devices, power control systems, and panels

Publications (2)

Publication Number Publication Date
JP2023024161A JP2023024161A (en) 2023-02-16
JP7688540B2 true JP7688540B2 (en) 2025-06-04

Family

ID=85203330

Family Applications (2)

Application Number Title Priority Date Filing Date
JP2021130283A Active JP7688540B2 (en) 2021-08-06 2021-08-06 Power control device, power control system, and panel
JP2025086219A Pending JP2025114871A (en) 2021-08-06 2025-05-23 Power control devices, power control systems, and panels

Family Applications After (1)

Application Number Title Priority Date Filing Date
JP2025086219A Pending JP2025114871A (en) 2021-08-06 2025-05-23 Power control devices, power control systems, and panels

Country Status (1)

Country Link
JP (2) JP7688540B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011078169A (en) 2009-09-29 2011-04-14 Panasonic Electric Works Co Ltd Power management system
JP2012060760A (en) 2010-09-08 2012-03-22 Sekisui Chem Co Ltd Local electric power interchange system
US20140265584A1 (en) 2013-03-15 2014-09-18 Cyboenergy, Inc. Online Surveillance System to Protect Solar Power Plants

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2629132B2 (en) * 1994-06-30 1997-07-09 オスカー電子株式会社 Power line communication network and coupler for power line communication

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011078169A (en) 2009-09-29 2011-04-14 Panasonic Electric Works Co Ltd Power management system
JP2012060760A (en) 2010-09-08 2012-03-22 Sekisui Chem Co Ltd Local electric power interchange system
US20140265584A1 (en) 2013-03-15 2014-09-18 Cyboenergy, Inc. Online Surveillance System to Protect Solar Power Plants

Also Published As

Publication number Publication date
JP2025114871A (en) 2025-08-05
JP2023024161A (en) 2023-02-16

Similar Documents

Publication Publication Date Title
US11050259B2 (en) Power supply device and control device
US11757304B2 (en) Versatile site energy router
CN100373734C (en) Power system
CN107534298B (en) Hybrid Inverter Power Control System for PV Strings, Batteries, Grid and Backup Loads
US9553480B2 (en) Power system
IL301644A (en) Dynamic management of critical loads
JP4468881B2 (en) Power storage system, route generation device, and route generation method
JP6974273B2 (en) Drop-in board and board
JP7100443B2 (en) housing complex
EP3811486A1 (en) System for the control of electric energy
WO2012050208A1 (en) Power management system
JP7566887B2 (en) Method and apparatus for power distribution - Patents.com
JP7688540B2 (en) Power control device, power control system, and panel
JP6243617B2 (en) Power system
JP7084844B2 (en) Power management system and apartment building
JP7138760B2 (en) Draw-in board and board
JP7260495B2 (en) pull-in board
JP2016046829A (en) Power supply system
JP7165595B2 (en) Power supply system and housing complex
JP7640774B2 (en) Power supply equipment, housing complexes and power supply panels
JP2014017940A (en) Modification method of building and building with emergency space
JP7057245B2 (en) Power supply system and construction method of power supply system
JP7084285B2 (en) Drop-in board, power supply system, and apartment building
CN220615543U (en) Electric automobile charging network energy management device
US20180124880A1 (en) Direct Current Power Server

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240117

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20241118

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20241217

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250217

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250507

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250523

R150 Certificate of patent or registration of utility model

Ref document number: 7688540

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150