JP7689892B2 - Structure and method for mounting nose-end PC to steel structure - Google Patents
[go: Go Back, main page]

JP7689892B2 - Structure and method for mounting nose-end PC to steel structure - Google Patents

Structure and method for mounting nose-end PC to steel structure Download PDF

Info

Publication number
JP7689892B2
JP7689892B2 JP2021157723A JP2021157723A JP7689892B2 JP 7689892 B2 JP7689892 B2 JP 7689892B2 JP 2021157723 A JP2021157723 A JP 2021157723A JP 2021157723 A JP2021157723 A JP 2021157723A JP 7689892 B2 JP7689892 B2 JP 7689892B2
Authority
JP
Japan
Prior art keywords
nose
steel beam
plate
tip
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021157723A
Other languages
Japanese (ja)
Other versions
JP2023048423A (en
Inventor
博史 高野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daiwa House Industry Co Ltd
Original Assignee
Daiwa House Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiwa House Industry Co Ltd filed Critical Daiwa House Industry Co Ltd
Priority to JP2021157723A priority Critical patent/JP7689892B2/en
Publication of JP2023048423A publication Critical patent/JP2023048423A/en
Application granted granted Critical
Publication of JP7689892B2 publication Critical patent/JP7689892B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

本発明は、鼻先PCの鉄骨造への取付構造及び鼻先PCの取付方法に関する。 The present invention relates to a structure for mounting a nose-end PC to a steel structure and a method for mounting a nose-end PC.

従来、片持ちスラブを有する建物が知られている。例えば、特許文献1に記載の如くである。 Buildings with cantilever slabs are known in the past, such as those described in Patent Document 1.

特許文献1には、コンクリートにより形成されたバルコニーを有する中高層建造物が記載されている。上記バルコニーのような片持ちスラブをRC造で施工する場合、階層ごとに分けて型枠にコンクリートを打設する必要がある。また、上記バルコニーにおいて手摺や腰壁等が設けられる鼻先部分は、比較的複雑な形状となる。このため、上記鼻先部分の施工には、比較的複雑な型枠を組み付けることを要する。 Patent Document 1 describes a mid-to-high rise building with a balcony made of concrete. When constructing a cantilever slab like the balcony using reinforced concrete, concrete must be poured into the formwork for each floor. In addition, the nose portion of the balcony, where the handrails, waist walls, etc. are provided, has a relatively complex shape. For this reason, the construction of the nose portion requires the assembly of a relatively complex formwork.

このように、RC造での片持ちスラブの鼻先部分の施工は、階層ごとに型枠や型枠支保工を運んで組み付ける作業に手間がかかり、特に鉄骨造においては型枠支保工を設置すること自体が困難であるため施工性の観点から改善が望まれる。 As such, construction of the nose of a cantilever slab in reinforced concrete construction requires time-consuming work to transport and assemble formwork and formwork supports for each floor, and since installing formwork supports is particularly difficult in steel-frame construction, improvements are needed from the perspective of workability.

特開2010-144403公報JP 2010-144403 A

本発明は、以上の如き状況を鑑みてなされたものであり、その解決しようとする課題は、施工の手間を削減することができる鼻先PCの鉄骨造への取付構造及び鼻先PCの取付方法を提供するものである。RC造では既に実用化されているが、鉄骨造でRCの鼻先部分を施工する方法は確立されていない。 The present invention was made in consideration of the above situation, and the problem it aims to solve is to provide a mounting structure and method for a nose PC to a steel frame structure that can reduce the amount of work required for construction. This has already been put to practical use in reinforced concrete structures, but a method for constructing the nose part of reinforced concrete in steel frame structures has not yet been established.

本発明の解決しようとする課題は以上の如くであり、次にこの課題を解決するための手段を説明する。 The problem that the present invention aims to solve is as described above, and the means for solving this problem will be explained next.

即ち、請求項1においては、水平方向に張り出す片持ちスラブの先端部を構成し、プレキャストコンクリートで形成される鼻先PCと、前記鼻先PCの底面に設けられ、第一孔を有するプレートと、前記第一孔に対応する第二孔を有し、前記第一孔及び前記第二孔に挿通された止具により前記プレートが固定される第一鉄骨梁と、前記第一鉄骨梁から水平方向に張り出す第二鉄骨梁と、前記第二鉄骨梁に設けられ、前記プレートと同厚さに形成されると共に、前記鼻先PCが載置される載置部と、を具備するものである。 That is, in claim 1, the slab comprises a nose PC formed of precast concrete that constitutes the tip of a cantilever slab that protrudes horizontally, a plate provided on the bottom surface of the nose PC and having a first hole, a first steel beam that has a second hole corresponding to the first hole and to which the plate is fixed by fasteners inserted through the first hole and the second hole, a second steel beam that protrudes horizontally from the first steel beam, and a support portion provided on the second steel beam, formed to the same thickness as the plate, and on which the nose PC is placed.

請求項2においては、前記第一鉄骨梁の上部には、前記片持ちスラブのコンクリートが打設されるデッキプレートが設けられ、前記鼻先PCは、水平方向における所定の第一方向に延びると共に、平面視において前記第一方向に直交する第二方向に間隔を空けて配置され、前記コンクリートと定着する複数の鉄筋を有し、前記デッキプレートは、前記第二方向に連続する複数の山部及び谷部を有する波板形状に形成され、前記鉄筋及び前記谷部は、平面視において互いに重複するように配置されるものである。 In claim 2, a deck plate onto which the concrete of the cantilever slab is poured is provided on top of the first steel beam, the nose PC extends in a predetermined first direction in the horizontal direction and has a plurality of reinforcing bars that are spaced apart in a second direction perpendicular to the first direction in a plan view and are fixed to the concrete, the deck plate is formed in a corrugated shape with a plurality of peaks and valleys that are continuous in the second direction, and the reinforcing bars and the valleys are arranged so as to overlap each other in a plan view.

請求項3においては、前記鼻先PCは、足場の壁つなぎを接続可能な接続部を有するものである。 In claim 3, the nose PC has a connection part that can connect to the wall joint of the scaffolding.

請求項4においては、水平方向に張り出す片持ちスラブの先端部を構成し、プレキャストコンクリートで形成される鼻先PCの底面に、プレートを固定するプレート固定工程と、前記片持ちスラブを下方から支持する第一鉄骨梁に対して、前記プレートを介して複数の前記鼻先PCを仮固定する仮固定工程と、前記第一鉄骨梁にデッキプレートを設置するデッキプレート設置工程と、仮固定された隣接する複数の前記鼻先PCを共通の調整冶具で挟み込むことで複数の前記鼻先PCの位置を調整する位置調整工程と、前記デッキプレートと、前記第一鉄骨梁と、位置が調整された前記鼻先PCと、を互いに固定する固定工程と、を具備するものである。 In claim 4, the method includes a plate fixing step of fixing a plate to the bottom surface of the nose PC, which constitutes the tip of the cantilever slab extending horizontally and is made of precast concrete; a temporary fixing step of temporarily fixing the plurality of nose PCs to a first steel beam that supports the cantilever slab from below via the plate; a deck plate installation step of installing a deck plate on the first steel beam; a position adjustment step of adjusting the positions of the plurality of nose PCs by clamping the adjacent temporarily fixed nose PCs with a common adjustment tool; and a fixing step of fixing the deck plate, the first steel beam, and the nose PC whose position has been adjusted to each other.

請求項5においては、前記固定工程においては、前記第一鉄骨梁と前記鼻先PCとがボルトで固定された後、前記片持ちスラブのコンクリートが打設されることにより、前記デッキプレートと前記鼻先PCとがコンクリートにより一体的に固定されるものである。 In claim 5, in the fixing process, the first steel beam and the nose PC are fixed with bolts, and then the concrete of the cantilever slab is poured, so that the deck plate and the nose PC are fixed integrally with the concrete.

請求項6においては、前記位置調整工程において、隣接する複数の前記鼻先PCを前記調整冶具で上下方向に挟み込むことで複数の前記鼻先PCの上下方向の位置を調整するものである。 In claim 6, in the position adjustment process, the vertical positions of the multiple adjacent nose tips PC are adjusted by clamping the multiple nose tips PC in the vertical direction with the adjustment jig.

請求項7においては、前記位置調整工程において、隣接する複数の前記鼻先PCを前記調整冶具で水平方向に挟み込むことで複数の前記鼻先PCの水平方向の位置を調整するものである。 In claim 7, in the position adjustment process, the horizontal positions of the multiple adjacent nose tips PC are adjusted by clamping the multiple nose tips PC horizontally with the adjustment jig.

本発明の効果として、以下に示すような効果を奏する。 The effects of the present invention are as follows:

請求項1においては、施工の手間を削減することができる。 In claim 1, the work involved in construction can be reduced.

請求項2においては、デッキプレートの山部と鼻先PCの鉄筋とが干渉することを抑制することができる。 In claim 2, interference between the peak of the deck plate and the reinforcing bars of the nose PC can be suppressed.

請求項3においては、足場の壁つなぎの盛り替えを容易に行うことができる。 In claim 3, the wall joints of the scaffolding can be easily replaced.

請求項4においては、施工の手間を削減することができる。 In claim 4, the construction work can be reduced.

請求項5においては、デッキプレートと鼻先PCとを好適に一体化することができる。 In claim 5, the deck plate and nose tip PC can be conveniently integrated.

請求項6においては、調整冶具を用いて鼻先PCの上下方向の位置を調整することで、施工の精度を向上させることができる。 In claim 6, the accuracy of construction can be improved by adjusting the vertical position of the nose tip PC using an adjustment jig.

請求項7においては、調整冶具を用いて鼻先PCの水平方向の位置を調整することで、施工の精度を向上させることができる。 In claim 7, the accuracy of construction can be improved by adjusting the horizontal position of the nose tip PC using an adjustment jig.

本発明の一実施形態に係る鼻先PCの取付構造を備える建物の庇を示した平面図。1 is a plan view showing a building eave equipped with a nose tip PC mounting structure according to one embodiment of the present invention; 図1の領域Bにおける鼻先PCの取付構造を示した平面図。FIG. 2 is a plan view showing the mounting structure of the nose tip PC in region B of FIG. 1 . 図2におけるX1-X1断面図。3 is a cross-sectional view taken along the line X1-X1 in FIG. 2 . 図2におけるY-Y断面図。3 is a cross-sectional view taken along the line YY in FIG. 2 . 鼻先PC及びパネルを示した分解背面斜視図。FIG. (a)鼻先PCを示した平面図。(b)コーナー部分に使用される鼻先PCを示した平面図。1A is a plan view showing a nose tip PC, and FIG. 1B is a plan view showing a nose tip PC used in a corner portion. 本発明の一実施形態に係る鼻先PCの取付方法を示したフローチャート。4 is a flowchart showing a method for attaching a nose tip PC according to an embodiment of the present invention. 鉄骨梁に、鼻先PC及びパネルを仮固定する様子を示した側断面図。A side cross-sectional view showing how the nose PC and panel are temporarily fixed to the steel beam. 鼻先PCの位置調整を行う様子を示した平面図。FIG. 13 is a plan view showing how the position of the nose tip PC is adjusted. 図9におけるX2-X2断面図。10 is a cross-sectional view taken along the line X2-X2 in FIG.

以下では、図1から図10までを用いて、本発明の一実施形態に係る鼻先PC20の取付構造(鼻先PC20の鉄骨造への取付構造)1について説明する。また、以下では、図中の矢印に基づいて、前後方向、左右方向及び上下方向を定義して説明を行う。 In the following, a mounting structure 1 for a nose tip PC 20 according to one embodiment of the present invention (mounting structure for mounting a nose tip PC 20 to a steel frame structure) will be described using Figures 1 to 10. In the following, the front-rear direction, left-right direction, and up-down direction will be defined based on the arrows in the figures.

本実施形態に係る取付構造1は、鉄骨造の建物Aに設けられた庇2の先端部を構成する鼻先PC20を、建物Aの鉄骨梁10に取り付ける構造である。 The mounting structure 1 in this embodiment is a structure for mounting a nose tip PC 20, which constitutes the tip of a eaves 2 installed on a steel-framed building A, to a steel beam 10 of the building A.

以下ではまず、図1及び図2を用いて建物Aについて説明する。 Below, we will first explain Building A using Figures 1 and 2.

建物Aは、躯体を構成する柱及び梁が、鉄骨部材により形成されている。建物Aは、複数階を有する。図1では、建物Aのうち、2階以上の所定の階を示している。建物Aは、庇2を有する。 The columns and beams that make up the structure of Building A are made of steel members. Building A has multiple floors. Figure 1 shows a specific floor of Building A, which is the second floor or higher. Building A has eaves 2.

庇2は、建物Aの外壁3から水平方向(図例では前方)に張り出す片持ちスラブである。庇2は、建物Aの2階以上の各階及び屋上にそれぞれ形成される。庇2は、建物Aの室内(外壁3の内側)から出入り可能なバルコニー(ベランダ)の床として使用可能である。庇2は、建物Aの所定の位置に設けられる。なお以下では、主として建物Aの前側部分に設けられる庇2に注目して、庇2の説明を行う。 The eaves 2 are cantilever slabs that extend horizontally (forward in the illustrated example) from the exterior wall 3 of building A. The eaves 2 are formed on each floor of building A from the second floor onwards and on the roof. The eaves 2 can be used as a floor for a balcony (veranda) that can be accessed from the interior of building A (inside the exterior wall 3). The eaves 2 are provided at a specified position on building A. Note that the following explanation of the eaves 2 focuses mainly on the eaves 2 provided on the front part of building A.

庇2は、平面視において、左右方向に長尺な矩形状に形成される。庇2は、鉄骨梁10により下方から支持される。庇2は、先端部(前端部)を除いて、現場打ちのコンクリート60により形成される。庇2の先端部(鼻先)は、プレキャストコンクリートにより形成された鼻先PC20により形成される。なお、鼻先PC20の詳細な説明は後述する。 In plan view, the eaves 2 are formed in a rectangular shape that is long in the left-right direction. The eaves 2 are supported from below by steel beams 10. Except for the tip (front end), the eaves 2 is formed from cast-in-place concrete 60. The tip (nose) of the eaves 2 is formed by a nose tip PC 20 made from precast concrete. A detailed explanation of the nose tip PC 20 will be given later.

図2は、図1のうち一点鎖線で囲まれた領域Bにおける庇2(建物A)を示している。また、図2は、施工段階の庇2を示している。この状態では、建物Aの躯体の周囲に作業用の足場4が設置されている。足場4は、所定間隔(例えば1800mm)を空けて設けられる壁つなぎ5を介して建物Aの躯体と接続される。 Figure 2 shows the eaves 2 (building A) in area B surrounded by a dashed line in Figure 1. Figure 2 also shows the eaves 2 during the construction stage. In this state, work scaffolding 4 is installed around the frame of building A. The scaffolding 4 is connected to the frame of building A via wall connectors 5 that are installed at a specified interval (e.g., 1800 mm).

次に、図1から図6までを用いて、鼻先PC20の取付構造1の詳細について説明する。本実施形態に係る取付構造1は、主として、鉄骨梁10、鼻先PC20、プレート30、板部材40、デッキプレート50及びコンクリート60を具備する。 Next, the details of the mounting structure 1 for the nose PC 20 will be described with reference to Figures 1 to 6. The mounting structure 1 according to this embodiment mainly comprises a steel beam 10, the nose PC 20, a plate 30, a plate member 40, a deck plate 50, and concrete 60.

図1から図4までに示す鉄骨梁10は、庇2を下方から支持するものである。鉄骨梁10は、フランジ及びウェブを有するH型の鉄骨を組み合わせて形成される。鉄骨梁10は、固定鉄骨梁11及び支持鉄骨梁14を具備する。 The steel beam 10 shown in Figures 1 to 4 supports the eaves 2 from below. The steel beam 10 is formed by combining H-shaped steel frames having flanges and webs. The steel beam 10 includes a fixed steel beam 11 and a supporting steel beam 14.

固定鉄骨梁11は、後述するプレート30が固定されるものである。固定鉄骨梁11は、建物Aの柱同士を接続する梁(大梁)から水平方向に張り出すように設けられる(図1を参照)。固定鉄骨梁11は、平面視において、庇2のうち鼻先部分(鼻先PC20の本体部21)よりも後側の部分と重複する。固定鉄骨梁11は、第一固定鉄骨梁12及び第二固定鉄骨梁13を具備する。 The fixed steel beams 11 are fixed to the plate 30 described later. The fixed steel beams 11 are arranged to extend horizontally from the beams (main beams) that connect the columns of building A (see Figure 1). In a plan view, the fixed steel beams 11 overlap with the part of the eaves 2 that is rearward of the nose portion (main body 21 of nose PC 20). The fixed steel beams 11 include a first fixed steel beam 12 and a second fixed steel beam 13.

第一固定鉄骨梁12は、建物Aの大梁から水平方向(前方)に張り出す片持ち梁である。第一固定鉄骨梁12は、長手方向を前後方向に向けて配置される。第一固定鉄骨梁12の後端部(固定端)は、建物Aの大梁側に固定される。第一固定鉄骨梁12は、左右方向に所定の間隔を空けて複数設けられる。 The first fixed steel beam 12 is a cantilever beam that extends horizontally (forward) from the main girder of building A. The first fixed steel beam 12 is arranged with its longitudinal direction facing the front-to-rear direction. The rear end (fixed end) of the first fixed steel beam 12 is fixed to the main girder side of building A. Multiple first fixed steel beams 12 are provided at predetermined intervals in the left-right direction.

第二固定鉄骨梁13は、複数の第一固定鉄骨梁12の先端部(自由端)同士を接続するものである。第二固定鉄骨梁13は、長手方向を左右方向に向けて配置される。図3に示すように、第二固定鉄骨梁13の上面は、第一固定鉄骨梁12の上面と概ね同じ高さに位置する。第二固定鉄骨梁13は、固定孔13aを有する。 The second fixed steel beam 13 connects the tips (free ends) of the multiple first fixed steel beams 12 together. The second fixed steel beam 13 is arranged with its longitudinal direction facing the left-right direction. As shown in FIG. 3, the top surface of the second fixed steel beam 13 is located at approximately the same height as the top surface of the first fixed steel beam 12. The second fixed steel beam 13 has a fixing hole 13a.

図2、図3及び図8に示す固定孔13aは、後述するプレート30の固定に用いられる孔である。固定孔13aは、第二固定鉄骨梁13の上側のフランジを、上下に貫通するように形成される。図8に示すように、固定孔13aは、第二固定鉄骨梁13の上側のフランジの後部分に形成される。固定孔13aは、左右方向に所定の間隔を空けて複数設けられる。 The fixing holes 13a shown in Figures 2, 3 and 8 are holes used to fix the plate 30 described below. The fixing holes 13a are formed so as to penetrate the upper flange of the second fixed steel beam 13 from top to bottom. As shown in Figure 8, the fixing holes 13a are formed in the rear part of the upper flange of the second fixed steel beam 13. A plurality of fixing holes 13a are provided at predetermined intervals in the left-right direction.

図2から図4までに示す支持鉄骨梁14は、鼻先PC20を支持する片持ち梁である。支持鉄骨梁14は、固定鉄骨梁11から水平方向(前方)に張り出すように設けられる。支持鉄骨梁14の後端部(固定端)は、固定鉄骨梁11に固定される。図3に示すように、支持鉄骨梁14の上面は、第一固定鉄骨梁12及び第二固定鉄骨梁13の上面と概ね同じ高さに位置する。 The supporting steel beam 14 shown in Figures 2 to 4 is a cantilever beam that supports the nose PC 20. The supporting steel beam 14 is arranged to protrude horizontally (forward) from the fixed steel beam 11. The rear end (fixed end) of the supporting steel beam 14 is fixed to the fixed steel beam 11. As shown in Figure 3, the upper surface of the supporting steel beam 14 is located at approximately the same height as the upper surfaces of the first fixed steel beam 12 and the second fixed steel beam 13.

支持鉄骨梁14は、左右方向に所定の間隔を空けて複数設けられる。支持鉄骨梁14は、例えば、第一固定鉄骨梁12の長手方向の延長線上に設けられる(図2を参照)。なお、支持鉄骨梁14は、第一固定鉄骨梁12の延長線上に限られず、必要に応じて第二固定鉄骨梁13の適宜の位置に設けられる。 Multiple supporting steel beams 14 are provided at a predetermined interval in the left-right direction. The supporting steel beams 14 are provided, for example, on the longitudinal extension of the first fixed steel beam 12 (see FIG. 2). Note that the supporting steel beams 14 are not limited to being provided on the longitudinal extension of the first fixed steel beam 12, but are provided at an appropriate position on the second fixed steel beam 13 as necessary.

図2から図6までに示す鼻先PC20は、庇2の先端部分(鼻先)を構成するものである。鼻先PC20は、工場等で予め製造されたプレキャストコンクリートで形成される。鼻先PC20は、本体部21、上筋22及び下筋23を具備する。 The nose tip PC20 shown in Figures 2 to 6 constitutes the tip portion (nose tip) of the eaves 2. The nose tip PC20 is formed from precast concrete manufactured in advance in a factory or the like. The nose tip PC20 comprises a main body portion 21, an upper reinforcement 22, and a lower reinforcement 23.

本体部21は、鼻先PC20の主たる構造体である。本体部21は、庇2の長手方向(左右方向)に長尺な形状に形成される。図3及び図5に示すように、本体部21の前端部は、上方に立ち上がるように形成される。本体部21の上記立ち上がる部分には、所定の手摺や腰壁等を設置可能である。 The main body 21 is the main structure of the nose tip PC 20. The main body 21 is formed in an elongated shape in the longitudinal direction (left-right direction) of the eaves 2. As shown in Figures 3 and 5, the front end of the main body 21 is formed to rise upward. A handrail, waist wall, etc. can be installed on the rising portion of the main body 21.

本体部21の底面には、プレート30の固定に用いられるねじ穴21aが形成されている。ねじ穴21aは、所定のボルトを取付可能に形成される。ねじ穴21aは、例えば、本体部21の底面に埋め込まれるインサートに形成される。図3及び図5に示すように、ねじ穴21aは、前後方向に間隔を空けて一対形成される。また、上記一対のねじ穴21aは、左右方向に所定間隔を空けて複数(例えば3つ)形成される。 A screw hole 21a used to fix the plate 30 is formed in the bottom surface of the main body 21. The screw hole 21a is formed so that a predetermined bolt can be attached. The screw hole 21a is formed, for example, in an insert embedded in the bottom surface of the main body 21. As shown in Figures 3 and 5, a pair of screw holes 21a are formed with a gap in the front-rear direction. In addition, multiple (e.g., three) of the pair of screw holes 21a are formed with a predetermined gap in the left-right direction.

本体部21の前面には、壁つなぎ5の固定に用いられるねじ穴21bが形成されている。ねじ穴21bは、壁つなぎ5の端部と接続可能に形成される。ねじ穴21bは、例えば、本体部21の前面に埋め込まれるインサートに形成される。ねじ穴21bは、左右方向に所定間隔(例えば1800mm)を空けて複数(例えば2つ)形成される。 A screw hole 21b used to fasten the wall connector 5 is formed on the front surface of the main body 21. The screw hole 21b is formed so that it can be connected to the end of the wall connector 5. The screw hole 21b is formed, for example, in an insert that is embedded in the front surface of the main body 21. A plurality of screw holes 21b (for example, two) are formed at a predetermined interval (for example, 1800 mm) in the left-right direction.

図3から図6までに示す上筋22は、本体部21の後面から後方に突出する鉄筋である。上筋22は、所定のピッチ(例えば150mm程度)を空けて左右方向に複数設けられる。上筋22の突出寸法としては、例えば600mm程度の寸法を採用可能である。なお、上筋22は、コンクリート60のかぶりを確保する観点等から適宜折り曲げられる。 The upper reinforcement 22 shown in Figures 3 to 6 is a reinforcing bar that protrudes rearward from the rear surface of the main body 21. Multiple upper reinforcement bars 22 are provided in the left-right direction at a predetermined pitch (e.g., about 150 mm). The protruding dimension of the upper reinforcement bars 22 can be, for example, about 600 mm. The upper reinforcement bars 22 are bent as appropriate to ensure the covering of the concrete 60, etc.

下筋23は、上筋22の下方において、本体部21の後面から後方に突出する鉄筋である。下筋23は、上筋22よりも大きいピッチを空けて左右方向に複数設けられる。本実施形態では、下筋23のピッチを上筋22のピッチの2倍程度(例えば300mm程度)に形成している。下筋23の突出寸法は、上筋22の突出寸法よりも小さい寸法(例えば300mm)に形成される。 The lower reinforcement bars 23 are reinforcing bars that protrude rearward from the rear surface of the main body 21 below the upper reinforcement bars 22. The lower reinforcement bars 23 are provided in multiples in the left-right direction at a pitch greater than that of the upper reinforcement bars 22. In this embodiment, the pitch of the lower reinforcement bars 23 is approximately twice that of the upper reinforcement bars 22 (e.g., approximately 300 mm). The protruding dimension of the lower reinforcement bars 23 is smaller than the protruding dimension of the upper reinforcement bars 22 (e.g., 300 mm).

図1に示すように、鼻先PC20は、庇2の周方向(左右方向又は前後方向)に沿って複数設けられる。隣接する鼻先PC20同士の間には、所定の寸法(例えば20mm程度)の隙間が形成される。 As shown in FIG. 1, multiple nose tip PCs 20 are provided along the circumferential direction (left-right direction or front-back direction) of the visor 2. A gap of a predetermined dimension (e.g., about 20 mm) is formed between adjacent nose tip PCs 20.

図1及び図6(a)に示すように、庇2の左右方向の途中部分に位置する鼻先PC20の本体部21は、本体部21が平面視略長方形状に形成される。また、図1及び図6(b)に示すように、庇2のコーナー部分に位置する鼻先PC20の本体部21は、コーナー部分において他の鼻先PC20と突き合わされる端部が、平面視において斜めに切り欠かれた形状に形成される。 As shown in Fig. 1 and Fig. 6(a), the main body 21 of the nose tip PC 20 located in the middle of the eaves 2 in the left-right direction is formed in a generally rectangular shape in plan view. Also, as shown in Fig. 1 and Fig. 6(b), the main body 21 of the nose tip PC 20 located in the corner portion of the eaves 2 is formed in a shape in which the end portion that butts against another nose tip PC 20 at the corner portion is cut out at an angle in plan view.

図2、図3及び図5に示すプレート30は、鼻先PC20(本体部21)の底面に設けられるものである。プレート30は、板面を上下方向に向けた板形状に形成される。また、プレート30は、平面視において、前後方向に長尺な略矩形状に形成される。プレート30は、金属により形成される。プレート30は、鼻先PC20に対して左右方向に所定間隔を空けて複数(例えば3つ)設けられる。プレート30は、第一固定孔31及び第二固定孔32を具備する。 The plate 30 shown in Figures 2, 3 and 5 is provided on the bottom surface of the nose tip PC 20 (main body 21). The plate 30 is formed in a plate shape with the plate surface facing in the up-down direction. The plate 30 is formed in a generally rectangular shape that is elongated in the front-to-back direction in a plan view. The plate 30 is made of metal. A plurality of plates 30 (e.g., three) are provided at a predetermined interval in the left-to-right direction relative to the nose tip PC 20. The plate 30 has a first fixing hole 31 and a second fixing hole 32.

第一固定孔31は、鼻先PC20との固定に用いられる孔である。第一固定孔31は、プレート30を上下に貫通するように形成される。第一固定孔31は、プレート30の前側部分において、前後方向に間隔を空けて一対形成される。 The first fixing holes 31 are holes used for fixing to the nose tip PC 20. The first fixing holes 31 are formed so as to penetrate the plate 30 from top to bottom. A pair of the first fixing holes 31 are formed in the front part of the plate 30 with a gap between them in the front-rear direction.

第二固定孔32は、第二固定鉄骨梁13(固定鉄骨梁11)との固定に用いられる孔である。第二固定孔32は、プレート30を上下に貫通するように形成される。第二固定孔32は、プレート30の後側部分に形成される。 The second fixing hole 32 is a hole used for fixing to the second fixed steel beam 13 (fixed steel beam 11). The second fixing hole 32 is formed so as to penetrate the plate 30 from top to bottom. The second fixing hole 32 is formed in the rear portion of the plate 30.

図2、図3及び図8に示す板部材40は、支持鉄骨梁14に設けられると共に、鼻先PC20が載置されるものである。板部材40は、板面を上下方向に向けた板形状に形成される。また、板部材40は、平面視において略矩形状に形成される。板部材40は、金属により形成される。板部材40の厚さ寸法は、プレート30の厚さ寸法と同じ寸法に形成される。板部材40は、支持鉄骨梁14の上面における先端部に、溶接により固定される。 The plate member 40 shown in Figures 2, 3 and 8 is provided on the supporting steel beam 14 and has the nose PC 20 placed on it. The plate member 40 is formed in a plate shape with the plate surface facing up and down. The plate member 40 is formed in a substantially rectangular shape in a plan view. The plate member 40 is made of metal. The thickness of the plate member 40 is formed to be the same as the thickness of the plate 30. The plate member 40 is fixed to the tip of the upper surface of the supporting steel beam 14 by welding.

図2から図4までに示すデッキプレート50は、庇2のうちの鼻先PC20よりも後側の部分の下地となる部分である。デッキプレート50は、固定鉄骨梁11の上面に配置される。デッキプレート50の上面には、後述するコンクリート60が打設される。図4に示すように、デッキプレート50は、上方に突出する山部51と下方に凹む谷部52とが左右方向に連続して形成される波板形状に形成される。山部51及び谷部52は、デッキプレート50の全体に亘って前後方向に延出するように形成される。谷部52は、下筋23のピッチと概ね同じピッチとなるように形成される。 The deck plate 50 shown in Figures 2 to 4 is the base for the portion of the eaves 2 rearward of the nose PC 20. The deck plate 50 is placed on the upper surface of the fixed steel beams 11. Concrete 60, described below, is poured onto the upper surface of the deck plate 50. As shown in Figure 4, the deck plate 50 is formed in a corrugated shape in which upwardly protruding peaks 51 and downwardly recessed valleys 52 are formed continuously in the left-right direction. The peaks 51 and valleys 52 are formed to extend in the front-rear direction over the entire deck plate 50. The valleys 52 are formed to have approximately the same pitch as the pitch of the lower reinforcement bars 23.

ここで、一般的には、デッキプレート50は、山部51及び谷部52の延出方向を庇2の長手方向に向けて配置される。一方、本実施形態では、山部51及び谷部52の延出方向を庇2の短手方向(前後方向)に向けて、デッキプレート50を配置している。 Generally, the deck plate 50 is arranged so that the extension direction of the peaks 51 and valleys 52 faces the longitudinal direction of the eaves 2. On the other hand, in this embodiment, the deck plate 50 is arranged so that the extension direction of the peaks 51 and valleys 52 faces the short side direction (front-to-back direction) of the eaves 2.

上述の如きデッキプレート50及び鼻先PC20を設けた状態では、鼻先PC20の下筋23と谷部52とが上下方向に重複するように位置する。これにより、下筋23とデッキプレート50との干渉を抑制することができる。また、デッキプレート50上にコンクリート60が打設された場合に、下筋23のコンクリート60のかぶりを確保することができる。 When the deck plate 50 and nose PC 20 are installed as described above, the lower reinforcement 23 and the valley portion 52 of the nose PC 20 are positioned so as to overlap in the vertical direction. This makes it possible to suppress interference between the lower reinforcement 23 and the deck plate 50. In addition, when concrete 60 is poured on the deck plate 50, it is possible to ensure that the concrete 60 covers the lower reinforcement 23.

図3に示すコンクリート60は、庇2のうちの鼻先PC20よりも後側の部分の床面を構成するものである。コンクリート60は、場所打ち工法(現場打ち工法)によりデッキプレート50の上に打設される。なお、デッキプレート50上には、所定の鉄筋やワイヤーメッシュ等が必要に応じて設けられる。 The concrete 60 shown in FIG. 3 constitutes the floor surface of the portion of the eaves 2 that is behind the nose PC 20. The concrete 60 is poured onto the deck plate 50 by a cast-in-place method. In addition, predetermined reinforcing bars, wire mesh, etc. are provided on the deck plate 50 as necessary.

デッキプレート50上に打設されたコンクリート60は、鼻先PC20の上筋22及び下筋23と定着する。これにより、コンクリート60と鼻先PC20とが一体的に固定される。 The concrete 60 poured onto the deck plate 50 is fixed to the upper reinforcement 22 and lower reinforcement 23 of the nose PC 20. This fixes the concrete 60 and the nose PC 20 together.

次に、図7から図10までを用いて、鼻先PC20の取付方法(施工方法)について説明する。鼻先PC20の取付方法は、図7に示すように、プレート固定工程(ステップS10)、仮固定工程(ステップS11)、デッキプレート設置工程(ステップS12)、位置調整工程(ステップS13)、ボルト固定工程(ステップS14)、コンクリート打設工程(ステップS15)及び壁つなぎ盛り替え工程(ステップS16)を具備する。 Next, the installation method (construction method) of the nose tip PC 20 will be described with reference to Figures 7 to 10. As shown in Figure 7, the installation method of the nose tip PC 20 includes a plate fixing process (step S10), a temporary fixing process (step S11), a deck plate installation process (step S12), a position adjustment process (step S13), a bolt fixing process (step S14), a concrete pouring process (step S15), and a wall connecting and re-laying process (step S16).

プレート固定工程(ステップS10)は、鼻先PC20の本体部21の底面に、プレート30を固定する工程である。図5及び図8に示すように、プレート30の第一固定孔31に挿通されるボルトが、鼻先PC20のねじ穴21aにねじ止めされることで、プレート30が鼻先PC20に固定される。プレート固定工程は、例えば、鼻先PC20が施工現場に搬入された後に、施工現場で行われる。なお、上記態様に代えて、鼻先PC20が施工現場に搬入される前に、所定の工場でプレート固定工程を行うようにしてもよい。 The plate fixing process (step S10) is a process of fixing the plate 30 to the bottom surface of the main body 21 of the nose PC 20. As shown in Figs. 5 and 8, a bolt inserted into the first fixing hole 31 of the plate 30 is screwed into the screw hole 21a of the nose PC 20, thereby fixing the plate 30 to the nose PC 20. The plate fixing process is performed at the construction site, for example, after the nose PC 20 is delivered to the construction site. Alternatively, the plate fixing process may be performed at a designated factory before the nose PC 20 is delivered to the construction site.

仮固定工程(ステップS11)は、プレート30が固定された鼻先PC20を、鉄骨梁10(第二固定鉄骨梁13)に対して仮固定する工程である。図8に示すように、仮固定工程においては、所定のクレーンで吊り上げたプレート30が固定された鼻先PC20を、鉄骨梁10の固定箇所まで移動させる。 The temporary fixing process (step S11) is a process of temporarily fixing the nose tip PC 20 to which the plate 30 is fixed to the steel beam 10 (second fixed steel beam 13). As shown in FIG. 8, in the temporary fixing process, the nose tip PC 20 to which the plate 30 is fixed is lifted by a specified crane and moved to the fixing point of the steel beam 10.

仮固定工程においては、図3及び図8に示すように、支持鉄骨梁14の上面に鼻先PC20を載置した状態で、プレート30の第二固定孔32及び第二固定鉄骨梁13の固定孔13aに挿通したボルトにナットを取り付けると共に、ボルト及びナットを用いてプレート30及び第二固定鉄骨梁13を締結する。なお、上記締結は、後述する位置調整工程において鼻先PC20の位置を調整可能な程度に行われる。これにより、鼻先PC20は鉄骨梁10(第一固定鉄骨梁12)に対して仮固定される。なお、鼻先PC20を載置した状態では、鼻先PC20の本体部21の底面が板部材40の上面に載置される。 In the temporary fixing process, as shown in Figures 3 and 8, with the nose tip PC 20 placed on the upper surface of the supporting steel beam 14, nuts are attached to the bolts inserted through the second fixing holes 32 of the plate 30 and the fixing holes 13a of the second fixed steel beam 13, and the plate 30 and the second fixed steel beam 13 are fastened using the bolts and nuts. Note that the above fastening is performed to an extent that the position of the nose tip PC 20 can be adjusted in the position adjustment process described below. As a result, the nose tip PC 20 is temporarily fixed to the steel beam 10 (first fixed steel beam 12). Note that with the nose tip PC 20 placed, the bottom surface of the main body 21 of the nose tip PC 20 is placed on the upper surface of the plate member 40.

また、図8に示すように、仮固定工程の時点では、足場4の壁つなぎ5は、鉄骨梁10(第二固定鉄骨梁13)に対して固定されている。 Also, as shown in FIG. 8, at the time of the temporary fixing process, the wall tie 5 of the scaffolding 4 is fixed to the steel beam 10 (second fixed steel beam 13).

デッキプレート設置工程(ステップS12)は、デッキプレート50を、固定鉄骨梁11の上面に設置(固定)する工程である(図10を参照)。デッキプレート設置工程は、仮固定工程を実行した後に行われる。デッキプレート設置工程においては、図2及び図4に示すように、山部51及び谷部52の延出方向が庇2の短手方向(前後方向)に向くようにデッキプレート50を配置する。 The deck plate installation process (step S12) is a process of installing (fixing) the deck plate 50 to the upper surface of the fixed steel beam 11 (see Figure 10). The deck plate installation process is performed after the temporary fixing process. In the deck plate installation process, as shown in Figures 2 and 4, the deck plate 50 is positioned so that the extension direction of the peaks 51 and valleys 52 faces the short side direction (front-to-back direction) of the eaves 2.

位置調整工程(ステップS13)は、仮固定された鼻先PC20の位置を調整する工程である。位置調整工程においては、隣接する2つの鼻先PC20同士の位置を、調整冶具70を用いて調整する。位置調整工程は、デッキプレート設置工程を実行した後に行われる。 The position adjustment process (step S13) is a process for adjusting the position of the temporarily fixed nose tip PC 20. In the position adjustment process, the relative positions of two adjacent nose tip PCs 20 are adjusted using an adjustment jig 70. The position adjustment process is performed after the deck plate installation process is executed.

図9及び図10に示す調整冶具70は、隣接する鼻先PC20同士を挟み込むことで互いの位置を調整するものである。調整冶具70は、アングル材71及び連結部72を具備する。 The adjustment jig 70 shown in Figures 9 and 10 adjusts the positions of adjacent nose tip PCs 20 by clamping them together. The adjustment jig 70 includes an angle bar 71 and a connecting portion 72.

アングル材71は、断面視略L字形状の左右方向に長尺な部材である。アングル材71は、金属により形成される。図10に示すように、アングル材71は、鼻先PC20の本体部21の所定の面(上下方向又は前後方向に向く面)に沿うように配置される第一板部71aと、第一板部71aに対して直交する第二板部71bを有する。アングル材71には、第一板部71aを貫通する孔が形成されている。アングル材71は、本体部21を挟んで一対設けられる。 The angle iron 71 is a member that is elongated in the left-right direction and has a generally L-shaped cross section. The angle iron 71 is made of metal. As shown in FIG. 10, the angle iron 71 has a first plate portion 71a that is arranged along a predetermined surface (a surface facing the up-down direction or the front-rear direction) of the main body portion 21 of the nose tip PC 20, and a second plate portion 71b that is perpendicular to the first plate portion 71a. The angle iron 71 has a hole that penetrates the first plate portion 71a. A pair of angle irons 71 are provided, sandwiching the main body portion 21.

連結部72は、一対のアングル材71同士を連結するものである。連結部72は、アングル材71の第一板部71aに形成された孔に挿通されるボルトと、当該ボルトに取り付けられるナットと、により形成される。 The connecting portion 72 connects a pair of angle bars 71 together. The connecting portion 72 is formed by a bolt that is inserted into a hole formed in the first plate portion 71a of the angle bar 71 and a nut that is attached to the bolt.

上述の如き一対のアングル材71で隣接する鼻先PC20同士を挟み込んだ状態で、連結部72のボルト及びナットを締め付けることで、一対のアングル材71を互いに近接する方向に移動させることができる。これにより、隣接する鼻先PC20同士の相対的な位置関係の調整を行うことができる。 When adjacent nose tip PCs 20 are sandwiched between a pair of angle bars 71 as described above, the pair of angle bars 71 can be moved closer to each other by tightening the bolts and nuts of the connecting parts 72. This allows the relative positional relationship between the adjacent nose tip PCs 20 to be adjusted.

具体的には、図9及び図10に示すように、隣接する本体部21同士を一対のアングル材71で上下に挟み込んだ状態で、連結部72のボルト及びナットを締め付けることで、隣接する鼻先PC20同士の上下方向の相対的な位置関係の調整を行うことができる。また、図9及び図10に示すように、隣接する本体部21同士を一対のアングル材71で前後に挟み込んだ状態で、連結部72のボルト及びナットを締め付けることで、隣接する鼻先PC20同士の前後方向の相対的な位置関係の調整を行うことができる。 Specifically, as shown in Figures 9 and 10, the relative positional relationship between adjacent nose tip PCs 20 in the vertical direction can be adjusted by clamping adjacent main body parts 21 vertically with a pair of angle bars 71 and tightening the bolts and nuts of the connecting parts 72. Also, as shown in Figures 9 and 10, the relative positional relationship between adjacent nose tip PCs 20 in the front-to-back direction can be adjusted by clamping adjacent main body parts 21 vertically with a pair of angle bars 71 and tightening the bolts and nuts of the connecting parts 72.

なお、図9及び図10に示す例では、二つの調整冶具70を用いて、隣接する鼻先PC20同士の上下方向及び前後方向の位置関係を調整する例を示している。ここで、例えば、図1及び図6(b)に示すように、庇2のコーナー部分で突き合わされる鼻先PC20同士の位置関係を調整する場合には、一つの調整冶具70を用いて、上下方向の相対的な位置関係のみを調整するようにしてもよい。 In the example shown in Figures 9 and 10, two adjustment jigs 70 are used to adjust the vertical and front-to-rear positional relationship between adjacent nose tip PCs 20. Here, for example, as shown in Figures 1 and 6(b), when adjusting the positional relationship between nose tip PCs 20 that are butted together at a corner portion of the awning 2, one adjustment jig 70 may be used to adjust only the relative vertical positional relationship.

ここで、調整冶具70を用いた位置調整を行った際に、鼻先PC20の本体部21の底面と、板部材40の上面と、の間に隙間が形成された場合には、適宜の金属製の板を用いて上記隙間を埋める。上記金属製の板は、溶接等により板部材40に固定される。 If a gap is formed between the bottom surface of the main body 21 of the nose tip PC 20 and the top surface of the plate member 40 when the position adjustment is performed using the adjustment jig 70, the gap is filled with an appropriate metal plate. The metal plate is fixed to the plate member 40 by welding or the like.

ボルト固定工程(ステップS14)は、位置調整を行った後の鼻先PC20のプレート30を、鉄骨梁10(第二固定鉄骨梁13)に対して固定する工程である。上記固定は、ボルト及びナットを用いてプレート30及び第二固定鉄骨梁13を完全に締結することで行われる。なお、ボルト固定工程においては、上記ボルト及びナットの緩みを防止するための溶接を行うようにしてもよい。ボルト固定工程を実行した後は、調整冶具70は鼻先PC20から取り外される。 The bolt fixing process (step S14) is a process of fixing the plate 30 of the nose tip PC 20 after position adjustment to the steel beam 10 (second fixed steel beam 13). The above fixing is performed by completely fastening the plate 30 and the second fixed steel beam 13 using bolts and nuts. In the bolt fixing process, welding may be performed to prevent the bolts and nuts from loosening. After the bolt fixing process is performed, the adjustment jig 70 is removed from the nose tip PC 20.

コンクリート打設工程(ステップS15)は、デッキプレート50の上面にコンクリート60を打設する工程である(図3を参照)。コンクリート打設工程は、ボルト固定工程を実行した後に行われる。コンクリート60を打設することで、庇2のうちの鼻先PC20よりも後側の部分のスラブが形成される。また、コンクリート60が硬化し、鼻先PC20の上筋22及び下筋23がコンクリート60と定着することで、鼻先PC20とコンクリート60とが一体的に固定される。また、これにより、デッキプレート50と固定鉄骨梁11と鼻先PC20とがコンクリート60により一体的に固定される、 The concrete pouring process (step S15) is a process of pouring concrete 60 onto the upper surface of the deck plate 50 (see FIG. 3). The concrete pouring process is carried out after the bolt fixing process is carried out. Pouring the concrete 60 forms a slab in the portion of the eaves 2 behind the nose PC 20. In addition, the concrete 60 hardens and the upper reinforcement 22 and lower reinforcement 23 of the nose PC 20 are fixed to the concrete 60, so that the nose PC 20 and the concrete 60 are fixed together. In addition, the deck plate 50, the fixed steel beam 11, and the nose PC 20 are fixed together by the concrete 60.

壁つなぎ盛り替え工程(ステップS16)は、鉄骨梁10に固定されていた壁つなぎ5を、鼻先PC20に固定するように盛り替える工程である(図3及び図10を参照)。壁つなぎ盛り替え工程は、コンクリート60が硬化した後に行われる。壁つなぎ盛り替え工程においては、鼻先PC20のねじ穴21bに、壁つなぎ5の端部を固定する。その後、鉄骨梁10に固定されていた壁つなぎ5を取り外す。 The wall tie replacement process (step S16) is a process of replacing the wall tie 5 that was fixed to the steel beam 10 so that it is fixed to the nose PC 20 (see Figures 3 and 10). The wall tie replacement process is performed after the concrete 60 has hardened. In the wall tie replacement process, the end of the wall tie 5 is fixed to the screw hole 21b of the nose PC 20. Then, the wall tie 5 that was fixed to the steel beam 10 is removed.

上述の如き工程を行うことで、鼻先PC20の取り付けが完了する。本実施形態に係る鼻先PC20の取付方法によれば、庇2の施工の手間を削減することができる。すなわち、仮にRC造の建物において庇(片持ちスラブ)を形成する場合、庇の鼻先部分の施工において、階層ごとに型枠や型枠支保工を運んで組み付ける作業に手間がかかることが考えられる。本実施形態によれば、鉄骨造の建物Aの庇2の鼻先部分に鼻先PC20を用いたことで、階層ごとに型枠や型枠支保工を運んで組み付けるような施工の手間を削減することができる。 By carrying out the above-mentioned steps, the installation of the nose PC 20 is completed. According to the method of installing the nose PC 20 in this embodiment, the labor required for constructing the eaves 2 can be reduced. That is, if eaves (cantilever slabs) are formed in a reinforced concrete building, the construction of the nose part of the eaves can be considered to be labor-intensive, as it requires transporting and assembling formwork and formwork supports for each floor. According to this embodiment, by using the nose PC 20 for the nose part of the eaves 2 of the steel-framed building A, the labor required for construction, such as transporting and assembling formwork and formwork supports for each floor, can be reduced.

また、本実施形態では、仮固定工程において、鼻先PC20を支持鉄骨梁14の板部材40に載置させた状態で、ボルト及びナットを用いてプレート30及び第二固定鉄骨梁13を締結することで、プレート30を介して鼻先PC20及び第二固定鉄骨梁13を容易に仮固定することができる。 In addition, in this embodiment, in the temporary fixing process, the nose PC 20 is placed on the plate member 40 of the supporting steel beam 14, and the plate 30 and the second fixed steel beam 13 are fastened using bolts and nuts, so that the nose PC 20 and the second fixed steel beam 13 can be easily temporarily fixed via the plate 30.

また、本実施形態では、仮固定工程において、鼻先PC20を仮固定した状態で、調整冶具70を用いて鼻先PC20の上下方向及び前後方向の位置を調整した後に、鼻先PC20を第二固定鉄骨梁13に固定するようにしている。これにより、施工の精度を向上させることができる。 In addition, in this embodiment, in the temporary fixing process, the nose tip PC 20 is temporarily fixed, and the adjustment jig 70 is used to adjust the vertical and front-to-rear position of the nose tip PC 20, and then the nose tip PC 20 is fixed to the second fixed steel beam 13. This improves the accuracy of construction.

また、従来は、鉄骨造の建物の鉄骨梁10に固定された壁つなぎ5を盛り替える場合、建物の化粧材の目地の部分等に壁つなぎ5の端部を固定する方法が一般的であった。本実施形態では、壁つなぎ盛り替え工程において、鼻先PC20に予め埋め込まれたインサートのねじ穴21bに壁つなぎ5を固定することで、容易に壁つなぎ5の盛り替えを行うことができる。また、本実施形態によれば、従来の目地の部分から壁つなぎ5を取る方法よりも、壁つなぎ5の強度を向上させることができ、足場4の安全性を向上させることができる。 In addition, conventionally, when replacing a wall tie 5 fixed to the steel beams 10 of a steel-framed building, the general method was to fix the end of the wall tie 5 to the joints of the building's decorative materials. In this embodiment, in the wall tie replacement process, the wall tie 5 can be easily replaced by fixing the wall tie 5 to the screw hole 21b of the insert that is pre-embedded in the nose PC 20. Furthermore, according to this embodiment, the strength of the wall tie 5 can be improved compared to the conventional method of removing the wall tie 5 from the joints, and the safety of the scaffolding 4 can be improved.

また、仮にRC造の建物に壁つなぎ5を固定する場合、ある階のコンクリートを打つ前に型枠にインサートを仕込んでおき、コンクリートが硬化した後に上記インサートに壁つなぎ5を固定する方法が一般的であった。この場合は、各階のコンクリートの打設が終わるごとにしか(一層ずつでしか)、足場4を上へ伸ばすことができなかった。本実施形態では、鼻先PC20に予め形成されたねじ穴21bに壁つなぎ5を固定することで、複数層に亘って足場4を上へ伸ばすことができる。 In addition, if the wall ties 5 were to be fixed to a reinforced concrete building, the general method was to place an insert in the formwork before pouring the concrete on a certain floor, and then fix the wall ties 5 to the insert after the concrete had hardened. In this case, the scaffolding 4 could only be extended upwards (one layer at a time) after the concrete had been poured on each floor. In this embodiment, the wall ties 5 are fixed to the screw holes 21b pre-formed in the nose PC 20, allowing the scaffolding 4 to be extended upwards over multiple layers.

以上のように、本発明の一実施形態に係る鼻先PC20の取付構造1は、
水平方向に張り出す片持ちスラブ(庇2)の先端部を構成し、プレキャストコンクリートで形成される鼻先PC20と、
前記鼻先PC20の底面に設けられ、第一孔(第二固定孔32)を有するプレート30と、
前記第一孔(第二固定孔32)に対応する第二孔(固定孔13a)を有し、前記第一孔(第二固定孔32)及び前記第二孔(固定孔13a)に挿通された止具(ボルト及びナット)により前記プレート30が固定される第一鉄骨梁(固定鉄骨梁11)と、
前記第一鉄骨梁(固定鉄骨梁11)から水平方向に張り出す第二鉄骨梁(支持鉄骨梁14)と、
前記第二鉄骨梁(支持鉄骨梁14)に設けられ、前記プレート30と同厚さに形成されると共に、前記鼻先PC20が載置される載置部(板部材40)と、を具備するものである。
As described above, the mounting structure 1 for the nose tip PC 20 according to one embodiment of the present invention is as follows:
A nose tip PC20 made of precast concrete constitutes the tip of the cantilever slab (eaves 2) that protrudes horizontally;
A plate 30 provided on a bottom surface of the nose tip PC 20 and having a first hole (a second fixing hole 32);
a first steel beam (fixed steel beam 11) having a second hole (fixing hole 13a) corresponding to the first hole (second fixing hole 32), and to which the plate 30 is fixed by fasteners (bolts and nuts) inserted into the first hole (second fixing hole 32) and the second hole (fixing hole 13a);
A second steel beam (supporting steel beam 14) extending horizontally from the first steel beam (fixed steel beam 11);
It is provided on the second steel beam (supporting steel beam 14), is formed to the same thickness as the plate 30, and comprises a mounting portion (plate member 40) on which the nose tip PC 20 is placed.

このような構成により、施工の手間を削減することができる。
すなわち、鉄骨造の建物Aの片持ちスラブ(庇2)の鼻先部分に鼻先PC20を用いたことで、例えばRC造で片持ちスラブ(庇2)の鼻先部分を形成する場合とは異なり、階層ごとに型枠や型枠支保工を運んで組み付けるような施工の手間を削減することができる。
また、鼻先PC20を第二鉄骨梁(支持鉄骨梁14)の載置部(板部材40)に載置させた状態で、止具(ボルト及びナット)を用いて鼻先PC20を第一鉄骨梁(固定鉄骨梁11)に容易に固定することができる。
With this configuration, the construction work can be reduced.
In other words, by using nose tip PC 20 for the nose tip part of the cantilever slab (eaves 2) of steel-framed building A, it is possible to reduce the construction work of transporting and assembling formwork and formwork supports for each floor, which is different from, for example, when forming the nose tip part of a cantilever slab (eaves 2) in reinforced concrete construction.
In addition, with the nose tip PC 20 placed on the mounting portion (plate member 40) of the second steel beam (supporting steel beam 14), the nose tip PC 20 can be easily fixed to the first steel beam (fixed steel beam 11) using fasteners (bolts and nuts).

また、前記第一鉄骨梁(固定鉄骨梁11)の上部には、前記片持ちスラブ(庇2)のコンクリート60が打設されるデッキプレート50が設けられ、
前記鼻先PC20は、
水平方向における所定の第一方向に延びると共に、平面視において前記第一方向に直交する第二方向に間隔を空けて配置され、前記コンクリート60と定着する複数の鉄筋(下筋23)を有し、
前記デッキプレート50は、
前記第二方向に連続する複数の山部51及び谷部52を有する波板形状に形成され、
前記鉄筋(下筋23)及び前記谷部52は、
平面視において互いに重複するように配置されるものである。
In addition, a deck plate 50 on which the concrete 60 of the cantilever slab (eaves 2) is poured is provided on the upper part of the first steel beam (fixed steel beam 11),
The nose tip PC 20 is
The concrete structure includes a plurality of reinforcing bars (under bars 23) extending in a predetermined first direction in the horizontal direction and arranged at intervals in a second direction perpendicular to the first direction in a plan view, and fixed to the concrete structure;
The deck plate 50 is
The plate is formed in a corrugated shape having a plurality of peaks 51 and valleys 52 that are continuous in the second direction,
The reinforcing bar (underbar 23) and the valley portion 52 are
They are arranged so as to overlap each other in a plan view.

このような構成により、デッキプレート50の山部51と鼻先PC20の鉄筋(下筋23)とが干渉することを抑制することができる。また、鉄筋(下筋23)のコンクリート60のかぶりを確保することができる。 This configuration can prevent interference between the ridge 51 of the deck plate 50 and the reinforcing bars (underbars 23) of the nose PC 20. It also ensures that the concrete 60 covers the reinforcing bars (underbars 23).

また、前記鼻先PC20は、
足場4の壁つなぎ5を接続可能な接続部(ねじ穴21b)を有するものである。
In addition, the nose tip PC 20 is
It has a connection part (screw hole 21b) to which the wall tie 5 of the scaffolding 4 can be connected.

このような構成により、足場4の壁つなぎ5の盛り替えを容易に行うことができる。 This configuration makes it easy to rearrange the wall ties 5 of the scaffolding 4.

また、本発明の一実施形態に係る鼻先PCの取付方法は、
水平方向に張り出す片持ちスラブ(庇2)の先端部を構成し、プレキャストコンクリートで形成される鼻先PC20の底面に、プレート30を固定するプレート固定工程(ステップS10)と、
前記片持ちスラブ(庇2)を下方から支持する第一鉄骨梁(固定鉄骨梁11)に対して、前記プレート30を介して複数の前記鼻先PC20を仮固定する仮固定工程(ステップS11)と、
前記第一鉄骨梁(固定鉄骨梁11)にデッキプレート50を設置するデッキプレート設置工程(ステップS12)と、
仮固定された隣接する複数の前記鼻先PC20を共通の調整冶具70で挟み込むことで複数の前記鼻先PC20の位置を調整する位置調整工程(ステップS13)と、
前記デッキプレート50と、前記第一鉄骨梁(固定鉄骨梁11)と、位置が調整された前記鼻先PC20と、を互いに固定する固定工程(ステップS14、ステップS15)と、を具備するものである。
In addition, a method for attaching the nose tip PC according to an embodiment of the present invention includes the steps of:
A plate fixing process (step S10) for fixing a plate 30 to the bottom surface of a nose tip PC 20 made of precast concrete, which constitutes the tip of a cantilever slab (eaves 2) extending horizontally;
A temporary fixing process (step S11) in which a plurality of the nose tip PCs 20 are temporarily fixed via the plate 30 to a first steel beam (fixed steel beam 11) that supports the cantilever slab (eaves 2) from below;
A deck plate installation process (step S12) of installing a deck plate 50 on the first steel beam (fixed steel beam 11);
a position adjustment step (step S13) of adjusting the positions of the plurality of adjacent nose tip PCs 20 by clamping the plurality of temporarily fixed nose tip PCs 20 with a common adjustment jig 70;
The method includes a fixing process (steps S14 and S15) of fixing the deck plate 50, the first steel beam (fixed steel beam 11), and the nose tip PC 20 whose position has been adjusted to each other.

このような構成により、施工の手間を削減することができる。すなわち、鉄骨造の建物Aの片持ちスラブ(庇2)の鼻先部分に鼻先PC20を用いたことで、例えばRC造で片持ちスラブ(庇2)の鼻先部分を形成する場合とは異なり、階層ごとに型枠や型枠支保工を運んで組み付けるような施工の手間を削減することができる。また、鼻先PC20を仮固定した状態で、調整冶具70を用いて鼻先PC20の位置を調整した後に、鼻先PC20を第一鉄骨梁(固定鉄骨梁11)に固定するようにしている。これにより、施工の精度を向上させることができる。 This configuration can reduce the amount of work required for construction. In other words, by using the nose PC 20 for the nose portion of the cantilever slab (eaves 2) of steel-framed building A, unlike, for example, forming the nose portion of a cantilever slab (eaves 2) in reinforced concrete construction, it is possible to reduce the amount of work required for construction, such as transporting and assembling formwork and formwork supports for each floor. In addition, with the nose PC 20 temporarily fixed, the position of the nose PC 20 is adjusted using an adjustment jig 70, and then the nose PC 20 is fixed to the first steel beam (fixed steel beam 11). This can improve the accuracy of construction.

また、前記固定工程(ステップS14、ステップS15)においては、
前記第一鉄骨梁(固定鉄骨梁11)と前記鼻先PC20とがボルトで固定された後(ステップS14)、前記片持ちスラブ(庇2)のコンクリート60が打設されることにより、前記デッキプレート50と前記鼻先PC20とがコンクリート60により一体的に固定されるものである。
In addition, in the fixing step (step S14, step S15),
After the first steel beam (fixed steel beam 11) and the nose end PC 20 are fixed with bolts (step S14), concrete 60 is poured into the cantilever slab (eaves 2), so that the deck plate 50 and the nose end PC 20 are fixed together by the concrete 60.

このような構成により、デッキプレート50と鼻先PC20とを好適に一体化することができる。 This configuration allows the deck plate 50 and the nose PC 20 to be integrated in an optimal manner.

また、前記位置調整工程(ステップS13)において、
隣接する複数の前記鼻先PC20を前記調整冶具70で上下方向に挟み込むことで複数の前記鼻先PC20の上下方向の位置を調整するものである。
In addition, in the position adjustment step (step S13),
The vertical positions of the plurality of adjacent nose tips PC20 are adjusted by vertically clamping the plurality of nose tips PC20 with the adjustment jig 70.

このような構成により、調整冶具70を用いて鼻先PC20の上下方向の位置を調整することで、施工の精度をより向上させることができる。 With this configuration, the accuracy of construction can be further improved by adjusting the vertical position of the nose tip PC 20 using the adjustment jig 70.

また、前記位置調整工程(ステップS13)において、
隣接する複数の前記鼻先PC20を前記調整冶具70で水平方向に挟み込むことで複数の前記鼻先PC20の水平方向の位置を調整するものである。
In addition, in the position adjustment step (step S13),
The horizontal positions of the plurality of adjacent nose tips PC20 are adjusted by clamping the plurality of nose tips PC20 horizontally with the adjustment jig 70.

このような構成により、調整冶具70を用いて鼻先PC20の水平方向の位置を調整することで、施工の精度をより向上させることができる。 With this configuration, the horizontal position of the nose tip PC 20 can be adjusted using the adjustment jig 70, further improving the accuracy of construction.

なお、本実施形態に庇2は、本発明に係る片持ちスラブの一形態である。
また、本実施形態に係る固定鉄骨梁11は、本発明に係る第一鉄骨梁の一形態である。
また、本実施形態に係る支持鉄骨梁14は、本発明に係る第二鉄骨梁の一形態である。
また、本実施形態に係る第二固定孔32は、本発明に係る第一孔の一形態である。
また、本実施形態に係る固定孔13aは、本発明に係る第二孔の一形態である。
また、本実施形態に係る板部材40は、本発明に係る載置部の一形態である。
また、本実施形態に係る下筋23は、本発明に係る鉄筋の一形態である。
また、本実施形態に係るねじ穴21bは、本発明に係る接続部の一形態である。
In addition, the eave 2 in this embodiment is one form of a cantilever slab according to the present invention.
Moreover, the fixed steel beam 11 according to this embodiment is one form of a first steel beam according to the present invention.
Moreover, the supporting steel beam 14 in this embodiment is one form of a second steel beam in accordance with the present invention.
Further, the second fixing hole 32 according to the present embodiment is one form of the first hole according to the present invention.
The fixing hole 13a according to this embodiment is one form of the second hole according to the present invention.
Moreover, the plate member 40 according to this embodiment is one form of a mounting portion according to the present invention.
Moreover, the underbar 23 in this embodiment is one form of reinforcing bar according to the present invention.
Moreover, the screw hole 21b according to this embodiment is one form of a connecting portion according to the present invention.

以上、本発明の一実施形態を説明したが、本発明は上記構成に限定されるものではなく、特許請求の範囲に記載された発明の範囲内で種々の変更が可能である。 Although one embodiment of the present invention has been described above, the present invention is not limited to the above configuration, and various modifications are possible within the scope of the invention described in the claims.

例えば、本実施形態では、鼻先PC20の本体部21に、壁つなぎ5を接続可能なねじ穴21bを設けた例を示したが、このような態様に限られない。例えば、本体部21にねじ穴21bを設けないようにしてもよい。 For example, in the present embodiment, an example is shown in which the main body 21 of the nose PC 20 is provided with a screw hole 21b to which the wall connector 5 can be connected, but this is not limited to such an embodiment. For example, the main body 21 may not be provided with a screw hole 21b.

また、本実施形態では、デッキプレート50の山部51及び谷部52の延出方向を、庇2の短手方向(前後方向)に向けて配置した例を示したが、このような態様に限られない。例えば、デッキプレート50の山部51及び谷部52の延出方向を、庇2の長手方向(左右方向)に向けて配置してもよい。この場合は、下筋23とデッキプレート50との干渉を避けるために、下筋23を適宜折り曲げるようにしてもよい。 In addition, in this embodiment, an example is shown in which the extension direction of the peaks 51 and valleys 52 of the deck plate 50 is arranged in the short direction (front-to-back direction) of the eaves 2, but this is not limited to this aspect. For example, the extension direction of the peaks 51 and valleys 52 of the deck plate 50 may be arranged in the longitudinal direction (left-right direction) of the eaves 2. In this case, the lower reinforcement 23 may be appropriately bent to avoid interference between the lower reinforcement 23 and the deck plate 50.

また、本実施形態では、鼻先PC20に対してプレート30を3つ設けた例を示したが、このような態様に限られない。鼻先PC20に対するプレート30の個数は、2つ以下でもよく、4つ以上でもよい。 In addition, in this embodiment, an example in which three plates 30 are provided for the nose tip PC 20 is shown, but this is not limited to this embodiment. The number of plates 30 for the nose tip PC 20 may be two or less, or four or more.

また、本実施形態では、プレート30を、固定鉄骨梁11の第二固定鉄骨梁13に固定した例を示したが、このような態様に限られない。例えば、プレート30を、第一固定鉄骨梁12に固定してもよい。この場合は、第一固定鉄骨梁12にプレート30の第二固定孔32に対応する孔を形成してもよい。 In addition, in this embodiment, an example is shown in which the plate 30 is fixed to the second fixed steel beam 13 of the fixed steel beam 11, but this is not limited to this form. For example, the plate 30 may be fixed to the first fixed steel beam 12. In this case, a hole corresponding to the second fixing hole 32 of the plate 30 may be formed in the first fixed steel beam 12.

また、本実施形態では、デッキプレート設置工程(ステップS12)を実行した後に、位置調整工程(ステップS13)を実行する例を示したが、このような態様に限られない。例えば、位置調整工程を実行した後に、デッキプレート設置工程を実行してもよい。また、ボルト固定工程(ステップS14)を実行した後に、デッキプレート設置工程を実行してもよい。 In addition, in this embodiment, an example is shown in which the position adjustment process (step S13) is performed after the deck plate installation process (step S12), but this is not limited to this embodiment. For example, the deck plate installation process may be performed after the position adjustment process. Also, the deck plate installation process may be performed after the bolt fixing process (step S14).

また、本実施形態では、庇2をバルコニー(ベランダ)の床として使用可能な片持ちスラブとした例を示したが、このような態様に限られない。例えば、庇2を廊下等として使用可能な片持ちスラブとしてもよく、主として日よけや雨よけとして使用される庇(軒)としてもよい。 In addition, in this embodiment, an example is shown in which the eaves 2 are a cantilever slab that can be used as a balcony (veranda) floor, but this is not limited to this form. For example, the eaves 2 may be a cantilever slab that can be used as a corridor, etc., or may be an eaves (eaves) that is used mainly as a sunshade or rain shelter.

1 鼻先PCの取付構造
2 庇
10 鉄骨梁
20 鼻先PC
30 プレート
40 板部材
50 デッキプレート
60 コンクリート
70 調整冶具
1 Nose end PC mounting structure 2 Eaves 10 Steel beam 20 Nose end PC
30 Plate 40 Plate member 50 Deck plate 60 Concrete 70 Adjustment jig

Claims (7)

水平方向に張り出す片持ちスラブの先端部を構成し、プレキャストコンクリートで形成される鼻先PCと、
前記鼻先PCの底面に設けられ、第一孔を有するプレートと、
前記第一孔に対応する第二孔を有し、前記第一孔及び前記第二孔に挿通された止具により前記プレートが固定される第一鉄骨梁と、
前記第一鉄骨梁から水平方向に張り出す第二鉄骨梁と、
前記第二鉄骨梁に設けられ、前記プレートと同厚さに形成されると共に、前記鼻先PCが載置される載置部と、を具備する、
鼻先PCの鉄骨造への取付構造。
The nose PC, which constitutes the tip of the cantilever slab that protrudes horizontally and is made of precast concrete,
A plate provided on a bottom surface of the nose tip PC and having a first hole;
a first steel beam having a second hole corresponding to the first hole, the first steel beam being fixed to the plate by a fastener inserted through the first hole and the second hole;
A second steel beam extending horizontally from the first steel beam;
A mounting portion is provided on the second steel beam, formed to the same thickness as the plate, and on which the nose tip PC is placed.
Mounting structure for nose PC to steel structure.
前記第一鉄骨梁の上部には、前記片持ちスラブのコンクリートが打設されるデッキプレートが設けられ、
前記鼻先PCは、
水平方向における所定の第一方向に延びると共に、平面視において前記第一方向に直交する第二方向に間隔を空けて配置され、前記コンクリートと定着する複数の鉄筋を有し、
前記デッキプレートは、
前記第二方向に連続する複数の山部及び谷部を有する波板形状に形成され、
前記鉄筋及び前記谷部は、
平面視において互いに重複するように配置される、
請求項1に記載の鼻先PCの鉄骨造への取付構造。
A deck plate on which the concrete of the cantilever slab is poured is provided on the upper portion of the first steel beam,
The nose tip PC is
The concrete structure includes a plurality of reinforcing bars extending in a first direction in the horizontal direction and spaced apart in a second direction perpendicular to the first direction in a plan view, the reinforcing bars being fixed to the concrete;
The deck plate is
The plate is formed in a corrugated shape having a plurality of peaks and valleys extending continuously in the second direction,
The reinforcing bar and the valley portion are
are arranged so as to overlap each other in a plan view;
A structure for mounting the nose tip PC according to claim 1 to a steel frame structure.
前記鼻先PCは、
足場の壁つなぎを接続可能な接続部を有する、
請求項1又は請求項2に記載の鼻先PCの鉄骨造への取付構造。
The nose tip PC is
Having a connection part that can connect the wall tie of the scaffolding,
3. A structure for mounting the nose tip PC according to claim 1 or 2 to a steel frame structure.
水平方向に張り出す片持ちスラブの先端部を構成し、プレキャストコンクリートで形成される鼻先PCの底面に、プレートを固定するプレート固定工程と、
前記片持ちスラブを下方から支持する第一鉄骨梁に対して、前記プレートを介して複数の前記鼻先PCを仮固定する仮固定工程と、
前記第一鉄骨梁にデッキプレートを設置するデッキプレート設置工程と、
仮固定された隣接する複数の前記鼻先PCを共通の調整冶具で挟み込むことで複数の前記鼻先PCの位置を調整する位置調整工程と、
前記デッキプレートと、前記第一鉄骨梁と、位置が調整された前記鼻先PCと、を互いに固定する固定工程と、を具備する、
鼻先PCの取付方法。
A plate fixing process is a process of fixing a plate to the bottom surface of a nose PC made of precast concrete, which constitutes the tip of the cantilever slab that protrudes in the horizontal direction;
A temporary fixing process of temporarily fixing the plurality of nose end PCs via the plate to a first steel beam that supports the cantilever slab from below;
a deck plate installation process for installing a deck plate on the first steel beam;
a position adjustment step of adjusting positions of the plurality of adjacent temporarily fixed nose tips PC by clamping the plurality of nose tips PC with a common adjustment jig;
and a fixing step of fixing the deck plate, the first steel beam, and the nose tip PC whose position has been adjusted to each other.
How to install the nose PC.
前記固定工程においては、
前記第一鉄骨梁と前記鼻先PCとがボルトで固定された後、前記片持ちスラブのコンクリートが打設されることにより、前記デッキプレートと前記鼻先PCとがコンクリートにより一体的に固定される、
請求項4に記載の鼻先PCの取付方法。
In the fixing step,
After the first steel beam and the nose end PC are fixed with bolts, the concrete of the cantilever slab is poured, so that the deck plate and the nose end PC are fixed integrally with the concrete.
The method for attaching the nose tip PC according to claim 4.
前記位置調整工程において、
隣接する複数の前記鼻先PCを前記調整冶具で上下方向に挟み込むことで複数の前記鼻先PCの上下方向の位置を調整する、
請求項4又は請求項5に記載の鼻先PCの取付方法。
In the position adjustment step,
The vertical positions of the plurality of adjacent nose tips PC are adjusted by vertically clamping the plurality of nose tips PC with the adjustment jig.
6. A method for attaching a nose tip PC according to claim 4 or 5.
前記位置調整工程において、
隣接する複数の前記鼻先PCを前記調整冶具で水平方向に挟み込むことで複数の前記鼻先PCの水平方向の位置を調整する、
請求項4から請求項6までのいずれか一項に記載の鼻先PCの取付方法。
In the position adjustment step,
The horizontal positions of the plurality of adjacent nose tips PC are adjusted by horizontally clamping the plurality of nose tips PC with the adjustment jig.
A method for mounting a nose tip PC according to any one of claims 4 to 6.
JP2021157723A 2021-09-28 2021-09-28 Structure and method for mounting nose-end PC to steel structure Active JP7689892B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021157723A JP7689892B2 (en) 2021-09-28 2021-09-28 Structure and method for mounting nose-end PC to steel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021157723A JP7689892B2 (en) 2021-09-28 2021-09-28 Structure and method for mounting nose-end PC to steel structure

Publications (2)

Publication Number Publication Date
JP2023048423A JP2023048423A (en) 2023-04-07
JP7689892B2 true JP7689892B2 (en) 2025-06-09

Family

ID=85779928

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021157723A Active JP7689892B2 (en) 2021-09-28 2021-09-28 Structure and method for mounting nose-end PC to steel structure

Country Status (1)

Country Link
JP (1) JP7689892B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000144996A (en) 1998-11-16 2000-05-26 Zenitaka Corp Floor structure of apartment house
DE102010012500A1 (en) 2009-03-14 2010-09-30 Mt-Energie Gmbh & Co. Kg Concrete wall of a container
US20150159386A1 (en) 2012-12-07 2015-06-11 Gary Michael Dinmore Stay-in-Place Fascia Forms and Methods and Equipment for Installation Thereof

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10331250A (en) * 1997-05-29 1998-12-15 Sekisui House Ltd Balcony / corridor structure and floorboards used for it
JP3961116B2 (en) * 1998-05-28 2007-08-22 大和ハウス工業株式会社 Floor structure in steel-frame building

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000144996A (en) 1998-11-16 2000-05-26 Zenitaka Corp Floor structure of apartment house
DE102010012500A1 (en) 2009-03-14 2010-09-30 Mt-Energie Gmbh & Co. Kg Concrete wall of a container
US20150159386A1 (en) 2012-12-07 2015-06-11 Gary Michael Dinmore Stay-in-Place Fascia Forms and Methods and Equipment for Installation Thereof

Also Published As

Publication number Publication date
JP2023048423A (en) 2023-04-07

Similar Documents

Publication Publication Date Title
CN103180528A (en) Structure for constructing a high-rise building having a reinforced concrete structure comprising a steel frame
JP2017179997A (en) Column-beam joint structure and construction method therefor
US8505599B2 (en) Panelization system and method
JP7689892B2 (en) Structure and method for mounting nose-end PC to steel structure
JP7010709B2 (en) How to build prefabricated and concrete structures
KR102120884B1 (en) The construction method of structure using RC wall and composite beam
JP7193081B2 (en) stair structure
JP7505336B2 (en) Sash installation method
JP7583543B2 (en) Suspended scaffolding installation structure
JP3734571B2 (en) Wall panel mounting structure
KR200340346Y1 (en) Truss deck panel for slab
JPH0673203U (en) Beam-column joint structure
KR200296951Y1 (en) Deck panel for reinforced concrete slab
JP7625772B2 (en) How to build a wall parapet
JP7767069B2 (en) Composite slabs, plate members and deck plates
JP2021188273A (en) Column-beam frame
JP7479228B2 (en) Precast concrete slabs and method for constructing concrete structures
JP4296548B2 (en) Exterior wall structure
KR200296952Y1 (en) Deck panel for reinforced concrete slab
KR200397203Y1 (en) Truss Deck Plate with Improved End Structure
JPH0967940A (en) Reinforcement structure of existing building
KR20040017560A (en) Deck panel for reinforced concrete slab
JPH0254065A (en) Construction of slab with rib and spacer for rib reinforcement
JP2024035981A (en) Floor structure of steel corridor stair unit
JP3015819U (en) Panel mounting structure and panel unit for wooden buildings

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240823

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250327

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250507

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250528

R150 Certificate of patent or registration of utility model

Ref document number: 7689892

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150