JP7692738B2 - 電力需給計画作成装置及び方法 - Google Patents
電力需給計画作成装置及び方法 Download PDFInfo
- Publication number
- JP7692738B2 JP7692738B2 JP2021095394A JP2021095394A JP7692738B2 JP 7692738 B2 JP7692738 B2 JP 7692738B2 JP 2021095394 A JP2021095394 A JP 2021095394A JP 2021095394 A JP2021095394 A JP 2021095394A JP 7692738 B2 JP7692738 B2 JP 7692738B2
- Authority
- JP
- Japan
- Prior art keywords
- demand plan
- supply
- stabilization
- power
- power system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote monitoring or remote control of equipment in a power distribution network
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—ELECTRIC POWER NETWORKS; CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for feeding a single network from two or more generators or sources in parallel; Arrangements for feeding already energised networks from additional generators or sources in parallel
- H02J3/46—Controlling the sharing of generated power between the generators, sources or networks
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Description
(1-1)本実施の形態の電力需給計画作成装置の構成
図1において、1は全体として本実施の形態による電力需給計画作成装置を示す。この電力需給計画作成装置1は、予め与えられた電力系統2に関する各種情報と、電力系統2から取得した各種計測情報とに基づいて電力系統2における電力の需給計画を作成する機能を有する装置である。
次に、電力需給計画作成装置1に搭載された本実施の形態による電力需給計画作成機能について説明する。
図3は、かかる電力需給計画作成機能に関連して電力需給計画作成装置1において実行される需給計画作成処理の具体的な流れを示す。この需給計画作成処理は、ユーザにより入力装置25(図1)を介して需給計画作成処理の実行命令(以下、これを需給計画作成処理実行命令と呼ぶ)が入力されたことをトリガとして開始される。
以上のように本実施の形態の電力需給計画作成装置1では、時刻ごとの各想定事故に対する電力系統2の安定性をそれぞれ評価して不安定ケースを抽出し、抽出した不安定ケースごとの安定化対策をそれぞれ算出し、算出した安全化対策ごとにその安全化対策を近似した安定化運用制約式を算出し、算出した安定化運用制約式を利用し数理最適化技術等を活用して需給計画を作成する。
図1との対応部分に同一符号を付して示す図7は、第2の実施の形態による電力需給計画作成装置60を示す。この電力需給計画作成装置60は、プログラムとして想定外乱追加作成部61が追加されている点と、これに伴って系統安定性評価部62及び画面表示・結果保存部63の一部機能がそれぞれ異なる点とを除いて第1の実施の形態による電力需給計画作成装置1と同様に構成されている。
なお上述の第1及び第2の実施の形態においては、電力需給計画作成装置1,60を1つのコンピュータ装置により構成するようにした場合について述べたが、本発明はこれに限らず、かかる電力需給計画作成装置1,60の機能を、分散コンピューティングシステムを構成する複数のコンピュータ装置に分散して搭載するようにしてもよい。
Claims (12)
- 対象とする電力系統における電力の需給計画を作成する電力需給計画作成装置において、
各時刻の各想定事故に対する前記電力系統の安定性を評価する系統安定性評価部と、
前記系統安定性評価部により不安定と評価された前記時刻及び前記想定事故の組合せでなる各不安定ケースについて、前記電力系統を安定化させる安定化対策を作成する系統安定化条件抽出部と、
前記系統安定化条件抽出部により作成された前記不安定ケースごとの前記安定化対策を、それぞれ安定化運用制約式に近似する近似制約条件作成部と、
前記近似制約条件作成部により近似された前記不安定ケースごとの前記安定化運用制約式をすべて満たすように前記需給計画を作成する需給計画作成部と
を備えることを特徴とする電力需給計画作成装置。 - 前記需給計画作成部により作成された前記需給計画は前記系統安定性評価部に与えられ、
前記系統安定性評価部は、
前記需給計画作成部から与えられた前記需給計画における各機器の運用状況に基づいて、各時刻の各前記想定事故に対する前記電力系統の安定性を評価し、
前記不安定ケースがなくなるまで前記系統安定化条件抽出部、前記近似制約条件作成部、前記需給計画作成部及び前記系統安定性評価部による処理が繰り返され、
前記需給計画作成部は、
前記系統安定化条件抽出部、前記近似制約条件作成部、前記需給計画作成部及び前記系統安定性評価部による処理が繰り返されるごとに前記近似制約条件作成部により累積的に作成されたすべての前記安定化運用制約式を満たすように前記需給計画を作成する
ことを特徴とする請求項1に記載の電力需給計画作成装置。 - 前記系統安定化条件抽出部は、
前記不安定ケースごとに、特定の機器を指定した前記安定化対策を作成し、
前記安定化対策に基づいて、任意の機器で前記電力系統の安定性に関する条件を制約する前記安定化運用制約式を作成する近似制約作成部をさらに備える
ことを特徴とする請求項1に記載の電力需給計画作成装置。 - 前記安定化運用制約式に含まれる閾値を、対応する前記安定化対策を適用後の前記電力系統の運用条件から算出する近似制約作成部をさらに備える
ことを特徴とする請求項1に記載の電力需給計画作成装置。 - 前記需給計画の変更点と、安定化確保のための変更理由とを表示する画面表示部を備える
ことを特徴とする請求項1に記載の電力需給計画作成装置。 - 各時刻に想定される気象変化に応じた機器の出力変化又はインバランス量を想定外乱として、時刻ごと及び当該時刻の前記想定外乱ごとの前記電力系統の解析モデルをそれぞれ構築する想定外乱追加作成部を備え、
前記系統安定性評価部は、
前記想定外乱追加作成部により構築された各前記解析モデルも利用して各時刻の各想定事故に対する前記電力系統の安定性を評価する
ことを特徴とする請求項1に記載の電力需給計画作成装置。 - 対象とする電力系統における電力の需給計画を作成する電力需給計画作成装置により実行される電力需給計画作成方法であって、
各時刻の各想定事故に対する前記電力系統の安定性を評価する第1のステップと、
不安定と評価した前記時刻及び前記想定事故の組合せでなる各不安定ケースについて、前記電力系統を安定化させる安定化対策を作成する第2のステップと、
作成した前記不安定ケースごとの前記安定化対策を、それぞれ安定化運用制約式に近似する第3のステップと、
近似した前記不安定ケースごとの前記安定化運用制約式をすべて満たすように前記需給計画を作成する第4のステップと
を備えることを特徴とする電力需給計画作成方法。 - 作成した前記需給計画に基づいて各時刻の各想定事故に対する前記電力系統の安定性を評価する第5のステップをさらに備え、
前記不安定ケースがなくなるまで前記第2乃至第5のステップの処理が繰り返され、
前記第4のステップでは、
前記第2乃至第5のステップの処理が繰り返されるごとに前記第3のステップで累積的に作成されたすべての前記安定化運用制約式を満たすように前記需給計画を作成する
ことを特徴とする請求項7に記載の電力需給計画作成方法。 - 前記第2のステップでは、
前記不安定ケースごとに、特定の機器を指定した前記安定化対策を作成し、
前記第3のステップでは、
作成した前記安定化対策に基づいて、任意の機器で前記電力系統の安定性に関する条件を制約する前記安定化運用制約式を作成する
ことを特徴とする請求項7に記載の電力需給計画作成方法。 - 前記第3のステップでは、
前記安定化運用制約式に含まれる閾値を、対応する前記安定化対策を適用後の前記電力系統の運用条件から算出する
ことを特徴とする請求項7に記載の電力需給計画作成方法。 - 前記需給計画の変更点と、安定化確保のための変更理由とを表示する
ことを特徴とする請求項7に記載の電力需給計画作成方法。 - 前記第2のステップでは、
各時刻に想定される気象変化に応じた機器の出力変化又はインバランス量を想定外乱として、時刻ごと及び当該時刻の前記想定外乱ごとの前記電力系統の解析モデルをそれぞれ構築し、
構築した各前記解析モデルも利用して各時刻の各想定事故に対する前記電力系統の安定性を評価する
ことを特徴とする請求項7に記載の電力需給計画作成方法。
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021095394A JP7692738B2 (ja) | 2021-06-07 | 2021-06-07 | 電力需給計画作成装置及び方法 |
| PCT/JP2022/016417 WO2022259738A1 (ja) | 2021-06-07 | 2022-03-31 | 電力需給計画作成装置及び方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021095394A JP7692738B2 (ja) | 2021-06-07 | 2021-06-07 | 電力需給計画作成装置及び方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2022187382A JP2022187382A (ja) | 2022-12-19 |
| JP7692738B2 true JP7692738B2 (ja) | 2025-06-16 |
Family
ID=84425212
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2021095394A Active JP7692738B2 (ja) | 2021-06-07 | 2021-06-07 | 電力需給計画作成装置及び方法 |
Country Status (2)
| Country | Link |
|---|---|
| JP (1) | JP7692738B2 (ja) |
| WO (1) | WO2022259738A1 (ja) |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2020031481A (ja) | 2018-08-22 | 2020-02-27 | 株式会社日立製作所 | 潮流変動監視装置、潮流変動監視方法及び電力系統安定性予測方法 |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0715876A (ja) * | 1993-06-23 | 1995-01-17 | Toshiba Corp | 電力系統過渡安定度の予防制御方法 |
| JP3737280B2 (ja) * | 1998-05-29 | 2006-01-18 | 三菱電機株式会社 | 電力系統監視装置及び電力系統監視方法 |
-
2021
- 2021-06-07 JP JP2021095394A patent/JP7692738B2/ja active Active
-
2022
- 2022-03-31 WO PCT/JP2022/016417 patent/WO2022259738A1/ja not_active Ceased
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2020031481A (ja) | 2018-08-22 | 2020-02-27 | 株式会社日立製作所 | 潮流変動監視装置、潮流変動監視方法及び電力系統安定性予測方法 |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2022187382A (ja) | 2022-12-19 |
| WO2022259738A1 (ja) | 2022-12-15 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP3392995B1 (en) | Voltage stability monitoring device and method | |
| Koltermann et al. | Power curves of megawatt-scale battery storage technologies for frequency regulation and energy trading | |
| Tsai et al. | Challenges of planning for high renewable futures: Experience in the US midcontinent electricity market | |
| Sellick et al. | Comparing methods of calculating voltage drop in low voltage feeders | |
| Ramanathan et al. | Contingency analysis using node/breaker model for operation studies | |
| US20240113558A1 (en) | Power system supervisory control apparatus, power system supervisory control system, and power system supervisory control method | |
| Ibe et al. | Adequacy analysis and security reliability evaluation of bulk power system | |
| Aydin et al. | Fairness-aware dynamic hosting capacity and the impacts of strategic solar pv curtailment | |
| JP7692738B2 (ja) | 電力需給計画作成装置及び方法 | |
| Volkanovski | Wind generation impact on electricity generation adequacy and nuclear safety | |
| Táczi et al. | Role of voltage control devices in low voltage state estimation process | |
| Guerra et al. | A review of tools, models and techniques for long-term assessment of distribution systems using OpenDSS and parallel computing | |
| Chen et al. | Optimal bidding strategy for virtual power plant using information gap decision theory | |
| Bonadia et al. | Monte Carlo-Based Approach for Obtaining the Marginal Costs of Grid Reinforcement for the Accommodation of Rooftop PVs | |
| Rabby et al. | Bifurcation analysis to identify voltage collapse in bangladesh power system | |
| Divakar et al. | A survey on methods of evaluation of reliability of distribution systems with distributed generation | |
| Jawad Abed et al. | Reliability assessment of PV location based on a new coordination and failure rates of protection relays to minimize indices energy | |
| JP7760469B2 (ja) | 系統安定化装置 | |
| Pierrou | Long-term voltage stability of power systems under uncertainty: Analytical methods and data-driven control | |
| Al-Saadi | Hosting capacity determination via risk analysis approach involving likelihood and severity of operational constraint violation | |
| kumar Samanta et al. | Smart grid stability analysis on smart demand load response in coordinated network | |
| Yu | Network Planning with Power Tracing and Analytics Tool | |
| Zhou | Online voltage stability prediction and control using computational intelligence technique | |
| Kale | ATC Computation Using AI Techniques (snVARMAx) and Detection of Transmission Congestion Network | |
| Putratama et al. | Uncertainties Impact and Mitigation with an Adaptive Model-Based Voltage Controller |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20240207 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20241224 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20250213 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20250520 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20250604 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7692738 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |