Monitoring device, monitoring method, and monitoring program Download PDF

Info

Publication number
JP7698200B2
JP7698200B2 JP2021146882A JP2021146882A JP7698200B2 JP 7698200 B2 JP7698200 B2 JP 7698200B2 JP 2021146882 A JP2021146882 A JP 2021146882A JP 2021146882 A JP2021146882 A JP 2021146882A JP 7698200 B2 JP7698200 B2 JP 7698200B2
Authority
JP
Japan
Prior art keywords
stave
fluctuation index
temperature fluctuation
period
temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021146882A
Other languages
Japanese (ja)
Other versions
JP2023039651A (en
Inventor
眞六 松崎
琢哉 夏井
伸治 宮岡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Nippon Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Corp filed Critical Nippon Steel Corp
Priority to JP2021146882A priority Critical patent/JP7698200B2/en
Publication of JP2023039651A publication Critical patent/JP2023039651A/en
Application granted granted Critical
Publication of JP7698200B2 publication Critical patent/JP7698200B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Blast Furnaces (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)
  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)

Description

本発明は、高炉の操業を監視する監視装置、監視方法及び監視プログラムに関する。 The present invention relates to a monitoring device, a monitoring method, and a monitoring program for monitoring the operation of a blast furnace.

生産計画に沿った出銑の達成は、高炉操業の重要な目的の一つである。生産計画に沿った出銑に加えて、高炉内の熱分布の安定化、出銑コストの低減、消費エネルギの低減、出銑する溶銑の品質の安定化、溶銑に含まれるシリコン等の不純物の含有率の低減も高炉操業の重要な課題である。これらの課題を解決するためには、高炉を安定的に操業することが望まれる。 One of the important objectives of blast furnace operation is to achieve tapping in accordance with the production plan. In addition to tapping in accordance with the production plan, other important issues in blast furnace operation include stabilizing the heat distribution within the blast furnace, reducing tapping costs, reducing energy consumption, stabilizing the quality of the molten iron tapped, and reducing the content of impurities such as silicon in the molten iron. In order to solve these issues, it is desirable to operate the blast furnace stably.

高炉を安定的に操業するために、高炉の炉壁の周方向及び高さ方向により規定される2次元平面内における所定の時間でのステーブ温度変化量から標準偏差を用いて、高炉の安定性を判定する技術が知られている(例えば、特許文献1を参照)。特許文献1に記載される技術では、所定の時間間隔でのステーブ温度変化量に基づいて高炉の操業異常の有無を判定するため、気温が変化することでステーブクーラーの冷却配管に流れる冷却水の温度が変化した場合でも、精度よく高炉の操業異常の有無を判定することができる。 In order to operate a blast furnace stably, a technique is known that uses the standard deviation from the amount of change in stave temperature over a given time in a two-dimensional plane defined by the circumferential and vertical directions of the blast furnace wall to determine the stability of the blast furnace (see, for example, Patent Document 1). The technique described in Patent Document 1 determines the presence or absence of an operational abnormality in the blast furnace based on the amount of change in stave temperature over a given time interval, so that even if the temperature of the cooling water flowing through the cooling pipes of the stave cooler changes due to a change in air temperature, it is possible to accurately determine the presence or absence of an operational abnormality in the blast furnace.

特開2020-7611号公報JP 2020-7611 A

特許文献1に記載される技術では、高炉の操業異常の有無を判定するために使用される上限及び下限のしきい値である第1しきい値及び第2しきい値は、過去の高炉操業データを参照したオペレータが自らの経験に基づいて設定される。特許文献1に記載される技術では、第1しきい値及び第2しきい値は、オペレータの経験に基づいて設定されるため、適正な値ではなく、適正な値よりも高め又は低めの値に設定されるおそれがある。 In the technology described in Patent Document 1, the first and second thresholds, which are the upper and lower thresholds used to determine whether or not there is an abnormality in the operation of the blast furnace, are set by an operator based on his or her own experience with reference to past blast furnace operation data. In the technology described in Patent Document 1, the first and second thresholds are set based on the operator's experience, so there is a risk that they will be set to values that are higher or lower than the appropriate values, rather than the appropriate values.

例えば、下限しきい値である第2しきい値が高めの値に設定されたとき、標準偏差が第2しきい値を下回ったことに応じて還元材が高炉に過剰に投入され、コークス比すなわち還元材比が増加して高炉の操業が不安定になるおそれがある。また、下限しきい値である第2しきい値が低めの値に設定されたとき、炉壁部不活性の検出が遅れるおそれがある。高炉の壁面に付着する付着物が生成及び成長の検出が遅れると、大きく成長した付着物が高炉の壁面から剥離し、高炉内の充填構造が乱れ、高炉内のガス流れが変動するおそれがある。高炉内のガス流れが変動すると、シャフト圧が変動する等の高炉操業が不安定となり、還元材比を大幅に増加させ、出銑コストが増加するおそれがある。 For example, when the second threshold value, which is the lower limit threshold, is set to a relatively high value, excessive reducing material may be added to the blast furnace in response to the standard deviation falling below the second threshold value, increasing the coke rate, i.e., the reducing agent rate, and causing the blast furnace operation to become unstable. Also, when the second threshold value, which is the lower limit threshold, is set to a relatively low value, there is a risk that detection of furnace wall inactivity may be delayed. If detection of the formation and growth of deposits adhering to the wall surface of the blast furnace is delayed, the deposits that have grown large may peel off from the wall surface of the blast furnace, disrupting the filling structure within the blast furnace, and causing fluctuations in the gas flow within the blast furnace. If the gas flow within the blast furnace fluctuates, this may cause the shaft pressure to fluctuate, causing the blast furnace operation to become unstable, significantly increasing the reducing agent rate, and increasing the cost of tapping iron.

そこで、本発明は、還元材比の増加を抑制可能な監視装置、監視方法及び監視プログラムを提供することを目的とする。 The present invention aims to provide a monitoring device, a monitoring method, and a monitoring program that can suppress an increase in the reducing agent ratio.

このような課題を解決する本発明は、以下の監視装置、監視方法及び監視プログラムを要旨とするものである。
(1)高炉の炉壁に配置される複数のステーブクーラーについて複数のステーブ温度を、高炉の休風期間を含めて、一定の時間間隔毎に取得するステーブ温度取得部と、
複数のステーブ温度から、高炉の炉壁の所定の位置における温度の所定の時間間隔での変化量である複数の温度変化量を演算する温度変化量演算部と、
複数の温度変化量の標準偏差であるステーブ温度変動指数を演算するステーブ温度変動指数演算部と、
ステーブ温度変動指数が所定の下限しきい値以下であるか否かを判定する判定部と、を有し、
下限しきい値の初期値は、休風期間におけるステーブ温度変動指数から抽出される、ことを特徴とする監視装置。
(2)下限しきい値の初期値は、休風期間において、複数のステーブクーラーが送風の影響を受けていないと推定される期間におけるステーブ温度変動指数の最大値と推定される値である、(1)に記載の監視装置。
(3)下限しきい値の初期値は、休風期間を含む期間において演算されたステーブ温度変動指数の相対頻度が最大である第1極大値と、相対頻度が第1極大値に次ぐ大きさである第2極大値との間の最小値に対応するステーブ温度変動指数である、(2)に記載の監視装置。
(4)ステーブ温度変動指数に基づいて、炉壁部不活性が発生しているか否かを判定し、
炉壁部不活性が発生していると判定されたときに、炉壁部不活性領域における少なくとも休風期間を含む期間での前記ステーブ温度変動指数の最大値を下限しきい値に変更する下限しきい値変更部を更に有する(1)~(3)の何れか一つに記載の監視装置。
(5)下限しきい値変更部は、炉壁部不活性領域における休風期間でのステーブ温度変動指数の最大値を前記下限しきい値とする、(4)に記載の監視装置。
(6)高炉の炉壁に配置される複数のステーブクーラーについて複数のステーブ温度を、前記高炉の休風期間を含めて、一定の時間間隔毎に取得し、
複数のステーブ温度から、高炉の炉壁の所定の位置における温度の所定の時間間隔での変化量である複数の温度変化量を演算し、
複数の温度変化量の標準偏差であるステーブ温度変動指数を演算し、
ステーブ温度変動指数が所定の下限しきい値以下であるか否かを判定する、ことを含み、
下限しきい値の初期値は、前記休風期間における前記ステーブ温度変動指数から抽出される、ことを特徴とする監視方法。
(7)高炉の炉壁に配置される複数のステーブクーラーについて複数のステーブ温度を、高炉の休風期間を含めて、一定の時間間隔毎に取得し、
複数のステーブ温度から、高炉の炉壁の所定の位置における温度の所定の時間間隔での変化量である複数の温度変化量を演算し、
複数の温度変化量の標準偏差であるステーブ温度変動指数を演算し、
ステーブ温度変動指数が所定の下限しきい値以下であるか否かを判定する、処理をコンピュータに実行させ、
下限しきい値の初期値は、前記休風期間における前記ステーブ温度変動指数から抽出される、ことを特徴とする監視プログラム。
The present invention, which solves the above problems, is summarized as follows: a monitoring device, a monitoring method, and a monitoring program.
(1) A stave temperature acquisition unit that acquires a plurality of stave temperatures for a plurality of stave coolers arranged on the wall of a blast furnace at regular time intervals, including a blast furnace rest period;
A temperature change amount calculation unit that calculates a plurality of temperature change amounts, which are change amounts of temperature at a predetermined position of the furnace wall of the blast furnace at a predetermined time interval, from a plurality of stave temperatures;
A stave temperature fluctuation index calculation unit that calculates a stave temperature fluctuation index which is the standard deviation of a plurality of temperature change amounts;
A determination unit that determines whether the stave temperature fluctuation index is equal to or lower than a predetermined lower limit threshold value,
A monitoring device characterized in that the initial value of the lower threshold value is extracted from the stave temperature fluctuation index during the wind stop period.
(2) The initial value of the lower limit threshold is a value estimated to be the maximum value of the stave temperature fluctuation index during a period when the multiple stave coolers are estimated to be not affected by the blowing of air during a period of no-air-flow. The monitoring device described in (1).
(3) The initial value of the lower threshold value is a stave temperature fluctuation index corresponding to the minimum value between a first maximum value having a maximum relative frequency of the stave temperature fluctuation index calculated during a period including the wind stop period, and a second maximum value having a relative frequency second largest after the first maximum value. This is a monitoring device described in (2).
(4) Based on the stave temperature fluctuation index, it is determined whether or not furnace wall inactivation has occurred;
When it is determined that the furnace wall portion is inactivated, a lower limit threshold value change unit changes the maximum value of the stave temperature fluctuation index in a period including at least a halt period in the furnace wall portion inactivation region to a lower limit threshold value. The monitoring device described in any one of (1) to (3).
(5) The monitoring device described in (4), wherein the lower limit threshold value change unit sets the maximum value of the stave temperature fluctuation index during a period of no-air-stop in the furnace wall inactive region as the lower limit threshold value.
(6) A plurality of stave temperatures for a plurality of stave coolers arranged on the furnace wall of a blast furnace are obtained at regular time intervals, including the blast furnace's refueling period;
Calculating a plurality of temperature change amounts, which are change amounts of temperature at a predetermined position of the blast furnace wall at a predetermined time interval, from the plurality of stave temperatures;
Calculate a stave temperature fluctuation index, which is the standard deviation of multiple temperature changes;
determining whether the stave temperature fluctuation index is equal to or less than a predetermined lower threshold;
A monitoring method characterized in that an initial value of the lower threshold value is extracted from the stave temperature fluctuation index during the non-winding period.
(7) acquiring a plurality of stave temperatures for a plurality of stave coolers arranged on the furnace wall of the blast furnace at regular time intervals, including during the blast furnace refueling period;
Calculating a plurality of temperature change amounts, which are change amounts of temperature at a predetermined position of the blast furnace wall at a predetermined time interval, from the plurality of stave temperatures;
Calculate a stave temperature fluctuation index, which is the standard deviation of multiple temperature changes;
A process is performed by a computer to determine whether or not the stave temperature fluctuation index is equal to or less than a predetermined lower threshold value;
A monitoring program characterized in that an initial value of the lower limit threshold is extracted from the stave temperature fluctuation index during the non-winding period.

本発明に係る監視装置、監視方法及び監視プログラム監視装置は、還元材比の増加を抑制することができる。 The monitoring device, monitoring method, and monitoring program of the present invention can suppress an increase in the reducing agent ratio.

第1実施形態に係る監視装置を含む高炉操業システムを示す図である。1 is a diagram showing a blast furnace operation system including a monitoring device according to a first embodiment. FIG. 図1に示す監視装置が操業異常の有無を監視しながら高炉の操業を監視する監視処理のフローチャートである。2 is a flowchart of a monitoring process in which the monitoring device shown in FIG. 1 monitors the operation of a blast furnace while monitoring for the presence or absence of an operational abnormality. (a)は図1に示す温度変化量演算部によって演算される高炉の炉壁について周方向及び高さ方向により規定される2次元平面内における温度変化量の等値線の一例を示す図であり、(b)は図1に示す温度変化量演算部によって温度変化量が推定される温度推定点の一例を示す図である。2A is a diagram showing an example of contour lines of temperature change amount in a two-dimensional plane defined by the circumferential and height directions for a furnace wall of a blast furnace calculated by the temperature change amount calculation unit shown in FIG. 1 , and FIG. 2B is a diagram showing an example of a temperature estimation point at which a temperature change amount is estimated by the temperature change amount calculation unit shown in FIG. 1 . 図2に示すS106の処理で使用される下限しきい値の初期値を図1に示す監視装置が決定する初期値決定処理のフローチャートである。3 is a flowchart of an initial value determination process in which the monitoring device shown in FIG. 1 determines an initial value of a lower limit threshold value used in the process of S106 shown in FIG. 2; (a)は初期値抽出期間の第1例を示す図であり、(b)は初期値抽出期間の第2例を示す図であり、(c)は初期値抽出期間の第3例を示す図である。1A is a diagram showing a first example of an initial value extraction period, FIG. 1B is a diagram showing a second example of an initial value extraction period, and FIG. 1C is a diagram showing a third example of an initial value extraction period. S106に示す下限しきい値の初期値を決定する処理を説明するための図である。FIG. 11 is a diagram for explaining the process of determining an initial value of the lower limit threshold shown in S106. 図2に示すS106の処理で使用される下限しきい値を図1に示す監視装置が変更する下限しきい値変更処理のフローチャートである。3 is a flowchart of a lower limit threshold changing process in which the monitoring device shown in FIG. 1 changes a lower limit threshold used in the process of S106 shown in FIG. 2; S307の処理を説明するための図である。FIG. 11 is a diagram for explaining the processing of S307. 特許文献1に記載される技術における還元材の装入量と、本発明に係る技術における還元材の装入量との比率を示す図である。FIG. 1 is a diagram showing a ratio of a charging amount of a reducing material in the technology described in Patent Document 1 to a charging amount of a reducing material in the technology according to the present invention.

以下図面を参照して、監視装置、監視方法及び監視プログラムについて説明する。但し、本発明の技術的範囲はそれらの実施の形態に限定されない。 The monitoring device, monitoring method, and monitoring program will be described below with reference to the drawings. However, the technical scope of the present invention is not limited to these embodiments.

(実施形態に係る監視装置の概要)
実施形態に係る監視装置は、高炉の操業異常の有無を判定する下限しきい値として、高炉の休風期間における標準偏差から決定される値を使用することで、オペレータの経験に基づいて下限しきい値を設定するよりも適正な値で下限しきい値を設定できる。
(Overview of monitoring device according to embodiment)
The monitoring device of the embodiment uses a value determined from the standard deviation during the blast furnace's blast shutdown period as the lower threshold value for determining whether or not there is an operational abnormality in the blast furnace, thereby making it possible to set the lower threshold value at a more appropriate value than if the lower threshold value were set based on the operator's experience.

(実施形態に係る監視装置の構成及び機能)
図1は、第1実施形態に係る監視装置を含む高炉操業システムを示す図である。
(Configuration and Functions of Monitoring Device According to the Embodiment)
FIG. 1 is a diagram showing a blast furnace operation system including a monitoring device according to a first embodiment.

高炉操業システム100は、監視装置1と、高炉110の炉壁に全体に亘って配置される複数のステーブクーラのステーブ温度を検出する複数のステーブ温度センサ101とを有する。複数のステーブ温度センサ101は、監視装置1とLAN(Local Area Network)102を介して接続される。ステーブ温度センサ101は、1つのステーブクーラーに1つずつ配置されてもよく、1つのステーブクーラーに複数配置されてもよい。 The blast furnace operation system 100 has a monitoring device 1 and multiple stave temperature sensors 101 that detect the stave temperatures of multiple stave coolers arranged throughout the furnace wall of the blast furnace 110. The multiple stave temperature sensors 101 are connected to the monitoring device 1 via a LAN (Local Area Network) 102. The stave temperature sensors 101 may be arranged one per stave cooler, or multiple stave temperature sensors 101 may be arranged per stave cooler.

実施形態に係る監視装置1は、通信部11と、記憶部12と、入力部13と、出力部14と、処理部20とを有する。通信部11、記憶部12、入力部13、出力部14及び処理部20は、バス15を介して互いに接続される。監視装置1は、高炉の操業異常の有無を判定するときに使用される下限しきい値を決定及び変更すると共に、演算されたステーブ温度変動指数が下限しきい値以下であるか否かを判定する監視制御装置である。 The monitoring device 1 according to the embodiment has a communication unit 11, a memory unit 12, an input unit 13, an output unit 14, and a processing unit 20. The communication unit 11, the memory unit 12, the input unit 13, the output unit 14, and the processing unit 20 are connected to each other via a bus 15. The monitoring device 1 is a monitoring control device that determines and changes a lower threshold value used when determining whether or not there is an operational abnormality in a blast furnace, and determines whether or not the calculated stave temperature fluctuation index is equal to or lower than the lower threshold value.

通信部11は、イーサネット(登録商標)などの有線の通信インターフェース回路を有する。通信部11は、LAN102を介して複数のステーブ温度センサ101及び不図示の上位制御装置等と通信を行う。 The communication unit 11 has a wired communication interface circuit such as Ethernet (registered trademark). The communication unit 11 communicates with multiple stave temperature sensors 101 and a higher-level control device (not shown) via the LAN 102.

記憶部12は、例えば、半導体記憶装置、磁気テープ装置、磁気ディスク装置、又は光ディスク装置のうちの少なくとも一つを備える。記憶部12は、処理部20での処理に用いられるオペレーティングシステムプログラム、ドライバプログラム、アプリケーションプログラム、データ等を記憶する。例えば、記憶部12は、アプリケーションプログラムとして、高炉の操業を監視する監視処理を処理部20に実行させるための監視プログラムを記憶する。また、記憶部12は、監視処理で使用される下限しきい値の初期値を決定する初期値決定処理を処理部20に実行させるための初期値決定プログラムを記憶する。また、記憶部12は、監視処理で使用される下限しきい値を変更する下限しきい値変更処理を処理部20に実行させるための下限しきい値変更プログラムを記憶する。監視プログラム、初期値決定プログラム及び下限しきい値変更プログラムは、例えばCD-ROM、DVD-ROM等のコンピュータ読み取り可能な可搬型記録媒体から、公知のセットアッププログラム等を用いて記憶部12にインストールされてもよい。 The storage unit 12 includes at least one of a semiconductor storage device, a magnetic tape device, a magnetic disk device, and an optical disk device. The storage unit 12 stores an operating system program, a driver program, an application program, data, and the like used in the processing in the processing unit 20. For example, the storage unit 12 stores a monitoring program as an application program for causing the processing unit 20 to execute a monitoring process for monitoring the operation of a blast furnace. The storage unit 12 also stores an initial value determination program for causing the processing unit 20 to execute an initial value determination process for determining an initial value of a lower limit threshold value used in the monitoring process. The storage unit 12 also stores a lower limit threshold change program for causing the processing unit 20 to execute a lower limit threshold change process for changing a lower limit threshold value used in the monitoring process. The monitoring program, the initial value determination program, and the lower limit threshold change program may be installed in the storage unit 12 using a known setup program or the like from a computer-readable portable recording medium such as a CD-ROM or DVD-ROM.

また、記憶部12は、監視処理で使用される種々のデータを記憶する。さらに、記憶部12は、所定の処理に係る一時的なデータを一時的に記憶してもよい。 The storage unit 12 also stores various data used in the monitoring process. Furthermore, the storage unit 12 may temporarily store temporary data related to a specific process.

入力部13は、データの入力が可能であればどのようなデバイスでもよく、例えば、タッチパネル、キーボード等である。不図示のオペレータは、入力部13を用いて、文字、数字、記号等を入力することができる。入力部13は、オペレータにより操作されると、その操作に対応する信号を生成する。そして、生成された信号は、オペレータの指示として、処理部20に供給される。 The input unit 13 may be any device capable of inputting data, such as a touch panel or a keyboard. An operator (not shown) can use the input unit 13 to input letters, numbers, symbols, etc. When operated by the operator, the input unit 13 generates a signal corresponding to the operation. The generated signal is then supplied to the processing unit 20 as an instruction from the operator.

出力部14は、映像や画像等の表示が可能であればどのようなデバイスでもよく、例えば、液晶ディスプレイ又は有機EL(Electro-Luminescence)ディスプレイ等である。出力部14は、処理部20から供給された映像データに応じた映像や、画像データに応じた画像等を表示する。また、出力部14は、紙などの表示媒体に、映像、画像又は文字等を印刷する出力装置であってもよい。 The output unit 14 may be any device capable of displaying video, images, etc., such as a liquid crystal display or an organic EL (Electro-Luminescence) display. The output unit 14 displays video corresponding to video data supplied from the processing unit 20, images corresponding to image data, etc. The output unit 14 may also be an output device that prints video, images, text, etc. on a display medium such as paper.

処理部20は、一又は複数個のプロセッサ及びその周辺回路を有する。処理部20は、監視装置1の全体的な動作を統括的に制御するものであり、例えば、CPUである。処理部20は、記憶部12に記憶されているプログラム(ドライバプログラム、オペレーティングシステムプログラム、アプリケーションプログラム等)に基づいて処理を実行する。また、処理部20は、複数のプログラム(アプリケーションプログラム等)を並列に実行できる。 The processing unit 20 has one or more processors and their peripheral circuits. The processing unit 20 centrally controls the overall operation of the monitoring device 1, and is, for example, a CPU. The processing unit 20 executes processing based on programs (driver programs, operating system programs, application programs, etc.) stored in the memory unit 12. The processing unit 20 can also execute multiple programs (application programs, etc.) in parallel.

処理部20は、ステーブ温度取得部21と、温度変化量演算部22と、ステーブ温度変動指数演算部23と、操業異常判定部24と、警報信号出力部25と、初期値決定部26と、下限しきい値変更部27とを有する。これらの各部は、処理部20が備えるプロセッサで実行されるプログラムにより実現される機能モジュールである。あるいは、これらの各部は、ファームウェアとして監視装置1に実装されてもよい。 The processing unit 20 has a stave temperature acquisition unit 21, a temperature change amount calculation unit 22, a stave temperature fluctuation index calculation unit 23, an operation abnormality determination unit 24, an alarm signal output unit 25, an initial value determination unit 26, and a lower threshold change unit 27. Each of these units is a functional module realized by a program executed by a processor provided in the processing unit 20. Alternatively, each of these units may be implemented in the monitoring device 1 as firmware.

(実施形態に係る監視装置による監視処理)
図2は、監視装置1が高炉110の操業異常の有無を監視しながら高炉を操業する監視処理のフローチャートである。図2に示す監視処理は、予め記憶部12に記憶されているプログラムに基づいて、主に処理部20により監視装置1の各要素と協働して実行される。
(Monitoring process by monitoring device according to embodiment)
2 is a flowchart of a monitoring process in which the monitoring device 1 operates the blast furnace 110 while monitoring whether or not there is an operational abnormality in the blast furnace 110. The monitoring process shown in FIG. 2 is executed mainly by the processing unit 20 in cooperation with each element of the monitoring device 1 based on a program stored in advance in the storage unit 12.

まず、ステーブ温度取得部21は、高炉110の炉壁に配置される複数のステーブクーラーについて、ステーブ温度センサ101からLAN102を介して複数のステーブ温度を取得する(S101)。複数のステーブ温度センサ101の配置されているステーブクーラーや、ステーブ温度センサ101の配置されていないステーブクーラーが存在する場合がある。ステーブクーラーとステーブ温度センサ101、及びステーブクーラーとステーブ温度は、それぞれ必ずしも一対一対応するものではない。ただし、1つのステーブクーラーに対し1つのステーブ温度センサが配置され1つのステーブ温度が取得される場合、複数のステーブ温度を対応するステーブクーラーの識別番号と関連付けて記憶部12に記憶することができる。ステーブ温度取得部21は、取得した複数のステーブ温度のそれぞれを、ステーブ温度センサ101の配置位置、又は、対応するステーブクーラーの識別番号と関連付けて、記憶部12に記憶する。ステーブ温度取得部21は一定の時間間隔毎にステーブ温度を取得し、時間間隔は、例えば、1秒、1分又は5分等であってもよい。 First, the stave temperature acquisition unit 21 acquires multiple stave temperatures from the stave temperature sensor 101 via the LAN 102 for multiple stave coolers arranged on the furnace wall of the blast furnace 110 (S101). There may be stave coolers with multiple stave temperature sensors 101 arranged therein and stave coolers without stave temperature sensors 101 arranged therein. The stave coolers and the stave temperature sensors 101, and the stave coolers and the stave temperatures do not necessarily correspond one-to-one to each other. However, when one stave temperature sensor is arranged for one stave cooler and one stave temperature is acquired, the multiple stave temperatures can be associated with the identification number of the corresponding stave cooler and stored in the memory unit 12. The stave temperature acquisition unit 21 associates each of the acquired multiple stave temperatures with the arrangement position of the stave temperature sensor 101 or the identification number of the corresponding stave cooler and stores them in the memory unit 12. The stave temperature acquisition unit 21 acquires the stave temperature at regular time intervals, and the time intervals may be, for example, 1 second, 1 minute, or 5 minutes.

次いで、温度変化量演算部22は、S101の処理で取得された複数のステーブ温度のそれぞれの所定の時間間隔での変化量を示す複数の温度変化量を演算する(S102)。まず、温度変化量演算部22は、S101の処理で取得された複数のステーブ温度のそれぞれについて、所定の時間間隔前の監視処理で取得したステーブ温度と、今回の監視処理で取得したステーブ温度との差から所定の時間間隔での温度変化量を演算する。温度変化量演算部22は、演算した温度変化量のそれぞれを、ステーブ温度センサ101の配置位置、又は、対応するステーブクーラーの識別番号と関連付けて、記憶部12に記憶する。なお、所定の時間間隔は一定とすることができ、ステーブ温度を取得する時間間隔と同一でも同一でなくともよく、例えば、1分間又は5分間であってもよい。また、温度変化量の算出に当たっては、例えば特開2002-317217号公報に開示されているようにステーブ温度の影響度を考慮する重み係数を任意に設定することができ、例えば忘却の強さを定義する忘却係数を用いて設定することができる。 Next, the temperature change amount calculation unit 22 calculates a plurality of temperature change amounts indicating the change amount at a predetermined time interval for each of the plurality of stave temperatures acquired in the processing of S101 (S102). First, for each of the plurality of stave temperatures acquired in the processing of S101, the temperature change amount calculation unit 22 calculates the temperature change amount at a predetermined time interval from the difference between the stave temperature acquired in the monitoring processing before the predetermined time interval and the stave temperature acquired in the current monitoring processing. The temperature change amount calculation unit 22 associates each of the calculated temperature change amounts with the arrangement position of the stave temperature sensor 101 or the identification number of the corresponding stave cooler and stores it in the memory unit 12. Note that the predetermined time interval can be constant and may or may not be the same as the time interval at which the stave temperature is acquired, and may be, for example, 1 minute or 5 minutes. In addition, when calculating the amount of temperature change, a weighting coefficient that takes into account the influence of the stave temperature can be set arbitrarily, for example, as disclosed in JP 2002-317217 A, and can be set using, for example, a forgetting coefficient that defines the strength of forgetting.

次いで、温度変化量演算部22は、高炉110の炉壁について周方向及び高さ方向により規定される2次元平面内における温度変化量の等値線を演算する。温度変化量演算部22は、S201の処理で演算されたステーブ温度変化量、及び演算されたステーブ温度変化量のそれぞれに対応するステーブ温度センサ101の配置位置から、2次元平面内における温度変化量の等値線を演算する。温度変化量演算部22は、例えば、特開2002-194405号公報及び特開2002-317217号公報等に記載される等値線探索手法によって等値線を演算することができる。 Next, the temperature change amount calculation unit 22 calculates isolines of the temperature change amount in a two-dimensional plane defined by the circumferential and height directions for the furnace wall of the blast furnace 110. The temperature change amount calculation unit 22 calculates isolines of the temperature change amount in the two-dimensional plane from the stave temperature change amount calculated in the processing of S201 and the arrangement positions of the stave temperature sensors 101 corresponding to each of the calculated stave temperature change amounts. The temperature change amount calculation unit 22 can calculate the isolines by an isoline search method described in, for example, JP 2002-194405 A and JP 2002-317217 A.

図3(a)は、温度変化量演算部22によって演算される高炉110の炉壁について周方向及び高さ方向により規定される2次元平面内における温度変化量の等値線の一例を示す図である。図3(a)において、横軸は高炉110の周方向を示し、縦軸は高炉110の高さ方向を示す。 Figure 3(a) is a diagram showing an example of contour lines of temperature change in a two-dimensional plane defined by the circumferential and height directions for the furnace wall of the blast furnace 110 calculated by the temperature change calculation unit 22. In Figure 3(a), the horizontal axis indicates the circumferential direction of the blast furnace 110, and the vertical axis indicates the height direction of the blast furnace 110.

次いで、温度変化量演算部22は、高炉110の炉壁について周方向及び高さ方向により規定される2次元平面内に格子状に配置される複数の温度推定点における温度変化量を推定する。温度変化量は、例えば5分間等の所定の時間に変化した温度の変化量である。温度変化量演算部22は、演算された等値線と、温度推定点との間の位置関係から、温度推定点における温度変化量を推定する。温度変化量演算部22は、例えば、多項式補間、スプライン補間等の公知の内挿方法によって温度推定点における温度変化量を推定する。 Then, the temperature change amount calculation unit 22 estimates the temperature change amount at a plurality of temperature estimation points arranged in a grid pattern in a two-dimensional plane defined by the circumferential and height directions of the furnace wall of the blast furnace 110. The temperature change amount is the amount of change in temperature over a predetermined period of time, such as five minutes. The temperature change amount calculation unit 22 estimates the temperature change amount at the temperature estimation point from the positional relationship between the calculated isoline and the temperature estimation point. The temperature change amount calculation unit 22 estimates the temperature change amount at the temperature estimation point by a known interpolation method, such as polynomial interpolation or spline interpolation.

図3(b)は、温度変化量演算部22によって温度変化量が推定される温度推定点の一例を示す図である。図3(b)において、横軸は高炉110の周方向を示し、縦軸は高炉110の高さ方向を示す。図3(b)において、温度推定点は、高炉の周方向及び高さ方向にそれぞれ延伸する破線の交点に配置される白丸で示される。図3(b)において、温度推定点は、12×7の格子状に配置される。 Figure 3(b) is a diagram showing an example of a temperature estimation point at which a temperature change is estimated by the temperature change calculation unit 22. In Figure 3(b), the horizontal axis indicates the circumferential direction of the blast furnace 110, and the vertical axis indicates the height direction of the blast furnace 110. In Figure 3(b), the temperature estimation points are indicated by white circles located at the intersections of dashed lines extending in the circumferential and height directions of the blast furnace. In Figure 3(b), the temperature estimation points are arranged in a 12 x 7 grid pattern.

次いで、ステーブ温度変動指数演算部23は、S102の処理で演算された複数の温度変化量の標準偏差であるステーブ温度変動指数を演算する(S103)。ステーブ温度変動指数演算部23は、演算したステーブ温度変動指数を記憶部12に記憶する。ステーブ温度変動指数演算部23は、ステーブ温度変動指数を演算する毎に、演算したステーブ温度変動指数を記憶部12に記憶してもよい。また、ステーブ温度変動指数演算部23は、一定期間に亘って演算したステーブ温度変動指数の平均値を記憶部12に記憶してもよい。例えば、ステーブ温度変動指数演算部23は、60分に亘って5分毎に演算したステーブ温度変動指数の平均値を、ステーブ温度変動指数として記憶部12に記憶してもよい。 Next, the stave temperature fluctuation index calculation unit 23 calculates a stave temperature fluctuation index, which is the standard deviation of the multiple temperature change amounts calculated in the process of S102 (S103). The stave temperature fluctuation index calculation unit 23 stores the calculated stave temperature fluctuation index in the memory unit 12. The stave temperature fluctuation index calculation unit 23 may store the calculated stave temperature fluctuation index in the memory unit 12 each time it calculates a stave temperature fluctuation index. In addition, the stave temperature fluctuation index calculation unit 23 may store the average value of the stave temperature fluctuation index calculated over a certain period of time in the memory unit 12. For example, the stave temperature fluctuation index calculation unit 23 may store the average value of the stave temperature fluctuation index calculated every 5 minutes over a period of 60 minutes as the stave temperature fluctuation index in the memory unit 12.

次いで、操業異常判定部24は、記憶部12に記憶されたステーブ温度変動指数が下限しきい値以下であるか否かを判定する(S104)。下限しきい値は、図4~6を参照して説明される初期値決定処理及び下限しきい値変更処理が実行されることにより、決定及び変更され、記憶部12に記憶される。操業異常判定部24は、記憶部12に記憶されたステーブ温度変動指数が下限しきい値以下であると判定する(S104-YES)と、炉下部不活性となったことを示す操業異常フラグを記憶部12に記憶する(S105)。 Next, the operation abnormality determination unit 24 determines whether the stave temperature fluctuation index stored in the memory unit 12 is equal to or less than the lower threshold value (S104). The lower threshold value is determined and changed by executing the initial value determination process and the lower threshold value change process described with reference to Figures 4 to 6, and is stored in the memory unit 12. When the operation abnormality determination unit 24 determines that the stave temperature fluctuation index stored in the memory unit 12 is equal to or less than the lower threshold value (S104-YES), it stores an operation abnormality flag indicating that the lower furnace portion has become inactive in the memory unit 12 (S105).

次いで、警報信号出力部25は、記憶部12に操業異常フラグが記憶されているか否かを判定する(S106)。警報信号出力部25は、記憶部12に第2操業異常フラグが記憶されていると判定する(S106-YES)と、高炉110の炉壁に付着した付着物の厚さが厚くなったことを示す警報信号を出力する(S107)。 Then, the alarm signal output unit 25 determines whether or not an operation abnormality flag is stored in the memory unit 12 (S106). If the alarm signal output unit 25 determines that a second operation abnormality flag is stored in the memory unit 12 (S106-YES), it outputs an alarm signal indicating that the thickness of the deposits on the furnace wall of the blast furnace 110 has increased (S107).

(実施形態に係る監視装置による初期値決定処理)
図4は、図2に示すS106の処理で使用される下限しきい値の初期値を監視装置1が決定する初期値決定処理のフローチャートである。図4に示す初期値決定処理は、予め記憶部12に記憶されているプログラムに基づいて、主に処理部20により監視装置1の各要素と協働して実行される。S201~S203の処理は、S101~S103の処理と同様なので、ここでは詳細な説明は省略する。
(Initial Value Determination Process by Monitoring Device According to the Embodiment)
Fig. 4 is a flowchart of an initial value determination process in which the monitoring device 1 determines an initial value of the lower limit threshold used in the process of S106 shown in Fig. 2. The initial value determination process shown in Fig. 4 is executed mainly by the processing unit 20 in cooperation with each element of the monitoring device 1, based on a program previously stored in the storage unit 12. The processes of S201 to S203 are similar to the processes of S101 to S103, and therefore detailed description thereof will be omitted here.

S203の処理に次いで、初期値決定部26は、下限しきい値の初期値を決定することを示す初期値決定指示が入力されたか否かを判定する(S204)。初期値決定部26は、オペレータにより入力部13を介して初期値決定指示が入力されたか否かを判定する。初期値決定部26によって初期値決定指示が入力されたと判定される(S204-YES)まで、S201~S204の処理が繰り返される。S201~S204の処理が繰り返されることにより、ステーブ温度変動指数が繰り返し演算され、演算されたステーブ温度変動指数が記憶部12に記憶される。 Following the process of S203, the initial value determination unit 26 determines whether or not an initial value determination instruction indicating that an initial value of the lower limit threshold value is to be determined has been input (S204). The initial value determination unit 26 determines whether or not an initial value determination instruction has been input by the operator via the input unit 13. The processes of S201 to S204 are repeated until the initial value determination unit 26 determines that an initial value determination instruction has been input (S204-YES). By repeating the processes of S201 to S204, the stave temperature fluctuation index is repeatedly calculated, and the calculated stave temperature fluctuation index is stored in the memory unit 12.

初期値決定部26は、初期値決定指示が入力されたと判定する(S204-YES)と、高炉110が休風する期間である休風期間を少なくとも1回含む初期値抽出期間に演算されたステーブ温度変動指数を取得する(S205)。初期値決定部26は、オペレータによって入力部13を介して初期値抽出期間が入力されることに応じて、初期値抽出期間に演算されたステーブ温度変動指数を取得する。高炉110の休風期間は、羽口からの送風を停止してから、羽口からの送風を開始するまでの期間である。 When the initial value determination unit 26 determines that an initial value determination command has been input (S204-YES), it acquires the stave temperature fluctuation index calculated during the initial value extraction period that includes at least one blast stop period during which the blast furnace 110 is blast stopped (S205). The initial value determination unit 26 acquires the stave temperature fluctuation index calculated during the initial value extraction period in response to the initial value extraction period being input by the operator via the input unit 13. The blast furnace 110 blast stop period is the period from when blasting from the tuyere is stopped to when blasting from the tuyere is started.

次いで、初期値決定部26は、初期値抽出期間に演算されたステーブ温度変動指数に基づいて、高炉110の操業異常の有無を判定するときに使用される下限しきい値の初期値を決定する(S206)。初期値決定部26は、休風期間において、複数のステーブクーラーが送風の影響を受けていないと推定される期間におけるステーブ温度変動指数の最大値と推定される値を、下限しきい値の初期値に決定する。送風の影響を受けていないと推定される期間は、例えば変動指数が0.0005以下となる期間である。 Next, the initial value determination unit 26 determines the initial value of the lower threshold value used when determining whether or not there is an operational abnormality in the blast furnace 110, based on the stave temperature fluctuation index calculated during the initial value extraction period (S206). The initial value determination unit 26 determines the initial value of the lower threshold value to be the estimated maximum value of the stave temperature fluctuation index during the period during which it is estimated that the multiple stave coolers are not affected by the blowing of air during the blowing stop period. The period estimated to be not affected by the blowing of air is, for example, a period during which the fluctuation index is 0.0005 or less.

図5(a)は初期値抽出期間の第1例を示す図であり、図5(b)は初期値抽出期間の第2例を示す図であり、図5(c)は初期値抽出期間の第3例を示す図である。図5(a)~5(c)において、横軸は時間を示し、縦軸はステーブ温度変動指数を示す。また、図5(a)~5(c)において、双方向矢印Aは休風期間を示し、双方向矢印Bは複数のステーブクーラーが送風の影響を受けていないと推定される期間を示す。 Figure 5(a) is a diagram showing a first example of an initial value extraction period, Figure 5(b) is a diagram showing a second example of an initial value extraction period, and Figure 5(c) is a diagram showing a third example of an initial value extraction period. In Figures 5(a) to 5(c), the horizontal axis indicates time, and the vertical axis indicates the stave temperature fluctuation index. Also, in Figures 5(a) to 5(c), the bidirectional arrow A indicates a period of no airflow, and the bidirectional arrow B indicates a period during which multiple stave coolers are estimated to be unaffected by airflow.

図5(a)に示す第1例では、休風期間は3時から24時までの21時間であり、複数のステーブクーラーが送風の影響を受けていないと推定される期間は4時から24時までの20時間である。第1例では、複数のステーブクーラーは、休風期間が開始してから約2時間後と比較的早い時期から送風の影響を受けていない。複数のステーブクーラーが送風の影響を受けていないと推定される期間でのステーブ温度変動指数の最大値は、0.0005程度である。 In the first example shown in FIG. 5(a), the off-air period is 21 hours from 3:00 to 24:00, and the period during which the multiple stave coolers are estimated to be unaffected by the airflow is 20 hours from 4:00 to 24:00. In the first example, the multiple stave coolers are not affected by the airflow from a relatively early time, about 2 hours after the start of the off-air period. The maximum value of the stave temperature fluctuation index during the period during which the multiple stave coolers are estimated to be unaffected by the airflow is about 0.0005.

図5(b)に示す第2例では、休風期間は3時から24時までの21時間であり、複数のステーブクーラーが送風の影響を受けていないと推定される期間は9時から24時までの15時間である。第2例では、複数のステーブクーラーは、休風期間が開始してから約9時間後と比較的遅い時期から送風の影響を受けなくなる。複数のステーブクーラーが送風の影響を受けていないと推定される期間でのステーブ温度変動指数の最大値は、0.0004程度である。 In the second example shown in FIG. 5(b), the off-air period is 21 hours from 3:00 to 24:00, and the period during which the multiple stave coolers are estimated to be unaffected by the airflow is 15 hours from 9:00 to 24:00. In the second example, the multiple stave coolers are no longer affected by the airflow from a relatively late time, about 9 hours after the start of the off-air period. The maximum value of the stave temperature fluctuation index during the period during which the multiple stave coolers are estimated to be unaffected by the airflow is about 0.0004.

図5(c)に示す第3例では、休風期間は6時から翌日の9時までの27時間であり、複数のステーブクーラーが送風の影響を受けていないと推定される期間は9時から翌日の9時までの24時間である。第3例では、複数のステーブクーラーは、休風期間が開始してから約3時間後と比較的速い時期から送風の影響を受けなくなる。複数のステーブクーラーが送風の影響を受けていないと推定される期間でのステーブ温度変動指数の最大値は、0.0003程度である。 In the third example shown in FIG. 5(c), the off-air period is 27 hours from 6:00 to 9:00 the following day, and the period during which the multiple stave coolers are estimated to be unaffected by the airflow is 24 hours from 9:00 to 9:00 the following day. In the third example, the multiple stave coolers are no longer affected by the airflow from a relatively early time, about 3 hours after the start of the off-air period. The maximum value of the stave temperature fluctuation index during the period during which the multiple stave coolers are estimated to be unaffected by the airflow is about 0.0003.

休風期間が開始してから複数のステーブクーラーが送風の影響を受けなくなるまでの間の長さは、高炉110の炉況、ステーブクーラーの位置等により相違するため、複数のステーブクーラーが送風の影響を受けていない期間を推定することは、容易ではない。以下、初期値決定部26が、複数のステーブクーラーが送風の影響を受けていないと推定される期間におけるステーブ温度変動指数の最大値を推定する方法について説明する。 The length of time from the start of the rest period until the multiple stave coolers are no longer affected by the blast air varies depending on the furnace conditions of the blast furnace 110, the position of the stave coolers, etc., so it is not easy to estimate the period during which the multiple stave coolers are not affected by the blast air. Below, we will explain how the initial value determination unit 26 estimates the maximum value of the stave temperature fluctuation index during the period during which the multiple stave coolers are estimated to be no longer affected by the blast air.

初期値決定部26は、演算されたステーブ温度変動指数の相対頻度が最大である第1極大値と、相対頻度が第1極大値に次ぐ大きさである第2極大値との間の最小値に対応するステーブ温度変動指数を抽出する。初期値決定部26は、抽出したステーブ温度変動指数を、複数のステーブクーラーが送風の影響を受けていない期間におけるステーブ温度変動指数の最大値と推定し、下限しきい値の初期値に決定する。 The initial value determination unit 26 extracts a stave temperature fluctuation index corresponding to the minimum value between a first maximum value, which is the maximum relative frequency of the calculated stave temperature fluctuation index, and a second maximum value, which is the second largest relative frequency after the first maximum value. The initial value determination unit 26 estimates the extracted stave temperature fluctuation index as the maximum value of the stave temperature fluctuation index during a period when the multiple stave coolers are not affected by the air blowing, and determines it as the initial value of the lower threshold value.

図6は、S206に示す下限しきい値の初期値を決定する処理を説明するための図である。図6において、横軸はステーブ温度変動指数を対数表示で示し、縦軸は初期値抽出期間に検出されたステーブ温度から演算されるステーブ温度変動指数の数を正規化した相対頻度を示す。 Figure 6 is a diagram for explaining the process of determining the initial value of the lower threshold shown in S206. In Figure 6, the horizontal axis shows the stave temperature fluctuation index in logarithmic display, and the vertical axis shows the relative frequency normalized for the number of stave temperature fluctuation indices calculated from the stave temperatures detected during the initial value extraction period.

まず、初期値決定部26は、ステーブ温度変動指数の相対頻度が最大である第1極大値に対応するステーブ温度変動指数を抽出する。図4に示す例では、図6において矢印Cで示される「1.0」の相対頻度に対応する「0.0002」を抽出し、抽出したステーブ温度変動指数を第1極大値に対応するステーブ温度変動指数として記憶部12に記憶する。 First, the initial value determination unit 26 extracts the stave temperature fluctuation index corresponding to the first maximum value, which is the maximum relative frequency of the stave temperature fluctuation index. In the example shown in FIG. 4, "0.0002" is extracted, which corresponds to the relative frequency of "1.0" indicated by the arrow C in FIG. 6, and the extracted stave temperature fluctuation index is stored in the memory unit 12 as the stave temperature fluctuation index corresponding to the first maximum value.

次いで、初期値決定部26は、ステーブ温度変動指数の相対頻度が第1極大値に次ぐ大きさである第2極大値に対応するステーブ温度変動指数を抽出する。図4に示す例では、図6において矢印Dで示される「0.8」の相対頻度に対応する「0.001」を抽出し、抽出したステーブ温度変動指数を最小値に対応するステーブ温度変動指数として記憶部12に記憶する。 Next, the initial value determination unit 26 extracts the stave temperature fluctuation index corresponding to the second maximum value, which is the second largest relative frequency of the stave temperature fluctuation index after the first maximum value. In the example shown in FIG. 4, "0.001" is extracted, which corresponds to the relative frequency of "0.8" indicated by the arrow D in FIG. 6, and the extracted stave temperature fluctuation index is stored in the memory unit 12 as the stave temperature fluctuation index corresponding to the minimum value.

そして、初期値決定部26は、第1極大値と第2極大値との間の最小値に対応するステーブ温度変動指数を、下限しきい値の初期値に決定する。初期値決定部26は、第1極大値に対応するステーブ温度変動指数「0.0002」と第2極大値に対応するステーブ温度変動指数「0.001」との間で、相対頻度が最小となるステーブ温度変動指数「0.0035」を抽出する。初期値決定部26は、抽出した対頻度が最小となるステーブ温度変動指数「0.0035」を下限しきい値の初期値として記憶部12に記憶する。 Then, the initial value determination unit 26 determines the stave temperature fluctuation index corresponding to the minimum value between the first maximum value and the second maximum value as the initial value of the lower threshold value. The initial value determination unit 26 extracts the stave temperature fluctuation index "0.0035" with the smallest relative frequency between the stave temperature fluctuation index "0.0002" corresponding to the first maximum value and the stave temperature fluctuation index "0.001" corresponding to the second maximum value. The initial value determination unit 26 stores the extracted stave temperature fluctuation index "0.0035" with the smallest relative frequency in the memory unit 12 as the initial value of the lower threshold value.

監視装置1は、図6を参照して説明されるように、相対頻度が最大である第1極大値と、相対頻度が第1極大値に次ぐ大きさである第2極大値との間の最小値に対応するステーブ温度変動指数を、下限しきい値の初期値に決定する。第1極大値及び第2極大値の一方は休風期間のステーブ温度変動指数であり、第1極大値及び第2極大値の他方は休風期間のステーブ温度変動指数であると推定される。休風期間に移行するとき、ステーブ温度変動指数は、急激に低下するので、休風期間に移行する間のステーブ温度変動指数の相対頻度は、休風期間に移行する前、及び休風期間に移行した後のステーブ温度変動指数の相対頻度よりも小さくなる。休風期間に移行すると、ステーブクーラーの周囲のガスの流れが急激に停滞し、ステーブクーラーに流れる冷却水の温度変化量が小さくなるので、ステーブ温度変動指数は、休風期間に移行するときに急激に低下する。第1極大値と第2極大値との間の最小値に対応するステーブ温度変動指数を、下限しきい値の初期値に決定することで、送風の影響を受けていない期間におけるステーブ温度変動指数の最大値に近いステーブ温度変動指数を下限しきい値の初期値に決定できる。 As described with reference to FIG. 6, the monitoring device 1 determines the stave temperature fluctuation index corresponding to the minimum value between the first maximum value, which has the highest relative frequency, and the second maximum value, which has the second largest relative frequency after the first maximum value, as the initial value of the lower threshold value. One of the first maximum value and the second maximum value is the stave temperature fluctuation index in the no-air-stop period, and the other of the first maximum value and the second maximum value is the stave temperature fluctuation index in the no-air-stop period. When transitioning to the no-air-stop period, the stave temperature fluctuation index drops sharply, so that the relative frequency of the stave temperature fluctuation index during the transition to the no-air-stop period is smaller than the relative frequency of the stave temperature fluctuation index before and after transition to the no-air-stop period. When transitioning to the no-air-stop period, the flow of gas around the stave cooler suddenly stagnates, and the temperature change amount of the cooling water flowing through the stave cooler becomes smaller, so that the stave temperature fluctuation index drops sharply when transitioning to the no-air-stop period. By determining the stave temperature fluctuation index corresponding to the minimum value between the first maximum value and the second maximum value as the initial value of the lower threshold, the stave temperature fluctuation index close to the maximum value of the stave temperature fluctuation index during the period not affected by the air blowing can be determined as the initial value of the lower threshold.

(実施形態に係る監視装置による下限しきい値変更処理)
図7は、図2に示すS106の処理で使用される下限しきい値を監視装置1が変更する下限しきい値変更処理のフローチャートである。図7に示す下限しきい値変更処理は、予め記憶部12に記憶されているプログラムに基づいて、主に処理部20により監視装置1の各要素と協働して実行される。
(Lower Threshold Change Process by Monitoring Device According to the Embodiment)
Fig. 7 is a flowchart of a lower threshold value changing process in which the monitoring device 1 changes the lower threshold value used in the process of S106 shown in Fig. 2. The lower threshold value changing process shown in Fig. 7 is executed mainly by the processing unit 20 in cooperation with each element of the monitoring device 1, based on a program previously stored in the storage unit 12.

監視装置1は、ステーブ温度変動指数と炉壁部不活性との相関性に基づいて、下限しきい値を変更する。炉壁部不活性は、高炉110の炉壁の近傍に配置されるステーブクーラーにガスが接触しなくなる状態である。炉壁部不活性が発生する原因は、ステーブクーラーと前面に位置する装入物との間に粉原料が侵入する現象、あるいは軟化した後に再固化した原料がステーブクーラーの前面に付着する現象等があげられる。また、炉壁部不活性が発生する原因となる現象が複合して発生して、強固な付着物がステーブクーラーの前面に生成して、炉壁部不活性が発生することがある。 The monitoring device 1 changes the lower threshold value based on the correlation between the stave temperature fluctuation index and furnace wall inactivation. Furnace wall inactivation is a state in which gas does not come into contact with the stave cooler arranged near the furnace wall of the blast furnace 110. Causes of furnace wall inactivation include the phenomenon in which powdered raw materials get between the stave cooler and the charge located in front of it, or the phenomenon in which raw materials that have softened and then resolidified adhere to the front of the stave cooler. In addition, a combination of phenomena that cause furnace wall inactivation can occur, causing strong adhesion to form on the front of the stave cooler, resulting in furnace wall inactivation.

炉壁部不活性が発生すると、ステーブ温度が低下して、熱負荷が低下する。熱負荷は、ステーブクーラーの冷却配管を流れる冷却水の抜熱量であり、ステーブクーラーの冷却配管を流れる冷却水の温度上昇から算出される。炉壁部不活性が発生して、ステーブ温度が低下することに従って、ステーブ温度変化量が低下して、ステーブ温度変動指数が低下する。ステーブ温度変動指数の低下を精度良く検知することにより、炉壁部不活性の発生を精度良く検知することができる。 When furnace wall inactivation occurs, the stave temperature drops and the heat load drops. The heat load is the amount of heat removed by the cooling water flowing through the cooling piping of the stave cooler, and is calculated from the temperature rise of the cooling water flowing through the cooling piping of the stave cooler. As furnace wall inactivation occurs and the stave temperature drops, the amount of stave temperature change drops and the stave temperature fluctuation index drops. By accurately detecting the drop in the stave temperature fluctuation index, the occurrence of furnace wall inactivation can be accurately detected.

S301~S303の処理は、S101~S103の処理と同様なので、ここでは詳細な説明は省略する。S303の処理に次いで、下限しきい値変更部27は、下限しきい値を変更することを示す下限しきい値変更指示が入力されたか否かを判定する(S304)。下限しきい値変更部27は、オペレータにより入力部13を介して下限しきい値変更指示が入力されたか否かを判定する。下限しきい値変更部27によって下限しきい値変更指示が入力されたと判定される(S304-YES)まで、S301~S304の処理が繰り返される。S301~S304の処理が繰り返されることにより、ステーブ温度変動指数が繰り返し演算され、演算されたステーブ温度変動指数が記憶部12に記憶される。 The processes of S301 to S303 are similar to those of S101 to S103, and therefore detailed description thereof will be omitted here. Following the process of S303, the lower threshold change unit 27 determines whether or not a lower threshold change instruction indicating that the lower threshold is to be changed has been input (S304). The lower threshold change unit 27 determines whether or not a lower threshold change instruction has been input by the operator via the input unit 13. The processes of S301 to S304 are repeated until the lower threshold change unit 27 determines that a lower threshold change instruction has been input (S304-YES). By repeating the processes of S301 to S304, the stave temperature fluctuation index is repeatedly calculated, and the calculated stave temperature fluctuation index is stored in the memory unit 12.

下限しきい値変更部27は、下限しきい値変更指示が入力されたと判定する(S304-YES)と、高炉110の休風期間を少なくとも1回含む炉壁部不活性判定期間に演算されたステーブ温度変動指数を取得する(S305)。下限しきい値変更部27は、オペレータによって入力部13を介して炉壁部不活性判定期間が入力されることに応じて、炉壁部不活性判定期間に演算されたステーブ温度変動指数を取得する。 When the lower limit threshold change unit 27 determines that a lower limit threshold change instruction has been input (S304-YES), it acquires the stave temperature fluctuation index calculated during the furnace wall deactivation determination period that includes at least one blast stop period of the blast furnace 110 (S305). The lower limit threshold change unit 27 acquires the stave temperature fluctuation index calculated during the furnace wall deactivation determination period in response to the furnace wall deactivation determination period being input by the operator via the input unit 13.

次いで、下限しきい値変更部27は、S305の処理で取得されたステーブ温度変動指数に基づいて、炉壁部不活性が発生しているか否かを判定する(S306)。 Next, the lower limit threshold change unit 27 determines whether or not furnace wall deactivation has occurred based on the stave temperature fluctuation index obtained in the processing of S305 (S306).

下限しきい値変更部27は、休風期間におけるステーブ温度変動指数と、休風期間外のステーブ温度変動指数とを比較して、炉壁部不活性が発生しているか否かを判定する。例えば、下限しきい値変更部27は、高炉110の何れかの領域において、休風期間外のステーブ温度変動指数の最大値のオーダが、休風期間におけるステーブ温度変動指数の最大値のオーダと同一であるとき、場合、炉壁部不活性が発生していると判定する。また、下限しきい値変更部27は、炉壁部不活性が発生していることを確認したオペレータによって入力部13を介して入力される情報に基づいて、炉壁部不活性が発生していると判定してもよい。 The lower threshold value change unit 27 compares the stave temperature fluctuation index during the blasting rest period with the stave temperature fluctuation index outside the blasting rest period to determine whether or not furnace wall inactivation has occurred. For example, the lower threshold value change unit 27 determines that furnace wall inactivation has occurred when, in any region of the blast furnace 110, the order of the maximum value of the stave temperature fluctuation index outside the blasting rest period is the same as the order of the maximum value of the stave temperature fluctuation index during the blasting rest period. The lower threshold value change unit 27 may also determine that furnace wall inactivation has occurred based on information input via the input unit 13 by an operator who has confirmed that furnace wall inactivation has occurred.

下限しきい値変更部27によって、炉壁部不活性が発生していないと判定される(S306-NO)と、下限しきい値変更処理は終了する。 When the lower threshold change unit 27 determines that furnace wall deactivation has not occurred (S306-NO), the lower threshold change process ends.

下限しきい値変更部27は、炉壁部不活が性発生していると判定する(S306-YES)と、炉壁部不活性が発生している炉壁部不活性領域における少なくとも休風期間を含む最大値抽出期間でのステーブ温度変動指数の最大値を抽出する(S307)。 When the lower threshold change unit 27 determines that furnace wall inactivation has occurred (S306-YES), it extracts the maximum value of the stave temperature fluctuation index during the maximum value extraction period that includes at least the wind stop period in the furnace wall inactive region where the furnace wall inactivation has occurred (S307).

図8は、S307の処理を説明するための図である。図8において、横軸は時間を示し、縦軸はステーブ温度変動指数を示す。また、図8において、双方向矢印Aは休風期間を示し、双方向矢印Eは最大値抽出期間を示す。 Figure 8 is a diagram for explaining the processing of S307. In Figure 8, the horizontal axis indicates time, and the vertical axis indicates the stave temperature fluctuation index. Also, in Figure 8, the bidirectional arrow A indicates the wind-off period, and the bidirectional arrow E indicates the maximum value extraction period.

図8に示す例では、休風期間は6時から翌日の9時までの27時間であり、最大値抽出期間は前日の18時から翌日の21時までの51時間である。図8に示す例において、最大値抽出期間は、休風期間、並びに休風期間の開始前12時間及び休風期間終了後12時間である。本実施形態において、休風期間を少なくとも含めばよく、休風期間ではない期間(例えば、休風期間の開始前12時間および、休風期間終了後12時間)を含んでいてもよい。また、休風期間ではない期間として、休風期間の開始前12時間および、休風期間終了後12時間としたが、12時間に限られず、適宜設定してもよい。 In the example shown in FIG. 8, the wind-off period is 27 hours from 6:00 to 9:00 the following day, and the maximum value extraction period is 51 hours from 18:00 the previous day to 21:00 the following day. In the example shown in FIG. 8, the maximum value extraction period is the wind-off period, as well as 12 hours before the start of the wind-off period and 12 hours after the end of the wind-off period. In this embodiment, it is sufficient to include at least the wind-off period, and it may also include a period that is not a wind-off period (for example, 12 hours before the start of the wind-off period and 12 hours after the end of the wind-off period). In addition, the period that is not a wind-off period is set to 12 hours before the start of the wind-off period and 12 hours after the end of the wind-off period, but is not limited to 12 hours and may be set as appropriate.

次いで、下限しきい値変更部27は、S307の処理で抽出されたステーブ温度変動指数の最大値が下限しきい値となるように、記憶部12に記憶された下限しきい値を変更して(S308)、下限しきい値変更処理は終了する。 Next, the lower threshold change unit 27 changes the lower threshold stored in the memory unit 12 so that the maximum value of the stave temperature fluctuation index extracted in the process of S307 becomes the lower threshold (S308), and the lower threshold change process ends.

(実施形態に係る監視装置の作用効果)
監視装置1は、高炉110の休風期間におけるステーブ温度変動指数から下限しきい値の初期値を決定することで、適切な下限しきい値により炉下部不活性を早期に検出し、高炉110における操業異常の有無を判定することができる。炉下部不活性を早期に検出できないと、高炉101内のガスの流れが変動し、シャフト圧が変動して、高炉の操業が不安定となる。高炉の操業が不安定になるとコークスの使用量が増加し、還元材比が大幅に増加すると共に出銑コストが増加する。これに対し、高炉操業装置1では、炉壁部不活性を早期に検出することができるので、高炉101内のガスの流れの変動が抑制されて、シャフト圧の変動が抑制される。これによって、高炉の操業が安定化する。よって、監視装置1では、コークスの使用量を増やす必要がなく、還元材比の増加及び出銑コスト増加が抑制される。
(Functions and Effects of the Monitoring Device According to the Embodiment)
The monitoring device 1 determines the initial value of the lower limit threshold from the stave temperature fluctuation index during the blast furnace 110's blast stop period, and can detect the inactivation of the lower furnace part at an early stage by the appropriate lower limit threshold, and can determine the presence or absence of an operation abnormality in the blast furnace 110. If the inactivation of the lower furnace part cannot be detected at an early stage, the gas flow in the blast furnace 101 fluctuates, the shaft pressure fluctuates, and the operation of the blast furnace becomes unstable. When the operation of the blast furnace becomes unstable, the amount of coke used increases, the reducing agent ratio increases significantly, and the tapping cost increases. In contrast, the blast furnace operation device 1 can detect the inactivation of the furnace wall part at an early stage, so that the fluctuation of the gas flow in the blast furnace 101 is suppressed, and the fluctuation of the shaft pressure is suppressed. This stabilizes the operation of the blast furnace. Therefore, in the monitoring device 1, there is no need to increase the amount of coke used, and the increase in the reducing agent ratio and the tapping cost are suppressed.

高炉110が休風する間、送風によるガスは、高炉110の炉内に吹き込まないため、高炉110の炉内の温度は基本的に変化せず、ステーブ温度の変化量は小さく、ステーブ温度変動指数はゼロに限りなく近づく。高炉110が休風する間、ステーブ温度変動指数は、高炉110の炉内の温度変化ではなく、ステーブクーラーの冷却配管を流れる冷却水の温度変化、及び高炉110の炉内に装入された装入物のわずかな移動等の影響により若干変動する。監視装置1は、高炉110の休風期間におけるステーブ温度変動指数から下限しきい値の初期値を決定することで、適切な下限しきい値を決定することができる。 During the time when the blast furnace 110 is shut down, gas from the blowing is not blown into the blast furnace 110, so the temperature inside the blast furnace 110 basically does not change, the amount of change in the stave temperature is small, and the stave temperature fluctuation index approaches zero. During the time when the blast furnace 110 is shut down, the stave temperature fluctuation index fluctuates slightly not due to temperature changes inside the blast furnace 110, but due to the effects of temperature changes in the cooling water flowing through the cooling pipes of the stave cooler and slight movement of the charges charged into the blast furnace 110. The monitoring device 1 can determine an appropriate lower threshold value by determining an initial value of the lower threshold value from the stave temperature fluctuation index during the shut down period of the blast furnace 110.

より具体的には、監視装置1は、休風期間において、高炉110が有する複数のステーブクーラーが羽口からの送風の影響を受けていないと推定される期間におけるステーブ温度変動指数の最大値と推定される値を、下限しきい値の初期値として使用する。羽口からの送風の影響を複数のステーブクーラーが受けていないと推定される期間におけるステーブ温度変動指数の最大値を下限しきい値の初期値として使用することで、送風の影響を受けていない期間の最大値を下限しきい値の初期値に設定できる。 More specifically, during the air suspension period, the monitoring device 1 uses the estimated maximum value of the stave temperature fluctuation index during the period when the multiple stave coolers of the blast furnace 110 are estimated to be not affected by the air blown from the tuyere as the initial value of the lower threshold. By using the maximum value of the stave temperature fluctuation index during the period when the multiple stave coolers are estimated to be not affected by the air blown from the tuyere as the initial value of the lower threshold, the maximum value during the period when the coolers are not affected by the air blow can be set as the initial value of the lower threshold.

また、監視装置1は、炉壁部不活性領域における休風期間を含む期間でのステーブ温度変動指数の最大値を下限しきい値に変更することで、炉壁部不活性が発生した実測値に応じたステーブ温度変動指数を下限しきい値として使用できる。 In addition, the monitoring device 1 can change the maximum value of the stave temperature fluctuation index during the period including the wind stop period in the furnace wall inactivation area to the lower threshold value, thereby allowing the stave temperature fluctuation index corresponding to the actual measurement value at which the furnace wall inactivation occurs to be used as the lower threshold value.

監視装置1は、送風の影響を受けていない期間の最大値を下限しきい値の初期値に設定することで、還元材比の低減等、より厳しい操業条件を追求しつつ操業安定を達成することができる。 By setting the maximum value of the period not affected by the air blowing as the initial value of the lower threshold, the monitoring device 1 can achieve stable operation while pursuing stricter operating conditions, such as reducing the reducing agent ratio.

図9は、特許文献1に記載される技術における還元材の装入量と、本発明に係る技術における還元材の装入量との比率を示す図である。 Figure 9 shows the ratio of the amount of reducing material charged in the technology described in Patent Document 1 to the amount of reducing material charged in the technology according to the present invention.

本発明に係る技術では、高炉110に装入される還元材の量を、特許文献1に記載される技術において高炉110に装入される還元材の量よりも5%程度低減できる。 The technology according to the present invention can reduce the amount of reducing material charged into the blast furnace 110 by about 5% compared to the amount of reducing material charged into the blast furnace 110 in the technology described in Patent Document 1.

1 監視装置
21 ステーブ温度取得部
22 温度変化量演算部
23 ステーブ温度変動指数演算部
24 操業異常判定部
25 警報信号出力部
26 初期値決定部
27 下限しきい値変更部
Reference Signs List 1 Monitoring device 21 Stave temperature acquisition unit 22 Temperature change amount calculation unit 23 Stave temperature fluctuation index calculation unit 24 Operation abnormality determination unit 25 Alarm signal output unit 26 Initial value determination unit 27 Lower limit threshold change unit

Claims (7)

高炉の炉壁に配置される複数のステーブクーラーについて複数のステーブ温度を、前記高炉の休風期間を含めて、一定の時間間隔毎に取得するステーブ温度取得部と、
前記複数のステーブ温度から、高炉の炉壁の所定の位置における温度の所定の時間間隔での変化量である複数の温度変化量を演算する温度変化量演算部と、
前記複数の温度変化量の標準偏差であるステーブ温度変動指数を演算するステーブ温度変動指数演算部と、
前記ステーブ温度変動指数が所定の下限しきい値以下であるか否かを判定する操業異常判定部と、を有し、
前記下限しきい値の初期値は、前記休風期間における前記ステーブ温度変動指数から抽出されると共に、前記下限しきい値は、炉壁部不活性が発生していると判定されたときに変更される、ことを特徴とする監視装置。
A stave temperature acquisition unit that acquires a plurality of stave temperatures for a plurality of stave coolers arranged on the furnace wall of the blast furnace at regular time intervals, including the blast furnace rest period;
A temperature change amount calculation unit that calculates a plurality of temperature change amounts, which are change amounts of temperature at a predetermined position of the furnace wall of the blast furnace at a predetermined time interval, from the plurality of stave temperatures;
A stave temperature fluctuation index calculation unit that calculates a stave temperature fluctuation index, which is the standard deviation of the plurality of temperature change amounts;
An operation abnormality determination unit that determines whether the stave temperature fluctuation index is equal to or lower than a predetermined lower limit threshold value,
The initial value of the lower limit threshold is extracted from the stave temperature fluctuation index during the halt period , and the lower limit threshold is changed when it is determined that furnace wall inactivation has occurred. A monitoring device.
前記下限しきい値の初期値は、前記休風期間において、前記複数のステーブクーラーが送風の影響を受けていないと推定される期間における前記ステーブ温度変動指数の最大値と推定される値である、請求項1に記載の監視装置。 The monitoring device according to claim 1, wherein the initial value of the lower limit threshold is a value estimated to be the maximum value of the stave temperature fluctuation index during the period during which the plurality of stave coolers are estimated to be unaffected by the blowing of air during the wind-off period. 前記下限しきい値の初期値は、前記休風期間を含む期間において演算された前記ステーブ温度変動指数の相対頻度が最大である第1極大値と、前記相対頻度が前記第1極大値に次ぐ大きさである第2極大値との間の最小値に対応する前記ステーブ温度変動指数である、請求項2に記載の監視装置。 The monitoring device according to claim 2, wherein the initial value of the lower limit threshold is the stave temperature fluctuation index corresponding to the minimum value between a first maximum value at which the relative frequency of the stave temperature fluctuation index calculated during a period including the wind stop period is the maximum, and a second maximum value at which the relative frequency is the second largest after the first maximum value. 前記ステーブ温度変動指数に基づいて、炉壁部不活性が発生しているか否かを判定し、
前記炉壁部不活性が発生していると判定されたときに、炉壁部不活性領域における少なくとも前記休風期間を含む期間での前記ステーブ温度変動指数の最大値を前記下限しきい値に変更する下限しきい値変更部を更に有する請求項1~3の何れか一項に記載の監視装置。
Based on the stave temperature fluctuation index, it is determined whether or not furnace wall inactivation has occurred,
When it is determined that the furnace wall portion is inactivated, a lower limit threshold value change unit changes the maximum value of the stave temperature fluctuation index in a period including at least the wind stop period in the furnace wall portion inactivation region to the lower limit threshold value. The monitoring device according to any one of claims 1 to 3, further comprising: a lower limit threshold value change unit.
前記下限しきい値変更部は、前記炉壁部不活性領域における前記休風期間での前記ステーブ温度変動指数の最大値を前記下限しきい値とする、請求項4に記載の監視装置。 The monitoring device according to claim 4, wherein the lower threshold value change unit sets the maximum value of the stave temperature fluctuation index during the wind-stop period in the furnace wall inactive region as the lower threshold value. 高炉の炉壁に配置される複数のステーブクーラーについて複数のステーブ温度を、前記高炉の休風期間を含めて、一定の時間間隔毎に取得し、
前記複数のステーブ温度から、高炉の炉壁の所定の位置における温度の所定の時間間隔での変化量である複数の温度変化量を演算し、
前記複数の温度変化量の標準偏差であるステーブ温度変動指数を演算し、
前記ステーブ温度変動指数が所定の下限しきい値以下であるか否かを判定する、ことを含み、
前記下限しきい値の初期値は、前記休風期間における前記ステーブ温度変動指数から抽出されると共に、前記下限しきい値は、炉壁部不活性が発生していると判定されたときに変更される、ことを特徴とする監視方法。
A plurality of stave temperatures for a plurality of stave coolers arranged on the furnace wall of a blast furnace are obtained at regular time intervals, including a blast stop period of the blast furnace;
From the plurality of stave temperatures, a plurality of temperature change amounts, which are change amounts of temperature at a predetermined position of the furnace wall of the blast furnace at a predetermined time interval, are calculated;
Calculate a stave temperature fluctuation index, which is the standard deviation of the plurality of temperature changes;
Determining whether the stave temperature fluctuation index is equal to or less than a predetermined lower threshold value;
The initial value of the lower limit threshold is extracted from the stave temperature fluctuation index during the halt period , and the lower limit threshold is changed when it is determined that furnace wall inactivation has occurred. A monitoring method.
高炉の炉壁に配置される複数のステーブクーラーについて複数のステーブ温度を、前記高炉の休風期間を含めて、一定の時間間隔毎に取得し、
前記複数のステーブ温度から、高炉の炉壁の所定の位置における温度の所定の時間間隔での変化量である複数の温度変化量を演算し、
前記複数の温度変化量の標準偏差であるステーブ温度変動指数を演算し、
前記ステーブ温度変動指数が所定の下限しきい値以下であるか否かを判定する、処理をコンピュータに実行させ、
前記下限しきい値の初期値は、前記休風期間における前記ステーブ温度変動指数から抽出されると共に、前記下限しきい値は、炉壁部不活性が発生していると判定されたときに変更される、ことを特徴とする監視プログラム。
A plurality of stave temperatures for a plurality of stave coolers arranged on the furnace wall of a blast furnace are obtained at regular time intervals, including a blast stop period of the blast furnace;
From the plurality of stave temperatures, a plurality of temperature change amounts, which are change amounts of temperature at a predetermined position of the furnace wall of the blast furnace at a predetermined time interval, are calculated;
Calculate a stave temperature fluctuation index, which is the standard deviation of the plurality of temperature changes;
A process is performed on a computer to determine whether the stave temperature fluctuation index is equal to or lower than a predetermined lower threshold value;
The initial value of the lower limit threshold is extracted from the stave temperature fluctuation index during the halt period , and the lower limit threshold is changed when it is determined that furnace wall inactivation has occurred. A monitoring program.
JP2021146882A 2021-09-09 2021-09-09 Monitoring device, monitoring method, and monitoring program Active JP7698200B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021146882A JP7698200B2 (en) 2021-09-09 2021-09-09 Monitoring device, monitoring method, and monitoring program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021146882A JP7698200B2 (en) 2021-09-09 2021-09-09 Monitoring device, monitoring method, and monitoring program

Publications (2)

Publication Number Publication Date
JP2023039651A JP2023039651A (en) 2023-03-22
JP7698200B2 true JP7698200B2 (en) 2025-06-25

Family

ID=85614020

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021146882A Active JP7698200B2 (en) 2021-09-09 2021-09-09 Monitoring device, monitoring method, and monitoring program

Country Status (1)

Country Link
JP (1) JP7698200B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006111904A (en) 2004-10-13 2006-04-27 Nippon Steel Corp Blast furnace operation method
WO2011062261A1 (en) 2009-11-19 2011-05-26 新日本製鐵株式会社 Stave, blast furnace, and blast furnace operation method
JP2020007611A (en) 2018-07-09 2020-01-16 日本製鉄株式会社 Blast furnace monitoring device, blast furnace monitoring method, and blast furnace monitoring program

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110091356A (en) * 2010-02-05 2011-08-11 (주)포스프로 Blast furnace detection device and stave monitoring system using the same

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006111904A (en) 2004-10-13 2006-04-27 Nippon Steel Corp Blast furnace operation method
WO2011062261A1 (en) 2009-11-19 2011-05-26 新日本製鐵株式会社 Stave, blast furnace, and blast furnace operation method
JP2020007611A (en) 2018-07-09 2020-01-16 日本製鉄株式会社 Blast furnace monitoring device, blast furnace monitoring method, and blast furnace monitoring program

Also Published As

Publication number Publication date
JP2023039651A (en) 2023-03-22

Similar Documents

Publication Publication Date Title
JP7073951B2 (en) Blast furnace monitoring device, blast furnace monitoring method, and blast furnace monitoring program
JPWO2017022312A1 (en) Information processing apparatus, information processing system, information processing method, and program
CN110699503B (en) Method and device for determining state adjustment strategy of blast furnace hearth and electronic equipment
JP7698200B2 (en) Monitoring device, monitoring method, and monitoring program
JP7343748B2 (en) Image judgment learning device, image judgment learning program, image judgment learning method, and blast furnace monitoring device
EP2144165A1 (en) Controlling a computer system having a processor including a plurality of cores
Agrawal et al. Advances in thermal level measurement techniques using mathematical models, statistical models and decision support systems in blast furnace
JP6540636B2 (en) Blast furnace operation method
CN106091510B (en) Control method, control device and the air conditioner of air conditioner
JP7307341B2 (en) Furnace gas pressure fluctuation detection method
EP3985132B1 (en) Blast furnace anomaly determining apparatus, blast furnace anomaly determining method, blast furnace operating method, and hot metal producing method
CN114730180B (en) Operating methods and operating systems of production equipment
CN116814874B (en) Control method, device, equipment and medium for blast furnace top pressure
CN118912902A (en) Method and device for detecting state of lining of multi-jet-hole rotary kiln, electronic equipment and storage medium
JP4336262B2 (en) In-furnace pressure fluctuation prediction method and apparatus
CN110459499A (en) A New Wafer Position Detection System
JP2025000528A (en) Blast furnace operation abnormality estimation method, blast furnace operation abnormality estimation device, blast furnace operation abnormality estimation program, and blast furnace operation abnormality estimation system
TWI797716B (en) Method and system for detecting abnormal temperature rise
JPH04173908A (en) Method for preventing blowby in blast furnace operation
TW202401345A (en) System and method for monitoring temperature of carbon brick of furnace
CN118965801A (en) A method, device, electronic device and storage medium for calculating parameters of multi-spray hole rotary kiln lining
JP7552643B2 (en) DATA PROCESSING APPARATUS, DATA PROCESSING METHOD, AND PROGRAM
JPH10310807A (en) Operation of blast furnace
JPH0711018B2 (en) Blow-through prevention method in blast furnace operation
TWM646516U (en) Condenser cleaning judgment device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240520

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250117

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250218

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250415

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250513

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250526

R150 Certificate of patent or registration of utility model

Ref document number: 7698200

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150