Plant function management support method and plant function management support device Download PDFInfo
- Publication number
- JP7699565B2 JP7699565B2 JP2022137308A JP2022137308A JP7699565B2 JP 7699565 B2 JP7699565 B2 JP 7699565B2 JP 2022137308 A JP2022137308 A JP 2022137308A JP 2022137308 A JP2022137308 A JP 2022137308A JP 7699565 B2 JP7699565 B2 JP 7699565B2
- Authority
- JP
- Japan
- Prior art keywords
- plant
- time
- action
- monitoring
- parameter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Monitoring And Testing Of Nuclear Reactors (AREA)
- Testing And Monitoring For Control Systems (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
本発明は、原子力プラントのプラント機能管理支援方法及びプラント機能管理支援装置に関する。 The present invention relates to a method and device for supporting plant function management of a nuclear power plant.
近年、原子力発電は、再生可能エネルギー導入拡大により生産性の競争力が求められている。加えて、電力供給ひっ迫により計画的かつ継続的に安定供給可能なベースロード電源としても期待される。このため、発電設備の計画外停止要因を排除するため、信頼性の高い設備の管理技術がますます必要となっている。 In recent years, the expansion of renewable energy has led to demands for nuclear power generation to be more competitive in terms of productivity. In addition, nuclear power generation is also expected to serve as a baseload power source that can provide a stable supply in a planned and continuous manner due to tight power supplies. For this reason, there is an increasing need for highly reliable equipment management technology to eliminate factors that lead to unplanned shutdowns of power generation facilities.
例えば、特許文献1には、発電プラントの運転パラメータを抽出する運転パラメータ抽出部と、運転パラメータ抽出部が抽出した発電プラントの運転パラメータの情報を送信する情報送信指令部と、を備えるようにして、原子力プラントを含む発電プラントの運転管理に関する情報を適切に共有することを可能にする発電プラントの運転管理支援装置が開示されている。
For example,
原子力発電所では、設計要件、設計構成情報、物理構成の3要素の整合性維持又は管理を行う、Configuration Management(CM)という取り組みが、事業者の管理において求められている。この3要素について、原子力発電所では運転開始以降、開始時の性能を維持するような保守的な保全を行うことで、この3要素の整合性が保たれてきた。
従来、原子力発電所における設備は、要求される設備の性能や劣化状態に対し、大きな裕度を持って保全が行われていたが、今後より経済性、安定性を高めた保全と施設管理が求められる。
At nuclear power plants, the operator is required to take on an initiative called Configuration Management (CM), which maintains or manages the consistency of the three elements of design requirements, design configuration information, and physical configuration. Since the start of operation, the consistency of these three elements has been maintained at nuclear power plants by performing conservative maintenance to maintain the performance at the time of start-up.
Conventionally, maintenance of equipment at nuclear power plants has been carried out with a large margin of error in terms of required equipment performance and deterioration state, but in the future, more economical and stable maintenance and facility management will be required.
より信頼性と経済性を高め設備を維持又は管理していくためには、設備又は機器に求められる性能を監視し、性能低下に対し、3要素を保ちつつ適切なタイミングで効果的な保全活動を行う必要がある。 In order to maintain and manage equipment with greater reliability and cost-effectiveness, it is necessary to monitor the performance required of the equipment or device and take effective maintenance measures at the appropriate time to prevent performance degradation while maintaining the three elements.
本発明の目的は、プラント機能に係るパラメータの監視を行い、パラメータ情報を基にプラント機能及び性能の適切な維持又は管理による3要素の整合性を維持するプラント機能管理支援方法及びプラント機能管理支援装置を提供することにある。 The object of the present invention is to provide a plant function management support method and a plant function management support device that monitors parameters related to plant functions and maintains the consistency of the three elements by appropriately maintaining or managing plant functions and performance based on the parameter information.
前記課題を解決するため、本発明のプラント機能管理支援方法は、プラント要求機能を監視する監視パラメータを抽出するとともに、プラントの機能及び性能における維持又は管理を判定する前記監視パラメータの設計要求閾値を抽出するステップと、前記監視パラメータの値を取得するステップと、取得した監視パラメータ値に基づいて監視パラメータの経年変化を予測し、監視パラメータの予測値が前記設計要求閾値に達する時刻を求め、前記時刻からアクションリードタイムを減じた時刻における監視パラメータの経年変化の予測値をアクション閾値とするステップと、取得した監視パラメータ値と前記アクション閾値とを対比するステップと、を含み、取得した監視パラメータ値が前記アクション閾値に達した際に、プラントの保全又は是正措置を実施するようにした。
In order to solve the above-mentioned problems, the plant function management support method of the present invention includes the steps of extracting monitoring parameters that monitor plant required functions and extracting design requirement thresholds of the monitoring parameters that determine maintenance or management of plant functions and performance, acquiring values of the monitoring parameters, predicting changes over time in the monitoring parameters based on the acquired monitoring parameter values, determining the time at which the predicted value of the monitoring parameters will reach the design requirement threshold, and setting the predicted value of the changes over time in the monitoring parameters at a time obtained by subtracting an action lead time from the aforementioned time as an action threshold, and comparing the acquired monitoring parameter values with the action threshold, so that when the acquired monitoring parameter value reaches the action threshold, plant maintenance or corrective measures are implemented .
また、本発明のプラント機能管理支援装置は、プラント要求機能を監視する監視パラメータを抽出するとともに、プラントの機能又は性能における維持又は管理を判定する前記監視パラメータの設計要求閾値を抽出するプラント機能管理部と、前記監視パラメータを取得するパラメータ監視部と、取得した前記監視パラメータと前記設計要求閾値とを対比するパラメータ判定部と、取得した監視パラメータ値に基づいて監視パラメータの経年変化を予測し、監視パラメータの予測値が前記設計要求閾値に達する時刻を求め、前記時刻からアクションリードタイムを減じた時刻における監視パラメータの経年変化の予測値をアクション閾値とするアクション閾値更新部を備え、前記パラメータ判定部は、取得した監視パラメータ値と前記アクション閾値とを対比し、取得した監視パラメータ値が前記アクション閾値に達した際に、プラントの保全又は是正措置を実施するようにした。
In addition, the plant function management support device of the present invention includes a plant function management unit that extracts monitoring parameters that monitor plant required functions and extracts design requirement thresholds of the monitoring parameters for determining maintenance or management of plant functions or performance, a parameter monitoring unit that acquires the monitoring parameters, a parameter judgment unit that compares the acquired monitoring parameters with the design requirement thresholds, and an action threshold update unit that predicts changes over time in the monitoring parameters based on the acquired monitoring parameter values, determines the time at which the predicted value of the monitoring parameter will reach the design requirement thresholds, and sets the predicted value of the changes over time in the monitoring parameters at a time obtained by subtracting an action lead time from the aforementioned time as an action threshold, and the parameter judgment unit compares the acquired monitoring parameter values with the action thresholds, and implements maintenance or corrective measures for the plant when the acquired monitoring parameter value reaches the action threshold .
本発明によれば、パラメータ情報を基にプラント機能及び性能の適切な維持又は管理による3要素の整合性維持するプラント機能管理方法及びプラント機能管理装置を提供することができる。
また、パラメータの監視を利用して設備又は機器の性能低下予測と保全又は是正措置を実施するためのリードタイム情報を組み合わせることで、ユーザへの保全アクション実施の適切なタイミングを提供できる。
さらに、予測データを監視パラメータ実測値により更新することでより精度を高め、継続的な3要素の維持又は管理の支援を行うことができる。
According to the present invention, it is possible to provide a plant function management method and a plant function management device for maintaining the consistency of three elements by appropriately maintaining or managing the plant functions and performance based on parameter information.
Additionally, parameter monitoring can be used to predict facility or equipment performance degradation in combination with lead time information for implementing maintenance or corrective measures, providing users with the appropriate timing for implementing maintenance actions.
Furthermore, by updating the prediction data based on the actual measured values of the monitoring parameters, it is possible to improve accuracy and assist in the continuous maintenance or management of the three elements.
以下、本発明の実施形態について、図面を参照しながら詳細に説明する。
まず、実施形態の原子力プラントのプラント機能管理支援方法及びプラント機能管理支援装置におけるCMの設計要件、設計構成情報、物理構成の3要素について、図1により説明する。
Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings.
First, three elements of design requirements, design configuration information, and physical configuration of a CM in a plant function management support method and a plant function management support apparatus for a nuclear plant according to an embodiment will be described with reference to FIG.
実施形態の原子力プラントのプラント機能管理支援方法及びプラント機能管理支援装置では、図1に示すように、プラントの設計、建設、製造における設計要求(設計要求閾値)と要求される機能情報(プラント要求機能)をCMの設計要件として、設計要求データベース(以下、設計要求DB50と記す)に記憶する。 In the embodiment of the plant function management support method and plant function management support device for a nuclear plant, as shown in FIG. 1, the design requirements (design requirement thresholds) and required function information (plant required functions) in the design, construction, and manufacture of the plant are stored as CM design requirements in a design requirement database (hereinafter referred to as design requirement DB50).
プラント機能管理支援方法及びプラント機能管理支援装置は、設計要求DB50に基づいて、要求データに対応する監視パラメータの情報が紐付けられ、また、定性的な機能情報から対応する監視パラメータ情報と閾値情報に定量化する。 The plant function management support method and plant function management support device link monitoring parameter information corresponding to the request data based on the design request DB50, and also quantify the corresponding monitoring parameter information and threshold information from the qualitative function information.
そして、設計要求閾値の根拠情報と、設計要求機能と監視パラメータの関係、対象コンポーネント情報とをCMの設計構成情報として、設計情報データベース(以下、設計情報DB60と記す)に記憶する。 Then, the basis information for the design requirement thresholds, the relationship between the design requirement functions and the monitoring parameters, and the target component information are stored in a design information database (hereinafter referred to as design information DB60) as CM design configuration information.
プラント機能管理支援方法及びプラント機能管理支援装置では、設計要求機能と監視パラメータの関連性、運転限界値となる閾値及びその根拠情報、また監視パラメータに対応するコンポーネント情報が、設計情報DB60から抽出される。また、設計要求機能定量化のための閾値情報が、設計情報DB60から抽出される。
In the plant function management support method and the plant function management support device, the relationship between the design requirement function and the monitoring parameters, the thresholds that are the operating limit values and their basis information, and the component information corresponding to the monitoring parameters are extracted from the
さらに、監視パラメータ(パラメータの記録と最新値)をCMの物理構成として、監視パラメータデータベース33(以下、監視パラメータDB33と記す)を記憶する。
詳しくは、監視パラメータDB33は、取得した監視パラメータのデータを記憶し、また、類似するパラメータの過去データや試験データを記憶する。
Furthermore, the monitoring parameters (parameter records and latest values) are stored in a monitoring parameter database 33 (hereinafter, referred to as monitoring parameter DB 33) as the physical configuration of the CM.
In detail, the
実施形態の原子力プラントのプラント機能管理支援方法及びプラント機能管理支援装置では、原子力プラントの保全において、設計要求DB50と設計情報DB60と監視パラメータDB33の3要素の整合性維持又は管理を行う。
In the embodiment of the plant function management support method and plant function management support device for a nuclear plant, the consistency of three elements, the
つまり、設計要求DB50はCMの設計要件に相当するものであり、設計情報DB60はCMの設計構成情報に相当するものであり、監視パラメータDB33はCMの物理構成に相当するものであり、設計要求DB50と設計情報DB60と監視パラメータDB33の3要素の整合性維持又は管理を行うようにしているので、実施形態の原子力プラントのプラント機能管理支援方法及びプラント機能管理支援装置は、CMという取り組みに沿うものになっている。 In other words, the design requirements DB50 corresponds to the design requirements of the CM, the design information DB60 corresponds to the design configuration information of the CM, and the monitoring parameter DB33 corresponds to the physical configuration of the CM. Since the consistency of the three elements of the design requirements DB50, the design information DB60, and the monitoring parameter DB33 is maintained or managed, the plant function management support method and the plant function management support device for the nuclear plant of the embodiment are in line with the CM initiative.
図2は、本実施形態のプラント機能管理支援装置の構成を示す図である。
本実施形態のプラント機能管理支援装置は、プラント要求機能に対する整合性情報の管理を行うプラント機能管理部10と、監視パラメータがパラメータに設定される各種閾値の範囲に収まっているかを判定するパラメータ判定部20と、パラメータ情報の取得と監視パラメータに関連する情報の記録を行うパラメータ監視部30と、当該装置の操作情報を入力する入力部70と、他の機器とデータ授受を行う通信部80と、ユーザへの警告とアクション情報を通知する出力部90と、を備える。
FIG. 2 is a diagram showing the configuration of the plant function management support device of this embodiment.
The plant function management support device of this embodiment includes a plant
詳しくは、プラント機能管理部10は、詳細を後述する、プラント要求機能抽出部11と、プラント要求機能関連情報抽出部12と、監視パラメータ抽出部13と、設計要求閾値抽出部14と、要求判定部15と、から構成する。
In more detail, the plant
また、パラメータ判定部20は、詳細を後述する、閾値判定部21と、パラメータ変化影響判定部22と、から構成する。
パラメータ監視部30は、詳細を後述する、監視情報入力部31と、入力情報記録部32と、監視パラメータDB33と、から構成する。
The
The
図2では、本実施形態のプラント機能管理支援装置が、通信部80を介して、他の管理装置と共有する設計要求DB50と設計情報DB60に接続する構成を示しているが、プラント機能管理支援装置が、設計要求DB50と設計情報DB60とを備えるように構成してもよい。
In FIG. 2, the plant function management support device of this embodiment is shown as being connected to a
具体的には、本実施形態のプラント機能管理支援装置は、CPU(Central Processing Unit)、ROM(Read Only Memory)、RAM(Random Access Memory)、HDD(hard disk drive)等の記憶装置、ディスプレイを備えるコンピュータ(情報処理装置)により構成する。 Specifically, the plant function management support device of this embodiment is configured with a computer (information processing device) equipped with a CPU (Central Processing Unit), a ROM (Read Only Memory), a RAM (Random Access Memory), a storage device such as a HDD (hard disk drive), and a display.
そして、図2に示すように、HDDにより上述した各種の情報を記憶する監視パラメータDB33を形成し、HDDに記憶されたプログラムをCPUが実行することにより、プラント機能管理部10とパラメータ判定部20とパラメータ監視部30として機能する。出力部90は、ディスプレイである。
As shown in FIG. 2, the HDD forms a
つぎに、図3のフロー図により、本実施形態のプラント機能管理支援装置による3要素の整合の確認動作を説明する。 Next, the operation of checking the consistency of the three elements by the plant function management support device of this embodiment will be explained using the flow diagram in Figure 3.
図3のフローにより、CMに要求される性能の達成のための設計要求閾値と監視パラメータの測定値(監視パラメータの値)を、プラント機能管理支援装置により整理(可視化)し、3要素の整合を確認する。 Using the flow in Figure 3, the design requirement thresholds for achieving the performance required of CM and the measured values of the monitoring parameters (monitoring parameter values) are organized (visualized) using the plant function management support device, and the consistency of the three elements is confirmed.
図3では、フロー中に関連付けした情報や値が関連情報とし、相互に参照が可能な状態として保存される。また、図3では、設計要求における運転限界値や経済的指標の要素機能の閾値により決められ、要素機能に関連付けられた監視パラメータと対比する閾値を「設計要求閾値」とする。 In Figure 3, information and values associated during the flow are stored as related information that can be referenced from one another. Also, in Figure 3, the thresholds that are determined by the thresholds of the element functions of the operating limit values and economic indicators in the design requirements and are compared with the monitoring parameters associated with the element functions are called "design requirement thresholds."
ステップS31で、プラント機能管理部10のプラント要求機能抽出部11が、設計要求DB50からプラント要求機能を抽出する。
In step S31, the plant required function extraction unit 11 of the plant
ステップS32で、プラント要求機能関連情報抽出部12が、ステップS31で抽出した要求機能の要素機能及び設計根拠情報を設計情報DB60から抽出し、要求機能の関連情報とし管理する。ここで、要素機能とは要求機能の達成のために必要な機器の性能、状態、劣化情報などである。設計の観点では機能設計から機器設計へ与える制約条件となる情報も含まれる。
In step S32, the plant required function related
ステップS33で、監視パラメータ抽出部13が、要素機能に関連する既存の監視パラメータ及び設計根拠情報を設計情報DB60から抽出し、要素機能の関連情報とし管理する。
In step S33, the monitoring
ステップS34で、設計要求閾値抽出部14が、プラント要求機能を達成するために必要な要素機能の必要最低限となる性能値を閾値として設計情報DB60から抽出し、監視パラメータに関連付ける。また、設計要求閾値抽出部14が、要素機能の閾値の根拠となる情報を関連情報として設計情報DB60から抽出する。
In step S34, the design requirement
上記のステップS31からステップS34により、図1の設計要求DB50と設計情報DB60における、プラント要求性能と監視パラメータの関係及び関連情報整理される。
By performing steps S31 to S34 above, the relationship between the plant required performance and the monitoring parameters and related information are organized in the
ステップS35で、パラメータ判定部20の閾値判定部21は、パラメータ監視部30で取得した監視パラメータの最新値が要素機能と関連づけられた監視パラメータの閾値を超えていないことを確認する。そして、要求判定部15が、プラント要求機能に関連付けられた要素機能の全てにおいて、閾値を超えていないことを確認する。
以上により、図1の設計要求DB50と設計情報DB60と監視パラメータDB33の整合性を確認できる。
In step S35, the threshold
In this manner, the consistency between the
つぎに、本実施形態のプラント機能管理支援装置が、プラント運転中の設備又は機器に求められる性能を監視し、CMの3要素(設計要求DB50と設計情報DB60と監視パラメータDB33)の整合性を維持するように、プラントの保全計画を策定する場合を説明する。
Next, we will explain how the plant function management support device of this embodiment monitors the performance required of equipment or devices during plant operation and formulates a plant maintenance plan to maintain consistency among the three elements of CM (
例えば、計画外のプラント停止さらには長期間停止を防止するため、監視パラメータの変化予測と保全アクションのリードタイム情報を活用し、3要素の整合を継続的に維持していくことを支援する。なお、アクションリードタイムとは、設備又は機器の機能回復のためのアクション実施に必要な検討、調達、作業等の時間を意味するものとする。 For example, to prevent unplanned plant shutdowns or even long-term shutdowns, predictions of changes in monitoring parameters and information on lead times for maintenance actions can be used to help continuously maintain consistency among the three elements. Note that action lead time refers to the time required for consideration, procurement, work, etc., required to implement an action to restore the functionality of facilities or equipment.
図4は、保全計画を策定する場合における本実施形態のプラント機能管理支援装置の構成を示す図である。 Figure 4 is a diagram showing the configuration of the plant function management support device of this embodiment when formulating a maintenance plan.
本実施形態のプラント機能管理支援装置は、図2で説明したプラント機能管理支援装置に、保全計画を策定するアクション閾値更新部40を付加して構成する。本実施形態のプラント機能管理支援装置の他の構成は、図2と同様のため、ここでは説明を省略する。
The plant function management support device of this embodiment is configured by adding an action
アクション閾値更新部40は、詳細を後述する、予測情報抽出部41と、予測実行部42と、保全又は是正措置の情報抽出部43と、アクションリードタイム見積部44と、アクション閾値決定部45と、から構成する。
The action
アクション閾値更新部40は、この構成により、監視パラメータの予測値からプラント要求機能の閾値に達する時刻を予測するとともに、保全アクションの抽出とそのリードタイムを抽出する。そして、上記の時刻情報(予測した時刻)とリードタイム情報(抽出したリードタイム)から、閾値判定部21における、監視パラメータの新たな閾値(アクション閾値)を設定する。言い換えれば、アクション閾値更新部40は、性能低下予測と保全又は是正措置の実施のためのリードタイム情報を組み合わせ、アクションの実施トリガーとなる閾値(アクション閾値)を設定する。
With this configuration, the action
本実施形態のプラント機能管理支援装置は、これを保全アクションの閾値とし、監視パラメータがこの閾値に達したことを検知した場合に、ユーザに警告とアクション情報を通知するか、又は調達等の保全工程を起動する。
これにより、プラント機能管理支援装置は、設備又は機器が要求機能を喪失する前に保全関連アクション(計画、調達、実作業等)を開始し、アクションを完了することを可能とする。
The plant function management support device of this embodiment uses this as a threshold for maintenance actions, and when it detects that a monitoring parameter has reached this threshold, it either notifies the user of a warning and action information, or initiates a maintenance process such as procurement.
This enables the plant function management support device to start maintenance-related actions (planning, procurement, actual work, etc.) and complete the actions before the facility or equipment loses the required function.
つぎに、図5により、アクション閾値更新部40における保全又は是正措置のアクション実施のための監視パラメータに対するアクション閾値の決定処理を説明する。
Next, referring to FIG. 5, the process of determining the action threshold for the monitoring parameters for implementing conservation or corrective actions in the action
ステップS51で、アクション閾値更新部40(図4参照)は、アクション閾値の設定を行う監視パラメータを選択する。 In step S51, the action threshold update unit 40 (see FIG. 4) selects the monitoring parameters for setting the action threshold.
ステップS52で、アクション閾値更新部40の予測情報抽出部41(図4参照)は、ステップS51で選択した監視パラメータに関する設計要求閾値を、設計要求DB50及び設計情報DB60から抽出する。さらに、監視パラメータDB33の過去データや試験データを含み、監視パラメータの経年変化の予測に必要なシミュレーション情報等の予測情報を取得する。取得した予測情報は、監視パラメータDB33に記憶する。
In step S52, the prediction information extraction unit 41 (see FIG. 4) of the action
ステップS53で、予測実行部42(図4参照)は、ステップS52で取得した予測情報に基づいて、シミュレーション等により監視パラメータの経年変化の予測を行う。この際の、予測方法についてはパラメータの種類やデータにより既知の技術から適当な手法を選択し行う。 In step S53, the prediction execution unit 42 (see FIG. 4) predicts the aging of the monitoring parameters by simulation or the like based on the prediction information acquired in step S52. In this case, the prediction method is selected from known techniques according to the type of parameters and data.
ステップS52とステップS53に並行して、ステップS54で、保全又は是正措置の情報抽出部43(図4参照)は、設計情報DB60からステップS51で選択した監視パラメータに関連するコンポーネント情報を抽出する。また、不図示の保全又は是正措置データベースから対象のコンポーネントの保全又は是正措置の情報を抽出する。
In parallel with steps S52 and S53, in step S54, the maintenance or corrective action information extraction unit 43 (see FIG. 4) extracts component information related to the monitoring parameter selected in step S51 from the
保全又は是正措置の情報とは、対象のコンポーネントの機能又は性能の低下や劣化に対する点検又は修理を行うために必要な情報である。例えば、作業情報、必要な資材、作業リソース情報、作業制約情報等である。 Maintenance or corrective action information is information necessary to inspect or repair the decline or deterioration of the functionality or performance of the target component. For example, it is work information, required materials, work resource information, work constraint information, etc.
ステップS55で、アクションリードタイム見積部44が、ステップS52で抽出した保全又は是正措置の情報に基づいて保全又は是正措置のアクションリードタイムを見積もる。例えば、資材調達、作業リソース確保、実作業時間、作業制約条件等の情報に基づいて、保全のアクションリードタイムを見積もる。また必要であれば、パラメータ変化原因の検討期間もアクションリードタイムに含めて見積もる。
In step S55, the action lead
ステップS56で、アクション閾値決定部45が、ステップS53の監視パラメータの経年変化の予測結果とステップS55のアクションリードタイムの見積もり結果からアクション閾値を決定する。
In step S56, the action
詳しくは、アクション閾値決定部45は、監視パラメータの経年変化の予測値が監視パラメータに設定される設計要求閾値に達する時刻を基準とし、アクションリードタイム分を減算した時刻に対応する監視パラメータの経年変化の予測値を、アクション閾値とする。この時、設計要求閾値は、監視パラメータの管理目的に応じて設定しなおすことが可能である。
In detail, the action
ステップS57で、アクション閾値決定部45が、ステップS56で決定したアクション閾値を監視パラメータDB33へ格納する。
In step S57, the action
ここで、ステップS56のアクション閾値の決定方法を、図6Aと図6Bにより詳細に説明する。
図6Aは、監視パラメータの測定値から求められる経年変化の予測曲線が、直線や単純な曲線の場合を示している。
Here, the method of determining the action threshold in step S56 will be described in more detail with reference to FIGS. 6A and 6B.
FIG. 6A shows a case where the predicted curve of the aging change obtained from the measured values of the monitored parameters is a straight line or a simple curve.
図6Aでは、ステップS56で説明したように、まず、監視パラメータの経年変化の予測曲線が監視パラメータの設計要求閾値に達する時刻を求め、この時刻からアクションリードタイム分を減じた時刻を、アクションを開始する時刻として求める。そして、監視パラメータの経年変化の予測曲線における、アクションを開始する時刻に対応する監視パラメータの予測値をアクション閾値とする。 In FIG. 6A, as explained in step S56, first, the time when the predicted curve of the aging change of the monitoring parameter reaches the design requirement threshold of the monitoring parameter is calculated, and the time when the action is to be started is calculated by subtracting the action lead time from this time. Then, the predicted value of the monitoring parameter corresponding to the time when the action is to be started on the predicted curve of the aging change of the monitoring parameter is set as the action threshold.
図6Aでは説明を単純化するため、監視パラメータの経年変化の予測曲線が単純減少する場合について説明したが、監視パラメータの特性に制限はなく、また、パラメータは様々な要因から変化しうるため、図6Bに示すように、監視パラメータの測定値は幅を持つことが考えられる。この場合には、監視パラメータの設計要求閾値は上限値と下限値を設定して管理し、アクション閾値もこれに応じて設定する。 In order to simplify the explanation in Figure 6A, a case has been described in which the predicted curve of the aging change of the monitored parameter simply decreases, but since there are no limitations on the characteristics of the monitored parameter and the parameters can change due to various factors, the measured value of the monitored parameter may have a range, as shown in Figure 6B. In this case, the design requirement threshold of the monitored parameter is managed by setting upper and lower limits, and the action threshold is also set accordingly.
図6Bは、監視パラメータの測定値の上限側のピーク値に基づいて、監視パラメータの経年変化の予測曲線を求め、アクション閾値を求める場合を示している。詳しくは、監視パラメータの経年変化の予測曲線が監視パラメータの上限の設計要求閾値に達する時刻を求め、この時刻からアクションリードタイム分を減じた時刻を、アクションを開始する時刻として求める。そして、監視パラメータの経年変化の予測曲線における、アクションを開始する時刻に対応する監視パラメータの予測値をアクション閾値とする。 Figure 6B shows a case where a predicted curve of the aging of a monitored parameter is calculated based on the upper peak value of the measured value of the monitored parameter, and an action threshold is calculated. In detail, the time at which the predicted curve of the aging of the monitored parameter reaches the upper design requirement threshold of the monitored parameter is calculated, and the time at which the action is to be started is calculated by subtracting the action lead time from this time. The predicted value of the monitored parameter corresponding to the time at which the action is to be started on the predicted curve of the aging of the monitored parameter is then set as the action threshold.
監視パラメータの測定値の上限側のピーク値に替えて、監視パラメータの測定値の下限側のピーク値に基づいて、監視パラメータの経年変化の予測曲線を求め、アクション閾値を求めてもよい。 Instead of the upper peak value of the measured value of the monitored parameter, a predicted curve of the change over time of the monitored parameter may be calculated based on the lower peak value of the measured value of the monitored parameter, and an action threshold may be calculated.
以下、より具体的なアクション閾値の設定例を説明する。
か 図7は、米国のEPRI(Electric Power Research Institute:電力研究所)が発行する「TR-107434 System Monitoring by System Engineers 37 System Monitoring Plans」に記載されている制御棒駆動機構(CRD)の炉心反応度と出力の制御機能における機能又は性能の監視項目を示している。以下、これを対象にアクション閾値の設定を行う例を説明する。
A more specific example of setting the action threshold will be described below.
Figure 7 shows the monitoring items for the function or performance of the control rod drive mechanism (CRD) core reactivity and power control function described in "TR-107434 System Monitoring by System Engineers 37 System Monitoring Plans" issued by the Electric Power Research Institute (EPRI) of the United States. Below, we will explain an example of setting action thresholds for this.
図7に示す制御棒駆動機構(CRD)の炉心反応度と出力の制御機能においては、監視パラメータとして、ポンプの流量、CRD軸受け温度、ポンプ回転部又はギアボックス又はモーターの振動数、CRDポンプの吐出圧力が選択されている。以下に、ポンプの流量におけるアクション閾値の設定方法を説明する。 In the control function of the control rod drive (CRD) core reactivity and power shown in Figure 7, the pump flow rate, CRD bearing temperature, pump rotor or gearbox or motor vibration frequency, and CRD pump discharge pressure are selected as monitoring parameters. The method for setting the action threshold for the pump flow rate is explained below.
図8に、ポンプが運転時の経年変化により性能が低下し、ポンプ流量が減少していく場合を示している。ポンプ流量の通常運転範囲は40-42GPMである。監視パラメータとするポンプ流量の変化量の予測曲線(経年変化の予測曲線)は、測定値からの予測、ポンプ試験の結果、過去データ等から得ることができる。 Figure 8 shows a case where the pump's performance deteriorates due to aging during operation, causing the pump flow rate to decrease. The normal operating range of the pump flow rate is 40-42 GPM. The predicted curve of the change in pump flow rate (predicted curve of aging change), which is a monitoring parameter, can be obtained from predictions based on measured values, pump test results, past data, etc.
図9は、ポンプの流量と吐出圧力の関係を示すポンプ性能曲線の一例を示す図である。ポンプの運転限界値と設計値と測定値とは、3要素の整合を満たす関係にあり、ポンプの吐出圧力を監視パラメータとして、経年変化の予測曲線を求めることができる。 Figure 9 shows an example of a pump performance curve showing the relationship between pump flow rate and discharge pressure. The pump's operating limit value, design value, and measured value have a relationship that satisfies the consistency of the three elements, and a predicted curve of aging can be obtained by using the pump's discharge pressure as a monitoring parameter.
つぎに、保全又は是正措置のアクションに対し開始から終了(機能回復)までにかかる時間をアクションリードタイムとして時間の見積りを行う。ポンプ流量の低下によるアクションとしては、ポンプの検査、接続の確認、バルブの劣化検証、修理が挙げられる。 Next, the time required from start to finish (function recovery) of the maintenance or corrective action is estimated as the action lead time. Actions due to reduced pump flow rate include inspecting the pump, checking connections, verifying valve deterioration, and making repairs.
ここでは、図10に示すように、ポンプの点検又は修理作業をアクションとして、アクションリードタイムを見積もる。詳しくは、アクションの各作業の検討や計画を行う時間、資材調達に掛かる時間、実作業時間、作業実施の制約条件(作業許可までに掛かる時間)等を抽出し、整理する。他作業と並行して実施することが可能な項目がある場合は最短時間合計とする。作業の実施に直接寄与する検討又は計画、資材又は役務の調達、実作業、制約条件に掛かる時間はアクションの実施に対し原則不変である。制約条件は作業の経済性向上など効果的なタイミングでアクションを行うことが求められる場合に設定される条件である。 Here, as shown in Figure 10, the action lead time is estimated for pump inspection or repair work. In more detail, the time required to consider and plan each task of the action, the time required to procure materials, the actual work time, and constraints on carrying out the work (the time required until work permission is granted), etc. are extracted and organized. If there are items that can be carried out in parallel with other work, the shortest total time is used. The time required for consideration or planning, procurement of materials or services, actual work, and constraints that directly contribute to carrying out the work are generally constant for the implementation of the action. Constraints are conditions that are set when it is required to carry out an action at an effective timing, such as to improve the economic efficiency of the work.
図8に戻り、監視パラメータ(ポンプ流量)の経年変化の予測曲線に基づいて、ポンプ流量が設計要求値を下回るタイミングを基準にアクションリードタイムを考慮しアクション閾値を設定する。そして、ポンプ流量の測定値が、アクション閾値に達した際に、保全又は是正措置のアクションを実施する。 Returning to Figure 8, based on the predicted curve of the aging of the monitored parameter (pump flow rate), an action threshold is set taking into account the action lead time and the timing at which the pump flow rate falls below the design requirement value. Then, when the measured pump flow rate reaches the action threshold, a maintenance or corrective action is implemented.
ここで、保全又は是正措置のアクションの実施制約条件として、プラントの計画停止期間に実作業を行うこと、すなわちプラントの運転スケジュールを考慮して、アクション閾値を設定する場合を、図11により説明する。 Here, we will use Figure 11 to explain a case where an action threshold is set taking into account the execution constraint of a maintenance or corrective action, that is, the operation schedule of the plant, in which actual work is performed during the plant's planned shutdown period.
図11は、同値の設計要求閾値が設定されている2つの管理対象の監視パラメータの時間変化を、ひとつのグラフに示した図である。2つの管理対象の経年変化の予測曲線が設計要求閾値に達する時間は、運転スケジュールにおいて、プラント運転中のタイミングとなる。対象の保全又は是正措置によるプラントの運転停止を抑止するように、保全又は是正措置のアクションの実施制約条件が設定されている場合には、2つの管理対象の経年変化の予測曲線が設計要求閾値に達する時間を含むプラントの運転期間の直前の停止期間で、対象の保全又は是正措置の作業を実施する。 Figure 11 shows, on a single graph, the time changes in the monitoring parameters of two managed objects that have the same design requirement threshold value. The time when the predicted curves of the aging changes of the two managed objects reach the design requirement threshold value is a timing during plant operation in the operation schedule. If a constraint condition for implementing the maintenance or corrective action is set to prevent the plant from being shut down due to the maintenance or corrective action of the target, the maintenance or corrective action work for the target is carried out during the shutdown period immediately preceding the plant operation period that includes the time when the predicted curves of the aging changes of the two managed objects reach the design requirement threshold value.
そして、プラントの停止期間の開始タイミングからアクションリードタイム分を減算した時刻を求め、この時刻に対応するそれぞれの監視パラメータの経年変化の予測値を、アクション閾値とする。図11では、保全又は是正措置の計画と部材調達に6ヶ月を要するものとして、アクションリードタイムを6ヶ月としている。
上記の処理は、アクション閾値更新部40で実施する。
Then, the time is calculated by subtracting the action lead time from the start timing of the plant shutdown period, and the predicted value of the aging change of each monitoring parameter corresponding to this time is set as the action threshold value. In Fig. 11, the action lead time is set to 6 months, assuming that it takes 6 months to plan the maintenance or corrective action and to procure parts.
The above process is performed by the action
また、図11では、対象の監視パラメータにおける経年変化の予測曲線の変化特性が異なるために、異なるアクション閾値を設定する。
以上により、アクションリードタイムとその他制約条件により監視している設備のアクション閾値を適切に設定することができる。
In addition, in FIG. 11, different action thresholds are set because the change characteristics of the predicted curves of the aging changes in the target monitoring parameters are different.
As a result, the action threshold of the equipment being monitored can be appropriately set based on the action lead time and other constraints.
アクション閾値は、上記のように、監視パラメータの設計要求閾値と監視間隔、保全アクションのリードタイミングによって決まるため、設計要求や運転要求、保全方法等の変更により、値を変更する必要がある。 As mentioned above, the action threshold is determined by the design requirement threshold and monitoring interval of the monitoring parameters, and the timing of the lead of the maintenance action, so the value must be changed depending on changes in the design requirements, operational requirements, maintenance methods, etc.
このため、本実施形態のプラント機能管理支援装置は、図12に示すフローを繰り返して、アクション閾値を利用したプラント機能要求の継続維持又は管理を行う。 For this reason, the plant function management support device of this embodiment repeats the flow shown in FIG. 12 to continuously maintain or manage the plant function requirements using the action threshold.
ステップS121で、プラント機能管理支援装置は、監視パラメータデータや新たな試験データ等を継続して取得してアクション閾値の継続更新を行う。 In step S121, the plant function management support device continuously acquires monitoring parameter data, new test data, etc., and continuously updates the action threshold.
ステップS122で、プラント機能管理支援装置は、パラメータ判定部20により、監視パラメータがアクション閾値に達しているか否かを判定し、達している場合には(S122のYes)、ステップS123に進む。達していない場合には(S122のNo)、処理を終了する。
In step S122, the plant function management support device uses the
ステップS123で、プラント機能管理支援装置は、ユーザへの警告と保全又は是正措置の実施に必要なリソース、作業内容、制約条件等のアクション情報を出力、又は、保全工程を開始する。 In step S123, the plant function management support device outputs a warning to the user and action information such as resources, work content, and constraints required to implement maintenance or corrective measures, or starts a maintenance process.
ステップS124で、プラント機能管理支援装置は、実施した保全又は是正措置のアクションの内容及び結果を保全又は是正措置データベースへ記録する。 In step S124, the plant function management support device records the content and results of the maintenance or corrective action taken in the maintenance or corrective action database.
ステップS125で、プラント機能管理支援装置は、監視パラメータに問題がないことを確認する。
本実施形態のプラント機能管理支援装置は、ステップS121からステップS125を繰り返して、アクション閾値を利用したプラント機能要求の継続維持又は管理を行う。
In step S125, the plant function management support device confirms that there are no problems with the monitoring parameters.
The plant function management support device of this embodiment repeats steps S121 to S125 to continuously maintain or manage the plant function requirements using the action threshold value.
上記では、プラント機能管理支援装置は、監視パラメータがアクション閾値に達した際に、保全又は是正措置の実施に係るアクションを行うことを説明したが、プラント性能の急激な変化や機器の故障や故障の予兆がある場合には、ある期間のパラメータ変化量が明らかに増加している(パラメータの変化傾きの急激な変化)等の監視パラメータの異常変化が起きることがある。 As explained above, the plant function management support device takes action to implement maintenance or corrective measures when a monitored parameter reaches an action threshold. However, if there is a sudden change in plant performance or equipment failure or signs of failure, there may be an abnormal change in the monitored parameter, such as a clear increase in the amount of parameter change over a certain period of time (a sudden change in the slope of the parameter change).
このため、本実施形態のプラント機能管理支援装置は、監視パラメータの通常と異なる変化を検知するパラメータ変化影響判定部22(図2参照)を設け、監視パラメータの通常と異なる変化を検知した際に、警報を出力する。 For this reason, the plant function management support device of this embodiment is provided with a parameter change impact determination unit 22 (see FIG. 2) that detects unusual changes in the monitoring parameters, and outputs an alarm when an unusual change in the monitoring parameters is detected.
詳しくは、パラメータ変化影響判定部22は、アクション閾値の更新により再設定されたアクション閾値が、経年変化の予測曲線において、更新する前のアクション閾値に対応する時刻より過去の時刻の値であると判定した際に、監視パラメータの通常と異なる変化を検知したと判定する。
In more detail, the parameter change
パラメータ変化影響判定部22は、また、監視パラメータの時間当たりの変化量(変化の傾き)が許容変化量を超えた際に、監視パラメータの通常と異なる変化を検知したと判定するとともに、判定の許容変化量を、検知を行う監視パラメータの監視目的や必要性に応じ、許容変化量を設定できるようにしてもよい。
The parameter change
本発明は上記した実施例に限定されるものではなく、様々な変形例が含まれる。上記の実施例は本発明で分かりやすく説明するために詳細に説明したものであり、必ずしも説明した全ての構成を備えるものに限定されるものではない。また、ある実施形態の構成の一部を他の実施形態の構成に置き換えることが可能であり、また、ある実施形態の構成に他の実施形態の構成を加えることも可能である。 The present invention is not limited to the above-mentioned examples, and includes various modified examples. The above-mentioned examples have been described in detail to provide an easy-to-understand explanation of the present invention, and are not necessarily limited to those having all of the configurations described. In addition, it is possible to replace part of the configuration of one embodiment with the configuration of another embodiment, and it is also possible to add the configuration of another embodiment to the configuration of one embodiment.
10 プラント機能管理部
20 パラメータ判定部
30 パラメータ監視部
33 監視パラメータDB
50 設計要求DB
60 設計情報DB
70 入力部
80 通信部
90 出力部
10 Plant
50 Design requirements DB
60 Design information DB
70
Claims (9)
前記監視パラメータの値を取得するステップと、
取得した監視パラメータ値に基づいて監視パラメータの経年変化を予測し、監視パラメータの予測値が前記設計要求閾値に達する時刻を求め、前記時刻からアクションリードタイムを減じた時刻における監視パラメータの経年変化の予測値をアクション閾値とするステップと、
取得した監視パラメータ値と前記アクション閾値とを対比するステップと、
を含み、取得した監視パラメータ値が前記アクション閾値に達した際に、プラントの保全又は是正措置を実施することを特徴とするプラント機能管理支援方法。 Extracting monitoring parameters for monitoring required plant functions and extracting design requirement thresholds for the monitoring parameters for determining maintenance or management of the plant functions and performance;
obtaining values of the monitored parameters;
a step of predicting an aging change of the monitoring parameter based on the acquired monitoring parameter value, determining a time when the predicted value of the monitoring parameter will reach the design requirement threshold, and setting the predicted value of the aging change of the monitoring parameter at a time obtained by subtracting an action lead time from the determined time as an action threshold;
comparing the obtained monitored parameter value with said action threshold;
and implementing a plant maintenance or corrective action when the acquired monitoring parameter value reaches the action threshold .
監視パラメータの時間当たりの変化量が許容変化量を超えた際に、監視パラメータの通常と異なる変化を検知したと判定する
ことを特徴とするプラント機能管理支援方法。 2. The plant function management support method according to claim 1,
A plant function management support method, comprising the steps of: determining that an abnormal change in a monitored parameter has been detected when a change in the monitored parameter per unit time exceeds an allowable change amount.
前記アクションリードタイムは、プラントの保全又は是正措置のための資材調達、作業リソース確保、実作業時間、又は作業制約条件の情報である
ことを特徴とするプラント機能管理支援方法。 2. The plant function management support method according to claim 1 ,
The plant function management support method, wherein the action lead time is information on material procurement, work resource acquisition, actual work time, or work constraint conditions for plant maintenance or corrective measures.
前記取得した監視パラメータ値が幅を持つ場合に、上限側又は下限側のピーク値に基づいて監視パラメータの経年変化を予測する
ことを特徴とするプラント機能管理支援方法。 2. The plant function management support method according to claim 1 ,
A plant function management support method, comprising: predicting, when the acquired monitoring parameter value has a range, a change over time in the monitoring parameter based on a peak value on the upper or lower limit side.
取得した監視パラメータ値に基づいて監視パラメータの経年変化を予測し、監視パラメータの予測値が前記設計要求閾値に達する時刻を求め、前記時刻がプラントの運転期間であった際に、当該運転期間の直前の停止期間の開始時刻からアクションリードタイムを減じた時刻における監視パラメータの経年変化の予測値をアクション閾値とするステップ
を含み、前記停止期間に、プラントの保全又は是正措置を実施する
ことを特徴とするプラント機能管理支援方法。 2. The plant function management support method according to claim 1 ,
1. A plant function management support method comprising the steps of: predicting a change over time of a monitoring parameter based on an acquired monitoring parameter value; determining a time at which the predicted value of the monitoring parameter will reach said design requirement threshold; and, when said time is during a plant operation period, setting as an action threshold the predicted value of the change over time of the monitoring parameter at a time obtained by subtracting an action lead time from the start time of a shutdown period immediately preceding said operation period; and implementing maintenance or corrective measures for the plant during said shutdown period.
アクション閾値の更新により再設定されたアクション閾値が、更新する前のアクション閾値に対応する時刻より過去の時刻の値であると判定した際に、監視パラメータの通常と異なる変化を検知したと判定する
ことを特徴とするプラント機能管理支援方法。 2. The plant function management support method according to claim 1 ,
A plant function management support method, comprising the steps of: determining that an abnormal change in a monitoring parameter has been detected when it is determined that an action threshold that has been reset by updating the action threshold is a value corresponding to a time earlier than a time corresponding to the action threshold before the update.
前記監視パラメータを取得するパラメータ監視部と、
取得した前記監視パラメータと前記設計要求閾値とを対比するパラメータ判定部と、
取得した監視パラメータ値に基づいて監視パラメータの経年変化を予測し、監視パラメータの予測値が前記設計要求閾値に達する時刻を求め、前記時刻からアクションリードタイムを減じた時刻における監視パラメータの経年変化の予測値をアクション閾値とするアクション閾値更新部を備え、
前記パラメータ判定部は、取得した監視パラメータ値と前記アクション閾値とを対比し、取得した監視パラメータ値が前記アクション閾値に達した際に、プラントの保全又は是正措置を実施する、
ことを特徴とするプラント機能管理支援装置。 A plant function management unit extracts monitoring parameters for monitoring required plant functions and extracts design required thresholds for the monitoring parameters for determining whether the plant functions and performances are maintained or managed;
A parameter monitoring unit that acquires the monitoring parameters;
a parameter determination unit that compares the acquired monitoring parameters with the design requirement thresholds;
an action threshold update unit that predicts an aging change of a monitoring parameter based on the acquired monitoring parameter value, determines a time when the predicted value of the monitoring parameter will reach the design requirement threshold, and sets the predicted value of the aging change of the monitoring parameter at a time obtained by subtracting an action lead time from the determined time as an action threshold;
the parameter determination unit compares the acquired monitoring parameter value with the action threshold, and when the acquired monitoring parameter value reaches the action threshold, implements a plant maintenance or corrective action.
A plant function management support device comprising:
前記アクション閾値更新部は、
取得した監視パラメータ値に基づいて監視パラメータの経年変化を予測し、監視パラメータの予測値が前記設計要求閾値に達する時刻を求め、前記時刻がプラントの運転期間であった際に、当該運転期間の直前の停止期間の開始時刻からアクションリードタイムを減じた時刻における監視パラメータの経年変化の予測値をアクション閾値とし、
前記停止期間に、プラントの保全又は是正措置を実施する
ことを特徴とするプラント機能管理支援装置。 8. The plant function management support device according to claim 7 ,
The action threshold update unit,
predicting the aging change of the monitoring parameter based on the acquired monitoring parameter value, determining the time when the predicted value of the monitoring parameter will reach the design requirement threshold, and when the time is during the plant operation period, setting the predicted value of the aging change of the monitoring parameter at a time obtained by subtracting an action lead time from the start time of a shutdown period immediately preceding the operation period as the action threshold;
A plant function management support device characterized in that during the shutdown period, maintenance or corrective measures are implemented for the plant.
監視パラメータの時間当たりの変化量が許容変化量を超えた際に、監視パラメータの通常と異なる変化を検知したと判定するか、又は、アクション閾値の更新により再設定されたアクション閾値が、更新する前のアクション閾値に対応する時刻より過去の時刻の値であると判定した際に、監視パラメータの通常と異なる変化を検知したと判定するパラメータ変化影響判定部を備える
ことを特徴とするプラント機能管理支援装置。
8. The plant function management support device according to claim 7 ,
A plant function management support device comprising: a parameter change influence determination unit that determines that an unusual change in a monitored parameter has been detected when an amount of change per unit time in the monitored parameter exceeds an allowable amount of change, or that an unusual change in a monitored parameter has been detected when it is determined that an action threshold that has been reset by updating the action threshold is a value at a time earlier than a time corresponding to the action threshold before the update.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2022137308A JP7699565B2 (en) | 2022-08-30 | 2022-08-30 | Plant function management support method and plant function management support device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2022137308A JP7699565B2 (en) | 2022-08-30 | 2022-08-30 | Plant function management support method and plant function management support device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2024033623A JP2024033623A (en) | 2024-03-13 |
| JP7699565B2 true JP7699565B2 (en) | 2025-06-27 |
Family
ID=90194231
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2022137308A Active JP7699565B2 (en) | 2022-08-30 | 2022-08-30 | Plant function management support method and plant function management support device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7699565B2 (en) |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2003114294A (en) | 2001-10-04 | 2003-04-18 | Toshiba Corp | Power plant monitoring, diagnosis, inspection, and maintenance systems |
| JP2012128674A (en) | 2010-12-15 | 2012-07-05 | Toshiba Corp | Operational management supporting apparatus of power generating plant |
| JP2015084176A (en) | 2013-10-25 | 2015-04-30 | 日立建機株式会社 | Fault diagnostic apparatus and active machine |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3333823B2 (en) * | 1996-04-05 | 2002-10-15 | 株式会社日立製作所 | Cable deterioration management method and system |
-
2022
- 2022-08-30 JP JP2022137308A patent/JP7699565B2/en active Active
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2003114294A (en) | 2001-10-04 | 2003-04-18 | Toshiba Corp | Power plant monitoring, diagnosis, inspection, and maintenance systems |
| JP2012128674A (en) | 2010-12-15 | 2012-07-05 | Toshiba Corp | Operational management supporting apparatus of power generating plant |
| JP2015084176A (en) | 2013-10-25 | 2015-04-30 | 日立建機株式会社 | Fault diagnostic apparatus and active machine |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2024033623A (en) | 2024-03-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107862463B (en) | Method and control system for scheduling load of power plant | |
| JP6159059B2 (en) | Plant operation optimization system and method | |
| US9551633B2 (en) | Systems and methods for improved reliability operations | |
| JP7179444B2 (en) | Sign detection system and sign detection method | |
| US20130041783A1 (en) | System and method for dynamic spare part management | |
| KR102799093B1 (en) | System and method for optimization of recommended service intervals | |
| JP2006503368A (en) | Process for determining the probability of competing causal events and / or system availability when multiple events occur simultaneously | |
| Dewangan et al. | Reliability investigation of steam turbine used in thermal power plant | |
| Adumene et al. | A Markovian reliability approach for offshore wind energy system analysis in harsh environments | |
| CN117616655A (en) | Electric power demand forecasting method and system | |
| US8811563B2 (en) | Method and system for assessing failures of fuel rods | |
| CN114492005A (en) | Task success prediction method for ship task system | |
| US20150323422A1 (en) | System and method for evaluating opportunities to extend operating durations | |
| JP7699565B2 (en) | Plant function management support method and plant function management support device | |
| JP4034195B2 (en) | Plant operating method and operating apparatus thereof | |
| Zhang et al. | Condition based maintenance and operation of wind turbines | |
| JP6710039B2 (en) | Planning device, planning method and program | |
| EP3945385A1 (en) | Continuous flow engine monitoring method and system | |
| Liu et al. | Optimal condition–based maintenance strategy model for multi-component batch production system under dynamic demand | |
| Bukhsh et al. | Risk and reliability assessment of future power systems | |
| Qi et al. | Optimal Opportunistic Maintenance Strategy for a Serial System Considering Quality Characteristic and Maintenance Effect | |
| Mandelli et al. | A performance-based reliability approach | |
| Ilişescu et al. | Availability and Reliability Evaluation of Romanian hydro generating units using Markov analysis | |
| CN119053766A (en) | Continuous flow engine maintenance planning and prediction system | |
| Cai et al. | CBM with Heterogeneous Failure Dependence |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20240815 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20250318 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20250325 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20250508 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20250603 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20250617 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7699565 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |