JP7702218B2 - Method for constructing structure and structure - Google Patents
Method for constructing structure and structure Download PDFInfo
- Publication number
- JP7702218B2 JP7702218B2 JP2022003752A JP2022003752A JP7702218B2 JP 7702218 B2 JP7702218 B2 JP 7702218B2 JP 2022003752 A JP2022003752 A JP 2022003752A JP 2022003752 A JP2022003752 A JP 2022003752A JP 7702218 B2 JP7702218 B2 JP 7702218B2
- Authority
- JP
- Japan
- Prior art keywords
- reinforcement
- shear
- retaining wall
- ground
- constructed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
本発明は、作業構台に用いる先行床を境とする地上躯体と地下躯体とから構成された構造物及びその構築方法に関する。 The present invention relates to a structure composed of an above-ground structure and an underground structure separated by a leading floor used for a work platform, and a method for constructing the same.
地下躯体と地上躯体とから構成された構造物の従来の構築方法としては、地下と地上の躯体工事を並行して進める逆打ち工法のほかに、地盤を掘削して構築された掘削溝の底面に基礎を構築し、この基礎に立設させた支柱により1階床を支持しながら、地上面と略同一高さに1階床を構築した後に、1階床を作業床として地下躯体及び地上躯体の構築作業を同時進行させる二段打ち工法が存在している(特許文献1)。 Conventional methods for constructing structures consisting of an underground framework and an aboveground framework include the inverted construction method, in which underground and aboveground framework construction is carried out in parallel, as well as the two-stage construction method, in which a foundation is constructed at the bottom of an excavation trench constructed by excavating the ground, and the first floor is supported by pillars erected on this foundation and constructed at approximately the same height as the ground surface. After that, the first floor is used as a work floor and construction work on the underground framework and aboveground framework is carried out simultaneously (Patent Document 1).
逆打ち工法では、完成した地下躯体では不必要となる構真柱を埋設しながら掘削し、地下躯体を上の階から構築するために精度管理が難しく、施工費用が高くなってしまうという問題がある。また、上記二段打ち工法では、基礎を構築して鉄骨柱を建てた後1階床が早期に構築されることから、地下躯体を構築する前に、1階床によって掘削溝(地下空間)全体が塞がれてしまう。そのため、地上面に設置されたクレーン等の揚重機を用いて、掘削溝内に地下躯体の部材を搬入することが困難になり、施工効率が低くなってしまう場合があるという問題点を有していた。 In the upside-down construction method, excavation is performed while burying structural columns that will not be necessary for the completed underground structure, and the underground structure is constructed from the upper floors onwards, which makes it difficult to control the accuracy and increases construction costs. In addition, in the two-stage construction method, the first floor is constructed early after the foundations are built and the steel columns are erected, so the entire excavation trench (underground space) is blocked by the first floor before the underground structure is constructed. This makes it difficult to transport the underground structure components into the excavation trench using a lifting machine such as a crane installed on the ground surface, which can result in low construction efficiency.
そこで、出願人は、以下の各工程を含む構造物構築方法を開発した(特許文献2)。
(1)地盤を掘削し、地下躯体を構築するための掘削溝を構築する掘削溝構築工程。
(2)掘削溝内の一部に、地盤に隣接するようにして分割地下躯体を構築し、当該分割地下躯体上に揚重機を設置する分割地下躯体構築工程。
(3)揚重機を用いて、分割地下躯体に隣接するようにして他の分割地下躯体を増築する分割地下躯体増築工程。
(4)必要回数分の分割地下躯体増築工程を繰り返すことにより、掘削溝内に複数の分割地下躯体から構成される地下躯体を構築するとともに、当該分割地下躯体上で地上躯体を構築する構造物構築工程。
Therefore, the applicant developed a structure construction method including the following steps (Patent Document 2).
(1) An excavation trench construction process for excavating the ground and constructing an excavation trench for constructing an underground structure.
(2) A divided underground structure construction process, in which a divided underground structure is constructed in a part of the excavation trench adjacent to the ground and a lifting machine is installed on the divided underground structure.
(3) A process of expanding a divided underground structure by using a lifting machine to expand another divided underground structure adjacent to the divided underground structure.
(4) A structure construction process in which an underground structure consisting of multiple divided underground structures is constructed within the excavation trench by repeating the divided underground structure expansion process the required number of times, and an aboveground structure is constructed on the divided underground structures.
しかし、従来の構造物構築方法においても、種々の要因により、地下躯体の工事に長期間を要してしまう場合がある。その場合において、地上躯体の工事は上棟まで進む場合もあるが、地下躯体が完成するまでに地震が発生することが懸念され、そのための安全対策が求められていた。 However, even with conventional methods for constructing structures, construction of the underground structure can take a long time due to various factors. In such cases, construction of the above-ground structure may proceed up to the construction of the roof, but there is concern that an earthquake may occur before the underground structure is completed, and safety measures are required to prevent this.
本発明は、上記問題点を解決するためになされたものであり、長期間にわたる施工期間中の地震時の安全性を確保することが可能となる構造物の構築方法及び構造物を提供することを課題とする。 The present invention was made to solve the above problems, and aims to provide a method for constructing a structure and a structure that can ensure safety in the event of an earthquake during the long construction period.
上記課題に鑑み、本発明は、先行床を境とする、地上躯体と地下躯体とから構成される構造物の構築方法において、芯材を有する山留壁を設けて、地盤を床付け面の深さまで掘削する地盤掘削工程と、上記床付け面に基礎躯体を構築する基礎躯体構築工程と、上記基礎躯体の上に、柱と梁で構成される鉄骨架構を建方する地下鉄骨建方工程と、上記鉄骨架構の頂部において、周囲に外周梁を備える上記先行床を構築するとともに、上記山留壁と上記外周梁を、せん断伝達部材を介して接合する先行床構築工程と、を含み、上記先行床を作業架台として上記地上躯体の構築を行うことにより、上記地上躯体と上記地下躯体の構築作業を並行して行うことを特徴とする構造物の構築方法である(以下、上記構造物の構築方法を「本構築方法」という場合がある。)。 In view of the above problems, the present invention provides a method for constructing a structure composed of an above-ground structure and an underground structure bounded by a preceding floor, the method comprising: a ground excavation step of providing a retaining wall having a core material and excavating the ground to the depth of the flooring surface; a foundation structure construction step of constructing a foundation structure on the flooring surface; a subway frame construction step of erecting a steel frame structure composed of columns and beams on the foundation structure; and a preceding floor construction step of constructing the preceding floor with an outer perimeter beam on the top of the steel frame structure and connecting the retaining wall and the outer perimeter beam via a shear transfer member, the preceding floor being constructed as a work platform for constructing the above-ground structure, thereby performing construction work for the above-ground structure and the underground structure in parallel (hereinafter, the above-mentioned method for constructing a structure may be referred to as "this construction method").
また、本構築方法において、上記外周梁には、主筋と、せん断補強筋(スターラップ)と、上記せん断伝達部材の周囲を補強するための外周補強筋と、が配筋されていることが好適である。 In addition, in this construction method, it is preferable that the outer perimeter beam is provided with main reinforcement bars, shear reinforcement bars (stirrups), and outer perimeter reinforcement bars for reinforcing the periphery of the shear transmission member.
また、本構築方法において、上記外周補強筋は、上記山留壁に対して平行に配筋されている軸筋(軸鉄筋)と、上記せん断伝達部材及び上記せん断補強筋の少なくとも一部を囲繞するコ字形状に形成されている囲繞補強筋とを備え、上記囲繞補強筋は、上記せん断伝達部材を囲繞するとともに、上記せん断補強筋の上記山留壁側の垂直部及び上記垂直部に接続する上下端部を抱持して囲繞する態様で、上記せん断補強筋と上記せん断伝達部材を繋ぐように配筋されていることが好適である。 In addition, in this construction method, the outer peripheral reinforcement comprises axial reinforcement (axial steel bar) arranged parallel to the retaining wall, and surrounding reinforcement formed in a U-shape surrounding the shear transmission member and at least a portion of the shear reinforcement , and it is preferable that the surrounding reinforcement is arranged to connect the shear reinforcement and the shear transmission member in a manner that surrounds the shear transmission member and embraces and surrounds the vertical portion of the shear reinforcement on the retaining wall side and the upper and lower ends connected to the vertical portion .
ここで、先行床は、地上躯体と地下躯体の境界部となる床躯体であり、当該床躯体を利用して、地上躯体を構築するための作業構台に用いることになる。但し、先行床は、厳密に、対象地盤の地表面と一致して形成されている必要はない。
また、せん断伝達部材は、外周梁と山留壁との間でせん断力を伝達するために設ける部材であり、その種類を問うものでない。例えば、せん断伝達部材には、スタッド等の鋼棒を使用することができ、その効果を高めるためには芯材と接合されていることが好ましい。
Here, the preliminary floor is a floor structure that is the boundary between the above-ground structure and the underground structure, and is used as a work platform for constructing the above-ground structure. However, the preliminary floor does not need to be formed strictly in line with the ground surface of the target ground.
The shear transfer member is a member provided to transfer the shear force between the perimeter beam and the earth retaining wall, and the type of the member does not matter. For example, a steel rod such as a stud can be used as the shear transfer member, and it is preferable that it is joined to the core material to enhance its effect.
また、囲繞補強筋は、せん断伝達部材と、せん断補強筋の少なくとも一部の周囲に配筋されており、当該せん断伝達部材とせん断補強筋とを包囲(抱持)して補強する(繋ぐ)役割(一部を囲む態様を含む)を果たす鉄筋であり、コ字状、U字状、C字状、フープ状等、適宜の形態とすることが好適である。
なお、外周梁に使用される、主筋、せん断補強筋と、外周補強筋(軸筋及び囲繞補強筋)は、施工状況において、適切な規格及び本数を用いることができる。
In addition, the surrounding reinforcement is a steel bar that is arranged around the shear transmission member and at least a portion of the shear reinforcement, and serves to surround (embrace) the shear transmission member and the shear reinforcement to reinforce (connect) them (including a form in which it partially surrounds them), and it is preferable for it to be in an appropriate shape such as a C-shape, U-shape, C-shape, hoop shape, etc.
In addition, the main reinforcement, shear reinforcement, and peripheral reinforcement (axial reinforcement and surrounding reinforcement) used in the peripheral beams can be of appropriate standards and numbers depending on the construction situation.
また、芯材を含む山留壁の構造についても制限はなく、例えば、ソイルセメント柱列壁工法、地中連続壁工法等により構築することができる。使用される芯材についても、H形鋼、I形鋼等、各種の鋼材等を使用することができる。
また、本構築方法及び本構造物に関し、対象とする構造物についての制限はない(本段落に記載されている内容は、下記本発明の構造物においても同様である)。
There is also no limitation on the structure of the earth retaining wall including the core material, and it can be constructed by, for example, a soil cement column wall method, a diaphragm wall method, etc. As for the core material to be used, various steel materials such as H-shaped steel, I-shaped steel, etc. can be used.
Furthermore, there are no limitations on the target structure with respect to this construction method and this structure (the content described in this paragraph also applies to the structure of the present invention described below).
本構築方法によれば、先行床構築工程を備え、芯材を有する山留壁と先行床とを外周梁を介して接合しており、当該外周梁と山留壁の接合部には、せん断伝達部材が設けられている。そのため、先行床と山留壁を強固に一体化することが可能となるため、施工中における地震時の安全性を充分に確保することができる。 This construction method includes a preliminary floor construction process, in which a retaining wall having a core material is joined to the preliminary floor via a perimeter beam, and a shear transfer member is provided at the joint between the perimeter beam and the retaining wall. This makes it possible to firmly integrate the preliminary floor and the retaining wall, ensuring sufficient safety during earthquakes during construction.
また、本発明は、基礎躯体の上部であり、芯材を備える山留壁の内側に構築されている地下躯体と、先行床を介して、上記地下躯体の上部に構築されている地上躯体と、から構成され、上記地上躯体と地下躯体の構築が並行して行われる構造物において、上記先行床と上記山留壁の接合部には、主筋と、せん断補強筋と、せん断伝達部材の周囲を補強するための外周補強筋とが配筋されている外周梁が介設されており、上記山留壁と上記外周梁との接合部には、上記芯材に設けられた上記せん断伝達部材と上記外周補強筋が設けられているものであり、上記外周補強筋は、上記山留壁に対して平行に配筋される軸筋と、上記せん断伝達部材及び上記せん断補強筋の少なくとも一部を囲繞するコ字形状に形成されている囲繞補強筋と、を備え、上記囲繞補強筋は、上記せん断伝達部材を囲繞するとともに、上記せん断補強筋の上記山留壁側の垂直部及び上記垂直部に接続する上下端部を抱持して囲繞する態様で、上記せん断補強筋と上記せん断伝達部材を繋ぐように配筋されていることを特徴とする構造物(以下、「本構造物」という場合がある。)である。
The present invention also relates to a structure that is composed of an underground structure that is an upper part of a foundation structure and is constructed inside an earth retaining wall having a core material, and an aboveground structure that is constructed on the upper part of the underground structure via a preceding floor, and in which the aboveground structure and the underground structure are constructed in parallel, a perimeter beam having main reinforcement, shear reinforcement, and peripheral reinforcement for reinforcing the periphery of a shear transfer member is interposed at a joint between the preceding floor and the earth retaining wall, and the shear transfer member and the peripheral reinforcement provided in the core material are provided at a joint between the earth retaining wall and the peripheral beam. The structure (hereinafter sometimes referred to as "this structure") is characterized in that the outer peripheral reinforcement comprises axial reinforcement arranged parallel to the retaining wall, and surrounding reinforcement formed in a U-shape surrounding the shear transmission member and at least a portion of the shear reinforcement, and the surrounding reinforcement is arranged to connect the shear reinforcement and the shear transmission member in a manner that surrounds the shear transmission member and embraces and surrounds the vertical portion of the shear reinforcement on the retaining wall side and the upper and lower ends connected to the vertical portion.
なお、本構造物は、地上躯体と地下躯体の構築が並行して行われることにより構築された構造物又は構築中の構造物であり、本構築方法によって施工することが好適であるが、その施工方法を問うものではない。 This structure is a structure that has been constructed or is currently being constructed by constructing aboveground and underground structures in parallel, and is preferably constructed using this construction method, but the construction method is not critical.
また、本構造物は「地上躯体と地下躯体の構築が並行して行われる」ことを構成要素としているが、地上躯体と地下躯体の構築期間が完全に一致している必要はなく、先行床を地上躯体の構築に利用することにより、一定期間の間、地上躯体と地下躯体の施工期間が重複しているものであればよい。 In addition, while this structure is constructed in such a way that the above-ground structure and the underground structure are constructed in parallel, the construction periods for the above-ground structure and the underground structure do not need to be exactly the same. It is sufficient that the construction periods for the above-ground structure and the underground structure overlap for a certain period of time by using the preceding floor for the construction of the above-ground structure.
本構造物によれば、芯材を備える山留壁と先行床とが外周梁を介して接合されており、当該山留壁と外周梁との接合部に、芯材に設けられたせん断伝達部材と外周補強筋が設けられているため、先行床と山留壁を強固に一体化することが可能となり、施工中における地震時の安全性を充分に確保することができる。 In this structure, the retaining wall with a core material and the leading floor are joined via the perimeter beam, and the joint between the retaining wall and the perimeter beam is provided with a shear transfer member and perimeter reinforcement bar attached to the core material, so that the leading floor and the retaining wall can be firmly integrated, and safety in the event of an earthquake during construction can be fully ensured.
本発明によれば、長期間にわたる施工期間中の地震時の安全性を確保することが可能となる構造物の構築方法及び構造物を提供することができる。 The present invention provides a method for constructing a structure and a structure that can ensure safety during earthquakes over a long construction period.
以下、図面を参照しつつ、本構築方法及び本構築物方法で構築された本構造物Kの実施形態の一例について、詳細に説明する。なお、図面に基づく説明では、同一要素には同一符号を付し、重複する説明を省略する。 Below, an example of an embodiment of the present structure K constructed by the present construction method and the present construction method will be described in detail with reference to the drawings. Note that in the description based on the drawings, the same elements are given the same reference numerals, and duplicate explanations will be omitted.
[本構築方法]
本構築方法は、先行床10を境界部とする、地上躯体Uと地下躯体Lとから構成される本構造物Kの構築方法である。
本構築方法は、(1)地盤掘削工程と、(2)基礎躯体構築工程と、(3)地下鉄骨建方工程と、(4)先行床構築工程と、を含み、先行床10を作業構台として使用して、地上躯体Uと地下躯体Lの構築作業を並行して行うものである。以下、各工程を詳細に説明する。
[This construction method]
This construction method is a method for constructing a main structure K which is composed of an above-ground structure U and an underground structure L, with a preceding floor 10 as its boundary.
This construction method includes (1) a ground excavation process, (2) a foundation framework construction process, (3) a subway frame erection process, and (4) a preliminary floor construction process, and uses the preliminary floor 10 as a work platform to carry out construction work for the above-ground framework U and the underground framework L in parallel. Each process will be described in detail below.
(1)地盤掘削工程
地盤掘削工程は、芯材21を有する山留壁20を構築して、地盤Gを所定深度である床付け面G1の深さまで掘削し、地下躯体Uを構築するための地下空間部Sを形成する作業を行う工程である(図1)。
山留壁20は、例えば、土とセメント系懸濁液を原位置で混合攪拌することにより地中壁を形成するソイルミキシングウォール工法(SMW工法)等を用いて、掘削する地下空間部Sの周囲を取り囲むように構築されている。また、山留壁20には、芯材21として、鉛直方向に所定間隔で所定本数のH鋼材(芯材)が配設されている。
(1) Ground excavation process The ground excavation process is a process in which a retaining wall 20 having a core material 21 is constructed, the ground G is excavated to a predetermined depth, that is, the depth of the flooring surface G1, and an underground space section S for constructing an underground structure U is formed (Figure 1).
The retaining wall 20 is constructed to surround the periphery of the underground space S to be excavated, for example, by using a soil mixing wall method (SMW method) in which soil and a cement-based suspension are mixed and stirred in situ to form a diaphragm wall. The retaining wall 20 also has a predetermined number of H-shaped steel members (core members) arranged at predetermined intervals in the vertical direction as core members 21.
このとき、掘削の深度に対応させて、順次、対向する山留壁20の間に切梁(ともに図示せず)を設置し、山留壁20を補強しながら掘削作業を行う。 At this time, struts (not shown) are installed between opposing retaining walls 20 in sequence according to the depth of the excavation, reinforcing the retaining walls 20 while the excavation work is carried out.
(2)基礎躯体構築工程
基礎躯体構築工程は、床付け面G1に、基礎躯体である耐圧盤コンクリート30を構築する作業を行う工程である(図2)。本実施形態では、杭基礎としており、基礎杭31を打設して杭頭処理を行い、平坦化して床付け面G1を形成する。そして、床付け面G1の上面に所定厚さとなるように配筋を行い、耐圧盤コンクリート30を打設する。
なお、地盤状態により他の基礎形式を選択することも可能であり、また、適宜地盤改良が行われているものであってもよい。
(2) Foundation framework construction process The foundation framework construction process is a process of constructing the foundation framework, which is a pressure-resistant concrete plate 30, on the flooring surface G1 (FIG. 2). In this embodiment, a pile foundation is used, and foundation piles 31 are driven in, the pile heads are treated, and the flooring surface G1 is formed by flattening. Then, reinforcement is applied to the upper surface of the flooring surface G1 to a predetermined thickness, and the pressure-resistant concrete plate 30 is poured.
It is also possible to select other foundation types depending on the ground conditions, and the ground may be improved as appropriate.
(3)地下鉄骨建方工程
地下鉄骨建方工程は、耐圧盤コンクリート30の上に、鉄骨架構40を建方する作業を行う工程である(図3)。本作業は、下方の所定箇所の切梁(図示せず)を解体して、作業空間を確保しながら、先行床10の高さとなるように、複数本の鉄骨柱41と複数本の鉄骨梁42で構成される鉄骨架構40を組み上げることにより行う。
(3) Subway Frame Construction Process The subway frame construction process is a process of erecting a steel frame 40 on top of the pressure plate concrete 30 (FIG. 3). This work is carried out by dismantling the struts (not shown) at predetermined locations below to secure a work space and assembling the steel frame 40, which is composed of multiple steel columns 41 and multiple steel beams 42, to the height of the advance floor 10.
(4)先行床構築工程
先行床構築工程は、鉄骨架構40の頂部において、上面が地盤Gの上面と、略同一面となるように、周囲に外周梁50を備える先行床10を構築するとともに、山留壁20と外周梁50を、スタッド25(せん断伝達部材)を介して接合する作業を行う工程である(図4)。
(4) Pre-floor Construction Process The pre-floor construction process is a process in which a pre-floor 10 having a peripheral beam 50 is constructed around the top of the steel frame 40 so that the top surface is approximately flush with the top surface of the ground G, and the retaining wall 20 and the peripheral beam 50 are joined via studs 25 (shear transfer members) (Figure 4).
なお、先行床構築工程を実施する前までに、予め、山留壁20の芯材21であるH形鋼のフランジの所定位置において、所定本数のスタッド25を、外周梁50側に突出するように設けておくことが(図5(b))、効率的に施工を行う上で好適である。 In addition, in order to carry out construction efficiently, it is preferable to set up a predetermined number of studs 25 at predetermined positions on the flange of the H-shaped steel, which is the core material 21 of the retaining wall 20, so that they protrude toward the outer perimeter beam 50 (Figure 5 (b)) before carrying out the preliminary floor construction process.
先行床10は、鉄骨架構40の頂部において、下記外周梁50を含め、主筋12及びスターラップ13等の所定の配筋を行い、コンクリート11を打設することにより施工される。 The advance floor 10 is constructed by placing the main reinforcement bars 12, stirrups 13, etc., including the outer perimeter beams 50 described below, at the top of the steel frame 40, and pouring concrete 11.
先行床10の周囲である周縁部の全体には、外周梁50が一体的に設けられており、当該外周梁50の部分において、山留壁20と接合されている。
鉄骨柱41の外周梁50の上部位置に相当する箇所には、山留壁20と平行方向に、H形鋼である鉄骨梁42’が接合されている。そして、鉄骨梁42’の上下のフランジ部の各左右縁端部の近傍には、水平方向において複数本の主鉄筋61が配筋されるとともに、所定間隔で当該上下の各主鉄筋61を高さ方向において囲繞するスターラップ62(せん断補強筋)が配筋されている。また、鉄骨梁42’の下方側において、水平方向における所定の高さ方向には複数本の水平筋14が配筋されるとともに、鉛直方向の所定位置には複数本の鉛直筋15が配筋されている。
An outer perimeter beam 50 is integrally formed around the entire peripheral edge of the leading floor 10, and is joined to the retaining wall 20 at the portion of the outer perimeter beam 50.
A steel beam 42', which is an H-shaped steel, is joined to the steel column 41 at a location corresponding to the upper position of the outer peripheral beam 50 in a direction parallel to the retaining wall 20. A plurality of main reinforcing bars 61 are arranged in the horizontal direction near the left and right edge ends of the upper and lower flanges of the steel beam 42', and stirrups 62 (shear reinforcement bars) are arranged at predetermined intervals to surround the upper and lower main reinforcing bars 61 in the height direction. Further, on the lower side of the steel beam 42', a plurality of horizontal reinforcements 14 are arranged in a predetermined height direction in the horizontal direction, and a plurality of vertical reinforcements 15 are arranged at predetermined positions in the vertical direction.
外周梁50と山留壁20の接合部60には、外周補強筋65が配筋されている。
外周補強筋65は、山留壁20に対して平行かつ水平方向に配筋されている複数本の軸鉄筋66と、コ字形状に形成されている囲繞補強筋67とを備えている(図5(a))。
Periphery reinforcement bars 65 are arranged at the joint 60 between the outer periphery beam 50 and the retaining wall 20.
The outer periphery reinforcement 65 includes a plurality of axial reinforcements 66 arranged parallel and horizontally to the retaining wall 20, and a surrounding reinforcement 67 formed in a U-shape (Figure 5 (a)).
軸鉄筋66は、異なる高さ方向及び先行床10の方向における所定位置に複数本が配筋されており、特に、スタッド25と近接する外周梁50の端部側は、密となるように配筋されている。
囲繞補強筋67は、コ字形状の開口部が接合される山留壁20と反対側となるように、かつ、先端部が外周梁50の略中央部に位置するように配筋されている。また、囲繞補強筋67は、各スタッド25を囲繞するとともに、スターラップ62の山留壁20側の垂直部及び当該垂直部に接続する上下端部を抱持して囲繞する態様で、スターラップ62とスタッド25を繋ぐように配筋されている。
Multiple axial reinforcements 66 are arranged at predetermined positions in different height directions and in the direction of the preceding floor 10, and in particular, the end side of the outer perimeter beam 50 close to the stud 25 is arranged so as to be densely packed.
The surrounding reinforcement bars 67 are arranged so that the U-shaped opening is on the opposite side to the earth retaining wall 20 to which it is joined, and so that their tips are located approximately in the center of the outer perimeter beam 50. The surrounding reinforcement bars 67 surround each stud 25, and are arranged to connect the stirrups 62 and the studs 25 in such a manner that they embrace and surround the vertical part of the stirrup 62 on the earth retaining wall 20 side and the upper and lower ends connected to the vertical part.
そして、各鉄筋及び鉄骨梁42’の周囲に、コンクリート11が打設されることにより、外周梁50が形成されている。 Then, concrete 11 is poured around each reinforcing bar and steel beam 42' to form the outer perimeter beam 50.
本工程の終了後は、先行床10を作業構台として、上方に向かって地上躯体Uを構築するとともに、先行床10の下方において、地下躯体Lの構築を継続して、構造物Kの完成がなされることになる(図6)。 After this process is completed, the above-ground structure U is constructed upward using the leading floor 10 as a work platform, while construction of the underground structure L continues below the leading floor 10, completing the structure K (Figure 6).
本構築方法によれば、先行床構築工程を備えており、同工程において、芯材21を有する山留壁20と先行床10とを外周梁50を介して接合している。山留壁20と外周梁50との接合部60には、芯材21に取り付けられている複数本のスタッド25を設けて強固に接合した上で、先行床10を作業架台として、地上躯体Uと地下躯体Lの構築作業を並行して行うことができる。このように、先行床10と山留壁20とを強固に一体化することが可能となるため、施工中における地上躯体U及び地下躯体Lの地震時の安全性を、充分に確保することができる。 This construction method includes a preliminary floor construction process, in which the earth retaining wall 20 having the core material 21 is joined to the preliminary floor 10 via the outer perimeter beam 50. A plurality of studs 25 attached to the core material 21 are provided at the joint 60 between the earth retaining wall 20 and the outer perimeter beam 50 to firmly join them, and the construction work of the above-ground structure U and the underground structure L can be carried out in parallel using the preliminary floor 10 as a work platform. In this way, the preliminary floor 10 and the earth retaining wall 20 can be firmly integrated, so that the safety of the above-ground structure U and the underground structure L during construction in the event of an earthquake can be fully ensured.
[本構築物]
本構造物Kは、作業構台に用いる先行床10を境界部とする、地上躯体Uと地下躯体Lから構成されており、当該地上躯体Uと地下躯体Lの構築が並行して行われることにより構築された構造物である(図6)。
[This construct]
This structure K is composed of an above-ground structure U and an underground structure L, with the boundary being a pilot floor 10 used for a work platform, and is a structure constructed by constructing the above-ground structure U and the underground structure L in parallel (Figure 6).
本構造物Kは、床付け面G1に構築された耐圧盤コンクリート30の上部に構築されている地下躯体Lと、当該地下躯体Lの上部に構築されている先行床10と、当該先行床10の上部に構築されている地上躯体Uと、から構成されている。
地下躯体Lは、山留壁20の内側に形成されている地下空間部Sに構築されており、当該山留壁20は、所定間隔に打設されている複数本の芯材21が設けられている。
This structure K is composed of an underground structure L constructed on top of a pressure-resistant concrete plate 30 constructed on the flooring surface G1, a preliminary floor 10 constructed on top of the underground structure L, and an above-ground structure U constructed on top of the preliminary floor 10.
The underground structure L is constructed in an underground space S formed inside a retaining wall 20, and the retaining wall 20 is provided with a plurality of core materials 21 cast at predetermined intervals.
先行床10の周縁部の全体(周囲)には、外周梁50が設けられており、当該外周梁50と山留壁20が接合されている。すなわち、先行床10と山留壁20との間には、外周梁50が介設されている。そして、山留壁20と外周梁50との接合部60には、芯材21であるH形鋼のフランジの所定位置に取り付けられているスタッド25と、外周補強筋65が設けられている(詳細は、上記本構築方法における説明と同様である)。 A perimeter beam 50 is provided around the entire periphery (surrounding) of the leading floor 10, and the perimeter beam 50 is joined to the retaining wall 20. In other words, the perimeter beam 50 is interposed between the leading floor 10 and the retaining wall 20. The joint 60 between the retaining wall 20 and the perimeter beam 50 is provided with studs 25 attached to predetermined positions of the flange of the H-shaped steel, which is the core material 21, and with peripheral reinforcement bars 65 (details are the same as those explained in the construction method above).
本構築物Kによれば、芯材21を備える山留壁20と先行床10とが外周梁50を介して接合されており、当該山留壁20と外周梁50との接合部60には、芯材21に取り付けられた複数本のスタッド25と外周補強筋65が設けられている。そのため、先行床10と山留壁20を強固に一体化することが可能となり、施工中における上部躯体U及び下部躯体Lの地震時の安全性を充分に確保することができる。 According to this structure K, the retaining wall 20 with the core material 21 and the leading floor 10 are joined via the outer perimeter beam 50, and the joint 60 between the retaining wall 20 and the outer perimeter beam 50 is provided with a number of studs 25 attached to the core material 21 and outer perimeter reinforcement bars 65. This makes it possible to firmly integrate the leading floor 10 and the retaining wall 20, and sufficiently ensures the safety of the upper structure U and the lower structure L during construction in the event of an earthquake.
以上、本発明について、好適な実施形態についての一例を説明したが、本発明は当該実施形態に限られず、本発明の趣旨を逸脱しない範囲で各要素に関して、適宜、必要となる他の工程を付加するものであってもよい。 Although an example of a preferred embodiment of the present invention has been described above, the present invention is not limited to this embodiment, and other necessary steps may be added to each element as appropriate within the scope of the present invention.
上記のとおり、木構築方法及び本構造物に関する各種構成要素の態様に制限はなく、最適な構成要素を採用することができる。特に、木地上躯体と地下躯体、先行床、基礎躯体、鉄骨架構及び外周梁の形態等は、実施態様に応じて適切に定めることが可能である。
また、本構築方法及び本構造物に関しては、必要最小限の構成要素を例示したものであり、本発明の作用効果を阻害しない限り、他の工程及び他の構成要素を付加するものであってもよい。
As described above, there are no limitations on the form of the wooden construction method and the various components of the structure, and the most suitable components can be used. In particular, the form of the wooden structure above ground and below ground, the preliminary floor, the foundation structure, the steel frame, and the perimeter beams can be appropriately determined according to the embodiment.
Furthermore, with regard to this construction method and this structure, the minimum necessary components are exemplified, and other steps and other components may be added as long as they do not impair the effects of the present invention.
K 構築物
U 地上躯体
L 地下躯体
G 地盤
G1 床付け面
10 先行床
20 山留壁
21 芯材
25 スタッド(せん断伝達部材)
30 耐圧盤コンクリート(基礎躯体)
31 基礎杭
40 鉄骨架構
41 鉄骨柱
42,42’ 鉄骨梁
50 外周梁
60 接合部
61 主鉄筋
62 スターラップ(せん断補強筋)
65 外周補強筋
66 軸鉄筋
67 囲繞補強筋
K Structure U Above-ground structure L Underground structure G Ground G1 Floor surface 10 Pre-floor 20 Earth retaining wall 21 Core material 25 Stud (shear transfer member)
30 Pressure-resistant concrete (foundation structure)
31 Foundation pile 40 Steel frame 41 Steel column 42, 42' Steel beam 50 Periphery beam 60 Joint 61 Main reinforcing bar 62 Stirrup (shear reinforcement bar)
65 Periphery reinforcement 66 Axial reinforcement 67 Surrounding reinforcement
Claims (2)
芯材を有する山留壁を設けて、地盤を床付け面の深さまで掘削する地盤掘削工程と、
前記床付け面に基礎躯体を構築する基礎躯体構築工程と、
前記基礎躯体の上に、柱と梁で構成される鉄骨架構を建方する地下鉄骨建方工程と、
前記鉄骨架構の頂部において、周囲に外周梁を備える前記先行床を構築するとともに、
前記山留壁と前記外周梁を、せん断伝達部材を介して接合する先行床構築工程と、を含み、
前記先行床を作業架台として前記地上躯体の構築を行うことにより、前記地上躯体と前記地下躯体の構築作業を並行して行うものであり、
前記外周梁には、主筋と、せん断補強筋と、前記せん断伝達部材の周囲を補強するための外周補強筋とが配筋されており、
前記外周補強筋は、
前記山留壁に対して平行に配筋される軸筋と、
前記せん断伝達部材及び前記せん断補強筋の少なくとも一部を囲繞するコ字形状に形成されている囲繞補強筋と、を備え、
前記囲繞補強筋は、前記せん断伝達部材を囲繞するとともに、前記せん断補強筋の前記山留壁側の垂直部及び前記垂直部に接続する上下端部を抱持して囲繞する態様で、前記せん断補強筋と前記せん断伝達部材を繋ぐように配筋されている、ことを特徴とする構造物の構築方法。 A method for constructing a structure consisting of an above-ground structure and an underground structure with a preceding floor as a boundary, comprising:
a ground excavation step of providing an earth retaining wall having a core material and excavating the ground to a depth of a bedding surface;
A foundation framework construction process for constructing a foundation framework on the floor mounting surface;
A subway frame erection process of erecting a steel frame structure composed of columns and beams on the foundation structure;
At the top of the steel frame structure, the preceding floor having an outer periphery beam is constructed around the periphery,
A preliminary floor construction process for joining the retaining wall and the outer perimeter beam via a shear transfer member,
The above-ground structure is constructed using the preceding floor as a work platform, so that the above-ground structure and the underground structure can be constructed in parallel.
The outer periphery beam is provided with main reinforcement, shear reinforcement, and outer periphery reinforcement for reinforcing the periphery of the shear transmission member,
The peripheral reinforcement is
Axial reinforcement arranged parallel to the retaining wall;
The shear transmission member and the surrounding reinforcement are formed in a U-shape to surround at least a part of the shear reinforcement,
A method for constructing a structure, characterized in that the surrounding reinforcement is arranged to connect the shear reinforcement and the shear transfer member in a manner that surrounds the shear transfer member and embraces and surrounds the vertical portion of the shear reinforcement on the retaining wall side and the upper and lower ends connected to the vertical portion .
先行床を介して、前記地下躯体の上部に構築されている地上躯体と、から構成され、前記地上躯体と地下躯体の構築が並行して行われる構造物において、
前記先行床と前記山留壁の接合部には、主筋と、せん断補強筋と、せん断伝達部材の周囲を補強するための外周補強筋とが配筋されている外周梁が介設されており、
前記山留壁と前記外周梁との接合部には、前記芯材に設けられた前記せん断伝達部材と前記外周補強筋が設けられているものであり、
前記外周補強筋は、
前記山留壁に対して平行に配筋される軸筋と、
前記せん断伝達部材及び前記せん断補強筋の少なくとも一部を囲繞するコ字形状に形成されている囲繞補強筋と、を備え、
前記囲繞補強筋は、前記せん断伝達部材を囲繞するとともに、前記せん断補強筋の前記山留壁側の垂直部及び前記垂直部に接続する上下端部を抱持して囲繞する態様で、前記せん断補強筋と前記せん断伝達部材を繋ぐように配筋されている、ことを特徴とする構造物。 An underground structure constructed inside the retaining wall having a core material;
A structure constructed of a ground structure constructed on the upper part of the underground structure via a preceding floor, and the construction of the ground structure and the underground structure are carried out in parallel,
At the joint between the preceding floor and the retaining wall , a peripheral beam is interposed in which main reinforcement, shear reinforcement, and peripheral reinforcement for reinforcing the periphery of the shear transfer member are arranged,
The joint between the retaining wall and the outer perimeter beam is provided with the shear transfer member and the outer perimeter reinforcement provided in the core material ,
The peripheral reinforcement is
Axial reinforcement arranged parallel to the retaining wall;
The shear transmission member and the surrounding reinforcement are formed in a U-shape to surround at least a part of the shear reinforcement,
A structure characterized in that the surrounding reinforcement is arranged to connect the shear reinforcement and the shear transfer member in a manner that surrounds the shear transfer member and embraces and surrounds the vertical portion of the shear reinforcement on the retaining wall side and the upper and lower ends connected to the vertical portion .
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2022003752A JP7702218B2 (en) | 2022-01-13 | 2022-01-13 | Method for constructing structure and structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2022003752A JP7702218B2 (en) | 2022-01-13 | 2022-01-13 | Method for constructing structure and structure |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2023102967A JP2023102967A (en) | 2023-07-26 |
| JP7702218B2 true JP7702218B2 (en) | 2025-07-03 |
Family
ID=87377601
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2022003752A Active JP7702218B2 (en) | 2022-01-13 | 2022-01-13 | Method for constructing structure and structure |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7702218B2 (en) |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3053938B2 (en) | 1991-11-18 | 2000-06-19 | 株式会社竹中工務店 | Double striking method |
| JP2018100508A (en) | 2016-12-20 | 2018-06-28 | 大成建設株式会社 | Building construction method |
-
2022
- 2022-01-13 JP JP2022003752A patent/JP7702218B2/en active Active
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3053938B2 (en) | 1991-11-18 | 2000-06-19 | 株式会社竹中工務店 | Double striking method |
| JP2018100508A (en) | 2016-12-20 | 2018-06-28 | 大成建設株式会社 | Building construction method |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2023102967A (en) | 2023-07-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP6855296B2 (en) | Building foundation structure and its construction method | |
| KR20200032316A (en) | Method for Forming Top-down-typed Underground Strucutre using Trus-typed Support | |
| JP4060323B2 (en) | Bracket support type downward frame driving system and downward frame driving method using the same | |
| JP5579635B2 (en) | Underground structure and construction method of underground structure | |
| KR100640244B1 (en) | Construction Method of Slab-Outer Wall Simultaneous Placement Using Basement File Without Edge Beam | |
| JPH11172710A (en) | Construction method of underground part of steel reinforced concrete building | |
| JP5764245B2 (en) | Construction method of underground structure and underground structure | |
| JP2001349065A (en) | Underground base isolating construction method for existing building | |
| JP4550534B2 (en) | Building basic structure | |
| JP7386095B2 (en) | Underground structure construction method | |
| JP7702218B2 (en) | Method for constructing structure and structure | |
| JP5875651B2 (en) | Underground structure and construction method of underground structure | |
| JP7811105B2 (en) | How to build the foundation structure | |
| JPS5829922A (en) | Constructing method for underground outer wall | |
| JP2003003690A (en) | Seismic isolation method for seismically isolated buildings and existing buildings | |
| JP3109038B2 (en) | Underground skeleton structure and construction method | |
| JPH07119465B2 (en) | Underground excavation construction method | |
| JP7554720B2 (en) | How to rebuild a building | |
| JP7727500B2 (en) | basic structure | |
| JP2894217B2 (en) | Building structural frame | |
| JP7283659B2 (en) | Mountain retaining structure | |
| JP2763488B2 (en) | Prefabricated pillar and inverted ramen prefabricated construction method | |
| JP7510328B2 (en) | Construction Method | |
| KR100694762B1 (en) | Simultaneous construction of slab-outer wall of basement level without edge beam | |
| JPH08291526A (en) | How to build an underground structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20240820 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20250219 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20250225 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20250313 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20250620 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20250620 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7702218 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |