JP7705227B2 - Ground reinforcement method - Google Patents
[go: Go Back, main page]

JP7705227B2 - Ground reinforcement method - Google Patents

Ground reinforcement method Download PDF

Info

Publication number
JP7705227B2
JP7705227B2 JP2021186711A JP2021186711A JP7705227B2 JP 7705227 B2 JP7705227 B2 JP 7705227B2 JP 2021186711 A JP2021186711 A JP 2021186711A JP 2021186711 A JP2021186711 A JP 2021186711A JP 7705227 B2 JP7705227 B2 JP 7705227B2
Authority
JP
Japan
Prior art keywords
pipe
terminal
ground
reinforcing
packer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021186711A
Other languages
Japanese (ja)
Other versions
JP2023073930A (en
Inventor
和則 森田
航 小野
正 岡部
真至 間野
厚 井本
Original Assignee
株式会社ケー・エフ・シー
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社ケー・エフ・シー filed Critical 株式会社ケー・エフ・シー
Priority to JP2021186711A priority Critical patent/JP7705227B2/en
Publication of JP2023073930A publication Critical patent/JP2023073930A/en
Application granted granted Critical
Publication of JP7705227B2 publication Critical patent/JP7705227B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

本発明は、トンネル掘削時に切羽の前方地山に長尺補強管を打設し、長尺補強管から周辺地山に固結材を注入して前方地山を補強する地山補強工法に関する。 The present invention relates to a ground reinforcement method in which long reinforcing pipes are cast into the ground in front of the tunnel face during excavation, and cement is injected from the long reinforcing pipes into the surrounding ground to reinforce the ground in front.

従来、地山補強を行う際に、地山補強管である鋼管を複数直列に連結、接続して地山に打設していく手法が知られている。例えばトンネル掘削工事の切羽前方補強において、図7に示すように、地山201の前方上方又は外周に向けて鋼管220を複数本直列に接続して長尺鋼管202を打ち込み、打ち込んだ長尺鋼管202から固結材を注入して固結領域203を形成し、地山201の地盤改良を行う長尺先受け工204や、鋼管220を複数本直列に接続して長尺鋼管205を切羽から地山201の前方に打ち込み、打ち込んだ長尺鋼管205から固結材を注入して地山の地盤改良を行う長尺鏡補強工206が行われている。 Conventionally, when reinforcing the ground, a method is known in which multiple steel pipes, which are ground reinforcing pipes, are connected in series and cast into the ground. For example, in the reinforcement in front of the face of a tunnel excavation work, as shown in FIG. 7, multiple steel pipes 220 are connected in series and long steel pipes 202 are cast toward the front upper side or outer periphery of the ground 201, and a consolidation material is injected from the driven long steel pipes 202 to form a consolidation area 203, thereby improving the ground of the ground 201. A long-length pre-support work 204 is performed by connecting multiple steel pipes 220 in series and casting long steel pipes 205 from the face forward of the ground 201, and a long-length mirror reinforcement work 206 is performed by injecting a consolidation material from the driven long steel pipes 205 to improve the ground of the ground.

長尺先受け工204や長尺鏡補強工206を施工する場合、例えばトンネル空間Tにおいて、ドリルジャンボ207の削孔用アーム208のガイドセル209上に内部に削孔ロッド211が内挿された鋼管220を搭載し、ガイドセル209上で削孔ロッド211が連結された削孔機械210を前進させることにより、削孔しながら鋼管220を引き込むようにして地山201に打設する。そして、第1の鋼管220(220a)及び第1の削孔ロッドを根元近傍まで地山201に打設したところで、これに後続する第2の鋼管220(220b)及び第2の削孔ロッドを連結する作業を行い、多くのケースでは3m程度の鋼管220を4本程度接続して長尺鋼管202、205を打設する(図7、図8参照)。長尺鋼管202、205の打設後には、削孔ロッド211を抜き出して回収し、長尺鋼管202、205に注入管を入れて長尺鋼管202、205の内外にシリカレジン、ウレタン、セメント系等の固結材を注入して地盤補強が行われる。 When constructing the long-length pre-supporting work 204 and the long-length mirror reinforcement work 206, for example, in the tunnel space T, a steel pipe 220 with a drilling rod 211 inserted inside is mounted on the guide cell 209 of the drilling arm 208 of the drill jumbo 207, and the drilling machine 210 to which the drilling rod 211 is connected is advanced on the guide cell 209 to drive the steel pipe 220 into the natural ground 201 while drilling holes. Then, when the first steel pipe 220 (220a) and the first drilling rod are driven into the natural ground 201 up to the base, the subsequent second steel pipe 220 (220b) and the second drilling rod are connected, and in many cases, about four steel pipes 220 of about 3 m are connected to drive the long steel pipes 202, 205 (see Figures 7 and 8). After the long steel pipes 202, 205 are cast, the drilling rod 211 is removed and retrieved, and an injection pipe is inserted into the long steel pipes 202, 205 to inject a consolidating material such as silica resin, urethane, or cement into the inside and outside of the long steel pipes 202, 205 to reinforce the ground.

こうした地山補強の施工では、切羽近傍の高所において作業員が人力で鋼管の連結作業を行わなければならないため、作業労力を低減すべく、特許文献1~3のように押し込むだけで連結できる鋼管を用いて、ガイドセル上で後続の鋼管を機械力で押し込むだけで連結する手法も検討されている。 In this type of ground reinforcement work, workers must manually connect the steel pipes at high altitudes near the face, so in order to reduce the labor required, methods are being considered that use steel pipes that can be connected simply by pushing them in, as in Patent Documents 1 to 3, and connect the following steel pipes simply by mechanically pushing them in on the guide cell.

特開2004-190758号公報JP 2004-190758 A 特許第6112918号公報Patent No. 6112918 特許第6486657号公報Patent No. 6486657

ところで、地山に長尺鋼管を打設する際に、先頭の鋼管の先端に設けられる削孔ビットは、鋼管を引き込んで打設する必要上、鋼管よりも僅かに大径になっているため、鋼管外周と削孔壁との間には隙間ができる。そして、削孔の口元の隙間をそのままにしておくと、口元の隙間から固結材の注入作業時に固結材が削孔の手前側のトンネル空間にリークしてしまうため、口元にコーキングを施す必要がある。 When driving long steel pipes into the ground, the drilling bit attached to the tip of the first steel pipe has a slightly larger diameter than the steel pipe because it needs to draw in the steel pipe to drive it in, so a gap is created between the outer circumference of the steel pipe and the wall of the drilled hole. If the gap at the mouth of the drilled hole is left as it is, the binder will leak from the gap into the tunnel space in front of the hole when it is injected, so it is necessary to apply caulking to the mouth.

このような口元コーキングの処理は、削孔毎に作業員が高所に上がって手作業でウェスやコーキングカプセル(カプセル型接着剤)を孔口に押し込んで行われているのが実情であり、危険性があり且つ時間がかかる作業となる。そのため、安全性が高く、施工効率の高い口元コーキング処理を行える地山補強工法が望まれている。 In reality, this type of mouth caulking is done by workers climbing to a high position and manually pushing rags or caulking capsules (capsule-type adhesive) into the hole mouth after each drilling, which is dangerous and time-consuming work. For this reason, there is a need for a ground reinforcement method that can perform mouth caulking that is safe and has high construction efficiency.

本発明は上記課題に鑑み提案するものであって、安全性が高く、施工効率の高い口元コーキング処理を行える地山補強工法を提供することを目的とする。 The present invention has been proposed in light of the above problems, and aims to provide a ground reinforcement method that allows for highly safe and efficient caulking of the edge of the foundation.

本発明の地山補強工法は、トンネル掘削時に切羽の前方地山に補強管を直列に連結して長尺補強管を打設し、前記長尺補強管の周辺地山に固結材を注入して前方地山を補強する地山補強工法であって、前記長尺補強管の端末に、外周面と削孔壁との間を閉塞可能な周状突部が設けられた端末補強管を打設する第1工程と、前記端末補強管の内部における前記周状突部より孔奥側の位置にパッカーを配置する第2工程と、前記パッカーの内部に固結材を注入し、前記パッカーから削孔の口元側に前記固結材を浸出させて口元コーキング領域を形成する第3工程と、前記パッカーより孔奥側に固結材を注入する第4工程と、を備えることを特徴とする。
これによれば、端末補強管の打設によって端末補強管の外周面と削孔壁との間の隙間を周状突部で閉塞することができ、削孔毎に作業員が高所に上がって手で口元にウェスやコーキングカプセルを詰める作業を無くすことができる。従って、安全性が高く、施工効率の高い口元コーキング処理を行うことができる。
The ground reinforcement method of the present invention is a ground reinforcement method in which, during tunnel excavation, long reinforcing pipes are cast by connecting the reinforcing pipes in series into the ground in front of the face, and a consolidation material is injected into the ground around the long reinforcing pipe to reinforce the ground in front, and is characterized by comprising the following steps: a first step of casting a terminal reinforcing pipe, which has a circumferential protrusion that can block the space between the outer circumferential surface and the drilled hole wall, at the end of the long reinforcing pipe; a second step of positioning a packer inside the terminal reinforcing pipe at a position deeper into the hole than the circumferential protrusion; a third step of injecting consolidation material into the inside of the packer and causing the consolidation material to seep out from the packer toward the mouth of the drilled hole to form a mouth caulking area; and a fourth step of injecting consolidation material deeper into the hole than the packer.
This allows the gap between the outer periphery of the end reinforcing pipe and the wall of the drilled hole to be blocked by the circumferential protrusion, eliminating the need for workers to climb to a high position and manually pack the opening with a rag or caulking capsule each time a hole is drilled. This allows for a safe and efficient caulking process.

本発明の地山補強工法は、前記第1工程において、前記端末補強管を途中まで打設した状態で、ガイドセルに設けられ且つ前記端末補強管を支持するセントラライザーを下降し、前記セントラライザーを前記周状突部と干渉しないように前記周状突部の後側に移動して上昇させ、前記セントラライザーで前記端末補強管の前記周状突部より後側の位置を支持し、前記端末補強管の打設作業を再開することを特徴とする。
これによれば、端末補強管の周状突部とセントラライザーとの干渉や、干渉による周状突部やセントラライザーの破損を防止することができる。また、端末補強管のセントラライザーによる芯出しも確保することができる。
The ground reinforcement method of the present invention is characterized in that, in the first step, with the terminal reinforcement pipe having been cast halfway, a centralizer that is provided in a guide cell and supports the terminal reinforcement pipe is lowered, the centralizer is moved to the rear of the circumferential protrusion so as not to interfere with the circumferential protrusion and then raised, the centralizer supports a position of the terminal reinforcement pipe rear of the circumferential protrusion, and the casting work of the terminal reinforcement pipe is resumed.
This makes it possible to prevent interference between the circumferential protrusion of the end reinforcing tube and the centralizer, and to prevent damage to the circumferential protrusion or the centralizer due to interference. Also, centering of the end reinforcing tube by the centralizer can be ensured.

本発明の地山補強工法は、前記端末補強管の前記周状突部が軸方向に間隔を開けて複数設けられていることを特徴とする。
これによれば、軸方向に間隔を開けて配置される複数の周状突部による隔壁によって、端末補強管の外周面と削孔壁との間の隙間をより確実に閉塞状態にすることができる。複数の周状突起部が軸方向に間隔を開けて設けられていることによって、固結材が周状突起部と周状突起部の間に回り込んだ場合にそこにしっかりと限定注入され口元コーキングが確実に行われる。
The natural ground reinforcement method of the present invention is characterized in that the end reinforcing pipe has a plurality of circumferential protrusions provided at intervals in the axial direction.
According to this, the gap between the outer circumferential surface of the end reinforcing pipe and the drilled wall can be more reliably sealed by the partition formed by the multiple circumferential protrusions spaced apart in the axial direction. By providing multiple circumferential protrusions spaced apart in the axial direction, if the consolidation material gets into the gap between the circumferential protrusions, it is injected firmly and exclusively into the gap, and the mouth caulking is reliably performed.

本発明の地山補強工法は、前記端末補強管の前記周状突部が後端に向かって漸次拡径するテーパ状に形成されていることを特徴とする。
これによれば、周状突部を削孔内にスムーズに挿入して端末補強管の外周面と削孔壁との間の隙間を確実に閉塞状態にすることができる。
The natural ground reinforcement method of the present invention is characterized in that the circumferential protrusion of the end reinforcement pipe is formed in a tapered shape that gradually increases in diameter toward the rear end.
This allows the circumferential projection to be smoothly inserted into the drilled hole, ensuring that the gap between the outer circumferential surface of the end reinforcing tube and the wall of the drilled hole is closed.

本発明の地山補強工法によれば、安全性が高く、施工効率の高い口元コーキング処理を行うことができる。 The ground reinforcement method of the present invention allows for highly safe and efficient caulking of the mouth of the tunnel.

(a)~(e)は本発明による実施形態の地山補強工法の前半工程を説明する工程説明図。4A to 4E are process explanatory diagrams illustrating the first half of the natural ground reinforcement method according to an embodiment of the present invention. (a)~(e)は実施形態の地山補強工法の後半工程を説明する工程説明図。4A to 4E are process explanatory diagrams illustrating the latter steps of the natural ground reinforcement method according to an embodiment. 実施形態の地山補強工法で用いられる端末補強管の後端周辺と端末キャップを示す斜視図。1 is a perspective view showing the rear end periphery of a terminal reinforcing pipe and a terminal cap used in a natural ground reinforcement method according to an embodiment. FIG. (a)、(b)は端末補強管の後端周辺に口元コーキング領域を形成する工程を説明する模式説明図。5A and 5B are schematic explanatory views illustrating a process of forming a mouth caulking region around the rear end of an end reinforcement pipe. 実施形態の地山補強工法で用いられる別例の端末補強管の後端周辺と端末キャップを示す斜視図。13 is a perspective view showing the rear end periphery and the terminal cap of another example of a terminal reinforcing pipe used in the natural ground reinforcement method of the embodiment. FIG. (a)、(b)は別例の端末補強管の後端周辺に口元コーキング領域を形成する工程を説明する模式説明図。5A and 5B are schematic explanatory views illustrating a process of forming a mouth caulking region around the rear end of an end reinforcement pipe in another example. トンネル掘削工事における長尺先受け工と鏡補強工を説明する説明図。An explanatory diagram showing long-length pre-support work and mirror reinforcement work in tunnel excavation work. 既に打設された第1の鋼管への第2の鋼管の連結を説明する斜視説明図。FIG. 2 is an explanatory perspective view illustrating the connection of a second steel pipe to a first steel pipe that has already been cast.

〔実施形態の地山補強工法〕
本発明による実施形態の地山補強工法は、トンネル掘削時に切羽の前方地山に補強管10、10aを直列に連結して長尺補強管20を打設し、長尺補強管20の周辺地山に固結材を注入して前方地山を補強する地山補強工法であり、その施工の際には、例えば図1(a)に示すように、吹付コンクリート52が設けられた地山51の切羽から地山補強管である補強管10を地山51に打設する。尚、地山補強管である補強管10は鋼管とすると好適であるが、樹脂等の他の素材による補強管とすることも可能である。
[Embodiment of ground reinforcement method]
The natural ground reinforcement method according to an embodiment of the present invention is a natural ground reinforcement method in which reinforcing pipes 10, 10a are connected in series to cast a long reinforcing pipe 20 into the natural ground in front of the tunnel face during excavation, and a consolidation material is injected into the natural ground around the long reinforcing pipe 20 to reinforce the natural ground in front, and during construction, as shown in Fig. 1(a), for example, the natural ground reinforcement pipe 10 is cast into the natural ground 51 from the face of the natural ground 51 where sprayed concrete 52 is provided. Note that the natural ground reinforcement pipe 10 is preferably a steel pipe, but it is also possible to use a reinforcing pipe made of other materials such as resin.

補強管10の打設では、例えばドリルジャンボのアームに取り付けられたガイドセル11を有し、ガイドセル11上に削孔機械12が前進後退自在に搭載されている削孔装置を用いる(図1参照)。ガイドセル11上には削孔機械12に装着される補強管10を下側から支持するセントラライザーが設けられ、図示例では、ガイドセル11の先頭位置に固定セントラライザー13が固定され、ガイドセル11上の所定領域を前進後退するように移動セントラライザー14が設けられている。 When driving the reinforcing pipe 10, for example, a drilling device is used, which has a guide cell 11 attached to the arm of a drill jumbo, and a drilling machine 12 mounted on the guide cell 11 so that it can move forward and backward (see Figure 1). A centralizer is provided on the guide cell 11 to support the reinforcing pipe 10 attached to the drilling machine 12 from below. In the illustrated example, a fixed centralizer 13 is fixed at the leading position of the guide cell 11, and a movable centralizer 14 is provided to move forward and backward in a specified area on the guide cell 11.

補強管10の内部には削孔ロッドが挿入され(図示省略)、先頭の補強管10には、削孔ロッドの先頭にある削孔ビットが、先頭の補強管10の先でケーシングシューを介して係合される。この係合は削孔機械12の正転によって係合し、逆転によって離脱する構成になっている。即ち、地山51に既に打設されている補強管10が先頭管である場合には、先頭管の補強管10の先端部で削孔ビットが係合され、補強管10に削孔ロッドが内挿されている状態となる。図1(a)は、先頭管と中間管で構成される複数の補強管10が既に連結されて地山51に打設され、中間管の補強管10の端末部分が削孔53から地山51の外側に突出した状態を示している。 A drilling rod is inserted inside the reinforcing pipe 10 (not shown), and the drilling bit at the head of the drilling rod is engaged with the leading reinforcing pipe 10 via a casing shoe at the tip of the leading reinforcing pipe 10. This engagement is achieved by rotating the drilling machine 12 forward and disengaged by rotating it in the reverse direction. In other words, if the reinforcing pipe 10 that has already been driven into the natural ground 51 is the leading pipe, the drilling bit is engaged with the tip of the reinforcing pipe 10 of the leading pipe, and the drilling rod is inserted into the reinforcing pipe 10. Figure 1(a) shows a state in which multiple reinforcing pipes 10 consisting of leading pipes and intermediate pipes have already been connected and driven into the natural ground 51, and the end portion of the reinforcing pipe 10 of the intermediate pipe protrudes outside the natural ground 51 from the drilling hole 53.

また、補強管10は、先行する補強管10に後続の補強管10を押し込んで連結、接続する構造のものである。この補強管10は、例えば後端部の外周に略C字形状に形成された係合部材を外嵌合し、その先端部の内周に係合部材が内側から嵌合される嵌合溝を形成して構成する。そして、後続の補強管10の先端部を先行する補強管10の後端部の外側に嵌めるように押し込んで係合部材を僅かに縮径し、係合部材を後続の補強管10の溝位置で元の径に弾性復元させて嵌合溝に嵌合することにより、先行する補強管10と後続の補強管10を連結する。 The reinforcing tubes 10 are structured so that the following reinforcing tube 10 is pushed into the preceding reinforcing tube 10 to connect and connect them. For example, the reinforcing tube 10 is configured by fitting an engaging member formed in a roughly C-shape to the outer periphery of the rear end, and forming an engaging groove on the inner periphery of the tip into which the engaging member is fitted from the inside. The leading reinforcing tube 10 and the trailing reinforcing tube 10 are connected by pushing the tip of the trailing reinforcing tube 10 so that it fits into the outside of the rear end of the leading reinforcing tube 10 to slightly reduce the diameter of the engaging member, and then elastically restoring the engaging member to its original diameter at the groove position of the trailing reinforcing tube 10 and fitting it into the fitting groove.

図1(a)、(b)では、地山51に既に打設された先行する中間管の補強管10に、補強管10と同様の押し込んで連結、接続する構造を有する端末補強管10aを固定セントラライザー13、移動セントラライザー14で芯出しして近づけ、中間管の補強管10に後続の端末補強管10aを押し込んで連結している。中間管に連結された端末補強管10aは、先頭管の補強管10と中間管の補強管10と共に、削孔ビットの削孔によって地山51の奥側に打設されていく。 In Figures 1(a) and (b), a terminal reinforcing pipe 10a, which has a structure for connecting and connecting by pushing in the same way as the reinforcing pipe 10, is brought close to the reinforcing pipe 10 of the preceding intermediate pipe that has already been cast into the natural ground 51 by centering it with a fixed centralizer 13 and a movable centralizer 14, and the following terminal reinforcing pipe 10a is pushed into and connected to the reinforcing pipe 10 of the intermediate pipe. The terminal reinforcing pipe 10a connected to the intermediate pipe is cast into the deep side of the natural ground 51 together with the reinforcing pipe 10 of the leading pipe and the reinforcing pipe 10 of the intermediate pipe by drilling holes with a drilling bit.

端末補強管10aには、先頭管や中間管の補強管10と同様に、周壁101aに固結材の吐出孔102aが形成されていると共に、周壁101aの外周面と削孔53の削孔壁54との間を閉塞可能な周状突部103aが後部に設けられている(図1~図4参照)。 The end reinforcing pipe 10a, like the reinforcing pipes 10 of the leading pipe and intermediate pipe, has a consolidation material discharge hole 102a formed in the peripheral wall 101a, and a circumferential protrusion 103a is provided at the rear that can close the gap between the outer periphery of the peripheral wall 101a and the drilling wall 54 of the drilling hole 53 (see Figures 1 to 4).

図1~図4の周状突部103aは、周壁101aから鍔状に突出する突条で形成されており、軸方向に間隔を開けて複数設けられ、図示例では3条の周状突部103aが相互に間隔を開けて設けられている。この突条の周状突部103aは、例えば周壁101aに溶接加工等して設けられる。また、周状突部103aの孔奥側の先端は、端末補強管10aの後端から80cm程度の距離に設けると好適であり、端末補強管10aは吹付コンクリート52から外側に15~30cm位突出した状態で打設完了になることから、3条等の複数条の周状突部103aは端末補強管10aの後端から40~80cm程度の範囲に設けることが好ましい。 The circumferential protrusion 103a in Figs. 1 to 4 is formed of a protrusion that protrudes from the peripheral wall 101a in a flange-like shape, and is provided in multiple axially spaced relation, with three circumferential protrusions 103a provided at intervals in the illustrated example. The circumferential protrusions 103a of the protrusions are provided, for example, by welding to the peripheral wall 101a. In addition, the tip of the circumferential protrusion 103a on the inner side of the hole is preferably provided at a distance of about 80 cm from the rear end of the terminal reinforcement pipe 10a, and since the casting of the terminal reinforcement pipe 10a is completed with the terminal reinforcement pipe 10a protruding outwardly by about 15 to 30 cm from the sprayed concrete 52, it is preferable that the multiple circumferential protrusions 103a, such as three, are provided within a range of about 40 to 80 cm from the rear end of the terminal reinforcement pipe 10a.

そして、端末補強管10aの打設が進行して、端末補強管10aの周状突部103aがセントラライザーの近くまで到達した際には、端末補強管10aを途中まで打設した状態で、端末補強管10aを支持しているセントラライザー、本例では固定セントラライザー13と移動セントラライザー14とを下降し、セントラライザーを周状突部103aと干渉しないように周状突部103aの後側に移動して上昇させ、セントラライザーで端末補強管10aの周状突部103aより後側の位置を支持し、端末補強管10aの打設作業を再開する(図1(c)~(e)参照)。 Then, when the casting of the terminal reinforcement pipe 10a progresses and the circumferential protrusion 103a of the terminal reinforcement pipe 10a reaches close to the centralizer, the centralizers supporting the terminal reinforcement pipe 10a (in this example, the fixed centralizer 13 and the movable centralizer 14) are lowered while the terminal reinforcement pipe 10a is cast partway, and the centralizers are moved to the rear of the circumferential protrusion 103a so as not to interfere with it, and then raised. The centralizers support the position of the terminal reinforcement pipe 10a behind the circumferential protrusion 103a, and the casting of the terminal reinforcement pipe 10a is resumed (see Figures 1(c) to (e)).

図1(c)~(e)の例では、固定セントラライザー13と移動セントラライザー14で構成されるセントラライザーが設けられているガイドセル11を下降し、セントラライザーが周状突部103aの後側に配置されるようにガイドセル11を移動して上昇させ、セントラライザーで端末補強管10aの周状突部103aより後側の位置を支持するようにガイドセル11を上昇させている。尚、図1(d)においては、図示の都合上ガイドセル11を十分に下降させた状態を示しているが、実施工でこの工程を行う際には、端末補強管10aに内挿されている削孔ロッドがある為ガイドセル11を周状突部103aが通過できるだけ僅かに下げれば十分であり、それも難しい場合には削孔ロッドをガイドセル11上の削孔機械12から取り外し、セントラライザーで端末補強管10aの周状突部103aより後側の位置を支持するように配置した後に、削孔ロッドを削孔機械12に再度取り付けるようにしても差し支えない。また、セントラライザー13、14がガイドセル11に対して下降する構成でも良く、さらに、例えば周状突起103aの前面を前方に向かって傾斜する傾斜面とする形状等、周状突部103aとセントラライザー13、14があまり干渉せずに通過できるように形状を工夫しておくことによりセントラライザー13、14の下降、上昇工程を伴わずにそのまま通過させることも可能ではある。 In the example of Figures 1(c) to (e), the guide cell 11, which is provided with a centralizer consisting of a fixed centralizer 13 and a movable centralizer 14, is lowered, the guide cell 11 is moved and raised so that the centralizer is positioned behind the circumferential protrusion 103a, and the guide cell 11 is raised so that the centralizer supports the position behind the circumferential protrusion 103a of the terminal reinforcement tube 10a. Note that in Figure 1(d), for convenience of illustration, the guide cell 11 is shown in a state where it is fully lowered, but when performing this process in actual construction, since there is a drilling rod inserted into the terminal reinforcement tube 10a, it is sufficient to lower the guide cell 11 slightly so that the circumferential protrusion 103a can pass through. If this is difficult, the drilling rod may be removed from the drilling machine 12 on the guide cell 11, and after the centralizer is positioned to support the position behind the circumferential protrusion 103a of the terminal reinforcement tube 10a, the drilling rod may be reattached to the drilling machine 12. The centralizers 13 and 14 may also be configured to descend relative to the guide cell 11. Furthermore, by devising a shape that allows the circumferential projection 103a and the centralizers 13 and 14 to pass without much interference, such as by making the front surface of the circumferential projection 103a an inclined surface that slopes forward, it is possible to allow the centralizers 13 and 14 to pass directly without the process of lowering and raising them.

端末補強管10aの打設作業を再開した後、端末補強管10aの周状突部103aが削孔53に入り込み、周壁101aの外周面と削孔壁54との間を閉塞するように周状突部103aが配置された既定位置まで端末補強管10aを打設することにより、端末補強管10aの打設作業を完了する。打設された端末補強管10aは長尺補強管20の端末を構成する(図2(a)参照)。尚、端末補強管10a、先頭管や中間管の補強管10からは、内挿されていた削孔ロッドが抜き出されて回収される。 After resuming the installation of the end reinforcement pipe 10a, the circumferential protrusion 103a of the end reinforcement pipe 10a enters the drilled hole 53, and the end reinforcement pipe 10a is installed up to a predetermined position where the circumferential protrusion 103a is positioned so as to close the gap between the outer circumferential surface of the peripheral wall 101a and the drilled hole wall 54, completing the installation of the end reinforcement pipe 10a. The installed end reinforcement pipe 10a forms the end of the long reinforcement pipe 20 (see Figure 2 (a)). The drilling rods inserted in the end reinforcement pipe 10a and the reinforcement pipes 10 of the leading pipe and intermediate pipe are removed and collected.

打設された端末補強管10aには、固結材の注入器具30を取り付ける(図2(b)、(c)参照)。注入器具30は、端末補強管10aの後端に着脱自在に外嵌合して取り付けられる端末キャップ31と、端末キャップ31の基板311に貫通するように設けられ、端末補強管10aの内部に挿入されるパッカー用注入ホース32と、パッカー用注入ホース32の先端に設けられ、端末補強管10aの内部に配置されるパッカー33と、端末キャップ31の基板311に貫通するように設けられ、長尺補強管20の内部に挿入される奥側注入ホース34とから構成される。尚、図面においては簡略化の為、奥側注入ホース34を1本だけ図示しているが、実施工における奥側注入ホース34は長尺補強管20の長さに応じて、それぞれ長さの異なるものを複数本用い、パッカー33より奥側の注入工程において注入エリアごとに段階的な注入が出来るように配置することが多い。 The cast terminal reinforcement pipe 10a is fitted with a consolidation material injection tool 30 (see Figs. 2(b) and (c)). The injection tool 30 is composed of a terminal cap 31 that is attached by external fitting to the rear end of the terminal reinforcement pipe 10a in a freely detachable manner, a packer injection hose 32 that is inserted into the terminal reinforcement pipe 10a so as to penetrate the base plate 311 of the terminal cap 31, a packer 33 that is attached to the tip of the packer injection hose 32 and placed inside the terminal reinforcement pipe 10a, and a rear injection hose 34 that is inserted into the long reinforcement pipe 20 so as to penetrate the base plate 311 of the terminal cap 31. Note that, for simplification, only one rear injection hose 34 is shown in the drawing, but in actual construction, multiple rear injection hoses 34 of different lengths are used according to the length of the long reinforcement pipe 20, and are often arranged so that stepwise injection can be performed for each injection area in the injection process behind the packer 33.

そして、図2(c)、図4(a)に示すように、パッカー33は、端末補強管10aの内部における周状突部103aより孔奥側の位置に配置され、好ましくは端末補強管10aの軸方向で周状突部103aの孔奥側先端から離間して配置される。例えば3条の周状突部103aが端末補強管10aの後端から40~80cmの範囲に配置されている場合には、パッカー33は端末補強管10aの後端から孔奥側の1m程度の位置に配置される。 As shown in Figures 2(c) and 4(a), the packer 33 is placed inside the terminal reinforcing tube 10a at a position closer to the inner hole than the circumferential protrusion 103a, and is preferably placed away from the inner hole tip of the circumferential protrusion 103a in the axial direction of the terminal reinforcing tube 10a. For example, if the three circumferential protrusions 103a are placed within a range of 40 to 80 cm from the rear end of the terminal reinforcing tube 10a, the packer 33 is placed about 1 m from the rear end of the terminal reinforcing tube 10a toward the inner hole.

この状態で、パッカー33の内部に固結材41を注入し、パッカー33から削孔53の口元側に固結材41を浸出させて口元コーキング領域42を形成する(図2(c)、(d)、図4(b)参照)。パッカー33には、固結材41が口元側のみに染み出し可能なものを用いると好適であり、例えば孔奥側を固結材41が浸出しないナイロン、ビニール、ゴム等の材質で形成し、口元側を固結材41が浸出する布等の材質で形成したパッカー33とすると良好である。 In this state, the consolidation material 41 is injected into the packer 33, and the consolidation material 41 seeps out from the packer 33 to the mouth side of the drilled hole 53 to form the mouth caulking area 42 (see Figures 2 (c), (d), and 4 (b)). It is preferable to use a packer 33 that allows the consolidation material 41 to seep out only to the mouth side. For example, it is preferable to use a packer 33 in which the inner side of the hole is made of a material such as nylon, vinyl, or rubber that does not allow the consolidation material 41 to seep out, and the mouth side is made of a material such as cloth that allows the consolidation material 41 to seep out.

端末補強管10aの内部に配置されたパッカー33と複数条の周状突部103aの孔奥側の先端との間における端末補強管10aの周壁101aには、固結材の吐出孔102aが形成されている。そして、パッカー33の内部に固結材41を注入すると、パッカー33が固結材41の充填で膨らんだ後、パッカー33から浸み出した固結材41が、削孔53の口元側の端末補強管10aの内部に注入されていくと共に、パッカー33と周状突部103aの孔奥側の先端との間における周壁101aの吐出孔102aから端末補強管10aの外側に吐出されて削孔53、地山51に注入され、口元コーキング領域42が形成される。 The peripheral wall 101a of the terminal reinforcement pipe 10a between the packer 33 arranged inside the terminal reinforcement pipe 10a and the tip of the multiple circumferential protrusions 103a on the inner side of the hole has a consolidation material discharge hole 102a. When the consolidation material 41 is injected into the inside of the packer 33, the packer 33 expands with the filling of the consolidation material 41, and the consolidation material 41 that seeps out from the packer 33 is injected into the inside of the terminal reinforcement pipe 10a on the mouth side of the drilled hole 53, and is discharged from the discharge hole 102a of the peripheral wall 101a between the packer 33 and the tip of the circumferential protrusions 103a on the inner side of the hole, and is injected into the drilled hole 53 and the ground 51 to form the mouth caulking area 42.

口元コーキング領域42の形成後には、長尺補強管20の内部に挿入されている奥側注入ホース34から固結材43を注入する。固結材43は、口元コーキング領域42より孔奥側の長尺補強管20の内部に注入されていくと共に、端末補強管10aの吐出孔102a、長尺補強管20を構成する中間管と先頭管の補強管10に形成されている吐出孔から、長尺補強管20の外側に吐出されて削孔53、地山51に注入されていき、口元コーキング領域42で固結材43の漏れが防止された状態で固結領域44が形成される(図2(e)参照)。 After the mouth caulking area 42 is formed, the consolidation material 43 is injected from the rear injection hose 34 inserted inside the long reinforcing pipe 20. The consolidation material 43 is injected into the inside of the long reinforcing pipe 20 on the inner side of the hole from the mouth caulking area 42, and is also discharged from the discharge hole 102a of the end reinforcing pipe 10a and the discharge holes formed in the intermediate pipe and the leading pipe reinforcing pipe 10 that constitute the long reinforcing pipe 20 to the outside of the long reinforcing pipe 20 and injected into the drilled hole 53 and the ground 51, forming the consolidation area 44 in a state where leakage of the consolidation material 43 is prevented in the mouth caulking area 42 (see FIG. 2(e)).

本実施形態の地山補強工法によれば、端末補強管10aの打設によって端末補強管10aの外周面と削孔壁54との間の隙間を周状突部103aで閉塞することができ、削孔毎に作業員が高所に上がって手で口元にウェスやコーキングカプセルを詰める作業を無くすことができる。従って、安全性が高く、施工効率の高い口元コーキング処理を行うことができる。 According to the ground reinforcement method of this embodiment, the gap between the outer surface of the terminal reinforcement pipe 10a and the drilled hole wall 54 can be blocked by the circumferential protrusion 103a by casting the terminal reinforcement pipe 10a, eliminating the need for workers to climb to a high position and manually pack the opening with a rag or caulking capsule each time a hole is drilled. This allows for a highly safe and efficient caulking process.

また、端末補強管10aの軸方向に間隔を開けて配置される複数の周状突部103aによる隔壁によって、端末補強管10aの外周面と削孔壁54との間の隙間をより確実に閉塞状態にすることができる。複数の周状突起部103aが軸方向に間隔を開けて設けられていることによって、固結材が周状突起部103aと周状突起の間に回り込んだ場合にそこにしっかりと限定注入され口元コーキングが確実に行われる。尚、周状突起部103aが1つだけの場合には、パッカー33の内部に固結材41注入する際に多めに注入することで、しっかりと口元コーキングを行うことができる。 In addition, the partition wall of the multiple circumferential protrusions 103a spaced apart in the axial direction of the terminal reinforcement tube 10a can more reliably close the gap between the outer surface of the terminal reinforcement tube 10a and the drilled hole wall 54. By providing multiple circumferential protrusions 103a spaced apart in the axial direction, if the consolidation material gets between the circumferential protrusions 103a, it is injected into the gap and the mouth caulking is performed reliably. In addition, if there is only one circumferential protrusion 103a, a larger amount of the consolidation material 41 can be injected into the inside of the packer 33 to perform the mouth caulking reliably.

また、セントラライザーを下降、後方移動して上昇させ、セントラライザーで端末補強管10aの周状突部103aより後側の位置を支持し、端末補強管10aの打設作業を再開する工程により、端末補強管10aの周状突部103aとセントラライザーとの干渉や、干渉による周状突部103aやセントラライザーの破損を防止することができる。また、端末補強管10aのセントラライザーによる芯出しも確保することができる。 In addition, by lowering the centralizer, moving it backwards, and then raising it, supporting a position behind the circumferential protrusion 103a of the terminal reinforcement tube 10a with the centralizer, and resuming the casting work of the terminal reinforcement tube 10a, it is possible to prevent interference between the circumferential protrusion 103a of the terminal reinforcement tube 10a and the centralizer, and damage to the circumferential protrusion 103a or the centralizer due to interference. It is also possible to ensure centering by the centralizer of the terminal reinforcement tube 10a.

〔本明細書開示発明の包含範囲〕
本明細書開示の発明は、発明として列記した各発明、実施形態、各例の他に、適用可能な範囲で、これらの部分的な内容を本明細書開示の他の内容に変更して特定したもの、或いはこれらの内容に本明細書開示の他の内容を付加して特定したもの、或いはこれらの部分的な内容を部分的な作用効果が得られる限度で削除して上位概念化して特定したものを包含する。そして、本明細書開示の発明には下記内容や下記の更なる変形例も含まれる。
[Scope of the invention disclosed herein]
The invention disclosed in this specification includes, in addition to each invention, embodiment, and example listed as the invention, those specified by changing partial contents of these to other contents disclosed in this specification, those specified by adding other contents disclosed in this specification to these contents, or those specified by deleting partial contents of these to the extent that partial action and effect can be obtained, and specifying them as a higher conceptualization. The invention disclosed in this specification also includes the following contents and further modified examples described below.

例えば本発明の地山補強工法で用いられる端末補強管の構成は、上記実施形態の端末補強管10aに限定されず本発明の趣旨の範囲内で適宜であり、例えば図5及び図6に示す端末補強管10bを用いても好適である。端末補強管10bは、補強管10や端末補強管10aと同様の押し込んで連結、接続する構造を有するものであり、周壁101bに固結材の吐出孔102bが形成されていると共に、周壁101bの外周面と削孔53の削孔壁54との間を閉塞可能な周状突部103bが後部に設けられている。 For example, the configuration of the terminal reinforcement pipe used in the ground reinforcement method of the present invention is not limited to the terminal reinforcement pipe 10a of the above embodiment, but may be any appropriate configuration within the scope of the present invention, and for example, the terminal reinforcement pipe 10b shown in Figures 5 and 6 may be used. The terminal reinforcement pipe 10b has a structure that is pushed in and connected, similar to the reinforcement pipe 10 and the terminal reinforcement pipe 10a, and has a discharge hole 102b for the consolidation material formed in the peripheral wall 101b, and a circumferential protrusion 103b that can close the gap between the outer periphery of the peripheral wall 101b and the drilled hole wall 54 of the drilled hole 53 is provided at the rear.

端末補強管10bの周状突部103bは、後端に向かって漸次拡径するテーパ状に形成されており、図示例では後端に向かって外周面が漸次拡径するテーパ状のゴム製筒材になっている。端末補強管10bの後端近傍における周壁101bには、鍔状に外側に突出する環状プレート104bが形成され、溶接等で周壁101bに固定されている。本例のテーパ状のゴム製筒材で構成される周状突部103bは、その後端面を位置規制する環状プレート104bの先端面に当接するようにして周壁101bの外側に嵌め込まれている。 The circumferential protrusion 103b of the terminal reinforcing tube 10b is tapered so that its diameter gradually increases toward the rear end, and in the illustrated example, it is a tapered rubber tubular material whose outer circumferential surface gradually increases in diameter toward the rear end. A flange-like annular plate 104b is formed on the peripheral wall 101b near the rear end of the terminal reinforcing tube 10b and is fixed to the peripheral wall 101b by welding or the like. The circumferential protrusion 103b, which is made of a tapered rubber tubular material in this example, is fitted to the outside of the peripheral wall 101b so as to abut against the tip surface of the annular plate 104b, which regulates the position of the rear end surface.

端末補強管10bにおけるテーパ状の周状突部103bの孔奥側の先端は、端末補強管10bの後端から80cm程度までの距離に設けると好適であり、さらにテーパ状の周状突部103bの先端は環状プレート104bから50cm位の位置となるのが望ましい。また、端末補強管10bは吹付コンクリート52から外側に15~30cm位突出した状態で打設完了になると共に、打設完了状態で周状突部103bの後端面及び環状プレート104bは吹付コンクリート52の外側に配置されることから、テーパ状の周状突部103bの後端面は端末補強管10bの後端から2~20cm程度の位置に配置することが好ましい。 The tip of the tapered circumferential protrusion 103b on the end reinforcing pipe 10b at the back of the hole is preferably located about 80 cm from the rear end of the end reinforcing pipe 10b, and the tip of the tapered circumferential protrusion 103b is preferably located about 50 cm from the annular plate 104b. In addition, the end reinforcing pipe 10b is completed casting in a state where it protrudes about 15 to 30 cm outward from the sprayed concrete 52, and since the rear end surface of the circumferential protrusion 103b and the annular plate 104b are located outside the sprayed concrete 52 when casting is completed, it is preferable to position the rear end surface of the tapered circumferential protrusion 103b at a position about 2 to 20 cm from the rear end of the end reinforcing pipe 10b.

端末補強管10bの打設作業においても、上述の端末補強管10aと同様に、端末補強管10bの周状突部103bがセントラライザーの近くまで到達した際には、端末補強管10bを途中まで打設した状態で、端末補強管10bを支持しているセントラライザーを下降し、セントラライザーを周状突部103b及び環状プレート104bと干渉しないように周状突部103b及び環状プレート104bの後側に移動して上昇させ、セントラライザーで端末補強管10bの周状突部103b及び環状プレート104bより後側の位置を支持し、端末補強管10bの打設作業を再開する。 In the installation work of the terminal reinforcement pipe 10b, similarly to the terminal reinforcement pipe 10a described above, when the circumferential protrusion 103b of the terminal reinforcement pipe 10b reaches close to the centralizer, the terminal reinforcement pipe 10b is installed halfway, the centralizer supporting the terminal reinforcement pipe 10b is lowered, the centralizer is moved to the rear of the circumferential protrusion 103b and the annular plate 104b so as not to interfere with them, and then raised, and the centralizer supports the position of the terminal reinforcement pipe 10b behind the circumferential protrusion 103b and the annular plate 104b, and the installation work of the terminal reinforcement pipe 10b is resumed.

端末補強管10bの打設作業を再開した後、端末補強管10bの周状突部103bのテーパ面を削孔壁54に押し当てるようにして周壁101bの外周面と削孔壁54との間を閉塞し、既定位置まで端末補強管10bを打設することにより、長尺補強管20の端末を構成する端末補強管10bの打設作業を完了する。 After resuming the installation of the terminal reinforcing pipe 10b, the tapered surface of the circumferential protrusion 103b of the terminal reinforcing pipe 10b is pressed against the drilled wall 54 to close the gap between the outer circumferential surface of the peripheral wall 101b and the drilled wall 54, and the terminal reinforcing pipe 10b is installed to the specified position, thereby completing the installation of the terminal reinforcing pipe 10b that constitutes the end of the long reinforcing pipe 20.

打設された端末補強管10bには、上述の固結材の注入器具30を取り付け、パッカー33を、端末補強管10bの内部における周状突部103bより孔奥側の位置に配置し、好ましくは端末補強管10bの軸方向で周状突部103bの孔奥側先端から離間して配置する。この状態で、パッカー33の内部に固結材41を注入し、パッカー33から削孔53の口元側に固結材41を浸出させて口元コーキング領域42を形成する。 The above-mentioned consolidation material injection tool 30 is attached to the cast terminal reinforcement pipe 10b, and the packer 33 is placed inside the terminal reinforcement pipe 10b at a position on the inner side of the hole from the circumferential protrusion 103b, preferably spaced apart from the inner tip of the circumferential protrusion 103b in the axial direction of the terminal reinforcement pipe 10b. In this state, the consolidation material 41 is injected inside the packer 33, and the consolidation material 41 is allowed to seep out from the packer 33 to the mouth side of the drilled hole 53, forming the mouth caulking area 42.

端末補強管10bの内部に配置されたパッカー33とテーパ状の周状突部103bの孔奥側の先端との間における端末補強管10bの周壁101bには、固結材の吐出孔102bが形成されている。そして、パッカー33の内部に固結材41を注入すると、パッカー33が固結材41の充填で膨らんだ後、パッカー33から浸み出した固結材41が、削孔53の口元側の端末補強管10bの内部に注入されていくと共に、パッカー33と周状突部103bの孔奥側の先端との間における周壁101bの吐出孔102bから端末補強管10bの外側に吐出されて削孔53、地山51に注入され、口元コーキング領域42が形成される。 The peripheral wall 101b of the terminal reinforcement pipe 10b between the packer 33 arranged inside the terminal reinforcement pipe 10b and the tip of the tapered circumferential protrusion 103b on the inner side of the hole has a consolidation material discharge hole 102b formed therein. When the consolidation material 41 is injected into the inside of the packer 33, the packer 33 expands with the filling of the consolidation material 41, and the consolidation material 41 seeps out of the packer 33 and is injected into the inside of the terminal reinforcement pipe 10b on the mouth side of the drilled hole 53. At the same time, the consolidation material 41 is discharged from the discharge hole 102b of the peripheral wall 101b between the packer 33 and the tip of the circumferential protrusion 103b on the inner side of the hole, and is injected into the drilled hole 53 and the ground 51 to form the mouth caulking area 42.

口元コーキング領域42の形成後には、端末補強管10aを用いる場合と同様に、長尺補強管20の内部に挿入されている必要本数の奥側注入ホース34から固結材43を順次注入し、口元コーキング領域42で固結材43の漏れが防止された状態で固結領域44を形成する。 After the mouth caulking area 42 is formed, similar to the case of using the terminal reinforcing pipe 10a, the consolidation material 43 is sequentially injected from the required number of rear injection hoses 34 inserted inside the long reinforcing pipe 20, and the consolidation area 44 is formed in a state where leakage of the consolidation material 43 is prevented in the mouth caulking area 42.

端末補強管10bを用いる地山補強工法によれば、端末補強管10aを用いる地山補強工法と対応する構成から対応する効果を得ることができると共に、テーパ状の周状突部103bを削孔53内にスムーズに挿入して端末補強管10bの外周面と削孔壁54との間の隙間を確実に閉塞状態にすることができる。 The ground reinforcement method using the terminal reinforcement pipe 10b has a configuration corresponding to that of the ground reinforcement method using the terminal reinforcement pipe 10a, and the tapered circumferential protrusion 103b can be smoothly inserted into the drilled hole 53 to reliably close the gap between the outer circumferential surface of the terminal reinforcement pipe 10b and the drilled hole wall 54.

本発明は、トンネル掘削時に切羽の前方地山に長尺鋼管を打設し、長尺鋼管から周辺地山に固結材を注入して前方地山を補強する際に利用することができる。 This invention can be used when driving long steel pipes into the ground in front of a tunnel face during excavation, and injecting cement from the long steel pipes into the surrounding ground to reinforce the ground in front.

10…補強管 11…ガイドセル 12…削孔機械 13…固定セントラライザー 14…移動セントラライザー 10a…端末補強管 101a…周壁 102a…吐出孔 103a…周状突部 10b…端末補強管 101b…周壁 102b…吐出孔 103b…周状突部 104b…環状プレート 20…長尺補強管 30…注入器具 31…端末キャップ 311…基板 32…パッカー用注入ホース 33…パッカー 34…奥側注入ホース 41…固結材 42…口元コーキング領域 43…固結材 44…固結領域 51…地山 52…吹付コンクリート 53…削孔 54…削孔壁 201…地山 202…長尺鋼管 203…固結領域 204…長尺先受け工 205…長尺鋼管 206…長尺鏡補強工 207…ドリルジャンボ 208…削孔用アーム 209…ガイドセル 210…削孔機械 211…削孔ロッド 220、220a、220b…鋼管 T…トンネル空間
LIST OF SYMBOLS 10...Reinforcement pipe 11...Guide cell 12...Drilling machine 13...Fixed centralizer 14...Moveable centralizer 10a...Terminal reinforcement pipe 101a...Circumferential wall 102a...Discharge hole 103a...Circumferential protrusion 10b...Terminal reinforcement pipe 101b...Circumferential wall 102b...Discharge hole 103b...Circumferential protrusion 104b...Annular plate 20...Long reinforcement pipe 30...Injection tool 31...Terminal cap 311...Base plate 32...Injection hose for packer 33...Packer 34...Rear injection hose 41...Consolidation material 42...Mouth caulking area 43...Consolidation material 44...Consolidation area 51...Natural ground 52...Sprayed concrete 53...Drilling 54...Drilling wall 201...Natural ground 202...Long steel pipe 203...Consolidation area 204: Long-length pre-support structure 205: Long-length steel pipe 206: Long-length mirror reinforcement structure 207: Drill jumbo 208: Drilling arm 209: Guide cell 210: Drilling machine 211: Drilling rod 220, 220a, 220b: Steel pipe T: Tunnel space

Claims (3)

トンネル掘削時に切羽の前方地山に補強管を直列に連結して長尺補強管を打設し、前記長尺補強管の周辺地山に固結材を注入して前方地山を補強する地山補強工法であって、
前記長尺補強管の端末に、外周面と削孔壁との間を閉塞可能な周状突部が後部に設けられた端末補強管を打設する第1工程と、
前記端末補強管の内部における前記周状突部より孔奥側の位置にパッカーを配置する第2工程と、
前記パッカーの内部に固結材を注入し、前記パッカーから削孔の口元側に前記固結材を浸出させて口元コーキング領域を形成する第3工程と、
前記パッカーより孔奥側に固結材を注入する第4工程と、を備え
前記第1工程において、前記端末補強管を途中まで打設した状態で、ガイドセルに設けられ且つ前記端末補強管を支持するセントラライザーを下降し、前記セントラライザーを前記周状突部と干渉しないように前記周状突部の後側に移動して上昇させ、前記セントラライザーで前記端末補強管の前記周状突部より後側の位置を支持し、前記端末補強管の打設作業を再開することを特徴とする地山補強工法。
A ground reinforcement method in which reinforcing pipes are connected in series to the ground in front of the tunnel face during excavation, and long reinforcing pipes are cast, and a consolidated material is injected into the ground around the long reinforcing pipes to reinforce the ground in front,
A first step of installing a terminal reinforcing pipe at the end of the long reinforcing pipe, the terminal reinforcing pipe having a circumferential protrusion at its rear that can close a gap between an outer circumferential surface and a wall of a drilled hole;
A second step of disposing a packer inside the end reinforcing tube at a position deeper into the hole than the circumferential protrusion;
A third step of injecting a binder into the packer and causing the binder to seep out from the packer to the mouth side of the drilled hole to form a mouth caulking area;
A fourth step of injecting a consolidation material into the hole from the packer ,
a ground reinforcement method characterized in that, in the first step, with the terminal reinforcement pipe having been cast halfway, a centralizer that is provided in a guide cell and supports the terminal reinforcement pipe is lowered, the centralizer is moved to the rear of the circumferential protrusion so as not to interfere with the circumferential protrusion and then raised, the centralizer supports a position of the terminal reinforcement pipe rearward of the circumferential protrusion, and the casting work of the terminal reinforcement pipe is resumed .
トンネル掘削時に切羽の前方地山に補強管を直列に連結して長尺補強管を打設し、前記長尺補強管の周辺地山に固結材を注入して前方地山を補強する地山補強工法であって、
前記長尺補強管の端末に、外周面と削孔壁との間を閉塞可能な周状突部が後部に設けられた端末補強管を打設する第1工程と、
前記端末補強管の内部における前記周状突部より孔奥側の位置にパッカーを配置する第2工程と、
前記パッカーの内部に固結材を注入し、前記パッカーから削孔の口元側に前記固結材を浸出させて口元コーキング領域を形成する第3工程と、
前記パッカーより孔奥側に固結材を注入する第4工程と、を備え、
前記端末補強管の前記周状突部が軸方向に間隔を開けて複数設けられていることを特徴とする地山補強工法。
A ground reinforcement method in which reinforcing pipes are connected in series to the ground in front of the tunnel face during excavation, and long reinforcing pipes are cast, and a consolidated material is injected into the ground around the long reinforcing pipes to reinforce the ground in front,
A first step of installing a terminal reinforcing pipe at the end of the long reinforcing pipe, the terminal reinforcing pipe having a circumferential protrusion at its rear that can close a gap between an outer circumferential surface and a wall of a drilled hole;
A second step of disposing a packer inside the end reinforcing tube at a position deeper into the hole than the circumferential protrusion;
A third step of injecting a binder into the packer and causing the binder to seep out from the packer to the mouth side of the drilled hole to form a mouth caulking area;
A fourth step of injecting a consolidation material into the hole from the packer,
A ground reinforcement method, characterized in that the terminal reinforcement pipe has a plurality of circumferential protrusions provided at intervals in the axial direction .
トンネル掘削時に切羽の前方地山に補強管を直列に連結して長尺補強管を打設し、前記長尺補強管の周辺地山に固結材を注入して前方地山を補強する地山補強工法であって、
前記長尺補強管の端末に、外周面と削孔壁との間を閉塞可能な周状突部が後部に設けられた端末補強管を打設する第1工程と、
前記端末補強管の内部における前記周状突部より孔奥側の位置にパッカーを配置する第2工程と、
前記パッカーの内部に固結材を注入し、前記パッカーから削孔の口元側に前記固結材を浸出させて口元コーキング領域を形成する第3工程と、
前記パッカーより孔奥側に固結材を注入する第4工程と、を備え、
前記端末補強管の前記周状突部が後端に向かって漸次拡径するテーパ状に形成されていることを特徴とする地山補強工法。
A ground reinforcement method in which reinforcing pipes are connected in series to the ground in front of the tunnel face during excavation, and long reinforcing pipes are cast, and a consolidated material is injected into the ground around the long reinforcing pipes to reinforce the ground in front,
A first step of installing a terminal reinforcing pipe at the end of the long reinforcing pipe, the terminal reinforcing pipe having a circumferential protrusion at its rear that can close a gap between an outer circumferential surface and a wall of a drilled hole;
A second step of disposing a packer inside the end reinforcing tube at a position deeper into the hole than the circumferential protrusion;
A third step of injecting a binder into the packer and causing the binder to seep out from the packer to the mouth side of the drilled hole to form a mouth caulking area;
A fourth step of injecting a consolidation material into the hole from the packer,
A ground reinforcement method, characterized in that the circumferential projection of the terminal reinforcement pipe is formed in a tapered shape that gradually increases in diameter toward the rear end .
JP2021186711A 2021-11-16 2021-11-16 Ground reinforcement method Active JP7705227B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021186711A JP7705227B2 (en) 2021-11-16 2021-11-16 Ground reinforcement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021186711A JP7705227B2 (en) 2021-11-16 2021-11-16 Ground reinforcement method

Publications (2)

Publication Number Publication Date
JP2023073930A JP2023073930A (en) 2023-05-26
JP7705227B2 true JP7705227B2 (en) 2025-07-09

Family

ID=86425601

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021186711A Active JP7705227B2 (en) 2021-11-16 2021-11-16 Ground reinforcement method

Country Status (1)

Country Link
JP (1) JP7705227B2 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006249773A (en) 2005-03-10 2006-09-21 Nishimatsu Constr Co Ltd Mouth caulking device of pipe
JP2010203128A (en) 2009-03-03 2010-09-16 Kumagai Gumi Co Ltd Pipe
JP2014037714A (en) 2012-08-16 2014-02-27 St Engineering Kk Long mirror bolt construction method
JP2014173373A (en) 2013-03-12 2014-09-22 Ohbayashi Corp Pipe connection structure for civil engineering work
JP2019019505A (en) 2017-07-13 2019-02-07 積水化学工業株式会社 Tunnel rehabilitation method and rock bolt

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006249773A (en) 2005-03-10 2006-09-21 Nishimatsu Constr Co Ltd Mouth caulking device of pipe
JP2010203128A (en) 2009-03-03 2010-09-16 Kumagai Gumi Co Ltd Pipe
JP2014037714A (en) 2012-08-16 2014-02-27 St Engineering Kk Long mirror bolt construction method
JP2014173373A (en) 2013-03-12 2014-09-22 Ohbayashi Corp Pipe connection structure for civil engineering work
JP2019019505A (en) 2017-07-13 2019-02-07 積水化学工業株式会社 Tunnel rehabilitation method and rock bolt

Also Published As

Publication number Publication date
JP2023073930A (en) 2023-05-26

Similar Documents

Publication Publication Date Title
US10557241B2 (en) Piling construction management method
KR20220053956A (en) Constructing method of grouting steel pipe having cocking packer module and grouting steel pipe having cocking packer module
CN115217481A (en) A method for preventing tunneling instability of shield machine under adverse geological conditions
JP2020159125A (en) Method of creating pile holes for enlarged piles
JP7705227B2 (en) Ground reinforcement method
JP2009263966A (en) Removal method of existing pile
CN114622548A (en) Bored concrete pile pore-forming construction structure for complex stratum
CN114622549A (en) Bored concrete pile hole-forming construction method for complex stratum
JP6735138B2 (en) Construction method of retaining wall structure and retaining wall structure
JP3978469B2 (en) Expansion drilling equipment and pile bottom expansion method
KR20180093358A (en) Slot casing with spacer and a method of construction for retaining wall using slot casing
JP2017145641A (en) Reinforcement method of existing tunnel and tunnel reinforcement device
JP2005220573A (en) Pile driving method
JP4113305B2 (en) Ground obstruction removal method
KR100551579B1 (en) Auger Drilling Machine with Stabilizer and Construction Method for Underground Excavation
JP2000154541A (en) Pulling-out device for existing pile
KR890003263B1 (en) Final excavation method and apparatus
JP4249873B2 (en) Removal method of existing pipeline
JP7704016B2 (en) How to install the core material
JP2020159124A (en) Mechanical diameter expansion bucket equipped with a hydraulic mechanism and pile hole excavator for intermediate diameter expansion part
JP7701131B2 (en) Ground reinforcement pipe connection device
JP2015183374A (en) Pile construction method
JPS6128774B2 (en)
KR0134073B1 (en) Earth auger apparatus and concrete pile making method in the underground
JP4515307B2 (en) Ground improvement method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240909

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250415

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250423

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250501

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250626

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250626

R150 Certificate of patent or registration of utility model

Ref document number: 7705227

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150