JP7707226B2 - Apparatus and method for evaluating the fluidity degree of ready-mixed concrete. - Google Patents
[go: Go Back, main page]

JP7707226B2 - Apparatus and method for evaluating the fluidity degree of ready-mixed concrete. - Google Patents

Apparatus and method for evaluating the fluidity degree of ready-mixed concrete. Download PDF

Info

Publication number
JP7707226B2
JP7707226B2 JP2023046757A JP2023046757A JP7707226B2 JP 7707226 B2 JP7707226 B2 JP 7707226B2 JP 2023046757 A JP2023046757 A JP 2023046757A JP 2023046757 A JP2023046757 A JP 2023046757A JP 7707226 B2 JP7707226 B2 JP 7707226B2
Authority
JP
Japan
Prior art keywords
rod members
fluidity
vibrator
fresh concrete
evaluating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2023046757A
Other languages
Japanese (ja)
Other versions
JP2024135866A (en
Inventor
真史 山崎
真史 田中
悟志 昇
雅也 橋田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fudo Tetra Corp
Original Assignee
Fudo Tetra Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fudo Tetra Corp filed Critical Fudo Tetra Corp
Priority to JP2023046757A priority Critical patent/JP7707226B2/en
Publication of JP2024135866A publication Critical patent/JP2024135866A/en
Application granted granted Critical
Publication of JP7707226B2 publication Critical patent/JP7707226B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Description

本発明は、生コンクリートの流動化程度評価装置および生コンクリート流動化程度の評価方法に関する。 The present invention relates to a device for evaluating the fluidity level of ready-mix concrete and a method for evaluating the fluidity level of ready-mix concrete.

コンクリートの締固め完了判定方法が知られている(特許文献1参照)。この方法では、浮遊体をコンクリートの打ち込み前に型枠底部に設置し、浮遊体の浮上をもってコンクリートの締固め完了と判定する。 A method for determining the completion of concrete compaction is known (see Patent Document 1). In this method, a floating body is placed at the bottom of a formwork before the concrete is poured, and the completion of concrete compaction is determined when the floating body rises to the surface.

特開2019-183392号公報JP 2019-183392 A

ところで、近年の建設業界における人手不足の問題から、若い働き手の育成や外国人材の活用などが社会的なニーズとして存在する。一方、これまでのコンクリートの締固めは、熟練した職人によって行われていたが、職人の高齢化の問題があり、職人の技術を若い働き手や外国人材に伝達することが急務になっている。しかしながら、特許文献1のコンクリートの締固め完了判定方法では、コンクリートの締固めにおける時間経過と締固め程度の関係を直感的に把握することができず、若い働き手や外国人材が技術を習得しにくい問題がある。また、コンクリートの骨材の影響によって、浮遊体が表面まで浮上しなかった場合には、浮遊体を回収できない問題がある。 In recent years, the construction industry has been facing a labor shortage, which has led to a social need to train young workers and utilize foreign workers. Meanwhile, concrete compaction has traditionally been performed by experienced craftsmen, but the problem of craftsmen aging has created an urgent need to transfer the skills of these craftsmen to young workers and foreign workers. However, the method for determining the completion of concrete compaction in Patent Document 1 does not allow for an intuitive understanding of the relationship between the passage of time during concrete compaction and the degree of compaction, making it difficult for young workers and foreign workers to learn the technique. In addition, if the floating bodies do not rise to the surface due to the influence of the aggregate in the concrete, the floating bodies cannot be recovered.

従って、本発明の目的は、極めて簡単な構成で生コンクリート流動化程度を直感的に把握することができる生コンクリートの流動化程度評価装置、および生コンクリートの流動化程度の評価方法を提供することにある。 The object of the present invention is therefore to provide a ready-mix concrete fluidity degree evaluation device and a ready-mix concrete fluidity degree evaluation method that can intuitively grasp the ready-mix concrete fluidity degree with an extremely simple configuration.

上記課題は、以下の本発明により解決される。すなわち、本発明(1)の生コンクリート流動化程度の評価装置は、
型枠内に打設された生コンクリートの流動化程度を評価できる生コンクリート流動化程度の評価装置であって、
前記生コンクリートの表層に対して下端が差し込まれて起立した1以上の棒部材と、
前記1以上の棒部材の周囲に設けられて前記1以上の棒部材を上下動可能に支持する1以上の転倒防止具と、
前記棒部材の近傍で前記生コンクリート内に差し込まれて振動するバイブレータであって、重力の作用で前記棒部材の前記下端が前記型枠内の底部に当接するまで周辺の前記生コンクリートを流動化させるバイブレータと、
を備える。
The above problems are solved by the present invention. That is, the evaluation device for evaluating the degree of fluidity of ready-mixed concrete according to the present invention (1) comprises:
A ready-mixed concrete fluidity evaluation device capable of evaluating the fluidity of ready-mixed concrete poured into a formwork,
One or more rod members having their lower ends inserted into and standing on the surface layer of the fresh concrete;
One or more anti-tip devices are provided around the one or more rod members and support the one or more rod members so that the one or more rod members can move up and down;
a vibrator that is inserted into the fresh concrete near the rod member and vibrates, and fluidizes the fresh concrete around the rod member until the lower end of the rod member abuts against the bottom of the formwork under the effect of gravity;
Equipped with.

また、本発明(2)の生コンクリート流動化程度の評価装置は、(1)記載の生コンクリート流動化程度の評価装置であって、
前記棒部材は、前記下端からの距離を示す目盛りを有する。
The apparatus for evaluating the fluidity degree of fresh concrete according to the present invention (2) is the apparatus for evaluating the fluidity degree of fresh concrete according to the present invention (1),
The bar member has a scale indicating the distance from the bottom end.

また、本発明(3)の生コンクリート流動化程度の評価装置は、(1)記載の生コンクリート流動化程度の評価装置であって、
前記バイブレータは、前記バイブレータの直径の100~500%の長さを前記棒部材から離間した位置に差し込まれる。
The apparatus for evaluating the fluidity degree of fresh concrete according to the present invention (3) is the apparatus for evaluating the fluidity degree of fresh concrete according to the present invention (1),
The vibrator is inserted at a position spaced from the rod member by a length of 100 to 500% of the diameter of the vibrator.

また、本発明(4)の生コンクリート流動化程度の評価装置は、(1)記載の生コンクリート流動化程度の評価装置であって、
前記1以上の棒部材は、複数であり、複数の前記棒部材は、前記型枠内の複数の仮想格子点の近傍に設けられ、
前記転倒防止具は、複数であり、複数の前記転倒防止具のそれぞれは、前記複数の仮想格子点の近傍に設けられ前記複数の棒部材のそれぞれを支持し、
前記バイブレータは、前記仮想格子点に対応する位置で前記生コンクリートに差し込まれる。
The apparatus for evaluating the fluidity degree of fresh concrete according to the present invention (4) is the apparatus for evaluating the fluidity degree of fresh concrete according to the present invention (1),
the one or more rod members are a plurality of rod members, the plurality of rod members being provided in the vicinity of a plurality of virtual lattice points within the formwork;
a plurality of the fall prevention devices are provided, each of the plurality of fall prevention devices being provided in the vicinity of the plurality of virtual lattice points and supporting each of the plurality of rod members;
The vibrator is inserted into the ready-mix concrete at a position corresponding to the virtual lattice point.

また、本発明(5)の生コンクリート流動化程度の評価装置は、(4)の何れか記載の生コンクリート流動化程度の評価装置であって、
前記複数の棒部材は、前記複数の仮想格子点のうち、隣接する仮想格子点同士が形成する四角の中心の位置にも設けられ、
複数の前記転倒防止具は、前記中心の位置にも設けられ前記中心の位置に設けられる前記複数の棒部材をそれぞれ支持し、
前記バイブレータは、前記中心の位置の近傍に対応する位置で前記生コンクリートに差し込まれる。
The apparatus for evaluating the degree of fluidity of ready-mixed concrete according to the present invention (5) is an apparatus for evaluating the degree of fluidity of ready-mixed concrete according to any one of the items (4),
the plurality of bar members are also provided at center positions of squares formed by adjacent virtual lattice points among the plurality of virtual lattice points,
The plurality of fall prevention devices are also provided at the center position and support the plurality of rod members provided at the center position,
The vibrator is inserted into the ready mixed concrete at a location corresponding to the vicinity of the central location.

また、本発明(6)の生コンクリート流動化程度の評価方法は、
1以上の棒部材と、前記1以上の棒部材を支持可能な1以上の転倒防止具と、バイブレータと、を備える生コンクリート流動化程度の評価装置を用いて、型枠内に打設された生コンクリートの流動化程度を評価できる生コンクリート流動化程度の評価方法であって、
前記1以上の転倒防止具の内側に前記1以上の棒部材を通しつつ、前記生コンクリートの表層に対して前記1以上の棒部材の下端を差し込んで前記1以上の棒部材を起立させる第1工程と、
振動する前記バイブレータを前記生コンクリート内の前記1以上の棒部材の近傍に差し込んで、重力の作用で前記1以上の棒部材の前記下端が前記型枠内の底部に当接するまで周辺の前記生コンクリートを流動化させる第2工程と、
を備える。
The method for evaluating the degree of fluidity of fresh concrete according to the present invention (6) is as follows:
A method for evaluating the fluidity of fresh concrete, which can evaluate the fluidity of fresh concrete poured in a formwork using an evaluation device for evaluating the fluidity of fresh concrete, the evaluation device comprising one or more rod members, one or more fall prevention devices capable of supporting the one or more rod members, and a vibrator,
A first step of inserting the lower ends of the one or more rod members into the surface layer of the fresh concrete while passing the one or more rod members through the inside of the one or more fall prevention devices to stand the one or more rod members;
A second step of inserting the vibrator into the fresh concrete near the one or more rod members and fluidizing the fresh concrete around the vibrator until the lower ends of the one or more rod members abut against the bottom of the formwork by the action of gravity;
Equipped with.

また、本発明(7)の生コンクリート流動化程度の評価方法は、(6)記載の生コンクリート流動化程度の評価方法であって、
前記バイブレータを除去する前に前記1以上の棒部材を除去する第3工程を備える。
The method for evaluating the degree of fluidity of ready-mixed concrete according to the present invention (7) is the method for evaluating the degree of fluidity of ready-mixed concrete according to the present invention (6),
A third step of removing the one or more rod members before removing the vibrator.

また、本発明(8)の生コンクリート流動化程度の評価方法は、(7)記載の生コンクリート流動化程度の評価方法であって、
前記第3工程において、前記1以上の棒部材を除去した0.1秒~5分後に前記バイブレータを除去する。
The method for evaluating the fluidity of ready-mixed concrete according to the present invention (8) is the method for evaluating the fluidity of ready-mixed concrete according to the present invention (7),
In the third step, the vibrator is removed 0.1 seconds to 5 minutes after the one or more rod members are removed.

また、本発明(9)の生コンクリート流動化程度の評価方法は、(6)記載の生コンクリート流動化程度の評価方法であって、
前記バイブレータは、前記バイブレータの直径の100~500%の長さを前記棒部材から離間した位置に差し込まれる。
The method for evaluating the degree of fluidity of ready-mixed concrete according to the present invention (9) is the method for evaluating the degree of fluidity of ready-mixed concrete according to the present invention (6),
The vibrator is inserted at a position spaced from the rod member by a length of 100 to 500% of the diameter of the vibrator.

また、本発明(10)の生コンクリート流動化程度の評価方法は、(6)記載の生コンクリート流動化程度の評価方法であって、
前記1以上の棒部材は、複数であって、複数の前記棒部材は、前記型枠内の複数の仮想格子点の近傍に設けられ、
前記1以上の転倒防止具は、複数であって、複数の前記転倒防止具のそれぞれは、前記複数の仮想格子点の近傍に設けられ前記複数の棒部材のそれぞれを支持し、
前記第2工程において、前記仮想格子点に対応する位置で前記生コンクリートに前記バイブレータを順番に差し込んで、前記複数の棒部材を前記型枠の底部に当接させる。
The method for evaluating the degree of fluidity of ready-mixed concrete according to the present invention (10) is the method for evaluating the degree of fluidity of ready-mixed concrete according to the present invention (6),
the one or more rod members are a plurality of rod members, the plurality of rod members being provided in the vicinity of a plurality of virtual lattice points within the formwork;
the one or more fall prevention devices are a plurality of devices, each of the plurality of fall prevention devices being provided in the vicinity of the plurality of virtual lattice points and supporting each of the plurality of rod members;
In the second step, the vibrator is inserted in sequence into the fresh concrete at positions corresponding to the virtual lattice points, and the plurality of rod members are brought into contact with the bottom of the formwork.

また、本発明(11)の生コンクリート流動化程度の評価方法は、(10)記載の生コンクリート流動化程度の評価方法であって、
前記複数の棒部材は、前記複数の仮想格子点のうち、隣接する仮想格子点同士が形成する四角の中心の位置にも設けられ、
複数の前記転倒防止具は、前記中心の位置にも設けられ前記中心の位置に設けられる前記複数の棒部材をそれぞれ支持し、
前記第2工程において、前記中心の位置の近傍に前記バイブレータを順番に差し込んで、前記複数の棒部材を前記型枠の底部に当接させる。
The method for evaluating the degree of fluidity of ready-mixed concrete according to the present invention (11) is the method for evaluating the degree of fluidity of ready-mixed concrete according to the present invention (10),
the plurality of bar members are also provided at center positions of squares formed by adjacent virtual lattice points among the plurality of virtual lattice points,
The plurality of fall prevention devices are also provided at the center position and support the plurality of rod members provided at the center position,
In the second step, the vibrator is inserted in sequence near the center position, and the plurality of rod members are brought into contact with the bottom of the formwork.

本発明によれば、極めて簡単な構成で生コンクリート流動化程度を直感的に把握することができる生コンクリートの流動化程度評価装置、および生コンクリートの流動化程度の評価方法を提供できる。 The present invention provides a ready-mix concrete fluidity degree evaluation device and a ready-mix concrete fluidity degree evaluation method that can intuitively grasp the ready-mix concrete fluidity degree with an extremely simple configuration.

第1実施形態の生コンクリート流動化程度の評価装置を模式的に示す正面図である。FIG. 1 is a front view showing a schematic diagram of an evaluation device for evaluating the degree of fluidization of fresh concrete according to a first embodiment. 図1に示す生コンクリート流動化程度の評価装置を上方から模式的に示した平面図である。FIG. 2 is a plan view showing a schematic view from above of the ready-mixed concrete fluidity degree evaluation device shown in FIG. 1. 第2実施形態の生コンクリート流動化程度の評価装置を上方から模式的に示した平面図である。FIG. 11 is a plan view showing a schematic view of the ready-mixed concrete fluidization degree evaluation device of the second embodiment from above. 実施例1の評価方法を模式的に示した正面図である。FIG. 2 is a front view showing a schematic diagram of an evaluation method for Example 1. 図4に示す評価方法において、バイブレータを差し込み後に下がり長さ(沈下量)を測定する方法を模式的に示した正面図である。FIG. 5 is a front view showing a schematic diagram of a method for measuring a lowering length (amount of subsidence) after inserting a vibrator in the evaluation method shown in FIG. 4 . 実施例1の結果を示すグラフである。1 is a graph showing the results of Example 1. 実施例2の結果を示すグラフである。1 is a graph showing the results of Example 2.

本発明の生コンクリートの流動化程度評価方法は、
1以上の棒部材と、前記1以上の棒部材を支持可能な1以上の転倒防止具と、バイブレータと、を備える生コンクリート流動化程度の評価装置を用いて、型枠内に打設された生コンクリートの流動化程度を評価できる生コンクリート流動化程度の評価方法であって、
前記1以上の転倒防止具の内側に前記1以上の棒部材を通しつつ、前記生コンクリートの表層に対して前記1以上の棒部材の下端を差し込んで前記1以上の棒部材を起立させる第1工程と、
振動する前記バイブレータを前記生コンクリート内の前記1以上の棒部材の近傍に差し込んで、重力の作用で前記棒部材が前記型枠の底部に当接するまで周辺の前記生コンクリートを流動化させる第2工程と、
を備える。
The method for evaluating the fluidity degree of ready-mixed concrete of the present invention includes:
A method for evaluating the fluidity of fresh concrete, which can evaluate the fluidity of fresh concrete poured in a formwork using an evaluation device for evaluating the fluidity of fresh concrete, the evaluation device comprising one or more rod members, one or more fall prevention devices capable of supporting the one or more rod members, and a vibrator,
A first step of inserting the lower ends of the one or more rod members into the surface layer of the fresh concrete while passing the one or more rod members through the inside of the one or more fall prevention devices to stand the one or more rod members;
A second step of inserting the vibrator into the fresh concrete near the one or more rod members to fluidize the fresh concrete around the rod members until the rod members abut against the bottom of the formwork under the action of gravity;
Equipped with.

第1工程において、作業者は、生コンクリートの表層に対して1以上の棒部材の下端を差し込む。下端の差込長さとしては、例えば、1~10cm程度を差し込むことが好ましい。 In the first step, the worker inserts the bottom ends of one or more rod members into the surface layer of the ready-mix concrete. It is preferable to insert the bottom ends a distance of, for example, about 1 to 10 cm.

棒部材は、例えば、直径1~50mm、好ましくは5~30mm、より好ましくは9~11mmの丸棒を用いることができる。棒部材は、100~2000mm、好ましくは500~900mm、より好ましくは600~800mmの軸方向の長さを有する丸棒を用いることができる。棒部材は、丸棒以外にも、角棒、円筒や角パイプなどの中空形状など、他の形態の棒であってもよい。 The rod member may be, for example, a round bar having a diameter of 1 to 50 mm, preferably 5 to 30 mm, and more preferably 9 to 11 mm. The rod member may be a round bar having an axial length of 100 to 2000 mm, preferably 500 to 900 mm, and more preferably 600 to 800 mm. The rod member may be a bar of other shape, such as a square bar, or a hollow shape such as a cylinder or square pipe, in addition to a round bar.

棒部材は、塩化ビニル製の丸棒であってもよいし、アルミニウム製の丸棒であってもよいし、鉄筋コンクリート用の鉄筋として一般的な異形棒鋼であってもよい。棒部材は、評価時間の短縮のために、生コンクリートが流動化した際に自重によって短時間で沈下する異形棒鋼を用いることが好ましい。 The rod member may be a polyvinyl chloride round bar, an aluminum round bar, or a deformed steel bar that is commonly used as reinforcing bar for reinforced concrete. In order to shorten the evaluation time, it is preferable to use a deformed steel bar that sinks in a short time due to its own weight when the fresh concrete becomes fluid.

バイブレータの直径は、例えば20~150mmであることが一般的である。バイブレータは、バイブレータの直径の100~500%の長さを棒部材から離間した位置に差し込まれる。すなわち、バイブレータの直径が50mmである場合には、50~250mmの長さを棒部材から離間した位置に差し込まれる。バイブレータの直径が100mmである場合には、100~500mmの長さを棒部材から離間した位置に差し込まれる。 The diameter of the vibrator is typically, for example, 20 to 150 mm. The vibrator is inserted at a position spaced from the rod member by a length that is 100 to 500% of the vibrator's diameter. In other words, if the vibrator has a diameter of 50 mm, it is inserted at a position spaced from the rod member by a length of 50 to 250 mm. If the vibrator has a diameter of 100 mm, it is inserted at a position spaced from the rod member by a length of 100 to 500 mm.

生コンクリートは、例えば、以下の配合条件で作成することができる。生コンクリートの呼び強度は18N/mmで、スランプは5cmで、ある。粗骨材最大寸法は20mmである。また、セメントの種類は普通セメントである。 Ready-mix concrete can be prepared, for example, under the following mix conditions: the nominal strength of the ready-mix concrete is 18 N/mm2, the slump is 5 cm, the maximum size of the coarse aggregate is 20 mm, and the type of cement is normal cement.

第2工程において、作業者は、1以上の棒部材の近傍に、振動するバイブレータを生コンクリート内に差し込むことで行う。バイブレータの振動によって、生コンクリートの粒子間の摩擦力が低下して生コンクリートが流動化して、棒部材に働く摩擦力が低下して、重力の作用で棒部材が沈下する。バイブレータを生コンクリート内に投入する時間は、振動するバイブレータを生コンクリート内に差し込んでから棒部材の下端が型枠内の底部に到着するまでの時間である。バイブレータを生コンクリート内に投入する時間は、例えば、1箇所につき1秒~10分、好ましくは3秒~5分、より好ましくは5秒~30秒である。 In the second step, the worker inserts a vibrating vibrator into the fresh concrete near one or more rods. The vibration of the vibrator reduces the friction between the particles of the fresh concrete, causing the fresh concrete to flow, reducing the friction acting on the rods, causing the rods to sink under the effect of gravity. The time it takes to insert the vibrator into the fresh concrete is the time it takes from inserting the vibrating vibrator into the fresh concrete until the lower end of the rod reaches the bottom of the formwork. The time it takes to insert the vibrator into the fresh concrete is, for example, 1 second to 10 minutes per location, preferably 3 seconds to 5 minutes, and more preferably 5 seconds to 30 seconds.

生コンクリート流動化程度の評価方法は、バイブレータを除去する前に1以上の棒部材を除去する第3工程を備える。第3工程では、作業者は、先に棒部材を除去した後に、続いてバイブレータを除去するようにする。バイブレータは、棒部材を除去した後、例えば0.1秒~5分後に除去され、より好ましくは0.1秒~1分後に除去され、最も好ましくは0.1秒後に除去されることが望ましい。 The method for evaluating the degree of fluidity of fresh concrete includes a third step of removing one or more rod members before removing the vibrator. In the third step, the worker first removes the rod members and then the vibrator. It is desirable that the vibrator is removed, for example, 0.1 seconds to 5 minutes after removing the rod members, more preferably 0.1 seconds to 1 minute, and most preferably 0.1 seconds later.

バイブレータは、棒部材の除去後、遅くとも、5分後に除去され、或いは、5、4、3、2、1分後に生コンクリートから除去されることが好ましく、或いは、0.1秒後に生コンクリートから除去されることが最も好ましい。 The vibrator is removed at the latest 5 minutes after removal of the rod member, or preferably 5, 4, 3, 2 or 1 minute after removal from the fresh concrete, or most preferably 0.1 seconds after removal from the fresh concrete.

以下図面を参照して、本発明の生コンクリート流動化程度の評価方法に用いられる生コンクリート流動化程度の評価装置の実施形態について説明する。
[第1実施形態]
Hereinafter, an embodiment of an evaluation device for evaluating the fluidity degree of fresh concrete used in the evaluation method for the fluidity degree of fresh concrete of the present invention will be described with reference to the drawings.
[First embodiment]

図1に示すように、生コンクリート流動化程度の評価装置11は、型枠12と、型枠12内に打設された生コンクリート13と、生コンクリート13の表層に対して下端14Aが差し込まれた1以上の棒部材14と、1以上の棒部材14を上下動可能に支持する転倒防止具15と、1以上の棒部材14の近傍に差し込まれて振動するバイブレータ16(図4、図5参照)と、を備える。 As shown in FIG. 1, the fresh concrete fluidity evaluation device 11 includes a formwork 12, fresh concrete 13 poured into the formwork 12, one or more rod members 14 with their lower ends 14A inserted into the surface layer of the fresh concrete 13, a tip-over prevention device 15 that supports the one or more rod members 14 so that they can move up and down, and a vibrator 16 (see FIGS. 4 and 5) that is inserted near the one or more rod members 14 and vibrates.

本実施形態において、棒部材14は、複数であってもよいし、1個であってもよい。転倒防止具15は、複数であってもよいし、1個であってもよい。 In this embodiment, the number of rod members 14 may be multiple or may be one. The number of fall prevention devices 15 may be multiple or may be one.

図2に示すように、型枠12が大型になる場合には、生コンクリート流動化程度の評価装置11は、型枠12内に位置する棒部材14を起立させたり除去したりするための、複数の足場17を有する。足場17は、上方から見て縦方向と横方向に格子状に設けることができる。図2では、足場17を破線の直線で示している。足場17は、例えば、一般構造用炭素鋼製の断面円形のロッド(単管パイプ)を井桁状に組んで互いに固定することで構成されている。すなわち、足場17は、上方から見て、縦方向に延びる複数の第1ロッド17Aと、横方向に延びる複数の第2ロッド17Bと、第1ロッド17Aと第2ロッド17Bとが交差する位置に設けられる格子点17C(仮想格子点)と、を含んでいる。 As shown in FIG. 2, when the formwork 12 is large, the fresh concrete fluidity evaluation device 11 has multiple scaffoldings 17 for raising and removing the rod members 14 located in the formwork 12. The scaffoldings 17 can be arranged in a grid pattern in the vertical and horizontal directions when viewed from above. In FIG. 2, the scaffoldings 17 are shown by dashed straight lines. The scaffoldings 17 are, for example, constructed by assembling rods (single-tube pipes) made of general structural carbon steel with a circular cross section in a grid pattern and fixing them together. That is, the scaffoldings 17 include multiple first rods 17A extending vertically when viewed from above, multiple second rods 17B extending horizontally, and lattice points 17C (virtual lattice points) provided at the positions where the first rods 17A and the second rods 17B intersect.

足場17同士は、例えば50cm間隔で均等なピッチで設けられている。最も外側に位置する足場17は、型枠12から例えば25cm間隔で設けられている。 The scaffolding 17 are spaced apart at equal intervals, for example 50 cm apart. The outermost scaffolding 17 is spaced apart, for example 25 cm apart, from the formwork 12.

型枠12は、生コンクリート13を固化させるのに一般に用いられる木製や鋼製の枠で構成されている。型枠12内の底部18は、すでに先に打たれたコンクリートであってもよいし、底型枠であってもよいし、地面であってもよい。
転倒防止具15は、棒部材14の数に応じて、増減することができる。
The formwork 12 is made of a wooden or steel frame that is generally used for solidifying ready mixed concrete 13. The bottom 18 within the formwork 12 may be concrete that has already been poured, a bottom formwork, or the ground.
The number of fall prevention devices 15 can be increased or decreased depending on the number of rod members 14.

転倒防止具15は、型枠12の外側に設けられた支柱部21と、支柱部21から延びた連結部22と、連結部22の先端に設けられ例えばリング状をなした支持部23と、を有する。支持部23の構造は、リング状に限られるものではなく、不連続なリング状であってもよい。また、例えば棒部材14が金属製であれば、支持部23を磁気装置として任意の形状であってもよいし、棒部材14が中空形状であれば、支持部23は中空部に挿入できる任意の形状であってもよい。連結部22および支持部23は、番線や針金等によって一体的に形成されていてもよい。あるいは、支持部23を筒状の部材で構成し、その筒状の部材である支持部23と足場17を番線で構成される連結部22で固定してもよい。 The fall prevention device 15 has a support part 21 provided on the outside of the formwork 12, a connecting part 22 extending from the support part 21, and a support part 23, for example, in the shape of a ring, provided at the tip of the connecting part 22. The structure of the support part 23 is not limited to a ring shape, and may be a discontinuous ring shape. Also, for example, if the rod member 14 is made of metal, the support part 23 may be of any shape as a magnetic device, and if the rod member 14 is hollow, the support part 23 may be of any shape that can be inserted into the hollow part. The connecting part 22 and the support part 23 may be integrally formed by wire or wire. Alternatively, the support part 23 may be formed of a cylindrical member, and the cylindrical member support part 23 and the scaffolding 17 may be fixed by the connecting part 22 made of wire.

転倒防止具15は、型枠12の内側に設けられている場合には、支柱部21を省略することができる。この場合、転倒防止具15は、足場17に対して連結部22を介して固定される。 When the fall prevention device 15 is installed inside the formwork 12, the support part 21 can be omitted. In this case, the fall prevention device 15 is fixed to the scaffolding 17 via the connecting part 22.

支持部23およびそれに支持される棒部材14は、足場17の格子点17Cの近傍に設けられる。より詳細には、支持部23およびそれに支持される棒部材14は、格子点17Cから5~25cmの長さ(直径5cmのバイブレータ16の直径の100~500%の長さ)を離間した位置に設けられている。 The support part 23 and the rod member 14 supported by it are provided near the lattice point 17C of the scaffolding 17. More specifically, the support part 23 and the rod member 14 supported by it are provided at a position spaced 5 to 25 cm away from the lattice point 17C (a length that is 100 to 500% of the diameter of the vibrator 16, which has a diameter of 5 cm).

バイブレータ16は、建設現場で用いられる一般的なバイブレータ16で構成される。バイブレータ16の直径は、20~150mmであることが一般的である。バイブレータ16は、後述するように、格子点17Cに対応する位置で、生コンクリート13内に差し込まれる。 The vibrator 16 is a typical vibrator 16 used at construction sites. The diameter of the vibrator 16 is generally 20 to 150 mm. The vibrator 16 is inserted into the ready-mix concrete 13 at a position corresponding to the lattice point 17C, as described below.

棒部材14は、1個であってもよいし、型枠が大型になる場合には、複数であってもよい。棒部材14同士は、互いに同形態に形成されている。棒部材14のそれぞれは、直径1~50mmの例えば円柱形(丸棒)をなしている。棒部材14は、下端14Aと、上端14Bと、を有する。棒部材14は、例えば、樹脂材料(塩化ビニル)、アルミニウム合金材料、鋼材料のいずれかによって形成されている。棒部材14は、鋼材料、特に異形棒鋼で形成されていることが望ましい。 There may be one bar member 14, or multiple bars if the formwork is large. The bar members 14 are formed in the same shape. Each bar member 14 is, for example, cylindrical (round bar) with a diameter of 1 to 50 mm. The bar member 14 has a lower end 14A and an upper end 14B. The bar member 14 is formed from, for example, a resin material (vinyl chloride), an aluminum alloy material, or a steel material. It is desirable that the bar member 14 be formed from a steel material, particularly a deformed steel bar.

棒部材14の外周面には、例えば、テープ等で構成されるマーカーによって、下端14Aからの距離を示す目盛り24が形成されていることが望ましい。目盛り24は、例えば、10cmおきに形成されていてもよい。 It is desirable that a scale 24 indicating the distance from the lower end 14A is formed on the outer peripheral surface of the rod member 14 using a marker such as tape. The scale 24 may be formed, for example, at intervals of 10 cm.

本実施形態の生コンクリート流動化程度の評価装置11を用いた生コンクリート流動化程度の評価方法について説明する。
まず、作業者は、図1、図2に示すように、生コンクリート13が内部に打設された型枠12に対して足場17を設置する。足場17は、図2に破線の直線で示すように、上方からみて、型枠12に対して、縦方向および横方向に組まれて固定される。足場17は、一定のピッチで格子状に設置される。さらに、転倒防止具15を型枠12の外部または足場17に対して設置する。
A method for evaluating the fluidity degree of fresh concrete using the evaluation device 11 for evaluating the fluidity degree of fresh concrete of this embodiment will be described.
First, as shown in Figures 1 and 2, a worker sets up scaffolding 17 on the formwork 12 inside which ready-mixed concrete 13 has been poured. As shown by the dashed straight lines in Figure 2, the scaffolding 17 is assembled and fixed vertically and horizontally on the formwork 12 when viewed from above. The scaffolding 17 is set up in a lattice pattern with a fixed pitch. Furthermore, fall prevention devices 15 are installed outside the formwork 12 or on the scaffolding 17.

型枠12に近い位置の転倒防止具15は、図1に示すように支柱部21を型枠12の外部に起立するように設置する。この支柱部21に対して連結部22および支持部23を設置する。型枠12の中央部に近い位置の転倒防止具15は、支柱部21を省略して、足場17で形成された格子点17Cに対して連結部22および支持部23を設置する。図2に示すように、転倒防止具15の支持部23のそれぞれは、図中に×印で示される格子点17Cの近傍(格子点から5~25cmの位置)に配置される。これによって、生コンクリート流動化程度の評価装置11の事前の準備が完了する。 As shown in Figure 1, the anti-tip device 15 located close to the formwork 12 is installed so that the support section 21 stands outside the formwork 12. The connecting section 22 and the support section 23 are installed on this support section 21. The anti-tip device 15 located close to the center of the formwork 12 omits the support section 21 and installs the connecting section 22 and the support section 23 on the grid point 17C formed by the scaffolding 17. As shown in Figure 2, each of the support sections 23 of the anti-tip device 15 is placed near the grid point 17C indicated by an x in the figure (5 to 25 cm from the grid point). This completes the advance preparation of the fresh concrete fluidity degree evaluation device 11.

生コンクリートの流動化程度評価装置11を用いた生コンクリート流動化程度の評価方法は、第1工程、第2工程、および第3工程を備える。 The method for evaluating the fluidity level of fresh concrete using the ready-mix concrete fluidity level evaluation device 11 includes a first step, a second step, and a third step.

作業者は、第1工程として、この転倒防止具15の支持部23の内側に棒部材14を通すようにして設置する。その際、棒部材14の下端は、生コンクリート13の表面に対して1~5cmほど差し込むようにする。このようにして、生コンクリート13の表面に対して棒部材14を起立させる。図2に示すように、すべての転倒防止具15に対して棒部材14を通すことで、足場17のすべての格子点17Cの近傍に対して棒部材14を設置する。 In the first step, the worker installs the anti-tip device 15 by passing the rod 14 through the inside of the support part 23. At this time, the lower end of the rod 14 is inserted about 1 to 5 cm into the surface of the fresh concrete 13. In this way, the rod 14 is raised up against the surface of the fresh concrete 13. As shown in Figure 2, by passing the rod 14 through all the anti-tip devices 15, the rod 14 is installed near all the grid points 17C of the scaffolding 17.

作業者は、第2工程として、図中に×印で示す格子点17Cの位置に対応する生コンクリート13に対してバイブレータ16を差し込んで、当該位置で生コンクリート13に加振する(図4、図5参照)。どの位置の格子点17Cに対応する生コンクリート13から順番にバイブレータ16を差し込むかは、任意である。 In the second step, the worker inserts the vibrator 16 into the ready-mix concrete 13 corresponding to the position of the lattice point 17C indicated by an x in the figure, and vibrates the ready-mix concrete 13 at that position (see Figures 4 and 5). It is up to the worker to decide the order in which the ready-mix concrete 13 corresponding to the lattice point 17C is inserted.

バイブレータ16による加振は、棒部材14の下端14Aが型枠12内の底部18に当接するまで行う。棒部材14が直径10mmの異形棒鋼で構成される場合で、棒部材14から10cmの位置で生コンクリート13に振動する直径50mmのバイブレータ16を差し込んだ場合には、およそ20~30秒の加振で棒部材14の下端を型枠12内の底部18に接触させることができる。作業者は、図2に×印で示す格子点17Cの位置に対して、順番に生コンクリート13に対して振動するバイブレータ16を差し込んで、すべての棒部材14を漏れなく型枠12内の底部18に当接させるように生コンクリート13を流動化させる。このとき、バイブレータ16の直径が5cmであるときに、生コンクリート13を概ね流動化できる範囲として、図2に破線の円25で直径50cmの範囲(円)を示す。 Vibration by the vibrator 16 is continued until the lower end 14A of the rod member 14 abuts against the bottom 18 of the formwork 12. When the rod member 14 is made of a deformed steel bar with a diameter of 10 mm, and a vibrating vibrator 16 with a diameter of 50 mm is inserted into the fresh concrete 13 at a position 10 cm from the rod member 14, the lower end of the rod member 14 can be brought into contact with the bottom 18 of the formwork 12 with vibration for approximately 20 to 30 seconds. The worker inserts the vibrating vibrator 16 into the fresh concrete 13 in order at the positions of the lattice points 17C shown by the x marks in Figure 2, and fluidizes the fresh concrete 13 so that all the rod members 14 abut against the bottom 18 of the formwork 12 without exception. At this time, when the diameter of the vibrator 16 is 5 cm, the range (circle) with a diameter of 50 cm is shown in the dashed circle 25 in Figure 2 as the range in which the fresh concrete 13 can be roughly fluidized.

作業者は、第3工程として、下端14Aが底部18に接している棒部材14を生コンクリート13から除去する。作業者は、棒部材14の除去後に、振動するバイブレータ16を生コンクリート13から除去する。バイブレータ16は、棒部材14の除去後に、遅くとも5分後に、最も好ましくは0.1秒後に除去される。これによって、棒部材14を除去した後の空洞部分を周囲の生コンクリート13で埋めることができる。このため、当該部分が空洞として欠陥になってしまうことが防止される。 In the third step, the worker removes the rod 14 with its lower end 14A in contact with the bottom 18 from the ready-mix concrete 13. After removing the rod 14, the worker removes the vibrating vibrator 16 from the ready-mix concrete 13. The vibrator 16 is removed no later than 5 minutes, and most preferably 0.1 seconds, after the rod 14 is removed. This allows the hollow area left after the rod 14 is removed to be filled with the surrounding ready-mix concrete 13. This prevents the area from becoming a cavity and becoming a defect.

以上の工程により、型枠12内の生コンクリート13を概ね流動化して、型枠12内の生コンクリート13の締固めを完了できる。 Through the above steps, the fresh concrete 13 in the formwork 12 is largely fluidized, and compaction of the fresh concrete 13 in the formwork 12 is completed.

本実施形態によれば以下のことがいえる。生コンクリート流動化程度の評価装置11は、型枠12内に打設された生コンクリート13の流動化程度を評価でき、生コンクリート13の表層に対して下端が差し込まれて起立した1以上の棒部材14と、1以上の棒部材14の周囲に設けられて1以上の棒部材14を上下動可能に支持する1以上の転倒防止具15と、棒部材14の近傍で生コンクリート13内に差し込まれて振動するバイブレータ16であって、重力の作用で棒部材14の下端14Aが型枠12内の底部18に当接するまで周辺の生コンクリート13を流動化させるバイブレータ16と、を備える。 According to this embodiment, the following can be said. The fresh concrete fluidity evaluation device 11 can evaluate the fluidity of the fresh concrete 13 poured in the formwork 12, and is equipped with one or more rod members 14 that are inserted at their lower ends into the surface layer of the fresh concrete 13 and stand upright, one or more anti-tip devices 15 that are provided around the one or more rod members 14 and support the one or more rod members 14 so that they can move up and down, and a vibrator 16 that is inserted into the fresh concrete 13 near the rod members 14 and vibrates, and fluidizes the surrounding fresh concrete 13 until the lower end 14A of the rod member 14 abuts against the bottom 18 inside the formwork 12 under the action of gravity.

この構成によれば、バイブレータ16で生コンクリートの流動化を行って、棒部材14が型枠12内の底部18に当接して停止することで、作業者が生コンクリート13の流動化および締固めが完了したことを直感的に把握することができる。これによって、若い働き手や外国人材が生コンクリート13の締固め作業のやり方を直感的に把握することができる。これによって、若い働き手や外国人材の人材育成を効率よく行うことができる。また、棒部材14は、上端14B付近が生コンクリートから露出するため、回収不能となる事態を生じることを防止できる。 With this configuration, the vibrator 16 fluidizes the fresh concrete, and the rod member 14 comes into contact with the bottom 18 inside the formwork 12 and stops, allowing the worker to intuitively understand that fluidization and compaction of the fresh concrete 13 has been completed. This allows young workers and foreign personnel to intuitively understand how to compact the fresh concrete 13. This allows for efficient human resource development of young workers and foreign personnel. In addition, the rod member 14 can be prevented from becoming impossible to recover because the upper end 14B of the rod member 14 is exposed from the fresh concrete.

棒部材14は、下端14Aからの距離を示す目盛りを有する。この構成によれば、棒部材14の沈下量(下がりの長さ)によって、作業者が生コンクリート13の流動化および締固めの程度を視覚的・直感的に把握することができる。これによって、若い働き手や外国人材が生コンクリート13の締固め作業のやり方を直感的に把握することができる。 The rod member 14 has a scale that indicates the distance from the lower end 14A. With this configuration, the worker can visually and intuitively grasp the degree of fluidization and compaction of the ready-mix concrete 13 based on the amount of sinking (length of descent) of the rod member 14. This allows young workers and foreign personnel to intuitively grasp how to compact the ready-mix concrete 13.

バイブレータ16は、バイブレータ16の直径の100~500%の長さを棒部材14から離間した位置に差し込まれる。この構成によれば、バイブレータ16による加振時間として一般的な5~30秒の時間内に棒部材14の下端14Aを型枠12の底部18に当接させることができる。これによって、現実的な時間内に生コンクリート13の流動化および締固めを完了させることができ、現場での効率的な作業を維持しつつ人材育成をすることができる。 The vibrator 16 is inserted at a position separated from the rod member 14 by a length that is 100-500% of the diameter of the vibrator 16. With this configuration, the lower end 14A of the rod member 14 can be brought into contact with the bottom 18 of the formwork 12 within 5-30 seconds, which is the typical vibration time for the vibrator 16. This makes it possible to complete the fluidization and compaction of the ready-mix concrete 13 within a realistic time frame, and allows for human resource development while maintaining efficient work on-site.

1以上の棒部材14は、複数であり、複数の棒部材14は、型枠12内の複数の仮想格子点17C上に設けられ、転倒防止具15は、複数であり、複数の転倒防止具15のそれぞれは、複数の仮想格子点17C上に設けられ複数の棒部材14のそれぞれを支持する。 There are multiple rod members 14, and the multiple rod members 14 are provided on multiple virtual lattice points 17C within the formwork 12, and there are multiple anti-tip devices 15, and each of the multiple anti-tip devices 15 is provided on a multiple virtual lattice point 17C and supports each of the multiple rod members 14.

この構成によれば、型枠12内の生コンクリート13のすべてを均一に流動化して締固めを確実に行うことができる。これによって、若い働き手や外国人材であっても、簡単かつ確実に生コンクリート13の流動化および締固めを完了させることができる。 This configuration allows all of the ready-mix concrete 13 in the formwork 12 to be uniformly fluidized and compacted reliably. This allows even young workers or foreign personnel to easily and reliably complete the fluidization and compaction of the ready-mix concrete 13.

生コンクリート流動化程度の評価方法は、1以上の棒部材14と、1以上の棒部材14を支持可能な1以上の転倒防止具15と、バイブレータ16と、を備える生コンクリート流動化程度の評価装置11を用いて、型枠12内に打設された生コンクリートの流動化程度を評価でき、1以上の転倒防止具15の内側に1以上の棒部材14を通しつつ、生コンクリート13の表層に対して1以上の棒部材14の下端を差し込んで1以上の棒部材14を起立させる第1工程と、振動するバイブレータ16を生コンクリート13内の1以上の棒部材14の近傍に差し込んで、重力の作用で1以上の棒部材14の下端14Aが型枠12内の底部18に当接するまで周辺の生コンクリート13を流動化させる第2工程と、を備える。 The method for evaluating the degree of fluidity of fresh concrete can evaluate the degree of fluidity of fresh concrete poured into a formwork 12 using an evaluation device 11 for evaluating the degree of fluidity of fresh concrete, which includes one or more rod members 14, one or more anti-tipping devices 15 capable of supporting the one or more rod members 14, and a vibrator 16. The method includes a first step of inserting the lower ends of the one or more rod members 14 into the surface layer of the fresh concrete 13 to stand the one or more rod members 14 upright while passing the one or more rod members 14 inside the one or more anti-tipping devices 15, and a second step of inserting a vibrating vibrator 16 near the one or more rod members 14 in the fresh concrete 13 to fluidize the surrounding fresh concrete 13 until the lower ends 14A of the one or more rod members 14 abut against the bottom 18 in the formwork 12 under the action of gravity.

この構成によれば、バイブレータ16で生コンクリート13の流動化を行うと、棒部材14が型枠12内の底部18に当接して停止する。これによって、作業者が生コンクリート13の流動化および締固めが完了したことを直感的に把握することができる。また、若い働き手や外国人材が技術を直感的に把握することができる。これによって、若い働き手や外国人材の人材育成を効率よく行うことができる。また、棒部材14は、上端14B付近が生コンクリートから露出するため、回収不能となる問題を生じることを防止できる。 According to this configuration, when the vibrator 16 fluidizes the ready-mix concrete 13, the rod member 14 comes into contact with the bottom 18 inside the formwork 12 and stops. This allows the worker to intuitively know that the fluidization and compaction of the ready-mix concrete 13 has been completed. It also allows young workers and foreign personnel to intuitively understand the technique. This allows for efficient human resource development of young workers and foreign personnel. In addition, the rod member 14 can be prevented from becoming unrecoverable because the area near the upper end 14B is exposed from the ready-mix concrete.

生コンクリート流動化程度の評価方法は、バイブレータ16を除去する前に1以上の棒部材14を除去する第3工程を備える。この構成によれば、棒部材14を除去した箇所を周囲の生コンクリートで埋めることができ、棒部材14を除去した箇所が空洞(欠陥)になってしまう不具合を生じることを防止できる。 The method for evaluating the degree of fluidity of fresh concrete includes a third step of removing one or more rod members 14 before removing the vibrator 16. This configuration allows the area where the rod member 14 has been removed to be filled with the surrounding fresh concrete, preventing the area where the rod member 14 has been removed from becoming hollow (defective).

生コンクリート流動化程度の評価方法は、前記第3工程において、1以上の棒部材14を除去した0.1秒~5分後にバイブレータ16を除去する。この構成によれば、棒部材14を除去した箇所が空洞(欠陥)になってしまう不具合を生じる可能性をより一層低減することができる。 The method for evaluating the degree of fluidity of fresh concrete involves removing the vibrator 16 0.1 seconds to 5 minutes after removing one or more rod members 14 in the third step. This configuration further reduces the possibility of a defect in which the area where the rod member 14 was removed becomes hollow (defective).

以下の実施形態では、主として第1実施形態と異なる部分について説明し、第1実施形態と共通する部分については、図示又は説明を省略する。
[第2実施形態]
In the following embodiment, the differences from the first embodiment will be mainly described, and illustrations or descriptions of parts common to the first embodiment will be omitted.
[Second embodiment]

図3を参照して、第2実施形態の生コンクリート流動化程度の評価装置11およびこれを用いる生コンクリート流動化程度の評価方法について説明する。
本実施形態において、1以上の転倒防止具15は、第1実施形態のように足場17の格子点17C(仮想格子点)の近傍だけでなく、隣接する4個の格子点17C同士が形成する四角の中心の位置31にも追加的に設けられている。したがって、本実施形態では、転倒防止具15のそれぞれの支持部23は、隣接する4個の格子点17C(仮想格子点)同士が形成する四角の中心の位置31に追加的に配置されている。
With reference to FIG. 3, a ready-mixed concrete fluidity degree evaluation device 11 according to a second embodiment and a ready-mixed concrete fluidity degree evaluation method using the same will be described.
In this embodiment, one or more fall prevention devices 15 are additionally provided not only near the lattice points 17C (virtual lattice points) of the scaffolding 17 as in the first embodiment, but also at the center positions 31 of the squares formed by four adjacent lattice points 17C. Therefore, in this embodiment, the support parts 23 of each fall prevention device 15 are additionally disposed at the center positions 31 of the squares formed by four adjacent lattice points 17C (virtual lattice points).

この追加的転倒防止具32は、支柱部21が省略されている。追加的転倒防止具15は、支持部23と、連結部22と、を備える。連結部22は、一方の端部で足場17に固定され、他方の端部で支持部23に固定されている。追加的転倒防止具15の支持部23および連結部22は、番線によって一体的に形成されていてもよい。或いは、支持部23を筒状の部材で構成し、その筒状の部材である支持部23と足場17を番線で構成される連結部22で固定してもよい。 In this additional fall prevention device 32, the support pole 21 is omitted. The additional fall prevention device 15 includes a support part 23 and a connecting part 22. The connecting part 22 is fixed to the scaffolding 17 at one end and to the support part 23 at the other end. The support part 23 and the connecting part 22 of the additional fall prevention device 15 may be integrally formed by wire. Alternatively, the support part 23 may be formed of a cylindrical member, and the cylindrical member, the support part 23, and the scaffolding 17 may be fixed by the connecting part 22 formed of wire.

本実施形態の生コンクリートの流動化程度の評価装置11を用いた生コンクリートの流動化程度評価方法について説明する。 This embodiment describes a method for evaluating the fluidity level of ready-mix concrete using the ready-mix concrete fluidity level evaluation device 11.

まず、作業者は、図3に示すように、生コンクリート13が内部に打たれた型枠12に対して足場17を設置する。足場17は、図3に破線の直線で示すように、上方からみて、型枠12に対して、縦方向および横方向に組まれて固定される。足場17は、一定のピッチで格子状に設置される。転倒防止具15を型枠12の外部および足場17に対して設置する。さらに、追加的転倒防止具15を足場17に対して取り付ける。 First, as shown in Figure 3, workers set up scaffolding 17 on the formwork 12 into which ready-mix concrete 13 has been poured. As shown by the dashed straight lines in Figure 3, the scaffolding 17 is assembled and fixed vertically and horizontally to the formwork 12 when viewed from above. The scaffolding 17 is set up in a lattice pattern with a fixed pitch. Fall prevention devices 15 are installed on the outside of the formwork 12 and on the scaffolding 17. Furthermore, additional fall prevention devices 15 are attached to the scaffolding 17.

型枠12に近い位置の転倒防止具15は、支柱部21を型枠12の外部に起立するように設置する。この支柱部21に対して連結部22および支持部23を設置する。型枠12の中央部に近い位置の転倒防止具15は、支柱部21を省略して、足場17で形成された格子点17Cに対して連結部22および支持部23を設置する。転倒防止具15の支持部23のそれぞれは、格子点17Cの近傍(格子点から5~25cmの位置)に配置される。追加的転倒防止具15の支持部23のそれぞれは、隣接する4個の格子点17C(仮想格子点)同士が形成する四角の中心の位置31に配置される。これによって、生コンクリート13の流動化程度の評価装置の事前の準備が完了する。 The anti-tip device 15 located near the formwork 12 is installed so that the support section 21 stands outside the formwork 12. The connecting section 22 and the support section 23 are installed on the support section 21. The anti-tip device 15 located near the center of the formwork 12 omits the support section 21 and installs the connecting section 22 and the support section 23 on the lattice point 17C formed by the scaffolding 17. Each of the support sections 23 of the anti-tip device 15 is placed near the lattice point 17C (5 to 25 cm from the lattice point). Each of the support sections 23 of the additional anti-tip device 15 is placed at the center position 31 of the square formed by four adjacent lattice points 17C (virtual lattice points). This completes the advance preparation of the evaluation device for the degree of fluidity of fresh concrete 13.

生コンクリート流動化程度の評価装置11を用いた生コンクリート流動化程度の評価方法は、第1工程、第2工程、および第3工程を備える。 The method for evaluating the degree of fluidity of fresh concrete using the evaluation device 11 for evaluating the degree of fluidity of fresh concrete includes a first step, a second step, and a third step.

作業者は、第1工程として、これら転倒防止具15および追加的転倒防止具15の支持部の内側に棒部材14を通すようにして設置する。その際、棒部材14の下端は、生コンクリート13の表面に対して1~5cmほど差し込むようにする。このようにして、生コンクリート13の表面に対して棒部材14を起立させる。図3に示すように、すべての転倒防止具15およびすべての追加的転倒防止具15に対して棒部材14を設置することで、足場17で形成された格子のすべての格子点17Cの近傍、および隣接する4個の格子点17C(仮想格子点)同士が形成する四角の中心の位置31、に対して棒部材14が設置される。 In the first step, the worker installs the rod members 14 by passing them through the inside of the support parts of the fall prevention devices 15 and the additional fall prevention devices 15. At this time, the lower end of the rod members 14 is inserted about 1 to 5 cm into the surface of the fresh concrete 13. In this way, the rod members 14 are erected against the surface of the fresh concrete 13. As shown in FIG. 3, by installing the rod members 14 for all the fall prevention devices 15 and all the additional fall prevention devices 15, the rod members 14 are installed near all the lattice points 17C of the lattice formed by the scaffolding 17, and at the center position 31 of the square formed by four adjacent lattice points 17C (virtual lattice points).

作業者は、第2工程として、格子点17Cの位置に対応する生コンクリート13および隣接する4個の格子点17C(仮想格子点)同士が形成する四角の中心の位置31に対応する生コンクリート13に対してバイブレータ16を差し込んで、当該位置で生コンクリート13に加振する。どの位置に対応する生コンクリート13から順番にバイブレータ16を差し込むかは、任意である。 In the second step, the worker inserts the vibrator 16 into the ready-mixed concrete 13 corresponding to the position of the lattice point 17C and the ready-mixed concrete 13 corresponding to the center position 31 of the square formed by the four adjacent lattice points 17C (virtual lattice points), and vibrates the ready-mixed concrete 13 at that position. The order in which the worker inserts the vibrator 16 into the ready-mixed concrete 13 is arbitrary.

バイブレータ16による加振は、棒部材14の下端が型枠12内の底部18に当接するまで行う。棒部材14が直径10mmの異形棒鋼で構成される場合で、棒部材14から10cmの位置で生コンクリート13に振動するバイブレータ16を差し込んだ場合には、およそ20~40秒の加振で棒部材14の下端14Aを型枠12内の底部18に接触させることができる。作業者は、図3に×印で示す格子点17Cの位置および4個の格子点17C(仮想格子点)同士が形成する四角の中心の位置31(厳密には、当該位置31にある棒部材14の近傍)に対して、順番に生コンクリート13に対して振動するバイブレータ16を差し込んで、すべての棒部材14を漏れなく型枠12内の底部18に当接させるように生コンクリート13を流動化させる。このとき、図3に破線の円で示されるように、バイブレータ16の直径が5cmであるときに、一般に直径50cmの範囲が生コンクリート13を流動化できる範囲である。 The vibrator 16 continues to vibrate until the lower end of the rod 14 abuts against the bottom 18 in the formwork 12. If the rod 14 is made of a deformed steel bar with a diameter of 10 mm, and the vibrating vibrator 16 is inserted into the fresh concrete 13 at a position 10 cm from the rod 14, the lower end 14A of the rod 14 can be brought into contact with the bottom 18 in the formwork 12 with approximately 20 to 40 seconds of vibration. The worker inserts the vibrating vibrator 16 into the fresh concrete 13 in order at the position of the lattice point 17C indicated by the x mark in FIG. 3 and at the center position 31 of the square formed by the four lattice points 17C (virtual lattice points) (strictly speaking, in the vicinity of the rod 14 at that position 31), and fluidizes the fresh concrete 13 so that all the rods 14 abut against the bottom 18 in the formwork 12 without exception. In this case, as shown by the dashed circle in Figure 3, when the diameter of the vibrator 16 is 5 cm, the range in which the ready-mix concrete 13 can be fluidized is generally within a diameter of 50 cm.

作業者は、第3工程として、下端14Aが底部18に接している棒部材14を生コンクリート13から除去する。作業者は、棒部材14の除去後に、振動するバイブレータ16を生コンクリート13から除去する。バイブレータ16は、棒部材14の除去後に、遅くとも5分後に、最も好ましくは0.1秒後に除去される。これによって、棒部材14を除去した後の空洞部分を周囲の生コンクリート13で埋めることができる。このため、当該部分が空洞として欠陥になってしまうことが防止される。 In the third step, the worker removes the rod 14 with its lower end 14A in contact with the bottom 18 from the ready-mix concrete 13. After removing the rod 14, the worker removes the vibrating vibrator 16 from the ready-mix concrete 13. The vibrator 16 is removed no later than 5 minutes, and most preferably 0.1 seconds, after the rod 14 is removed. This allows the hollow area left after the rod 14 is removed to be filled with the surrounding ready-mix concrete 13. This prevents the area from becoming a cavity and becoming a defect.

以上の工程により、型枠12内の生コンクリート13を概ね流動化して、型枠12内の生コンクリート13の締固めを完了できる。 Through the above steps, the fresh concrete 13 in the formwork 12 is largely fluidized, and compaction of the fresh concrete 13 in the formwork 12 is completed.

本実施形態によれば、以下のことがいえる。複数の棒部材14は、前記複数の仮想格子点のうち、隣接する仮想格子点同士が形成する四角の中心の位置31にも設けられ、複数の転倒防止具は、前記中心の位置31にも設けられ前記中心の位置31に設けられる複数の棒部材14をそれぞれ支持し、バイブレータ16は、中心の位置31の近傍に対応する位置で生コンクリート13に差し込まれる。この構成によれば、四角の中心の位置31で、生コンクリート13の流動化および締固めが十分になされない事態を生じることを防止できる。これによって、生コンクリート13の流動化および締固めをさらに確実にすることができる。 According to this embodiment, the following can be said. A plurality of rod members 14 are also provided at the center position 31 of the square formed by adjacent virtual lattice points among the plurality of virtual lattice points, a plurality of anti-tip devices are also provided at the center position 31 and support the plurality of rod members 14 provided at the center position 31, and the vibrator 16 is inserted into the ready-mixed concrete 13 at a position corresponding to the vicinity of the center position 31. With this configuration, it is possible to prevent a situation in which the ready-mixed concrete 13 is not sufficiently fluidized and compacted at the center position 31 of the square. This makes it possible to further ensure the fluidization and compaction of the ready-mixed concrete 13.

発明者らは、本願発明を完成させるに先立ち、バイブレータ16からの棒部材14の距離に関する実験(実施例1)と、棒部材14の材質に関する実験(実施例2)と、を行った。
[実施例1]
Prior to completing the present invention, the inventors conducted an experiment regarding the distance of the rod member 14 from the vibrator 16 (Example 1) and an experiment regarding the material of the rod member 14 (Example 2).
[Example 1]

図4、図5に実施例1の評価方法を示す。図4に示すように、直径50mmのバイブレータ16のある位置(加振位置)から10cm、30cm、50cm、90cmの位置に棒部材14を起立するように配置して、バイブレータ16からの距離の影響を検討した。棒部材14として、直径10mm、長さ700mmの異形棒鋼を用いた。 Figures 4 and 5 show the evaluation method for Example 1. As shown in Figure 4, the rod members 14 were placed upright at positions 10 cm, 30 cm, 50 cm, and 90 cm from the position (vibration position) of the vibrator 16 with a diameter of 50 mm, and the effect of the distance from the vibrator 16 was examined. A deformed steel bar with a diameter of 10 mm and a length of 700 mm was used as the rod member 14.

今回使用した生コンクリート13の配合条件は、上記実施形態と同様とした。生コンクリート13の呼び強度は18N/mmで、スランプは5cmであった。粗骨材最大寸法は20mmである。また、セメントの種類は普通セメントであった。生コンクリート13の深さ(高さ)は、60cmである。 The mix conditions of the ready-mixed concrete 13 used this time were the same as those of the above embodiment. The nominal strength of the ready-mixed concrete 13 was 18 N/ mm2 , and the slump was 5 cm. The maximum dimension of the coarse aggregate was 20 mm. The type of cement used was normal cement. The depth (height) of the ready-mixed concrete 13 was 60 cm.

図5に示すように、この状態で、生コンクリート13に振動するバイブレータ16を差し込んだ。図6に、時間経過と棒部材14の沈下量の結果を示す。バイブレータ16のある位置(加振位置)から10cmに棒部材14を配置すると、棒部材14が感度良く沈下して、20~30秒で棒部材14の下端が型枠12内の底部18にまで沈下した。一方、バイブレータ16のある位置(加振位置)から30cm、50cm、90cmの位置に棒部材14を配置した場合、加振による生コンクリート13の流動化の影響が起こらずに、棒部材14の沈下がほとんど見られないことが分かった。
[実施例2]
In this state, as shown in Figure 5, a vibrating vibrator 16 was inserted into the fresh concrete 13. Figure 6 shows the results of the amount of sinking of the rod 14 over time. When the rod 14 was placed 10 cm from the position (vibration position) of the vibrator 16, the rod 14 sunk with good sensitivity, and the lower end of the rod 14 sunk to the bottom 18 inside the formwork 12 in 20 to 30 seconds. On the other hand, when the rod 14 was placed 30 cm, 50 cm, or 90 cm from the position (vibration position) of the vibrator 16, it was found that the vibration did not affect the fluidization of the fresh concrete 13, and almost no sinking of the rod 14 was observed.
[Example 2]

続いて、棒部材14の材質を変化させて、棒部材14の沈下量に変化が出るかを検討した。バイブレータ16から棒部材14までの距離は、10cmとした。棒部材14として、異形棒鋼、アルミニウム合金(アルミ)製の丸棒、および塩化ビニル樹脂(塩ビ)製の丸棒、の3種類を容易した。棒部材14は、直径10mm、長さ700mmである。生コンクリート13の配合条件および深さ(高さ)は、実施例1と同様とした。結果を図7に示す。 Next, we investigated whether changing the material of the rod member 14 would affect the amount of sinking of the rod member 14. The distance from the vibrator 16 to the rod member 14 was 10 cm. Three types of rod member 14 were used: a deformed steel bar, a round bar made of aluminum alloy (aluminum), and a round bar made of polyvinyl chloride resin (PVC). The rod member 14 had a diameter of 10 mm and a length of 700 mm. The mix conditions and depth (height) of the ready-mix concrete 13 were the same as in Example 1. The results are shown in Figure 7.

棒部材14として異形棒鋼を用いた場合には、20~30秒で棒部材14が感度良く沈下して、棒部材14の下端14Aが型枠12内の底部18にまで沈下した。一方、異形棒鋼より比重の小さいアルミニウム合金製の棒部材14では、加振時間に対する沈下量が緩やかとなり、さらに比重の小さい塩化ビニル樹脂製の棒部材14では、さらに加振時間に対する沈下量が小さくなった。
[考察]
When deformed steel bars were used as the bar members 14, the bar members 14 sunk sensitively in 20 to 30 seconds, and the lower ends 14A of the bar members 14 sunk to the bottom 18 within the formwork 12. On the other hand, in the case of the bar members 14 made of an aluminum alloy, which has a smaller specific gravity than the deformed steel bars, the amount of sinking relative to the vibration time was gentler, and in the case of the bar members 14 made of polyvinyl chloride resin, which has an even smaller specific gravity, the amount of sinking relative to the vibration time was even smaller.
[Consideration]

発明者らは、上記実施例1、実施例2の結果から、生コンクリートの流動化程度を最も感度良く検出できる棒部材14として、異形棒鋼を選択した。また、バイブレータ16に対する棒部材14の位置として、バイブレータ16から10cmの位置が最も感度良く沈下が起こり望ましいことを確認した。さらに、棒部材14として、異形棒鋼を選択し、バイブレータ16から10cmの位置に棒部材14を配置することで、20~30秒で棒部材14の下端14Aが型枠12内の底部18にまで感度良く沈下することを確認した。この20~30秒の加振時間は、生コンクリート13を流動化するのに必要かつ十分な時間として、作業現場での実情にも合致している。 Based on the results of Examples 1 and 2 above, the inventors selected deformed steel bars as the bar members 14 that can most sensitively detect the degree of fluidity of fresh concrete. They also confirmed that the most sensitive settlement occurs when the bar members 14 are positioned 10 cm from the vibrator 16. They further confirmed that by selecting deformed steel bars as the bar members 14 and positioning the bar members 14 10 cm from the vibrator 16, the lower end 14A of the bar members 14 can be sensitively sunk to the bottom 18 of the formwork 12 in 20 to 30 seconds. This vibration time of 20 to 30 seconds is both necessary and sufficient to fluidize the fresh concrete 13, and is consistent with the actual conditions at the work site.

11 評価装置
12 型枠
13 生コンクリート
14 棒部材
14A 下端
15 転倒防止具
16 バイブレータ
17C 格子点
18 底部
24 目盛り
31 位置
32 追加的転倒防止具
11 Evaluation device 12 Formwork 13 Fresh concrete 14 Bar member 14A Lower end 15 Fall prevention device 16 Vibrator 17C Grid point 18 Bottom 24 Scale 31 Position 32 Additional fall prevention device

Claims (11)

型枠内に打設された生コンクリートの流動化程度を評価できる生コンクリート流動化程度の評価装置であって、
前記生コンクリートの表層に対して下端が差し込まれて起立した1以上の棒部材と、
前記1以上の棒部材の周囲に設けられて前記1以上の棒部材を上下動可能に支持する1以上の転倒防止具と、
前記棒部材の近傍で前記生コンクリート内に差し込まれて振動するバイブレータであって、重力の作用で前記棒部材の前記下端が前記型枠内の底部に当接するまで周辺の前記生コンクリートを流動化させるバイブレータと、
を備える生コンクリート流動化程度の評価装置。
A ready-mixed concrete fluidity evaluation device capable of evaluating the fluidity of ready-mixed concrete poured into a formwork,
One or more rod members having their lower ends inserted into and standing on the surface layer of the fresh concrete;
One or more anti-tip devices are provided around the one or more rod members and support the one or more rod members so that the one or more rod members can move up and down;
a vibrator that is inserted into the fresh concrete near the rod member and vibrates, and fluidizes the fresh concrete around the rod member until the lower end of the rod member abuts against the bottom of the formwork under the effect of gravity;
An apparatus for evaluating the degree of fluidity of fresh concrete.
前記棒部材は、前記下端からの距離を示す目盛りを有する請求項1に記載の生コンクリート流動化程度の評価装置。 The device for evaluating the degree of fluidity of fresh concrete according to claim 1, wherein the rod member has a scale indicating the distance from the lower end. 前記バイブレータは、前記バイブレータの直径の100~500%の長さを前記棒部材から離間した位置に差し込まれる請求項1に記載の生コンクリート流動化程度の評価装置。 The ready-mix concrete fluidity evaluation device according to claim 1, wherein the vibrator is inserted at a position spaced from the rod member by a length that is 100 to 500% of the diameter of the vibrator. 前記1以上の棒部材は、複数であり、複数の前記棒部材は、前記型枠内の複数の仮想格子点の近傍に設けられ、
前記転倒防止具は、複数であり、複数の前記転倒防止具のそれぞれは、前記複数の仮想格子点の近傍に設けられ前記複数の棒部材のそれぞれを支持し、
前記バイブレータは、前記仮想格子点に対応する位置で前記生コンクリートに差し込まれる請求項1に記載の生コンクリート流動化程度の評価装置。
the one or more rod members are a plurality of rod members, the plurality of rod members being provided in the vicinity of a plurality of virtual lattice points within the formwork;
a plurality of the fall prevention devices are provided, each of the plurality of fall prevention devices being provided in the vicinity of the plurality of virtual lattice points and supporting each of the plurality of rod members;
The device for evaluating the degree of fluidity of ready-mixed concrete according to claim 1 , wherein the vibrator is inserted into the ready-mixed concrete at a position corresponding to the virtual lattice point.
前記複数の棒部材は、前記複数の仮想格子点のうち、隣接する仮想格子点同士が形成する四角の中心の位置にも設けられ、
複数の前記転倒防止具は、前記中心の位置にも設けられ前記中心の位置に設けられる前記複数の棒部材をそれぞれ支持し、
前記バイブレータは、前記中心の位置の近傍に対応する位置で前記生コンクリートに差し込まれる請求項4に記載の生コンクリート流動化程度の評価装置。
the plurality of bar members are also provided at center positions of squares formed by adjacent virtual lattice points among the plurality of virtual lattice points,
The plurality of fall prevention devices are also provided at the center position and support the plurality of rod members provided at the center position,
The apparatus for evaluating the degree of fluidity of ready-mixed concrete according to claim 4 , wherein the vibrator is inserted into the ready-mixed concrete at a position corresponding to the vicinity of the center position.
1以上の棒部材と、前記1以上の棒部材を支持可能な1以上の転倒防止具と、バイブレータと、を備える生コンクリート流動化程度の評価装置を用いて、型枠内に打設された生コンクリートの流動化程度を評価できる生コンクリート流動化程度の評価方法であって、
前記1以上の転倒防止具の内側に前記1以上の棒部材を通しつつ、前記生コンクリートの表層に対して前記1以上の棒部材の下端を差し込んで前記1以上の棒部材を起立させる第1工程と、
振動する前記バイブレータを前記生コンクリート内の前記1以上の棒部材の近傍に差し込んで、重力の作用で前記1以上の棒部材の前記下端が前記型枠内の底部に当接するまで周辺の前記生コンクリートを流動化させる第2工程と、
を備える生コンクリート流動化程度の評価方法。
A method for evaluating the fluidity of fresh concrete, which can evaluate the fluidity of fresh concrete poured in a formwork using an evaluation device for evaluating the fluidity of fresh concrete, the evaluation device comprising one or more rod members, one or more fall prevention devices capable of supporting the one or more rod members, and a vibrator,
A first step of inserting the lower ends of the one or more rod members into the surface layer of the fresh concrete while passing the one or more rod members through the inside of the one or more fall prevention devices to stand the one or more rod members;
A second step of inserting the vibrator into the fresh concrete near the one or more rod members and fluidizing the fresh concrete around the vibrator until the lower ends of the one or more rod members abut against the bottom of the formwork by the action of gravity;
A method for evaluating the degree of fluidity of ready-mixed concrete.
前記バイブレータを除去する前に前記1以上の棒部材を除去する第3工程を備える請求項6に記載の生コンクリート流動化程度の評価方法。 The method for evaluating the degree of fluidity of fresh concrete according to claim 6, further comprising a third step of removing the one or more rod members before removing the vibrator. 前記第3工程において、前記1以上の棒部材を除去した0.1秒~5分後に前記バイブレータを除去する請求項7に記載の生コンクリート流動化程度の評価方法。 The method for evaluating the degree of fluidity of fresh concrete according to claim 7, wherein in the third step, the vibrator is removed 0.1 seconds to 5 minutes after the one or more rod members are removed. 前記バイブレータは、前記バイブレータの直径の100~500%の長さを前記棒部材から離間した位置に差し込まれる、請求項6に記載の生コンクリート流動化程度の評価方法。 The method for evaluating the degree of fluidity of fresh concrete according to claim 6, wherein the vibrator is inserted at a position spaced from the rod member by a length of 100 to 500% of the diameter of the vibrator. 前記1以上の棒部材は、複数であって、複数の前記棒部材は、前記型枠内の複数の仮想格子点の近傍に設けられ、
前記1以上の転倒防止具は、複数であって、複数の前記転倒防止具のそれぞれは、前記複数の仮想格子点の近傍に設けられ前記複数の棒部材のそれぞれを支持し、
前記第2工程において、前記仮想格子点に対応する位置で前記生コンクリートに前記バイブレータを順番に差し込んで、前記複数の棒部材を前記型枠の底部に当接させる、請求項6に記載の生コンクリート流動化程度の評価方法。
the one or more rod members are a plurality of rod members, the plurality of rod members being provided in the vicinity of a plurality of virtual lattice points within the formwork;
the one or more fall prevention devices are a plurality of devices, each of the plurality of fall prevention devices being provided in the vicinity of the plurality of virtual lattice points and supporting each of the plurality of rod members;
7. The method for evaluating the degree of fluidity of fresh concrete according to claim 6, wherein in the second step, the vibrator is inserted into the fresh concrete in sequence at positions corresponding to the virtual lattice points, and the plurality of rod members are brought into contact with the bottom of the formwork.
前記複数の棒部材は、前記複数の仮想格子点のうち、隣接する仮想格子点同士が形成する四角の中心の位置にも設けられ、
複数の前記転倒防止具は、前記中心の位置にも設けられ前記中心の位置に設けられる前記複数の棒部材をそれぞれ支持し、
前記第2工程において、前記中心の位置の近傍に前記バイブレータを順番に差し込んで、前記複数の棒部材を前記型枠の底部に当接させる、請求項10に記載の生コンクリート流動化程度の評価方法。
the plurality of bar members are also provided at center positions of squares formed by adjacent virtual lattice points among the plurality of virtual lattice points,
The plurality of fall prevention devices are also provided at the center position and support the plurality of rod members provided at the center position,
The method for evaluating the degree of fluidity of fresh concrete according to claim 10, wherein in the second step, the vibrator is inserted in sequence near the center position to bring the plurality of rod members into contact with the bottom of the formwork.
JP2023046757A 2023-03-23 2023-03-23 Apparatus and method for evaluating the fluidity degree of ready-mixed concrete. Active JP7707226B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2023046757A JP7707226B2 (en) 2023-03-23 2023-03-23 Apparatus and method for evaluating the fluidity degree of ready-mixed concrete.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2023046757A JP7707226B2 (en) 2023-03-23 2023-03-23 Apparatus and method for evaluating the fluidity degree of ready-mixed concrete.

Publications (2)

Publication Number Publication Date
JP2024135866A JP2024135866A (en) 2024-10-04
JP7707226B2 true JP7707226B2 (en) 2025-07-14

Family

ID=92912773

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2023046757A Active JP7707226B2 (en) 2023-03-23 2023-03-23 Apparatus and method for evaluating the fluidity degree of ready-mixed concrete.

Country Status (1)

Country Link
JP (1) JP7707226B2 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012154080A (en) 2011-01-25 2012-08-16 Chugoku Electric Power Co Inc:The Rodding rod
JP2019183392A (en) 2018-04-02 2019-10-24 学校法人金沢工業大学 Determining method of concrete compaction completion

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60105765A (en) * 1983-11-11 1985-06-11 株式会社大林組 Vibrator for solidifying raw concrete
JP7390873B2 (en) * 2019-11-21 2023-12-04 株式会社安藤・間 Concrete compaction evaluation device and concrete compaction evaluation method
JP6918081B2 (en) * 2019-11-28 2021-08-11 りんかい日産建設株式会社 Concrete compaction measuring tool and concrete compaction measuring method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012154080A (en) 2011-01-25 2012-08-16 Chugoku Electric Power Co Inc:The Rodding rod
JP2019183392A (en) 2018-04-02 2019-10-24 学校法人金沢工業大学 Determining method of concrete compaction completion

Also Published As

Publication number Publication date
JP2024135866A (en) 2024-10-04

Similar Documents

Publication Publication Date Title
CN104264902B (en) Steel pipe concrete column and pile foundation connection structure
CN108035554B (en) Construction method of section steel column support frame of super high-rise building frame column
CN106193330B (en) A kind of steel building construction land tenure foot bolt pre-embedded construction method
CN108643192A (en) Brace in Deep Footing Groove supporting ultralong steel tube column pile construction method
CN105155853A (en) Process for positioning and constructing reinforced concrete for high-rise residential buildings
JP7187743B2 (en) Confirmation method of concrete pouring and construction method of concrete structure
CN112458905A (en) Splicing adjustment method for prefabricated capping beam and prefabricated stand column
CN110630032B (en) A node connection device for adding a new beam to an existing reinforced concrete column beam
JP7707226B2 (en) Apparatus and method for evaluating the fluidity degree of ready-mixed concrete.
CN111945714B (en) Steel sleeve guiding method combined with steel upright column inserting construction method
CN117536354A (en) Shock insulation support and installation and construction method thereof
CN113863330B (en) Ultra-deep foundation pit narrow fertilizer groove concrete backfill structure and construction method
JP3251567B2 (en) Construction method of open caisson bottom
JP2023135052A (en) Vibrator unit and compaction method for columnar concrete
CN222120249U (en) Lattice column assembly
CN113106984A (en) Enclosure pile foundation pit inter-pile net shotcrete structure and construction method
JPH03295931A (en) Construction method for frame straight pillar
JP5425957B2 (en) Construction method using concrete placement scaffold
JP4611113B2 (en) Integrated construction method of pile and column
CN106368330B (en) Steel building construction land tenure foot bolt pre-embedded construction method
CN117051989A (en) Steel structure column foot bolt pre-burying device and construction method
CN211499464U (en) Steel pipe concrete composite column for high-rise building and reinforcing system thereof
CN113982017A (en) Method for installing reinforcement cage in pile hole
CN113073553A (en) Pile cap embedded upright post steel bar positioning device and construction method thereof
CN115897554B (en) Cast-in-place pile head protection system under complex construction environment and construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240926

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250530

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250619

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250702

R150 Certificate of patent or registration of utility model

Ref document number: 7707226

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150