JP7707773B2 - Electrical equipment remote inspection system, Electrical equipment remote inspection method - Google Patents
Electrical equipment remote inspection system, Electrical equipment remote inspection methodInfo
- Publication number
- JP7707773B2 JP7707773B2 JP2021143201A JP2021143201A JP7707773B2 JP 7707773 B2 JP7707773 B2 JP 7707773B2 JP 2021143201 A JP2021143201 A JP 2021143201A JP 2021143201 A JP2021143201 A JP 2021143201A JP 7707773 B2 JP7707773 B2 JP 7707773B2
- Authority
- JP
- Japan
- Prior art keywords
- inspection
- odor
- electrical equipment
- data
- information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Testing And Monitoring For Control Systems (AREA)
- Selective Calling Equipment (AREA)
Description
本発明は、変電所などの電気施設に設置された電気設備などの日常的な保守点検の全般を遠隔で自動的に行う技術に関する。 The present invention relates to a technology for remotely and automatically performing general routine maintenance and inspection of electrical equipment installed in electrical facilities such as substations.
変電所などの電気設備の保守点検については、従来から保守点検員が電気設備の設置された現地に赴き、点検項目に従って設備の状態を観察する方法が採られている。 When it comes to maintenance and inspection of electrical equipment such as substations, the traditional method has been for maintenance and inspection personnel to visit the site where the electrical equipment is installed and observe the condition of the equipment according to the inspection items.
点検項目としては、(1)電気設備に設置されているメータの読取/モニタに表示されている数値・状態値の確認、(2)設備の汚れや損傷などの外観の観察、(3)設備から発せられる異音の観察、(4)設備における異臭の有無の確認などが用いられている。 Inspection items include (1) reading meters installed on electrical equipment and checking the numerical and status values displayed on the monitor, (2) observing the appearance of the equipment, such as dirt and damage, (3) observing any abnormal sounds coming from the equipment, and (4) checking for the presence or absence of abnormal odors from the equipment.
メータの読取については、特許文献1に示すように、カメラで撮影した画像を処理することでアナログメータのメモリを読み取る方法が提案されている。また、モニタに表示されている数値や状態値の確認については、非特許文献1,2に示すように、電気設備の状態をネットワーク経由で読み取るシステムが提案されている。 Regarding meter reading, as shown in Patent Document 1, a method has been proposed in which the memory of an analog meter is read by processing an image captured by a camera. In addition, regarding confirmation of numerical values and status values displayed on a monitor, as shown in Non-Patent Documents 1 and 2, a system has been proposed that reads the status of electrical equipment via a network.
外観の観察については、非特許文献3に示すように、監視カメラを用いて設備の外観を監視する試みが提案されている。すなわち、省力化によるコストダウンに加え少子化による労働力不足から変電所の巡視省力化が従来以上に要請されているため、目視による巡視代替の手段として、ドローン,パトロールロボット,多数のカメラの利用が考えられている。 Regarding external observation, as shown in Non-Patent Document 3, an attempt has been proposed to monitor the external appearance of facilities using surveillance cameras. That is, in addition to cost reduction through labor saving, there is a greater demand than ever for labor saving in patrols of substations due to labor shortages caused by the declining birthrate, so the use of drones, patrol robots, and multiple cameras is being considered as a means of replacing visual patrols.
もっとも、ドローンは狭隘な箇所や電磁界影響による墜落の懸念があり、また変電所パトロールロボットは高コストなことから非特許文献3では、目視による巡視の代替の可能性を調査するために複数のカメラを使った変電所見守りシステムを構築している。 However, there are concerns that drones may crash in narrow spaces or due to electromagnetic field effects, and substation patrol robots are expensive. Therefore, in non-patent document 3, a substation monitoring system using multiple cameras is constructed to investigate the possibility of replacing visual patrols.
異音の観察については、非特許文献4に示すように、マイクで収取した音を解析することで機器の異常を検知する方法が提案されている。また、異臭の確認については、非特許文献5,6に示すように、サンプルを実験室に持ち帰って、におい分析を行う装置が提案されている。さらに非特許文献7の火災警報器に示すように、各種ガスセンサが提案されている。 Regarding the observation of abnormal sounds, as shown in Non-Patent Document 4, a method has been proposed in which sounds picked up by a microphone are analyzed to detect abnormalities in equipment. In addition, regarding the confirmation of abnormal odors, as shown in Non-Patent Documents 5 and 6, devices have been proposed in which samples are taken back to a laboratory and odor analysis is performed. Furthermore, as shown in Non-Patent Document 7, Fire Alarms, various gas sensors have been proposed.
特許文献1および非特許文献1~7の方法は、保守点検員が実施する個々の点検項目については補助となり有益である。しかしながら、それぞれの提案で一つの点検項目が自動化されるだけなので、他の点検項目は人手で観察・確認しなければならない。 The methods in Patent Document 1 and Non-Patent Documents 1 to 7 are useful as supplements for individual inspection items performed by maintenance and inspection personnel. However, each proposal only automates one inspection item, so other inspection items must be observed and checked manually.
その結果、結局は保守点検員が現地に赴くこととなり、保守点検の省略とならないおそれがある。特に異臭確認については、変電所などの電気設備において油臭・焦げ臭を確認するためのセンシングシステムができておらず、保守点検員の感覚に頼らざるをえない。 As a result, maintenance and inspection personnel will end up having to go to the site, and there is a risk that maintenance and inspection will not be omitted. In particular, when it comes to checking for abnormal odors, there is no sensing system in place to check for oily or burnt odors in electrical equipment such as substations, so maintenance and inspection personnel must rely on their own senses.
本発明は、このような従来の課題を解決するためになされ、電気設備の各点検項目を自動計測し、保守点検員が現地に赴くことなく日常点検を可能とすることを解決課題としている。 The present invention was made to solve these problems in the past, and its problem-solving objective is to automatically measure each inspection item of electrical equipment, enabling daily inspections without the need for maintenance and inspection personnel to visit the site.
(1)本発明の一態様は、
電気施設の屋外に設置された電気設備と、
前記電気施設の電気室内に設置された制御盤と、
を点検対象として遠隔から自動的に保守点検を行うシステムであって、
前記制御盤に設置され、前記制御盤に集まってくる前記電気設備の内蔵センサによる計測値を取得する情報通信装置と、
前記電気設備に設置されたメータを撮影し、前記メータの指針値を撮影された画像に基づき読み取って取得するメータ読取装置と、
前記点検対象の外観を撮影し、撮影画像を取得する監視カメラ装置と、
前記点検対象の周囲の音響信号をマイクにより収集し、収集された音響信号に基づき異音の有無および異音レベルを求めて異音情報を取得する音響収集装置と、
前記点検対象の周囲のガスを吸気し、該吸気されたガスから得られた臭覚センサ信号に基づき異臭の有無を診断した異臭情報を取得する臭覚センサ装置と、
前記点検対象の設置された環境情報を計測して取得する環境計測装置と、
前記電気室内に設置され、前記各装置の取得した情報を点検データとして整理・保存する現地点検サーバと、
前記現地点検サーバにより整理・保存された点検データをネットワーク経由で提供される遠隔監視装置と、
を備えることを特徴としている。
(1) One aspect of the present invention is
Electrical equipment installed outdoors at the electrical facility;
A control panel installed in an electrical room of the electrical facility;
A system for automatically performing maintenance inspection remotely on a target object,
An information and communication device that is installed on the control panel and acquires measurement values collected by built-in sensors of the electrical equipment and that are collected on the control panel;
a meter reading device that photographs a meter installed in the electrical equipment and reads and acquires the indication value of the meter based on the photographed image;
A surveillance camera device that captures an external view of the inspection target and acquires a captured image;
a sound collecting device that collects sound signals from the surroundings of the inspection target using a microphone and obtains abnormal sound information by determining the presence or absence of abnormal sound and the level of the abnormal sound based on the collected sound signals;
an odor sensor device that draws in gas around the inspection target and acquires odor information that diagnoses the presence or absence of an odor based on an odor sensor signal obtained from the drawn in gas;
an environmental measuring device that measures and acquires environmental information about an environment in which the inspection target is installed;
an on-site inspection server that is installed in the electrical room and organizes and stores information acquired by each of the devices as inspection data;
a remote monitoring device that receives the inspection data organized and stored by the on-site inspection server via a network;
The present invention is characterized by the following.
(2)本発明の他の態様は、
電気施設の屋外に設置された電気設備と、
前記電気施設の電気室内に設置された制御盤と、
を点検対象として遠隔から自動的に保守点検するシステムの実行する方法であって、
前記制御盤に設置された情報通信装置が、前記制御盤に集まってくる前記電気設備の内蔵センサによる計測値を取得するステップと、
メータ読取装置により前記電気設備に設置されたメータを撮影し、前記メータの指針値を撮影された画像に基づき読み取って取得するステップと、
監視カメラ装置により前記点検対象の外観を撮影し、撮影画像を取得するステップと、
音響収集装置が、前記点検対象の周囲の音響信号をマイクにより収集し、収集された音響信号に基づき異音の有無および異音レベルを求めて異音情報を取得するステップと、
臭覚センサ装置が、前記点検対象の周囲のガスを吸気し、該吸気されたガスから得られた臭覚センサ信号に基づき異臭の有無を診断した異臭情報を取得するステップと、
環境計測装置により前記点検対象の設置された環境情報を計測して取得するステップと、
前記電気室内に設置された現地点検サーバが、前記各装置の取得した情報を点検データとして整理・保存するステップと、
前記現地点検サーバにより整理・保存された点検データをネットワーク経由で遠隔監視装置に提供するステップと、
を有することを特徴としている。
(2) Another aspect of the present invention is
Electrical equipment installed outdoors at the electrical facility;
A control panel installed in an electrical room of the electrical facility;
A method for performing a remote and automatic maintenance inspection system for an inspection target, comprising:
An information communication device installed in the control panel acquires measurement values by built-in sensors of the electrical equipment collected in the control panel;
taking an image of a meter installed in the electrical equipment by a meter reading device, and reading and acquiring the indication value of the meter based on the image taken;
A step of photographing an external view of the inspection target by a surveillance camera device and acquiring a photographed image;
a step in which an acoustic collection device collects acoustic signals around the inspection target using a microphone, and obtains abnormal sound information by determining the presence or absence of abnormal sound and the level of the abnormal sound based on the collected acoustic signals;
an odor sensor device inhaling gas around the inspection target and acquiring odor information diagnosing the presence or absence of an odor based on an odor sensor signal obtained from the inhaled gas;
measuring and acquiring information about an environment in which the inspection target is installed by an environment measuring device;
An on-site inspection server installed in the electrical room organizes and stores the acquired information of each of the devices as inspection data;
providing the inspection data organized and stored by the on-site inspection server to a remote monitoring device via a network;
The present invention is characterized in that it has the following features.
本発明によれば、電気設備の各点検項目が自動計測されるため、保守点検員が現地に赴くことなく日常点検を行うことが可能となる。 According to the present invention, each inspection item of electrical equipment is measured automatically, making it possible for maintenance and inspection personnel to perform daily inspections without visiting the site.
以下、本発明の実施形態に係る電気設備遠隔総合点検システム(電気設備遠隔総合点検方法)を説明する。このシステムによれば、変電所などの電気施設に設置された電気設備などの日常的な保守点検の全般を遠隔にて自動的に行うことができる。 The following describes an embodiment of the electrical equipment remote comprehensive inspection system (remote comprehensive inspection method for electrical equipment) of the present invention. This system makes it possible to automatically and remotely carry out all routine maintenance and inspection of electrical equipment installed in electrical facilities such as substations.
すなわち、点検項目のメータやモニタの数値・状態値の確認・外観観察・異音観察・異臭確認のすべての項目を自動的に計測し、保守点検員が現地に赴くことなく日常点検全般を行うことを可能とする。特に従来方法では実現できていない異臭確認について、複合的なセンシングシステムを構築して信頼度の高い異臭確認が実現されている。 In other words, all items of inspection, such as checking the numerical values and status values of meters and monitors, observing the appearance, observing abnormal sounds, and checking for abnormal odors, are measured automatically, making it possible for maintenance and inspection personnel to carry out general daily inspections without visiting the site. In particular, a complex sensing system has been constructed to enable highly reliable detection of abnormal odors, which was not possible with conventional methods.
図1~図38に基づき前記システムの実施例1を説明する。図1中の1は、前記システムを示している。 The first embodiment of the system will be described with reference to Figures 1 to 38. The number 1 in Figure 1 indicates the system.
前記システム1は、情報通信端末4群・メータ読取装置5群・固定式監視カメラ装置6群・移動式監視カメラ装置7群・音響収集装置8群・嗅覚センサ装置9群・屋内環境計測装置10群・屋外環境計測装置11群・現地点検サーバ12・遠隔監視端末13を備えている。 The system 1 includes 4 information communication terminals, 5 meter reading devices, 6 fixed surveillance camera devices, 7 mobile surveillance camera devices, 8 acoustic collection devices, 9 olfactory sensor devices, 10 indoor environment measuring devices, 11 outdoor environment measuring devices, an on-site inspection server 12, and a remote monitoring terminal 13.
ここでは前記各装置4~11は、変電所の電気設備を遠隔点検するために用いられているため、点検装置と呼ぶことができる。また、前記各装置4~11は、点検対象となる電気設備10・制御盤20(以下、点検対象設備とする。)の個数に応じて用意され、それぞれ点検対象設備毎に設置される。 In this case, the devices 4 to 11 can be called inspection devices because they are used to remotely inspect the electrical equipment of the substation. Furthermore, the devices 4 to 11 are prepared according to the number of electrical equipment 10 and control panels 20 (hereinafter referred to as equipment to be inspected) to be inspected, and are installed for each piece of equipment to be inspected.
≪配置状況≫
変電所などの電気施設では、図13および図14に示すように、変圧器や遮断器などの電気設備30を並べて設置し、それらの電気設備30を制御する制御盤20を電気室に並べて設置している。従来の保守点検員の行う保守点検作は、徒歩にて電気施設内を周回し、電気設備30や制御盤20などを点検する。
<Deployment Status>
In an electrical facility such as a substation, electrical equipment 30 such as transformers and circuit breakers are arranged side by side, and control panels 20 for controlling the electrical equipment 30 are arranged side by side in an electrical room, as shown in Figures 13 and 14. Conventional maintenance and inspection work performed by maintenance and inspection personnel involves walking around the electrical facility and inspecting the electrical equipment 30 and the control panels 20.
これに対して本実施例では、前記各装置4~12を電気施設内の各所に配置し、点検対象設備の状態を遠隔監視する。なお、遠隔監視端末は遠隔地の保守管理室に配置される。 In contrast, in this embodiment, the devices 4 to 12 are placed in various locations within the electrical facility, and the status of the equipment to be inspected is remotely monitored. The remote monitoring terminal is placed in a remote maintenance room.
(1)電気室内
図13に基づき電気室における前記各装置4,6,8~10,12の配置例を説明する(前記装置5,7,11は電気室内には配置されていない。)。
(1) Inside the Electrical Room With reference to FIG. 13, an example of the arrangement of the devices 4, 6, 8 to 10, and 12 in the electrical room will be described (the devices 5, 7, and 11 are not arranged in the electrical room).
図13中の20-1,20-2,20-3...20-Nは、電気室内に配置された制御盤20を示している。この各制御盤20内に情報通信端末4が配置される。また、各制御盤20-1,20-2,20-3...20-Nの周囲を囲繞するように音響収集装置8,臭覚センサ装置9,屋内環境装置10が配置される。 In FIG. 13, 20-1, 20-2, 20-3...20-N indicate control panels 20 arranged in the electrical room. An information communication terminal 4 is arranged inside each control panel 20. In addition, an acoustic collection device 8, an odor sensor device 9, and an indoor environment device 10 are arranged so as to surround each of the control panels 20-1, 20-2, 20-3...20-N.
この各装置8~10を囲繞するように固定式監視カメラ6が配置される(電気室内には前記装置5,7,11は配置されない。)。なお、電気室内の所定箇所に現地点検サーバ12が配置される。 Fixed surveillance cameras 6 are placed around each of these devices 8 to 10 (devices 5, 7, and 11 are not placed inside the electrical room). An on-site inspection server 12 is placed at a designated location inside the electrical room.
(2)屋外
図14に基づき電気施設の屋外における前記各装置4~11の配置例を説明する。図14中の30-1,30-2,30-3...30-Nは、屋外に設置された電気設備30を示している。また、30-2は、機械式メータなどの通信手段を持たないメータの設置された電気設備30を示し、メータ読取装置5が配置されている。
(2) Outdoors An example of the arrangement of the devices 4 to 11 outdoors in an electrical facility will be described with reference to Fig. 14. In Fig. 14, 30-1, 30-2, 30-3...30-N indicate electrical equipment 30 installed outdoors. Also, 30-2 indicates electrical equipment 30 equipped with a meter that does not have a communication means, such as a mechanical meter, and the meter reading device 5 is also installed.
この各電気設備30-1,30-2,30-3...30-Nを囲繞するように音響収集装置8,臭覚センサ装置9,屋外環境装置11が配置されている。この各装置8,9,11を囲繞するように移動式監視カメラ11が配置され、前記装置11を囲繞するように固定式監視カメラ装置6が配置されている。 A sound collecting device 8, an olfactory sensor device 9, and an outdoor environment device 11 are arranged to surround each of the electrical equipment 30-1, 30-2, 30-3... 30-N. A mobile surveillance camera 11 is arranged to surround each of the devices 8, 9, 11, and a fixed surveillance camera device 6 is arranged to surround the device 11.
≪各装置4~13の構成≫
(1)情報通信装置4
各情報通信装置4には、非特許文献1の汎用データ収集・伝送端末/非特許文献2の多機能形デジタル継電器を用いることができ、同文献1,2と同様に変電所の電気室内の各種制御盤20に設置される。
<Configuration of each device 4 to 13>
(1) Information and communication device 4
Each information and communication device 4 can be a general-purpose data collection and transmission terminal as described in non-patent document 1 or a multi-function digital relay as described in non-patent document 2, and is installed in various control panels 20 in the electrical room of the substation, as in documents 1 and 2.
ここでは各情報通信装置4には、現地点検サーバ12から制御パラメータが入力され、入力された制御パラメータに応じて制御盤20に集まってくる電気設備30の内蔵センサによる計測値・電気設備30の「ON」/「OFF」などの状態値を収集して取得する。 Here, each information communication device 4 receives control parameters from the on-site inspection server 12, and collects and acquires measurement values from the built-in sensors of the electrical equipment 30 and status values such as "ON"/"OFF" of the electrical equipment 30 that are collected in the control panel 20 according to the input control parameters.
また、電気設備30に設置されたメータのうちメータ指針値を通信手段によって収集可能なスマートメータなどについては、情報通信端末4により前記メータ指針値が計測値として収集される。なお、各情報通信装置4は、入力された制御パラメータに従って取得した計測値・状態値を現地点検サーバ12に送信する。 Furthermore, for meters installed in the electrical equipment 30, such as smart meters whose meter indications can be collected by communication means, the meter indications are collected as measurement values by the information communication terminal 4. Each information communication device 4 transmits the measurement values and status values acquired according to the input control parameters to the on-site inspection server 12.
(2)メータ読取装置5
電気設備30に設置されたメータのうち変圧器の油面計のように機械式メータであって通信手段を持たないものについては、情報通信装置4ではメータ指針値を収集することができない。そこで、前述のように電気設備30-2にメータ読取装置5を設置し、メータ指針値を収集する。
(2) Meter reading device 5
For meters installed in the electrical equipment 30 that are mechanical meters without communication means, such as a transformer oil level gauge, the meter readings cannot be collected by the information and communication device 4. Therefore, as described above, a meter reading device 5 is installed in the electrical equipment 30-2 to collect the meter readings.
具体的には各メータ読取装置5は、図2に示すように、カメラ5a・照明5b・メータ読取端末5cを有している。メータ読取端末5cには、現地点検サーバ12から解析パラメータおよび制御パラメータが入力される。この制御パラメータに応じて照明制御信号を出力することで証明5bを点灯/消灯させる。ここでは照明5bの点灯時にカメラ5aによりメータが撮影され、撮影画像がメータ読取端末5cに入力される。 Specifically, as shown in FIG. 2, each meter reading device 5 has a camera 5a, a light 5b, and a meter reading terminal 5c. Analysis parameters and control parameters are input to the meter reading terminal 5c from the on-site inspection server 12. The light control signal is output according to the control parameters to turn the light 5b on and off. Here, the meter is photographed by the camera 5a when the light 5b is turned on, and the photographed image is input to the meter reading terminal 5c.
また、メータ読取端末5cは、入力された解析パラメータに従って特許文献1と同様な手法により撮影画像を解析し、メータ指針値を読み取る。ここで読み取られたメータ指針値および撮影画像は、入力された制御パラメータに従って現地点検サーバ12に送信される。 The meter reading terminal 5c also analyzes the captured image in accordance with the input analysis parameters using a method similar to that described in Patent Document 1, and reads the meter reading. The meter reading and captured image thus read are transmitted to the on-site inspection server 12 in accordance with the input control parameters.
このときカメラ5aから入力させた撮影画像は、メータ読取端末5cに用意された図示省略の記憶領域に一時的に保存(保管)される。ただし、前記領域の記憶容量に達すれば古い撮影画像を順次に削除し、新しい撮影画像を保存していくものとする。 At this time, the captured image input from the camera 5a is temporarily saved (stored) in a memory area (not shown) provided in the meter reading terminal 5c. However, when the memory capacity of the memory area is reached, the oldest captured image is deleted in order, and the new captured image is saved.
(3)固定式監視カメラ6
各固定式監視カメラ装置6は、図3に示すように、可視光カメラ6a・赤外線カメラ6b・照明6c・カメラ雲台6d・固定式画像撮影端末6eを有している。この固定式画像撮影端末6eは、現地点検サーバ12から入力された制御パラメータに従って点検対象設備20,30の外観を撮影させ、撮影画像を現地点検サーバ12に送信する。
(3) Fixed surveillance camera 6
Each fixed monitoring camera device 6 has a visible light camera 6a, an infrared camera 6b, a light 6c, a camera head 6d, and a fixed image capturing terminal 6e, as shown in Fig. 3. This fixed image capturing terminal 6e captures images of the exterior of the inspection target facilities 20, 30 in accordance with control parameters input from the on-site inspection server 12, and transmits the captured images to the on-site inspection server 12.
すなわち、固定式画像撮影端末6eは、雲台動作信号を出力して前記雲台6dの動作を制御することで前記両カメラ6a,6bの撮影方向を調整し、さらに照明制御信号を出力して照明6cを点灯/消灯させる。 That is, the fixed image capturing terminal 6e outputs a tripod operation signal to control the operation of the tripod head 6d, thereby adjusting the capturing direction of the cameras 6a and 6b, and further outputs a lighting control signal to turn the lighting 6c on and off.
ここでは照明6cは消費電力の小さな可視光のLED照明などが好ましく、該照明6cの点灯時に両カメラ6a,6bが電気設備30・制御盤20の外観を撮影する。このとき可視光カメラ6aにより撮影された可視光および赤外線カメラ6bにより撮影された赤外線画像は、それぞれ固定式画像撮影端末6eに入力されて現地点検サーバ12に送信される。 Here, the lighting 6c is preferably a visible light LED lighting with low power consumption, and when the lighting 6c is turned on, the cameras 6a and 6b capture the exterior of the electrical equipment 30 and the control panel 20. At this time, the visible light images captured by the visible light camera 6a and the infrared images captured by the infrared camera 6b are input to the fixed image capture terminal 6e and transmitted to the on-site inspection server 12.
(4)移動式監視カメラ7
各移動式監視カメラ7は、図4に示すように、可視光カメラ7a・赤外線カメラ7b・照明7c・カメラ雲台7d・移動カメラ台車7e・移動式画像撮影端末7fを有している。この台車7eには移動カメラ台車コントローラ7hが内蔵されている。
(4) Mobile surveillance camera 7
4, each mobile surveillance camera 7 has a visible light camera 7a, an infrared camera 7b, a light 7c, a camera head 7d, a mobile camera dolly 7e, and a mobile image capturing terminal 7f. A mobile camera dolly controller 7h is built into the dolly 7e.
移動式画像撮影端末7fは、現地点検サーバ12から入力された制御パラメータに従って電気設備30の外観を撮影し、撮影画像を現地点検サーバ12に送信する。すなわち、移動式画像撮影端末7fは、台車動作信号を前記コントローラ7hに出力して前記台車7eの動作を制御する。ここでは前記台車7eはモノレール式の移動台車に構成され、前記各種機器7a~7dを搭載してレール7gの設置範囲を移動自在となっている。 The mobile image capturing terminal 7f captures images of the exterior of the electrical equipment 30 according to the control parameters input from the on-site inspection server 12, and transmits the captured images to the on-site inspection server 12. That is, the mobile image capturing terminal 7f outputs a dolly operation signal to the controller 7h to control the operation of the dolly 7e. Here, the dolly 7e is configured as a monorail-type mobile dolly, and is capable of freely moving within the installation range of the rail 7g while carrying the various devices 7a to 7d.
また、移動式画像撮影端末7fは、雲台動作信号を出力して前記雲台7dの動作を制御することで前記両カメラ7a,7bの撮影方向を調整し、照明制御信号を出力して照明7cを点灯/消灯させる。ここでは照明7cは、照明6cと同様に消費電力の小さな可視光のLED照明などが好ましく、該照明7cの点灯時に両カメラ7a,7bが電気設備30の外観を撮影する。 The mobile image capturing terminal 7f also outputs a tripod operation signal to control the operation of the tripod 7d to adjust the capturing direction of the cameras 7a and 7b, and outputs a lighting control signal to turn on/off the lighting 7c. Here, the lighting 7c is preferably a visible light LED lighting with low power consumption like the lighting 6c, and when the lighting 7c is turned on, the cameras 7a and 7b capture the exterior of the electrical equipment 30.
このとき可視光カメラ7aにより撮影された可視光画像および赤外線カメラ6bにより撮影された赤外線画像は、それぞれ移動式画像撮影端末7fに入力されて現地点検サーバ12に送信される。 At this time, the visible light image captured by the visible light camera 7a and the infrared image captured by the infrared camera 6b are each input to the mobile image capturing terminal 7f and transmitted to the on-site inspection server 12.
(5)音響収集装置8
各音響収集装置8は、図5に示すように、マイク8a・音響収集端末8bを有している。この音響収集端末8bには、現地管理サーバ3から制御パラメータおよび解析パラメータが入力される。
(5) Sound collecting device 8
5, each sound collecting device 8 has a microphone 8a and a sound collecting terminal 8b. Control parameters and analysis parameters are input from the on-site management server 3 to this sound collecting terminal 8b.
音響収集端末8bには、マイク8aにより収集された点検対象設備20,30の周囲の音響信号が入力される。このとき音響収集端末8bは、入力された解析パラメータに従って非特許文献4の手法で入力された音響信号を解析し、異音の有無・異音レベルを異音データとして取得する。 The acoustic signal collected by the microphone 8a from the surroundings of the inspection target equipment 20, 30 is input to the acoustic collection terminal 8b. At this time, the acoustic collection terminal 8b analyzes the input acoustic signal using the method of non-patent document 4 according to the input analysis parameters, and obtains the presence or absence of abnormal sound and the level of the abnormal sound as abnormal sound data.
また、音響収集端末8bは、入力された制御パラメータに従って異音データおよび音響信号を現地管理サーバ3に送信する。なお、マイク8aから入力された音響信号は音響収集端末8bに用意された図示省略の記憶領域に一時的に保存され、該領域の記憶容量に達すれば古い音響信号が順次に削除され、新しい音響信号を保存していくものとする。 The sound collection terminal 8b also transmits the abnormal sound data and sound signals to the local management server 3 according to the input control parameters. The sound signals input from the microphone 8a are temporarily stored in a storage area (not shown) provided in the sound collection terminal 8b, and when the storage capacity of the storage area is reached, the oldest sound signals are deleted in order and new sound signals are stored.
(6)臭覚センサ装置9
臭覚センサ装置9は、図6に示すように、一対の「NaOH」フィルタ9a・活性炭フィルタ9b・電磁弁9A,9B・嗅覚センサ9c・ポンプ9d・装置制御部9e・データ解析部9fを有している。「NaOH」フィルタ9aは空気中に含まれる腐食性がガスを除去するフィルタであり、活性炭フィルタ9bは空気中に含まれる異臭成分を除去するフィルタである。
(6) Odor sensor device 9
6, the odor sensor device 9 includes a pair of "NaOH" filters 9a, an activated carbon filter 9b, solenoid valves 9A and 9B, an odor sensor 9c, a pump 9d, a device control unit 9e, and a data analysis unit 9f. The "NaOH" filter 9a is a filter that removes corrosive gases contained in the air, and the activated carbon filter 9b is a filter that removes unpleasant odor components contained in the air.
電磁弁9A,9Bは、それぞれ装置制御部9eからの弁調整指令(弁開閉度合A,B)の入力により弁開閉度合を調整する。臭覚センサ9cは、吸気したガスに応じたセンサ信号を出力し、特許文献2・非特許文献8のような複数のセンサを搭載したセンサアレイにより構成した人工臭覚システムが用いられている。 The solenoid valves 9A and 9B adjust the degree of opening and closing of the valves in response to valve adjustment commands (valve opening and closing degrees A and B) input from the device control unit 9e. The olfactory sensor 9c outputs a sensor signal corresponding to the inhaled gas, and an artificial olfactory system is used that is configured with a sensor array equipped with multiple sensors as described in Patent Document 2 and Non-Patent Document 8.
ポンプ9dは、ガスを吸引して臭覚センサ装置9内にガスを循環させる。本実施例で使用するポンプ9dは流量計が付属しており、ガス流量の装置制御指令に基づき臭覚センサ装置9内を循環させるガスの流量を制御することができる。 The pump 9d draws in the gas and circulates it within the odor sensor device 9. The pump 9d used in this embodiment is equipped with a flow meter, and can control the flow rate of the gas circulating within the odor sensor device 9 based on the device control command for the gas flow rate.
装置制御部9eは、現地管理サーバ3から制御パラメータが入力され、事前に設定された制御情報に基づき電磁弁9A,9B・ポンプ9d・データ解析部9fを制御する。 The device control unit 9e receives control parameters from the local management server 3 and controls the solenoid valves 9A and 9B, the pump 9d, and the data analysis unit 9f based on pre-set control information.
データ解析部9fは、現地管理サーバ12から入力された解析パラメータを記録し、装置制御部9eから入力された制御パラメータ・センサ信号記録指令・データ解析指令を記録する。ここでは嗅覚センサ9cから入力された嗅覚信号をセンサ記録指令に従って時系列のセンサ信号データとして記録する。また、データ解析指令に応じてデータ解析を行って点検対象設備20,30の周囲における異臭の有無を診断する。 The data analysis unit 9f records the analysis parameters input from the on-site management server 12, and records the control parameters, sensor signal recording commands, and data analysis commands input from the device control unit 9e. Here, the olfactory signal input from the olfactory sensor 9c is recorded as time-series sensor signal data in accordance with the sensor recording command. In addition, data analysis is performed in accordance with the data analysis command to diagnose the presence or absence of abnormal odors around the equipment 20, 30 to be inspected.
臭覚センサ装置9の動作の詳細を説明すれば、ポンプ9dを制御することで内部にガスを吸気する。このとき電磁弁9A,9Bの開閉度を制御することで両フィルタ9a,9bを通したガスと、活性炭フィルタ9bを通さずに「NaOH」フィルタ9aのみを通したガスとを交互に吸気する。 To explain the details of the operation of the odor sensor device 9, gas is drawn into the device by controlling the pump 9d. At this time, the opening and closing degree of the solenoid valves 9A and 9B is controlled to alternately draw in gas that has passed through both filters 9a and 9b and gas that has passed only through the "NaOH" filter 9a without passing through the activated carbon filter 9b.
ここで吸気されたガスの異臭成分を嗅覚センサ9cにより検出し、検出された異臭成分がデータ解析部9fに出力される。データ解析部9fは、センサ信号記録指令およびデータ解析指令に応じて、以下のように解析制御状態値を設定する(ただし、前記記録指令が優先設定されている。)。
(A)両指令の値「0」=「待機状態値」に設定される。
(B)センサ信号記録指令の値「1」=センサ信号データの「記録状態値」に設定される。なお、センサ信号記録指令が優先設定されているため、両指令の値「1」の場合には「記録状態値」に設定される。
(C)センサ信号記録指令の値「0」 AND データ解析指令の値「1」=「データ解析状態値」に設定される。
The odor components in the inhaled gas are detected by the olfactory sensor 9c, and the detected odor components are output to the data analysis unit 9f. The data analysis unit 9f sets the analysis control state values as follows in response to the sensor signal recording command and the data analysis command (however, the recording command has priority).
(A) The value of both commands is set to "0" = "standby state value."
(B) The value of the sensor signal recording command is "1" = the "recording state value" of the sensor signal data is set. Note that since the sensor signal recording command has priority, if both commands have the value "1", the "recording state value" is set.
(C) The value of the sensor signal recording command is set to "0" AND the value of the data analysis command is set to "1" = "data analysis status value."
設定された解析制御状態値が「記録状態値」の場合には、前述のように嗅覚センサ6cから入力されたセンサ信号を時系列に整理したセンサ信号データを記録する。一方、「解析状態値」の場合には、制御パラメータとセンサ信号データとを抽出し、当該センサ信号データの特徴量データを作成する。 When the set analysis control state value is the "recorded state value," the sensor signal data is recorded by organizing the sensor signal input from the olfactory sensor 6c in chronological order as described above. On the other hand, when the analysis control state value is the "analysis state value," the control parameters and the sensor signal data are extracted, and feature quantity data of the sensor signal data is created.
すなわち、まずサンプルOFF時間(弁開閉度合A,B=「0」)のセンサ信号の平均値が算出され、算出された平均値からセンサ信号データの差分値を離散的に算出して並べることによりセンサ毎の特徴量データを作成する。この特徴量データの作成例を図7に示す。 That is, first, the average value of the sensor signal during the sample OFF time (valve opening/closing degree A, B = "0") is calculated, and then the difference values of the sensor signal data are calculated discretely from the calculated average value and arranged to create feature data for each sensor. An example of how this feature data is created is shown in Figure 7.
つぎに算出された特徴量データからなる高次元ベクトルデータに整理する。この高次元ベクトルデータが特徴量データとなる。高次元ベクトルに整理して特徴量データとする一例を図8に示す。 The calculated feature data is then organized into high-dimensional vector data. This high-dimensional vector data becomes the feature data. Figure 8 shows an example of the feature data organized into a high-dimensional vector.
その後、データ解析部9fは、解析パラメータおよび特徴量データを図示省略のサポートベクタマシン(SVM)に供して異臭の有無を診断する。この診断により得られた「異臭有り」・「異臭無し」の診断結果が異臭データとして現地点検サーバ12に送信される。本実施例では異臭として油臭・焦げ臭の有無が診断される。 Then, the data analysis unit 9f provides the analysis parameters and feature data to a support vector machine (SVM) (not shown) to diagnose the presence or absence of an abnormal odor. The diagnosis result obtained from this diagnosis, "abnormal odor present" or "abnormal odor not present", is sent to the on-site inspection server 12 as abnormal odor data. In this embodiment, the presence or absence of an oily odor or a burnt odor is diagnosed as an abnormal odor.
前記サポートベクタ―マシンは、2クラス分類器であって、解析パラメータが適用される。すなわち、解析パラメータは、事前に採取された「異臭あり」・「異臭なし」の異臭成分のセンサ信号データに基づく特徴量を教師データとするオフラインに学習により得られた2クラス分類器の線形入力素子のパラメータを含む。例えば教師データからの閾値判定により異臭の有無の診断することができる。 The support vector machine is a two-class classifier to which analysis parameters are applied. In other words, the analysis parameters include parameters of the linear input elements of the two-class classifier obtained by offline learning using training data that is based on the sensor signal data of odor components classified in advance as "odor present" and "odor absent." For example, the presence or absence of an odor can be diagnosed by threshold judgment from the training data.
(7)屋内環境装置10
屋内環境計測装置10は、図9に示すように、温度計10a・湿度計10b・COガスセンサ(一酸化炭素ガスセンサ)10c・屋内環境計測端末10dを有している。この屋内環境計測端末10dは、現地点検サーバ12から制御パラメータが入力される。
(7) Indoor environment device 10
9, the indoor environment measuring device 10 includes a thermometer 10a, a hygrometer 10b, a CO gas sensor (carbon monoxide gas sensor) 10c, and an indoor environment measuring terminal 10d. Control parameters are input to the indoor environment measuring terminal 10d from the on-site inspection server 12.
また、屋内環境計測端末10dには、温度計10aから温度情報・湿度計10bから湿度情報・前記センサ10cからCOガスセンサ強度(一酸化ガスの濃度)の情報がそれぞれ入力される。ここで入力された情報群を制御パラメータに従って電気室内の制御盤20周囲の屋内環境情報として整理し、現地点検サーバ12に送信する。 The indoor environment measuring terminal 10d also receives inputs of temperature information from the thermometer 10a, humidity information from the hygrometer 10b, and CO gas sensor intensity (concentration of monoxide gas) information from the sensor 10c. The input information is organized according to control parameters as indoor environment information around the control panel 20 in the electrical room, and transmitted to the on-site inspection server 12.
(8)屋外環境計測装置11
屋外環境計測装置11は、図10に示すように、温度計11a・湿度計11b・COガスセンサ11c・風速計11d・屋外環境計測端11eを有している。この屋外環境計測端末11eは、現地点検サーバ12から制御パラメータが入力される。
(8) Outdoor environment measuring device 11
10, the outdoor environment measuring device 11 has a thermometer 11a, a hygrometer 11b, a CO gas sensor 11c, an anemometer 11d, and an outdoor environment measuring terminal 11e. Control parameters are input from the on-site inspection server 12 to this outdoor environment measuring terminal 11e.
また、屋外環境計測端末11eには、温度計11aから温度情報・湿度計11bから湿度情報・前記センサ11cからCOガスセンサ強度の情報・風速計11dから風向や風速の情報がそれぞれ入力される。ここで入力された情報群を制御パラメータに従って電気設備30周囲の屋外環境情報として整理し、現地点検サーバ12に送信する。 The outdoor environment measurement terminal 11e also receives inputs of temperature information from the thermometer 11a, humidity information from the hygrometer 11b, CO gas sensor strength information from the sensor 11c, and wind direction and speed information from the anemometer 11d. The input information is organized as outdoor environment information around the electrical equipment 30 according to control parameters, and transmitted to the on-site inspection server 12.
(9)現地点検サーバ12
現地点検サーバ11は、電気室内に配置されたサーバにより構成され、図11に示すように、オフラインで作成された制御パラメータおよび解析パラメータをダウンロードし、内蔵の記憶装置(図示省略)に保存する。
(9) On-site inspection server 12
The on-site inspection server 11 is composed of a server installed in the electrical room, and as shown in FIG. 11, downloads control parameters and analysis parameters created offline and stores them in an internal storage device (not shown).
ここで保存された制御パラメータおよび解析パラメータを前記各装置4~11に送信する一方、前記各装置4~11の送信情報を受信してデータ整理および保存を行う。また、遠隔監視端末12に対して点検画面を提供し、該点検画面に対する遠隔監視端末12の点検画面入力データを受け付けて、該受け付けた前記データの入力値を整理して保存する。 The control parameters and analysis parameters stored here are transmitted to each of the devices 4 to 11, while transmission information from each of the devices 4 to 11 is received and data is organized and stored. Also, an inspection screen is provided to the remote monitoring terminal 12, input data for the inspection screen from the remote monitoring terminal 12 is accepted, and the input values of the accepted data are organized and stored.
(10)遠隔監視端末13
遠隔監視端末は、図12に示すように、現地点検サーバ12の提供する点検画面をネットワーク経由で表示する。この点検画面を閲覧中の保守点検員は、該点検画面上で各種入力を行うことができ、その点検画面入力データをネットワーク経由で現地点検サーバ12へ送信する。なお、点検画面上で整理した点検レポートをファイルやプリンタなどへ出力することもできる。
(10) Remote monitoring terminal 13
12, the remote monitoring terminal displays an inspection screen provided by the on-site inspection server 12 via the network. While viewing this inspection screen, the maintenance inspector can perform various inputs on the inspection screen, and the inspection screen input data is transmitted via the network to the on-site inspection server 12. The inspection report organized on the inspection screen can also be output to a file, a printer, etc.
≪制御パラメータ・解析パラメータ≫
(1)制御パラメータ
図15に基づき制御パラメータを説明する。ここでは制御パラメータとして、以下のパラメータが用いられている。
<Control parameters/analysis parameters>
(1) Control parameters The control parameters will be described with reference to Fig. 15. Here, the following parameters are used as the control parameters.
・情報通信端末4に入力される制御パラメータ(図15中の情報端末制御パラメータ)
・メータ読取装置5のメータ読取端末5cに入力される制御パラメータ(同メータ読取制御パラメータ)
・固定式監視カメラ装置6の固定式画像撮影端末6eに入力される制御パラメータ(同固定式監視カメラ制御パラメータ)
・移動式監視カメラ装置7の移動式画像撮影端末7fに入力される制御パラメータ(同移動式監視カメラ制御パラメータ)
・音響収集装置8の音響収集端末8bに入力される制御パラメータ(同音響収集制御パラメータ)
・臭覚センサ装置9の装置制御部9eに入力される制御パラメータ(同臭覚センサ制御パラメータ)
・屋内環境計測装置10に入力される制御パラメータ(同屋内環境計測制御パラメータ)
・屋外環境計測装置11に入力される制御パラメータ(同屋外環境計測制御パラメー
情報通信端末制御パラメータは、情報通信端末4の収集した計測値・状態値を現地点検サーバへ送信する情報端末送信指令により構成されている。メータ読取制御パラメータは、メータ読取端末5cに指令するメータ読取指令と、メータ読取端末5cに照明制御信号を出力させて照明5bの点灯/消灯を制御する照明操作指令とにより構成されている。
Control parameters input to the information communication terminal 4 (information terminal control parameters in FIG. 15)
Control parameters input to the meter reading terminal 5c of the meter reading device 5 (meter reading control parameters)
Control parameters input to the fixed image capturing terminal 6e of the fixed surveillance camera device 6 (fixed surveillance camera control parameters)
Control parameters input to the mobile image capturing terminal 7f of the mobile surveillance camera device 7 (mobile surveillance camera control parameters)
Control parameters input to the sound collection terminal 8b of the sound collection device 8 (sound collection control parameters)
Control parameters input to the device control unit 9e of the odor sensor device 9 (same odor sensor control parameters)
Control parameters input to the indoor environment measuring device 10 (indoor environment measuring control parameters)
Control parameters input to the outdoor environment measuring device 11 (outdoor environment measuring control parameters) The information communication terminal control parameters are composed of information terminal transmission commands for transmitting the measurement values and status values collected by the information communication terminal 4 to the on-site inspection server. The meter reading control parameters are composed of a meter reading command to be issued to the meter reading terminal 5c, and a lighting operation command for causing the meter reading terminal 5c to output a lighting control signal to control the turning on/off of the lighting 5b.
固定式監視カメラ制御パラメータは、前記カメラ6a,6bによる撮影を固定式画像撮影端末6eに指令する固定式カメラ撮影指令と、固定式画像撮影端末6eに照明制御信号を出力させて照明6cを操作させる照明操作指令と、固定式カメラ動作リストとにより構成されている。 The fixed surveillance camera control parameters are composed of a fixed camera shooting command that commands the fixed image shooting terminal 6e to shoot with the cameras 6a and 6b, a lighting operation command that causes the fixed image shooting terminal 6e to output a lighting control signal to operate the lighting 6c, and a fixed camera operation list.
固定式カメラ動作リストは、事前に作成された複数の固定式カメラ動作パラメータの一覧であって、固定式カメラ動作パラメータには観測箇所ラベル・カメラパン角・カメラチルト角・可視カメラズーム値などの各種データが含まれる。また、固定式カメラ動作リストは、前記システム1が保守点検動作を行う前に予め現地点検サーバ12から固定式画像撮影端末6eに送信され、該端末6e内に保存しておくものとする。 The fixed camera operation list is a list of multiple fixed camera operation parameters created in advance, and the fixed camera operation parameters include various data such as observation location labels, camera pan angles, camera tilt angles, and visible camera zoom values. In addition, the fixed camera operation list is transmitted in advance from the on-site inspection server 12 to the fixed image capture terminal 6e before the system 1 performs a maintenance inspection operation, and is stored in the terminal 6e.
移動式監視カメラ制御パラメータは、前記カメラ7a,7bによる撮影を移動式画像撮影端末7fに指令する移動式カメラ撮影指令と、移動式画像撮影端7feに照明制御信号を出力させて照明7cを操作させる照明操作指令と、移動式カメラ動作リストとにより構成されている。 The mobile surveillance camera control parameters are composed of a mobile camera shooting command that commands the mobile image shooting terminal 7f to take pictures using the cameras 7a and 7b, a lighting operation command that causes the mobile image shooting terminal 7fe to output a lighting control signal to operate the lighting 7c, and a mobile camera operation list.
移動式カメラ動作リストは、事前に作成された複数の移動式カメラ動作パラメータの一覧であって、移動式カメラ動作パラメータには観測箇所ラベル・カメラパン角・カメラチルト角・可視カメラズーム値などの各種データが含まれる。また、移動式カメラ動作リストは、前記システム1が保守点検動作を行う前に予め現地点検サーバ12から移動式画像撮影端末7fに送信され、該端末7f内に保存しておくものとする。 The mobile camera operation list is a list of multiple mobile camera operation parameters created in advance, and the mobile camera operation parameters include various data such as observation location labels, camera pan angles, camera tilt angles, and visible camera zoom values. In addition, the mobile camera operation list is transmitted in advance from the on-site inspection server 12 to the mobile image capture terminal 7f before the system 1 performs a maintenance inspection operation, and is stored in the terminal 7f.
音響収集制御パラメータは、音響収集端末8bによる音響信号の収集を制御する音響収集指令と、音響信号を収集する時間を示す音響収集時間とにより構成されている。この音響収集時間は、前前システム1が保守点検動作を行う前に予め現地点検サーバ12から音響収集端末8bに送信され、該端末8b内に保存しておくものとする。 The acoustic collection control parameters consist of an acoustic collection command that controls the collection of acoustic signals by the acoustic collection terminal 8b, and an acoustic collection time that indicates the time for collecting acoustic signals. This acoustic collection time is transmitted from the on-site inspection server 12 to the acoustic collection terminal 8b in advance before the pre-pre-system 1 performs a maintenance inspection operation, and is stored in the terminal 8b.
嗅覚センサ制御パラメータは、装置制御部9eへの異臭検査指令と嗅覚センサ6cの動作パラメータとにより構成されている。この動作パラメータは、電磁弁9A,9Bおよびポンプ9dの操作を行う際に使用される。また、前記動作パラメータは、前記システムが保守点検動作を行う前に予め現地点検サーバ12から装置制御部9eに送信され、該制御部9e内に保存しておくものとする。 The olfactory sensor control parameters consist of an odor inspection command to the device control unit 9e and the operating parameters of the olfactory sensor 6c. These operating parameters are used when operating the solenoid valves 9A, 9B and the pump 9d. The operating parameters are transmitted from the on-site inspection server 12 to the device control unit 9e in advance before the system performs a maintenance inspection operation, and are stored in the control unit 9e.
屋内環境計測制御パラメータは、屋内環境情報を収集・整理して現地点検サーバ12に送信させる屋内環境計測指令により構成されている。また、屋外環境計測装置11用の制御パラメータは、屋外環境情報を収集・整理して現地点検サーバ12に送信させる屋外環境計測指令により構成されている。 The indoor environment measurement control parameters are composed of indoor environment measurement commands that collect and organize indoor environment information and transmit it to the on-site inspection server 12. The control parameters for the outdoor environment measurement device 11 are composed of outdoor environment measurement commands that collect and organize outdoor environment information and transmit it to the on-site inspection server 12.
(2)解析パラメータ
図16に基づき解析パラメータを説明する。ここでは解析パラメータとして、以下のパラメータが用いられている。
(2) Analysis parameters The analysis parameters will be described with reference to Fig. 16. Here, the following parameters are used as the analysis parameters.
・メータ読取装置5のメータ読取端末5cに入力される解析パラメータ(図16中のメータ読取解析パラメータ)
・音響収集装置8の音響収集端末8bに入力される解析パラメータ(同音響解析パラメータ)
・臭覚センサ装置9のデータ解析部9fに入力される解析パラメータ(同臭覚センサ解析パラメータ。)
メータ読取解析パラメータは、例えば特許文献1のような方法により画像を解析し、メータ指針値を読み取るためのデータ解析用パラメータにより構成されている。また、メータ読取解析パラメータは、前記システム1が保守点検動作を行う前に予め現地点検サーバ12からメータ読取端末5cに送信され、該端末5c内に保存しておくものとする。
Analysis parameters input to the meter reading terminal 5c of the meter reading device 5 (meter reading analysis parameters in FIG. 16)
Analysis parameters input to the sound collection terminal 8b of the sound collection device 8 (same sound analysis parameters)
Analysis parameters input to the data analysis unit 9f of the odor sensor device 9 (same odor sensor analysis parameters)
The meter reading analysis parameters are configured by data analysis parameters for analyzing an image and reading a meter indication value, for example, by a method such as that described in Patent Document 1. The meter reading analysis parameters are transmitted in advance from the on-site inspection server 12 to the meter reading terminal 5c before the system 1 performs a maintenance inspection operation, and are stored in the terminal 5c.
音響解析パラメータは、例えば非特許文献4のような方法により音響信号を解析し、異音有無・異音レベルを求めるためのデータ解析用パラメータにより構成されている。また、音響解析パラメータは、前記システム1が保守点検動作を行う前に予め現地点検サーバ12から音響収集端末8bに送信され、該端末8bに保存しておくものとする。 The acoustic analysis parameters are composed of data analysis parameters for analyzing acoustic signals by a method such as that described in Non-Patent Document 4, and determining the presence or absence of abnormal sounds and their levels. The acoustic analysis parameters are transmitted from the on-site inspection server 12 to the acoustic collection terminal 8b in advance before the system 1 performs a maintenance inspection operation, and are stored in the terminal 8b.
嗅覚センサ解析パラメータは、嗅覚センサの嗅覚センサ信号を解析して、異臭の有無をサポートベクタマシンにより判断する際に使用する。異臭の有無としては、主に油臭の有無・焦げ臭の有無を扱い、それぞれの判断に必要なサポートベクタマシンの学習パラメータを嗅覚センサ解析パラメータ内に個別に保存する。 The olfactory sensor analysis parameters are used to analyze the olfactory sensor signal from the olfactory sensor and determine the presence or absence of an abnormal odor using a support vector machine. The presence or absence of an abnormal odor is mainly determined by the presence or absence of an oily odor or a burnt odor, and the learning parameters of the support vector machine required for each judgment are stored separately within the olfactory sensor analysis parameters.
また、嗅覚センサ解析パラメータは、前記システムが保守点検動作を行う前に予め現地点検サーバ12から嗅覚センサ装置9に送信され、該装置9のデータ解析部9f内に保存しておくものとする。 In addition, the olfactory sensor analysis parameters are transmitted from the on-site inspection server 12 to the olfactory sensor device 9 before the system performs a maintenance inspection operation, and are stored in the data analysis unit 9f of the device 9.
≪動作例≫
以下、各点検装置4~12の動作例を説明する。
<Example of operation>
An example of the operation of each of the inspection devices 4 to 12 will now be described.
(1)情報通信端末4
図17に基づき情報通信端末4の動作例を説明する。
(1) Information communication terminal 4
An example of the operation of the information communication terminal 4 will be described with reference to FIG.
S01,S02:情報通信端末4は、動作開始時に現地点検サーバ12から制御パラメータ(情報端末送信指令)を受信したか否かを確認する(S01)この確認の結果、情報端末送信指令を受信していなければ装置を停止し(S02)、処理を終了する。 S01, S02: When starting operation, the information communication terminal 4 checks whether it has received control parameters (information terminal transmission command) from the on-site inspection server 12 (S01). If the result of this check is that the information terminal transmission command has not been received, the device is stopped (S02) and processing ends.
S03~S05:S01の確認の結果、情報端末送信指令を受信していれば、各電気設備30の内蔵センサから制御盤20に集まった計測値・状態値を収集し(S03)、収集した計測値・状態値を現地点検サーバ12に送信する(S04)。その後、次の制御パラメータを受信しなければ(S05)、S02に進んで装置を停止して処理を終了する。 S03 to S05: If the result of checking in S01 is that an information terminal transmission command has been received, the measurement values and status values collected in the control panel 20 from the built-in sensors of each piece of electrical equipment 30 are collected (S03), and the collected measurement values and status values are transmitted to the on-site inspection server 12 (S04). If the next control parameter has not been received thereafter (S05), proceed to S02, shut down the device, and end the process.
(2)メータ読取装置5
図18に基づきメータ読取装置5の動作例を説明する。
(2) Meter reading device 5
An example of the operation of the meter reading device 5 will be described with reference to FIG.
S11:メータ読取端末5cは、動作開始時に現地点検サーバ12からメータ読取指示を受信したか否かを確認する。 S11: When starting operation, the meter reading terminal 5c checks whether a meter reading instruction has been received from the on-site inspection server 12.
S12,S13:S11の確認の結果、メータ読取指示を受信していなければ装置を停止し(S12)、処理を終了する。一方、メータ読取指示を受信していれば照明操作指令の受信を確認する(S13)。 S12, S13: If the result of checking in S11 is that a meter reading command has not been received, the device is stopped (S12) and the process ends. On the other hand, if a meter reading command has been received, the reception of a lighting operation command is confirmed (S13).
S14:S13の確認の結果、照明操作指令を受信していなければ、照明5bを点灯させることなくカメラ5aでメータを撮影し、S20に進む。 S14: If the result of checking in S13 is that a lighting operation command has not been received, the camera 5a photographs the meter without turning on the lighting 5b, and the process proceeds to S20.
S15~S19:S13の確認の結果、照明操作指令を受信していれば照明制御信号ONを出力し(S15)、照明5bを点灯させる(S16)。その後、カメラ5aでメータを撮影し(S17)、撮影終了後に照明制御信号OFFを出力して(S18)、照明5bを消灯させて(S19)、S20に進む。 S15 to S19: If the result of checking in S13 is that a lighting operation command has been received, a lighting control signal ON is output (S15) and lighting 5b is turned on (S16). After that, the meter is photographed by camera 5a (S17), and after the photographing is completed, a lighting control signal OFF is output (S18) and lighting 5b is turned off (S19), and the process proceeds to S20.
S20~S23:S14,S17の撮影画像をメータ読取端末5cに保存し、メータ読取解析パラメータに従って該撮影画像を解析してメータ読取を実施する。ここで読み取ったメータ指針値と前記保存された撮影画像とを現地点検サーバ12に送信する(S21,S22)。その後、次のメータ読取指令を受信していなければ(S23)、S12に進んで装置を停止して処理を終了する。 S20 to S23: The captured images from S14 and S17 are stored in the meter reading terminal 5c, and the captured images are analyzed according to the meter reading analysis parameters to perform meter reading. The meter indication value read here and the captured images stored above are transmitted to the on-site inspection server 12 (S21, S22). If the next meter reading command has not been received (S23), the process proceeds to S12, where the device is stopped and the process ends.
(3)固定式カメラ装置6
図19に基づき固定式カメラ装置6の動作例を説明する。
(3) Fixed camera device 6
An example of the operation of the fixed camera device 6 will be described with reference to FIG.
S31,S32:固定式画像撮影端末6eは、動作開始時に固定式カメラ撮影指令を受信した否かを確認する(S31)。確認の結果、固定式カメラ撮影指令を受信していなければ装置を停止し(S32)、処理を終了する。 S31, S32: The fixed image capturing terminal 6e checks whether or not a fixed camera capturing command has been received at the start of operation (S31). If the result of the check is that a fixed camera capturing command has not been received, the device is stopped (S32) and processing ends.
S33~S35:S31の確認の結果、固定式カメラ撮影指令を受信していれば、固定式カメラ動作リストから固定式カメラ動作パラメータを順次に読み出す(S33)。 S33 to S35: If the result of checking in S31 is that a fixed camera shooting command has been received, the fixed camera operation parameters are read out sequentially from the fixed camera operation list (S33).
ここで読み出された固定式カメラ動作パラメタータに従って、雲台制御信号を出力して雲台6dの角度を調整することで各カメラ6a,6bの撮影方向を制御し(S34)、その後に照明操作指令を受信したか否かを確認する(S35)。 In accordance with the fixed camera operation parameters read out here, a camera platform control signal is output to adjust the angle of the camera platform 6d, thereby controlling the shooting direction of each camera 6a, 6b (S34), and then it is confirmed whether a lighting operation command has been received (S35).
S36,S37:S35の確認の結果、照明操作指令を受信していなければ、照明6cを点灯させることなく、各カメラ6a,6bにより点検対象設備20,30の可視光画像および赤外線画像を撮影し、撮影された前記各画像を固定式画像撮影端末6e内のメモリ(RAM)に一時保存する。 S36, S37: If the result of checking S35 is that a lighting operation command has not been received, the lighting 6c is not turned on, and visible light images and infrared images of the inspection target equipment 20, 30 are taken by each camera 6a, 6b, and each of the captured images is temporarily stored in the memory (RAM) of the fixed image capture terminal 6e.
S38~S43:S35の確認の結果、照明操作指令を受信していれば、照明制御信号ONを出力し(S38)、照明6cを点灯させる(S39)。その後、各カメラ6a,6bにより点検対象設備20,30の可視光画像および赤外線画像を撮影し(S40,S41)、撮影された前記各画像を固定式画像撮影端末6e内のメモリ(RAM)に一時保存する。この撮影後に照明制御信号OFFを出力し(S42)、照明6cを消灯させる(S43)。 S38 to S43: If the result of checking S35 is that a lighting operation command has been received, a lighting control signal ON is output (S38) and the lighting 6c is turned on (S39). After that, visible light images and infrared images of the inspection target equipment 20, 30 are taken by each camera 6a, 6b (S40, S41), and each of the captured images is temporarily stored in the memory (RAM) of the fixed image capture terminal 6e. After this capture, a lighting control signal OFF is output (S42) and the lighting 6c is turned off (S43).
S44~S47:S36,S37,S40,S41で撮影された画像を前記メモリからすべて読み出し(S44)、現地点検サーバ12に送信する(S45,S46)。その後、次の固定式カメラ撮影指令を受信していなければ(S47)、S32に進んで装置を停止して処理を終了する。 S44 to S47: The images captured in S36, S37, S40, and S41 are all read from the memory (S44) and transmitted to the on-site inspection server 12 (S45, S46). If the next fixed camera capture command has not been received (S47), the process proceeds to S32, where the device is shut down and the process ends.
(4)移動式カメラ装置7
図20に基づき移動式カメラ装置7の動作例を説明する。
(4) Mobile camera device 7
An example of the operation of the mobile camera device 7 will be described with reference to FIG.
S51,S52:移動式画像撮影端末7fは、動作開始時に移動式カメラ撮影指令を受信した否かを確認する(S51)。確認の結果、移動式カメラ撮影指令を受信していなければ装置を停止し(S52)、処理を終了する。 S51, S52: The mobile image capture terminal 7f checks whether or not a mobile camera capture command has been received at the start of operation (S51). If the result of the check is that a mobile camera capture command has not been received, the device is stopped (S52) and the process ends.
S53~S55:S51の確認の結果、移動式カメラ撮影指令を受信していれば、移動式カメラ動作リストから移動式カメラ動作パラメータを順次に読み出す(S53)。 S53 to S55: If the result of checking in S51 is that a mobile camera shooting command has been received, the mobile camera operation parameters are read out sequentially from the mobile camera operation list (S53).
ここで読み出された移動式カメラ動作パラメタータに従って、まず移動カメラ台車コントローラ7hに台車動作信号を出力し、移動カメラ台車7eをレール7gに沿って移動させ、各カメラ7a,7bの撮影位置を制御する(S54)。 In accordance with the mobile camera operation parameters read out here, a dolly operation signal is first output to the mobile camera dolly controller 7h, which moves the mobile camera dolly 7e along the rails 7g and controls the shooting positions of the cameras 7a and 7b (S54).
つぎに雲台制御信号を出力して雲台7dの角度を調整することで各カメラ6a,6bの撮影方向を制御し(S55)、その後に照明操作指令を受信したか否かを確認する(S56)。 Then, a camera-head control signal is output to adjust the angle of the camera-head 7d to control the shooting direction of each camera 6a, 6b (S55), and then it is confirmed whether a lighting operation command has been received (S56).
S57,S58:S56の確認の結果、照明操作指令を受信していなければ、照明7cを点灯させることなく、各カメラ7a,7bにより電気設備30の可視光画像および赤外線画像を撮影し、撮影された前記各画像を移動式画像撮影端末7f内のメモリ(RAM)に一時保存する。 S57, S58: If the result of checking S56 is that a lighting operation command has not been received, the lighting 7c is not turned on, and visible light images and infrared images of the electrical equipment 30 are taken by each of the cameras 7a and 7b, and the captured images are temporarily stored in the memory (RAM) of the mobile image capture terminal 7f.
S59~S64:S56の確認の結果、照明操作指令を受信していれば、照明制御信号ONを出力し(S59)、照明7cを点灯させる(S60)。その後、各カメラ7a,7bにより電気設備30の可視光画像および赤外線画像を撮影し(S61,S62)、撮影された前記各画像を移動式画像撮影端末7f内のメモリ(RAM)に一時保存する。この撮影後に照明制御信号OFFを出力し(S63)、照明7cを消灯させる(S64)。 S59 to S64: If the result of checking in S56 is that a lighting operation command has been received, a lighting control signal ON is output (S59), and lighting 7c is turned on (S60). After that, visible light images and infrared images of the electrical equipment 30 are taken by each camera 7a, 7b (S61, S62), and the captured images are temporarily stored in the memory (RAM) of the mobile image capture terminal 7f. After this capture, a lighting control signal OFF is output (S63), and lighting 7c is turned off (S64).
S65~S67:S57,S58,S61,S62で撮影された画像を前記メモリからすべて読み出し(S65)、現地点検サーバ12に送信する(S66,S67)。その後、次の固定式カメラ撮影指令を受信していなければ(S68)、S52に進んで装置を停止して処理を終了する。 S65 to S67: The images captured in S57, S58, S61, and S62 are all read from the memory (S65) and transmitted to the on-site inspection server 12 (S66, S67). If the next fixed camera capture command has not been received (S68), the process proceeds to S52, where the device is shut down and processing ends.
(5)音響収集装置8
図19に基づき音響収集装置8の動作例を説明する。
(5) Sound collecting device 8
An example of the operation of the sound collecting device 8 will be described with reference to FIG.
S71,S72:音響収集端末8bは、動作開始時に音響収集指令を受信したか否かを確認する(S71)。この確認の結果、音響収集指令を受信していなければ、装置を停止し(S72)、処理を終了する。 S71, S72: The sound collection terminal 8b checks whether or not a sound collection command has been received at the start of operation (S71). If the result of this check is that a sound collection command has not been received, the device is stopped (S72) and processing ends.
S73~S79:S71の確認の結果、音響収集指令を受信していれば音響収集時間に設定した時間分の音響信号をマイク8aから取得して録音し、音響収集端末8bに保存する。その後、音響解析パラメータに従って保存された音響信号の音響解析を実施し(S75)、点検対象設備20,30の周囲における異音の有無・異音レベルを求めて異音データとして整理する(S76)。 S73 to S79: If the result of checking in S71 is that an acoustic collection command has been received, an acoustic signal for the time period set as the acoustic collection time is acquired from the microphone 8a, recorded, and stored in the acoustic collection terminal 8b. After that, an acoustic analysis of the stored acoustic signal is performed according to the acoustic analysis parameters (S75), and the presence or absence of abnormal sounds around the inspection target equipment 20, 30 and the level of the abnormal sounds are determined and organized as abnormal sound data (S76).
ここで整理された異音データおよび保存された音響信号を現地点検サーバ12にそれぞれ送信する(S77,S78)。その後、次の音響収集指令を受信していなければ(S79)、S72に進んで装置を停止して処理を終了する。 The abnormal sound data organized here and the stored acoustic signal are sent to the on-site inspection server 12 (S77, S78). If the next acoustic collection command is not received (S79), the process proceeds to S72, where the device is stopped and the process ends.
(6)臭覚センサ装置9
図22に基づき臭覚センサ装置9の動作例を説明する。
(6) Odor sensor device 9
An example of the operation of the odor sensor device 9 will be described with reference to FIG.
S81,S82:装置制御部9cは、動作開始時に臭覚検査指令を受信したか否かを確認する(S81)。この確認の結果、臭覚検査指令を受信していなければ、装置を停止し(S82)、処理を終了する。 S81, S82: The device control unit 9c checks whether an olfactory test command has been received at the start of operation (S81). If the result of this check is that an olfactory test command has not been received, the device is stopped (S82) and processing ends.
S83~S87:S81の確認の結果、臭覚検査指令を受信していれば装置制御部9eは、臭覚センサ動作パラメータに従って電磁弁9A,9Bに弁開閉度合A,Bを出力し、ポンプ9dに制御パラメータを出力し、内部にガスを吸気して臭覚センサ9cにより臭覚センサ信号を計測させる(S83)。 S83 to S87: If the result of checking in S81 is that an olfactory test command has been received, the device control unit 9e outputs valve opening and closing degrees A and B to the solenoid valves 9A and 9B according to the olfactory sensor operation parameters, outputs control parameters to the pump 9d, draws gas into the pump, and causes the olfactory sensor 9c to measure the olfactory sensor signal (S83).
ここで計測された臭覚センサ信号はデータ解析部9fに出力され、データ解析部9fは臭覚センサパラメータに従って臭覚センサ信号を解析する(S84)。このときデータ解析部9fは、油臭の有無・焦げ臭の有無をそれぞれ並列に判断するものとする(S84a,S84b)。 The odor sensor signal measured here is output to the data analysis unit 9f, which analyzes the odor sensor signal according to the odor sensor parameters (S84). At this time, the data analysis unit 9f determines in parallel whether there is an oily odor and a burnt odor (S84a, S84b).
解析結果は点検対象設備20,30周囲の異臭データとして整理され(S85)、整理された異臭データを現地点検サーバ12に送信する(S86)。その後、次の異臭検査指令を受信していなければ(S87)、S82に進んで装置を停止して処理を終了する。 The analysis results are organized as odor data around the equipment 20, 30 to be inspected (S85), and the organized odor data is sent to the on-site inspection server 12 (S86). If the next odor inspection command has not been received (S87), the process proceeds to S82, the device is stopped, and the process ends.
(7)屋内環境計測装置10
図23に基づき屋内環境装置10の動作例を説明する。
(7) Indoor environment measuring device 10
An example of the operation of the indoor environmental device 10 will be described with reference to FIG.
S91,S92:屋内環境装置10は、動作開始時に屋内環境計測指令を受信したか否かを確認する(S91)。この確認の結果、屋内環境計測指令を受信していなければ、装置を停止し(S92)、処理を終了する。 S91, S92: The indoor environment device 10 checks whether or not an indoor environment measurement command has been received at the start of operation (S91). If the result of this check is that an indoor environment measurement command has not been received, the device is stopped (S92) and processing ends.
S93~S96:S91の確認の結果、屋内環境計測指令を受信していれば、温度計10a,湿度計10b,COガスセンサ10cにより、制御盤20周囲の温度・湿度・COガス強度を計測する(S93)。 S93 to S96: If the result of checking in S91 is that an indoor environment measurement command has been received, the temperature, humidity, and CO gas intensity around the control panel 20 are measured using the thermometer 10a, hygrometer 10b, and CO gas sensor 10c (S93).
ここで計測された各情報を屋内環境データとして整理し(S94)、整理された屋内環境データを現地点検サーバ12に送信する(S95)。その後、次の屋内環境計測指令を受信していなければ(S96)、S92に進んで装置を停止して処理を終了する。 The measured information is organized as indoor environment data (S94), and the organized indoor environment data is sent to the on-site inspection server 12 (S95). If the next indoor environment measurement command has not been received (S96), the process proceeds to S92, where the device is shut down and the process ends.
(8)屋外環境計測装置11
図24に基づき屋外環境計測装置11の動作例を説明する。
(8) Outdoor environment measuring device 11
An example of the operation of the outdoor environment measuring device 11 will be described with reference to FIG.
S101,S102:屋外環境装置11は、動作開始時に屋外環境計測指令を受信したか否かを確認する(S101)。この確認の結果、屋外環境計測指令を受信していなければ、装置を停止し(S102)、処理を終了する。 S101, S102: The outdoor environment device 11 checks whether or not an outdoor environment measurement command has been received at the start of operation (S101). If the result of this check is that an outdoor environment measurement command has not been received, the device is stopped (S102) and processing ends.
S103~S106:S101の確認の結果、屋外環境計測指令を受信していれば、温度計11a,湿度計11b,COガスセンサ11c,風速計11dにより、電気設備30周囲の温度・湿度・COガス強度・風速・および風向を計測する(S103)。 S103 to S106: If the result of checking in S101 is that an outdoor environment measurement command has been received, the temperature, humidity, CO gas intensity, wind speed, and wind direction around the electrical equipment 30 are measured using the thermometer 11a, hygrometer 11b, CO gas sensor 11c, and anemometer 11d (S103).
ここで計測された各情報を屋外環境データとして整理し(S104)、整理された屋外環境データを現地点検サーバ12に送信する(S105)。その後、次の屋外環境計測指令を受信していなければ(S106)、S102に進んで装置を停止して処理を終了する。 The measured information is organized as outdoor environment data (S104), and the organized outdoor environment data is sent to the on-site inspection server 12 (S105). If the next outdoor environment measurement command has not been received (S106), the process proceeds to S102, where the device is shut down and the process ends.
(9)現地点検サーバ12
図25に基づき現地点検サーバ12の動作例を説明する。
(9) On-site inspection server 12
An example of the operation of the site inspection server 12 will be described with reference to FIG.
現地点検サーバ12は、動作開始後に点検用機能部(各種設定機能部40,点検スケジュール管理機能部50,データ収集・記録機能部60,総合解機能部70,点検レポート作成機能部80)の処理を並列に動作させる(S111)。 After starting operation, the on-site inspection server 12 operates the inspection function units (various settings function unit 40, inspection schedule management function unit 50, data collection and recording function unit 60, overall solution function unit 70, and inspection report creation function unit 80) in parallel (S111).
この各機能部40~80の動作処理がすべて終了すれば、装置を停止して動作を停止する(S112)。一方、すべて終了していなければ、各機能部40~80の処理を継続する。 When all the operational processes of the functional units 40 to 80 have been completed, the device is shut down and operation is stopped (S112). On the other hand, if all the processes have not been completed, the processing of the functional units 40 to 80 continues.
なお、遠隔監視端末13は、ネットワーク経由で現地点検サーバ12にアクセスし、現地点検サーバ12の各種設定機能部40を遠隔から利用することが可能となっている。 The remote monitoring terminal 13 can access the on-site inspection server 12 via the network and remotely use the various setting function units 40 of the on-site inspection server 12.
≪点検用機能部40~80の詳細≫
(1)各種設定機能部40
図26に基づき各種設定機能部40の詳細を説明する。ここでは各種設定機能部40は、現地点検サーバ12/遠隔監視端末13からアクセスして操作可能な点検設定画面90をWebブラウザに表示させる。すなわち、保守点検員がWebブラウザで点検設定画面90を選択することで(S120)、該当する点検設定画面90が呼び出される(S121)。
<Details of inspection function units 40 to 80>
(1) Various setting function section 40
Details of the various setting function unit 40 will be described with reference to Fig. 26. Here, the various setting function unit 40 displays, on a Web browser, an inspection setting screen 90 that can be accessed and operated from the on-site inspection server 12/remote monitoring terminal 13. That is, when a maintenance inspector selects an inspection setting screen 90 on the Web browser (S120), the corresponding inspection setting screen 90 is called up (S121).
本実施例では点検設定画面90として、制御パラメータ設定画面90a・解析パラメータ設定画面90b・点検スケジュール管理画面90c・点検データ閲覧画面90d・点検レポート作成画面90eの各種画面が用意されている。 In this embodiment, the inspection setting screen 90 includes various screens, such as a control parameter setting screen 90a, an analysis parameter setting screen 90b, an inspection schedule management screen 90c, an inspection data viewing screen 90d, and an inspection report creation screen 90e.
そして、保守点検などのユーザは、各点検画面90a~90e上で閲覧および設定入力などの操作を行う(S122)。この閲覧・操作の終了後に点検設定画面90の画面を閉じれば(S123)、各種設定機能部40の動作処理が終了する。 Then, the user, performing maintenance inspection, etc., performs operations such as viewing and inputting settings on each of the inspection screens 90a to 90e (S122). When the user has finished viewing and operating, he or she closes the inspection setting screen 90 (S123), and the operation processing of the various setting function unit 40 ends.
(2)点検スケジュール管理機能部50
点検スケジュール管理機能部50は、各点検装置4~11の点検スケジュールを常時監視する。図27に基づき動作処理を説明すれば、動作開始時に現地点検サーバ12の時計91の時刻が点検時刻となっているか否かを確認し(S131)、点検時刻になっていなければ、そのままS132に進む。
(2) Inspection Schedule Management Function Unit 50
The inspection schedule management function unit 50 constantly monitors the inspection schedule of each of the inspection devices 4 to 11. To explain the operation process based on Fig. 27, at the start of the operation, it is confirmed whether the time on the clock 91 of the on-site inspection server 12 is the inspection time (S131), and if it is not the inspection time, the process proceeds directly to S132.
一方、点検時刻になっていれば、制御パラメータの情報端末送信指令・メータ読取指令・固定式カメラ撮影指令・移動式カメラ撮影指令・音響収集指令・異臭検査指令・屋内環境計測指令・屋外環境計測指令の各指令値を「Yes」に設定してアクティブ化し、それぞれの制御パラメータを各点検装置4~11に送信し、S132に進む。 On the other hand, if it is time for inspection, the control parameters of the information terminal transmission command, meter reading command, fixed camera shooting command, mobile camera shooting command, sound collection command, odor inspection command, indoor environment measurement command, and outdoor environment measurement command are set to "Yes" to activate them, and the respective control parameters are sent to each inspection device 4 to 11, and the process proceeds to S132.
S132では、点検停止が遠隔監視端末13から指令されているか否かを確認し、指令されていなければ次の点検時刻となるまで待機する。一方、指令されていれば動作処理を終了する。 In S132, it is confirmed whether or not an instruction to stop inspection has been issued from the remote monitoring terminal 13, and if no such instruction has been issued, the system waits until the next inspection time. On the other hand, if an instruction has been issued, the operation process is terminated.
(3)データ収集・記録機能部60
データ収集・記録機能部60は、各点検装置4~11から受信した各点検データを整理して点検記録データベースに保存する。すなわち、データ収集・記録機能部60は、図28に示すように、動作開始時に点検データの受信を確認し(S141)、点検データを受信していなければ、そのままS142に進む。
(3) Data collection and recording function unit 60
The data collection and recording function unit 60 organizes the inspection data received from each of the inspection devices 4 to 11 and stores it in an inspection record database. That is, as shown in Fig. 28, the data collection and recording function unit 60 checks receipt of inspection data at the start of operation (S141), and if no inspection data has been received, proceeds directly to S142.
一方、点検データを受信していれば受信した点検データを整理し(S143)、整理した点検データを前記点検記録データベースに保存し(S144)、S142に進む。S142では、点検停止が遠隔監視端末13から指令されているか否かを確認し、指令されていなければS141に戻って動作処理を継続する。一方、指令されていれば動作処理を終了する。 On the other hand, if inspection data has been received, the received inspection data is organized (S143), the organized inspection data is stored in the inspection record database (S144), and the process proceeds to S142. In S142, it is confirmed whether or not an instruction to stop inspection has been issued from the remote monitoring terminal 13, and if not, the process returns to S141 to continue the operation process. On the other hand, if an instruction has been issued, the operation process ends.
以下、図29に基づき点検データベースの構成を説明する。この点検データベースは、点検日時ごとの各点検データを記録し、点検装置4~11・点検対象設備20,30・観測箇所ラベル・点検データ・点検データ状態・確認状態の情報を1つのまとまりとしたデータ列で構成する。 The configuration of the inspection database will be explained below with reference to Figure 29. This inspection database records each inspection data for each inspection date and time, and is configured as a data string that compiles information on the inspection devices 4 to 11, the equipment to be inspected 20, 30, the observation point label, the inspection data, the inspection data status, and the confirmation status.
点検装置の欄は、点検データの計測や解析を行う情報通信端末4・メータ読取装置5・固定式監視カメラ装置6・移動式監視カメラ装置7・音響収集装置8・嗅覚センサ装置9・屋内環境計測装置10・屋外環境計測装置11・現地点検サーバ12の分類を記録する。図29中では、それぞれの点検装置4~11群の一つを4-1~11-1と例示している。 The inspection equipment column records the classification of the information communication terminal 4, meter reading device 5, fixed surveillance camera device 6, mobile surveillance camera device 7, acoustic collection device 8, olfactory sensor device 9, indoor environment measuring device 10, outdoor environment measuring device 11, and on-site inspection server 12 that measure and analyze the inspection data. In Figure 29, one of each of the inspection equipment groups 4 to 11 is shown as 4-1 to 11-1.
点検対象設備の欄は、電気設備30や制御盤20の分類を記録し、図29中では制御盤20-1,電気設備30-1が例示されている。このとき音響収集装置8・嗅覚センサ装置9・屋内環境計測装置10・屋外環境計測装置11については、屋内/屋外の分類を記録する。なお、現地点検サーバについては空欄とする。 The inspection target equipment column records the classification of the electrical equipment 30 or control panel 20, and in FIG. 29, a control panel 20-1 and electrical equipment 30-1 are shown as examples. At this time, the indoor/outdoor classification is recorded for the acoustic collection device 8, olfactory sensor device 9, indoor environment measuring device 10, and outdoor environment measuring device 11. Note that the field for the on-site inspection server is left blank.
観測箇所ラベルの欄は、情報通信端末について電流値・電圧値などの計測値名を記録する。また、メータ読取装置5・固定式監視カメラ装置6・移動式監視カメラ装置7については油面計・変圧器上部・遮断機左部などの観測箇所を記録する。さらに音響収集装置8・嗅覚センサ装置9・屋内環境計測装置10・屋外環境計測装置11については、屋内1地点や屋外1地点など各点検装置8~10の設置個所を記録する。なお、現地点検サーバ12については、後述する異音分布推定・異臭分布推定などの総合解析の種類を記録する。 The observation location label column records the names of measurement values such as current and voltage values for the information communication terminal. Additionally, for the meter reading device 5, fixed surveillance camera device 6, and mobile surveillance camera device 7, observation locations such as the oil level gauge, top of the transformer, and left part of the circuit breaker are recorded. Furthermore, for the sound collection device 8, olfactory sensor device 9, indoor environment measuring device 10, and outdoor environment measuring device 11, the installation location of each inspection device 8-10, such as one indoor location or one outdoor location, is recorded. Note that for the on-site inspection server 12, the type of comprehensive analysis, such as abnormal sound distribution estimation and abnormal odor distribution estimation, which will be described later, is recorded.
点検データの欄は、各点検装置4~11から受信した点検データ(計測値・メータ指針値など)を記録する。点検データ状態の欄は、点検データの状態について未定・正常・異常の点検データ状態値を記録する。ただし、現地点検サーバ12がデータ収集・記録機能部60を動作させた時点では、点検データ状態値に未定を設定しておくものとする。 The inspection data column records the inspection data (measurement values, meter indication values, etc.) received from each inspection device 4 to 11. The inspection data status column records the inspection data status value of undetermined, normal, or abnormal for the state of the inspection data. However, when the on-site inspection server 12 operates the data collection and recording function unit 60, the inspection data status value is set to undetermined.
確認状態の欄は、点検データを保守員が確認済か未確認かの確認状態値を記録する。ただし、現地点検サーバ12がデータ収集・記録機能部60を動作させた時点では、確認状態値に未確認を設定しておくものとする。 The confirmation status column records the confirmation status value of whether the inspection data has been confirmed by the maintenance personnel or not. However, when the on-site inspection server 12 operates the data collection and recording function unit 60, the confirmation status value is set to "not confirmed."
(4)総合解析機能部70
総合解析機能部70は、現地点検サーバ12がデータ収集・記録機能部60を動作させて後に動作が実行される。図30に基づき説明すれば、総合解析機能部70の動作処理が開始されると、点検データ閾値判断(S151)・点検データ状態判断(S152)・異音分布推定(S153)・異臭分布推定(S154)の動作処理を順に実行する。
(4) Comprehensive analysis function unit 70
The overall analysis function unit 70 starts its operation after the on-site inspection server 12 starts the data collection and recording function unit 60. Explaining with reference to Fig. 30, when the operation process of the overall analysis function unit 70 starts, it sequentially executes the operation processes of inspection data threshold determination (S151), inspection data state determination (S152), abnormal sound distribution estimation (S153), and abnormal odor distribution estimation (S154).
その後、点検停止が遠隔監視端末13から指令されているか否かを確認し、指令されていなければS151~S154の動作処理を繰り返す。一方、指令されていれば動作処理を終了する。以下、S151~S154の動作処理の詳細を説明する。 Then, it is checked whether or not an instruction to stop the inspection has been issued from the remote monitoring terminal 13. If no instruction has been issued, the operation process of S151 to S154 is repeated. On the other hand, if an instruction has been issued, the operation process is terminated. The details of the operation process of S151 to S154 are explained below.
S151:点検データ閾値判断においては、情報通信端末4で収集した計測値(点検データ)が事前設定の上限値~下限値の間の許容範囲に入っているかを確認する。確認の結果、許容範囲に入っていれば該点検データの点検データ状態を正常に設定する一方、そうでなければ点検データ状態を異常に設定する。 S151: In the inspection data threshold judgment, it is confirmed whether the measurement value (inspection data) collected by the information communication terminal 4 is within the tolerance range between the pre-set upper and lower limits. If the result of the confirmation is that it is within the tolerance range, the inspection data status of the inspection data is set to normal, whereas if not, the inspection data status is set to abnormal.
また、メータ読取装置5で収集したメータ指針値(点検データ)が事前設定の上限値~下限値の間の許容範囲に入っているかを確認する。確認結果、許容範囲に入っていれば該点検データの点検データ状態値を正常に設定する一方、そうでなければ点検データ状態を異常に設定する。このときメータ指針値に付随するメータの撮影画像の点検データ状態値についても、メータ指針値と同様に点検データ状態値を設定する。 It also checks whether the meter reading (inspection data) collected by the meter reading device 5 is within the tolerance range between the preset upper and lower limits. If the check results in a value within the tolerance range, the inspection data status value of the inspection data is set to normal, whereas if not, the inspection data status is set to abnormal. At this time, the inspection data status value of the photographed image of the meter that accompanies the meter reading is also set to the same inspection data status value as the meter reading.
さらに固定式監視カメラ装置6で収集した赤外画像(点検データ)を確認し、事前に設定した最大温度以上の箇所が存在すれば、異常加熱と判断して該点検データの点検データ状態値を異常に設定する。一方、そうでなければ点検データ状態値を正常に設定する。 Furthermore, the infrared images (inspection data) collected by the fixed monitoring camera device 6 are checked, and if any areas are found to have a temperature above a preset maximum temperature, it is determined that abnormal heating has occurred and the inspection data status value of that inspection data is set to abnormal. On the other hand, if not, the inspection data status value is set to normal.
同様に移動式監視カメラ装置7で収集した赤外画像(点検データ)を確認し、事前に設定した最大温度以上の箇所が存在すれば、異常加熱と判断して該点検データの点検データ状態値を異常に設定する。一方、そうでなければ点検データ状態値を正常に設定する。 Similarly, the infrared images (inspection data) collected by the mobile surveillance camera device 7 are checked, and if any areas are found to have a temperature above a preset maximum temperature, it is determined that abnormal heating has occurred and the inspection data status value of that inspection data is set to abnormal. On the other hand, if not, the inspection data status value is set to normal.
S152:点検データ状態判断においては、まず情報通信端末4で収集した「ON」/「OFF」などの状態値(点検データ)を、電気設備30の運用中として正しい状態値での運用状態値と比較する。比較の結果、正しければ該点検データを正常に設定する一方、そうでなければ点検データ状態値を異常に設定する。 S152: In judging the inspection data status, first, the status value (inspection data) such as "ON"/"OFF" collected by the information communication terminal 4 is compared with the operation status value for the correct status value when the electrical equipment 30 is in operation. If the comparison result is correct, the inspection data is set to normal, whereas if not, the inspection data status value is set to abnormal.
つぎに音響収集装置8の異音データ(点検データ)が異音有りの場合には該点検データの点検データ状態値を異常に設定する一方、そうでなれば点検データ状態値を正常に設定する。 Next, if the abnormal sound data (inspection data) from the sound collecting device 8 indicates the presence of an abnormal sound, the inspection data status value of the inspection data is set to abnormal, whereas if not, the inspection data status value is set to normal.
ただし、異常に設定された異音データについては、異音レベルが事前設定の上限値~下限値の間の許容範囲に入っているかを確認する。確認結果、許容範囲に入っていれば該点検データの点検データ状態値を正常に更新する。一方、そうでなければ点検データ状態を異常に設定されたままとする。 However, for abnormal sound data that has been set to abnormal, a check is made to see if the abnormal sound level is within the tolerance range between the pre-set upper and lower limits. If the check finds that the abnormal sound level is within the tolerance range, the inspection data status value of that inspection data is updated to normal. On the other hand, if not, the inspection data status remains set to abnormal.
また、臭覚センサ装置9の異臭データ(点検データ)中に「油臭あり」とあれば該点検データの点検データ状態を異常に設定する一方、そうでなければ点検データ状態を正常に設定する。同様に異臭データ(点検データ)に「焦げ臭あり」とあれば該点検データを異常に設定する一方、そうでなければ点検データ状態を正常に設定する。 In addition, if the odor data (inspection data) from the odor sensor device 9 indicates that there is an "oil smell", the inspection data status of the inspection data is set to abnormal, whereas if not, the inspection data status is set to normal. Similarly, if the odor data (inspection data) indicates that there is a "burnt smell", the inspection data is set to abnormal, whereas if not, the inspection data status is set to normal.
S153:図31に基づき異音分布推定(S153)の処理内容を説明する。まず、動作処理の開始後に電気設備30の配置図上に音響収集装置8の設置個所をプロットする(S161)。つぎにプロットされた設置個所を中心として異音データの異音レベルに応じたサイズの円を描画し(S162)、異音分布推定図を作成する。この異音分布推定図中の円を異音推定円と呼ぶ。 S153: The process of estimating abnormal sound distribution (S153) will be explained with reference to FIG. 31. First, after the operation process starts, the installation location of the sound collection device 8 is plotted on the layout diagram of the electrical equipment 30 (S161). Next, a circle of a size according to the abnormal sound level of the abnormal sound data is drawn with the plotted installation location as its center (S162), and an abnormal sound distribution estimation diagram is created. The circle in this abnormal sound distribution estimation diagram is called the abnormal sound estimation circle.
その後、異音推定円の近傍にある電気設備を異音発生注意設備としてリスト化する(S163)。ここでリスト化された異音発生注意設備リストと異音分布推定図とを異音分布推定結果として整理し、点検記録データベースへ保存する(S164)。 Then, electrical equipment in the vicinity of the abnormal noise estimation circle is listed as abnormal noise generating equipment (S163). The abnormal noise generating equipment list and the abnormal noise distribution estimation map are organized as abnormal noise distribution estimation results and stored in the inspection record database (S164).
図32は異音分布推定図の一例を示し、電気設備30-1と電気設備30-2とが異音発生注意設備リストに記述される。このように点検対象設備20,30の周囲の何処かに異音がある場合は、これら点検データの点検データ状態値を異常に設定し、そうでなければ点検状態値を正常に設定して(S165)、動作処理を終了する。 Figure 32 shows an example of an abnormal sound distribution estimation diagram, with electrical equipment 30-1 and electrical equipment 30-2 described in the abnormal sound generation equipment watch list. In this way, if there is an abnormal sound anywhere around the equipment 20, 30 to be inspected, the inspection data status value of these inspection data is set to abnormal, otherwise the inspection status value is set to normal (S165) and the operation process ends.
S154:図33に基づき異臭分布推定(S154)を説明する。まず、動作処理の開始後に電気設備30の配置図上に嗅覚センサ装置9の設置個所をプロットする(S171)。つぎに屋内(電気室内)では、前記設置個所を中心として予め決められた屋内異臭サイズの円を描画し(S172)、異臭分布推定図を作成する。 S154: The off-odor distribution estimation (S154) will be explained with reference to FIG. 33. First, after the operational process starts, the installation location of the olfactory sensor device 9 is plotted on the layout diagram of the electrical equipment 30 (S171). Next, indoors (inside the electrical room), a circle of a predetermined indoor off-odor size is drawn with the installation location as its center (S172), and an off-odor distribution estimation diagram is created.
一方、屋外では、プロットされた嗅覚センサ装置9と同じ設置位置(図14参照)の屋外環境計測装置11で計測した風速・風向に応じて屋外異臭推定中心を求める(S173)。この屋外異臭推定中心に基づき予め決められた屋外異臭サイズの円を描写し(S174)、異臭分布推定図を作成する。 On the other hand, outdoors, the estimated outdoor odor center is determined (S173) based on the wind speed and direction measured by the outdoor environment measuring device 11 installed in the same location (see FIG. 14) as the plotted olfactory sensor device 9. Based on this estimated outdoor odor center, a circle of a predetermined outdoor odor size is drawn (S174), and an estimated odor distribution map is created.
ここで作成された異臭分布推定図(S172,S174)中の円を異臭推定円と呼ぶ。異臭分布推定図の作成にあたっては、異臭データに基づき油臭による異音推定円と焦げ臭による異音推定円とは別の色で表現する。 The circles in the off-odor distribution estimation map (S172, S174) created here are called off-odor estimation circles. When creating the off-odor distribution estimation map, the off-odor noise estimation circles due to oily odors and the off-odor noise estimation circles due to burnt odors are shown in different colors based on the off-odor data.
また、プロットされた嗅覚センサ装置9と同じ設置個所にある屋外環境計測装置11/屋内環境計測装置10(図13,図14参照)のCOガスセンサ強度が、予め設定した許容COガスセンサ強度よりも大きい場合には異臭推定円を別の色で表現する。さらに焦げ臭とCOガスセンサ強度との両方に異常が見られた場合は、異臭推定円をさらに別の色で表現する。 In addition, if the CO gas sensor strength of the outdoor environment measuring device 11/indoor environment measuring device 10 (see Figures 13 and 14) installed at the same installation location as the plotted olfactory sensor device 9 is greater than a preset allowable CO gas sensor strength, the off-odor estimation circle is displayed in a different color. Furthermore, if abnormalities are found in both the burnt odor and the CO gas sensor strength, the off-odor estimation circle is displayed in yet another color.
このとき電気設備30や制御盤20の構造物に何らかの加熱があった場合は、嗅覚センサ装置9が反応し、構造物がさらに高温となり燃焼に近づくとCOガスが発生する。そこで、嗅覚センサ装置9とCOガスセンサ10cの出力を協調することにより電気設備30や制御盤20で発生する異常加熱の検出精度を高める効果が期待できる。 At this time, if any heating occurs in the structure of the electrical equipment 30 or the control panel 20, the olfactory sensor device 9 will react, and as the temperature of the structure increases and it approaches combustion, CO gas will be generated. Therefore, by coordinating the outputs of the olfactory sensor device 9 and the CO gas sensor 10c, it is expected that the accuracy of detecting abnormal heating occurring in the electrical equipment 30 or the control panel 20 can be improved.
その後、異臭推定円の近傍にある電気設備を異臭発生注意設備としてリスト化する(S175)。図34は、異臭分布推定図の一例を示し、屋外では電気設備30-1,30-2が異臭発生注意設備リストに記述される一方、屋内(電気室内)では制御盤20-1,20-2が同リストに記述される。 After that, electrical equipment in the vicinity of the estimated odor circle is listed as equipment to watch out for generating abnormal odors (S175). Figure 34 shows an example of an estimated odor distribution map, where electrical equipment 30-1 and 30-2 outdoors are listed in the list of equipment to watch out for generating abnormal odors, while control panels 20-1 and 20-2 indoors (inside the electrical room) are listed in the same list.
ここでリスト化された異臭発生注意設備リストと異臭分布推定図とを異臭分布推定結果として整理し、点検記録データベースへ保存する(S176)。このように点検対象設備20,30の周囲の何処かに異臭がある場合は、これら点検データの点検データ状態値を異常に設定し、そうでなければ点検状態値を正常に設定して(S177)、動作処理を終了する。 The list of equipment to beware of foul odor generation and the foul odor distribution estimation map are organized as foul odor distribution estimation results and saved in the inspection record database (S176). In this way, if there is an foul odor anywhere around the equipment 20, 30 to be inspected, the inspection data status value of this inspection data is set to abnormal, otherwise the inspection status value is set to normal (S177), and the operation process ends.
(5)点検結果レポート作成機能部80
図35に基づき点検レポート作成機能部80の動作処理を説明する。動作処理が開始されると点検レポート作成機能部80は、指定した点検日時の各点検データを点検記録データベースから読み出し(S181)、点検レポートに整理してファイル出力する(S182,S183)。例えば点検レポートの出力先がプリンタに設定すれば点検レポートをプリンタに出力して用紙に印刷し、処理を終了する。
(5) Inspection result report creation function unit 80
The operation process of the inspection report creation function unit 80 will be described with reference to Fig. 35. When the operation process is started, the inspection report creation function unit 80 reads each inspection data for the specified inspection date and time from the inspection record database (S181), organizes it into an inspection report, and outputs it as a file (S182, S183). For example, if the output destination of the inspection report is set to a printer, the inspection report is output to the printer and printed on paper, and the process ends.
≪日常点検例≫
本実施例による点検対象設備20,30の日常点検例を説明する。遠隔監視端末13の点検スケジュール管理画面90cにおいて、点検時間の間隔を2時間などに予め設定し、設定された点検時間の間隔で点検スケジュールに点検時刻を自動的に登録する。ここでは一例として1か月先までの点検スケジュールを自動的に登録しておくものとする。
<Daily inspection example>
An example of daily inspection of the inspection target facilities 20, 30 according to this embodiment will be described. On the inspection schedule management screen 90c of the remote monitoring terminal 13, the inspection time interval is preset to, for example, two hours, and the inspection time is automatically registered in the inspection schedule at the set inspection time interval. As an example, the inspection schedule for up to one month in advance is automatically registered.
点検スケジュールは、前述の自動登録に限らず、点検時刻の手動による追加・変更・削除も可能である。点検対象設備20,30についての各点検データの収集は、点検スケジュールに従って各点検装置4~11が自動的に動作することで実施される。 The inspection schedule is not limited to the automatic registration described above; inspection times can also be added, changed, or deleted manually. Collection of inspection data for the equipment to be inspected 20, 30 is carried out by the inspection devices 4 to 11 automatically operating according to the inspection schedule.
(1)日常点検の際に保守点検員は、遠隔監視端末13によりネットワーク経由で現地点検サーバ12にアクセスし、現地点検サーバ12の各種設定機能部40を遠隔から利用して点検スケジュール管理画面90cを閲覧する。 (1) During daily inspections, a maintenance inspector accesses the on-site inspection server 12 via the network using the remote monitoring terminal 13, and remotely uses the various setting function unit 40 of the on-site inspection server 12 to view the inspection schedule management screen 90c.
点検スケジュール管理画面90cには、図36(a)に示すように、月毎スケジュールが表示される。この月毎スケジュールの各日付には、「点検済」・「確認済」・「点検予約」・「異常」の各点検作業状態が表示される。この表示中、「点検済」は日付の全ての点検時刻における各点検データを収集した状態を示し、「確認済」は点検済でこの日の点検時刻のどこかの点検データを保守点検員が確認した状態を示し、「点検予約」は点検時刻が登録されているが各点検データを収集していない状態を示し、「異常」は点検装置4~11の故障などの理由により日付の点検時刻の何処かで各点検データを収集できなかった状態を示している。 The inspection schedule management screen 90c displays a monthly schedule, as shown in FIG. 36(a). For each date in this monthly schedule, the inspection work status of "Inspected", "Confirmed", "Inspection reservation", and "Abnormal" is displayed. In this display, "Inspected" indicates a state in which inspection data has been collected at all inspection times on the date, "Confirmed" indicates a state in which inspection has been completed and inspection data at some inspection time on this day has been confirmed by a maintenance inspector, "Inspection reservation" indicates a state in which an inspection time has been registered but inspection data has not been collected, and "Abnormal" indicates a state in which inspection data could not be collected at some inspection time on the date due to a malfunction of inspection devices 4 to 11 or other reasons.
月毎スケジュールの日付を指定すると、図36(b)に示すように、日毎スケジュールが表示される。この日毎スケジュールは、各点検時刻毎に「点検済」・「確認済」・「点検予約」・「異常」の各点検作業状態が表示される。 When you specify a date for the monthly schedule, the daily schedule will be displayed as shown in Figure 36 (b). This daily schedule displays the status of each inspection operation for each inspection time: "Inspected", "Confirmed", "Inspection scheduled", and "Abnormal".
(2)日常の点検作業は、日毎スケジュールの点検済の時刻を保守点検員が指定し、点検データ閲覧確認画面90dを保守点検員が操作して各点検装置4~11の点検データを確認することで行われる。このとき点検データ閲覧確認画面90dには、図37に示すように、指定した点検日時の各点検データを点検記録データベースから読み出して整理し表示される。 (2) Daily inspection work is performed by the maintenance inspector specifying the inspection time on the daily schedule and operating the inspection data viewing confirmation screen 90d to check the inspection data of each inspection device 4 to 11. At this time, the inspection data for the specified inspection date and time is read from the inspection record database, organized, and displayed on the inspection data viewing confirmation screen 90d, as shown in FIG. 37.
点検記録データベースには、点検装置4~11毎に(a)点検対象設備20,30、(b)観測箇所ラベル、(c)参考情報、(d)点検データ、(e)点検データ状態、(f)確認状態の各項目が表示される。ここで点検対象設備は制御盤20・電気設備30を示し、観測箇所ラベルは事前設定された点検対象設備20,30の観測箇所(電流値・電圧値・油面計・観測箇所・屋外地点・屋内地点)を示している。 In the inspection record database, the following items are displayed for each inspection device 4-11: (a) the equipment 20, 30 to be inspected, (b) observation location label, (c) reference information, (d) inspection data, (e) inspection data status, and (f) confirmation status. Here, the equipment to be inspected indicates the control panel 20 and electrical equipment 30, and the observation location label indicates the previously set observation locations (current value, voltage value, oil level gauge, observation location, outdoor location, indoor location) of the equipment 20, 30 to be inspected.
参考情報としては、例えば点検データの計測値に対する上限値と下限値,点検データ状態値に対する運用状態値,可視光画像および赤外画像の過去情報(1ヶ月前の撮影結果など),温度湿度・COガスセンサ強度・風速・風向などの環境計測値の過去情報(1ヶ月前の計測結果など)などを表示する。 Reference information displayed may include, for example, upper and lower limits for the inspection data measurement values, operational status values for the inspection data status values, past information on visible light images and infrared images (e.g., photographic results from one month ago), and past information on environmental measurements such as temperature and humidity, CO gas sensor strength, wind speed, and wind direction (e.g., measurement results from one month ago).
また、点検データ状態値は、現地点検サーバ12の総合解析機能部70による各点検データの総合解析の結果として出力された状態値を示している。さらに確認状態は、保守点検員による点検データ等の確認状態を示している。 The inspection data status value indicates the status value output as a result of the comprehensive analysis of each inspection data by the comprehensive analysis function unit 70 of the on-site inspection server 12. Furthermore, the confirmation status indicates the confirmation status of the inspection data, etc. by the maintenance inspector.
このような各項目のうち可視光画像・赤外線画像・音響信号(グラフ)・異音分布推定図・異音発生注意設備リスト・異臭分布推定図・異臭発生注意設備リストなどのデータ列で構成される点検データについては、点検データ閲覧確認画面90dに縮小画像を表示する。また、前記各項目を点検データ閲覧確認画面90dから選択すれば、図38に示すように、選択された項目のみによる詳細点検データ閲覧確認画面90fが表示される。 For inspection data consisting of data strings such as visible light images, infrared images, acoustic signals (graphs), estimated abnormal sound distribution maps, list of equipment that generates abnormal sounds, estimated abnormal odor distribution maps, and list of equipment that generates abnormal odors, reduced images are displayed on the inspection data viewing confirmation screen 90d. In addition, when each of the above items is selected from the inspection data viewing confirmation screen 90d, a detailed inspection data viewing confirmation screen 90f is displayed with only the selected item, as shown in FIG. 38.
(3)保守点検員は、点検データ閲覧確認画面90d・詳細点検データ閲覧確認画面90fを閲覧して前記各項目の点検データ状態値の妥当性を確認し、確認が済めば該当項目の確認状態を確認済に設定する。 (3) The maintenance inspector views the inspection data viewing confirmation screen 90d and the detailed inspection data viewing confirmation screen 90f to confirm the validity of the inspection data status value for each item, and when the confirmation is complete, sets the confirmation status of the corresponding item to "confirmed."
このとき画像(可視光画像・赤外線画像)・温度・湿度・COガスセンサ強度・風速・風向など現地点検サーバ12の総合解析機能部70で点検データ状態値が設定されないものについては、保守点検員が各点検データを見て点検データ状態を判断し、点検データ状態値を設定する。 At this time, for the images (visible light images and infrared images), temperature, humidity, CO gas sensor strength, wind speed, wind direction, etc., for which inspection data status values are not set in the comprehensive analysis function unit 70 of the on-site inspection server 12, the maintenance inspector looks at each piece of inspection data, judges the inspection data status, and sets the inspection data status value.
また、現地点検サーバ12の総合解析機能部70で設定済の点検データ状態値であっても保守点検員の判断で変更することが可能であり、さらに保守点検員は点検データの確認作業を行って得た所感を備考欄に記入するものとする。 In addition, even if the inspection data status value has already been set in the comprehensive analysis function unit 70 of the on-site inspection server 12, it is possible for the maintenance inspector to change it at his/her discretion, and furthermore, the maintenance inspector is to enter his/her impressions obtained after checking the inspection data in the remarks column.
そして、保守点検員が全ての項目について確認状態を設定し、点検データ閲覧確認画面90dを閉じれば、日毎スケジュールの該当時刻の点検作業状態が「確認済」に設定される。これにより月毎スケジュールの該当日付の点検作業状態も「確認済」に設定される。 Then, when the maintenance inspector sets the confirmation status for all items and closes the inspection data viewing confirmation screen 90d, the inspection work status for the corresponding time in the daily schedule is set to "confirmed." This also sets the inspection work status for the corresponding date in the monthly schedule to "confirmed."
「確認済」となった点検日時の点検データ閲覧確認画面90dの表示項目については、点検結果レポート作成機能部80により点検レポートとして出力することができる。保守点検員は、必要に応じて出力したい点検日時を指定し、点検レポートをファイルやプリンタに出力する。 Display items on the inspection data viewing confirmation screen 90d for inspection dates and times that have been "confirmed" can be output as an inspection report by the inspection result report creation function unit 80. If necessary, the maintenance inspector can specify the inspection date and time to be output, and output the inspection report to a file or printer.
したがって、本実施例によれば、従来から人間の感覚に頼っていた異臭確認などを含めた日常点検作業の全般が自動計測され、保守点検員が現地に赴くことなく、遠隔で保守点検作業を行うことが可能となる。 Therefore, according to this embodiment, all daily inspection work, including checking for abnormal odors, which has traditionally relied on human senses, can be measured automatically, making it possible to perform maintenance and inspection work remotely without the need for maintenance and inspection personnel to visit the site.
このとき臭覚センサ装置9の異臭データと可視光カメラ6a,7aの撮影画像(油漏れの確認)とを保守点検員が考慮することで信頼度の高い油臭確認を実現することができる。また、臭覚センサ装置9の異臭データ・COガスセンサ強度・赤外線カメラ6b,7bの赤外線画像(異常加熱の確認)を保守点検員が考慮することで信頼度の高い焦げ臭確認を実現することもできる。 At this time, a maintenance inspector can take into consideration the strange odor data from the odor sensor device 9 and the images captured by the visible light cameras 6a and 7a (to confirm oil leaks) to achieve highly reliable confirmation of oily odors. In addition, a maintenance inspector can take into consideration the strange odor data from the odor sensor device 9, the CO gas sensor intensity, and the infrared images from the infrared cameras 6b and 7b (to confirm abnormal heating) to achieve highly reliable confirmation of burning odors.
図39~図43に基づき前記システム1の実施例2を説明する。ここでは前記システム1に臭覚レベル検出が加えられている。 A second embodiment of the system 1 will be described with reference to Figures 39 to 43. In this embodiment, olfactory level detection is added to the system 1.
実施例1では嗅覚センサ装置9のデータ解析部9fは、臭覚センサ信号解析時に油臭の有無・焦げ臭の有無をそれぞれ並列して判断している。この点につき本実施例のデータ解析部9fは、臭覚センサ信号解析時にさらに油臭レベル検出・焦げ臭レベル検出を並列して行う。 In the first embodiment, the data analysis unit 9f of the olfactory sensor device 9 determines in parallel whether there is an oily odor and whether there is a burnt odor when analyzing the olfactory sensor signal. In this regard, the data analysis unit 9f in this embodiment also detects the oily odor level and the burnt odor level in parallel when analyzing the olfactory sensor signal.
具体的には図39に示すように、データ解析部9fの臭覚センサ信号解析(S84)に油臭レベル検出(S200a)・焦げ臭レベル検出(200b)が追加されている。 Specifically, as shown in FIG. 39, oily odor level detection (S200a) and burnt odor level detection (200b) have been added to the odor sensor signal analysis (S84) of the data analysis unit 9f.
(2)油臭レベル検出
図40に基づき油臭レベル検出(S200a)を説明する。この油臭レベル検出では油臭のガスの濃度量に応じて油臭レベルを求める。ここでは事前に油臭の学習サンプルとして濃度量が異なる3段階の学習サンプル(油臭レベル1~3)を用意し、それぞれの濃度量に対してサポートベクタマシンを学習し嗅覚センサ解析パラメータを予め作成しておくものとする。
(2) Oil odor level detection The oil odor level detection (S200a) will be explained with reference to Fig. 40. In this oil odor level detection, the oil odor level is obtained according to the concentration of the oil odor gas. Here, three learning samples with different concentrations (oil odor levels 1 to 3) are prepared in advance as learning samples for the oil odor, and a support vector machine is trained for each concentration to create olfactory sensor analysis parameters in advance.
そして、油臭レベル検出が開始されると、S83で計測された臭覚センサ信号を油臭レベル1~3のそれぞれのサポートベクタマシンによる検出器500に供することで各検出器500を並列に動作させて、すべての検出器500が「油臭無し」を出力した否かを確認する(S201)。 When oil odor level detection begins, the olfactory sensor signal measured in S83 is provided to the detectors 500 using support vector machines for each of the oil odor levels 1 to 3, causing each detector 500 to operate in parallel, and it is checked whether all detectors 500 have output "no oil odor" (S201).
確認の結果、すべての検出器500が「油臭無し」を出力していれば、油臭レベル「0」とする(S202)。一方、いずれかの検出器500が「油臭有り」を出力した場合には検出器500の出力である確率値が最も高い検出器500のレベルを油臭レベルとして設定する(S203)。このとき「油臭有り」を出力した検出器500のうち、最も濃度量の高い検出器500の油臭レベルに設定してもよい。 If, as a result of the check, all detectors 500 output "no oil odor", the oil odor level is set to "0" (S202). On the other hand, if any detector 500 outputs "oil odor present", the level of the detector 500 with the highest probability value of being the output of the detector 500 is set as the oil odor level (S203). At this time, among the detectors 500 that output "oil odor present", the oil odor level of the detector 500 with the highest concentration may be set.
その後、S84aの油臭有無の判断に進む。S84aでは、S202の「油臭レベル」が「0」であれば「油臭無し」と判断する一方、それ以外は「油臭有り」と判断する。 Then, the process proceeds to S84a to determine whether or not there is an oily odor. In S84a, if the "oil odor level" in S202 is "0", it is determined that there is no oily odor, otherwise it is determined that there is an oily odor.
(3)焦げ臭レベル検出
図41に基づき焦げ臭レベル検出(S200b)の詳細を説明する。この焦げ臭レベル検出では焦げ臭のガスの濃度量に応じて焦げ臭レベルを求める。ここでは焦げ臭の学習サンプルとして濃度量が異なる3段階の学習サンプル(焦げ臭レベル1~3)を用意し、それぞれの濃度量に対してサポートベクタマシンを学習し嗅覚センサ解析パラメータを予め作成しておくものとする。
(3) Burning odor level detection Burning odor level detection (S200b) will be described in detail with reference to Fig. 41. In this burning odor level detection, the burning odor level is determined according to the concentration of the burning odor gas. Here, three learning samples with different concentrations (burning odor levels 1 to 3) are prepared as learning samples for the burning odor, and a support vector machine is trained for each concentration to create olfactory sensor analysis parameters in advance.
そして、焦げ臭レベル検出が開始されると、S83で計測された臭覚センサ信号を焦げ臭レベル1~3のそれぞれのサポートベクタマシンによる検出器600に供することで各検出器600を並列に動作させて、すべての検出器600が「焦げ臭無し」を出力した否かを確認する(S301)。 When the burnt odor level detection starts, the olfactory sensor signal measured in S83 is provided to the detectors 600 using the support vector machines for each burnt odor level 1 to 3, causing each detector 600 to operate in parallel, and it is confirmed whether all detectors 600 have output "no burnt odor" (S301).
確認の結果、すべての検出器600が「焦げ臭無し」を出力していれば、焦げ臭レベル「0」とする(S302)。一方、いずれかの検出器600が「焦げ臭有り」を出力した場合には検出器600の出力である確率値が最も高い検出器600のレベルを異臭レベルとして設定する(S303)。このとき「焦げ臭有り」を出力した検出器600のうち、最も濃度量の高い検出器600の焦げ臭レベルに設定してもよい。 If, as a result of the check, all detectors 600 output "no burning odor", the burning odor level is set to "0" (S302). On the other hand, if any detector 600 outputs "burning odor present", the level of the detector 600 with the highest probability value of being the detector 600 output is set as the off-odor level (S303). At this time, among the detectors 600 that output "burning odor present", the burning odor level of the detector 600 with the highest concentration may be set.
その後、S84bの焦げ臭有無の判断に進む。S84bでは、S302の焦げ臭レベルが「0」であれば「焦げ臭無し」と判断する一方、それ以外は「焦げ臭有り」と判断する。 Then, the process proceeds to S84b to determine whether or not there is a burning odor. In S84b, if the burning odor level in S302 is "0", it is determined that there is no burning odor, otherwise it is determined that there is a burning odor.
(3)異音分布推定
本実施例の現地点検サーバ12で実施する異臭分布推定は、図42に示すように、実施例1の異臭分布推定に加えて、油臭レベル/焦げ臭レベルを異臭推定円の中に文字で表示する(S400)。図43は、本実施例による異臭分布推定図を示し、屋外の異臭推定円に「レベル2」が表示されている一方、屋内(電気室)の異臭推定円に「レベル1」が表示されている。
(3) Abnormal sound distribution estimation The off-odor distribution estimation performed by the on-site inspection server 12 in this embodiment, in addition to the off-odor distribution estimation of embodiment 1, displays the oily odor level/burnt odor level in text within an off-odor estimation circle (S400) as shown in Fig. 42. Fig. 43 shows an off-odor distribution estimation diagram according to this embodiment, with "Level 2" displayed in the outdoor off-odor estimation circle and "Level 1" displayed in the indoor (electrical room) off-odor estimation circle.
このように本実施例によれば、実施例1の効果に加えて油臭レベル・焦げ臭レベルの情報が追加されるため、現地での異臭発生の状態について保守点検員の理解度を向上させることができる。また、異臭について定量的な記録を残すことができるため、蓄積された点検記録を有効に利用することができる。 In this way, according to this embodiment, in addition to the effects of embodiment 1, information on the oily odor level and burnt odor level is added, so that the maintenance and inspection personnel can improve their understanding of the state of the odor generation at the site. In addition, since a quantitative record of the odor can be kept, the accumulated inspection records can be effectively used.
図44~図46に基づき前記システム1の実施例2を説明する。ここでは前記システム1の現地点検サーバ12には、図44に示すように、点検データ時系列解析機能部95の処理が追加されている。 A second embodiment of the system 1 will be described with reference to Figures 44 to 46. Here, the on-site inspection server 12 of the system 1 is added with the processing of an inspection data time series analysis function unit 95, as shown in Figure 44.
すなわち、点検データ時系列解析機能部95は、情報通信端末4で収集した計測値および状態値・メータ読取装置5で収集したメータ指針値・屋内環境計測装置10で収集した屋内環境データ・屋外環境計測装置11で収集した屋外環境データの各点検データを時系列にプロットした点検データ時系列グラフを作成し、表示する。 That is, the inspection data time series analysis function unit 95 creates and displays an inspection data time series graph in which each piece of inspection data, namely, the measurement values and status values collected by the information communication terminal 4, the meter indication value collected by the meter reading device 5, the indoor environment data collected by the indoor environment measuring device 10, and the outdoor environment data collected by the outdoor environment measuring device 11, are plotted in time series.
図45に基づき説明すれば、点検データ閲覧確認画面90dにて点検データ(計測値および状態値・メータ指針値・屋内環境データ・屋外環境データ)を選択することで点検データ時系列解析機能部95の処理が開始される。 To explain based on FIG. 45, by selecting inspection data (measurement values and status values, meter indication value, indoor environmental data, and outdoor environmental data) on the inspection data viewing confirmation screen 90d, processing by the inspection data time series analysis function unit 95 is started.
処理の開始時には、点検データ時系列グラフのグラフ表示期間の指定があるか否かを確認する(S501)。確認の結果、指定があればグラフ表示期間を指定された期間に設定する(S502)一方、指定がなければグラフ表示期間を過去1ヵ月に設定する(S503)。 At the start of processing, a check is made to see if a graph display period for the inspection data time series graph has been specified (S501). If a period has been specified, the graph display period is set to the specified period (S502), whereas if no period has been specified, the graph display period is set to the past month (S503).
その後、S502,S503のグラフ表示期間分の点検データ(計測値および状態値・メータ指針値・屋内環境データ・屋外環境データ)を点検記録データベースから読み出し(S503)、時系列データグラフを作成して(S504)、図46に示す詳細点検データ閲覧画面105に表示し(S505)、処理を終了する。 Then, the inspection data (measurement values and status values, meter indication value, indoor environmental data, and outdoor environmental data) for the graph display period of S502 and S503 is read from the inspection record database (S503), a time series data graph is created (S504), and the graph is displayed on the detailed inspection data viewing screen 105 shown in FIG. 46 (S505), and the process ends.
このとき時系列グラフに表示したい期間については詳細点検データ閲覧画面105で設定して変更することができるものとする。このような本実施例によれば、実施例1,2の効果に加えて、保守点検員が時系列データグラフを閲覧することにより電気設備30の状態の時系列変化を容易に確認することができる。 At this time, the period to be displayed on the time series graph can be set and changed on the detailed inspection data viewing screen 105. According to this embodiment, in addition to the effects of the first and second embodiments, the maintenance and inspection personnel can easily check the time series changes in the condition of the electrical equipment 30 by viewing the time series data graph.
1…電気設備遠隔総合点検システム
4…情報通信端末
5…メータ読取装置
5a…カメラ
5b,6c,7c…照明
5c…メータ読取装置
6…固定式監視カメラ装置
6a,7a…可視光カメラ
6b,7b…赤外線カメラ
6d,7d…雲台
6e…固定式画像撮影端末
7…移動式監視カメラ装置
7e…移動カメラ台車
7f…移動式画像撮影端末
7g…レール
7h…移動カメラ台車コントローラ
8…音響取集装置
8a…マイク
8b…音響収集端末
9…嗅覚センサ装置
9A,9B…電磁弁
9a…NaOHフィルタ
9b…活性炭フィルタ
9c…嗅覚センサ
9d…ポンプ
9e…装置制御部
9f…データ解析部
10…屋内環境計測装置
10a,11a…温度計
10b,11b…湿度計
10c,11c…COガスセンサ
10d…屋内環境計測端末
11…屋外環境計測装置
11d…風速計
11e…屋外環境計測端末
12…現地点検サーバ
13…遠隔監視端末
20…制御盤(点検対象設備)
30…電気設備(点検対象設備)
40…各種設定機能部
50…点検スケジュール管理機能部
60…データ収集・記録機能部
70…総合解析機能部
80…点検レポート作成機能部
90…点検設定画面
90a…制御パラメータ設定画面
90b…解析パラメータ設定画面
90c…点検スケジュール管理画面
90d…点検データ閲覧確認画面
90e…点検レポート作成画面
90f…詳細点検データ閲覧確認画面
91…時計
95…点検データ時系列解析機能部
105…詳細点検データ閲覧画面105
500,600…検出器
LIST OF SYMBOLS 1...Electrical equipment remote comprehensive inspection system 4...Information and communication terminal 5...Meter reading device 5a...Camera 5b, 6c, 7c...Lighting 5c...Meter reading device 6...Fixed surveillance camera device 6a, 7a...Visible light camera 6b, 7b...Infrared camera 6d, 7d...Pan head 6e...Fixed image capture terminal 7...Mobile surveillance camera device 7e...Mobile camera dolly 7f...Mobile image capture terminal 7g...Rail 7h...Mobile camera dolly controller 8...Sound collection device 8a...Microphone 8b...Sound collection terminal 9...Olfactory sensor device 9A, 9B...Solenoid valve 9a...NaOH filter 9b...Activated carbon filter 9c...Olfactory sensor 9d...Pump 9e...Device control unit 9f...Data analysis unit 10...Indoor environment measuring device 10a, 11a...Thermometer 10b, 11b...Hygrometer 10c, 11c...CO gas sensor 10d... Indoor environment measuring terminal 11... Outdoor environment measuring device 11d... Anemometer 11e... Outdoor environment measuring terminal 12... On-site inspection server 13... Remote monitoring terminal 20... Control panel (equipment to be inspected)
30...Electrical equipment (equipment to be inspected)
40...Various setting function section 50...Inspection schedule management function section 60...Data collection and recording function section 70...General analysis function section 80...Inspection report creation function section 90...Inspection setting screen 90a...Control parameter setting screen 90b...Analysis parameter setting screen 90c...Inspection schedule management screen 90d...Inspection data viewing confirmation screen 90e...Inspection report creation screen 90f...Detailed inspection data viewing confirmation screen 91...Clock 95...Inspection data time series analysis function section 105...Detailed inspection data viewing screen 105
500, 600...detector
Claims (18)
前記電気施設の電気室内に設置された制御盤と、
を点検対象として遠隔から自動的に保守点検を行うシステムであって、
前記制御盤に設置され、前記制御盤に集まってくる前記電気設備の内蔵センサによる計測値を取得する情報通信装置と、
前記電気設備に設置されたメータを撮影し、前記メータの指針値を撮影された画像に基づき読み取って取得するメータ読取装置と、
前記点検対象の外観を撮影し、撮影画像を取得する監視カメラ装置と、
前記点検対象の周囲の音響信号をマイクにより収集し、収集された音響信号に基づき異音の有無および異音レベルを求めて異音情報を取得する音響収集装置と、
前記点検対象の周囲のガスを吸気し、該吸気されたガスから得られたセンサ信号に基づき異臭の有無を診断した異臭情報を取得する嗅覚センサ装置と、
前記点検対象の設置された環境情報を計測して取得する環境計測装置と、
前記電気室内に設置され、前記各装置の取得した情報を点検データとして整理・保存する現地点検サーバと、
前記現地点検サーバにより整理・保存された点検データをネットワーク経由で提供される遠隔監視装置と、
を備え、
前記環境計測装置は、
前記電気室内の環境情報を取得する屋内環境計測装置と、
前記電気設備の設置された屋外の環境情報を取得する屋外環境計測装置と、
を備え、
前記屋内環境計測装置は、前記電気室内の温度情報・湿度情報・一酸化炭素ガスの濃度情報を前記環境情報として取得する一方、
前記屋外環境計測装置は、前記屋外の温度情報・湿度情報・一酸化炭素ガスの濃度情報・風速および風向の情報を前記環境情報として取得する
ことを特徴とする電気設備遠隔総合点検システム。 Electrical equipment installed outdoors at the electrical facility;
A control panel installed in an electrical room of the electrical facility;
A system for automatically performing maintenance inspection remotely on a target object,
An information and communication device that is installed on the control panel and acquires measurement values collected by built-in sensors of the electrical equipment and that are collected on the control panel;
a meter reading device that photographs a meter installed in the electrical equipment and reads and acquires the indication value of the meter based on the photographed image;
A surveillance camera device that captures an external view of the inspection target and acquires a captured image;
a sound collecting device that collects sound signals from the surroundings of the inspection target using a microphone and obtains abnormal sound information by determining the presence or absence of abnormal sound and the level of the abnormal sound based on the collected sound signals;
an olfactory sensor device that inhales gas around the inspection target and acquires odor information that diagnoses the presence or absence of an odor based on a sensor signal obtained from the inhaled gas;
an environmental measuring device that measures and acquires environmental information about an environment in which the inspection target is installed;
an on-site inspection server that is installed in the electrical room and organizes and stores information acquired by each of the devices as inspection data;
a remote monitoring device that receives the inspection data organized and stored by the on-site inspection server via a network;
Equipped with
The environment measuring device includes:
An indoor environment measuring device for acquiring environmental information in the electrical room;
an outdoor environment measuring device that acquires information about an outdoor environment in which the electrical equipment is installed;
Equipped with
The indoor environment measuring device acquires temperature information, humidity information, and carbon monoxide gas concentration information in the electric room as the environmental information,
The outdoor environment measuring device acquires the outdoor temperature information, humidity information, carbon monoxide gas concentration information, and wind speed and direction information as the environmental information.
A remote comprehensive inspection system for electrical equipment.
前記電気設備の列を挟んで配置された一対の移動式監視カメラ装置と、
前記制御盤または前記移動式監視カメラ装置の周囲を囲繞する位置に配置された複数の固定式監視カメラと、
を備え、
前記両監視カメラ装置は、
前記外観の可視光画像を撮影して取得する可視光カメラと、
前記外観の赤外線画像を撮影して取得する赤外線カメラと
を備え、
前記各移動式監視カメラ装置は、レール設置範囲を移動自在な移動カメラ台車を備えることを特徴とする請求項1記載の電気設備総合点検システム。 The surveillance camera device includes:
A pair of mobile surveillance camera devices arranged on either side of the row of electrical equipment;
A plurality of fixed surveillance cameras arranged in positions surrounding the control panel or the mobile surveillance camera device;
Equipped with
Both of the surveillance camera devices are
a visible light camera that captures and acquires a visible light image of the appearance;
and an infrared camera that captures and acquires an infrared image of the exterior,
2. The electrical equipment comprehensive inspection system according to claim 1, wherein each of said mobile surveillance camera devices is provided with a mobile camera dolly that is movable within a rail installation range.
事前に異臭成分の臭覚センサ信号を学習したサポートベクタ-マシンに供することで異臭の有無を診断することを特徴とする請求項1または2記載の電気設備遠隔総合点検システム。 The olfactory sensor device is configured to alternately inhale a gas that has passed through an activated carbon filter and a gas that has not passed through the activated carbon filter, and obtain a sensor signal by:
3. The electrical equipment remote comprehensive inspection system according to claim 1, wherein the presence or absence of an abnormal odor is diagnosed by providing the odor sensor signal of the abnormal odor components to a learned support vector machine in advance.
前記各装置の点検設定画面を提供する各種設定機能部と、
前記各装置の点検スケジュールを監視する点検スケジュール管理機能部と、
前記各装置の前記点検データをデータ列としてデータベースに記録するデータ収集・記録機能部と、
前記データベースに記録された前記データ列に基づき前記各点検データ状態の正常または異常を判定する総合解析機能部と、
前記判定後の前記データ列に基づき指定された日時の前記点検データを読み出して出力する点検レポート作成機能部と、
を備えることを特徴とする請求項2記載の電気設備遠隔点点検システム。 The on-site inspection server,
A setting function unit that provides an inspection setting screen for each of the devices;
an inspection schedule management function unit that monitors the inspection schedule of each of the devices;
a data collection and recording function unit that records the inspection data of each of the devices in a database as a data string;
a comprehensive analysis function unit that judges whether each of the inspection data states is normal or abnormal based on the data strings recorded in the database;
an inspection report creation function unit that reads out and outputs the inspection data for a specified date and time based on the data string after the determination;
3. The electrical equipment remote inspection system according to claim 2, further comprising:
確認の結果、前記許容値範囲内であれば前記計測値の点検データ状態を正常と判定する一方、
前記許容値範囲内でなければ前記計測値の点検データ状態を異常と判定することを特徴とする請求項4記載の電気設備遠隔総合点検システム。 the comprehensive analysis function unit confirms whether the measurement value in the data string is within a preset allowable range between an upper limit value and a lower limit value,
If the result of the check is within the allowable range, the inspection data state of the measurement value is determined to be normal;
5. The system according to claim 4 , wherein if the measured value is not within the allowable range, the inspection data state of the measured value is determined to be abnormal.
確認の結果、前記許容値範囲内であれば前記指針値の点検データ状態を正常と判定する一方、
前記許容値範囲内でなければ前記指針値の点検データ状態を異常と判定することを特徴とする請求項4または5記載の電気設備遠隔総合点検システム。 The comprehensive analysis function unit checks whether the guideline value in the data string is within a preset allowable range between an upper limit value and a lower limit value,
If the result of the check is within the allowable range, the inspection data state of the indicator value is determined to be normal;
6. The system for remotely inspecting electrical equipment according to claim 4 , wherein if the indicator value is not within the allowable range, the inspection data state of the indicator value is judged to be abnormal.
確認の結果、前記最大温度以上の箇所があれば前記赤外線画像の点検データ状態を異常と判定する一方、
前記最大温度以上の箇所がなければ前記赤外線画像の点検データ状態を正常と判定することを特徴とする請求項4~6のいずれか記載の電気設備遠隔総合点検システム。 the comprehensive analysis function unit confirms whether or not there is a location in the infrared image in the data string that is equal to or higher than a preset maximum temperature;
If the result of the check is that there is a location where the temperature is equal to or higher than the maximum temperature, the inspection data state of the infrared image is determined to be abnormal;
The system for remotely inspecting electrical equipment according to any one of claims 4 to 6 , characterized in that if there is no part whose temperature is equal to or higher than the maximum temperature, the state of the inspection data of the infrared image is determined to be normal.
確認の結果、異音が無ければ点検データ状態を正常と判定する一方、異音があれば点検データ状態を異常と判定する
ことを特徴とする請求項4~7のいずれか記載の電気設備遠隔総合点検システム。 The comprehensive analysis function unit checks the abnormal sound data in the data string,
The electrical equipment remote comprehensive inspection system according to any one of claims 4 to 7, characterized in that, as a result of the confirmation, if there is no abnormal sound, the inspection data status is judged to be normal, whereas if there is an abnormal sound, the inspection data status is judged to be abnormal.
前記設置個所を中心に異音データの異音レベルに応じたサイズの異音推定円を描写することで異音部分布推定図を作成し、
前記異音推定円の近傍に位置する前記電気設備または前記制御盤のリストを作成し、
前記推定図および前記リストを前記データベースに保存することを特徴とする請求項4~8のいずれか記載の電気設備遠隔総合点検システム。 The comprehensive analysis function unit plots the installation locations of the sound collecting devices on a layout diagram of the electrical equipment or a layout diagram of the electrical room,
An abnormal sound distribution estimation map is created by drawing an abnormal sound estimation circle of a size corresponding to the abnormal sound level of the abnormal sound data with the installation location as the center;
creating a list of the electrical equipment or the control panel located in the vicinity of the abnormal noise estimation circle;
The electrical equipment remote comprehensive inspection system according to any one of claims 4 to 8, characterized in that the estimated drawing and the list are stored in the database.
確認の結果、異臭が無ければ点検データ状態を正常と判定する一方、異臭があれば点検データ状態を異常と判定する
ことを特徴とする請求項4~9のいずれか記載の電気設備遠隔総合点検システム。 The comprehensive analysis function unit checks the inspection data in the data string,
The electrical equipment remote comprehensive inspection system according to any one of claims 4 to 9, characterized in that, as a result of the check, if no abnormal odor is detected, the inspection data status is determined to be normal, whereas if an abnormal odor is detected, the inspection data status is determined to be abnormal.
前記設置個所を中心に事前に定められたサイズの異臭推定円を描写することで異臭分布推定図を作成し、
前記異臭推定円の近傍に位置する前記制御盤のリストを作成し、
前記推定図および前記リストを前記データベースに保存することを特徴とする請求項4~10のいずれか記載の電気設備遠隔総合点検システム。 the comprehensive analysis function unit plots an installation location of the olfactory sensor device on a layout diagram of the electrical room,
A map of estimated odor distribution is created by drawing an estimated odor circle of a predetermined size centered on the installation location,
Create a list of the control panels located near the odor estimation circle;
The electrical equipment remote comprehensive inspection system according to any one of claims 4 to 10, characterized in that the estimated diagram and the list are stored in the database.
前記設置個所の前記屋外環境計測装置による風速および風向に応じて推定中心を求め、該推定中心から事前に定められたサイズの異臭推定円を描写した異臭分布推定図を作成し、
前記異臭推定円の近傍に位置する前記制御盤のリストを作成し、
前記推定図および前記リストを前記データベースに保存することを特徴とする請求項4~10のいずれか記載の電気設備遠隔総合点検システム。 the comprehensive analysis function unit plots an installation location of the olfactory sensor device on a layout diagram of the electrical equipment,
An estimated center is obtained according to the wind speed and wind direction measured by the outdoor environment measuring device at the installation location, and an estimated odor distribution map is created that depicts an estimated odor circle of a predetermined size from the estimated center.
Create a list of the control panels located near the odor estimation circle;
The electrical equipment remote comprehensive inspection system according to any one of claims 4 to 10, characterized in that the estimated diagram and the list are stored in the database.
ことを特徴とする請求項11または12記載の電気設備遠隔総合点検システム。 The electrical equipment remote comprehensive inspection system according to claim 11 or 12 , characterized in that the comprehensive analysis function unit depicts the peculiar odor estimation circle separately depending on the type of peculiar odor or the carbon monoxide concentration of the environmental information.
前記総合解析機能部は、前記データ列中の前記状態値が前記設備の運用中として正しい状態値であるか否かを確認し、
正しければ前記状態値を正常と判定する一方、正しくなければ前記状態値を異常と判定する
ことを特徴とする請求項4~13のいずれか記載の電気設備遠隔総合点検システム。 The information communication device acquires an ON or OFF state value of the equipment,
The comprehensive analysis function unit confirms whether or not the status value in the data string is a correct status value for the equipment being in operation,
The electrical equipment remote comprehensive inspection system according to any one of claims 4 to 13 , characterized in that if the value is correct, the status value is judged to be normal, whereas if the value is not correct, the status value is judged to be abnormal.
前記総合解析機能部は、前記異臭推定円に前記異臭レベルを付与することを特徴とする請求項11または12記載の電気設備遠隔総合点検システム。 The olfactory sensor device detects an odor level corresponding to a concentration of an odorous gas based on the sensor signal, and
13. The electrical equipment remote comprehensive inspection system according to claim 11 , wherein the comprehensive analysis function unit assigns the odor level to the odor estimation circle.
前記各濃度量に応じたサポートベクタマシンによる検出器の出力結果に応じて前記異臭レベルを検出し、
前記異臭レベルに応じて異臭の有無を診断することを特徴とする請求項15記載の電気設備遠隔総合点検システム。 The olfactory sensor device prepares a plurality of samples having different concentrations in advance, and learns a support vector machine for each concentration,
Detecting the level of the off-odor according to an output result of a detector using a support vector machine corresponding to each concentration amount;
16. The electrical equipment remote comprehensive inspection system according to claim 15 , wherein the presence or absence of an abnormal odor is diagnosed according to the abnormal odor level.
前記点検設定画面には、前記点検データ時系列グラフを閲覧可能な点検データ閲覧確認画面が含まれ、
前記閲覧確認画面は、選択された任意の点検データのみを表示する詳細点検データ閲覧確認画面を有し、
前記詳細点検データ閲覧確認画面には、指定期間分の前記点検データ時系列グラフが表示されることを特徴とする請求項4~16のいずれか記載の電気設備遠隔総合点検システム。 The on-site inspection server includes an inspection data time series analysis function unit that creates an inspection data time series graph in which each of the inspection data is plotted in a time series,
The inspection setting screen includes an inspection data viewing confirmation screen on which the inspection data time series graph can be viewed,
The viewing confirmation screen has a detailed inspection data viewing confirmation screen that displays only the selected arbitrary inspection data,
17. The electrical equipment remote comprehensive inspection system according to claim 4 , wherein the detailed inspection data viewing confirmation screen displays a time series graph of the inspection data for a specified period.
前記電気施設の電気室内に設置された制御盤と、
を点検対象として遠隔から自動的に保守点検するシステムの実行する方法であって、
前記制御盤に設置された情報通信装置が、前記制御盤に集まってくる前記電気設備の内蔵センサによる計測値を取得するステップと、
メータ読取装置により前記電気設備に設置されたメータを撮影し、前記メータの指針値を撮影された画像に基づき読み取って取得するステップと、
監視カメラ装置により前記点検対象の外観を撮影し、撮影画像を取得するステップと、
音響収集装置が、前記点検対象の周囲の音響信号をマイクにより収集し、収集された音響信号に基づき異音の有無および異音レベルを求めて異音情報を取得するステップと、
嗅覚センサ装置が、前記点検対象の周囲のガスを吸気し、該吸気されたガスから得られたセンサ信号に基づき異臭の有無を診断した異臭情報を取得するステップと、
環境計測装置により前記点検対象の設置された環境情報を計測して取得するステップと、
前記電気室内に設置された現地点検サーバが、前記各装置の取得した情報を点検データとして整理・保存するステップと、
前記現地点検サーバにより整理・保存された点検データをネットワーク経由で遠隔監視装置に提供するステップと、
を有し、
前記環境計測装置は、
前記電気室内の環境情報を取得する屋内環境計測装置と、
前記電気設備の設置された屋外の環境情報を取得する屋外環境計測装置と、
を備え、
前記環境情報を計測して取得するステップは、
前記屋内環境計測装置により前記電気室内の温度情報・湿度情報・一酸化炭素ガスの濃度情報を前記環境情報として取得するステップと、
前記屋外環境計測装置により前記屋外の温度情報・湿度情報・一酸化炭素ガスの濃度情報・風速および風向の情報を前記環境情報として取得するステップと、
を有する
ことを特徴とする電気設備遠隔総合点検方法。
Electrical equipment installed outdoors at the electrical facility;
A control panel installed in an electrical room of the electrical facility;
A method for performing a remote and automatic maintenance inspection system for an inspection target, comprising:
An information communication device installed in the control panel acquires measurement values by built-in sensors of the electrical equipment collected in the control panel;
taking an image of a meter installed in the electrical equipment by a meter reading device, and reading and acquiring the indication value of the meter based on the image taken;
A step of photographing an external view of the inspection target by a surveillance camera device and acquiring a photographed image;
a step in which an acoustic collection device collects acoustic signals around the inspection target using a microphone, and obtains abnormal sound information by determining the presence or absence of abnormal sound and the level of the abnormal sound based on the collected acoustic signals;
an olfactory sensor device inhaling gas around the inspection target and acquiring abnormal odor information diagnosing the presence or absence of an abnormal odor based on a sensor signal obtained from the inhaled gas;
measuring and acquiring information about an environment in which the inspection target is installed by an environment measuring device;
An on-site inspection server installed in the electrical room organizes and stores the acquired information of each of the devices as inspection data;
providing the inspection data organized and stored by the on-site inspection server to a remote monitoring device via a network;
having
The environment measuring device includes:
An indoor environment measuring device for acquiring environmental information in the electrical room;
an outdoor environment measuring device that acquires information about an outdoor environment in which the electrical equipment is installed;
Equipped with
The step of measuring and acquiring the environmental information includes:
acquiring temperature information, humidity information, and carbon monoxide gas concentration information in the electric room as the environmental information by the indoor environment measuring device;
acquiring outdoor temperature information, humidity information, carbon monoxide gas concentration information, and wind speed and direction information as the environmental information by the outdoor environment measuring device;
A method for remotely inspecting electrical equipment comprising the steps of:
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021143201A JP7707773B2 (en) | 2021-09-02 | 2021-09-02 | Electrical equipment remote inspection system, Electrical equipment remote inspection method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021143201A JP7707773B2 (en) | 2021-09-02 | 2021-09-02 | Electrical equipment remote inspection system, Electrical equipment remote inspection method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2023036254A JP2023036254A (en) | 2023-03-14 |
| JP7707773B2 true JP7707773B2 (en) | 2025-07-15 |
Family
ID=85508860
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2021143201A Active JP7707773B2 (en) | 2021-09-02 | 2021-09-02 | Electrical equipment remote inspection system, Electrical equipment remote inspection method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7707773B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118361361B (en) * | 2024-06-19 | 2024-08-20 | 广东阳硕绿建科技股份有限公司 | Wind driven generator running state monitoring system |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2012529104A (en) | 2009-06-05 | 2012-11-15 | ザ・ボーイング・カンパニー | Monitoring and control of heterogeneous autonomous work |
| WO2013030929A1 (en) | 2011-08-29 | 2013-03-07 | 株式会社日立製作所 | Monitoring device, monitoring system and monitoring method |
| JP2014191536A (en) | 2013-03-27 | 2014-10-06 | Hitachi Zosen Corp | Plant monitoring system |
| JP2020119393A (en) | 2019-01-25 | 2020-08-06 | 住友重機械エンバイロメント株式会社 | Monitoring device |
| JP2020165924A (en) | 2019-03-29 | 2020-10-08 | 太陽誘電株式会社 | Determination system, information processor, server, program, and method for determination |
| JP6814910B1 (en) | 2019-02-21 | 2021-01-20 | 日本テクノ株式会社 | Cubicle (high voltage power receiving equipment) automatic security inspection system |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0623675B2 (en) * | 1987-11-26 | 1994-03-30 | 新コスモス電機株式会社 | Gas leak source detection method and apparatus |
| JP2735744B2 (en) * | 1992-06-16 | 1998-04-02 | 東電設計株式会社 | Fire alarm |
| JPH10105225A (en) * | 1996-10-02 | 1998-04-24 | Hitachi Ltd | Monitoring system |
| JP3801761B2 (en) * | 1997-12-02 | 2006-07-26 | 高圧ガス保安協会 | Gas leak detection system |
-
2021
- 2021-09-02 JP JP2021143201A patent/JP7707773B2/en active Active
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2012529104A (en) | 2009-06-05 | 2012-11-15 | ザ・ボーイング・カンパニー | Monitoring and control of heterogeneous autonomous work |
| WO2013030929A1 (en) | 2011-08-29 | 2013-03-07 | 株式会社日立製作所 | Monitoring device, monitoring system and monitoring method |
| JP2014191536A (en) | 2013-03-27 | 2014-10-06 | Hitachi Zosen Corp | Plant monitoring system |
| JP2020119393A (en) | 2019-01-25 | 2020-08-06 | 住友重機械エンバイロメント株式会社 | Monitoring device |
| JP6814910B1 (en) | 2019-02-21 | 2021-01-20 | 日本テクノ株式会社 | Cubicle (high voltage power receiving equipment) automatic security inspection system |
| JP2021064384A (en) | 2019-02-21 | 2021-04-22 | 日本テクノ株式会社 | Automatic security check system for cubicles (high-voltage power receiving equipment) |
| JP2020165924A (en) | 2019-03-29 | 2020-10-08 | 太陽誘電株式会社 | Determination system, information processor, server, program, and method for determination |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2023036254A (en) | 2023-03-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20250044786A1 (en) | Systems and Methods for Artificial Intelligence-Based Maintenance of An Air Conditioning System | |
| US11055797B1 (en) | Autonomous property monitoring | |
| US11656145B2 (en) | Consumable gas leak detection | |
| CN110136832B (en) | Cognitive ability assessment system and method based on daily behaviors of old people | |
| US20120072029A1 (en) | Intelligent system and method for detecting and diagnosing faults in heating, ventilating and air conditioning (hvac) equipment | |
| CN111798407A (en) | A fault diagnosis method for live equipment based on neural network model | |
| JP2005504947A (en) | Air quality monitoring system and method | |
| CN118331212B (en) | Industrial electrical machine room environment monitoring system and method with multi-source acquisition and data modeling | |
| CN104948914B (en) | Use the process piping abnormality detection of thermal imaging | |
| CN113849774A (en) | Equipment intelligent maintenance platform based on life analysis and health monitoring | |
| JP7707773B2 (en) | Electrical equipment remote inspection system, Electrical equipment remote inspection method | |
| CN117392614A (en) | Laboratory safety risk intelligent detection methods, devices and emergency safety cabinets | |
| JP2000039914A (en) | Plant monitoring equipment | |
| KR102479951B1 (en) | Construction safety managing system, server and method based on IoT | |
| CN118937592A (en) | A laboratory air quality monitoring management system and method | |
| CN116399462A (en) | Digital visual cable temperature sensing early warning method and system | |
| KR102496128B1 (en) | Message transmission and management system using a apparatus for managing indoor air quality and method thereof | |
| CN118391294B (en) | Unmanned on duty system in tunnel axial fan room | |
| KR20230065028A (en) | System and method of situation reconition and action notice by using environmenttal sensors beased on artifical intelligence | |
| US11852797B2 (en) | System and method for monitoring of states of components of a microscope | |
| CN117366779A (en) | An equipment monitoring system and method applied to central air conditioning systems | |
| KR20230043048A (en) | Analysis method for state of building and analysis apparatus | |
| JP7737053B1 (en) | Performance evaluation system, pollutant removal device, information processing device | |
| CN113270167A (en) | Child psychological state assessment system based on fuzzy evaluation | |
| US20250146688A1 (en) | Determining HVAC Cycle Type Through Remote Web-Connected Sensor Data |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20240226 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20240925 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20241001 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20241106 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20250114 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20250225 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20250603 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20250616 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7707773 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |