JP7709844B2 - Construction machinery manufacturing management system - Google Patents

Construction machinery manufacturing management system

Info

Publication number
JP7709844B2
JP7709844B2 JP2021060223A JP2021060223A JP7709844B2 JP 7709844 B2 JP7709844 B2 JP 7709844B2 JP 2021060223 A JP2021060223 A JP 2021060223A JP 2021060223 A JP2021060223 A JP 2021060223A JP 7709844 B2 JP7709844 B2 JP 7709844B2
Authority
JP
Japan
Prior art keywords
work
progress
production
production line
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021060223A
Other languages
Japanese (ja)
Other versions
JP2022156498A (en
Inventor
一樹 大野
裕章 柳本
勇一郎 水町
洋平 稲垣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Construction Machinery Co Ltd
Original Assignee
Hitachi Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Construction Machinery Co Ltd filed Critical Hitachi Construction Machinery Co Ltd
Priority to JP2021060223A priority Critical patent/JP7709844B2/en
Publication of JP2022156498A publication Critical patent/JP2022156498A/en
Application granted granted Critical
Publication of JP7709844B2 publication Critical patent/JP7709844B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • General Factory Administration (AREA)

Description

本発明は建設機械の製造管理システムに係り、特に製造ラインの円滑化を図る技術に関する。 The present invention relates to a manufacturing management system for construction machinery, and in particular to technology for streamlining the manufacturing line.

一般的に、油圧ショベルは、下部走行体と上部旋回体とで分けて製造されている。すなわち、油圧ショベルの製造工程では、下部走行体と上部旋回体とをそれぞれ所定の製造工程まで実施したあと、下部走行体に上部旋回体を搭載させている。ここで、例えば上部旋回体の製造工程を鑑みると、加工工程や切断工程、組立工程等の複数の工程がある(特許文献1)。 Generally, hydraulic excavators are manufactured separately into a lower traveling body and an upper rotating body. That is, in the manufacturing process of a hydraulic excavator, the lower traveling body and the upper rotating body are each manufactured up to a predetermined stage, and then the upper rotating body is mounted on the lower traveling body. Here, for example, in the manufacturing process of the upper rotating body, there are multiple steps such as a processing step, a cutting step, and an assembly step (Patent Document 1).

特開2014-095198号公報JP 2014-095198 A

しかしながら、上記特許文献1に開示される技術のような複数の工程を有する製造工程にあっては、部品の欠品等により製造工程が滞留するようなことがある。このように製造工程が滞留すると、下部走行体(第1仕掛品)と上部旋回体(第2仕掛品)とを合体させる時期がずれ込み、予定通りに製造が進まないことがある。 However, in a manufacturing process having multiple steps such as the technology disclosed in Patent Document 1, the manufacturing process may be delayed due to a shortage of parts, etc. When the manufacturing process is delayed in this way, the timing for combining the lower traveling body (first work-in-progress) and the upper rotating body (second work-in-progress) may be delayed, and manufacturing may not proceed as planned.

そこで、このような場合、製造工程が滞留している製品(滞留製品)より後に同一製造ライン上で製造される製品(後製品)の製造まで滞留する虞があるため、滞留製品を当該製造ラインから外し、後製品を先に製造することが考えられる。しかしながら、このような滞留製品を当該製造ラインから外す指示をする管理者が、製造工程上で製造が滞留していることに気づかない可能性があり、製造ラインの管理についてさらなる改善の余地があった。 In such a case, there is a risk that the production process will remain stalled until the production of a product (successor product) that is produced on the same production line after the product that is stalled (stagnant product). Therefore, it is possible to remove the stalled product from the production line and produce the successor product first. However, there is a possibility that the manager who issues the instruction to remove such a stalled product from the production line will not realize that production is stalled in the production process, leaving room for further improvement in the management of the production line.

本発明はこのような課題に鑑みてなされたものであり、その目的とするところは、製造現場における製造工程の遅延を認識することができる建設機械の製造管理システムを提供することにある。 The present invention was made in consideration of these problems, and its purpose is to provide a construction machinery manufacturing management system that can recognize delays in the manufacturing process at the manufacturing site.

上記の目的を達成するため、本発明の建設機械の製造管理システムは、 第1仕掛品製造ラインにおいて建設機械の第1構成要素を第1仕掛品として製造し、第2仕掛品製造ラインにおいて該建設機械の第2構成要素を第2仕掛品として製造し、完成ラインにおいて前記第1仕掛品及び前記第2仕掛品を組み合わせて完成品としての該建設機械を製造する建設機械の製造管理システムであって、前記第1仕掛品製造ラインにおける前記第1仕掛品の製造状況を監視する第1監視ユニットと、前記第2仕掛品製造ラインにおける前記第2仕掛品の製造状況を監視する第2監視ユニットと、管理者に所定の情報を表示するモニタと、前記モニタに表示する前記所定の情報を制御する制御装置と、を備え、前記制御装置は、前記第1監視ユニットによって監視されている前記第1仕掛品の製造状況に基づいて前記第1仕掛品製造ラインの製造工程に遅延が生じているか否かを判定し、前記第2監視ユニットによって監視されている前記第2仕掛品の製造状況に基づいて前記第2仕掛品製造ラインの製造工程に遅延が生じているか否かを判定する遅延判定部と、前記モニタに対し、前記第1仕掛品製造ライン前記第2仕掛品製造ライン及び前記完成ラインにおける前記第1仕掛品前記第2仕掛品及び前記完成品の製造状況を、横軸を時間とし縦軸を前記第1仕掛品製造ライン、前記第2仕掛品製造ライン及び前記完成ラインの各1つの製造工程とし、前記第1仕掛品製造ラインでの1つの前記第1仕掛品の製造の開始から完了までが1つの線によって結ばれ、前記第2仕掛品製造ラインでの1つの前記第2仕掛品の製造の開始から完了までが1つの線によって結ばれ、前記第1仕掛品製造ラインでの前記1つの前記第1仕掛品の製造の完了及び前記第2仕掛品製造ラインでの前記1つの前記第2仕掛品の製造の完了と前記完成ラインでの前記1つの前記第1仕掛品及び前記1つの前記第2仕掛品の結合の開始とがそれぞれ1つの線によって結ばれ、前記完成ラインでの前記1つの前記第1仕掛品及び前記1つの前記第2仕掛品の前記結合の開始から前記完成品としての1つの建設機械の製造の完了までが1つの線によって結ばれたグラフと、前記第1仕掛品製造ライン及び前記第2仕掛品製造ラインのうちの前記遅延判定部によって製造工程に遅延が生じていると判定された仕掛品製造ラインについて該仕掛品製造ラインの製造工程に遅延が生じていることを示す情報と、を表示させるデータを出力する出力部と、を有することを特徴とする。 In order to achieve the above object, the present invention provides a construction machine manufacturing management system which manufactures a first component of a construction machine as a first work-in-progress in a first work-in-progress manufacturing line, manufactures a second component of the construction machine as a second work-in-progress in a second work-in-progress manufacturing line, and manufactures the construction machine as a finished product by combining the first work-in-progress and the second work-in-progress in a completion line, the system comprising a first monitoring unit which monitors the manufacturing status of the first work-in-progress in the first work-in-progress manufacturing line, a second monitoring unit which monitors the manufacturing status of the second work-in-progress in the second work-in-progress manufacturing line, a monitor which displays predetermined information to an administrator, and a control device for controlling the predetermined information to be displayed on the monitor, the control device comprising a delay determining section for determining whether or not a delay has occurred in the manufacturing process of the first work-in-progress manufacturing line based on the manufacturing status of the first work-in-progress monitored by the first monitoring unit, and for determining whether or not a delay has occurred in the manufacturing process of the second work-in-progress manufacturing line based on the manufacturing status of the second work - in-progress monitored by the second monitoring unit ; The horizontal axis represents time, and the vertical axis represents one of the manufacturing processes of the first work-in-progress production line, the second work-in-progress production line, and the finished line, and one line connects the start to completion of the production of one of the first work-in-progress products on the first work-in-progress production line, one line connects the start to completion of the production of one of the second work-in-progress products on the second work-in-progress production line, and one line connects the start to completion of the production of one of the first work-in-progress products on the first work-in-progress production line and the completion of the production of one of the second work-in-progress products on the second work-in-progress production line and the completion of the production of one of the first work-in-progress products on the finished line. the start of the joining of the one first work-in-process and the one second work-in-process on the completed line is connected by a line to the start of the joining of the one first work-in-process and the one second work-in-process on the completed line is connected by a line to the completion of the manufacture of the one construction machine as the finished product ; and an output unit that outputs data displaying information indicating that a delay is occurring in the manufacturing process of a work-in-process manufacturing line for which a delay is determined to be occurring in the manufacturing process by the delay determination unit, of the first work-in-process manufacturing line and the second work-in-process manufacturing line.

これにより、第1監視ユニット及び第2監視ユニットによって監視される第1仕掛品製造ラインの第1仕掛品及び第2仕掛品製造ラインの第2仕掛品の製造状況に基づいて、第1仕掛品製造ライン及び第2仕掛品製造ラインの少なくともいずれか一方の製造工程の遅延を遅延判定部により判定し、出力部からモニタに第1仕掛品製造ラインの1つの第1仕掛品及び第2仕掛品製造ラインの1つの第2仕掛品の製造の開始から完了まで、当該1つの第1仕掛品及び当該1つの第2仕掛品の製造の完了から完成ラインでの当該1つの第1仕掛品及び当該1つの第2仕掛品の結合の開始まで、並びに完成ラインでの当該1つの第1仕掛品及び当該1つの第2仕掛品の結合の開始から完成品としての1つの建設機械の製造の完了までをそれぞれ1つの線によって結んでグラフ上に表示しつつ、遅延判定部によって判定される第1仕掛品製造ライン及び第2仕掛品製造ラインの少なくともいずれか一方の製造工程の遅延の情報を表示するデータを出力することで、各仕掛品製造ラインにおける各1つの仕掛品の製造の開始から完成ラインでの各1つの仕掛品の結合、そしてその後の完成ラインにおける完成品としての1つの建設機械の製造の完了までの製造進捗を複雑にすることなくグラフ上で表示して、製造現場における製造工程の遅延を認識可能となり、例えばモニタを見ながら製造現場の指揮をとる管理者が、当該モニタに出力された第1仕掛品製造ライン及び第2仕掛品製造ラインの少なくともいずれか一方の製造工程の遅延の情報を基に、製造現場の作業者に的確な指示をすることが可能とされる。 Thereby, a delay in at least one of the manufacturing processes of the first work-in-process manufacturing line and the second work-in-process manufacturing line is determined by the delay determination unit based on the manufacturing status of the first work-in-process on the first work-in-process manufacturing line and the second work-in-process on the second work-in-process manufacturing line monitored by the first monitoring unit and the second monitoring unit , and the output unit outputs to the monitor one line each of a start to completion of manufacturing of one first work-in-process on the first work-in-process manufacturing line and one second work-in-process on the second work-in-process manufacturing line, a time from the completion of manufacturing of the one first work-in-process and the one second work-in-process to the start of combining the one first work-in-process and the one second work-in-process on the completed line, and a time from the start of combining the one first work-in-process and the one second work-in-process on the completed line to the completion of manufacturing of one construction machine as a completed product. Therefore, by connecting and displaying on a graph, and outputting data indicating information on a delay in at least one of the manufacturing processes of the first work-in-progress production line and the second work-in-progress production line as determined by the delay determination unit, the manufacturing progress from the start of manufacturing of each work-in-progress on each work-in-progress production line to the joining of each work-in-progress on the completed line, and then the completion of manufacturing of one construction machine as a finished product on the completed line can be displayed on a graph without complicating the process, making it possible to recognize delays in the manufacturing processes at the manufacturing site.For example, a manager in charge of the manufacturing site can give accurate instructions to workers at the manufacturing site based on the information on the delay in at least one of the manufacturing processes of the first work-in-progress production line and the second work-in-progress production line output on the monitor.

その他の態様として、前記制御装置は、前記第1仕掛品製造ライン及び前記第2仕掛品製造ラインの製造計画が入力される計画入力部を有しており、前記遅延判定部は、前記計画入力部に入力される前記製造計画と前記第1仕掛品及び前記第2仕掛品の製造状況とを照合することで前記第1仕掛品製造ライン及び前記第2仕掛品製造ラインの製造工程に遅延が生じているか否かを判定し、前記出力部は、前記計画入力部に入力される前記製造計画を示す情報を前記グラフ上に表示させ、前記遅延が生じていることを示す情報を表示させるデータを前記モニタに出力するのが好ましい。 In another aspect, the control device has a plan input unit to which the production plans of the first work-in-progress production line and the second work-in-progress production line are input, the delay determination unit determines whether or not a delay has occurred in the production process of the first work-in-progress production line and the second work-in-progress production line by comparing the production plan input to the plan input unit with the production status of the first work-in-progress and the second work-in-progress, and the output unit preferably displays information indicating the production plan input to the plan input unit on the graph and outputs data to the monitor that displays information indicating that the delay has occurred.

これにより、計画入力部に入力される製造計画と第1仕掛品製造ラインの第1仕掛品及び第2仕掛品製造ラインの第2仕掛品の製造状況とを照合して第1仕掛品製造ライン及び第2仕掛品製造ラインの少なくともいずれか一方の製造工程の遅延を判定し、計画入力部に入力される製造計画に係る製造計画をグラフ上にグラフで表示し、遅延の情報を表示することで、第1仕掛品製造ライン及び第2仕掛品製造ラインの少なくともいずれか一方の製造工程の遅延についての情報を表示しつつ、製造計画と製造状況との差異を明確にすることが可能とされる。 This makes it possible to compare the production plan input to the plan input section with the production status of the first work-in-process on the first work-in-process production line and the second work-in-process on the second work-in-process production line to determine a delay in at least one of the production processes on the first work-in-process production line and the second work-in-process production line, and to display the production plan related to the production plan input to the plan input section on a graph and to display information on the delay, thereby making it possible to clearly show the difference between the production plan and the production status while displaying information on the delay in at least one of the production processes on the first work-in-process production line and the second work-in-process production line.

その他の態様として、前記出力部は、前記グラフのうち、前記遅延判定部によって遅延していると判定された仕掛品製造ラインの製造状況を示すグラフを点滅させて表示させるデータを前記モニタに出力するのが好ましい。 In another aspect, the output unit preferably outputs data to the monitor to cause a graph showing the production status of a work-in-progress production line that has been determined to be delayed by the delay determination unit to flash.

これにより、出力部は、グラフのうち、遅延判定部によって遅延していると判定された仕掛品製造ラインの製造状況を示すグラフを点滅させて表示することで、遅延している製造ラインを明確に認識することが可能とされる。 As a result, the output unit blinks the graph showing the production status of the work-in-progress production line that has been determined to be delayed by the delay determination unit, making it possible to clearly identify the delayed production line.

その他の態様として、前記第1仕掛品及び前記第2仕掛品には、該第1仕掛品及び該第2仕掛品を特定する情報を記憶する情報記憶器が設けられおり、前記第1監視ユニット及び前記第2監視ユニットは、前記第1仕掛品製造ライン及び前記第2仕掛品製造ライン上に複数配設されており、前記情報記憶器のうち、前記第1監視ユニット及び前記第2監視ユニットを通過する情報記憶器に記憶された情報を抽出する情報読取装置であるのが好ましい。 In another embodiment, the first work-in-progress and the second work-in-progress are provided with information storage devices that store information identifying the first work-in-progress and the second work-in-progress, and the first monitoring unit and the second monitoring unit are arranged in multiple units on the first work-in-progress production line and the second work-in-progress production line, and it is preferable that the information storage devices are information reading devices that extract information stored in the information storage devices that pass through the first monitoring unit and the second monitoring unit.

これにより、第1仕掛品製造ライン及び第2仕掛品製造ライン上に複数配設された情報記憶器のうち、情報読取装置を通過する情報記憶器に記憶された情報を抽出することで、第1仕掛品及び第2仕掛品がどの工程に位置しているかを確実に監視することが可能とされる。 As a result, by extracting information stored in an information storage device that passes through an information reading device among multiple information storage devices arranged on the first work-in-progress production line and the second work-in-progress production line, it is possible to reliably monitor which process the first work-in-progress and second work-in-progress are in.

その他の態様として、前記第1監視ユニット及び前記第2監視ユニットは、前記第1仕掛品製造ライン及び前記第2仕掛品製造ライン中の少なくともひとつの工程を撮像するよう配設された撮像装置を有し、前記遅延判定部は、前記撮像装置によって撮像された映像に基づいて該撮像装置が撮像する工程の遅延を判定するのが好ましい。 In another aspect, the first monitoring unit and the second monitoring unit preferably have an imaging device arranged to capture images of at least one process in the first work-in-progress production line and the second work-in-progress production line, and the delay determination unit preferably determines a delay in the process captured by the imaging device based on the image captured by the imaging device.

これにより、撮像装置によって撮像された映像に基づいて該撮像装置が撮像する工程の遅延を遅延判定部によって判定することで、各工程内における遅延を好適に判定することが可能とされる。 This allows the delay determination unit to determine the delay in the process in which the imaging device captures images based on the video captured by the imaging device, making it possible to appropriately determine the delay within each process.

その他の態様として、前記第1仕掛品及び前記第2仕掛品の少なくとも一方には、該第1仕掛品及び該第2仕掛品の少なくとも一方の位置情報を発信する発信機が設けられおり、前記第1監視ユニット及び前記第2監視ユニットの少なくとも一方は、前記発信機から発信される前記第1仕掛品及び前記第2仕掛品の少なくとも一方の位置情報を受信する受信機であり、前記遅延判定部は、前記受信機によって受信される前記第1仕掛品及び前記第2仕掛品の少なくとも一方の位置情報に基づいて前記遅延を判定するのが好ましい。 In another embodiment, at least one of the first work-in-progress and the second work-in-progress is provided with a transmitter that transmits position information of at least one of the first work-in-progress and the second work-in-progress, at least one of the first monitoring unit and the second monitoring unit is a receiver that receives the position information of at least one of the first work-in-progress and the second work-in-progress transmitted from the transmitter, and it is preferable that the delay determination unit determines the delay based on the position information of at least one of the first work-in-progress and the second work-in-progress received by the receiver.

これにより、発信機から発信される第1仕掛品及び第2仕掛品の少なくとも一方の位置情報を受信機によって受信し、第1仕掛品及び第2仕掛品の少なくとも一方の位置情報に基づいて遅延を判定することで、例えば次工程に移行する際に異なる敷地に移動するような場合であっても、当該移動中に生じた渋滞等による遅延を監視することが可能とされる。 As a result, by receiving the location information of at least one of the first work-in-progress and the second work-in-progress transmitted from the transmitter by the receiver and determining the delay based on the location information of at least one of the first work-in-progress and the second work-in-progress, it becomes possible to monitor delays caused by traffic congestion or the like that occur during the movement, even when, for example, the work-in-progress is moved to a different site when moving to the next process.

その他の態様として、前記モニタは、携帯可能なタブレット端末に含まれてなるのが好ましい。 In another embodiment, the monitor is preferably included in a portable tablet device.

これにより、携帯可能なタブレット端末に含まれるモニタに第1仕掛品製造ライン及び第2仕掛品製造ラインの少なくともいずれか一方の製造工程の遅延の情報を出力することで、管理者は、タブレット端末を携帯して製造現場を監視しつつ、他の作業をすることが可能とされる。 This allows the manager to carry the tablet terminal and monitor the manufacturing site while performing other tasks by outputting information about delays in at least one of the manufacturing processes of the first work-in-progress production line and the second work-in-progress production line to the monitor included in the portable tablet terminal.

本発明の建設機械の製造管理システムによれば、第1監視ユニット及び第2監視ユニットによって監視される第1仕掛品製造ラインの第1仕掛品及び第2仕掛品製造ラインの第2仕掛品の製造状況に基づいて、第1仕掛品製造ライン及び第2仕掛品製造ラインの少なくともいずれか一方の製造工程の遅延を遅延判定部により判定し、出力部からモニタに第1仕掛品製造ラインの1つの第1仕掛品及び第2仕掛品製造ラインの1つの第2仕掛品の製造の開始から完了まで、当該1つの第1仕掛品及び当該1つの第2仕掛品の製造の完了から完成ラインでの当該1つの第1仕掛品及び当該1つの第2仕掛品の結合の開始まで、並びに完成ラインでの当該1つの第1仕掛品及び当該1つの第2仕掛品の結合の開始から完成品としての1つの建設機械の製造の完了までをそれぞれ1つの線によって結んでグラフ上に表示し、遅延判定部によって判定される第1仕掛品製造ライン及び第2仕掛品製造ラインの少なくともいずれか一方の製造工程の遅延の情報を表示するデータを出力するようにしたので、各仕掛品製造ラインにおける各1つの仕掛品の製造の開始から完成ラインでの各1つの仕掛品の結合、そしてその後の完成ラインにおける完成品としての1つの建設機械の製造の完了までの製造進捗を複雑にすることなくグラフ上で表示して、製造現場における製造工程の遅延を認識でき、例えばモニタを見ながら製造現場の指揮をとる管理者が、当該モニタに出力された第1仕掛品製造ライン及び第2仕掛品製造ラインの少なくともいずれか一方の製造工程の遅延についての情報を基に、製造現場の作業者に的確な指示をすることができる。 According to the construction machine production management system of the present invention, a delay in at least one of the production processes of the first work-in-process production line and the second work-in-process production line is determined by the delay determination unit based on the production status of the first work-in-process on the first work-in-process production line and the second work-in-process on the second work-in-process production line monitored by the first monitoring unit and the second monitoring unit, and the output unit outputs to the monitor a time period from the start to the completion of production of one first work-in-process on the first work-in-process production line and one second work-in-process on the second work-in-process production line, from the completion of the production of the one first work-in-process and the one second work-in-process to the start of combining the one first work-in-process and the one second work-in-process on the completion line, and from the start of combining the one first work-in-process and the one second work-in-process on the completion line to the completion of production of one construction machine as a finished product. Each of the work-in-progress production lines is connected by a line and displayed on a graph, and data indicating information on a delay in at least one of the production processes of the first work-in-progress production line and the second work-in-progress production line determined by the delay determination unit is output. Therefore, the production progress from the start of production of each work-in-progress production line on each work-in-progress production line to the combination of each work-in-progress production line on the completed line, and then the completion of production of one construction machine as a completed product on the completed line can be displayed on a graph without complicating the process, making it possible to recognize delays in the production processes at the production site. For example, a manager in charge of the production site can give accurate instructions to workers at the production site while looking at a monitor based on the information about delays in at least one of the production processes of the first work-in-progress production line and the second work-in-progress production line output on the monitor.

下部走行体及び上部旋回体を有する油圧ショベルの完成品製造ラインの模式図である。FIG. 1 is a schematic diagram of a finished hydraulic excavator manufacturing line having a lower traveling body and an upper rotating body. 本発明に係る管理システムの制御に係る制御ユニットの接続構成が示されたブロック図である。FIG. 2 is a block diagram showing a connection configuration of a control unit related to control of the management system according to the present invention. 演算部のデータ結合部が実行する、データ結合処理制御の制御手順を示すルーチンについてのフローチャートである。11 is a flowchart of a routine showing a control procedure of data combination processing control executed by a data combination unit of the calculation unit. 横軸に時間を示し、縦軸に製造ラインを示す、油圧ショベル単体における製造進捗が表されたグラフである。1 is a graph showing the progress of production of a single hydraulic excavator, with the horizontal axis indicating time and the vertical axis indicating the production line. 演算部の遅延判定部が実行する、遅延判定制御の制御手順を示すルーチンについてのフローチャートである。11 is a flowchart of a routine showing a control procedure of delay determination control executed by a delay determination unit of the calculation unit. 油圧ショベルが製造計画通りに製造された際に表示ユニットの液晶モニタに表示されるグラフである。11 is a graph that is displayed on a liquid crystal monitor of a display unit when the hydraulic excavator is manufactured according to the manufacturing plan. 油圧ショベルの製造工程に遅延が生じた際に表示ユニットの液晶モニタに表示されるグラフである。13 is a graph displayed on a liquid crystal monitor of a display unit when a delay occurs in the manufacturing process of a hydraulic excavator.

以下、図面に基づき本発明の一実施形態について説明する。
図1を参照すると、下部走行体101及び上部旋回体102を有する油圧ショベル100の完成品製造ライン1の模式図が示されている。油圧ショベル100は、複数の仕掛品製造ラインによって製造された仕掛品を結合することで完成される完成品である。具体的には、油圧ショベル100を製造する完成品製造ライン(製造ライン)1は、第1仕掛品製造ライン11、第2仕掛品製造ライン12及び完成ライン13を備えている。また、完成品製造ライン1には、検出ユニット3(3a、3b)が配設され、完成品製造ライン1や検出ユニット3から離れた位置には、制御ユニット(制御装置)5及び表示ユニット7が配設されている。
Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
1, there is shown a schematic diagram of a finished product production line 1 for a hydraulic excavator 100 having a lower traveling body 101 and an upper rotating body 102. The hydraulic excavator 100 is a finished product that is completed by combining work-in-progress produced by a plurality of work-in-progress production lines. Specifically, a finished product production line (production line) 1 for producing the hydraulic excavator 100 includes a first work-in-progress production line 11, a second work-in-progress production line 12, and a finished product line 13. In addition, a detection unit 3 (3a, 3b) is provided in the finished product production line 1, and a control unit (control device) 5 and a display unit 7 are provided at positions away from the finished product production line 1 and the detection unit 3.

第1仕掛品製造ライン11は、第1工程21及び第2工程22を有しており、第1工程21、第2工程22の順に工程を実施することで、下部走行体(第1構成要素)101を製造することが可能な製造ラインである。第2仕掛品製造ライン12は、第3工程23及び第4工程24を有しており、第3工程23、第4工程24の順に工程を実施することで、上部旋回体(第2構成要素)102を製造することが可能な製造ラインである。完成ライン13は、結合工程25を有しており、第1仕掛品製造ライン11で製造された下部走行体(第1仕掛品)101と第2仕掛品製造ライン12で製造された上部旋回体(第2仕掛品)102とを結合工程25で結合させ、その後、油圧ショベル(完成品)100を完成させることが可能な製造ラインである。 The first work-in-progress production line 11 has a first process 21 and a second process 22, and is a production line capable of producing a lower running body (first component) 101 by carrying out the processes in the order of the first process 21 and the second process 22. The second work-in-progress production line 12 has a third process 23 and a fourth process 24, and is a production line capable of producing an upper rotating body (second component) 102 by carrying out the processes in the order of the third process 23 and the fourth process 24. The completed line 13 has a joining process 25, and is a production line capable of joining the lower running body (first work-in-progress) 101 manufactured on the first work-in-progress production line 11 and the upper rotating body (second work-in-progress) 102 manufactured on the second work-in-progress production line 12 in the joining process 25, and then completing the hydraulic excavator (finished product) 100.

また、完成品製造ライン1には、追加工程26が設けられている。追加工程26は、第1仕掛品製造ライン11、第2仕掛品製造ライン12及び完成ライン13上の下部走行体101、上部旋回体102及び油圧ショベル100を一時的に退避させることや、必要に応じて補修をすることが可能な、臨時的に使用する工程である。 The finished product production line 1 also has an additional process 26. The additional process 26 is a process used temporarily to temporarily evacuate the lower traveling body 101, the upper rotating body 102, and the hydraulic excavator 100 on the first work-in-progress production line 11, the second work-in-progress production line 12, and the finished product line 13, and to make repairs as necessary.

検出ユニット3は、完成品製造ライン1内における各工程の進捗を検出して製造状況を監視するセンサ等の総称である。具体的には、検出ユニット3には、RFIDリーダ(情報読取装置)31、ビデオカメラ(撮像装置)35及び受信機37が含まれる。なお、説明の便宜上、検出ユニット3のうち、第1仕掛品製造ライン11に用いられるセンサ等を第1検出ユニット(第1監視ユニット)3aとし、第2仕掛品製造ライン12に用いられるセンサ等を第2検出ユニット(第2監視ユニット)3bとする。 The detection unit 3 is a general term for sensors and the like that detect the progress of each process in the finished product production line 1 and monitor the production status. Specifically, the detection unit 3 includes an RFID reader (information reading device) 31, a video camera (imaging device) 35, and a receiver 37. For ease of explanation, among the detection units 3, the sensors and the like used in the first work-in-progress production line 11 are referred to as the first detection unit (first monitoring unit) 3a, and the sensors and the like used in the second work-in-progress production line 12 are referred to as the second detection unit (second monitoring unit) 3b.

RFIDリーダ31は、RFID(Radio Frequency Identifier)タグ33内に記憶された情報を読み取る(抽出する)ことが可能な読取装置である。このRFIDリーダ31は、第1工程21~第4工程24、結合工程25、追加工程26等の各工程が行われる位置に配設されている。一方、RFIDタグ(情報記憶器)33は、下部走行体101や上部旋回体102の例えばフレームに取り付けられており、下部走行体101の製品番号等の識別情報が記憶されている。したがって、RFIDリーダ31は、各工程でRFIDタグ33を読み取ることで、下部走行体101や上部旋回体102のうち、どの製品番号の製品がどの工程にいつ入り、いつ出たか等の情報を検出して製造状況を監視することが可能である。 The RFID reader 31 is a reading device capable of reading (extracting) information stored in an RFID (Radio Frequency Identifier) tag 33. This RFID reader 31 is disposed at a position where each process, such as the first process 21 to the fourth process 24, the joining process 25, the adding process 26, etc., is performed. Meanwhile, the RFID tag (information storage device) 33 is attached to, for example, the frame of the lower traveling body 101 or the upper rotating body 102, and stores identification information such as the product number of the lower traveling body 101. Therefore, by reading the RFID tag 33 at each process, the RFID reader 31 can detect information such as when a product with a product number of the lower traveling body 101 or the upper rotating body 102 entered and exited which process, and monitor the manufacturing status.

ビデオカメラ35は、各工程が行われる位置に配設される撮像装置であり、各工程が実施されている状況を撮像することが可能である。受信機37は、発信機39から発信される情報を受信することが可能な通信機器である。この受信機37は、制御ユニット5の近傍に配設されている。一方、発信機39は、GPS(Global Positioning System)等によって発信機39自身の現在地を特定することが可能な通信機器であり、例えば第2工程22後の下部走行体101を積載したパレット104に配設されている。したがって、完成ライン13が実施される場所に向かって第2工程22後の下部走行体101が移動している際、受信機37は、発信機39が配設されたパレット104を介して下部走行体101の現在地を具体的に特定して製造状況を監視することが可能である。 The video camera 35 is an imaging device disposed at the position where each process is performed, and is capable of capturing images of the situation in which each process is being performed. The receiver 37 is a communication device capable of receiving information transmitted from the transmitter 39. This receiver 37 is disposed near the control unit 5. On the other hand, the transmitter 39 is a communication device capable of identifying its own current location by GPS (Global Positioning System) or the like, and is disposed, for example, on a pallet 104 carrying the lower body 101 after the second process 22. Therefore, when the lower body 101 after the second process 22 is moving toward the location where the completion line 13 is performed, the receiver 37 can specifically identify the current location of the lower body 101 via the pallet 104 on which the transmitter 39 is disposed, and monitor the manufacturing situation.

表示ユニット7は、液晶モニタ(モニタ)7aを有するタブレット端末であり、制御ユニット5と通信することができる。この表示ユニット7は、制御ユニット5から送信される画像データ(所定の情報)を液晶モニタ7aに表示することができる。また、表示ユニット7は、液晶モニタ7aに直接触れることで、情報を入力することができる。なお、説明の便宜上、液晶モニタ7aにおける情報を入力するための例えば仮想キーボードやタッチ操作の検出部を入力部7b(図2参照)とする。 The display unit 7 is a tablet terminal having a liquid crystal monitor (monitor) 7a, and can communicate with the control unit 5. The display unit 7 can display image data (predetermined information) transmitted from the control unit 5 on the liquid crystal monitor 7a. The display unit 7 can also input information by directly touching the liquid crystal monitor 7a. For ease of explanation, a virtual keyboard or a touch operation detection unit for inputting information on the liquid crystal monitor 7a is referred to as the input unit 7b (see FIG. 2).

図2を参照すると、本発明に係る管理システムの制御に係る制御ユニット5の接続構成がブロック図で示されている。制御ユニット5は、本発明に係る管理システムの制御全般を実施する高速演算処理装置である。この制御ユニット5は、演算部41、計画入力部43、記憶部45及び出力部47を有している。 Referring to FIG. 2, a block diagram shows the connection configuration of the control unit 5 involved in controlling the management system according to the present invention. The control unit 5 is a high-speed calculation processing device that performs the overall control of the management system according to the present invention. This control unit 5 has a calculation unit 41, a plan input unit 43, a memory unit 45, and an output unit 47.

演算部41は、入力された情報に基づいて判定等を実施する演算部である。具体的には、演算部41は、データ結合部51、遅延判定部53及び計画照合部55を有している。データ結合部51は、結合工程25以降の重複する情報をまとめる、データ結合処理制御を実行することが可能である。遅延判定部53は、完成品製造ライン1における製造工程の遅延を判定することが可能である。計画照合部55は、完成品製造ライン1における製造実績(製造状況)と製造計画とを照合することが可能である。 The calculation unit 41 is a calculation unit that performs judgments, etc. based on input information. Specifically, the calculation unit 41 has a data combination unit 51, a delay judgment unit 53, and a plan comparison unit 55. The data combination unit 51 is capable of executing data combination process control that consolidates overlapping information after the combination process 25. The delay judgment unit 53 is capable of determining delays in the manufacturing process in the finished product manufacturing line 1. The plan comparison unit 55 is capable of comparing the manufacturing results (manufacturing status) in the finished product manufacturing line 1 with the manufacturing plan.

計画入力部43は、管理者が表示ユニット7の入力部7bを操作して入力した、完成品製造ライン1全般の製造計画に関する情報が入力される入力部である。記憶部45は、演算部41による各種演算結果や計画入力部43に入力された情報を記憶するメモリである。出力部47は、演算部41による演算結果に基づいて、表示ユニット7の液晶モニタ7aに表示させる情報を演算して出力する出力部である。 The plan input unit 43 is an input unit to which information regarding the overall manufacturing plan of the finished product production line 1 is input, which is input by the manager by operating the input unit 7b of the display unit 7. The storage unit 45 is a memory that stores various calculation results by the calculation unit 41 and information input to the plan input unit 43. The output unit 47 is an output unit that calculates and outputs information to be displayed on the liquid crystal monitor 7a of the display unit 7 based on the calculation results by the calculation unit 41.

ここで、制御ユニット5の入力側には、RFIDリーダ31、ビデオカメラ35、受信機37及び表示ユニット7が例えば情報通信可能に接続されている。これにより、制御ユニット5は、RFIDリーダ31からはRFIDタグ33に記憶されている製品番号等の識別情報やRFIDタグ33を読み取った時刻に関する情報が入力され、ビデオカメラ35からは第1工程21及び第3工程23で実施された各工程の状況に関する情報が入力され、受信機37からは第2工程22後の下部走行体101を積載したパレット104の経時的な位置情報が入力され、表示ユニット7からは入力部7bを介して入力された完成品製造ライン1全般の製造計画に関する情報が入力されている。
一方、制御ユニット5の出力側には、表示ユニット7が通信可能に接続されており、制御ユニット5の出力部47によって演算された情報が液晶モニタ7aに表示される。
Here, the RFID reader 31, the video camera 35, the receiver 37, and the display unit 7 are connected to the input side of the control unit 5 so as to be capable of communicating information, for example. As a result, the control unit 5 receives input from the RFID reader 31 of identification information such as the product number stored in the RFID tag 33 and information relating to the time when the RFID tag 33 was read, input from the video camera 35 of information relating to the status of each process carried out in the first process 21 and the third process 23, input from the receiver 37 of positional information over time of the pallet 104 carrying the lower traveling body 101 after the second process 22, and input from the display unit 7 of information relating to the overall manufacturing plan of the finished product production line 1 input via the input unit 7b.
On the other hand, the display unit 7 is communicatively connected to the output side of the control unit 5, and information calculated by the output section 47 of the control unit 5 is displayed on a liquid crystal monitor 7a.

図3を参照すると、演算部41のデータ結合部51が実行する、データ結合処理制御の制御手順を示すルーチンがフローチャートで示されており、以下、同フローチャートに沿いデータ結合処理制御の制御手順について説明する。 Referring to FIG. 3, a routine showing the control procedure for data combination processing control executed by the data combination unit 51 of the calculation unit 41 is shown in a flowchart. Below, the control procedure for data combination processing control will be explained according to the flowchart.

ステップS1では、RFIDリーダ31、ビデオカメラ35及び受信機37から入力されるデータから結合フラグデータを有するデータ(結合データ)を抽出してステップS2に移行する。ここで、結合フラグデータとは、例えばRFIDリーダ31によって複数のRFIDタグ33が同時期に読み込まれたときにおけるRFIDタグ33に紐づけられた複数の情報のことをいう。 In step S1, data having combination flag data (combined data) is extracted from the data input from the RFID reader 31, the video camera 35, and the receiver 37, and the process proceeds to step S2. Here, combination flag data refers to multiple pieces of information linked to RFID tags 33 when multiple RFID tags 33 are read simultaneously by the RFID reader 31, for example.

ステップS2では、ステップS1で結合データを抽出したか否かを判別する。ステップS2の判別結果が偽(No)で、結合データを抽出していないと判別すると、ステップS1に戻る。一方、ステップS2の判別結果が真(Yes)で、結合データを抽出したと判別すると、ステップS3に移行する。これにより、ステップS1、S2は、結合データを抽出するまで繰り返し(ステップS2でNo)、結合データを抽出すると(ステップS2でYes)、ステップS3に移行することができる。 In step S2, it is determined whether or not combined data has been extracted in step S1. If the determination result in step S2 is false (No), meaning that combined data has not been extracted, the process returns to step S1. On the other hand, if the determination result in step S2 is true (Yes), meaning that combined data has been extracted, the process proceeds to step S3. As a result, steps S1 and S2 are repeated until combined data is extracted (No in step S2), and once combined data has been extracted (Yes in step S2), the process proceeds to step S3.

ステップS3では、ステップS1で抽出された結合データ内のデータそれぞれの構成要素名を抽出してステップS4に移行する。ここで、構成要素名とは、下部走行体(第1構成要素)101や上部旋回体(第2構成要素)102といった油圧ショベル100を構成する製品名を示す。次に、ステップS4では、ステップS3で抽出された複数の構成要素名のうち、例えば予め設定した代表の構成要素名に係るデータ以外のデータの、結合工程25以降のデータを削除してステップS5に移行する。そして、ステップS5では、結合工程25以降の代表となる構成要素のデータの、グラフにおけるラベル(後述する図4のグラフのラベル61、62)を結合後の製品を指す名称(ラベル63)に変更してステップS6に移行する。 In step S3, the component names of each piece of data in the combined data extracted in step S1 are extracted, and the process proceeds to step S4. Here, the component names refer to the product names that make up the hydraulic excavator 100, such as the lower traveling body (first component) 101 and the upper rotating body (second component) 102. Next, in step S4, data from the combining process 25 onwards is deleted from the multiple component names extracted in step S3, except for data relating to a preset representative component name, and the process proceeds to step S5. Then, in step S5, the labels in the graph (labels 61 and 62 in the graph in Figure 4 described later) of the data of the representative component from the combining process 25 onwards are changed to a name (label 63) that indicates the product after the combining process, and the process proceeds to step S6.

したがって、ステップS3、S4では、結合工程25以降のデータを予め設定した代表の構成要素名に係るデータに絞り、データが重複することを防止することができる。また、ステップS5では、グラフにおけるラベル61、62を、結合工程25以降の代表となる構成要素のデータである結合後の製品を指す名称のラベル63に統一することができる。 Therefore, in steps S3 and S4, the data from the combining process 25 onwards can be narrowed down to data related to a preset representative component name, preventing data duplication. In addition, in step S5, labels 61 and 62 in the graph can be unified to label 63, which is the name of the combined product, which is the data of the representative component from the combining process 25 onwards.

ステップS6では、ステップS1~S5によって演算された情報を製造実績データとして記憶部45に記憶して本ルーチンを終了し、再び本ルーチンを繰り返す。これにより、管理者は、記憶部45に記憶された製造実績データの情報を基に完成品製造ライン1の改善等を検討することができる。 In step S6, the information calculated in steps S1 to S5 is stored in the memory unit 45 as manufacturing performance data, the routine ends, and the routine is repeated again. This allows the manager to consider improvements to the finished product production line 1 based on the manufacturing performance data stored in the memory unit 45.

図4は、横軸に時間を示し、縦軸に各製造ラインを示す、油圧ショベル100単体における製造進捗が表されたグラフである。当該グラフによると、下部走行体101は、8:00に第1工程21を開始して8:20に完了し、9:10に第2工程22を開始して10:00に完了し、10:50に結合工程25を開始している。一方、上部旋回体102は、7:00に第3工程23を開始して7:50に完了し、8:40に第4工程24を開始して9:30に完了し、10:50に結合工程25を開始している。そして、完成ライン13における結合工程25以降の工程においては、下部走行体101と上部旋回体102とを結合してなる油圧ショベル100の製造が実施されている。 Figure 4 is a graph showing the progress of manufacturing the hydraulic excavator 100 alone, with the horizontal axis showing time and the vertical axis showing each manufacturing line. According to this graph, the first process 21 for the lower traveling body 101 starts at 8:00 and is completed at 8:20, the second process 22 starts at 9:10 and is completed at 10:00, and the joining process 25 starts at 10:50. Meanwhile, the third process 23 for the upper rotating body 102 starts at 7:00 and is completed at 7:50, the fourth process 24 starts at 8:40 and is completed at 9:30, and the joining process 25 starts at 10:50. Then, in the processes after the joining process 25 on the completion line 13, the hydraulic excavator 100 formed by joining the lower traveling body 101 and the upper rotating body 102 is manufactured.

したがって、データ結合部51によってデータ結合処理制御が実行されることで、結合工程25以降の重複する情報をひとつの情報に束ねることができる。ゆえに、データ結合処理制御は、制御ユニット5が管理するデータ量を軽減させることや、結合工程25以降における当該グラフに表示する表示名を特定することができる。そして、ステップS6では、これらデータ結合処理制御で演算された情報を記憶部45に記憶させることで、上記データ結合処理制御の説明に係る油圧ショベル100の製造実績を製造実績データとして記憶し、以降も製造実績データを累積的に記憶させることができる。 Therefore, by executing the data combination process control by the data combination unit 51, it is possible to bundle the overlapping information from the combination process 25 onwards into a single piece of information. Therefore, the data combination process control can reduce the amount of data managed by the control unit 5 and specify the display name to be displayed on the graph from the combination process 25 onwards. Then, in step S6, the information calculated by the data combination process control is stored in the memory unit 45, so that the manufacturing performance of the hydraulic excavator 100 described above in the data combination process control is stored as manufacturing performance data, and the manufacturing performance data can be stored cumulatively thereafter.

図5を参照すると、演算部41の遅延判定部53が実行する、遅延判定制御の制御手順を示すルーチンがフローチャートで示されており、以下、同フローチャートに沿い遅延判定制御の制御手順について説明する。 Referring to FIG. 5, a flow chart shows a routine indicating the control procedure of the delay judgment control executed by the delay judgment unit 53 of the calculation unit 41. Below, the control procedure of the delay judgment control will be explained according to the flow chart.

ステップS101では、遅延判定をする製品を選択してステップS102に移行する。具体的には、ステップS101では、管理者が表示ユニット7の入力部7bを介して指定した時間帯に製造された製品を、遅延判定をする製品として選択する。ステップS102では、ステップS101で選択した製品の製造データをグラフに変換して出力してステップS103に移行する。したがって、ステップS101、S102では、管理者が指定した時間帯における製造データを、グラフで表示ユニット7の液晶モニタ7aに表示することができる(図4や後述する図6、7参照)。 In step S101, a product for which a delay judgment is to be made is selected, and the process proceeds to step S102. Specifically, in step S101, a product manufactured during a time period designated by the manager via the input section 7b of the display unit 7 is selected as a product for which a delay judgment is to be made. In step S102, the manufacturing data of the product selected in step S101 is converted into a graph, output, and the process proceeds to step S103. Therefore, in steps S101 and S102, the manufacturing data for the time period designated by the manager can be displayed in a graph on the liquid crystal monitor 7a of the display unit 7 (see FIG. 4 and FIGS. 6 and 7 described below).

ステップS103では、ステップS101で選択した製品の製造データのうち、工程の実施時間が一定値以上のデータがあるか否かを判別する。ここで、一定値とは、例えば第1仕掛品製造ライン11や第2仕掛品製造ライン12上に延び、下部走行体101や上部旋回体102が搭載されて一定速度で駆動するベルトコンベアの、対象の工程における距離を当該ベルトコンベアの速度で割った値を用いる。ステップS103の判別結果が偽(No)で、工程間の時間的間隔が一定値以上のデータはないと判別すると、ステップS106に移行し、ステップS103の判別結果が真(Yes)で、工程間の時間的間隔が一定値以上のデータがあると判別すると、ステップS104に移行する。 In step S103, it is determined whether or not there is any data in the manufacturing data of the product selected in step S101 in which the execution time of the process is equal to or greater than a certain value. Here, the certain value is, for example, a value obtained by dividing the distance of the target process of the belt conveyor that extends over the first work-in-progress production line 11 or the second work-in-progress production line 12, on which the lower running body 101 or the upper rotating body 102 is mounted and which drives at a constant speed, by the speed of the belt conveyor. If the determination result in step S103 is false (No), and it is determined that there is no data in which the time interval between processes is equal to or greater than the certain value, the process proceeds to step S106, and if the determination result in step S103 is true (Yes), and it is determined that there is data in which the time interval between processes is equal to or greater than the certain value, the process proceeds to step S104.

ステップS104では、工程間の時間的間隔が一定値以上のデータに係る工程、すなわち製造が遅延している工程があることを、例えばグラフ上の該当する工程を点滅する丸Cで囲むことで表示し(後述する図7参照)、ステップS105に移行する。ステップS105では、遅延している工程におけるビデオカメラ35よって撮像された映像を小窓W(後述する図7参照)として出力部47に出力してステップS106に移行する。 In step S104, the system indicates that there is a process related to data in which the time interval between processes is equal to or greater than a certain value, i.e., that there is a process in which production is delayed, for example by encircling the relevant process on the graph with a blinking circle C (see FIG. 7 described later), and then proceeds to step S105. In step S105, the image captured by the video camera 35 in the delayed process is output to the output unit 47 as a small window W (see FIG. 7 described later), and then proceeds to step S106.

したがって、ステップS103~S105では、工程の実施時間が一定値以上であるような遅延が生じている工程を検出して製造状況を監視し(ステップS103)、該当する工程を点滅する丸Cで囲み(ステップS104)、ビデオカメラ35よって撮像された当該工程にかかる映像(S108)を、出力部47を介して表示ユニット7の液晶モニタ7aに表示する。これにより、管理者に当該工程での遅延が生じていることを認識させることや、当該工程の現状を映像で管理者に伝えることができる。 Therefore, in steps S103 to S105, any process that is experiencing a delay such that the process execution time is equal to or greater than a certain value is detected and the manufacturing status is monitored (step S103), the process in question is surrounded by a blinking circle C (step S104), and an image of that process captured by the video camera 35 (S108) is displayed on the liquid crystal monitor 7a of the display unit 7 via the output section 47. This makes it possible to make the manager aware that a delay is occurring in that process, and to convey the current state of that process to the manager through the image.

ステップS105以降、ステップS106~S108では、計画照合部55による計画照合制御が介在して同制御を実行する。ステップS106では、計画入力部43に入力された完成品製造ライン1全般の製造計画に関する情報に基づいて、製造計画と製造実績との時刻差が規定値以上の工程を有する製造データがあるか否かを判別する。ここで、規定値とは、例えば20分程度とすればよい。 After step S105, in steps S106 to S108, the plan matching control is performed by the plan matching unit 55. In step S106, based on the information about the manufacturing plan for the entire finished product manufacturing line 1 input to the plan input unit 43, it is determined whether there is manufacturing data for a process in which the time difference between the manufacturing plan and the actual manufacturing results is equal to or greater than a specified value. Here, the specified value may be, for example, about 20 minutes.

ステップS106の判別結果が偽(No)で、製造計画と製造実績との時刻差が規定値以上の工程はないと判別すると、遅延判定制御を終了する。一方、ステップS106の判別結果が真(Yes)で、製造計画と製造実績との時刻差が規定値以上の工程があると判別すると、ステップS107に移行する。 If the result of the determination in step S106 is false (No), and it is determined that there is no process in which the time difference between the manufacturing plan and the manufacturing results is equal to or greater than the specified value, the delay determination control ends. On the other hand, if the result of the determination in step S106 is true (Yes), and it is determined that there is a process in which the time difference between the manufacturing plan and the manufacturing results is equal to or greater than the specified value, the process proceeds to step S107.

ステップS107では、製造計画と製造実績との時刻差が規定値以上の工程についての製造計画をグラフで出力部47を介して出力し、ステップS108に移行する。ステップS108では、製造計画と製造実績との時刻差が規定値以上の工程を有する製品についての実績値のグラフを点滅させて遅延判定制御を終了する。 In step S107, the manufacturing plan for the process in which the time difference between the manufacturing plan and the actual manufacturing result is equal to or greater than a specified value is output in the form of a graph via the output unit 47, and the process proceeds to step S108. In step S108, the graph of the actual value for the product in which the time difference between the manufacturing plan and the actual manufacturing result is equal to or greater than a specified value is caused to flash, and the delay determination control is terminated.

したがって、ステップS106~S108では、製造計画と製造実績との時刻差が規定値以上であるような、製造が計画から大幅に遅れている製造状況を監視し(ステップS106)、製造計画にかかるグラフ(S107)と点滅する実績値のグラフ(S108)とを表示ユニット7の液晶モニタ7aに表示することができる。 Therefore, in steps S106 to S108, the system monitors the production status where production is significantly behind schedule, such as when the time difference between the production plan and the production results is equal to or greater than a specified value (step S106), and displays a graph related to the production plan (S107) and a flashing graph of the results (S108) on the liquid crystal monitor 7a of the display unit 7.

図6を参照すると、油圧ショベル100が製造計画通りに製造された際に表示ユニット7の液晶モニタ7aに表示されるグラフが示されている。また、図7を参照すると、下部走行体Aにおける第1仕掛品製造ライン11の第2工程22で遅延が生じた際に表示ユニット7の液晶モニタ7aに表示されるグラフが示されている。 Referring to FIG. 6, a graph is shown on the liquid crystal monitor 7a of the display unit 7 when the hydraulic excavator 100 is manufactured according to the manufacturing plan. Also, referring to FIG. 7, a graph is shown on the liquid crystal monitor 7a of the display unit 7 when a delay occurs in the second process 22 of the first work-in-progress manufacturing line 11 in the lower traveling body A.

以下、図5~7に沿って遅延判定制御による作用効果を説明するが、説明の便宜上、先行して製造が開始された油圧ショベル100を油圧ショベルA、油圧ショベルAの後から製造が開始された油圧ショベル100を油圧ショベルBとする。また、下部走行体101及び上部旋回体102についても同様に、先行して製造が開始されたものを下部走行体A及び上部旋回体A、下部走行体A及び上部旋回体Aの後から製造が開始されたものを下部走行体B及び上部旋回体Bとする。またさらに、図6、7のグラフ上における白丸は工程の開始を意味し、黒丸は工程の終了を意味する。 The effect of the delay judgment control will be explained below with reference to Figures 5 to 7. For ease of explanation, the hydraulic excavator 100 whose manufacture started first will be referred to as hydraulic excavator A, and the hydraulic excavator 100 whose manufacture started after hydraulic excavator A will be referred to as hydraulic excavator B. Similarly, for the lower running body 101 and the upper rotating body 102, the ones whose manufacture started first will be referred to as lower running body A and upper rotating body A, and the ones whose manufacture started after lower running body A and upper rotating body A will be referred to as lower running body B and upper rotating body B. Furthermore, the open circles on the graphs in Figures 6 and 7 indicate the start of the process, and the black circles indicate the end of the process.

まず、図5、6に沿い、油圧ショベルA、Bがともに製造計画通りに製造された場合(場合1)について説明する。管理者が表示ユニット7の入力部7bを介して7:00~17:00の時間帯で製造された油圧ショベルを指定することで(ステップS101)、油圧ショベルA、Bの製造データが図6のグラフで表示ユニット7の液晶モニタ7aに表示される(ステップS102)。 First, referring to Figures 5 and 6, a case where both hydraulic excavators A and B were manufactured according to the manufacturing plan (case 1) will be described. When the manager specifies hydraulic excavators manufactured between 7:00 and 17:00 via the input section 7b of the display unit 7 (step S101), the manufacturing data for hydraulic excavators A and B is displayed on the liquid crystal monitor 7a of the display unit 7 in the form of a graph as shown in Figure 6 (step S102).

ここで、油圧ショベルA、Bは、ともに製造計画通りに製造されているため、工程間の時間的間隔が一定値以上のデータはなく(ステップS103でNo)、製造計画と製造実績との時刻差が規定値以上の工程はないため(ステップS106でNo)、点滅する丸Cや(ステップS104)、小窓W(ステップS105)が表示されることなく、グラフのみが表示ユニット7の液晶モニタ7aに表示される。 Here, both hydraulic excavators A and B are manufactured according to the manufacturing plan, so there is no data where the time interval between processes is greater than a certain value (No in step S103), and there is no process where the time difference between the manufacturing plan and the actual manufacturing results is greater than a specified value (No in step S106), so the blinking circle C (step S104) and the small window W (step S105) are not displayed, and only the graph is displayed on the liquid crystal monitor 7a of the display unit 7.

このように図6のグラフによれば、データ結合部51によってデータ結合処理制御が実行されることで、結合工程25以降のグラフが油圧ショベルA、Bのそれぞれ一本ずつにまとめることができるので、グラフが複雑になることを抑制することができる。また、グラフにラベル61、62、63を表示することで、グラフ上の各線がどの製品を示しているかを簡単に認識することができる。 As shown in the graph of FIG. 6, the data combining unit 51 executes data combining process control, and the graphs from the combining step 25 onwards can be combined into one line each for hydraulic excavators A and B, preventing the graph from becoming too complicated. In addition, by displaying labels 61, 62, and 63 on the graph, it is easy to recognize which product each line on the graph represents.

次に、図5、7に沿い、第1仕掛品製造ライン11の第2工程22において、油圧ショベルAの下部走行体Aの製造に遅延が生じた場合(場合2)について、場合1と異なる点を説明する。 Next, referring to Figures 5 and 7, we will explain the differences from Case 1 in the case where a delay occurs in the production of the undercarriage A of the hydraulic excavator A in the second process 22 of the first work-in-progress production line 11 (Case 2).

場合2では、図7中の第1判定時において、第1仕掛品製造ライン11の第2工程22で下部走行体Aの製造に遅延が生じているため、下部走行体Aが第2工程22に投入されてから搬出されるまでに係る時間、すなわち第2工程22の実施時間が一定値以上となっている(ステップS103でYes)。したがって、場合2では、第2工程22の遅延を管理者に認識させるべく、第2工程22を点滅する丸Cで囲い(ステップS104)、小窓Wをグラフの右側上部に位置させた(ステップS105)映像が表示ユニット7の液晶モニタ7aに表示される。 7, a delay occurs in the production of the lower running body A in the second process 22 of the first work-in-progress production line 11, and therefore the time from when the lower running body A is put into the second process 22 until it is taken out, i.e., the execution time of the second process 22, is equal to or greater than a certain value (Yes in step S103). Therefore, in case 2, in order to make the manager aware of the delay in the second process 22, an image is displayed on the liquid crystal monitor 7a of the display unit 7, in which the second process 22 is surrounded by a blinking circle C (step S104) and a small window W is positioned in the upper right part of the graph (step S105).

これにより、管理者は、表示ユニット7の液晶モニタ7aに表示されるグラフのうち、第2工程22において何かしらの事情により下部走行体Aの製造に遅延が生じていることを点滅する丸Cにより好適に認識することができる。また、管理者は、第2工程22におけるビデオカメラ35よって撮像された映像が小窓Wに表示されることで、第2工程22に生じている遅延の原因をビデオカメラ35よって撮像された映像を基に判断することができる。 This allows the manager to easily recognize from the blinking circle C in the graph displayed on the liquid crystal monitor 7a of the display unit 7 that a delay has occurred in the manufacturing of the lower running body A in the second process 22 for some reason. In addition, the image captured by the video camera 35 in the second process 22 is displayed in the small window W, allowing the manager to determine the cause of the delay occurring in the second process 22 based on the image captured by the video camera 35.

このようにして第2工程22における下部走行体Aの製造の遅延を認識した管理者は、第2工程22にある下部走行体Aを追加工程26に移動させるよう、作業者に指示することで、先行する下部走行体Aに代えて下部走行体Bを第2工程22に位置させることができる(図7参照)。 In this way, the manager who recognizes the delay in the production of lower running body A in the second process 22 can instruct the worker to move lower running body A at the second process 22 to the additional process 26, thereby positioning lower running body B at the second process 22 in place of the preceding lower running body A (see Figure 7).

一方、図7中の第2判定時において、第1判定時に下部走行体Aに代えて下部走行体Bを第2工程22に位置させると、下部走行体Bは、製造計画より早期に第2工程22を実施することができる。また、製造計画より早期に下部走行体Bの第2工程22を実施することで、下部走行体Bの第2工程22における製造実績と製造計画との間には規定値以上の差異が生じる場合がある(ステップS106でYes)。したがって、場合2では、下部走行体Bの製造計画を管理者に指標として示すべく、製造計画をグラフで表示し(ステップS107)、実績値のグラフを点滅させる(ステップS105)。 On the other hand, at the time of the second judgment in FIG. 7, if the lower running body B is positioned in the second process 22 instead of the lower running body A at the time of the first judgment, the lower running body B can carry out the second process 22 earlier than the manufacturing plan. Also, by carrying out the second process 22 of the lower running body B earlier than the manufacturing plan, a difference between the manufacturing results and the manufacturing plan for the second process 22 of the lower running body B may occur that is greater than a specified value (Yes in step S106). Therefore, in case 2, in order to show the manufacturing plan of the lower running body B as an indicator to the manager, the manufacturing plan is displayed in a graph (step S107), and the graph of the actual value is made to flash (step S105).

このようにして下部走行体Bの製造計画のグラフを指標として示された管理者は、下部走行体B及び上部旋回体B並びに油圧ショベルBの製造を予定より早めるよう、製造計画のグラフを参酌しつつ作業者に指示することができる。また、下部走行体Aの後から製造が開始された下部走行体Bの製造計画を表示することで、下部走行体Bより後に製造が開始される下部走行体101の製造計画に生じる遅延を軽減させるためにはどの程度下部走行体B及び上部旋回体B並びに油圧ショベルBの製造を予定より早める必要があるかを容易に検討することができる。 In this way, the manager, who is shown the graph of the manufacturing plan for the lower running body B as an indicator, can instruct the workers to advance the manufacturing of the lower running body B, the upper rotating body B, and the hydraulic excavator B ahead of schedule while taking into consideration the graph of the manufacturing plan. In addition, by displaying the manufacturing plan for the lower running body B, whose manufacturing began after the lower running body A, it is possible to easily consider to what extent the manufacturing of the lower running body B, the upper rotating body B, and the hydraulic excavator B needs to be advanced from schedule in order to reduce delays occurring in the manufacturing plan for the lower running body 101, whose manufacturing begins after the lower running body B.

特に、データ結合部51によってデータ結合処理制御が実行されて、結合工程25以降の重複する情報をひとつの情報に束ねられるため、下部走行体B及び上部旋回体B並びに油圧ショベルBの製造を予定より早めるようなイレギュラーな対応がされた場合であっても、結合工程25以降のグラフが煩雑になることを抑制することができる。 In particular, the data combining unit 51 executes data combining process control and combines overlapping information from combining process 25 onwards into a single piece of information, so that even if irregular measures are taken such as accelerating the manufacture of the lower traveling body B, the upper rotating body B and the hydraulic excavator B earlier than planned, the graphs from combining process 25 onwards can be prevented from becoming complicated.

次に、本実施形態の別実施例について説明する。別実施例では、ビデオカメラ35よって撮像された映像を基に、各工程の開始や終了を検出及び判定する。これにより、例えば製造される製品がRFIDタグ33を貼りつけることが困難な製品である場合であっても、ビデオカメラ35よって撮像された映像を基に結合フラグデータを生成することや、グラフを出力することができ、ひいては各工程の遅延をビデオカメラ35よって撮像された映像を基に判定することができる。 Next, another example of this embodiment will be described. In this example, the start and end of each process are detected and determined based on the image captured by the video camera 35. As a result, even if the product being manufactured is one for which it is difficult to attach an RFID tag 33, it is possible to generate combination flag data and output graphs based on the image captured by the video camera 35, and ultimately to determine delays in each process based on the image captured by the video camera 35.

以上説明したように、本発明に係る建設機械の製造管理システムでは、複数の仕掛品を組み合わせて油圧ショベル100を製造する完成品製造ライン1の管理システムであって、複数の仕掛品のひとつである下部走行体101を製造する第1仕掛品製造ライン11の製造状況を監視する第1検出ユニット3aと、上部旋回体102を製造する第2仕掛品製造ライン12の製造状況を監視する第2検出ユニット3bと、管理者に表示する表示ユニット7の液晶モニタ7aと、液晶モニタ7aに表示する情報を演算する制御ユニット5と、を備え、制御ユニット5は、第1仕掛品製造ライン11及び第2仕掛品製造ライン12の遅延を判定する遅延判定部53と、液晶モニタ7aに出力する情報を生成する出力部47と、を有し、遅延判定部53は、第1検出ユニット3a及び第2検出ユニット3bによって監視される第1仕掛品製造ライン11及び第2仕掛品製造ライン12の製造状況に基づいて、第1仕掛品製造ライン11及び第2仕掛品製造ライン12の製造工程に遅延が生じているか否かを判定し、出力部47は、液晶モニタ7aに対し、第1仕掛品製造ライン11及び第2仕掛品製造ライン12の製造状況を同一のグラフ上に表示し、遅延判定部53によって判定される第1仕掛品製造ライン11及び第2仕掛品製造ライン12の製造工程に遅延が生じていることを示す情報を表示するデータを出力する。 As described above, the construction machinery manufacturing management system according to the present invention is a management system for a finished product manufacturing line 1 that manufactures a hydraulic excavator 100 by combining a plurality of work-in-progress products, and is equipped with a first detection unit 3a that monitors the manufacturing status of a first work-in-progress manufacturing line 11 that manufactures a lower traveling body 101, which is one of the plurality of work-in-progress products, a second detection unit 3b that monitors the manufacturing status of a second work-in-progress manufacturing line 12 that manufactures an upper rotating body 102, a liquid crystal monitor 7a of a display unit 7 that displays information to a manager, and a control unit 5 that calculates information to be displayed on the liquid crystal monitor 7a. The control unit 5 also includes a delay determination unit 53 that determines delays in the first work-in-progress manufacturing line 11 and the second work-in-progress manufacturing line 12. , and an output unit 47 that generates information to be output to the liquid crystal monitor 7a, and the delay determination unit 53 determines whether or not a delay has occurred in the manufacturing process of the first work-in-progress production line 11 and the second work-in-progress production line 12 based on the manufacturing status of the first work-in-progress production line 11 and the second work-in-progress production line 12 monitored by the first detection unit 3a and the second detection unit 3b, and the output unit 47 displays the manufacturing status of the first work-in-progress production line 11 and the second work-in-progress production line 12 on the same graph on the liquid crystal monitor 7a, and outputs data indicating information indicating that a delay has occurred in the manufacturing process of the first work-in-progress production line 11 and the second work-in-progress production line 12 as determined by the delay determination unit 53.

従って、第1検出ユニット3a及び第2検出ユニット3bによって監視される第1仕掛品製造ライン11及び第2仕掛品製造ライン12の製造状況に基づいて、第1仕掛品製造ライン11及び第2仕掛品製造ライン12の製造工程の遅延を遅延判定部53により判定し、出力部47から液晶モニタ7aに、第1仕掛品製造ライン11及び第2仕掛品製造ライン12の製造状況を同一のグラフ上に表示し、遅延判定部53によって判定される第1仕掛品製造ライン11及び第2仕掛品製造ライン12の製造工程の遅延の情報を表示するデータを出力するようにしたので、例えば液晶モニタ7aを見ながら製造現場の指揮をとる管理者が、当該液晶モニタ7aに出力された第1仕掛品製造ライン11及び第2仕掛品製造ライン12の製造工程の遅延についての情報を基に、製造現場の作業者に的確な指示をすることができる。 Therefore, based on the production status of the first work-in-progress production line 11 and the second work-in-progress production line 12 monitored by the first detection unit 3a and the second detection unit 3b, the delay determination unit 53 determines the delay in the production process of the first work-in-progress production line 11 and the second work-in-progress production line 12, and the production status of the first work-in-progress production line 11 and the second work-in-progress production line 12 are displayed on the same graph from the output unit 47 to the liquid crystal monitor 7a, and data displaying information on the delay in the production process of the first work-in-progress production line 11 and the second work-in-progress production line 12 determined by the delay determination unit 53 is output. Therefore, for example, a manager in charge of the production site while looking at the liquid crystal monitor 7a can give accurate instructions to workers at the production site based on the information on the delay in the production process of the first work-in-progress production line 11 and the second work-in-progress production line 12 output to the liquid crystal monitor 7a.

そして、制御ユニット5は、第1仕掛品製造ライン11及び第2仕掛品製造ライン12の製造計画が入力される計画入力部43を有しており、遅延判定部53は、計画入力部43に入力される製造計画と第1仕掛品製造ライン11及び第2仕掛品製造ライン12の製造実績(製造状況)とを照合することで第1仕掛品製造ライン11及び第2仕掛品製造ライン12の製造工程の遅延を判定し、出力部47は、液晶モニタ7aに対し、計画入力部43に入力される製造計画に係る製造計画をグラフ上にグラフで表示し、遅延が生じていることを示す情報を表示させるデータを出力して遅延を認識させるようにしたので、第1仕掛品製造ライン11及び第2仕掛品製造ライン12の製造工程の遅延についての表示をしつつ、製造計画と製造実績(製造状況)との差異を明確にすることができる。 The control unit 5 has a plan input section 43 to which the production plans of the first work-in-process production line 11 and the second work-in-process production line 12 are input, and the delay determination section 53 determines a delay in the production process of the first work-in-process production line 11 and the second work-in-process production line 12 by comparing the production plan input to the plan input section 43 with the production results (production status) of the first work-in-process production line 11 and the second work-in-process production line 12, and the output section 47 displays the production plan related to the production plan input to the plan input section 43 on the LCD monitor 7a in a graph and outputs data displaying information indicating that a delay has occurred to make the user aware of the delay, so that the difference between the production plan and the production results (production status) can be made clear while displaying the delay in the production process of the first work-in-process production line 11 and the second work-in-process production line 12.

そして、出力部47は、グラフのうち、遅延判定部53によって遅延していると判定された仕掛品製造ラインの製造状況を示すグラフを点滅させて表示させるデータを出力するようにしたので、遅延している完成品製造ライン1を明確に管理者に認識させることができる。 The output unit 47 outputs data that causes the graph showing the production status of the work-in-progress production line that has been determined to be delayed by the delay determination unit 53 to flash, so that the manager can clearly recognize the finished product production line 1 that is delayed.

そして、下部走行体101及び上部旋回体102には、該下部走行体101及び該上部旋回体102を特定する情報を記憶するRFIDタグ33が設けられおり、第1検出ユニット3a及び第2検出ユニット3bは、第1仕掛品製造ライン11及び第2仕掛品製造ライン12上に複数配設されたRFIDリーダ31であり、RFIDタグ33のうち、RFIDリーダ31を通過するRFIDタグ33に記憶された情報を抽出するようにしたので、下部走行体101及び上部旋回体102がどの工程に位置しているかを確実に検出して製造状況を監視することができる。 The lower traveling body 101 and the upper rotating body 102 are provided with RFID tags 33 that store information identifying the lower traveling body 101 and the upper rotating body 102, and the first detection unit 3a and the second detection unit 3b are RFID readers 31 arranged in multiple locations on the first work-in-progress production line 11 and the second work-in-progress production line 12, and are configured to extract information stored in the RFID tags 33 that pass through the RFID readers 31. This makes it possible to reliably detect which process the lower traveling body 101 and the upper rotating body 102 are in and monitor the production status.

そして、第1検出ユニット3a及び第2検出ユニット3bは、第1仕掛品製造ライン11及び第2仕掛品製造ライン12中の少なくともひとつの工程を撮像するよう配設されたビデオカメラ35を有し、遅延判定部53は、ビデオカメラ35によって撮像された映像に基づいて該ビデオカメラ35が撮像する工程の遅延を判定したので、各工程内における遅延を好適に判定することができる。 The first detection unit 3a and the second detection unit 3b each have a video camera 35 arranged to capture an image of at least one process in the first work-in-progress production line 11 and the second work-in-progress production line 12, and the delay determination unit 53 determines the delay in the process captured by the video camera 35 based on the image captured by the video camera 35, so that the delay within each process can be appropriately determined.

そして、下部走行体101及び上部旋回体102の少なくとも一方には、該下部走行体101及び該上部旋回体102の少なくとも一方の位置情報を発信する発信機39が設けられおり、第1検出ユニット3a及び第2検出ユニット3bの少なくとも一方は、発信機39から発信される下部走行体101及び上部旋回体102の少なくとも一方の位置情報を受信する受信機37であり、遅延判定部53は、受信機37によって受信される下部走行体101及び上部旋回体102の少なくとも一方の位置情報に基づいて遅延を判定したので、例えば次工程に移行する際に異なる敷地に移動するような場合であっても、当該移動中に生じた渋滞等による遅延を検出して製造状況を監視することができる。 At least one of the lower running body 101 and the upper rotating body 102 is provided with a transmitter 39 that transmits position information of at least one of the lower running body 101 and the upper rotating body 102, and at least one of the first detection unit 3a and the second detection unit 3b is a receiver 37 that receives the position information of at least one of the lower running body 101 and the upper rotating body 102 transmitted from the transmitter 39. The delay determination unit 53 determines the delay based on the position information of at least one of the lower running body 101 and the upper rotating body 102 received by the receiver 37. Therefore, even if the workpiece is moved to a different site when moving to the next process, for example, a delay caused by traffic congestion or the like during the movement can be detected and the manufacturing status can be monitored.

そして、液晶モニタ7aは、携帯可能な表示ユニット7に含まれてなるので、管理者は、表示ユニット7を携帯して製造現場を監視しつつ、他の作業をすることができる。 The LCD monitor 7a is included in the portable display unit 7, so the manager can carry the display unit 7 with him and perform other tasks while monitoring the manufacturing site.

以上で本発明に係る発明の名称の説明を終えるが、本発明は上記実施形態に限られるものではなく、発明の主旨を逸脱しない範囲で変更可能である。
例えば、本実施形態では、遅延判定制御中のステップS101で、管理者が表示ユニット7の入力部7bを介して指定した時間帯に製造された製品を、遅延判定をする製品として選択するようにしたが、計画入力部43に入力された製造計画と比較して規定値より遅延している製品とその前後の製品を、遅延判定をする製品として選択するようにしてもよい。
Although the description of the title of the invention according to the present invention is completed above, the present invention is not limited to the above-described embodiment, and can be modified within the scope of the gist of the invention.
For example, in this embodiment, in step S101 during delay judgment control, the products manufactured during the time period specified by the manager via the input section 7b of the display unit 7 are selected as the products for which delay judgment is to be made, but it is also possible to select the products for which delay judgment is to be made that are delayed more than a specified value compared with the manufacturing plan inputted to the plan input section 43 and the products before and after that.

また、本実施形態では、遅延判定制御のステップS101で、管理者が表示ユニット7の入力部7bを介して指定した時間帯に製造された製品を、遅延判定をする製品として選択するようにしたが、完成品製造ライン1上に位置するすべての製品を管理者の操作によらず自動で遅延判定をする製品とするようにしてもよい。 In addition, in this embodiment, in step S101 of the delay judgment control, the products manufactured during the time period specified by the manager via the input section 7b of the display unit 7 are selected as products for which a delay judgment is to be made, but all products located on the finished product production line 1 may be automatically selected as products for which a delay judgment is to be made without the manager's operation.

また、本実施形態では、グラフ中の遅延が生じている工程を点滅する丸Cによって囲み、遅延が生じている工程の映像を小窓Wに表示し及び実績値のグラフを点滅させて、管理者に遅延が生じていることを認識させるようにしたが、音や振動によって認識させるようにしてもよく、または表示とこれらを併用してもよい。 In addition, in this embodiment, the process in the graph where a delay is occurring is surrounded by a blinking circle C, an image of the process where a delay is occurring is displayed in a small window W, and the graph of the actual values is made blinking to make the manager aware of the delay, but the manager may also be made aware by sound or vibration, or these may be used in combination with the display.

1 完成品製造ライン(製造ライン)
3a 第1検出ユニット(第1監視ユニット)
3b 第2検出ユニット(第2監視ユニット)
5 制御ユニット(制御装置)
7 表示ユニット(タブレット端末)
7a 液晶モニタ(モニタ)
11 第1仕掛品製造ライン
12 第2仕掛品製造ライン
31 RFIDリーダ(情報読取装置)
33 RFIDタグ(情報記憶器)
35 ビデオカメラ(撮像装置)
37 受信機
39 発信機
47 出力部
53 遅延判定部
100 油圧ショベル(完成品)
101 下部走行体(第1仕掛品)
102 上部旋回体(第2仕掛品)
1. Finished product production line (production line)
3a First detection unit (first monitoring unit)
3b Second detection unit (second monitoring unit)
5. Control unit (control device)
7 Display unit (tablet device)
7a Liquid crystal monitor (monitor)
11 First work-in-progress production line 12 Second work-in-progress production line 31 RFID reader (information reading device)
33 RFID tag (information storage device)
35 Video camera (imaging device)
37 Receiver 39 Transmitter 47 Output section 53 Delay determination section 100 Hydraulic excavator (finished product)
101 Lower running body (first work in progress)
102 Upper rotating body (second work in progress)

Claims (7)

第1仕掛品製造ラインにおいて建設機械の第1構成要素を第1仕掛品として製造し、第2仕掛品製造ラインにおいて該建設機械の第2構成要素を第2仕掛品として製造し、完成ラインにおいて前記第1仕掛品及び前記第2仕掛品を組み合わせて完成品としての該建設機械を製造する建設機械の製造管理システムであって、
前記第1仕掛品製造ラインにおける前記第1仕掛品の製造状況を監視する第1監視ユニットと、
前記第2仕掛品製造ラインにおける前記第2仕掛品の製造状況を監視する第2監視ユニットと、
管理者に所定の情報を表示するモニタと、
前記モニタに表示する前記所定の情報を制御する制御装置と、を備え、
前記制御装置は、
前記第1監視ユニットによって監視されている前記第1仕掛品の製造状況に基づいて前記第1仕掛品製造ラインの製造工程に遅延が生じているか否かを判定し、前記第2監視ユニットによって監視されている前記第2仕掛品の製造状況に基づいて前記第2仕掛品製造ラインの製造工程に遅延が生じているか否かを判定する遅延判定部と、
前記モニタに対し、前記第1仕掛品製造ライン前記第2仕掛品製造ライン及び前記完成ラインにおける前記第1仕掛品前記第2仕掛品及び前記完成品の製造状況を、横軸を時間とし縦軸を前記第1仕掛品製造ライン、前記第2仕掛品製造ライン及び前記完成ラインの各1つの製造工程とし、前記第1仕掛品製造ラインでの1つの前記第1仕掛品の製造の開始から完了までが1つの線によって結ばれ、前記第2仕掛品製造ラインでの1つの前記第2仕掛品の製造の開始から完了までが1つの線によって結ばれ、前記第1仕掛品製造ラインでの前記1つの前記第1仕掛品の製造の完了及び前記第2仕掛品製造ラインでの前記1つの前記第2仕掛品の製造の完了と前記完成ラインでの前記1つの前記第1仕掛品及び前記1つの前記第2仕掛品の結合の開始とがそれぞれ1つの線によって結ばれ、前記完成ラインでの前記1つの前記第1仕掛品及び前記1つの前記第2仕掛品の前記結合の開始から前記完成品としての1つの建設機械の製造の完了までが1つの線によって結ばれたグラフと、前記第1仕掛品製造ライン及び前記第2仕掛品製造ラインのうちの前記遅延判定部によって製造工程に遅延が生じていると判定された仕掛品製造ラインについて該仕掛品製造ラインの製造工程に遅延が生じていることを示す情報と、を表示させるデータを出力する出力部と、を有することを特徴とする建設機械の製造管理システム。
A manufacturing management system for a construction machine, which manufactures a first component of a construction machine as a first work-in-progress in a first work-in-progress manufacturing line, manufactures a second component of the construction machine as a second work-in-progress in a second work-in-progress manufacturing line, and manufactures the construction machine as a finished product by combining the first work-in-progress and the second work-in-progress in a completion line,
a first monitoring unit for monitoring a production status of the first work-in-progress product in the first work-in-progress production line;
a second monitoring unit for monitoring a production status of the second work-in-progress in the second work-in-progress production line;
a monitor that displays predetermined information to an administrator;
a control device for controlling the predetermined information to be displayed on the monitor;
The control device includes:
a delay determination unit that determines whether or not a delay has occurred in the manufacturing process of the first work-in-progress production line based on the manufacturing status of the first work-in-progress monitored by the first monitoring unit, and that determines whether or not a delay has occurred in the manufacturing process of the second work-in-progress production line based on the manufacturing status of the second work-in-progress monitored by the second monitoring unit;
The monitor is configured to display the production status of the first work-in-progress , the second work- in-progress , and the finished product in the first work-in-progress production line, the second work-in-progress production line, and the finished product on the basis of a horizontal axis representing time and a vertical axis representing one production process of the first work-in-progress production line, the second work-in-progress production line, and the finished product, the start to completion of the production of one of the first work-in-progress products in the first work-in-progress production line being connected by one line, the start to completion of the production of one of the second work-in-progress products in the second work-in-progress production line being connected by one line, and the completion of the production of one of the first work-in-progress products in the first work-in-progress production line and the completion of the production of one of the second work-in-progress products in the second work-in-progress production line being connected by one line. a graph in which a line connects each of the start of the combination of the one first work-in-process and the one second work-in-process on the completed line with a line, and a line connects from the start of the combination of the one first work-in-process and the one second work-in-process on the completed line to the completion of production of the one construction machine as the finished product with a line ; and information indicating that a delay is occurring in the production process of a work-in-process production line for which a delay is determined to be occurring in the production process by the delay determination unit among the first work-in-process production line and the second work-in-process production line.
前記制御装置は、前記第1仕掛品製造ライン及び前記第2仕掛品製造ラインの製造計画が入力される計画入力部を有しており、
前記遅延判定部は、前記計画入力部に入力される前記製造計画と前記第1仕掛品及び前記第2仕掛品の製造状況とを照合することで前記第1仕掛品製造ライン及び前記第2仕掛品製造ラインの製造工程に遅延が生じているか否かを判定し、
前記出力部は、前記計画入力部に入力される前記製造計画を示す情報を前記グラフ上に表示させ、前記遅延が生じていることを示す情報を表示させるデータを前記モニタに出力する、
ことを特徴とする、請求項1に記載の建設機械の製造管理システム。
the control device has a plan input unit to which production plans of the first work-in-progress production line and the second work-in-progress production line are input,
the delay determination unit determines whether or not a delay has occurred in a manufacturing process of the first work-in-progress production line and the second work-in-progress production line by comparing the production plan input to the plan input unit with a production status of the first work-in-progress product and the second work-in-progress product;
the output unit displays information indicating the manufacturing plan input to the plan input unit on the graph, and outputs data indicating the occurrence of the delay to the monitor.
2. A manufacturing management system for a construction machine according to claim 1.
前記出力部は、前記グラフのうち、前記遅延判定部によって遅延していると判定された仕掛品製造ラインの製造状況を示すグラフを点滅させて表示させるデータを前記モニタに出力する、
ことを特徴とする、請求項2に記載の建設機械の製造管理システム。
the output unit outputs to the monitor data for flashing a graph showing a production status of a work-in-progress production line determined to be delayed by the delay determination unit, among the graphs.
3. The construction machine production management system according to claim 2.
前記第1仕掛品及び前記第2仕掛品には、該第1仕掛品及び該第2仕掛品を特定する情報を記憶する情報記憶器が設けられており、
前記第1監視ユニット及び前記第2監視ユニットは、前記第1仕掛品製造ライン及び前記第2仕掛品製造ライン上に複数配設されており、前記情報記憶器のうち、前記第1監視ユニット及び前記第2監視ユニットを通過する情報記憶器に記憶された情報を抽出する情報読取装置である、
ことを特徴とする、請求項1に記載の建設機械の製造管理システム。
The first work-in-progress and the second work-in-progress are provided with an information storage device that stores information identifying the first work-in-progress and the second work-in-progress,
the first monitoring unit and the second monitoring unit are provided in plurality on the first work-in-progress production line and the second work-in-progress production line, and are information reading devices that extract information stored in an information storage device that passes through the first monitoring unit and the second monitoring unit among the information storage devices;
2. A manufacturing management system for a construction machine according to claim 1.
前記第1監視ユニット及び前記第2監視ユニットは、前記第1仕掛品製造ライン及び前記第2仕掛品製造ライン中の少なくともひとつの工程を撮像するよう配設された撮像装置を有し、
前記遅延判定部は、前記撮像装置によって撮像された映像に基づいて該撮像装置が撮像する工程の遅延を判定する、
ことを特徴とする、請求項1に記載の建設機械の製造管理システム。
The first monitoring unit and the second monitoring unit each have an imaging device arranged to image at least one process in the first work-in-progress production line and the second work-in-progress production line,
The delay determination unit determines a delay in a process of imaging by the imaging device based on an image captured by the imaging device.
2. A manufacturing management system for a construction machine according to claim 1.
前記第1仕掛品及び前記第2仕掛品の少なくとも一方には、該第1仕掛品及び該第2仕掛品の少なくとも一方の位置情報を発信する発信機が設けられおり、
前記第1監視ユニット及び前記第2監視ユニットの少なくとも一方は、前記発信機から発信される前記第1仕掛品及び前記第2仕掛品の少なくとも一方の位置情報を受信する受信機であり、
前記遅延判定部は、前記受信機によって受信される前記第1仕掛品及び前記第2仕掛品の少なくとも一方の位置情報に基づいて前記遅延を判定する、
ことを特徴とする、請求項1に記載の建設機械の製造管理システム。
At least one of the first work-in-progress and the second work-in-progress is provided with a transmitter that transmits position information of at least one of the first work-in-progress and the second work-in-progress,
At least one of the first monitoring unit and the second monitoring unit is a receiver that receives position information of at least one of the first work-in-progress and the second work-in-progress transmitted from the transmitter,
the delay determination unit determines the delay based on position information of at least one of the first work-in-progress and the second work-in-progress received by the receiver.
2. A manufacturing management system for a construction machine according to claim 1.
前記モニタは、携帯可能なタブレット端末に含まれてなる、
ことを特徴とする、請求項1に記載の建設機械の製造管理システム。
The monitor is included in a portable tablet terminal.
2. A manufacturing management system for a construction machine according to claim 1.
JP2021060223A 2021-03-31 2021-03-31 Construction machinery manufacturing management system Active JP7709844B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021060223A JP7709844B2 (en) 2021-03-31 2021-03-31 Construction machinery manufacturing management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021060223A JP7709844B2 (en) 2021-03-31 2021-03-31 Construction machinery manufacturing management system

Publications (2)

Publication Number Publication Date
JP2022156498A JP2022156498A (en) 2022-10-14
JP7709844B2 true JP7709844B2 (en) 2025-07-17

Family

ID=83559951

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021060223A Active JP7709844B2 (en) 2021-03-31 2021-03-31 Construction machinery manufacturing management system

Country Status (1)

Country Link
JP (1) JP7709844B2 (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006139751A (en) 2005-04-22 2006-06-01 Tpics Systems:Kk Production management apparatus, production management program, and production management method
US20070219835A1 (en) 2006-03-14 2007-09-20 Jochen Steinbach Rough-cut manufacturing operations for use in planning
JP2010009614A (en) 2009-09-14 2010-01-14 Nec Computertechno Ltd Radio tag control device
JP2012053772A (en) 2010-09-02 2012-03-15 Canon Electronics Inc Cell production equipment and cell production processing support apparatus
JP2012208900A (en) 2011-03-30 2012-10-25 Mitsubishi Heavy Ind Ltd Progress display device, progress display method, and progress display program
JP2019021014A (en) 2017-07-18 2019-02-07 株式会社日立製作所 System and method for monitoring progress/operation
WO2019087870A1 (en) 2017-10-30 2019-05-09 Necフィールディング株式会社 Work assistance device, work assistance method, and program
WO2019131773A1 (en) 2017-12-27 2019-07-04 三菱電機株式会社 Manufacturing process statistical processing system, manufacturing process statistical processing method, and program
JP2020013341A (en) 2018-07-18 2020-01-23 コニカミノルタ株式会社 Work process management system, work process management method, and work process management program
JP2020013388A (en) 2018-07-19 2020-01-23 株式会社日立産機システム Process management device and method
JP2020049634A (en) 2018-09-28 2020-04-02 富士通株式会社 Manufacturing line monitoring program, manufacturing line monitoring method and manufacturing line monitor system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07200901A (en) * 1993-12-28 1995-08-04 Misawa Homes Co Ltd Production of management system

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006139751A (en) 2005-04-22 2006-06-01 Tpics Systems:Kk Production management apparatus, production management program, and production management method
US20070219835A1 (en) 2006-03-14 2007-09-20 Jochen Steinbach Rough-cut manufacturing operations for use in planning
JP2010009614A (en) 2009-09-14 2010-01-14 Nec Computertechno Ltd Radio tag control device
JP2012053772A (en) 2010-09-02 2012-03-15 Canon Electronics Inc Cell production equipment and cell production processing support apparatus
JP2012208900A (en) 2011-03-30 2012-10-25 Mitsubishi Heavy Ind Ltd Progress display device, progress display method, and progress display program
JP2019021014A (en) 2017-07-18 2019-02-07 株式会社日立製作所 System and method for monitoring progress/operation
WO2019087870A1 (en) 2017-10-30 2019-05-09 Necフィールディング株式会社 Work assistance device, work assistance method, and program
WO2019131773A1 (en) 2017-12-27 2019-07-04 三菱電機株式会社 Manufacturing process statistical processing system, manufacturing process statistical processing method, and program
JP2020013341A (en) 2018-07-18 2020-01-23 コニカミノルタ株式会社 Work process management system, work process management method, and work process management program
JP2020013388A (en) 2018-07-19 2020-01-23 株式会社日立産機システム Process management device and method
JP2020049634A (en) 2018-09-28 2020-04-02 富士通株式会社 Manufacturing line monitoring program, manufacturing line monitoring method and manufacturing line monitor system

Also Published As

Publication number Publication date
JP2022156498A (en) 2022-10-14

Similar Documents

Publication Publication Date Title
JP6824838B2 (en) Work data management system and work data management method
JP4784752B2 (en) Image processing device
US12322183B2 (en) Information processing device for improving work process, information processing method, and recording medium
KR20190076770A (en) A augmented reality based assembly guide system
JP6902332B2 (en) Defect information acquisition system
KR101904426B1 (en) System and method for monitoring system of wayside working in railroad safety supervision
JP2012022602A (en) Operation improvement analysis system
JP7809162B2 (en) surveillance system
JP7474303B2 (en) Management System
JP6977296B2 (en) Work time measurement system and work instruction system using it
EP2363767A1 (en) Process analysis system
JP2007323199A (en) Production management device, production management method, production management program, recording medium recording the same, and production system
JP2008257700A (en) Quality improvement system
JP7139987B2 (en) Process information acquisition system, process information acquisition method, and process information acquisition program
JP2020095440A (en) Information processing device, and production instruction support method
CN112666911A (en) Collaborative Control System
JP2011134335A (en) Production line management device, production line management method, program, and computer-readable recording medium with program recorded
JP7709844B2 (en) Construction machinery manufacturing management system
JP4736689B2 (en) Production management device, production management method, production management program, recording medium recording production management program, and production system
JP2008217608A (en) Industrial machine remote monitoring system and method
CN116775750B (en) Data management method and device based on metallurgical industry
WO2019180950A1 (en) Placement position notification system
KR20050015966A (en) System of perceiving operation time and system of preparing operation order
US20210021797A1 (en) Augmented reality glasses device and display program
JP7674388B2 (en) Support Equipment and Machine Systems

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20231212

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20231212

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20231212

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240821

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240904

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20241030

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250129

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250325

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250702

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250707

R150 Certificate of patent or registration of utility model

Ref document number: 7709844

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150