JP7712976B2 - Disaster prevention receiving panel and tunnel disaster prevention system - Google Patents
[go: Go Back, main page]

JP7712976B2 - Disaster prevention receiving panel and tunnel disaster prevention system - Google Patents

Disaster prevention receiving panel and tunnel disaster prevention system

Info

Publication number
JP7712976B2
JP7712976B2 JP2023063934A JP2023063934A JP7712976B2 JP 7712976 B2 JP7712976 B2 JP 7712976B2 JP 2023063934 A JP2023063934 A JP 2023063934A JP 2023063934 A JP2023063934 A JP 2023063934A JP 7712976 B2 JP7712976 B2 JP 7712976B2
Authority
JP
Japan
Prior art keywords
spare
board
disaster prevention
partition
receiving panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2023063934A
Other languages
Japanese (ja)
Other versions
JP2023089100A (en
Inventor
泰周 杉山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hochiki Corp
Original Assignee
Hochiki Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hochiki Corp filed Critical Hochiki Corp
Priority to JP2023063934A priority Critical patent/JP7712976B2/en
Publication of JP2023089100A publication Critical patent/JP2023089100A/en
Application granted granted Critical
Publication of JP7712976B2 publication Critical patent/JP7712976B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fire Alarms (AREA)
  • Alarm Systems (AREA)

Description

本発明は、監視対象領域に設置した火災検知器等の端末機器を接続して監視対象領域の異常を監視する防災受信盤及び当該防災受信盤を備えたトンネル防災システムに関する。
The present invention relates to a disaster prevention receiving panel that is connected to terminal devices such as fire detectors installed in a monitored area to monitor for abnormalities in the monitored area, and to a tunnel disaster prevention system equipped with the disaster prevention receiving panel.

従来、監視対象領域となる自動車専用道路等のトンネルには、トンネル内で発生する火災事故から人身及び車両を守るため、非常用施設が設置されている。 Traditionally, emergency facilities have been installed in tunnels on expressways and other areas subject to monitoring to protect people and vehicles from fires that may occur within the tunnel.

このような非常用施設としては、火災の監視と通報のため火災検知器、手動通報装置、非常電話が設けられ、また火災の消火や延焼防止のために消火栓装置が設けられ、更にトンネル躯体を火災から防護するために水噴霧ヘッドから消火用水を散水させる水噴霧設備などが設置され、これらの非常用施設の端末機器を監視制御する防災受信盤を設けることで、トンネル防災システムを構築している。 Such emergency facilities include fire detectors, manual reporting devices, and emergency telephones for monitoring and reporting fires, as well as fire hydrants for extinguishing fires and preventing the spread of fires, and water spray equipment that sprays fire-extinguishing water from water spray heads to protect the tunnel structure from fires. A tunnel disaster prevention system is created by installing a disaster prevention receiving panel that monitors and controls the terminal equipment of these emergency facilities.

防災受信盤と端末機器で構成するトンネル防災システムは、R型伝送方式とP型直送方式に大別される。R型伝送方式は、伝送回線にアドレスを設定した火災検知器等の端末機器を接続し、伝送制御により端末機器単位に検知と制御を行う個別管理を可能とする。P型直送方式は、端末機器の種別に応じて所定の区画単位に分け、区画単位に引き出した信号回線に同一区画に属する複数の端末機器を接続し、信号回線単位に検知と制御を行う。 Tunnel disaster prevention systems, consisting of disaster prevention receiving panels and terminal devices, are broadly divided into R-type transmission methods and P-type direct transmission methods. The R-type transmission method connects terminal devices such as fire detectors with addresses set to the transmission line, enabling individual management with detection and control on a terminal device basis through transmission control. The P-type direct transmission method divides the terminal devices into designated partition units according to their type, connects multiple terminal devices belonging to the same partition to the signal lines drawn out for each partition, and performs detection and control on a signal line basis.

このようなトンネル防災システムは、トンネルの完成に伴いトンネル内の監視を開始して車両通行が始まると、通常、トンネル内を通行止めとすることができないため、24時間継続してトンネル内を監視し続ける。 This type of tunnel disaster prevention system begins monitoring the inside of the tunnel once it is completed and vehicle traffic begins, so it is usually not possible to close the tunnel to traffic, and so continues to monitor the inside of the tunnel 24 hours a day.

また、非常用施設における設備機器の保守点検や故障などによりトンネル内を監視できなくなった場合には、トンネル内の監視員通路に人員を立たせるなどを実施することにより監視し、非常時に備える場合もある。このため防災受信盤は、制御基板や区画基板などの重要な回路基板による主機能を二重化するなどして冗長化を図っている。 In addition, if it becomes impossible to monitor the inside of the tunnel due to maintenance inspection or malfunction of the equipment in the emergency facilities, personnel may be stationed in the monitor passages inside the tunnel to monitor and prepare for an emergency. For this reason, the disaster prevention receiving board has redundancy achieved by duplicating main functions on important circuit boards such as the control board and partition board.

また、制御基板や区画基板が故障した場合の復旧を迅速に行うことを可能とするため、トンネルが完成して運用が開始された段階で、制御基板や区画基板等の予備基板を準備して施設内に保管するようにしている。 In addition, to enable rapid recovery in the event of a control board or partition board failure, once the tunnel is completed and operations begin, spare boards such as control boards and partition boards are prepared and stored within the facility.

特開2002-246962号公報JP 2002-246962 A 特開平11-128381号公報Japanese Patent Application Publication No. 11-128381 特開2006-106833号公報JP 2006-106833 A 特開平09-330245号公報Japanese Patent Application Publication No. 09-330245

しかしながら、防災受信盤の故障に対処するために制御基板や区画基板等の予備基板を準備して保管管理するようにした場合、運用期間が長くなって防災受信盤で使用している制御基板や区画基板が経年劣化等により故障を起こすようになると、保管管理している予備基板も経年劣化している場合があり、故障した回路基板を予備基板に交換しても正常に機能しなくなる場合が想定され、予備基板の信頼性が十分に確保されない問題がある。 However, if spare boards such as control boards and partition boards are prepared and stored to deal with failures in the disaster prevention receiving panel, if the control board or partition board used in the disaster prevention receiving panel begins to malfunction due to deterioration over time after a long period of operation, the stored spare boards may also deteriorate over time. Even if the failed circuit board is replaced with a spare board, it may no longer function properly, and there is a problem that the reliability of the spare boards cannot be sufficiently ensured.

本発明は、防災受信盤の回路基板が故障した場合に交換した予備基板が確実に動作することを保証して信頼性を向上する防災受信盤及び当該防災受信盤を備えたトンネル防災システムを提供することを目的とする。
The present invention aims to provide a disaster prevention receiving panel that improves reliability by ensuring that a replacement spare board will function reliably if the circuit board of the disaster prevention receiving panel fails, and a tunnel disaster prevention system equipped with the disaster prevention receiving panel.

(防災受信盤及びトンネル防災システム)
本発明は、端末機器を接続してトンネル内で発生する異常を監視可能とする防災受信盤及び当該防災受信盤を備えたトンネル防災システムであって、
防災受信盤に設けられる所定の回路基板は、交換可能であり、
防災受信盤は、所定の回路基板と交換するために保管されている予備基板の動作を交換前に確認できる予備基板試験部を備えることを特徴とする。
(Disaster prevention receiving panel and tunnel disaster prevention system)
The present invention relates to a disaster prevention receiving panel that can be connected to a terminal device to monitor abnormalities occurring in a tunnel, and a tunnel disaster prevention system equipped with the disaster prevention receiving panel,
The circuit board provided in the disaster prevention receiving panel is replaceable,
The disaster prevention receiving panel is characterized by having a spare board testing section that can check the operation of a spare board stored to replace a specified circuit board before the board is replaced.

(予備基板の接続部)
予備基板は、予備基板試験部に対して着脱自在なコネクタを介して接続される。
(Connection part of spare board)
The spare board is connected to the spare board testing section via a detachable connector.

(予備基板の接続)
予備基板は、動作を確認するときに予備基板試験部に接続され、動作を確認しないときには予備基板試験部に接続しないことが可能である。
(Connection of spare board)
The spare board can be connected to the spare board testing section when checking the operation, and can be unconnected from the spare board testing section when not checking the operation.

(予備基板の試験)
予備基板試験部は、防災受信盤の電源部から電源供給を受けて予備基板の動作確認を行い、
防災受信盤は、予備基板試験部による予備基板の動作確認とは独立して異常の監視機能を維持させることが可能である。
(Testing spare boards)
The spare board testing section receives power from the power supply section of the disaster prevention receiving panel to check the operation of the spare board.
The disaster prevention receiving panel is capable of maintaining its abnormality monitoring function independently of the standby board operation check by the standby board testing section.

(区画基板)
所定の回路基板は、端末機器からの信号を受信する区画基板を含む。
(Division board)
A given circuit board includes a partition board that receives signals from terminal equipment.

(制御基板)
所定の回路基板は、端末機器から受信した信号に基づき所定の制御を行う制御基板を含む。
(Control board)
The predetermined circuit board includes a control board that performs predetermined control based on a signal received from the terminal device.

(基本的な効果)
本発明は、端末機器を接続してトンネル内で発生する異常を監視可能とする防災受信盤及び当該防災受信盤を備えたトンネル防災システムであって、防災受信盤に設けられる所定の回路基板は、交換可能であり、防災受信盤は、所定の回路基板と交換するために保管されている予備基板の動作を交換前に確認できる予備基板試験部を備えたため、保管管理している所定の回路基板である予備用制御基板や予備用区画基板を、例えば定期的に行われる保守点検の際に、防災受信盤の予備基板試験部に接続して動作試験を行うことで、予備用制御基板及び予備用区画基板等の回路基板が正常に動作するか否か確認することができ、もし、予備用回路基板が正常に動作しない場合には、新たに予備用回路基板を手配して保管管理することが可能となり、動作が確認された予備用回路基板が常に保管されていることで、防災受信盤の故障に迅速に対処して監視対象領域の監視機能が失われる事態を必要最小限に留めることが可能となり、防災システムの信頼性を高めることができる。
(Basic Effects)
The present invention relates to a disaster prevention receiving panel that can be connected to terminal devices to monitor abnormalities occurring inside a tunnel, and a tunnel disaster prevention system that is equipped with the disaster prevention receiving panel, in which a specified circuit board provided in the disaster prevention receiving panel is replaceable, and the disaster prevention receiving panel is equipped with a spare board test section that can check the operation of a spare board that is stored to replace the specified circuit board before the replacement. Therefore, the spare control board and spare partition board, which are the specified circuit boards that are stored and managed, can be connected to the spare board test section of the disaster prevention receiving panel during, for example, periodic maintenance and inspection to conduct an operation test, thereby checking whether the circuit boards such as the spare control board and spare partition board operate normally. If the spare circuit board does not operate normally, it is possible to arrange for a new spare circuit board to be stored and managed. By always storing a spare circuit board whose operation has been confirmed, it is possible to quickly respond to a failure of the disaster prevention receiving panel and minimize the situation in which the monitoring function of the monitored area is lost, thereby improving the reliability of the disaster prevention system.

また、予備基板試験部は防災受信盤に設けられることから、防災受信盤が備える伝送路や電源等の機能を必要に応じて利用することができる。 In addition, because the spare board testing section is installed in the disaster prevention receiving panel, the functions of the disaster prevention receiving panel, such as the transmission path and power supply, can be used as needed.

トンネル防災システムの概要を示した説明図An explanatory diagram showing the overview of the tunnel disaster prevention system 防災受信盤の基板構成を端末回線接続と共に示したブロック図Block diagram showing the circuit board configuration of the disaster prevention receiving panel along with the terminal line connections 予備用区画基板の動作を確認する予備基板試験部の実施形態を示した回路ブロック図A circuit block diagram showing an embodiment of a spare board testing unit for verifying the operation of a spare partition board. 予備用メイン区画CPU基板と予備用サブ区画CPU基板の動作を確認する予備基板試験部の実施形態を示した回路ブロック図A circuit block diagram showing an embodiment of a spare board test unit for checking the operation of a spare main partition CPU board and a spare sub partition CPU board. 予備用メイン制御CPU基板と予備用サブ制御CPU基板の動作を確認する予備基板試験部の実施形態を示した回路ブロック図A circuit block diagram showing an embodiment of a spare board test unit for verifying the operation of a spare main control CPU board and a spare sub-control CPU board.

[トンネル防災システムの概要]
図1はトンネル防災システムの概要を示した説明図であり、P型直送方式を例にとっている。図1に示すように、自動車専用道路のトンネルとして、上り線トンネル1aと下り線トンネル1bが構築され、上り線トンネル1aと下り線トンネル1bは避難連絡坑2でつながっている。
[Outline of tunnel disaster prevention system]
Figure 1 is an explanatory diagram showing the outline of a tunnel disaster prevention system, taking the P-type direct delivery method as an example. As shown in Figure 1, an up-line tunnel 1a and an out-line tunnel 1b are constructed as tunnels for a motorway, and the up-line tunnel 1a and the out-line tunnel 1b are connected by an evacuation tunnel 2.

上り線トンネル1aと下り線トンネル1bの内部には、トンネル長手方向の壁面に沿って例えば50メートル間隔で端末機器として機能する火災検知器16が設置されている。火災検知器16は左右50メートルとなる両側に監視エリアを設定し、火災による炎を検知して火災発報し、火災検知信号を出力する。 Inside the up-bound tunnel 1a and the down-bound tunnel 1b, fire detectors 16 functioning as terminal devices are installed along the walls in the longitudinal direction of the tunnels, for example at intervals of 50 meters. The fire detectors 16 set monitoring areas on both sides, 50 meters to the left and right, and when they detect flames caused by a fire, they sound a fire alarm and output a fire detection signal.

また、上り線トンネル1aと下り線トンネル1bの内部には、トンネル長手方向の監視員通路の壁面に沿って例えば50メートル間隔で消火栓装置18と自動弁装置23が設置されている。消火栓装置18には端末機器として機能する手動通報装置20と消火栓スイッチ22が設けられている。 In addition, inside the up-bound tunnel 1a and the down-bound tunnel 1b, fire hydrant devices 18 and automatic valve devices 23 are installed, for example, at intervals of 50 meters along the walls of the guard passage in the longitudinal direction of the tunnel. The fire hydrant devices 18 are equipped with manual reporting devices 20 and fire hydrant switches 22 that function as terminal devices.

消火栓装置18は消火栓扉内にノズル付きホースが収納されており、火災時には消火栓扉を開いてノズル付きホースを引き出し、消火栓弁開閉レバーを開操作すると消火用水が放水され、また、消火栓弁開閉検出スイッチがオンしてポンプ起動信号を出力して消火ポンプを起動させる。 The fire hydrant device 18 has a hose with a nozzle stored inside the hydrant door. In the event of a fire, the hydrant door is opened to pull out the hose with the nozzle, and when the fire hydrant valve opening/closing lever is opened, fire water is discharged. In addition, the fire hydrant valve opening/closing detection switch is turned on to output a pump start signal and start the fire pump.

また、消火栓装置18には消火器扉が設けられ、その中に消火器を収納している。また、消火栓装置18には消防隊が使用する給水栓が設けられ、これに合わせて消防隊員が操作するとポンプ起動信号を出力するポンプ起動スイッチが設けられている。消火栓弁開閉検出スイッチとポンプ起動スイッチは並列接続されており、これが図示の消火栓スイッチ22として機能する。 The fire hydrant device 18 is also provided with a fire extinguisher door, which houses a fire extinguisher. The fire hydrant device 18 is also provided with a water supply hydrant for use by the fire brigade, and is also provided with a pump start switch that outputs a pump start signal when operated by a fire brigade member. The fire hydrant valve open/close detection switch and the pump start switch are connected in parallel, and function as the fire hydrant switch 22 shown in the figure.

更に、消火栓装置18には通報装置扉が設けられており、通報装置扉には発信機として機能する手動通報装置20が設けられている。手動通報装置20が操作されると火災通報信号が防災受信盤10に出力され、防災受信盤10からの応答信号により応答ランプが点灯される。 Furthermore, the fire hydrant device 18 is provided with a notification device door, and the notification device door is provided with a manual notification device 20 that functions as a transmitter. When the manual notification device 20 is operated, a fire notification signal is output to the disaster prevention receiving panel 10, and a response lamp is turned on by a response signal from the disaster prevention receiving panel 10.

また、上り線トンネル1aと下り線トンネル1bの内部には、トンネル長手方向の監視員通路の壁面に沿って例えば50メートル間隔で水噴霧設備の自動弁装置23が設置されており、自動弁装置23は作動用電動弁の遠隔開制御により主弁を開駆動し、トンネル壁面の上部の長手方向に設置した複数の水噴霧ヘッドから消火用水を放水してトンネル躯体を火災から防護する。水噴霧設備の自動弁装置23には端末機器として水噴霧ヘッドからの水噴霧開始を検出する水噴霧スイッチ24が設けられている。水噴霧スイッチ24は自動弁の開作動による放水圧力を検出してオンする圧力スイッチが用いられる。 In addition, inside the up-bound tunnel 1a and the down-bound tunnel 1b, automatic valve devices 23 for the water spray equipment are installed at intervals of, for example, 50 meters along the walls of the guard passage in the longitudinal direction of the tunnel. The automatic valve devices 23 open the main valve by remotely controlling the opening of an operating motorized valve, and spray fire-extinguishing water from multiple water spray heads installed in the longitudinal direction at the top of the tunnel wall to protect the tunnel structure from fire. The automatic valve devices 23 for the water spray equipment are equipped with water spray switches 24 as terminal devices that detect the start of water spraying from the water spray heads. The water spray switches 24 use pressure switches that detect the water spray pressure caused by the opening of the automatic valves and turn on.

トンネル内に設置している火災検知器16、手動通報装置20、消火栓スイッチ22及び水噴霧スイッチ24などの端末機器を接続してトンネル内の異常を監視するため、監視センター等に防災受信盤10が設置されている。 A disaster prevention receiving panel 10 is installed in a monitoring center or the like to connect terminal devices such as fire detectors 16, manual reporting devices 20, fire hydrant switches 22, and water spray switches 24 installed in the tunnel to monitor for abnormalities inside the tunnel.

防災受信盤10からは上り線トンネル1aと下り線トンネル1b内に、P型の信号回線群11,12が引き出され、トンネル内に設置している火災検知器16、手動通報装置20、消火栓スイッチ22及び水噴霧スイッチ24が接続されている。 P-type signal lines 11, 12 are pulled out from the disaster prevention receiving panel 10 into the up-line tunnel 1a and the down-line tunnel 1b, and are connected to a fire detector 16, a manual reporting device 20, a fire hydrant switch 22, and a water spray switch 24 installed in the tunnels.

本実施形態にあっては、トンネル内を所定長さ、例えば800メートルを1区間として例えば2グループに分けており、各グループの火災検知器16に対して個別に引き出された信号回線が接続され、それ以外の手動通報装置20、消火栓スイッチ22及び水噴霧スイッチ24については、800メートルの1区間を例えば200メートルのブロック区間に分け、ブロック区間単位に引き出された信号回線に接続されている。なお、以下の説明では、トンネル長を1600メートルとして2区間に分けた場合を例にとって説明する。 In this embodiment, the tunnel is divided into two groups, each of which has a predetermined length, for example 800 meters, and the fire detectors 16 in each group are connected to individual signal lines. The remaining manual reporting devices 20, fire hydrant switches 22, and water spray switches 24 are connected to signal lines that are drawn out for each block section, with each 800-meter section being divided into block sections of, for example, 200 meters. Note that the following explanation takes the example of a tunnel that is 1,600 meters long and divided into two sections.

ここで、P型の信号回線は信号線とコモン線で構成され、火災検知器16、手動通報装置20、消火栓スイッチ22及び水噴霧スイッチ24は、それぞれの作動に基づき回線電流を流すことで、火災検知信号、火災通報信号、ポンプ起動信号、水噴霧開始信号を防災受信盤10に送るようにしている。 Here, the P-type signal line is composed of a signal line and a common line, and the fire detector 16, manual notification device 20, fire hydrant switch 22, and water spray switch 24 send fire detection signals, fire notification signals, pump start signals, and water spray start signals to the disaster prevention receiving panel 10 by passing line current based on their respective activations.

また、防災受信盤10からトンネル内に設置している火災検知器16、手動通報装置20、消火栓スイッチ22及び水噴霧スイッチ24などの端末機器に対しては電源ラインが引き出され、例えばDC48Vが供給されている。 In addition, power lines are drawn from the disaster prevention receiving panel 10 to terminal devices installed inside the tunnel, such as a fire detector 16, a manual reporting device 20, a fire hydrant switch 22, and a water spray switch 24, and DC 48V, for example, is supplied.

トンネルの非常用施設としては、これ以外に、消火ポンプ設備25、換気設備28、警報表示板設備30、ラジオ再放送設備32、TV監視設備34及び照明設備36、IG子局設備38等が設けられており、IG子局設備38がデータ伝送回線で接続される点を除き、それ以外の設備はP型の信号回線群14により防災受信盤10に個別に接続されている。 Other emergency facilities for the tunnel include a fire pump system 25, ventilation system 28, warning display board system 30, radio rebroadcast system 32, TV monitoring system 34, lighting system 36, and IG satellite station system 38. Except for the IG satellite station system 38, which is connected by a data transmission line, all other equipment is individually connected to the disaster prevention receiving panel 10 by a P-type signal line group 14.

ここで、IG子局設備38は、防災受信盤10と遠方管理設備42を、ネットワーク40を経由して結ぶ通信設備である。換気設備28は、トンネル内の天井側に設置しているジェットファンの運転による高い吹き出し風速によってトンネル内の空気にエネルギーを与えて、トンネル長手方向に換気の流れを起こす設備である。 Here, the IG child station equipment 38 is a communication equipment that connects the disaster prevention receiving panel 10 and the remote management equipment 42 via the network 40. The ventilation equipment 28 is an equipment that gives energy to the air in the tunnel by operating a jet fan installed on the ceiling side of the tunnel to blow out air at a high speed, thereby creating a ventilation flow in the longitudinal direction of the tunnel.

また、警報表示板設備30は、トンネル内の利用者に対して、トンネル内の火災発生や水噴霧開始等を電光表示板に表示して知らせる設備である。ラジオ再放送設備32は、トンネル内で運転者等が道路管理者からの情報を受信できるようにするための設備である。TV監視設備34は、火災の規模や位置を確認したり、水噴霧設備の作動、避難誘導を行う場合のトンネル内の状況を把握するための設備である。照明設備36はトンネル内の照明機器を駆動して管理する設備である。 The warning display board equipment 30 is equipment that notifies users inside the tunnel of the outbreak of a fire inside the tunnel, the start of water spraying, etc. by displaying it on an electronic display board. The radio rebroadcast equipment 32 is equipment that enables drivers and others inside the tunnel to receive information from the road administrator. The TV monitoring equipment 34 is equipment that is used to confirm the scale and location of a fire, activate the water spray equipment, and grasp the situation inside the tunnel when providing evacuation guidance. The lighting equipment 36 is equipment that drives and manages the lighting equipment inside the tunnel.

[防災受信盤の基板構成]
図2は防災受信盤の基板構成を端末回線接続と共に示したブロック図である。図2に示すように、防災受信盤10には、制御ラック46と区画ラック52が設けられている。制御ラック46には主制御基板として機能する二重化されたメイン制御CPU基板48とサブ制御CPU基板50が設けられている。
[Disaster prevention receiving panel board configuration]
Fig. 2 is a block diagram showing the board configuration of the disaster prevention receiving panel together with the terminal line connection. As shown in Fig. 2, the disaster prevention receiving panel 10 is provided with a control rack 46 and a partition rack 52. The control rack 46 is provided with a main control CPU board 48 and a sub-control CPU board 50 which are duplicated and function as the main control board.

メイン制御CPU基板48とサブ制御CPU基板50は二重化された主制御部として機能し、火災検知器16からの火災検知信号又は手動通報装置20からの火災通報信号の受信を判別した場合は所定の火災警報制御を行い、消火栓スイッチ22からのポンプ起動信号の受信を判別した場合は消火ポンプ設備25の起動制御を行い、更に、水噴霧スイッチ24からの水噴霧開始信号の受信を判別した場合は警報表示板設備30に水噴霧開始に伴うトンネル侵入禁止の警告表示を電光表示板に表示する制御等を行わせる。 The main control CPU board 48 and the sub-control CPU board 50 function as a duplicated main control unit, and when it determines that a fire detection signal from the fire detector 16 or a fire notification signal from the manual notification device 20 has been received, it performs a specified fire alarm control, when it determines that a pump start signal has been received from the fire hydrant switch 22, it performs start-up control of the fire pump equipment 25, and further when it determines that a water spray start signal has been received from the water spray switch 24, it controls the alarm display board equipment 30 to display a warning message on the electronic display board that warns against entering the tunnel when water spray starts.

区画ラック52には区画制御基板として機能する二重化されたメイン区画CPU基板54とサブ区画CPU基板56が設けられている。また、区画ラック52には、上り線トンネル1aの800メートルの2区間の端末機器に対応して区画基板60-1,60-2が設けられ、また、下り線トンネル1bの800メートルの2区間の端末機器に対応して区画基板60-3,60-4が設けられ、区画基板60-1,60-2には上り線トンネル1aに設置された端末機器が信号回線群11により接続され、区画基板60-3,60-4には下り線トンネル1bに設置された端末機器が信号回線群12により接続されている。 The partition rack 52 is provided with a duplicated main partition CPU board 54 and a sub partition CPU board 56 that function as partition control boards. The partition rack 52 is also provided with partition boards 60-1 and 60-2 corresponding to the terminal equipment of the two 800-meter sections of the up-line tunnel 1a, and partition boards 60-3 and 60-4 corresponding to the terminal equipment of the two 800-meter sections of the down-line tunnel 1b. The terminal equipment installed in the up-line tunnel 1a is connected to the partition boards 60-1 and 60-2 by a signal line group 11, and the terminal equipment installed in the down-line tunnel 1b is connected to the partition boards 60-3 and 60-4 by a signal line group 12.

なお、区画ラック52には図1に示した外部の消火ポンプ設備25、換気設備28、警報表示板設備30、ラジオ再放送設備32、TV監視設備34及び照明設備36が接続されるP型出力基板が設けられているが、図示を省略している。 The partition rack 52 is provided with P-type output boards to which the external fire pump equipment 25, ventilation equipment 28, alarm display board equipment 30, radio rebroadcast equipment 32, TV monitoring equipment 34, and lighting equipment 36 shown in FIG. 1 are connected, but are not shown in the figure.

区画基板60-1からは上り線トンネル1aの0~800メートル区間に設置されたグループG1の火災検知器16、手動通報装置20、消火栓スイッチ22及び水噴霧スイッチ24に対しP型の信号回線群80-1,82-1,84-1,86-1が引き出されており、火災検知器16が回線単位に接続され、手動通報装置20、消火栓スイッチ22及び水噴霧スイッチ24がブロック単位に接続されている。 P-type signal circuits 80-1, 82-1, 84-1, 86-1 are drawn from the partition board 60-1 to the fire detectors 16, manual reporting devices 20, fire hydrant switches 22, and water spray switches 24 of group G1 installed in the 0-800 meter section of the up-bound tunnel 1a. The fire detectors 16 are connected on a circuit-by-circuit basis, and the manual reporting devices 20, fire hydrant switches 22, and water spray switches 24 are connected on a block-by-block basis.

区画基板60-2からは上り線トンネル1aの800~1600メートル区間に設置されたグループG2の火災検知器16、手動通報装置20、消火栓スイッチ22及び水噴霧スイッチ24に対しP型の信号回線群80-2,82-2,84-2,86-2が引き出されており、火災検知器16が回線単位に接続され、手動通報装置20、消火栓スイッチ22及び水噴霧スイッチ24がブロック単位に接続されている。 P-type signal circuits 80-2, 82-2, 84-2, 86-2 are drawn from the partition board 60-2 to the fire detectors 16, manual reporting devices 20, fire hydrant switches 22, and water spray switches 24 of group G2 installed in the 800-1600 meter section of the up-bound tunnel 1a. The fire detectors 16 are connected on a circuit-by-circuit basis, and the manual reporting devices 20, fire hydrant switches 22, and water spray switches 24 are connected on a block-by-block basis.

ここで、火災検知器16は800メートルの1区間で16台、それ以外の端末機器は800メートルを200メートルの4ブロックにわけていることから、信号回線群80-1,80-2は各々16回線、信号回線群82-1~86-2は各々4回線となり、信号回線群11は56回線を束ねている。 Here, there are 16 fire detectors 16 in one 800-meter section, and the other terminal equipment is divided into four 200-meter blocks over the 800 meters, so signal line groups 80-1 and 80-2 each have 16 lines, signal line groups 82-1 to 86-2 each have 4 lines, and signal line group 11 bundles 56 lines.

なお、区画ラック52には、火災検知器16に対して渡り配線となる試験信号回線により試験信号を送る検知器試験基板が設けられるが、図示を省略している。 In addition, the partition rack 52 is provided with a detector test board that sends a test signal to the fire detector 16 via a test signal line that serves as a jumper wiring, but this is not shown in the figure.

区画基板60-1,60-2には端末機器からの信号回線に対応して回線受信部が設けられ、回線受信部により端末機器からの回線信号を受信すると回線受信検出信号を伝送信号線群92の対応する伝送信号線を介してメイン区画CPU基板54とサブ区画CPU基板56に出力する。 The partition boards 60-1 and 60-2 are provided with line receiving units corresponding to the signal lines from the terminal equipment, and when the line receiving units receive a line signal from the terminal equipment, they output a line reception detection signal to the main partition CPU board 54 and the sub-partition CPU board 56 via the corresponding transmission signal line of the transmission signal line group 92.

区画基板60-3,60-4は下り線トンネル1bに対応して設けられ、上り線トンネル1aに対応した区画基板60-1,60-2と基本的に同じになる。 Partition boards 60-3 and 60-4 are provided to correspond to down-line tunnel 1b, and are essentially the same as partition boards 60-1 and 60-2 that correspond to up-line tunnel 1a.

ここで、メイン区画CPU基板54及びサブ区画CPU基板56及び区画ラック60-1~60-4を接続する伝送信号線群には、各基板に電源を供給する電源線が含まれている。 Here, the group of transmission signal lines connecting the main partition CPU board 54, the sub partition CPU board 56, and the partition racks 60-1 to 60-4 includes power lines that supply power to each board.

メイン区画CPU基板54とサブ区画CPU基板56は、二重化されたRS-485などのシリアル伝送路76,78を介して二重化されたメイン制御CPU基板48とサブ制御CPU基板50に接続されている。 The main partition CPU board 54 and the sub-partition CPU board 56 are connected to the duplicated main control CPU board 48 and the sub-control CPU board 50 via duplicated serial transmission paths 76, 78 such as RS-485.

メイン区画CPU基板54とサブ区画CPU基板56は二重化された区画制御部として機能し、トンネル内に設置した端末機器から区画基板60-1,60-2を介して回線受信検出信号を受信した場合、受信した信号回線に接続した端末機器の種別と回線番号を含む回線受信情報信号をメイン制御CPU基板48とサブ制御CPU基板50により二重化された主制御部に送って所定の制御を行わせる。 The main partition CPU board 54 and the sub-partition CPU board 56 function as a duplicated partition control unit, and when a line reception detection signal is received from a terminal device installed inside the tunnel via the partition boards 60-1 and 60-2, a line reception information signal including the type of terminal device connected to the received signal line and the line number is sent to the main control unit duplicated by the main control CPU board 48 and the sub-control CPU board 50 to perform the specified control.

また、防災受信盤10には操作表示CPU基板64が設けられ、タッチパネルや各種の操作スイッチを備えた操作部66及びスピーカを備えた音響部68が接続されると共に、表示制御基板70を介して液晶ディスプレイや各種表示灯を備えた表示部72が接続される。更に、防災受信盤10にはシリアルCPU基板74が設けられ、図1に示したIG子局設備38が接続される。 The disaster prevention receiving panel 10 is also provided with an operation display CPU board 64, to which an operation section 66 equipped with a touch panel and various operation switches and an audio section 68 equipped with a speaker are connected, and a display section 72 equipped with a liquid crystal display and various indicator lights is connected via a display control board 70. The disaster prevention receiving panel 10 is also provided with a serial CPU board 74, to which the IG slave station equipment 38 shown in FIG. 1 is connected.

更に、防災受信盤10には電源ラック75が設けられている。電源ラック75は非常電源AC100Vによる交流電力を入力して系統毎に異なる所定電圧の直流電力に変換し、C5Vの盤内処理系統、DC12Vの盤内表示系統、DC24Vの盤外移報系統、DC48Vのトンネル内監視系の電源ラインに供給している。なお、防災受信盤には図示しない電源監視ラックが設けられ、電源切替回路、電圧監視回路、蓄電池回路等が設けられ、電源ラック75に設けられた電源部の監視制御やトンネル内の消火栓装置に設けられた赤色表示灯や応答ランプの表示制御等を行うようにしている。 The disaster prevention receiving panel 10 is further provided with a power supply rack 75. The power supply rack 75 receives AC power from an emergency power supply of AC 100V, converts it into DC power of a different predetermined voltage for each system, and supplies it to the power lines of the C5V in-panel processing system, the DC12V in-panel display system, the DC24V external reporting system, and the DC48V tunnel monitoring system. The disaster prevention receiving panel is also provided with a power supply monitoring rack (not shown), which is equipped with a power supply switching circuit, a voltage monitoring circuit, a storage battery circuit, etc., and is used to monitor and control the power supply unit provided in the power supply rack 75 and to control the display of the red indicator lamp and response lamp provided on the fire hydrant device in the tunnel.

[予備用回路基板の保管管理]
図2に示したトンネル防災システムが設置されたトンネルの工事が完了して防災受信盤10によるトンネル内の監視が開始される場合には、防災受信盤10に設けている制御基板として機能するメイン制御CPU基板48、サブ制御CPU基板50、メイン区画CPU基板54及びサブ区画CPU基板56に対応した予備基板として、予備用メイン制御CPU基板48a、予備用サブ制御CPU基板50a、予備用メイン区画CPU基板54a及び予備用サブ区画CPU基板56aを準備して施設内に保管して管理している。なお、予備用メイン制御CPU基板48a、予備用サブ制御CPU基板50aは図示を省略している。
[Storage and management of spare circuit boards]
2 is installed, and monitoring of the inside of the tunnel by the disaster prevention receiving panel 10 is started, a spare main control CPU board 48a, a spare sub-control CPU board 50a, a spare main partition CPU board 54a, and a spare sub-partition CPU board 56a are prepared as spare boards corresponding to the main control CPU board 48, the sub-control CPU board 50, the main partition CPU board 54, and the sub-partition CPU board 56 which function as control boards provided in the disaster prevention receiving panel 10, and are stored and managed within the facility. Note that the spare main control CPU board 48a and the spare sub-control CPU board 50a are omitted from the illustration.

また、防災受信盤10に設けている区画基板60-1~60-4に対応した予備基板として1又は複数枚の予備用区画基板60aを準備して施設内に保管して管理している。 In addition, one or more spare partition boards 60a are prepared as spare boards corresponding to the partition boards 60-1 to 60-4 installed in the disaster prevention receiving panel 10, and are stored and managed within the facility.

このように保管管理されている予備用メイン区画CPU基板54a、予備用サブ区画CPU基板56a及び予備用区画基板60aの動作を確認するため予備基板試験部100が区画ラック52に設けられ、また、保管管理されている予備用メイン制御CPU基板48a、予備用サブ制御CPU基板50aの動作を確認するため、制御ラック46に予備基板試験部102が設けられている。 A spare board testing section 100 is provided in the partition rack 52 to check the operation of the spare main partition CPU board 54a, spare sub-partition CPU board 56a, and spare partition board 60a, which are stored and managed in this manner, and a spare board testing section 102 is provided in the control rack 46 to check the operation of the spare main control CPU board 48a and spare sub-control CPU board 50a, which are also stored and managed.

区画ラック52に設けられた予備基板試験部100には、伝送コネクタ部104,114-1,114-2が設けられ、予備用区画基板60aの動作試験の際には、予備用区画基板60aに対し想像線で示すように、試験操作部106が回線コネクタ部105により接続されるが、その詳細は後の説明で明らかにする。 The spare board testing section 100 provided in the partition rack 52 is provided with transmission connector sections 104, 114-1, and 114-2, and when testing the operation of the spare partition board 60a, the test operation section 106 is connected to the spare partition board 60a by the line connector section 105, as shown by the imaginary line; details of this will be explained later.

また、メイン制御CPU基板48、サブ制御CPU基板50、メイン区画CPU基板54、サブ区画CPU基板56はCPU基板コネクタ88に対し着脱自在に設けられ、区画基板60-1~60-4は区画基板コネクタ90に対し着脱自在に設けられ、それぞれ予備用基板との交換が簡単且つ容易に行えるようにしている。 In addition, the main control CPU board 48, sub-control CPU board 50, main partition CPU board 54, and sub-partition CPU board 56 are detachably attached to the CPU board connector 88, and the partition boards 60-1 to 60-4 are detachably attached to the partition board connector 90, allowing each to be easily and simply replaced with a spare board.

[予備用区画基板の運用管理]
(予備基板試験部の構成)
図3は予備用区画基板の動作を確認する予備基板試験部の実施形態を示した回路ブロック図である。
[Operational management of spare partition boards]
(Configuration of spare board testing section)
FIG. 3 is a circuit block diagram showing an embodiment of a spare board testing section for checking the operation of a spare partition board.

図3に示すように、図2の区画ラック52に設けられた予備基板試験部100には、伝送信号線群92に対し予備用区画基板60aを着脱自在に接続するための伝送コネクタ部104が設けられ、また、予備用区画基板60aの回線接続側に回線コネクタ部105により着脱自在に試験操作部106が設けられる。 As shown in FIG. 3, the spare board testing section 100 provided in the partition rack 52 in FIG. 2 is provided with a transmission connector section 104 for detachably connecting the spare partition board 60a to the transmission signal line group 92, and a test operation section 106 is provided detachably on the line connection side of the spare partition board 60a by a line connector section 105.

予備用区画基板60aには、トンネル側に設置された端末機器に対応して複数の回線受信部110が設けられている。予備用区画基板60aの回線接続側に回線コネクタ部105により接続される試験操作部106には、予備用区画基板60aの回線受信部110に対応して試験スイッチ108が設けられており、予備用区画基板60aに回線コネクタ部105により接続すると、試験スイッチ108は回線受信部110に入力接続される。 The spare partition board 60a is provided with multiple line receiving units 110 corresponding to the terminal equipment installed on the tunnel side. The test operation unit 106, which is connected to the line connection side of the spare partition board 60a by the line connector unit 105, is provided with a test switch 108 corresponding to the line receiving unit 110 of the spare partition board 60a, and when connected to the spare partition board 60a by the line connector unit 105, the test switch 108 is input-connected to the line receiving unit 110.

伝送コネクタ部104には、伝送信号線群92に含まれる電源線93が分岐接続されており、伝送コネクタ104に予備用区画基板60aを嵌め込むと、伝送コネクタ部104を介して電源線93から予備用区画基板60aに電源が供給されて動作状態となる。 The power supply line 93 included in the transmission signal line group 92 is branched and connected to the transmission connector section 104. When the spare partition board 60a is fitted into the transmission connector 104, power is supplied from the power supply line 93 via the transmission connector section 104 to the spare partition board 60a, causing it to enter an operating state.

なお、図2に示した伝送コネクタ部104は、図3に想像線で示すように、回線受信部110の出力を伝送信号線群92に接続しているが、予備用区画基板60aを接続する伝送コネクタ部104には回線受信部110の出力を伝送信号線群92に接続する想像線で示すラインは設けられていない。 Note that the transmission connector section 104 shown in FIG. 2 connects the output of the line receiving section 110 to the transmission signal line group 92 as shown by the imaginary lines in FIG. 3, but the transmission connector section 104 that connects the spare partition board 60a does not have the line shown by the imaginary line that connects the output of the line receiving section 110 to the transmission signal line group 92.

また、伝送コネクタ部104には試験表示部112が設けられており、予備用区画基板60aが接続されると、回線受信部110の出力が試験表示部112に入力接続される。試験表示部112は複数の回線受信部110の何れから回線受信検出信号が出力されるとLED等の試験表示灯を点灯又は点滅させる。 The transmission connector section 104 is also provided with a test display section 112, and when the spare partition board 60a is connected, the output of the line receiving section 110 is input and connected to the test display section 112. When a line reception detection signal is output from any of the multiple line receiving sections 110, the test display section 112 lights or blinks a test indicator light such as an LED.

(予備用区画基板の動作試験)
トンネル防災システムの定期点検の際には、図2に示したように、点検員は、防災受信盤10の区画ラック52に設けられている図3に示した予備基板試験部100の伝送コネクタ部104に、動作確認を行うため、保管していた予備用区画基板60aの出力側接続し、また予備用区画基板60aの回線接続側に回線コネクタ部105により試験操作部106を接続する。
(Operation test of spare partition board)
During regular inspection of the tunnel disaster prevention system, as shown in Figure 2, an inspector connects the output side of a stored spare partition board 60a to the transmission connector part 104 of the spare board testing part 100 shown in Figure 3, which is provided on the partition rack 52 of the disaster prevention receiving panel 10, in order to check its operation, and also connects a test operation part 106 to the line connection side of the spare partition board 60a via a line connector part 105.

回線コネクタ部105に予備用区画基板60aを接続すると電源線93からの電源供給を受けて予備用区画基板60aが動作状態となる。この状態で試験操作部106に設けている試験スイッチ108を順番にオン操作する。 When the spare partition board 60a is connected to the line connector section 105, the spare partition board 60a receives power from the power line 93 and enters an operating state. In this state, the test switches 108 provided in the test operation section 106 are turned on in sequence.

試験スイッチ108をオン操作すると、トンネル内に設置している端末機器が回線信号を出力したと同じ状態となり、擬似的な回線信号が信号線接続された予備用区画基板60aの回線受信部110に出力され、回線受信部110が正常に動作すると回線受信検出信号が出力され、伝送コネクタ部104に設けた試験表示部112が試験表示灯を例えば点灯し、点検員は、予備用区画基板60aが正常に動作したことを確認できる。 When the test switch 108 is turned on, the terminal device installed in the tunnel is put into the same state as outputting a line signal, and a pseudo line signal is output to the line receiving section 110 of the spare partition board 60a connected by the signal line. If the line receiving section 110 operates normally, a line reception detection signal is output, and the test display section 112 provided on the transmission connector section 104 turns on a test indicator light, for example, allowing the inspector to confirm that the spare partition board 60a is operating normally.

予備用区画基板60aの動作試験は、試験操作部106に設けられた全ての試験スイッチ108をオン操作し、試験表示部112により試験表示灯の点灯が全ての試験スイッチ108のオン操作で行われた場合に、予備用区画基板60aが正常に動作することが確認できる。 The operation test of the spare partition board 60a is performed by turning on all test switches 108 provided in the test operation unit 106, and when the test indicator lights are lit by the test display unit 112 when all test switches 108 are turned on, it can be confirmed that the spare partition board 60a is operating normally.

これに対し試験スイッチ108をオン操作しても試験表示部112により表示灯が点灯しなかった場合には、予備用区画基板60aが故障等により動作不良を起こしていることが分かり、動作不良を起こしている予備用区画基板60aは保管対象から外し、新たな予備用区画基板60aを発注して納品させるといった対応が可能となる。 On the other hand, if the indicator light by the test display unit 112 does not light up even when the test switch 108 is turned on, it is determined that the spare partition board 60a is malfunctioning due to a breakdown or the like, and the malfunctioning spare partition board 60a can be removed from storage and a new spare partition board 60a can be ordered and delivered.

このような予備基板試験部100による予備用区画基板60aの動作を確認する試験にあっては、防災受信盤10から電源供給は受けるが、それ以下の防災受信盤の回路部との連携は行われておらず、防災受信盤10によるトンネル内の監視機能に影響を及ぼすことなく、防災監視盤10のトンネル内の監視機能から独立して予備用区画基板60aの動作確認を行うことができる。 When the spare board testing section 100 tests to check the operation of the spare partition board 60a, it receives power from the disaster prevention receiving panel 10, but is not connected to the circuit section of the disaster prevention receiving panel below that, so that the operation of the spare partition board 60a can be checked independently of the tunnel monitoring function of the disaster prevention monitoring panel 10 without affecting the tunnel monitoring function of the disaster prevention receiving panel 10.

[予備用区画CPU基板の運用管理]
(予備基板試験部の構成)
図4は予備用メイン区画CPU基板と予備用サブ区画CPU基板の動作を確認する予備基板試験部の実施形態を示した回路ブロック図である。
[Operational management of spare partition CPU board]
(Configuration of spare board testing section)
FIG. 4 is a circuit block diagram showing an embodiment of a spare board testing section for checking the operation of a spare main-partition CPU board and a spare sub-partition CPU board.

図4に示すように、図2の区画ラック52に設けられた予備基板試験部100には、シリアル伝送路76,78及び伝送信号線群92に対し予備用メイン区画CPU基板54aを着脱自在に接続するための伝送コネクタ部114-1(第1の伝送コネクタ部)と、予備用サブ区画CPU基板56aを着脱自在に接続するための伝送コネクタ部114-2(第2の伝送コネクタ部)が設けられる。 As shown in FIG. 4, the spare board testing section 100 provided in the partition rack 52 in FIG. 2 is provided with a transmission connector section 114-1 (first transmission connector section) for detachably connecting the spare main partition CPU board 54a to the serial transmission paths 76, 78 and the transmission signal line group 92, and a transmission connector section 114-2 (second transmission connector section) for detachably connecting the spare sub partition CPU board 56a.

予備用メイン区画CPU基板54a及び予備用サブ区画CPU基板56aには、CPU120、メモリ部122、2回線分のシリアル伝送部124及びI/Oポート部126が設けられている。 The spare main partition CPU board 54a and the spare sub partition CPU board 56a are provided with a CPU 120, a memory section 122, two serial transmission sections 124, and an I/O port section 126.

伝送コネクタ部114-1には、二重化されたシリアル伝送路76,78が分岐接続され、これにより予備用メイン区画CPU基板54aのシリアル伝送部124のシリアル伝送路76,78へ接続させる。また、伝送コネクタ部114-1は、伝送信号線群92の中の各伝送信号線をI/Oポート部126の各ポートに接続させると共に、伝送信号線群92の中の電源線93を分岐し、予備用メイン区画CPU基板54aに対する電源供給を行わせる。 The duplicated serial transmission paths 76, 78 are branched and connected to the transmission connector unit 114-1, thereby connecting to the serial transmission paths 76, 78 of the serial transmission unit 124 of the spare main partition CPU board 54a. The transmission connector unit 114-1 also connects each transmission signal line in the transmission signal line group 92 to each port of the I/O port unit 126, and branches the power line 93 in the transmission signal line group 92 to supply power to the spare main partition CPU board 54a.

また、伝送コネクタ部114-1には試験スイッチ116-1とLEDを用いた試験表示灯118-1が設けられ、試験スイッチ116-1は予備用メイン区画CPU基板54aに設けられたI/Oポート部126の中の入力ポートに接続され、試験表示灯118-1は予備用メイン区画CPU基板54aに設けられたI/Oポート部126の出力ポートに接続される。 The transmission connector section 114-1 is also provided with a test switch 116-1 and a test indicator light 118-1 using an LED. The test switch 116-1 is connected to an input port in the I/O port section 126 provided on the spare main partition CPU board 54a, and the test indicator light 118-1 is connected to an output port of the I/O port section 126 provided on the spare main partition CPU board 54a.

予備用サブ区画CPU基板56aの動作試験に用いられ伝送コネクタ部114-2も伝送コネクタ部114-1と同様であり、電源線93を分岐接続し、試験スイッチ116-2とLEDを用いた試験表示灯118-2が設けられ、試験スイッチ116-2は予備用サブ区画CPU基板56aに設けられたI/Oボート部126の中の入力ポートに接続され、試験表示灯118-2は予備用サブ区画CPU基板56aに設けられたI/Oポート部126の出力ポートに接続される。 The transmission connector section 114-2 used for the operation test of the spare sub-partition CPU board 56a is similar to the transmission connector section 114-1, and is provided with a branch connection of the power line 93, a test switch 116-2, and a test indicator light 118-2 using an LED, the test switch 116-2 is connected to an input port in the I/O port section 126 provided on the spare sub-partition CPU board 56a, and the test indicator light 118-2 is connected to an output port of the I/O port section 126 provided on the spare sub-partition CPU board 56a.

予備用メイン区画CPU基板54aは、CPU120により実行される区画制御プログラムによる区画制御機能に加え、試験スイッチ116-1のオン操作による試験指示信号の入力を検出した場合に、シリアル伝送部124に指示して予備用サブ区画CPU基板56aに試験伝送信号を送信し、予備用サブ区画CPU基板56aから試験伝送信号を受信した場合に、シリアル伝送部124に指示して試験伝送確認信号を応答送信させ、更に、予備用サブ区画CPU基板56aから試験伝送確認信号を受信した場合に、試験表示灯118-1を点灯又は点滅させる試験伝送制御機能が設けられている。 In addition to the partition control function by the partition control program executed by the CPU 120, the spare main partition CPU board 54a is provided with a test transmission control function that instructs the serial transmission unit 124 to send a test transmission signal to the spare sub-partition CPU board 56a when it detects the input of a test instruction signal by turning on the test switch 116-1, instructs the serial transmission unit 124 to respond by sending a test transmission confirmation signal when it receives a test transmission signal from the spare sub-partition CPU board 56a, and turns on or blinks the test indicator light 118-1 when it receives a test transmission confirmation signal from the spare sub-partition CPU board 56a.

この点は、予備用サブ区画CPU基板56aについても同様であり、CPU120のプログラム実行による区画制御機能に加え、試験スイッチ116-2のオン操作による試験指示信号の入力を検出した場合に、シリアル伝送部124に指示して予備用メイン区画CPU基板54aに試験伝送信号を送信し、予備用メイン区画CPU基板54aから試験伝送信号を受信した場合に、シリアル伝送部124に指示して試験伝送確認信号を応答送信させ、更に、予備用メイン区画CPU基板54aから試験伝送確認信号を受信した場合に、試験表示灯118-2を点灯又は点滅させる試験伝送制御機能が設けられている。 The same is true for the spare sub-partition CPU board 56a, which, in addition to the partition control function by the CPU 120 executing the program, is provided with a test transmission control function that, when it detects the input of a test instruction signal by turning on the test switch 116-2, instructs the serial transmission unit 124 to send a test transmission signal to the spare main partition CPU board 54a, and when it receives a test transmission signal from the spare main partition CPU board 54a, instructs the serial transmission unit 124 to respond by sending a test transmission confirmation signal, and further, when it receives a test transmission confirmation signal from the spare main partition CPU board 54a, turns on or blinks the test indicator light 118-2.

更に、試験表示灯118-1,118-2は、試験伝送信号の送信時にも点灯又は点滅され、送信動作が正常に行われることが分かるようしている。 In addition, the test indicator lights 118-1 and 118-2 are lit or flashing when a test transmission signal is being sent, allowing the user to know that the transmission operation is normal.

(予備用区画CPU基板の動作試験)
トンネル防災システムの定期点検の際には、図2に示したように、点検員は、防災受信盤10の区画ラック52に設けられている図4に示した予備基板試験部100の伝送コネクタ部114-1に予備用メイン区画CPU基板54aを接続し、また、伝送コネクタ部114-2に予備用サブ区画CPU基板56aを接続する。
(Operation test of spare partition CPU board)
During regular inspection of the tunnel disaster prevention system, as shown in Figure 2, an inspector connects the spare main partition CPU board 54a to the transmission connector part 114-1 of the spare board testing part 100 shown in Figure 4, which is provided on the partition rack 52 of the disaster prevention receiving panel 10, and also connects the spare sub-partition CPU board 56a to the transmission connector part 114-2.

この状態で、予備用メイン区画CPU基板54aの伝送コネクタ部114-1に設けている試験スイッチ116-1をオン操作すると、予備用メイン区画CPU基板54aのCPU120による試験伝送制御機能により予備用サブ区画CPU基板56aに試験伝送信号が送信され、正常に送信されると試験表示灯118-1が例えば点滅し、続いて、予備用サブ区画CPU基板56aが正常に動作すれば試験伝送確認信号が受信されることから、伝送コネクタ部114-1の試験表示灯118-1が例えば点灯する。 In this state, when the test switch 116-1 provided on the transmission connector section 114-1 of the spare main partition CPU board 54a is turned on, a test transmission signal is sent to the spare sub-partition CPU board 56a by the test transmission control function of the CPU 120 of the spare main partition CPU board 54a, and if the transmission is successful, the test indicator light 118-1, for example, flashes, and then, if the spare sub-partition CPU board 56a operates normally, a test transmission confirmation signal is received, and the test indicator light 118-1 of the transmission connector section 114-1, for example, lights up.

次に、予備用サブ区画CPU基板56aの伝送コネクタ部114-2に設けている試験スイッチ116-2をオン操作すると、予備用サブ区画CPU基板56aのCPU120による試験伝送制御機能により予備用メイン区画CPU基板54aに試験伝送信号が送信され、正常に送信されると試験表示灯118-1が例えば点滅し、続いて、予備用メイン区画CPU基板54aが正常に動作すれば試験伝送確認信号が受信されることから、伝送コネクタ部114-2の試験表示灯118-2が例えば点灯する。 Next, when the test switch 116-2 provided on the transmission connector section 114-2 of the spare sub-partition CPU board 56a is turned on, a test transmission signal is sent to the spare main partition CPU board 54a by the test transmission control function of the CPU 120 of the spare sub-partition CPU board 56a, and if the transmission is successful, the test indicator light 118-1, for example, flashes, and then, if the spare main partition CPU board 54a operates normally, a test transmission confirmation signal is received, and the test indicator light 118-2 of the transmission connector section 114-2, for example, lights up.

このような試験スイッチ116-1,116-2の操作による試験指示で、予備用メイン区画CPU基板54aと予備用サブ区画CPU基板56aとの間で正常に双方伝送が行われた場合、予備用メイン区画CPU基板54aと予備用サブ区画CPU基板56aは正常に動作することが確認できる。 When a test command issued by operating test switches 116-1 and 116-2 normally transmits data between the spare main partition CPU board 54a and the spare sub-partition CPU board 56a, it can be confirmed that the spare main partition CPU board 54a and the spare sub-partition CPU board 56a are operating normally.

これに対し試験スイッチ116-1,116-2の操作により試験指示を行っても試験表示灯118-1,118-2による送信表示や応答確認表示が行われなかった場合には、予備用メイン区画CPU基板54a及び又は予備用サブ区画CPU基板56aが故障等により動作不良を起こしていることが分かり、動作不良を起こしている予備用区画CPU基板は保管対象から外し、新たな予備用区画CPU基板を発注して納品させるといった対応が可能となる。 In contrast, if a test command is issued by operating the test switches 116-1, 116-2 but no transmission or response confirmation is indicated by the test indicator lights 118-1, 118-2, it is clear that the spare main partition CPU board 54a and/or the spare sub-partition CPU board 56a is malfunctioning due to a failure or other reason, and the malfunctioning spare partition CPU board can be removed from storage and a new spare partition CPU board can be ordered and delivered.

また、予備用メイン区画CPU基板54aで送信表示が行われ、応答確認表示が行われない場合は、予備用サブ区画CPU基板56aの動作不良と判断でき、一方、予備用サブ区画CPU基板56aで送信表示が行われ、応答確認表示が行われない場合は、予備用メイン区画CPU基板54aの動作不良と判断できる。 In addition, if a transmission indication is made on the spare main partition CPU board 54a but a response confirmation indication is not made, it can be determined that the spare sub-partition CPU board 56a is malfunctioning, and on the other hand, if a transmission indication is made on the spare sub-partition CPU board 56a but a response confirmation indication is not made, it can be determined that the spare main partition CPU board 54a is malfunctioning.

[予備用制御CPU基板の運用管理]
(予備基板試験部の構成)
図5は予備用メイン制御CPU基板と予備用サブ制御CPU基板の動作を確認する予備基板試験部の実施形態を示した回路ブロック図である。
[Operational management of spare control CPU board]
(Configuration of spare board testing section)
FIG. 5 is a circuit block diagram showing an embodiment of a spare board testing section for checking the operation of the spare main control CPU board and the spare sub-control CPU board.

図5に示すように、図2の制御ラック46に設けられた予備基板試験部102には、シリアル伝送路76,78に対し予備用メイン制御CPU基板48aを着脱自在に接続するための伝送コネクタ部130-1(第1の伝送コネクタ部)と、予備用サブ制御CPU基板50aを着脱自在に接続するための伝送コネクタ部130-2(第2の伝送コネクタ部)が設けられる。 As shown in FIG. 5, the spare board testing section 102 provided in the control rack 46 in FIG. 2 is provided with a transmission connector section 130-1 (first transmission connector section) for detachably connecting the spare main control CPU board 48a to the serial transmission paths 76, 78, and a transmission connector section 130-2 (second transmission connector section) for detachably connecting the spare sub-control CPU board 50a.

予備用メイン制御CPU基板48a及び予備用サブ制御CPU基板50aには、CPU136、メモリ部138、2回線分のシリアル伝送部140及びI/Oポート部142が設けられている。 The spare main control CPU board 48a and the spare sub-control CPU board 50a are provided with a CPU 136, a memory section 138, two serial transmission sections 140, and an I/O port section 142.

伝送コネクタ部130-1には、二重化されたシリアル伝送路76,78が分岐接続され、これにより予備用メイン制御CPU基板48aのシリアル伝送部140をシリアル伝送路76,78へ接続させ、また、伝送コネクタ部130-1には、シリアル伝送路76,78の中の電源線(図示せず)が分岐接続され、予備用メイン制御CPU基板48aに対する電源供給を行わせる。 The duplicated serial transmission paths 76, 78 are branched and connected to the transmission connector section 130-1, thereby connecting the serial transmission section 140 of the spare main control CPU board 48a to the serial transmission paths 76, 78, and the power lines (not shown) in the serial transmission paths 76, 78 are branched and connected to the transmission connector section 130-1, thereby supplying power to the spare main control CPU board 48a.

また、伝送コネクタ部130-1には試験スイッチ132-1とLEDを用いた試験表示灯134-1が設けられ、試験スイッチ132-1は予備用メイン制御CPU基板48aに設けられたI/Oポート部142の中の入力ポートに接続され、試験表示灯134-1は予備用メイン制御CPU基板48aに設けられたI/Oポート部142の出力ポートに接続される。 The transmission connector section 130-1 is also provided with a test switch 132-1 and a test indicator light 134-1 using an LED. The test switch 132-1 is connected to an input port in the I/O port section 142 provided on the spare main control CPU board 48a, and the test indicator light 134-1 is connected to an output port in the I/O port section 142 provided on the spare main control CPU board 48a.

予備用サブ制御CPU基板50aの動作試験に用いられ伝送コネクタ部130-2も伝送コネクタ部130-1と同様であり、試験スイッチ132-2とLEDを用いた試験表示灯134-2が設けられている。 The transmission connector section 130-2 used for the operation test of the spare sub-control CPU board 50a is similar to the transmission connector section 130-1, and is provided with a test switch 132-2 and a test indicator light 134-2 using an LED.

予備用メイン制御CPU基板48aは、CPU136により実行される主制御プログラムによる主制御機能に加え、試験スイッチ132-1のオン操作による試験指示信号の入力を検出した場合に、シリアル伝送部140に指示して予備用サブ制御CPU基板50aに試験伝送信号を送信し、予備用サブ制御CPU基板50aから試験伝送信号を受信した場合に、シリアル伝送部140に指示して試験伝送確認信号を応答送信させ、更に、予備用サブ制御CPU基板50aから試験伝送確認信号を受信した場合に、試験表示灯134-1を点灯又は点滅させる試験伝送制御機能が設けられている。 In addition to the main control function based on the main control program executed by the CPU 136, the spare main control CPU board 48a is provided with a test transmission control function that instructs the serial transmission unit 140 to send a test transmission signal to the spare sub-control CPU board 50a when it detects the input of a test instruction signal by turning on the test switch 132-1, instructs the serial transmission unit 140 to respond by sending a test transmission confirmation signal when it receives a test transmission signal from the spare sub-control CPU board 50a, and further lights or flashes the test indicator light 134-1 when it receives a test transmission confirmation signal from the spare sub-control CPU board 50a.

この点は、予備用サブ制御CPU基板50aについても同様であり、CPU136のプログラム実行による主制御機能に加え、試験スイッチ132-2のオン操作による試験指示信号の入力を検出した場合に、シリアル伝送部140に指示して予備用メイン制御CPU基板48aに試験伝送信号を送信し、予備用メイン制御CPU基板48aから試験伝送信号を受信した場合に、シリアル伝送部140に指示して試験伝送確認信号を応答送信させ、更に、予備用メイン制御CPU基板48aから試験伝送確認信号を受信した場合に、試験表示灯134-2を点灯又は点滅させる試験伝送制御機能が設けられている。 The same is true for the spare sub-control CPU board 50a, which, in addition to the main control function of the CPU 136 executing the program, has a test transmission control function that, when it detects the input of a test instruction signal by turning on the test switch 132-2, instructs the serial transmission unit 140 to send a test transmission signal to the spare main control CPU board 48a, when it receives a test transmission signal from the spare main control CPU board 48a, instructs the serial transmission unit 140 to respond by sending a test transmission confirmation signal, and further, when it receives a test transmission confirmation signal from the spare main control CPU board 48a, turns on or blinks the test indicator light 134-2.

更に、試験表示灯134-1,134-2は、試験伝送信号の送信時にも点灯又は点滅され、送信動作が正常に行われることが分かるようしている。 In addition, the test indicator lights 134-1 and 134-2 are lit or flashing when a test transmission signal is being sent, allowing the user to know that the transmission operation is normal.

(予備用制御CPU基板の動作試験)
トンネル防災システムの定期点検の際には、図2に示したように、点検員は、防災受信盤10の制御ラック46に設けられている図5に示した予備基板試験部102の伝送コネクタ部130-1に予備用メイン制御CPU基板48aを接続し、また、伝送コネクタ部130-2に予備用サブ制御CPU基板50aを接続する。
(Operation test of spare control CPU board)
During regular inspection of the tunnel disaster prevention system, as shown in Figure 2, an inspector connects the spare main control CPU board 48a to the transmission connector section 130-1 of the spare board testing section 102 shown in Figure 5, which is provided on the control rack 46 of the disaster prevention receiving panel 10, and also connects the spare sub-control CPU board 50a to the transmission connector section 130-2.

この状態で、予備用メイン制御CPU基板48aの伝送コネクタ部130-1に設けている試験スイッチ132-1をオン操作すると、予備用メイン制御CPU基板48aのCPU136による試験伝送制御機能により予備用サブ制御CPU基板50aに試験伝送信号が送信され、正常に送信されると試験表示灯134-1が例えば点滅し、続いて、予備用サブ制御CPU基板50aが正常に動作すれば試験伝送確認信号が受信されることから、伝送コネクタ部130-1の試験表示灯134-1が例えば点灯する。 In this state, when the test switch 132-1 provided on the transmission connector section 130-1 of the spare main control CPU board 48a is turned on, a test transmission signal is sent to the spare sub-control CPU board 50a by the test transmission control function of the CPU 136 of the spare main control CPU board 48a, and if the signal is sent successfully, the test indicator light 134-1, for example, flashes. Next, if the spare sub-control CPU board 50a is operating normally, a test transmission confirmation signal is received, and the test indicator light 134-1 of the transmission connector section 130-1, for example, lights up.

次に、予備用サブ制御CPU基板50aの伝送コネクタ部130-2に設けている試験スイッチ132-2をオン操作すると、予備用サブ制御CPU基板50aのCPU136による試験伝送制御機能により予備用メイン制御CPU基板48aに試験伝送信号が送信され、正常に送信されると試験表示灯134-2が例えば点滅し、続いて、予備用メイン制御CPU基板48aが正常に動作すれば試験伝送確認信号が受信されることから、伝送コネクタ部130-2の試験表示灯134-2が例えば点灯する。 Next, when the test switch 132-2 provided on the transmission connector section 130-2 of the spare sub-control CPU board 50a is turned on, a test transmission signal is sent to the spare main control CPU board 48a by the test transmission control function of the CPU 136 of the spare sub-control CPU board 50a, and if the signal is sent successfully, the test indicator light 134-2 flashes, for example. Next, if the spare main control CPU board 48a is operating normally, a test transmission confirmation signal is received, and the test indicator light 134-2 of the transmission connector section 130-2 lights up, for example.

このような試験スイッチ132-1,132-2の操作による試験指示で、予備用メイン制御CPU基板48aと予備用サブ制御CPU基板50aとの間で正常に双方伝送が行われた場合、予備用メイン制御CPU基板48aと予備用サブ制御CPU基板50aは正常に動作することが確認できる。 When test instructions issued by operating test switches 132-1 and 132-2 in this manner result in normal bidirectional transmission between the spare main control CPU board 48a and the spare sub-control CPU board 50a, it can be confirmed that the spare main control CPU board 48a and the spare sub-control CPU board 50a are operating normally.

これに対し試験スイッチ132-1,132-2の操作により試験指示を行っても試験表示灯134-1,134-2による送信表示や応答確認表示が行われなかった場合には、予備用メイン制御CPU基板48a及び又は予備用サブ制御CPU基板50aが故障等により動作不良を起こしていることが分かり、動作不良を起こしている予備用制御CPU基板は保管対象から外し、新たな予備用制御CPU基板を発注して納品させるといった対応が可能となる。 In contrast, if a test command is issued by operating the test switches 132-1, 132-2 but no transmission or response confirmation is indicated by the test indicator lights 134-1, 134-2, it is clear that the spare main control CPU board 48a and/or the spare sub-control CPU board 50a is malfunctioning due to a breakdown or the like, and the malfunctioning spare control CPU board can be removed from storage and a new spare control CPU board can be ordered and delivered.

また、予備用メイン制御CPU基板48aで送信表示が行われ、応答確認表示が行われない場合は、予備用サブ制御CPU基板50aの動作不良と判断でき、一方、予備用サブ制御CPU基板50aで送信表示が行われ、応答確認表示が行われない場合は、予備用メイン制御CPU基板48aの動作不良と判断できる。 In addition, if the spare main control CPU board 48a displays a transmission but does not display a response confirmation, it can be determined that the spare sub-control CPU board 50a is malfunctioning, and on the other hand, if the spare sub-control CPU board 50a displays a transmission but does not display a response confirmation, it can be determined that the spare main control CPU board 48a is malfunctioning.

[本発明の変形例]
(区画基板と区画CPU基板の信号伝送)
上記の実施形態は、区画基板に設けられた複数の回線受信部の出力を伝送信号線により区画CPU基板のI/Oポート部の各ポートに接続して回線受信検出信号を伝送しているが、これに限定されない。例えば、区画基板と区画CPU基板に伝送部を設けて伝送路で接続し、区画基板の伝送部に複数の回線受信部の出力を入力し、回線受信検出信号を伝送部から伝送路を介して区画CPU基板に伝送するようにしても良い。この場合、予備基板試験部は、試験操作部の試験スイッチの操作により回線受信部から回線受信検出信号が出力されると伝送部が伝送信号を出力することから、伝送コネクタ部で予備用区画基板の伝送部の出力を検出して試験表示灯を点灯又は点滅させるようにすれば良い。
[Modifications of the present invention]
(Signal transmission between partition board and partition CPU board)
In the above embodiment, the output of the multiple line receiving units provided on the partition board is connected to each port of the I/O port unit of the partition CPU board by a transmission signal line to transmit the line reception detection signal, but the present invention is not limited to this. For example, a transmission unit may be provided on the partition board and the partition CPU board and connected by a transmission line, the output of the multiple line receiving units may be input to the transmission unit of the partition board, and the line reception detection signal may be transmitted from the transmission unit to the partition CPU board via the transmission line. In this case, the spare board testing unit may detect the output of the transmission unit of the spare partition board with the transmission connector unit and turn on or blink the test indicator light, since the transmission unit outputs a transmission signal when the line receiving unit outputs a line reception detection signal by operating the test switch of the test operation unit.

(試験結果の表示)
上記の実施形態では、予備用区画基板60a、予備用メイン/サブ区画CPU基板54a,56a、予備用メイン/サブ制御CPU基板48a,50aの試験結果を伝送コネクタ部に設けた表示部により表示しているが、操作表示CPU基板64に送信し、表示制御基板70を介して表示部72に表示させても良い。
(Display of test results)
In the above embodiment, the test results of the spare partition board 60a, the spare main/sub partition CPU boards 54a, 56a, and the spare main/sub control CPU boards 48a, 50a are displayed on a display unit provided in the transmission connector section, but the results may also be transmitted to the operation display CPU board 64 and displayed on the display unit 72 via the display control board 70.

(R型伝送方式)
上記の実施形態は、P型直送方式のトンネル防災システムにおける防災受信盤の電源部を例にとっているが、伝送回線にアドレスを設定した火災検知器等の端末機器を接続し、伝送制御により端末機器単位に検知と制御を行う個別管理を可能とするR型伝送方式のトンネル防災システムにおける防災受信盤の電源部について、前述した実施形態と同様に予備基板試験部を設けるようにしても良い。
(R-type transmission method)
The above embodiment takes as an example the power supply unit of a disaster prevention receiving panel in a tunnel disaster prevention system using a P-type direct transmission method, but for the power supply unit of a disaster prevention receiving panel in a tunnel disaster prevention system using an R-type transmission method, which connects terminal devices such as fire detectors with addresses set to the transmission line and enables individual management by performing detection and control on a terminal device basis through transmission control, a spare board testing unit may be provided as in the above-mentioned embodiment.

(端末機器)
上記の実施形態は、区画基板に信号回線により接続される端末機器として、火災検知器、手動通報装置、消火栓スイッチ、水噴霧スイッチを例にとっているが、これに限定されず、火災に関連して操作する適宜の端末機器の操作、例えば非常電話の通報操作、消火器の取出等を端末機器として区画基板に接続する場合にも適用できる。
(Terminal Equipment)
The above embodiments take fire detectors, manual reporting devices, fire hydrant switches, and water spray switches as examples of terminal equipment connected to the partition board via signal lines, but are not limited to these and can also be applied to cases where the operation of any appropriate terminal equipment related to a fire, such as emergency telephone reporting operations, removal of a fire extinguisher, etc., is connected to the partition board as terminal equipment.

(その他)
また、本発明は、その目的と利点を損なわない適宜の変形を含み、更に上記の実施形態に示した数値による限定は受けない。
(others)
Furthermore, the present invention includes appropriate modifications that do not impair the objects and advantages of the present invention, and is not limited to the numerical values shown in the above embodiment.

1a:上り線トンネル
1b:下り線トンネル
10:防災受信盤
11,12,14:信号回線群
16:火災検知器
18:消火栓装置
20:手動通報装置
22:消火栓スイッチ
23:自動弁装置
24:水噴霧スイッチ
25:消火ポンプ設備
28:換気設備
30:警報表示板設備
32:ラジオ再放送設備
34:TV監視設備
36:照明設備
38:IG子局設備
40:ネットワーク
42:遠方管理設備
46:制御ラック
48:メイン制御CPU基板
48a:予備用メイン制御CPU基板
50:サブ制御CPU基板
50a:予備用サブ制御CPU基板
52:区画ラック
54:メイン区画CPU基板
54a:予備用メイン区画CPU基板
56:サブ区画CPU基板
56a:予備用サブ区画CPU基板
60-1~60-4:区画基板
60a:予備用区画基板
64:操作表示CPU基板
66:操作部
68:音響部
70:表示制御基板
72:表示部
74:シリアルCPU基板
75:電源ラック
76,78:シリアル伝送路
80-1~86-4:信号回線群
88:CPU基板コネクタ
90:区画基板コネクタ
92:伝送信号線群
93:電源線
100,102:予備基板試験部
104,114-1,114-2,130-1,130-2:伝送コネクタ部
105:回線コネクタ部
106:試験操作部
108,116-1,116-2,132-1,132-2:試験スイッチ
112:試験表示部
118-1,118-2,134-1,134-2:試験表示灯
120,136:CPU
122,138:メモリ部
124,140:シリアル伝送部
126,142:I/Oポート部




1a: Up line tunnel 1b: Down line tunnel 10: Disaster prevention receiving panel 11, 12, 14: Signal line group 16: Fire detector 18: Fire hydrant device 20: Manual reporting device 22: Fire hydrant switch 23: Automatic valve device 24: Water spray switch 25: Fire pump equipment 28: Ventilation equipment 30: Alarm display board equipment 32: Radio rebroadcast equipment 34: TV monitoring equipment 36: Lighting equipment 38: IG satellite station equipment 40: Network 42: Remote management equipment 46: Control rack 48: Main control CPU board 48a: Spare main control CPU board 50: Sub-control CPU board 50a: Spare sub-control CPU board 52: Partition rack 54: Main partition CPU board 54a: Spare main partition CPU board 56: Sub-partition CPU board 56a: Spare sub-partition CP U boards 60-1 to 60-4: Partition board 60a: Spare partition board 64: Operation display CPU board 66: Operation section 68: Sound section 70: Display control board 72: Display section 74: Serial CPU board 75: Power supply racks 76, 78: Serial transmission paths 80-1 to 86-4: Signal line group 88: CPU board connector 90: Partition board connector 92: Transmission signal line group 93: Power lines 100, 102: Spare board test section 104, 114-1, 114-2, 130-1, 130-2: Transmission connector section 105: Line connector section 106: Test operation section 108, 116-1, 116-2, 132-1, 132-2: Test switch 112: Test display section 118-1, 118-2, 134-1, 134-2: Test indicator light 120, 136: CPU
122, 138: memory section 124, 140: serial transmission section 126, 142: I/O port section




Claims (7)

端末機器を接続してトンネル内で発生する異常を監視可能とするトンネル防災システム用の防災受信盤であって、
前記防災受信盤に設けられる所定の回路基板は、交換可能であり、
前記防災受信盤は、前記所定の回路基板と交換するために保管されている予備基板の動作を交換前に確認できる予備基板試験部を備えることを特徴とする防災受信盤。
A disaster prevention receiving panel for a tunnel disaster prevention system that can monitor abnormalities occurring in a tunnel by connecting terminal devices,
The predetermined circuit board provided in the disaster prevention receiving panel is replaceable,
The disaster prevention receiving panel is characterized in that it is equipped with a spare board testing section that can check the operation of a spare board stored to replace the specified circuit board before replacement.
請求項1記載の防災受信盤であって、
前記予備基板は、前記予備基板試験部に対して着脱自在なコネクタを介して接続されることを特徴とする防災受信盤。
The disaster prevention receiving panel according to claim 1,
An emergency receiving panel, characterized in that the spare board is connected to the spare board testing section via a detachable connector.
請求項1記載の防災受信盤であって、
前記予備基板は、動作を確認するときに前記予備基板試験部に接続され、動作を確認しないときには前記予備基板試験部に接続しないことが可能であることを特徴とする防災受信盤。
The disaster prevention receiving panel according to claim 1,
This disaster prevention receiving panel is characterized in that the spare board can be connected to the spare board testing unit when checking operation, and can be unconnected to the spare board testing unit when not checking operation.
請求項1記載の防災受信盤であって、
前記予備基板試験部は、前記防災受信盤の電源部から電源供給を受けて前記予備基板の動作確認を行い、
前記防災受信盤は、前記予備基板試験部による予備基板の動作確認とは独立して前記異常の監視機能を維持させることが可能であることを特徴とする防災受信盤。
The disaster prevention receiving panel according to claim 1,
The spare board testing unit receives power from the power supply unit of the disaster prevention receiving panel to check the operation of the spare board,
The disaster prevention receiving panel is characterized in that it is possible to maintain the abnormality monitoring function independently of the spare board operation check by the spare board testing section.
請求項1記載の防災受信盤であって、
前記所定の回路基板は、前記端末機器からの信号を受信する区画基板を含むことを特徴とする防災受信盤。
The disaster prevention receiving panel according to claim 1,
The disaster prevention receiving panel, wherein the predetermined circuit board includes a partition board for receiving signals from the terminal device.
請求項1又は5記載の防災受信盤であって、
前記所定の回路基板は、前記端末機器から受信した信号に基づき所定の制御を行う制御基板を含むことを特徴とする防災受信盤。
The disaster prevention receiving panel according to claim 1 or 5,
A disaster prevention receiving panel characterized in that the specified circuit board includes a control board which performs specified control based on a signal received from the terminal device.
請求項1乃至6何れかに記載の防災受信盤に対して所定の端末機器を接続してトンネル内で発生する異常を監視することを特徴とするトンネル防災システム。
7. A tunnel disaster prevention system comprising a disaster prevention receiving panel according to claim 1, connected to a predetermined terminal device, for monitoring abnormalities occurring within a tunnel.
JP2023063934A 2017-10-22 2023-04-11 Disaster prevention receiving panel and tunnel disaster prevention system Active JP7712976B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2023063934A JP7712976B2 (en) 2017-10-22 2023-04-11 Disaster prevention receiving panel and tunnel disaster prevention system

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2017204106A JP6946145B2 (en) 2017-10-22 2017-10-22 Tunnel disaster prevention system
JP2021149909A JP7262541B2 (en) 2017-10-22 2021-09-15 Disaster prevention receiver and disaster prevention system
JP2023063934A JP7712976B2 (en) 2017-10-22 2023-04-11 Disaster prevention receiving panel and tunnel disaster prevention system

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2021149909A Division JP7262541B2 (en) 2017-10-22 2021-09-15 Disaster prevention receiver and disaster prevention system

Publications (2)

Publication Number Publication Date
JP2023089100A JP2023089100A (en) 2023-06-27
JP7712976B2 true JP7712976B2 (en) 2025-07-24

Family

ID=66627817

Family Applications (3)

Application Number Title Priority Date Filing Date
JP2017204106A Active JP6946145B2 (en) 2017-10-22 2017-10-22 Tunnel disaster prevention system
JP2021149909A Active JP7262541B2 (en) 2017-10-22 2021-09-15 Disaster prevention receiver and disaster prevention system
JP2023063934A Active JP7712976B2 (en) 2017-10-22 2023-04-11 Disaster prevention receiving panel and tunnel disaster prevention system

Family Applications Before (2)

Application Number Title Priority Date Filing Date
JP2017204106A Active JP6946145B2 (en) 2017-10-22 2017-10-22 Tunnel disaster prevention system
JP2021149909A Active JP7262541B2 (en) 2017-10-22 2021-09-15 Disaster prevention receiver and disaster prevention system

Country Status (1)

Country Link
JP (3) JP6946145B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6946145B2 (en) * 2017-10-22 2021-10-06 ホーチキ株式会社 Tunnel disaster prevention system
KR102828476B1 (en) * 2024-09-24 2025-07-04 디투유이앤씨(주) Fire receiver equipped dual main-module

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006106833A (en) 2004-09-30 2006-04-20 Nohmi Bosai Ltd Backup device for main control unit and tunnel disaster prevention equipment in monitoring panel
JP2008311778A (en) 2007-06-12 2008-12-25 Toshiba Corp Line accommodation connection system and line switching apparatus preliminary switching method

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5926991B2 (en) * 1975-06-14 1984-07-02 松下電工株式会社 Evacuation guidance method
JPH0620183A (en) * 1992-07-03 1994-01-28 Fujitsu Ltd Status display test method
JP3141260B2 (en) * 1992-10-05 2001-03-05 能美防災株式会社 Tunnel disaster prevention board
JP3465172B2 (en) * 1993-03-31 2003-11-10 能美防災株式会社 Tunnel disaster prevention equipment
JPH0915310A (en) * 1995-06-27 1997-01-17 Matsushita Electric Works Ltd Power supply
JP2872113B2 (en) * 1996-06-12 1999-03-17 日本電気通信システム株式会社 Micro diagnostic system for information processing equipment
US6011465A (en) * 1998-06-26 2000-01-04 Wang; Randall Backup arrangement for alarm system
JP2006080743A (en) * 2004-09-08 2006-03-23 Nippon Telegr & Teleph Corp <Ntt> Service node equipment
JP2006268521A (en) * 2005-03-24 2006-10-05 Nec Corp Standby cell test system
JP6577780B2 (en) * 2015-08-03 2019-09-18 ホーチキ株式会社 Tunnel disaster prevention system
JP6946145B2 (en) * 2017-10-22 2021-10-06 ホーチキ株式会社 Tunnel disaster prevention system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006106833A (en) 2004-09-30 2006-04-20 Nohmi Bosai Ltd Backup device for main control unit and tunnel disaster prevention equipment in monitoring panel
JP2008311778A (en) 2007-06-12 2008-12-25 Toshiba Corp Line accommodation connection system and line switching apparatus preliminary switching method

Also Published As

Publication number Publication date
JP2023089100A (en) 2023-06-27
JP7262541B2 (en) 2023-04-21
JP2019079156A (en) 2019-05-23
JP2021193603A (en) 2021-12-23
JP6946145B2 (en) 2021-10-06

Similar Documents

Publication Publication Date Title
JP7712976B2 (en) Disaster prevention receiving panel and tunnel disaster prevention system
JP2020010359A (en) Tunnel disaster prevention system
JP7447066B2 (en) Tunnel disaster prevention system
JP2022122933A (en) disaster prevention system
JP6455879B2 (en) Tunnel disaster prevention system
JP7615192B2 (en) Disaster Prevention System
JP7163451B2 (en) disaster prevention system
JP7379621B2 (en) disaster prevention system
CN111612998A (en) A Ship Escape Indication Device Based on Dual Redundancy Technology
JP7161584B2 (en) Disaster prevention system and disaster prevention receiver
JP2024129079A (en) Wiring evaluation system for renewal facilities
JP6258669B2 (en) Integrated fire fighting system
JPH0775628B2 (en) Automatic control system for gas fire extinguishing equipment
JP2023089167A (en) disaster prevention system
JP6689711B2 (en) Tunnel disaster prevention system
JP7203152B2 (en) disaster prevention system
JP6916926B2 (en) Disaster prevention system
JP4424570B2 (en) Sprinkler fire extinguishing equipment
JP2018045541A (en) Tunnel disaster prevention system
JP7538832B2 (en) Disaster Prevention System
US20240003561A1 (en) System and method of a loop architecture of a fixed piping system implemented within a safety system of a structure to continuously supply breathable air therewithin
JP2001218865A (en) Sprinkler fire extinguishing equipment
JP2024061299A (en) Fire hydrant equipment and disaster prevention systems

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20230411

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20230414

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230510

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240731

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240910

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20241211

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250304

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250711

R150 Certificate of patent or registration of utility model

Ref document number: 7712976

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150