Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7713401B2 - Power measuring equipment and distribution boards - Google Patents
[go: Go Back, main page]

JP7713401B2 - Power measuring equipment and distribution boards - Google Patents

Power measuring equipment and distribution boards

Info

Publication number
JP7713401B2
JP7713401B2 JP2022005513A JP2022005513A JP7713401B2 JP 7713401 B2 JP7713401 B2 JP 7713401B2 JP 2022005513 A JP2022005513 A JP 2022005513A JP 2022005513 A JP2022005513 A JP 2022005513A JP 7713401 B2 JP7713401 B2 JP 7713401B2
Authority
JP
Japan
Prior art keywords
time
power
clock circuit
power consumption
current time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022005513A
Other languages
Japanese (ja)
Other versions
JP2023104493A (en
Inventor
大地 榎本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Corp
Panasonic Holdings Corp
Original Assignee
Panasonic Corp
Matsushita Electric Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panasonic Corp, Matsushita Electric Industrial Co Ltd filed Critical Panasonic Corp
Priority to JP2022005513A priority Critical patent/JP7713401B2/en
Publication of JP2023104493A publication Critical patent/JP2023104493A/en
Application granted granted Critical
Publication of JP7713401B2 publication Critical patent/JP7713401B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Distribution Board (AREA)

Description

本発明は、電力計測装置、及び、分電盤に関する。 The present invention relates to a power measuring device and a distribution board.

例えば、特許文献1には、複数の分岐回路に関する回路情報及び電力計測器により計測された各分岐回路の電力情報を外部装置へ出力する電力計測器及びそれを用いた分電盤が開示されている。 For example, Patent Document 1 discloses a power meter that outputs circuit information related to multiple branch circuits and power information of each branch circuit measured by the power meter to an external device, and a distribution board using the same.

特開2015-211570号公報JP 2015-211570 A

従来、電力計測器は、外付け電池及び内蔵電源を備えており、これらの電源が停電時にバックアップ電源として機能する。しかしながら、電池交換又は内部電源の故障の際に、電力計測器の時刻を計時する時計回路の時刻が初期化されると、記憶部に保存されている消費電力データのうち、初期化された時刻よりも後の、つまり、未来の時刻が付された消費電力データは消去される。 Conventionally, power meters are equipped with an external battery and an internal power source, and these power sources function as backup power sources in the event of a power outage. However, when the time of the clock circuit that keeps time on the power meter is initialized when the battery is replaced or the internal power source fails, the power consumption data stored in the memory unit that is after the initialized time, i.e., the power consumption data with a future time is erased.

そこで、本発明は、時計回路の時刻が初期化された場合に、記憶部に保存されている消費電力データが消去されることを防ぐことができる電力計測装置、及び、分電盤を提供する。 The present invention provides a power measurement device and a distribution board that can prevent the power consumption data stored in the memory unit from being erased when the time in the clock circuit is initialized.

本発明の一態様に係る電力計測装置は、施設に設けられた分岐回路における消費電力を計測する計測回路と、時刻を計時する時計回路と、前記計測回路によって計測された消費電力に前記時計回路によって計時された時刻が紐づけられた消費電力データを保存する記憶部と、前記時計回路への電力供給がオフされて前記時計回路によって計時される時刻が初期化された後に前記時計回路に設定された現在時刻に基づいて、前記記憶部に保存された前記消費電力データを消去するか否かを判定する制御部と、を備える。 The power measurement device according to one aspect of the present invention includes a measurement circuit that measures the power consumption in a branch circuit installed in a facility, a clock circuit that keeps time, a memory unit that stores power consumption data in which the power consumption measured by the measurement circuit is linked to the time kept by the clock circuit, and a control unit that determines whether to erase the power consumption data stored in the memory unit based on the current time set in the clock circuit after the power supply to the clock circuit is turned off and the time kept by the clock circuit is initialized.

本発明の一態様に係る分電盤は、上記電力計測器を備える。 A distribution board according to one aspect of the present invention is equipped with the above-mentioned power meter.

本発明によれば、時計回路の時刻が初期化された場合に、記憶部に保存されている消費電力データが消去されることを防ぐことができる電力計測装置、及び、分電盤が実現される。 The present invention provides a power measurement device and a distribution board that can prevent the power consumption data stored in the memory unit from being erased when the time of the clock circuit is initialized.

図1は、実施の形態に係る電力計測装置を備える分電盤の構成を示すブロック図である。FIG. 1 is a block diagram showing a configuration of a distribution board including a power measuring device according to an embodiment. 図2は、実施の形態に係る電力計測装置の動作の第1例を示すフローチャートである。FIG. 2 is a flowchart illustrating a first example of the operation of the power measuring device according to the embodiment. 図3は、実施の形態に係る電力計測装置の動作の第2例を示すフローチャートである。FIG. 3 is a flowchart illustrating a second example of the operation of the power measuring device according to the embodiment. 図4は、分電盤における表示部の位置及び表示部に表示される設定画面の一例を示す図である。FIG. 4 is a diagram showing an example of the position of the display unit on the distribution board and a setting screen displayed on the display unit. 図5は、現在時刻の設定におけるユーザへの通知の一例を示す図である。FIG. 5 is a diagram showing an example of a notification to the user in setting the current time.

以下、実施の形態について、図面を参照しながら説明する。なお、以下で説明する実施の形態は、いずれも包括的または具体的な例を示すものである。以下の実施の形態で示される数値、形状、材料、構成要素、構成要素の配置位置及び接続形態、ステップ、ステップの順序などは、一例であり、本発明を限定する主旨ではない。また、以下の実施の形態における構成要素のうち、最上位概念を示す独立請求項に記載されていない構成要素については、任意の構成要素として説明される。 The following describes the embodiments with reference to the drawings. Note that the embodiments described below are all comprehensive or specific examples. The numerical values, shapes, materials, components, component placement and connection forms, steps, and order of steps shown in the following embodiments are merely examples and are not intended to limit the present invention. Furthermore, among the components in the following embodiments, components that are not described in an independent claim that indicates a superordinate concept are described as optional components.

なお、各図は模式図であり、必ずしも厳密に図示されたものではない。また、各図において、実質的に同一の構成に対しては同一の符号を付し、重複する説明は省略または簡略化される場合がある。 Note that each figure is a schematic diagram and is not necessarily a precise illustration. In addition, in each figure, the same reference numerals are used for substantially the same configurations, and duplicate explanations may be omitted or simplified.

(実施の形態)
[1.構成]
図1は、実施の形態に係る電力計測装置及び分電盤の構成の一例を示すブロック図である。例えば、図1に示されるように、実施の形態に係る電力計測装置10及び分電盤20は、外部装置60と通信可能に接続された電力計測システム100であってもよい。外部装置60は、時刻を計時する時計回路を備える装置であり、かつ、電力計測装置10と通信可能な装置であれば、特に限定されないが、例えば、スマートフォン、タブレット端末、又は、パーソナルコンピュータである。
(Embodiment)
[1. Configuration]
Fig. 1 is a block diagram showing an example of the configuration of a power measurement device and a distribution board according to an embodiment. For example, as shown in Fig. 1, a power measurement device 10 and a distribution board 20 according to the embodiment may be a power measurement system 100 communicably connected to an external device 60. The external device 60 is a device that includes a clock circuit that measures time and is capable of communicating with the power measurement device 10, and is not particularly limited thereto, but may be, for example, a smartphone, a tablet terminal, or a personal computer.

[分電盤]
図1に示されるように、分電盤20は、主幹ブレーカ21と、複数の分岐ブレーカ22と、電力計測装置10とを備える。分電盤20は、施設50に設けられ、施設50内に配置されている。施設50は、例えば、戸建住宅である。施設50内には、壁又は扉などで仕切られた複数の部屋が含まれる。
[Distribution board]
1 , the distribution board 20 includes a main breaker 21, a plurality of branch breakers 22, and a power measuring device 10. The distribution board 20 is provided in a facility 50 and is disposed within the facility 50. The facility 50 is, for example, a detached house. The facility 50 includes a plurality of rooms separated by walls, doors, or the like.

分電盤20は、系統電源30からの電力供給をオンまたはオフするための主幹ブレーカ21を有する。主幹ブレーカ21は、所定の電流(例えば、電力会社との契約で定められる電力に基づく電流)を超える電流が系統電源30から流れたときに、系統電源30からの電力の供給を停止するブレーカである。 The distribution board 20 has a main breaker 21 for turning on and off the power supply from the system power source 30. The main breaker 21 is a breaker that stops the supply of power from the system power source 30 when a current that exceeds a predetermined current (for example, a current based on the power specified in a contract with the power company) flows from the system power source 30.

また、分電盤20は、主幹回路31から分岐した複数の分岐回路32のそれぞれに対して、複数の分岐ブレーカ22を有する。つまり、分電盤20は、分岐回路32毎に、分岐ブレーカ22を有する。分岐ブレーカ22は、当該分岐ブレーカ22に接続された分岐回路32に過電流が流れた場合に、当該分岐回路32への電力の供給を停止するブレーカである。各分岐回路32は、施設50内の所定の部屋に設置された複数の機器(例えば、負荷40a)又は所定の機器(例えば、負荷40b、負荷40c)へ電力を供給する。 The distribution board 20 also has multiple branch breakers 22 for each of the multiple branch circuits 32 branching off from the main circuit 31. In other words, the distribution board 20 has a branch breaker 22 for each branch circuit 32. The branch breaker 22 is a breaker that stops the supply of power to the branch circuit 32 when an overcurrent flows through the branch circuit 32 connected to the branch breaker 22. Each branch circuit 32 supplies power to multiple devices (e.g., load 40a) or specific devices (e.g., load 40b, load 40c) installed in a specific room in the facility 50.

[電力計測装置]
電力計測装置10は、施設50に設けられた複数の分岐回路32のそれぞれにおける消費電力を計測する。電力計測装置10は、言い換えると、多回路電力計測器である。
[Power Measuring Device]
The power measurement device 10 measures the power consumption in each of a plurality of branch circuits 32 provided in the facility 50. In other words, the power measurement device 10 is a multi-circuit power meter.

例えば、図1に示されるように、電力計測装置10は、通信部11と、制御部12と、記憶部13と、時刻記憶部14と、計測回路15と、時計回路16と、バックアップ電源17と、表示部18と、受付部19とを備える。 For example, as shown in FIG. 1, the power measurement device 10 includes a communication unit 11, a control unit 12, a memory unit 13, a time memory unit 14, a measurement circuit 15, a clock circuit 16, a backup power supply 17, a display unit 18, and a reception unit 19.

通信部11は、電力計測装置10が外部装置60と通信を行うための通信モジュール(通信回路)である。通信部11によって行われる通信は、例えば、無線通信であるが、有線通信であってもよい。通信に用いられる通信規格についても特に限定されない。 The communication unit 11 is a communication module (communication circuit) that allows the power measurement device 10 to communicate with the external device 60. The communication performed by the communication unit 11 is, for example, wireless communication, but may also be wired communication. There are no particular limitations on the communication standard used for the communication.

制御部12は、電力計測装置10の制御に関する各種情報処理を行う。制御部12は、具体的には、プロセッサ、マイクロコンピュータ又は専用回路によって実現される。制御部12の具体的な動作については後述される。 The control unit 12 performs various information processing related to the control of the power measurement device 10. Specifically, the control unit 12 is realized by a processor, a microcomputer, or a dedicated circuit. The specific operation of the control unit 12 will be described later.

記憶部13は、制御部12が実行するプログラム、収集データなどが記憶される記憶装置である。収集データは、例えば、計測回路15によって計測された各分岐回路32の消費電力に時計回路16によって計時された時刻が紐づけられた消費電力データである。記憶部13は、例えば、HDD(Hard Disk Drive)又は半導体メモリによって実現される。 The memory unit 13 is a storage device that stores the programs executed by the control unit 12, collected data, and the like. The collected data is, for example, power consumption data in which the power consumption of each branch circuit 32 measured by the measurement circuit 15 is linked to the time measured by the clock circuit 16. The memory unit 13 is realized, for example, by a hard disk drive (HDD) or a semiconductor memory.

時刻記憶部14は、時計回路16によって計測される時刻が定期的に記憶される記憶装置である。時刻記憶部14は、例えば、HDD又は半導体メモリによって実現される。 The time memory unit 14 is a storage device that periodically stores the time measured by the clock circuit 16. The time memory unit 14 is realized, for example, by a HDD or a semiconductor memory.

計測回路15は、施設50に設けられた分岐回路32における消費電力を計測する。計測回路15は、複数の分岐回路32に設けられたCT(Current Transformer)を含み、当該CTにより分岐回路32ごとに消費電力を計測する。 The measurement circuit 15 measures the power consumption in the branch circuits 32 installed in the facility 50. The measurement circuit 15 includes a current transformer (CT) installed in multiple branch circuits 32, and measures the power consumption for each branch circuit 32 using the CT.

時計回路16は、時刻を時計する。 The clock circuit 16 keeps track of the time.

バックアップ電源17は、施設50が停電したときに時計回路16によって使用される。 The backup power supply 17 is used by the clock circuit 16 when the facility 50 experiences a power outage.

表示部18は、画像を表示する。表示部18は、例えば、時刻記憶部14に記憶された最新の時刻を含む、現在時刻を設定するための設定画面を表示する。表示部18は、例えば、液晶(LC)パネル又は有機EL(Electro Luminescence)パネルなどの表示パネルによって実現される。 The display unit 18 displays an image. For example, the display unit 18 displays a setting screen for setting the current time, including the latest time stored in the time memory unit 14. The display unit 18 is realized by a display panel, such as a liquid crystal (LC) panel or an organic EL (Electro Luminescence) panel.

受付部19は、ユーザの設定操作を受け付ける。受付部19は、例えば、タッチパネル又はハードウェアボタンなどによって実現される。 The reception unit 19 receives setting operations from the user. The reception unit 19 is realized, for example, by a touch panel or a hardware button.

[2.動作]
続いて、実施の形態に係る電力計測装置10の動作について図面を参照しながら具体的に説明する。
[2. Operation]
Next, the operation of the power measuring device 10 according to the embodiment will be specifically described with reference to the drawings.

[第1例]
まず、動作の第1例について説明する。第1例では、施設50が停電して時計回路16へのバックアップ電源17からの電力供給がオフされたときに、時計回路16が計時する時刻が初期化され、初期化された時刻を現在時刻に設定する。図2は、実施の形態に係る電力計測装置10の動作の第1例を示すフローチャートである。
[First Example]
First, a first example of the operation will be described. In the first example, when a power outage occurs in the facility 50 and the power supply from the backup power source 17 to the clock circuit 16 is turned off, the time kept by the clock circuit 16 is initialized, and the initialized time is set as the current time. Fig. 2 is a flowchart showing a first example of the operation of the power measuring device 10 according to the embodiment.

図2に示されるように、電力計測装置10の計測回路15は、複数の分岐回路32のそれぞれにおける消費電力を計測する(S01)。時計回路16は、時刻を計時する(S02)。ステップS01及びS02の処理は、どちらが先に行われてもよいし、同時に行われてもよい。 As shown in FIG. 2, the measurement circuit 15 of the power measurement device 10 measures the power consumption in each of the multiple branch circuits 32 (S01). The clock circuit 16 keeps time (S02). The processes of steps S01 and S02 may be performed in any order, or may be performed simultaneously.

次に、制御部12は、ステップS01で計測回路15によって計測された消費電力に、ステップS02で時計回路16によって計時された時刻を紐づけて記憶部13に保存する(S03)。 Next, the control unit 12 links the power consumption measured by the measurement circuit 15 in step S01 to the time measured by the clock circuit 16 in step S02 and stores them in the memory unit 13 (S03).

施設50が停電しなければ(S04でNo)、電力計測装置10は、ステップS01~S03の処理を繰り返す。一方、施設50が停電すると(S04でYes)、バックアップ電源17から時計回路16へ電力供給が開始され(S05)、時計回路16は、時刻を計時する(S06)。 If the facility 50 does not experience a power outage (No in S04), the power metering device 10 repeats the process of steps S01 to S03. On the other hand, if the facility 50 experiences a power outage (Yes in S04), the backup power source 17 starts supplying power to the clock circuit 16 (S05), and the clock circuit 16 starts measuring the time (S06).

バックアップ電源17から時計回路16への電力供給がオフされなければ(S07でNo)、時計回路16は時刻を計時する(S06)。一方、バックアップ電源17から時計回路16への電力供給がオフされると(S07でYes)、時計回路16によって計時される時刻が初期化される(S08)。施設50の停電が解消しない場合(S09でNo)、電力計測装置10は、動作を停止する。 If the power supply from the backup power source 17 to the clock circuit 16 is not turned off (No in S07), the clock circuit 16 keeps track of the time (S06). On the other hand, if the power supply from the backup power source 17 to the clock circuit 16 is turned off (Yes in S07), the time kept by the clock circuit 16 is initialized (S08). If the power outage in the facility 50 is not resolved (No in S09), the power metering device 10 stops operating.

一方、施設50の停電が解消すると(S09でYes)、制御部12は、現在時刻を設定する(S10)。例えば、制御部12は、設定画面に入力された時刻情報に基づいて現在時刻を設定してもよいし、外部装置60が保持する時刻情報を外部装置60から受信し、受信された時刻情報に基づいて現在時刻を設定してもよい。 On the other hand, when the power outage in the facility 50 is resolved (Yes in S09), the control unit 12 sets the current time (S10). For example, the control unit 12 may set the current time based on time information entered into the setting screen, or may receive time information held by the external device 60 from the external device 60 and set the current time based on the received time information.

次に、制御部12は、ステップS10で時計回路16に設定された現在時刻に基づいて、記憶部13に保存された消費電力データを消去するか否かを判定する(S11)。例えば、ステップS11において、制御部12は、記憶部13に保存された消費電力データが時計回路16に設定された現在時刻よりも過去の時間に紐づけられた消費電力を示す消費電力データである場合、記憶部13に保存された消費電力データを消去しないと判定する(S11でNo)。そして、制御部12は、記憶部13に保存された消費電力データを消去しない(不図示)。 Next, the control unit 12 determines whether or not to erase the power consumption data stored in the memory unit 13 based on the current time set in the clock circuit 16 in step S10 (S11). For example, in step S11, if the power consumption data stored in the memory unit 13 indicates power consumption linked to a time earlier than the current time set in the clock circuit 16, the control unit 12 determines not to erase the power consumption data stored in the memory unit 13 (No in S11). Then, the control unit 12 does not erase the power consumption data stored in the memory unit 13 (not shown).

一方、ステップS11において、例えば、制御部12は、記憶部13に保存された消費電力データのうち、時計回路16に設定された現在時刻よりも未来の時刻に紐づけられた消費電力を示す消費電力データを消去すると判定し、記憶部13に保存された消費電力データのうち、時計回路16に設定された現在時刻よりも過去の時刻に紐づけられた消費電力を示す消費電力データを消去しないと判定する(S11でYes)。そして、制御部12は、記憶部13に保存された消費電力データのうち、現在時刻よりも未来の時刻の消費電力データを消去し、現在時刻よりも過去の時刻の消費電力データを消去しない(S12)。 On the other hand, in step S11, for example, the control unit 12 determines to erase the power consumption data indicating the power consumption linked to a time later than the current time set in the clock circuit 16 from the power consumption data stored in the memory unit 13, and determines not to erase the power consumption data indicating the power consumption linked to a time earlier than the current time set in the clock circuit 16 from the power consumption data stored in the memory unit 13 (Yes in S11). Then, the control unit 12 erases the power consumption data for a time later than the current time from the power consumption data stored in the memory unit 13, and does not erase the power consumption data for a time earlier than the current time (S12).

[第2例]
続いて、動作の第2例について説明する。第1例では、時刻が初期化された後に、ユーザにより設定画面に入力された時刻情報、又は、外部装置60から受信した時刻情報に基づいて現在時刻を設定する例を説明した。第2例では、時刻記憶部14が時計回路16によって計時された時刻を定期的に記憶し、記憶された時刻のうち最新の時刻を設定画面に表示する。図3は、実施の形態に係る電力計測装置の動作の第2例を示すフローチャートである。図3では、図2と同じ処理には同じステップ番号を付している。以下、第1例と異なる点を中心に説明し、重複する内容については説明を省略又は簡略化する。
[Second Example]
Next, a second example of the operation will be described. In the first example, an example was described in which the current time is set based on the time information input by the user to the setting screen or the time information received from the external device 60 after the time is initialized. In the second example, the time memory unit 14 periodically stores the time measured by the clock circuit 16, and displays the latest time among the stored times on the setting screen. FIG. 3 is a flowchart showing a second example of the operation of the power measuring device according to the embodiment. In FIG. 3, the same step numbers are assigned to the same processes as in FIG. 2. Below, the differences from the first example will be mainly described, and the description of the overlapping contents will be omitted or simplified.

図3に示されるように、電力計測装置10の計測回路15は、複数の分岐回路32のそれぞれにおける消費電力を計測し(S01)、時計回路16は、時刻を計時する(S02)。ステップS01及びS02の処理は、どちらが先に行われてもよいし、同時に行われてもよい。 As shown in FIG. 3, the measurement circuit 15 of the power measurement device 10 measures the power consumption in each of the multiple branch circuits 32 (S01), and the clock circuit 16 keeps time (S02). The processes of steps S01 and S02 may be performed in any order, or may be performed simultaneously.

次に、制御部12は、時刻記憶部14に、ステップS02で時計回路16によって計時された時刻を定期的に記憶させる(S21)。例えば、制御部12は、時計回路16によって計時された時刻を1分毎に時刻記憶部14に記憶させてもよい。 Next, the control unit 12 periodically stores the time measured by the clock circuit 16 in step S02 in the time memory unit 14 (S21). For example, the control unit 12 may store the time measured by the clock circuit 16 in the time memory unit 14 every minute.

次に、制御部12は、ステップS01で計測回路15によって計測された消費電力に、ステップS02で時計回路16によって計時された時刻を紐づけて記憶部13に保存する(S03)。 Next, the control unit 12 links the power consumption measured by the measurement circuit 15 in step S01 to the time measured by the clock circuit 16 in step S02 and stores them in the memory unit 13 (S03).

施設50が停電しなければ(S04でNo)、電力計測装置10は、ステップS01、S02、S21、及び、S03の処理を繰り返す。一方、施設50が停電すると(S04でYes)、バックアップ電源17から時計回路16へ電力供給が開始され(S05)、時計回路16は、時刻を計時する(S06)。制御部12は、時刻記憶部14に、ステップS06で時計回路16によって計時された時刻を定期的に記憶させる(S22)。 If the facility 50 does not experience a power outage (No in S04), the power metering device 10 repeats the processes of steps S01, S02, S21, and S03. On the other hand, if the facility 50 experiences a power outage (Yes in S04), power supply from the backup power source 17 to the clock circuit 16 begins (S05), and the clock circuit 16 keeps track of the time (S06). The control unit 12 periodically stores the time kept by the clock circuit 16 in step S06 in the time memory unit 14 (S22).

バックアップ電源17から時計回路16への電力供給がオフされなければ(S07でNo)、時計回路16は時刻を計時し(S06)、制御部12は、時刻記憶部14に、計時された時刻を定期的に記憶させる(S22)。一方、バックアップ電源17から時計回路16への電力供給がオフされると(S07でYes)、時計回路16によって計時される時刻が初期化される(S08)。施設50の停電が解消しない場合(S09でNo)、電力計測装置10は、動作を停止する。 If the power supply from the backup power source 17 to the clock circuit 16 is not turned off (No in S07), the clock circuit 16 keeps time (S06), and the control unit 12 periodically stores the kept time in the time memory unit 14 (S22). On the other hand, if the power supply from the backup power source 17 to the clock circuit 16 is turned off (Yes in S07), the time kept by the clock circuit 16 is initialized (S08). If the power outage in the facility 50 is not resolved (No in S09), the power measurement device 10 stops operating.

一方、施設50の停電が解消すると(S09でYes)、制御部12は、表示部18に、時刻記憶部14に記憶された最新の時刻を含む、現在時刻を設定するための設定画面を表示させる(S23)。図4は、分電盤20における表示部18の位置及び表示部18に表示される設定画面の一例を示す図である。図4に示されるように、表示部18は、例えば、装置の現在時刻として、時刻記憶部14に記憶された最新の時刻を含む、設定画面を表示する。例えば、図4中の「時刻合わせ(手入力)」にも最新の時刻が表示されてもよい。 On the other hand, when the power outage in the facility 50 is resolved (Yes in S09), the control unit 12 causes the display unit 18 to display a setting screen for setting the current time, including the latest time stored in the time memory unit 14 (S23). FIG. 4 is a diagram showing the position of the display unit 18 in the distribution board 20 and an example of a setting screen displayed on the display unit 18. As shown in FIG. 4, the display unit 18 displays a setting screen including the latest time stored in the time memory unit 14 as the current time of the device, for example. For example, the latest time may also be displayed in "Time adjustment (manual input)" in FIG. 4.

次に、制御部12は、表示部18に、設定画面に表示されている最新の時刻が正確な現在時刻ではないことを提示させる(S24)。例えば、図4に示されるように、表示部18は、最新の時刻の表示と共に、「これは、正確な現在時刻ではありません」と表示してもよい。 Next, the control unit 12 causes the display unit 18 to indicate that the latest time displayed on the setting screen is not the correct current time (S24). For example, as shown in FIG. 4, the display unit 18 may display "This is not the correct current time" along with the latest time.

次に、制御部12は、現在時刻を設定する(S10)。例えば、制御部12は、設定画面に入力された時刻情報に基づいて現在時刻を設定してもよいし、外部装置60が保持する時刻情報を外部装置60から受信し、受信された時刻情報に基づいて現在時刻を設定してもよい。例えば、ユーザが「手入力」ボタンをタッチすると、図4中の「時刻合わせ(手入力)」に最新の時刻が表示され、ユーザが手入力で現在時刻を入力し、「設定」ボタンをタッチする。これにより、受付部19は現在時刻の設定の入力を受け付け、制御部12は、受け付けられた入力に従って現在時刻を設定する。また、例えば、ユーザが「手入力」ボタンの隣の「受信」ボタンをタッチすると、ユーザのスマートフォンなどの外部装置60が保持する時刻情報を外部装置60から受信し、「時刻合わせ(手入力)」の代わりに「時刻合わせ(受信)」に受信された時刻情報が表示される。そして、ユーザが「設定」ボタンをタッチすると、受付部19は現在時刻の設定の入力を受け付け、制御部12は、受け付けられた入力に従って現在時刻を設定する。 Next, the control unit 12 sets the current time (S10). For example, the control unit 12 may set the current time based on the time information input to the setting screen, or may receive time information held by the external device 60 from the external device 60 and set the current time based on the received time information. For example, when the user touches the "Manual Input" button, the latest time is displayed in "Time Setting (Manual Input)" in FIG. 4, and the user manually inputs the current time and touches the "Set" button. As a result, the reception unit 19 accepts the input for setting the current time, and the control unit 12 sets the current time according to the accepted input. Also, for example, when the user touches the "Receive" button next to the "Manual Input" button, time information held by the external device 60 such as the user's smartphone is received from the external device 60, and the received time information is displayed in "Time Setting (Receive)" instead of "Time Setting (Manual Input)". Then, when the user touches the "Set" button, the reception unit 19 accepts the input for setting the current time, and the control unit 12 sets the current time according to the accepted input.

次に、制御部12は、ステップS10で時計回路16に設定された現在時刻に基づいて、記憶部13に保存された消費電力データを消去するか否かを判定する(S11)。例えば、ステップS11において、制御部12は、記憶部13に保存された消費電力データが時計回路16に設定された現在時刻よりも過去の時間に紐づけられた消費電力を示す消費電力データである場合、記憶部13に保存された消費電力データを消去しないと判定する(S11でNo)。そして、制御部12は、記憶部13に保存された消費電力データを消去しない(不図示)。 Next, the control unit 12 determines whether or not to erase the power consumption data stored in the memory unit 13 based on the current time set in the clock circuit 16 in step S10 (S11). For example, in step S11, if the power consumption data stored in the memory unit 13 indicates power consumption linked to a time earlier than the current time set in the clock circuit 16, the control unit 12 determines not to erase the power consumption data stored in the memory unit 13 (No in S11). Then, the control unit 12 does not erase the power consumption data stored in the memory unit 13 (not shown).

なお、第1例及び第2例では、現在時刻の設定(S10)において、ユーザに確認を促す通知を提示してもよい。図5は、現在時刻の設定におけるユーザへの通知の一例を示す図である。例えば、図5の(a)に示されるように、ユーザが時刻記憶部14に記憶された最新の時刻よりも過去の時刻を現在時刻として設定しようとした場合、制御部12は、図5の(b)に示されるようにユーザに確認を促す通知を提示してもよい。例えば、表示部18は、ユーザに設定時刻よりも後ろの時刻の消費電力データが削除されることを知らせる通知と、削除を実行してもいいか確認する通知とを表示してもよい。また、例えば、ユーザが時刻記憶部14に記憶された最新の時刻よりも未来の時刻を現在時刻として設定しようとした場合、表示部18は、設定時刻を現在時刻に設定することを知らせる通知と、設定を実行してもいいか確認する通知とを表示してもよい。 In the first and second examples, a notification prompting the user to confirm the setting of the current time (S10) may be presented. FIG. 5 is a diagram showing an example of a notification to the user when setting the current time. For example, as shown in FIG. 5(a), when the user tries to set the current time to a time earlier than the latest time stored in the time storage unit 14, the control unit 12 may present a notification prompting the user to confirm the setting as shown in FIG. 5(b). For example, the display unit 18 may display a notification notifying the user that power consumption data for a time later than the set time will be deleted, and a notification to confirm whether or not to execute the deletion. Also, for example, when the user tries to set the current time to a time later than the latest time stored in the time storage unit 14, the display unit 18 may display a notification notifying the user that the set time will be set to the current time, and a notification to confirm whether or not to execute the setting.

[3.効果等]
以上説明したように、実施の形態に係る電力計測装置10は、施設50に設けられた分岐回路32における消費電力を計測する計測回路15と、時刻を計時する時計回路16と、計測回路15によって計測された消費電力に時計回路16によって計時された時刻が紐づけられた消費電力データを保存する記憶部13と、時計回路16への電力供給がオフされて時計回路16によって計時される時刻が初期化された後に時計回路16に設定された現在時刻に基づいて、記憶部13に保存された消費電力データを消去するか否かを判定する制御部12と、を備える。
[3. Effects, etc.]
As described above, the power measuring device 10 of the embodiment comprises a measurement circuit 15 that measures the power consumption in a branch circuit 32 provided in a facility 50, a clock circuit 16 that keeps time, a memory unit 13 that stores power consumption data in which the power consumption measured by the measurement circuit 15 is linked to the time kept by the clock circuit 16, and a control unit 12 that determines whether to erase the power consumption data stored in the memory unit 13 based on the current time set in the clock circuit 16 after the power supply to the clock circuit 16 is turned off and the time kept by the clock circuit 16 is initialized.

このような電力計測装置10は、時計回路16の時刻が初期化された場合に、初期化後に設定された現在時刻に基づいて記憶部13に保存されている消費電力データを消去するか否かを判定する。そのため、電力計測装置10は、時刻の初期化により初期化された時刻より未来の時刻に紐づけられた消費電力データが消去されない。したがって、電力計測装置10は、時計回路16の時刻が初期化された場合に、記憶部13に保存されている消費電力データが消去されることを防ぐことができる。 When the time of the clock circuit 16 is initialized, such a power measurement device 10 determines whether or not to erase the power consumption data stored in the memory unit 13 based on the current time set after the initialization. Therefore, the power measurement device 10 does not erase the power consumption data linked to a time in the future than the initialized time when the time is initialized. Therefore, the power measurement device 10 can prevent the power consumption data stored in the memory unit 13 from being erased when the time of the clock circuit 16 is initialized.

また、例えば、実施の形態に係る電力計測装置10は、さらに、施設50が停電したときに時計回路16によって使用されるバックアップ電源17を備え、時計回路16への電力供給は、バックアップ電源17から時計回路16への電力供給である。 For example, the power measurement device 10 according to the embodiment further includes a backup power source 17 that is used by the clock circuit 16 when the facility 50 experiences a power outage, and power is supplied to the clock circuit 16 from the backup power source 17.

このような電力計測装置10は、施設50が停電してもバックアップ電源17から時計回路16へ電力が供給され、その電力供給がオフされた場合に、時計回路16の時刻が初期化される。そのため、電力計測装置10は、施設50が停電した後でもバックアップ電源17からの電力供給が行われる間、時計回路16によって時刻を計時することができる。したがって、電力計測装置10は、施設50の停電により時計回路16の時刻が初期化されることを低減することができる。 In this type of power measurement device 10, even if the facility 50 experiences a power outage, power is supplied from the backup power source 17 to the clock circuit 16, and when the power supply is turned off, the time in the clock circuit 16 is initialized. Therefore, even after a power outage in the facility 50, the power measurement device 10 can keep time using the clock circuit 16 while power is being supplied from the backup power source 17. Therefore, the power measurement device 10 can reduce the possibility of the time in the clock circuit 16 being initialized due to a power outage in the facility 50.

また、例えば、実施の形態に係る電力計測装置10では、制御部12は、記憶部13に保存された消費電力データのうち、時計回路16に設定された現在時刻よりも未来の時刻に紐づけられた消費電力を示す消費電力データを消去すると判定し、記憶部13に保存された消費電力データのうち、時計回路16に設定された現在時刻よりも過去の時刻に紐づけられた消費電力を示す消費電力データを消去しないと判定する。 Furthermore, for example, in the power measuring device 10 according to the embodiment, the control unit 12 determines to erase the power consumption data stored in the memory unit 13 that indicates power consumption linked to a time later than the current time set in the clock circuit 16, and determines not to erase the power consumption data stored in the memory unit 13 that indicates power consumption linked to a time earlier than the current time set in the clock circuit 16.

このような電力計測装置10は、現在時刻よりも過去の時刻に紐づけられた消費電力データを保持することができるため、時刻の初期化により記憶部13に保存された消費電力データが全て消去されることを防ぐことができる。 Such a power measurement device 10 can hold power consumption data linked to a time earlier than the current time, and therefore can prevent all power consumption data stored in the memory unit 13 from being erased due to time initialization.

また、例えば、実施の形態に係る電力計測装置10は、さらに、時計回路16によって計時される時刻を定期的に記憶する時刻記憶部14と、時刻記憶部14に記憶された最新の時刻を含む、現在時刻を設定するための設定画面を表示する表示部18とを備え、制御部12は、設定画面に入力された時刻情報に基づいて現在時刻を設定する。 For example, the power measuring device 10 according to the embodiment further includes a time memory unit 14 that periodically stores the time measured by the clock circuit 16, and a display unit 18 that displays a setting screen for setting the current time, including the most recent time stored in the time memory unit 14, and the control unit 12 sets the current time based on the time information input to the setting screen.

このような電力計測装置10は、時計回路16によって計時される時刻を定期的に(例えば、1分毎に)時刻記憶部14に記憶させるため、施設50が停電になっても時計回路16への電力供給がオフされるまで時刻を定期的に記憶することができる。そのため、時刻記憶部14に記憶された最新の時刻は、現在時刻により近い時刻となる。したがって、電力計測装置10は、現在時刻に近い時刻を設定画面に提示することができるため、ユーザによる現在時刻の設定ミスを低減することができる。 Since such a power metering device 10 periodically (e.g., every minute) stores the time measured by the clock circuit 16 in the time memory unit 14, even if the facility 50 experiences a power outage, the time can be periodically stored until the power supply to the clock circuit 16 is turned off. Therefore, the latest time stored in the time memory unit 14 is closest to the current time. Therefore, the power metering device 10 can present a time close to the current time on the setting screen, reducing errors in setting the current time by the user.

また、例えば、実施の形態に係る電力計測装置10では、制御部12は、設定画面に表示されている最新の時刻が正確な現在時刻ではないことを提示する。 Also, for example, in the power measurement device 10 according to the embodiment, the control unit 12 indicates that the latest time displayed on the setting screen is not the correct current time.

このような電力計測装置10は、設定画面に表示される最新の時刻が正確な現在時刻ではないことをユーザに提示するため、ユーザは、より確実に、現在時刻を設定することができる。 Such a power measuring device 10 informs the user that the latest time displayed on the setting screen is not the accurate current time, allowing the user to set the current time more reliably.

また、例えば、実施の形態に係る電力計測装置10は、さらに、外部装置60が保持する時刻情報を外部装置60から受信する通信部11を備え、制御部12は、受信された時刻情報に基づいて現在時刻を設定する。 For example, the power measurement device 10 according to the embodiment further includes a communication unit 11 that receives time information held by the external device 60 from the external device 60, and the control unit 12 sets the current time based on the received time information.

このような電力計測装置10は、外部装置60が保持する時刻情報を現在時刻の設定に使用するため、より正確に、かつ、簡便に、現在時刻を設定することができる。 Such a power measurement device 10 uses the time information held by the external device 60 to set the current time, making it possible to set the current time more accurately and easily.

また、例えば、実施の形態に係る分電盤20は、上記のいずれかの電力計測装置10を備える。 For example, the distribution board 20 according to the embodiment includes any one of the power measurement devices 10 described above.

このような分電盤20は、時計回路16の時刻が初期化された場合に、電力計測装置10が初期化後に設定された現在時刻に基づいて記憶部13に保存されている消費電力データを消去するか否かを判定する。そのため、分電盤20は、時刻の初期化により初期化された時刻より未来の時刻に紐づけられた消費電力データが消去されない。したがって、分電盤20は、時計回路16の時刻が初期化された場合に、記憶部13に保存されている消費電力データが消去されることを防ぐことができる。 When the time of the clock circuit 16 is initialized, the distribution board 20 determines whether or not to erase the power consumption data stored in the memory unit 13 based on the current time set by the power measurement device 10 after initialization. Therefore, the distribution board 20 does not erase the power consumption data linked to a time in the future than the initialized time when the time is initialized. Therefore, the distribution board 20 can prevent the power consumption data stored in the memory unit 13 from being erased when the time of the clock circuit 16 is initialized.

(その他の実施の形態)
以上、実施の形態について説明したが、本発明は、上記実施の形態に限定されるものではない。
Other Embodiments
Although the embodiment has been described above, the present invention is not limited to the above embodiment.

例えば、上記実施の形態において、特定の処理部が実行する処理を別の処理部が実行してもよい。また、複数の処理の順序が変更されてもよいし、複数の処理が並行して実行されてもよい。 For example, in the above embodiment, the processing performed by a specific processing unit may be executed by another processing unit. Also, the order of multiple processes may be changed, or multiple processes may be executed in parallel.

また、上記実施の形態において、各構成要素は、専用のハードウェアで構成されるか、各構成要素に適したソフトウェアプログラムを実行することによって実現されてもよい。各構成要素は、CPUまたはプロセッサなどのプログラム実行部が、ハードディスクまたは半導体メモリなどの記録媒体に記録されたソフトウェアプログラムを読み出して実行することによって実現されてもよい。 In the above embodiment, each component may be configured with dedicated hardware, or may be realized by executing a software program suitable for each component. Each component may be realized by a program execution unit such as a CPU or processor reading and executing a software program recorded on a recording medium such as a hard disk or semiconductor memory.

また、各構成要素は、回路(または集積回路)でもよい。これらの回路は、全体として1つの回路を構成してもよいし、それぞれ別々の回路でもよい。また、これらの回路は、それぞれ、汎用的な回路でもよいし、専用の回路でもよい。 In addition, each component may be a circuit (or integrated circuit). These circuits may form a single circuit as a whole, or each may be a separate circuit. In addition, each of these circuits may be a general-purpose circuit or a dedicated circuit.

また、本発明の全般的または具体的な態様は、システム、装置、方法、集積回路、コンピュータプログラムまたはコンピュータ読み取り可能なCD-ROMなどの記録媒体で実現されてもよい。また、システム、装置、方法、集積回路、コンピュータプログラム及び記録媒体の任意な組み合わせで実現されてもよい。 The general or specific aspects of the present invention may be realized as a system, an apparatus, a method, an integrated circuit, a computer program, or a computer-readable recording medium such as a CD-ROM. The present invention may also be realized as any combination of a system, an apparatus, a method, an integrated circuit, a computer program, and a recording medium.

また、上記実施の形態において説明された電力計測装置の動作における複数の処理の順序は一例である。複数の処理の順序は、変更されてもよいし、複数の処理は、並行して実行されてもよい。 The order of the multiple processes in the operation of the power measurement device described in the above embodiment is an example. The order of the multiple processes may be changed, and the multiple processes may be executed in parallel.

その他、実施の形態等に対して当業者が思いつく各種変形を施して得られる形態、または、本発明の趣旨を逸脱しない範囲で各実施の形態における構成要素及び機能を任意に組み合わせることで実現される形態も本発明に含まれる。 In addition, the present invention also includes forms obtained by applying various modifications to the embodiments that a person skilled in the art may conceive, or forms realized by arbitrarily combining the components and functions of each embodiment without departing from the spirit of the present invention.

10 電力計測装置
11 通信部
12 制御部
13 記憶部
14 時刻記憶部
15 計測回路
16 時計回路
17 バックアップ電源
18 表示部
19 受付部
20 分電盤
32 分岐回路
50 施設
60 外部装置
REFERENCE SIGNS LIST 10 Power measurement device 11 Communication unit 12 Control unit 13 Memory unit 14 Time memory unit 15 Measurement circuit 16 Clock circuit 17 Backup power supply 18 Display unit 19 Reception unit 20 Distribution board 32 Branch circuit 50 Facility 60 External device

Claims (8)

施設に設けられた分岐回路における消費電力を計測する計測回路と、
時刻を計時する時計回路と、
前記計測回路によって計測された消費電力に前記時計回路によって計時された時刻が紐づけられた消費電力データを保存する記憶部と、
前記時計回路への電力供給がオフされて前記時計回路によって計時される時刻が初期化された後に前記時計回路に設定された現在時刻に基づいて、前記記憶部に保存された前記消費電力データを消去するか否かを判定する制御部と、
を備える
電力計測装置。
A measurement circuit that measures power consumption in a branch circuit installed in the facility;
A clock circuit for measuring time;
a storage unit for storing power consumption data in which the power consumption measured by the measurement circuit is associated with a time measured by the clock circuit;
a control unit that determines whether or not to erase the power consumption data stored in the storage unit based on a current time that is set in the clock circuit after power supply to the clock circuit is turned off and the time measured by the clock circuit is initialized;
A power measuring device comprising:
さらに、前記施設が停電したときに前記時計回路によって使用されるバックアップ電源を備え、
前記時計回路への電力供給は、前記バックアップ電源から前記時計回路への電力供給である
請求項1に記載の電力計測装置。
a backup power source for use by the clock circuit when the facility experiences a power outage;
The power measuring device according to claim 1 , wherein the power supply to the clock circuit is power supply from the backup power source to the clock circuit.
前記制御部は、
前記記憶部に保存された前記消費電力データのうち、前記時計回路に設定された前記現在時刻よりも未来の時刻に紐づけられた消費電力を示す消費電力データを消去すると判定し、
前記記憶部に保存された前記消費電力データのうち、前記時計回路に設定された前記現在時刻よりも過去の時刻に紐づけられた消費電力を示す消費電力データを消去しないと判定する
請求項1または2に記載の電力計測装置。
The control unit is
determining that power consumption data indicating power consumption associated with a time in the future than the current time set in the clock circuit should be erased from the power consumption data stored in the storage unit;
The power measuring device according to claim 1 or 2, further comprising: determining not to erase power consumption data indicating power consumption linked to a time earlier than the current time set in the clock circuit, among the power consumption data stored in the memory unit.
さらに、
前記時計回路によって計時される時刻を定期的に記憶する時刻記憶部と、
前記時刻記憶部に記憶された最新の時刻を含む、前記現在時刻を設定するための設定画面を表示する表示部と
を備え、
前記制御部は、前記設定画面に入力された時刻情報に基づいて前記現在時刻を設定する
請求項1~3のいずれか1項に記載の電力計測装置。
moreover,
a time storage unit that periodically stores the time kept by the clock circuit;
a display unit that displays a setting screen for setting the current time, the setting screen including the latest time stored in the time storage unit;
4. The power measurement device according to claim 1, wherein the control unit sets the current time based on time information inputted into the setting screen.
前記制御部は、前記設定画面に表示されている前記最新の時刻が正確な現在時刻ではないことを提示する
請求項4に記載の電力計測装置。
The power measurement device according to claim 4 , wherein the control unit indicates that the latest time displayed on the setting screen is not the correct current time.
さらに、外部装置が保持する時刻情報を前記外部装置から受信する通信部を備え、
前記制御部は、受信された前記時刻情報に基づいて前記現在時刻を設定する
請求項1~3のいずれか1項に記載の電力計測装置。
Further, a communication unit is provided for receiving time information held by an external device from the external device,
4. The power measurement device according to claim 1, wherein the control unit sets the current time based on the received time information.
前記制御部は、前記現在時刻の設定において、ユーザに確認を促す通知を提示する
請求項1~6のいずれか1項に記載の電力計測装置。
The power measuring device according to claim 1 , wherein the control unit presents a notification to a user to prompt confirmation of setting the current time.
請求項1~7のいずれか1項に記載の電力計測装置を備える、
分電盤。
A power measuring device according to any one of claims 1 to 7,
Distribution board.
JP2022005513A 2022-01-18 2022-01-18 Power measuring equipment and distribution boards Active JP7713401B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022005513A JP7713401B2 (en) 2022-01-18 2022-01-18 Power measuring equipment and distribution boards

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022005513A JP7713401B2 (en) 2022-01-18 2022-01-18 Power measuring equipment and distribution boards

Publications (2)

Publication Number Publication Date
JP2023104493A JP2023104493A (en) 2023-07-28
JP7713401B2 true JP7713401B2 (en) 2025-07-25

Family

ID=87379189

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022005513A Active JP7713401B2 (en) 2022-01-18 2022-01-18 Power measuring equipment and distribution boards

Country Status (1)

Country Link
JP (1) JP7713401B2 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5216357A (en) 1987-04-10 1993-06-01 Schlumberger Industries, Inc. Real time solid state register having battery backup
JP2005172579A (en) 2003-12-10 2005-06-30 Tokyo Electric Power Co Inc:The Electronic energy meter
JP2010233398A (en) 2009-03-27 2010-10-14 Fuji Xerox Co Ltd Management system, power supply apparatus, electric device, management apparatus, and processing program
JP2011149847A (en) 2010-01-22 2011-08-04 Chubu Electric Power Co Inc Time setting device for wattmeter
JP2017161474A (en) 2016-03-11 2017-09-14 中国電力株式会社 Time automatic correction system

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000074960A (en) * 1998-08-31 2000-03-14 Mitsubishi Electric Corp Method and device for measuring electric energy by time zone
JP2011002363A (en) * 2009-06-19 2011-01-06 Panasonic Electric Works Denro Co Ltd Electric power monitoring system
JP2015002588A (en) * 2013-06-14 2015-01-05 株式会社日立製作所 Power consumption management system and method
JP6739058B2 (en) * 2016-08-03 2020-08-12 パナソニックIpマネジメント株式会社 Communication system, terminal, time correction method for communication system, and program

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5216357A (en) 1987-04-10 1993-06-01 Schlumberger Industries, Inc. Real time solid state register having battery backup
JP2005172579A (en) 2003-12-10 2005-06-30 Tokyo Electric Power Co Inc:The Electronic energy meter
JP2010233398A (en) 2009-03-27 2010-10-14 Fuji Xerox Co Ltd Management system, power supply apparatus, electric device, management apparatus, and processing program
JP2011149847A (en) 2010-01-22 2011-08-04 Chubu Electric Power Co Inc Time setting device for wattmeter
JP2017161474A (en) 2016-03-11 2017-09-14 中国電力株式会社 Time automatic correction system

Also Published As

Publication number Publication date
JP2023104493A (en) 2023-07-28

Similar Documents

Publication Publication Date Title
US9535685B1 (en) Smartly identifying a version of a software application for installation
US20090228694A1 (en) Dynamically updating barcode data
CN103164506A (en) Method and system for using push notifications to reduce open browser connections
JP2025100766A (en) Notification system, notification method, and program
JP7713401B2 (en) Power measuring equipment and distribution boards
US7854544B2 (en) Correction apparatus and clock device using the same
JP2017015399A (en) Electronic watch, and program
JP2014052189A (en) Programmable logic controller, time correction system for the same, and external apparatus for the programmable logic controller
JP2012243259A (en) Machine control system, mobile terminal and program
JP5358317B2 (en) Energy management device used
US20070101171A1 (en) Information processing apparatus and resume control method
US20200410067A1 (en) License management system, license management method, non-transitory computer readable recording medium storing and license management program
JP4989351B2 (en) Air traffic control system, air traffic control information storage method, and air traffic control information storage program
JP6770632B2 (en) Electronic devices, calculation methods and programs
JP4882115B2 (en) Remote notification system, electronic computer, and remote notification method
JP2019079580A (en) Electronic apparatus, calculation method and program
JP6214261B2 (en) Power distribution monitoring system
JP2025131317A (en) Display control device, display control method, and program
JP2020155002A (en) Terminal, server device, method and program
JP6896010B2 (en) Display control device, display control method and display control program
JP2013054577A (en) Portable terminal and program
JP6944912B2 (en) Information processing equipment, voting system, guidance method and guidance program
JP6486295B2 (en) Electronic device, current consumption calculation method and program
JP2021157233A (en) Electronic device, electronic device system, electronic device function limit cancel method and electronic device function limit cancel program
US20220166836A1 (en) Measurement system, terminal, measurement instrument, and storage medium

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240913

TRDD Decision of grant or rejection written
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250625

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250701

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250714

R150 Certificate of patent or registration of utility model

Ref document number: 7713401

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150