JP7715093B2 - Emission calculation device - Google Patents
Emission calculation deviceInfo
- Publication number
- JP7715093B2 JP7715093B2 JP2022116820A JP2022116820A JP7715093B2 JP 7715093 B2 JP7715093 B2 JP 7715093B2 JP 2022116820 A JP2022116820 A JP 2022116820A JP 2022116820 A JP2022116820 A JP 2022116820A JP 7715093 B2 JP7715093 B2 JP 7715093B2
- Authority
- JP
- Japan
- Prior art keywords
- emission
- amount
- unit
- information
- usage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Economics (AREA)
- Engineering & Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Health & Medical Sciences (AREA)
- Strategic Management (AREA)
- General Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Health & Medical Sciences (AREA)
- General Physics & Mathematics (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
本開示は、排出量算出装置に関する。 This disclosure relates to an emission calculation device.
温室効果ガス排出量を削減するために、現状の温室効果ガス排出量の把握が重要である。従来、輸送手段などの複数の製品を扱う排出元の排出量を用いて、製品毎の排出量を算出する技術がある(特許文献1)。特許文献1の技術では、複数の個品を輸送する輸送手段などの排出元の排出量を用いて、個品毎の排出量を求める場合には、個品の重量が反映された重み度を用いて按分することにより個品毎の排出量を求めている。 In order to reduce greenhouse gas emissions, it is important to understand current greenhouse gas emissions. Conventionally, there is technology for calculating emissions for each product using emissions from sources that handle multiple products, such as transportation means (Patent Document 1). With the technology in Patent Document 1, when calculating emissions for each individual item using emissions from sources such as transportation means that transport multiple individual items, the emissions for each individual item are calculated by apportioning them using weights that reflect the weight of the individual items.
しかしながら、特許文献1の技術では、物品毎の温室効果ガス排出量に物品の重量が反映される。このため、温室効果ガス排出量の妥当性を適切に評価できないおそれがある。 However, with the technology in Patent Document 1, the weight of an item is reflected in the greenhouse gas emissions for each item. As a result, there is a risk that the validity of greenhouse gas emissions cannot be properly evaluated.
本開示は、以下の形態として実現することが可能である。
本開示の一形態によれば、温室効果ガスの排出量を算出する排出量算出装置が提供される。この排出量算出装置は、第1位置と前記第1位置よりも下流の第2位置とを有する製造ラインを流れる複数のワークについて、(i)前記複数のワークのそれぞれについての、前記第1位置の通過時刻と前記第2位置の前記通過時刻との情報を含むトレーサビリティ情報と、(ii)前記製造ラインの稼働に伴い使用されるエネルギーのエネルギー使用量情報と、を受信する通信部と、排出量算出部と、を備え、前記排出量算出部は、前記トレーサビリティ情報を用いて、前記複数のワークの一つを対象ワークとして、前記対象ワークが前記第1位置を通過してから前記第2位置を通過するまでの流通期間を分割した複数の単位期間毎に、前記製造ラインを流れているワークのワーク個数を取得する個数取得処理と、前記エネルギー使用量情報を用いて、前記複数の単位期間毎のエネルギー使用量である単位エネルギー使用量を取得する使用量取得処理と、前記複数の単位期間毎に、前記単位エネルギー使用量を前記ワーク個数で除して算出される前記複数の単位期間毎のワークエネルギー使用量を合計することにより、前記対象ワークの前記流通期間における合計エネルギー使用量を算出する合計算出処理と、前記合計エネルギー使用量を換算することにより、前記排出量を算出する換算処理と、を実行し、前記製造ラインは複数あり、前記複数のワークは前記複数の製造ラインのそれぞれを順に流れ、前記排出量算出部は、前記複数の製造ラインのそれぞれについて、前記対象ワークの前記排出量を算出し、さらに、前記複数の製造ラインのそれぞれについての前記排出量を合計して、合計排出量を算出する合計排出量算出処理を実行し、前記エネルギー使用量情報は、前記複数の製造ラインのいずれかの製造ラインに配置された製造装置にて使用される電力の電力使用量であって、前記流通期間の時間よりも長い使用量単位時間当たりの電力使用量を含み、前記排出量算出部は、前記使用量取得処理において、前記使用量単位時間当たりの電力使用量を用いて、前記複数の単位期間毎の電力使用量を算出して取得する。
The present disclosure can be realized in the following forms.
According to one aspect of the present disclosure, there is provided an emission calculation device for calculating greenhouse gas emissions. The emission calculation device includes: a communication unit that receives, for a plurality of workpieces flowing on a production line having a first position and a second position downstream of the first position, (i) traceability information, for each of the plurality of workpieces, including information on the time of passage at the first position and the time of passage at the second position, and (ii) energy usage information on energy used in operation of the production line; and an emission calculation unit, wherein the emission calculation unit uses the traceability information to perform a number acquisition process for acquiring the number of workpieces flowing on the production line for each of a plurality of unit periods obtained by dividing a distribution period from when the target workpiece passes the first position to when it passes the second position, using the traceability information; a usage amount acquisition process that uses the energy usage information to acquire unit energy usage, which is the energy usage for each of the plurality of unit periods; and a usage amount acquisition process that calculates, for each of the plurality of unit periods, the unit energy usage amount calculated by dividing the unit energy usage amount by the number of workpieces. The system executes a total calculation process that calculates the total energy usage of the target work during the distribution period by summing the energy usage of the work for each period, and a conversion process that calculates the emission amount by converting the total energy usage, wherein there are multiple production lines, and the multiple works flow sequentially through each of the multiple production lines, the emission calculation unit calculates the emission amount of the target work for each of the multiple production lines, and further executes a total emission calculation process that sums the emission amounts for each of the multiple production lines to calculate the total emission amount, the energy usage information is the amount of electricity used by manufacturing equipment arranged on any of the multiple production lines, and includes the amount of electricity usage per usage unit time that is longer than the time of the distribution period, and the emission calculation unit calculates and acquires the amount of electricity usage for each of the multiple unit periods using the amount of electricity usage per usage unit time in the usage acquisition process.
(1)本開示の一形態によれば、温室効果ガスの排出量を算出する排出量算出装置が提供される。この排出量算出装置は、第1位置と前記第1位置よりも下流の第2位置とを有する製造ラインを流れる複数のワークについて、(i)前記複数のワークのそれぞれについての、前記第1位置の通過時刻と前記第2位置の前記通過時刻との情報を含むトレーサビリティ情報と、(ii)前記製造ラインの稼働に伴い使用されるエネルギーのエネルギー使用量情報と、を受信する通信部と、排出量算出部と、を備え、前記排出量算出部は、前記トレーサビリティ情報を用いて、前記複数のワークの一つを対象ワークとして、前記対象ワークが前記第1位置を通過してから前記第2位置を通過するまでの流通期間を分割した複数の単位期間毎に、前記製造ラインを流れているワークのワーク個数を取得する個数取得処理と、前記エネルギー使用量情報を用いて、前記複数の単位期間毎のエネルギー使用量である単位エネルギー使用量を取得する使用量取得処理と、前記複数の単位期間毎に、前記単位エネルギー使用量を前記ワーク個数で除して算出される前記複数の単位期間毎のワークエネルギー使用量を合計することにより、前記対象ワークの前記流通期間における合計エネルギー使用量を算出する合計算出処理と、前記合計エネルギー使用量を換算することにより、前記排出量を算出する換算処理と、を実行する。この形態によれば、ワーク毎に温室効果ガスの排出量を精度良く算出することができるため、ワーク毎に排出量の妥当性を適切に評価することができる。
(2)上記形態の排出量算出装置であって、前記製造ラインは複数あり、前記複数のワークは前記複数の製造ラインのそれぞれを順に流れ、前記排出量算出部は、前記複数の製造ラインのそれぞれについて、前記対象ワークの前記排出量を算出し、さらに、前記複数の製造ラインのそれぞれについて前記排出量を合計して、合計排出量を算出する合計排出量算出処理を実行してもよい。この形態によれば、複数の製造ラインのすべての製造ラインで排出された排出量を算出することができる。
(3)上記形態の排出量算出装置であって、前記エネルギー使用量情報は、前記複数の製造ラインのいずれかの製造ラインに配置された製造装置にて使用される電力の電力使用量と、前記製造装置にて使用される燃料ガスの燃料ガス使用量と、前記製造装置に送り込まれる空気の空気使用量との少なくともいずれか1つを含んでもよい。この形態によれば、電力使用量と、燃料ガス使用量と、空気使用量とのいずれかを用いて排出量を算出することができる。
(4)上記形態の排出量算出装置であって、前記エネルギー使用量情報は、前記流通期間の時間よりも長い使用量単位時間当たりの電力使用量を含み、前記排出量算出部は、前記使用量取得処理において、前記使用量単位時間当たりの電力使用量を用いて、前記複数の単位期間毎の電力使用量を算出して取得してもよい。この形態によれば、単位期間毎の電力使用量を使用する場合と比較して、エネルギー使用量情報の情報量を減らすことができる。
(5)上記形態の排出量算出装置であって、前記複数のワークのそれぞれには識別情報が付与されており、前記排出量算出部は、前記複数のワークのそれぞれについて、前記排出量を算出し、さらに、前記識別情報と、前記排出量とを対応付けた排出量情報を作成する作成処理を実行してもよい。この形態によれば、排出量情報は、識別情報と排出量とが対応付けられているため、識別情報とトレーサビリティ情報とを用いて、排出量を時系列に並べることができ、一日単位、季節単位で排出量の増減を効率的に検証することができる。
本開示は、排出量算出装置以外の種々の形態で実現することも可能である。例えば、トレーサビリティ情報およびエネルギー使用量情報を記憶する記憶装置と排出量算出装置とを備える排出量算出システム、排出量算出装置の制御方法、その制御方法を実現するコンピュータプログラム、そのコンピュータプログラムを記録した一時的でない記録媒体等の形態で実現することができる。
(1) According to one aspect of the present disclosure, there is provided an emission calculation device that calculates greenhouse gas emissions. The emission calculation device includes: a communication unit that receives, for a plurality of workpieces flowing on a production line having a first position and a second position downstream of the first position, (i) traceability information for each of the plurality of workpieces, the traceability information including information on the time of passage through the first position and the time of passage through the second position, and (ii) energy usage information on energy used in operation of the production line; and an emission calculation unit that uses the traceability information to calculate, for one of the plurality of workpieces as a target workpiece, a distribution period from when the target workpiece passed the first position to when it passed the second position. a number acquisition process for acquiring the number of workpieces flowing through the production line for each of a plurality of unit periods obtained by dividing the production line into a plurality of unit periods, a usage acquisition process for acquiring a unit energy usage that is the energy usage for each of the plurality of unit periods using the energy usage information, a total calculation process for calculating a total energy usage for the target workpiece during the distribution period by summing up the workpiece energy usage for each of the plurality of unit periods that is calculated by dividing the unit energy usage by the number of workpieces for each of the plurality of unit periods, and a conversion process for calculating the emission amount by converting the total energy usage. According to this aspect, the greenhouse gas emission amount for each workpiece can be accurately calculated, and therefore the validity of the emission amount for each workpiece can be appropriately evaluated.
(2) In the emission calculation device of the above aspect, there may be a plurality of production lines, the plurality of workpieces flow through each of the plurality of production lines in order, and the emission calculation unit may execute a total emission calculation process to calculate the emission amount of the target workpiece for each of the plurality of production lines and further calculate a total emission amount by adding up the emission amounts for each of the plurality of production lines. According to this aspect, it is possible to calculate the emission amount emitted in all of the plurality of production lines.
(3) In the emission calculation device of the above aspect, the energy usage information may include at least one of an amount of electricity used by a manufacturing device arranged in any one of the plurality of manufacturing lines, an amount of fuel gas used by the manufacturing device, and an amount of air used to feed the manufacturing device. According to this aspect, the emission amount can be calculated using any one of the amount of electricity used, the amount of fuel gas used, and the amount of air used.
(4) In the emission calculation device of the above aspect, the energy usage information may include an amount of electricity usage per usage unit time that is longer than the duration of the distribution period, and the emission calculation unit may calculate and acquire the amount of electricity usage for each of the plurality of unit periods using the amount of electricity usage per usage unit time in the usage amount acquisition process. According to this aspect, the amount of information of the energy usage information can be reduced compared to when the amount of electricity usage per unit period is used.
(5) In the emission calculation device of the above aspect, each of the plurality of works is assigned with identification information, and the emission calculation unit may calculate the emission amount for each of the plurality of works and further execute a creation process to create emission information in which the identification information and the emission amount correspond to each other. According to this aspect, the emission information corresponds between the identification information and the emission amount, so that the emission amount can be arranged in chronological order using the identification information and the traceability information, and an increase or decrease in the emission amount can be efficiently verified on a daily or seasonal basis.
The present disclosure can also be realized in various forms other than an emission calculation device, such as an emission calculation system including an emission calculation device and a storage device that stores traceability information and energy usage information, a control method for an emission calculation device, a computer program that realizes the control method, a non-transitory recording medium on which the computer program is recorded, etc.
A.第1実施形態:
図1は、排出量算出装置10と、データサーバ100と、製造ラインL1との構成を示す模式図である。排出量算出装置10は、データサーバ100に記憶されている情報を用いて、製造ラインL1を流れるワークW毎の温室効果ガスの排出量を算出する。
A. First embodiment:
1 is a schematic diagram showing the configuration of an emission amount calculation device 10, a data server 100, and a production line L1. The emission amount calculation device 10 uses information stored in the data server 100 to calculate the amount of greenhouse gas emissions for each workpiece W flowing through the production line L1.
図1に示すように、製造ラインL1では、図1中の白抜きの矢印で示す搬送方向に、ベルトコンベア50により搬送される複数のワークWに対して、製造装置51により順次加工が行われる。製造装置51は、電源53から供給される電力により稼働する。 As shown in Figure 1, on production line L1, multiple workpieces W are transported by belt conveyor 50 in the transport direction indicated by the white arrow in Figure 1, and are sequentially processed by manufacturing equipment 51. Manufacturing equipment 51 operates using power supplied from power source 53.
各ワークWには、各ワークWを一義に特定するための識別情報が付与されている。具体的には、各ワークWには、識別情報としてのシリアル番号が記号化された識別マークMが取り付けられている。本実施形態では、識別マークMとして、QRコード(登録商標)が用いられている。なお、複数のワークWは、互いに同じ仕様のワークである場合と、互いに異なる仕様のワークである場合がある。 Each workpiece W is assigned identification information to uniquely identify it. Specifically, each workpiece W is affixed with an identification mark M that symbolizes a serial number as identification information. In this embodiment, a QR code (registered trademark) is used as the identification mark M. Note that multiple workpieces W may have the same specifications or different specifications.
製造ラインL1の第1位置P1と、第1位置P1よりも下流である第2位置P2とのそれぞれには、読み取り装置54が配置されている。各読み取り装置54は、撮像部55を備えている。撮像部55は、ワークWに取り付けられた識別マークMを撮像可能な位置に取り付けられている。読み取り装置54は、識別マークMを読み取ることによりシリアル番号を取得し、撮像した日時を通過時刻として、取得したシリアル番号と対応付けて記憶する。また、読み取り装置54は、互いに対応付けられた通過時刻とシリアル番号との情報を含む信号をデータサーバ100に送信する。 A reading device 54 is located at each of the first position P1 and the second position P2 downstream of the first position P1 on the production line L1. Each reading device 54 is equipped with an imaging unit 55. The imaging unit 55 is attached at a position where it can capture an image of the identification mark M attached to the workpiece W. The reading device 54 acquires the serial number by reading the identification mark M, and stores the date and time of the image capture as the passage time, correlating it with the acquired serial number. The reading device 54 also transmits a signal to the data server 100 that includes information on the correlated passage time and serial number.
なお、本実施形態では、識別情報を有する識別子としてQRコード(登録商標)が用いられているが、例えば、RFID(Radio Frequency Identifier)などのその他の種類の識別子を識別子として用いることができる。 In this embodiment, a QR code (registered trademark) is used as an identifier having identification information, but other types of identifiers, such as an RFID (Radio Frequency Identifier), can also be used as the identifier.
電力計52は、電源53から製造装置51に供給される電力の電力量を示す信号をデータサーバ100へ送信する。本実施形態では、電力計52は、現時点から過去1時間当たりの電力量を1時間ごとにデータサーバ100へ送信する。データサーバ100は、排出量算出装置10と通信可能である。 The power meter 52 transmits a signal indicating the amount of electricity supplied from the power source 53 to the manufacturing equipment 51 to the data server 100. In this embodiment, the power meter 52 transmits the amount of electricity per hour from the present to the data server 100 every hour. The data server 100 is capable of communicating with the emission amount calculation device 10.
記憶装置としてのデータサーバ100は、CPU110と、記憶部120と、通信部130とを備える。CPU110は、記憶部120に記憶されているプログラムを実行し、種々の処理を実行する。通信部130は、ネットワークを介して、他の情報処理装置と情報のやり取りを行う。記憶部120は、トレーサビリティ情報122と、エネルギー使用量情報124とを記憶している。トレーサビリティ情報122は、各読み取り装置54から送信される、互いに対応付けられた通過時刻とシリアル番号との情報を用いて逐次更新される情報である。同様に、エネルギー使用量情報124は、電力計52から送信される電力量を用いて逐次更新される情報である。 The data server 100, which serves as a storage device, comprises a CPU 110, a storage unit 120, and a communication unit 130. The CPU 110 executes programs stored in the storage unit 120 and performs various processes. The communication unit 130 exchanges information with other information processing devices via a network. The storage unit 120 stores traceability information 122 and energy usage information 124. The traceability information 122 is information that is updated sequentially using information on the passage time and serial number that are associated with each other and transmitted from each reading device 54. Similarly, the energy usage information 124 is information that is updated sequentially using the amount of power transmitted from the wattmeter 52.
排出量算出装置10は、CPU12と、記憶部16と、通信部18とを備える情報処理装置として構成されている。CPU12は、記憶部16に記憶されているプログラムを実行し、種々の処理を実行する。CPU12は、排出量算出部14を有する。排出量算出部14は、CPU12が記憶部16に記憶されているプログラムを実行することにより実現される機能部である。通信部18は、ネットワークを介して、データサーバ100と情報のやり取りを行う。後述する排出量算出処理では、通信部18は、記憶部120に記憶されているトレーサビリティ情報122およびエネルギー使用量情報124を受信する。ネットワークとして、インターネットや、LAN(Local Area Network)やWAN(Wide Area Network)などを用いることができる。 The emission amount calculation device 10 is configured as an information processing device including a CPU 12, a memory unit 16, and a communication unit 18. The CPU 12 executes programs stored in the memory unit 16 and performs various processes. The CPU 12 has an emission amount calculation unit 14. The emission amount calculation unit 14 is a functional unit realized when the CPU 12 executes programs stored in the memory unit 16. The communication unit 18 exchanges information with the data server 100 via a network. In the emission amount calculation process described below, the communication unit 18 receives traceability information 122 and energy usage information 124 stored in the memory unit 120. The network may be the Internet, a LAN (Local Area Network), or a WAN (Wide Area Network).
図2は、トレーサビリティ情報122およびエネルギー使用量情報124を説明する図である。トレーサビリティ情報122は、複数のワークWのそれぞれについての、第1位置P1の通過時刻と第2位置P2の通過時刻との情報を含む。具体的には、図2に示すように、トレーサビリティ情報122は、シリアル番号と、通過時刻としての通過日時と、通過場所とが互いに対応付けられた情報である。図2に示す「L1P1」とは、製造ラインL1の第1位置P1を示す。図2の「L1P2」とは、製造ラインL1の第2位置P2を示す。図2には、シリアル番号「S01」のワークWは、2022年1月18日の6時に第1位置P1を通過し、同日6時4分に第2位置P2を通過したことが示されている。 Figure 2 is a diagram illustrating traceability information 122 and energy usage information 124. Traceability information 122 includes information on the passing time of each of multiple workpieces W at first position P1 and second position P2. Specifically, as shown in Figure 2, traceability information 122 is information in which a serial number, a passing date and time as the passing time, and a passing location are associated with each other. "L1P1" in Figure 2 indicates first position P1 on production line L1. "L1P2" in Figure 2 indicates second position P2 on production line L1. Figure 2 shows that workpiece W with serial number "S01" passed first position P1 at 6:00 on January 18, 2022, and passed second position P2 at 6:04 on the same day.
エネルギー使用量情報124は、製造ラインL1の稼働に伴い使用されるエネルギーのエネルギー使用量の情報である。図2に示すように、エネルギー使用量情報124は、対応する製造ライン毎に、検出時刻と、使用量単位時間としての1時間当たりの電力使用量としての電力量とが互いに対応付けられたデータである。「対応する製造ライン」とは、エネルギーを使用している製造装置が配置された製造ラインを指す。例えば、図2中の「bb」は、製造ラインL1で、2022年1月18日の5時から6時までの1時間で使用された電力量である。なお、図2中、「1分間当たりの電力量」とは、後述する排出量算出処理にて作成される情報である。 Energy usage information 124 is information on the amount of energy used in the operation of production line L1. As shown in Figure 2, energy usage information 124 is data in which, for each corresponding production line, the detection time is associated with the amount of electricity used per hour, which is the amount of electricity used per unit time of usage. The "corresponding production line" refers to the production line in which the manufacturing equipment using energy is located. For example, "bb" in Figure 2 is the amount of electricity used by production line L1 for one hour from 5:00 to 6:00 on January 18, 2022. Note that in Figure 2, the "amount of electricity per minute" is information created in the emissions calculation process, which will be described later.
図3は、ワークW毎に、横軸の時刻に対して、製造ラインL1の第1位置P1を通過してから第2位置P2を通過するまで期間を斜線ハッチングにて描いた図である。図3では、例えば、識別番号「S01」のワークWが6時0分に第1位置P1を通過し、6時4分に第2位置P2を通過したことが示されている。図3に示されるように、本実施形態では、ワークWは、1分毎に製造ラインL1に投入される。また、各ワークWの第1位置P1を通過してから第2位置P2を通過するまでの流通期間DPは、エネルギー使用量情報124に含まれる電力量の単位時間である1時間よりも短い4分である。 Figure 3 shows, for each workpiece W, the period from when it passes through the first position P1 on the production line L1 until it passes through the second position P2, plotted with diagonal hatching, against the time on the horizontal axis. For example, Figure 3 shows that the workpiece W with identification number "S01" passed through the first position P1 at 6:00 and the second position P2 at 6:04. As shown in Figure 3, in this embodiment, the workpiece W is loaded onto the production line L1 every minute. Furthermore, the circulation period DP from when each workpiece W passes through the first position P1 until it passes through the second position P2 is four minutes, which is shorter than the unit time of one hour for the amount of electricity included in the energy usage information 124.
図4は、排出量算出部14が実行する排出量算出処理のフローチャートである。排出量算出処理は、製造ラインL1を流れ終わったワークWについて行われる処理である。排出量算出部14は、複数のワークWの一つを対象ワークとして、排出量算出処理を実行する。本実施形態では、識別番号「S05」のワークWが対象ワークである場合を例示して説明する。 Figure 4 is a flowchart of the emission amount calculation process executed by the emission amount calculation unit 14. The emission amount calculation process is performed on workpieces W that have finished flowing through the production line L1. The emission amount calculation unit 14 executes the emission amount calculation process using one of the multiple workpieces W as the target workpiece. In this embodiment, an example will be described in which the workpiece W with identification number "S05" is the target workpiece.
図4に示すように、排出量算出部14は、ステップS10にて、後述するステップS12からステップS16までの計算対象となる図3に示す単位期間UPを設定する。ここで、単位期間UPとは、図3に示すように、流通期間DPを分割した1つの期間である。本実施形態では、単位期間UPは、流通期間DPを4つに等分した期間であり、単位期間UPの時間は1分である。説明のため、図3に示すように、対象ワークである識別番号「S05」のワークWの4つの単位期間UPを早い順に、第1単位期間UP1、第2単位期間UP2、第3単位期間UP3、第4単位期間UP4と呼ぶ。排出量算出部14は、複数の単位期間UPのうち、時刻が早い方から順に対象の単位期間UPに設定する。つまり、排出量算出処理を開始してから最初に実行されるステップS10では、第1単位期間UP1が対象の単位期間UPに設定される。 As shown in FIG. 4, in step S10, the emission calculation unit 14 sets the unit period UP shown in FIG. 3, which is the target of calculations in steps S12 to S16, described below. Here, the unit period UP is one period obtained by dividing the distribution period DP, as shown in FIG. 3. In this embodiment, the unit period UP is a period obtained by dividing the distribution period DP into four equal parts, and the duration of the unit period UP is one minute. For explanatory purposes, as shown in FIG. 3, the four unit periods UP for the target workpiece, workpiece W with identification number "S05," are referred to in order of earliest to latest as the first unit period UP1, second unit period UP2, third unit period UP3, and fourth unit period UP4. The emission calculation unit 14 sets the target unit period UP among the multiple unit periods UP in order of earliest time. In other words, in step S10, which is executed first after the emission calculation process is started, the first unit period UP1 is set as the target unit period UP.
図4に示すステップS12において、排出量算出部14は、トレーサビリティ情報122を用いて、対象の単位期間UPにおいて、製造ラインL1を流れているワークWのワーク個数WNを取得する。図3に示すように、第1単位期間UP1では、識別番号が「S02」から「S05」までの4つのワークWが製造ラインL1を流れている。よって、ステップS12により取得されるワーク個数WNは、「4」である。 4, the emission amount calculation unit 14 acquires the number WN of workpieces W flowing on the production line L1 in the target unit period UP using the traceability information 122. As shown in FIG. 3, in the first unit period UP1, four workpieces W with identification numbers "S02" to "S05" flow on the production line L1. Therefore, the number WN of workpieces acquired in step S12 is "4."
図4に示すステップS14において、排出量算出部14は、エネルギー使用量情報124を用いて、第1単位期間UP1の単位エネルギー使用量UEを取得する。ここで、単位エネルギー使用量UEとは、単位期間UP毎のエネルギー使用量である。具体的にステップS14では、排出量算出部14は、図2中の「1時間当たりの電力量」を値60で除して、「1分当たりの電力量」を算出する。図2では、説明のため、「1分間当たりの電力量」を併記している。第1単位期間UP1は、2022年1月18日の6時4分から始まる期間である。したがって、具体的にステップS14では、単位エネルギー使用量UEとして、図2に示す2022年1月18日の7時に検出された1時間当たりの電力量であるcckWhを値60で除して算出される値であるfkWhが取得される。 In step S14 shown in FIG. 4, the emission amount calculation unit 14 uses the energy usage information 124 to obtain the unit energy usage UE for the first unit period UP1. Here, unit energy usage UE is the energy usage per unit period UP. Specifically, in step S14, the emission amount calculation unit 14 divides the "amount of electricity per hour" in FIG. 2 by the value 60 to calculate the "amount of electricity per minute." For ease of explanation, FIG. 2 also lists the "amount of electricity per minute." The first unit period UP1 is the period starting at 6:04 on January 18, 2022. Therefore, specifically, in step S14, the unit energy usage UE is obtained as fkWh, which is the value calculated by dividing cckWh, the amount of electricity per hour detected at 7:00 on January 18, 2022 shown in FIG. 2, by the value 60.
図4に示すステップS16において、排出量算出部14は、単位エネルギー使用量UEをワーク個数WNで除してワークエネルギー使用量WEを算出する。算出されるワークエネルギー使用量WEは、f/4kWhである。 In step S16 shown in FIG. 4, the emission amount calculation unit 14 calculates the work energy consumption amount WE by dividing the unit energy consumption amount UE by the number of workpieces WN. The calculated work energy consumption amount WE is f/4 kWh.
ステップS18において、排出量算出部14は、すべての単位期間UPについて、ワークエネルギー使用量WE量を算出したか否かを判断する。ワークエネルギー使用量WE量を算出していないと判断した場合(ステップS18:NO)、排出量算出部14は、処理をステップS10に戻す。 In step S18, the emission calculation unit 14 determines whether the work energy usage amount WE has been calculated for all unit periods UP. If it determines that the work energy usage amount WE has not been calculated (step S18: NO), the emission calculation unit 14 returns the process to step S10.
排出量算出部14は、第2単位期間UP2から第4単位期間UP4までの単位期間UPについても、上記と同様に、ステップS10からステップS16までを実行する。なお、本実施形態では、図3に示すように、第2単位期間UP2から第4単位期間UP4までのすべての単位期間UPにおいて、ワーク個数WNは「4」である。そして、第2単位期間UP2から第4単位期間UP4までのすべての単位期間UPにおいて、単位エネルギー使用量UEはfkWhである。このため、第2単位期間UP2から第4単位期間UP4までのすべての単位期間UPにおいて、ワークエネルギー使用量WEは、f/4kWhである。 The emission amount calculation unit 14 also executes steps S10 to S16 for the unit periods UP from the second unit period UP2 to the fourth unit period UP4 in the same manner as above. In this embodiment, as shown in FIG. 3, the number of workpieces WN is "4" in all unit periods UP from the second unit period UP2 to the fourth unit period UP4. The unit energy usage UE is f kWh in all unit periods UP from the second unit period UP2 to the fourth unit period UP4. Therefore, the work energy usage WE is f/4 kWh in all unit periods UP from the second unit period UP2 to the fourth unit period UP4.
図4に示すように、すべての単位期間UPについて、ワークエネルギー使用量WEを算出したと判断した場合(ステップS18:YES)、排出量算出部14は、流通期間DPのすべての単位期間UPについてのワークエネルギー使用量WEを合計して、合計エネルギー使用量TEを算出する(ステップS20)。本実施形態では、第1単位期間UP1から第4単位期間UP4までの4つの単位期間UPにおいて、ワークエネルギー使用量WEは、f/4kWhである。よって、合計エネルギー使用量TEは、fkWhである。 4, when it is determined that the work energy consumption WE has been calculated for all unit periods UP (step S18: YES), the emission calculation unit 14 calculates the total energy consumption TE by adding up the work energy consumption WE for all unit periods UP in the distribution period DP (step S20). In this embodiment, the work energy consumption WE for the four unit periods UP from the first unit period UP1 to the fourth unit period UP4 is f/4 kWh. Therefore, the total energy consumption TE is f kWh.
ステップS22において、排出量算出部14は、合計エネルギー使用量TEを温室効果ガスの排出量に換算する。本実施形態において、温室効果ガスは二酸化炭素である。そして、排出量算出部14は、記憶部16に予め記憶されている電力量を二酸化炭素の排出量[g]に換算する換算式を用いて、シリアル番号が「S05」であるワークWの製造ラインL1についての排出量を算出する。ステップS22の実行後、排出量算出部14は、本処理ルーチンを終了する。 In step S22, the emission calculation unit 14 converts the total energy usage TE into the amount of greenhouse gas emissions. In this embodiment, the greenhouse gas is carbon dioxide. Then, the emission calculation unit 14 calculates the amount of emissions for the production line L1 of the workpiece W whose serial number is "S05" using a conversion formula that converts the amount of electricity pre-stored in the memory unit 16 into carbon dioxide emissions [g]. After executing step S22, the emission calculation unit 14 terminates this processing routine.
排出量算出処理により、製造装置51で使用された電力量を用いて、ワークW毎の排出量を算出することができる。これにより、排出量の妥当性を適切に評価することができる。具体的には、例えば、仕様が同じ複数のワークWについて、排出量を比較することにより、例えば一日での排出量の変動を確認することができる。また、仕様が互いに異なる複数のワークWについて、排出量を比較することができる。そして、排出量を比較することにより、排出量を低減するために、ワークWの材料、大きさ、デザインなどを見直すことができる。 The emission calculation process allows the amount of emission for each workpiece W to be calculated using the amount of electricity used by the manufacturing equipment 51. This allows the appropriateness of the emission amount to be appropriately evaluated. Specifically, for example, by comparing the emission amounts for multiple workpieces W with the same specifications, it is possible to check fluctuations in emission amounts over the course of a day. It is also possible to compare the emission amounts for multiple workpieces W with different specifications. Then, by comparing the emission amounts, it is possible to review the material, size, design, etc. of the workpieces W in order to reduce emission amounts.
ステップS12を個数取得処理とも呼び、ステップS14を使用量取得処理とも呼び、ステップS20を合計算出処理とも呼び、ステップS22を換算処理とも呼ぶ。 Step S12 is also referred to as the quantity acquisition process, step S14 is also referred to as the usage amount acquisition process, step S20 is also referred to as the total calculation process, and step S22 is also referred to as the conversion process.
以上説明した第1実施形態によれば、排出量算出装置10は、排出量算出部14を備える。排出量算出部14は、ステップS12において、トレーサビリティ情報122を用いて、対象ワークの単位期間UP毎にワーク個数WNを取得する。また、排出量算出部14は、ステップS14において、エネルギー使用量情報124を用いて、単位期間UP毎の単位エネルギー使用量UEを取得する。そして、排出量算出部14は、ステップS20にて、単位期間UP毎に算出したワークエネルギー使用量WE量を合計して合計エネルギー使用量TEを算出する。排出量算出部14は、ステップS22にて、合計エネルギー使用量TEを換算して温暖化効果ガスの排出量を算出する。これにより、ワークW毎に温室効果ガスの排出量を精度良く算出することができるため、排出量の妥当性を適切に評価することができる。 According to the first embodiment described above, the emission amount calculation device 10 includes an emission amount calculation unit 14. In step S12, the emission amount calculation unit 14 uses the traceability information 122 to acquire the number of workpieces WN for each unit period UP of the target workpiece. In step S14, the emission amount calculation unit 14 also uses the energy usage information 124 to acquire the unit energy usage UE for each unit period UP. In step S20, the emission amount calculation unit 14 then calculates the total energy usage TE by summing the workpiece energy usage WE calculated for each unit period UP. In step S22, the emission amount calculation unit 14 converts the total energy usage TE to calculate the amount of greenhouse gas emissions. This allows the amount of greenhouse gas emissions for each workpiece W to be calculated with high accuracy, thereby enabling the appropriateness of the emissions to be appropriately evaluated.
また、エネルギー使用量情報124は、流通期間DPの時間よりも長い1時間当たりの電力量を含む。そして、排出量算出部14は、ステップS14において、1時間当たりの電力量を用いて、単位期間UP毎の電力使用量を算出して取得する。これにより、エネルギー使用量情報124が単位期間UP毎の電力使用量を有する場合と比較して、エネルギー使用量情報124の情報量を減らすことができる。 The energy usage information 124 also includes the amount of electricity per hour, which is longer than the duration of the distribution period DP. In step S14, the emission amount calculation unit 14 then calculates and obtains the amount of electricity used per unit period UP using the amount of electricity per hour. This allows the amount of information in the energy usage information 124 to be reduced compared to when the energy usage information 124 includes the amount of electricity used per unit period UP.
B.第2実施形態:
図5は、本実施形態に係る排出量算出装置10と、データサーバ100と、製造ラインL1~製造ラインL3との構成を示す模式図である。図6は、本実施形態に係るワークW毎に、横軸の時刻に対して、各製造ラインLの第1位置P1を通過してから第2位置P2を通過するまで期間を描いた図である。図7は、本実施形態に係るエネルギー使用量情報2124を説明する図である。図8は、本実施形態に係る複数ライン排出量算出処理のフローチャートである。本実施形態では、製造ラインLが3つあるため、排出量算出装置10は、3つの製造ラインLについては温室効果ガスの排出量を算出する点が、第1実施形態とは異なる。第1実施形態と同一の構成については同一の符号を付し、詳細な説明は適宜省略する。
B. Second embodiment:
FIG. 5 is a schematic diagram showing the configuration of the emission calculation device 10, data server 100, and production lines L1 to L3 according to this embodiment. FIG. 6 is a diagram illustrating the period from when each workpiece W passes through a first position P1 on each production line L to when it passes through a second position P2, versus time on the horizontal axis, for each workpiece W according to this embodiment. FIG. 7 is a diagram explaining energy usage information 2124 according to this embodiment. FIG. 8 is a flowchart of the multiple line emission calculation process according to this embodiment. This embodiment differs from the first embodiment in that, since there are three production lines L, the emission calculation device 10 calculates greenhouse gas emissions for the three production lines L. The same components as those in the first embodiment are designated by the same reference numerals, and detailed descriptions thereof will be omitted as appropriate.
図5に示すように、本実施形態では、複数のワークWは、製造ラインL1の後に、製造ラインL2と、製造ラインL3とを順に流れる。製造ラインL2と、製造ラインL3とを総称して製造ラインLとも呼ぶ。製造ラインL2に配置されている製造装置151は、ワークWを加熱する加熱炉である。製造装置151には、例えば都市ガスなどの商用の燃料ガス供給源153から供給される燃料ガスが加熱炉の加熱に用いられる。製造ラインL3に配置されている製造装置251は、ワークWを冷却する冷却装置である。製造装置251には、エアコンプレッサ253から供給される圧縮空気が冷却に用いられる。本実施形態では、エアコンプレッサ253が製造装置251に送り込む空気の空気使用量を用いて、エアコンプレッサ253が使用する電力に起因する二酸化炭素の排出量を求める。 As shown in FIG. 5, in this embodiment, multiple workpieces W flow sequentially through production line L1, followed by production line L2 and production line L3. Production line L2 and production line L3 are collectively referred to as production line L. Manufacturing device 151 arranged on production line L2 is a heating furnace that heats the workpieces W. Manufacturing device 151 uses fuel gas supplied from a commercial fuel gas supply source 153, such as city gas, to heat the heating furnace. Manufacturing device 251 arranged on production line L3 is a cooling device that cools the workpieces W. Manufacturing device 251 uses compressed air supplied from an air compressor 253 for cooling. In this embodiment, the amount of air consumed by air compressor 253 to supply air to manufacturing device 251 is used to calculate the amount of carbon dioxide emissions resulting from the electricity used by air compressor 253.
流量計152は、燃料ガス供給源153から製造装置151に供給される燃料ガスの流量を示す信号をデータサーバ100へ送信する。流量計252は、エアコンプレッサ253から製造装置251に供給される圧縮空気の流量を示す信号をデータサーバ100へ送信する。本実施形態では、流量計152および流量計252は、電力計52と同様に、現時点から過去1時間当たりの流量を1時間ごとにデータサーバ100へ送信する。 Flow meter 152 transmits a signal indicating the flow rate of fuel gas supplied from fuel gas supply source 153 to manufacturing equipment 151 to data server 100. Flow meter 252 transmits a signal indicating the flow rate of compressed air supplied from air compressor 253 to manufacturing equipment 251 to data server 100. In this embodiment, flow meter 152 and flow meter 252, like power meter 52, transmit the flow rate per hour from the present to the data server 100 every hour.
図6に示すように、本実施形態では、ワークWは、1分毎に製造ラインL1、製造ラインL2、および製造ラインL3のそれぞれに投入される。ここで、各流通期間DPを区別するために、製造ラインL1から製造ラインL3のそれぞれの流通期間DPを、順に第1流通期間DP1、第2流通期間DP2、第3流通期間DP3と呼ぶ。各ワークWの製造ラインL2の第1位置P1を通過してから第2位置P2を通過するまでの流通期間DPは2分である。各ワークWの製造ラインL3の第1位置P1を通過してから第2位置P2を通過するまでの流通期間DPは2分である。後述する複数ライン排出量算出処理では、第2流通期間DP2および第3流通期間DP3についても、第1流通期間DP1と同様に、単位期間UPの時間を1分として、単位期間UPが設定される。従って、第2流通期間DP2および第3流通期間DP3のいずれについても、2つの単位期間UPが設定されている。 As shown in FIG. 6 , in this embodiment, workpieces W are input to production lines L1, L2, and L3 every minute. To distinguish between the different circulation periods DP, the circulation periods DP for production lines L1 through L3 are referred to as the first circulation period DP1, the second circulation period DP2, and the third circulation period DP3, respectively. The circulation period DP for each workpiece W from passing through the first position P1 on production line L2 to passing through the second position P2 is two minutes. The circulation period DP for each workpiece W from passing through the first position P1 on production line L3 to passing through the second position P2 is also two minutes. In the multiple line emission calculation process described below, the unit period UP for the second circulation period DP2 and the third circulation period DP3 is set to one minute, similar to the first circulation period DP1. Therefore, two unit periods UP are set for both the second circulation period DP2 and the third circulation period DP3.
図7に示すように、本実施形態に係るエネルギー使用量情報2124には、3つの製造ラインLに対応して、電力使用量としての電力量と、燃料ガス使用量としてのガス流量と、空気使用量としての空気流量の情報が含まれている。図7に示す電力量とは、製造ラインL1に配置された製造装置51(図5)にて使用される電力の電力使用量としての電力量である。ガス流量とは、製造ラインL2に配置された製造装置151(図5)にて使用される燃料ガスの燃料ガス使用量としての流量である。空気流量とは、製造ラインL3に配置された製造装置251に送り込まれる空気の空気使用量としての流量である。 As shown in FIG. 7, the energy usage information 2124 according to this embodiment includes information on the amount of electricity used as the amount of power, the gas flow rate as the amount of fuel gas used, and the air flow rate as the amount of air used, corresponding to the three production lines L. The amount of electricity shown in FIG. 7 is the amount of electricity used as the amount of power used by the manufacturing equipment 51 (FIG. 5) arranged on production line L1. The gas flow rate is the flow rate of the fuel gas used as the amount of fuel gas used by the manufacturing equipment 151 (FIG. 5) arranged on production line L2. The air flow rate is the flow rate of the air sent to the manufacturing equipment 251 arranged on production line L3 as the amount of air used.
図8に示す複数ライン排出量算出処理について、本実施形態についても識別番号「S05」のワークWが対象ワークである場合を例示して説明する。排出量算出部14は、ステップS40において、次のステップS42の対象となる製造ラインLを設定する。本実施形態では、排出量算出部14は、対象の製造ラインLを、製造ラインL1、製造ラインL2、製造ラインL3の順に設定する。つまり、複数ライン排出量算出処理を開始してから最初に実行されるS40では、製造ラインL1が対象の製造ラインLに設定される。 8 , the present embodiment will be described by taking as an example a case where the workpiece W with identification number "S05" is the target workpiece. In step S40, the emission calculation unit 14 sets the target production line L for the next step S42. In this embodiment, the emission calculation unit 14 sets the target production lines L in the order of production line L1, production line L2, and production line L3. That is, in S40, which is executed first after the start of the multiple line emission calculation process, production line L1 is set as the target production line L.
排出量算出部14は、ステップS42において、サブルーチンである排出量算出処理を実行する。排出量算出処理の処理内容は、第1実施形態で説明した図4に示す排出量算出処理と同じである。複数ライン排出量算出処理を開始してから最初に実行されるステップS42では、対象ワークについて、製造ラインL1についての排出量が算出される。 In step S42, the emission amount calculation unit 14 executes the emission amount calculation process, which is a subroutine. The processing content of the emission amount calculation process is the same as the emission amount calculation process shown in FIG. 4 described in the first embodiment. In step S42, which is executed first after the multiple line emission amount calculation process is started, the emission amount for the target workpiece on production line L1 is calculated.
ステップS44において、排出量算出部14は、すべての製造ラインLについて、排出量を算出したか否かを判断する。すべての製造ラインLについて、排出量を算出していないと判断した場合(ステップS44:NO)、排出量算出部14は、処理をステップS40に戻す。 In step S44, the emission calculation unit 14 determines whether the emission amounts have been calculated for all production lines L. If it determines that the emission amounts have not been calculated for all production lines L (step S44: NO), the emission calculation unit 14 returns the process to step S40.
排出量算出部14は、製造ラインL2および製造ラインL3ついても、ステップS40およびステップS42を実行する。製造ラインL2および製造ラインL3と、製造ラインL1とでは、ワーク個数WNが異なるため、代表して製造ラインL2の排出量を算出する場合について説明する。図6に示すように、シリアル番号が「S05」の第2流通期間DP2の最初の単位期間UPでは、識別番号が「S04」および「S05」の2つのワークWが製造ラインL2を流れている。よって、ステップS12(図4)にて、取得されるワーク個数WNは、「2」である。シリアル番号が「S05」の第2流通期間DP2は、2022年1月18日6時8分から始まる。このため、図7に示すように、1時間当たりのガス流量はiiNm3であり、1分間当たりのガス流量はii/60Nm3である。したがって、ステップS16(図4)にて算出される、シリアル番号が「S05」の第2流通期間DP2の最初の単位期間UPについてのワークエネルギー使用量WEは、ii/120Nm3である。第2流通期間DP2の2番目の単位期間UPと、第2流通期間DP2についても同様に、ワークエネルギー使用量WEが算出される。 The emission calculation unit 14 also executes steps S40 and S42 for the production lines L2 and L3. Because the number of workpieces WN differs between the production lines L2 and L3 and the production line L1, the calculation of the emission amount for the production line L2 will be described as a representative example. As shown in FIG. 6 , in the first unit period UP of the second distribution period DP2 with the serial number "S05," two workpieces W with identification numbers "S04" and "S05" flow through the production line L2. Therefore, the number of workpieces WN acquired in step S12 ( FIG. 4 ) is "2." The second distribution period DP2 with the serial number "S05" begins at 6:08 AM on January 18, 2022. Therefore, as shown in FIG. 7 , the gas flow rate per hour is ii Nm³ , and the gas flow rate per minute is ii /60 Nm³. Therefore, the work energy consumption amount WE for the first unit period UP of the second circulation period DP2 having the serial number "S05", calculated in step S16 (FIG. 4), is ii/120 Nm3 . The work energy consumption amount WE is calculated similarly for the second unit period UP of the second circulation period DP2 and the second circulation period DP2.
図8に示すように、すべての製造ラインLについて、排出量を算出したと判断した場合(ステップS44:YES)、排出量算出部14は、すべての製造ラインLについての排出量を合計して、合計排出量を算出する(ステップS46)。 As shown in FIG. 8, if it is determined that the emissions have been calculated for all production lines L (step S44: YES), the emissions calculation unit 14 adds up the emissions for all production lines L to calculate the total emissions (step S46).
ステップS48において、排出量算出部14は、シリアル番号と、合計排出量とを対応付けた排出量情報を作成し、作成した排出量情報を記憶部16に記憶して、本処理ルーチンを終了する。シリアル番号と、合計排出量とが対応付けられた排出量情報が作成されることにより、シリアル番号とトレーサビリティ情報122とを用いて、排出量を時系列に並べることができる。時系列に並べられた排出量を用いて、一日単位、季節単位で排出量の増減を効率的に検証することができる。 In step S48, the emission amount calculation unit 14 creates emission information that associates serial numbers with total emission amounts, stores the created emission information in the memory unit 16, and terminates this processing routine. By creating emission information that associates serial numbers with total emission amounts, it is possible to arrange emission amounts in chronological order using the serial numbers and traceability information 122. Using the emission amounts arranged in chronological order, it is possible to efficiently verify increases or decreases in emission amounts on a daily or seasonal basis.
ステップS46を合計排出量算出処理とも呼び、ステップS48を作成処理とも呼ぶ。 Step S46 is also referred to as the total emission calculation process, and step S48 is also referred to as the creation process.
以上説明した第2実施形態によれば、第1実施形態と同様の効果を奏する。また、排出量算出部14は、ステップS42にて、複数の製造ラインLのそれぞれの排出量を算出し、ステップS46にて、すべての排出量を合計して合計排出量を算出する。これにより、製造ラインL1から製造ラインL3のすべての製造ラインLで排出された排出量を算出することができる。また、同じワークWについて、複数の製造ラインLのそれぞれの排出量を比較することにより、複数の製造ラインLのうち、排出量が多い製造ラインLを特定することができる。 The second embodiment described above achieves the same effects as the first embodiment. Furthermore, the emission amount calculation unit 14 calculates the emission amount for each of the multiple production lines L in step S42, and then calculates the total emission amount by adding up all of the emission amounts in step S46. This makes it possible to calculate the emission amount for all of the production lines L, from production line L1 to production line L3. Furthermore, by comparing the emission amounts for each of the multiple production lines L for the same workpiece W, it is possible to identify the production line L with the largest emission amount among the multiple production lines L.
また、エネルギー使用量情報2124は、製造装置51にて使用される電力の電力使用量と、製造装置151にて使用される燃料ガスの燃料ガス使用量と、製造装置251に送り込まれる空気の空気使用量とを含む。これにより、温室効果ガスの排出源となるエネルギーの使用量情報として、電力量と、燃料ガス使用量と、空気使用量とを用いることができる。 In addition, the energy usage information 2124 includes the amount of electricity used by the manufacturing equipment 51, the amount of fuel gas used by the manufacturing equipment 151, and the amount of air supplied to the manufacturing equipment 251. This allows the amount of electricity, the amount of fuel gas used, and the amount of air used to be used as energy usage information that is a source of greenhouse gas emissions.
また、排出量算出部14は、ステップS48において、シリアル番号と、合計排出量とを対応付けた排出量情報を作成する。これにより、シリアル番号を用いて、排出量を時系列に並べることができ、一日単位、季節単位で排出量の増減を効率的に検証することができる。 In addition, in step S48, the emission amount calculation unit 14 creates emission information that associates serial numbers with total emission amounts. This allows emissions to be arranged in chronological order using serial numbers, making it possible to efficiently verify increases or decreases in emission amounts on a daily or seasonal basis.
C.他の実施形態:
(C1)上記第1実施形態の排出量算出処理では、ステップS12、ステップS14の順に処理が行われるが、各ステップの順序は、上記に限られない。
C. Other Embodiments:
(C1) In the emission amount calculation process of the first embodiment, the process is performed in the order of step S12 and step S14, but the order of the steps is not limited to the above.
(C2)上記第1実施形態では、単位エネルギー使用量UEは、排出量算出処理のステップS14にて都度算出して取得される。単位エネルギー使用量UEが取得方法は、これに限られない。例えば、排出量算出部14は、すべての時刻について、「1分間当たりの電力量」が予め算出し、記憶部16に記憶しておき、ステップS14では、記憶部16に記憶されている情報を参照して取得してもよい。 (C2) In the first embodiment described above, the unit energy usage UE is calculated and acquired each time in step S14 of the emission amount calculation process. The method for acquiring the unit energy usage UE is not limited to this. For example, the emission amount calculation unit 14 may calculate the "amount of electricity per minute" for all time periods in advance and store it in the memory unit 16, and in step S14, acquire the amount by referring to the information stored in the memory unit 16.
(C3)上記第2実施形態に係る複数ライン排出量算出処理では、ステップS42にて、複数の製造ラインLのそれぞれについて、排出量を算出した後に、ステップS46で、複数の排出量が合算されている。これとは別に、エネルギーの使用量を排出量に換算する換算係数が同じ場合には、複数の製造ラインLのそれぞれのエネルギー使用量を合算した後に、エネルギー使用量を排出量に換算して、ワークW毎の排出量を算出してもよい。 (C3) In the multiple line emission amount calculation process according to the second embodiment, in step S42, the emission amount is calculated for each of the multiple production lines L, and then in step S46, the multiple emission amounts are added together. Alternatively, if the conversion coefficient for converting energy usage into emission amount is the same, the energy usage amounts of the multiple production lines L may be added together, and then the energy usage may be converted into emission amount to calculate the emission amount for each workpiece W.
(C4)上記第1実施形態に係る製造装置51は、ワークWに加工を行う。本願は、製造装置51がワークWに対して行う作業の種類によらず、電力を使用する製造装置51に対して適用することができる。上記第2実施形態に係る製造装置151および製造装置251についても同様である。例えば、製造装置151は、燃料ガスを用いるバーナーを備える装置でもよい。製造装置251は、コンプレッサを備えるエアブロー装置でもよい。また、上記各実施形態では、1つの製造装置に対して、1つの種類のエネルギーが使用される場合を説明した。1つの製造装置に対して、複数の種類のエネルギーが使用される場合にも本願を適用することができる。この場合、エネルギーの種類毎に排出量算出処理を適用するとよい。 (C4) The manufacturing apparatus 51 according to the first embodiment performs processing on the workpiece W. The present application can be applied to manufacturing apparatus 51 that uses electricity, regardless of the type of work performed on the workpiece W by the manufacturing apparatus 51. The same applies to manufacturing apparatus 151 and manufacturing apparatus 251 according to the second embodiment. For example, manufacturing apparatus 151 may be an apparatus equipped with a burner that uses fuel gas. Manufacturing apparatus 251 may be an air blowing apparatus equipped with a compressor. Furthermore, in each of the above embodiments, a case where one type of energy is used for one manufacturing apparatus has been described. The present application can also be applied to a case where multiple types of energy are used for one manufacturing apparatus. In this case, it is advisable to apply an emission calculation process for each type of energy.
(C5)上記第2実施形態では、製造ラインL1から製造ラインL3のそれぞれに、2つの読み取り装置54が備えられている。製造ラインLが連続する場合には、上流の製造ラインLの第2位置P2の通過時刻の読み取りと、下流の製造ラインLの第1位置P1の通過時刻の読み取りとが、一つの読み取り装置54により行われる構成としてもよい。また、上記第2実施形態では、ワークWは、製造ラインL1と、製造ラインL2とを連続して流れている。これに限られず、ワークWが製造ラインL1を流れ終わってから、製造ラインL2に投入されるまでの間に、時間の間隔がある場合にも本願を適用することができる。 (C5) In the second embodiment described above, two reading devices 54 are provided on each of production lines L1 to L3. If the production lines L are continuous, a single reading device 54 may be used to read the passage time at second position P2 on the upstream production line L and the passage time at first position P1 on the downstream production line L. Also, in the second embodiment described above, the workpiece W flows continuously through production lines L1 and L2. However, this is not limited to this, and the present application can also be applied to cases where there is a time gap between when the workpiece W finishes flowing through production line L1 and when it is input into production line L2.
(C6)上記第1実施形態では、トレーサビリティ情報122は、識別情報としてのシリアル番号と、第1位置P1の通過時刻および第2位置P2の通過時刻とが対応付けられている。トレーサビリティ情報122における個々のワークWの特定方法は、識別情報に限られない。排出量算出処理によれば、特定の時間帯におけるワークWの個数と、エネルギー使用量とを用いて、ワークW毎の排出量を算出できる。従って、例えば、算出対象の時間帯に投入された投入順に個々のワークWを特定することもできる。 (C6) In the first embodiment described above, the traceability information 122 associates a serial number as identification information with the time of passage through the first position P1 and the time of passage through the second position P2. The method for identifying individual workpieces W in the traceability information 122 is not limited to identification information. According to the emission amount calculation process, the emission amount for each workpiece W can be calculated using the number of workpieces W and the amount of energy used in a specific time period. Therefore, for example, it is also possible to identify individual workpieces W in the order in which they were inserted during the time period being calculated.
本開示は、上述の実施形態に限られるものではなく、その趣旨を逸脱しない範囲において種々の構成で実現することができる。例えば、発明の概要の欄に記載した各形態中の技術的特徴に対応する実施形態の技術的特徴は、上述の課題の一部又は全部を解決するために、あるいは、上述の効果の一部又は全部を達成するために、適宜、差し替えや、組み合わせを行うことが可能である。また、その技術的特徴が本明細書中に必須なものとして説明されていなければ、適宜、削除することが可能である。 This disclosure is not limited to the above-described embodiments, and can be realized in various configurations without departing from its spirit. For example, the technical features of the embodiments corresponding to the technical features in each aspect described in the Summary of the Invention section can be replaced or combined as appropriate to solve some or all of the above-described problems or achieve some or all of the above-described effects. Furthermore, if a technical feature is not described as essential in this specification, it can be deleted as appropriate.
10…排出量算出装置、12,110…CPU、14…排出量算出部、16,120…記憶部、18,130…通信部、50…ベルトコンベア、51,151,251…製造装置、52…電力計、53…電源、54…読み取り装置、55…撮像部、100…データサーバ、122…トレーサビリティ情報、124,2124…エネルギー使用量情報、152,252…流量計、153…燃料ガス供給源、253…エアコンプレッサ、DP…流通期間、DP1…第1流通期間、DP2…第2流通期間、DP3…第3流通期間、L,L1~L3…製造ライン、M…識別マーク、P1…第1位置、P2…第2位置、UP…単位期間、UP1…第1単位期間、UP2…第2単位期間、UP3…第3単位期間、UP4…第4単位期間、W…ワーク 10...emission calculation device, 12, 110...CPU, 14...emission calculation unit, 16, 120...storage unit, 18, 130...communication unit, 50...belt conveyor, 51, 151, 251...manufacturing equipment, 52...power meter, 53...power source, 54...reading device, 55...imaging unit, 100...data server, 122...traceability information, 124, 2124...energy usage information, 152, 252... Flow meter, 153...fuel gas supply source, 253...air compressor, DP...flow period, DP1...first flow period, DP2...second flow period, DP3...third flow period, L, L1-L3...production line, M...identification mark, P1...first position, P2...second position, UP...unit period, UP1...first unit period, UP2...second unit period, UP3...third unit period, UP4...fourth unit period, W...workpiece
Claims (2)
第1位置と前記第1位置よりも下流の第2位置とを有する製造ラインを流れる複数のワークについて、(i)前記複数のワークのそれぞれについての、前記第1位置の通過時刻と前記第2位置の前記通過時刻との情報を含むトレーサビリティ情報と、(ii)前記製造ラインの稼働に伴い使用されるエネルギーのエネルギー使用量情報と、を受信する通信部と、
排出量算出部と、を備え、
前記排出量算出部は、
前記トレーサビリティ情報を用いて、前記複数のワークの一つを対象ワークとして、前記対象ワークが前記第1位置を通過してから前記第2位置を通過するまでの流通期間を分割した複数の単位期間毎に、前記製造ラインを流れているワークのワーク個数を取得する個数取得処理と、
前記エネルギー使用量情報を用いて、前記複数の単位期間毎のエネルギー使用量である単位エネルギー使用量を取得する使用量取得処理と、
前記複数の単位期間毎に、前記単位エネルギー使用量を前記ワーク個数で除して算出される前記複数の単位期間毎のワークエネルギー使用量を合計することにより、前記対象ワークの前記流通期間における合計エネルギー使用量を算出する合計算出処理と、
前記合計エネルギー使用量を換算することにより、前記排出量を算出する換算処理と、を実行し、
前記製造ラインは複数あり、前記複数のワークは前記複数の製造ラインのそれぞれを順に流れ、
前記排出量算出部は、前記複数の製造ラインのそれぞれについて、前記対象ワークの前記排出量を算出し、さらに、
前記複数の製造ラインのそれぞれについての前記排出量を合計して、合計排出量を算出する合計排出量算出処理を実行し、
前記エネルギー使用量情報は、前記複数の製造ラインのいずれかの製造ラインに配置された製造装置にて使用される電力の電力使用量であって、前記流通期間の時間よりも長い使用量単位時間当たりの電力使用量を含み、
前記排出量算出部は、前記使用量取得処理において、
前記使用量単位時間当たりの電力使用量を用いて、前記複数の単位期間毎の電力使用量を算出して取得する、排出量算出装置。 An emission calculation device for calculating greenhouse gas emissions,
a communication unit that receives, for a plurality of workpieces flowing on a production line having a first position and a second position downstream of the first position, (i) traceability information including information on the time each of the plurality of workpieces passed through the first position and the time each of the plurality of workpieces passed through the second position, and (ii) energy usage information on energy used in the operation of the production line;
an emission calculation unit,
The emission calculation unit
a number acquisition process that acquires the number of workpieces flowing through the production line for each of a plurality of unit periods obtained by dividing a distribution period from when the target workpiece passes through the first position to when the target workpiece passes through the second position, using the traceability information;
a usage amount acquisition process for acquiring unit energy usage amounts, which are energy usage amounts for each of the plurality of unit periods, using the energy usage amount information;
a total calculation process for calculating a total energy consumption of the target work in the distribution period by summing up the work energy consumptions for the plurality of unit periods, the work energy consumptions being calculated by dividing the unit energy consumption by the number of works for each of the plurality of unit periods;
a conversion process for calculating the emission amount by converting the total energy consumption amount ;
There are a plurality of the manufacturing lines, and the plurality of works flow through each of the manufacturing lines in order,
The emission amount calculation unit calculates the emission amount of the target work for each of the plurality of production lines, and further
executing a total emission calculation process for calculating a total emission by adding up the emission amounts for each of the plurality of production lines;
the energy usage information is a power usage amount of power used by a manufacturing device disposed in any one of the plurality of manufacturing lines, and includes a power usage amount per usage unit time longer than a time of the distribution period;
In the usage amount acquisition process, the emission amount calculation unit
an emission calculation device that calculates and obtains the amount of power usage for each of the plurality of unit periods using the amount of power usage per usage unit time .
前記複数のワークのそれぞれには識別情報が付与されており、
前記排出量算出部は、前記複数のワークのそれぞれについて、前記排出量を算出し、さらに、
前記識別情報と、前記排出量とを対応付けた排出量情報を作成する作成処理を実行する、排出量算出装置。 The emission calculation device according to claim 1 ,
Identification information is assigned to each of the plurality of works,
The discharge amount calculation unit calculates the discharge amount for each of the plurality of works, and further
an emission calculation device that executes a creation process for creating emission information that associates the identification information with the emission amount;
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2022116820A JP7715093B2 (en) | 2022-07-22 | 2022-07-22 | Emission calculation device |
| CN202310802013.XA CN117455738A (en) | 2022-07-22 | 2023-06-30 | Emission calculation device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2022116820A JP7715093B2 (en) | 2022-07-22 | 2022-07-22 | Emission calculation device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2024014182A JP2024014182A (en) | 2024-02-01 |
| JP7715093B2 true JP7715093B2 (en) | 2025-07-30 |
Family
ID=89593535
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2022116820A Active JP7715093B2 (en) | 2022-07-22 | 2022-07-22 | Emission calculation device |
Country Status (2)
| Country | Link |
|---|---|
| JP (1) | JP7715093B2 (en) |
| CN (1) | CN117455738A (en) |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2009020654A (en) | 2007-07-11 | 2009-01-29 | Fujitsu Ltd | Environmental load value calculation device, environmental load value calculation program, and environmental load value calculation method |
| JP2010067114A (en) | 2008-09-12 | 2010-03-25 | Yokogawa Electric Corp | Production energy management system |
| JP2010097508A (en) | 2008-10-17 | 2010-04-30 | Hitachi Ltd | Environmental load calculation method, execution program thereof, and execution device thereof |
| JP2013130971A (en) | 2011-12-20 | 2013-07-04 | Ricoh Co Ltd | Information processing device and program |
| US20150268282A1 (en) | 2014-03-18 | 2015-09-24 | Cantech Industries, Llc | Process energy intensity monitoring and diagnostic system |
-
2022
- 2022-07-22 JP JP2022116820A patent/JP7715093B2/en active Active
-
2023
- 2023-06-30 CN CN202310802013.XA patent/CN117455738A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2009020654A (en) | 2007-07-11 | 2009-01-29 | Fujitsu Ltd | Environmental load value calculation device, environmental load value calculation program, and environmental load value calculation method |
| JP2010067114A (en) | 2008-09-12 | 2010-03-25 | Yokogawa Electric Corp | Production energy management system |
| JP2010097508A (en) | 2008-10-17 | 2010-04-30 | Hitachi Ltd | Environmental load calculation method, execution program thereof, and execution device thereof |
| JP2013130971A (en) | 2011-12-20 | 2013-07-04 | Ricoh Co Ltd | Information processing device and program |
| US20150268282A1 (en) | 2014-03-18 | 2015-09-24 | Cantech Industries, Llc | Process energy intensity monitoring and diagnostic system |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2024014182A (en) | 2024-02-01 |
| CN117455738A (en) | 2024-01-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20230206354A1 (en) | Information processing apparatus, information processing method, and computer-readable medium | |
| Ghiami et al. | A two-echelon production-inventory model for deteriorating items with multiple buyers | |
| JP5631348B2 (en) | Returns accepting apparatus and program | |
| CN106886874A (en) | A kind of order splits delivery system and splits delivery method | |
| US20220284443A1 (en) | Information processing system | |
| Bertolini et al. | Experimental evaluation of business impacts of RFID in apparel and retail supply chain | |
| WO2023105695A1 (en) | Environmental load information management method and information processing device | |
| JP7715093B2 (en) | Emission calculation device | |
| JP2006341937A (en) | Distributed traceability management system | |
| JP2021515948A (en) | How to repair process anomalies | |
| CN118365339A (en) | Product production process recording and tracing method based on bar code technology | |
| CN111798181A (en) | Automatic customer order warehousing method and system based on image recognition | |
| CN107194645A (en) | Vendor product sells automatic Consignment method and system | |
| Mohanty et al. | Vendor-buyer integrated production-inventory system for imperfect quality item under trade credit finance and variable setup cost | |
| CN114092047A (en) | Traceable system and method for electric power material detection information | |
| WO2011056617A1 (en) | Quality control record and data processing system for creating and maintaining same | |
| CN112184127A (en) | Supply chain asset life cycle management system based on block chain technology | |
| Ho et al. | An integrated vendor-buyer inventory model with defective items and partial backlogging | |
| Panday et al. | Cost and Quantity Inventory Analysis in the Garment Industry: A Case study | |
| JP2019021053A (en) | Gross profit calculating apparatus, gross profit calculating method, and gross profit calculating program | |
| KR20120132847A (en) | System for history pursuit and integration management using the barcode | |
| KR102047277B1 (en) | Thing as a service based asset procurement management apparatus | |
| JP2017167735A (en) | Item data management device, item data management system, item data management method, and item data management program | |
| Gholami et al. | Joint inventory-production inventory model with defective items, uncertain demand and allowable shortage | |
| JP7817973B2 (en) | Business support device, business support method, and business support program |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20240415 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20250218 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20250220 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20250410 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20250617 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20250630 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7715093 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |