JP7717014B2 - Power Generation Management System - Google Patents
[go: Go Back, main page]

JP7717014B2 - Power Generation Management System - Google Patents

Power Generation Management System

Info

Publication number
JP7717014B2
JP7717014B2 JP2022041207A JP2022041207A JP7717014B2 JP 7717014 B2 JP7717014 B2 JP 7717014B2 JP 2022041207 A JP2022041207 A JP 2022041207A JP 2022041207 A JP2022041207 A JP 2022041207A JP 7717014 B2 JP7717014 B2 JP 7717014B2
Authority
JP
Japan
Prior art keywords
electricity
unit
power generation
price
determination unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022041207A
Other languages
Japanese (ja)
Other versions
JP2023135891A (en
Inventor
崇之 渡邉
駿介 木村
麻理恵 辻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Gas Co Ltd
Original Assignee
Tokyo Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Gas Co Ltd filed Critical Tokyo Gas Co Ltd
Priority to JP2022041207A priority Critical patent/JP7717014B2/en
Publication of JP2023135891A publication Critical patent/JP2023135891A/en
Application granted granted Critical
Publication of JP7717014B2 publication Critical patent/JP7717014B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/30Hydrogen technology
    • Y02E60/50Fuel cells

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Fuel Cell (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、発電管理システムに関する。 The present invention relates to a power generation management system.

例えば、特許文献1には、燃料ガスを用いて電力および熱を生成する燃料電池ユニットを有するコージェネレーションシステムが開示されている。ここで、燃料ガスの使用量を計測するガスメータは、燃料ガスが予め設定された所定期間以上継続して流れていることを検出するとガス漏れの警報を発する保安機能を有している。燃料電池ユニットが燃料ガスを所定日数以上継続して使用すると、実際にはガス漏れではないにも拘らず、ガスメータの保安機能によってガス漏れの警報が発せられる。そこで、燃料ガスを継続して使用することを一旦中断させるため、燃料電池ユニットの連続稼働時間が当該所定日数に至る前に燃料電池ユニットを停止させることが行われる。特許文献1の技術では、燃料ガスが連続して流れている所定期間の消費電力量から燃料電池ユニットを停止できる時間帯の候補を抽出し、当該期間の経過後、抽出された当該時間帯に、燃料電池ユニットを停止させる。 For example, Patent Document 1 discloses a cogeneration system with a fuel cell unit that generates electricity and heat using fuel gas. The gas meter, which measures the amount of fuel gas used, has a safety function that issues a gas leak alarm if it detects that fuel gas has been flowing continuously for a predetermined period of time or longer. If the fuel cell unit continues to use fuel gas for a predetermined number of days or longer, the gas meter's safety function will issue a gas leak alarm, even though there is no actual gas leak. Therefore, to temporarily halt the continuous use of fuel gas, the fuel cell unit is shut down before the fuel cell unit's continuous operating time reaches the predetermined number of days. The technology in Patent Document 1 extracts candidate time periods during which the fuel cell unit can be shut down from the amount of power consumed during a predetermined period of continuous fuel gas flow, and then shuts down the fuel cell unit during the extracted time period after the period has elapsed.

特許第4511878号公報Patent No. 4511878

分散型電源装置の発電ユニットが止まると、発電ユニットが停止している間の電力については、電力系統から賄う必要がある。発電ユニットを有する需要家の電力の需給を管理するアグリゲータなどの管理者は、発電ユニットが停止している間、電力系統を通じて当該需要家に電力を供給(販売)する。当該管理者は、需要家に供給する電力を確保するために相応のコスト(例えば、電力原単価)がかかる。電力原単価が高い時間帯に当該発電ユニットが止まると、電力原単価の高騰度合いによっては、当該管理者は、電力の販売単価を上げなければならなくなる。そうすると、電力原単価が高い時間帯に当該発電ユニットが止まることによって、当該需要家は、高価な電力を購入することにつながる。このように、当該需要家が購入する電力の価格が高くなると、当該需要家にとっては、分散型電源装置を導入するメリットが低減されてしまう。 When a power generation unit in a distributed power system stops, the power required for the time the power generation unit is down must be supplied from the power grid. An administrator, such as an aggregator that manages the supply and demand of power for consumers with power generation units, supplies (sells) power to the consumer through the power grid while the power generation unit is down. The administrator incurs a corresponding cost (e.g., the unit price of electricity) to secure the power to be supplied to the consumer. If the power generation unit stops during a time period when the unit price of electricity is high, the administrator may be forced to raise the selling price of the electricity, depending on the extent to which the unit price of electricity rises. Consequently, the shutdown of the power generation unit during a time period when the unit price of electricity is high leads to the consumer purchasing more expensive electricity. In this way, if the price of electricity purchased by the consumer increases, the benefit of introducing a distributed power system is reduced for the consumer.

本発明は、このような課題に鑑み、発電ユニットを停止させたときの電力の購入価格を抑制することが可能な発電管理システムを提供することを目的としている。 In light of these issues, the present invention aims to provide a power generation management system that can reduce the purchase price of electricity when a power generation unit is shut down.

上記課題を解決するために、本発明の発電管理システムは、燃料ガスを消費して少なくとも電力を生成する発電ユニットと、発電ユニットが連続して稼働している時間を示す連続稼働時間を判断する稼働時間判断部と、発電ユニットを停止させるか否かを判断する停止判断部と、を備え、電力市場で取引される単位電力量当たりの価格が、電力市場単価であり、発電ユニットを有する需要家に電力を供給する電力供給者が管理する自家電源で発電するためにかかる単位電力量当たりの費用が、自家電源単価であり、電力供給者が他の電力事業者との間で締結した電力の取引契約に基づく単位電力量当たりの費用が、電力取引単価であり、電力市場単価、自家電源単価および電力取引単価のうち少なくともいずれかを含み、発電ユニットを有する需要家に供給する電力を電力供給者が確保するためにかかる単位電力量当たりの費用が、電力原単価であり、停止判断部は、連続稼働時間が所定時間以上の所定の制御タイミングで、電力原単価に基づき、発電ユニットを停止させるか否かを判断する。 To solve the above problem, the power generation management system of the present invention comprises a power generation unit that consumes fuel gas to generate at least electricity, an operation time determination unit that determines the continuous operation time indicating the time the power generation unit has been operating continuously, and a shutdown determination unit that determines whether to shut down the power generation unit, wherein the price per unit amount of electricity traded on the electricity market is the electricity market price, the cost per unit amount of electricity incurred to generate electricity from a private power source managed by a power supplier that supplies electricity to consumers having power generation units is the private power source price, the cost per unit amount of electricity based on an electricity trading contract concluded between the power supplier and another power utility is the electricity trading price, which includes at least one of the electricity market price, the private power source price, and the electricity trading price, and the cost per unit amount of electricity incurred by the power supplier to secure electricity to supply to consumers having power generation units is the power source price, and the shutdown determination unit determines whether to shut down the power generation unit based on the power source price at a predetermined control timing when the continuous operation time is equal to or exceeds a predetermined time.

また、発電ユニットおよび稼働時間判断部は、分散型電源装置に設けられ、停止判断部は、分散型電源装置と通信可能なサーバ装置に設けられ、稼働時間判断部は、連続稼働時間が所定時間以上である場合、連続稼働時間が所定時間以上である旨を示す稼働情報をサーバ装置に送信し、停止判断部は、稼働情報の受信に応じて、電力原単価に基づいて発電ユニットを停止させるか否かを判断し、発電ユニットを停止させると判断した場合、発電ユニットを停止させる停止指令を分散型電源装置に送信するようにしてもよい。 Furthermore, the power generation unit and operation time determination unit may be provided in the distributed power supply apparatus, and the stop determination unit may be provided in a server device capable of communicating with the distributed power supply apparatus, and if the continuous operation time is equal to or longer than a predetermined time, the operation time determination unit may transmit operation information indicating that the continuous operation time is equal to or longer than the predetermined time to the server device, and the stop determination unit may determine whether to stop the power generation unit based on the unit cost of electricity in response to receiving the operation information, and if it is determined that the power generation unit should be stopped, transmit a stop command to stop the power generation unit to the distributed power supply apparatus.

また、分散型電源装置を複数有し、停止判断部は、複数の分散型電源装置のいずれかから送信される稼働情報の受信に応じて、電力原単価に基づいて発電ユニットを停止させるか否かを判断し、発電ユニットを停止させると判断した場合、停止指令を複数の分散型電源装置に送信するようにしてもよい。 In addition, the system may have multiple distributed power supply devices, and the shutdown determination unit may determine whether to shut down the power generation unit based on the unit cost of electricity in response to receiving operation information transmitted from one of the multiple distributed power supply devices, and if it determines that the power generation unit should be shut down, may transmit a shutdown command to the multiple distributed power supply devices.

また、発電ユニット、稼働時間判断部および停止判断部は、分散型電源装置に設けられるようにしてもよい。 Furthermore, the power generation unit, operating time determination unit, and shutdown determination unit may be provided in a distributed power supply device.

また、停止判断部は、連続稼働時間が所定時間以上の所定の制御タイミングで、電力原単価が所定の基準値未満であれば、発電ユニットを停止させると判断するようにしてもよい。 The shutdown determination unit may also determine to shut down the power generation unit if the continuous operation time is equal to or longer than a predetermined time and the unit cost of electricity is less than a predetermined reference value at a predetermined control timing.

また、停止判断部は、電力原単価を定期的に取得して記憶装置に蓄積していき、記憶装置に記憶された過去の電力原単価に基づいて、基準値を設定するようにしてもよい。 The stop determination unit may also periodically acquire the electricity unit price and store it in a storage device, and set the reference value based on past electricity unit prices stored in the storage device.

また、停止判断部は、将来の電力原単価の予測値を、将来の日付と関連付けて複数導出し、最も低い予測値に対応する日に、発電ユニットを停止させると判断するようにしてもよい。 The shutdown decision unit may also derive multiple predicted values for future electricity unit costs in association with future dates, and decide to shut down the power generation unit on the day corresponding to the lowest predicted value.

本発明によれば、発電ユニットを停止させたときの電力の購入価格を抑制することが可能となる。 This invention makes it possible to reduce the purchase price of electricity when a power generation unit is shut down.

図1は、第1実施形態に係る発電管理システムの構成を示す概略図である。FIG. 1 is a schematic diagram showing the configuration of a power generation management system according to the first embodiment. 図2は、稼働時間判断部における動作の流れを説明するフローチャートである。FIG. 2 is a flowchart illustrating the flow of operations in the operating time determination unit. 図3は、停止判断部の動作の流れを説明するフローチャートである。FIG. 3 is a flowchart illustrating the flow of operations of the stop determination unit. 図4は、停止判断部の動作の流れの他の例を説明するフローチャートである。FIG. 4 is a flowchart illustrating another example of the flow of the operation of the stop determination unit. 図5は、第2実施形態に係る停止判断部の動作の流れを説明するフローチャートである。FIG. 5 is a flowchart illustrating the flow of operations of the stop determination unit according to the second embodiment. 図6は、第3実施形態に係る発電管理システムの構成を示す概略図である。FIG. 6 is a schematic diagram showing the configuration of a power generation management system according to the third embodiment. 図7は、第4実施形態に係る発電管理システムの構成を示す概略図である。FIG. 7 is a schematic diagram showing the configuration of a power generation management system according to the fourth embodiment. 図8は、第4実施形態に係る稼働時間判断部および停止判断部の動作の流れを説明するフローチャートである。FIG. 8 is a flowchart illustrating the flow of operations of the operating time determination unit and the stop determination unit according to the fourth embodiment.

以下に添付図面を参照しながら、本発明の好適な実施形態について詳細に説明する。かかる実施形態に示す寸法、材料、その他具体的な数値等は、発明の理解を容易にするための例示にすぎず、特に断る場合を除き、本発明を限定するものではない。なお、本明細書および図面において、実質的に同一の機能、構成を有する要素については、同一の符号を付することにより重複説明を省略し、また本発明に直接関係のない要素は図示を省略する。 Preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings. Dimensions, materials, and other specific values shown in these embodiments are merely examples to facilitate understanding of the invention and, unless otherwise specified, do not limit the present invention. Furthermore, in this specification and drawings, elements having substantially the same function and configuration are designated by the same reference numerals to avoid redundant explanation, and elements not directly related to the present invention are not shown.

(第1実施形態)
図1は、第1実施形態に係る発電管理システム1の構成を示す概略図である。発電管理システム1は、分散型電源装置10、電力市場12、第1サーバ装置14および第2サーバ装置16を含む。
(First embodiment)
1 is a schematic diagram showing the configuration of a power generation management system 1 according to a first embodiment. The power generation management system 1 includes a distributed power supply device 10, an electricity market 12, a first server device 14, and a second server device 16.

分散型電源装置10は、例えば、家屋などの建物に設置される。なお、分散型電源装置10は、複数の建物に亘って設置されてもよい。分散型電源装置10は、発電ユニット20、通信装置22および制御装置24を備える。 The distributed power supply system 10 is installed in a building such as a house. The distributed power supply system 10 may also be installed across multiple buildings. The distributed power supply system 10 includes a power generation unit 20, a communication device 22, and a control device 24.

発電ユニット20は、燃料ガスを消費して少なくとも電力を生成する。燃料ガスは、例えば、都市ガスとするが、この例に限らず、プロパンガスや水素ガスなどであってもよい。発電ユニット20は、例えば、燃料電池ユニットなど、燃料ガスを消費して電力および熱を生成するコージェネユニットである。しかし、発電ユニット20は、コージェネユニットに限らない。例えば、発電ユニット20は、燃料ガスを消費して電力を生成するモノジェネユニットなどであってもよく、燃料ガスを消費して少なくとも電力を生成する装置であればよい。 The power generation unit 20 consumes fuel gas to generate at least electricity. The fuel gas is, for example, city gas, but is not limited to this example and may be propane gas, hydrogen gas, or the like. The power generation unit 20 is, for example, a cogeneration unit, such as a fuel cell unit, that consumes fuel gas to generate electricity and heat. However, the power generation unit 20 is not limited to a cogeneration unit. For example, the power generation unit 20 may be a monogeneration unit that consumes fuel gas to generate electricity, or any device that consumes fuel gas to generate at least electricity.

分散型電源装置10の発電ユニット20には、導管30が連結されており、導管を通じて燃料ガスが供給される。なお、導管30は、分散型電源装置10が設置されている建物における他のガス機器にも連結されていてもよい。導管30には、ガスメータ32が設けられている。ガスメータ32は、建物におけるガスの使用量を計測する。なお、ガスメータ32は、計測対象をデジタルで計測するとともに通信機能を有するスマートメータであってもよい。 A conduit 30 is connected to the power generation unit 20 of the distributed power supply system 10, and fuel gas is supplied through the conduit. The conduit 30 may also be connected to other gas appliances in the building in which the distributed power supply system 10 is installed. A gas meter 32 is provided in the conduit 30. The gas meter 32 measures the amount of gas used in the building. The gas meter 32 may be a smart meter that digitally measures the measurement target and has communication capabilities.

ガスメータ32は、導管30内の燃料ガスの流れを監視し、燃料ガスの漏洩(内管漏洩)を検出する保安機能を有する。具体的には、ガスメータ32は、燃料ガスが予め設定された所定期間以上継続して流れていることを検出すると、燃料ガスが漏洩しているとして報知する。以後、このような漏洩の判断対象となる所定期間を、漏洩検出期間と呼ぶ場合がある。漏洩検出期間は、例えば、30日などに設定されるが、この例に限らず、漏洩を適切に検知可能な任意の期間に設定されてもよい。また、報知方法は、異常ランプを点灯または点滅させてもよいし、警報音を発してもよいし、通信によって通知してもよい。 The gas meter 32 has a safety function of monitoring the flow of fuel gas within the conduit 30 and detecting fuel gas leaks (inner pipe leaks). Specifically, if the gas meter 32 detects that fuel gas has been flowing continuously for a predetermined period of time or longer, it issues an alert that fuel gas is leaking. Hereinafter, this predetermined period of time during which a leak is determined may be referred to as the leak detection period. The leak detection period is set to, for example, 30 days, but is not limited to this example and may be set to any period that allows for appropriate leak detection. Furthermore, the alert may be issued by lighting or flashing an abnormality lamp, sounding an alarm, or by communication.

分散型電源装置10の発電ユニット20は、電力メータ40を介して電力系統42に電気的に接続されるとともに、負荷設備44に電気的に接続される。電力メータ40は、電力系統42からの受電電力量を計測する。なお、電力メータ40は、分散型電源装置10側から電力系統42側へ供給される電力量を計測することもできる。なお、電力メータ40は、スマートメータであってもよい。負荷設備は、電力を消費する任意の機器であってもよい。 The power generation unit 20 of the distributed power supply apparatus 10 is electrically connected to the power grid 42 via a power meter 40, and is also electrically connected to a load equipment 44. The power meter 40 measures the amount of power received from the power grid 42. The power meter 40 can also measure the amount of power supplied from the distributed power supply apparatus 10 to the power grid 42. The power meter 40 may be a smart meter. The load equipment may be any device that consumes power.

通信装置22は、有線通信または無線通信によって、第2サーバ装置16と通信を確立する。後述するが第2サーバ装置16は第1サーバ装置14と通信可能であるため、通信装置22は、第2サーバ装置16を介して第1サーバ装置14と通信することができる。 The communication device 22 establishes communication with the second server device 16 via wired or wireless communication. As will be described later, the second server device 16 is capable of communicating with the first server device 14, and therefore the communication device 22 can communicate with the first server device 14 via the second server device 16.

制御装置24は、中央処理装置、プログラム等が格納されたROM、および、ワークエリアとしてのRAM等を含む半導体集積回路から構成される。制御装置24は、プログラムを実行することで分散型電源装置10全体を制御する。また、制御装置24は、プログラムを実行することで、稼働時間判断部50として機能する。 The control device 24 is composed of a semiconductor integrated circuit including a central processing unit, ROM storing programs, etc., and RAM as a work area. The control device 24 controls the entire distributed power supply device 10 by executing the program. The control device 24 also functions as the operating time determination unit 50 by executing the program.

稼働時間判断部50は、発電ユニット20が連続して稼働している時間を示す連続稼働時間を判断する。稼働時間判断部50は、連続稼働時間をカウントするカウンタを有している。稼働時間判断部50については、後に詳述する。 The operating time determination unit 50 determines the continuous operating time, which indicates the time the power generation unit 20 has been operating continuously. The operating time determination unit 50 has a counter that counts the continuous operating time. The operating time determination unit 50 will be described in detail later.

電力市場12は、例えば、日本卸電力取引所(JEPX)である。電力市場12では、単位電力量当たりの価格を示す電力市場単価(円/kWh)が取引される。電力市場単価は、リアルタイムに変動する。 The electricity market 12 is, for example, the Japan Electric Power Exchange (JEPX). In the electricity market 12, electricity market unit prices (yen/kWh), which indicate the price per unit of electricity, are traded. The electricity market unit prices fluctuate in real time.

第1サーバ装置14は、例えば、上位のアグリゲータおよび下位のアグリゲータのうち、上位のアグリゲータが管理するサーバ装置である。第2サーバ装置16は、例えば、上位のアグリゲータおよび下位のアグリゲータのうち、下位のアグリゲータが管理するサーバ装置である。上位のアグリゲータは、下位のアグリゲータを介して分散型電源装置10の制御に関与することができる。下位のアグリゲータは、上位のアグリゲータの指示の下、分散型電源装置10の制御を実行する。なお、アグリゲータとは、需要家の電力の需給をマネジメントするサービスを提供する主体を意味する。第1サーバ装置14の管理者(例えば、上位のアグリゲータ)は、分散型電源装置10(すなわち、発電ユニット20)を有する需要家の電力の需給を管理する。 The first server device 14 is, for example, a server device managed by the upper aggregator of the upper aggregator and the lower aggregator. The second server device 16 is, for example, a server device managed by the lower aggregator of the upper aggregator and the lower aggregator. The upper aggregator can be involved in the control of the distributed power supply apparatus 10 via the lower aggregator. The lower aggregator controls the distributed power supply apparatus 10 under the instructions of the upper aggregator. Note that an aggregator refers to an entity that provides a service that manages the supply and demand of electricity for consumers. The administrator of the first server device 14 (for example, the upper aggregator) manages the supply and demand of electricity for consumers that have distributed power supply apparatuses 10 (i.e., power generation units 20).

第1サーバ装置14は、通信装置60、記憶装置62および制御装置64を備える。通信装置60は、有線通信または無線通信によって、第2サーバ装置16と通信を確立する。第2サーバ装置16は分散型電源装置10と通信可能であるため、通信装置60は、第2サーバ装置16を介して分散型電源装置10と通信することができる。記憶装置62は、ハードディスクドライブやフラッシュメモリなどであり、不揮発性素子から構成される。記憶装置62には、制御装置64で利用される各種の情報が記憶される。 The first server device 14 comprises a communication device 60, a storage device 62, and a control device 64. The communication device 60 establishes communication with the second server device 16 via wired or wireless communication. Because the second server device 16 is capable of communicating with the distributed power supply apparatus 10, the communication device 60 can communicate with the distributed power supply apparatus 10 via the second server device 16. The storage device 62 is a hard disk drive, flash memory, or other non-volatile element. The storage device 62 stores various types of information used by the control device 64.

制御装置64は、中央処理装置、プログラム等が格納されたROM、および、ワークエリアとしてのRAM等を含む半導体集積回路から構成される。制御装置64は、プログラムを実行することで第1サーバ装置14全体を制御する。また、制御装置64は、プログラムを実行することで、停止判断部70として機能する。 The control device 64 is composed of a semiconductor integrated circuit including a central processing unit, ROM storing programs, etc., and RAM as a work area. The control device 64 controls the entire first server device 14 by executing the programs. The control device 64 also functions as a stop determination unit 70 by executing the programs.

ここで、仮に、分散型電源装置10の発電ユニット20が停止したとする。その場合、発電ユニット20を有する需要家は、発電ユニット20が停止している間、負荷設備44で消費する電力を電力系統42から受電することになる。この際、第1サーバ装置14の管理者は、電力系統42から当該需要家(すなわち、分散型電源装置10)に供給される電力を管理することになる。 Now, let's assume that the power generation unit 20 of the distributed power supply apparatus 10 stops operating. In this case, the consumer that owns the power generation unit 20 will receive power from the power grid 42 to be consumed by the load equipment 44 while the power generation unit 20 is stopped. In this case, the administrator of the first server device 14 will manage the power supplied from the power grid 42 to the consumer (i.e., the distributed power supply apparatus 10).

すなわち、第1サーバ装置14の管理者は、発電ユニット20を有する需要家に電力系統42を通じて供給する電力を確保し、確保した電力を、電力系統42を通じて需要家(すなわち、分散型電源装置10)に供給する。この際、第1サーバ装置14の管理者は、供給する電力を需要者に販売することになる。すなわち、第1サーバ装置14の管理者は、発電ユニット20を有する需要者に電力を供給する電力供給者であるとともに、当該需要者に電力を販売する電力販売者であるとも言える。 In other words, the administrator of the first server device 14 secures power to be supplied to consumers having power generation units 20 through the power grid 42, and supplies the secured power to the consumers (i.e., distributed power supply devices 10) through the power grid 42. At this time, the administrator of the first server device 14 sells the supplied power to the consumers. In other words, the administrator of the first server device 14 can be said to be both a power supplier that supplies power to consumers having power generation units 20, and a power seller that sells power to the consumers.

第1サーバ装置14の管理者が電力を確保する方法としては、以下の3つの態様(第1の態様、第2の態様および第3の態様)が挙げられる。第1サーバ装置14の管理者は、第1の態様、第2の態様および第3の態様の少なくともいずれかにより電力を確保してもよいし、第1の態様、第2の態様および第3の態様のうち複数を組み合わせて電力を確保してもよい。 The administrator of the first server device 14 may secure power in the following three ways (first, second, and third ways). The administrator of the first server device 14 may secure power using at least one of the first, second, and third ways, or may secure power by combining two or more of the first, second, and third ways.

第1の態様としては、電力市場12から電力を調達して需要家に供給することが挙げられる。この第1の態様によって電力を確保する場合、第1サーバ装置14の管理者としては、電力市場12での取引で決まる電力市場単価分のコストがかかる。 The first method involves procuring electricity from the electricity market 12 and supplying it to consumers. When securing electricity using this first method, the administrator of the first server device 14 incurs costs equal to the electricity market unit price determined by transactions in the electricity market 12.

第2の態様としては、第1サーバ装置14の管理者が独自で管理する自家電源により発電した電力を需要家に供給することが挙げられる。自家電源は、発電ユニット20を有する需要者に電力を供給する電力供給者が管理する電源であり、他の電力事業者の電源や、需要家の分散型電源装置10などとは別に準備されている電源である。この第2の態様によって電力を確保する場合、第1サーバ装置14の管理者としては、自家電源で発電するためにかかる単位電力量当たりの費用を示す自家電源単価分のコストがかかる。 A second aspect is to supply electricity generated by a private power source managed independently by the administrator of the first server device 14 to consumers. A private power source is a power source managed by an electricity supplier that supplies electricity to consumers with power generation units 20, and is a power source that is prepared separately from the power sources of other electricity providers and the consumer's distributed power supply device 10. When securing electricity using this second aspect, the administrator of the first server device 14 incurs a cost equal to the private power source unit price, which indicates the cost per unit of electricity required to generate electricity using a private power source.

第3の態様としては、第1サーバ装置14の管理者と他の電力事業者との間で、電力の融通に関する取引契約を予め締結しておき、この取引契約に基づいて、他の電力事業者から電力の供給を受けて需要者に供給することが挙げられる。この第3の態様によって電力を確保する場合、第1サーバ装置14の管理者としては、当該管理者(電力供給者)が他の電力事業者との間で締結した電力の取引契約に基づく単位電力量当たりの費用を示す電力取引単価分のコストがかかる。 A third method is to enter into a trading contract for the interchange of electricity in advance between the administrator of the first server device 14 and another electric power supplier, and then receive electricity from the other electric power supplier based on this trading contract and supply it to consumers. When securing electricity using this third method, the administrator of the first server device 14 will incur a cost equal to the electricity trading unit price, which indicates the cost per unit of electricity based on the electricity trading contract that the administrator (electric power supplier) has entered into with the other electric power supplier.

これら3つの態様を考慮すると、第1サーバ装置14の管理者は、発電ユニット20を有する需要家に供給する電力を確保するために、以下の式(1)で示すような、電力原単価分のコストがかかる。電力原単価は、発電ユニット20を有する需要家に供給する電力を電力の供給者が確保するためにかかる単位電力量当たりの費用を示す。電力原単価は、電力市場単価、自家電源単価および電力取引単価を合計した値となる。
電力原単価=電力市場単価+自家電源単価+電力取引単価 ・・・(1)
Considering these three aspects, the administrator of the first server device 14 incurs a cost equal to the unit price of electricity as shown in the following formula (1) in order to secure the electricity to be supplied to the consumer having the power generation unit 20. The unit price of electricity indicates the cost per unit of electricity that an electricity supplier incurs in order to secure the electricity to be supplied to the consumer having the power generation unit 20. The unit price of electricity is the sum of the electricity market unit price, the private power source unit price, and the electricity trading unit price.
Electricity unit price = electricity market price + private power supply price + electricity trading price ... (1)

なお、電力原単価は、電力市場単価と自家電源単価と電力取引単価とを合計した値に限らない。電力原単価は、電力市場単価、自家電源単価および電力取引単価のうち少なくともいずれかを含むものであってもよい。例えば、電力原単価は、自家電源単価および電力取引単価が省略され、電力市場単価と等しくてもよい。電力原単価は、電力市場単価および電力取引単価が省略され、自家電源単価と等しくてもよい。電力原単価は、電力市場単価および自家電源単価が省略され、電力取引単価と等しくてもよい。電力原単価は、電力取引単価が省略され、電力市場単価と自家電源単価とを合計した値でもよい。電力原単価は、自家電源単価が省略され、電力市場単価と電力取引単価とを合計した値でもよい。電力原単価は、電力市場単価が省略され、自家電源単価と電力取引単価とを合計した値でもよい。 The electricity unit price is not limited to the sum of the electricity market price, the self-power source price, and the electricity trading price. The electricity unit price may include at least one of the electricity market price, the self-power source price, and the electricity trading price. For example, the electricity unit price may be equal to the electricity market price, with the self-power source price and the electricity trading price omitted. The electricity unit price may be equal to the self-power source price, with the electricity market price and the electricity trading price omitted. The electricity unit price may be equal to the electricity trading price, with the electricity market price and the self-power source price omitted. The electricity unit price may be the sum of the electricity market price and the self-power source price, with the electricity trading price omitted. The electricity unit price may be the sum of the electricity market price and the self-power source price, with the electricity trading price omitted. The electricity price may be calculated by omitting the electricity market price and adding up the private power source price and the electricity trading price.

電力市場単価は、自家電源単価および電力取引単価と比べて、変動が大きい。このため、電力原単価は、電力市場単価の変動の影響を受け易い。 Electricity market unit prices fluctuate more than private power generation unit prices and electricity trading unit prices. As a result, electricity unit prices are easily affected by fluctuations in electricity market unit prices.

自家電源単価および電力取引単価は、例えば、記憶装置62に予め記憶されている。制御装置64は、例えば、1週間など所定期間ごとに、現在の自家電源単価を決定し、決定した自家電源単価を記憶装置62に記憶させることで自家電源単価を更新する。また、制御装置64は、電力取引単価が改訂されるごとに、現在の電力取引単価を記憶装置62に記憶させることで電力取引単価を更新する。 The private power source unit price and the electricity trading unit price are stored in advance, for example, in the storage device 62. The control device 64 determines the current private power source unit price every predetermined period, for example, every week, and updates the private power source unit price by storing the determined private power source unit price in the storage device 62. In addition, the control device 64 updates the electricity trading unit price by storing the current electricity trading unit price in the storage device 62 each time the electricity trading unit price is revised.

ここで、電力原単価(あるいは、電力市場単価)が高い時間帯に発電ユニット20が止まると、第1サーバ装置14の管理者は、電力原単価(あるいは、電力市場単価)の高騰度合いによっては、発電ユニット20を有する需要家に販売する電力の販売単価を上げなければならなくなる。そうすると、発電ユニット20を有する需要家は、第1サーバ装置14の管理者から、高価な電力を購入しなければならなくなる。 Here, if the power generation unit 20 stops during a time period when the unit price of electricity (or the market price of electricity) is high, the administrator of the first server device 14 will have to raise the selling price of electricity sold to consumers who own the power generation unit 20, depending on the degree to which the unit price of electricity (or the market price of electricity) rises. As a result, consumers who own the power generation unit 20 will have to purchase expensive electricity from the administrator of the first server device 14.

そこで、停止判断部70は、発電ユニット20の連続稼働時間が所定時間以上の所定の制御タイミングで、発電ユニット20を有する需要家に電力を供給する電力供給者の電力原単価に基づき、発電ユニット20を停止させるか否かを判断する。具体的には、停止判断部70は、連続稼働時間が所定時間以上の所定の制御タイミングで、電力市場12から電力市場単価を取得する。停止判断部70は、電力市場単価に基づいて電力原単価を導出する。停止判断部70は、電力原単価が所定の基準値未満であれば、発電ユニット20を停止させると判断する。換言すると、停止判断部70は、電力原単価が所定の基準値以上であれば、発電ユニット20を停止させないと判断する。所定時間は、少なくとも漏洩検出期間より短い時間に設定される。所定の制御タイミングは、1日毎などの所定の制御周期で訪れるタイミングである。 The shutdown determination unit 70 therefore determines whether to shut down the power generation unit 20 based on the unit price of electricity of the power supplier supplying power to the consumer having the power generation unit 20, at a predetermined control timing when the power generation unit 20 has been continuously operating for a predetermined period of time or more. Specifically, the shutdown determination unit 70 acquires the market price of electricity from the power market 12 at a predetermined control timing when the power generation unit 20 has been continuously operating for a predetermined period of time or more. The shutdown determination unit 70 derives the market price of electricity based on the market price of electricity. If the market price of electricity is less than a predetermined reference value, the shutdown determination unit 70 determines to shut down the power generation unit 20. In other words, if the market price of electricity is equal to or greater than a predetermined reference value, the shutdown determination unit 70 determines not to shut down the power generation unit 20. The predetermined period of time is set to be at least shorter than the leakage detection period. The predetermined control timing occurs at a predetermined control cycle, such as once a day.

ここで、停止判断部70は、電力市場単価を定期的に(例えば、毎日)取得していき、電力市場単価を取得するごとに電力原単価を導出する。例えば、停止判断部70は、取得した電力市場単価、記憶装置62に記憶されている自家電源単価および電力取引単価を合計して、現在の電力原単価を導出する。停止判断部70は、導出した電力原単価を、当該電力原単価の導出日と関連付けて記憶装置62に記憶させる。停止判断部70は、記憶装置62に蓄積された過去の電力原単価に基づいて、現在の基準値を設定する。 Here, the stop determination unit 70 periodically (e.g., daily) acquires the electricity market unit price and derives the electricity source unit price each time it acquires the electricity market unit price. For example, the stop determination unit 70 derives the current electricity source unit price by summing the acquired electricity market unit price, the private power source unit price, and the electricity trading unit price stored in the storage device 62. The stop determination unit 70 stores the derived electricity source unit price in the storage device 62 in association with the date on which the electricity source unit price was derived. The stop determination unit 70 sets the current reference value based on past electricity source unit prices stored in the storage device 62.

具体的には、停止判断部70は、現在から1年前までの電力原単価の平均値を現在の基準値とする。また、停止判断部70は、現在の月に対して1年前の同月における電力原単価の平均値を現在の基準値としてもよい。例えば、現在が5月であれば、1年前の5月の電力原単価の平均値を現在の基準値としてもよい。また、停止判断部70は、現在から1か月前までの電力原単価の平均値を現在の基準値としてもよい。また、停止判断部70は、現在の月に対して1年前の同月における電力原単価の最大値から所定値だけ低い値を現在の基準値としてもよい。また、停止判断部70は、現在の月に対して1年前の同月における電力原単価の最小値から所定値だけ高い値を現在の基準値としてもよい。これらのように、基準値の設定方法は、任意の方法を採用することができる。 Specifically, the stop determination unit 70 sets the average value of the electricity unit cost from the present to one year ago as the current reference value. The stop determination unit 70 may also set the average value of the electricity unit cost for the same month one year ago for the current month as the current reference value. For example, if the current month is May, the average value of the electricity unit cost for May one year ago may be set as the current reference value. The stop determination unit 70 may also set the average value of the electricity unit cost from the present to one month ago as the current reference value. The stop determination unit 70 may also set the current reference value to a value that is a predetermined value lower than the maximum value of the electricity unit cost for the same month one year ago for the current month. The stop determination unit 70 may also set the current reference value to a value that is a predetermined value higher than the minimum value of the electricity unit cost for the same month one year ago for the current month. As described above, any method can be used to set the reference value.

このように、過去の電力原単価の実績値によって現在の基準値が変動するため、停止判断部70は、基準値を、常に適切な値にすることができる。その結果、停止判断部70は、現在の電力原単価が相対的に低いかを、適切に判断することができる。 In this way, because the current reference value fluctuates depending on past actual values of the electricity unit price, the stoppage judgment unit 70 can always set the reference value to an appropriate value. As a result, the stoppage judgment unit 70 can appropriately judge whether the current electricity unit price is relatively low.

なお、基準値は、過去の電力原単価に基づいて設定される変動値に限らない。例えば、基準値は、予め固定値として設定されてもよい。 Note that the reference value is not limited to a variable value set based on past electricity unit prices. For example, the reference value may be set in advance as a fixed value.

第2サーバ装置16は、通信装置80および制御装置82を備える。通信装置80は、有線通信または無線通信によって、第1サーバ装置14および分散型電源装置10と通信を確立する。通信装置80は、第1サーバ装置14から受信した情報を分散型電源装置10に送信するとともに、分散型電源装置10から受信した情報を第1サーバ装置14に送信する。 The second server device 16 includes a communication device 80 and a control device 82. The communication device 80 establishes communication with the first server device 14 and the distributed power supply apparatus 10 via wired or wireless communication. The communication device 80 transmits information received from the first server device 14 to the distributed power supply apparatus 10, and transmits information received from the distributed power supply apparatus 10 to the first server device 14.

制御装置82は、中央処理装置、プログラム等が格納されたROM、および、ワークエリアとしてのRAM等を含む半導体集積回路から構成される。制御装置82は、プログラムを実行することで第2サーバ装置16全体を制御する。 The control device 82 is composed of a semiconductor integrated circuit including a central processing unit, ROM storing programs, etc., and RAM as a work area. The control device 82 controls the entire second server device 16 by executing programs.

図2は、稼働時間判断部50における動作の流れを説明するフローチャートである。稼働時間判断部50は、所定の制御周期で訪れる所定の制御タイミングごとに、図2の一連の処理を繰り返す。所定の制御周期は、例えば、1日毎とするが、この例に限らず、例えば、1時間毎など、任意に設定することができる。 Figure 2 is a flowchart explaining the flow of operation in the operating time determination unit 50. The operating time determination unit 50 repeats the series of processes shown in Figure 2 at each predetermined control timing that occurs in a predetermined control cycle. The predetermined control cycle is, for example, once a day, but is not limited to this example and can be set arbitrarily, for example, once an hour.

所定の制御タイミングとなると、稼働時間判断部50は、連続稼働時間をカウントするカウンタのカウント値をインクリメントする(S10)。次に、稼働時間判断部50は、カウント値が所定の上限閾値以下であるか否かを判断する(S11)。漏洩検出期間が30日である場合、所定の上限閾値は、例えば、26日などに設定される。なお、所定の上限閾値は、この例に限らず、漏洩検出期間より短い任意の時間(日数)となるように設定されてもよい。 When a predetermined control timing occurs, the operation time determination unit 50 increments the count value of a counter that counts the continuous operation time (S10). Next, the operation time determination unit 50 determines whether the count value is equal to or less than a predetermined upper threshold (S11). If the leak detection period is 30 days, the predetermined upper threshold is set to, for example, 26 days. Note that the predetermined upper threshold is not limited to this example and may be set to any time (number of days) shorter than the leak detection period.

カウント値が上限閾値以上である場合(S11におけるYES)、稼働時間判断部50は、発電ユニット20の稼働を停止させる(S12)。これにより、発電ユニット20への燃料ガスの供給が停止される。漏洩検出期間に至る前に燃料ガスの流通が一時的に停止されるため、ガスメータ32の保安機能によって意図しない報知が行われることを回避することができる。 If the count value is equal to or greater than the upper threshold (YES in S11), the operating time determination unit 50 stops the operation of the power generation unit 20 (S12). This stops the supply of fuel gas to the power generation unit 20. Because the flow of fuel gas is temporarily stopped before the leak detection period is reached, it is possible to prevent the safety function of the gas meter 32 from issuing an unintended alarm.

ステップS12の後、稼働時間判断部50は、カウント値をリセットし(S13)、一連の処理を終了する。これにより、発電ユニット20が再起動した際には、カウント値が初期値からカウントされる。 After step S12, the operating time determination unit 50 resets the count value (S13) and ends the series of processes. As a result, when the power generation unit 20 is restarted, the count value starts counting from the initial value.

ここで、ガスメータ32の保安機能では、燃料ガスがガスメータ32を流通していない不使用時間が所定の基準時間以上となった場合に、漏洩検出の継続時間がリセットされる。この所定の基準時間は、例えば、12時間などに設定される。このため、分散型電源装置10の制御装置24は、少なくとも当該基準時間より長い時間、発電ユニット20の停止を維持させる。そして、制御装置24は、燃料ガスがガスメータ32を流通していない不使用時間が当該基準時間を経過した後に、発電ユニット20を再起動させる。なお、発電ユニット20が停止中に他のガス機器において燃料ガスが使用された場合、制御装置24は、他のガス機器での燃料ガスの使用が終了してからの不使用時間が当該基準時間より長くなってから、発電ユニット20を再起動させる。 The safety function of the gas meter 32 resets the leak detection duration when the period of non-use during which fuel gas is not circulating through the gas meter 32 exceeds a predetermined reference time. This predetermined reference time is set to, for example, 12 hours. Therefore, the control device 24 of the distributed power supply device 10 keeps the power generation unit 20 stopped for a period of time at least longer than the reference time. The control device 24 then restarts the power generation unit 20 after the period of non-use during which fuel gas is not circulating through the gas meter 32 has exceeded the reference time. Note that if fuel gas is used in another gas appliance while the power generation unit 20 is stopped, the control device 24 restarts the power generation unit 20 after the period of non-use since the other gas appliance stopped using fuel gas exceeds the reference time.

ステップS11において、カウント値が上限閾値未満である場合(S11におけるNO)、稼働時間判断部50は、カウント値が所定閾値以上であるか否かを判断する(S14)。この所定閾値は、ステップS11の上限閾値より小さい値に設定される。例えば、ステップS11の上限閾値が26日である場合、ステップS14の所定閾値は、21日などに設定される。なお、所定閾値は、この例に限らず、上限閾値より短い任意の時間(日数)となるように設定されてもよい。 If the count value is less than the upper threshold in step S11 (NO in S11), the operating time determination unit 50 determines whether the count value is greater than or equal to a predetermined threshold (S14). This predetermined threshold is set to a value smaller than the upper threshold in step S11. For example, if the upper threshold in step S11 is 26 days, the predetermined threshold in step S14 is set to 21 days, etc. Note that the predetermined threshold is not limited to this example and may be set to any time (number of days) shorter than the upper threshold.

カウント値が所定閾値未満である場合(S14におけるNO)、稼働時間判断部50は、一連の処理を終了する。カウント値が所定閾値以上である場合(S14におけるYES)、稼働時間判断部50は、連続稼働時間が所定時間以上である旨を示す稼働情報を、通信装置22を通じて第2サーバ装置16に送信し(S15)、一連の処理を終了する。第2サーバ装置16は、分散型電源装置10から当該稼働情報を受信すると、当該稼働情報を第1サーバ装置14に送信する。 If the count value is less than the predetermined threshold (NO in S14), the operation time determination unit 50 ends the series of processes. If the count value is equal to or greater than the predetermined threshold (YES in S14), the operation time determination unit 50 transmits operation information indicating that the continuous operation time is equal to or greater than the predetermined time to the second server device 16 via the communication device 22 (S15), and ends the series of processes. Upon receiving the operation information from the distributed power supply device 10, the second server device 16 transmits the operation information to the first server device 14.

図3は、停止判断部70の動作の流れを説明するフローチャートである。停止判断部70は、所定の制御周期で訪れる所定の割込みタイミングとなると、図3の一連の処理を実行する。 Figure 3 is a flowchart explaining the operation of the stop determination unit 70. When a predetermined interrupt timing occurs at a predetermined control cycle, the stop determination unit 70 executes the series of processes shown in Figure 3.

所定の割込みタイミングとなると、停止判断部70は、稼働情報を受信したか否かを判断する(S20)。稼働情報を受信していない場合(S20におけるNO)、停止判断部70は、一連の処理を終了する。 When the specified interrupt timing arrives, the stop determination unit 70 determines whether operation information has been received (S20). If operation information has not been received (NO in S20), the stop determination unit 70 ends the series of processes.

稼働情報を受信した場合(S20におけるYES)、停止判断部70は、電力市場12から電力市場単価を取得する(S21)。停止判断部70は、記憶装置62から自家電源単価および電力取引単価を読み出し、読み出した自家電源単価、読み出した電力取引単価、および、取得した電力市場単価を合計して、電力原単価を導出する(S22)次に、停止判断部70は、記憶装置62に蓄積された過去の電力原単価に基づいて、現在の基準値を設定する(S23)。 If operation information has been received (YES in S20), the shutdown determination unit 70 acquires the electricity market unit price from the electricity market 12 (S21). The shutdown determination unit 70 reads the private power source unit price and the electricity trading unit price from the storage device 62, and derives the electricity source unit price by summing the read private power source unit price, the read electricity trading unit price, and the acquired electricity market unit price (S22). Next, the shutdown determination unit 70 sets the current reference value based on the past electricity source unit prices stored in the storage device 62 (S23).

次に、停止判断部70は、電力原単価が基準値未満であるか否かを判断する(S24)。ステップS24の処理は、電力原単価に基づいて発電ユニット20を停止させるか否かを判断することに相当する。電力原単価が基準値以上である場合(S24におけるNO)、停止判断部70は、一連の処理を終了する。つまり、電力原単価が基準値以上となっている間、停止判断部70は、待機する。 Next, the stop determination unit 70 determines whether the unit price of electricity is less than a reference value (S24). The processing of step S24 corresponds to determining whether to stop the power generation unit 20 based on the unit price of electricity. If the unit price of electricity is equal to or greater than the reference value (NO in S24), the stop determination unit 70 ends the series of processes. In other words, the stop determination unit 70 waits while the unit price of electricity is equal to or greater than the reference value.

電力原単価が基準値未満である場合(S24におけるYES)、すなわち、発電ユニット20を停止させると判断した場合、停止判断部70は、発電ユニット20を停止させる停止指令を、通信装置60を通じて第2サーバ装置16に送信する(S25)。第2サーバ装置16は、第1サーバ装置14から当該停止指令を受信すると、当該停止指令を分散型電源装置10に送信する。 If the electricity unit cost is less than the reference value (YES in S24), i.e., if it is determined that the power generation unit 20 should be shut down, the shutdown determination unit 70 transmits a shutdown command to shut down the power generation unit 20 to the second server device 16 via the communication device 60 (S25). Upon receiving the shutdown command from the first server device 14, the second server device 16 transmits the shutdown command to the distributed power supply apparatus 10.

分散型電源装置10の稼働時間判断部50は、停止指令を受信すると、発電ユニット20を停止させ、カウント値をリセットする。これにより、発電ユニット20が再起動した際には、カウント値が初期値からカウントされる。 When the operating time determination unit 50 of the distributed power supply device 10 receives a shutdown command, it shuts down the power generation unit 20 and resets the count value. As a result, when the power generation unit 20 is restarted, the count value starts from the initial value.

なお、稼働時間判断部50は、カウント値が所定閾値以上、かつ、上限閾値未満のとき、稼働情報を送信し、停止判断部70は、稼働情報を受信したとき、電力原単価が基準値以上であれば、待機することになる。この場合、稼働時間判断部50は、次の制御タイミングで、再度、カウント値が所定閾値以上、かつ、上限閾値未満となると、稼働情報を再度送信する。そして、停止判断部70は、再送された稼働情報を受信したタイミングで電力原単価が基準値未満であれば、このタイミングで停止指令を送信する。つまり、稼働時間判断部50は、カウント値が所定閾値以上、かつ、上限閾値未満の条件を満たす間、第1サーバ装置14から停止指令を受信するまで、所定の制御周期ごとに稼働情報の送信を繰り返す。そして、停止判断部70は、稼働情報の受信ごとに、電力原単価が基準値未満であるか否かを判断し、電力原単価が基準値未満となったタイミングで停止指令を送信する。 The operation time determination unit 50 transmits operation information when the count value is equal to or greater than the predetermined threshold and less than the upper threshold. The stop determination unit 70 waits if the unit price of electricity is equal to or greater than the reference value when it receives the operation information. In this case, the operation time determination unit 50 transmits the operation information again at the next control timing when the count value is again equal to or greater than the predetermined threshold and less than the upper threshold. If the unit price of electricity is less than the reference value when the retransmitted operation information is received, the stop determination unit 70 transmits a stop command at this timing. In other words, while the count value satisfies the condition of being equal to or greater than the predetermined threshold and less than the upper threshold, the operation time determination unit 50 repeatedly transmits operation information at each predetermined control cycle until it receives a stop command from the first server device 14. Each time it receives operation information, the stop determination unit 70 determines whether the unit price of electricity is less than the reference value, and transmits a stop command when the unit price of electricity falls below the reference value.

以上のように、第1実施形態の発電管理システム1では、発電ユニット20の連続稼働時間が所定時間以上である場合において、電力原単価に基づいて発電ユニット20を停止させるか否かの判断が行われる。具体的には、停止判断部70は、稼働情報の受信に応じて、電力原単価に基づいて発電ユニット20を停止させるか否かを判断する。停止判断部70は、電力原単価が所定の基準値未満であれば、発電ユニット20を停止させると判断する。電力原単価が基準値未満であるタイミングで発電ユニット20が停止されるため、第1実施形態の発電管理システム1では、発電ユニット20の停止中に、発電ユニット20を有する需要家に電力供給者が販売する電力の販売単価を、基準値未満の電力原単価に基づいた単価とすることが可能となる。 As described above, in the power generation management system 1 of the first embodiment, when the continuous operation time of the power generation unit 20 is equal to or longer than a predetermined time, a determination is made based on the unit price of the power source as to whether to shut down the power generation unit 20. Specifically, the shutdown determination unit 70 determines whether to shut down the power generation unit 20 based on the unit price of the power source in response to receiving operation information. The shutdown determination unit 70 determines to shut down the power generation unit 20 if the unit price of the power source is less than a predetermined reference value. Because the power generation unit 20 is shut down when the unit price of the power source is less than the reference value, in the power generation management system 1 of the first embodiment, the selling price of electricity sold by the power supplier to consumers having the power generation unit 20 while the power generation unit 20 is shut down can be set to a price based on the unit price of the power source less than the reference value.

したがって、第1実施形態の発電管理システム1によれば、ガスメータ32の保安機能によって意図しない報知が行われることを回避しつつ、発電ユニット20を停止させたときの需要家が購入する電力の購入価格を抑制することが可能となる。 Therefore, the power generation management system 1 of the first embodiment makes it possible to reduce the purchase price of electricity purchased by consumers when the power generation unit 20 is stopped, while avoiding unintended alerts due to the safety function of the gas meter 32.

なお、第1実施形態の第1サーバ装置14および分散型電源装置10は、第2サーバ装置16を介して通信を行っていた。しかし、第2サーバ装置16が省略されて、第1サーバ装置14および分散型電源装置10が、直接的に相互に通信を行ってもよい。 In the first embodiment, the first server device 14 and the distributed power supply system 10 communicate with each other via the second server device 16. However, the second server device 16 may be omitted, and the first server device 14 and the distributed power supply system 10 may communicate with each other directly.

また、第1実施形態では、図2で示すように、カウント値が所定閾値以上である場合に、稼働時間判断部50は、連続稼働時間が所定時間以上である旨を示す稼働情報を送信していた。しかし、稼働時間判断部50は、所定閾値以上となったカウント値を稼働情報として第2サーバ装置16を介して第1サーバ装置14に送信してもよい。その場合、第1サーバ装置14の停止判断部70は、所定閾値以上となったカウント値を示す稼働情報を受信した場合に、図3で示す電力市場単価を取得するステップS21以降の処理を行ってもよい。また、稼働時間判断部50は、図2において、カウント値が上限閾値未満の場合(S11におけるNO)、カウント値が所定閾値以上であるか判断するステップS14の処理を省略し、その時点のカウント値を、第2サーバ装置16を介して第1サーバ装置14に送信してもよい。その場合、第1サーバ装置14の停止判断部70は、カウント値を受信したかを判断し、カウント値を受信すると、カウント値が所定閾値以上であるか判断してもよい。そして、カウント値が所定閾値以上である場合、停止判断部70は、図3で示す電力市場単価を取得するステップS21以降の処理を行ってもよい。 In the first embodiment, as shown in FIG. 2, when the count value is equal to or greater than the predetermined threshold, the operation time determination unit 50 transmits operation information indicating that the continuous operation time is equal to or greater than the predetermined time. However, the operation time determination unit 50 may transmit the count value that is equal to or greater than the predetermined threshold as operation information to the first server device 14 via the second server device 16. In this case, when the stop determination unit 70 of the first server device 14 receives operation information indicating the count value that is equal to or greater than the predetermined threshold, it may perform the processing from step S21 onward, which acquires the electricity market price shown in FIG. 3. Also, in FIG. 2, when the count value is less than the upper threshold (NO in S11), the operation time determination unit 50 may omit the processing of step S14, which determines whether the count value is equal to or greater than the predetermined threshold, and transmit the count value at that time to the first server device 14 via the second server device 16. In this case, the stop determination unit 70 of the first server device 14 may determine whether the count value has been received, and, upon receiving the count value, determine whether the count value is equal to or greater than the predetermined threshold. If the count value is equal to or greater than the predetermined threshold, the stop determination unit 70 may perform the processes from step S21 onwards, which acquires the electricity market unit price shown in Figure 3.

(第1実施形態の変形例)
第1実施形態では、電力原単価に基づいて発電ユニット20を停止させるか否かが判断されていた。しかし、停止判断部70は、電力市場12で取引される単位電力量当たりの価格を示す電力市場単価に基づいて、発電ユニット20を停止させるか否かを判断してもよい。
(Modification of the first embodiment)
In the first embodiment, whether to shut down the power generation unit 20 is determined based on the unit price of the power source. However, the shutdown determination unit 70 may determine whether to shut down the power generation unit 20 based on the power market unit price indicating the price per unit amount of power traded in the power market 12.

図4は、停止判断部70の動作の流れの他の例を説明するフローチャートである。停止判断部70は、図3の例と同様に、所定の割込みタイミングとなると、稼働情報を受信したか否かを判断し(S20)、稼働情報を受信した場合(S20におけるYES)、電力市場12から電力市場単価を取得する。 Figure 4 is a flowchart illustrating another example of the operational flow of the stop determination unit 70. As in the example of Figure 3, when a predetermined interrupt timing occurs, the stop determination unit 70 determines whether operation information has been received (S20), and if operation information has been received (YES in S20), it obtains the electricity market unit price from the electricity market 12.

次に、停止判断部70は、記憶装置62に蓄積された過去の電力市場単価に基づいて、現在の基準値を設定する(S23a)。 Next, the shutdown determination unit 70 sets the current reference value based on the past electricity market unit price stored in the storage device 62 (S23a).

具体的には、停止判断部70は、現在から1年前までの電力市場単価の平均値を現在の基準値とする。また、停止判断部70は、現在の月に対して1年前の同月における電力市場単価の平均値を現在の基準値としてもよい。例えば、現在が5月であれば、1年前の5月の電力市場単価の平均値を現在の基準値としてもよい。また、停止判断部70は、現在から1か月前までの電力市場単価の平均値を現在の基準値としてもよい。また、停止判断部70は、現在の月に対して1年前の同月における電力市場単価の最大値から所定値だけ低い値を現在の基準値としてもよい。また、停止判断部70は、現在の月に対して1年前の同月における電力市場単価の最小値から所定値だけ高い値を現在の基準値としてもよい。これらのように、基準値の設定方法は、任意の方法を採用することができる。 Specifically, the stop determination unit 70 sets the average value of the electricity market unit price from the present to one year ago as the current reference value. The stop determination unit 70 may also set the average value of the electricity market unit price for the same month one year ago for the current month as the current reference value. For example, if the current month is May, the average value of the electricity market unit price for May one year ago may be set as the current reference value. The stop determination unit 70 may also set the average value of the electricity market unit price from the present to one month ago as the current reference value. The stop determination unit 70 may also set the current reference value to a value that is a predetermined value lower than the maximum value of the electricity market unit price for the same month one year ago for the current month. The stop determination unit 70 may also set the current reference value to a value that is a predetermined value higher than the minimum value of the electricity market unit price for the same month one year ago for the current month. As described above, any method can be used to set the reference value.

次に、停止判断部70は、電力市場単価が基準値未満であるか否かを判断する(S24a)。ステップS24aの処理は、電力市場単価に基づいて発電ユニット20を停止させるか否かを判断することに相当する。電力市場単価が基準値以上である場合(S24aにおけるNO)、停止判断部70は、一連の処理を終了する。つまり、電力市場単価が基準値以上となっている間、停止判断部70は、待機する。 Next, the shutdown determination unit 70 determines whether the electricity market unit price is less than the reference value (S24a). The processing of step S24a corresponds to determining whether to shut down the power generation unit 20 based on the electricity market unit price. If the electricity market unit price is equal to or greater than the reference value (NO in S24a), the shutdown determination unit 70 ends the series of processes. In other words, the shutdown determination unit 70 waits while the electricity market unit price is equal to or greater than the reference value.

電力市場単価が基準値未満である場合(S24aにおけるYES)、すなわち、発電ユニット20を停止させると判断した場合、停止判断部70は、発電ユニット20を停止させる停止指令を、通信装置60を通じて第2サーバ装置16に送信する(S25)。第2サーバ装置16は、第1サーバ装置14から当該停止指令を受信すると、当該停止指令を分散型電源装置10に送信する。これにより、発電ユニット20が停止される。 If the electricity market unit price is less than the reference value (YES in S24a), that is, if it is determined that the power generation unit 20 should be shut down, the shutdown determination unit 70 transmits a shutdown command to the second server device 16 via the communication device 60 to shut down the power generation unit 20 (S25). Upon receiving the shutdown command from the first server device 14, the second server device 16 transmits the shutdown command to the distributed power supply apparatus 10. This shuts down the power generation unit 20.

この変形例では、発電ユニット20の停止中に、発電ユニット20を有する需要家に電力供給者が販売する電力の販売単価を、基準値未満の電力市場単価に基づいた単価とすることが可能となる。したがって、この変形例によれば、上記第1実施形態と同様に、ガスメータ32の保安機能によって意図しない報知が行われることを回避しつつ、発電ユニット20を停止させたときの需要家が購入する電力の購入価格を抑制することが可能となる。 In this modified example, while the power generation unit 20 is stopped, the selling price of electricity sold by the power supplier to the consumer having the power generation unit 20 can be set to a price based on the market price of electricity that is less than the reference value. Therefore, according to this modified example, as in the first embodiment described above, it is possible to reduce the purchase price of electricity purchased by the consumer when the power generation unit 20 is stopped, while avoiding unintended alerts due to the safety function of the gas meter 32.

(第2実施形態)
第1実施形態の停止判断部70は、電力市場12から取得した現在の電力市場単価から導出された現在の電力原単価が基準値未満である場合に、発電ユニット20を停止させていた。これに対し、第2実施形態の停止判断部70は、将来の電力原単価の予測値を、将来の日付と関連付けて、複数導出する。ここでの将来の複数の日付は、例えば、現在から、発電ユニット20の連続稼働時間の上限閾値に相当する日付までの期間に設定される。なお、将来の複数の日付は、漏洩検出期間の最後に相当する日付までの期間に設定されてもよい。以下では便宜的に、将来の複数の日付を、現在から1週間先までの日付として説明する。
Second Embodiment
The shutdown determination unit 70 of the first embodiment shuts down the power generation unit 20 when the current power source unit price derived from the current power market unit price acquired from the power market 12 is less than a reference value. In contrast, the shutdown determination unit 70 of the second embodiment derives multiple predicted values of future power source unit prices in association with future dates. The multiple future dates here are set, for example, to a period from the present to a date corresponding to an upper limit threshold for the continuous operation time of the power generation unit 20. Note that the multiple future dates may also be set to a period up to a date corresponding to the end of the leakage detection period. For convenience, the multiple future dates will be described below as dates up to one week from the present.

ここで、第1サーバ装置14の記憶装置62には、将来の電力原単価を予測するための教師データが複数記憶されている。教師データは、例えば、過去の電力原単価、電力原単価を導出した日付(曜日、祝日)、電力原単価を導出したときの天気(あるいは日照時間)、電力原単価を導出したときの気温などが関連付けられたデータである。日付、天気および気温は、電力消費量に影響するため、電力市場単価に関連すると考えられ、電力市場単価は電力原単価に関連している。 Here, the storage device 62 of the first server device 14 stores multiple pieces of training data for predicting future electricity unit prices. The training data is data that associates, for example, past electricity unit prices, the date (day of the week, public holiday) on which the electricity unit price was derived, the weather (or hours of sunshine) when the electricity unit price was derived, and the temperature when the electricity unit price was derived. The date, weather, and temperature affect electricity consumption and are therefore considered to be related to the electricity market unit price, which in turn is related to the electricity unit price.

停止判断部70は、上述の教師データにより機械学習を行い、所定の機械学習モデルを生成する。機械学習モデルは、日付、天気および気温の入力に応じて、当該入力に対応する電力原単価の予測値を出力する。 The shutdown determination unit 70 performs machine learning using the training data described above to generate a specific machine learning model. The machine learning model outputs a predicted value for the unit price of electricity corresponding to the input of date, weather, and temperature.

停止判断部70は、電力原単価を予測するための元データとなる、1週間先までの1日毎の天気および予想平均気温を、天気予報などから取得する。停止判断部70は、現在から1週間先までの1日毎の日付、天気および予想平均気温を、所定の機械学習モデルにそれぞれ入力し、現在から1週間先までの1日毎の電力原単価の予測値を取得する。これにより、現在から1週間先までの7つの予測値が取得される。 The stoppage determination unit 70 obtains the weather and predicted average temperature for each day up to one week into the future from weather forecasts, etc., which serve as the source data for predicting the electricity cost. The stoppage determination unit 70 inputs the date, weather, and predicted average temperature for each day from the present to one week into a specified machine learning model, and obtains predicted values for the electricity cost for each day from the present to one week into the future. This obtains seven predicted values for the period from the present to one week into the future.

そして、第2実施形態の停止判断部70は、複数の予測値のうち最も低い予測値に対応する日に、発電ユニット20を停止させると判断する。例えば、現在から1週間先までの1日毎の電力原単価の予測値のうち、3日目の電力原単価の予測値が最も低ければ、停止判断部70は、3日後に発電ユニット20を停止させると判断する。 Then, the shutdown determination unit 70 of the second embodiment determines to shut down the power generation unit 20 on the day corresponding to the lowest predicted value among the multiple predicted values. For example, if the predicted value for the power source cost on the third day is the lowest among the predicted values for the power source cost for each day up to one week from now, the shutdown determination unit 70 determines to shut down the power generation unit 20 three days from now.

図5は、第2実施形態に係る停止判断部70の動作の流れを説明するフローチャートである。第2実施形態の停止判断部70は、所定の制御周期で訪れる所定の割込みタイミングとなると、図5の一連の処理を実行する。 Figure 5 is a flowchart illustrating the operational flow of the stop determination unit 70 according to the second embodiment. The stop determination unit 70 according to the second embodiment executes the series of processes shown in Figure 5 when a predetermined interrupt timing occurs at a predetermined control cycle.

所定の割込みタイミングとなると、停止判断部70は、稼働情報を受信したか否かを判断する(S30)。稼働情報を受信していない場合(S30におけるNO)、停止判断部70は、一連の処理を終了する。 When the specified interrupt timing arrives, the stop determination unit 70 determines whether operation information has been received (S30). If operation information has not been received (NO in S30), the stop determination unit 70 ends the series of processes.

稼働情報を受信した場合(S30におけるYES)、停止判断部70は、記憶装置62に記憶されている教師データに基づいて、機械学習モデルを生成する(S31)。次に、停止判断部70は、予測の対象となる期間の天気および予想平均気温等の元データを取得する(S32)。次に、停止判断部70は、予測の対象となる期間の日付、天気および予想平均気温を機械学習モデルに入力して、電力原単価の予測値を導出する(S33)。 If operation information has been received (YES in S30), the shutdown determination unit 70 generates a machine learning model based on the training data stored in the storage device 62 (S31). Next, the shutdown determination unit 70 acquires raw data such as the weather and predicted average temperature for the period to be predicted (S32). Next, the shutdown determination unit 70 inputs the dates, weather, and predicted average temperature for the period to be predicted into the machine learning model to derive a predicted value for the electricity cost (S33).

次に、停止判断部70は、導出された複数の予測値のうち予測値が最低値となる日付を取得する(S34)。次に、停止判断部70は、取得された日付に停止指令を送信することを予約し(S35)、一連の処理を終了する。これにより、停止判断部70は、予約された日付となると、通信装置60を通じて停止指令を第2サーバ装置16に送信する。第2サーバ装置16は、停止指令を受信すると、当該停止指令を分散型電源装置10に送信する。分散型電源装置10の稼働時間判断部50は、停止指令を受信したタイミングで発電ユニット20を停止させ、カウント値をリセットする。 Next, the stop determination unit 70 obtains the date on which the minimum predicted value is obtained from the derived multiple predicted values (S34). Next, the stop determination unit 70 reserves the transmission of a stop command on the obtained date (S35), and ends the series of processes. As a result, when the reserved date arrives, the stop determination unit 70 transmits a stop command to the second server device 16 via the communication device 60. Upon receiving the stop command, the second server device 16 transmits the stop command to the distributed power supply apparatus 10. The operating time determination unit 50 of the distributed power supply apparatus 10 stops the power generation unit 20 at the timing when the stop command is received and resets the count value.

以上のように、第2実施形態の発電管理システム1では、電力原単価が最も低くなると予測されるタイミングで発電ユニット20を停止させることができる。このため、第2実施形態の発電管理システム1では、発電ユニット20を停止させたときの需要家が購入する電力の購入価格を、より抑制することが可能となる。 As described above, the power generation management system 1 of the second embodiment can shut down the power generation unit 20 at the timing when the unit price of electricity is predicted to be lowest. Therefore, the power generation management system 1 of the second embodiment can further reduce the purchase price of electricity purchased by consumers when the power generation unit 20 is shut down.

(第2実施形態の変形例)
第2実施形態では、将来の電力原単価の予測値を、将来の日付と関連付けて複数導出し、最も低い予測値に対応する日に、発電ユニット20を停止させると判断されていた。しかし、停止判断部70は、将来の電力市場単価の予測値を、将来の日付と関連付けて複数導出し、最も低い予測値に対応する日に、発電ユニット20を停止させると判断してもよい。
(Modification of the second embodiment)
In the second embodiment, multiple predicted values of the future electricity price are derived in association with future dates, and it is determined that the power generation unit 20 should be shut down on the day corresponding to the lowest predicted value. However, the shutdown determination unit 70 may also derive multiple predicted values of the future electricity market price in association with future dates, and determine that the power generation unit 20 should be shut down on the day corresponding to the lowest predicted value.

例えば、第1サーバ装置14の記憶装置62には、将来の電力市場単価を予測するための教師データが複数記憶されている。教師データは、例えば、過去の電力市場単価、電力市場単価を取得した日付(曜日、祝日)、電力市場単価を取得したときの天気(あるいは日照時間)、電力市場単価を取得したときの気温などが関連付けられたデータである。 For example, the storage device 62 of the first server device 14 stores multiple pieces of training data for predicting future electricity market unit prices. The training data is data that associates, for example, past electricity market unit prices, the dates (days of the week, holidays) on which the electricity market unit prices were acquired, the weather (or hours of sunshine) when the electricity market unit prices were acquired, and the temperature when the electricity market unit prices were acquired.

停止判断部70は、上述の教師データにより機械学習を行い、所定の機械学習モデルを生成する。機械学習モデルは、日付、天気および気温の入力に応じて、当該入力に対応する電力市場単価の予測値を出力する。 The shutdown determination unit 70 performs machine learning using the training data described above to generate a specific machine learning model. The machine learning model outputs a predicted value for the electricity market unit price corresponding to the input of date, weather, and temperature.

停止判断部70は、電力市場単価を予測するための元データとなる、1週間先までの1日毎の天気および予想平均気温を、天気予報などから取得する。停止判断部70は、現在から1週間先までの1日毎の日付、天気および予想平均気温を、所定の機械学習モデルにそれぞれ入力し、現在から1週間先までの1日毎の電力市場単価の予測値を取得する。これにより、現在から1週間先までの7つの予測値が取得される。 The shutdown determination unit 70 obtains the weather and predicted average temperature for each day up to one week into the future from weather forecasts, etc., which serve as the source data for predicting the electricity market unit price. The shutdown determination unit 70 inputs the date, weather, and predicted average temperature for each day from the present to one week into a specified machine learning model, and obtains predicted values for the electricity market unit price for each day from the present to one week into the future. This obtains seven predicted values for the period from the present to one week into the future.

そして、停止判断部70は、複数の予測値のうち最も低い予測値に対応する日に、発電ユニット20を停止させると判断する。例えば、現在から1週間先までの1日毎の電力原単価の予測値のうち、3日目の電力市場単価の予測値が最も低ければ、停止判断部70は、3日後に発電ユニット20を停止させると判断する。 The shutdown decision unit 70 then decides to shut down the power generation unit 20 on the day corresponding to the lowest predicted value among the multiple predicted values. For example, if the predicted value for the electricity market unit price on the third day is the lowest among the predicted values for the electricity unit price for each day up to one week from now, the shutdown decision unit 70 decides to shut down the power generation unit 20 three days from now.

この変形例では、電力市場単価が最も低くなると予測されるタイミングで発電ユニット20を停止させることができる。この変形例によれば、上記第2実施形態と同様に、発電ユニット20を停止させたときの需要家が購入する電力の購入価格を、より抑制することが可能となる。 In this variant, the power generation unit 20 can be shut down at the timing when the market price of electricity is predicted to be lowest. As with the second embodiment, this variant makes it possible to further reduce the purchase price of electricity purchased by consumers when the power generation unit 20 is shut down.

(第3実施形態)
図6は、第3実施形態に係る発電管理システム100の構成を示す概略図である。第3実施形態の発電管理システム100は、分散型電源装置10を複数有する点において第1実施形態と異なる。図6では、2つの分散型電源装置10を例示しているが、分散型電源装置10は、2つに限らず、3つ以上設けられてもよい。
(Third embodiment)
Fig. 6 is a schematic diagram showing the configuration of a power generation management system 100 according to the third embodiment. The power generation management system 100 of the third embodiment differs from the first embodiment in that it has a plurality of distributed power supply devices 10. Although Fig. 6 shows two distributed power supply devices 10 as an example, the number of distributed power supply devices 10 is not limited to two, and three or more distributed power supply devices 10 may be provided.

第3実施形態の第1サーバ装置14の停止判断部70は、複数の分散型電源装置10のいずれかから送信される稼働情報の受信に応じて、電力原単価に基づいて発電ユニット20を停止させるか否かの判断を行う。つまり、第3実施形態では、複数の分散型電源装置10のうちいずれかの分散型電源装置において連続稼働時間が所定時間以上となると、発電ユニット20を停止させるか否かの判断が行われる。 In the third embodiment, the shutdown determination unit 70 of the first server device 14 determines whether to shut down the power generation unit 20 based on the unit price of electricity in response to receiving operation information transmitted from one of the multiple distributed power supply devices 10. In other words, in the third embodiment, when the continuous operation time of any of the multiple distributed power supply devices 10 reaches or exceeds a predetermined time, a determination is made as to whether to shut down the power generation unit 20.

そして、停止判断部70は、発電ユニット20を停止させると判断した場合、停止指令を複数の分散型電源装置10に送信する。つまり、第2実施形態では、複数の分散型電源装置10を同じタイミングで一斉に停止させる。 Then, when the shutdown determination unit 70 determines that the power generation unit 20 should be shut down, it sends a shutdown command to the multiple distributed power supply devices 10. In other words, in the second embodiment, the multiple distributed power supply devices 10 are shut down simultaneously at the same time.

したがって、第3実施形態の発電管理システム100では、分散型電源装置10を個別に停止させる態様と比べ、停止判断部70の処理負荷を低減することが可能となる。 Therefore, in the power generation management system 100 of the third embodiment, it is possible to reduce the processing load on the shutdown determination unit 70 compared to a configuration in which the distributed power supply devices 10 are shut down individually.

また、第3実施形態では、第1実施形態と同様に、発電ユニット20を停止させたときの需要家が購入する電力の購入価格を抑制することが可能となる。 Furthermore, in the third embodiment, as in the first embodiment, it is possible to reduce the purchase price of electricity purchased by consumers when the power generation unit 20 is stopped.

なお、第3実施形態に第2実施形態の特徴を組み合わせてもよい。具体的には、停止判断部70は、将来の電力原単価の予測値を導出し、複数の予測値のうち最も低い予測値に対応する日に、複数の分散型電源装置10に停止指令を送信してもよい。また、第3実施形態に第1実施形態の変形例の特徴を組み合わせてもよいし、第3実施形態に第2実施形態の変形例の特徴を組み合わせてもよい。 The third embodiment may be combined with the features of the second embodiment. Specifically, the shutdown determination unit 70 may derive a predicted value for the future unit price of electricity and send a shutdown command to multiple distributed power generation devices 10 on the day corresponding to the lowest predicted value among the multiple predicted values. The third embodiment may also be combined with the features of the modified first embodiment, or the third embodiment may be combined with the features of the modified second embodiment.

(第4実施形態)
図7は、第4実施形態に係る発電管理システム200の構成を示す概略図である。上述の第1実施形態では、停止判断部70が第1サーバ装置14に設けられていた。これに対し、第4実施形態では、第1サーバ装置14および第2サーバ装置16が省略され、停止判断部270が分散型電源装置10に設けられる。第4実施形態の分散型電源装置10の制御装置24は、稼働時間判断部50として機能するとともに、停止判断部270としても機能する。
(Fourth embodiment)
7 is a schematic diagram showing the configuration of a power generation management system 200 according to a fourth embodiment. In the first embodiment described above, the stop determination unit 70 was provided in the first server device 14. In contrast, in the fourth embodiment, the first server device 14 and the second server device 16 are omitted, and a stop determination unit 270 is provided in the distributed power supply apparatus 10. The control device 24 of the distributed power supply apparatus 10 in the fourth embodiment functions as the operating time determination unit 50 and also as the stop determination unit 270.

第4実施形態の停止判断部270は、連続稼働時間が所定時間以上の所定の制御タイミングで、電力市場12から電力市場単価を取得する。停止判断部270は、取得した電力市場単価に基づいて電力原単価を導出する。停止判断部270は、電力原単価が所定の基準値未満であれば、発電ユニット20を停止させると判断する。 In the fourth embodiment, the shutdown determination unit 270 acquires the electricity market unit price from the electricity market 12 at a predetermined control timing when the continuous operation time is equal to or longer than a predetermined time. The shutdown determination unit 270 derives the electricity source unit price based on the acquired electricity market unit price. If the electricity source unit price is less than a predetermined reference value, the shutdown determination unit 270 determines to shut down the power generation unit 20.

図8は、第4実施形態に係る稼働時間判断部50および停止判断部270の動作の流れを説明するフローチャートである。図8のステップS10~ステップS14は、図2のステップS10~ステップS14と同じである。図8は、ステップS14がYESのときの処理以降が図2と異なる。また、稼働時間判断部50は、所定の制御周期で訪れる所定の制御タイミングごとに図8の一連の処理を開始する。 Figure 8 is a flowchart illustrating the operation of the operating time determination unit 50 and the stop determination unit 270 according to the fourth embodiment. Steps S10 to S14 in Figure 8 are the same as steps S10 to S14 in Figure 2. Figure 8 differs from Figure 2 in the processing that follows when step S14 is YES. In addition, the operating time determination unit 50 starts the series of processing in Figure 8 at each predetermined control timing that occurs in a predetermined control cycle.

ステップS14において、カウント値が所定閾値以上である場合(S14におけるYES)、すなわち、連続稼働時間が所定時間以上である場合、停止判断部270は、電力市場12から電力市場単価を取得する(S40)。停止判断部270は、記憶装置62から自家電源単価および電力取引単価を読み出し、読み出した自家電源単価、読み出した電力取引単価、および、取得した電力市場単価を合計して、電力原単価を導出する(S41)次に、停止判断部270は、記憶装置62に蓄積された過去の電力原単価に基づいて、現在の基準値を設定する(S42)。 In step S14, if the count value is equal to or greater than the predetermined threshold (YES in S14), i.e., if the continuous operation time is equal to or greater than the predetermined time, the stop determination unit 270 acquires the electricity market unit price from the electricity market 12 (S40). The stop determination unit 270 reads the private power source unit price and the electricity trading unit price from the storage device 62, and derives the electricity source unit price by summing the read private power source unit price, the read electricity trading unit price, and the acquired electricity market unit price (S41). Next, the stop determination unit 270 sets the current reference value based on the past electricity source unit prices stored in the storage device 62 (S42).

次に、停止判断部270は、電力原単価が基準値未満であるか否かを判断する(S43)。電力原単価が基準値以上である場合(S43におけるNO)、停止判断部270は、一連の処理を終了する。 Next, the stop determination unit 270 determines whether the unit price of electricity is less than the reference value (S43). If the unit price of electricity is equal to or greater than the reference value (NO in S43), the stop determination unit 270 ends the series of processes.

電力原単価が基準値未満の場合(S43におけるYES)、停止判断部270は、発電ユニット20を停止させると判断し、それにより、制御装置24は、発電ユニット20を停止する(S44)。そして、停止判断部270は、カウント値をリセットして(S45)、一連の処理を終了する。 If the electricity unit cost is less than the reference value (YES in S43), the stop determination unit 270 determines to stop the power generation unit 20, and the control device 24 accordingly stops the power generation unit 20 (S44). The stop determination unit 270 then resets the count value (S45), and the series of processes ends.

以上のように、第4実施形態の発電管理システム200では、第1実施形態と同様に、連続稼働時間が所定時間以上である場合において、電力原単価に基づいて発電ユニット20を停止させるか否かの判断が行われる。 As described above, in the power generation management system 200 of the fourth embodiment, similar to the first embodiment, when the continuous operation time is equal to or longer than a predetermined time, a decision is made based on the unit cost of electricity as to whether to shut down the power generation unit 20.

したがって、第4実施形態の発電管理システム200では、第1実施形態と同様に、発電ユニット20を停止させたときの需要家が購入する電力の購入価格を抑制することが可能となる。 Therefore, in the fourth embodiment, the power generation management system 200, like the first embodiment, makes it possible to reduce the purchase price of electricity purchased by consumers when the power generation unit 20 is stopped.

なお、第4実施形態に第2実施形態の特徴を組み合わせてもよい。具体的には、分散型電源装置10の停止判断部270は、将来の電力原単価の予測値を導出し、複数の予測値のうち最も低い予測値に対応する日に、発電ユニット20を停止させると判断してもよい。また、第4実施形態に第1実施形態の変形例の特徴を組み合わせてもよいし、第4実施形態に第2実施形態の変形例の特徴を組み合わせてもよい。 The fourth embodiment may be combined with the features of the second embodiment. Specifically, the shutdown decision unit 270 of the distributed power supply device 10 may derive a predicted value for the future unit price of electricity and decide to shut down the power generation unit 20 on the day corresponding to the lowest predicted value among multiple predicted values. The fourth embodiment may also be combined with the features of the modified first embodiment, or the fourth embodiment may be combined with the features of the modified second embodiment.

以上、添付図面を参照しながら本発明の好適な実施形態について説明したが、本発明はかかる実施形態に限定されないことは言うまでもない。当業者であれば、特許請求の範囲に記載された範疇内において、各種の変更例または修正例に想到し得ることは明らかであり、それらについても当然に本発明の技術的範囲に属するものと了解される。 While the preferred embodiments of the present invention have been described above with reference to the accompanying drawings, it goes without saying that the present invention is not limited to such embodiments. It is clear that a person skilled in the art could conceive of various modifications or alterations within the scope of the claims, and it is understood that these also naturally fall within the technical scope of the present invention.

例えば、上記各実施形態および各変形例において、電力原単価は、電力市場単価、自家電源単価および電力取引単価を合計した値としていた。しかし、電力の確保に自家電源の電力を用いない場合には、自家電源単価が電力原単価に含まれなくてもよい。同様に、電力の確保に他の電力事業者との取引契約に基づく電力を用いない場合には、電力取引単価が電力原単価に含まれなくてもよい。すなわち、電力原単価は、電力市場単価と等しくてもよい。 For example, in each of the above embodiments and variations, the electricity unit price is the sum of the electricity market unit price, the private power source unit price, and the electricity trading unit price. However, if electricity from a private power source is not used to secure power, the private power source unit price does not need to be included in the electricity unit price. Similarly, if electricity based on a trading contract with another power supplier is not used to secure power, the electricity trading unit price does not need to be included in the electricity unit price. In other words, the electricity unit price may be equal to the electricity market unit price.

1、100、200 発電管理システム
10 分散型電源装置
12 電力市場
14 第1サーバ装置
20 発電ユニット
50 稼働時間判断部
70、270 停止判断部
Reference Signs List 1, 100, 200 Power generation management system 10 Distributed power supply device 12 Electricity market 14 First server device 20 Power generation unit 50 Operation time determination unit 70, 270 Stop determination unit

Claims (7)

燃料ガスを消費して少なくとも電力を生成する発電ユニットと、
前記発電ユニットが連続して稼働している時間を示す連続稼働時間を判断する稼働時間判断部と、
前記発電ユニットを停止させるか否かを判断する停止判断部と、
を備え、
電力市場で取引される単位電力量当たりの価格が、電力市場単価であり、
前記発電ユニットを有する需要家に電力を供給する電力供給者が管理する自家電源で発電するためにかかる単位電力量当たりの費用が、自家電源単価であり、
前記電力供給者が他の電力事業者との間で締結した電力の取引契約に基づく単位電力量当たりの費用が、電力取引単価であり、
前記電力市場単価、前記自家電源単価および前記電力取引単価のうち少なくともいずれかを含み、前記発電ユニットを有する需要家に供給する電力を前記電力供給者が確保するためにかかる単位電力量当たりの費用が、電力原単価であり、
前記停止判断部は、
前記連続稼働時間が所定時間以上の所定の制御タイミングで、前記電力原単価に基づき、前記発電ユニットを停止させるか否かを判断する、発電管理システム。
a power generation unit that consumes fuel gas to generate at least electrical power;
an operation time determination unit that determines a continuous operation time indicating a time during which the power generation unit has been operating continuously;
a stop determination unit that determines whether or not to stop the power generation unit;
Equipped with
The price per unit of electricity traded in the electricity market is the electricity market unit price.
The cost per unit of electricity required to generate electricity from a private power source managed by an electricity supplier that supplies electricity to a consumer having the power generation unit is the private power source unit price,
The cost per unit of electricity based on an electricity trading contract concluded between the electricity supplier and another electricity supplier is the electricity trading unit price,
an electricity price is a cost per unit of electricity that the electricity supplier incurs to secure electricity to be supplied to the consumer having the power generation unit, the cost including at least one of the electricity market price, the private power source price, and the electricity trading price;
The stop determination unit
a power generation management system that determines, at a predetermined control timing when the continuous operation time is equal to or longer than a predetermined time, whether to stop the power generation unit based on the unit price of electricity.
前記発電ユニットおよび前記稼働時間判断部は、分散型電源装置に設けられ、
前記停止判断部は、前記分散型電源装置と通信可能なサーバ装置に設けられ、
前記稼働時間判断部は、前記連続稼働時間が所定時間以上である場合、前記連続稼働時間が所定時間以上である旨を示す稼働情報を前記サーバ装置に送信し、
前記停止判断部は、前記稼働情報の受信に応じて、前記電力原単価に基づいて前記発電ユニットを停止させるか否かを判断し、前記発電ユニットを停止させると判断した場合、前記発電ユニットを停止させる停止指令を前記分散型電源装置に送信する請求項1に記載の発電管理システム。
the power generation unit and the operating time determination unit are provided in a distributed power supply apparatus,
the stop determination unit is provided in a server device that can communicate with the distributed power supply apparatus,
the operation time determination unit, when the continuous operation time is equal to or longer than a predetermined time, transmits operation information indicating that the continuous operation time is equal to or longer than the predetermined time to the server device;
The power generation management system described in claim 1, wherein the shutdown judgment unit judges whether to shut down the power generation unit based on the unit cost of electricity in response to receiving the operation information, and if it judges to shut down the power generation unit, sends a shutdown command to the distributed power supply device to shut down the power generation unit.
前記分散型電源装置を複数有し、
前記停止判断部は、前記複数の分散型電源装置のいずれかから送信される前記稼働情報の受信に応じて、前記電力原単価に基づいて前記発電ユニットを停止させるか否かを判断し、前記発電ユニットを停止させると判断した場合、前記停止指令を前記複数の分散型電源装置に送信する請求項2に記載の発電管理システム。
a plurality of the distributed power supply devices;
The power generation management system of claim 2, wherein the shutdown determination unit determines whether to shut down the power generation unit based on the unit cost of electricity in response to receiving the operation information transmitted from any of the plurality of distributed power generation devices, and if it determines that the power generation unit should be shut down, transmits the shutdown command to the plurality of distributed power generation devices.
前記発電ユニット、前記稼働時間判断部および前記停止判断部は、分散型電源装置に設けられる請求項1に記載の発電管理システム。 The power generation management system of claim 1, wherein the power generation unit, the operating time determination unit, and the shutdown determination unit are provided in a distributed power supply device. 前記停止判断部は、前記連続稼働時間が所定時間以上の所定の制御タイミングで、前記電力原単価が所定の基準値未満であれば、前記発電ユニットを停止させると判断する請求項1から4のいずれか1項に記載の発電管理システム。 A power generation management system according to any one of claims 1 to 4, wherein the stop determination unit determines to stop the power generation unit if the unit price of electricity is less than a predetermined reference value at a predetermined control timing when the continuous operation time is equal to or longer than a predetermined time. 前記停止判断部は、
前記電力原単価を定期的に取得して記憶装置に蓄積していき、
前記記憶装置に記憶された過去の前記電力原単価に基づいて、前記基準値を設定する請求項5に記載の発電管理システム。
The stop determination unit
The electricity unit price is periodically acquired and stored in a storage device,
The power generation management system according to claim 5 , wherein the reference value is set based on the past unit price of electricity stored in the storage device.
前記停止判断部は、将来の前記電力原単価の予測値を、将来の日付と関連付けて複数導出し、最も低い前記予測値に対応する日に、前記発電ユニットを停止させると判断する請求項1から4のいずれか1項に記載の発電管理システム。 A power generation management system according to any one of claims 1 to 4, wherein the shutdown decision unit derives multiple predicted values of the future unit cost of electricity in association with future dates, and decides to shut down the power generation unit on the day corresponding to the lowest predicted value.
JP2022041207A 2022-03-16 2022-03-16 Power Generation Management System Active JP7717014B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022041207A JP7717014B2 (en) 2022-03-16 2022-03-16 Power Generation Management System

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022041207A JP7717014B2 (en) 2022-03-16 2022-03-16 Power Generation Management System

Publications (2)

Publication Number Publication Date
JP2023135891A JP2023135891A (en) 2023-09-29
JP7717014B2 true JP7717014B2 (en) 2025-08-01

Family

ID=88145294

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022041207A Active JP7717014B2 (en) 2022-03-16 2022-03-16 Power Generation Management System

Country Status (1)

Country Link
JP (1) JP7717014B2 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005353292A (en) 2004-06-08 2005-12-22 Ebara Ballard Corp Fuel cell system
JP2014183017A (en) 2013-03-21 2014-09-29 Toyota Home Kk Fuel cell battery power generation system
JP2016223690A (en) 2015-05-29 2016-12-28 大阪瓦斯株式会社 Gas power generation system
JP2021027707A (en) 2019-08-06 2021-02-22 ダイハツ工業株式会社 Battery system
JP2021158808A (en) 2020-03-27 2021-10-07 大和ハウス工業株式会社 Power supply system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005353292A (en) 2004-06-08 2005-12-22 Ebara Ballard Corp Fuel cell system
JP2014183017A (en) 2013-03-21 2014-09-29 Toyota Home Kk Fuel cell battery power generation system
JP2016223690A (en) 2015-05-29 2016-12-28 大阪瓦斯株式会社 Gas power generation system
JP2021027707A (en) 2019-08-06 2021-02-22 ダイハツ工業株式会社 Battery system
JP2021158808A (en) 2020-03-27 2021-10-07 大和ハウス工業株式会社 Power supply system

Also Published As

Publication number Publication date
JP2023135891A (en) 2023-09-29

Similar Documents

Publication Publication Date Title
US11927976B2 (en) Utility console for controlling energy resources
US11629884B2 (en) Tank-based and tankless water heater systems
US11271400B2 (en) Power control device, operation plan planning method, and recording medium
CA2647411C (en) Energy budget manager
US6216956B1 (en) Environmental condition control and energy management system and method
US20100138363A1 (en) Smart grid price response service for dynamically balancing energy supply and demand
AU2018210244A1 (en) Method of optimizing market supply and demand dynamics for energy distribution and consumption
JP2008021152A (en) Method and system for controlling operation of electrical equipment
JP6069738B2 (en) Charge / discharge control system, charge / discharge control method, and charge / discharge control program
JP2012200138A (en) Systems and methods for managing energy distribution network
JP6769889B2 (en) Power control system and power control method
JP6901345B2 (en) Power control system storage battery deterioration diagnosis method
JP2018025962A (en) Operation plan planning method, operation plan planning device, and program
JP2019088151A (en) Hot-water supply device control system and hot-water supply device control method
JP5853647B2 (en) Remote control device and heat source machine
JP7717014B2 (en) Power Generation Management System
AU2019226175A1 (en) Contract assistance apparatus, contract assistance system, and contract assistance method
JP2022066217A (en) Hot water supply method and control device
AU2016210018B2 (en) Control method and apparatus
JP6816962B2 (en) Power monitor, display control method and display control program
JP2017169320A (en) Photovoltaic power generation apparatus control device, server, photovoltaic power generation system, information distribution method, photovoltaic power generation apparatus control method and program
JP2008271659A (en) Driving support system and driving support method for energy supply and demand system
JP6921680B2 (en) Power management system
JP2008113523A (en) Power supply system, consumer group equipment, and monitoring and control method thereof
Kukard et al. The optimized scheduling of a sanitary water heating system for commercial high rise apartment buildings

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240918

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250612

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250708

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250722

R150 Certificate of patent or registration of utility model

Ref document number: 7717014

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150