JP7724000B2 - Building foundation reinforcement structure - Google Patents
Building foundation reinforcement structureInfo
- Publication number
- JP7724000B2 JP7724000B2 JP2023128554A JP2023128554A JP7724000B2 JP 7724000 B2 JP7724000 B2 JP 7724000B2 JP 2023128554 A JP2023128554 A JP 2023128554A JP 2023128554 A JP2023128554 A JP 2023128554A JP 7724000 B2 JP7724000 B2 JP 7724000B2
- Authority
- JP
- Japan
- Prior art keywords
- ground
- improvement body
- foundation
- concrete
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/01—Flat foundations
- E02D27/08—Reinforcements for flat foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/28—Stressing the soil or the foundation structure while forming foundations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/12—Consolidating by placing solidifying or pore-filling substances in the soil
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- Mining & Mineral Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Agronomy & Crop Science (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Foundations (AREA)
Description
本発明は、支持層が比較的浅い場合、又は地盤が比較的良い場合に好適な建築物の基礎補強構造に関する。 The present invention relates to a foundation reinforcement structure for buildings that is suitable when the supporting layer is relatively shallow or the ground is relatively good.
支持層が比較的浅い場合の建築物の基礎補強として、建築物の基礎下の支持層までの地盤をコンクリートに置換するラップルコンクリートが一般的に採用される(例えば、特許文献1参照)。 When reinforcing the foundations of buildings where the supporting layer is relatively shallow, rapple concrete is commonly used, which replaces the ground below the building's foundation up to the supporting layer with concrete (see, for example, Patent Document 1).
他方、軟弱地盤上に建築物を建築する場合の基礎補強として、べた基礎の下に地盤改良体を設置するものがある(例えば、特許文献2参照)。この地盤改良体は、軟弱地盤の表層部を改良したものであり、水平板状の上部改良体と、前記上部改良体の下面から垂下して外枠を形成する外周部改良体と、前記上部改良体の下面から垂下して、前記外枠間を連結して前記外周部改良体の内側の領域を複数の領域に仕切る少なくとも1個の内部改良体とにより形成される。 On the other hand, one method of reinforcing the foundation when constructing a building on soft ground involves installing a ground improvement body under a mat foundation (see, for example, Patent Document 2). This ground improvement body improves the surface layer of soft ground and is made up of a horizontal plate-shaped upper improvement body, a peripheral improvement body that hangs down from the underside of the upper improvement body to form an outer frame, and at least one internal improvement body that hangs down from the underside of the upper improvement body, connects the outer frames, and divides the area inside the peripheral improvement body into multiple regions.
ラップルコンクリートにより基礎補強を行う場合、ラップルコンクリートを打設するための型枠を設置する必要があり、前記型枠を設置するために、掘削孔を大きく余堀りする必要がある。 When reinforcing foundations with ruffle concrete, it is necessary to install formwork for pouring the ruffle concrete, and in order to install this formwork, it is necessary to over-excavate the excavated hole significantly.
また、ラップルコンクリート打設部分の現地土は残土処分が必要である。さらに、ラップルコンクリートの打設後に、ラップルコンクリートの側方の余掘部に土を埋め戻す必要があるとともに、埋戻し土の強度管理が必要になる。 In addition, the local soil in the area where the rapple concrete is being poured will need to be disposed of. Furthermore, after the rapple concrete is poured, it will be necessary to backfill the excavated area to the side of the rapple concrete with soil, and the strength of the backfill soil will need to be managed.
また、前記型枠の設置、及び脱型の工期と手間が掛かる。さらに、ラップルコンクリートの上は、通常の基礎形式であるため、基礎の型枠設置、配筋及び脱型、並びに基礎の側方に土を埋め戻す必要があるとともに、埋戻し土の強度管理が必要になる。 In addition, installing and removing the formwork requires time and effort. Furthermore, because a standard foundation is placed on top of the wrap concrete, it is necessary to install the formwork for the foundation, arrange the reinforcement, remove the formwork, and backfill the soil to the side of the foundation, as well as manage the strength of the backfill soil.
べた基礎の下に前記地盤改良体を設置する基礎補強は、軟弱地盤(例えば、約20m程度の深さにわたりN値が非常に小さい地盤)には好適なものである。 Foundation reinforcement, which involves installing the ground improvement body under a mat foundation, is suitable for soft ground (e.g., ground with a very low N-value over a depth of approximately 20 m).
しかしながら、対象地盤が軟弱地盤ではなく、支持層が比較的浅い場合、又は地盤が比較的良い場合には、前記外周部改良体及び前記内部改良体を形成するために、それらの体積が必要以上に大きくなってしまう。 However, if the target ground is not soft, the bearing layer is relatively shallow, or the ground is relatively good, the volume of the outer periphery improvement body and the inner improvement body will be larger than necessary in order to form them.
したがって、改良土量の増大によりセメント系固化材等の固化材の使用量が増大するとともに、工期と手間が掛かる。その上、基礎コンクリートが、地面一面に鉄筋コンクリートを施工するべた基礎であるので、一層工期と手間が掛かる。 As a result, an increase in the volume of improved soil requires an increase in the amount of cement-based solidification materials used, and construction takes longer and takes more work. Furthermore, the foundation concrete is a mat foundation in which reinforced concrete is laid across the entire surface of the ground, which further increases construction time and effort.
本発明は、支持層が比較的浅い場合、又は地盤が比較的良い場合に、短工期、省資源、及びローコストを実現できる建築物の基礎補強構造を提供することを目的とする。 The purpose of the present invention is to provide a foundation reinforcement structure for buildings that can be constructed in a short period of time, with reduced resource consumption, and at low cost when the supporting layer is relatively shallow or the ground is relatively good.
本発明の要旨は以下のとおりである。 The gist of the present invention is as follows:
〔1〕
表層地盤を改良した地盤改良体及び前記地盤改良体上に打設した基礎コンクリートを含む建築物の基礎補強構造であって、
前記表層地盤の支持層の位置が地表面から5m以下である場合、又は、前記表層地盤が、地山で、砂質土若しくは粘性土で、N値は2以上であり、N値の深度分布において上方よりも下方が小さくならない地盤である場合に用いられ、
前記地盤改良体は、上部改良体及び下部改良体からなり、
前記基礎コンクリートは、前記地盤改良体を掘削して形成した凹部内に打設されたものであり、
前記上部改良体は、水平板状の全面改良体であり、
前記下部改良体は、前記基礎コンクリートの上方の建築物の柱の下方に位置し、前記上部改良体の下面から下方へ突出する独立改良体である、
建築物の基礎補強構造。
[1]
A foundation reinforcement structure for a building including a ground improvement body that improves the surface ground and foundation concrete poured on the ground improvement body,
This method is used when the position of the supporting layer of the surface ground is 5 m or less from the ground surface, or when the surface ground is natural ground, is sandy soil or clayey soil, has an N value of 2 or more, and is ground in which the N value depth distribution is not smaller at the bottom than at the top,
The ground improvement body consists of an upper improvement body and a lower improvement body,
The foundation concrete is poured into a recess formed by excavating the ground improvement body,
The upper improved body is a horizontal plate-shaped full improved body,
The lower improvement body is an independent improvement body located below the column of the building above the foundation concrete and protruding downward from the underside of the upper improvement body.
Foundation reinforcement structure of a building.
〔2〕
前記基礎コンクリートは独立基礎である、
〔1〕に記載の建築物の基礎補強構造。
[2]
The foundation concrete is an independent foundation;
The foundation reinforcement structure of the building described in [1].
本発明の建築物の基礎補強構造は、地盤改良体及び前記地盤改良体上に打設した基礎コンクリートを含む。前記地盤改良体の上部改良体は、水平板状の全面改良体であることから、地盤面の平面剛性が確保できるので、地中梁が不要となる。前記地盤改良体の下部改良体は、独立改良体であり、建築物の柱の下方に位置することから、前記柱から前記基礎コンクリートに伝達された建物荷重を分散して現地盤に伝えることができるとともに、改良土量が大幅に少なくなる。したがって、表層地盤の支持層が比較的浅い場合(前記支持層の位置が地表面から5m以下である場合)、又は表層地盤が比較的良い場合(前記表層地盤が、地山で、砂質土若しくは粘性土で、N値は2以上であり、N値の深度分布において上方よりも下方が小さくならない地盤である場合)において、短工期、省資源、及びローコストを実現できる。 The foundation reinforcement structure for a building of the present invention includes a ground improvement body and foundation concrete poured on the ground improvement body. The upper improvement body of the ground improvement body is a horizontal plate-shaped, full-surface improvement body, ensuring the planar rigidity of the ground surface and eliminating the need for underground beams. The lower improvement body of the ground improvement body is an independent improvement body located below the building's columns. Therefore, the building load transmitted from the columns to the foundation concrete can be dispersed and transmitted to the existing ground, and the amount of soil to be improved is significantly reduced. Therefore, when the bearing layer of the surface ground is relatively shallow (when the bearing layer is located 5 m or less from the ground surface) or when the surface ground is relatively good (when the surface ground is natural ground, is sandy or clayey, has an N value of 2 or more, and the N value depth distribution is not smaller at the bottom than at the top), short construction periods, resource conservation, and low costs can be achieved.
前記基礎コンクリートは、前記地盤改良体を掘削して形成した凹部内に打設されたものであるので、前記基礎コンクリートを打設するための型枠施工を省力化できる。また、通常は捨てコンクリート下に設ける必要がある砕石層を設ける必要がなくなるので、砕石施工を省力化できる。したがって、表層地盤の支持層が比較的浅い場合、又は表層地盤が比較的良い場合に用いる建築物の基礎補強構造において、さらに、短工期、省資源、及びローコストを実現できる。 Since the foundation concrete is poured into a recess formed by excavating the ground improvement body, the labor required for constructing formwork to pour the foundation concrete can be reduced. Furthermore, since there is no need to provide a crushed stone layer, which is normally required under the base concrete, the labor required for crushed stone construction can be reduced. Therefore, in foundation reinforcement structures for buildings used when the bearing layer of the surface ground is relatively shallow or when the surface ground is relatively good, shorter construction periods, resource conservation, and low costs can be achieved.
前記基礎コンクリートが独立基礎である場合は、べた基礎又は布基礎である場合と比較して、柱の下にのみ基礎を設ける構造であるので、表層地盤の支持層が比較的浅い場合、又は表層地盤が比較的良い場合に用いる建築物の基礎補強構造において、より一層、短工期、省資源、及びローコストを実現できる。 When the foundation concrete is an independent foundation, compared to a mat foundation or a strip foundation, the foundation is only installed under the columns, which means that in foundation reinforcement structures for buildings used when the bearing layer of the surface ground is relatively shallow or when the surface ground is relatively good, it is possible to achieve even shorter construction periods, resource conservation, and low costs.
以下、本発明の実施形態を図面に基づいて説明する。 Embodiments of the present invention will be described below with reference to the drawings.
[建築物の基礎補強構造]
本発明の実施形態に係る建築物の基礎補強構造Fの例を、図1の平面図、図1の矢視X1-X1断面図である図2A、及び図1の矢視X2-X2断面図である図2B、並びに、図2Aの要部拡大図である図3に示す。
[Building foundation reinforcement structure]
An example of a foundation reinforcement structure F for a building according to an embodiment of the present invention is shown in the plan view of Figure 1, Figure 2A, a cross-sectional view taken along the arrow X1-X1 in Figure 1, Figure 2B, a cross-sectional view taken along the arrow X2-X2 in Figure 1, and Figure 3, an enlarged view of a key portion of Figure 2A.
建築物の基礎補強構造Fは、表層地盤Gを改良した地盤改良体1及び地盤改良体1上に打設した基礎コンクリート2を含み、表層地盤Gの支持層が比較的浅い場合(前記支持層の位置が地表面GLから5m以下である場合)、又は表層地盤Gが比較的良い場合(表層地盤Gが、地山で、砂質土若しくは粘性土で、N値は2以上であり、N値の深度分布において上方よりも下方が小さくならない地盤である場合)に用いる。 The foundation reinforcement structure F for a building includes a ground improvement body 1 that has been improved from the surface ground G, and foundation concrete 2 poured on top of the ground improvement body 1. It is used when the bearing layer of the surface ground G is relatively shallow (when the position of the bearing layer is 5m or less from the ground surface GL), or when the surface ground G is relatively good (when the surface ground G is natural ground, is sandy or clayey soil, has an N value of 2 or more, and is a ground where the N value depth distribution is not smaller at the bottom than at the top).
[地盤改良体]
地盤改良体1は、上部改良体1H及び下部改良体1Lからなる。上部改良体1Hは、水平板状の全面改良体Aである。下部改良体1Lは、基礎コンクリート2の上方の建築物の鉄骨柱3の下方に位置し、上部改良体1Hの下面Dから下方へ突出する、本実施形態では9個である四角柱状の独立改良体Bである。
[Ground improvement body]
The ground improvement body 1 consists of an upper improvement body 1H and a lower improvement body 1L. The upper improvement body 1H is a horizontal plate-shaped full-surface improvement body A. The lower improvement bodies 1L are rectangular pillar-shaped independent improvement bodies B, nine in number in this embodiment, located below the steel columns 3 of the building above the foundation concrete 2 and protruding downward from the underside D of the upper improvement body 1H.
本実施形態では、図1に示すように、1個の上部改良体1Hの平面形状は正方形であり、9個の下部改良体1Lの平面形状も夫々正方形である。 In this embodiment, as shown in Figure 1, the planar shape of one upper improvement body 1H is square, and the planar shapes of the nine lower improvement bodies 1L are also square.
図3に示す上部改良体1Hの高さH1、及び下部改良体1Lの高さH2は、例えば、300mm≦H1≦1500mm、300mm≦H2≦1500mmである。 The height H1 of the upper improvement body 1H and the height H2 of the lower improvement body 1L shown in Figure 3 are, for example, 300 mm ≦ H1 ≦ 1500 mm and 300 mm ≦ H2 ≦ 1500 mm.
上部改良体1Hは水平板状の全面改良体Aである。そのため、地盤面の平面剛性が確保できるので、地中梁が不要となる。下部改良体1Lは独立改良体Bであり、鉄骨柱3の下方に位置する。そのため、鉄骨柱3から基礎コンクリート2に伝達された建物荷重を分散して現地盤に伝えることができるとともに、改良土量が大幅に少なくなる。したがって、表層地盤Gの支持層が比較的浅い場合、又は表層地盤Gが比較的良い場合において、短工期、省資源、及びローコストを実現できる。 The upper improvement body 1H is a horizontal plate-shaped full-surface improvement body A. This ensures the planar rigidity of the ground surface, eliminating the need for underground beams. The lower improvement body 1L is an independent improvement body B, located below the steel column 3. This allows the building load transmitted from the steel column 3 to the foundation concrete 2 to be dispersed and transmitted to the on-site ground, while significantly reducing the amount of improved soil. Therefore, when the bearing layer of the surface ground G is relatively shallow or when the surface ground G is relatively good, short construction periods, resource conservation, and low costs can be achieved.
[基礎コンクリート]
図2A及び図3に示すように、基礎コンクリート2は、地盤改良体1を掘削して形成した凹部C内に打設されたものであり、本実施形態では、独立基礎である。図1に示すように、本実施形態では9個である基礎コンクリート2の平面形状は、夫々正方形であり、例えば特許第6868301号公報における基礎コンクリートと同様の立体形状である場合の例を示している。
[Foundation concrete]
As shown in Figures 2A and 3, the foundation concrete 2 is poured into a recess C formed by excavating the ground improvement body 1, and in this embodiment, it is an independent foundation. As shown in Figure 1, in this embodiment, the planar shape of the nine foundation concrete 2 is each square, and an example of a three-dimensional shape similar to the foundation concrete in Japanese Patent No. 6868301 is shown.
基礎コンクリート2を打設する地盤改良体1の凹部Cの深さは、図3のように上部改良体1H内である場合、上部改良体1Hの下面Dと面一である場合、及び下部改良体1L内まで及ぶ場合の何れかである。 The depth of the recess C in the ground improvement body 1 into which the foundation concrete 2 is poured can be either within the upper improvement body 1H as shown in Figure 3, flush with the underside D of the upper improvement body 1H, or extending into the lower improvement body 1L.
地盤改良体1を掘削して形成した凹部C内に基礎コンクリート2を打設することにより、基礎コンクリート2を打設するための型枠施工を省力化できる。また、通常は捨てコンクリート下に設ける必要がある砕石層を設ける必要がなくなるので(図3の捨てコンクリート5参照)、砕石施工を省力化できる。したがって、表層地盤Gの支持層が比較的浅い場合、又は表層地盤Gが比較的良い場合に用いる建築物の基礎補強構造Fにおいて、さらに、短工期、省資源、及びローコストを実現できる。 By pouring the foundation concrete 2 into the recess C formed by excavating the ground improvement body 1, it is possible to reduce the labor required for constructing formwork to pour the foundation concrete 2. Furthermore, since there is no need to provide a crushed stone layer, which is normally required under the basin concrete (see basin concrete 5 in Figure 3), the labor required for crushed stone construction can be reduced. Therefore, in a building foundation reinforcement structure F used when the bearing layer of the surface ground G is relatively shallow or when the surface ground G is relatively good, it is possible to achieve even shorter construction periods, resource conservation, and low costs.
また、基礎コンクリート2が独立基礎であることから、べた基礎又は布基礎である場合と比較して、鉄骨柱3の下にのみ基礎を設ける構造であるので、表層地盤Gの支持層が比較的浅い場合、又は表層地盤Gが比較的良い場合に用いる建築物の基礎補強構造Fにおいて、より一層、短工期、省資源、及びローコストを実現できる。 Furthermore, because the foundation concrete 2 is an independent foundation, compared to a mat foundation or a strip foundation, the structure has a foundation established only below the steel columns 3. This allows for even shorter construction periods, resource conservation, and lower costs in the foundation reinforcement structure F of a building used when the bearing layer of the surface ground G is relatively shallow or when the surface ground G is relatively good.
基礎コンクリート2の平面形状は、正方形でなくてもよい。すなわち、基礎コンクリート2の平面形状は、例えば、長方形でもよく、四角形以上の多角形であればよい。独立改良体Bである下部改良体1Lの平面形状は、独立基礎である基礎コンクリート2の平面形状に合わせるのが好ましい実施態様である。すなわち、基礎コンクリート2の平面形状が前記多角形であるn角形である場合、独立改良体Bである下部改良体1Lの平面形状もn角形にするのが好ましい実施態様である。 The planar shape of the foundation concrete 2 does not have to be square. That is, the planar shape of the foundation concrete 2 may be, for example, rectangular, or any polygon with four or more sides. It is a preferred embodiment that the planar shape of the lower improvement body 1L, which is the independent improvement body B, matches the planar shape of the foundation concrete 2, which is the independent foundation. In other words, if the planar shape of the foundation concrete 2 is an n-gon, which is a polygon, it is a preferred embodiment that the planar shape of the lower improvement body 1L, which is the independent improvement body B, is also an n-gon.
また、下部改良体1Lの平面形状の大きさは、基礎コンクリートの平面形状の大きさよりも大きくする場合、例えば、図1及び図3において、0<E≦1000mmとする。あるいは、下部改良体1Lの平面形状の大きさを、基礎コンクリートの平面形状の大きさ以下にする場合もあり、例えば、-500mm<E≦0とする。 Furthermore, if the planar size of the lower improvement body 1L is made larger than the planar size of the foundation concrete, for example, in Figures 1 and 3, it is set to 0 < E ≦ 1000 mm. Alternatively, the planar size of the lower improvement body 1L may be made smaller than the planar size of the foundation concrete, for example, -500 mm < E ≦ 0.
[建築物の基礎補強構造等の施工工程]
建築物の基礎補強構造F等は、例えば、以下のように施工する。
[Construction process for building foundation reinforcement structures, etc.]
The foundation reinforcement structure F of a building is constructed, for example, as follows.
<地盤改良工程>
(掘下げ工程)
図2A及び図2B、並びに図3に示す地表面GLから下側の表層地盤Gを、例えばバックホウによる鋤取り等により、上部改良体1Hの所要形状に掘り下げる。
<Soil improvement process>
(Drilling process)
The surface ground G below the ground surface GL shown in Figures 2A and 2B and Figure 3 is excavated to the required shape of the upper improved body 1H, for example, by plowing with a backhoe.
(一次改良工程)
9箇所の四角柱状の下部改良体1Lを形成する範囲の土の上に、セメント系固化材等の固化材を散布する。アタッチメントとしてミキシングフォークを装着したバックホウ等により、前記土及び前記固化材を混合撹拌し、重機及びローラー等により締め固めて下部改良体1Lを形成する。
(Primary improvement process)
A solidification material such as a cement-based solidification material is spread on the soil in the area where nine rectangular pillar-shaped lower improvement bodies 1L will be formed. The soil and the solidification material are mixed and stirred using a backhoe or similar device equipped with a mixing fork, and then compacted with heavy machinery and rollers to form the lower improvement bodies 1L.
(二次改良工程)
前記掘下げ工程により掘り下げた土を、水平板状の上部改良体1Hの部分に、バックホウ等により埋め戻して敷き均す。埋め戻して敷き均した前記土の上に、セメント系固化材等の固化材を散布する。アタッチメントとしてミキシングフォークを装着したバックホウ等により、前記土及び前記固化材を混合撹拌し、重機及びローラー等により締め固めて上部改良体1Hを形成する。
(Secondary improvement process)
The soil excavated in the excavation process is backfilled and spread evenly in the horizontal plate-shaped upper improvement body 1H using a backhoe or similar tool. A solidification material such as a cement-based solidification material is spread on top of the backfilled and spread evenly. The soil and the solidification material are mixed and stirred using a backhoe or similar tool equipped with a mixing fork, and then compacted using heavy machinery and rollers to form the upper improvement body 1H.
<基礎掘削工程>
前記地盤改良工程で構築した地盤改良体1に対し、鉄骨柱3の地上側部分の下方に位置する地盤改良体1の上部を、バックホウ等により所定深さまで基礎コンクリート2の立体形状に掘削し、凹部Cを形成する。
<Foundation excavation process>
For the ground improvement body 1 constructed in the ground improvement process, the upper part of the ground improvement body 1 located below the above-ground part of the steel column 3 is excavated to a predetermined depth using a backhoe or the like to form a three-dimensional shape of the foundation concrete 2, thereby forming a recess C.
<基礎打設工程>
図3に示す捨てコンクリート5を打設する。鉄骨柱3固定用の柱脚アンカーボルトを捨てコンクリート5に固定し、基礎配筋を行って基礎コンクリート2を打設する。鉄骨柱3を設置し、土間コンクリート4を打設する。
<Foundation pouring process>
The basal concrete 5 shown in Figure 3 is poured. The column base anchor bolts for fixing the steel column 3 are fixed to the basal concrete 5, the foundation reinforcement is arranged, and the foundation concrete 2 is poured. The steel column 3 is installed, and the concrete floor 4 is poured.
以上の工程により建築物の基礎補強構造F等の施工が完了する。 The above steps complete the construction of the building's foundation reinforcement structure F, etc.
本発明の実施形態に係る建築物の基礎補強構造によれば、例えば、特許文献1のようなラップルコンクリートにより基礎補強を行う場合と比較して工期が約1/3程度になる。また、本発明の実施形態に係る建築物の基礎補強構造によれば、例えば、特許文献2のようなべた基礎の下に地盤改良体を設置し、前記地盤改良体が、水平板状の上部改良体と、前記上部改良体の下面から垂下して外枠を形成する外周部改良体と、前記上部改良体の下面から垂下して、前記外枠間を連結して前記外周部改良体の内側の領域を複数の領域に仕切る内部改良体とにより形成されるものと比較して、一次改良工程における改良土量が約1/4程度になる。 With the foundation reinforcement structure for a building according to an embodiment of the present invention, the construction period is approximately one-third of that required when, for example, foundation reinforcement is performed using rapple concrete as in Patent Document 1. Furthermore, with the foundation reinforcement structure for a building according to an embodiment of the present invention, the amount of improved soil in the primary improvement process is approximately one-quarter of that required when, for example, a ground improvement body is installed under a mat foundation as in Patent Document 2, and the ground improvement body is formed by a horizontal plate-shaped upper improvement body, a peripheral improvement body that hangs down from the underside of the upper improvement body to form an outer frame, and an internal improvement body that hangs down from the underside of the upper improvement body, connects the outer frames, and divides the area inside the peripheral improvement body into multiple areas.
以上の実施形態の記載はすべて例示であり、これに制限されるものではない。本発明の範囲から逸脱することなく種々の改良及び変更を施すことができる。 The above description of the embodiments is by way of example only and is not intended to be limiting. Various improvements and modifications may be made without departing from the scope of the present invention.
1 地盤改良体
1H 上部改良体
1L 下部改良体
2 基礎コンクリート
3 鉄骨柱
4 土間コンクリート
5 捨てコンクリート
A 全面改良体
B 独立改良体
C 凹部
D 下面
E 下部改良体の平面形状の大きさと基礎コンクリートの平面形状の大きさとの差
F 建築物の基礎補強構造
G 表層地盤
GL 地表面
H1 上部改良体の高さ
H2 下部改良体の高さ
1 Ground improvement body 1H Upper improvement body 1L Lower improvement body 2 Foundation concrete 3 Steel column 4 Floor concrete 5 Disposal concrete A Full surface improvement body B Independent improvement body C Recess D Underside E Difference between the size of the planar shape of the lower improvement body and the size of the planar shape of the foundation concrete F Foundation reinforcement structure of the building G Surface ground GL Ground surface H1 Height of upper improvement body H2 Height of lower improvement body
Claims (2)
前記表層地盤の支持層の位置が地表面から5m以下である場合、又は、前記表層地盤が、地山で、砂質土若しくは粘性土で、N値は2以上であり、N値の深度分布において上方よりも下方が小さくならない地盤である場合に用いられ、
前記地盤改良体は、上部改良体及び下部改良体からなり、
前記基礎コンクリートは、前記地盤改良体を掘削して形成した凹部内に打設されたものであり、
前記上部改良体は、水平板状の全面改良体であり、
前記下部改良体は、前記基礎コンクリートの上方の建築物の柱の下方に位置し、前記上部改良体の下面から下方へ突出する独立改良体である、
建築物の基礎補強構造。 A foundation reinforcement structure for a building including a ground improvement body that improves the surface ground and foundation concrete poured on the ground improvement body,
This method is used when the position of the supporting layer of the surface ground is 5 m or less from the ground surface, or when the surface ground is natural ground, is sandy soil or clayey soil, has an N value of 2 or more, and is ground in which the N value depth distribution is not smaller at the bottom than at the top,
The ground improvement body consists of an upper improvement body and a lower improvement body,
The foundation concrete is poured into a recess formed by excavating the ground improvement body,
The upper improved body is a horizontal plate-shaped full improved body,
The lower improvement body is an independent improvement body located below the column of the building above the foundation concrete and protruding downward from the underside of the upper improvement body.
Foundation reinforcement structure of a building.
請求項1に記載の建築物の基礎補強構造。 The foundation concrete is an independent foundation;
The foundation reinforcement structure for a building according to claim 1.
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2023128554A JP7724000B2 (en) | 2023-08-07 | 2023-08-07 | Building foundation reinforcement structure |
| PCT/JP2024/017692 WO2025032905A1 (en) | 2023-08-07 | 2024-05-13 | Foundation-reinforcing structure for building |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2023128554A JP7724000B2 (en) | 2023-08-07 | 2023-08-07 | Building foundation reinforcement structure |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2025024444A JP2025024444A (en) | 2025-02-20 |
| JP7724000B2 true JP7724000B2 (en) | 2025-08-15 |
Family
ID=94533939
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2023128554A Active JP7724000B2 (en) | 2023-08-07 | 2023-08-07 | Building foundation reinforcement structure |
Country Status (2)
| Country | Link |
|---|---|
| JP (1) | JP7724000B2 (en) |
| WO (1) | WO2025032905A1 (en) |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2021111690A1 (en) | 2019-12-02 | 2021-06-10 | 株式会社タケウチ建設 | Foundation structure for building, and method for constructing same |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3608568B1 (en) * | 2003-11-12 | 2005-01-12 | 謹治 竹内 | The structure of the foundation of the building consisting of the ground improvement body and the solid foundation, and the foundation construction method for the ground improvement |
| JP6436256B1 (en) * | 2017-07-04 | 2018-12-12 | 株式会社タケウチ建設 | Building basic structure and construction method |
| JP7175054B1 (en) * | 2022-01-07 | 2022-11-18 | 株式会社タケウチ建設 | ground improvement body |
-
2023
- 2023-08-07 JP JP2023128554A patent/JP7724000B2/en active Active
-
2024
- 2024-05-13 WO PCT/JP2024/017692 patent/WO2025032905A1/en active Pending
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2021111690A1 (en) | 2019-12-02 | 2021-06-10 | 株式会社タケウチ建設 | Foundation structure for building, and method for constructing same |
Also Published As
| Publication number | Publication date |
|---|---|
| WO2025032905A1 (en) | 2025-02-13 |
| JP2025024444A (en) | 2025-02-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102444142B (en) | Pile group column replacement expanded basement and construction method of same | |
| KR19990078524A (en) | Composite Underground Structure Construction Method | |
| RU2392387C2 (en) | Device and method for reinforcement of mast base | |
| JP6868301B1 (en) | Foundation structure of a building and its construction method | |
| KR100376590B1 (en) | Multi-phased underground construction method for wide excavation using permanent structural members as temporary struts | |
| JP7724000B2 (en) | Building foundation reinforcement structure | |
| CN106988337B (en) | It is a kind of for reducing the reinforcement means of bar shaped shallow foundation house differential settlement | |
| KR102223856B1 (en) | Foundation structure of waste landfill site and construction method thereof | |
| JP5071852B2 (en) | Structure subsidence suppression structure | |
| JPS62260919A (en) | Small pile for reinforcing foundation ground to earthquake | |
| JP3641227B2 (en) | Construction method of underground structure | |
| CN1204714A (en) | Method for forming retaining wall | |
| CN1333139C (en) | Column supported underground continuous wall | |
| CN111501829B (en) | Construction method of backfill type basement | |
| JPH11350746A (en) | Underground structure of building | |
| JP7129290B2 (en) | Building floor structure for rebuilding | |
| JPH07138972A (en) | Construction method for underground skeleton | |
| JP7735014B1 (en) | Construction methods and buildings | |
| Marchand | A DEEP BASEMENT IN ALDERSGATE STREET, LONDON. PART 1: CONTRACTOR'S DESIGN AND PLANNING. | |
| JP3059058U (en) | Solid foundation structure with stabilizer | |
| CN116905814B (en) | A construction method | |
| JP7398609B2 (en) | Concrete frame construction method and underground structure | |
| RU64650U1 (en) | SPATIAL FUNDAMENTAL PLATFORM FOR BUILDINGS AND CONSTRUCTIONS FOR CONSTRUCTION ON WEAK, LOWING, EMBEDDED SOILS AND IN SEISMIC ZONES | |
| JPH0886117A (en) | Building installation method | |
| JP4344733B2 (en) | Seismic reinforcement structure for existing pile foundation structures |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20240628 |
|
| A871 | Explanation of circumstances concerning accelerated examination |
Free format text: JAPANESE INTERMEDIATE CODE: A871 Effective date: 20240628 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20240723 |
|
| A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20241001 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20250728 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7724000 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |