JP7724018B2 - Grit basin and sand collection method - Google Patents
Grit basin and sand collection methodInfo
- Publication number
- JP7724018B2 JP7724018B2 JP2024070387A JP2024070387A JP7724018B2 JP 7724018 B2 JP7724018 B2 JP 7724018B2 JP 2024070387 A JP2024070387 A JP 2024070387A JP 2024070387 A JP2024070387 A JP 2024070387A JP 7724018 B2 JP7724018 B2 JP 7724018B2
- Authority
- JP
- Japan
- Prior art keywords
- sand
- fluid
- trough
- groove
- discharge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Sewage (AREA)
Description
本発明は、受け入れた水に含まれている砂が池底部に沈降する沈砂池および沈降した砂を集める集砂方法に関する。 The present invention relates to a settling basin in which sand contained in received water settles to the bottom of the basin, and a method for collecting the settled sand.
汚水処理施設には、下水および雨水などの汚水を受け入れ、その汚水に含まれている砂を池底部の底面や池底部に設けられた溝内に沈降させた後、底面や溝内に堆積した砂を集砂ピットに集めて汚水から取り除く沈砂池が設けられているものがある。この沈砂池として、沈砂池内の汚水を排出して底面に堆積した砂を大気中に露出させた後、沈砂池の側壁近傍に設けられた複数の吐出口から流体を吐出し、その流体により砂を溝に向かって流す集砂手段を備えたものが知られている。この溝は、断面がU字状または円弧状の長尺部材で構成されており、池幅方向と直交する直交方向に延在し、後端は集砂ピットに接続している。また、溝は、集砂ピットに向かうにしたがって下方に傾斜しており、集砂ピット側が最も深くなっている。溝内に堆積した砂は、溝の先端側から溝内に吐出された流体の流れによって集砂ピットまで搬送される。搬送の際、溝内に供給された流体の、集砂ピット側への流れが、溝の傾斜により補助される。これにより、溝内の砂を集砂ピット側に移動しやすくなっている。集砂ピットに搬送された砂は、集砂ピット内に配置された揚砂ポンプで沈砂池の外部に排出される。このような溝や側壁近傍に設けられた複数の吐出口やを備えた沈砂池として、例えば特許文献1および2に記載されたものが知られている。 Some wastewater treatment facilities are equipped with a settling basin that receives wastewater, such as sewage and rainwater, allows the sand contained in the wastewater to settle on the bottom of the basin or in a groove installed in the basin, and then collects the sand accumulated on the bottom or in the groove in a sand collection pit to remove it from the wastewater. A known settling basin is equipped with a sand collection device that discharges wastewater from the basin, exposing the sand accumulated on the bottom to the atmosphere, and then discharges a fluid from multiple outlets installed near the sidewall of the basin to flush the sand toward the groove. The groove is composed of a long member with a U-shaped or arc-shaped cross section, extends perpendicular to the width of the basin, and connects to the sand collection pit at its rear end. The groove also slopes downward toward the sand collection pit, with the sand collection pit being the deepest. The sand accumulated in the groove is transported to the sand collection pit by the flow of fluid discharged into the groove from the tip of the groove. During transport, the flow of fluid supplied into the groove toward the sand collection pit is assisted by the inclination of the groove. This makes it easier for the sand in the groove to move toward the sand collection pit. The sand transported to the sand collection pit is discharged outside the settling basin by a sand lifting pump located inside the sand collection pit. Settling basins equipped with such grooves and multiple discharge ports near the side walls are known, for example, from Patent Documents 1 and 2.
しかしながら、溝の先端側から溝内に吐出された流体が溝内に堆積した砂に衝突した際に、流体および砂が池幅方向に飛び散ってしまうことがある。砂が飛び散ってしまうと、せっかく流した底面に砂が戻ってしまい集砂効率が低下してしまう。そればかりか、吐出によって生じた流体の流れが流体と砂との衝突によって弱まってしまうので、この点でも集砂効率が低下する。 However, when the fluid discharged into the groove from the tip side collides with the sand accumulated in the groove, the fluid and sand may be scattered across the width of the pond. If the sand is scattered, it will return to the bottom where it was discharged, reducing the efficiency of sand collection. Not only that, but the flow of fluid generated by the discharge is weakened by the collision between the fluid and the sand, which also reduces the efficiency of sand collection.
本発明は上記事情に鑑み、砂を効率的に集砂できる沈砂池および集砂方法を提供することを目的とする。 In consideration of the above circumstances, the present invention aims to provide a settling basin and a sand collection method that can efficiently collect sand.
上記目的を解決する本発明の沈砂池は、受け入れた水に含まれている砂が池底部に沈降する沈砂池において、
前記池底部に設けられ、所定方向に延在した溝と、
前記溝に溜まった水中において、前記所定方向に流体を吐出する第1の吐出口と、
前記池底部に設けられ、この沈砂池の側壁から前記溝の間に形成されて該溝に接続した底面と、
前記底面に堆積した砂を前記側壁側から前記溝に向かって流すための流体を大気中に吐出する第2の吐出口と、
前記第1の吐出口から前記所定方向に向かって延びる仮想軸の周囲を覆い、下端部分に開口を有する覆い部材とを備え、
前記底面は、前記覆い部材の上端位置よりも上方に位置したものであり、
前記第1の吐出口と前記第2の吐出口は、交互に流体を吐出するものであり、
前記第1の吐出口は、前記覆い部材の上端位置よりも上に水位がある状態で流体を吐出するものであることを特徴とする。
The settling basin of the present invention, which solves the above-mentioned object, is a settling basin in which sand contained in received water settles to the bottom of the basin,
A groove provided in the bottom of the pond and extending in a predetermined direction;
a first discharge port that discharges fluid in the predetermined direction into the water accumulated in the groove;
a bottom surface provided at the bottom of the pond, formed between the side wall of the settling basin and the groove and connected to the groove;
a second outlet that discharges a fluid into the atmosphere to cause the sand accumulated on the bottom surface to flow from the side wall toward the groove;
a cover member that covers a periphery of an imaginary axis extending from the first discharge port in the predetermined direction and has an opening at a lower end portion,
The bottom surface is located above the upper end position of the covering member,
the first discharge port and the second discharge port alternately discharge fluid,
The first discharge port is characterized in that it discharges fluid when the water level is above the upper end position of the cover member .
また、上記目的を解決する本発明の集砂方法は、受け入れた水に含まれている砂を沈降させる沈砂池において、所定方向に延在した溝と、下端部分に開口を有する覆い部材と、この沈砂池の側壁から該溝の間に形成されて該溝に接続し該覆い部材の上端位置よりも上方に位置した底面とを有する池底部に堆積した砂を集める集砂方法であって、
前記溝に溜まった水中において、前記覆い部材によって覆われた空間に第1の吐出口から流体を前記所定方向に吐出する水中吐出工程と、
前記底面に堆積した砂を前記側壁側から前記溝に向かって流すための流体を第2の吐出口から大気中に吐出する大気中吐出工程とを有し、
前記水中吐出工程と前記大気中吐出工程は交互に実行される工程であり、
前記水中吐出工程は、前記第1の吐出口から前記所定方向に向かって延びる仮想軸の周囲を覆う前記覆い部材の上端位置よりも上に水位がある状態で流体を吐出する工程であることを特徴とする。
The sand collection method of the present invention, which solves the above-mentioned object, is a method for collecting sand deposited on the bottom of a settling basin that settles sand contained in received water, the settling basin having a groove extending in a predetermined direction, a cover member having an opening at its lower end, and a bottom surface formed between the side wall of the settling basin and the groove, connected to the groove, and positioned above the upper end position of the cover member,
an underwater discharge step of discharging fluid from a first discharge port in the predetermined direction into a space covered by the cover member in the water accumulated in the groove;
an atmospheric discharge step of discharging a fluid from a second discharge port into the atmosphere to cause the sand accumulated on the bottom surface to flow from the side wall side toward the groove,
the underwater discharging step and the atmospheric discharging step are alternately performed,
The underwater discharge process is characterized in that it is a process of discharging fluid when the water level is above the upper end position of the covering member that covers the periphery of a virtual axis extending from the first discharge port in the predetermined direction.
本発明によれば、砂を効率的に集砂できる沈砂池および集砂方法を提供することができる。 The present invention provides a settling basin and a method for efficiently collecting sand.
以下、図面を参照して本発明の実施の形態を説明する。本発明の一実施形態である沈砂池は、汚水処理施設に配置され、下水および雨水などの汚水に含まれる砂を沈降させた後、沈降させた砂を集砂ピットに移動させて汚水から取り除くものである。 Embodiments of the present invention will now be described with reference to the drawings. One embodiment of the present invention, a grit basin, is installed in a wastewater treatment facility and allows sand contained in wastewater such as sewage and rainwater to settle, after which the settled sand is moved to a sand collection pit and removed from the wastewater.
図1は、本発明の一実施形態に相当する沈砂池を含む汚水処理施設の概略断面図である。 Figure 1 is a schematic cross-sectional view of a wastewater treatment facility including a grit basin, which corresponds to one embodiment of the present invention.
図1に示すように、汚水処理施設1は、沈砂池2と、ポンプ井3と、ダム装置4とを有する。この汚水処理施設1には、下水および雨水などの汚水が流入してくる。汚水処理施設1は、図1における左側から汚水を受け入れる。受け入れた汚水は、沈砂池2において、その汚水に含まれている砂を沈降させつつ図の右側のポンプ井3に向かってゆっくりと流れていく(図1に示す直線の矢印参照)。以下、受け入れた汚水の流れにおける上流側を、単に上流側と称し、汚水の流れの下流側を、単に下流側と称する。 As shown in Figure 1, the sewage treatment facility 1 has a grit basin 2, a pump well 3, and a dam device 4. Wastewater such as sewage and rainwater flows into this sewage treatment facility 1. The sewage treatment facility 1 receives wastewater from the left side in Figure 1. The received wastewater flows slowly toward the pump well 3 on the right side of the figure, while the sand contained in the wastewater settles in the grit basin 2 (see the straight arrow in Figure 1). Hereinafter, the upstream side of the flow of the received wastewater will be simply referred to as the upstream side, and the downstream side of the flow of the wastewater will be simply referred to as the downstream side.
汚水処理施設1の、沈砂池2よりも上流側には、ダム装置4が配置されている。このダム装置4は、開口壁41と、流入ゲート42と、ゲート駆動装置43とを有する。開口壁41下流側の壁面は、沈砂池2の上流端を画定している。開口壁41の下端部分には、流入口411が開口している。流入ゲート42は、開口壁41上流側の壁面に沿って上下動可能に設けられている。この流入ゲート42は、図1に実線で示した下方位置にあるときには流入口411を閉塞してダム装置4よりも上流側にある汚水の、沈砂池2への流入を堰き止めている。また、流入ゲート42が、図1において二点鎖線で示した上方位置に引き上げられているときには、汚水が沈砂池2に流入することを許容している。ゲート駆動装置43は、その内部に図示しない駆動機構を有しており、ダム装置4を制御する制御装置からの指令に応じて流入ゲート42を上下動させる。この上下動により、流入ゲート42は、上方位置と下方位置の何れかの位置に選択的に配置される。 A dam device 4 is located upstream of the settling basin 2 in the wastewater treatment facility 1. This dam device 4 has an opening wall 41, an inflow gate 42, and a gate drive device 43. The downstream wall surface of the opening wall 41 defines the upstream end of the settling basin 2. An inflow port 411 opens at the lower end of the opening wall 41. The inflow gate 42 is movable up and down along the upstream wall surface of the opening wall 41. When this inflow gate 42 is in the lower position shown by the solid line in Figure 1, it blocks the inflow port 411, blocking the flow of wastewater upstream of the dam device 4 into the settling basin 2. When the inflow gate 42 is raised to the upper position shown by the two-dot chain line in Figure 1, it allows wastewater to flow into the settling basin 2. The gate drive device 43 has an internal drive mechanism (not shown) and moves the inflow gate 42 up and down in response to commands from a control device that controls the dam device 4. This up and down movement allows the inlet gate 42 to be selectively positioned in either the upper or lower position.
沈砂池2には、その上流側に配置された除塵機5と、中流付近に配置された集砂ピット6と、集砂ピット6内の砂を池外に搬出する揚砂ポンプ61とが設けられている。揚砂ポンプ61には揚砂管64が接続されている。揚砂ポンプ61によって吸引された砂は、この揚砂管64を通して沈砂池2の外部に設けられた不図示の沈砂分離機に送られる。除塵機5は、沈砂池2に流れ込んできた汚水に混入している混入物(し渣)を除去するためのものである。沈砂池2の構成については後に詳述する。 The settling basin 2 is equipped with a dust remover 5 located upstream, a sand collection pit 6 located midstream, and a sand lifting pump 61 that transports sand from the sand collection pit 6 out of the basin. A sand lifting pipe 64 is connected to the sand lifting pump 61. The sand sucked up by the sand lifting pump 61 is sent through the sand lifting pipe 64 to a sediment separator (not shown) located outside the settling basin 2. The dust remover 5 is used to remove impurities (screen residue) from the wastewater that flows into the settling basin 2. The configuration of the settling basin 2 will be described in detail later.
汚水処理施設1の、沈砂池2よりも下流側には、ポンプ井3が形成されている。ポンプ井3には、沈砂池2によって砂が取り除かれた汚水が貯留される。ポンプ井3の底部は、汚水処理施設1における最深部となっている。ポンプ井3には、揚水ポンプ31と給水ポンプ33が配置が配置されている。揚水ポンプ31は、ポンプ井3に貯留された汚水を、汚水処理施設1の外部に移動するものである。揚水ポンプ31には揚水管32が接続されている。揚水ポンプ31によって吸引された汚水は、この揚水管32を通して次の段階の汚水処理を行う不図示の沈殿池等に送られる。給水ポンプ33は、上述の揚水ポンプ31よりも、ポンプ井の底部に近い位置に配置されている。給水ポンプ33には給水管34が接続されている。給水ポンプ33によって吸引された汚水は、この給水管34を通して後述する各ノズル等に送られる。給水ポンプ33によって吸引された汚水を、以下の説明では流体と称する。 A pump well 3 is formed downstream of the settling basin 2 in the sewage treatment facility 1. The pump well 3 stores sewage from which sand has been removed by the settling basin 2. The bottom of the pump well 3 is the deepest part of the sewage treatment facility 1. A lift pump 31 and a feed pump 33 are disposed in the pump well 3. The lift pump 31 moves the sewage stored in the pump well 3 outside the sewage treatment facility 1. A lift pipe 32 is connected to the lift pump 31. The sewage sucked by the lift pump 31 is sent through this lift pipe 32 to a sedimentation basin (not shown) where the next stage of sewage treatment is performed. The feed pump 33 is disposed closer to the bottom of the pump well than the above-mentioned lift pump 31. A feed pipe 34 is connected to the feed pump 33. The sewage sucked by the feed pump 33 is sent through this feed pipe 34 to each nozzle, etc., described below. The wastewater sucked by the water supply pump 33 will be referred to as the fluid in the following description.
図2は、本発明の一実施形態に相当する沈砂池を上方から見た平面図である。図2では除塵機を二点鎖線の矩形で示している。また、汚水の流れ方向を直線の矢印で示している。 Figure 2 is a plan view of a settling basin corresponding to one embodiment of the present invention, viewed from above. In Figure 2, the dust collector is indicated by a two-dot chain rectangle. The flow direction of the wastewater is indicated by a straight arrow.
図2に示すように、沈砂池2は、左側壁Waと右側壁Wbの間に、除塵機5と、集砂ピット6と、底平面71と、小トラフ72と、接続面73と、主トラフ8と、集砂手段9とを備えた、平面視で概略長方形状の池である。この底平面71および小トラフ72は、底面の一例に相当する。また、主トラフ8は、溝の一例に相当する。以下、左側壁Waと右側壁Wbとを合わせて側壁Wと称することがある。沈砂池2上流側の池幅方向中央部分には、除塵機5を支持するための突出壁10が設けられている。集砂ピット6、底平面71、小トラフ72、接続面73、および主トラフ8は、それぞれ沈砂池2の池底部に設けられている。この底平面71は、池底部に打設されたコンクリートの表面で形成されている。主トラフ8は、沈砂池2の上流側端部近傍から長手方向に延在し、後端が集砂ピット6に接続した上流側第1主トラフ815および上流側第2主トラフ816と、沈砂池2の下流側端部近傍から長手方向に延在し、後端が集砂ピット6に接続した下流側主トラフ82とから構成されている。この上流側第1主トラフ815は、第1溝の一例に相当し、上流側第2主トラフ816は、第2溝の一例に相当する。この沈砂池2は、沈砂池2内の汚水を排水した状態で流体を底平面71および小トラフ72に吐出し、底平面71および小トラフ72に沈降した砂を集砂する、いわゆる低圧集砂方式の沈砂池である。以下、沈砂池2の長辺方向を長手方向と称し、短辺方向を池幅方向と称する。この長手方向は、池幅方向に直交する直交方向でもある。 As shown in Figure 2, the settling basin 2 is a roughly rectangular pond in plan view, with a dust collector 5, a sand collection pit 6, a bottom surface 71, a small trough 72, a connecting surface 73, a main trough 8, and a sand collection means 9 between a left side wall Wa and a right side wall Wb. The bottom surface 71 and the small trough 72 correspond to an example of a bottom surface. The main trough 8 corresponds to an example of a groove. Hereinafter, the left side wall Wa and the right side wall Wb may be collectively referred to as the side wall W. A protruding wall 10 for supporting the dust collector 5 is provided in the central portion of the width of the settling basin 2 on the upstream side. The sand collection pit 6, bottom surface 71, small trough 72, connecting surface 73, and main trough 8 are each provided at the bottom of the settling basin 2. The bottom surface 71 is formed by the surface of concrete poured at the bottom of the pond. The main trough 8 is composed of an upstream first main trough 815 and an upstream second main trough 816, which extend longitudinally from near the upstream end of the settling basin 2 and connect at their rear ends to the sand collection pit 6, and a downstream main trough 82, which extends longitudinally from near the downstream end of the settling basin 2 and connects at its rear end to the sand collection pit 6. The upstream first main trough 815 corresponds to an example of a first groove, and the upstream second main trough 816 corresponds to an example of a second groove. The settling basin 2 is a so-called low-pressure sand collection type settling basin, in which, after draining wastewater from the settling basin 2, fluid is discharged onto the bottom plane 71 and small troughs 72 to collect the sand that has settled on the bottom plane 71 and small troughs 72. Hereinafter, the long side direction of the settling basin 2 is referred to as the longitudinal direction, and the short side direction is referred to as the basin width direction. This longitudinal direction is also the orthogonal direction perpendicular to the basin width direction.
沈砂池2の上方(図2における紙面手前側)には、図示しない建屋や配管等が配置されている場合がある。そして、その建屋等を支持する目的で、沈砂池2に隣接して柱11が形成されていることがある。図2に示す沈砂池2では、左側壁Waの近傍に柱11が形成されている。その左側壁Waのうち、柱11の土台になる部分は、池幅方向中央に向かって突出した凸壁部Wa1が形成されている。逆に、その左側壁Waのうち、左側壁Waの上に柱11が存在しない部分では、池幅方向外側に向かって凹んだ凹み壁部Wa2が形成されているとも言える。また、凸壁部Wa1と凹み壁部Wa2とを繋ぐ部分は、長手方向および池幅方向に対して傾斜した傾斜壁部Wa3が形成されている。なお、右側壁Wbの近傍には柱11が存在しないので、右側壁Wbは、平面視でほぼ直線状に形成されている。 Above the settling basin 2 (near the paper in Figure 2), buildings, piping, etc. (not shown) may be located. A pillar 11 may be formed adjacent to the settling basin 2 to support the buildings, etc. In the settling basin 2 shown in Figure 2, a pillar 11 is formed near the left side wall Wa. The portion of the left side wall Wa that forms the base of the pillar 11 has a convex wall portion Wa1 that protrudes toward the center of the pond width. Conversely, the portion of the left side wall Wa where no pillar 11 is present has a concave wall portion Wa2 that is concave toward the outside of the pond width. Furthermore, the portion connecting the convex wall portion Wa1 and the concave wall portion Wa2 has an inclined wall portion Wa3 that is inclined with respect to the longitudinal direction and the pond width direction. Since no pillar 11 is present near the right side wall Wb, the right side wall Wb is formed in a substantially straight line in plan view.
集砂ピット6は、沈砂池2の長手方向の中央よりもやや下流側の位置に配置されている。この集砂ピット6は、沈砂池2の池幅方向中央部に形成された凹部によって構成されている。集砂ピット6の内部には、揚砂ポンプ61と、攪拌ノズル62が配置されている。この集砂ピット6は、沈砂池2において最も深い最深部になっている。この集砂ピット6は、平面視で矩形をしている。側壁Wから集砂ピット6の間は、池幅方向の中央部分にある集砂ピット6側に向かって徐々に深くなるように傾斜した集砂ピット傾斜面6bになっている。 The sand collection pit 6 is located slightly downstream of the longitudinal center of the sedimentation basin 2. The sand collection pit 6 is composed of a recess formed in the center of the sedimentation basin 2 in the width direction. A sand lifting pump 61 and an agitation nozzle 62 are located inside the sand collection pit 6. The sand collection pit 6 is the deepest part of the sedimentation basin 2. The sand collection pit 6 has a rectangular shape in plan view. Between the side wall W and the sand collection pit 6 is a sand collection pit slope 6b that gradually becomes deeper toward the sand collection pit 6, which is located in the center of the pond width direction.
攪拌ノズル62は、集砂ピット6の各角部近傍に合計4つ配置されている。この攪拌ノズル62は、集砂ピット6に集められた砂を撹拌するためのものである。揚砂ポンプ61を駆動している時に攪拌ノズル62の吐出口62aから流体を吐出することで、集砂ピット6に集まった砂の、揚砂ポンプ61による吸引効率を高めることができる。集砂ピット傾斜面6bの池幅方向の両端部それぞれには2つづつピット用集砂ノズル63が配置されている。沈砂池2の水位を所定値よりも低くした状態で、ピット用集砂ノズル63の吐出口63aから流体を吐出することで、集砂ピット傾斜面6bに堆積している砂を集砂ピット6に集めることができる。 A total of four agitation nozzles 62 are located near each corner of the sand collection pit 6. These agitation nozzles 62 are used to agitate the sand collected in the sand collection pit 6. By discharging fluid from the discharge port 62a of the agitation nozzle 62 when the sand lifting pump 61 is operating, the efficiency with which the sand collected in the sand collection pit 6 is suctioned by the sand lifting pump 61. Two pit sand collection nozzles 63 are located at each end of the sand collection pit slope 6b in the pond width direction. By discharging fluid from the discharge port 63a of the pit sand collection nozzle 63 when the water level in the settling basin 2 is lower than a predetermined value, the sand accumulated on the sand collection pit slope 6b can be collected into the sand collection pit 6.
底平面71は、左側壁Waと上流側第1主トラフ815の間に形成された第1底面711と、右側壁Wbと上流側第2主トラフ816の間に形成された第2底面712と、左側壁Waと下流側主トラフ82の間に形成された第3底面713と、右側壁Wbと下流側主トラフ82の間に形成された第4底面714とから構成されている。底平面71および小トラフ72は、沈砂池2の池幅方向中央側で主トラフ8に接続している。底平面71は、主トラフ8側端部が最も深くなるように、池幅方向外側端部にある側壁W側から主トラフ8に向かうにしたがって下方に約5度傾斜している。一方、底平面71は、長手方向には水平に形成されている。小トラフ72は、断面がU字状をした樋状のものであり、側壁Wの近傍から池幅方向に延在している。小トラフ72は、長手方向に等間隔に複数配置されている。本実施形態では、主トラフ8を挟んで池幅方向の一方側と他方側それぞれに28本、合計56本の小トラフ72が配置されている。この小トラフ72も、底平面71と同様に、主トラフ8と接続した部分が最も池底側に位置するように、側壁W側から主トラフ8側に向かって下方に約5度傾斜している。 The bottom surface 71 is composed of a first bottom surface 711 formed between the left sidewall Wa and the upstream first main trough 815, a second bottom surface 712 formed between the right sidewall Wb and the upstream second main trough 816, a third bottom surface 713 formed between the left sidewall Wa and the downstream main trough 82, and a fourth bottom surface 714 formed between the right sidewall Wb and the downstream main trough 82. The bottom surface 71 and small troughs 72 are connected to the main trough 8 at the center of the settling basin 2 in the width direction. The bottom surface 71 slopes downward by approximately 5 degrees from the sidewall W at the outer end of the width direction of the pond toward the main trough 8, so that the end of the main trough 8 is the deepest. Meanwhile, the bottom surface 71 is horizontal in the longitudinal direction. The small troughs 72 are gutter-shaped with a U-shaped cross section and extend from near the sidewall W in the width direction of the pond. Multiple small troughs 72 are arranged at equal intervals in the longitudinal direction. In this embodiment, 28 small troughs 72 are arranged on each side of the main trough 8 in the pond width direction, for a total of 56 small troughs 72. Like the bottom plane 71, these small troughs 72 are also inclined downward by approximately 5 degrees from the side wall W toward the main trough 8 so that the part connected to the main trough 8 is located closest to the pond bottom.
上流側第1主トラフ815、上流側第2主トラフ816、および下流側主トラフ82は、断面が2/3円の円弧状をした、ステンレス鋼板であるトラフ形成体によって形成された溝である。ただし、これらの上流側第1主トラフ815、上流側第2主トラフ816、および下流側主トラフ82は、底平面71と一体にコンクリートで形成したものであってもよい。上流側第1主トラフ815、上流側第2主トラフ816、および下流側主トラフ82は、沈砂池の端部近傍から集砂ピット6に接続した部分まで長手方向全長に渡って水平に配置されている。 The upstream first main trough 815, the upstream second main trough 816, and the downstream main trough 82 are grooves formed by trough forming bodies made of stainless steel plates and having a cross section shaped like a 2/3 circle arc. However, the upstream first main trough 815, the upstream second main trough 816, and the downstream main trough 82 may also be formed of concrete integrally with the bottom surface 71. The upstream first main trough 815, the upstream second main trough 816, and the downstream main trough 82 are arranged horizontally along the entire longitudinal length from near the end of the settling basin to the part connected to the sand collection pit 6.
図2に示すように、上流側第1主トラフ815は、池幅方向中央に対して左側壁Wa側に設けられ、長手方向に延在している。また、上流側第2主トラフ816は、池幅方向中央に対して右側壁Wb側に設けられ、長手方向に延在している。上流側第1主トラフ815と上流側第2主トラフ816とは、ともに全長10mであり、形状も同一である。上流側第1主トラフ815および上流側第2主トラフ816の下流端は、集砂ピット6に接続している。上流側第1主トラフ815の上流端部分(上流側第1主トラフ815の先端部分)には、トラフ第1吐出口831aを有する上流トラフ第1ノズル831が設けられている。また、上流側第2主トラフ816の上流端部分(上流側第2主トラフ816の先端部分)には、トラフ第2吐出口832aを有する上流トラフ第2ノズル832が設けられている。これらのトラフ第1吐出口831aおよびトラフ第2吐出口832aは、第1の吐出口の一例に相当する。上流側第1主トラフ815の内部には、第1覆い部材13が配置されている。また、上流側第2主トラフ816の内部には、第2覆い部材14が配置されている。この第1覆い部材13および第2覆い部材14は、それぞれ上流側第1主トラフ815および上流側第2主トラフ816に沿って延在している。第1覆い部材13および第2覆い部材14の全長は、上流側第1主トラフ815および上流側第2主トラフ816の全長と略同じである。図2に示すように、第1覆い部材13は、トラフ第1吐出口831aよりも上流から、上流側第1主トラフ815の、集砂ピット6に接続した部分を超えてほんの少し下流まで延在している。上流側第1主トラフ815内に汚水が溜まった状態で、トラフ第1吐出口831aから流体を吐出することで、上流側第1主トラフ815に堆積した砂を集砂ピット6に移動させることができる。また、第2覆い部材14は、トラフ第2吐出口832aよりも上流から、上流側第2主トラフ816の、集砂ピット6に接続した部分を超えてほんの少し下流まで延在している。上流側第2主トラフ816内に汚水が溜まった状態で、トラフ第2吐出口832aから流体を吐出することで、上流側第2主トラフ816に堆積した砂を集砂ピット6に移動させることができる。上流側第1主トラフ815および上流側第2主トラフ816内の砂の移動、並びに第1覆い部材13および第2覆い部材14についての詳しい説明は後述する。 As shown in Figure 2, the upstream first main trough 815 is located on the left wall Wa side of the center of the pond width and extends longitudinally. The upstream second main trough 816 is located on the right wall Wb side of the center of the pond width and extends longitudinally. The upstream first main trough 815 and the upstream second main trough 816 both have a total length of 10 m and are identical in shape. The downstream ends of the upstream first main trough 815 and the upstream second main trough 816 are connected to the sand collection pit 6. An upstream trough first nozzle 831 having a trough first outlet 831a is provided at the upstream end portion of the upstream first main trough 815 (the tip portion of the upstream first main trough 815). Furthermore, an upstream trough second nozzle 832 having a trough second outlet 832a is provided at the upstream end portion of the upstream second main trough 816 (the tip portion of the upstream second main trough 816). The trough first outlet 831a and the trough second outlet 832a correspond to an example of a first outlet. A first cover member 13 is disposed inside the upstream first main trough 815. A second cover member 14 is disposed inside the upstream second main trough 816. The first cover member 13 and the second cover member 14 extend along the upstream first main trough 815 and the upstream second main trough 816, respectively. The total lengths of the first cover member 13 and the second cover member 14 are substantially the same as the total lengths of the upstream first main trough 815 and the upstream second main trough 816. As shown in FIG. 2 , the first cover member 13 extends from upstream of the trough first outlet 831a to just a little downstream, beyond the portion of the upstream first main trough 815 that connects to the sand collection pit 6. By discharging a fluid from the trough first outlet 831a when wastewater has accumulated in the upstream first main trough 815, the sand accumulated in the upstream first main trough 815 can be moved to the sand collection pit 6. Furthermore, the second cover member 14 extends from upstream of the trough second outlet 832a to just a little downstream, beyond the portion of the upstream second main trough 816 that connects to the sand collection pit 6. By discharging a fluid from the trough second outlet 832a when wastewater has accumulated in the upstream second main trough 816, the sand accumulated in the upstream second main trough 816 can be moved to the sand collection pit 6. The movement of sand within the upstream first main trough 815 and upstream second main trough 816, as well as the first covering member 13 and second covering member 14, will be described in detail below.
下流側主トラフ82は、沈砂池2の幅方向中央で長手方向に直線状に延在している。下流側主トラフ82の全長は5mである。下流側主トラフ82の上流端は、集砂ピット6に接続している。下流側主トラフ82の下流端(下流側主トラフ82の先端部分)には、トラフ第3吐出口84aを有する下流トラフ用ノズル84が設けられている。このトラフ第3吐出口84aも、第1の吐出口の一例に相当する。下流側主トラフ82の内部には、第3覆い部材15が配置されている。この第3覆い部材15は、下流側主トラフ82に沿って延在している。第3覆い部材15の全長は、下流側主トラフ82の全長と略同じである。図2に示すように、第3覆い部材15は、トラフ第3吐出口84aよりも下流から、下流側主トラフ82の、集砂ピット6に接続した部分を超えてほんの少し上流まで延在している。下流側主トラフ82内に汚水が溜まった状態で、トラフ第3吐出口84aから流体を吐出することで下流側主トラフ82に堆積した砂を集砂ピット6に移動させることができる。下流側主トラフ82内の砂の移動、および第3覆い部材15についての詳しい説明は後述する。 The downstream main trough 82 extends linearly in the longitudinal direction at the center of the width of the settling basin 2. The total length of the downstream main trough 82 is 5 m. The upstream end of the downstream main trough 82 is connected to the sand collection pit 6. A downstream trough nozzle 84 having a third trough outlet 84a is provided at the downstream end of the downstream main trough 82 (the tip of the downstream main trough 82). This third trough outlet 84a also corresponds to an example of a first outlet. A third cover member 15 is disposed inside the downstream main trough 82. This third cover member 15 extends along the downstream main trough 82. The total length of the third cover member 15 is approximately the same as the total length of the downstream main trough 82. As shown in Figure 2, the third cover member 15 extends from downstream of the third trough outlet 84a to a short distance upstream, beyond the portion of the downstream main trough 82 connected to the sand collection pit 6. When wastewater has accumulated in the downstream main trough 82, fluid can be discharged from the trough third outlet 84a to move the sand accumulated in the downstream main trough 82 to the sand collection pit 6. The movement of sand within the downstream main trough 82 and the third cover member 15 will be described in detail later.
上流側第1主トラフ815および上流側第2主トラフ816の間であって、沈砂池2の上流側部分には、除塵機5を支持するための突出壁10が形成されている。この突出壁10は、沈砂池2の上端近傍まで立ち上がったコンクリート製の壁である。接続面73は、上流側第1主トラフ815および上流側第2主トラフ816の間であって、この突出壁10よりも下流側の池底部に配置されている。すなわち、接続面73は、上流側第1主トラフ815および上流側第2主トラフ816の間における、突出壁10が設けられた領域を除いた部分に形成されている。接続面73は、長手方向に沿って延在する稜線部731と、その稜線部731と上流側第1主トラフ815とを接続する第1接続面732と、稜線部731と上流側第2主トラフ816とを接続する第2接続面733とで構成されている。なお、稜線部731の延在方向は、長手方向と完全に同一でなくてもよく、例えば長手方向に対して池幅方向および上下方向に多少傾斜した方向であってもよい。また、稜線部731は池幅方向および上下方向に多少蛇行していてもよい。すなわち、「長手方向に沿って延在する」とは、多少の傾斜や蛇行を含む概念である。 Between the upstream first main trough 815 and the upstream second main trough 816, a protruding wall 10 for supporting the dust collector 5 is formed in the upstream portion of the settling basin 2. This protruding wall 10 is a concrete wall that rises up to near the top of the settling basin 2. The connection surface 73 is located between the upstream first main trough 815 and the upstream second main trough 816, at the bottom of the basin downstream of this protruding wall 10. In other words, the connection surface 73 is formed in the area between the upstream first main trough 815 and the upstream second main trough 816, excluding the area where the protruding wall 10 is provided. The connection surface 73 is composed of a ridge portion 731 extending along the longitudinal direction, a first connection surface 732 connecting the ridge portion 731 to the upstream first main trough 815, and a second connection surface 733 connecting the ridge portion 731 to the upstream second main trough 816. The extension direction of ridge line 731 does not have to be exactly the same as the longitudinal direction; for example, it may be slightly inclined in the pond width direction and vertically relative to the longitudinal direction. Also, ridge line 731 may meander slightly in the pond width direction and vertically. In other words, "extending along the longitudinal direction" is a concept that includes slight inclinations and meandering.
図3は、図2に示す沈砂池のX-X断面図である。この図3では除塵機は図示省略している。 Figure 3 is a cross-sectional view of the grit basin shown in Figure 2 taken along the X-X line. The dust collector is not shown in Figure 3.
図3に示すように、第1接続面732は、上流側第1主トラフ815に向かうにしたがって下方に傾斜した傾斜面である。また、第2接続面733は、上流側第2主トラフ816に向かうにしたがって下方に傾斜した傾斜面である。第1接続面732および第2接続面733は、コンクリートの表面によって構成されている。第1接続面732および第2接続面733の傾斜角度は、水平面に対して約45度である。接続面が傾斜していることで、接続面73に沈降してくる砂を接続面73上に残留させることなく上流側第1主トラフ815または上流側第2主トラフ816内に集めることができる。第1接続面732および第2接続面733の傾斜角度が15度以上であれば、沈砂池2内の汚水の中を接続面73に沈降してくる砂は、その自重により大半が接続面73を滑り落ちる。また、第1接続面732および第2接続面733の傾斜角度を30度以上にすれば、接続面73に沈降してくる砂は、接続面73をより滑り落ちやすくなるので好ましい。ただし、傾斜角度を大きくしすぎると、接続面73を構成するコンクリートの池幅方向の厚みが稜線部731の近傍部分で薄くなりすぎ、稜線部731部分が欠損しやすくなってしまう。このため、第1接続面732および第2接続面733の成す稜線部731の角度が30度以上になるように、第1接続面732および第2接続面733の成す稜線部731の角度を設定することが好ましい。なお、第1接続面732および第2接続面733のうちの一方または両方は、単一平面で構成しなくてもよく、例えば傾斜角度が異なる複数の面で構成してもよい。この場合、複数の面全ての傾斜角度を15度以上にすればよい。また、第1接続面732および第2接続面733のうちの一方を垂直面とし、他方を傾斜面としてもよい。ただし、本実施形態のように第1接続面732および第2接続面733それぞれを傾斜面にすることで、上流側第1主トラフ815と上流側第2主トラフ816に砂を振り分けて滑り落とすことができるので、それぞれ傾斜面にすることが好ましい。また、本実施形態のように、上流側第1主トラフ815と上流側第2主トラフ816の間の中央部分に稜線部731を設けることで、上流側第1主トラフ815と上流側第2主トラフ816に滑り落ちる砂の量を均一化できる。こうすることで、上流側第1主トラフ815と上流側第2主トラフ816のうちの一方に多量の砂が堆積してしまうことが抑制されるので、上流側第1主トラフ815と上流側第2主トラフ816内の砂の搬送抵抗により集砂ピット6に砂を搬送できなくなってしまうことを防止できる。 As shown in FIG. 3 , the first connection surface 732 is an inclined surface that slopes downward toward the upstream first main trough 815. The second connection surface 733 is an inclined surface that slopes downward toward the upstream second main trough 816. The first connection surface 732 and the second connection surface 733 are made of concrete surfaces. The inclination angle of the first connection surface 732 and the second connection surface 733 is approximately 45 degrees with respect to the horizontal plane. The inclination of the connection surfaces allows sand that settles on the connection surface 73 to be collected in the upstream first main trough 815 or the upstream second main trough 816 without remaining on the connection surface 73. If the inclination angle of the first connection surface 732 and the second connection surface 733 is 15 degrees or more, most of the sand that settles on the connection surface 73 in the wastewater in the grit basin 2 slides down the connection surface 73 due to its own weight. Furthermore, it is preferable to set the inclination angle of the first connecting surface 732 and the second connecting surface 733 at 30 degrees or more, because this allows sand settling on the connecting surface 73 to slide down the connecting surface 73 more easily. However, if the inclination angle is too large, the thickness of the concrete constituting the connecting surface 73 in the pond width direction becomes too thin near the ridge line 731, making the ridge line 731 more susceptible to damage. For this reason, it is preferable to set the angle of the ridge line 731 formed by the first connecting surface 732 and the second connecting surface 733 so that the angle is 30 degrees or more. Note that one or both of the first connecting surface 732 and the second connecting surface 733 do not have to be formed as a single plane, but may be formed from multiple surfaces with different inclination angles, for example. In this case, the inclination angle of all multiple surfaces should be 15 degrees or more. Alternatively, one of the first connection surface 732 and the second connection surface 733 may be a vertical surface, and the other an inclined surface. However, by making each of the first connection surface 732 and the second connection surface 733 an inclined surface as in this embodiment, sand can be distributed and slid down to the upstream first main trough 815 and the upstream second main trough 816, so it is preferable to make each an inclined surface. Furthermore, by providing a ridge portion 731 in the center between the upstream first main trough 815 and the upstream second main trough 816 as in this embodiment, the amount of sand sliding down to the upstream first main trough 815 and the upstream second main trough 816 can be made uniform. This prevents a large amount of sand from accumulating in one of the upstream first main trough 815 and the upstream second main trough 816, thereby preventing the sand from being unable to be transported to the sand collection pit 6 due to transport resistance of the sand in the upstream first main trough 815 and the upstream second main trough 816.
図4(a)は、図3のZ部を拡大して示す拡大図であり、図4(b)は、第1覆い部材および上流トラフ第1ノズルを示す概略斜視図である。この図4(a)では図の左右方向が池幅方向になり、紙面に直交する方向が長手方向になる。また、図4(a)では、上流側第1主トラフおよび第1覆い部材の、断面を表すハッチングは省略している。 Figure 4(a) is an enlarged view of the Z portion of Figure 3, and Figure 4(b) is a schematic perspective view showing the first cover member and the upstream trough first nozzle. In Figure 4(a), the left-right direction of the figure corresponds to the pond width direction, and the direction perpendicular to the paper surface corresponds to the longitudinal direction. Also, in Figure 4(a), hatching representing the cross section of the upstream first main trough and first cover member has been omitted.
図4(a)には、上流側第1主トラフ815、上流トラフ第1ノズル831、および第1覆い部材13が示されている。上流側第2主トラフ816、上流トラフ第2ノズル832、および第2覆い部材14、並びに下流側主トラフ82、下流トラフ用ノズル84、および第3覆い部材15は、接続している底平面71または接続面73を除いて同様の形状をしているので説明は省略する。上述したように、本実施形態の上流側第1主トラフ815は、2/3円の断面形状をしている。すなわち、径方向の中心であるトラフ円弧中心815cを中心点とした円弧状をしている。ただし、上流側第1主トラフ815の断面形状は円弧状に限られず、U字状やV字状等であってもよい。上流側第1主トラフ815は、内径300mmの円筒体の上方を切り欠いた形状のものであり、その全長に渡って上方に向かって開口している。以下、この開口している部分を第1トラフ開口815bと称することがある。この第1トラフ開口815bには、小トラフ72が接続されており、第1トラフ開口815bの高さ方向の位置は、小トラフ72下端の高さ方向の位置と同一である。上流側第1主トラフ815の、トラフ円弧中心815cよりも上の上側部分815aは、上端の第1トラフ開口815bに向かうにつれて池幅方向の幅が狭くなっている。これにより、上流側第1主トラフ815内で砂が舞い上がったとしても、上側部分815aがかえしとして作用し、舞い上がった砂を上流側第1主トラフ815内に戻すことができる。 Figure 4(a) shows the upstream first main trough 815, the upstream trough first nozzle 831, and the first cover member 13. The upstream second main trough 816, the upstream trough second nozzle 832, and the second cover member 14, as well as the downstream main trough 82, the downstream trough nozzle 84, and the third cover member 15, have similar shapes except for the connecting bottom plane 71 or connecting surface 73, and therefore will not be described here. As described above, the upstream first main trough 815 in this embodiment has a cross-sectional shape of 2/3 of a circle. That is, it has an arc shape with the trough arc center 815c, which is the radial center, as its center point. However, the cross-sectional shape of the upstream first main trough 815 is not limited to an arc shape and may be U-shaped, V-shaped, or the like. The upstream first main trough 815 is shaped like a cylinder with an inner diameter of 300 mm, with the upper part cut out and open upward along its entire length. Hereinafter, this open portion may be referred to as the first trough opening 815b. The small trough 72 is connected to this first trough opening 815b, and the height position of the first trough opening 815b is the same as the height position of the lower end of the small trough 72. The upper portion 815a of the upstream first main trough 815 above the trough arc center 815c narrows in the pond width direction toward the first trough opening 815b at the upper end. As a result, even if sand is blown up inside the upstream first main trough 815, the upper portion 815a acts as a return wall, returning the blown up sand into the upstream first main trough 815.
第1覆い部材13は、下端部分に開口13aを有する5/6円の断面形状をしている。すなわち、径方向の中心である覆い円弧中心13cを中心点とした円弧状をしている。この第1覆い部材13は、板厚3mmのステンレス製の板材を、内径150mmの断面円弧状に成形したものである。開口13aは、第1覆い部材13の全長に渡って設けられている。第1覆い部材13は、上流側第1主トラフ815の内部空間を仕切っている。第1覆い部材13の内側の空間は、第1覆い部材13によって覆われた空間である搬送空間FSになる。第1覆い部材13は、上側部分が閉塞した円弧状をしているので、沈砂池2内を第1覆い部材13の上側部分に向かって沈降してきた砂は、第1覆い部材13の上側部分の外表面を滑り落ちやすい。滑り落ちた砂は、上流側第1主トラフ815の下方に堆積する。また、第1覆い部材13の、覆い円弧中心13cよりも下側の搬送空間FSは、下方の開口13aに向かうにつれて池幅方向が狭くなっている。第1覆い部材13は、沈砂池2の池底に打設されたコンクリートにケミカルアンカー(登録商標)で固定された支持金具131(図5参照)によって支持されている。第1覆い部材13の上端の高さ位置は、第1トラフ開口815bとほぼ同じ高さに位置している。第1覆い部材13の上端の高さ位置は、第1トラフ開口815bとほぼ同じ高さ、または第1トラフ開口815bよりも低い位置にすることが望ましい。この位置にすることで、上流側第1主トラフ815内に水を満たしておけば、第1覆い部材13の内部を水で満たすことができる。トラフ第1吐出口831aから流体を水中に吐出した時に、第1覆い部材13の内部を水で満たしておくことで、第1覆い部材13の内部に流体の強い流れを作りだすことができる。また、第1覆い部材13の開口13aは、上流側第1主トラフ815の高さ方向の中央815hよりも下方に配置されている。この配置にすることで、第1覆い部材13の開口13aと上流側第1主トラフ815の下方に堆積する砂とを近づけることができるので、第1覆い部材13内の流体の流れによって上流側第1主トラフ815内に堆積した砂を第1覆い部材13の内部に吸い上げやすくなる。なお、第1覆い部材13の延在方向の両端は開放されているので、沈砂池2の水位が第1覆い部材13の上端位置よりも高ければ、搬送空間FS内に大気が残存することはなく、搬送空間FSは汚水で満たされる。また、本実施形態の第1覆い部材13は、断面形状が円弧状のものを例示したが、断面が多角形をしたものであってもよく、円弧と直線状部分とが連続した形状のものであってもよい。ただし、第1覆い部材13の上側部分の断面形状は、溝の幅方向に向かって下方に傾斜した傾斜面にすることが望ましい。第1覆い部材13の上側部分を傾斜面にすることで、第1覆い部材13の上側部分に沈降してきた砂は、その上側部分を滑り落ちやすくなるため、上流側第1主トラフ815内の下方に堆積しやすくなる。 The first covering member 13 has a 5/6-circular cross-sectional shape with an opening 13a at its lower end. That is, it has an arc shape with the covering arc center 13c, which is the radial center, as its center point. This first covering member 13 is made of a 3 mm thick stainless steel plate formed into an arc-shaped cross-section with an inner diameter of 150 mm. The opening 13a is provided along the entire length of the first covering member 13. The first covering member 13 separates the internal space of the upstream first main trough 815. The space inside the first covering member 13 forms the transport space FS, which is the space covered by the first covering member 13. Because the first covering member 13 has an arc shape with a closed upper portion, sand that settles within the settling basin 2 toward the upper portion of the first covering member 13 easily slides down the outer surface of the upper portion of the first covering member 13. The sliding sand accumulates below the upstream first main trough 815. Furthermore, the transfer space FS below the cover arc center 13c of the first cover member 13 narrows in the basin width direction toward the lower opening 13a. The first cover member 13 is supported by support brackets 131 (see FIG. 5) fixed with chemical anchors (registered trademark) to concrete poured into the bottom of the settling basin 2. The height position of the upper end of the first cover member 13 is located at approximately the same height as the first trough opening 815b. It is desirable to position the upper end of the first cover member 13 at approximately the same height as the first trough opening 815b or lower than the first trough opening 815b. By positioning the upper end of the first cover member 13 in this manner, the interior of the first cover member 13 can be filled with water by filling the upstream first main trough 815 with water. By filling the interior of the first cover member 13 with water when fluid is discharged into water from the trough first outlet 831a, a strong fluid flow can be created inside the first cover member 13. Furthermore, the opening 13a of the first covering member 13 is positioned below the center 815h in the height direction of the upstream first main trough 815. This positioning allows the opening 13a of the first covering member 13 to be closer to the sand accumulated below the upstream first main trough 815, making it easier for the flow of fluid within the first covering member 13 to suck up the sand accumulated in the upstream first main trough 815 into the first covering member 13. Since both ends of the first covering member 13 in the extension direction are open, if the water level of the settling basin 2 is higher than the upper end position of the first covering member 13, no air remains in the transfer space FS, and the transfer space FS is filled with wastewater. Furthermore, although the first covering member 13 of this embodiment has an arc-shaped cross section, it may have a polygonal cross section or a shape in which an arc and a straight line are connected. However, it is desirable that the cross-sectional shape of the upper portion of the first covering member 13 be an inclined surface that slopes downward in the width direction of the groove. By making the upper portion of the first covering member 13 an inclined surface, sand that settles in the upper portion of the first covering member 13 is more likely to slide down that upper portion, making it more likely to accumulate lower within the upstream first main trough 815.
トラフ第1吐出口831aは、第1覆い部材13内の搬送空間FS内に配置されている。このトラフ第1吐出口831aは、内径80mmのパイプの先端を上下から扁平につぶした長孔形状のものである。トラフ第1吐出口831aの池幅方向の最大開口長は117mmであり、上下方向の最大高さは18mmである。トラフ第1吐出口831aは、真円など他の形状であっても構わない。ただし、トラフ第1吐出口831aを扁平な形状にすることで、つぶす前の真円のものよりも、広い範囲に流体を吐出できる。トラフ第1吐出口831aから吐出される流体の吐出流速は、8m/sec以上とすることが好ましい。8m/sec未満では、流速不足になってしまい砂を所定距離移動させられない場合も生じる。また、トラフ第1吐出口831aから吐出される流体の吐出圧は、0.05MPa以上0.3MPa以下とすることが望ましい。トラフ第1吐出口831aの中心は、覆い円弧中心13cと一致している。トラフ第1吐出口831aは、第1覆い部材13の延在方向である長手方向に向かって流体を吐出する。図4(b)に示すように、第1覆い部材13は、トラフ第1吐出口831aを覆い、且つトラフ第1吐出口831aから吐出される流体を覆うように流体の吐出方向に延在している。このトラフ第1吐出口831aの中心(覆い円弧中心13c)を始点として、トラフ第1吐出口831aから吐出される流体の流れ方向に延在する軸が仮想軸VLになる。つまり、第1覆い部材13は、トラフ第1吐出口831aの中心から長手方向に延在する仮想軸VLを覆うように延在している。第1覆い部材13の延在方向およびトラフ第1吐出口831aから吐出される流体の吐出方向それぞれは、長手方向と完全に一致させる必要はないが、一致させることでより効率的に砂を搬送できる。なお、トラフ第1吐出口831aから吐出される流体の吐出方向と第1覆い部材13の延在方向とが多少異なっていた場合でも、吐出された流体は、第1覆い部材によって案内されるため、流体の流れ方向は第1覆い部材の延在方向と一致する。従って、この場合の仮想軸VLは、第1覆い部材の延在方向になる。ただし、この場合は流体が第1覆い部材と衝突して流れが弱まることがあるので、トラフ第1吐出口831aから吐出される流体の吐出方向と第1覆い部材13の延在方向は一致させることが望ましい。また、トラフ第1吐出口831aの中心は、覆い円弧中心13cとは異なる位置であってもよく、例えば覆い円弧中心13cよりも下方であって、開口13aよりも上方に配置してもよい。ただし、トラフ第1吐出口831aの中心を、覆い円弧中心13cと一致させることで、トラフ第1吐出口831aから吐出される流体の流れの損失を最小限にすることができる。一方、トラフ第1吐出口831aの中心を、覆い円弧中心13cよりも下方に配置することで、開口13aから搬送空間FS内に砂を吸い込む吸込み力を高めることができる。従って、トラフ第1吐出口831aの中心は、覆い円弧中心13cと第1覆い部材13の開口13aの間に配置することが望ましい。 The first trough outlet 831a is located within the transport space FS within the first cover member 13. This first trough outlet 831a is an elongated hole formed by flattening the tip of an 80 mm inner diameter pipe from above and below. The maximum opening length of the first trough outlet 831a in the pond width direction is 117 mm, and the maximum height in the vertical direction is 18 mm. The first trough outlet 831a may be a perfect circle or other shape. However, by making the first trough outlet 831a flat, the fluid can be discharged over a wider area than with a perfect circle before being flattened. The discharge flow velocity of the fluid discharged from the first trough outlet 831a is preferably 8 m/sec or greater. If the flow velocity is less than 8 m/sec, the flow velocity may be insufficient, and the sand may not be able to be transported the required distance. Furthermore, the discharge pressure of the fluid discharged from the trough first outlet 831a is preferably 0.05 MPa or more and 0.3 MPa or less. The center of the trough first outlet 831a coincides with the cover arc center 13c. The trough first outlet 831a discharges the fluid in the longitudinal direction, which is the extension direction of the first cover member 13. As shown in FIG. 4(b), the first cover member 13 covers the trough first outlet 831a and extends in the fluid discharge direction so as to cover the fluid discharged from the trough first outlet 831a. The axis extending in the flow direction of the fluid discharged from the trough first outlet 831a, starting from the center of the trough first outlet 831a (cover arc center 13c), becomes the virtual axis VL. In other words, the first cover member 13 extends so as to cover the virtual axis VL extending in the longitudinal direction from the center of the trough first outlet 831a. The extension direction of the first cover member 13 and the discharge direction of the fluid discharged from the trough first outlet 831a do not need to be perfectly aligned with the longitudinal direction, but aligning them allows for more efficient sand transport. Even if the discharge direction of the fluid discharged from the trough first outlet 831a and the extension direction of the first cover member 13 are slightly different, the discharged fluid is guided by the first cover member, so the fluid flow direction is aligned with the extension direction of the first cover member. Therefore, the virtual axis VL in this case is the extension direction of the first cover member. However, in this case, the fluid may collide with the first cover member and weaken its flow, so it is desirable to align the discharge direction of the fluid discharged from the trough first outlet 831a with the extension direction of the first cover member 13. Furthermore, the center of the trough first outlet 831a may be located at a position different from the cover arc center 13c. For example, it may be located below the cover arc center 13c and above the opening 13a. However, by aligning the center of the first trough outlet 831a with the cover arc center 13c, loss of fluid flow discharged from the first trough outlet 831a can be minimized. On the other hand, by positioning the center of the first trough outlet 831a below the cover arc center 13c, the suction force that sucks sand from the opening 13a into the transfer space FS can be increased. Therefore, it is desirable to position the center of the first trough outlet 831a between the cover arc center 13c and the opening 13a of the first cover member 13.
トラフ第1吐出口831aから搬送空間FS内に流体が吐出されることで、第1覆い部材13の内側の搬送空間FSに流体の流れが発生する。そして搬送空間FSと第1覆い部材13の外側との間で流体の流れによる圧力差が生じる。すなわち、流体の流れが発生している搬送空間FSには負圧が生じる。上流側第1主トラフ815内に堆積した砂は、図4(a)に示す曲線の矢印のように、負圧によって開口13aから搬送空間FS内に吸い込まれる。また、トラフ第1吐出口831aから吐出した流体は、第1覆い部材13によって長手方向と直交する放射方向への拡散が防止されるため、長距離にわたって搬送空間FS内で流れが維持される。吸い込まれた砂は、搬送空間FS内に生じている流体の流れによって集砂ピット6側に向かって搬送される。この実施形態では、第1覆い部材13によって搬送空間FSを形成することで、トラフ第1吐出口831aから吐出された流体の流れを損なうことなく砂の搬送に活用できる。その結果、上流側第1主トラフ815内に堆積した砂を集砂ピット6に向けて効率的に搬送できる。上述したように、搬送空間FSにおける覆い円弧中心13cよりも下側は、下方の開口13aに向かうにつれて池幅方向が狭くなっている。開口13aの池幅方向の幅を狭く形成することで、搬送空間FS内を搬送されている砂がその搬送空間FS内から外に漏れ出にくくなる。また、搬送空間FS内における流体が搬送空間FSから外に流出しにくくなるので流体の流れを長い距離維持可能になり、砂をより遠くまで移動させることができる。そして、トラフ第1吐出口831aから離れた位置でも搬送空間FS内の負圧を維持しやすくなる。 When fluid is discharged from the trough first outlet 831a into the transport space FS, a fluid flow is generated in the transport space FS inside the first cover member 13. This fluid flow generates a pressure difference between the transport space FS and the outside of the first cover member 13. In other words, a negative pressure is generated in the transport space FS where the fluid flow is occurring. Sand accumulated in the upstream first main trough 815 is sucked into the transport space FS through the opening 13a due to the negative pressure, as shown by the curved arrow in Figure 4(a). Furthermore, the first cover member 13 prevents the fluid discharged from the trough first outlet 831a from diffusing in the radial direction perpendicular to the longitudinal direction, maintaining a long-distance flow within the transport space FS. The sucked sand is transported toward the sand collection pit 6 by the fluid flow generated in the transport space FS. In this embodiment, by forming the transport space FS using the first cover member 13, the fluid flow discharged from the trough first outlet 831a can be utilized for sand transport without impairing it. As a result, sand accumulated in the upstream first main trough 815 can be efficiently transported toward the sand collection pit 6. As described above, the area below the cover arc center 13c in the transfer space FS narrows in the pond width direction toward the lower opening 13a. By narrowing the pond width of the opening 13a, sand being transported within the transfer space FS is less likely to leak out of the transfer space FS. Furthermore, because the fluid within the transfer space FS is less likely to leak out of the transfer space FS, the fluid flow can be maintained over a longer distance, allowing sand to be moved further. This also makes it easier to maintain negative pressure within the transfer space FS even at locations away from the trough first discharge port 831a.
図2に示すように、除塵機5は、沈砂池2の上流側部分に、突出壁10を挟んで池幅方向に2つ並んで設けられている。換言すれば、除塵機5は、左側壁Waと突出壁10の間および右側壁Wbと突出壁10の間それぞれに1つづつ配置されている。これら2つの除塵機5、5は同一の構成を有する。除塵機5は、沈砂池2に流れ込んできた汚水に混入している混入物(し渣)を除去するためのものである。図2の上側に示されている一方の除塵機5は、左側壁Waと突出壁10によって支持されており、図2の下側に示されている他方の除塵機5は、右側壁Wbと突出壁10によって支持されている。池幅方向に並んで2つの除塵機5、5を配置することで、各除塵機5の池幅方向の幅を短くすることができる。除塵機5の池幅方向の幅を短くすることで、除塵機5の強度が高まり、大雨などで沈砂池2に流入する汚水の量及び流速が増大しても、除塵機5が破損してしまうことを抑制できる。 As shown in Figure 2, two dust removers 5 are arranged side by side in the width direction of the pond, separated by a protruding wall 10, in the upstream portion of the settling basin 2. In other words, one dust remover 5 is arranged between the left side wall Wa and the protruding wall 10, and one is arranged between the right side wall Wb and the protruding wall 10. These two dust removers 5, 5 have the same configuration. The dust removers 5 are intended to remove impurities (screen residue) from the wastewater that flows into the settling basin 2. One dust remover 5 shown in the upper part of Figure 2 is supported by the left side wall Wa and the protruding wall 10, while the other dust remover 5 shown in the lower part of Figure 2 is supported by the right side wall Wb and the protruding wall 10. By arranging the two dust removers 5, 5 side by side in the width direction of the pond, the width of each dust remover 5 in the width direction of the pond can be shortened. By shortening the width of the dust collector 5 in the basin width direction, the strength of the dust collector 5 is increased, and damage to the dust collector 5 can be reduced even if the amount and flow rate of wastewater flowing into the grit basin 2 increases due to heavy rain or other reasons.
図5は、図2に示す沈砂池のA-A断面図である。図5では柱および揚砂ポンプを図示省略し、突出壁の形状を二点鎖線で示している。また、汚水の流れ方向を直線の矢印で示している。なお、沈砂池の水面WLは、流入する雨や下水の量等によって変動するが、雨や下水が想定されている量である通常時には、図5に示すように、沈砂池2の高さ方向の中程度の高さに位置している。 Figure 5 is a cross-sectional view of the settling basin shown in Figure 2 taken along the line A-A. In Figure 5, the pillars and sand-lifting pump are omitted, and the shape of the protruding wall is indicated by a two-dot chain line. The direction of wastewater flow is indicated by a straight arrow. The water level WL of the settling basin fluctuates depending on the amount of rain and sewage flowing in, but under normal circumstances when the amount of rain and sewage is expected, it is located at a mid-height in the settling basin 2, as shown in Figure 5.
図5に示すように、除塵機5は、無端チェーン51と、その無端チェーン51に間隔をあけて取り付けられた複数のレーキ52と、濾過スクリーン53とを有する。無端チェーン51は、沈砂池2の幅方向両側それぞれに斜めに起立した状態で設けられたものであり、地上側スプロケット511と、池底側スプロケット512に巻きかけられている。無端チェーン51の上側部分および地上側スプロケット511は、沈砂池2の地上部分に配置されている。水面WLが通常状態にある時に、地上側スプロケット511を図示しないモータによって円弧状の矢印Rで示した回転方向に駆動すると、無端チェーン51が循環し、レーキ52は水中を出入りする。図5には通常状態の水面WLが示されている。突出壁10は、この水面WLよりも上方に突出している。ただし、特に除塵機5を支持する以外の目的で突出壁10を形成する場合は、突出壁10は水面WLよりも低くても構わない。濾過スクリーン53は、無端チェーン51の下流側に配置されている。この濾過スクリーン53は、上下方向に延びるバーが池幅方向に所定間隔(例えば、25mm~75mm)で並べられたものであり、所定間隔以上の大きさの混入物の通過を遮る。濾過スクリーン53で遮られた混入物は、レーキ52によって掻き揚げられ、掻き揚げられた混入物は、地上側で不図示のベルトコンベア等の運搬手段に載せられる。なお、池底側スプロケット512および濾過スクリーン53の下端は、底平面71および主トラフ8よりも上流側に配置されている。一方、地上側スプロケット511および濾過スクリーン53の上端は、底平面71および主トラフ8の上流側部分の上方に位置している。すなわち、無端チェーン51および濾過スクリーン53の上側部分は、底平面71および主トラフ8と長手方向において重複している。なお、図5には、第3覆い部材15を支持する支持金具151も示されている。 As shown in Figure 5, the dust collector 5 comprises an endless chain 51, multiple rakes 52 attached at intervals to the endless chain 51, and a filter screen 53. The endless chain 51 is installed diagonally on both sides of the width of the settling basin 2 and is wound around a ground-side sprocket 511 and a bottom-side sprocket 512. The upper portion of the endless chain 51 and the ground-side sprocket 511 are located above ground in the settling basin 2. When the water level WL is in a normal state, driving the ground-side sprocket 511 in the direction indicated by the arc-shaped arrow R by a motor (not shown) causes the endless chain 51 to circulate, and the rake 52 to move in and out of the water. Figure 5 shows the water level WL in its normal state. The protruding wall 10 protrudes above the water level WL. However, if the protruding wall 10 is formed for purposes other than supporting the dust collector 5, the protruding wall 10 may be lower than the water level WL. The filter screen 53 is located downstream of the endless chain 51. This filter screen 53 is composed of vertically extending bars arranged at a predetermined interval (e.g., 25 mm to 75 mm) across the width of the pond, blocking the passage of contaminants larger than the predetermined interval. Contaminants blocked by the filter screen 53 are scooped up by the rake 52 and then placed on a conveyor belt or other transport means (not shown) on the ground. The bottom-side sprocket 512 and the lower ends of the filter screen 53 are located upstream of the bottom plane 71 and main trough 8. Meanwhile, the upper ends of the ground-side sprocket 511 and the filter screen 53 are located above the bottom plane 71 and the upstream portions of the main trough 8. In other words, the upper portions of the endless chain 51 and the filter screen 53 longitudinally overlap the bottom plane 71 and main trough 8. Figure 5 also shows a support bracket 151 supporting the third cover member 15.
集砂手段9は、沈砂池2の左側壁Wa側に配置された第1ノズルヘッダ9a、第2ノズルヘッダ9b、第3ノズルヘッダ9cと、右側壁Wb側に配置された第4ノズルヘッダ9d、第5ノズルヘッダ9e、第6ノズルヘッダ9fとを有する(図2参照)。図5では左側壁Wa側の集砂手段9が示されている。右側壁Wb側の集砂手段9も同様の構成をしているため、右側壁Wb側の集砂手段9は説明を省略する。第1ノズルヘッダ9a、第2ノズルヘッダ9b、第3ノズルヘッダ9cそれぞれは、10個の集砂ノズル91と、供給管92と、母管93とを有する。供給管92は、左側壁Waに対向して配置され、長手方向に延在している。母管93は、沈砂池2の上方に伸びた単管931と、単管931の池底側端部に接続された分岐管932とを有する。この単管931および分岐管932は、図示しない固定金具によって左側壁Waに固定されている。 The sand collection means 9 includes a first nozzle header 9a, a second nozzle header 9b, and a third nozzle header 9c arranged on the left side wall Wa of the settling basin 2, and a fourth nozzle header 9d, a fifth nozzle header 9e, and a sixth nozzle header 9f arranged on the right side wall Wb (see Figure 2). Figure 5 shows the sand collection means 9 on the left side wall Wa. The sand collection means 9 on the right side wall Wb has a similar configuration, so a description of the sand collection means 9 on the right side wall Wb is omitted. Each of the first nozzle header 9a, the second nozzle header 9b, and the third nozzle header 9c includes 10 sand collection nozzles 91, a supply pipe 92, and a main pipe 93. The supply pipe 92 is positioned opposite the left side wall Wa and extends longitudinally. The main pipe 93 includes a single pipe 931 extending above the settling basin 2 and a branch pipe 932 connected to the bottom end of the single pipe 931. The single pipe 931 and branch pipe 932 are fixed to the left wall Wa with fixing brackets (not shown).
図6は、図5のB部を拡大して示す拡大図である。この図6では、汚水の流れ方向を直線の矢印で示している。図6には側壁も示されている。また、図6は、6つのノズルヘッダのうちの一つを示しているが、他の5つのノズルヘッダも図6で示したノズルヘッダと同様の構成をしている。 Figure 6 is an enlarged view of part B in Figure 5. In Figure 6, the flow direction of the wastewater is indicated by a straight arrow. Figure 6 also shows the side wall. Also, Figure 6 shows one of the six nozzle headers, but the other five nozzle headers have the same configuration as the nozzle header shown in Figure 6.
図6に示すように、分岐管932は、単管931にフランジ継手933によって接続されている。分岐管932は、単管931に接続された部分の下方側で2又に分岐しており、分岐した先の分岐部分は、沈砂池2の長手方向にそれぞれ延在している。分岐部分の先端部分には、それぞれラップジョイント934が固定された供給管92が接続されている。本実施形態では、1本の母管93に対し、分岐管932よりも上流側に配置された上流側供給管921と、分岐管932よりも下流側に配置された下流側供給管923と、上流側供給管921と下流側供給管923の間に配置された中間供給管922の、3本の供給管92が設けられている。上流側供給管921および下流側供給管923の、分岐管932と接続された一方の端部とは反対側の他方の端部は、蓋97によって閉塞されている。中間供給管922は、その両端が分岐管932と接続されている。 As shown in FIG. 6 , the branch pipe 932 is connected to the main pipe 931 via a flange joint 933. The branch pipe 932 branches into two parts below the part connected to the main pipe 931, and the two branch parts extend in the longitudinal direction of the settling basin 2. A supply pipe 92, to which a lap joint 934 is fixed, is connected to the tip of each branch part. In this embodiment, three supply pipes 92 are provided for one main pipe 93: an upstream supply pipe 921 located upstream of the branch pipe 932, a downstream supply pipe 923 located downstream of the branch pipe 932, and an intermediate supply pipe 922 located between the upstream supply pipe 921 and the downstream supply pipe 923. The ends of the upstream supply pipe 921 and the downstream supply pipe 923, opposite the ends connected to the branch pipe 932, are closed by lids 97. Both ends of the intermediate supply pipe 922 are connected to the branch pipe 932.
上流側供給管921および下流側供給管923には、それぞれ3つの集砂ノズル91が等間隔に固定されている。また、中間供給管922には、4つの集砂ノズル91が等間隔に固定されている。これらの合計10個の集砂ノズル91が配置されている間隔は、全て等間隔に配置されている。また、第1ノズルヘッダ9a(図2参照)の最も下流側の集砂ノズル91と、第2ノズルヘッダ9bの最も上流側の集砂ノズル91の間隔も、上述の10個の集砂ノズルの間隔と同一の間隔である。すなわち、集砂ノズル91は、沈砂池2の長手方向において全て等間隔に配置されている。なお、各供給管92に配置される集砂ノズル91の数は、供給管92の長さ等の要素に応じて適宜決定すればよい。各集砂ノズル91の先端には吐出口911が形成されている。この吐出口911は、第2の吐出口の一例に相当する。各吐出口911のうち、第1ノズルヘッダ9a(図2参照)および第2ノズルヘッダ9bに設けられた吐出口911は、一方側吐出口の一例に相当し、第4ノズルヘッダ9dおよび第5ノズルヘッダ9e(図2参照)に設けられた吐出口911は、他方側吐出口の一例に相当する。沈砂池2の水位を所定値よりも低下させて底平面71および小トラフ72に堆積している砂および吐出口911を大気中に露出させた状態で、吐出口911から大気中に流体を吐出することで、図2および図5に示した底平面71および小トラフ72に堆積している砂を主トラフ8に流すことができる。1つの吐出口911から噴射される流体の吐出圧は、例えば0.005MPaであり、好ましくは0.0002MPa以上0.005MPa以下である。すなわち、吐出口911から吐出される流体の吐出圧は、トラフ第1吐出口831aから吐出される流体の吐出圧(0.05MPa以上0.3MPa以下)より低い。こうすることで、底平面71および小トラフ72に堆積している砂を主トラフ8に流すことができる流量を確保しつつ、流体を供給するための給水ポンプ33に安価で小型のものが利用できる。 Three sand collection nozzles 91 are fixed at equal intervals to each of the upstream supply pipe 921 and the downstream supply pipe 923. Four sand collection nozzles 91 are fixed at equal intervals to the intermediate supply pipe 922. These ten sand collection nozzles 91 are all equally spaced apart. The spacing between the most downstream sand collection nozzle 91 of the first nozzle header 9a (see Figure 2) and the most upstream sand collection nozzle 91 of the second nozzle header 9b is also the same as the spacing between the ten sand collection nozzles. In other words, the sand collection nozzles 91 are all equally spaced apart along the length of the settling basin 2. The number of sand collection nozzles 91 on each supply pipe 92 may be determined appropriately depending on factors such as the length of the supply pipe 92. An outlet 911 is formed at the tip of each sand collection nozzle 91. This outlet 911 corresponds to an example of a second outlet. Among the outlets 911, the outlets 911 provided in the first nozzle header 9a (see FIG. 2) and the second nozzle header 9b correspond to an example of a one-side outlet, and the outlets 911 provided in the fourth nozzle header 9d and the fifth nozzle header 9e (see FIG. 2) correspond to an example of a other-side outlet. By lowering the water level of the settling basin 2 below a predetermined value to expose the sand accumulated on the bottom surface 71 and the small trough 72 and the outlets 911 to the atmosphere, and then discharging a fluid from the outlets 911 into the atmosphere, the sand accumulated on the bottom surface 71 and the small trough 72 shown in FIGS. 2 and 5 can be flushed into the main trough 8. The discharge pressure of the fluid sprayed from one outlet 911 is, for example, 0.005 MPa, and preferably 0.0002 MPa or higher and 0.005 MPa or lower. That is, the discharge pressure of the fluid discharged from the discharge port 911 is lower than the discharge pressure (0.05 MPa or more and 0.3 MPa or less) of the fluid discharged from the trough first discharge port 831a. This ensures a flow rate that allows the sand accumulated on the bottom surface 71 and small trough 72 to flow into the main trough 8, while allowing the use of an inexpensive and compact water supply pump 33 for supplying the fluid.
供給管92のうち、凸壁部Wa1に対向した部分と凹み壁部Wa2に対向した部分では、供給管92から左側壁Waまでの間隔が異なっている。すなわち、供給管92には、左側壁Waから池幅方向に第1間隔をあけて延在する第1領域92aと、左側壁Waから池幅方向に第2間隔をあけて延在する第2領域92bとが存在する。また、本実施形態の沈砂池2には、凸壁部Wa1と凹み壁部Wa2とを繋ぐ部分に傾斜壁部Wa3が形成されていることから、供給管92には、前記第1領域と前記第2領域をつなぐ領域である第3領域92cが存在する。各集砂ノズル91およびその吐出口911は、左側壁Waに対向して配置され、長手方向に並んで供給管92に固定されている。図6に示した第2ノズルヘッダ9bでは、上流側供給管921は、凸壁部Wa1に対向して配置されている。すなわち、上流側供給管921がある領域は、第1領域92aに相当する。一方、中間供給管922のうち、最も上流側供給管921に近い部分にある吐出口911が配置された領域は、傾斜壁部Wa3に対向して配置されている。すなわち、その領域は第3領域92cに相当する。また、中間供給管922のうち、下流側供給管923側から3個の吐出口911が配置された領域と、下流側供給管923のうち、中間供給管922側から2個の吐出口911が配置された領域は、凹み壁部Wa2に対向して配置されている。すなわち、それらの領域は第2領域92bに相当する。また、下流側供給管923のうち、最も下流側にある吐出口911が配置された領域は、傾斜壁部Wa3に対向して配置されている。すなわち、その領域は第3領域92cに相当する。これらの各領域の間には、ラップジョイント934を用いた方向変更手段が設けられている。 The distance from the supply pipe 92 to the left side wall Wa differs between the portion facing the convex wall Wa1 and the portion facing the concave wall Wa2. Specifically, the supply pipe 92 has a first region 92a extending from the left side wall Wa at a first distance in the pond width direction, and a second region 92b extending from the left side wall Wa at a second distance in the pond width direction. Furthermore, in this embodiment, the settling basin 2 has an inclined wall Wa3 formed at the portion connecting the convex wall Wa1 and the concave wall Wa2. Therefore, the supply pipe 92 has a third region 92c connecting the first and second regions. Each sand collection nozzle 91 and its discharge port 911 are positioned opposite the left side wall Wa and are aligned longitudinally and fixed to the supply pipe 92. In the second nozzle header 9b shown in Figure 6, the upstream supply pipe 921 is positioned opposite the convex wall Wa1. That is, the region where the upstream supply pipe 921 is located corresponds to the first region 92a. Meanwhile, the region of the intermediate supply pipe 922 where the outlet 911 closest to the upstream supply pipe 921 is located faces the inclined wall portion Wa3. That is, this region corresponds to the third region 92c. Furthermore, the region of the intermediate supply pipe 922 where the three outlets 911 are located from the downstream supply pipe 923 side and the region of the downstream supply pipe 923 where the two outlets 911 are located from the intermediate supply pipe 922 side face the recessed wall portion Wa2. That is, these regions correspond to the second region 92b. Furthermore, the region of the downstream supply pipe 923 where the most downstream outlet 911 is located faces the inclined wall portion Wa3. That is, this region corresponds to the third region 92c. A direction change means using a lap joint 934 is provided between these regions.
図7(a)は、ラップジョイントが設けられた一方の管が他方の管に結合された状態を説明するための断面図であり、図7(b)は、ボルトを緩めることでラップジョイントが設けられた一方の管が他方の管に対してその軸方向を中心として回転自在になった状態を説明するための断面図である。この図7では、一方の管として供給管を示し、他方の管として分岐管を示しているが、供給管どうしをラップジョイントを設けて接続する場合も同様の構成である。 Figure 7(a) is a cross-sectional view illustrating the state in which one pipe equipped with a lap joint is connected to another pipe, and Figure 7(b) is a cross-sectional view illustrating the state in which the one pipe equipped with a lap joint is free to rotate about its axial direction relative to the other pipe by loosening the bolt. In Figure 7, a supply pipe is shown as one pipe and a branch pipe as the other pipe, but the same configuration applies when supply pipes are connected using a lap joint.
図7(a)および図7(b)に示すように、供給管92の端部にはラップジョイント934が溶接されている。このラップジョイント934は、供給管92に溶接された小径部934aと分岐管932側に配置された大径部934bとから構成されている。小径部934aの外径は、供給管92の外径と同一径に形成されている。ラップジョイント934の外周には、フリーフランジ935が配置されている。このフリーフランジ935は、内径がラップジョイント934の外径よりもほんの少しだけ大きいリング状をしている。フリーフランジ935には、ボルト95が挿入されるフリーフランジ貫通孔935aが周方向に均等に8つ形成されている。フリーフランジ935は、ラップジョイント934に対し回動自在かつ軸方向に移動自在にラップジョイント934と結合している。分岐管932先端の外径部分には、固定フランジ9322が溶接されている。この固定フランジ9322には、フリーフランジ935と同様にボルト95が挿入される固定フランジ貫通孔9322aが8つ形成されている。ラップジョイント934と固定フランジ9322の間にはリング状のパッキン94が配置されている。このパッキン94は、供給管92と分岐管932とが接合された状態において、供給管92と分岐管932内部を通過する流体が漏洩することを防止するためのものである。 As shown in Figures 7(a) and 7(b), a lap joint 934 is welded to the end of the supply pipe 92. This lap joint 934 is composed of a small-diameter portion 934a welded to the supply pipe 92 and a large-diameter portion 934b located on the branch pipe 932 side. The outer diameter of the small-diameter portion 934a is the same as the outer diameter of the supply pipe 92. A free flange 935 is located on the outer periphery of the lap joint 934. This free flange 935 is ring-shaped, with an inner diameter slightly larger than the outer diameter of the lap joint 934. Eight free flange through-holes 935a, into which bolts 95 are inserted, are formed evenly around the periphery of the free flange 935. The free flange 935 is connected to the lap joint 934 so as to be rotatable and axially movable relative to the lap joint 934. A fixed flange 9322 is welded to the outer diameter portion of the tip of the branch pipe 932. The fixed flange 9322 has eight fixed flange through-holes 9322a into which bolts 95 are inserted, similar to the free flange 935. A ring-shaped packing 94 is disposed between the lap joint 934 and the fixed flange 9322. This packing 94 is intended to prevent leakage of fluid passing through the supply pipe 92 and the branch pipe 932 when the supply pipe 92 and the branch pipe 932 are joined.
ボルト95は、固定フランジ9322の固定フランジ貫通孔9322aとフリーフランジ935のフリーフランジ貫通孔935aに挿入されている。ボルト95とナット96とを締め付けた状態では、図7(a)に示された供給管92のように、ラップジョイント934がパッキン94とともに固定フランジ9322とフリーフランジ935によって挟まれることで、分岐管932に対し供給管92が固定される。一方、ボルト95を緩めると、図7(b)に示された供給管92のように、分岐管932に対し供給管92がその軸線方向を中心として回動可能になる。すなわち、本実施形態では、母管93(図5参照)と供給管92とをラップジョイント934とフリーフランジ935を利用して接続しているので、供給管92は、その軸線方向を中心として、母管93に対して無段階に回動可能に構成されている。なお、ラップジョイント934の代わりにルーズフランジ等の他の遊合形フランジを用いても、母管93に対して供給管92を無段階に回動可能に接続することができる。 The bolt 95 is inserted into the fixed flange through-hole 9322a of the fixed flange 9322 and the free flange through-hole 935a of the free flange 935. When the bolt 95 and nut 96 are tightened, the lap joint 934, together with the gasket 94, is sandwiched between the fixed flange 9322 and the free flange 935, as in the supply pipe 92 shown in FIG. 7(a), thereby fixing the supply pipe 92 to the branch pipe 932. On the other hand, when the bolt 95 is loosened, the supply pipe 92 becomes rotatable about its axis relative to the branch pipe 932, as in the supply pipe 92 shown in FIG. 7(b). In other words, in this embodiment, the main pipe 93 (see FIG. 5) and the supply pipe 92 are connected using the lap joint 934 and the free flange 935, so the supply pipe 92 is configured to be infinitely rotatable about its axis relative to the main pipe 93. Furthermore, even if other loose flanges, such as loose flanges, are used instead of the lap joint 934, the supply pipe 92 can be connected to the mother pipe 93 in a manner that allows for stepless rotation.
また、図6に示すように、第1領域92aに配置された吐出口911と第3領域92cに配置された吐出口911の間、および第2領域92bに配置された吐出口911と第3領域92cに配置された吐出口911の間にはそれぞれラップジョイント934が配置されている。従って、第1領域92aと第2領域92bと第3領域92cそれぞれに配置された吐出口911は互いに独立して供給管92の軸線方向を中心として無段階に回転可能に構成されている。この構成により、供給管92から左側壁Waまでの間隔に応じて、各領域の吐出口911における流体の吐出方向をそれぞれ設定することができる。この第1領域92aに配置された吐出口911と第3領域92cに配置された吐出口911の間に配置されたラップジョイント934は、第1方向変更手段の一例に相当する。また、第2領域92bに配置された吐出口911と第3領域92cに配置された吐出口911の間に配置されたラップジョイント934は、第2方向変更手段の一例に相当する。また、図6に示した供給管92のうち、第1領域92aでは、第1領域92a内に並んだ3個の吐出口911における流体の吐出方向ををまとめて変更できるので、第1領域92aにおける吐出方向が容易に調整できる。図6に示した供給管92のうち、第2領域92bでは、中間供給管922に配置された3個の吐出口911をまとめて変更でき、下流側供給管923に配置された2個の吐出口911をまとめて変更できるので、第2領域92bにおける吐出方向が容易に調整できる。すなわち、複数個の吐出口911の吐出方向をまとめて変更できるように構成した場合のラップジョイント934は、一括方向変更手段の一例に相当する。なお、第3領域92cの長手方向が短く第3領域92c内に吐出口911が存在しない場合や、第3領域92cが存在しない場合には、第1領域92aと第2領域92bの間にラップジョイント934を配置すればよい。 As shown in FIG. 6 , lap joints 934 are disposed between the outlets 911 in the first region 92a and the third region 92c, and between the outlets 911 in the second region 92b and the third region 92c. Therefore, the outlets 911 in the first region 92a, the second region 92b, and the third region 92c are configured to be independently and continuously rotatable about the axial direction of the supply pipe 92. This configuration allows the fluid discharge direction of the outlets 911 in each region to be set according to the distance from the supply pipe 92 to the left side wall Wa. The lap joints 934 disposed between the outlets 911 in the first region 92a and the third region 92c are an example of a first direction changer. The lap joints 934 disposed between the outlets 911 in the second region 92b and the third region 92c are an example of a second direction changer. Furthermore, in the first region 92a of the supply pipe 92 shown in FIG. 6, the discharge direction of the fluid from the three discharge ports 911 arranged in the first region 92a can be changed collectively, allowing for easy adjustment of the discharge direction in the first region 92a. In the second region 92b of the supply pipe 92 shown in FIG. 6, the discharge direction of the fluid from the three discharge ports 911 arranged in the intermediate supply pipe 922 can be changed collectively, and the discharge direction of the fluid from the two discharge ports 911 arranged in the downstream supply pipe 923 can be changed collectively, allowing for easy adjustment of the discharge direction in the second region 92b. In other words, the lap joint 934, which is configured to change the discharge direction of multiple discharge ports 911 collectively, is an example of a collective direction changer. Note that if the third region 92c is too short in the longitudinal direction and no discharge ports 911 exist in the third region 92c, or if the third region 92c does not exist, the lap joint 934 can be disposed between the first region 92a and the second region 92b.
図8(a)は、図6のC-C断面図である。この図8(a)では側壁および底平面も示されている。 Figure 8(a) is a cross-sectional view taken along line C-C in Figure 6. The sidewalls and bottom surface are also shown in Figure 8(a).
上述した様に、左側壁Waは、凸壁部Wa1と、凹み壁部Wa2とを有している。図8(a)では、凸壁部Wa1は実線で示されており、凹み壁部Wa2は二点鎖線で示されている。図8(a)に実線で示した吐出口911では、流体の吐出方向を供給管92の中心から真下に向かう方向(垂直方向)よりも池幅方向中央側に向かう方向に向けている。この吐出口911では、底平面71に対して流体を吐出する角度θを約50度としている。角度θを約50度にすることで、底平面71に到達した流体を主トラフ8に向かう方向と凸壁部Wa1に向かう方向とに分流させることができる。この角度θは、吐出した流体が主トラフ8に向かう方向と凸壁部Wa1に向かう方向とに分流する角度であればよく、具体的には底平面71に対して30度以上60度以下であればよい。この角度に設定することで、凸壁部Wa1のように供給管92と左側壁Waとが近い場合、すなわち第1領域92a(図6参照)では、供給管92と左側壁Waの間の底平面71の上に堆積した砂にも分流した流体が到達し、その砂を流すことができる。また、供給管92の垂直方向よりも池幅方向中央の主トラフ8側に流体の吐出方向が向いているので、左側壁Wa側に流れる流体の勢いよりも主トラフ8側に流れる流体の勢いが強くなる。この流体の勢いにより、供給管92と主トラフ8の間の底平面71の上に堆積した砂を効率的に主トラフ8に向けて流すことができる。 As described above, the left side wall Wa has a convex wall portion Wa1 and a concave wall portion Wa2. In Figure 8(a), the convex wall portion Wa1 is indicated by a solid line, and the concave wall portion Wa2 is indicated by a two-dot chain line. The discharge port 911, indicated by a solid line in Figure 8(a), discharges the fluid toward the center of the pond width direction rather than directly downward (vertically) from the center of the supply pipe 92. This discharge port 911 discharges the fluid at an angle θ of approximately 50 degrees relative to the bottom plane 71. By setting the angle θ to approximately 50 degrees, the fluid that reaches the bottom plane 71 can be diverted toward the main trough 8 and the convex wall portion Wa1. This angle θ may be any angle that diverges the discharged fluid toward the main trough 8 and the convex wall portion Wa1; specifically, it may be between 30 and 60 degrees relative to the bottom plane 71. By setting this angle, when the supply pipe 92 and the left side wall Wa are close to each other, as in the convex wall portion Wa1, i.e., in the first region 92a (see Figure 6), the diverted fluid reaches and flushes away sand accumulated on the bottom surface 71 between the supply pipe 92 and the left side wall Wa. Furthermore, because the fluid discharge direction is oriented toward the main trough 8 in the center of the pond width direction rather than perpendicular to the supply pipe 92, the momentum of the fluid flowing toward the main trough 8 is stronger than the momentum of the fluid flowing toward the left side wall Wa. This fluid momentum allows sand accumulated on the bottom surface 71 between the supply pipe 92 and the main trough 8 to be efficiently flushed toward the main trough 8.
一方、図8(a)に二点鎖線で示した凹み壁部Wa2部分では、供給管92と左側壁Waとが離間している。このため、実線で示した吐出口911の吐出方向では、吐出した流体が分流しても凹み壁部Wa2近傍まで到達しないか、到達したとしても極僅かな量の流体しか到達しない。凹み壁部Wa2近傍に到達する流体の量が少ないと、供給管92と凹み壁部Wa2の間に堆積した砂のうち、凹み壁部Wa2近傍にある砂を十分に流すことができない。 On the other hand, at the recess wall portion Wa2 indicated by the two-dot chain line in Figure 8(a), the supply pipe 92 and the left side wall Wa are separated. Therefore, in the discharge direction of the discharge port 911 indicated by the solid line, even if the discharged fluid is diverted, it does not reach the vicinity of the recess wall portion Wa2, or even if it does, only a very small amount of fluid reaches it. If the amount of fluid reaching the vicinity of the recess wall portion Wa2 is small, the sand accumulated between the supply pipe 92 and the recess wall portion Wa2 and that near the recess wall portion Wa2 cannot be sufficiently flushed away.
本実施形態では、供給管92をその軸線方向を中心として回動可能に構成しているので、集砂ノズル91からの流体の吐出方向を自在に変更できる。図8(a)には、凹み壁部Wa2の位置に対応して吐出口911から吐出される流体の吐出方向を調整した集砂ノズル91が二点鎖線で示されている。この二点鎖線で示された集砂ノズル91では、吐出口911から吐出される流体の吐出方向を、供給管92の中心から真下に向かう方向(垂直方向)よりも池幅方向外側に向けている。供給管92から左側壁Waまでの距離に応じて、吐出口911から吐出される流体の吐出方向を調整することで、第2領域92b(図6参照)のように供給管92と左側壁Waとが離間していても、左側壁Wa近傍に堆積している砂を十分に流すことができる。なお、本実施形態では、母管93と供給管92または供給管92どうしをラップジョイント934とフリーフランジ935を利用して接続しているので、接続された供給管92をその軸線を中心として無段階に回転させることができる。無段階に回転できるので、凸壁部Wa1と凹み壁部Wa2の間にある傾斜壁部Wa3(図2参照)に対向した位置にある供給管92(第3領域92c)では、図8(a)に実線で示した集砂ノズル91の吐出方向と二点鎖線で示した集砂ノズル91の吐出方向の中間方向に流体の吐出方向を設定することもできる。 In this embodiment, the supply pipe 92 is configured to be rotatable about its axis, allowing the direction of fluid discharge from the sand collection nozzle 91 to be freely changed. Figure 8(a) shows a sand collection nozzle 91 in which the direction of fluid discharged from the discharge port 911 is adjusted to correspond to the position of the recessed wall portion Wa2, as indicated by a two-dot chain line. In this sand collection nozzle 91 shown by the two-dot chain line, the direction of fluid discharged from the discharge port 911 is directed outward in the pond width direction rather than directly downward (vertically) from the center of the supply pipe 92. By adjusting the direction of fluid discharged from the discharge port 911 depending on the distance from the supply pipe 92 to the left side wall Wa, sand accumulated near the left side wall Wa can be sufficiently flushed away, even when the supply pipe 92 and the left side wall Wa are separated, as in the second region 92b (see Figure 6). In this embodiment, the main pipe 93 and supply pipe 92, or the supply pipes 92 themselves, are connected using a lap joint 934 and a free flange 935, allowing the connected supply pipe 92 to rotate continuously about its axis. Because of this continuous rotation, the fluid discharge direction can be set midway between the discharge direction of the sand collection nozzle 91 shown by the solid line in Figure 8(a) and the discharge direction of the sand collection nozzle 91 shown by the two-dot chain line in the supply pipe 92 (third region 92c) facing the inclined wall portion Wa3 (see Figure 2) between the convex wall portion Wa1 and the concave wall portion Wa2.
また、本実施形態では、母管93に分岐管932を備えているので、1本の母管93に対して、上流側供給管921と中間供給管922と下流側供給管923の合計3本の供給管92が沈砂池2の長手方向に並んで接続されている。これに対し、分岐管932が無く、単管931に供給管92を接続する場合は、1本の母管93に対して沈砂池2の長手方向には多くても2本の供給管92しか接続できない。すなわち、母管93の先端から沈砂池2の上流側に伸びた供給管92と下流側にお伸びた供給管92の2本になる。吐出口911から吐出される流体の吐出方向は、各供給管92毎に設定できる。従って、分岐管932がない場合と比較して、分岐管932を設けた場合は、吐出口911から吐出される流体の吐出方向を、沈砂池2の長手方向において多くの箇所で調整できるので、側壁Wの形状により柔軟に対応することが可能になる。 In addition, in this embodiment, the main pipe 93 is provided with a branch pipe 932, so a total of three supply pipes 92—the upstream supply pipe 921, the intermediate supply pipe 922, and the downstream supply pipe 923—are connected to one main pipe 93 in a row along the longitudinal direction of the settling basin 2. In contrast, if the branch pipe 932 were not provided and supply pipes 92 were connected to a single pipe 931, at most two supply pipes 92 could be connected to one main pipe 93 along the longitudinal direction of the settling basin 2. That is, there would be two supply pipes 92: one extending from the tip of the main pipe 93 to the upstream side of the settling basin 2 and one extending to the downstream side. The discharge direction of the fluid discharged from the discharge port 911 can be set for each supply pipe 92. Therefore, compared to when the branch pipe 932 is not provided, when the branch pipe 932 is provided, the discharge direction of the fluid discharged from the discharge port 911 can be adjusted at multiple points along the longitudinal direction of the settling basin 2, allowing for more flexible adaptation to the shape of the side wall W.
図8(b)は、集砂ノズルによる吐出方向の変更を説明するための、図8(a)と同様の断面図である。この図8(b)では側壁および底平面も示されている。 Figure 8(b) is a cross-sectional view similar to Figure 8(a) to illustrate how the sand collection nozzle changes the discharge direction. Figure 8(b) also shows the side walls and bottom surface.
図8(b)に示すように、集砂ノズル91は、中間部分で屈曲しており実線で示した状態では、長手方向に見て逆くの字状に形成されている。逆くの字状に形成されているので、実線で示した集砂ノズル91を、供給管92との取付部分の軸線Lを中心にして180度回転させると、二点鎖線で示した様に、流体の吐出方向を池幅方向中央側から池幅方向外側に変更することができる。集砂ノズル91を逆くの字状に形成し、集砂ノズル91と供給管92との接続部分を回転可能に構成することで、吐出口911毎に流体の吐出方向を変更することが可能になる。すなわち、本実施形態における集砂ノズル91の形状および集砂ノズル91が供給管92に対して回転可能な構成が、個別方向変更手段の一例に相当する。 As shown in Figure 8(b), the sand collection nozzle 91 is bent at its middle and, as shown by the solid line, is formed in an inverted L-shape when viewed longitudinally. Because of its inverted L-shape, rotating the sand collection nozzle 91 shown by the solid line 180 degrees around the axis L of its attachment to the supply pipe 92 changes the fluid discharge direction from the center of the pond width to the outside of the pond width, as shown by the two-dot chain line. By forming the sand collection nozzle 91 in an inverted L-shape and configuring the connection between the sand collection nozzle 91 and the supply pipe 92 to be rotatable, it becomes possible to change the fluid discharge direction for each discharge port 911. In other words, the shape of the sand collection nozzle 91 in this embodiment and the configuration that allows the sand collection nozzle 91 to rotate relative to the supply pipe 92 correspond to an example of an individual direction changing means.
図9は汚水処理施設における給水系統図である。 Figure 9 is a diagram of the water supply system at a sewage treatment facility.
図9に示すように、給水ポンプ33は、ポンプ井3の水を、攪拌ノズル62、ピット用集砂ノズル63、上流トラフ第1ノズル831、上流トラフ第2ノズル832、下流トラフ用ノズル84、および集砂手段9に選択的に供給する。給水ポンプ33に接続された給水管34には、上述の各ノズルおよび集砂手段9側に流体を供給するか否かを切り替えるための供給切替弁Vaと、給水ポンプで吸い上げた流体をポンプ井3に戻すか否かを切り替えるためのリリーフ切替弁Vbとが設けられている。供給切替弁Vaと攪拌ノズル62の間の管路には、攪拌ノズル62に流体を供給するか否かを切り替える攪拌切替弁Vcが設けられている。供給切替弁Vaとピット用集砂ノズル63の間の管路には、ピット用集砂ノズル63に流体を供給するか否かを切り替えるピット集砂切替弁Vdが設けられている。供給切替弁Vaと上流トラフ第1ノズル831の間の管路には、上流トラフ第1ノズル831に流体を供給するか否かを切り替える上流トラフ第1切替弁Ve1が設けられている。供給切替弁Vaと上流トラフ第2ノズル832の間の管路には、上流トラフ第2ノズル832に流体を供給するか否かを切り替える上流トラフ第2切替弁Ve2が設けられている。供給切替弁Vaと下流トラフ用ノズル84の間の管路には、下流トラフ用ノズル84に流体を供給するか否かを切り替える下流トラフ切替弁Vfが設けられている。また、供給切替弁Vaと集砂手段9の各ノズルヘッダ9a、9b、9c、9d、9e、9fの間の各管路には、各ノズルヘッダ9a、9b、9c、9d、9e、9fに流体を供給するか否かを切り替える集砂切替弁Vg1、Vg2、Vg3、Vg4、Vg5、Vg6がそれぞれ設けられている。これらの切替弁は、電磁弁で構成されており、図示しない制御装置によって弁の開閉が制御される。 As shown in FIG. 9 , the water supply pump 33 selectively supplies water from the pump well 3 to the agitation nozzle 62, the pit sand collection nozzle 63, the upstream trough first nozzle 831, the upstream trough second nozzle 832, the downstream trough nozzle 84, and the sand collection means 9. The water supply pipe 34 connected to the water supply pump 33 is provided with a supply switching valve Va for switching whether or not fluid is supplied to the above-mentioned nozzles and the sand collection means 9, and a relief switching valve Vb for switching whether or not fluid pumped up by the water supply pump is returned to the pump well 3. The pipeline between the supply switching valve Va and the agitation nozzle 62 is provided with an agitation switching valve Vc for switching whether or not fluid is supplied to the agitation nozzle 62. The pipeline between the supply switching valve Va and the pit sand collection nozzle 63 is provided with a pit sand collection switching valve Vd for switching whether or not fluid is supplied to the pit sand collection nozzle 63. A first upstream trough selector valve Ve1 is provided in the pipeline between the supply selector valve Va and the first upstream trough nozzle 831, switching whether or not to supply fluid to the first upstream trough nozzle 831. A second upstream trough selector valve Ve2 is provided in the pipeline between the supply selector valve Va and the second upstream trough nozzle 832, switching whether or not to supply fluid to the second upstream trough nozzle 832. A downstream trough selector valve Vf is provided in the pipeline between the supply selector valve Va and the downstream trough nozzle 84, switching whether or not to supply fluid to the downstream trough nozzle 84. In addition, sand collection selector valves Vg1, Vg2, Vg3, Vg4, Vg5, and Vg6 are provided in the pipelines between the supply selector valve Va and the nozzle headers 9a, 9b, 9c, 9d, 9e, and 9f of the sand collecting means 9, respectively, switching whether or not to supply fluid to each of the nozzle headers 9a, 9b, 9c, 9d, 9e, and 9f. These switching valves are composed of solenoid valves, and their opening and closing is controlled by a control device (not shown).
図10は、沈砂池の水位と水位センサを示す説明図である。 Figure 10 is an explanatory diagram showing the water level of the settling basin and the water level sensor.
図10に示すように、沈砂池2の集砂ピット6には水位センサ99が配置されている。この水位センサ99は、沈砂池2の水位が底平面71よりも上にある第1高水位HHWLと、第1高水位HHWLよりも下で各覆い部材13,14,15の上端位置13b(主トラフ8の上端8bすなわち主トラフ8の開口とほぼ同じ位置であり、小トラフ72の下端72bともほぼ同じ位置である。)よりも上にある第2高水位THWLと、各覆い部材13,14,15の上端位置13b付近にある第1低水位TLWLと、第2高水位THWLと第1低水位TLWLとの間の第1中間水位TMWLと、主トラフ8の上端8bよりも下側で主トラフ8の下端8aよりも上にある第3高水位HWLと、集砂ピット6内の下方にある第2低水位LWLと、第3高水位HWLと第2低水位LWLとの間の第2中間水位MWLと、第2低水位LWLよりさらに低いインターロック水位LLWLになったことをそれぞれ検知して出力するものである。 As shown in Figure 10, a water level sensor 99 is disposed in the sand collection pit 6 of the settling basin 2. This water level sensor 99 detects a first high water level HHWL, where the water level of the settling basin 2 is above the bottom plane 71; a second high water level THWL, which is below the first high water level HHWL and above the upper end position 13b of each cover member 13, 14, 15 (approximately the same position as the upper end 8b of the main trough 8, i.e., the opening of the main trough 8, and also approximately the same position as the lower end 72b of the small trough 72); and a first low water level TLW, which is near the upper end position 13b of each cover member 13, 14, 15. It detects and outputs the following: L, the first intermediate water level TMWL between the second high water level THWL and the first low water level TLWL, the third high water level HWL below the upper end 8b of the main trough 8 and above the lower end 8a of the main trough 8, the second low water level LWL below the sand collection pit 6, the second intermediate water level MWL between the third high water level HWL and the second low water level LWL, and the interlock water level LLWL which is even lower than the second low water level LWL.
図11は、汚水処理施設における砂の除去動作の流れを示すフローチャートである。 Figure 11 is a flowchart showing the procedure for sand removal in a wastewater treatment facility.
上述の構成を有する汚水処理施設1の動作について図1、図2および図11等を参照して説明する。沈砂池2の池底部にある程度砂が堆積した所定の時期に、汚水処理施設1は堆積した砂の除去動作を行う。この時期は、例えば月に一回など定期的でもよく、沈砂池2に流入または沈砂池2から排出された汚水の合計流量が一定量になったときでもよい。砂の除去動作では、先ず図1に示したダム装置4の流入ゲート42を駆動して流入口411を閉塞し、汚水の沈砂池2への流入を堰き止める(ステップS1)。次に、揚水ポンプ31を駆動して沈砂池2の水位を低下させる。ポンプ井3の水位が所定値まで下がったら揚水ポンプ31を停止する(ステップS2)。そして、数分程度給水ポンプ33を駆動し、図2に示す攪拌ノズル62から流体を吐出させる。給水ポンプの停止後、揚砂ポンプ61を駆動する。沈砂池2の水位が第2高水位THWL(図10参照)まで低下したら、再度給水ポンプ33を駆動し、図2に示す攪拌ノズル62から流体を吐出させる。そして、揚砂ポンプ61の駆動を、以下に説明する動作モードAに設定する(ステップS3)。揚砂ポンプ61は、動作モードAまたは動作モードBのうちの何れか一方のモードで動作する。動作モードAでは、水位センサ99からの第1低水位TLWL(図10参照)を示す出力に応じて駆動を停止し、第2高水位THWL(図10参照)を示す出力に応じて駆動を再開する制御が自動で実行される。この動作モードAは、水位が各覆い部材13,14,15の上端位置13bよりも上になるように維持されるモードである。したがって、動作モードAでは、各覆い部材13,14,15、トラフ第1吐出口831a、トラフ第2吐出口832a、およびトラフ第3吐出口84aは水中に没した状態になる。動作モードBでは、水位センサ99からの第2低水位LWL(図10参照)を示す出力に応じて揚砂ポンプ61の駆動を停止し、第3高水位HWL(図10参照)を示す出力に応じて駆動を再開する制御が自動で実行される。この動作モードBは、水位が小トラフ72の下端72bよりも下になるように維持されるモードである。したがって、底平面71、小トラフ72、およびそれらの上に堆積した砂、並びに集砂手段9は大気中に露出した状態になる。一方、図1に示す給水ポンプ33は、砂の除去動作が終わるまで駆動が継続される。集砂ピット6に搬送された砂は揚砂ポンプ61が駆動しているときに、揚砂ポンプ61によって沈砂池2外の不図示の沈砂分離機に運ばれる。なお、水位センサ99が第1高水位HHWLまたはインターロック水位LLWL(図10参照)になったことを検知した場合、何らかの異常が発生したと考えられるため、アラートを表示して汚水処理施設1は砂の除去動作を停止する。 The operation of the wastewater treatment facility 1 having the above-described configuration will be described with reference to Figures 1, 2, and 11. When a certain amount of sand has accumulated at the bottom of the settling basin 2, the wastewater treatment facility 1 performs an operation to remove the accumulated sand. This operation can be performed periodically, such as once a month, or when the total flow rate of wastewater flowing into or discharged from the settling basin 2 reaches a certain level. In the sand removal operation, the inflow gate 42 of the dam device 4 shown in Figure 1 is first activated to block the inlet 411 and prevent wastewater from flowing into the settling basin 2 (Step S1). Next, the lift pump 31 is activated to lower the water level in the settling basin 2. When the water level in the pump well 3 drops to a predetermined value, the lift pump 31 is stopped (Step S2). The water supply pump 33 is then activated for several minutes to discharge fluid from the agitation nozzle 62 shown in Figure 2. After the water supply pump is stopped, the sand lift pump 61 is activated. When the water level in the settling basin 2 drops to the second high water level THWL (see FIG. 10), the water supply pump 33 is driven again to discharge fluid from the agitation nozzle 62 shown in FIG. 2. Then, the operation of the sand lifting pump 61 is set to operation mode A (step S3), which will be described below. The sand lifting pump 61 operates in either operation mode A or operation mode B. In operation mode A, the operation is automatically stopped in response to an output from the water level sensor 99 indicating the first low water level TLWL (see FIG. 10), and resumed in response to an output indicating the second high water level THWL (see FIG. 10). In operation mode A, the water level is maintained above the upper end positions 13b of the cover members 13, 14, and 15. Therefore, in operation mode A, the cover members 13, 14, and 15, the trough first outlet 831a, the trough second outlet 832a, and the trough third outlet 84a are submerged. In operation mode B, the sand lifting pump 61 is automatically stopped in response to an output from the water level sensor 99 indicating the second low water level LWL (see FIG. 10) and resumed in response to an output indicating the third high water level HWL (see FIG. 10). In operation mode B, the water level is maintained below the lower end 72b of the small trough 72. Therefore, the bottom surface 71, the small trough 72, the sand accumulated thereon, and the sand collecting means 9 are exposed to the atmosphere. Meanwhile, the water supply pump 33 shown in FIG. 1 continues to operate until the sand removal operation is completed. When the sand lifting pump 61 is operating, the sand transported to the sand collection pit 6 is carried by the sand lifting pump 61 to a sedimentation separator (not shown) outside the settling basin 2. If the water level sensor 99 detects that the water level has reached the first high water level HHWL or the interlock water level LLWL (see Figure 10), it is assumed that some kind of abnormality has occurred, so an alert is displayed and the wastewater treatment facility 1 stops sand removal operations.
その後、図2に示す攪拌ノズル62と上流トラフ第1ノズル831および上流トラフ第2ノズル832から一定時間流体を吐出させて上流側第1主トラフ815および上流側第2主トラフ816に堆積した砂を集砂ピット6に流す(ステップS4)。なお、このステップS4では、上流トラフ第1ノズル831と上流トラフ第2ノズル832のうちの一方から一定時間流体を吐出した後、他方から一定時間流体を吐出させてもよい。攪拌ノズル62と上流トラフ第1ノズル831および上流トラフ第2ノズル832からの流体の吐出が停止したら、揚砂ポンプ61を動作モードBに切り替える(ステップS5)。そして、水位が第3高水位HWL以下であることを検出したら、第5ノズルヘッダ9eに設けられた吐出口911(図6参照)から流体を吐出させる。この吐出により、第5ノズルヘッダ9eが配置されている付近の右側壁Wbから上流側第2主トラフ816の間の底平面71および小トラフ72の上に堆積した砂を上流側第2主トラフ816に流すことができる。その砂を十分に流せる所定時間が経過したら、第5ノズルヘッダ9eに設けられた吐出口911の流体吐出を継続しながら、揚砂ポンプ61を動作モードAに切り替える。その後、水位が第1中間水位TMWL以上であることを検出したら、第5ノズルヘッダ9eに設けられた吐出口911からの流体の吐出を停止する(ステップS6)。そして、攪拌ノズル62と上流トラフ第2ノズル832から一定時間流体を吐出させて上流側第2主トラフ816に流された砂を集砂ピット6に送る(ステップS7)。攪拌ノズル62と上流トラフ第2ノズル832からの流体の吐出が停止したら、揚砂ポンプ61を動作モードBに切り替える(ステップS8)。そして、水位が第3高水位HWL以下であることを検出したら、第2ノズルヘッダ9bに設けられた吐出口911から流体を吐出させる。第2ノズルヘッダ9bが配置されている付近の左側壁Waから上流側第1主トラフ815の間の底平面71および小トラフ72の上に堆積した砂を十分に流せる所定時間が経過したら、第2ノズルヘッダ9bに設けられた吐出口911の流体吐出を継続しながら、揚砂ポンプ61を動作モードAに切り替える。その後、水位が第1中間水位TMWL以上であることを検出したら、第2ノズルヘッダ9bに設けられた吐出口911からの流体の吐出を停止する(ステップS9)本実施形態では、左側壁Waのうち、凹み壁部Wa2および傾斜壁部Wa3の近傍にある吐出口911は、供給管92から左側壁Waまでの距離に応じて左側壁Waにある程度の流体が到達するように流体の吐出方向が調整されている。従って、第2ノズルヘッダ9bが配置されている付近の左側壁Waから上流側第1主トラフ815の間の底平面71および小トラフ72の上に堆積した全ての砂を上流側第1主トラフ815まで流すことができる。第2ノズルヘッダ9bに設けられた吐出口911からの流体の吐出を停止した後、攪拌ノズル62と上流トラフ第1ノズル831から一定時間流体を吐出させて上流側第1主トラフ815に流された砂を集砂ピット6に送る(ステップS10)。攪拌ノズル62と上流トラフ第2ノズル832からの流体の吐出が停止したら、揚砂ポンプ61を動作モードBに切り替える(ステップS11)。その後、上述のステップS6~S10の動作と同様に、第4ノズルヘッダ9dに設けられた吐出口911からの流体の吐出と所定時間経過後の動作モードAへの切り替え(ステップS12)、攪拌ノズル62と上流トラフ第2ノズル832からの流体の吐出(ステップS13)、動作モードBへの切替(ステップS14)、第1ノズルヘッダ9aに設けられた吐出口911からの流体の吐出と所定時間経過後の動作モードAへの切り替え(ステップS15)、攪拌ノズル62と上流トラフ第1ノズル831からの流体の吐出(ステップS16)の順に動作させることで、集砂ピット6より上流側の池底部に堆積した砂は全て沈砂池2の外部に搬出される。なお、各ノズルヘッダ9a、9b、9d、9eから流体を吐出する順番は任意の順で構わない。しかし、集砂ピット6から遠い側に堆積した砂を先に流すと、流そうとする砂とともに集砂ピット6に近い側に堆積している砂が主トラフ8に崩れ落ちて主トラフ内に砂が溜まってしまい、主トラフ8内の砂を集砂ピット6に送ることが困難になってしまうことがある。このため、集砂ピット6に近い側の第2ノズルヘッダ9bおよび第5ノズルヘッダ9eから流体を吐出した後に、集砂ピット6から遠い側の第1ノズルヘッダ9aおよび第4ノズルヘッダ9dから流体を吐出することが望ましい。 Then, fluid is discharged for a certain period of time from the agitation nozzle 62 and the upstream trough first nozzle 831 and upstream trough second nozzle 832 shown in FIG. 2 to flush the sand accumulated in the upstream first main trough 815 and upstream second main trough 816 into the sand collection pit 6 (step S4). Note that in step S4, fluid may be discharged for a certain period of time from one of the upstream trough first nozzle 831 and upstream trough second nozzle 832, followed by a certain period of time from the other. Once the discharge of fluid from the agitation nozzle 62 and upstream trough first nozzle 831 and upstream trough second nozzle 832 has stopped, the sand lifting pump 61 is switched to operation mode B (step S5). Then, when it is detected that the water level is below the third high water level HWL, fluid is discharged from the discharge port 911 (see FIG. 6) provided in the fifth nozzle header 9e. This discharge allows sand accumulated on the bottom plane 71 and small troughs 72 between the right side wall Wb near the fifth nozzle header 9e and the upstream second main trough 816 to flow into the upstream second main trough 816. After a predetermined time has elapsed to allow the sand to flow sufficiently, the sand lifting pump 61 is switched to operation mode A while continuing to discharge fluid from the discharge port 911 provided in the fifth nozzle header 9e. Thereafter, when it is detected that the water level is equal to or higher than the first intermediate water level TMWL, the discharge of fluid from the discharge port 911 provided in the fifth nozzle header 9e is stopped (step S6). Then, fluid is discharged from the agitation nozzle 62 and the upstream trough second nozzle 832 for a certain period of time to send the sand that has flowed into the upstream second main trough 816 to the sand collection pit 6 (step S7). After the discharge of fluid from the agitation nozzle 62 and the upstream trough second nozzle 832 is stopped, the sand lifting pump 61 is switched to operation mode B (step S8). Then, when it is detected that the water level is equal to or lower than the third high water level HWL, fluid is discharged from the outlet 911 provided in the second nozzle header 9b. After a predetermined time has elapsed to sufficiently flush away sand accumulated on the bottom plane 71 and the small trough 72 between the left side wall Wa near where the second nozzle header 9b is located and the upstream first main trough 815, the sand lifting pump 61 switches to operation mode A while continuing to discharge fluid from the outlet 911 provided in the second nozzle header 9b. Thereafter, when it is detected that the water level is equal to or higher than the first intermediate water level TMWL, discharge of fluid from the outlet 911 provided in the second nozzle header 9b is stopped (step S9). In this embodiment, the discharge direction of the outlets 911 provided in the left side wall Wa near the recessed wall portion Wa2 and the inclined wall portion Wa3 is adjusted so that a certain amount of fluid reaches the left side wall Wa depending on the distance from the supply pipe 92 to the left side wall Wa. Therefore, all sand accumulated on the bottom plane 71 and small troughs 72 between the left side wall Wa near where the second nozzle header 9b is located and the upstream first main trough 815 can be flushed down to the upstream first main trough 815. After the discharge of fluid from the discharge port 911 provided in the second nozzle header 9b is stopped, fluid is discharged from the agitation nozzle 62 and the upstream trough first nozzle 831 for a certain period of time to send the sand that has flowed down to the upstream first main trough 815 to the sand collection pit 6 (step S10). After the discharge of fluid from the agitation nozzle 62 and the upstream trough second nozzle 832 is stopped, the sand lifting pump 61 is switched to operation mode B (step S11). Thereafter, similar to the operations of steps S6 to S10 described above, the following operations are performed in order: discharge of fluid from the outlet 911 provided in the fourth nozzle header 9d and switching to operation mode A after a predetermined time has elapsed (step S12), discharge of fluid from the agitation nozzle 62 and the upstream trough second nozzle 832 (step S13), switching to operation mode B (step S14), discharge of fluid from the outlet 911 provided in the first nozzle header 9a and switching to operation mode A after a predetermined time has elapsed (step S15), and discharge of fluid from the agitation nozzle 62 and the upstream trough first nozzle 831 (step S16). All sand deposited on the pond bottom upstream of the sand collection pit 6 is transported to the outside of the settling basin 2. The order in which fluid is discharged from each nozzle header 9a, 9b, 9d, and 9e may be any order. However, if sand accumulated farther from the sand collection pit 6 is flushed first, the sand accumulated closer to the sand collection pit 6 may collapse into the main trough 8 along with the sand being flushed, causing sand to accumulate in the main trough, making it difficult to send the sand in the main trough 8 to the sand collection pit 6. For this reason, it is desirable to eject fluid from the second nozzle header 9b and fifth nozzle header 9e, which are closer to the sand collection pit 6, and then eject fluid from the first nozzle header 9a and fourth nozzle header 9d, which are farther from the sand collection pit 6.
上述の動作により上流側に堆積した砂を取り除いた後、攪拌ノズル62と下流トラフ用ノズル84から一定時間流体を吐出させて下流側主トラフ82に堆積した砂を集砂ピット6に流す(ステップS17)。攪拌ノズル62と下流トラフ用ノズル84からの流体の吐出を停止が停止したら、揚砂ポンプ61を動作モードBに切り替える(ステップS18)。そして、水位が第3高水位HWL以下であることを検出したら、第6ノズルヘッダ9fに設けられた吐出口911から流体を吐出させる。第6ノズルヘッダ9fが配置されている付近の右側壁Wbから下流側主トラフ82の間の底平面71および小トラフ72の上に堆積した砂を十分に流せる所定時間が経過したら、第6ノズルヘッダ9fに設けられた吐出口911の流体吐出を継続しながら、揚砂ポンプ61を動作モードAに切り替える。その後、水位が第1中間水位TMWL以上であることを検出したら、第6ノズルヘッダ9fに設けられた吐出口911からの流体の吐出を停止する(ステップS19)。そして、攪拌ノズル62と下流側主トラフ82から一定時間流体を吐出させて下流側主トラフ82に流された砂を集砂ピット6に送る(ステップS20)。攪拌ノズル62と下流側主トラフ82からの流体の吐出が停止したら、揚砂ポンプ61を動作モードBに切り替える(ステップS21)。そして、上述のステップS19とS20の動作と同様に、第3ノズルヘッダ9c設けられた吐出口911からの流体の吐出と所定時間経過後の動作モードAへの切り替え(ステップS22)、攪拌ノズル62と下流トラフ用ノズル84からの流体の吐出(ステップS23)の順に動作させることで、集砂ピット6より下流側の池底部に堆積した砂は全て沈砂池2の外部に搬出される。最後に、ピット用集砂ノズル63から流体を吐出することで、集砂ピット傾斜面6bの上に堆積した砂を集砂ピット6に流す(ステップS24)。これらの動作が全て完了したら、給水ポンプ33を停止させ、所定時間経過後に揚砂ポンプ61も停止させる。 After removing the sand accumulated upstream through the above-described operations, fluid is discharged from the agitation nozzle 62 and downstream trough nozzle 84 for a certain period of time to flush the sand accumulated in the downstream main trough 82 into the sand collection pit 6 (step S17). Once the discharge of fluid from the agitation nozzle 62 and downstream trough nozzle 84 has stopped, the sand lifting pump 61 is switched to operation mode B (step S18). Then, once it is detected that the water level is below the third high water level HWL, fluid is discharged from the outlet 911 provided in the sixth nozzle header 9f. Once a predetermined time has elapsed to sufficiently flush the sand accumulated on the bottom plane 71 and small troughs 72 between the right side wall Wb near the location of the sixth nozzle header 9f and the downstream main trough 82, the sand lifting pump 61 is switched to operation mode A while continuing to discharge fluid from the outlet 911 provided in the sixth nozzle header 9f. Then, if the water level is detected to be equal to or higher than the first intermediate water level TMWL, the discharge of fluid from the outlet 911 of the sixth nozzle header 9f is stopped (step S19). Then, fluid is discharged from the agitation nozzle 62 and the downstream main trough 82 for a certain period of time, and the sand flowing into the downstream main trough 82 is sent to the sand collection pit 6 (step S20). Once the discharge of fluid from the agitation nozzle 62 and the downstream main trough 82 has stopped, the sand lifting pump 61 is switched to operation mode B (step S21). Then, similar to the operations of steps S19 and S20 described above, the discharge of fluid from the outlet 911 of the third nozzle header 9c is followed by switching to operation mode A after a predetermined time has elapsed (step S22), and then the discharge of fluid from the agitation nozzle 62 and the downstream trough nozzle 84 (step S23) is performed in this order, thereby transporting all sand deposited on the bottom of the pond downstream of the sand collection pit 6 to the outside of the settling basin 2. Finally, fluid is ejected from the pit sand collection nozzle 63 to flush the sand accumulated on the sand collection pit inclined surface 6b into the sand collection pit 6 (step S24). Once all of these operations are complete, the water supply pump 33 is stopped, and after a predetermined time has passed, the sand lifting pump 61 is also stopped.
この砂の除去動作では、揚砂ポンプ61を動作モードAから動作モードBに切り替えた時に、水位が第3高水位HWL以下であることを検出するまでは、沈砂池2への流体の供給を停止している。これにより、水位の低下速度を速めることができる。その際、沈砂池2への流体の供給を停止するために、図9に示す供給切替弁Vaを閉じてリリーフ切替弁Vbを開放し、給水ポンプ33がくみ上げた流体をポンプ井3に戻している。こうすることで、給水ポンプ33の駆動を継続したまま、沈砂池2への流体の供給を停止できる。ここまでに説明した砂の除去動作における、ステップS4、S7、S10、S13、S16、S17、S20、およびS23それぞれが水中吐出工程の一例に相当する。また、ステップS6、S9、S12、S15、S19、およびS22それぞれが大気中吐出工程の一例に相当する。すなわち、本実施形態では、大気中吐出工程の実行後に水中吐出工程を実行する処理を一組の集砂処理(ステップS6とS7、S9とS10、S12とS13、S15とS16、S19とS20、S22とS23の各組合せ)として、その集砂処理を複数回実行している。また、最初の集砂処理(ステップS6とS7)を行う前に水中吐出工程(ステップS4)を実行している。大気中吐出工程の際に主トラフ8内に砂が残留していると、大気中吐出工程によって主トラフ8に流された砂が残留した砂に上乗せされてしまい、主トラフ8内に大量の砂が堆積しまう虞がある。また、大気中吐出工程の際に、主トラフ8内が砂で満たされて、あふれた砂が底平面71に残留してしまう虞もある。本実施形態では、底平面71から主トラフ8に流された砂は、一組の集砂処理のなかで集砂ピット8まで搬送されるので、主トラフ8内に砂が残留してしまうことがない。また、最初の集砂処理(ステップS6とS7、およびS19とS20の各組合せ)を行う前に水中吐出工程(ステップS4およびS17)を実行しているので、最初の集砂処理の際にも主トラフ8内に砂が残留していることがない。 During this sand removal operation, when the sand lifting pump 61 is switched from operating mode A to operating mode B, the supply of fluid to the settling basin 2 is stopped until it is detected that the water level is below the third high water level HWL. This allows the water level to decrease more quickly. To stop the supply of fluid to the settling basin 2, the supply switching valve Va shown in FIG. 9 is closed and the relief switching valve Vb is opened, returning the fluid pumped by the feedwater pump 33 to the pump well 3. This allows the supply of fluid to the settling basin 2 to be stopped while the feedwater pump 33 continues to operate. In the sand removal operation described above, steps S4, S7, S10, S13, S16, S17, S20, and S23 each correspond to an example of the submerged discharge process. Furthermore, steps S6, S9, S12, S15, S19, and S22 each correspond to an example of the atmospheric discharge process. That is, in this embodiment, the process of performing the atmospheric discharge process followed by the submerged discharge process is considered as one set of sand collection processes (combinations of steps S6 and S7, S9 and S10, S12 and S13, S15 and S16, S19 and S20, and S22 and S23), and this sand collection process is performed multiple times. Furthermore, the submerged discharge process (step S4) is performed before the first sand collection process (steps S6 and S7). If sand remains in the main trough 8 during the atmospheric discharge process, the sand flowing into the main trough 8 during the atmospheric discharge process may be piled on top of the remaining sand, resulting in a large amount of sand accumulating in the main trough 8. Furthermore, there is a risk that the main trough 8 may be filled with sand during the atmospheric discharge process, and the overflowing sand may remain on the bottom surface 71. In this embodiment, the sand flowing from the bottom surface 71 to the main trough 8 is transported to the sand collection pit 8 as part of one set of sand collection processes, so that no sand remains in the main trough 8. Furthermore, because the underwater discharge process (steps S4 and S17) is performed before the first sand collection process (combinations of steps S6 and S7, and S19 and S20), no sand remains in the main trough 8 even during the first sand collection process.
なお、本実施形態では、上述の砂の除去動作を実行している時は、給水ポンプ33がくみ上げる流体の量よりも揚砂ポンプ61がくみ上げる流体の量の方が少し多くなるように設定されている。このため、除去動作を実行している間に揚砂ポンプ61は停止と再開を複数回繰り返すことになる。しかし、揚砂ポンプ61は駆動と停止を繰り返すと、駆動開始時の突入電流によりポンプ寿命が低下してしまう。この対策として、給水ポンプ33におけるくみ上げ能力と揚砂ポンプ61における流体のくみ上げ能力を近づけることで砂の除去動作における水位の変化を最小限にしてもよい。また、水位センサ99が、動作モードAでは第1中間水位TMWL、動作モードBでは第2中間水位MWLまで低下したことを検知したら、その時点で流体を吐出しているノズルに加え、他のノズルから追加で流体を吐出させてもよい。流体を吐出するノズルを増やすことで、流体の流れに対する負荷(絞り抵抗)が減るので、給水ポンプ33が吸い上げる流体が増加し、結果として多くの流体を沈砂池2に供給することができる。これにより第1低水位TLWLまたは第2低水位LWLになりにくくなるので、揚砂ポンプ61が停止と再開を実行する回数を減らすことができる。ここで、他のノズルは、その次に吐出する予定のノズルヘッダに設けられた集砂ノズル91であることが望ましい。次に吐出する予定のノズルヘッダから流体を吐出させることで、次に流す底平面71および小トラフ72にある砂を予備的に流しておくことができるので、砂の残留をより抑制することができる。また、追加で吐出させる流体は、他の設備に蓄えられた流体であってもよい。さらに、第1低水位TLWLまたは第2低水位LWLになっても揚砂ポンプ61を停止しないで、その停止の代わりに給水ポンプ33がくみ上げた流体に加えて他の設備に蓄えられた流体を沈砂池2に供給するように構成してもよい。この様に構成した場合、他の設備に蓄えられた流体は、第2高水位THWLまたは第3高水位HWLになったら沈砂池2への供給を停止すればよい。揚砂ポンプ61が停止と駆動を繰り返す回数を減らすことで、揚砂ポンプ61の劣化を抑制して寿命を延ばすことができる。 In this embodiment, when the sand removal operation described above is being performed, the sand lifting pump 61 is set to pump a slightly larger amount of fluid than the water supply pump 33. Therefore, the sand lifting pump 61 will repeatedly stop and restart multiple times during the removal operation. However, if the sand lifting pump 61 is repeatedly started and stopped, the inrush current at the start of operation shortens the pump's lifespan. To address this issue, the pumping capacity of the water supply pump 33 and the sand lifting pump 61 may be made similar to minimize changes in water level during the sand removal operation. Furthermore, when the water level sensor 99 detects a drop to the first intermediate water level TMWL in operation mode A or the second intermediate water level MWL in operation mode B, additional fluid may be discharged from other nozzles in addition to the nozzles currently discharging fluid. Increasing the number of nozzles discharging fluid reduces the load (throttle resistance) on the fluid flow, increasing the amount of fluid pumped by the water supply pump 33. As a result, more fluid can be supplied to the settling basin 2. This reduces the likelihood of the first low water level TLWL or the second low water level LWL occurring, thereby reducing the number of times the sand lifting pump 61 must be stopped and restarted. The other nozzle is preferably a sand collection nozzle 91 attached to the nozzle header scheduled to discharge next. Discharging fluid from the nozzle header scheduled to discharge next allows for preliminary flushing of sand from the bottom surface 71 and small trough 72 to be discharged next, further reducing the amount of sand remaining. The additional fluid discharged may be fluid stored in another facility. Furthermore, instead of stopping the sand lifting pump 61 when the first low water level TLWL or the second low water level LWL occurs, a configuration may be adopted in which fluid stored in another facility is supplied to the settling basin 2 in addition to the fluid pumped by the feedwater pump 33. In this configuration, the supply of fluid stored in another facility to the settling basin 2 can be stopped when the second high water level THWL or the third high water level HWL occurs. By reducing the number of times the sand pump 61 is stopped and started repeatedly, deterioration of the sand pump 61 can be suppressed, extending its lifespan.
ところで、本実施形態では、吐出口911を沈砂池2の池底部近傍に配置している。これに対し、例えば特開2011-245391には、吐出口911を備える集砂手段9を沈砂池2の上側部分に配置し、側壁Wに向かって流体を吐出し、その側壁Wの壁面を流体が流下するようにした沈砂池2が提案されている。 In this embodiment, the discharge port 911 is located near the bottom of the settling basin 2. In contrast, for example, Japanese Patent Application Laid-Open No. 2011-245391 proposes a settling basin 2 in which a sand collection means 9 equipped with a discharge port 911 is located in the upper part of the settling basin 2, and fluid is discharged toward the side wall W so that it flows down the surface of the side wall W.
図12は、沈砂池の上側部分に集砂手段を配置した場合と沈砂池の池底部近傍に集砂手段を配置した場合を示す図5と同様の沈砂池の断面図である。この図12では、沈砂池の上側部分に配置された集砂手段は二点鎖線で示されている。また、配管および側壁を示す線のうち、沈砂池の上側部分に配置された集砂手段と交差する線は、その交差した部分を省略して示している。 Figure 12 is a cross-sectional view of a sedimentation basin similar to Figure 5, showing cases where a sand collection means is placed in the upper part of the sedimentation basin and cases where a sand collection means is placed near the bottom of the sedimentation basin. In Figure 12, the sand collection means placed in the upper part of the sedimentation basin is shown with a two-dot chain line. Furthermore, of the lines showing the piping and side walls, the lines that intersect with the sand collection means placed in the upper part of the sedimentation basin are shown with the intersecting portions omitted.
図12には、沈砂池2の上側部分に、仮想の上側ノズルヘッダ90が示されている。この上側ノズルヘッダ90は、第1ノズルヘッダ9aの代わりに用いられるものである。沈砂池2の上流端には、斜めに起立した除塵機5が配置されている。集砂手段9は、除塵機5に干渉しないように配置する必要がある。従って、沈砂池2の上側部分に配置される上側ノズルヘッダ90は、図12に示すように沈砂池2の池底部近傍に配置する場合と比較して下流側に位置することになる。つまり、上側ノズルヘッダ90は、第1ノズルヘッダ9aよりも、距離Sだけ下流側に配置せざるを得ない。上述したように、除塵機5を構成する無端チェーン51および濾過スクリーン53の上側部分は、底平面71および主トラフ8と長手方向において重複している。このため、上側ノズルヘッダ90から流体を吐出しても、底平面71のうち、最上流側の部分には吐出した流体が到達しない部分が発生してしまう。除塵機5および上側ノズルヘッダ90を、図5や図12に示した位置よりも距離S分だけ上流側に配置すれば、底平面71の最上流側の部分まで流体を到達させることができる。しかし、その配置では沈砂池2の長手方向の長さが長くなってしまう。その結果、沈砂池2が大型化して沈砂池2の設置に大きな土地が必要になる上に、沈砂池2が高価になってしまう。本実施形態の沈砂池2は、第1ノズルヘッダ9aを沈砂池2の池底部近傍に配置しているので、沈砂池2の上側部分に配置した上側ノズルヘッダ90を用いる場合と比較して、沈砂池2の大型化を抑制し、沈砂池2を安価に提供できるといった効果がある。 Figure 12 shows a virtual upper nozzle header 90 in the upper portion of the settling basin 2. This upper nozzle header 90 is used in place of the first nozzle header 9a. A dust collector 5 is located at an angle at the upstream end of the settling basin 2. The sand collection means 9 must be positioned so as not to interfere with the dust collector 5. Therefore, the upper nozzle header 90 located in the upper portion of the settling basin 2 is located downstream compared to when it is located near the bottom of the settling basin 2, as shown in Figure 12. In other words, the upper nozzle header 90 must be located downstream by a distance S from the first nozzle header 9a. As described above, the upper portions of the endless chain 51 and the filter screen 53 that constitute the dust collector 5 overlap longitudinally with the bottom plane 71 and the main trough 8. Therefore, even when fluid is discharged from the upper nozzle header 90, there will be a portion of the bottom plane 71 that the discharged fluid does not reach at the most upstream portion of the bottom plane 71. If the dust collector 5 and upper nozzle header 90 are positioned a distance S upstream from the positions shown in Figures 5 and 12, the fluid can reach the most upstream part of the bottom plane 71. However, this positioning increases the longitudinal length of the settling basin 2. As a result, the settling basin 2 becomes larger, requiring a large amount of land to install it, and becoming expensive. In the settling basin 2 of this embodiment, the first nozzle header 9a is positioned near the bottom of the settling basin 2, which prevents the settling basin 2 from becoming larger and allows the settling basin 2 to be provided at a lower cost than when an upper nozzle header 90 is positioned in the upper part of the settling basin 2.
次に、接続面73の変形例について説明する。以下に説明する変形例においては、図1~図11に示した実施形態との相違点を中心に説明し、図1~図11に示した実施形態における構成要素の名称と同じ名称の構成要素には、これまで用いた符号を付して説明し、重複する説明は省略する。 Next, we will explain modified examples of the connection surface 73. In the modified examples described below, we will focus on the differences from the embodiment shown in Figures 1 to 11. Components with the same names as those in the embodiment shown in Figures 1 to 11 will be described using the same reference numerals as before, and duplicate explanations will be omitted.
図13は、接続面の変形例を示す図3と同様の断面図である。 Figure 13 is a cross-sectional view similar to Figure 3, showing a modified connection surface.
この変形例では、接続面73を曲面にで形成している点が、図3に示された例と異なる。接続面73は、長手方向に沿って延在する稜線部731と、第1接続面732と、第2接続面733とで構成されている。図13に示すように、第1接続面732および第2接続面733は、1/4円の断面形状をしている。つまり、接続面73は、全体として上側に突出した半円柱形状の表面で構成されている。稜線部731は、その半円柱形状の上端の線で構成されている。この変形例においても、図3に示された例と同様に、沈砂池2内の汚水の中を接続面73に沈降してくる砂が、その自重により接続面73から滑り落ちやすい。ただし、稜線部731付近では、接続面73の接平面における傾斜角度が緩くなってしまうので、その付近では砂が残留してしまう虞がある。一方、接続面73を構成するコンクリートの池幅方向の厚みが稜線部731の近傍部分でも厚いので、稜線部731部分が欠損しにくいという効果がある。なお、第1接続面732と第2接続面733のうちの一方を図3に示された例のように平面状に形成し、他方を図13に示された変形例のように曲面状に形成してもよい。さらに、第1接続面732と第2接続面733の一方または両方を、曲面と平面が複合した面に形成してもよい。 This modified example differs from the example shown in Figure 3 in that the connection surface 73 is formed as a curved surface. The connection surface 73 is composed of a ridge portion 731 extending along the longitudinal direction, a first connection surface 732, and a second connection surface 733. As shown in Figure 13, the first connection surface 732 and the second connection surface 733 have a cross-sectional shape of a quarter circle. In other words, the connection surface 73 is composed of a semi-cylindrical surface that protrudes upward as a whole. The ridge portion 731 is composed of the line at the top end of the semi-cylindrical shape. In this modified example, as in the example shown in Figure 3, sand that settles to the connection surface 73 in the wastewater in the grit basin 2 easily slides off the connection surface 73 due to its own weight. However, near the ridge portion 731, the inclination angle of the tangent plane of the connection surface 73 becomes gentle, which may result in sand remaining in that area. On the other hand, because the thickness of the concrete making up connection surface 73 in the pond width direction is thick even in the vicinity of ridge line 731, there is the effect that ridge line 731 is less likely to be damaged. One of first connection surface 732 and second connection surface 733 may be formed flat as in the example shown in Figure 3, and the other may be formed curved as in the modified example shown in Figure 13. Furthermore, one or both of first connection surface 732 and second connection surface 733 may be formed as a surface that combines curved and flat surfaces.
次いで集砂手段9の変形例について説明する。 Next, we will explain modified examples of the sand collection means 9.
図14(a)は、図8に示す供給管と集砂ノズルの第1変形例を示す図であり、図14(b)は、図8に示す供給管と集砂ノズルの第2変形例を示す図である。 Figure 14(a) is a diagram showing a first modified example of the supply pipe and sand collection nozzle shown in Figure 8, and Figure 14(b) is a diagram showing a second modified example of the supply pipe and sand collection nozzle shown in Figure 8.
この第1変形例は、供給管92にラップジョイント934が配置されておらず、供給管92と分岐管932とがフランジ結合されている点と、集砂ノズル91に球継手912を設けている点が図8(a)に示した例と異なる。図14(a)では、凸壁部Wa1に対応した集砂ノズル91が実線で示されており、凹み壁部Wa2に対応した集砂ノズル91が二点鎖線で示されている。この変形例では、供給管92と各吐出口911の間に球継手912が設けられている。この球継手912により、供給管92の軸線を中心とした回転方向だけでなく、それ以外の様々な方向にも流体の吐出方向を無段階に変更できる。従って、吐出口911毎に吐出方向のきめ細かい調整が可能になる。なお、供給管92にラップジョイント934を配置し、さらに集砂ノズル91に球継手912を設けてもよい。この場合、ラップジョイント934は、一括変更手段の一例に相当し、球継手912は、個別方向変更手段の一例に相当する。 This first variant differs from the example shown in Figure 8(a) in that the supply pipe 92 does not have a lap joint 934; the supply pipe 92 and the branch pipe 932 are flange-connected; and the sand collection nozzle 91 is provided with a ball joint 912. In Figure 14(a), the sand collection nozzle 91 corresponding to the convex wall portion Wa1 is shown in solid lines, and the sand collection nozzle 91 corresponding to the concave wall portion Wa2 is shown in dashed double-dashed lines. In this variant, ball joints 912 are provided between the supply pipe 92 and each discharge port 911. These ball joints 912 allow the fluid discharge direction to be continuously changed not only in the rotational direction around the axis of the supply pipe 92, but also in various other directions. This allows for fine adjustment of the discharge direction for each discharge port 911. Alternatively, a lap joint 934 may be provided on the supply pipe 92, and a ball joint 912 may also be provided on the sand collection nozzle 91. In this case, the lap joint 934 corresponds to an example of a collective direction changing means, and the ball joint 912 corresponds to an example of an individual direction changing means.
第2変形例では、供給管92にラップジョイント934が配置されておらず、供給管92と分岐管932とがフランジ結合されている点と、供給管92の周方向に集砂ノズル91の装着部924が複数形成されている点が図8(a)に示した例と異なる。図14(b)では、凸壁部Wa1に対応した集砂ノズル91が実線で示されており、凹み壁部Wa2に対応した集砂ノズル91が二点鎖線で示されている。この変形例では、集砂ノズル91の装着部924が供給管92の周方向に6か所形成されている。これにより、供給管92を分岐管932に固定した後に、6か所の装着部924のうちから任意の装着部924に集砂ノズル91を装着できる。なお、集砂ノズル91装着前は、全ての装着部924に栓部材が取り付けられている。集砂ノズル91を装着する場合は、その栓部材を取り除いてから集砂ノズル91を装着する。なお、供給管92にラップジョイント934を配置し、さらに供給管92に装着部924を形成してもよい。この場合、ラップジョイント934は、一括変更手段の一例に相当し、装着部924は、個別方向変更手段の一例に相当する。なお、この変形例では、装着部924を周方向に6か所形成しているが、この装着部924は、2か所以上5か所以下でもよく、7か所以上でもよい。 The second modified example differs from the example shown in Figure 8(a) in that the supply pipe 92 does not have a lap joint 934. Instead, the supply pipe 92 and the branch pipe 932 are flange-connected. Additionally, multiple attachment points 924 for the sand collection nozzle 91 are formed around the supply pipe 92. In Figure 14(b), the sand collection nozzle 91 corresponding to the convex wall portion Wa1 is indicated by a solid line, and the sand collection nozzle 91 corresponding to the concave wall portion Wa2 is indicated by a two-dot chain line. In this modified example, six attachment points 924 for the sand collection nozzle 91 are formed around the supply pipe 92. This allows the sand collection nozzle 91 to be attached to any of the six attachment points 924 after the supply pipe 92 is fixed to the branch pipe 932. Before the sand collection nozzle 91 is attached, plugs are attached to all of the attachment points 924. To attach the sand collection nozzle 91, the plugs are removed before the sand collection nozzle 91 is attached. Alternatively, a lap joint 934 may be disposed on the supply pipe 92, and mounting portions 924 may also be formed on the supply pipe 92. In this case, the lap joint 934 corresponds to an example of a collective direction changing means, and the mounting portions 924 correspond to an example of an individual direction changing means. In this modification, six mounting portions 924 are formed around the circumference, but the number of mounting portions 924 may be two to five or more, or seven or more.
次に、主トラフ8、各覆い部材13,14,15、および底平面71の変形例について説明する。 Next, we will explain modified examples of the main trough 8, each cover member 13, 14, 15, and the bottom surface 71.
図15は、主トラフ、覆い部材、および底平面の変形例を示す図5と同様の断面図である。 Figure 15 is a cross-sectional view similar to Figure 5, showing modified versions of the main trough, cover member, and bottom surface.
この変形例では主トラフ8、各覆い部材13,14,15、および底平面71を集砂ピット6に向けて下方に傾斜させて配置している点が、図5に示された例と異なる。なお、図15では、傾斜を分かりやすく示すため、主トラフ8、各覆い部材13,14,15、および底平面71の傾斜を誇張して示している。図15に示すように、底平面71は、集砂ピット6に向かって集砂ピット6側端部が最も深くなるように長手方向に向かって下方に約0.5度傾斜している。また、上流側第1主トラフ815および下流側主トラフ82も、底平面71と同様に集砂ピット6に向かうにしたがって下方に約0.5度傾斜しており、集砂ピット6に接続した部分が最も深くなっている。さらに、第1覆い部材13および第3覆い部材15も、集砂ピット6に向かうにしたがって下方に約0.5度傾斜しており、集砂ピット6に接続した部分が最も深くなっている。なお、図15に図示されていない上流側第1主トラフ815および第2覆い部材14も、同様に集砂ピット6に向かうにしたがって下方に約0.5度傾斜している。この変形例では、各覆い部材13,14,15を設けることで、主トラフ8内の砂の搬送力を高めるだけでなく、主トラフ8および各覆い部材13,14,15を傾斜させることで各覆い部材13,14,15内に吐出された流体の流れが補助される。これにより、主トラフ8に堆積した砂をより長い距離搬送することができる。なお、主トラフ8の長さに合わせて、傾斜角度は適宜設定すればよい。 This modified example differs from the example shown in Figure 5 in that the main trough 8, each cover member 13, 14, 15, and bottom surface 71 are arranged at an inclination downward toward the sand collection pit 6. Note that in Figure 15, the inclination of the main trough 8, each cover member 13, 14, 15, and bottom surface 71 is exaggerated to clearly illustrate the inclination. As shown in Figure 15, the bottom surface 71 is inclined downward by approximately 0.5 degrees in the longitudinal direction toward the sand collection pit 6, so that the end toward the sand collection pit 6 is the deepest. Similarly to the bottom surface 71, the upstream first main trough 815 and the downstream main trough 82 are also inclined downward by approximately 0.5 degrees toward the sand collection pit 6, with the deepest portions connected to the sand collection pit 6. Furthermore, the first cover member 13 and the third cover member 15 are also inclined downward by approximately 0.5 degrees toward the sand collection pit 6, with the deepest portions connected to the sand collection pit 6. The upstream first main trough 815 and second cover member 14, not shown in Figure 15, are also similarly inclined downward by approximately 0.5 degrees toward the sand collection pit 6. In this modification, the provision of each cover member 13, 14, 15 not only increases the sand transport force within the main trough 8, but also assists the flow of fluid discharged into each cover member 13, 14, 15 by inclining the main trough 8 and each cover member 13, 14, 15. This allows sand accumulated in the main trough 8 to be transported a longer distance. The inclination angle can be set appropriately to match the length of the main trough 8.
図16は、図15に示す変形例における、沈砂池の上流側端部近傍の底平面と集砂ピット近傍の底平面とを示した図8(a)と同様の断面図である。この図16では側壁および底平面も示されている。 Figure 16 is a cross-sectional view similar to Figure 8(a), showing the bottom surface near the upstream end of the settling basin and the bottom surface near the sand collection pit in the modified example shown in Figure 15. Figure 16 also shows the side walls and bottom surface.
図16は、図15に示すように集砂ピット6側端部が最も深くなるように集砂ピット6側に向かって底平面71を下方に傾斜させた場合の、底平面71の高さ方向の位置の相違を示している。図16では、沈砂池2の上流側端部近傍の底平面71は実線で示されており、集砂ピット6近傍の底平面71は二点鎖線で示されている。図16に示すように、この場合は沈砂池2の上流側端部近傍の底平面71よりも、集砂ピット6近傍の方が低い位置に底平面71が存在している。同図に示されているように、同一の位置にある吐出口911から流体を吐出したとしても、沈砂池2の上流側端部と集砂ピット6近傍では、底平面71の高さ方向の位置が異なるので、吐出した流体の底平面71への到達点に距離Yの違いが発生してしまう。特に長手方向の長さが長い沈砂池2では、距離Yが長くなってしまい、沈砂池2の上流側端部と集砂ピット6近傍の一方に最適な吐出方向でも他方には非効率的な吐出方向になってしまうことがある。本実施形態では、吐出口911からの流体の吐出方向を変更することができるので、底平面71の高さ(供給管92から底平面71までの距離)に対応させて最適な吐出方向に流体を吐出することができる。 Figure 16 shows the difference in the height position of the bottom plane 71 when the bottom plane 71 is tilted downward toward the sand collection pit 6 so that the end of the sand collection pit 6 is the deepest, as shown in Figure 15. In Figure 16, the bottom plane 71 near the upstream end of the settling basin 2 is shown in solid lines, and the bottom plane 71 near the sand collection pit 6 is shown in dashed two-dot lines. As shown in Figure 16, in this case, the bottom plane 71 near the sand collection pit 6 is lower than the bottom plane 71 near the upstream end of the settling basin 2. As shown in the figure, even if fluid is discharged from the same outlet 911, the height position of the bottom plane 71 differs between the upstream end of the settling basin 2 and near the sand collection pit 6, resulting in a difference in distance Y between the point where the discharged fluid reaches the bottom plane 71. In particular, in a settling basin 2 with a long longitudinal length, distance Y becomes long, and an optimal discharge direction either near the upstream end of the settling basin 2 or near the sand collection pit 6 may be an inefficient discharge direction for the other. In this embodiment, the direction in which the fluid is ejected from the ejection port 911 can be changed, allowing the fluid to be ejected in the optimal direction according to the height of the bottom surface 71 (the distance from the supply pipe 92 to the bottom surface 71).
次に、主トラフ8の高さを高くした場合の変形例について説明する。 Next, we will explain a modified example in which the height of the main trough 8 is increased.
図17は、主トラフの高さ高くした場合の水位の検出例を示す図10と同様の説明図である。 Figure 17 is an explanatory diagram similar to Figure 10, showing an example of water level detection when the height of the main trough is increased.
図10に示した例では、各覆い部材13,14,15は、主トラフ8の高さの半分を超える高さに形成されていた。そして、各覆い部材13,14,15の上端位置13bは、小トラフ72の下端72b(主トラフ8の上端8b)とほぼ同じ位置であった。上述したように、揚砂ポンプ61の動作モードAは、各覆い部材13,14,15が水中に没した状態を維持する制御モードであるため、各覆い部材13,14,15の上端位置13bよりも上に第1低水位TLWLを設定する必要がある。また、揚砂ポンプ61の動作モードBは、水位が小トラフ72の下端72bよりも下になるように維持された状態にする制御モードであるため、小トラフ72の下端72bよりも下に第3高水位HWLを設定する必要がある。図10に示した例では、上端位置13bの上に第1低水位TLWLを設定し、下端72bよりも下に第3高水位HWLを設定するという条件を満たすために、第1低水位TLWLよりも下に第3高水位HWLを設定せざるを得ない。これにより、動作モードAと動作モードBでの水位の維持範囲に重複がなくなり、一方のモードから他方のモードに切り替えた際に、水位が他方モードの範囲内に入るまで、待機時間が発生していた。図17に示すように、主トラフ8の高さを高くし、主トラフ8の下側部分に各覆い部材13,14,15を配置した場合は、各覆い部材13,14,15の上端位置13bは、小トラフ72の下端72bよりも下方に位置する。従って、上記条件を満たしたとしても、第1低水位TLWLよりも上に第3高水位HWLを設定することができる。すなわち、動作モードAでの水位の範囲D1の一部と動作モードBでの水位の範囲D2の一部を重複させることができので、モード切替後の待機時間を削除または削減できる。 In the example shown in Figure 10, each cover member 13, 14, 15 was formed at a height exceeding half the height of the main trough 8. The upper end position 13b of each cover member 13, 14, 15 was approximately the same position as the lower end 72b of the small trough 72 (the upper end 8b of the main trough 8). As described above, operating mode A of the sand lifting pump 61 is a control mode that maintains each cover member 13, 14, 15 submerged in water, so the first low water level TLWL must be set above the upper end position 13b of each cover member 13, 14, 15. Furthermore, operating mode B of the sand lifting pump 61 is a control mode that maintains the water level below the lower end 72b of the small trough 72, so the third high water level HWL must be set below the lower end 72b of the small trough 72. In the example shown in Figure 10, in order to satisfy the condition of setting the first low water level TLWL above the upper end position 13b and the third high water level HWL below the lower end 72b, the third high water level HWL must be set below the first low water level TLWL. This eliminates overlap between the water level maintenance ranges in operation mode A and operation mode B, and when switching from one mode to the other, a waiting time occurs until the water level falls within the range of the other mode. As shown in Figure 17, if the height of the main trough 8 is increased and the cover members 13, 14, and 15 are placed below the main trough 8, the upper end positions 13b of the cover members 13, 14, and 15 are located below the lower end 72b of the small trough 72. Therefore, even if the above condition is satisfied, the third high water level HWL can be set above the first low water level TLWL. In other words, part of the water level range D1 in operation mode A and part of the water level range D2 in operation mode B can overlap, eliminating or reducing the waiting time after switching modes.
本発明は上述の実施形態や変形例に限られることなく特許請求の範囲に記載した範囲で種々の変形を行うことが出来る。たとえば、本実施形態では、下水および雨水が流入してくる汚水処理施設1の沈砂池2に本発明を用いているが、雨水のみが流入してくる雨水処理設備の沈砂池にも適用できる。また、本実施形態では、集砂ピット6よりも上流側の底平面71および小トラフ72に堆積した砂を流した後に、集砂ピット6よりも下流側の底平面71および小トラフ72に堆積した砂を流しているが、先に下流側の底平面71および小トラフ72に堆積した砂を流してもよい。また、本実施形態では、除塵機5および突出壁10を沈砂池2の上流側端部に配置した例を示したが、除塵機5および突出壁10を沈砂池2の下流側端部に配置してもよい。除塵機5および突出壁10を沈砂池2の下流側端部に配置した場合、下流側主トラフ82を2つ設け、その突出壁10対して左側壁Wa側と右側壁Wb側にそれぞれに配置すればよい。そして、それら2つの下流側主トラフ82の間であって、その突出壁10が設けられた領域を除いた部分に、稜線部と第1接続面と第2接続面とを形成すればよい。また、本実施形態では、主トラフ8の、集砂ピット6とは反対側の端部(先端部分)に、搬送空間FSに流体を吐出する吐出口を1つづつ設けたが、各覆い部材13,14,15延在方向の中間位置等に吐出口を有するノズルを追加で設けてもよい。特に、各覆い部材13,14,15の延在方向の長さが長い場合または流体の吐出圧が低い場合には、中間位置等にノズルを追加することが望ましい。また、本実施形態では、各覆い部材13,14,15が水中に完全に没した状態で、搬送空間FSに流体を吐出したが、各覆い部材13,14,15内の一部が水中に没していれば、搬送空間FS内に大気が残存している状態で流体を吐出してもよい。また、本実施形態では、トラフ第1吐出口831a、トラフ第2吐出口832a、またはトラフ第3吐出口84aが完全に水中に没した状態で流体を吐出したが、それらの吐出口831a,832a,84aの一部が水中に没し、残りの部分が大気中に露出した状態で流体を吐出させてもよい。ただし、これらの場合、特に大気と水との界面部分で吐出した流体の流れに損失が発生する。従って、各覆い部材13,14,15とトラフ第1吐出口831a、トラフ第2吐出口832a、トラフ第3吐出口84aが完全に水中に没した状態で、それらの吐出口831a,832a,84aから流体を吐出することが望ましい。 The present invention is not limited to the above-described embodiments and modifications, and various modifications can be made within the scope of the claims. For example, in this embodiment, the present invention is applied to the settling basin 2 of a sewage treatment facility 1 into which sewage and rainwater flow, but it can also be applied to the settling basin of a stormwater treatment facility into which only rainwater flows. Furthermore, in this embodiment, sand accumulated on the bottom plane 71 and small trough 72 upstream of the sand collection pit 6 is flushed out before sand accumulated on the bottom plane 71 and small trough 72 downstream of the sand collection pit 6 is flushed out. However, sand accumulated on the bottom plane 71 and small trough 72 downstream may be flushed out first. Furthermore, in this embodiment, the dust collector 5 and protruding wall 10 are disposed at the upstream end of the settling basin 2, but the dust collector 5 and protruding wall 10 may also be disposed at the downstream end of the settling basin 2. When the dust collector 5 and the protruding wall 10 are disposed at the downstream end of the settling basin 2, two downstream main troughs 82 may be provided, one on the left wall Wa side and one on the right wall Wb side of the protruding wall 10. The ridge portion, the first connecting surface, and the second connecting surface may be formed between the two downstream main troughs 82, excluding the area where the protruding wall 10 is disposed. In this embodiment, each of the main troughs 8 has one outlet for discharging fluid into the transfer space FS at the end (tip) opposite the sand collection pit 6. However, additional nozzles with outlets may be provided at intermediate positions in the extension direction of each of the cover members 13, 14, and 15. In particular, when the length of each cover member 13, 14, and 15 in the extension direction is long or the fluid discharge pressure is low, it is desirable to add a nozzle at an intermediate position. In this embodiment, the fluid is discharged into the transfer space FS with the cover members 13, 14, and 15 completely submerged in water. However, if a portion of each cover member 13, 14, and 15 is submerged in water, the fluid may be discharged while the atmosphere remains in the transfer space FS. In this embodiment, the fluid is discharged while the first trough outlet 831a, the second trough outlet 832a, or the third trough outlet 84a is completely submerged in water. However, the fluid may be discharged while a portion of each outlet 831a, 832a, and 84a is submerged in water and the remaining portion is exposed to the atmosphere. However, in these cases, loss occurs in the flow of the discharged fluid, especially at the interface between the atmosphere and water. Therefore, it is desirable to discharge fluid from the trough first outlet 831a, trough second outlet 832a, and trough third outlet 84a when each cover member 13, 14, and 15 and each outlet 831a, 832a, and 84a are completely submerged in water.
本実施形態またはその変形例によれば、砂を効率的に集砂できる。また、底平面71、小トラフ72、および接続面73に堆積した砂を残留させることなく流体で流すことができる。また、左側壁Waまたは右側壁Wbが直線状に形成されていない沈砂池でも、直線状の供給管92を用いることができるので、沈砂池2を安価に提供できる。加えて、沈砂池2の設計時や供給管92の作成時に側壁Wの形状が不明でも、沈砂池2を施工する際に吐出方向を調整することができるので、様々な形状の沈砂池2に柔軟に対応できる。さらに、接続面73に沈降した砂は、第1接続面732又は第2接続面733を滑り落ちて上流側第1主トラフ815又は上流側第2主トラフ816に堆積するので、上流側第1主トラフ815および上流側第2主トラフ816の間に砂が残留してしまうことがない。また、本実施形態では、第1底面711および第2底面712の傾斜角度は、堆積した砂を吐出口911から吐出される流体で流すことができる程度の緩い傾斜角度(約5度)にしている。これにより、地面を深く掘り下げなくても沈砂池2を作成できる。一方、第1底面711および第2底面712よりも接続面73を急角度にすることで、吐出口911から吐出される流体が接続面73に到達しない構成であるにも関わらず、接続面73に沈降してきた砂を上流側第1主トラフ815または上流側第2主トラフ816に堆積させることができる。 According to this embodiment or its modified examples, sand can be efficiently collected. Furthermore, sand accumulated on the bottom surface 71, small trough 72, and connecting surface 73 can be washed away by fluid without remaining behind. Furthermore, a straight supply pipe 92 can be used even in a settling basin whose left side wall Wa or right side wall Wb is not formed in a straight line, allowing for the provision of a settling basin 2 at low cost. Furthermore, even if the shape of the side wall W is unknown when designing the settling basin 2 or constructing the supply pipe 92, the discharge direction can be adjusted during construction, allowing for flexible adaptation to settling basins 2 of various shapes. Furthermore, sand that settles on the connecting surface 73 slides down the first connecting surface 732 or the second connecting surface 733 and is deposited in the upstream first main trough 815 or the upstream second main trough 816. Therefore, sand does not remain between the upstream first main trough 815 and the upstream second main trough 816. Furthermore, in this embodiment, the inclination angle of the first bottom surface 711 and the second bottom surface 712 is gentle enough (approximately 5 degrees) to allow the accumulated sand to be washed away by the fluid discharged from the discharge port 911. This makes it possible to create the settling basin 2 without digging deep into the ground. On the other hand, by making the connecting surface 73 at a steeper angle than the first bottom surface 711 and the second bottom surface 712, even though the fluid discharged from the discharge port 911 is configured not to reach the connecting surface 73, sand that has settled on the connecting surface 73 can be deposited in the upstream first main trough 815 or the upstream second main trough 816.
また、沈砂池2は、長手方向の長さが20メートル以上に達するものも多い。従来の沈砂池2では、主トラフ8は、集砂ピット6側に向かって下方に例えば1度傾斜させていた。このため、主トラフ8の池端側端部(先端部分)が配置される深さ位置に対し、集砂ピット6側端部(後端部分)は沈砂池2の長さに比例した、より深い位置に配置される。また、底平面71は主トラフ8と同一の傾斜角度で形成されるので、底平面71も同様に、集砂ピット6側が深い位置に配置される。沈砂池2の長手方向の長さが長い場合、主トラフ8および底平面71における集砂ピット6側部分は、沈砂池2の長手方向の長さが短い場合と比較してよりいっそう深い位置に配置されることになる。沈砂池2を施工する場合、沈砂池2の最も深い位置よりも下まで地面を掘り下げ、その後にコンクリートで沈砂池2を形作っていく。主トラフ8および底平面71が傾斜していると、傾斜していない場合と比較して集砂ピット6を深い位置に配置することになるため、地面を深く掘り下げる必要があり、掘り下げ工事に手間がかかる。また、掘り下げた位置からコンクリートで底平面71を形作る際に、底平面71に傾斜をつけるために集砂ピット6側から沈砂池の端部に向かって徐々にコンクリートを厚くしていく必要があり、コンクリートを大量に使用していた。これらにより、沈砂池2が高価になってしまうという問題があった。本実施形態では、覆い部材13,14,15を設けて集砂効率を高めているので、主トラフ8および底平面71の傾斜角度を緩くしても、主トラフ8内の砂を集砂ピット6に搬送できる。この傾斜角度は、0度以上1度未満が好ましく、0度以上0.5度以下がより好ましい。傾斜角度を緩くすることので、地面を深く掘り下げる必要がなく、コンクリートの使用量も少なくてすむので、沈砂池2を安価に作成できる。 Furthermore, many settling basins 2 have longitudinal lengths of 20 meters or more. In conventional settling basins 2, the main trough 8 is inclined downward, for example, by 1 degree toward the sand collection pit 6. Therefore, the end of the main trough 8 on the side of the pond edge (leading end) is positioned at a depth proportional to the length of the settling basin 2, while the end on the side of the sand collection pit 6 (rear end) is positioned at a depth proportional to the length of the settling basin 2. Furthermore, because the bottom plane 71 is formed at the same inclination angle as the main trough 8, the bottom plane 71 is also positioned at a deeper position on the side of the sand collection pit 6. When the longitudinal length of the settling basin 2 is long, the portions of the main trough 8 and bottom plane 71 on the side of the sand collection pit 6 are positioned at a deeper position than when the longitudinal length of the settling basin 2 is short. When constructing the settling basin 2, the ground is excavated below the deepest point of the settling basin 2, and then the settling basin 2 is shaped with concrete. If the main trough 8 and bottom plane 71 are inclined, the sand collection pit 6 is located deeper than if it were not inclined, which requires digging deeper into the ground, making the excavation work more time-consuming. Furthermore, when forming the bottom plane 71 from the excavated position with concrete, the concrete must be gradually thickened from the sand collection pit 6 toward the end of the settling basin to create the slope of the bottom plane 71, resulting in the use of a large amount of concrete. These factors result in the high cost of the settling basin 2. In this embodiment, the covering members 13, 14, and 15 are provided to improve sand collection efficiency, allowing sand in the main trough 8 to be transported to the sand collection pit 6 even if the inclination angle of the main trough 8 and bottom plane 71 is gentle. This inclination angle is preferably between 0 degrees and less than 1 degree, and more preferably between 0 degrees and 0.5 degrees. The gentle inclination angle eliminates the need to dig deeper into the ground and reduces the amount of concrete used, allowing the settling basin 2 to be constructed inexpensively.
本実施形態の沈砂池からは、以下の発明概念も抽出できる。 The following inventive concepts can also be extracted from the settling tank of this embodiment.
受け入れた水に含まれている砂が沈降する沈砂池において、
側壁よりも下方になる池底部に設けられ、所定方向に延在した溝と、
前記池底部に設けられ、前記溝に接続した底面と、
前記底面に沈降した砂を前記側壁側から前記溝に向かって流すための流体を吐出する複数の吐出口と、
前記吐出口が設けられた供給管とを有し、
前記複数の吐出口には、該吐出口が設けられた前記供給管の軸線よりも池幅方向中央側に向かって流体を吐出するものと、該供給管の軸線よりも池幅方向外側に向かって流体を吐出するものとがあることを特徴とする沈砂池。
In a settling basin where sand contained in the received water settles,
A groove provided in the bottom of the pond below the side wall and extending in a predetermined direction;
a bottom surface provided at the bottom of the pond and connected to the groove;
a plurality of discharge ports that discharge a fluid for causing the sand that has settled on the bottom surface to flow from the side wall toward the groove;
a supply pipe provided with the discharge port,
A sedimentation basin characterized in that the multiple discharge outlets include those that discharge fluid toward the center of the pond width direction relative to the axis of the supply pipe in which the discharge outlet is installed, and those that discharge fluid toward the outside of the pond width direction relative to the axis of the supply pipe.
また、本実施形態の沈砂池からは、以下の発明概念も抽出できる。 In addition, the following inventive concepts can be extracted from the settling basin of this embodiment.
受け入れた水に含まれている砂が沈降する沈砂池において、
側壁よりも下方になる池底部に設けられ、所定方向に延在した溝と、
前記池底部に設けられ、前記溝に接続した底面と、
前記底面に沈降した砂を前記側壁側から前記溝に向かって流すための流体を吐出する吐出口とを有し、
前記吐出口から吐出される流体の吐出方向を変更可能にしたことを特徴とする沈砂池。
In a settling basin where sand contained in the received water settles,
A groove provided in the bottom of the pond below the side wall and extending in a predetermined direction;
a bottom surface provided at the bottom of the pond and connected to the groove;
a discharge port that discharges a fluid for causing the sand that has settled on the bottom surface to flow from the side wall toward the groove,
A settling basin characterized in that the direction of fluid discharged from the discharge port is changeable.
この沈砂池において、
前記吐出口が設けられた供給管と、
前記供給管に流体を供給する母管とを有し、
前記供給管は、該供給管の軸線方向を中心として前記母管に対して回動可能なものであってもよい。
In this settling basin,
a supply pipe provided with the discharge port;
a header pipe for supplying a fluid to the supply pipe;
The supply pipe may be rotatable relative to the mother pipe around the axial direction of the supply pipe.
また、上記沈砂池において、
前記供給管は、複数の吐出口を備えたものであってもよい。
In addition, in the settling basin,
The supply pipe may have a plurality of outlets.
さらに、上記沈砂池において、
前記吐出口が設けられた供給管を有し、
前記吐出口は、前記供給管と該吐出口の間に配置された球継手によって流体の吐出方向を変更可能なものであってもよい。
Furthermore, in the settling basin,
a supply pipe provided with the discharge port,
The discharge port may be capable of changing the discharge direction of the fluid by means of a ball joint disposed between the supply pipe and the discharge port.
加えて、上記沈砂池において、
前記吐出口が着脱可能に設けられた供給管を有し、
前記供給管は、前記吐出口が装着される装着部を該供給管の周方向に複数有するものであってもよい。
In addition, in the settling basin,
a supply pipe provided with the discharge port in a detachable manner;
The supply pipe may have a plurality of attachment portions, to which the discharge ports are attached, in the circumferential direction of the supply pipe.
また、本実施形態の沈砂池からは、以下の発明概念も抽出できる。 In addition, the following inventive concepts can be extracted from the settling basin of this embodiment.
受け入れた水に含まれている砂が沈降する沈砂池において、
側壁よりも下方になる池底部に設けられ、所定方向に延在した溝と、
前記池底部に設けられ、前記溝に接続した底面と、
前記底面に沈降した砂を前記側壁側から前記溝に向かって流すための流体を吐出する吐出口と
前記側壁よりも池幅方向中央側に配置され、複数の前記吐出口が前記所定方向に並んだ供給管とを有し、
前記供給管は、前記側壁から池幅方向に第1間隔をあけて延在する第1領域と、該側壁から池幅方向に第2間隔をあけて延在する第2領域を有するものであり、
前記第1領域に配置された吐出口と前記第2領域に配置された吐出口とは、互いに独立して流体の吐出方向を変更可能であることを特徴とする沈砂池。
In a settling basin where sand contained in the received water settles,
A groove provided in the bottom of the pond below the side wall and extending in a predetermined direction;
a bottom surface provided at the bottom of the pond and connected to the groove;
a supply pipe arranged closer to the center of the pond width direction than the side wall, and a plurality of the discharge ports arranged in the predetermined direction;
the supply pipe has a first region extending from the side wall in the pond width direction at a first interval, and a second region extending from the side wall in the pond width direction at a second interval,
A sedimentation basin characterized in that the discharge direction of the fluid from the discharge outlet arranged in the first region and the discharge outlet arranged in the second region can be changed independently of each other.
前記第1領域に設けられた吐出口は複数であってもよいし1個であってもよい。前記第1領域に設けられた吐出口が複数である場合には、それらの吐出口からの流体の吐出方向をまとめて変更可能であることが好ましい。また、前記第2領域に設けられた吐出口も複数であってもよいし1個であってもよい。前記第2領域に設けられた吐出口が複数である場合にも、それらの吐出口からの流体の吐出方向をまとめて変更可能であることが好ましい。ここにいう「まとめて変更可能」とは、例えば、前記供給管のうちの、前記第1領域の部分と前記第2領域の部分とが、該供給管の軸線方向を中心として別個に回動することで実現される。加えて、前記供給管のうちの、前記第1領域の両端部分に回動可能部が設けられていてもよく、前記第2領域の両端部分に回動可能部が設けられていてもよい。なお、前記供給管は、直線状の管であってもよいし、多少曲がった部分が設けられた管であってもよい。 The first region may have a single or multiple outlets. If the first region has a multiple outlets, it is preferable that the discharge direction of the fluid from those outlets be changeable collectively. The second region may have a single or multiple outlets. If the second region has a multiple outlets, it is preferable that the discharge direction of the fluid from those outlets be changeable collectively. Here, "changeable collectively" refers to, for example, the first region portion and the second region portion of the supply pipe being able to rotate independently around the axial direction of the supply pipe. In addition, the supply pipe may have rotatable portions at both ends of the first region, and rotatable portions at both ends of the second region. The supply pipe may be a straight pipe or a pipe with a slightly curved portion.
前記供給管は、前記第1領域と前記第2領域をつなぐ第3領域が設けられたものであり、
前記第3領域に設けられた吐出口は、前記第1領域に設けられた吐出口および前記第2領域に設けられた吐出口とは別に、流体の吐出方向を変更可能であるものであってもよい。
the supply pipe is provided with a third region connecting the first region and the second region,
The ejection port provided in the third region may be capable of changing the ejection direction of the fluid, separately from the ejection port provided in the first region and the ejection port provided in the second region.
前記第3領域は、前記側壁との間隔が延在方向に、漸次変化する傾斜した領域であってもよいし、段階的に変化する領域であってもよい。 The third region may be an inclined region in which the distance from the side wall gradually changes in the extension direction, or may be a region in which the distance changes in steps.
また、前記第3領域に設けられた吐出口も複数であってもよいし1個であってもよい。前記第3領域に設けられた吐出口が複数である場合には、それらの吐出口からの流体の吐出方向もまとめて変更可能であることが好ましい。ここにいう「まとめて変更可能」とは、例えば、前記供給管のうちの、前記第3領域の部分が、前記第1領域の部分および前記第2領域の部分とは別に、該供給管の軸線方向を中心として回動することで実現される。 The third region may have multiple or single outlets. If the third region has multiple outlets, it is preferable that the direction of fluid discharge from these outlets be changeable collectively. Here, "changeable collectively" means, for example, that the third region portion of the supply pipe rotates around the axial direction of the supply pipe separately from the first region portion and the second region portion.
また、本実施形態の沈砂池からは、以下の発明概念も抽出できる。 In addition, the following inventive concepts can be extracted from the settling basin of this embodiment.
受け入れた水に含まれている砂が沈降する沈砂池において、
側壁よりも下方になる池底部に設けられ、所定方向に延在した溝と、
前記池底部に設けられ、前記溝に接続した底面と、
前記側壁に対向して配置され、前記底面に沈降した砂を該側壁側から前記溝に向かって流すための流体を吐出する複数の吐出口とを有し、
前記側壁は、池幅方向中央側に突出し前記所定方向に延在した凸壁部と該池幅方向外側に向かって凹み前記所定方向に延在した凹み壁部とを有するものであり、
前記吐出口は、前記凸壁部と前記凹み壁部それぞれに対向して配置されたものであり、
前記凸壁部に対向して配置された吐出口から吐出される流体の吐出方向に対して、前記凹み壁部に対向して配置された吐出口から吐出される流体の吐出方向を異なる方向に変更可能な方向変更手段を備えたことを特徴とする沈砂池。
In a settling basin where sand contained in the received water settles,
A groove provided in the bottom of the pond below the side wall and extending in a predetermined direction;
a bottom surface provided at the bottom of the pond and connected to the groove;
a plurality of discharge ports disposed opposite the side wall and discharging a fluid for causing the sand that has settled on the bottom surface to flow from the side wall toward the groove;
The side wall has a convex wall portion that protrudes toward the center in the pond width direction and extends in the predetermined direction, and a concave wall portion that is concave toward the outside in the pond width direction and extends in the predetermined direction,
the discharge ports are disposed opposite the convex wall portion and the concave wall portion,
A sedimentation basin characterized by being equipped with a direction change means that can change the discharge direction of a fluid discharged from an outlet arranged opposite the recessed wall portion to a different direction from the discharge direction of a fluid discharged from an outlet arranged opposite the convex wall portion.
さらに、本実施形態の沈砂池からは、以下の発明概念も抽出できる。 Furthermore, the following inventive concepts can be extracted from the settling basin of this embodiment.
受け入れた水に含まれている砂が沈降する沈砂池において、
側壁よりも下方になる池底部に設けられ、所定方向に延在した溝と、
前記池底部に設けられ、前記溝に接続した底面と、
前記側壁に対向して配置され、前記所定方向に延在した供給管と、
前記供給管に配置され、前記底面に沈降した砂を該側壁側から前記溝に向かって流すための流体を吐出する複数の吐出口とを有し、
前記側壁は、池幅方向中央側に突出し前記所定方向に延在した凸壁部と該池幅方向外側に向かって凹み前記所定方向に延在した凹み壁部とを有するものであり、
前記吐出口は、前記凸壁部に対向した位置と前記凹み壁部に対向した位置それぞれに配置されたものであり、
前記供給管は、前記凸壁部に対向した位置に配置された吐出口と、前記凹み壁部に対向した位置に配置された吐出口との間に、吐出口から吐出される流体の吐出方向を変更可能な方向変更手段を備えたものであることを特徴とする沈砂池。
In a settling basin where sand contained in the received water settles,
A groove provided in the bottom of the pond below the side wall and extending in a predetermined direction;
a bottom surface provided at the bottom of the pond and connected to the groove;
a supply pipe disposed opposite the side wall and extending in the predetermined direction;
a plurality of discharge ports disposed in the supply pipe for discharging a fluid for causing the sand that has settled on the bottom surface to flow from the side wall toward the groove;
The side wall has a convex wall portion that protrudes toward the center in the pond width direction and extends in the predetermined direction, and a concave wall portion that is concave toward the outside in the pond width direction and extends in the predetermined direction,
the discharge ports are disposed at positions facing the convex wall portion and at positions facing the concave wall portion,
A sedimentation basin characterized in that the supply pipe is provided with a direction change means between an outlet located at a position opposite the convex wall portion and an outlet located at a position opposite the concave wall portion, which means that the direction of discharge of the fluid discharged from the outlet can be changed.
また、この沈砂池において、
前記側壁は、前記凸壁部と前記凹み壁部の間に形成され、前記所定方向および前記池幅方向に対して傾斜した方向に延在した傾斜壁部を有し、
前記吐出口は、前記傾斜壁部に対向した位置にも配置されたものであり、
前記供給管は、前記凸壁部に対向して配置された吐出口と、前記傾斜壁部に対向して配置された吐出口との間に、該吐出口から吐出される流体の吐出方向を変更可能な第1方向変更手段を備え、
前記凹み壁部に対向して配置された複数の吐出口と、前記傾斜壁部に対向して配置された吐出口との間に、前記吐出口から吐出される流体の吐出方向を変更可能な第2方向変更手段を備えたものであってもよい。
In addition, in this settling basin,
the side wall has an inclined wall portion formed between the convex wall portion and the concave wall portion and extending in a direction inclined with respect to the predetermined direction and the pond width direction,
the discharge port is also disposed at a position facing the inclined wall portion,
the supply pipe includes a first direction change means, between a discharge port arranged opposite the convex wall portion and a discharge port arranged opposite the inclined wall portion, capable of changing a discharge direction of the fluid discharged from the discharge port;
The nozzle may be provided with a second direction change means between the plurality of outlets arranged opposite the recessed wall portion and the outlets arranged opposite the inclined wall portion, which is capable of changing the direction of discharge of fluid discharged from the outlets.
加えて、本実施形態の沈砂池からは、以下の発明概念も抽出できる。 In addition, the following inventive concepts can be extracted from the settling tank of this embodiment.
受け入れた水に含まれている砂が沈降する沈砂池において、
側壁よりも下方になる池底部に設けられ、所定方向に延在した溝と、
前記池底部に設けられ、前記溝に接続した底面と、
前記底面に沈降した砂を前記側壁側から前記溝に向かって流すための流体を吐出する複数の吐出口と、
前記複数の吐出口のうちの少なくとも2つの吐出口から吐出される流体の吐出方向をまとめて変更可能な一括方向変更手段と、
前記吐出口から出される流体の吐出方向を該吐出口毎に変更可能な個別方向変更手段とを備えたことを特徴とする沈砂池。
In a settling basin where sand contained in the received water settles,
A groove provided in the bottom of the pond below the side wall and extending in a predetermined direction;
a bottom surface provided at the bottom of the pond and connected to the groove;
a plurality of discharge ports that discharge a fluid for causing the sand that has settled on the bottom surface to flow from the side wall toward the groove;
a collective direction changing means capable of collectively changing the ejection direction of fluids ejected from at least two of the plurality of ejection ports;
A settling basin characterized by being equipped with an individual direction changing means that can change the discharge direction of the fluid discharged from the discharge outlet for each discharge outlet.
また、本実施形態の沈砂池からは、以下の発明概念も抽出できる。 In addition, the following inventive concepts can be extracted from the settling basin of this embodiment.
池幅方向の端面を構成する一方の側壁と他方の側壁の間で、受け入れた水を該池幅方向と直交する直交方向に流下させ該水に含まれている砂を沈降させる沈砂池において、
池底部に設けられ、前記池幅方向に間隔をあけて、前記直交方向にそれぞれ延在した第1溝および第2溝と、
前記第1溝と前記第2溝の間に形成され、前記池底部から上方に突出した突出壁とを有し、
前記池底部のうち前記第1溝と前記第2溝の間であって前記突出壁が設けられた領域を除いた部分に、前記直交方向に沿って延在する稜線部と、該稜線部と前記第1溝とを接続する第1接続面と、該稜線部と前記第2溝とを接続する第2接続面とが形成されていることを特徴とする沈砂池。
In a settling basin, water is received between one side wall and the other side wall that form the end faces in the width direction of the basin, and the water flows down in a direction perpendicular to the width direction of the basin, thereby allowing sand contained in the water to settle.
a first groove and a second groove provided at the bottom of the pond, spaced apart in the pond width direction and extending in the perpendicular direction;
a protruding wall formed between the first groove and the second groove and protruding upward from the bottom of the reservoir;
A sedimentation basin characterized in that a ridge portion extending along the perpendicular direction, a first connection surface connecting the ridge portion to the first groove, and a second connection surface connecting the ridge portion to the second groove are formed in the portion of the bottom of the basin between the first groove and the second groove, excluding the area where the protruding wall is provided.
前記第1接続面は、前記稜線部から前記第1溝に向かうにしたがって下方に傾斜した傾斜面であり、
前記第2接続面は、前記稜線部から前記第2溝に向かうにしたがって下方に傾斜した傾斜面であってもよい。
the first connection surface is an inclined surface that is inclined downward from the ridge line portion toward the first groove,
The second connection surface may be an inclined surface that slopes downward from the ridge line portion toward the second groove.
前記第1溝は、前記一方の側壁側に設けられたものであり、
前記第2溝は、前記他方の側壁側に設けられたものであり、
前記一方の側壁と前記第1溝の間に形成され、該第1溝に向かうにしたがって下方に傾斜した第1底面と、
前記他方の側壁と前記第2溝の間に形成され、該第2溝に向かうにしたがって下方に傾斜した第2底面とを備え、
前記第1接続面および前記第2接続面それぞれの傾斜角度は、前記第1底面および前記第2底面の傾斜角度よりも急角度であってもよい。
the first groove is provided on the one side wall side,
the second groove is provided on the other side wall side,
a first bottom surface formed between the one sidewall and the first groove and inclined downward toward the first groove;
a second bottom surface formed between the other side wall and the second groove and inclined downward toward the second groove;
The inclination angles of the first connecting surface and the second connecting surface may be steeper than the inclination angles of the first bottom surface and the second bottom surface.
前記第1底面に沈降した砂を前記一方の側壁側から前記第1溝に向かって流すための流体を吐出する一方側吐出口と、
前記第2底面に沈降した砂を前記他方の側壁側から前記第2溝に向かって流すための流体を吐出する他方側吐出口とを有していてもよい。
a one-side outlet that discharges a fluid for causing the sand that has settled on the first bottom surface to flow from the one side wall side toward the first groove;
The sand trap may further include an other-side discharge port that discharges a fluid for causing the sand that has settled on the second bottom surface to flow from the other side wall side toward the second groove.
前記一方の側壁と前記突出壁の間および前記他方の側壁と該突出壁の間それぞれに配置され、受け入れた水に含まれている混入物を除去する2つの除塵機を備えていてもよい。 Two dust removers may be provided, one between the one side wall and the protruding wall and the other between the other side wall and the protruding wall, to remove impurities contained in the received water.
また、本実施形態の沈砂池からは、以下の発明概念も抽出できる。 In addition, the following inventive concepts can be extracted from the settling basin of this embodiment.
池幅方向の端面を構成する一方の側壁と他方の側壁の間で、受け入れた水を該池幅方向と直交する直交方向に流下させ該水に含まれている砂を沈降させる沈砂池において、
池底部に設けられ、前記池幅方向に間隔をあけて、前記直交方向にそれぞれ延在した第1溝および第2溝と、
前記池底部に設けられ、前記第1溝が接続されるとともに前記第2溝が接続された集砂ピットと、
前記第1溝と前記第2溝の間に形成され、前記池底部から上方に突出した突出壁とを有し、
前記池底部のうち前記第1溝と前記第2溝の間であって前記集砂ピットと前記突出壁の間の部分に、前記直交方向に沿って延在する稜線部と、該稜線部と前記第1溝とを接続する第1接続面と、該稜線部と前記第2溝とを接続する第2接続面とが形成されていることを特徴とする沈砂池。
In a settling basin, water is received between one side wall and the other side wall that form the end faces in the width direction of the basin, and the water flows down in a direction perpendicular to the width direction of the basin, thereby allowing sand contained in the water to settle.
a first groove and a second groove provided at the bottom of the pond, spaced apart in the pond width direction and extending in the perpendicular direction;
a sand collection pit provided at the bottom of the pond, to which the first groove is connected and to which the second groove is connected;
a protruding wall formed between the first groove and the second groove and protruding upward from the bottom of the reservoir;
A sedimentation basin characterized in that a ridge portion extending along the perpendicular direction, a first connection surface connecting the ridge portion to the first groove, and a second connection surface connecting the ridge portion to the second groove are formed in the portion of the bottom of the basin between the first groove and the second groove and between the sand collection pit and the protruding wall.
以上説明した沈砂池は、受け入れた水に含まれている砂が池底部に沈降する沈砂池において、
前記池底部に設けられ、所定方向に延在した溝と、
前記溝に溜まった水中において、前記所定方向に流体を吐出する第1の吐出口と、
前記池底部に設けられ、前記溝に接続した底面と、
前記底面に堆積した砂をこの沈砂池の側壁側から前記溝に向かって流すための流体を大気中に吐出する第2の吐出口と、
前記第1の吐出口の中心から前記所定方向に向かって延びる仮想軸の周囲を覆い、下端部分に開口を有する覆い部材とを備えたことを特徴としてもよい。
The settling basin described above is a settling basin in which sand contained in the received water settles to the bottom of the basin,
A groove provided in the bottom of the pond and extending in a predetermined direction;
a first discharge port that discharges fluid in the predetermined direction into the water accumulated in the groove;
a bottom surface provided at the bottom of the pond and connected to the groove;
a second outlet that discharges a fluid into the atmosphere to cause the sand accumulated on the bottom surface to flow from the side wall of the settling basin toward the groove;
The nozzle may further include a cover member that covers the periphery of an imaginary axis extending from the center of the first outlet in the predetermined direction and has an opening at a lower end portion.
この沈砂池において、前記覆い部材の開口は、前記溝の高さ方向の中央よりも下方に配置された態様であってもよい。 In this settling basin, the opening of the cover member may be positioned below the center of the groove in the height direction.
この態様によれば、覆い部材の開口と溝の下方に堆積する砂とが近づくので、溝内に堆積した砂を覆い部材の内部に吸い上げやすくなる。 This configuration brings the opening of the cover member closer to the sand that has accumulated below the groove, making it easier to suck up the sand that has accumulated in the groove into the cover member.
また、以上説明した集砂方法は、受け入れた水に含まれている砂を、所定方向に延在した溝と該溝に接続した底面とを有する池底部に沈降させる沈砂池において、該池底部に堆積した砂を集める集砂方法であって、
前記溝に溜まった水中において、第1の吐出口から流体を前記所定方向に吐出する水中吐出工程と、
前記底面に堆積した砂を側壁側から前記溝に向かって流すための流体を第2の吐出口から大気中に吐出する大気中吐出工程とを有し、
前記水中吐出工程は、下端部分に開口を有し前記第1の吐出口の中心から前記所定方向に向かって延びる仮想軸の周囲を覆う覆い部材によって覆われた空間に流体を吐出する工程であることを特徴としてもよい。
The sand collection method described above is a method for collecting sand deposited on the bottom of a settling basin that has a groove extending in a predetermined direction and a bottom surface connected to the groove, and in which sand contained in received water is allowed to settle on the bottom of the basin,
an underwater discharge step of discharging a fluid from a first discharge port in the predetermined direction into the water accumulated in the groove;
an atmospheric discharge step of discharging a fluid from a second discharge port into the atmosphere to cause the sand accumulated on the bottom surface to flow from the side wall side toward the groove,
The underwater ejection process may be characterized in that it is a process of ejecting fluid into a space covered by a covering member that has an opening at a lower end portion and covers the periphery of an imaginary axis extending from the center of the first ejection port toward the specified direction.
また、この集砂方法において、前記水中吐出工程は、前記覆い部材以上に水位が維持された状態で行われる工程であり、
前記大気中吐出工程は、前記底面以下に水位が維持された状態で行われる工程であってもよい。
In this sand collecting method, the underwater discharge step is performed in a state where the water level is maintained above the covering member,
The atmospheric discharge step may be a step performed in a state where the water level is maintained below the bottom surface.
水中吐出工程では、覆い部材内が流体で満たされた状態で第1の吐出口から流体を水中に吐出するので、吐出圧の損失が少なく、覆い部材内に強い流体の流れを作ることができる。また、大気中吐出工程では、底面に堆積した砂が大気中に露出しているので、第2の吐出口から吐出される流体の吐出圧が弱くても、底面に堆積した砂を流すことができる。 In the underwater discharge process, the fluid is discharged into the water from the first discharge port while the cover member is filled with fluid, resulting in little loss of discharge pressure and creating a strong fluid flow within the cover member. Furthermore, in the atmospheric discharge process, the sand accumulated on the bottom surface is exposed to the atmosphere, so even if the discharge pressure of the fluid discharged from the second discharge port is weak, the sand accumulated on the bottom surface can be flushed away.
また、この集砂方法において、前記大気中吐出工程の実行後に前記水中吐出工程を実行する処理を一組の集砂処理として、該集砂処理を複数回行ってもよい。 Furthermore, in this sand collection method, the atmospheric discharge process may be followed by the underwater discharge process as a set of sand collection processes, and the sand collection process may be performed multiple times.
大気中吐出工程によって溝に流された砂が溝内に残留してしまうと、次の大気中吐出工程によって溝に流された砂が残留した砂に上乗せされてしまい、溝内に大量の砂が堆積してしまうことがある。大量の砂が堆積していると、その砂が妨げとなって水中吐出工程における溝内の砂の搬送が困難になってしまう虞がある。また、次の大気中吐出工程によって溝に砂を流そうとしても、溝内が砂で満たされてしまい、あふれた砂が底面に残留してしまう虞もある。この集砂方法では、大気中吐出工程によって溝に流す処理と、水中吐出工程によって溝内を搬送する処理を一組の集砂処理としているので、次の集砂処理の際には前の集砂処理で溝内に流した砂が溝内に残留したままになってしまうことがない。これにより、次の集砂処理における大気中吐出工程では、砂が除去された溝に向けて砂を流せるので、砂が溝からあふれてしまうことを防止できる。また、次の集砂処理における水中吐出工程では、溝内に堆積した大量の砂によって、溝内の砂の搬送が困難になってしまうことを防止できる。 If sand released into the groove during the atmospheric discharge process remains in the groove, the sand released into the groove during the next atmospheric discharge process may be piled on top of the remaining sand, resulting in a large amount of sand accumulating in the groove. If a large amount of sand accumulates, it may obstruct the transport of the sand in the groove during the submerged discharge process. Furthermore, even if sand is attempted to be released into the groove during the next atmospheric discharge process, the groove may become filled with sand, causing the overflowed sand to remain at the bottom. This sand collection method combines the atmospheric discharge process of releasing sand into the groove and the submerged discharge process of transporting sand within the groove. Therefore, during the next sand collection process, sand released into the groove during the previous sand collection process does not remain in the groove. This allows the sand to flow toward the groove from which sand was removed during the atmospheric discharge process, preventing sand from overflowing from the groove. Furthermore, during the submerged discharge process, the large amount of sand accumulated in the groove prevents the sand from becoming difficult to transport within the groove.
さらに、この集砂方法において、前記集砂処理を複数回行う前に、前記水中吐出工程を実行しておいてもよい。 Furthermore, in this sand collection method, the underwater discharge process may be carried out before the sand collection process is performed multiple times.
最初の集砂処理前に、溝内に沈降した砂を水中吐出工程によって搬送しておくことで、最初の集砂処理における大気中吐出工程では、砂が除去された溝に向けて砂を流せるので、砂が溝からあふれてしまうことを防止できる。また、最初の集砂処理における水中吐出工程では、溝内に堆積した大量の砂によって、溝内の砂の搬送が困難になってしまうことを防止できる。 By transporting the sand that has settled in the trenches using the underwater discharge process before the first sand collection process, the sand can be directed toward the trenches from which it has been removed during the atmospheric discharge process of the first sand collection process, preventing the sand from overflowing from the trenches. Furthermore, during the underwater discharge process of the first sand collection process, it is possible to prevent the large amount of sand that has accumulated in the trenches from making it difficult to transport the sand within the trenches.
以上説明した沈砂池は、受け入れた水に含まれている砂が池底部に沈降する沈砂池において、
前記池底部に設けられ、所定方向に延在した溝と、
前記溝に溜まった水中において、前記所定方向に流体を吐出する第1の吐出口と、
前記池底部に設けられ、前記溝に接続した底面と、
前記底面に堆積した砂をこの沈砂池の側壁側から前記溝に向かって流すための流体を大気中に吐出する第2の吐出口と、
前記第1の吐出口の中心から前記所定方向に向かって延びる仮想軸の周囲を覆い、下端部分に開口を有する覆い部材とを備え、
前記底面は、前記側壁から前記溝の間に形成された底平面を有するものであり、
前記溝および前記底平面は、前記所定方向に向かって水平なものまたは該所定方向に向かって下方に1度未満の角度で傾斜したものであることを特徴とする。
The settling basin described above is a settling basin in which sand contained in the received water settles to the bottom of the basin,
A groove provided in the bottom of the pond and extending in a predetermined direction;
a first discharge port that discharges fluid in the predetermined direction into the water accumulated in the groove;
a bottom surface provided at the bottom of the pond and connected to the groove;
a second outlet that discharges a fluid into the atmosphere to cause the sand accumulated on the bottom surface to flow from the side wall of the settling basin toward the groove;
a cover member that covers a periphery of an imaginary axis extending from the center of the first discharge port in the predetermined direction and has an opening at a lower end portion,
the bottom surface has a bottom plane formed between the side wall and the groove,
The groove and the bottom plane are either horizontal toward the predetermined direction or inclined downward toward the predetermined direction at an angle of less than 1 degree.
ここで覆い部材は、その上側部分に溝の幅方向に向かって下方に傾斜した傾斜面を有するものであってもよい。この傾斜面は、平面で構成されていてもよく、曲面で形成されていてもよい。傾斜面が曲面で形成されている場合、その曲面は上方を凸にした湾曲形状であることが好ましい。また、覆い部材は、下端に開口を有する円筒形状であってもよい。 The covering member may have an inclined surface on its upper portion that slopes downward in the width direction of the groove. This inclined surface may be flat or curved. If the inclined surface is curved, it is preferable that the curved surface has a convex curved shape. The covering member may also be cylindrical with an opening at the bottom end.
この沈砂池によれば、第1の吐出口から所定方向に吐出された流体は、覆い部材により所定方向と直交する放射方向への拡散が防止され、覆い部材内に流体の強い流れを作り出す。この流れによって覆い部材の内外で圧力差が生じ、溝内に堆積している砂は、覆い部材の下端部分にある開口から覆い部材の内部に吸い込まれる。そして、吸い込まれた砂は、覆い部材内の流体の流れによって搬送される。すなわち、第1の吐出口から吐出された流体の流れを搬送に有効に利用できるので、溝内に堆積している砂を効率的に搬送することができる。 With this settling basin, the fluid discharged in a predetermined direction from the first outlet is prevented by the cover member from diffusing in a radial direction perpendicular to the predetermined direction, creating a strong fluid flow within the cover member. This flow creates a pressure difference between the inside and outside of the cover member, and the sand accumulated in the groove is sucked into the cover member through an opening at the bottom end of the cover member. The sucked-in sand is then transported by the fluid flow within the cover member. In other words, the flow of the fluid discharged from the first outlet can be effectively used for transportation, allowing the sand accumulated in the groove to be efficiently transported.
この沈砂池において、前記底平面は、前記覆い部材の上端位置よりも上方に位置したものであり、
前記第2の吐出口は、前記覆い部材の上端位置よりも下方に水位が維持された状態で流体を吐出するものであってもよい。
In this settling basin, the bottom plane is located above the upper end position of the cover member,
The second outlet may be configured to discharge the fluid while the water level is maintained below the upper end position of the cover member.
また、以上説明した集砂方法は、所定方向に延在し該所定方向に向かって水平または該所定方向に向かって下方に1度未満の角度で傾斜した溝と、該所定方向に向かって水平または該所定方向に向かって下方に1度未満の角度で傾斜した底平面を備え該溝に接続した底面とを有する池底部に、受け入れた水に含まれている砂を沈降させる沈砂池において、該池底部に堆積した砂を集める集砂方法であって、
前記溝に溜まった水中において、第1の吐出口から流体を前記所定方向に吐出する水中吐出工程と、
前記底面に堆積した砂を側壁側から前記溝に向かって流すための流体を第2の吐出口から大気中に吐出する大気中吐出工程とを有し、
前記水中吐出工程は、下端部分に開口を有し前記第1の吐出口の中心から前記所定方向に向かって延びる仮想軸の周囲を覆う覆い部材によって覆われた空間に流体を吐出する工程であることを特徴とする。
The sand collection method described above is a method for collecting sand that has accumulated on a bottom of a settling basin, which allows received water to settle on a bottom portion of the basin having a groove that extends in a predetermined direction and is horizontal toward the predetermined direction or inclined downward toward the predetermined direction at an angle of less than 1 degree, and a bottom surface that has a bottom plane that is horizontal toward the predetermined direction or inclined downward toward the predetermined direction at an angle of less than 1 degree and is connected to the groove, and
an underwater discharge step of discharging a fluid from a first discharge port in the predetermined direction into the water accumulated in the groove;
an atmospheric discharge step of discharging a fluid from a second discharge port into the atmosphere to cause the sand accumulated on the bottom surface to flow from the side wall side toward the groove,
The underwater ejection process is characterized in that it is a process of ejecting fluid into a space covered by a covering member that has an opening at the lower end portion and covers the periphery of a virtual axis extending from the center of the first ejection port toward the specified direction.
ここで水中吐出工程は、覆い部材内が流体で満たされた状態で行われる工程であってもよく、覆い部材内に大気が残存している状態で行われる工程であってもよい。また、水中吐出工程は、第1の吐出口が完全に水中に没した工程で行われる工程であってもよく、第1の吐出口の一部が水中に没し、残りの部分が大気中に露出した状態で行われる工程であってもよい。 Here, the underwater ejection process may be a process carried out with the covering member filled with fluid, or may be a process carried out with air remaining inside the covering member. Furthermore, the underwater ejection process may be a process carried out with the first ejection port completely submerged in water, or may be a process carried out with part of the first ejection port submerged in water and the remaining part exposed to the air.
この集砂方法によれば、水中吐出工程において第1の吐出口から所定方向に吐出された流体は、覆い部材内に流体の強い流れを作り出し、溝内に堆積している砂を覆い部材の内部に吸い込んで所定方向に搬送するので、砂を効率的に搬送して集めることができる。また、大気中吐出工程において第2の吐出口から大気中に吐出された流体は、水の抵抗を受けないので底面に堆積した砂を効率的に流すことができる。 According to this sand collection method, the fluid discharged in a predetermined direction from the first discharge port during the underwater discharge process creates a strong fluid current within the cover member, sucking sand accumulated in the groove into the cover member and transporting it in the predetermined direction, thereby efficiently transporting and collecting the sand. Furthermore, the fluid discharged into the atmosphere from the second discharge port during the atmospheric discharge process does not encounter water resistance, so sand accumulated on the bottom surface can be efficiently flushed away.
また、この集砂方法において、前記大気中吐出工程は、上端位置が前記底平面よりも下
方に位置した前記覆い部材の上端位置よりもさらに下方に水位が維持された状態で行われる工程であってもよい。
In addition, in this sand collection method, the atmospheric discharge process may be a process carried out in a state where the water level is maintained further below the upper end position of the covering member, whose upper end position is located below the bottom plane.
また、以上説明した集砂方法は、所定方向に延在した溝と、この沈砂池の側壁から該溝の間に形成されて該溝に接続した底面とを有する池底部に、受け入れた水に含まれている砂を沈降させる沈砂池において、該池底部に堆積した砂を集める集砂方法であって、
前記溝に溜まった水中において、第1の吐出口から流体を前記所定方向に吐出する水中吐出工程と、
前記底面に堆積した砂を前記側壁側から前記溝に向かって流すための流体を第2の吐出口から大気中に吐出する大気中吐出工程とを有し、
前記水中吐出工程は、下端部分に開口を有し前記第1の吐出口から前記所定方向に向かって延びる仮想軸の周囲を覆う覆い部材によって覆われた空間に流体を吐出する工程であり、
前記大気中吐出工程は、上端位置が前記底面よりも下方に位置した前記覆い部材の上端位置よりもさらに下方に水位が維持された状態で行われる工程であることを特徴としてもよい。
The sand collection method described above is a method for collecting sand deposited on the bottom of a settling basin, which allows sand contained in received water to settle on the bottom, the bottom having a groove extending in a predetermined direction and a bottom surface formed between the side wall of the settling basin and the groove and connected to the groove, and
an underwater discharge step of discharging a fluid from a first discharge port in the predetermined direction into the water accumulated in the groove;
an atmospheric discharge step of discharging a fluid from a second discharge port into the atmosphere to cause the sand accumulated on the bottom surface to flow from the side wall side toward the groove,
the underwater discharge step is a step of discharging the fluid into a space covered by a cover member that has an opening at a lower end portion and covers a periphery of an imaginary axis extending from the first discharge port in the predetermined direction,
The atmospheric discharge step may be a step performed in a state where the water level is maintained below the upper end position of the covering member, the upper end position of which is located below the bottom surface.
以上説明した沈砂池は、受け入れた水に含まれている砂が池底部に沈降する沈砂池において、
前記池底部に設けられ、所定方向に延在した溝と、
前記溝に溜まった水中において、前記所定方向に流体を吐出する第1の吐出口と、
前記池底部に設けられ、この沈砂池の側壁から前記溝の間に形成されて該溝に接続した底面と、
前記底面に堆積した砂を前記側壁側から前記溝に向かって流すための流体を大気中に吐出する第2の吐出口と、
前記第1の吐出口から前記所定方向に向かって延びる仮想軸の周囲を覆い、下端部分に開口を有する覆い部材とを備え、
前記底面は、前記覆い部材の上端位置よりも上方に位置したものであり、
前記第2の吐出口は、前記覆い部材の上端位置よりも下方に水位が維持された状態で流体を吐出するものであることを特徴とする。
The settling basin described above is a settling basin in which sand contained in the received water settles to the bottom of the basin,
A groove provided in the bottom of the pond and extending in a predetermined direction;
a first discharge port that discharges fluid in the predetermined direction into the water accumulated in the groove;
a bottom surface provided at the bottom of the pond, formed between the side wall of the settling basin and the groove and connected to the groove;
a second outlet that discharges a fluid into the atmosphere to cause the sand accumulated on the bottom surface to flow from the side wall toward the groove;
a cover member that covers a periphery of an imaginary axis extending from the first discharge port in the predetermined direction and has an opening at a lower end portion,
The bottom surface is located above the upper end position of the covering member,
The second discharge port is characterized in that it discharges the fluid in a state where the water level is maintained below the upper end position of the covering member.
また、前記溝は、前記所定方向に向かって0度以上1度未満の角度で下方に傾斜したものであってもよい。 The groove may also be inclined downward at an angle of 0 degrees or more and less than 1 degree toward the specified direction.
また、以上説明した集砂方法は、受け入れた水に含まれている砂を沈降させる沈砂池において、所定方向に延在した溝と、この沈砂池の側壁から該溝の間に形成されて該溝に接続した底面とを有する池底部に堆積した砂を集める集砂方法であって、
前記溝に溜まった水中において、第1の吐出口から流体を前記所定方向に吐出する水中吐出工程と、
前記底面に堆積した砂を前記側壁側から前記溝に向かって流すための流体を第2の吐出口から大気中に吐出する大気中吐出工程とを有し、
前記水中吐出工程は、下端部分に開口を有し前記第1の吐出口から前記所定方向に向かって延びる仮想軸の周囲を覆う覆い部材によって覆われた空間に流体を吐出する工程であり、
前記大気中吐出工程は、上端位置が前記底面よりも下方に位置した前記覆い部材の上端位置よりもさらに下方に水位が維持された状態で行われる工程であることを特徴とする。
以上説明した沈砂池は、受け入れた水に含まれている砂が池底部に沈降する沈砂池において、
前記池底部に設けられ、所定方向に延在した溝と、
前記溝に溜まった水中において、前記所定方向に流体を吐出する第1の吐出口と、
前記池底部に設けられ、この沈砂池の側壁から前記溝の間に形成されて該溝に接続した底面と、
前記底面に堆積した砂を前記側壁側から前記溝に向かって流すための流体を大気中に吐出する第2の吐出口と、
前記第1の吐出口から前記所定方向に向かって延びる仮想軸の周囲を覆い、下端部分に開口を有する覆い部材とを備え、
前記底面は、前記覆い部材の上端位置よりも上方に位置したものであることを特徴とする。
また、以上説明した集砂方法は、受け入れた水に含まれている砂を沈降させる沈砂池において、所定方向に延在した溝と、この沈砂池の側壁から該溝の間に形成されて該溝に接続した底面とを有する池底部に堆積した砂を集める集砂方法であって、
前記溝に溜まった水中において、第1の吐出口から流体を前記所定方向に吐出する水中吐出工程と、
前記底面に堆積した砂を前記側壁側から前記溝に向かって流すための流体を第2の吐出口から大気中に吐出する大気中吐出工程とを有し、
前記水中吐出工程は、下端部分に開口を有し前記第1の吐出口から前記所定方向に向かって延びる仮想軸の周囲を覆う覆い部材によって覆われた空間に流体を吐出する工程であることを特徴とする。
The sand collection method described above is a method for collecting sand deposited on the bottom of a settling basin that settles sand contained in received water, the settling basin having a groove extending in a predetermined direction and a bottom surface formed between the side wall of the settling basin and the groove and connected to the groove,
an underwater discharge step of discharging a fluid from a first discharge port in the predetermined direction into the water accumulated in the groove;
an atmospheric discharge step of discharging a fluid from a second discharge port into the atmosphere to cause the sand accumulated on the bottom surface to flow from the side wall side toward the groove,
the underwater discharge step is a step of discharging the fluid into a space covered by a cover member that has an opening at a lower end portion and covers a periphery of an imaginary axis extending from the first discharge port in the predetermined direction,
The atmospheric discharge step is characterized in that it is a step carried out in a state where the water level is maintained below the upper end position of the covering member, the upper end position of which is located below the bottom surface.
The settling basin described above is a settling basin in which sand contained in the received water settles to the bottom of the basin,
A groove provided in the bottom of the pond and extending in a predetermined direction;
a first discharge port that discharges fluid in the predetermined direction into the water accumulated in the groove;
a bottom surface provided at the bottom of the pond, formed between the side wall of the settling basin and the groove and connected to the groove;
a second outlet that discharges a fluid into the atmosphere to cause the sand accumulated on the bottom surface to flow from the side wall toward the groove;
a cover member that covers a periphery of an imaginary axis extending from the first discharge port in the predetermined direction and has an opening at a lower end portion,
The bottom surface is characterized in that it is positioned above the upper end position of the covering member.
The sand collection method described above is a method for collecting sand deposited on the bottom of a settling basin that settles sand contained in received water, the settling basin having a groove extending in a predetermined direction and a bottom surface formed between the side wall of the settling basin and the groove and connected to the groove,
an underwater discharge step of discharging a fluid from a first discharge port in the predetermined direction into the water accumulated in the groove;
an atmospheric discharge step of discharging a fluid from a second discharge port into the atmosphere to cause the sand accumulated on the bottom surface to flow from the side wall side toward the groove,
The underwater ejection process is characterized in that it is a process of ejecting fluid into a space covered by a covering member that has an opening at the lower end portion and covers the periphery of an imaginary axis extending from the first ejection port in the predetermined direction.
なお、以上説明した実施形態や各変形例の記載それぞれにのみ含まれている構成要件であっても、その構成要件を、実施形態や他の変形例に適用してもよい。 Note that even if a component is included only in the description of the embodiment or each variation described above, that component may also be applied to the embodiment or other variation.
2 沈砂池
8 主トラフ
13 第1覆い部材
13a 開口
14 第2覆い部材
15 第3覆い部材
84a トラフ第3吐出口
71 底平面
831a トラフ第1吐出口
832a トラフ第2吐出口
911 吐出口
側壁 W
2 Grit chamber 8 Main trough 13 First cover member 13a Opening 14 Second cover member 15 Third cover member 84a Trough third outlet 71 Bottom surface 831a Trough first outlet 832a Trough second outlet 911 Outlet Side wall W
Claims (2)
前記池底部に設けられ、所定方向に延在した溝と、
前記溝に溜まった水中において、前記所定方向に流体を吐出する第1の吐出口と、
前記池底部に設けられ、この沈砂池の側壁から前記溝の間に形成されて該溝に接続した底面と、
前記底面に堆積した砂を前記側壁側から前記溝に向かって流すための流体を大気中に吐出する第2の吐出口と、
前記第1の吐出口から前記所定方向に向かって延びる仮想軸の周囲を覆い、下端部分に開口を有する覆い部材とを備え、
前記底面は、前記覆い部材の上端位置よりも上方に位置したものであり、
前記第1の吐出口と前記第2の吐出口は、交互に流体を吐出するものであり、
前記第1の吐出口は、前記覆い部材の上端位置よりも上に水位がある状態で流体を吐出するものであることを特徴とする沈砂池。 In a settling basin where sand contained in the received water settles to the bottom of the basin,
A groove provided in the bottom of the pond and extending in a predetermined direction;
a first discharge port that discharges fluid in the predetermined direction into the water accumulated in the groove;
a bottom surface provided at the bottom of the pond, formed between the side wall of the settling basin and the groove and connected to the groove;
a second outlet that discharges a fluid into the atmosphere to cause the sand accumulated on the bottom surface to flow from the side wall toward the groove;
a cover member that covers a periphery of an imaginary axis extending from the first discharge port in the predetermined direction and has an opening at a lower end portion,
The bottom surface is located above the upper end position of the covering member,
the first discharge port and the second discharge port alternately discharge fluid,
A settling basin characterized in that the first discharge outlet discharges fluid when the water level is above the upper end position of the cover member .
前記溝に溜まった水中において、前記覆い部材によって覆われた空間に第1の吐出口から流体を前記所定方向に吐出する水中吐出工程と、
前記底面に堆積した砂を前記側壁側から前記溝に向かって流すための流体を第2の吐出口から大気中に吐出する大気中吐出工程とを有し、
前記水中吐出工程と前記大気中吐出工程は、交互に実行される工程であり、
前記水中吐出工程は、前記第1の吐出口から前記所定方向に向かって延びる仮想軸の周囲を覆う前記覆い部材の上端位置よりも上に水位がある状態で流体を吐出する工程であることを特徴とする集砂方法。 A method for collecting sand deposited on the bottom of a settling basin that settles sand contained in received water, the settling basin having a groove extending in a predetermined direction, a cover member having an opening at its lower end, and a bottom surface formed between the side wall of the settling basin and the groove, connected to the groove , and positioned above the upper end position of the cover member ,
an underwater discharge step of discharging fluid from a first discharge port in the predetermined direction into a space covered by the cover member in the water accumulated in the groove;
an atmospheric discharge step of discharging a fluid from a second discharge port into the atmosphere to cause the sand accumulated on the bottom surface to flow from the side wall side toward the groove,
the underwater discharging step and the atmospheric discharging step are alternately performed,
A sand collecting method characterized in that the underwater discharge process is a process of discharging fluid when the water level is above the upper end position of the covering member that covers the periphery of an imaginary axis extending from the first discharge outlet in the predetermined direction.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2024070387A JP7724018B2 (en) | 2018-07-13 | 2024-04-24 | Grit basin and sand collection method |
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2018133175A JP2020011167A (en) | 2018-07-13 | 2018-07-13 | Sedimentation basin and sand collection method |
| JP2023008159A JP7485412B2 (en) | 2018-07-13 | 2023-01-23 | Grit basin and sand collection method |
| JP2024070387A JP7724018B2 (en) | 2018-07-13 | 2024-04-24 | Grit basin and sand collection method |
Related Parent Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2023008159A Division JP7485412B2 (en) | 2018-07-13 | 2023-01-23 | Grit basin and sand collection method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2024091887A JP2024091887A (en) | 2024-07-05 |
| JP7724018B2 true JP7724018B2 (en) | 2025-08-15 |
Family
ID=69169104
Family Applications (3)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2018133175A Pending JP2020011167A (en) | 2018-07-13 | 2018-07-13 | Sedimentation basin and sand collection method |
| JP2023008159A Active JP7485412B2 (en) | 2018-07-13 | 2023-01-23 | Grit basin and sand collection method |
| JP2024070387A Active JP7724018B2 (en) | 2018-07-13 | 2024-04-24 | Grit basin and sand collection method |
Family Applications Before (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2018133175A Pending JP2020011167A (en) | 2018-07-13 | 2018-07-13 | Sedimentation basin and sand collection method |
| JP2023008159A Active JP7485412B2 (en) | 2018-07-13 | 2023-01-23 | Grit basin and sand collection method |
Country Status (1)
| Country | Link |
|---|---|
| JP (3) | JP2020011167A (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7503820B2 (en) * | 2020-03-30 | 2024-06-21 | アクアインテック株式会社 | Transport System |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2002282607A (en) | 2001-03-28 | 2002-10-02 | Hitachi Metals Ltd | Sand collecting device of sedimentation basin |
| JP2005342568A (en) | 2004-05-31 | 2005-12-15 | Maezawa Ind Inc | Sediment removal equipment |
| JP2016165701A (en) | 2015-03-10 | 2016-09-15 | アクアインテック株式会社 | Solid-liquid separation facility |
| JP2016172254A (en) | 2016-05-19 | 2016-09-29 | アクアインテック株式会社 | Method for removing sand in sedimentation basin |
| JP2018065138A (en) | 2018-01-31 | 2018-04-26 | アクアインテック株式会社 | Sand removal method for sand basin |
Family Cites Families (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3315490B2 (en) * | 1993-10-01 | 2002-08-19 | 東京都 | Sand collection method and device for sand basin |
| JP3895505B2 (en) * | 1999-06-24 | 2007-03-22 | 虎男 井上 | Equipment for collecting and transferring sediment |
| JP5810437B2 (en) * | 2010-05-25 | 2015-11-11 | アクアインテック株式会社 | Sand collection device for sand basin |
| JP5679365B2 (en) * | 2012-06-20 | 2015-03-04 | アクアインテック株式会社 | Transport system |
| JP6175712B2 (en) * | 2013-06-14 | 2017-08-09 | アクアインテック株式会社 | Transport system |
| JP5782593B2 (en) * | 2013-12-20 | 2015-09-24 | アクアインテック株式会社 | Screen for catching impurities in sand basin |
| JP6481853B2 (en) * | 2015-01-30 | 2019-03-13 | アクアインテック株式会社 | Solid-liquid separation system |
| JP2018051461A (en) * | 2016-09-28 | 2018-04-05 | アクアインテック株式会社 | Transfer device |
| JP2017039134A (en) * | 2016-11-29 | 2017-02-23 | アクアインテック株式会社 | Sand sedimentation pond |
| JP6476406B2 (en) * | 2017-11-20 | 2019-03-06 | アクアインテック株式会社 | Sand basin sand removal equipment |
| JP6718073B2 (en) * | 2018-02-19 | 2020-07-08 | アクアインテック株式会社 | Sand pond |
-
2018
- 2018-07-13 JP JP2018133175A patent/JP2020011167A/en active Pending
-
2023
- 2023-01-23 JP JP2023008159A patent/JP7485412B2/en active Active
-
2024
- 2024-04-24 JP JP2024070387A patent/JP7724018B2/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2002282607A (en) | 2001-03-28 | 2002-10-02 | Hitachi Metals Ltd | Sand collecting device of sedimentation basin |
| JP2005342568A (en) | 2004-05-31 | 2005-12-15 | Maezawa Ind Inc | Sediment removal equipment |
| JP2016165701A (en) | 2015-03-10 | 2016-09-15 | アクアインテック株式会社 | Solid-liquid separation facility |
| JP2016172254A (en) | 2016-05-19 | 2016-09-29 | アクアインテック株式会社 | Method for removing sand in sedimentation basin |
| JP2018065138A (en) | 2018-01-31 | 2018-04-26 | アクアインテック株式会社 | Sand removal method for sand basin |
Also Published As
| Publication number | Publication date |
|---|---|
| JP7485412B2 (en) | 2024-05-16 |
| JP2023033625A (en) | 2023-03-10 |
| JP2024091887A (en) | 2024-07-05 |
| JP2020011167A (en) | 2020-01-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP4380842B2 (en) | Sand lifting equipment | |
| JP4754462B2 (en) | Sand collection device for sand basin | |
| JP6544559B2 (en) | Solid-liquid separation facility | |
| JP7724018B2 (en) | Grit basin and sand collection method | |
| JP7675466B2 (en) | Grit chamber | |
| JP7577380B2 (en) | Grit chamber | |
| JP2019214048A (en) | Solid-liquid separation system and solid-liquid separation method | |
| JP7396734B2 (en) | sand pond | |
| JP5545475B2 (en) | Nozzle header | |
| JP7120606B2 (en) | sand pond | |
| JP6809724B2 (en) | Solid-liquid separation facility | |
| JP6718074B2 (en) | Sand pond | |
| JP2023009253A (en) | Solid-liquid separation installation | |
| JP6519059B2 (en) | Sediment basin | |
| JP6727100B2 (en) | Sand removal equipment for sand basins | |
| JP7455616B2 (en) | Cleaning method and sedimentation equipment for inclined plate equipment | |
| JP7503823B2 (en) | Method for renovating a sedimentation basin facility and sedimentation basin facility | |
| DK174732B1 (en) | Duct element and method for constructing a ducting duct | |
| JP6531287B2 (en) | Sedimentation basin collecting equipment | |
| JP4267355B2 (en) | Sand collection method and sand collection equipment | |
| JP2021053639A (en) | Solid-liquid separation facility | |
| CN118653563A (en) | Drainage ditch flushing and desilting system | |
| JPH10296234A (en) | Water tank equipment for cleaning and agitating water tank with stored water |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20240424 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20250129 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20250225 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20250425 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20250715 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20250728 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7724018 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |