JP7726478B2 - Die-casting manufacturing method and device - Google Patents
Die-casting manufacturing method and deviceInfo
- Publication number
- JP7726478B2 JP7726478B2 JP2022024102A JP2022024102A JP7726478B2 JP 7726478 B2 JP7726478 B2 JP 7726478B2 JP 2022024102 A JP2022024102 A JP 2022024102A JP 2022024102 A JP2022024102 A JP 2022024102A JP 7726478 B2 JP7726478 B2 JP 7726478B2
- Authority
- JP
- Japan
- Prior art keywords
- runner
- pressurizing
- pressurizing means
- cavity
- molten metal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Moulds For Moulding Plastics Or The Like (AREA)
- Injection Moulding Of Plastics Or The Like (AREA)
Description
本発明はダイカスト製造方法及び装置に係り、特に金型の溶湯入口であるランナー部の加圧を下方から行う場合の障害を無くしたダイカスト製造方法及び装置に関する。 The present invention relates to a die-casting manufacturing method and apparatus, and in particular to a die-casting manufacturing method and apparatus that eliminates obstacles when pressurizing the runner portion, which is the entrance for molten metal in the mold, from below.
従来、ダイカスト製品の鋳造方法には、図13に示す「通常のダイカスト製法」と図14に示す「センターゲート製法」が知られている。 Conventionally, two methods for casting die-cast products are known: the "normal die-casting method" shown in Figure 13 and the "center gate method" shown in Figure 14.
最も一般的な「通常のダイカスト製法」は、金型で作ったキャビティにアルミ等の溶湯をプランジャーで押し込み、キャビティに倣って冷却凝固した形状の製品を取り出して行う。製品として冷却成形するときに巣の発生を抑え製品密度が向上するように、ダイカストマシンのプランジャーを加圧動作することに合わせ、ランナーを更に加圧する方法が提案されている。 The most common "normal die-casting method" involves forcing molten metal such as aluminum into a cavity made in a mold with a plunger, and then removing a product that cools and solidifies to match the shape of the cavity. To prevent porosity during cooling and molding and improve product density, a method has been proposed in which the runner is further pressurized in conjunction with the pressure action of the plunger of the die-casting machine.
ランナーは、プランジャーの押し出し方向に沿う分流子ランナー部とこれに直交して上方に向かう立上りランナー部とからなるが、ランナーを介して二次的な加圧を行うために、キャビティに直結する立上りランナーに出入りする加圧ピンを設け、プランジャーの加圧が完了した後にランナーの加圧ピンを作動させて更なる加圧を行うようにしている(特許文献1)。 The runner consists of a branch runner section that runs in the direction of the plunger's extrusion and a rising runner section that runs perpendicular to this and points upward. In order to perform secondary pressurization through the runner, a pressure pin that moves in and out of the rising runner that is directly connected to the cavity is provided, and after plunger pressurization is complete, the pressure pin on the runner is activated to perform further pressurization (Patent Document 1).
特許文献1のランナーからの加圧では、加圧部分とプランジャー先端チップ面がつながった状態となっており、加圧できる圧力は金型投影面積に鋳造圧力を掛けた値が型締力を超えてはならなかった。通常の鋳造機ではこの限界圧力は70MPa程度でありこれを超えた加圧ができない。このような観点から、特許文献2に掲げる技術が提案されており、立上りランナー部を形成する部材の内径と、加圧ピンの外径との間の隙間を、0.5~3.0mmとして、逆流防止機能を発揮させるようにし、押し込み効果が得られるようにしたものである(特許文献2)。 When applying pressure from the runner in Patent Document 1, the pressure applying part and the plunger tip surface are connected, and the maximum pressure that can be applied is the casting pressure multiplied by the mold projected area, which must not exceed the mold clamping force. With a typical casting machine, this limit pressure is around 70 MPa, and pressure beyond this cannot be applied. From this perspective, the technology described in Patent Document 2 has been proposed, which sets the gap between the inner diameter of the member forming the rising runner and the outer diameter of the pressure pin to 0.5 to 3.0 mm, thereby preventing backflow and achieving a pushing effect (Patent Document 2).
隙間のみに着目したこの方法では以下の不具合があり現実的ではない。通常鋳造後の製品取り出しは、ビスケット部を掴んで行われるが、ランナー部を加工して設置したシリンダーへ加圧ピンを押し込んで凝固した鋳造品の製品部とビスケット部は、シリンダー内径と加圧ピン外径との隙間で形成される肉厚の薄い円筒形で繋がれた状態となる。そのため、立上りランナー部シリンダーを移動するランナー部加圧ピンの移動長さLが長くなるとビスケット部と製品をつないでいる部分の強度が低下し、製品取り出し時に破損して製品取り出しに失敗し、連続生産に支障が生じる。一般的に、環状隙間の流量Qは環状隙間Δの3乗に比例し、その長さLに反比例する。したがって隙間Δを小さくすることは逆流防止に効果があり、ランナー部からの加圧ピンによる製品部分への加圧可能限界値はこの隙間Δおよびその長さLによって決まる。一方、加圧ピンの移動量は製品部分の鋳巣発生容積予測量によって決定される。溶湯アルミの収縮率は約6%であり引け巣の発生防止には製品容積の約2%程度の溶湯を押し込める加圧ピン移動が必要となる。ランナー部からの加圧による連続鋳造を可能とするためには、立上りランナー部と加圧ピンの隙間Δの値、加圧ピンの移動量L、鋳造後の製品取り出しに必要なビスケットと製品をつなぐ強度の3要素の最適な値設定が必要となり、立上りランナーの内径と加圧ピンの外径との間の隙間Δを0.5~3.0mmとする要素だけでは連続鋳造は困難であり、期待する効果は得られないという課題がある。 This method, which focuses solely on the gap, is impractical due to the following drawbacks. Normally, the product is removed from the casting by grasping the biscuit portion. However, when a pressure pin is inserted into a cylinder with a machined runner portion, the product and biscuit portions of the solidified casting are connected by a thin cylindrical gap formed between the cylinder's inner diameter and the pressure pin's outer diameter. Therefore, as the travel length L of the runner pressure pin moving through the rising runner cylinder increases, the strength of the portion connecting the biscuit portion and the product decreases, resulting in breakage during product removal and failure to remove the product, hindering continuous production. Generally, the flow rate Q of the annular gap is proportional to the cube of the annular gap Δ and inversely proportional to its length L. Therefore, reducing the gap Δ is effective in preventing backflow, and the limit at which the pressure pin can apply pressure to the product from the runner portion is determined by this gap Δ and its length L. Meanwhile, the travel distance of the pressure pin is determined by the predicted volume of porosity in the product. The shrinkage rate of molten aluminum is approximately 6%, so to prevent shrinkage cavities, it is necessary to move the pressure pin so that it compresses the molten metal by approximately 2% of the product volume. To enable continuous casting by applying pressure from the runner section, it is necessary to set optimal values for three elements: the value of the gap Δ between the rising runner section and the pressure pin, the amount of movement L of the pressure pin, and the strength required to connect the biscuit and the product, which is necessary to remove the product after casting. However, continuous casting is difficult with only the element of setting the gap Δ between the inner diameter of the rising runner and the outer diameter of the pressure pin to 0.5 to 3.0 mm, and the expected effect cannot be achieved, which is an issue.
これに対し、本願発明者等は、図13に示されるように、型締された固定金型1と可動金型2に第1加圧手段3により溶湯を射出した後、第2加圧手段4によりキャビティ5に直結するランナー6にシリンダー形状部分を加工設置し、そこを移動する加圧ピン7にて第2加圧を行うが、第2加圧手段4のシリンダー内に凸溝によるオリフィス8を設け、当該オリフィス8部分でのメタルシールにより溶湯の逆流を防止しつつ、第2加圧手段4によりキャビティ加圧を成すことを特徴とする凸溝オリフィス構造を発明した。この凸溝のオリフィス8により逆流防止効果が得られ、また、凝固後のビスケット部と製品部分がつながる薄い部分の長さを極小化でき強度向上が可能となる。ランナー部の加圧ピン7の必要ストロークは、引け巣発生予想容量と相関しており製品部容積によって決まるが、従来は必要ストロークを得るためにビスケット部と製品部をつなぐ部分が長くなって強度が得られなかった。凸溝オリフィスを設置することで必要加圧ピンストローク長の影響を受けないで、隙間Δと凸溝オリフィス幅のみを決めることで逆流防止効果と製品取り出し時の折損防止強度の両方の効果を得ることができる。また、従来技術では加圧ピン7がシリンダーに挿入された部分の隙間長さは加圧ピン7の移動量によって変化する。環状隙間の流量Qは環状隙間Δの3乗に比例し、その長さLに反比例するため逆流防止効果は、加圧ピンストローク長が大きくなるほど大きくなる。一方、凸溝のオリフィス8を設置した場合は、少なくとも加圧ピンがオリフィス部分は通過することを前提とすると、逆流防止効果は隙間Δのみで決定され加圧ピンストローク長の影響は受けない。すなわち逆流効果決定要素が、ストローク移動量と共に変化する可変値の隙間長さLと隙間Δから、固定値のオリフィス隙間長さLと隙間Δになり、安定した逆流防止効果を得るための最適なランナー部加圧ピンシリンダー設計が容易になることを示している。 In response to this issue, the present inventors have invented a convex groove orifice structure, as shown in Figure 13. After molten metal is injected into the clamped fixed mold 1 and movable mold 2 by the first pressurizing means 3, a cylindrical section is machined and installed on the runner 6 directly connected to the cavity 5 by the second pressurizing means 4, and a pressure pin 7 moves along the runner to apply second pressure. The cylinder of the second pressurizing means 4 is provided with a convex groove orifice 8, and a metal seal at the orifice 8 prevents backflow of molten metal while the second pressurizing means 4 applies cavity pressure. This convex groove orifice 8 prevents backflow and minimizes the length of the thin section connecting the biscuit and product sections after solidification, improving strength. The required stroke of the pressure pin 7 on the runner section correlates with the expected shrinkage cavity generation capacity and is determined by the volume of the product section. However, in the past, the required stroke required a long section connecting the biscuit and product sections, resulting in insufficient strength. By installing a convex groove orifice, both backflow prevention and breakage prevention strength during product removal can be achieved by determining only the gap Δ and the convex groove orifice width, without being affected by the required pressure pin stroke length. Furthermore, in prior art, the gap length where the pressure pin 7 is inserted into the cylinder varies depending on the amount of movement of the pressure pin 7. The flow rate Q of the annular gap is proportional to the cube of the annular gap Δ and inversely proportional to its length L, so the backflow prevention effect increases with the pressure pin stroke length. On the other hand, when a convex groove orifice 8 is installed, assuming that the pressure pin at least passes through the orifice portion, the backflow prevention effect is determined solely by the gap Δ and is not affected by the pressure pin stroke length. In other words, the factors determining the backflow effect change from variable gap length L and gap Δ, which change with stroke movement, to fixed orifice gap length L and gap Δ, making it easier to design an optimal runner pressure pin cylinder to achieve stable backflow prevention.
「通常のダイカスト製法」では、ランナー6は製品の下部に位置し、下からキャビティ5部へ向けて上方にアルミ溶湯を射出するが、第2加圧手段4は、第1加圧手段3により形成される分流子ランナー部から先のキャビティに繋がる立上りランナー部を対象として第2加圧を行うため、第2加圧手段4は第1加圧手段によって形成される分流子がある。分流子には冷却手段が設けられるが、第2加圧手段4が干渉してしまい、第2加圧手段4の配置が困難となる問題が生じて、ランナー加圧をする時は分流子を新製する必要があった。 In the "normal die-casting method," the runner 6 is located at the bottom of the product, and molten aluminum is injected upward from below toward the cavity 5. However, the second pressurizing means 4 applies second pressure to the rising runner section that connects the branch runner section formed by the first pressurizing means 3 to the cavity beyond, so the second pressurizing means 4 has a branch formed by the first pressurizing means. The branch is equipped with a cooling means, but this interferes with the second pressurizing means 4, making it difficult to position the second pressurizing means 4. As a result, a new branch must be manufactured when applying runner pressure.
また、図14に示される「センターゲート製法」では、円錐状態の形状部品等や点対称部品に適用されるが、充填バランスを良くするためにキャビティ5の中心部から溶湯を充填させるように用いられる。特許文献3では、固定金型1と可動金型2の間に、第2可動金型9を設け、ここにキャビティ5とランナー6を繋ぐスプール10を設けてキャビティ5の全体に溶湯が行き渡るようにしている。そして、射出完了し製品が凝固し取り出す際に、図15に示すように、ゲート切断用カッター11により、ランナー部分を切りはなし、次いで、可動金型2,9同士を離反させてスプール10を持った製品を取り出すようにしている。 The "center gate manufacturing method" shown in Figure 14 is applied to conical shaped parts and point-symmetric parts, and is used to fill the molten metal from the center of the cavity 5 to improve filling balance. In Patent Document 3, a second movable mold 9 is installed between the fixed mold 1 and the movable mold 2, and a spool 10 is installed here connecting the cavity 5 and the runner 6, allowing the molten metal to spread throughout the cavity 5. Then, when injection is complete and the product has solidified and is ready to be removed, the runner portion is cut away using a gate-cutting cutter 11, and then the movable molds 2 and 9 are separated from each other, allowing the product with the spool 10 to be removed, as shown in Figure 15.
このように「センターゲート製法」では、「通常のダイカスト製法」と同じように下部より第2加圧手段であるランナー部加圧を適用して、ダイカスト製品の製品密度向上にある程度の効果を得ることが可能であるが、「通常のダイカスト製法」では溶湯の入り口であるゲートが、キャビティ下部にあるのに対して、「センターゲート製法」ではゲート部をキャビティ中央部に上方へ移動して配置しているため、ゲート切断用カッター11により下部に設けた第2加圧手段4がゲート除去とともに切断除去されてしまう。また、第2加圧手段の加圧ピン7がキャビティゲート部から離れた位置となり高圧が伝わりにくく「通常のダイカスト製法」に対するほど大きな効果は得られないという課題と、「通常のダイカスト製法」と同じように分流子の冷却手段と第2加圧手段が干渉するという課題がある。 As described above, the "center gate method," like the "standard die casting method," can apply runner pressurization from below as a second pressurizing means, and achieve some degree of effectiveness in improving the density of die-cast products. However, while the gate, which is the entrance for molten metal, is located at the bottom of the cavity in the "standard die casting method," the "center gate method" moves the gate upward and positions it in the center of the cavity. This means that the gate-cutting cutter 11 cuts and removes the second pressurizing means 4 located at the bottom along with the gate. Furthermore, the pressure pin 7 of the second pressurizing means is positioned away from the cavity gate, making it difficult to transmit high pressure, meaning that the effect is not as great as with the "standard die casting method." Another issue is that, like the "standard die casting method," the cooling means for the shunt and the second pressurizing means interfere with each other.
本発明は、「通常のダイカスト製法」及び「センターゲート製法」での上記問題点に着目し、プランジャーによる溶湯射出後に「通常のダイカスト製法」及び「センターゲート製法」に対して第2加圧手段を設置するに際して、加圧手段を分流子の冷却手段との干渉が無い位置に配置することができ、ビスケット等の冷却手段との干渉が無い場合でもランナー部加圧及びスプール部加圧手段の配置位置選択自由度を増して金型加工を容易にすることを目的とする。 The present invention addresses the above-mentioned problems with "normal die casting methods" and "center gate methods," and aims to facilitate mold processing by enabling the installation of a second pressurizing means for "normal die casting methods" and "center gate methods" after molten metal is injected by the plunger to be positioned so that the pressurizing means does not interfere with the cooling means for the diverter, and by increasing the freedom to select the placement location of the runner section pressurizing means and spool section pressurizing means even when there is no interference with cooling means such as biscuits.
また、「センターゲート製法」に対する立上りランナー部への第2加圧手段設置の場合の課題であった加圧ピンからキャビティのゲートまでの距離が長くなることによる加圧効果減少に対して、キャビティのゲートまでの距離が短いスプール部加圧手段を適用することにより、加圧効果減少を回避することを目的とする。 In addition, when installing a second pressure means on the rising runner section in the "center gate manufacturing method," the problem of reduced pressure effect due to the longer distance from the pressure pin to the cavity gate is addressed. By applying a spool section pressure means that is closer to the cavity gate, this aims to avoid this reduction in pressure effect.
「通常のダイカスト製法」での上記目的を達成するため、ビスケット部冷却手段装置により第2加圧手段の配置が困難となった場合は、立上りランナー部をU字形あるいはV字形に屈曲させることにビスケット部冷却手段装置との干渉を回避する方法を考案した。屈曲後の第2加圧手段の設置についてはU字形の場合は図2のごとく、V字形の場合は図5のごとく設置し、キャビティに直結するランナーを通じて第2加圧を行うに際し、オリフィスを配置することにより、第2加圧ピンによる加圧効果を下げることなくビスケット部冷却手段装置との干渉を回避することができることを特徴とする。この場合において、前記屈曲部はU字型若しくはV字型に形成されていることを特徴とする。 To achieve the above objectives with the "normal die-casting method," we devised a method of avoiding interference with the biscuit cooling means device by bending the rising runner section into a U-shape or V-shape when it becomes difficult to position the second pressure means due to the biscuit cooling means device. The second pressure means is installed after bending as shown in Figure 2 if it is U-shaped, or as shown in Figure 5 if it is V-shaped. When applying second pressure through a runner directly connected to the cavity, an orifice is installed, which makes it possible to avoid interference with the biscuit cooling means device without reducing the pressure effect of the second pressure pin. In this case, the bent section is characterized by being formed in a U-shape or V-shape.
「通常のダイカスト製法」における本発明に係るダイカスト製造装置は、ダイカスト金型に溶湯を射出する第1加圧手段と、キャビティに連通するランナーを屈曲させ、この屈曲部におけるキャビティ直結ランナー部に設けられキャビティ方向に加圧する第2加圧手段と、前記第2加圧手段の加圧ピンによる加圧経路に設けられ当該加圧ピンとの間で溶湯遮蔽をなし得るオリフィスと、からなる射出部を設けたことを特徴とする。この場合、前記屈曲部はU字型若しくはV字型とされていることを特徴とする。 The die-casting manufacturing apparatus of the present invention, which uses a "normal die-casting method," is characterized by having an injection section consisting of a first pressurizing means for injecting molten metal into a die-casting mold, a second pressurizing means that bends a runner that communicates with the cavity and is located in the runner section directly connected to the cavity at the bend to apply pressure toward the cavity, and an orifice that is located in the pressurizing path of the pressurizing pin of the second pressurizing means and can shield the molten metal from the pressurizing pin. In this case, the bend is characterized by being U-shaped or V-shaped.
「センターゲート製法」における本発明に係るダイカスト製造装置は、ダイカスト金型に溶湯を射出する第1加圧手段と、立上りランナー部からスプール部方向に屈曲した部分をキャビティ方向に加圧する第2加圧手段と、前記第2加圧手段の加圧ピンによる加圧経路に設けられ当該加圧ピンとの間で溶湯遮蔽をなし得るオリフィスと、からなる射出部を設けたことを特徴とする。この場合、第2加圧手段の加圧ピンは三分割金型の比較的設置が容易な固定型に設置されキャビティセンター方向に加圧することを特徴とする。 The die-casting manufacturing equipment of the present invention for the "center gate manufacturing method" is characterized by having an injection section consisting of a first pressurizing means for injecting molten metal into the die-casting mold, a second pressurizing means for pressurizing the portion bending from the rising runner portion toward the spool portion toward the cavity, and an orifice that is provided in the pressurizing path of the pressurizing pin of the second pressurizing means and can shield the molten metal from the pressurizing pin. In this case, the pressurizing pin of the second pressurizing means is installed in a fixed mold that is relatively easy to install in a three-piece mold, and presses toward the cavity center.
「通常のダイカスト製法」においては、上記のように構成されたランナー部加圧を用いた手法により第1加圧手段としてプランジャーによる射出後に、第2加圧手段としての加圧ピンによる溶湯加圧を行うようにしている。ランナー加圧をなす第2加圧手段とオリフィスがその絞り効果によりメタルシールをなして、逆流を遮蔽して圧力を維持し、もって製品部への追加加圧が可能となる。第2加圧手段とオリフィスがランナー屈曲部に配置されており、ランナー屈曲部は冷却手段を避けて配置され、第2加圧手段の加圧方向を自在に配置することができる。このため、ビスケット部分の冷却装置などと干渉することがなく、金型の中子の回避も容易となる。更に、ビスケット部分の冷却装置などと干渉がない場合もランナーを屈曲させて第2加圧装置を設置させることで第2加圧装置の設置場所、加圧ピン動作方向などを自由に変更することができるため第2加圧装置設置設計自由度を向上させることが可能となる。 In the "normal die casting method," the runner section is pressurized as described above. After injection by the plunger as the first pressurizing means, the molten metal is pressurized by the pressurizing pin as the second pressurizing means. The second pressurizing means and orifice that pressurize the runner form a metal seal due to their throttling effect, blocking backflow and maintaining pressure, thereby enabling additional pressurization of the product section. The second pressurizing means and orifice are located at the runner bend, which is positioned to avoid the cooling means, allowing the pressure direction of the second pressurizing means to be freely positioned. This prevents interference with the cooling device for the biscuit section, and makes it easy to avoid the mold core. Furthermore, even if there is no interference with the cooling device for the biscuit section, bending the runner to install the second pressurizing device allows for free modification of the installation location of the second pressurizing device, the direction of operation of the pressurizing pin, and other aspects, thereby improving the design flexibility of the second pressurizing device installation.
また、「センターゲート製法」においては、固定金型に設置された第2加圧手段により第1加圧手段としてプランジャーによる射出後に、第2加圧手段としての加圧ピンによる溶湯加圧を行うようにしている。スプール部加圧をなす第2加圧手段とオリフィスがその絞り効果によりメタルシールをなして、逆流を遮蔽して圧力を維持し、もって製品部への追加加圧が可能となる。 In addition, in the "center gate manufacturing method," a second pressurizing means installed in the fixed mold pressurizes the molten metal using a pressure pin as the second pressurizing means after injection using a plunger as the first pressurizing means. The second pressurizing means that pressurizes the spool section and the orifice form a metal seal due to their throttling effect, blocking backflow and maintaining pressure, thereby enabling additional pressure to be applied to the product section.
更に、オリフィス部を設置することによりランナー部とスプール部を繋ぐ円筒形肉厚部の厚さを調整可能となり、油圧シリンダーによるパンチによるカットを容易にする肉厚設定が可能となる。オリフィスの隙間長さLに比例するが、隙間Δをカットが容易な強度まで薄くするためのオリフィスの隙間長さLを決定すれば容易なカットが可能となる。 Furthermore, by installing the orifice, it is possible to adjust the thickness of the cylindrical thick-walled section connecting the runner section and the spool section, making it possible to set the thickness to facilitate cutting with a hydraulic cylinder punch. The thickness is proportional to the orifice gap length L, but by determining the orifice gap length L to thin the gap Δ to a strength that makes cutting easy, cutting becomes easy.
以下に、本発明の実施例に係るダイカスト製造方法と装置を、図面を参照しつつ、詳細に説明する。なお、以下の説明は一つの実施例に過ぎず、本発明の趣旨を変えない限り、本発明には種々の変形例を含み得るものである。 The die-casting manufacturing method and apparatus according to an embodiment of the present invention will be described in detail below with reference to the drawings. Please note that the following description is merely one embodiment, and various modifications may be made to the present invention as long as they do not deviate from the spirit of the present invention.
図1~2に、本実施例に係るダイカスト製造装置の要部断面図と側面図を示している。ダイカスト製造装置は、移動盤に取り付けた可動金型12と、固定盤に取り付けた固定金型14とを備え、両金型12,14を当接することにより形成されるキャビティ16内に溶湯を射出し、キャビティ16に倣った形状の製品ができあがる。製品は金型12、14を離反させ、可動金型12の背面部に設けた押し出しピンを作動させてキャビティ16から取り出すことができる。 Figures 1 and 2 show a cross-sectional view and a side view of the main parts of the die-casting manufacturing equipment according to this embodiment. The die-casting manufacturing equipment comprises a movable mold 12 attached to a movable platen and a fixed mold 14 attached to a fixed platen. Molten metal is injected into a cavity 16 formed by bringing the two molds 12, 14 into contact, resulting in a product shaped to match the cavity 16. The product can be removed from the cavity 16 by separating the molds 12, 14 and activating an ejector pin attached to the back of the movable mold 12.
このようなダイカスト製造装置のキャビティ16に溶湯を供給するための射出部として給湯手段がキャビティ16の下位に位置して配置されている。これは固定盤を水平に貫通して取り付けられ固定金型14に達する射出スリーブ18と、射出スリーブ18内に配設されたプランジャー20と、プランジャー20の後方にあってプランジャー20を押し引き出来る加圧装置と、からなる第1加圧手段22から構成される。 The molten metal supply means is positioned below the cavity 16 as an injection section for supplying molten metal to the cavity 16 of this die-casting manufacturing device. This is composed of a first pressure means 22 consisting of an injection sleeve 18 that penetrates horizontally through the fixed platen and reaches the fixed mold 14, a plunger 20 disposed within the injection sleeve 18, and a pressure device located behind the plunger 20 that can push and pull the plunger 20.
射出スリーブ18の前端にはキャビティ16に至る通路となるランナー24が形成されており、このランナー24は、射出スリーブ18からほぼ水平に延長され徐々に断面が絞られた分流子ランナー26と、キャビティ16の下部に直結するように上方向に向きを変えた立上りランナー28とからなり、プランジャー20によって押し出された溶湯が、分流子ランナー26を経由し、立上りランナー28によって上方に向きを変え、キャビティ16に射出噴射するように構成されている。 A runner 24 is formed at the front end of the injection sleeve 18, serving as a passageway leading to the cavity 16. This runner 24 consists of a diverter runner 26 that extends almost horizontally from the injection sleeve 18 and gradually narrows in cross section, and a rising runner 28 that turns upward to connect directly to the bottom of the cavity 16. The molten metal extruded by the plunger 20 passes through the diverter runner 26, is turned upward by the rising runner 28, and is injected into the cavity 16.
このような立上りランナー28には、キャビティ16内の溶湯を二次的に加圧せしめる第2加圧手段30が設けられているが、この実施例では立上りランナー28に屈曲部を形成し、この屈曲部のキャビティ直結ランナー部32に対して第2加圧手段30を設けるように構成されている。 Such a rising runner 28 is provided with a second pressurizing means 30 that secondarily pressurizes the molten metal in the cavity 16. In this embodiment, a bent portion is formed in the rising runner 28, and the second pressurizing means 30 is provided on the runner portion 32 of this bent portion that is directly connected to the cavity.
具体的には、図2に示すように、立上りランナー28は、分流子ランナー26側から直接溶湯が流れ込む下部水平ランナー部34と、その先端で立上りランナー28と平行に立ち上がっている連結ランナー部36と、連結ランナー部36の先端で元の立上りランナー28側に戻り、溶湯をキャビティ16に導入する前記下部水平ランナー部34と平行な上部水平ランナー部すなわちキャビティ直結ランナー部32とから構成されている。これらの下部水平ランナー部34,連結ランナー部36、キャビティ直結ランナー部32はU字型屈曲部38を形成している。そして、第2加圧手段30の加圧ピン40は、キャビティ直結ランナー部32内に出入りして溶湯を加圧することにより、二次的な加圧ができるようになっている。 Specifically, as shown in Figure 2, the rising runner 28 is composed of a lower horizontal runner section 34 into which molten metal flows directly from the diverter runner 26 side; a connecting runner section 36 that rises parallel to the rising runner 28 at its tip; and an upper horizontal runner section, i.e., a cavity-direct runner section 32, that is parallel to the lower horizontal runner section 34 and returns to the original rising runner 28 side at the tip of the connecting runner section 36, and introduces molten metal into the cavity 16. The lower horizontal runner section 34, connecting runner section 36, and cavity-direct runner section 32 form a U-shaped bend section 38. The pressure pin 40 of the second pressure means 30 moves in and out of the cavity-direct runner section 32 to pressurize the molten metal, thereby enabling secondary pressure application.
第2加圧手段30は、金型12、14に装備されたアクチュエータ(図示せず)と、このアクチュエータによって連結ランナー部36の端面から突出移動し、キャビティ直結ランナー部32を水平に移動する加圧ピン40とから構成されている。図3に示されているように、加圧ピン40の直径dはキャビティ直結ランナー部32の内径Dより小さくして、加圧ピン40のキャビティ直結ランナー部32における左右摺動を可能としている。したがって、加圧ピン40のキャビティ直結ランナー部32への圧入量V(図3参照)がキャビティ16による製品の密度を向上させることになる。 The second pressure applying means 30 is composed of an actuator (not shown) mounted on the molds 12, 14, and a pressure pin 40 that protrudes from the end face of the connecting runner portion 36 by the actuator and moves horizontally along the cavity-direct runner portion 32. As shown in Figure 3, the diameter d of the pressure pin 40 is smaller than the inner diameter D of the cavity-direct runner portion 32, allowing the pressure pin 40 to slide left and right along the cavity-direct runner portion 32. Therefore, the amount V (see Figure 3) of pressure applied by the pressure pin 40 into the cavity-direct runner portion 32 improves the density of the product formed by the cavity 16.
ところで、本実施例では、特に、屈曲部38における連結ランナー部36とキャビティ直結ランナー部32の交差部(図3のA-B区間)より右方のキャビティ直結ランナー部32側(図2のB部分)に、その内径を絞るオリフィス42を形成している。これはキャビティ直結ランナー部32の内径部分に断面矩形の環状突起44を形成したもので、その突起44の高さ(すなわちキャビティ直結ランナー部32の内径寸法)をできるだけ加圧ピン40の外径dに合わせて、ここでメタルシールができるようにしている。具体的には、キャビティ16の大きさにもよるが、キャビティ直結ランナー部32の内径Dと加圧ピン40の外径dの差の1/2が隙間寸法Δであるが、その隙間寸法Δが1/2~1/3以下となるように環状突起44の高さを決めている。すなわち環状突起44の内径と加圧ピン40の外径dの差の1/2がメタルシール部分の隙間寸法δであり、δ=Δ×1/2とし、望ましくはδ=Δ×1/3としており、下限値はメタルシールが破損するときの値である。また、環状突起44の軸方向長さLは10mm程度として、メタルシールが確実におこなわれるようにしている。 In this embodiment, an orifice 42 that narrows the inner diameter is formed on the cavity-direct runner section 32 side (section B in Figure 2) to the right of the intersection of the connecting runner section 36 and the cavity-direct runner section 32 at the bend 38 (section A-B in Figure 3). This is an annular protrusion 44 with a rectangular cross section formed on the inner diameter of the cavity-direct runner section 32, and the height of this protrusion 44 (i.e., the inner diameter dimension of the cavity-direct runner section 32) is matched as closely as possible to the outer diameter d of the pressure pin 40, allowing for a metal seal. Specifically, although this depends on the size of the cavity 16, the gap dimension Δ is 1/2 of the difference between the inner diameter D of the cavity-direct runner section 32 and the outer diameter d of the pressure pin 40. The height of the annular protrusion 44 is determined so that this gap dimension Δ is 1/2 to 1/3 or less. In other words, the gap dimension δ of the metal seal portion is 1/2 of the difference between the inner diameter of the annular protrusion 44 and the outer diameter d of the pressure pin 40, where δ = Δ × 1/2, and preferably δ = Δ × 1/3, with the lower limit being the value at which the metal seal breaks. Furthermore, the axial length L of the annular protrusion 44 is set to approximately 10 mm to ensure a reliable metal seal.
このように構成された第2加圧手段30は、第1加圧手段22のプランジャー20による射出が完了した後に、図4(1)に示すような位置から加圧し始め、加圧ピン40が環状突起44に差し掛かると、オリフィス42部分に上位の溶湯が差し込んでメタルシールを形成し(図4(2))、その部分で遮蔽機能を発揮する。このため、このオリフィス42部分でのメタルシールによって、キャビティ16内への溶湯充填量が増し、加圧ピン40による押し込み動作により、ストロークが長くなって作業を完了するのである(図4(3))。 The second pressurizing means 30 configured in this manner begins applying pressure from the position shown in Figure 4 (1) after injection by the plunger 20 of the first pressurizing means 22 is complete. When the pressurizing pin 40 reaches the annular protrusion 44, the molten metal from above enters the orifice 42, forming a metal seal (Figure 4 (2)), which performs a shielding function. As a result, the metal seal at the orifice 42 increases the amount of molten metal filled into the cavity 16, and the pushing action of the pressurizing pin 40 lengthens the stroke, completing the operation (Figure 4 (3)).
なお、オリフィス42を形成する環状突起44は、実施例のように角形断面としてもよいが、V字型、円弧型の断面形状とすることができる。この場合、V字型、円弧型の切っ先部分が鋭利となっているとメタルシールが取れないので、先端を削った形状とすることが望ましい。 The annular protrusion 44 that forms the orifice 42 may have a rectangular cross section as in the embodiment, but it can also have a V-shaped or arc-shaped cross section. In this case, if the tip of the V-shaped or arc-shaped protrusion is sharp, it will be difficult to remove the metal seal, so it is desirable to have a shaved tip.
また、オリフィス42を形成している環状突起44には、冷却手段を配置することができる。これは水平方式・水冷方式でも、あるいは油冷方式でも可能で、第1加圧手段22による射出が完了し、第2加圧手段30による加圧が環状突起44にかかった時に(図4(2))冷却するとよい。こうすることによってメタルシールが形成しやすくなる。 In addition, a cooling means can be placed on the annular protrusion 44 that forms the orifice 42. This can be a horizontal water-cooled system or an oil-cooled system, and it is recommended that cooling be performed when injection by the first pressurizing means 22 is completed and pressure is applied to the annular protrusion 44 by the second pressurizing means 30 (Figure 4 (2)). This makes it easier to form a metal seal.
上記実施例ではオリフィス42を形成する環状突起44を別部品として形成し、ランナー24を形成する際にはめ込み構造で取り付けるようにしてもよい。これは金型の分割線でランナー24が割れる構造であるため、半円構造とした立上りランナー28への装着が簡単にできるからである。
また、上記実施例はホットチャンバーのランナーを押すことにも、またプラスチックを成形する際にも応用できる。
In the above embodiment, the annular protrusion 44 that forms the orifice 42 may be formed as a separate part and attached by a fitting structure when forming the runner 24. This is because the runner 24 is structured to split at the parting line of the mold, making it easy to attach to the rising runner 28 that has a semicircular structure.
The above embodiment can also be applied to pushing a runner in a hot chamber and when molding plastics.
このように本実施例によれば、キャビティ16への射出を第1加圧手段22により行い、ランナー24に溶湯が充満した状態から第2加圧手段30を作動させる。そうすると、加圧ピン40が連結ランナー部36とキャビティ直結ランナー部32の交差部(図3A→B)に達する間は、通常の押し出し作用をなすが、連結ランナー部36が途切れてキャビティ直結ランナー部32に達した途端に環状突起44が、隙間δでメタルシールにより溶湯金属が固化し、ここで圧力が遮断する(図4(2))。したがって、加圧ピン40の上位に位置するまだ固まらないキャビティ16側のランナー溶湯は遮断された圧力を背景にキャビティ16側に押し込まれる。 As described above, according to this embodiment, injection into the cavity 16 is performed by the first pressurizing means 22, and the second pressurizing means 30 is activated once the runner 24 is filled with molten metal. The normal extrusion action occurs while the pressurizing pin 40 reaches the intersection of the connecting runner portion 36 and the cavity-direct runner portion 32 (Figure 3A->B). However, as soon as the connecting runner portion 36 ends and the runner portion 32 is reached, the annular protrusion 44 solidifies the molten metal by the metal seal in the gap δ, and pressure is interrupted (Figure 4 (2)). Therefore, the unsolidified runner molten metal on the cavity 16 side, located above the pressurizing pin 40, is pushed toward the cavity 16 against the backdrop of the interrupted pressure.
これによって、加圧ピンを、従来のストロークより多く前進させることができ(図4(3))、第2加圧手段30により、より緻密な製品を製造することができる。この時の効果は同じ容積のキャビティ16に溶湯を充填した場合、1.7%の重量増のなり、この業界では驚異的な値である。 This allows the pressure pin to be advanced by a greater stroke than with conventional methods (Figure 4 (3)), and the second pressure means 30 can be used to produce a denser product. The effect of this is that when filling a cavity 16 of the same volume with molten metal, it results in a 1.7% increase in weight, an astonishing value in this industry.
特にこの実施例では、特に立上りランナー28にU字型屈曲部38を設け、そのキャビティ16に通じる通路であるキャビティ直結ランナー部32に第2加圧手段30を取り付けるようにしているので、第2加圧手段30を、肉厚のあるビスケット46や中子等に付帯する冷却手段を避けて配置でき、設計自由度が増す。 In particular, in this embodiment, a U-shaped bend 38 is provided in the rising runner 28, and the second pressurizing means 30 is attached to the cavity-directly connected runner section 32, which is the passage leading to the cavity 16. This allows the second pressurizing means 30 to be positioned away from the cooling means associated with the thick biscuit 46, core, etc., thereby increasing design flexibility.
次に、図5には第2実施例を示す。この例は、前記実施例が屈曲部をU字形にしたのに対し、V字型としたものである。第1加圧手段22とキャビティ16間を連絡しているランナー24の特に立上りランナー28の途中をV字状に屈曲し、基端を第1加圧手段22に通じる第1傾斜ランナー部50と、この第1傾斜ランナー部50と連絡され、キャビティ16に直結する第2傾斜ランナー部52とから構成されている。第2傾斜ランナー部52には、その軸芯に沿って往復摺動できる加圧ピン40を備えた第2加圧手段30が取り付けられている。また、両傾斜ランナー部50、52の交差部分より第2傾斜ランナー部52側にはその内径を絞るオリフィス42が設けられ、当該オリフィス42部分での第2加圧手段30の加圧ピン40との間でメタルシールにより溶湯の逆流を防止しつつ第2加圧手段30により加圧を成すようにしている。その他の構成は上記実施例と同様なので説明を省略する。 Next, Figure 5 shows a second embodiment. While the previous embodiment had a U-shaped bend, this embodiment uses a V-shaped bend. The runner 24, which connects the first pressurizing means 22 and the cavity 16, is bent in a V-shape, particularly the rising runner 28, midway. The runner 24 comprises a first inclined runner section 50 whose base end leads to the first pressurizing means 22, and a second inclined runner section 52 connected to the first inclined runner section 50 and directly connected to the cavity 16. The second inclined runner section 52 is fitted with a second pressurizing means 30 equipped with a pressurizing pin 40 that can slide back and forth along its axis. An orifice 42 is provided on the second inclined runner section 52 side of the intersection of the inclined runner sections 50 and 52 to reduce its inner diameter. A metal seal is formed between the orifice 42 and the pressurizing pin 40 of the second pressurizing means 30, preventing backflow of molten metal while applying pressure from the second pressurizing means 30. The rest of the configuration is the same as in the previous example, so explanations will be omitted.
この実施例では加圧経路となっている立上りランナー28にV字型屈曲部54としたため斜め方向となるが、斯かる構成によっても冷却手段を回避でき、設計自由度が増す。 In this embodiment, the rising runner 28, which serves as the pressure path, has a V-shaped bend 54, which causes it to bend obliquely, but this configuration also makes it possible to avoid the need for a cooling means, increasing design flexibility.
次に図6には「センターゲート製法」への適用例を示す。「センターゲート製法」では、円形・円錐状態の形状部品等や点対称部品に適用されるが、充填バランスを良くするためにキャビティ5の中心部から溶湯を充填させるようにして用いられる。 Next, Figure 6 shows an example of application to the "center gate manufacturing method." The "center gate manufacturing method" is applied to circular or conical shaped parts and point-symmetric parts, and is used by filling the molten metal from the center of cavity 5 to improve filling balance.
このセンターゲート製法を実施する装置は、図6に示すように、固定金型60と可動金型62の間に、第2可動金型64を設け、可動金型(以下、第1可動金型という。)62と第2可動金型64の間に円形のキャビティ66を形成し、このキャビティ66とランナー68を繋ぐスプール70を当該第2可動金型64に形成している。スプール70は、円錐形に形成されており、頂点部は円形キャビティ66の中心部に位置し、その頂点から溶湯を供給することによりスプール70を通じてキャビティ66の全体に溶湯が行き渡るものである。ランナー68は固定金型60の型合わせ面に形成され、スプール70の頂点部から直角に屈曲して下方に延びており、固定金型60の下方に設けられ、水平に伸びたプランジャースリーブ72に通じている。プランジャースリーブ72にはプランジャー74が内挿され、図示しないアクチュエータにより溶湯を射出する1次加圧するようになっている。このプランジャー74を含む加圧手段が第1加圧手段76である。また、固定金型60と第2可動金型64の合わせ面には、ランナー68を対向するゲート切断用油圧シリンダー78が設けられ、型開した際、このゲート切断用油圧シリンダー78がスプール70からランナー68を切断して切り離すようになっている。 As shown in Figure 6, the device for implementing this center gate manufacturing method has a second movable mold 64 installed between a fixed mold 60 and a movable mold 62. A circular cavity 66 is formed between the movable mold (hereinafter referred to as the first movable mold) 62 and the second movable mold 64. A spool 70 connecting this cavity 66 to a runner 68 is formed in the second movable mold 64. The spool 70 is formed in a conical shape, with its apex located at the center of the circular cavity 66. By supplying molten metal from this apex, the molten metal is distributed throughout the cavity 66 through the spool 70. The runner 68 is formed on the mating surface of the fixed mold 60, bends at a right angle from the apex of the spool 70, and extends downward. It connects to a horizontally extending plunger sleeve 72 installed below the fixed mold 60. A plunger 74 is inserted into the plunger sleeve 72, and an actuator (not shown) applies primary pressure to inject the molten metal. The pressure applying means including this plunger 74 is the first pressure applying means 76. In addition, a gate cutting hydraulic cylinder 78 facing the runner 68 is provided on the mating surface between the fixed mold 60 and the second movable mold 64, and when the molds are opened, this gate cutting hydraulic cylinder 78 cuts and separates the runner 68 from the spool 70.
前記スプール70の頂点に対向して、固定金型60側には第2加圧手段80が設けられている。これは加圧シリンダー82とこれから出入りされる加圧ピン84からなり、加圧ピン84を第2可動金型64に形成されたスプール70の頂点部に向けて出入りするように構成されている。具体的には、詳細を図6の拡大部に示しているように、ランナー68とスプール70とを繋ぐ箇所に設けられた屈曲通路86を加圧ピン84の出入り通路とし、これは第2可動金型64の内部に形成されており、キャビティ66に繋がる通路となる。加圧ピン84はランナー68を横断し、屈曲通路86に至った途端、キャビティ66の加圧をなす。屈曲通路86には円形リング88が装着され、その内径を絞るオリフィス90とされる。これは屈曲通路86の内径部分に断面矩形の環状突起を形成したもので、その突起の高さをできるだけ加圧ピン84の外径dに合わせて、ここでメタルシールができるようにしている。したがって、図6の拡大図に示すように(同図下部の図)、加圧ピン84による押し込み量がキャビティ66への加圧量となるのである。 A second pressure applying means 80 is provided on the fixed mold 60 side, facing the apex of the spool 70. It consists of a pressure cylinder 82 and a pressure pin 84 that moves in and out of the pressure cylinder 82. The pressure pin 84 moves in and out toward the apex of the spool 70 formed in the second movable mold 64. Specifically, as shown in the enlarged portion of Figure 6, a curved passage 86 provided at the point connecting the runner 68 and the spool 70 serves as the passage for the pressure pin 84. This passage is formed inside the second movable mold 64 and connects to the cavity 66. The pressure pin 84 crosses the runner 68 and pressurizes the cavity 66 upon reaching the curved passage 86. A circular ring 88 is attached to the curved passage 86, forming an orifice 90 that narrows its inner diameter. This is an annular protrusion with a rectangular cross section formed on the inner diameter of the curved passage 86. The height of the protrusion is adjusted as closely as possible to the outer diameter d of the pressure pin 84, allowing a metal seal to be formed here. Therefore, as shown in the enlarged view of Figure 6 (bottom view), the amount of pressure applied by the pressure pin 84 determines the amount of pressure applied to the cavity 66.
この「センターゲート製法」の実際の作業工程を図7~図12に示す。まず、型締状態では第1加圧手段76、ゲート切断用油圧シリンダー78、第2加圧手段80も待機状態にあり、最初にプランジャースリーブ72の注湯口から溶湯を注湯する(図7)。その後、注湯が完了したら第1加圧手段76の作動を開始し、高速移動させるとともに前進限で低速高圧の射出を行って完了する。溶湯アルミはランナー68に入り、上昇して屈曲通路86を経て、スプール70からキャビティ66に充填される(図8)。その後、第1加圧手段76による射出動作が完了した後、第2加圧手段80による二次加圧が行われる。これは第2加圧手段80の待機位置(図6拡大図上図)から加圧シリンダー82により加圧ピン84を押し出し、ランナー68を横断し、屈曲通路86に至ってオリフィス90部分に上位の溶湯が差し込んでメタルシールを形成し、その部分で遮蔽機能を発揮する。このため、このオリフィス90部分でのメタルシールによって、キャビティ66内への溶湯充填量が増し、加圧ピン84による押し込み動作により、ストロークが長くなって作業を完了するのである(図9)。次いで第2可動金型64を含んで第1可動金型62が後退し、中間型の片開が行われる。これによってランナー68がキャビティ66側に付いた状態となる(図10)。この型開の状態でゲート切断用油圧シリンダー78を作動され、ランナー部分をカット除去する(図11)。最終的に第1可動金型62を更に後退移動させ、中間型の第2可動金型64と第1可動金型62の間を拡開し、キャビティ66から製品を取り出して終了するのである(図12)。 Figures 7 through 12 show the actual process of this "center gate manufacturing method." First, with the mold clamped, the first pressurizing device 76, the gate-cutting hydraulic cylinder 78, and the second pressurizing device 80 are also in standby mode. Molten aluminum is first poured through the inlet of the plunger sleeve 72 (Figure 7). After pouring is complete, the first pressurizing device 76 begins operation, moving at high speed while completing the forward thrust for low-speed, high-pressure injection. The molten aluminum enters the runner 68, rises, passes through the curved passage 86, and fills the cavity 66 from the spool 70 (Figure 8). After the first pressurizing device 76 completes injection, the second pressurizing device 80 applies secondary pressure. This occurs when the pressure cylinder 82 pushes the pressure pin 84 from its standby position (top view of the enlarged view in Figure 6) across the runner 68 and into the curved passage 86. The molten aluminum from the upper portion penetrates the orifice 90, forming a metal seal that provides a shielding function. Therefore, the metal seal at this orifice 90 increases the amount of molten metal filled into the cavity 66, and the pushing action of the pressure pin 84 lengthens the stroke, completing the process (Figure 9). Next, the first movable mold 62, including the second movable mold 64, moves back, and one side of the intermediate mold is opened. This leaves the runner 68 in contact with the cavity 66 (Figure 10). In this mold-open state, the gate-cutting hydraulic cylinder 78 is activated, cutting and removing the runner portion (Figure 11). Finally, the first movable mold 62 is moved back further, widening the gap between the second movable mold 64 and the first movable mold 62 of the intermediate mold, and the product is removed from the cavity 66, completing the process (Figure 12).
このように「センターゲート製法」によれば、キャビティ66の中心部に位置するスプール70の加圧をなす第2加圧手段80とオリフィス90がその絞り効果によりメタルシールをなして、逆流を遮蔽して圧力を維持し、もって製品部への追加加圧が可能となる。ひいてはランナー68の下部に第2加圧手段80を置かなくてもよくなり、第2加圧手段80が邪魔になることはない。更に、オリフィス90を設置することによりランナー68とスプール70を繋ぐ円筒形肉厚部の厚さを調整可能となり、ゲート切断用油圧シリンダー78によるパンチによるカットを容易にする肉厚設定が可能となる。オリフィス90の隙間長さLに比例するが、隙間Δをカットが容易な強度まで薄くするためのオリフィスの隙間長さLを決定すれば容易なカットが可能となる等の効果が得られる。 In this way, with the "center gate manufacturing method," the second pressurizing means 80 and orifice 90, which pressurize the spool 70 located in the center of the cavity 66, form a metal seal due to their throttling effect, blocking backflow and maintaining pressure, thereby enabling additional pressure to be applied to the product portion. This eliminates the need to place the second pressurizing means 80 below the runner 68, and the second pressurizing means 80 does not get in the way. Furthermore, by installing the orifice 90, the thickness of the cylindrical thick-walled portion connecting the runner 68 and spool 70 can be adjusted, allowing for thickness settings that facilitate cutting with a punch using the gate-cutting hydraulic cylinder 78. While the orifice gap length L is proportional to the gap length L of the orifice 90, determining the gap Δ to a strength that allows for easy cutting provides other benefits, such as easier cutting.
本発明は、ダイカスト製造を第1加圧手段のプランジャー加圧に引き続き、第2加圧手段により「通常のダイカスト製法」のランナー部、及び「センターゲート製法」のスプール部を加圧することができ製品密度を向上できるとともに、「通常のダイカスト製法」では第2加圧手段をビスケット等の冷却手段と干渉しないように配置することができ、「センターゲート製法」では設置が容易な固定金型に設置する方法と装置である。 This invention is a method and apparatus for die casting production in which, following plunger pressure from the first pressure means, the second pressure means can pressurize the runner portion in "normal die casting methods" and the spool portion in "center gate methods," improving product density. In addition, in "normal die casting methods," the second pressure means can be positioned so as not to interfere with cooling means such as biscuits, and in "center gate methods," it can be installed in a fixed mold, which is easy to install.
1……固定金型、
2……可動金型、
3……第1加圧手段、
4……第2加圧手段、
5……キャビティ、
6……ランナー、
7……加圧ピン、
8……オリフィス、
9……第2可動金型、
10……スプール、
11……ゲート切断用カッター、
12……可動金型、
14……固定金型、
16……キャビティ、
18……射出スリーブ、
20……プランジャー、
22……第1加圧手段、
24……ランナー、
26……分流子ランナー、
28……立上りランナー、
30……第2加圧手段、
32……キャビティ直結ランナー部(上部水平ランナー部)、
34……下部水平ランナー部、
36……連結ランナー部、
38……U字型屈曲部、
40……加圧ピン、
42……オリフィス、
44……環状突起、
46……ビスケット、
50……第1傾斜ランナー部、
52……第2傾斜ランナー部、
54……V字型屈曲部、
60……固定金型、
62……第1可動金型、
64……第2可動金型、
66……キャビティ、
68……ランナー、
70……スプール、
72……プランジャースリーブ、
74……プランジャー、
76……第1加圧手段、
78……ゲート切断用油圧シリンダー、
80……第2加圧手段、
82……加圧シリンダー、
84……加圧ピン、
86……屈曲通路、
88……円形リング、
90……オリフィス。
1...Fixed mold,
2... Movable mold,
3...first pressurizing means,
4...Second pressurizing means,
5...cavity,
6...Runner,
7...Pressure pin,
8...Orifice,
9...second movable mold,
10...spool,
11...gate cutting cutter,
12... Movable mold,
14...Fixed mold,
16...cavity,
18... injection sleeve,
20... plunger,
22...first pressurizing means,
24...Runner,
26...Divider Runner,
28...Runner standing up,
30...second pressurizing means,
32: Runner section directly connected to cavity (upper horizontal runner section),
34...Lower horizontal runner section,
36...Connecting runner part,
38...U-shaped bent part,
40...Pressure pin,
42...Orifice,
44...annular protrusion,
46...biscuit,
50...first inclined runner portion,
52...second inclined runner portion,
54...V-shaped bent part,
60...Fixed mold,
62...first movable mold,
64...second movable mold,
66...cavity,
68...Runner,
70...spool,
72... plunger sleeve,
74...plunger,
76...first pressurizing means,
78... Hydraulic cylinder for gate cutting,
80: Second pressurizing means,
82...pressurized cylinder,
84...Pressure pin,
86...Bending passage,
88...Circular ring,
90...Orifice.
Claims (9)
キャビティに連通するランナーを屈曲させ、この屈曲部におけるキャビティ直結ランナー部に設けられキャビティ方向に加圧する第2加圧手段と、
前記第2加圧手段の加圧ピンによる加圧経路に設けられ当該加圧ピンとの間で溶湯遮蔽をなし得るオリフィスと、
からなる射出部を設けたことを特徴とするダイカスト製造装置。 a first pressurizing means for injecting molten metal into a die-casting mold;
a second pressurizing means for bending the runner communicating with the cavity and for applying pressure in the direction of the cavity, the second pressurizing means being provided at the bent portion of the runner directly connected to the cavity;
an orifice that is provided in a pressurizing path by a pressurizing pin of the second pressurizing means and that can shield the molten metal between the pressurizing pin and the orifice;
A die-casting manufacturing device characterized by having an injection section comprising:
スプールに対向して前記第1加圧手段による加圧後に溶湯加圧をなす固定金型設置の第2加圧手段と、
前記ランナーにスプールに至る屈曲部に設けられる通路に配置されたオリフィスを設け、当該オリフィス部分での前記第2加圧手段の加圧ピンとの間でメタルシールにより溶湯の逆流を防止しつつ第2加圧手段により加圧を成すことを特徴とするダイカスト製造装置。 In a center gate manufacturing method, a first pressurizing means for injecting molten metal into a clamped mold cavity through a runner and a spool;
a second pressurizing means provided in a fixed mold, facing the spool and pressurizing the molten metal after the first pressurizing means pressurizes the molten metal;
A die casting manufacturing apparatus characterized in that an orifice is provided in a passage provided in a bent portion of the runner leading to a spool, and pressurization is performed by the second pressurizing means while preventing backflow of molten metal at the orifice portion by a metal seal between the orifice and the pressurizing pin of the second pressurizing means.
前記スプールに対向し固定金型に設置された第2加圧手段と、
前記第2加圧手段の加圧ピンをスプール部に設置の屈曲部に出入り可能とし、この屈曲部に設けたオリフィスとの間でメタルシールにより溶湯の逆流を防止する加圧ピンを設けスプール部加圧をなすことを特徴とするダイカスト製造装置。 In a center gate manufacturing method, a first pressurizing means for injecting molten metal into a clamped mold cavity via a runner and a spool that communicates with the mold cavity via a bent portion at the tip of the runner;
a second pressurizing means disposed in the fixed mold opposite the spool;
A die casting manufacturing apparatus characterized in that the pressure pin of the second pressure means is capable of moving in and out of a bent portion installed in the spool portion, and a pressure pin is provided between the bent portion and an orifice provided in this bent portion and prevents backflow of molten metal by a metal seal, thereby pressurizing the spool portion.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2022024102A JP7726478B2 (en) | 2022-02-18 | 2022-02-18 | Die-casting manufacturing method and device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2022024102A JP7726478B2 (en) | 2022-02-18 | 2022-02-18 | Die-casting manufacturing method and device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2023120942A JP2023120942A (en) | 2023-08-30 |
| JP7726478B2 true JP7726478B2 (en) | 2025-08-20 |
Family
ID=87797535
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2022024102A Active JP7726478B2 (en) | 2022-02-18 | 2022-02-18 | Die-casting manufacturing method and device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7726478B2 (en) |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2005052886A (en) | 2003-08-07 | 2005-03-03 | Toyota Motor Corp | Injection mold |
| JP2009208327A (en) | 2008-03-04 | 2009-09-17 | Hajime Sangyo Kk | Mold for injection molding |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5997749A (en) * | 1982-11-24 | 1984-06-05 | Toyota Central Res & Dev Lab Inc | Casting method for die casting |
| JPH0671414A (en) * | 1992-04-03 | 1994-03-15 | Mitsubishi Materials Corp | Die for forging molten metal |
| JPH08281408A (en) * | 1995-04-17 | 1996-10-29 | Aisan Ind Co Ltd | Die casting method and its apparatus |
| JPH10146662A (en) * | 1996-11-13 | 1998-06-02 | Denso Corp | Die casting method and die casting apparatus |
-
2022
- 2022-02-18 JP JP2022024102A patent/JP7726478B2/en active Active
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2005052886A (en) | 2003-08-07 | 2005-03-03 | Toyota Motor Corp | Injection mold |
| JP2009208327A (en) | 2008-03-04 | 2009-09-17 | Hajime Sangyo Kk | Mold for injection molding |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2023120942A (en) | 2023-08-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3506800B2 (en) | Injection control method and apparatus for die casting machine | |
| US4380261A (en) | Die-casting method | |
| JP7706583B2 (en) | Method for controlling die casting device and die casting method | |
| US10894286B2 (en) | High-pressure die casting apparatus and method | |
| WO2022145109A1 (en) | Die-casting manufacturing method and apparatus | |
| JP7726478B2 (en) | Die-casting manufacturing method and device | |
| KR100841032B1 (en) | Injection molding method and injection molding machine | |
| JP7090254B1 (en) | Die casting manufacturing method and equipment | |
| US4446907A (en) | Die-casting method | |
| JP7783375B2 (en) | Pressure rod operation control method, die casting method | |
| WO2023228390A1 (en) | Die cast manufacturing method and apparatus | |
| CN120480139A (en) | Die casting machine and die casting method based on die casting machine | |
| JP7727309B2 (en) | Partial ultra-high pressure die casting manufacturing method and device | |
| JP7750482B2 (en) | Die-casting manufacturing method and device | |
| JP2678933B2 (en) | Injection molding equipment | |
| JP2000117411A (en) | Die casting apparatus and die casting method | |
| JP2003230951A (en) | Injection molding dies and molded products for molding cylindrical parts | |
| JP3386466B2 (en) | Injection device for cold chamber die casting machine | |
| JPH03264148A (en) | Die instrument in die casting for rotor of induction motor | |
| JP2025059796A (en) | Die casting manufacturing method and device | |
| JPH08281408A (en) | Die casting method and its apparatus | |
| JPH0451261B2 (en) | ||
| WO2025099810A1 (en) | Die-casting machine and die-casting manufacturing method | |
| JPS6054261A (en) | Die casting device | |
| JP2026068201A (en) | Die casting machine, and die casting method using a die casting machine |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20240531 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20250314 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20250507 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20250528 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20250702 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20250730 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7726478 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R154 | Certificate of patent or utility model (reissue) |
Free format text: JAPANESE INTERMEDIATE CODE: R154 |