Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7726543B2 - Work boat - Google Patents
[go: Go Back, main page]

JP7726543B2 - Work boat - Google Patents

Work boat

Info

Publication number
JP7726543B2
JP7726543B2 JP2023208597A JP2023208597A JP7726543B2 JP 7726543 B2 JP7726543 B2 JP 7726543B2 JP 2023208597 A JP2023208597 A JP 2023208597A JP 2023208597 A JP2023208597 A JP 2023208597A JP 7726543 B2 JP7726543 B2 JP 7726543B2
Authority
JP
Japan
Prior art keywords
seabed
rubble
surveying
ship
display
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2023208597A
Other languages
Japanese (ja)
Other versions
JP2025093086A (en
Inventor
昌幸 野田
Original Assignee
有限会社善徳丸建設
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 有限会社善徳丸建設 filed Critical 有限会社善徳丸建設
Priority to JP2023208597A priority Critical patent/JP7726543B2/en
Publication of JP2025093086A publication Critical patent/JP2025093086A/en
Application granted granted Critical
Publication of JP7726543B2 publication Critical patent/JP7726543B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Or Underwater Handling Of Building Materials (AREA)

Description

この発明は、海底における捨石基礎の構築状態を作業員に確認させるための技術に関する。 This invention relates to technology that allows workers to check the construction status of a rubble foundation on the seabed.

港湾構造物(洋上風車、防波堤等)は、海底に構築した捨石基礎の上に建造されている。捨石基礎は、捨石マウンドを海底に形成し、この捨石マウンドを突き固めることによって構築される。 Port structures (offshore wind turbines, breakwaters, etc.) are built on rubble foundations constructed on the seabed. Rubble foundations are constructed by forming rubble mounds on the seabed and then tamping them down.

捨石マウンドは、例えば特許文献1に示されているように、海上側から海底に投入した捨石を海底に堆積させたものである。また、捨石基礎は、例えば特許文献2に示されているように、海底に形成した捨石マウンドを重錘で突き固めることによって構築される。 As shown in Patent Document 1, for example, a rubble mound is formed by depositing rubble dumped onto the seabed from above. As shown in Patent Document 2, for example, a rubble foundation is constructed by compacting a rubble mound formed on the seabed with weights.

特開2021-161673号公報Japanese Patent Application Laid-Open No. 2021-161673 特開2021-161674号公報Japanese Patent Application Laid-Open No. 2021-161674

しかしながら、捨石基礎を設計通りに構築するには、適当なタイミングで構築中の捨石基礎の状態を確認する必要がある。例えば、捨石マウンドの形成にかかる作業工程においては、海底に堆積させた捨石が設計高さよりも高い箇所や、設計高さよりも低い箇所の有無を確認している。すなわち、捨石マウンドに対して堆積させた捨石を取り除く箇所(海底に堆積させた捨石が設計高さよりも高い箇所)や、捨石マウンドに対して捨石を追加投入する箇所(海底に堆積させた捨石が設計高さよりも低い箇所)を確認している。 However, in order to construct a rubble mound according to design, it is necessary to check the condition of the rubble mound during construction at appropriate times. For example, during the work process of forming a rubble mound, it is checked to see if there are any areas where the rubble piled on the seabed is higher or lower than the design height. In other words, it is checked for areas where rubble piled on the rubble mound needs to be removed (areas where the rubble piled on the seabed is higher than the design height) and areas where additional rubble needs to be added to the rubble mound (areas where the rubble piled on the seabed is lower than the design height).

また、例えば、捨石マウンドの天面や法面を突き固める作業工程においては、突き固めが不十分である箇所の有無の確認や、捨石基礎が設計通りに構築できているかどうかの確認等を行っている。 For example, during the work process of compacting the top surface and slope of a rubble mound, we check for any areas where compaction is insufficient and whether the rubble foundation has been constructed as designed.

従来、構築中の捨石基礎の状態の確認は、海中に潜らせた潜水士により行われていた。すなわち、海中に潜った潜水士が、構築中の捨石基礎の状態を目視で確認していた。 Previously, the condition of rubble foundations during construction was checked by divers who were sent underwater. In other words, divers who were underwater visually checked the condition of the rubble foundations during construction.

最近では、捨石基礎を水深の深い場所に構築するケースが増加しており、潜水士が潜る水深が深くなる傾向にある。また、潜水士が減少しており、構築中の捨石基礎の状態を確認する潜水士の手配が困難になっており、捨石基礎の構築にかかる工期が長くなることもあった。 Recently, there has been an increase in cases where rubble foundations are constructed in deep water, and divers are tending to dive deeper. In addition, the number of divers is decreasing, making it difficult to arrange divers to check the condition of rubble foundations during construction, which can result in longer construction times for rubble foundations.

このようなことから、構築中の捨石基礎の状態確認を潜水士に頼らずに行える手法が求められている。 For these reasons, there is a need for a method to check the condition of rubble foundations during construction without relying on divers.

この発明の目的は、構築中の捨石基礎の状態が潜水士に頼らずに確認できる技術を提供することにある。 The purpose of this invention is to provide technology that allows the condition of rubble foundations under construction to be checked without relying on divers.

この発明の作業船は、上記目的を達するために、以下のように構成している。 To achieve the above objectives, the workboat of this invention is configured as follows:

この発明にかかる作業船は、海底における捨石基礎の構築が行われている場合に、捨石基礎の構築状態の確認作業に利用される。 The work vessel of this invention is used to check the construction status of rubble foundations when they are being constructed on the seabed.

測量装置は、海底を測量する。測量装置は、例えば公知のソナー装置である。測量装置によって、海底に構築中の捨石基礎を測量することができる。 The surveying device surveys the seabed. The surveying device may be, for example, a known sonar device. The surveying device can be used to survey a rubble foundation being constructed on the seabed.

表示装置は、測量装置による海底の測量結果を表示器に表示させる。したがって、表示器には、測量装置による測量結果として、海底に構築中の捨石基礎の形状、大きさ等が表示される。すなわち、作業員は、表示器に表示された測量装置の測量結果により、構築中の捨石基礎の構築状態を確認できる。 The display device displays the results of seabed surveying by the surveying device on the display. Therefore, the display shows the shape, size, etc. of the rubble foundation being constructed on the seabed as the surveying results by the surveying device. In other words, workers can check the construction status of the rubble foundation being constructed by the surveying device's surveying results displayed on the display.

また、船底部の外板には、船内から船外を見通せる開口部が形成されている。この開口部は、作業船が海上に浮かべられた場合に、海面よりも下(すなわち、海中)に位置する部分に形成されている。 In addition, an opening is formed in the outer plating of the bottom of the vessel, allowing visibility outside the vessel from inside. This opening is formed in a part that is located below the water level (i.e., underwater) when the work vessel is floating on the sea.

また、開口部が形成された外板には、開口部全体を塞ぐ透明板が取り付けられている。作業船が海上に浮かべられた場合、開口部を通して船内に海水が浸入することはない。透明板は、例えば、ある程度の透過率(例えば、50%以上の透過率)を有する部材であれば、アクリル板であってもよいし、強化ガラスであってもよいし、その他の部材であってもよい。但し、透明板は、水圧等に対する強度を確保できる厚さにしている。 In addition, a transparent plate that completely covers the opening is attached to the outer panel where the opening is formed. When the work vessel is afloat on the sea, seawater will not enter the vessel through the opening. The transparent plate may be, for example, an acrylic plate, tempered glass, or any other material as long as it has a certain degree of transmittance (for example, a transmittance of 50% or more). However, the transparent plate is made thick enough to ensure strength against water pressure, etc.

作業員は、構築中の捨石基礎の構築状態(形状、大きさ等)を、開口部を通して目視で確認できる。 Workers can visually check the construction status (shape, size, etc.) of the rubble foundation being constructed through the opening.

したがって、作業員は、表示器に表示された測量装置の測量結果、および目視確認より、捨石基礎の構築状態を確認できる。この作業船を利用することで、潜水士に頼らずに、構築中の捨石基礎の状態を確認することができる。 Therefore, workers can check the construction status of the rubble foundation by visually inspecting and viewing the surveying results displayed on the display. By using this work boat, it is possible to check the status of the rubble foundation under construction without relying on divers.

また、作業船は、例えば、自船の位置を測位する測位装置を備え、表示装置が、測位装置によって測位された自船の位置を基準にして記測量装置による海底の測量結果を変換し、変換した測量結果を表示器に表示させる構成にしてもよい。 The work vessel may also be equipped with, for example, a positioning device that measures its own position, and the display device may convert the results of seabed surveying by the surveying device based on the position of the vessel measured by the positioning device, and display the converted surveying results on the display.

このように構成すれば、表示器に表示された測量結果から、構築中の捨石基礎の絶対位置(例えば、緯度、経度、高度)の確認も行える。 With this configuration, the absolute position (e.g., latitude, longitude, altitude) of the rubble foundation being constructed can also be confirmed from the survey results displayed on the display.

また、作業船は、例えば、船底部には、捨石基礎の構築状態を確認する作業員が入室する確認作業室が設けられ、この確認作業室は、外板に形成された開口部が位置する空間としてもよい。この場合、確認作業室は、隔壁で仕切った空間とし、隔壁は、第1隔壁と、第2隔壁とを有し、第1隔壁と、第2隔壁とを隙間を設けて対向配置した構造にすればよい。このように構成すれば、透明板が、なんらかの衝撃を受けて破損した場合であっても、海水が浸入する浸水エリアを確認作業室に抑えられる。 Furthermore, the work vessel may be provided, for example, with an inspection room at the bottom of the vessel where workers can enter to check the construction status of the rubble foundation. This inspection room may be the space where an opening formed in the outer plating is located. In this case, the inspection room may be a space separated by a bulkhead, which may include a first bulkhead and a second bulkhead, with the first bulkhead and the second bulkhead positioned opposite each other with a gap between them. With this configuration, even if the transparent plate is damaged by some kind of impact, the area through which seawater can enter can be limited to the inspection room.

また、確認作業室は、例えば、船首側に設けてもよいし、右舷側に設けてもよいし、左舷側に設けてもよい。 The inspection room may also be located, for example, on the bow side, starboard side, or port side.

また、作業船は、起重機を装備している起重機台船であってもよい。この起重機は、捨石を海上側から海底に投入し、捨石を海底に堆積させる工程で使用してもよいし、重錘を吊り上げ、吊り上げた重錘を海底に堆積させた捨石によって形成された捨石マウンドに落下させてこの捨石マウンドを突き固める工程で使用してもよいし、これら2つの工程で使用してもよい。 The work vessel may also be a crane barge equipped with a crane. This crane may be used in the process of dumping riprap onto the seabed from the sea surface and depositing the riprap on the seabed, or in the process of lifting a weight and dropping it onto a riprap mound formed by riprap deposited on the seabed to compact the riprap, or it may be used in both of these processes.

また、例えば、外板には、複数の前記開口部が形成され、複数の前記開口部を1枚の透明板によって塞いだ構成にしてもよい。このように構成すれば、透明板に加わる圧力を抑え、透明板が破損する危険性を低下させられる。 Also, for example, the outer panel may have multiple openings formed therein, and these openings may be covered by a single transparent panel. This configuration reduces the pressure applied to the transparent panel and the risk of the panel being damaged.

この発明によれば、構築中の捨石基礎の状態の確認が潜水士に頼らずに行える。 This invention allows the condition of rubble foundations to be checked during construction without relying on divers.

図1(A)、(B)は、捨石基礎を海底に構築する起重機台船を示す概略図である。1A and 1B are schematic diagrams showing a crane barge for constructing a rubble foundation on the seabed. 起重機台船に装備されている主要機器の接続を示す図である。FIG. 1 is a diagram showing the connections of the main equipment equipped on the crane barge. 起重機台船の全長方向における確認作業室の断面概略図である。This is a schematic cross-sectional view of the inspection chamber in the overall length direction of the crane barge. 起重機台船の船首側から、起重機台船の全長方向にみた確認作業室が位置する部分の外板の概略平面図である。This is a schematic plan view of the outer plating of the part where the inspection work chamber is located, viewed from the bow side of the crane barge in the direction of the crane barge's entire length. 海底に形成された捨石マウンドの目視確認が行われる状態を説明する図である。FIG. 10 is a diagram illustrating the state in which a rubble mound formed on the seabed is visually inspected. 別の例にかかる起重機台船の船首側から、起重機台船の全長方向にみた確認作業室が位置する部分の外板の概略平面図である。This is a schematic plan view of the outer plate of the part where the inspection work chamber is located, viewed from the bow side of the crane barge in another example, in the direction of the entire length of the crane barge.

以下、この発明の実施形態について説明する。 The following describes an embodiment of this invention.

図1(A)、(B)は、捨石基礎を海底に構築する起重機台船を示す概略図である。図1(A)は、捨石マウンドを海底に形成する工程を行う場合の概略図であり、図1(B)は、海底に形成した捨石マウンドを突き固める工程を行う場合の概略図である。 Figures 1(A) and (B) are schematic diagrams showing a crane barge that constructs a rubble foundation on the seabed. Figure 1(A) is a schematic diagram of the process of forming a rubble mound on the seabed, and Figure 1(B) is a schematic diagram of the process of compacting the rubble mound formed on the seabed.

この例では、起重機台船1が、この発明で言う作業船に相当する。起重機台船1には、起重機2が装備されている。この例では、起重機2は、起重機台船1の船首側に取り付けられている。 In this example, the crane barge 1 corresponds to the work boat referred to in this invention. The crane barge 1 is equipped with a crane 2. In this example, the crane 2 is attached to the bow side of the crane barge 1.

なお、起重機2は、起重機台船1の船尾側に取り付けられていてもよいし、船首と船尾との中間に取り付けられていてもよい。 The crane 2 may be attached to the stern side of the crane barge 1, or midway between the bow and stern.

図1(A)に示すように、捨石マウンドを海底に形成する工程を行うとき、グラブバケット3が起重機2のワイヤに取り付けられる。また、図1(B)に示すように、海底に形成した捨石マウンドを突き固める工程を行うとき、重錘4が起重機2のワイヤに取り付けられる。図1(B)では、捨石マウンドの天端面を突き固める重錘4が起重機2のワイヤに取り付けられている。 As shown in Figure 1(A), when the process of forming a rubble mound on the seabed is carried out, a grab bucket 3 is attached to the wire of a crane 2. Also, as shown in Figure 1(B), when the process of compacting the rubble mound formed on the seabed is carried out, a weight 4 is attached to the wire of the crane 2. In Figure 1(B), the weight 4 that compacts the top surface of the rubble mound is attached to the wire of the crane 2.

捨石基礎の構築にかかる工程には、捨石を海底に堆積させて捨石マウンドを形成する工程と、形成した捨石マウンドの天端面、および法面を突き固める工程と、が含まれている。捨石マウンドを形成する工程、および捨石マウンドの天端面、および法面を突き固める工程については、様々な手法(例えば、上記した特許文献1や、特許文献2に示された手法)が公知である。この例では、捨石マウンドを形成する工程の手法、および捨石マウンドの天端面、および法面を突き固める工程の手法は、公知のいずれの手法を用いてもよい。言い換えれば、この例では、捨石マウンドがどのような手法で海底に形成されるものであってもよいし、また、捨石マウンドの天端面、および法面がどのような手法で突き固められるものであってもよい。 The process of constructing a rubble mound includes the process of piling rubble on the seabed to form a rubble mound, and the process of compacting the top surface and slope of the rubble mound that has been formed. Various methods (for example, the methods shown in Patent Document 1 and Patent Document 2, mentioned above) are known for the process of forming a rubble mound and the process of compacting the top surface and slope of the rubble mound. In this example, any known method may be used for the process of forming the rubble mound and the process of compacting the top surface and slope of the rubble mound. In other words, in this example, any method may be used to form the rubble mound on the seabed, and any method may be used to compact the top surface and slope of the rubble mound.

例えば、捨石マウンドの形成に用いる捨石は、起重機台船1に積載されている。起重機2が、起重機台船1に積載されている捨石をグラブバケット3で掴み取り、掴み取った捨石を海上側から海中に投入することによって捨石マウンドを海底に形成する。また、起重機2が、海底に形成した捨石マウンドの天端面、および法面を、重錘4を落下させて突き固める。 For example, the rubble used to form the rubble mound is loaded on a crane barge 1. A crane 2 uses a grab bucket 3 to grab the rubble loaded on the crane barge 1 and dumps the grabbed rubble into the sea from the sea surface, forming the rubble mound on the seabed. The crane 2 also drops a weight 4 onto the top surface and slope of the rubble mound formed on the seabed to compact it.

起重機台船1には、船首側に確認作業室10が設けられている。この確認作業室10は、作業員が、海底に形成されている捨石マウンドの形状、大きさ等の確認や、海底に形成された捨石マウンドの天端面、および法面を突き固めて構築している捨石基礎の状態の確認を行う空間(部屋)である。 The crane barge 1 is provided with an inspection workroom 10 on the bow side. This inspection workroom 10 is a space (room) where workers can check the shape, size, etc. of the rubble mound formed on the seabed, as well as the condition of the top surface of the rubble mound formed on the seabed and the rubble foundation being constructed by tamping the slope.

図2は、起重機台船に装備されている主要機器の接続を示す図である。この例の起重機台船1は、測量装置11、測位装置12、統合装置13、および表示器14を装備している。 Figure 2 shows the connections of the main equipment installed on the crane barge. In this example, the crane barge 1 is equipped with a surveying device 11, a positioning device 12, an integration device 13, and a display 14.

測量装置11は、自船の位置を基準位置にして海底を測量する。測量装置11は、例えば、公知のソナー装置である。測量装置11は、海底を測量することで、海底に形成されている捨石マウンドや捨石基礎の形状、大きさ等を得る。測量装置11は、海底の測量結果を統合装置13に出力する。 The surveying device 11 surveys the seabed using the ship's position as a reference position. The surveying device 11 is, for example, a known sonar device. By surveying the seabed, the surveying device 11 obtains the shape, size, etc. of rubble mounds and rubble foundations formed on the seabed. The surveying device 11 outputs the results of the seabed survey to the integrated device 13.

測位装置12は、自船の絶対位置(緯度、経度、高度)を測位する。測位装置12は、例えば、公知のGPS(Global Positioning System)装置である。測位装置12は、測位結果(自船の絶対位置)を統合装置13に出力する。 The positioning device 12 determines the ship's absolute position (latitude, longitude, and altitude). The positioning device 12 is, for example, a well-known GPS (Global Positioning System) device. The positioning device 12 outputs the positioning results (the ship's absolute position) to the integrated device 13.

統合装置13は、測量装置11の測量結果、および測位装置12の測位結果を基に、海底に形成されている捨石マウンドや捨石基礎の絶対位置を算出する。統合装置13は、海底に形成されている捨石マウンドや捨石基礎の絶対位置、形状、大きさ等を示す画面データを生成し、表示器14に出力する。統合装置13が、この発明で言う表示装置に相当する。 The integrating device 13 calculates the absolute positions of the rubble mounds and rubble foundations formed on the seabed based on the surveying results of the surveying device 11 and the positioning results of the positioning device 12. The integrating device 13 generates screen data showing the absolute positions, shapes, sizes, etc. of the rubble mounds and rubble foundations formed on the seabed, and outputs this to the display device 14. The integrating device 13 corresponds to the display device referred to in this invention.

表示器14は、統合装置13が出力した画面データに応じた画面を表示する。 The display 14 displays a screen according to the screen data output by the integrated device 13.

表示器14は、確認作業室10に設置されている。測量装置11、測位装置12、および統合装置13は、確認作業室10に設置されていてもよいし、他の場所に設置されていてもよい。但し、測量装置11が海底を測量するのに用いる測量センサ(例えば、超音波センサ)は、海底の測量が行える場所に取り付けられ、測位装置12が自船の位置を測位するのに用いる測位センサ(例えば、GPSセンサ)は、衛星からのGPS信号を受信しやすい場所に取り付けられる。 The display 14 is installed in the confirmation work room 10. The surveying device 11, positioning device 12, and integrated device 13 may be installed in the confirmation work room 10 or in other locations. However, the surveying sensor (e.g., ultrasonic sensor) used by the surveying device 11 to survey the seabed is installed in a location where seabed surveying can be performed, and the positioning sensor (e.g., GPS sensor) used by the positioning device 12 to determine the ship's position is installed in a location where it is easy to receive GPS signals from satellites.

次に、確認作業室10について説明する。この例の起重機台船1は、図1に示すように、船首側の船底部に確認作業室10を設けている。図3は、起重機台船の全長方向における確認作業室の断面概略図である。確認作業室10は、船首側が起重機台船1の外板21に面した空間である。確認作業室10は、外板21に面していない面が、隔壁によって仕切られた空間である。 Next, the inspection work room 10 will be described. As shown in Figure 1, the crane barge 1 in this example has the inspection work room 10 located on the bottom of the vessel on the bow side. Figure 3 is a schematic cross-sectional view of the inspection work room along the entire length of the crane barge. The inspection work room 10 is a space whose bow side faces the outer plating 21 of the crane barge 1. The side of the inspection work room 10 that does not face the outer plating 21 is a space partitioned off by a bulkhead.

図3に示す例の確認作業室10の側面(外板21に面している面を除く。)、および天面の隔壁は、2重壁構造である。具体的には、確認作業室10の側面(外板21に面している面を除く。)、および天面は、外隔壁25と内隔壁26とを隙間を設けて対向配置した隔壁で仕切られている。外隔壁25と内隔壁26とは、例えば1m程度の隙間を設けて対向配置されている。対向配置されている外隔壁25と内隔壁26との間の空間を、ここでは空気室と言う。 The side walls (excluding the surface facing the outer panel 21) and the top wall of the inspection work chamber 10 in the example shown in Figure 3 have a double-wall structure. Specifically, the side walls (excluding the surface facing the outer panel 21) and the top wall of the inspection work chamber 10 are separated by an outer partition wall 25 and an inner partition wall 26, which are arranged opposite each other with a gap between them. The outer partition wall 25 and the inner partition wall 26 are arranged opposite each other with a gap of, for example, about 1 m between them. The space between the outer partition wall 25 and the inner partition wall 26, which are arranged opposite each other, is referred to here as the air chamber.

なお、確認作業室10は、床面についても2重壁構造としてもよい。 The floor of the inspection work room 10 may also have a double-wall structure.

図4は、起重機台船の船首側から、起重機台船の全長方向にみた確認作業室が位置する部分の外板の概略平面図である。確認作業室10内に位置する外板21には、開口部21aが形成されている。また、この開口部21a全体を塞ぐ透明板22が取り付けられている。透明板22は、例えば、ある程度の透過率(例えば、50%以上の透過率)を有する部材であれば、アクリル板であってもよいし、強化ガラスであってもよいし、その他の部材であってもよい。但し、透明板22は、ある程度の水圧に対する強度(通常の航行時に加わる水圧によって破損しない強度)を確保できる厚さである。例えば、透明板22は、数cm(例えば、3~7cm程度)の厚さである。また、透明板22の大きさは、縦方向の長さが数m(1~3m)であり、横方向の長さが数m(1~3m)である。透明板22は、縦方向の長さと、横方向の長さとが同じであってもよいし、異なっていてもよい。また、ここでは、透明板22の外形は、矩形形状である例を示しているが、円形形状等の他の形状であってもよい。 Figure 4 is a schematic plan view of the outer panel of the portion of the crane barge where the inspection chamber is located, viewed from the bow of the crane barge along its entire length. An opening 21a is formed in the outer panel 21 located within the inspection chamber 10. A transparent plate 22 is attached to completely cover this opening 21a. The transparent plate 22 may be made of, for example, an acrylic plate, tempered glass, or other material with a certain degree of transmittance (e.g., 50% or more). However, the transparent plate 22 must be thick enough to withstand a certain degree of water pressure (enough to withstand the water pressure experienced during normal navigation). For example, the transparent plate 22 is several centimeters thick (e.g., approximately 3-7 cm). The size of the transparent plate 22 is several meters (1-3 m) vertically and several meters (1-3 m) horizontally. The vertical and horizontal lengths of the transparent plate 22 may be the same or different. Additionally, although the transparent plate 22 shown here has a rectangular outer shape, it may have other shapes such as a circular shape.

また、図3に示すドア25aは、確認作業室10外と、空気室との間で出入する作業員の通路を開閉する。また、図3に示すドア26aは、確認作業室10内と、空気室との間で出入する作業員の通路を開閉する。例えば、外部から確認作業室10に入出する作業員は、ドア25aを開閉して空気室に入り、さらにドア26aを開閉して確認作業室10に入る。ドア25a、26aは、作業員の閉め忘れを防止するため、所謂ドアクローザを装備するのが好ましい。ドアクローザは、周知のように、開状態であるドア25a、26aを閉状態に移行させるものである。 Furthermore, door 25a shown in Figure 3 opens and closes the passageway for workers entering and exiting between the outside of the inspection work room 10 and the air chamber. Further, door 26a shown in Figure 3 opens and closes the passageway for workers entering and exiting between the inside of the inspection work room 10 and the air chamber. For example, a worker entering or exiting the inspection work room 10 from the outside opens and closes door 25a to enter the air chamber, and then opens and closes door 26a to enter the inspection work room 10. Doors 25a and 26a are preferably equipped with so-called door closers to prevent workers from forgetting to close them. As is well known, door closers transition doors 25a and 26a from an open state to a closed state.

確認作業室10に入室した作業員は、透明板22、開口部21aを通して、海底に形成されている捨石マウンドや、海底に構築された捨石基礎を目視できる。すなわち、作業員は、確認作業室10において、海底に形成されている捨石マウンドや、海底に構築された捨石基礎の状態を目視で確認することができる。 Workers who enter the inspection workroom 10 can visually inspect the rubble mound formed on the seabed and the rubble foundation constructed on the seabed through the transparent panel 22 and opening 21a. In other words, in the inspection workroom 10, workers can visually inspect the condition of the rubble mound formed on the seabed and the rubble foundation constructed on the seabed.

図5は、海底に形成された捨石マウンドの目視確認が行われる状態を説明する図である。この例の起重機台船1は、確認作業室10が船首側に設けられているので、船首を目視確認する捨石マウンドに対向させる。確認作業室10に入室している作業員は、開口部21aを塞いでいる透明板22を通して、捨石マウンドを目視する。作業員は、捨石マウンドの表面において、堆積している捨石がへこんでいる箇所や、突出している箇所を確認する。 Figure 5 is a diagram illustrating the state in which a riprap mound formed on the seabed is visually inspected. In this example, the crane barge 1 has the inspection workroom 10 located on the bow side, so the bow is positioned facing the riprap mound to be visually inspected. Workers entering the inspection workroom 10 visually inspect the riprap mound through the transparent plate 22 covering the opening 21a. The workers check the surface of the riprap mound for any depressions or protrusions in the piled riprap.

測量装置11は、起重機台船1(測量センサ)の位置を基準位置として海底を測量する。測位装置12は、起重機台船1(測位センサ)の絶対位置(緯度、経度、高度)を測位する。起重機台船1における測量センサの取付位置、および起重機台船1における測位センサの取付位置は、既知であるので、測位装置12の測位結果から起重機台船1の測量センサの絶対位置を得ることができる。 The surveying device 11 surveys the seabed using the position of the crane barge 1 (surveying sensor) as the reference position. The positioning device 12 measures the absolute position (latitude, longitude, altitude) of the crane barge 1 (positioning sensor). Since the mounting positions of the surveying sensor on the crane barge 1 and the positioning sensor on the crane barge 1 are known, the absolute position of the surveying sensor on the crane barge 1 can be obtained from the positioning results of the positioning device 12.

統合装置13は、測量装置11の測量結果、および測位装置12の測位結果を基に、海底に形成されている捨石マウンドの絶対位置、形状、大きさ等を表示器14の画面に表示させる。例えば、表示器14の画面には、測量装置11により測量された海底の地形に、絶対位置を重ね合わせた画像が表示される。 Based on the surveying results of the surveying device 11 and the positioning results of the positioning device 12, the integrated device 13 displays the absolute position, shape, size, etc. of the rubble mound formed on the seabed on the screen of the display device 14. For example, the screen of the display device 14 displays an image in which the absolute position is superimposed on the seabed topography surveyed by the surveying device 11.

したがって、作業員は、開口部21aを塞いでいる透明板22を通して目視した捨石マウンドにおいて堆積している捨石がへこんでいるのではないかと感じた箇所や、突出しているのではないかと感じた箇所について、表示器14の画面で確認することができる。また、作業員は、表示器の画面に表示されている海底の地形から、形成されている捨石マウンドに凹凸が生じている箇所を確認し、開口部21aを塞いでいる透明板22を通して、確認した凹凸が生じている箇所の目視確認を念入りに行うことができる。したがって、作業員は、起重機台船1の確認作業室10において、捨石マウンドの状態の目視確認を簡単かつ正確に行える。 As a result, workers can visually inspect the rubble mound through the transparent plate 22 covering the opening 21a and check on the screen of the display 14 any areas where they feel the rubble piled up may be sunken or protruding. Furthermore, workers can check areas where irregularities have occurred in the rubble mound from the seabed topography displayed on the display screen, and carefully visually inspect the irregularities they have identified through the transparent plate 22 covering the opening 21a. Therefore, workers can easily and accurately visually inspect the condition of the rubble mound in the inspection workroom 10 of the crane barge 1.

なお、上記の説明では、作業者による捨石マウンドの目視確認を例にして説明したが、捨石マウンドの天端面、および法面を突き固めた捨石基礎であっても同様に、作業者が起重機台船1の確認作業室10において、捨石基礎の状態の目視確認を簡単かつ正確に行える。 In the above explanation, we have used the example of a worker visually inspecting a rubble mound, but even for the top surface of a rubble mound and a rubble foundation where the slope has been compacted, workers can easily and accurately visually inspect the condition of the rubble foundation in the inspection work chamber 10 of the crane barge 1.

また、確認作業室10は、二重壁構造の隔壁によって仕切られた空間であるので、開口部21aを塞いでいる透明板22が破損した場合に、海水が浸入する浸水エリアを確認作業室10内に抑えられる。 In addition, since the inspection work chamber 10 is a space separated by a partition wall with a double-wall structure, if the transparent plate 22 covering the opening 21a is damaged, the flooded area through which seawater can enter is limited to within the inspection work chamber 10.

上記説明した通り、この例の起重機台船1は、捨石マウンドや、捨石基礎の状態の目視確認を、確認作業室10に入室した作業員に行わせることができる。したがって、構築中の捨石基礎の状態の確認が潜水士に頼らずに行える。 As explained above, the crane barge 1 in this example allows workers who enter the inspection work chamber 10 to visually inspect the condition of the rubble mound and rubble foundation. Therefore, the condition of the rubble foundation under construction can be inspected without relying on divers.

また、図6に示すように、確認作業室10内に位置する外板21に複数の開口部21bを形成してもよい。この場合、開口部21b毎に、その開口部21bを塞ぐ透明板22を設けてもよいが、図6に示すように、全ての開口部21bを1枚の透明板22で塞いでもよい。 Also, as shown in Figure 6, multiple openings 21b may be formed in the outer panel 21 located inside the inspection work chamber 10. In this case, a transparent panel 22 may be provided to cover each opening 21b, or, as shown in Figure 6, all openings 21b may be covered with a single transparent panel 22.

なお、図6に示す複数の開口部21bの配置は、一例であり、他のどのような配置であってもよい。 Note that the arrangement of the multiple openings 21b shown in Figure 6 is just one example, and any other arrangement is acceptable.

また、上記の説明では、確認作業室10は、起重機台船1の船首側に設けられているとしたが、右舷や左舷に設けられていてもよい。 In addition, in the above explanation, the inspection workroom 10 is located on the bow side of the crane barge 1, but it may also be located on the starboard or port side.

また、この発明にかかる作業船は、上記の例で説明した起重機台船1に限らず、どのような種類の船(例えば、捨石投下台船)であってもよい。 Furthermore, the work vessel according to this invention is not limited to the crane barge 1 described in the above example, but may be any type of vessel (for example, a rock dumping barge).

また、確認作業室10を仕切る隔壁は、二重壁構造でなくてもよい。また、外板21に形成された開口部21aが位置する空間は、隔壁によって仕切られていない空間であってもよい。 Furthermore, the partition separating the inspection chamber 10 does not have to have a double-wall structure. Furthermore, the space in which the opening 21a formed in the outer panel 21 is located may be a space that is not separated by a partition.

なお、この発明は、上記実施形態そのままに限定されるものではなく、実施段階ではその要旨を逸脱しない範囲で構成要素を変形して具体化できる。また、上記実施形態に開示されている複数の構成要素の適宜な組み合せにより種々の発明を形成できる。例えば、実施形態に示される全構成要素から幾つかの構成要素を削除してもよい。 Note that this invention is not limited to the above-described embodiment, and the components can be modified and embodied in practice without departing from the spirit of the invention. Furthermore, various inventions can be created by appropriately combining multiple components disclosed in the above-described embodiment. For example, some components may be omitted from all of the components shown in the embodiment.

1…起重機台船
2…起重機
3…グラブバケット
4…重錘
10…確認作業室
11…測量装置
12…測位装置
13…統合装置
14…表示器
21…外板
21a、21b…開口部
22…透明板
25…外隔壁
26…内隔壁
25a、26a…ドア
1...Crane barge 2...Crane 3...Grab bucket 4...Download weight 10...Inspection work room 11...Surveying device 12...Positioning device 13...Integration device 14...Display 21...Outer plate 21a, 21b...Opening 22...Transparent plate 25...Outer bulkhead 26...Inner bulkhead 25a, 26a...Door

Claims (8)

底を測量する測量装置と、
前記測量装置による海底の測量結果を表示器に表示させる表示装置と、を備える作業船であって、
船底部には、隔壁で仕切った空間である確認作業室が設けられ、
前記隔壁は、第1隔壁と、第2隔壁とを有し、前記第1隔壁と前記第2隔壁とを隙間を設けて対向配置した構造であり、
前記確認作業室には、船内から船外を見通せる開口部が船底部の外板に形成され、
前記開口部が形成された前記外板には、前記開口部全体を塞ぐ透明板が取り付けられている、作業船。
a surveying device for surveying the seabed ;
a display device that displays the results of seabed surveying by the surveying device on a display,
At the bottom of the ship, there is a space separated by a bulkhead called the inspection room.
the partition wall has a first partition wall and a second partition wall, and the first partition wall and the second partition wall are disposed opposite each other with a gap therebetween,
In the inspection room , an opening through which the outside of the ship can be seen from inside the ship is formed in the outer plating of the bottom of the ship,
A work boat, wherein a transparent plate that completely covers the opening is attached to the outer plate in which the opening is formed.
海底を測量する測量装置と、a surveying device for surveying the seabed;
前記測量装置による海底の測量結果を表示器に表示させる表示装置と、を備える作業船であって、a display device that displays the results of seabed surveying by the surveying device on a display,
船底部の外板には、船内から船外を見通せる複数の開口部が形成され、The outer hull of the ship has multiple openings that allow the outside to be seen from inside the ship.
複数の前記開口部は、1枚の透明板によって塞がれている、作業船。The workboat, wherein the plurality of openings are covered by a single transparent plate.
前記外板には、複数の前記開口部が形成され、
複数の前記開口部は、1枚の前記透明板によって塞がれている、請求項1に記載の作業船。
The outer plate is formed with a plurality of the openings,
The work boat according to claim 1 , wherein the plurality of openings are covered by one of the transparent plates.
船底部には、確認作業室が設けられ、
前記確認作業室は、前記外板に形成された複数の前記開口部が位置する空間である、請求項に記載の作業船。
An inspection room is provided at the bottom of the ship.
The work vessel according to claim 2 , wherein the inspection chamber is a space in which the plurality of openings formed in the outer plate are located.
自船の位置を測位する測位装置を備え、
前記表示装置は、前記測位装置によって測位された自船の位置を基準にして、前記測量装置による海底の測量結果を変換し、変換した測量結果を前記表示器に表示させる、請求項1~4のいずれかに記載の作業船。
Equipped with a positioning device that determines the ship's position,
A work vessel as described in any one of claims 1 to 4, wherein the display device converts the results of the seabed survey by the surveying device based on the position of the vessel determined by the positioning device, and displays the converted survey results on the display.
前記確認作業室は、船首側に設けられている、請求項1、3、4のいずれかに記載の作業船。 5. The work vessel according to claim 1 , wherein the inspection chamber is provided on the bow side. 捨石を海上側から海底に投入し、捨石を海底に堆積させる起重機を装備している、請求項1~4のいずれかに記載の作業船。 A work vessel as described in any one of claims 1 to 4, equipped with a crane for dumping riprap onto the seabed from the sea surface and depositing the riprap on the seabed. 重錘を吊り上げ、吊り上げた前記重錘を海底に堆積させた捨石によって形成された捨石マウンドに落下させてこの捨石マウンドを突き固める起重機を装備している、請求項1~4のいずれかに記載の作業船。 A work vessel as described in any one of claims 1 to 4, equipped with a crane that lifts a weight and drops the lifted weight onto a rubble mound formed by rubble piled on the seabed, thereby compacting the rubble mound.
JP2023208597A 2023-12-11 2023-12-11 Work boat Active JP7726543B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2023208597A JP7726543B2 (en) 2023-12-11 2023-12-11 Work boat

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2023208597A JP7726543B2 (en) 2023-12-11 2023-12-11 Work boat

Publications (2)

Publication Number Publication Date
JP2025093086A JP2025093086A (en) 2025-06-23
JP7726543B2 true JP7726543B2 (en) 2025-08-20

Family

ID=96135022

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2023208597A Active JP7726543B2 (en) 2023-12-11 2023-12-11 Work boat

Country Status (1)

Country Link
JP (1) JP7726543B2 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013238549A (en) 2012-05-17 2013-11-28 Kajima Corp Method and system for measuring displacement of fluctuation surface
JP2019203297A (en) 2018-05-23 2019-11-28 株式会社本間組 Management system

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5364935A (en) * 1976-11-20 1978-06-09 Mitsubishi Heavy Ind Ltd Ground levelling vessel
JPS5622192U (en) * 1979-07-31 1981-02-27
JPS6276094U (en) * 1985-11-01 1987-05-15

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013238549A (en) 2012-05-17 2013-11-28 Kajima Corp Method and system for measuring displacement of fluctuation surface
JP2019203297A (en) 2018-05-23 2019-11-28 株式会社本間組 Management system

Also Published As

Publication number Publication date
JP2025093086A (en) 2025-06-23

Similar Documents

Publication Publication Date Title
JP2014169625A (en) Method for constructing foundation structure for wind power generation facility
JP7345943B1 (en) Rubble mound leveling system and rubble mound leveling method
CN107169215A (en) Tackle the design method of the submarine cable buried depth requirement of anchor evil
JP7726543B2 (en) Work boat
CN118621791A (en) A method for laying underwater submerged pipe
Coleman Underwater archaeology in thunder bay national marine sanctuary, lake huron—preliminary results from a shipwreck mapping survey
JP2022144881A (en) Installation guide member for immersed tunnel and method for constructing immersed tunnel
KR102180234B1 (en) Underwater Construction System
CN110258725A (en) Water works water tank fabrication and installation method
Shiraishi Unmanned excavation systems in pneumatic caissons
JPS6358965B2 (en)
JP4775738B2 (en) Long-period wave reduction structure
JP3595906B1 (en) Buoyancy adjusting device and method of using the same
Evans Seabed Protection Systems to prevent Scour from High-Speed Ships
JP2597878B2 (en) Weir structure
JP3388416B2 (en) Construction equipment for the layer for preventing the suction of landfill soil in reclaimed seawalls
CN116122316B (en) Cofferdam bottom sealing construction method
JP6406838B2 (en) Movable breakwater and movable breakwater facility
Dessureault et al. Design and tests of a trawl-resistant package for an acoustic Doppler current profiler
JP7245145B2 (en) Seafloor crustal deformation observation equipment
Tabri et al. Numerical assessment procedure for the bottom contact of MV Estonia
JP2006249690A (en) Structure for maintaining height of container for underwater civil engineering construction method
JPWO2019207637A1 (en) Strength test method for underwater anchors
Ruiz de Temiño Alonso Gravity base foundations for offshore wind farms: marine operations and installation processes
Truitt et al. Considerations for capping subaqueous dredged material deposits

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240404

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250401

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250528

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250722

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250731

R150 Certificate of patent or registration of utility model

Ref document number: 7726543

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150