Construction management device and program

Info

Publication number
JP7729541B2
JP7729541B2 JP2021095199A JP2021095199A JP7729541B2 JP 7729541 B2 JP7729541 B2 JP 7729541B2 JP 2021095199 A JP2021095199 A JP 2021095199A JP 2021095199 A JP2021095199 A JP 2021095199A JP 7729541 B2 JP7729541 B2 JP 7729541B2
Authority
JP
Japan
Prior art keywords
unit
design drawing
display device
planar image
management device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021095199A
Other languages
Japanese (ja)
Other versions
JP2022187262A (en
Inventor
圭二 竹内
豊 小野
貴司 柳本
隆之 鈴木
哲治 久家
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2021095199A priority Critical patent/JP7729541B2/en
Publication of JP2022187262A publication Critical patent/JP2022187262A/en
Application granted granted Critical
Publication of JP7729541B2 publication Critical patent/JP7729541B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本開示は、施工管理装置及びプログラムに関する。 This disclosure relates to a construction management device and program.

特許文献1には、「施工対象の施工を管理する施工管理システムであって、前記施工対象の仕様に関する仕様データを記憶している仕様データ記憶部と、実空間における前記施工の状況に関する実施工データを記憶している実施工データ記憶部と、前記仕様データ及び前記実施工データに基づいて、前記施工の進捗状況を表す進捗データを生成するデータ生成部と、前記進捗データを出力するデータ出力部と、を備える施工管理システム」が記載されている。 Patent Document 1 describes a "construction management system that manages the construction of a construction object, comprising: a specification data storage unit that stores specification data related to the specifications of the construction object; an implementation data storage unit that stores implementation data related to the status of the construction in real space; a data generation unit that generates progress data representing the progress status of the construction based on the specification data and the implementation data; and a data output unit that outputs the progress data."

特開2020-140257号公報(請求項1)JP 2020-140257 A (Claim 1)

設備工事現場では、管理対象物(例えばスリーブ等)が設計図面通りに設置されたか否かが管理される。管理は、例えばカメラを用い、管理対象物を含むように設備工事現場を撮像することで行われる。撮像により得られた画像は、記録用の例えば帳票としてそれぞれ管理される。しかし、特許文献1に記載の技術では、管理対象物を含む画像の取り扱いについて記載されていない。特許文献1に記載の技術では、記録された画像を都度選択して確認するため、施工管理に手間がかかる。
本開示が解決しようとする課題は、簡便に施工管理可能な施工管理装置及びプログラムの提供である。
At an equipment construction site, it is necessary to manage whether or not a management object (e.g., a sleeve) has been installed according to the design drawings. This management is performed, for example, by using a camera to capture an image of the equipment construction site that includes the management object. The captured images are managed as records, for example, as slips. However, the technology described in Patent Document 1 does not describe how to handle images that include the management object. With the technology described in Patent Document 1, the recorded images must be selected and checked each time, which makes construction management time-consuming.
The problem that the present disclosure aims to solve is to provide a construction management device and program that enable simple construction management.

本開示の施工管理装置は、平面画像上で認識するための目印を付した目印スリーブを含む複数のスリーブを設置した設備工事現場を撮像した、単一画角による前記平面画像上において、前記目印を手掛かりとして、複数の前記スリーブの配置パターン及び前記スリーブが持つ属性情報の認識により、前記平面画像中での前記目印スリーブの位置を認識する認識部と、前記平面画像と、前記設備工事現場の設計図面である平面図とを、前記設計図面上の通り芯と、前記平面画像における前記目印スリーブの平面内座標位置の基準軸となる前記通り芯とが重なるように、表示装置に重畳表示する重畳表示部と、を備える。その他の解決手段は発明を実施するための形態において後記する。 The construction management device of the present disclosure includes a recognition unit that recognizes the position of the marker sleeve in a planar image captured at a single angle of view of an equipment construction site where multiple sleeves have been installed , including marker sleeves with markers for recognition on the planar image, by recognizing the arrangement pattern of the multiple sleeves and attribute information of the sleeves using the markers as clues on the planar image, and a superimposition display unit that superimposes the planar image and a floor plan that is a design drawing of the equipment construction site on a display device so that the center line on the design drawing and the center line that serves as a reference axis for the in-plane coordinate position of the marker sleeve in the planar image overlap . Other solutions will be described later in the description for carrying out the invention.

本開示によれば、簡便に施工管理可能な施工管理装置及びプログラムを提供できる。 This disclosure provides a construction management device and program that allows for easy construction management.

本開示の施工管理装置を備える施工管理システムの機能ブロック図である。1 is a functional block diagram of a construction management system including a construction management device according to the present disclosure. 表示装置に表示される電子黒板である。This is an electronic whiteboard displayed on a display device. 表示装置に表示される設計図面である。1 is a design drawing displayed on a display device. 表示装置に表示される画像上での墨出し位置を示す図である。FIG. 10 is a diagram showing marking positions on an image displayed on a display device. 設置予定位置を含む設計図面と、墨出し位置を含む画像と、を表示装置に重畳表示した図である。10 is a diagram showing a design drawing including a planned installation position and an image including a marking position superimposed on a display device. FIG. 設置予定位置を含む設計図面と、墨出し位置を含む画像と、実際に設置された管理対象物を含む画像と、を表示装置に重畳表示した図である。10 is a diagram showing a design drawing including a planned installation position, an image including a marked-out position, and an image including an actually installed managed object superimposed on a display device. FIG. 施工結果に関するデータベースを示した図である。FIG. 10 is a diagram showing a database relating to construction results.

以下、図面を参照しながら本開示を実施するための形態(実施形態と称する)を説明する。以下の一の実施形態の説明の中で、適宜、一の実施形態に適用可能な別の実施形態の説明も行う。本開示は以下の一の実施形態に限られず、異なる実施形態同士を組み合わせたり、本開示の効果を著しく損なわない範囲で任意に変形したりできる。また、同じ部材については同じ符号を付すものとし、重複する説明は省略する。更に、同じ機能を有するものは同じ名称を付すものとする。図示の内容は、あくまで模式的なものであり、図示の都合上、本開示の効果を著しく損なわない範囲で実際の構成から変更したり、図面間で一部の部材の図示を省略したり変形したりすることがある。 Below, modes for implementing the present disclosure (hereinafter referred to as "embodiments") will be described with reference to the drawings. Within the description of one embodiment below, other embodiments that are applicable to the first embodiment will also be described as appropriate. The present disclosure is not limited to the single embodiment below, and different embodiments can be combined or modified as desired without significantly impairing the effects of the present disclosure. Furthermore, the same components will be given the same reference numerals, and duplicate descriptions will be omitted. Furthermore, components having the same functions will be given the same names. The contents shown are merely schematic, and for the sake of illustration, the actual configuration may be changed, and some components may be omitted or modified between drawings, within the scope of not significantly impairing the effects of the present disclosure.

図1は、本開示の施工管理装置100を備える施工管理システム1000の機能ブロック図である。施工管理システム1000は、カメラ50と、施工管理装置100とを備える。カメラ50は、撮像部57と保存部58と通信部59とを備える。撮像部57での撮像により得られた設備工事現場S(図4)の画像204,207(図6)は、保存部58及び通信部59を通じて施工管理装置100に送信される。 Figure 1 is a functional block diagram of a construction management system 1000 equipped with the construction management device 100 of the present disclosure. The construction management system 1000 includes a camera 50 and the construction management device 100. The camera 50 includes an imaging unit 57, a storage unit 58, and a communication unit 59. Images 204, 207 (Figure 6) of the facility construction site S (Figure 4) obtained by imaging with the imaging unit 57 are transmitted to the construction management device 100 via the storage unit 58 and communication unit 59.

施工管理装置100は、通信部101と、画像入力部102と、入力部103と、記録部104と、印刷部105と、制御部110と、表示装置120とを備える。通信部101は、通信部59との間で通信するものである。画像入力部102は、保存部58から画像204,207を入力されるものである。入力部103は例えばキーボード、マウス、マイク、I/F(InterFace)(いずれも不図示)等であり、外部からの入力を受け付けるものである。設計図面201(図3)は、入力部103を通じて入力される。記録部104は、制御部110での処理結果を記録するものである。印刷部105は、制御部110での処理結果(例えば帳票等)を印刷するものである。表示装置120は、表示部121とタッチパネル122とを備える。 The construction management device 100 comprises a communication unit 101, an image input unit 102, an input unit 103, a recording unit 104, a printing unit 105, a control unit 110, and a display device 120. The communication unit 101 communicates with the communication unit 59. The image input unit 102 receives images 204 and 207 from the storage unit 58. The input unit 103 is, for example, a keyboard, mouse, microphone, or I/F (Interface) (none of which are shown), and receives input from outside. A design drawing 201 (Figure 3) is input via the input unit 103. The recording unit 104 records the processing results of the control unit 110. The printing unit 105 prints the processing results of the control unit 110 (e.g., forms, etc.). The display device 120 comprises a display unit 121 and a touch panel 122.

施工管理装置100は、制御部110に、電子黒板作成部111と、認識部112と、重畳表示部113と、抽出部114と、計算部115と、判断部116と、表示切替部117と、DB作成部118とを備える。 The construction management device 100 includes a control unit 110, an electronic whiteboard creation unit 111, a recognition unit 112, an overlay display unit 113, an extraction unit 114, a calculation unit 115, a judgment unit 116, a display switching unit 117, and a DB creation unit 118.

電子黒板作成部111は、電子黒板200(図2)を作成するものである。重畳表示部113は、電子黒板作成部111により作成された電子黒板200を表示装置120に表示する。これにより、詳細は後記する重畳表示時に電子黒板200を一緒に表示でき、電子黒板200に入力された情報を参照しながら重畳表示を確認できる。 The electronic whiteboard creation unit 111 creates the electronic whiteboard 200 (Figure 2). The overlay display unit 113 displays the electronic whiteboard 200 created by the electronic whiteboard creation unit 111 on the display device 120. This allows the electronic whiteboard 200 to be displayed together with the information entered on the electronic whiteboard 200 during overlay display, details of which will be described later, and the overlay display can be confirmed while referring to the information entered on the electronic whiteboard 200.

図2は、表示装置120に表示される電子黒板200である。電子黒板200は、例えば、工事名称、検査日、工事種別、検査内容、検査範囲(場所)、検査範囲(管理対象物)、施工者、工事業者、立合者、担当者等の情報を入力可能に構成される。入力は、例えば、設備工事現場S(図4)において使用者が入力部103又はタッチパネル122(いずれも図1)を介し、行うことができる。入力は、例えば入力部103の一例であるマイク(不図示)を使用した音声により行ってもよい。なお、入力可能な情報の種類、電子黒板200のレイアウト等は、図示の例に限定されず、使用者(例えば担当者)が任意に決定できる。また、これらは、検査用途に応じて、複数のテンプレートを作成して利用してもよい。 Figure 2 shows an electronic whiteboard 200 displayed on the display device 120. The electronic whiteboard 200 is configured to allow input of information such as the name of the project, inspection date, type of project, inspection content, inspection scope (location), inspection scope (object to be managed), contractor, contractor, witness, and person in charge. Input can be made, for example, by a user at the facility construction site S (Figure 4) via the input unit 103 or touch panel 122 (both shown in Figure 1). Input can also be made by voice, for example, using a microphone (not shown), which is an example of the input unit 103. Note that the types of information that can be input, the layout of the electronic whiteboard 200, etc. are not limited to the examples shown in the figure and can be determined freely by the user (e.g., the person in charge). Furthermore, multiple templates may be created and used depending on the inspection purpose.

図3は、表示装置120に表示される設計図面201である。設計図面201には、管理対象物15(図6)の設置予定位置16が図示される。図示はしないが、設置予定位置16毎に、通り芯BI,BH,B08,B09からの距離が設計図面201上に示される。これにより、管理対象物10毎の位置座標を特定できる。設計図面201は、例えば、BIMデータ、CADデータ、PDFデータ等である。詳細は後記するが、使用者による例えばタッチパネル122用いた選択により、例えば設計図面201のみを単独で表示装置120に表示できる。 Figure 3 shows a design drawing 201 displayed on the display device 120. The design drawing 201 illustrates the planned installation locations 16 of the managed objects 15 (Figure 6). Although not shown, the distance from the center lines BI, BH, B08, and B09 for each planned installation location 16 is indicated on the design drawing 201. This makes it possible to identify the position coordinates of each managed object 10. The design drawing 201 may be, for example, BIM data, CAD data, PDF data, etc. Details will be described later, but the user can select, for example, using the touch panel 122, to display, for example, only the design drawing 201 alone on the display device 120.

図3には、更に、設計図面201における破線枠202で囲った領域が、紙面右側に示す設計図面201の全体におけるどの部分に相当するのかを示す画面203も示される。これにより、設計図面201の全体においてどの部分を拡大して示しているのかを把握し易くできる。 Figure 3 also shows a screen 203 that indicates which part of the overall design drawing 201 shown on the right side of the page corresponds to the area surrounded by a dashed frame 202 in the design drawing 201. This makes it easy to understand which part of the overall design drawing 201 is being enlarged.

図1に戻って、認識部112は、カメラ50により撮像された画像204での複数の管理対象物10の配置パターン及び管理対象物10が持つ属性情報の認識により、画像204中での管理対象物10の位置を認識するものである。これにより、得られた画像204において管理対象物10の位置を認識できる。なお、ここでいう属性情報は画像204に基づき決定されるものであり、後記する特定種類の文字情報は、設計図面201から抽出されるものである。 Returning to Figure 1, the recognition unit 112 recognizes the position of the managed objects 10 in the image 204 captured by the camera 50 by recognizing the arrangement pattern of the multiple managed objects 10 in the image 204 and the attribute information of the managed objects 10. This makes it possible to recognize the position of the managed objects 10 in the obtained image 204. Note that the attribute information referred to here is determined based on the image 204, and the specific type of text information described below is extracted from the design drawing 201.

図4は、表示装置120に表示される画像204上での墨出し位置12を示す図である。管理対象物10は、例えば、設備工事現場Sでの管理対象物15(例えばスリーブ等)の設置予定位置16(図3)に付された墨出し位置12、及び、設備工事現場Sで実際に設置された管理対象物15を含む。これにより、墨出し位置12と管理対象物15との設置位置を表示装置120を用いて比較できる。 Figure 4 is a diagram showing the marking position 12 on the image 204 displayed on the display device 120. The managed object 10 includes, for example, the marking position 12 marked at the planned installation position 16 (Figure 3) of the managed object 15 (e.g., a sleeve, etc.) at the equipment construction site S, and the managed object 15 actually installed at the equipment construction site S. This allows the marking position 12 and the installation position of the managed object 15 to be compared using the display device 120.

図示のように、管理対象物10(図6)が設備工事現場Sに多数(図示の例では管理対象物S1~S7の7つ)配置される場合がある。この場合、画像204中の管理対象物10が設計図面201(図3)における何れの管理対象物10に対応するのがわからないことがある。そこで、認識部112により、複数の管理対象物10の集合体である管理対象物群11の配置パターン及び管理対象物10が持つ属性情報を手掛かりとし、設計図面201での対応する管理対象物群11を認識する。これにより、管理対象物10の位置を容易に特定できる。なお、ここでいう属性情報は、画像204に基づき決定可能な情報であり、例えばスリーブならば直径、高さ等の形状又は大きさの少なくとも一方、ボックス形状であれば幅、奥行き、高さ等の形状又は大きさの少なくとも一方である。また、墨出し位置12に関する属性情報であれば、例えば墨出し時に表示される文字、墨出し位置12に設置される管理対象物15の直径、高さ等の形状又は大きさの少なくとも一方である。墨出し位置12の場合、例えば、墨出し位置12に付した目印17(後記)に基づき、形状又は大きさの少なくとも一方を決定できる。 As shown, a large number of managed objects 10 (Figure 6) may be located at the facility construction site S (seven managed objects S1 to S7 in the illustrated example). In this case, it may be unclear which managed object 10 in the image 204 corresponds to which managed object 10 in the design drawing 201 (Figure 3). Therefore, the recognition unit 112 uses the arrangement pattern of the managed object group 11, which is a collection of multiple managed objects 10, and the attribute information of the managed objects 10 as clues to recognize the corresponding managed object group 11 in the design drawing 201. This makes it easy to identify the location of the managed object 10. Note that the attribute information here refers to information that can be determined based on the image 204. For example, for a sleeve, this is at least one of the shape or size, such as diameter or height, and for a box-shaped object, this is at least one of the shape or size, such as width, depth, or height. Furthermore, attribute information related to the marking position 12 may include, for example, the text displayed when marking, and at least one of the shape or size, such as diameter or height, of the managed object 15 to be installed at the marking position 12. In the case of the marking position 12, for example, at least one of the shape and size can be determined based on the marking 17 (described below) attached to the marking position 12.

墨出しは、例えば管理対象物15の中心(基準点の一例)が交点になるように配置した二本の線分の直交により行われる。そして、詳細は後記するが、画像204での設備工事現場Sでの墨出し位置12の配置パターン及び管理対象物10が持つ上記の属性情報に基づくことで、設計図面201での対応する位置を認識できる。 The marking is performed, for example, by intersecting two perpendicular line segments arranged so that the center of the managed object 15 (an example of a reference point) is the intersecting point. Then, as will be described in detail later, the corresponding position on the design drawing 201 can be recognized based on the arrangement pattern of the marking positions 12 at the equipment construction site S in the image 204 and the above-mentioned attribute information of the managed object 10.

墨出し位置12を認識し易くするため、墨出し位置12に配置される管理対象物15の形状及び大きさを画像204で認識するために、管理対象物15の形状(例えばリング形状の例えば赤い丸、四角、L型の表示等)及び大きさを模した目印17を墨出し位置12に付した状態で、撮像できる。これにより、詳細は後記するが、墨出し位置12(図4)と、設置予定位置16(図3)とのずれを計算できる。図4に示す画像204は、一例として目印17を付した状態での撮像により得られたため、管理対象物15の形状及び大きさを模した目印17が含まれる。目印17は、任意の記号、QRコード(登録商標)等の二次元コードでもよい。この場合、設置される管理対象物15の形状及び大きさが二次元コードに記録されてもよい。また、設置される管理対象物15の形状及び大きさと二次元コードとを関連付けたデータベース(不図示。例えば認識部112が有する)を用いて、撮像した二次元コードに基づき、管理対象物15の形状及び大きさを決定してもよい。目印17は、管理対象物15に付されてもよい。 To facilitate recognition of the marking position 12, an image 204 can be captured with a mark 17 attached to the marking position 12 that resembles the shape and size of the managed object 15 (e.g., a ring-shaped mark, a red circle, a square, an L-shaped mark, etc.) and size of the managed object 15. As a result, as will be described in detail later, the deviation between the marking position 12 (Figure 4) and the planned installation position 16 (Figure 3) can be calculated. The image 204 shown in Figure 4 was captured with the mark 17 attached, as an example, and therefore includes the mark 17 that resembles the shape and size of the managed object 15. The mark 17 may be any symbol or a two-dimensional code such as a QR code (registered trademark). In this case, the shape and size of the managed object 15 to be installed may be recorded in the two-dimensional code. Furthermore, a database (not shown, for example, included in the recognition unit 112) that associates the shape and size of the installed managed object 15 with the two-dimensional code may be used to determine the shape and size of the managed object 15 based on the captured two-dimensional code. The mark 17 may be attached to the managed object 15.

なお、墨出し位置12と、設計図面201(図3)での設置予定位置16(図3)との対応関係を認識部112で認識することでも、設計図面201に基づき、墨出し位置12(図6)に実際に設置される管理対象物15の形状及び大きさ等を把握できる。 In addition, by having the recognition unit 112 recognize the correspondence between the marked-out position 12 and the planned installation position 16 (Figure 3) on the design drawing 201 (Figure 3), it is possible to determine the shape, size, etc. of the managed object 15 that will actually be installed at the marked-out position 12 (Figure 6) based on the design drawing 201.

図4には、カメラ50(図1)を用いて得られた画像204と、電子黒板200と、表205,206とが図示される。電子黒板200には、図示は省略するが、設備工事現場Sにおいて使用者が入力した情報が表示される。表205,206は、抽出部114(図1)によって抽出された情報が表示される。図示の例では、上段の表205には、設計図面201(図3)における墨出し位置12毎の通り芯B08からの距離が表示される。下段の表206には、設計図面201(図3)における墨出し位置12毎の通り芯BIからの距離が表示される。他にも、表205,206には、個々の墨出し位置12に付した通し番号等のID(計測番号)が表示される。 Figure 4 shows an image 204 obtained using camera 50 (Figure 1), an electronic whiteboard 200, and tables 205 and 206. Although not shown, electronic whiteboard 200 displays information entered by a user at facility construction site S. Tables 205 and 206 display information extracted by extraction unit 114 (Figure 1). In the example shown, table 205 in the upper row displays the distance from grid center line B08 for each marking position 12 in design drawing 201 (Figure 3). Table 206 in the lower row displays the distance from grid center line BI for each marking position 12 in design drawing 201 (Figure 3). Tables 205 and 206 also display IDs (measurement numbers), such as serial numbers, assigned to each marking position 12.

画像204は、例えば単一画角による1枚撮像、異なる画角で複数回撮像、又は、カメラ50(図1)としてステレオカメラを用いた撮像により得ることができる。画像204は、実際に撮像して得られた画像のオルソ変換(正斜変換)により処理されたオルソ画像であることが好ましい。これにより、オルソ画像と設計図面201(図3)とを重畳表示したときに、管理対象物10同士を比較し易くできる。本明細書では、画像204としてオルソ画像を例示するが、カメラ50を用いて撮像された画像に基づくものであれば、オルソ画像に限定されない。また、カメラ50に使用されるレンズ(不図示)としては、例えば魚眼(パノラマ)レンズ、広角レンズ、一般画角レンズ等を使用できるが、これらに限定されない。 Image 204 can be obtained, for example, by capturing a single image with a single angle of view, capturing multiple images with different angles of view, or capturing images using a stereo camera as camera 50 (Figure 1). Image 204 is preferably an orthoimage processed by ortho-transformation (ortho-oblique transformation) of an image obtained by actually capturing an image. This makes it easier to compare managed objects 10 when the orthoimage and design drawing 201 (Figure 3) are superimposed. In this specification, an orthoimage is used as image 204, but it is not limited to an orthoimage as long as it is based on an image captured using camera 50. In addition, the lens (not shown) used in camera 50 can be, for example, a fisheye (panoramic) lens, a wide-angle lens, a general-angle lens, etc., but is not limited to these.

カメラ50による撮像時、管理対象物10のほかに基準尺209を含むように設備工事現場Sを撮像することが好ましい。即ち、画像204は、管理対象物10及び基準尺209を含むことが好ましい。これにより、画像204での管理対象物10の座標位置、大きさ、形状等を容易に把握できる。基準尺209としては、例えば、長さ既知の所定長さを有するロッドを使用できる。 When capturing an image using the camera 50, it is preferable to capture the equipment construction site S so that it includes the reference scale 209 in addition to the managed object 10. In other words, it is preferable that the image 204 includes the managed object 10 and the reference scale 209. This makes it easy to grasp the coordinate position, size, shape, etc. of the managed object 10 in the image 204. The reference scale 209 can be, for example, a rod with a known, predetermined length.

図1に戻って、重畳表示部113は、管理対象物10(図4、図6)を含むように設備工事現場Sを撮像した画像204,207(図4、図6)と、設備工事現場Sの設計図面201(図3)とを表示装置120に重畳表示するものである。重畳表示は、画像204,207中の管理対象物10と、撮像した管理対象物10に対応する設計図面201上での設置予定位置16(図6)とを対応させるように行われる。重畳表示部113を備えることで、設計図面201上での設置予定位置16と、設備工事現場Sでの管理対象物10の実際の設置位置とを表示装置120において直感的に比較でき、簡便に施工管理できる。 Returning to Figure 1, the superimposition display unit 113 superimposes on the display device 120 images 204, 207 (Figures 4, 6) of the equipment construction site S, which include the managed object 10 (Figures 4, 6), and the design drawing 201 (Figure 3) of the equipment construction site S. The superimposition display is performed to match the managed object 10 in the images 204, 207 with the planned installation position 16 (Figure 6) on the design drawing 201 that corresponds to the captured managed object 10. The provision of the superimposition display unit 113 allows intuitive comparison on the display device 120 between the planned installation position 16 on the design drawing 201 and the actual installation position of the managed object 10 at the equipment construction site S, simplifying construction management.

重畳表示部113は、設備工事の計画段階での設計図面201と、計画段階での設計図面201の作成後に追加された設計図面(不図示の例えば修正図面、具体的には例えば最新図面)と、を切り替えて表示装置120に重畳する。これにより、設備工事現場Sの施工前である計画段階で作成された設計図面201が設備工事の経過で変更(修正)された場合に、何が変わったのかを表示装置120上で容易に比較できる。例えば修正図面等の設計図面(不図示)の追加は、例えば入力部103を通じて実行できる。 The overlay display unit 113 switches between the design drawing 201 at the planning stage of the equipment construction work and a design drawing (e.g., a revised drawing, not shown, specifically, the latest drawing, for example) added after the design drawing 201 was created at the planning stage, and overlays them on the display device 120. This makes it easy to compare what has changed on the display device 120 when the design drawing 201 created at the planning stage before construction at the equipment construction site S is changed (revised) over the course of the equipment construction work. For example, adding a design drawing (not shown), such as a revised drawing, can be performed, for example, via the input unit 103.

抽出部114は、設計図面201に含まれる文字情報のうちの少なくとも管理対象物10に関する文字情報を設計図面201から抽出するものである。管理対象物10に関する文字情報は、例えば、管理対象物10の識別番号、管理対象物10の形状、管理対象物10の大きさ、通り芯BI,BH,B08,B09(図3)からの距離等である。抽出は、設計図面201のファイル形式に応じて任意の方法で行うことができ、例えばCADデータの場合、xmlデータへの変換により文字情報を抽出できる。 The extraction unit 114 extracts from the design drawing 201 at least the character information relating to the managed object 10 from the character information contained in the design drawing 201. The character information relating to the managed object 10 includes, for example, the identification number of the managed object 10, the shape of the managed object 10, the size of the managed object 10, and the distance from the center lines BI, BH, B08, and B09 (Figure 3). Extraction can be performed using any method depending on the file format of the design drawing 201; for example, in the case of CAD data, the character information can be extracted by converting it to XML data.

上記の重畳表示部113は、更に、抽出部114により抽出した文字情報のうち紐づけるべき特定種類(例えば管理対象物10の形状)の文字情報が1つであれば、表示装置120に重畳表示された管理対象物10に紐づけて文字情報を表示装置120に表示する。一方で、重畳表示部113は、抽出部114により抽出した文字情報のうち紐づけるべき特定種類の文字情報が2つ以上であれば、表示装置120に重畳表示された複数の管理対象物10のうちのどの管理対象物10に紐づけるかを使用者に選択させる選択画面(不図示)を表示装置120に表示する。これにより、管理対象物10に関する文字情報の紐づけ(割り当て)の誤りを抑制できる。 Furthermore, if there is one piece of character information of a specific type (e.g., the shape of the managed object 10) to be linked among the character information extracted by the extraction unit 114, the superimposition display unit 113 links the character information to the managed object 10 superimposed and displayed on the display unit 120 and displays the character information on the display unit 120. On the other hand, if there is two or more pieces of character information of a specific type to be linked among the character information extracted by the extraction unit 114, the superimposition display unit 113 displays a selection screen (not shown) on the display unit 120 that allows the user to select which managed object 10 to link to among the multiple managed objects 10 superimposed and displayed on the display unit 120. This makes it possible to reduce errors in linking (assigning) character information related to the managed object 10.

計算部115は、例えばオルソ画像等の画像204(図4)に基づき決定した設備工事現場S(図4)での管理対象物10(図4)の位置と、設計図面201(図3)での設置予定位置16とのずれを計算するものである。これにより、後記する判断部116による判断が可能になる。また、重畳表示による直感的な比較に加えて、数値に基づいた客観的な比較又は管理基準を設定すれば管理値を逸脱した管理対象物10の選別又は抽出を簡便に行うことができる。 The calculation unit 115 calculates the deviation between the position of the managed object 10 (Figure 4) at the facility construction site S (Figure 4), determined based on an image 204 (Figure 4), such as an orthoimage, and the planned installation position 16 on the design drawing 201 (Figure 3). This enables a judgment by the judgment unit 116, which will be described later. In addition to intuitive comparisons using superimposed displays, objective comparisons based on numerical values or management criteria can be set, making it easy to select or extract managed objects 10 that deviate from management values.

設備工事現場Sでの管理対象物10(図4)の位置は、画像204での基準尺209(図4)を指標として、例えば任意の基準線(例えば通り芯B08,BI)からの距離として決定できる。また、設計図面201(図3)での設置予定位置16は、例えば設計図面201に含まれる文字情報に基づき決定でき、具体的には例えば表205,206(図4)に例示するように決定できる。 The position of the managed object 10 (Figure 4) at the facility construction site S can be determined as the distance from an arbitrary reference line (e.g., center line B08, BI) using the reference scale 209 (Figure 4) in the image 204 as an index. Furthermore, the planned installation position 16 in the design drawing 201 (Figure 3) can be determined based on text information included in the design drawing 201, for example, and specifically as shown in tables 205 and 206 (Figure 4).

図5は、設置予定位置16を含む設計図面201と、墨出し位置12を含む画像204と、を表示装置120に重畳表示した図である。図5では、墨出し位置12は実線で示され、設置予定位置16は破線で示される。 Figure 5 shows a design drawing 201 including the planned installation location 16 and an image 204 including the marking location 12 superimposed on the display device 120. In Figure 5, the marking location 12 is shown with a solid line, and the planned installation location 16 is shown with a dashed line.

重畳表示は、上記のように重畳表示部113(図1)により自動で行われ、例えば計算部115(図1)による計算結果に基づいて行うことができる。即ち、重畳表示部113は、計算部115による計算結果に基づいて画像204の対象範囲を設計図面201から抽出し、設計図面201に合わせて重ね合わせ調整を行う。これにより、使用者の手を煩わせずに重畳できる。 As described above, the superimposition display is performed automatically by the superimposition display unit 113 (Figure 1), and can be performed based on the calculation results by the calculation unit 115 (Figure 1), for example. That is, the superimposition display unit 113 extracts the target range of the image 204 from the design drawing 201 based on the calculation results by the calculation unit 115, and adjusts the superimposition to match the design drawing 201. This allows superimposition without any user intervention.

具体的には、重畳表示部113は、例えば、計算された各ずれが例えば最も小さくなるように、画像204の拡大倍率、縮小倍率、回転量又は移動量の少なくとも1つである変形パラメータを算出する。仮に、全ての墨出し位置12が設計図面201の通りに配置された場合、ずれは0である。また、重畳表示部113は、例えば、画像204中の基準尺209(図4)の長さを設計図面201の縮尺に合わせたり、画像204と設計図面201とで通り芯BI,BH,B08,B09(図3)が一致したりするように、変形パラメータを算出してもよい。そして、重畳表示部113は、算出した変形パラメータに基づき画像204を変形し、図5のように、設計図面201に重畳表示する。 Specifically, the overlay display unit 113 calculates a transformation parameter, which is at least one of the enlargement/reduction magnification, rotation amount, or movement amount of the image 204, so as to minimize each calculated deviation. If all marking positions 12 are positioned according to the design drawing 201, the deviation is zero. The overlay display unit 113 may also calculate a transformation parameter, for example, to match the length of the scale 209 (Figure 4) in the image 204 to the scale of the design drawing 201, or to match the center lines BI, BH, B08, and B09 (Figure 3) between the image 204 and the design drawing 201. The overlay display unit 113 then transforms the image 204 based on the calculated transformation parameters, and displays it superimposed on the design drawing 201, as shown in Figure 5.

図1に戻って、重畳表示部113(図1)は、更に、画像204(図4)に基づき決定した設備工事現場Sでの管理対象物10の位置と、設計図面201(図3)での設置予定位置16とを、表示装置120に文字情報(例えば数字)として表示する。これにより、管理対象物10の位置及び設置予定位置16を、文字として把握できる。 Returning to FIG. 1, the superimposition display unit 113 (FIG. 1) further displays the position of the managed object 10 at the equipment construction site S, determined based on the image 204 (FIG. 4), and the planned installation position 16 on the design drawing 201 (FIG. 3), as text information (e.g., numbers) on the display device 120. This allows the position of the managed object 10 and the planned installation position 16 to be understood as text.

表示される文字情報は、例えば、表205,206(図4)に示す墨出座標及び施工座標である。上記のように、重畳表示部113は、所定時に、表示装置120に重畳表示された複数の管理対象物10のうちのどの管理対象物10に紐づけるかを使用者に選択させる選択画面(不図示)を表示する。使用者が、文字情報と紐づける管理対象物10を選択することで、例えば表205,206における墨出し位置12の座標を示す「墨出座標」の項目が、管理対象物10毎に自動的に入力される。これとともに、計算部115により計算されたずれである「差1」が、管理対象物10毎に、表205,206に自動的に入力される。 The displayed text information is, for example, the marking coordinates and construction coordinates shown in tables 205 and 206 (Figure 4). As described above, the superimposition display unit 113 displays a selection screen (not shown) at a predetermined time, allowing the user to select which of the multiple managed objects 10 superimposed and displayed on the display device 120 the text information should be linked to. When the user selects the managed object 10 to link with the text information, the "Marking Coordinates" item in tables 205 and 206, which indicates the coordinates of the marking position 12, for example, is automatically entered for each managed object 10. At the same time, "Difference 1," which is the deviation calculated by the calculation unit 115, is automatically entered into tables 205 and 206 for each managed object 10.

判断部116は、計算部115により計算されたずれが、許容範囲を表す所定範囲内にあるか否かを判断するものである。そして、上記の重畳表示部113は、更に、判断部116による判断結果を表示装置120に表示する。これにより、客観的な指標である所定範囲内にあるかに基づいて墨出し位置12の位置の正確性を把握でき、客観的に判断できる。 The judgment unit 116 judges whether the deviation calculated by the calculation unit 115 is within a predetermined range that represents the tolerance range. The superimposed display unit 113 then displays the judgment result by the judgment unit 116 on the display device 120. This makes it possible to grasp the accuracy of the position of the marking position 12 based on whether it is within the predetermined range, which is an objective indicator, and to make an objective judgment.

図6は、設置予定位置16を含む設計図面201と、墨出し位置12を含む画像204と、実際に設置された管理対象物15を含む画像207と、を表示装置120に重畳表示した図である。図6では、墨出し位置12は実線で示され、設置予定位置16は破線で示され、実際に設置された管理対象物15は二点鎖線で示される。 Figure 6 shows a design drawing 201 including the planned installation location 16, an image 204 including the marked-out location 12, and an image 207 including the actually installed managed object 15, all superimposed on the display device 120. In Figure 6, the marked-out location 12 is shown with a solid line, the planned installation location 16 is shown with a dashed line, and the actually installed managed object 15 is shown with a two-dot chain line.

画像207は、設置された管理対象物10を含む設備工事現場Sの撮像により得られる。撮像は、墨出し位置12(図4)に代えて実際に設置した管理対象物15を含むこと以外は画像204の撮像と同様にできる。また、表示装置120への画像207の表示も、画像204(図4)と同様にして行われる。 Image 207 is obtained by capturing an image of the facility construction site S, including the installed managed object 10. The image can be captured in the same manner as image 204, except that the image includes the actually installed managed object 15 instead of the marking position 12 (Figure 4). Image 207 is also displayed on the display device 120 in the same manner as image 204 (Figure 4).

例えば認識部112(図1)は、画像207での複数の管理対象物15の配置パターンの認識により、画像207中での管理対象物15の位置を認識する。これにより、得られた画像207において管理対象物15の位置を認識できる。また、施工(管理)時の管理対象物10が持つ属性情報のうち同一のものが複数ある場合、例えばスリーブが群をなさず単体で独立して存在する場合、同じサイズ、同じ配置となる場合等の各場合には、人が介在して予め撮像を行う範囲を特定したり、複数の候補を抽出の上、人が選択して特定したりできる。 For example, the recognition unit 112 (Figure 1) recognizes the position of the managed objects 15 in the image 207 by recognizing the arrangement pattern of multiple managed objects 15 in the image 207. This makes it possible to recognize the position of the managed objects 15 in the obtained image 207. Furthermore, if the managed objects 10 have multiple pieces of the same attribute information during construction (management), for example, if the sleeves are not in a group but exist independently, or if they are the same size and arranged the same, a human can intervene and specify the range to be imaged in advance, or multiple candidates can be extracted and selected by a human.

重畳表示部113(図1)は、図6に示すように、管理対象物15を含むように設備工事現場Sを撮像した画像207と、設備工事現場Sの設計図面201とを、画像207中の管理対象物15と、撮像した管理対象物15に対応する設計図面201上での設置予定位置16とを対応させるように、表示装置120(図1)に重畳表示する。これにより、設計図面201上での設置予定位置16と、設備工事現場Sでの管理対象物15の実際の設置位置とを表示装置120において直感的に比較でき、簡便に施工管理できる。 As shown in FIG. 6, the superimposition display unit 113 (FIG. 1) superimposes an image 207 of the equipment construction site S, which includes the managed object 15, on the display device 120 (FIG. 1) so that the managed object 15 in the image 207 corresponds to the planned installation position 16 on the design drawing 201 that corresponds to the captured managed object 15. This allows an intuitive comparison on the display device 120 between the planned installation position 16 on the design drawing 201 and the actual installation position of the managed object 15 at the equipment construction site S, enabling easy construction management.

重畳表示部113は、更に、画像207に基づき決定した設備工事現場Sでの管理対象物15の位置と、設計図面201での設置予定位置16とを、表示装置120に文字情報(例えば数字)として表示する。これにより、管理対象物15及び設置予定位置16の位置を、文字として把握できる。 The superimposition display unit 113 further displays the position of the managed object 15 at the equipment construction site S determined based on the image 207 and the planned installation position 16 on the design drawing 201 as text information (e.g., numbers) on the display device 120. This allows the positions of the managed object 15 and the planned installation position 16 to be understood as text.

重畳表示部113は、更に、抽出部114によって抽出した文字情報のうち紐づけるべき特定種類の文字情報が1つであれば、表示装置120に重畳表示された管理対象物15に紐づけて文字情報を表示装置120に表示する。また、重畳表示部113は、抽出部114によって抽出した文字情報のうち紐づけるべき特定種類の文字情報が2つ以上であれば、表示装置120に重畳表示された複数の管理対象物15のうちのどの管理対象物15に紐づけるかを使用者に選択させる選択画面(不図示)を表示装置120に表示する。これにより、管理対象物15に関する文字情報の紐づけ(割り当て)の誤りを抑制できる。 Furthermore, if there is one piece of specific type of character information to be linked among the character information extracted by the extraction unit 114, the superimposition display unit 113 links the character information to the managed object 15 superimposed and displayed on the display unit 120 and displays the character information on the display unit 120. Furthermore, if there is two or more pieces of specific type of character information to be linked among the character information extracted by the extraction unit 114, the superimposition display unit 113 displays a selection screen (not shown) on the display unit 120 that allows the user to select which managed object 15 to link to among the multiple managed objects 15 superimposed and displayed on the display unit 120. This makes it possible to reduce errors in linking (assigning) character information related to the managed object 15.

重畳表示部113は、計算部115による計算結果に基づいて画像207(図6)の対象範囲を設計図面201から抽出し、設計図面201に合わせて重ね合わせ調整を行う。これにより、設備工事現場Sの施工前である計画段階で作成された設計図面201が設備工事の経過で変更(修正)された場合に、何が変わったのかを表示装置120上で容易に比較できる。例えば修正図面等の設計図面(不図示)の追加は、例えば入力部103を通じて実行できる。 The overlay display unit 113 extracts the target range of the image 207 (Figure 6) from the design drawing 201 based on the calculation results by the calculation unit 115, and adjusts the overlay to match the design drawing 201. This makes it easy to compare what has changed on the display device 120 when the design drawing 201, which was created in the planning stage before construction at the equipment construction site S, is changed (modified) over the course of the equipment construction. For example, adding a design drawing (not shown), such as a modified drawing, can be performed, for example, via the input unit 103.

計算部115(図1)は、画像207に基づき決定した設備工事現場Sでの管理対象物15の位置と、設計図面201での設置予定位置16とのずれである「差2」を計算する。これにより、重畳表示による直感的な比較に加えて、数値に基づき客観的にも比較できる。 The calculation unit 115 (Figure 1) calculates "difference 2," which is the deviation between the position of the managed object 15 at the facility construction site S determined based on the image 207 and the planned installation position 16 on the design drawing 201. This allows for an intuitive comparison using the superimposed display, as well as an objective comparison based on numerical values.

判断部116(図1)は、計算部115により計算されたずれである「差2」が、許容範囲を表す所定範囲内にあるか否かを判断する。これにより、客観的な指標である所定範囲内にあるかに基づいて管理対象物15の位置の正確性を把握でき、客観的に判断できる。 The determination unit 116 (Figure 1) determines whether "Difference 2," the deviation calculated by the calculation unit 115, is within a predetermined range that represents the tolerance range. This allows the accuracy of the position of the managed object 15 to be grasped and objectively determined based on whether it is within the predetermined range, which is an objective indicator.

上記の重畳表示部113(図1)は、更に、判断部116(図1)による判断結果を表示装置120に表示する。これにより、使用者が判断結果の項目を参照することで設計図面201の通りに施工されたか否かを把握でき、把握を容易に行うことができる。 The superimposed display unit 113 (Figure 1) also displays the judgment results made by the judgment unit 116 (Figure 1) on the display device 120. This allows the user to easily understand whether construction has been carried out in accordance with the design drawings 201 by referring to the judgment result items.

図示の例では、重畳表示部113は、所定条件を満たしたときに、表205,206での判定として「適合」を表示する。所定条件は、墨出し位置12の位置座標と設計図面201の設置予定位置16との位置のずれ(図6に示す「差1」)が上記所定範囲内であり、かつ、実際の管理対象物15の位置座標と設計図面201の設置予定位置16との位置のずれ(図6に示す「差2」)が上記所定範囲内である場合である。 In the illustrated example, the superimposition display unit 113 displays "Compliant" as the judgment in tables 205 and 206 when a predetermined condition is met. The predetermined condition is when the positional deviation between the position coordinates of the marking position 12 and the planned installation position 16 on the design drawing 201 ("Difference 1" shown in Figure 6) is within the above-mentioned predetermined range, and when the positional deviation between the position coordinates of the actual managed object 15 and the planned installation position 16 on the design drawing 201 ("Difference 2" shown in Figure 6) is within the above-mentioned predetermined range.

図1に戻って、表示切替部117は、表示装置120に表示された情報の一部の表示又は非表示を切り替えるものである。これにより、施工管理装置100により得られた情報の一部を所望により抜き出して表示装置120に表示でき、管理対象物10の施工を管理し易くできる。また、使用者及び設備工事現場Sでの工事段階によっては、施工管理に使用される情報が異なり得る。具体的には例えば、作業員におけるヒューマンエラーの確認、管理者(専門工事業者、建設会社等)における自主管理、監理者における監理業務及びそれぞれの報告業務等が挙げられる。そこで、表示切替部117を備えることで、施工管理における各段階と使用者に応じて、必要な情報を抜き出して表示できる。 Returning to FIG. 1, the display switching unit 117 switches between displaying and hiding a portion of the information displayed on the display device 120. This allows a portion of the information obtained by the construction management device 100 to be extracted and displayed on the display device 120 as desired, making it easier to manage the construction of the managed object 10. Furthermore, the information used for construction management may differ depending on the user and the construction stage at the facility construction site S. Specific examples include checking for human error by workers, self-management by managers (specialized contractors, construction companies, etc.), and supervision and reporting duties by supervisors. Therefore, by providing the display switching unit 117, necessary information can be extracted and displayed according to each stage and user in construction management.

表示又は非表示を切り替える情報は、例えば上記図2~図6及び後記の図7に示した図又は項目のうちの少なくとも一方における一部の情報であり、具体的には例えば表205,206(図3~図6)に示した項目の一部である。 The information to be displayed or hidden is, for example, part of the information in at least one of the figures or items shown in Figures 2 to 6 above and Figure 7 below, specifically, part of the items shown in Tables 205 and 206 (Figures 3 to 6).

DB作成部118は、電子黒板200(図7)と、電子黒板200に対応する撮像時の画像204,207(図6)と、設計図面201(図6)の全体における画像204,207に対応する位置とを関連付けたデータベース208(図7)を作成するものである。これにより、既に施工又は計測済みの部位と、未施工の部位とを容易に把握できる。 The DB creation unit 118 creates a database 208 (Figure 7) that associates the electronic whiteboard 200 (Figure 7), the images 204, 207 (Figure 6) captured on the electronic whiteboard 200, and the positions of the images 204, 207 in the overall design drawing 201 (Figure 6). This makes it easy to identify areas that have already been constructed or measured and areas that have yet to be constructed.

図7は、施工結果に関するデータベース208を示した図である。図7の紙面左側には、図2において入力された情報を含む電子黒板200が図示される。図7の紙面右側には、設計図面201の全体のうち、施工結果である画像204,207を表示する位置を示した画面203が図示される。画面203において、破線枠202で囲った領域は、画像204,207に対応する設計図面201での位置を示す。使用者は、例えばタッチパネル122(図1)の操作による画面遷移により、破線枠202で囲った領域における施工結果(例えば図6に示す画面)を表示装置120に表示できる。 Figure 7 is a diagram showing a database 208 related to construction results. On the left side of Figure 7, an electronic whiteboard 200 containing the information entered in Figure 2 is shown. On the right side of Figure 7, a screen 203 is shown showing the positions within the entire design drawing 201 where images 204 and 207, which are construction results, are displayed. On screen 203, the area surrounded by a dashed frame 202 indicates the positions in the design drawing 201 corresponding to images 204 and 207. By changing the screen, for example, by operating the touch panel 122 (Figure 1), the user can display the construction results (for example, the screen shown in Figure 6) in the area surrounded by the dashed frame 202 on the display device 120.

施工が進むにつれて、同一の設計図面201内の設置予定位置16(図3)に管理対象物10(図4。施工対象)が実際に施工され管理される。今回の施工管理装置100は、同一の設計図面201のデータに実施済みの施工管理記録が追加、上書きされたものを利用する仕組みを有する。このため、同一フロアのどの範囲の管理対象物10が既に施工され管理されているかが一目でわかり、数百から数万に及ぶ管理対象物10に対して、施工忘れ及び管理記録の未作成を簡便に抑制できる。 As construction progresses, managed objects 10 (Figure 4; construction target) are actually constructed and managed at the planned installation locations 16 (Figure 3) within the same design drawing 201. This construction management device 100 has a mechanism that uses data from the same design drawing 201 to which completed construction management records have been added and overwritten. This makes it possible to see at a glance which range of managed objects 10 on the same floor have already been constructed and managed, and easily prevents forgetting to construct or not creating management records for hundreds to tens of thousands of managed objects 10.

図1に戻って、施工管理装置100は何れも図示はしないが、例えばCPU(Central Processing Unit)、RAM(Random Access Memory)、記憶媒体等を備えて構成される。記憶媒体は、例えばROM(Read Only Memory)、SSD(Solid State Drive)、HDD(Hrd Disk Drive)、USB(Universal Serial Bus)メモリ等である。記憶媒体に格納されている所定の制御プログラム(施工管理装置100をコンピュータに実現させるためのプログラム)が例えばRAMに展開され、例えばCPUによって実行されることにより、施工管理装置100が具現化される。 Returning to Figure 1, the construction management device 100 is configured with, for example, a CPU (Central Processing Unit), RAM (Random Access Memory), storage media, etc., none of which are shown. Storage media include, for example, ROM (Read Only Memory), SSD (Solid State Drive), HDD (Hard Disk Drive), USB (Universal Serial Bus) memory, etc. A predetermined control program (a program for implementing the construction management device 100 on a computer) stored in the storage medium is expanded, for example, into RAM and executed, for example, by the CPU, thereby realizing the construction management device 100.

即ち、制御プログラムを実行すると、コンピュータが、電子黒板作成部111、認識部112、重畳表示部113、抽出部114、計算部115、判断部116、表示切替部117、DB作成部118等として機能する。従って、制御プログラムは、コンピュータを、少なくとも、管理対象物10(図4、図6)を含むように設備工事現場Sを撮像した画像204,207(図4、図6)と、設備工事現場Sの設計図面201(図3)とを、表示装置120に重畳表示する重畳表示部113として機能させるためのプログラムである。制御プログラムによる重畳表示は、画像204,207中の管理対象物10と、撮像した管理対象物10に対応する設計図面201上での設置予定位置16(図6)とを対応させるように行われる。 That is, when the control program is executed, the computer functions as an electronic whiteboard creation unit 111, a recognition unit 112, a superimposition display unit 113, an extraction unit 114, a calculation unit 115, a judgment unit 116, a display switching unit 117, a DB creation unit 118, and the like. Therefore, the control program causes the computer to function as a superimposition display unit 113 that superimposes on the display device 120 images 204, 207 (FIGS. 4, 6) of the equipment construction site S that include at least the managed object 10 (FIGS. 4, 6) and a design drawing 201 (FIG. 3) of the equipment construction site S. The superimposition display by the control program is performed so as to match the managed object 10 in the images 204, 207 with the planned installation position 16 (FIG. 6) on the design drawing 201 that corresponds to the imaged managed object 10.

施工管理装置100によれば、計画段階で作成された設計図面201(図3)と、施工結果を示す画像204,207(図6)とを重ね合わせて確認できるため、施工の間違いを低減できる。また、施工管理装置100による表205,206の作成により、手入力による手間及び入力の誤りを抑制できる。 The construction management device 100 allows the design drawings 201 (Figure 3) created during the planning stage to be overlaid on images 204, 207 (Figure 6) showing the construction results, reducing construction errors. Furthermore, the creation of tables 205, 206 by the construction management device 100 reduces the effort and input errors required for manual input.

また、各施工段階での施工結果(例えば墨出し段階、実際の設置後等)を計画段階である設計図面201に重ねて表示可能なため、簡便に施工管理できる。更に、設計図面201と画像204,207と表205,206とを関連付けて記録し、例えば重ねて表示することで、データベース208(図8)を作成できる。また、データベース208を帳票として出力でき、別途記録用の帳票を作成する作業を削減できる。更に、電子黒板200(図7)を作成することで、設備工事現場Sでの作業時間、事務所(不図示)での検証時間、帳票化及び報告書作成時間の各時間を短縮及び省力化できるとともに、これらへの誤入力を抑制できる。 In addition, construction results at each construction stage (e.g., the marking stage, after actual installation, etc.) can be displayed superimposed on the design drawing 201, which is the planning stage, allowing for easy construction management. Furthermore, by recording the design drawing 201, images 204, 207, and tables 205, 206 in association with each other and displaying them superimposed, for example, a database 208 (Figure 8) can be created. Database 208 can also be output as a report, eliminating the need to create separate reports for recording. Furthermore, by creating an electronic whiteboard 200 (Figure 7), it is possible to reduce and expedite the work required at the facility construction site S, the verification time in the office (not shown), and the time required for reporting and creating reports, while also reducing the number of input errors.

10 管理対象物
100 施工管理装置
1000 施工管理システム
101 通信部
102画像入力部
103 入力部
104 記録部
105 印刷部
11 管理対象物群
110 制御部
111 電子黒板作成部
112 認識部
113 重畳表示部
114 抽出部
115 計算部
116 判断部
117 表示切替部
118 DB作成部
12 墨出し位置
120 表示装置
121 表示部
122 タッチパネル
15 管理対象物
16 設置予定位置
17 目印
200 電子黒板
201 設計図面
202 破線枠
203 画面
204,207 画像
208 データベース
209 基準尺
50 カメラ
57 撮像部
58 保存部
59 通信部
10 Managed object 100 Construction management device 1000 Construction management system 101 Communication unit 102 Image input unit 103 Input unit 104 Recording unit 105 Printing unit 11 Managed object group 110 Control unit 111 Electronic whiteboard creation unit 112 Recognition unit 113 Superimposed display unit 114 Extraction unit 115 Calculation unit 116 Judgment unit 117 Display switching unit 118 DB creation unit 12 Marking position 120 Display device 121 Display unit 122 Touch panel 15 Managed object 16 Planned installation position 17 Mark 200 Electronic whiteboard 201 Design drawing 202 Dashed frame 203 Screen 204, 207 Image 208 Database 209 Standard scale 50 Camera 57 Imaging unit 58 Storage unit 59 Communication unit

Claims (11)

平面画像上で認識するための目印を付した目印スリーブを含む複数のスリーブを設置した設備工事現場を撮像した、単一画角による前記平面画像上において、前記目印を手掛かりとして、複数の前記スリーブの配置パターン及び前記スリーブが持つ属性情報の認識により、前記平面画像中での前記目印スリーブの位置を認識する認識部と、
前記平面画像と、前記設備工事現場の設計図面である平面図とを、前記設計図面上の通り芯と、前記平面画像における前記目印スリーブの平面内座標位置の基準軸となる前記通り芯とが重なるように、表示装置に重畳表示する重畳表示部と、を備える
ことを特徴とする施工管理装置。
A recognition unit that recognizes the position of the marker sleeve in the planar image by recognizing the arrangement pattern of the multiple sleeves and attribute information of the sleeves using the markers as clues on the planar image taken at a single angle of view of an equipment construction site where multiple sleeves are installed, including marker sleeves with markers for recognition on the planar image;
a superimposition display unit that displays the planar image and a floor plan, which is a design drawing of the equipment construction site, on a display device in such a manner that the center line on the design drawing and the center line, which serves as the reference axis for the in-plane coordinate position of the marker sleeve in the planar image, overlap .
前記重畳表示部は、更に、前記平面画像に基づき決定した前記設備工事現場での前記目印スリーブの位置と、前記設計図面での前記目印スリーブの設置予定位置とを、前記表示装置に文字情報として表示する
ことを特徴とする請求項1に記載の施工管理装置。
The construction management device described in claim 1, characterized in that the superimposed display unit further displays the position of the marker sleeve at the equipment construction site determined based on the planar image and the planned installation position of the marker sleeve on the design drawing as text information on the display device.
前記平面画像に基づき決定した前記設備工事現場での前記目印スリーブの位置と、前記設計図面での前記設置予定位置とのずれを計算する計算部を備える
ことを特徴とする請求項に記載の施工管理装置。
The construction management device according to claim 2 , further comprising a calculation unit that calculates the deviation between the position of the marker sleeve at the equipment construction site determined based on the planar image and the planned installation position on the design drawing.
前記計算部により計算された前記ずれが、許容範囲を表す所定範囲内にあるか否かを判断する判断部を備え、
前記重畳表示部は、更に、前記判断部による判断結果を前記表示装置に表示する
ことを特徴とする請求項に記載の施工管理装置。
a determination unit that determines whether the deviation calculated by the calculation unit is within a predetermined range that represents an allowable range,
The construction management device according to claim 3 , wherein the superimposed display unit further displays the determination result by the determination unit on the display device.
前記重畳表示部は、前記計算部による計算結果に基づいて前記平面画像の対象範囲を前記設計図面から抽出し、前記設計図面に合わせて重ね合わせ調整を行う
ことを特徴とする請求項又はに記載の施工管理装置。
The construction management device according to claim 3 or 4 , wherein the superimposition display unit extracts a target range of the planar image from the design drawing based on a calculation result by the calculation unit, and adjusts the superimposition to match the design drawing.
前記設計図面に含まれる文字情報のうちの少なくとも前記目印スリーブに関する文字情報を前記設計図面から抽出する抽出部を備え、
前記重畳表示部は、更に、
抽出した前記文字情報のうち紐づけるべき特定種類の文字情報が1つであれば、前記表示装置に重畳表示された前記目印スリーブに紐づけて前記文字情報を前記表示装置に表示するとともに、
抽出した前記文字情報のうち紐づけるべき特定種類の文字情報が2つ以上であれば、前記表示装置に重畳表示された複数の前記スリーブのうちのどの前記スリーブに紐づけるかを使用者に選択させる選択画面を前記表示装置に表示する
ことを特徴とする請求項1~の何れか1項に記載の施工管理装置。
an extraction unit that extracts from the design drawing at least character information related to the marker sleeve among character information included in the design drawing;
The superimposed display unit further
If there is one specific type of character information to be linked among the extracted character information, the character information is linked to the marker sleeve superimposed and displayed on the display device and displayed on the display device;
A construction management device as described in any one of claims 1 to 5, characterized in that if there are two or more specific types of character information to be linked among the extracted character information, a selection screen is displayed on the display device to allow the user to select which of the multiple sleeves superimposed on the display device to link to.
前記重畳表示部は、設備工事の計画段階での前記設計図面と、前記計画段階での前記設計図面の作成後に追加された設計図面と、を切り替えて前記表示装置に重畳する
ことを特徴とする請求項1~の何れか1項に記載の施工管理装置。
The construction management device according to any one of claims 1 to 6, characterized in that the superimposition display unit switches between the design drawings at the planning stage of the equipment construction and design drawings added after the design drawings at the planning stage were created and superimposed on the display device.
前記表示装置に表示された情報の一部の表示又は非表示を切り替える表示切替部を備える
ことを特徴とする請求項1~の何れか1項に記載の施工管理装置。
The construction management device according to any one of claims 1 to 7 , further comprising a display switching unit that switches between displaying and hiding part of the information displayed on the display device.
電子黒板を作成する電子黒板作成部を備え、
前記重畳表示部は、前記電子黒板作成部により作成された前記電子黒板を前記表示装置に表示する
ことを特徴とする請求項1~の何れか1項に記載の施工管理装置。
an electronic whiteboard creation unit for creating an electronic whiteboard;
The construction management device according to any one of claims 1 to 8 , wherein the superimposed display unit displays the electronic whiteboard created by the electronic whiteboard creation unit on the display device.
前記電子黒板と、前記電子黒板に対応する撮像時の前記平面画像と、前記設計図面の全体における前記平面画像に対応する位置と、を関連付けたデータベースを作成するデータベース作成部を備える
ことを特徴とする請求項に記載の施工管理装置。
The construction management device according to claim 9, further comprising a database creation unit that creates a database that associates the electronic whiteboard, the planar image captured corresponding to the electronic whiteboard, and the position corresponding to the planar image in the entire design drawing.
コンピュータを、平面画像上で認識するための目印を付した目印スリーブを含む複数のスリーブを設置した設備工事現場を撮像した、単一画角による前記平面画像上において、前記目印を手掛かりとして、複数の前記スリーブの配置パターン及び前記スリーブが持つ属性情報の認識により、前記平面画像中での前記目印スリーブの位置を認識する認識部、及び、前記平面画像と、前記設備工事現場の設計図面である平面図とを、前記設計図面上の通り芯と、前記平面画像における前記目印スリーブの平面内座標位置の基準軸となる前記通り芯とが重なるように、表示装置に重畳表示する重畳表示部として機能させるためのプログラム。 A program that causes a computer to function as a recognition unit that recognizes the position of the marker sleeve in a planar image taken at a single angle of view of an equipment construction site where multiple sleeves are installed , including marker sleeves with markers for recognition on the planar image, by using the markers as clues to recognize the arrangement pattern of the multiple sleeves and the attribute information possessed by the sleeves, and as a superimposition display unit that superimposes the planar image and a floor plan, which is a design drawing of the equipment construction site , on a display device so that the center line on the design drawing overlaps with the center line, which is the reference axis for the in-plane coordinate position of the marker sleeve in the planar image.
JP2021095199A 2021-06-07 2021-06-07 Construction management device and program Active JP7729541B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021095199A JP7729541B2 (en) 2021-06-07 2021-06-07 Construction management device and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021095199A JP7729541B2 (en) 2021-06-07 2021-06-07 Construction management device and program

Publications (2)

Publication Number Publication Date
JP2022187262A JP2022187262A (en) 2022-12-19
JP7729541B2 true JP7729541B2 (en) 2025-08-26

Family

ID=84525598

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021095199A Active JP7729541B2 (en) 2021-06-07 2021-06-07 Construction management device and program

Country Status (1)

Country Link
JP (1) JP7729541B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2023160107A (en) * 2022-04-21 2023-11-02 株式会社大林組 Process management support system, process management support method, and program

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002092081A (en) 2000-09-19 2002-03-29 Olympus Optical Co Ltd Construction supporting system and method and recording medium with construction supporting program recorded thereon
JP2014002536A (en) 2012-06-18 2014-01-09 Ohbayashi Corp Bar arrangement inspection system
JP2016132538A (en) 2015-01-20 2016-07-25 株式会社日立製作所 Carrying-in and installation work plan support device and carrying-in and installation work plan support method
JP2018124843A (en) 2017-02-02 2018-08-09 前田建設工業株式会社 On-site construction management system
JP2019109596A (en) 2017-12-15 2019-07-04 沖電気工業株式会社 Information processing device and information processing system
JP2019191927A (en) 2018-04-25 2019-10-31 有限会社リライト Structure inspection system and inspection method
JP2020201603A (en) 2019-06-06 2020-12-17 東芝エレベータ株式会社 Modeling support method and modeling support device

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11315637A (en) * 1998-05-01 1999-11-16 Takenaka Komuten Co Ltd Construction method selection support device and recording medium

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002092081A (en) 2000-09-19 2002-03-29 Olympus Optical Co Ltd Construction supporting system and method and recording medium with construction supporting program recorded thereon
JP2014002536A (en) 2012-06-18 2014-01-09 Ohbayashi Corp Bar arrangement inspection system
JP2016132538A (en) 2015-01-20 2016-07-25 株式会社日立製作所 Carrying-in and installation work plan support device and carrying-in and installation work plan support method
JP2018124843A (en) 2017-02-02 2018-08-09 前田建設工業株式会社 On-site construction management system
JP2019109596A (en) 2017-12-15 2019-07-04 沖電気工業株式会社 Information processing device and information processing system
JP2019191927A (en) 2018-04-25 2019-10-31 有限会社リライト Structure inspection system and inspection method
JP2020201603A (en) 2019-06-06 2020-12-17 東芝エレベータ株式会社 Modeling support method and modeling support device

Also Published As

Publication number Publication date
JP2022187262A (en) 2022-12-19

Similar Documents

Publication Publication Date Title
US7139685B2 (en) Video-supported planning of equipment installation and/or room design
CN104070266B (en) Weld seam information setting device, program, automatic teaching system and weld seam information setting method
JP5323103B2 (en) Graphical user interface device
US20160335578A1 (en) Program for creating work assistance data
WO2014128760A1 (en) Display device, display method, display program, and position-setting system
Corneli et al. Augmented reality and deep learning towards the management of secondary building assets
JP2015118535A (en) Construction information management system and construction information management method
JP7729541B2 (en) Construction management device and program
KR20010101333A (en) Method and devices for assisting in the control of butlding operations
KR100976829B1 (en) Design design review method of ship and its service system
CN109325276B (en) BIM model object-based examination processing method
JP7015130B2 (en) Data processing equipment
JP2011090355A (en) Piping drawing system and piping information management system using mobile terminal apparatus
US11748960B1 (en) Printed circuit board (PCB) virtual x-ray visualization
KR20060030902A (en) Information presentation device and information presentation system using the same
KR102020351B1 (en) A display apparatus for presenting and utilizing nuclear power plant intelligent general arrangement drawings
Aziz et al. Visual fire safety inspection framework using computer vision algorithms
JP2021015572A (en) Information management system and information management method
JP6350988B2 (en) Camera for diagnosing bridge damage
KR20120132950A (en) System and method for generating a fire control and safety plan from computer aided design modeling data about a ship
JP4398885B2 (en) Equipment location presentation system
CN115309303A (en) Control method and device for construction area, electronic equipment and readable storage medium
KR100886657B1 (en) System and method for creating dimensional quality inspection criteria document for hull block
JP7671448B2 (en) Construction management method and construction management device
KR102876727B1 (en) Location-based construction work management method and system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240513

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250219

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250225

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20250425

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250620

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250708

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250805

R150 Certificate of patent or registration of utility model

Ref document number: 7729541

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150