JP7730116B2 - Reactive Power Demand Response System - Google Patents
Reactive Power Demand Response SystemInfo
- Publication number
- JP7730116B2 JP7730116B2 JP2021130162A JP2021130162A JP7730116B2 JP 7730116 B2 JP7730116 B2 JP 7730116B2 JP 2021130162 A JP2021130162 A JP 2021130162A JP 2021130162 A JP2021130162 A JP 2021130162A JP 7730116 B2 JP7730116 B2 JP 7730116B2
- Authority
- JP
- Japan
- Prior art keywords
- reactive power
- power
- building multi
- air conditioner
- air
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/30—Reactive power compensation
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Description
本発明は、電力系統(配電系統)における無効電力を制御可能な無効電力デマンドレスポンスシステムに関する。 The present invention relates to a reactive power demand response system capable of controlling reactive power in a power system (power distribution system).
特許第6572113号公報(特許文献1)には、消費電力制御装置が開示されており、その[0019]には、「また、消費電力は、有効電力のみでも、無効電力のみでも、皮相電力(有効電力と無効電力の和)でも良い。ここでは、消費電力が皮相電力(VA)の場合について説明する。なお、無効電力分は、消費されないが、ここでは、電気機器が使用する無効電力分を含め、消費電力と称する。」と記載されている。
この消費電力制御装置の実施形態では、無効電力のみの制御は、全く開示されていない。
Japanese Patent No. 6572113 (Patent Document 1) discloses a power consumption control device, and states in paragraph [0019], "Furthermore, the power consumption may be active power only, reactive power only, or apparent power (the sum of active power and reactive power). Here, we will explain the case where the power consumption is apparent power (VA). Note that reactive power is not consumed, but here, the reactive power used by electrical equipment is included in the term power consumption."
In this embodiment of the power consumption control device, control of reactive power alone is not disclosed at all.
本発明の主な目的の一つは、配電系統において系統電圧を制御可能な無効電力デマンドレスポンスシステムを提供することである。 One of the main objectives of the present invention is to provide a reactive power demand response system capable of controlling system voltage in a power distribution system.
上記目的を達成するために、請求項1に記載の発明は、配電系統に対して、無効電力を、複数のビルマルチ空調機によって供給するように、各前記ビルマルチ空調機を制御するコンピュータを有しており、前記コンピュータは、前記無効電力を、各前記ビルマルチ空調機に対し、室温偏差に関する数理計画法に基づいて按分して、各前記ビルマルチ空調機における目標無効電力を割り振ることを特徴とするものである。
請求項2に記載の発明は、上記発明において、前記数理計画法は、各前記室温偏差の二乗の総和が最小となるように、前記無効電力に対する前記ビルマルチ空調機毎の按分比例係数を決定し、又は前記無効電力に前記按分比例係数を乗じた値に相当する前記ビルマルチ空調機毎の按分無効電力を決定する最小二乗法であることを特徴とするものである。
請求項3に記載の発明は、上記発明において、前記ビルマルチ空調機は、圧縮機モータと、前記圧縮機モータに接続されたインバータと、前記インバータに対する電力を調整するアクティブコンバータと、を有していることを特徴とするものである。
請求項4に記載の発明は、上記発明において、前記アクティブコンバータは、自身が属する前記ビルマルチ空調機の空調のための有効電力を制御することで、当該ビルマルチ空調機に割り振られた前記目標無効電力に係る無効電力を発生することを特徴とするものである。
In order to achieve the above object, the invention described in claim 1 comprises a computer that controls each of a plurality of building multi-air conditioners so that reactive power is supplied to a power distribution system by the building multi-air conditioners, and the computer allocates the reactive power to each of the building multi-air conditioners based on a mathematical programming method related to room temperature deviation, and allocates target reactive power for each of the building multi-air conditioners .
The invention described in claim 2 is characterized in that, in the above invention, the mathematical programming is a least squares method that determines an apportionment proportional coefficient for each building multi-air conditioner for the reactive power so that the sum of the squares of each room temperature deviation is minimized, or determines an apportioned reactive power for each building multi-air conditioner that corresponds to the value obtained by multiplying the reactive power by the apportionment proportional coefficient.
The invention described in claim 3 is characterized in that, in the above invention, the building multi-air conditioner has a compressor motor, an inverter connected to the compressor motor, and an active converter that adjusts the power to the inverter.
The invention described in claim 4 is characterized in that, in the above invention, the active converter generates reactive power related to the target reactive power allocated to the building multi-air conditioner by controlling the active power for air conditioning of the building multi-air conditioner to which it belongs.
本発明の主な効果の一つは、配電系統において系統電圧を制御可能な無効電力デマンドレスポンスシステムが提供されることである。 One of the main advantages of the present invention is that it provides a reactive power demand response system capable of controlling system voltage in a power distribution system.
以下、本発明の実施の形態及びその変更例が、適宜図面に基づいて説明される。本発明は、下記の形態及び変更例に限定されない。 Embodiments and modifications of the present invention will be described below with reference to the accompanying drawings. The present invention is not limited to the following embodiments and modifications.
[配電系統ESの局所的な電圧変動等]
図1は、配電系統ESに配備される無効電力デマンドレスポンスシステム1のブロック図である。
無効電力デマンドレスポンスシステム1に関連する事項である、配電系統ESの局所的な電圧変動が、まず説明される。
[Local voltage fluctuations in the power distribution system ES, etc.]
FIG. 1 is a block diagram of a reactive power demand response system 1 installed in a power distribution system ES.
First, local voltage fluctuations in the power distribution system ES, which are relevant to the reactive power demand response system 1, will be described.
昨今、配電系統ESには、太陽光発電D1、蓄電池システムD2、EV(Electric Vehicle:電気自動車)用の急速充電器D3といった、負荷にも電源にもなるDER(Distributed Energy Resourse:分散電源)が接続されつつあり、近い将来、DERが、半径数キロメートルの範囲内程度の比較的に狭い地域AR内で、大量に接続されることとなる。
即ち、1以上の任意の数の太陽光発電D1を有する事業者が、配電系統ESにおいて複数存在することとなる。又、1以上の任意の数の蓄電池システムD2を有する事業者が、配電系統ESにおいて複数存在することとなる。蓄電池システムD2は、BESS(Battery Energy Storage System:二次電池電力貯蔵システム)である。更に、1以上の任意の数の急速充電器D3を有する事業者が、配電系統ESにおいて複数存在することとなる。尚、DERは、太陽光発電D1、蓄電池システムD2、及び急速充電器D3に限られない。
この場合、配電系統ESにおいて局所的な電圧変動が発生し易くなる。例えば、日射変動により太陽光発電D1の発電量が変化して太陽光発電D1において電圧変動が発生し、又蓄電池システムD2のスイッチングにより充電(負荷)状態と放電(電源)状態とで切り替わって蓄電池システムD2において電圧変動が発生し、更にEVの充電により急速充電器D3が1台当たり30分程度の間、大きな負荷となるような電圧変動が発生する。
又、配電系統ESの逆潮流も、頻繁に複雑に発生するようになる。
Recently, DERs (Distributed Energy Resources) that can serve as both loads and power sources, such as photovoltaic power generation systems D1, battery storage systems D2, and rapid chargers D3 for electric vehicles (EVs), are being connected to the power distribution system ES, and in the near future, a large number of DERs will be connected within a relatively small area AR, typically within a radius of several kilometers.
That is, there are a plurality of businesses in the power distribution system ES that have any number of photovoltaic power generation systems D1 (one or more). Also, there are a plurality of businesses in the power distribution system ES that have any number of storage battery systems D2 (one or more). The storage battery systems D2 are BESSs (Battery Energy Storage Systems). Furthermore, there are a plurality of businesses in the power distribution system ES that have any number of quick chargers D3 (one or more). Note that the DER is not limited to the photovoltaic power generation system D1, the storage battery systems D2, and the quick chargers D3.
In this case, localized voltage fluctuations are likely to occur in the power distribution system ES. For example, fluctuations in solar radiation change the amount of power generated by the solar power generation system D1, causing voltage fluctuations in the solar power generation system D1, switching of the storage battery system D2 between a charging (load) state and a discharging (power supply) state causes voltage fluctuations in the storage battery system D2, and further voltage fluctuations occur when the quick charger D3 is charged, causing a large load for about 30 minutes per EV.
Furthermore, reverse power flows in the power distribution system ES also occur frequently and in a complex manner.
かような電圧変動は、配電系統ESにおいて、時々刻々と局所的に発生する。
又、かような電圧変動に対し、広域に属するDER群によるならし効果は、あまり期待できない。
更に、配電変電所TSの送り出し電圧制御、及び固定点の電圧調整機器では、電圧変動箇所が随時変化するため、かような電圧変動に対応し難い。
他方、配電系統ESにおいて、くまなく多くの地点に電圧を調整する専用の機器を新たに設置してそれぞれスタンバイさせ、かような電圧変動に対応することが考えられる。しかし、各電圧調整機器の製造費用、並びにそれらの設置費用、及びメンテナンスの費用等がかかり、コストが甚大となる。
Such voltage fluctuations occur locally from moment to moment in the power distribution system ES.
Furthermore, the smoothing effect of the DER group belonging to a wide range cannot be expected to be very effective against such voltage fluctuations.
Furthermore, the sending voltage control of the distribution substation TS and the voltage adjustment equipment at fixed points have difficulty in responding to such voltage fluctuations because the locations where voltage fluctuations occur change constantly.
On the other hand, it is conceivable to deal with such voltage fluctuations by installing new dedicated voltage adjusting devices at many points throughout the power distribution system ES and keeping them on standby, but this would entail enormous costs, including the costs of manufacturing, installing, and maintaining each voltage adjusting device.
これらの観点と異なり、無効電力デマンドレスポンスシステム1では、地域AR内で配電系統ESにおいて既に広く分布していて所定程度以上の規模を有する需要家の負荷設備群が用いられ、当該負荷設備群に属する1以上の負荷設備について、比較的に短時間で局所的に無効電力が制御されることで、かような電圧変動への対応が、低コストで十分に可能となっている。
無効電力デマンドレスポンスシステム1では、無効電力の制御によりDERが電圧変動抑制のために制御(マネージメント)される。よって、無効電力デマンドレスポンスシステム1は、スマートグリッド技術に係るDERMS(DER Management System)の一種となる。又、無効電力デマンドレスポンスシステム1は、状況に応じ(Demand)、無効電力(単位:var)を増減させる(Response)ことから、本願においてVarDRと適宜呼ばれる。
かような負荷設備は、普及していることから、通常、本来の機能を発揮しており、又、配電系統ESの安定に寄与するため、一時的に電源力率制御を優先して無効電力の制御を行う能力を有するものである。即ち、負荷設備は、普及の要因となった本来の機能を過度に損なうことなく無効電力を制御可能であり、本来の機能と無効電力制御とを両立可能である。
かような負荷設備として、例えばビル空調設備が用いられる。ビル空調設備は、一般にビルマルチ空調機BAと呼ばれ、複数の室内機ANの集合設備である。現状、都市部におけるオフィスビル等の業務用中小規模建物の多くに、ビルマルチ空調機BAが採用されている。配電系統ESにおいて、1以上の任意の数のビルマルチ空調機BAを有する需要家が、複数存在している。
In contrast to these viewpoints, the reactive power demand response system 1 uses a group of load equipment of consumers that is already widely distributed in the distribution system ES within the area AR and has a scale equal to or greater than a predetermined level, and by controlling the reactive power locally in a relatively short period of time for one or more load equipment belonging to the load equipment group, it becomes possible to respond to such voltage fluctuations at low cost.
In the reactive power demand response system 1, DER is controlled (managed) to suppress voltage fluctuations by controlling reactive power. Therefore, the reactive power demand response system 1 is a type of DER Management System (DERMS) related to smart grid technology. Furthermore, since the reactive power demand response system 1 increases or decreases (responses) reactive power (unit: var) depending on the situation (Demand), it is appropriately referred to as VarDR in this application.
Such load equipment is widespread and therefore normally performs its intended function, and also has the ability to temporarily prioritize power source power factor control and control reactive power in order to contribute to the stability of the power distribution system ES. In other words, the load equipment can control reactive power without excessively impairing the intended function that led to its widespread use, and is capable of both the intended function and reactive power control.
An example of such load equipment is a building air conditioning system. The building air conditioning system is generally called a building multi-air conditioner (BA) and is an integrated facility of multiple indoor units (AN). Currently, building multi-air conditioners (BA) are used in many small and medium-sized commercial buildings such as office buildings in urban areas. In a power distribution system (ES), there are multiple consumers that have any number of building multi-air conditioners (BA) greater than or equal to one.
[ビルマルチ空調機BA等]
ビルマルチ空調機BAの本来の機能は、室温制御である。ビルマルチ空調機BAは、室外機OUと、これに対して接続される複数の室内機ANと、を有する。
近時、配電系統ESへの高調波対策として、ビルマルチ空調機BAの室外機OUに対し、アクティブコンバータACを当初から搭載させ、あるいは付属機器としてのアクティブコンバータACを後付けで付設させることが多くなっている。アクティブコンバータACは、アクティブフィルタ、PMWコンバータとも呼ばれる。
[Building multi-air conditioner BA, etc.]
The primary function of the building multi-air conditioner BA is room temperature control. The building multi-air conditioner BA has an outdoor unit OU and a plurality of indoor units AN connected thereto.
Recently, as a countermeasure against harmonics in the power distribution system ES, it has become common to initially install an active converter AC in the outdoor unit OU of a building multi-air conditioner BA, or to retrofit an active converter AC as an accessory. Active converter AC is also called an active filter or PMW converter.
図2は、アクティブコンバータACを含む室外機OUのブロック図である。
アクティブコンバータACは、動力を得るため200V(ボルト)の配電系統ESに接続される。
アクティブコンバータACは、ビルマルチ空調機BAの室外機OUの圧縮機モータCMに接続されたインバータとしての室外機内蔵インバータINと、配電系統ESとの間に配置される。圧縮機モータCM、室外機内蔵インバータIN、及びアクティブコンバータACは、需要家毎に、ビルマルチ空調機BAの規模に応じた数だけ設置される。
各アクティブコンバータACは、リアクトルRAと、ブリッジ型スイッチング素子BSと、ダイオードDIと、抵抗RSと、平滑コンデンサSCと、電源電圧位相検出回路PPと、コンバータ制御回路CCと、を有する。
FIG. 2 is a block diagram of the outdoor unit OU including the active converter AC.
The active converter AC is connected to a 200V (volt) power distribution system ES for power generation.
The active converter AC is disposed between an outdoor unit built-in inverter IN, which serves as an inverter connected to a compressor motor CM of the outdoor unit OU of the building multi-air conditioner BA, and the power distribution system ES. The compressor motor CM, the outdoor unit built-in inverter IN, and the active converter AC are installed for each consumer, the number of which corresponds to the size of the building multi-air conditioner BA.
Each active converter AC has a reactor RA, a bridge-type switching element BS, a diode DI, a resistor RS, a smoothing capacitor SC, a power supply voltage phase detection circuit PP, and a converter control circuit CC.
リアクトルRAは、配電系統ESとブリッジ型スイッチング素子BSとの間に配置される。
ブリッジ型スイッチング素子BSは、三相電源に対応し、6組のダイオード及びトランジスタを有する。ブリッジ型スイッチング素子BSは、2線により、室外機内蔵インバータINに接続される。
ダイオードDIは、ブリッジ型スイッチング素子BSと室外機内蔵インバータINとの間の1つの線に対し、直列に挿入される。
抵抗RSは、ダイオードDIと並列に設けられる。
平滑コンデンサSCは、ブリッジ型スイッチング素子BSと室外機内蔵インバータINとの間の2つの線に対し、並列に挿入される。
The reactor RA is arranged between the power distribution system ES and the bridge-type switching element BS.
The bridge-type switching element BS corresponds to a three-phase power supply and has six pairs of diodes and transistors. The bridge-type switching element BS is connected to the outdoor unit built-in inverter IN by two wires.
The diode DI is inserted in series with one line between the bridge-type switching element BS and the outdoor unit built-in inverter IN.
The resistor RS is connected in parallel with the diode DI.
The smoothing capacitor SC is inserted in parallel with the two lines between the bridge-type switching element BS and the outdoor unit built-in inverter IN.
電源電圧位相検出回路PPは、電源の電圧及び位相を検出する回路である。より詳しくは、電源電圧位相検出回路PPは、リアクトルREと配電系統ESとの間における電圧及び位相を検出する。
コンバータ制御回路CCは、電源電圧位相検出回路PPに接続されている。コンバータ制御回路CCは、ブリッジ型スイッチング素子BSを制御する。より詳しくは、コンバータ制御回路CCは、ブリッジ型スイッチング素子BSの各ダイオードに対するスイッチングのタイミングを制御して、室外機内蔵インバータINに印加される電圧における大きさ及び位相の少なくとも一方を、電源の電圧における大きさ及び位相の少なくとも一方から所望のものに変換する。スイッチングの最小時間は、例えば50μ秒(マイクロ秒)であり、コンバータ制御回路CCは、スイッチングの最小時間毎に電流を切り替えることができる。
コンバータ制御回路CCは、高調波対策、即ち室外機内蔵インバータINに高調波が印加されてその動作に支障を来す事態を抑制するために普及しつつあることから、PMW制御による三相全波整流を行う。
一方で、コンバータ制御回路CCは、上述の通り電源の電圧における大きさ及び位相の少なくとも一方を所望のものに変換することが可能であり、コンバータ制御回路CCのソフトウェア(プログラム)の書き換え(追加を含む)を行うことで、三相全波整流を行いつつ、配電系統ESに対する無効電力の制御に寄与することが可能となる。
三相全波整流は、室外機内蔵インバータINを介した圧縮機モータCMの安定動作に寄与し、ビルマルチ空調機BAの安定動作に寄与して室温制御に寄与するため、ソフトウェアが変更されたコンバータ制御回路CCは、本来の機能を発揮するための室温制御と、配電系統ESの局所的な電圧変動を抑制するための無効電力の制御との協調制御を行うものである。
各アクティブコンバータACは、室外機内蔵インバータINに対する電力を調整する。
The power supply voltage phase detection circuit PP is a circuit that detects the voltage and phase of the power supply. More specifically, the power supply voltage phase detection circuit PP detects the voltage and phase between the reactor RE and the power distribution system ES.
The converter control circuit CC is connected to the power supply voltage phase detection circuit PP. The converter control circuit CC controls the bridge-type switching element BS. More specifically, the converter control circuit CC controls the switching timing of each diode of the bridge-type switching element BS to convert at least one of the magnitude and phase of the voltage applied to the outdoor unit's built-in inverter IN into a desired one from at least one of the magnitude and phase of the power supply voltage. The minimum switching time is, for example, 50 μs (microseconds), and the converter control circuit CC can switch the current every minimum switching time.
The converter control circuit CC performs three-phase full-wave rectification using PWM control, which is becoming increasingly popular as a countermeasure against harmonics, i.e., to prevent harmonics from being applied to the outdoor unit's built-in inverter IN and disrupting its operation.
On the other hand, as described above, the converter control circuit CC can convert at least one of the magnitude and phase of the power supply voltage to a desired one, and by rewriting (including adding) the software (program) of the converter control circuit CC, it becomes possible to perform three-phase full-wave rectification while contributing to the control of reactive power in the distribution system ES.
Three-phase full-wave rectification contributes to stable operation of the compressor motor CM via the outdoor unit's built-in inverter IN, and contributes to stable operation of the building multi-air conditioner BA and contributes to room temperature control.Therefore, the converter control circuit CC, whose software has been modified, performs coordinated control of room temperature control to perform its original function and reactive power control to suppress local voltage fluctuations in the distribution system ES.
Each active converter AC regulates the power to the outdoor unit's built-in inverter IN.
無効電力の制御としては、ビルマルチ空調機BAの電源部において、配電系統ESからの有効電力のみならず、無効電力の注入抽出のために自在且つ精密に交流入力の力率制御をすることが考えられる。
そして、配電系統ESにおいて短時間局所的に電圧変動する問題箇所が発生した場合、無効電力デマンドレスポンスシステム1は、その隣接域から受電している需要家の1台以上のビルマルチ空調機BAを臨機応変に選ぶことにより、配電系統ESにおいて時々刻々と移動していく局所的な配電電圧問題箇所を、当該問題が抑制されるように制御する。
In order to control reactive power, it is conceivable that the power factor of the AC input can be freely and precisely controlled in the power supply section of the building multi-air conditioner BA in order to inject and extract not only active power from the power distribution system ES but also reactive power.
If a problematic location occurs in the power distribution system ES where voltage fluctuates locally for a short period of time, the reactive power demand response system 1 flexibly selects one or more building multi-air conditioners BA of a consumer receiving power from the adjacent area, thereby controlling the local distribution voltage problematic location that moves from moment to moment in the power distribution system ES so that the problem is suppressed.
[無効電力デマンドレスポンスシステム1の構成等]
無効電力デマンドレスポンスシステム1は、DERMSサーバDSと、太陽光発電仲介サーバPMと、蓄電池システム仲介サーバBMと、急速充電器仲介サーバEMと、VarDRサーバVSと、太陽光発電D1に付設された第1ERC1Eと、蓄電池システムD2に付設された第2ERC2Eと、急速充電器D3に付設された第3ERC3Eと、ビルマルチ空調機BAに付設された第4ERC4Eと、を備えている。
各種の「サーバ」は、サーバコンピュータであり、それぞれ、制御部(例えばCPU)、記憶部(例えばメモリ)、入力部(例えばキーボード)、出力部(例えばモニタ)、通信部(例えばインターフェイス)を備えている。
尚、第1ERC1Eないし第3ERC3Eの少なくとも何れかは、無効電力デマンドレスポンスシステム1の構成要素に含められなくても良い。
[Configuration of reactive power demand response system 1]
The reactive power demand response system 1 includes a DERMS server DS, a solar power generation intermediation server PM, a battery system intermediation server BM, a rapid charger intermediation server EM, a VarDR server VS, a first ERC1E attached to the solar power generation D1, a second ERC2E attached to the battery system D2, a third ERC3E attached to the rapid charger D3, and a fourth ERC4E attached to the building multi-air conditioner BA.
Various "servers" are server computers, each equipped with a control unit (e.g., a CPU), a storage unit (e.g., a memory), an input unit (e.g., a keyboard), an output unit (e.g., a monitor), and a communication unit (e.g., an interface).
At least one of the first ERC 1E to the third ERC 3E does not have to be included in the components of the reactive power demand response system 1.
DERMSサーバDSは、送電機関PSの管理領域(例えば配電系統制御所)内に設置されている。
DERMSサーバDSは、インターネットNEを介して、太陽光発電仲介サーバPM、蓄電池システム仲介サーバBM、及び急速充電器仲介サーバEMに、それぞれ制御パラメータCP等を通信可能に接続されている。又、DERMSサーバDSは、VarDRサーバVSに、Var制御パラメータVP等を通信可能に接続されている。
尚、DERMSサーバDSは、太陽光発電仲介サーバPM、蓄電池システム仲介サーバBM、急速充電器仲介サーバEM、及びVarDRサーバVSの少なくとも何れかと、VPN(Virtial Private Network)あるいは専用網等を介して接続されていても良い。又、通信は、有線及び無線の少なくとも一方によっても良く、以下の他の通信においても同様である。
The DERMS server DS is installed in the management area (for example, a power distribution system control center) of the power transmission organization PS.
The DERMS server DS is connected to the photovoltaic power generation intermediation server PM, the battery system intermediation server BM, and the quick charger intermediation server EM via the Internet NE so as to be able to communicate control parameters CP, etc. The DERMS server DS is also connected to the VarDR server VS so as to be able to communicate Var control parameters VP, etc.
The DERMS server DS may be connected to at least one of the photovoltaic power generation intermediation server PM, the battery system intermediation server BM, the quick charger intermediation server EM, and the VarDR server VS via a VPN (Virtual Private Network) or a dedicated network, etc. Furthermore, communication may be by at least one of wired and wireless means, and the same applies to the other communications described below.
太陽光発電仲介サーバPMは、商用閉域通信網CNを介して、第1ERC1Eに、制御パラメータCP及び系統電圧定期報告VR等を通信可能に接続されている。
太陽光発電仲介サーバPMは、太陽光発電リソースアグリゲータの管理領域内に設置されている。
尚、太陽光発電仲介サーバPMは、インターネットNE等を介して、第1ERC1Eに接続されても良い。又、太陽光発電仲介サーバPMは、送電機関PSの管理領域内等に設置されても良い。更に、太陽光発電仲介サーバPMが省略され、DERMSサーバDSが、第1ERC1Eと直接、制御パラメータCP及び系統電圧定期報告VRを通信しても良い。
The photovoltaic power generation intermediation server PM is connected to the first ERC 1E via the commercial closed communication network CN so as to be able to communicate control parameters CP, system voltage periodic reports VR, and the like.
The photovoltaic power generation intermediation server PM is installed within the management area of the photovoltaic power generation resource aggregator.
The photovoltaic power generation intermediation server PM may be connected to the first ERC1E via the Internet NE, etc. The photovoltaic power generation intermediation server PM may also be installed within the management area of the power transmission organization PS, etc. Furthermore, the photovoltaic power generation intermediation server PM may be omitted, and the DERMS server DS may communicate the control parameters CP and the system voltage periodic report VR directly with the first ERC1E.
蓄電池システム仲介サーバBMは、商用閉域通信網CNを介して、第2ERC2Eに、制御パラメータCP及び系統電圧定期報告VR等を通信可能に接続されている。
蓄電池システム仲介サーバBMは、蓄電池システムリソースアグリゲータの管理領域内に設置されている。
尚、蓄電池システム仲介サーバBMは、インターネットNE等を介して、第2ERC2Eに接続されても良い。又、蓄電池システム仲介サーバBMは、送電機関PSの管理領域内等に設置されても良い。更に、蓄電池システム仲介サーバBMが省略され、DERMSサーバDSが、第2ERC2Eと直接、制御パラメータCP及び系統電圧定期報告VRを通信しても良い。
The battery system intermediation server BM is connected to the second ERC 2E via a commercial closed communication network CN so as to be able to communicate control parameters CP, system voltage periodic reports VR, and the like.
The battery system intermediation server BM is installed within the management area of the battery system resource aggregator.
The battery system intermediation server BM may be connected to the second ERC 2E via the Internet NE, etc. The battery system intermediation server BM may also be installed within the management area of the power transmission organization PS, etc. Furthermore, the battery system intermediation server BM may be omitted, and the DERMS server DS may communicate the control parameters CP and the system voltage periodic report VR directly with the second ERC 2E.
急速充電器仲介サーバEMは、商用閉域通信網CNを介して、第3ERC3Eに、制御パラメータCP及び系統電圧定期報告VR等を通信可能に接続されている。
急速充電器仲介サーバEMは、急速充電器リソースアグリゲータの管理領域内に設置されている。
尚、急速充電器仲介サーバEMは、インターネットNE等を介して、第3ERC3Eに接続されても良い。又、急速充電器仲介サーバEMは、送電機関PSの管理領域内等に設置されても良い。更に、急速充電器仲介サーバEMが省略され、DERMSサーバDSが、第3ERC3Eと直接、制御パラメータCP及び系統電圧定期報告VRを通信しても良い。
The quick charger intermediation server EM is connected to the third ERC 3E via the commercial closed communication network CN so as to be able to communicate control parameters CP, system voltage periodic reports VR, and the like.
The quick charger intermediation server EM is installed within the management area of the quick charger resource aggregator.
The rapid charger intermediation server EM may be connected to the third ERC 3E via the Internet NE, etc. The rapid charger intermediation server EM may also be installed within the management area of the power transmission organization PS, etc. Furthermore, the rapid charger intermediation server EM may be omitted, and the DERMS server DS may communicate the control parameters CP and the system voltage periodic report VR directly with the third ERC 3E.
VarDRサーバVSは、商用閉域通信網CNを介して、第4ERC4Eに、Var制御パラメータVP及び系統電圧定期報告VR等を通信可能に接続されている。
VarDRサーバVSは、VarDRリソースアグリゲータの管理領域内に設置されている。
尚、VarDRサーバVSは、インターネットNE等を介して、第4ERC4Eに接続されても良い。又、VarDRサーバVSは、送電機関PSの管理領域内等に設置されても良い。更に、VarDRサーバVSが省略され、DERMSサーバDSが、第4ERC4Eと直接、Var制御パラメータVP及び系統電圧定期報告VRを通信しても良い。各種のリソースアグリゲータのうちの少なくとも2つが、同じ機関であっても良い。
The VarDR server VS is connected to the fourth ERC 4E via a commercial closed communication network CN so as to be able to communicate Var control parameters VP, system voltage periodic reports VR, and the like.
The VarDR server VS is located within the management domain of the VarDR resource aggregator.
The VarDR server VS may be connected to the fourth ERC 4E via the Internet NE or the like. The VarDR server VS may also be installed within the management area of the power transmission organization PS or the like. Furthermore, the VarDR server VS may be omitted, and the DERMS server DS may communicate the Var control parameters VP and the system voltage periodic report VR directly with the fourth ERC 4E. At least two of the various resource aggregators may be the same organization.
第1ERC1Eは、従来のDERMSで行われる通り、太陽光発電D1における無効電力(単位:var)の制御を、受信した制御パラメータCP等に基づいて行う。又、第1ERC1Eは、従来のDERMSで行われる通りに有効電力(単位:W(ワット))の制御も可能である。ERCは、Energy Resource Controllerであり、所定区域(需要家の区域等)に属する1以上のDER機器を制御する制御装置である。第1ERC1Eは、1以上のDER機器(太陽光発電D1)を外部に対して通信するDERMS通信機能、並びに、個々のDER機器の電圧、有効電力、及び無効電力の当該需要家設備分を集約する集約機能を有している。但し、太陽光発電D1は、配電系統ESにおいて偏在している。又、第1ERC1Eは、太陽光発電D1の発電状態によっては、無効電力の制御を適切に行えない。
3箇所の太陽光発電D1は、配電系統ESの連系点GP1~GP3(電圧V1~V3)に対してそれぞれ接続されている。3箇所の太陽光発電D1における無効電力の制御は、無効電力制御分(無効電力量)ΔVar(kvar)を、対応する連系点GP1~GP3の電圧V1~V3に作用させて行われる。3箇所の太陽光発電D1における有効電力の制御は、有効電力制御分ΔW(kW(キロワット))を、対応する連系点GP1~GP3の電圧V1~V3に作用させて行われる。太陽光発電D1は、例えば数百kWの規模である。
各太陽光発電D1の一部又は全部は、別個の事業者に属しても良いし、同じ事業者に属しても良い。
尚、太陽光発電D1の数、及び接続する連系点GP1~GP3の少なくとも何れかは、上述のものに限られない。又、太陽光発電D1の有効電力の制御は、省略されたり、別のシステムで行われたりしても良い。
The first ERC1E controls the reactive power (unit: var) of the photovoltaic power generation system D1 based on the received control parameters CP, etc., as is done in conventional DERMSs. The first ERC1E can also control the active power (unit: W (watts)) as is done in conventional DERMSs. The ERC is an Energy Resource Controller, a control device that controls one or more DER devices belonging to a specified area (such as a consumer area). The first ERC1E has a DERMS communication function that communicates with the outside world via one or more DER devices (photovoltaic power generation system D1), as well as an aggregation function that aggregates the voltage, active power, and reactive power of each DER device for that consumer facility. However, the photovoltaic power generation system D1 is unevenly distributed in the power distribution system ES. Furthermore, the first ERC1E cannot appropriately control the reactive power depending on the power generation state of the photovoltaic power generation system D1.
The three photovoltaic power generation systems D1 are respectively connected to interconnection points GP1 to GP3 (voltages V1 to V3 ) of the power distribution system ES. Reactive power control in the three photovoltaic power generation systems D1 is performed by applying a reactive power control amount (reactive power amount) ΔVar (kvar) to the voltages V1 to V3 of the corresponding interconnection points GP1 to GP3. Active power control in the three photovoltaic power generation systems D1 is performed by applying an active power control amount ΔW (kW (kilowatts)) to the voltages V1 to V3 of the corresponding interconnection points GP1 to GP3. The photovoltaic power generation systems D1 have a scale of, for example, several hundred kW.
Some or all of the photovoltaic power generation units D1 may belong to different businesses or may belong to the same business.
The number of photovoltaic power generation units D1 and at least one of the interconnection points GP1 to GP3 to which they are connected are not limited to those described above. Also, the control of the active power of the photovoltaic power generation unit D1 may be omitted or may be performed by a different system.
第2ERC2Eは、従来のDERMSで行われる通り、蓄電池システムD2における無効電力の制御を、受信した制御パラメータCP等に基づいて行う。又、第2ERC2Eは、従来のDERMSで行われる通りに有効電力の制御も可能である。第2ERC1Eは、1以上のDER機器(蓄電池システムD2)を外部に対して通信するDERMS通信機能、並びに、個々のDER機器の電圧、有効電力、及び無効電力の当該需要家設備分を集約する集約機能を有している。但し、蓄電池システムD2は、配電系統ESにおいて偏在している。又、第2ERC2Eは、蓄電池システムD2における蓄電量が所定程度未満となったとき等、蓄電池システムD2の状態によっては、無効電力の制御を適切に行えない。
3箇所の蓄電池システムD2は、配電系統ESの連系点GP2,GP3,GP20(電圧V2,V3,V20)に対してそれぞれ接続されている。3箇所の蓄電池システムD2における無効電力の制御は、無効電力制御分ΔVarを、対応する連系点GP2,GP3,GP20の電圧V2,V3,V20に作用させて行われる。3箇所の蓄電池システムD2における有効電力の制御は、有効電力制御分ΔWを、対応する連系点GP2,GP3,GP20の電圧V2,V3,V20に作用させて行われる。蓄電池システムD2は、例えば数十kWの規模であり、ビルの非常電源用である。
各蓄電池システムD2の一部又は全部は、別個の事業者に属しても良いし、同じ事業者に属しても良い。
尚、蓄電池システムD2の数、及び接続する連系点GP2,GP3,GP20の少なくとも何れかは、上述のものに限られない。又、蓄電池システムD2の有効電力の制御は、省略されたり、別のシステムで行われたりしても良い。
The second ERC2E controls the reactive power in the battery system D2 based on the received control parameters CP, etc., as is done in conventional DERMSs. The second ERC2E can also control active power as is done in conventional DERMSs. The second ERC1E has a DERMS communication function that allows one or more DER devices (battery system D2) to communicate with the outside, and an aggregation function that aggregates the voltage, active power, and reactive power of each DER device for the corresponding consumer equipment. However, the battery system D2 is unevenly distributed in the power distribution system ES. Furthermore, the second ERC2E cannot appropriately control reactive power depending on the state of the battery system D2, such as when the amount of stored energy in the battery system D2 falls below a predetermined level.
The three storage battery systems D2 are respectively connected to interconnection points GP2, GP3, and GP20 (voltages V2 , V3 , and V20 ) of the power distribution system ES. Reactive power control in the three storage battery systems D2 is performed by applying a reactive power control amount ΔVar to the voltages V2 , V3 , and V20 of the corresponding interconnection points GP2, GP3, and GP20. Active power control in the three storage battery systems D2 is performed by applying an active power control amount ΔW to the voltages V2 , V3 , and V20 of the corresponding interconnection points GP2, GP3, and GP20. The storage battery systems D2 are, for example, on the scale of several tens of kW and are used as emergency power sources for the building.
Some or all of the storage battery systems D2 may belong to different businesses or to the same business.
The number of storage battery systems D2 and at least one of interconnection points GP2, GP3, and GP20 to which they are connected are not limited to those described above. In addition, the control of the active power of storage battery system D2 may be omitted or may be performed by another system.
第3ERC3Eは、従来のDERMSで行われる通り、急速充電器D3における無効電力の制御を、受信した制御パラメータCP等に基づいて行う。又、第3ERC3Eは、従来のDERMSで行われる通りに有効電力の制御も可能である。第3ERC3Eは、1以上のDER機器(急速充電器D3)を外部に対して通信するDERMS通信機能、並びに、個々のDER機器の電圧、有効電力、及び無効電力の当該需要家設備分を集約する集約機能を有している。但し、急速充電器D3は、配電系統ESにおいて偏在している。又、第3ERC3Eは、急速充電中等、急速充電器D3の状態によっては、無効電力の制御を適切に行えない。
3箇所の急速充電器D3は、配電系統ESの連系点GP3,GP20,GP39(電圧V3,V20,V39)に対してそれぞれ接続されている。3箇所の急速充電器D3における無効電力の制御は、無効電力制御分ΔVarを、対応するGP3,GP20,GP39の電圧V3,V20,V39に作用させて行われる。3箇所の急速充電器D3における有効電力の制御は、有効電力制御分ΔWを、対応する連系点GP3,GP20,GP39の電圧V3,V20,V39に作用させて行われる。急速充電器D3は、例えばEV10台程度分に係る数百kWの規模である。
各急速充電器D3の一部又は全部は、別個の事業者に属しても良いし、同じ事業者に属しても良い。
尚、急速充電器D3の数、及び接続する連系点GP3,GP20,GP39の少なくとも何れかは、上述のものに限られない。又、急速充電器D3の有効電力の制御は、省略されたり、別のシステムで行われたりしても良い。
The third ERC 3E controls the reactive power of the quick charger D3 based on the received control parameters CP, etc., as is done in a conventional DERMS. The third ERC 3E can also control active power, as is done in a conventional DERMS. The third ERC 3E has a DERMS communication function that allows one or more DER devices (quick charger D3) to communicate with the outside, and an aggregation function that aggregates the voltage, active power, and reactive power of each DER device for the corresponding customer facility. However, the quick chargers D3 are unevenly distributed in the power distribution system ES. Furthermore, the third ERC 3E may not be able to appropriately control reactive power depending on the state of the quick charger D3, such as during quick charging.
The three rapid chargers D3 are respectively connected to interconnection points GP3, GP20, and GP39 (voltages V3 , V20 , and V39 ) of the power distribution system ES. Reactive power control in the three rapid chargers D3 is performed by applying a reactive power control amount ΔVar to the voltages V3 , V20 , and V39 of the corresponding interconnection points GP3, GP20, and GP39. Active power control in the three rapid chargers D3 is performed by applying an active power control amount ΔW to the voltages V3 , V20 , and V39 of the corresponding interconnection points GP3, GP20, and GP39. The rapid chargers D3 have a capacity of several hundred kW, for example, sufficient for approximately 10 EVs.
Some or all of the rapid chargers D3 may belong to different operators or may belong to the same operator.
The number of quick chargers D3 and at least one of the interconnection points GP3, GP20, and GP39 to which they are connected are not limited to those described above. Also, the control of the active power of quick charger D3 may be omitted or may be performed by a separate system.
第4ERC4Eは、ビルマルチ空調機BAにおける無効電力の制御を、受信したVar制御パラメータVP等に基づいて行う。又、第4ERC4Eは、従来のDERMSで行われる通りに有効電力の制御も可能である。第4ERC4Eは、1以上のDER機器(ビルマルチ空調機BA)を外部に対して通信するDERMS通信機能、並びに、個々のDER機器の電圧、有効電力、及び無効電力の当該需要家設備分を集約する集約機能を有している。加えて、第4ERC4Eは、DERMS無効電力(地域AR内の特定区域における無効電力総量)から需要家設備に割り当てられた無効電力制御分ΔVarを、個々のDER機器(ビルマルチ空調機BA)に対して無効電力制御指令(目標無効電力)として割り付ける機能を有する。
多数(例えば23)箇所のビルマルチ空調機BAは、配電系統ESの連系点GP20,GP40(電圧V20,V40)等に対してそれぞれ接続されている。ビルマルチ空調機BAは、他のDER機器(太陽光発電D1,蓄電池システムD2,急速充電器D3)に比べ、配電系統ESにおいて行き渡っており、もともと配電系統ESの全域に広く設置されている。各ビルマルチ空調機BAにおける無効電力の制御は、無効電力制御分ΔVarを、対応する連系点GP20,GP40等の電圧V20,V40等に作用させて行われる。各ビルマルチ空調機BAにおける有効電力の制御は、有効電力制御分ΔWを、対応する連系点GP20,GP40等の電圧V20,V40等に作用させて行われる。
各ビルマルチ空調機BAの一部又は全部は、別個の需要家に属しても良いし、同じ需要家に属しても良い。
以下、連系点GP1~GP40は、まとめて連系点GPと呼ばれることがある。又、連系点GP1~GP40の少なくとも何れかが、連系点GPと呼ばれることがある。
連系点GP1~GP40における数字及び図1上の位置は、配電変電所TSからの距離を示すものではなく、空間的地点の分布を示唆するものではない。
尚、ビルマルチ空調機BAの数、及び接続する連系点GP20,GP40等の少なくとも何れかは、上述のものに限られない。又、ビルマルチ空調機BAの有効電力の制御は、省略されたり、別のシステムで行われたりしても良い。
The fourth ERC4E controls the reactive power in the building multi-air-conditioner BA based on the received Var control parameter VP, etc. The fourth ERC4E can also control active power as is done in conventional DERMS. The fourth ERC4E has a DERMS communication function that allows one or more DER devices (building multi-air-conditioners BA) to communicate with the outside, and an aggregation function that aggregates the voltage, active power, and reactive power of each DER device for the corresponding customer equipment. In addition, the fourth ERC4E has a function to allocate the reactive power control amount ΔVar allocated to the customer equipment from the DERMS reactive power (the total amount of reactive power in a specific area within the area AR) to each DER device (building multi-air-conditioner BA) as a reactive power control command (target reactive power).
A large number (e.g., 23) of building multi-air conditioners BA are connected to interconnection points GP20, GP40 (voltages V20 , V40 ) of the power distribution system ES. Compared to other DER devices (photovoltaic power generation D1, battery storage system D2, rapid charger D3), building multi-air conditioners BA are widespread in the power distribution system ES and are originally installed widely throughout the entire power distribution system ES. Reactive power control in each building multi-air conditioner BA is performed by applying a reactive power control amount ΔVar to the voltages V20 , V40 , etc. of the corresponding interconnection points GP20, GP40, etc. Active power control in each building multi-air conditioner BA is performed by applying an active power control amount ΔW to the voltages V20 , V40 , etc. of the corresponding interconnection points GP20, GP40, etc.
Some or all of the building multi-air conditioners BA may belong to different customers, or may belong to the same customer.
Hereinafter, the interconnection points GP1 to GP40 may be collectively referred to as the interconnection point GP. Furthermore, at least one of the interconnection points GP1 to GP40 may be referred to as the interconnection point GP.
The numbers at the interconnection points GP1 to GP40 and their positions on FIG. 1 do not indicate the distance from the distribution substation TS, and do not imply a spatial distribution of the points.
The number of building multi-air conditioners BA and at least one of the interconnection points GP20, GP40, etc. to which they are connected are not limited to those described above. Also, control of the active power of the building multi-air conditioners BA may be omitted or may be performed by a separate system.
[無効電力デマンドレスポンスシステム1の動作(無効電力按分方法)の例等]
以下、無効電力デマンドレスポンスシステム1の動作例が説明される。当該動作例は、無効電力按分方法の一例を含んでいる。
[Example of operation of reactive power demand response system 1 (reactive power allocation method)]
The following describes an example of the operation of the reactive power demand response system 1. The example of the operation includes an example of a reactive power allocation method.
図3は、当該動作例に係るフローチャートである。
DERMSサーバDSは、各種の系統電圧定期報告VRに基づいて、配電系統ES内の所定地点毎で系統電圧を安定させるために無効電力の制御が必要か否かを判断し(ステップS1)、必要な場合には(Yes)、その地点において必要な無効電力総量を算出する(ステップS2)と共に、隣接するビルマルチ空調機BAの需要家設備に対し、無効電力総量を按分して需要家設備毎の無効電力制御分ΔVarを演算する(ステップS3)。そして、DERMSサーバDSは、演算された無効電力制御分ΔVarに基づき、Var制御パラメータVP(無効電力制御指令)を、VarDRサーバVSを介して、第4ERC4Eに送信する(ステップS4)。
DERMSサーバDSにおけるこれらの無効電力制御の必要性の判断、必要な場合の無効電力総量及び各無効電力制御分ΔVarの演算、及びVar制御パラメータVPの送信は、その時点で適切な所定タイミング毎(例えば数秒から数十分の周期毎)に行われる。尚、当該タイミングは、無効電力制御の必要性の判断、必要な場合の無効電力総量及び各無効電力制御分ΔVarの演算並びにVar制御パラメータVPの送信の一部又は全部において、互いに異なっていても良い。
第4ERC4Eは、受信したVar制御パラメータVPに基づいて、各ビルマルチ空調機BAの運転を制御する。1つの需要家設備は、一般にビルマルチ空調機BAを10台程度含んでおり、各ビルマルチ空調機BAは、それぞれ独立して空調運転を行っているため、需要家毎に各ビルマルチ空調機BAをとりまとめる第4ERC4Eは、要求された無効電力制御指令に基づく目標無効電力を、1つの需要家に属する各ビルマルチ空調機BAに割り振る(ステップS5)。尚、VarDRサーバVSは、DERMSサーバDSの処理の一部を行ったり、当該処理の仲介を行ったりしても良い。例えば、VarDRサーバVSは、担当する区域の無効電力総量を受信し、これを複数の需要家設備に各無効電力制御分ΔVarとして割り当て、それら需要家設備の各第4ERC4Eが、VarDRサーバVSにより割り当てられた無効電力制御分ΔVarを、各ビルマルチ空調機BAに割り振っても良い。
各Var制御パラメータVPは、ここではV-Qドゥループカーブ(Droop Curve)のパラメータである。V-Qドゥループカーブは、横軸がV(連系点電圧)であり、縦軸の正側が無効電力の連系点への注入量であり、縦軸の負側が無効電力の連系点への注入量である座標に描かれる。V-Qドゥループカーブは、当該座標における右下がりの所定長さの直線部と、その左右両側につながる2つの水平線部とを含む。直線部は、所定の基準点(例えば系統電圧6600V)で横軸と交わり、直線部の傾きは、その基準点から電圧が所定量低くなった場合にどれだけの量の無効電力を連系点GPに注入するか、又その基準点から電圧が所定量低くなった場合にどれだけの量の無効電力を連系点GPから引き込むかによって定まる。このV-Qドゥループカーブの直線部の傾きの値が、Var制御パラメータVPとなる。無効電力を連系点GPに注入し、連系点GPの電流の位相を進めれば、連系点GPの電圧が上昇する。又、無効電力を連系点GPから引き込み、連系点GPの電流の位相を遅らせれば、連系点GPの電圧が降下する。DERMSサーバDSは、地域ARに属する連系点GP等の状況に基づき、各V-Qドゥループカーブ(各Var制御パラメータVP)を決定する。尚、DERMSサーバDSは、Var制御パラメータVPに代えて、あるいはVar制御パラメータVPと共に、V-Qドゥループカーブの情報等を第4ERC4Eに送信しても良い。又、各Var制御パラメータVPは、V-Qドゥループカーブの直線部の傾きの値以外とされても良い。
FIG. 3 is a flowchart relating to this operation example.
The DERMS server DS determines whether reactive power control is necessary to stabilize the system voltage at each predetermined point in the power distribution system ES based on various system voltage periodic reports VR (step S1), and if necessary (Yes), calculates the total amount of reactive power necessary at that point (step S2), and calculates the reactive power control amount ΔVar for each consumer facility by proportionally dividing the total amount of reactive power among the consumer facilities of adjacent building multi-air conditioners BA (step S3).The DERMS server DS then transmits a Var control parameter VP (reactive power control command) based on the calculated reactive power control amount ΔVar to the fourth ERC 4E via the VarDR server VS (step S4).
The DERMS server DS determines whether reactive power control is necessary, calculates the total amount of reactive power and each reactive power control amount ΔVar when necessary, and transmits the Var control parameter VP at predetermined timings appropriate at that time (for example, every few seconds to every few tens of minutes). Note that the timings may be different for some or all of the determination of whether reactive power control is necessary, the calculation of the total amount of reactive power and each reactive power control amount ΔVar when necessary, and the transmission of the Var control parameter VP.
The fourth ERC 4E controls the operation of each building multi-air conditioner BA based on the received Var control parameter VP. One customer facility generally includes about 10 building multi-air conditioners BA, and each building multi-air conditioner BA performs air conditioning operation independently. Therefore, the fourth ERC 4E, which manages each building multi-air conditioner BA for each customer, allocates the target reactive power based on the requested reactive power control command to each building multi-air conditioner BA belonging to one customer (step S5). Note that the VarDR server VS may perform part of the processing of the DERMS server DS or act as an intermediary in that processing. For example, the VarDR server VS may receive the total amount of reactive power in the area it is responsible for and allocate this to each of multiple consumer equipment units as a reactive power control amount ΔVar, and each fourth ERC4E of those consumer equipment units may then allocate the reactive power control amount ΔVar allocated by the VarDR server VS to each building multi-air conditioner BA.
Each Var control parameter VP is a parameter of a V-Q droop curve. The V-Q droop curve is drawn on a coordinate system where the horizontal axis represents V (connection point voltage), the positive side of the vertical axis represents the amount of reactive power injected into the interconnection point, and the negative side of the vertical axis represents the amount of reactive power injected into the interconnection point. The V-Q droop curve includes a straight line segment of a predetermined length sloping downward to the right on the coordinate system, and two horizontal line segments connecting to both the left and right sides of the straight line segment. The straight line segment intersects with the horizontal axis at a predetermined reference point (e.g., a system voltage of 6600 V). The slope of the straight line segment is determined by the amount of reactive power injected into the interconnection point GP when the voltage drops by a predetermined amount from the reference point, and the amount of reactive power drawn from the interconnection point GP when the voltage drops by a predetermined amount from the reference point. The value of the slope of the straight line segment of this V-Q droop curve is the Var control parameter VP. If reactive power is injected into the grid-connection point GP and the phase of the current at the grid-connection point GP is advanced, the voltage at the grid-connection point GP will increase. Furthermore, if reactive power is withdrawn from the grid-connection point GP and the phase of the current at the grid-connection point GP is delayed, the voltage at the grid-connection point GP will decrease. The DERMS server DS determines each V-Q droop curve (each Var control parameter VP) based on the status of the grid-connection points GP belonging to the area AR. The DERMS server DS may transmit information on the V-Q droop curve to the fourth ERC 4E instead of or together with the Var control parameter VP. Furthermore, each Var control parameter VP may be a value other than the slope of the linear portion of the V-Q droop curve.
第4ERC4Eによる、無効電力制御分ΔVarが割り当てられた需要家設備における複数のビルマルチ空調機BAに対する目標無効電力の割り付け(ステップS5)が、更に詳述される。
需要家設備(需要家設備毎の番号)cに対するDERMS無効電力指令値(当該需要家設備における全無効電力,合計無効電力)をQc
ADRとし、第4ERC4Eは全無効電力Qc
ADRをB台のビルマルチ空調機BAへそれぞれQb^
AC(b=1,2,…,b,…,B)で割り付けるものとする。ここで、Qb^
ACにおける「^」は、本来bの上に記載されるものであるところ、表現上の制約により、bの右隣に記載することがある。
仮に、需要家設備cに係る全無効電力Qc
ADRがB台のビルマルチ空調機BAへ均等に割り付けられると、例えば番号b=1のビルマルチ空調機BAは運転開始後相当の期間を経ており比較的に低消費電力の運転をしているのに対して番号b=2のビルマルチ空調機BAは運転開始直後であり比較的に高消費電力の運転をしていると行った場合に、余裕のある番号b=1のビルマルチ空調機BAをさほど活かせず、又番号b=2のビルマルチ空調機BAの運転を阻害し易くなる等、各ビルマルチ空調機BAの現時点での空調状況は加味されない。又、各ビルマルチ空調機BAの定格消費電力Pb
Rで比例按分ししたとしても、やはり各ビルマルチ空調機BAの現時点での空調状況は加味されない。
本発明の無効電力デマンドレスポンスシステム1では、次の式(1)で表されるアルゴリズムにより、目標無効電力の按分が決定される。ここで、[k1
PAC,…,kb
PAC,…,kB
PAC]は各ビルマルチ空調機BAの有効電力(現在値)Pb
ACの比例係数であり、[k1
TSA,…,kb
TSA,…,kB
TSA]は各ビルマルチ空調機BAの空調快適状態を示す室温偏差Tb
SAの比例係数である。室温偏差Tb
SAは、ビルマルチ空調機BAの各室内機ANにおける現在室温から設定温度を引いた差の平均である。[k1*
TSA,…,kb*
TSA,…,kB*
TSA]は、すぐ後で説明される。公知の通り、設定温度はビルマルチ空調機BA(各室内機AN)から得られ、現在室温は各空調対象(各室内機AN)の温度センサから得られる。
The allocation of target reactive power to a plurality of building multi-air conditioners BA in customer equipment to which the reactive power control amount ΔVar is allocated by the fourth ERC4E (step S5) will be described in further detail.
The DERMS reactive power command value (total reactive power in the consumer equipment) for consumer equipment c ( number for each consumer equipment) is QcADR , and the fourth ERC4E allocates the total reactive power QcADR to B building multi-air conditioners BA as Qb ^ AC (b = 1, 2, ..., b, ..., B). Here, the "^" in Qb ^ AC is normally written above b, but due to expression constraints, it may be written to the right of b.
If the total reactive power QcADR related to consumer equipment c is allocated evenly to B building multi-air conditioners BA, for example, if the building multi-air conditioner BA numbered b=1 has been in operation for a considerable period of time and is operating at a relatively low power consumption, while the building multi-air conditioner BA numbered b=2 has just started operation and is operating at a relatively high power consumption, the current air conditioning status of each building multi-air conditioner BA will not be taken into account, and the operation of the building multi-air conditioner BA numbered b=1, which has more surplus power, will likely be hindered, and the current air conditioning status of each building multi-air conditioner BA will not be taken into account. Furthermore, even if the allocation is proportionally distributed based on the rated power consumption PbR of each building multi-air conditioner BA , the current air conditioning status of each building multi-air conditioner BA will still not be taken into account.
In the reactive power demand response system 1 of the present invention, the allocation of target reactive power is determined by the algorithm expressed by the following equation (1): Here, [ k1PAC ,..., kbPAC ,..., kBPAC ] is the proportional coefficient of the active power (current value) PbAC of each building multi-air-conditioner BA, and [k1TSA , ... , kbTSA , ..., kBTSA ] is the proportional coefficient of the room temperature deviation TbSA indicating the air-conditioning comfort state of each building multi-air-conditioner BA . The room temperature deviation TbSA is the average of the difference between the current room temperature and the set temperature in each indoor unit AN of the building multi-air-conditioner BA. [k1 * TSA ,...,kb * TSA ,...,kB * TSA ] will be explained shortly. As is well known, the set temperature is obtained from the building multi-air conditioner BA (each indoor unit AN), and the current room temperature is obtained from a temperature sensor in each air-conditioning target (each indoor unit AN).
第4ERC4Eは、現在電力比例係数[k1
PAC,…,kb
PAC,…,kB
PAC]について、公知の方法で計量される各ビルマルチ空調機BAの現在電力をそのまま割り付け配分する。
他方、第4ERC4Eは、室内快適度を示す室温偏差比例係数[k1
TSA,…,kb
TSA,…,kB
TSA]について、次のような性質に着目して割り付けする。即ち、室温偏差は、±1℃以下の小さな偏差では多くの一般人に気づかれずあるいは許容され、±1℃を超えると一般人に気づかれて快適感を削ぎ、更に大きくなればなるほど非線形に急激に快適度が低下する性質である。かような性質に鑑み、VarDRサーバVSは、次の式(2)において、[k1
TSA,…,kb
TSA,…,kB
TSA]を割り付け配分し、按分比例係数として、[k1*
TSA,…,kb*
TSA,…,kB*
TSA]を得る。ここで、関数argminは、変数(各Tb
SAの二乗の和)が最小となる要素[k1
TSA,…,kb
TSA,…,kB
TSA]の抽出を示すものである。又、添え字*は、最適按分を示す。
The fourth ERC 4E allocates and distributes the current power of each building multi-air conditioner BA measured by a known method as it is for the current power proportional coefficient [k 1 PAC , . . . , k b PAC , . . . , k B PAC ].
On the other hand, the fourth ERC4E allocates the room temperature deviation proportional coefficients [k 1 TSA , ..., k b TSA , ..., k B TSA ] indicating the indoor comfort level, taking into account the following property: A small deviation of ±1°C or less is unnoticeable or tolerated by many ordinary people, whereas a deviation exceeding ±1°C is noticeable by ordinary people and reduces the sense of comfort. The larger the deviation, the more rapidly the comfort level decreases nonlinearly. In consideration of this property, the VarDR server VS allocates and distributes [k 1 TSA , ..., k b TSA , ..., k B TSA ] using the following formula (2) to obtain the apportionment proportional coefficients [k 1 * TSA , ..., k b * TSA , ..., k B * TSA ]. Here, the function argmin indicates extraction of the element [k 1 TSA , ..., k b TSA , ..., k B TSA ] that minimizes the variable (the sum of the squares of each T b SA ). The subscript * indicates optimal allocation.
即ち、式(2)の意味は、DERMS制御指令を按分するその時点の各ビルマルチ空調機BAの室温偏差Tb
SAの二乗を、全台数総和が最小となるように、室温偏差比例係数[k1
TSA,…,kb
TSA,…,kB
TSA]を割り付け配分することである(最小二乗法による割り付け)。
無効電力デマンドレスポンスシステム1では、第4ERC4Eが式(2)に基づいて目標無効電力の按分を決定することにより、各ビルマルチ空調機BAがその時点で必要としている空調能力への影響、ひいては各ビルマルチ空調機BAの快適性を示す室温偏差が最小となる状態で、第4ERC4Eが要求された無効電力制御指令に基づく目標無効電力を達成し、配電系統ESの電力安定に寄与することができる。
又、第4ERC4Eは、受信したVar制御パラメータVPを記憶し、特定タイミング毎(例えば数十秒から数分の周期)毎に参照(Look up)して、目標無効電力の按分を都度決定する。第4ERC4Eは、Var制御パラメータVPが新たな受信により更新されれば、そのVar制御パラメータVPを参照する。
尚、最小二乗法に代えて、例えば最適探索法等、他の数理計画法(数理最適化)により、割り付け配分された室温偏差比例係数[k1*
TSA,…,kb*
TSA,…,kB*
TSA]が決定されても良い。数理計画法は、線形計画法であっても良いし、非線形計画法であっても良い。又、無効電力を按分するための室温偏差の比例係数に代えて、按分すべき無効電力に室温偏差の按分比例係数を乗じた値に相当する按分無効電力が直接決定されても良い。
That is, the meaning of equation (2) is to allocate and distribute the square of the room temperature deviation T b SA of each building multi-air conditioner BA at that time when the DERMS control command is apportioned, by the room temperature deviation proportional coefficient [k 1 TSA , ..., k b TSA , ..., k B TSA ] so that the sum of all units is minimized (allocation using the least squares method).
In the reactive power demand response system 1, the fourth ERC4E determines the allocation of the target reactive power based on equation (2), so that the impact on the air conditioning capacity required by each building multi-air conditioner BA at that time, and ultimately the room temperature deviation indicating the comfort of each building multi-air conditioner BA, is minimized, and the fourth ERC4E can achieve the target reactive power based on the requested reactive power control command, contributing to power stability in the distribution system ES.
The fourth ERC 4E also stores the received Var control parameter VP and references (looks up) it at specific timings (for example, at intervals of several tens of seconds to several minutes) to determine the target reactive power allocation each time. When the Var control parameter VP is updated by receiving a new parameter, the fourth ERC 4E references the Var control parameter VP.
Note that instead of the least squares method, the allocated room temperature deviation proportional coefficients [k 1* TSA , ..., k b* TSA , ..., k B* TSA ] may be determined by other mathematical programming (mathematical optimization), such as an optimal search method. The mathematical programming may be linear programming or nonlinear programming. Furthermore, instead of the proportional coefficients of the room temperature deviation for apportioning the reactive power, the apportioned reactive power corresponding to the value obtained by multiplying the reactive power to be apportioned by the proportional coefficient of the room temperature deviation may be directly determined.
図4は、ビルマルチ空調機BAのアクティブコンバータACによる無効電力Qの制御原理を示すグラフである。図4のグラフの横軸は、皮相電力のうちの有効電力Pの成分を示し、縦軸は、無効電力Qの成分を示す。
無効電力Qの制御は、アクティブコンバータACにより室外機内蔵インバータINに対する有効電力P及び力率cosθ(θの単位:ラジアン)を操作することにより行われる。無効電力の増加は力率の進みに相当し、無効電力の減少は力率の遅れに相当する。
又、無効電力Qの制御は、アクティブコンバータAC及び室外機内蔵インバータINの最低動作力率cosθmaxによる制限、及びアクティブコンバータAC及び室外機内蔵インバータINの定格容量Smax(単位:VA)による制限を伴う。図4のグラフにおける円CLは、原点を中心とし、定格容量Smaxを半径とするものであり、アクティブコンバータAC及び室外機内蔵インバータINの動作時の電力は、この円CL内に収まる。
Fig. 4 is a graph showing the principle of control of reactive power Q by the active converter AC of a building multi-air conditioner BA. The horizontal axis of the graph in Fig. 4 represents the active power P component of the apparent power, and the vertical axis represents the reactive power Q component.
The reactive power Q is controlled by manipulating the active power P and power factor cos θ (θ in radians) for the outdoor unit's built-in inverter IN using the active converter AC. An increase in reactive power corresponds to a leading power factor, and a decrease in reactive power corresponds to a lagging power factor.
Furthermore, the control of reactive power Q involves limitations based on the minimum operating power factor cos θ max of the active converter AC and the outdoor unit built-in inverter IN, and limitations based on the rated capacity S max (unit: VA) of the active converter AC and the outdoor unit built-in inverter IN. The circle CL in the graph of Fig. 4 has its center at the origin and its radius at the rated capacity S max , and the power of the active converter AC and the outdoor unit built-in inverter IN during operation falls within this circle CL.
Var制御パラメータVPにより、DERMSサーバDSからビルマルチ空調機BAの第4ERC4Eに指令された目標無効電力をQTGTとすると、第4ERC4Eは、自身の動作モードに応じ、目標無効電力QTGTが発生するように動作を切り替えて、ビルマルチ空調機BAによる空調の快適性の低下を抑制しつつ、目標無効電力QTGTを達成し、自身の連系点GPを通じて配電系統ESに提供できるようにする。
各動作モードの境界に位置する有効電力P0~P3は、次の式(3)~(6)で示される。
When the target reactive power commanded by the DERMS server DS to the fourth ERC 4E of the building multi-air-conditioner BA based on the Var control parameter VP is Q TGT , the fourth ERC 4E switches its operation so as to generate the target reactive power Q TGT according to its own operation mode, thereby achieving the target reactive power Q TGT while suppressing a decrease in the comfort of the air conditioning by the building multi-air-conditioner BA, and making it possible to supply the target reactive power Q TGT to the distribution system ES through its own interconnection point GP.
The active powers P 0 to P 3 located at the boundaries of each operation mode are expressed by the following equations (3) to (6).
第4ERC4Eは、ビルマルチ空調機BAの運転により有効電力Pの範囲がP0<P≦P1となっている第1動作モードM1である場合、最低動作力率cosθmaxを維持しつつ目標無効電力QTGTに対応するため、無効電力Qに比例した有効電力Pを消費する。第1動作モードM1での無効電力Qの範囲は、Q≦Ptanθmaxとなる。
目標無効電力QTGTに対応しない通常のビルマルチ空調機BAでは、室温が設定温度付近に到達すると、室外機OUの運転が停止されて、各室内機ANへの冷媒の供給が停止(いわゆるサーモオフ)されるため、最低動作力率cosθmaxを維持しようとすると無効電力Qも供給できなくなる。
そこで、第4ERC4Eは、目標無効電力QTGTに対応する場合、無効電力Qを供給するため、室温が設定温度付近に到達したとしても、有効電力Pを消費させる。但し、室温偏差が所定値(例えば±2℃)以上となった場合、快適性の低下の影響を抑制するため、目標無効電力QTGTへの対応を停止(opt-out)する。即ち、第4ERC4Eは、所定値以内の室温偏差を許容して、無効電力Qを供給するため、有効電力Pを消費させる。
When the fourth ERC 4E is in the first operation mode M1 in which the range of active power P is P0 < P≦ P1 due to operation of the building multi-air-conditioner BA, it consumes active power P proportional to reactive power Q in order to correspond to the target reactive power QTGT while maintaining the minimum operating power factor cos θ max . The range of reactive power Q in the first operation mode M1 is Q≦Ptan θ max .
In a normal building multi-air conditioner BA that does not support the target reactive power Q TGT , when the room temperature reaches near the set temperature, the operation of the outdoor unit OU is stopped and the supply of refrigerant to each indoor unit AN is stopped (so-called thermo-off), so if you try to maintain the minimum operating power factor cos θ max , you will not be able to supply reactive power Q either.
Therefore, when the fourth ERC 4E corresponds to the target reactive power Q TGT , it supplies reactive power Q, and consumes active power P even if the room temperature reaches near the set temperature. However, when the room temperature deviation exceeds a predetermined value (for example, ±2°C), it stops responding to the target reactive power Q TGT (opt-out) in order to suppress the impact of a decrease in comfort. In other words, the fourth ERC 4E allows room temperature deviation within a predetermined value and consumes active power P to supply reactive power Q.
第4ERC4Eは、有効電力Pの範囲がP1<P≦P2となっている第2動作モードM2である場合、何れの有効電力Pにおいても最低動作力率cosθmax以上で運転でき、且つ目標無効電力QTGTを供給可能であるため、有効電力Pの制限を受けず、室温も通常時と同様に制御可能である。
第2動作モードM2での無効電力Qの範囲は、Q≦QTGTとなる。
When the fourth ERC 4E is in the second operation mode M2 in which the range of the active power P is P1 < P≦ P2 , it can operate at the minimum operating power factor cos θ max or more at any active power P and can supply the target reactive power Q TGT , so it is not subject to restrictions on the active power P and can control the room temperature in the same way as under normal conditions.
The range of the reactive power Q in the second operation mode M2 is Q≦Q TGT .
第4ERC4Eは、有効電力Pの範囲がP2<P≦P3となっている第3動作モードM3である場合、アクティブコンバータAC及び室外機内蔵インバータINの定格容量Smax(=P3)の制限のため、無効電力Qの供給が減少する。
そこで、第4ERC4Eは、目標無効電力QTGTを供給可能な有効電力P2以下まで有効電力Pを減少させる。
第3動作モードM3での無効電力Qの範囲は、Q≦(Smax
2-P2)1/2となる。
In the fourth ERC4E, when the range of the active power P is P2 < P≦ P3 , the supply of reactive power Q is reduced due to the limitations of the rated capacity Smax (= P3 ) of the active converter AC and the outdoor unit built-in inverter IN in the third operation mode M3.
Therefore, the fourth ERC 4E reduces the active power P to the active power P2 that can supply the target reactive power QTGT or less.
The range of the reactive power Q in the third operation mode M3 is Q≦(S max 2 −P 2 ) 1/2 .
かように、第4ERC4Eにより制御されるアクティブコンバータACは、自身が属するビルマルチ空調機BAの空調のための有効電力Pを制御することで、そのビルマルチ空調機BAに割り振られた目標無効電力QTGTに係る無効電力Qを発生する。 In this way, the active converter AC controlled by the fourth ERC4E controls the active power P for air conditioning of the building multi-air conditioner BA to which it belongs, thereby generating reactive power Q related to the target reactive power QTGT allocated to that building multi-air conditioner BA.
[無効電力デマンドレスポンスシステム1のシミュレーション例等]
無効電力デマンドレスポンスシステム1、及び比較例について、ビルマルチ空調機BAのモデルを用い、コンピュータによるシミュレーションがなされた。
無効電力デマンドレスポンスシステム1における第4ERC4Eは、上記式(1),(2)により、1つの需要家設備cに属する複数のビルマルチ空調機BAに全無効電力Qc
ADRを按分し、番号bのビルマルチ空調機BAに対する無効電力出力指令Qb^
ACを生成する。
需要家設備cに対し要求された無効電力制御分ΔVarに相当する全無効電力Qc
ADRを各ビルマルチ空調機BAに按分する係数kb
PAC,kb*
TSAは、ここでは次の式(7),(8)で示される。ここで、α1は消費電力の感度係数(ここでは1.0とされている)であり、α2は平均室温偏差の感度係数(ここでは2.0とされている)であり、Pbは番号bのビルマルチ空調機BAの空調のために消費する有効電力(kW)であり、Pb
maxは番号bのビルマルチ空調機BAの定格消費電力(kW)であり、Tb
SAは番号bのビルマルチ空調機BAに接続された複数の室内機ANの容量で加重平均した室温設定偏差(℃)である。
式(1),(2),(7),(8)の計算のために必要な情報は、VarDRサーバVS、及びDERMSサーバDSに送信される。VarDRサーバVS、及びDERMSサーバDSは、これらの情報を記憶する。
更に、無効電力デマンドレスポンスシステム1において、全無効電力Qc
ADRの按分は、一例として5分毎に行われることとした。
[Simulation example of reactive power demand response system 1]
A computer simulation was performed on the reactive power demand response system 1 and the comparative example using a model of a building multi-air conditioner BA.
The fourth ERC4E in the reactive power demand response system 1 allocates the total reactive power Q c ADR to multiple building multi-air conditioners BA belonging to one consumer facility c using the above equations (1) and (2), and generates a reactive power output command Q b^ AC for the building multi-air conditioner BA numbered b.
The coefficients k b PAC and k b * TSA that allocate the total reactive power Q c ADR , which corresponds to the reactive power control amount ΔVar requested for consumer equipment c, to each building multi-air-conditioner BA are given by the following equations (7) and (8): where α 1 is the sensitivity coefficient for power consumption (set to 1.0 here), α 2 is the sensitivity coefficient for average room temperature deviation (set to 2.0 here), P b is the active power (kW) consumed for air conditioning by the building multi-air-conditioner BA numbered b, P b max is the rated power consumption (kW) of the building multi-air-conditioner BA numbered b, and T b SA is the room temperature setting deviation (°C) weighted averaged by the capacity of multiple indoor units AN connected to the building multi-air-conditioner BA numbered b.
The information required for calculating equations (1), (2), (7), and (8) is sent to the VarDR server VS and the DERMS server DS, which store this information.
Furthermore, in the reactive power demand response system 1, the allocation of the total reactive power Q c ADR is performed every five minutes, for example.
又、比較例では、需要家設備cに要求される全無効電力Qc ADRは、番号bのビルマルチ空調機BAに対して、次の式(9)のように、単純に需要家設備cに属するビルマルチ空調機BAの台数Bで割って、各ビルマルチ空調機BAに対する無効電力出力指令Qb^ ACとして均等に割り付けられるものとした。 In addition, in the comparative example, the total reactive power Q c ADR required for the building multi-air conditioner BA numbered b is simply divided by the number B of building multi-air conditioners BA belonging to the customer facility c, as shown in the following equation (9), and is allocated evenly as a reactive power output command Q b^ AC to each building multi-air conditioner BA.
ビルマルチ空調機BAのモデルは、主にビルマルチ空調機BAの瞬時消費電力とビル室内空気温度との連系漸化式で形成される。シミュレーションを実行するコンピュータは、所定時間(ここでは1秒間)毎に、次の式(10)~(12)で表される電力漸化式と、次の式(13)~(15)で表される室温漸化式とを連系計算する。
電力漸化式は、DEAMSシミュレーター(配電系統ES)と関係づけられる。
DEAMSシミュレーターには、図4等で示される、ビルマルチ空調機BAのアクティブコンバータACによる無効電力Qの制御原理のモデルと、比較例による無効電力Qの制御原理のモデル(均等按分)が実装されている。
The model of the building multi-air-conditioner BA is mainly formed by a recursive equation linking the instantaneous power consumption of the building multi-air-conditioner BA and the building's indoor air temperature. The computer that executes the simulation performs a recursive calculation of the power recurrence equations expressed by the following equations (10) to (12) and the room temperature recurrence equations expressed by the following equations (13) to (15) every predetermined time (here, every second).
The power recursion equation is related to the DEAMS simulator (power distribution system ES).
The DEAMS simulator is implemented with a model of the control principle of reactive power Q by the active converter AC of a building multi-air conditioner BA, as shown in Figure 4 etc., and a model of the control principle of reactive power Q (equal distribution) according to a comparative example.
次の表1に、シミュレーションにおける各種の実行パラメタが示される。
ここでは、無効電力デマンドレスポンスシステム1、及び比較例のそれぞれにおいて、とある1つの需要家設備cに2台(番号b=1,2)のビルマルチ空調機BAが属していることとする。これら2台のビルマルチ空調機BAの空調状態には、次のような差が存在する。即ち、番号b=2のビルマルチ空調機BAの内部発熱負荷は、番号b=1のビルマルチ空調機BAの内部発熱負荷の1.8倍とされている。尚、シミュレーションにおいて、内部発熱負荷は変動しないものとする。
又、DERMSサーバDSから、VarDRサーバVSを介して、当該需要家設備cに対し、t=10(min(分))以降、需要家設備cに対し、全無効電力Qc
ADR=20(var)の配電系統ESへの供給が要求されるものとし、無効電力デマンドレスポンスシステム1及び比較例は、それぞれ、属する2台のビルマルチ空調機BA(第4ERC4E)に全無効電力Qc
ADRを配分することによって、全無効電力Qc
ADRへの対応を行う。かようなシミュレーションは、t=30minまで行う。
Table 1 below shows various execution parameters in the simulation.
Here, in both the reactive power demand response system 1 and the comparative example, it is assumed that two building multi-air conditioners BA (numbered b=1, 2) belong to a certain consumer facility c. There is the following difference in the air conditioning status of these two building multi-air conditioners BA. That is, the internal heat generation load of the building multi-air conditioner BA numbered b=2 is 1.8 times the internal heat generation load of the building multi-air conditioner BA numbered b=1. It is assumed that the internal heat generation load does not fluctuate in the simulation.
Furthermore, the DERMS server DS requests the consumer facility c via the VarDR server VS to supply a total reactive power QcADR of 20 (var) to the power distribution system ES from t=10 (min (minutes)) onwards, and the reactive power demand response system 1 and the comparative example each respond to the total reactive power QcADR by allocating the total reactive power QcADR to the two belonging building multi-air conditioners BA (fourth ERC4E ). Such a simulation is performed up to t=30 min.
図5(A)は、比較例における有効電力Pb
AC、無効電力Qb
AC及び室温偏差Tb
SAの経時変化を示すグラフである。図5(B)は、無効電力デマンドレスポンスシステム1における有効電力Pb
AC、無効電力Qb
AC及び室温偏差Tb
SAの経時変化を示すグラフである。
無効電力Qb
ACの制御開始前(t<10)では、無効電力デマンドレスポンスシステム1及び比較例の双方において、番号b=1,2の各ビルマルチ空調機BAは、熱負荷と冷房能力との設定温度における熱バランスがとれている定常状態にあり、室温偏差Tb
SAは0℃を保つ。但し、熱バランスがとれる有効電力はビルマルチ空調機BAの熱負荷によって異なっており、熱負荷の低い番号b=1のビルマルチ空調機BAが約10kWを消費しているのに対して、熱負荷の高い番号b=2のビルマルチ空調機BAが約14kWを消費している。
無効電力Qb
ACの制御開始後(t≦10)において、比較例では、全無効電力Qc
ADR=20が均等に分配され、番号b=1,2の各ビルマルチ空調機BAが10kvarずつ無効電力Qb
ACの供給を行う。
ここで、熱負荷の低い番号b=1のビルマルチ空調機BAでは、有効電力P1
ACが10kWで維持されたまま無効電力Q1
ACが10kvarで供給されても、皮相電力は、14.1kVAであり、アクティブコンバータAC及び室外機内蔵インバータINの定格容量Smax=15kVAを超過しない。有効電力P1
ACが維持されれば冷房能力も維持されるため、室温偏差T1
SAが0℃に保たれる。
一方、熱負荷の高い番号b=2のビルマルチ空調機BAでは、有効電力P2
ACが14kWで維持されたまま無効電力Q2
ACを10kvarで供給しようとしても、皮相電力が17.2kVAとなり、アクティブコンバータAC及び室外機内蔵インバータINの定格容量Smax=15kVAを超えてしまうため、このままでは無効電力Q2
ACを10kvarで供給できない。そこで、番号b=2のビルマルチ空調機BAの第4ERC4Eは、第3動作モードM3により有効電力P2
ACを減少させる。すると、番号b=2のビルマルチ空調機BAの冷房能力は減少し、熱負荷との熱バランスが崩れて室温が上昇に転じる。シミュレーション終了時点であるt=30minにおいて、室温偏差T1
SAは0℃であるものの、室温偏差T2
SAは、快適性維持の目安である+1℃を超過している。
5A is a graph showing the changes over time of active power P b AC , reactive power Q b AC , and room temperature deviation T b SA in the comparative example, and FIG. 5B is a graph showing the changes over time of active power P b AC , reactive power Q b AC , and room temperature deviation T b SA in the reactive power demand response system 1.
Before control of reactive power Q b AC begins (t<10), in both reactive power demand response system 1 and the comparative example, each building multi-air conditioner BA with numbers b=1 and 2 is in a steady state where heat balance is achieved at the set temperature between heat load and cooling capacity, and room temperature deviation T b SA remains at 0° C. However, the active power at which heat balance is achieved varies depending on the heat load of the building multi-air conditioner BA, with the building multi-air conditioner BA with number b=1, which has a low heat load, consuming approximately 10 kW, while the building multi-air conditioner BA with number b=2, which has a high heat load, consuming approximately 14 kW.
After control of the reactive power Q b AC starts (t≦10), in the comparative example, the total reactive power Q c ADR =20 is evenly distributed, and each of the building multi-air conditioners BA with numbers b=1 and 2 supplies 10 kvar of reactive power Q b AC .
Here, in the building multi-air conditioner BA with low heat load number b = 1, even if the reactive power Q1AC is supplied at 10 kvar while the active power P1AC is maintained at 10 kW, the apparent power is 14.1 kVA, which does not exceed the rated capacity Smax =15 kVA of the active converter AC and the outdoor unit built - in inverter IN. If the active power P1AC is maintained , the cooling capacity is also maintained, so the room temperature deviation T1SA is kept at 0°C.
Meanwhile, in the building multi-air-conditioning unit BA ( number b=2) with a high thermal load, even if reactive power Q2AC is supplied at 10 kvar while real power P2AC is maintained at 14 kW, the apparent power becomes 17.2 kVA, exceeding the rated capacity Smax = 15 kVA of the active converter AC and the outdoor unit's built - in inverter IN. Therefore, reactive power Q2AC cannot be supplied at 10 kvar. Therefore, the fourth ERC4E of the building multi-air-conditioning unit BA (number b=2) reduces real power P2AC by using the third operating mode M3. This reduces the cooling capacity of the building multi-air-conditioning unit BA (number b=2), disrupting the thermal balance with the thermal load and causing the room temperature to rise. At t=30 min, the end of the simulation, the room temperature deviation T1SA is 0°C, but the room temperature deviation T2SA exceeds the target of +1°C for maintaining comfort.
これに対し、無効電力デマンドレスポンスシステム1では、無効電力Qb
ACの制御開始後(t≦10)、5分毎に全無効電力Qc
ADRを再按分する。
t=10minの1回目の按分では、番号b=1,2の各ビルマルチ空調機BAの室温偏差Tb
SAは共に0℃であり差がないのに対し、有効電力Pb
ACは番号b=2のビルマルチ空調機BAが番号b=1のビルマルチ空調機BAに比べてより多く消費していることから、無効電力はQ1
AC>Q2
ACとなるように按分される。番号b=2のビルマルチ空調機BAでは、無効電力Q2
ACの供給のために有効電力P2
ACが減少されるので、室温偏差T2
SAが上昇する。
t=15minの2回目の按分において、番号b=2のビルマルチ空調機BAでは、1回目の按分に比べて室温偏差T2
SAのが上昇しているところ、有効電力P2
ACも減少しているので、kb
PAC+kb*
TSAの合計値が殆ど変わらず、結果的に按分される無効電力Qb
ACの配分に変化は生じない。
t=20minの3回目の按分において、番号b=2のビルマルチ空調機BAでは、更に室温偏差T2
SAが上昇して0.5℃となる一方、番号b=1のビルマルチ空調機BAでは、室温偏差T1
SAが0℃付近に留まり室内快適性に余裕があるため、番号b=1のビルマルチ空調機BAの無効電力Q1
ACが増加する一方、番号b=2のビルマルチ空調機BAの無効電力Q2
ACが減少する。ここで、番号b=1のビルマルチ空調機BAでも、室外機内蔵インバータINの容量の節約のために有効電力P1
ACが減少されるので、冷房能力と熱負荷の熱バランスが崩れて室温偏差T1
SAが上昇し始める。又、番号b=2のビルマルチ空調機BAでは、無効電力Q2
ACの減少により、有効電力が増加でき、冷房能力が増加できるため、室温偏差T1
SAの上昇が穏やかになる。
t=25minの4回目の按分は、t=20minの3回目の按分と同様の傾向となる。
かように、無効電力デマンドレスポンスシステム1では、各ビルマルチ空調機BAの室温快適性の余裕度に応じ、全無効電力Qc
ADRを各無効電力Qb
ACに按分する。よって、無効電力デマンドレスポンスシステム1は、全無効電力Qc
ADRに対応して配電系統ESの安定化に寄与しつつ、シミュレーション終了時点のt=30minにおける室温偏差Tb
SAが何れのビルマルチ空調機BAにおいても+1℃を超えないようにして、各ビルマルチ空調機BAによる空調の快適性の低下を抑制するのである。
In contrast, in the reactive power demand response system 1, after the control of the reactive power Q b AC starts (t≦10), the total reactive power Q c ADR is re-allocated every five minutes.
In the first allocation at t=10 min, the room temperature deviation T b SA of each of the building multi-air conditioners BA numbered b=1 and 2 is both 0°C, with no difference, but the building multi-air conditioner BA numbered b=2 consumes more active power P b AC than the building multi-air conditioner BA numbered b=1, so the reactive power is allocated so that Q 1 AC > Q 2 AC . In the building multi-air conditioner BA numbered b=2, active power P 2 AC is reduced to supply reactive power Q 2 AC , so the room temperature deviation T 2 SA rises.
In the second allocation at t=15 min, for the building multi-air conditioner BA with number b=2, the room temperature deviation T 2 SA has increased compared to the first allocation, and the active power P 2 AC has also decreased, so the total value of k b PAC + k b * TSA remains almost unchanged, and as a result, there is no change in the distribution of the allocated reactive power Q b AC .
In the third allocation at t=20 min, the room temperature deviation T2SA of the building multi-air conditioner BA numbered b= 2 rises further to 0.5°C, while the room temperature deviation T1SA of the building multi-air conditioner BA numbered b=1 remains around 0°C and there is a margin for indoor comfort, so the reactive power Q1AC of the building multi-air conditioner BA numbered b=1 increases, while the reactive power Q2AC of the building multi-air conditioner BA numbered b= 2 decreases.Here, the building multi-air conditioner BA numbered b=1 also reduces its active power P1AC to save on the capacity of the outdoor unit's built-in inverter IN, so the thermal balance between cooling capacity and heat load is disrupted and the room temperature deviation T1SA begins to rise. In addition, in the building multi-air conditioner BA with number b=2, the decrease in reactive power Q 2 AC allows the active power to increase, and the cooling capacity to increase, so the rise in room temperature deviation T 1 SA becomes gradual.
The fourth allocation at t=25 min shows the same tendency as the third allocation at t=20 min.
In this way, the reactive power demand response system 1 allocates the total reactive power QcADR to each reactive power QbAC according to the room temperature comfort margin of each building multi-air conditioner BA. Therefore, the reactive power demand response system 1 contributes to the stabilization of the power distribution system ES in accordance with the total reactive power QcADR , while preventing the room temperature deviation TbSA at t = 30 min , the end of the simulation , from exceeding +1° C for any of the building multi-air conditioners BA, thereby suppressing a decrease in the comfort of the air conditioning provided by each building multi-air conditioner BA.
[変電所の変圧器過負荷保護の発明に係る作用効果等]
以上の無効電力デマンドレスポンスシステム1は、配電系統ESに対して、当該需要家設備に対し要求された全無効電力Qc
ADR(無効電力)を、複数のビルマルチ空調機BAによって供給するように、各ビルマルチ空調機BAを制御するコンピュータ(第4ERC4E)を有している。
よって、配電系統ESにおいて、複数のビルマルチ空調機BAに係る連系点GPに対し無効電力Qの出し入れ及びその量を制御することで、連系点GPの電圧を制御可能な無効電力デマンドレスポンスシステム1が提供される。ビルマルチ空調機BAは、配電系統ESにおいてもともと広く存在しているため、無効電力デマンドレスポンスシステム1では、電圧制御を要する配電系統ESの地点に隣接する複数のビルマルチ空調機BAが対応可能である。又、ビルマルチ空調機BAは、他のDER機器(太陽光発電D1,蓄電池システムD2,急速充電器D3)に比べ、本来の機能を大きく損なわない状態で無効電力Qを提供可能である時間が長く、無効電力デマンドレスポンスシステム1では、より適切なタイミングで(配電系統ESの電圧変動に対しより即応可能に)連系点GPの電圧が制御される。
[Effects of the invention for transformer overload protection in substations]
The reactive power demand response system 1 described above has a computer (fourth ERC4E ) that controls each building multi-air conditioner BA so that the total reactive power QcADR (reactive power) requested for the consumer equipment is supplied to the power distribution system ES by the multiple building multi-air conditioners BA.
Therefore, a reactive power demand response system 1 is provided that can control the voltage of the interconnection point GP by controlling the input/output and amount of reactive power Q to/from the interconnection point GP associated with multiple building multi-air conditioners BA in the distribution system ES. Because building multi-air conditioners BA are originally widely present in the distribution system ES, the reactive power demand response system 1 can accommodate multiple building multi-air conditioners BA adjacent to points in the distribution system ES that require voltage control. Furthermore, compared to other DER devices (photovoltaic power generation system D1, storage battery system D2, rapid charger D3), building multi-air conditioners BA can provide reactive power Q for a longer period of time without significantly impairing their original functions, and the reactive power demand response system 1 controls the voltage of the interconnection point GP at a more appropriate timing (to be able to respond more quickly to voltage fluctuations in the distribution system ES).
又、第4ERC4Eは、全無効電力Qc
ADRを、各ビルマルチ空調機BAに対し、室温偏差Tb
SAに関する数理計画法に基づいて按分して、各ビルマルチ空調機BAにおける目標無効電力QTGTを割り振る。よって、無効電力デマンドレスポンスシステム1は、各ビルマルチ空調機BAにおける空調の快適性に配慮しながら、配電系統ESに無効電力Qを供給することができる。
更に、数理計画法は、各室温偏差Tb
SAの二乗の総和が最小となるように、当該需要家設備に対し要求された全無効電力Qc
ADRに対するビルマルチ空調機BA毎の按分比例係数[k1*
TSA,…,kb*
TSA,…,kB*
TSA]を決定する最小二乗法である。よって、無効電力デマンドレスポンスシステム1は、各ビルマルチ空調機BAにおける空調の快適性に一層容易に配慮しながら、配電系統ESに無効電力Qを供給することができる。
Furthermore, the fourth ERC 4E allocates the total reactive power QcADR to each building multi-air conditioner BA based on mathematical programming related to the room temperature deviation TbSA , and allocates the target reactive power QTGT to each building multi-air conditioner BA. Thus, the reactive power demand response system 1 can supply reactive power Q to the power distribution system ES while taking into consideration the comfort of the air conditioning in each building multi-air conditioner BA.
Furthermore, the mathematical programming is a least squares method that determines the apportionment proportional coefficients [k 1* TSA , ..., k b * TSA , ..., k B * TSA ] for each building multi-air conditioner BA for the total reactive power Q c ADR requested from the consumer equipment so that the sum of the squares of each room temperature deviation T b SA is minimized. Therefore, the reactive power demand response system 1 can supply reactive power Q to the distribution system ES while more easily considering the air conditioning comfort of each building multi-air conditioner BA.
加えて、各ビルマルチ空調機BAは、圧縮機モータCMと、圧縮機モータCMに接続された室外機内蔵インバータINと、室外機内蔵インバータINに対する電力を調整するアクティブコンバータACと、を有している。よって、無効電力デマンドレスポンスシステム1では、各ビルマルチ空調機BAにおいて、より効率的に、配電系統ESへの無効電力Qの供給がなされる。
又、各アクティブコンバータACは、自身が属するビルマルチ空調機BAの空調のための有効電力Pを制御することで、当該ビルマルチ空調機BAに割り振られた目標無効電力QTGTに係る無効電力Qを発生する。よって、無効電力デマンドレスポンスシステム1では、各ビルマルチ空調機BAにおいて、更に効率的に、配電系統ESへの無効電力Qの供給がなされる。
In addition, each building multi-air conditioner BA has a compressor motor CM, an outdoor unit built-in inverter IN connected to the compressor motor CM, and an active converter AC that adjusts the power to the outdoor unit built-in inverter IN. Therefore, in the reactive power demand response system 1, reactive power Q is supplied to the power distribution system ES more efficiently in each building multi-air conditioner BA.
Furthermore, each active converter AC controls the active power P for air conditioning of the building multi-air conditioner BA to which it belongs, thereby generating reactive power Q related to the target reactive power QTGT allocated to that building multi-air conditioner BA. Therefore, in the reactive power demand response system 1, reactive power Q is supplied to the power distribution system ES more efficiently in each building multi-air conditioner BA.
[変更例等]
尚、本発明の形態及びシミュレーションの少なくとも何れかは、上記の形態及び変更例に限定されず、次に示すような更なる変更例を適宜有する。
各種コンピュータの台数及びネットワーク上の配置、電力系統の構成、各種の式、並びに制御に係る回路及び指令等のうちの少なくとも何れかは、論理的に同等な他のものに変えられても良い。
[Examples of changes]
At least one of the embodiments and simulations of the present invention is not limited to the above-described embodiments and modifications, and may include further modifications as follows.
At least one of the number of various computers and their arrangement on the network, the configuration of the power system, various formulas, and circuits and commands related to control may be changed to other logically equivalent ones.
1・・無効電力デマンドレスポンスシステム、4E・・第4ERC(コンピュータ)、AC・・アクティブコンバータ、BA・・ビルマルチ空調機、CM・・圧縮機モータ、DS・・DERMSサーバ、ES・・配電系統、IN・・室外機内蔵インバータ(インバータ)、P・・有効電力、Q・・無効電力、Qc ADR・・全無効電力、QTGT・・目標無効電力、Tb SA・・室温偏差、VS・・VarDRサーバ。 1: Reactive power demand response system, 4E: 4th ERC (computer), AC: Active converter, BA: Building multi-air conditioner, CM: Compressor motor, DS: DERMS server, ES: Power distribution system, IN: Inverter built into outdoor unit (inverter), P: Active power, Q: Reactive power, Qc ADR : Total reactive power, QTGT : Target reactive power, Tb SA : Room temperature deviation, VS: VarDR server.
Claims (4)
前記コンピュータは、前記無効電力を、各前記ビルマルチ空調機に対し、室温偏差に関する数理計画法に基づいて按分して、各前記ビルマルチ空調機における目標無効電力を割り振る
ことを特徴とする無効電力デマンドレスポンスシステム。 a computer that controls each of the plurality of building multi-air-conditioners so that reactive power is supplied to the power distribution system by the building multi-air-conditioners ;
The computer allocates the reactive power to each of the building multi-air conditioners based on a mathematical programming method related to room temperature deviation, and allocates target reactive power to each of the building multi-air conditioners.
A reactive power demand response system comprising:
ことを特徴とする請求項1に記載の無効電力デマンドレスポンスシステム。 The reactive power demand response system described in claim 1, characterized in that the mathematical programming method determines an apportionment proportional coefficient for each building multi-air conditioner for the reactive power so that the sum of the squares of each room temperature deviation is minimized, or is a least squares method that determines an apportioned reactive power for each building multi-air conditioner equivalent to the value obtained by multiplying the reactive power by the apportionment proportional coefficient.
ことを特徴とする請求項1又は請求項2に記載の無効電力デマンドレスポンスシステム。 The reactive power demand response system of claim 1 or 2, characterized in that the building multi-air conditioner has a compressor motor, an inverter connected to the compressor motor, and an active converter that adjusts the power to the inverter.
ことを特徴とする請求項3に記載の無効電力デマンドレスポンスシステム。 The reactive power demand response system described in claim 3, characterized in that the active converter generates reactive power related to the target reactive power allocated to the building multi-air conditioner by controlling the active power for air conditioning of the building multi-air conditioner to which it belongs.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021130162A JP7730116B2 (en) | 2021-08-06 | 2021-08-06 | Reactive Power Demand Response System |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021130162A JP7730116B2 (en) | 2021-08-06 | 2021-08-06 | Reactive Power Demand Response System |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2023024088A JP2023024088A (en) | 2023-02-16 |
| JP7730116B2 true JP7730116B2 (en) | 2025-08-27 |
Family
ID=85204268
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2021130162A Active JP7730116B2 (en) | 2021-08-06 | 2021-08-06 | Reactive Power Demand Response System |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7730116B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102024120704A1 (en) * | 2024-07-22 | 2026-01-22 | Everllence Se | Method and control unit for operating a compressor connected to an electrical power grid, compressor and system with a compressor |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2017521034A (en) | 2014-07-04 | 2017-07-27 | エクスレント エナジー テクノロジーズ リミテッド ライアビリティ カンパニー | Power grid network gateway aggregation |
| JP2018207771A (en) | 2017-05-30 | 2018-12-27 | ダイキン工業株式会社 | Power supply quality management system and air conditioner |
| JP6572113B2 (en) | 2015-11-30 | 2019-09-04 | 株式会社東芝 | Power consumption control device and power consumption control method |
-
2021
- 2021-08-06 JP JP2021130162A patent/JP7730116B2/en active Active
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2017521034A (en) | 2014-07-04 | 2017-07-27 | エクスレント エナジー テクノロジーズ リミテッド ライアビリティ カンパニー | Power grid network gateway aggregation |
| JP6572113B2 (en) | 2015-11-30 | 2019-09-04 | 株式会社東芝 | Power consumption control device and power consumption control method |
| JP2018207771A (en) | 2017-05-30 | 2018-12-27 | ダイキン工業株式会社 | Power supply quality management system and air conditioner |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2023024088A (en) | 2023-02-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9864391B2 (en) | Tablet based distributed intelligent load management | |
| US9893526B2 (en) | Networked power management and demand response | |
| US10678198B2 (en) | Power distribution control system | |
| US20210325922A1 (en) | Method and apparatus for control of intelligent loads in microgrids | |
| Özkan | A new real time home power management system | |
| Dhulipala et al. | Distributed model-predictive control strategy for distribution network volt/var control: A smart-building-based approach | |
| AU2014404066B2 (en) | Power distribution control system | |
| US20140025216A1 (en) | Controlling device and method for controlling power consumption in a system of power consuming devices | |
| US20240266829A1 (en) | Methods and systems for energy management and optimization | |
| JP7512916B2 (en) | Power management system, server, and method for adjusting power supply and demand | |
| JP2020048370A (en) | Power management method and power management system | |
| JP7730116B2 (en) | Reactive Power Demand Response System | |
| JP7414601B2 (en) | Power management device and power management method | |
| JP7844549B2 (en) | Communication equipment and communication methods | |
| Rahbar et al. | Joint optimization of battery energy storage system and fans for frequency reserve capacities allocation and day-ahead energy management | |
| Sankur et al. | Dynamic programming for optimal load-shedding of office scale battery storage and plug-loads | |
| Tomar et al. | Priority-based control strategy for enhanced PV utilization in off-grid solar DC nanogrids | |
| JP7480246B2 (en) | Power management device and power management method | |
| JP7666769B1 (en) | CONTROL DEVICE, CONTROL METHOD, CONTROL PROGRAM, AND DISTRIBUTED POWER SUPPLY SYSTEM | |
| US20260092719A1 (en) | Allocation of power sources in an air conditioning system | |
| JP6008988B2 (en) | Electric power demand adjustment system and electric power demand adjustment method | |
| JP7225142B2 (en) | Power source management system | |
| WO2024241466A1 (en) | Distributed power supply integrated management system, distributed power supply integrated management device, distributed power supply integrated management method, and program | |
| CN119995078A (en) | Charging terminal, charging control method, storage medium and computer equipment | |
| CN121036259A (en) | A mobile photovoltaic energy storage and charging system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20240718 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20250410 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20250422 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20250617 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20250708 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20250806 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7730116 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |