Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7732649B2 - Method, device, system, and program for calculating the time offset of multiple seismometers - Google Patents
[go: Go Back, main page]

JP7732649B2 - Method, device, system, and program for calculating the time offset of multiple seismometers - Google Patents

Method, device, system, and program for calculating the time offset of multiple seismometers

Info

Publication number
JP7732649B2
JP7732649B2 JP2021148545A JP2021148545A JP7732649B2 JP 7732649 B2 JP7732649 B2 JP 7732649B2 JP 2021148545 A JP2021148545 A JP 2021148545A JP 2021148545 A JP2021148545 A JP 2021148545A JP 7732649 B2 JP7732649 B2 JP 7732649B2
Authority
JP
Japan
Prior art keywords
seismometers
calculating
building
measurement data
time offset
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021148545A
Other languages
Japanese (ja)
Other versions
JP2023041276A (en
Inventor
貴士 近藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daiwa House Industry Co Ltd
Original Assignee
Daiwa House Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiwa House Industry Co Ltd filed Critical Daiwa House Industry Co Ltd
Priority to JP2021148545A priority Critical patent/JP7732649B2/en
Publication of JP2023041276A publication Critical patent/JP2023041276A/en
Application granted granted Critical
Publication of JP7732649B2 publication Critical patent/JP7732649B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Measurement Of Mechanical Vibrations Or Ultrasonic Waves (AREA)

Description

本発明は、複数の地震計の時刻ずれ量の算定方法と算定装置、算定システム、及びプログラムに関する。 The present invention relates to a method, device, system, and program for calculating the time offset between multiple seismometers.

複数階建ての建物の例えば1階と上層階に加速度センサ等の地震計を設置し、地震時に計測された計測データから建物の変形を算定する際には、1階と上層階にある地震計同士を有線にて接続し、双方の地震計の時刻を同期することが望ましいものの、階を跨ぐ地震計同士の有線による接続は、接続工事の煩雑さに加えて設置場所の変更に対して臨機に対応できないこと、配線制限があることなどの課題を有している。 When installing seismometers such as acceleration sensors on the first and upper floors of a multi-story building and calculating building deformation from the measurement data collected during an earthquake, it is desirable to connect the seismometers on the first and upper floors via a wire and synchronize the time on both seismometers. However, connecting seismometers across floors via a wire poses challenges, including the complicated connection work, the inability to quickly adapt to changes in installation location, and wiring limitations.

それに対して、無線にて地震計同士を接続することにより、有線による接続の際のデメリットは解消されるものの、今度は、地震計同士の時刻の同期ができないことから、建物の同時刻における各階の変形を正しく算定できないといった別の課題が生じる。 On the other hand, by connecting seismometers wirelessly, the disadvantages of wired connections are eliminated, but this then creates another issue: the time on the seismometers cannot be synchronized, making it impossible to correctly calculate the deformation of each floor of the building at the same time.

ここで、特許文献1には、2つの地震計測器の計時時刻にずれが生じていたとしても、ずれを補正して正確な層間変位量を算出することのできる、解析方法が提案されている。具体的には、木造建物の1階床付近又は床下基礎部分に設置されて地震の揺れによる加速度を計測する第1の住宅地震履歴計で得られた、時刻歴に沿ったX軸方向とY軸方向、及びZ軸方向の第1の加速度データと、木造建物の1階天井付近又は2階床付近に設置されて地震の揺れによる加速度を計測する第2の住宅地震履歴計で得られた、時刻歴に沿ったX軸方向とY軸方向、及びZ軸方向の第2の加速度データとを用いて、あらかじめ定められた解析処理プログラムにより木造建物が揺れた時の少なくとも層間変位量を算出するに際し、第1の住宅地震履歴計からのZ軸方向の第1の加速度データと第2の住宅地震履歴計からのZ軸方向の第2の加速度データについて相関係数を算出し、算出結果に基づいて第1の加速度データと第2の加速度データの間の時刻歴のずれを補正したうえで、層間変位量の算出を行う解析方法である。 Patent Document 1 proposes an analysis method that can correct for discrepancies in the time measurements of two seismometers to accurately calculate inter-story displacement. Specifically, the method uses first acceleration data in the X-axis, Y-axis, and Z-axis directions along a time history obtained from a first residential seismometer installed near the first floor or in the foundation below the floor of a wooden building to measure acceleration due to earthquake shaking, and second acceleration data in the X-axis, Y-axis, and Z-axis directions along a time history obtained from a second residential seismometer installed near the first floor ceiling or second floor of the wooden building to measure acceleration due to earthquake shaking, and calculates at least the inter-story displacement when the wooden building shakes using a predetermined analysis processing program. The method calculates a correlation coefficient between the first acceleration data in the Z-axis direction from the first residential seismometer and the second acceleration data in the Z-axis direction from the second residential seismometer, corrects for the discrepancy in the time history between the first acceleration data and the second acceleration data based on the calculation result, and then calculates the inter-story displacement.

特開2018-100875号公報JP 2018-100875 A

特許文献1に記載の解析方法は、複数の地震計測器で計測された鉛直方向の加速度波形の時刻を少しずつずらしながら相関係数を算出し、相関係数が最大となるときの時刻ずれ量を、実際の時刻ずれ量と判断する方法である。そのため、全周波数帯で相関係数を算出することにより、ノイズが多くて精度が低くなり、このことは特に高周波数側において顕著になるといった課題がある。また、時刻を少しずつずらして逐次計算する必要があることから、計算量が膨大になるといった課題もある。 The analysis method described in Patent Document 1 calculates a correlation coefficient while gradually shifting the time of vertical acceleration waveforms measured by multiple seismometers, and determines the time shift when the correlation coefficient is at its maximum as the actual time shift. Therefore, calculating the correlation coefficient across the entire frequency band results in a high level of noise and low accuracy, which is particularly noticeable on the high-frequency side. Another issue is the need to shift the time slightly and perform calculations sequentially, resulting in a huge amount of calculation.

本発明は上記課題に鑑みてなされたものであり、逐次計算を不要にしながら、複数の地震計の時刻ずれ量を高い精度で算定し、算定された時刻ずれ量を時刻ずれの補正に供することを可能にした、複数の地震計の時刻ずれ量の算定方法と算定装置、算定システム、及びプログラムを提供することを目的としている。 The present invention was made in consideration of the above-mentioned problems, and aims to provide a method, device, system, and program for calculating the time offset between multiple seismometers, which eliminates the need for sequential calculations, calculates the time offset between multiple seismometers with high accuracy, and enables the calculated time offset to be used for time offset correction.

前記目的を達成すべく、本発明による複数の地震計の時刻ずれ量の算定方法の一態様は、
建物に搭載されている複数の地震計の時刻ずれ量の算定方法であって、
複数の前記地震計により測定された計測データに基づいて伝達関数を算定する、A工程と、
前記建物が共振しない低周波数帯の位相スペクトルの傾きを算定し、該位相スペクトルの傾きに基づいて以下の式(X)により、前記時刻ずれ量を算定する、B工程と、を有することを特徴とする。
In order to achieve the above object, one aspect of the method for calculating the time offset of a plurality of seismometers according to the present invention comprises:
A method for calculating the amount of time offset between multiple seismometers installed in a building, comprising:
Step A: calculating a transfer function based on measurement data measured by a plurality of the seismometers;
and step B of calculating the slope of the phase spectrum in a low frequency band in which the building does not resonate, and calculating the time offset amount based on the slope of the phase spectrum using the following formula (X).

本態様によれば、複数の地震計により測定された計測データに基づいて伝達関数を算定し、建物が共振しない低周波数帯の位相スペクトルの傾きを算定し、位相スペクトルの傾きに基づいて複数の地震計の時刻ずれ量を算定することにより、逐次計算を不要にしながら、複数の地震計の時刻ずれ量を高い精度で算定することができる。ここで、「複数の地震計」とは、例えば、1階(もしくは基礎階)と、2階以上の上層階に2つもしくは3つ以上の地震計が設置されている場合に、建物に入力される地盤振動を計測する1階もしくは基礎階の地震計と、2階以上の上層階のいずれか1つの地震計を意味しており、例えば、1階と2階の地震計、1階と3階の地震計、1階と屋上階(RF)の地震計等の組み合わせが含まれる。 According to this aspect, by calculating a transfer function based on measurement data measured by multiple seismometers, calculating the phase spectrum slope in the low-frequency band where the building does not resonate, and calculating the time offset between the multiple seismometers based on the phase spectrum slope, it is possible to calculate the time offset between the multiple seismometers with high accuracy without requiring sequential calculations. Here, "multiple seismometers" refers to, for example, when two or three or more seismometers are installed on the first floor (or foundation floor) and two or more floors above, the seismometer on the first or foundation floor that measures ground vibration input to the building, and one of the seismometers on the second or higher floors. This includes combinations such as seismometers on the first and second floors, seismometers on the first and third floors, and seismometers on the first floor and rooftop (RF) floor.

また、「建物が共振しない低周波数帯」とは、複数階の建物が全体的に並進挙動する程度の周波数帯や、応答が増幅しない周波数帯を意味しており、例えば全階が並進挙動することから複数階の地震計の位相差はゼロになる。 Furthermore, "low frequency bands where buildings do not resonate" refers to frequency bands where a multi-story building as a whole behaves in a translational manner, or frequency bands where the response is not amplified; for example, if all floors behave in a translational manner, the phase difference between seismometers on multiple floors will be zero.

伝達関数(位相)は、応答と入力の比:応答/入力の関数であり、例えば1階の地震計による計測データを地盤振動に関する入力データとし、上層階の地震計による計測データを当該階における応答データとした際に、建物が共振しない低周波数帯では、上記するように複数階の地震計の位相差がゼロであることを勘案すると、複数階の地震計の波形(例えば正弦波形)に時刻ずれ:Δtがある場合の伝達関数の位相は、-ωΔtとなる。式(X)では、任意の2つの周波数f1,f2の位相:φ1,φ2と角振動数ω1,ω2により、時刻ずれ量を算定することができる。 The transfer function (phase) is a function of the ratio of response to input: response/input. For example, if measurement data from a seismometer on the first floor is used as input data related to ground vibration, and measurement data from a seismometer on an upper floor is used as response data for that floor, and taking into account that the phase difference between seismometers on multiple floors is zero as mentioned above in the low frequency band where the building does not resonate, the phase of the transfer function will be -ωΔt if there is a time lag: Δt in the waveforms (for example, sinusoidal waveforms) of the seismometers on multiple floors. In equation (X), the amount of time lag can be calculated using the phases: φ1, φ2 of any two frequencies f1, f2, and the angular frequencies ω1, ω2.

また、本発明による複数の地震計の時刻ずれ量の算定方法の他の態様は、
前記低周波数帯の設定において、
前記低周波数帯の上限値は、前記建物の構造計算時の1次固有振動数:fに対して、塑性域を考慮してf/2とし、
前記低周波数帯の下限値は、0.5Hzとすることを特徴とする。
Another aspect of the method for calculating the time offset of a plurality of seismometers according to the present invention is to
In the setting of the low frequency band,
The upper limit of the low frequency band is set to f 0 /2 in consideration of the plastic region, where f 0 is the primary natural frequency during structural calculation of the building,
The lower limit of the low frequency band is set to 0.5 Hz.

本態様によれば、低周波数帯の上限値と下限値を定量的に設定することにより、式(X)を適用できる周波数帯を明確にすることができる。 According to this aspect, by quantitatively setting the upper and lower limits of the low frequency band, it is possible to clarify the frequency band to which formula (X) can be applied.

ここで、上限値の設定根拠に関しては、通常地震の際の弾性域における層間変形角が一般に1/200程度に設定され、大規模地震の際の塑性域における層間変形角が1/100~1/75程度に設定されることから、塑性域は弾性域のおよそ1/2倍程度になることに基づき、1次固有振動数:fの1/2倍を低周波数帯の上限値としている。 Here, the basis for setting the upper limit is that the inter-story deformation angle in the elastic region during a normal earthquake is generally set to about 1/200, and the inter-story deformation angle in the plastic region during a large-scale earthquake is set to about 1/100 to 1/75. Therefore, the plastic region is about half the elastic region, and therefore the upper limit for the low frequency band is set to half the primary natural frequency: f0 .

一方、下限値の設定根拠は、現在一般に使用されている地震計の性能(分解能)に基づいて0.5Hzを下限値としている。すなわち、下限値は、地震計の性能に応じて多様に変化し得ることから、ここでは現状使用の一般の地震計の性能に基づいて設定することとした。 On the other hand, the lower limit was set at 0.5 Hz based on the performance (resolution) of seismometers currently in general use. In other words, since the lower limit can vary depending on the performance of the seismometer, it was decided to set it here based on the performance of currently used general seismometers.

また、本発明による複数の地震計の時刻ずれ量の算定装置の一態様は、
建物に搭載されている複数の地震計の時刻ずれ量の算定装置であって、
算定部を有し、
前記算定部では、
複数の前記地震計により測定された計測データに基づいて伝達関数を算定し、
前記建物が共振しない低周波数帯の位相スペクトルの傾きを算定し、
前記位相スペクトルの傾きに基づいて以下の式(X)により、前記時刻ずれ量を算定することを特徴とする。
Furthermore, one aspect of the apparatus for calculating the time offset of a plurality of seismometers according to the present invention is
A device for calculating the amount of time offset between multiple seismometers mounted on a building, comprising:
It has a calculation department,
In the calculation unit,
Calculating a transfer function based on measurement data measured by the plurality of seismometers;
Calculating the slope of the phase spectrum in a low frequency band where the building does not resonate;
The time offset is calculated based on the gradient of the phase spectrum using the following formula (X):

本態様によれば、算定部において、複数の地震計により測定された計測データに基づいて伝達関数を算定し、建物が共振しない低周波数帯の位相スペクトルの傾きを算定し、位相スペクトルの傾きに基づいて複数の地震計の時刻ずれ量を算定することにより、逐次計算を不要にしながら、複数の地震計の時刻ずれ量を高い精度で算定することができる。 According to this aspect, the calculation unit calculates a transfer function based on measurement data measured by multiple seismometers, calculates the slope of the phase spectrum in the low-frequency band where the building does not resonate, and calculates the time offset between the multiple seismometers based on the slope of the phase spectrum. This makes it possible to calculate the time offset between the multiple seismometers with high accuracy while eliminating the need for sequential calculations.

また、本発明による複数の地震計の時刻ずれ量の算定システムの一態様は、
前記建物の備える複数の地震計と、前記算定装置とを有し、
前記地震計にて計測された計測データが前記算定装置にて受信されるように構成されていることを特徴とする。
Furthermore, one aspect of the system for calculating the time offset of a plurality of seismometers according to the present invention is
The building includes a plurality of seismometers and the calculation device,
The measurement data measured by the seismometer is received by the calculation device.

本態様によれば、複数の地震計にて計測された各計測データを、例えば建物を建設したハウスメーカーや建設会社等の本支店の関連部署等にある算定装置に無線通信等によって送信し、計測データを受信した算定装置にて対象建物の時刻ずれ量を速やかに算定し、算定された時刻ずれ量に基づいて複数の地震計の時刻ずれの補正(時刻の同期)を行った上で、建物の変形や層間変形角を高精度に算定することができる。ここで、算定装置における計測データの受信は、ネットワークを介して無線通信にて受信する方法の他にも、対象建物の入居者やハウスメーカーの担当者等が計測データを入手し、算定装置に入力する方法であってもよい。 In this embodiment, measurement data collected by multiple seismometers is transmitted via wireless communication or other means to a calculation device located in a related department, such as the head office or branch office of the home builder or construction company that constructed the building. The calculation device that receives the measurement data quickly calculates the time offset of the target building, corrects the time offset of the multiple seismometers (synchronizes the time) based on the calculated time offset, and then calculates the building's deformation and inter-story deformation angle with high accuracy. Here, the calculation device can receive the measurement data via wireless communication over a network, or it can receive the measurement data via a method in which a resident of the target building or a home builder employee obtains the measurement data and inputs it into the calculation device.

また、本発明によるプログラムの一態様は、
建物に搭載されている複数の地震計の時刻ずれ量の算定装置を構成するコンピュータに、以下の処理を実行させるプログラムであって、
複数の前記地震計により測定された計測データに基づいて伝達関数を算定し、
前記建物が共振しない低周波数帯の位相スペクトルの傾きを算定し、
前記位相スペクトルの傾きに基づいて以下の式(X)により、前記時刻ずれ量を算定することを特徴とする。
Furthermore, one aspect of the program according to the present invention is
A program that causes a computer constituting a calculation device for calculating the amount of time offset of multiple seismometers mounted on a building to execute the following processing:
Calculating a transfer function based on measurement data measured by the plurality of seismometers;
Calculating the slope of the phase spectrum in a low frequency band where the building does not resonate;
The time offset is calculated based on the gradient of the phase spectrum using the following formula (X):

本態様によれば、時刻ずれ量の算定装置を構成するコンピュータに所定の処理を実行させることにより、逐次計算を不要にしながら、複数の地震計の時刻ずれ量を高い精度で算定することができる。 According to this aspect, by having the computer constituting the time offset calculation device execute a predetermined process, it is possible to calculate the time offset of multiple seismometers with high accuracy while eliminating the need for sequential calculations.

以上の説明から理解できるように、本発明の複数の地震計の時刻ずれ量の算定方法と算定装置、算定システム、及びプログラムによれば、逐次計算を不要にしながら、複数の地震計の時刻ずれ量を高い精度で算定し、算定された時刻ずれ量を時刻ずれの補正に供することができる。 As can be understood from the above explanation, the method, device, system, and program for calculating the time offset between multiple seismometers of the present invention can calculate the time offset between multiple seismometers with high accuracy without requiring sequential calculations, and the calculated time offset can be used to correct the time offset.

実施形態に係る、複数の地震計の時刻ずれ量の算定システムの一例を示す全体構成図である。1 is an overall configuration diagram showing an example of a system for calculating the amount of time offset between multiple seismometers according to an embodiment; 実施形態に係る時刻ずれ量の算定装置のハードウェア構成の一例を示す図である。FIG. 2 is a diagram illustrating an example of a hardware configuration of a time lag calculation device according to an embodiment. 実施形態に係る時刻ずれ量の算定装置の機能構成の一例を示す図である。FIG. 2 is a diagram illustrating an example of a functional configuration of a time lag calculation device according to an embodiment. 実験にて実測した、時刻ずれなしのケースにおける、周波数と位相スペクトルの関係を示す図である。FIG. 10 is a diagram showing the relationship between frequency and phase spectrum in the case where there is no time lag, as measured in an experiment. 実験にて実測した、時刻ずれあり(+0.5s)のケースにおける、周波数と位相スペクトルの関係を示す図である。FIG. 10 is a diagram showing the relationship between frequency and phase spectrum in the case where there is a time lag (+0.5 s) measured in an experiment. 実験にて実測した、時刻ずれあり(+2.0s)のケースにおける、周波数と位相スペクトルの関係を示す図である。FIG. 10 is a diagram showing the relationship between frequency and phase spectrum in the case where there is a time lag (+2.0 s) measured in an experiment. 実験にて実測した、時刻ずれあり(-3.0s)のケースにおける、周波数と位相スペクトルの関係を示す図である。FIG. 10 is a diagram showing the relationship between frequency and phase spectrum in the case where there is a time lag (−3.0 s) as measured in an experiment. 実験結果に基づいて作成した、位相スペクトルの傾き(位相傾き)と時刻ずれ量(時刻ずれ)の関係グラフを示す図である。FIG. 10 is a graph showing the relationship between the phase spectrum gradient (phase gradient) and the time lag amount (time lag), which was created based on experimental results.

以下、実施形態に係る複数の地震計の時刻ずれ量の算定方法と算定装置、算定システム、及びプログラムの一例について、添付の図面を参照しながら説明する。尚、本明細書及び図面において、実質的に同一の構成要素については、同一の符号を付することにより重複した説明を省く場合がある。 Below, an example of a method, calculation device, calculation system, and program for calculating the time offset of multiple seismometers according to an embodiment will be described with reference to the accompanying drawings. Note that in this specification and drawings, substantially identical components may be designated by the same reference numerals to avoid redundant explanation.

[実施形態に係る複数の地震計の時刻ずれ量の算定方法と算定装置、算定システム、及びプログラム]
はじめに、図1乃至図3を参照して、実施形態に係る複数の地震計の時刻ずれ量の算定方法と算定装置、算定システム、及びプログラムの一例について説明する。ここで、図1は、実施形態に係る、複数の地震計の時刻ずれ量の算定システムの一例を示す全体構成図である。
[Method, apparatus, system, and program for calculating the amount of time offset between multiple seismometers according to an embodiment]
First, an example of a method, a calculation device, a calculation system, and a program for calculating the amount of time deviation between multiple seismometers according to an embodiment will be described with reference to Figures 1 to 3. Here, Figure 1 is an overall configuration diagram showing an example of a system for calculating the amount of time deviation between multiple seismometers according to an embodiment.

時刻ずれ量の算定システム50は、複数の地震計15を各階に備えている複数階建て(図示例は2階建て)の建物10と、建物10を建設したハウスメーカー30にある実施形態に係る算定装置40とを有し、地震計15と算定装置40がネットワーク20を介して接続されて計測データが算定装置40に送信されるようになっている。ここで、算定システムは、ネットワーク20を介することなく、建物10の入居者やハウスメーカーの担当者等が計測データを入手し、算定装置40に入力する形態であってもよく、このような形態も含んでいる。 The time lag calculation system 50 includes a multi-story building 10 (two stories in the illustrated example) equipped with multiple seismometers 15 on each floor, and a calculation device 40 according to an embodiment located at the home builder 30 that constructed the building 10. The seismometers 15 and calculation device 40 are connected via a network 20, and measurement data is transmitted to the calculation device 40. The calculation system may also be configured such that, without using the network 20, residents of the building 10 or a person in charge at the home builder obtains measurement data and inputs it into the calculation device 40, and this configuration is also included.

図示例の2階建ての建物10では、1階と2階にそれぞれ地震計15A,15Bが搭載されている。地盤G内を伝播されてきた地震動Eにより建物10が振動し、その際の地盤振動が1階にある地震計15Aにて測定され、測定された計測データ(加速度データで、例えば、X軸、Y軸、及びZ軸の加速度データ)が記録される。一方、建物の振動(応答振動)は2階(上層階)にある地震計15Bにて測定され、同様に加速度データとして記録される。双方の地震計15A,15Bは有線にて時刻同期されておらず、それぞれの計測データがネットワーク20を介して算定装置40に送信される。 In the illustrated example, the two-story building 10 has seismometers 15A and 15B mounted on the first and second floors, respectively. The building 10 vibrates due to seismic motion E propagating through the ground G, and the resulting ground vibrations are measured by seismometer 15A on the first floor, which records the measured measurement data (acceleration data, for example, acceleration data for the X, Y, and Z axes). Meanwhile, the building vibrations (response vibrations) are measured by seismometer 15B on the second floor (upper floor), which similarly records the acceleration data. Both seismometers 15A and 15B are not time-synchronized via a wired connection, and the respective measurement data are transmitted to the calculation device 40 via network 20.

ネットワーク20には、インターネット等の公衆ネットワーク、携帯電話網等の無線ネットワーク、VPN(Virtual Private Network)等の専用ネットワーク、LAN(Local Area Network)等が含まれる。 Network 20 includes public networks such as the Internet, wireless networks such as mobile phone networks, dedicated networks such as VPNs (Virtual Private Networks), LANs (Local Area Networks), etc.

次に、図2を参照して、時刻ずれ量の算定装置40のハードウェア構成の一例を説明するとともに、図3を参照して、時刻ずれ量の算定装置40の機能構成の一例を説明する。 Next, an example of the hardware configuration of the time lag calculation device 40 will be described with reference to Figure 2, and an example of the functional configuration of the time lag calculation device 40 will be described with reference to Figure 3.

図2に示すように、時刻ずれ量の算定装置40は、パーソナルコンピュータ(PC:Personal Computer)等の情報処理装置(コンピュータ)により構成される。 As shown in Figure 2, the time lag calculation device 40 is composed of an information processing device (computer) such as a personal computer (PC).

時刻ずれ量の算定装置40を構成するコンピュータは、接続バス46により相互に接続されているCPU(Central Processing Unit)41、主記憶装置42、補助記憶装置43、入出力IF(interface)44、及び通信IF45を備えている。主記憶装置42と補助記憶装置43は、コンピュータが読み取り可能な記録媒体である。尚、上記の構成要素はそれぞれ個別に設けられてもよいし、一部の構成要素を設けないようにしてもよい。 The computer that constitutes the time lag calculation device 40 includes a CPU (Central Processing Unit) 41, a main memory device 42, an auxiliary memory device 43, an input/output IF (interface) 44, and a communication IF 45, all of which are interconnected via a connection bus 46. The main memory device 42 and the auxiliary memory device 43 are computer-readable recording media. Note that the above components may be provided separately, or some components may not be provided.

CPU41は、MPU(Microprocessor)やプロセッサとも呼ばれ、CPU41は、単一のプロセッサであってもよいし、マルチプロセッサであってもよい。CPU41は、コンピュータからなる算定装置40の全体の制御を行う中央演算処理装置である。CPU41は、例えば、補助記憶装置43に記憶されたプログラムを主記憶装置42の作業領域にて実行可能に展開し、プログラムの実行を通じて周辺機器の制御を行うことにより、所定の目的に合致した機能を提供する。 The CPU 41 is also called an MPU (Microprocessor) or processor, and may be a single processor or a multiprocessor. The CPU 41 is a central processing unit that controls the entire computing device 40, which is made up of a computer. The CPU 41, for example, deploys programs stored in the auxiliary storage device 43 in an executable form in the working area of the main storage device 42, and controls peripheral devices through the execution of the programs, thereby providing functions that meet specific purposes.

主記憶装置42は、CPU41が実行するコンピュータプログラムや、CPU41が処理するデータ等を記憶する。主記憶装置42は、例えば、フラッシュメモリ、RAM(Random Access Memory)やROM(Read Only Memory)を含む。補助記憶装置43は、各種のプログラム及び各種のデータを読み書き自在に記録媒体に格納し、外部記憶装置とも呼ばれる。補助記憶装置43には、例えば、OS(Operating System)、各種プログラム、各種テーブル等が格納される。OSは、例えば、通信IF45を介して接続される外部装置等とのデータの受け渡しを行う通信インターフェースプログラムを含む。算定装置40に対する外部装置等には、地震計15や関連部署の他のコンピュータ(各種の構造計算用コンピュータ)等が含まれる。 The main memory device 42 stores computer programs executed by the CPU 41, data processed by the CPU 41, and the like. The main memory device 42 includes, for example, flash memory, RAM (Random Access Memory), and ROM (Read Only Memory). The auxiliary memory device 43 stores various programs and data on a readable and writable recording medium, and is also called an external memory device. The auxiliary memory device 43 stores, for example, an OS (Operating System), various programs, various tables, and the like. The OS includes, for example, a communications interface program that exchanges data with external devices connected via the communications IF 45. External devices for the calculation device 40 include the seismometer 15 and other computers in related departments (various structural calculation computers), etc.

補助記憶装置43は、例えば、主記憶装置42を補助する記憶領域として使用され、CPU41が実行するコンピュータプログラムや、CPU41が処理するデータ等を記憶する。補助記憶装置43は、不揮発性半導体メモリ(フラッシュメモリ、EPROM(Erasable Programmable ROM))を含むシリコンディスク、ハードディスクドライブ(HDD:Hard Disk Drive)装置、ソリッドステートドライブ装置等である。また、補助記憶装置43として、CDドライブ装置、DVDドライブ装置、BDドライブ装置といった着脱可能な記録媒体の駆動装置が例示され、着脱可能な記録媒体として、CD、DVD、BD、USB(Universal Serial Bus)メモリ、SD(Secure Digital)メモリカード等が例示される。 The auxiliary storage device 43 is used, for example, as a storage area that supports the main storage device 42, and stores computer programs executed by the CPU 41, data processed by the CPU 41, etc. The auxiliary storage device 43 may be a silicon disk including non-volatile semiconductor memory (flash memory, EPROM (Erasable Programmable ROM)), a hard disk drive (HDD), a solid state drive, etc. Examples of the auxiliary storage device 43 include drives for removable recording media such as CD drives, DVD drives, and BD drives, and examples of removable recording media include CDs, DVDs, BDs, USB (Universal Serial Bus) memory, and SD (Secure Digital) memory cards.

入出力IF44は、算定装置40に接続する機器との間でデータの入出力を行うインターフェイスである。入出力IF44には、例えば、キーボード、タッチパネルやマウス等のポインティングデバイス、マイクロフォン等の入力デバイス等が接続する。算定装置40は、入出力IF44を介して、入力デバイスを操作する操作者からの操作指示等を受け付ける。 The input/output IF 44 is an interface that inputs and outputs data between devices connected to the calculation device 40. Input devices such as a keyboard, a touch panel, a mouse, or other pointing device, and a microphone are connected to the input/output IF 44. The calculation device 40 receives operational instructions from an operator who operates the input device via the input/output IF 44.

また、入出力IF44には、例えば、液晶パネル(LCD:Liquid Crystal Display)や有機ELパネル(EL:Electroluminescence)等の表示デバイス、プリンタ、スピーカ等の出力デバイスが接続される。算定装置40では、伝達関数や二つの地震計15A,15Bの間の時刻ずれ量等が表示される。 In addition, the input/output IF 44 is connected to display devices such as liquid crystal displays (LCDs) and organic electroluminescence (EL) panels, as well as output devices such as printers and speakers. The calculation device 40 displays the transfer function and the time difference between the two seismometers 15A and 15B.

通信IF45は、算定装置40が接続するネットワーク20とのインターフェイスである。通信IF45は、上記するインターネット等の公衆ネットワークをはじめとする様々なネットワーク20を介して、地震計15から計測データを算定装置40に送信する。 The communication IF 45 is an interface with the network 20 to which the calculation device 40 is connected. The communication IF 45 transmits measurement data from the seismometer 15 to the calculation device 40 via various networks 20, including the above-mentioned public networks such as the Internet.

図3に示すように、算定装置40は、CPU41によるプログラムの実行により、少なくとも、通信部402、算定部404、及び格納部406の各種機能を提供する。ここで、上記処理機能の少なくとも一部が、DSP(Digital Signal Processor)、GPU(Graphics Processing Unit)等によって提供されてもよく、同様に、上記処理機能の少なくとも一部が、FPGA(Field-Programmable Gate Array)、数値演算プロセッサ、画像処理プロセッサ等の専用LSI(large scale integration)やその他のデジタル回路等であってもよい。 As shown in FIG. 3, the calculation device 40 provides various functions of at least the communication unit 402, calculation unit 404, and storage unit 406 through program execution by the CPU 41. Here, at least some of the above processing functions may be provided by a DSP (Digital Signal Processor), GPU (Graphics Processing Unit), etc. Similarly, at least some of the above processing functions may be provided by dedicated LSIs (large scale integration) such as FPGAs (Field-Programmable Gate Arrays), numerical calculation processors, image processing processors, or other digital circuits.

通信部402は、地震発生後に、各地震計15から送信された計測データを一定時間受信し、格納部406に随時格納する。 After an earthquake occurs, the communication unit 402 receives measurement data transmitted from each seismometer 15 for a certain period of time and stores the data in the storage unit 406 as needed.

算定部404は、計測データに基づいて、二つの地震計15A,15Bの間の時刻ずれ量を算定する。 The calculation unit 404 calculates the amount of time difference between the two seismometers 15A and 15B based on the measurement data.

ここで、2階の地震計15Bにより測定された建物10の建物振動(応答)と、1階の地震計15Aにより測定された地盤振動(入力)はそれぞれ、以下の式(Y1)、(Y2)により表すことができる。 Here, the building vibration (response) of building 10 measured by seismometer 15B on the second floor and the ground vibration (input) measured by seismometer 15A on the first floor can be expressed by the following equations (Y1) and (Y2), respectively.

式(Y1)、(Y2)より、伝達関数(位相)は、以下の式(Y3)により表すことができる。 From equations (Y1) and (Y2), the transfer function (phase) can be expressed by the following equation (Y3):

建物10が共振しない低周波数帯では、建物10の全体が並進挙動することから、二つの地震計15A,15Bの位相差はゼロとなることから、β=αとなり、式(Y3)に代入することにより、時刻ずれがある場合の伝達関数の位相は、以下の式(Y4)により表すことができる。 In the low frequency band where building 10 does not resonate, the entire building 10 behaves in a translational manner, and the phase difference between the two seismometers 15A and 15B is zero, so β = α. By substituting this into equation (Y3), the phase of the transfer function when there is a time lag can be expressed by the following equation (Y4).

時刻ずれ量を算定するべく、複数の周波数帯で位相を算定し、連立方程式を解く。すなわち、二つの周波数f1、f2のそれぞれの位相ずれφ1,φ2は、以下の式(Z1)、(Z2)により表すことができる。 To calculate the time offset, the phase is calculated for multiple frequency bands and a simultaneous equation is solved. That is, the phase offsets φ1 and φ2 for the two frequencies f1 and f2 can be expressed by the following equations (Z1) and (Z2).

式(Z1)、(Z2)により、時刻ずれ量Δtは、以下の式(X)により表すことができる。 From equations (Z1) and (Z2), the time lag Δt can be expressed by the following equation (X):

算定部404では、二つの地震計15A,15Bにより測定されたそれぞれの計測データに基づいて伝達関数を算定する、A工程を実行し、建物10が共振しない低周波数帯の位相スペクトルの傾きを算定し、位相スペクトルの傾きに基づいて式(X)により、時刻ずれ量を算定する、B工程を実行する。算定された時刻ずれ量Δtは、格納部406に格納される。この算定部404によるA工程とB工程の一連の処理は、実施形態に係る時刻ずれ量の算定方法となる。 The calculation unit 404 executes step A, which calculates a transfer function based on the measurement data measured by the two seismometers 15A and 15B, and then executes step B, which calculates the slope of the phase spectrum in the low-frequency band where the building 10 does not resonate, and calculates the time lag amount using equation (X) based on the slope of the phase spectrum. The calculated time lag amount Δt is stored in the storage unit 406. This series of processes in steps A and B by the calculation unit 404 constitutes the time lag calculation method according to the embodiment.

ここで、低周波数帯の上限値は、建物10の構造計算時の1次固有振動数:fに対して、塑性域を考慮してf/2に設定され、低周波数帯の下限値は、現在一般に使用されている地震計の性能に基づいて0.5Hzに設定される。 Here, the upper limit of the low frequency band is set to f0 /2, taking into account the plastic region , relative to the primary natural frequency: f0 during structural calculation of the building 10, and the lower limit of the low frequency band is set to 0.5 Hz based on the performance of currently commonly used seismometers.

算定装置40は、コンピュータに以下の処理を実行させるプログラムがインストール等されることにより、算定部404における上記処理が実行される。すなわち、このプログラムに基づく処理は、地震計15A,15Bにて測定された計測データに基づいて伝達関数を算定し、建物10が共振しない低周波数帯の位相スペクトルの傾きを算定し、位相スペクトルの傾きに基づいて上記の式(X)により、地震計15A,15Bの間の時刻ずれ量を算定する。 The calculation device 40 executes the above processing in the calculation unit 404 by installing a program that causes a computer to execute the following processing. That is, processing based on this program calculates a transfer function based on measurement data measured by seismometers 15A and 15B, calculates the slope of the phase spectrum in the low-frequency band where building 10 does not resonate, and calculates the amount of time difference between seismometers 15A and 15B using the slope of the phase spectrum using the above formula (X).

図示する地震計の時刻ずれ量の算定装置や算定システム、算定方法によれば、逐次計算を不要にして、例えば一度の計算にて求められる位相の傾きから、複数の地震計15A,15Bの時刻ずれ量を直接算定することができるため、時刻ずれ量の算定を簡易かつ短時間に行うことができる。 The illustrated seismometer time offset calculation device, calculation system, and calculation method eliminate the need for sequential calculations and can directly calculate the time offset of multiple seismometers 15A, 15B from, for example, the phase gradient obtained in a single calculation, making it possible to calculate the time offset easily and quickly.

さらに、低周波数帯を対象に時刻ずれ量の算定を行うことから、ノイズ(誤差)の影響が少なく、高い精度で時刻ずれ量の算定を行うことができる。 Furthermore, since the time offset is calculated for low frequency bands, the impact of noise (error) is minimal, allowing the time offset to be calculated with high accuracy.

算定装置40は、さらに、不図示の構造計算部を備えていて、算定された時刻ずれ量に基づいて地震計15A,15Bのそれぞれの計測データの時刻ずれを補正した後、時刻同期された双方の計測データに基づいて1階と2階の地震時の変形量を算定し、建物10の層間変形角を算定してもよい。算定された層間変形角等に基づき、建物10の安全度や損傷の程度等を評価することができる。 The calculation device 40 may further include a structural calculation unit (not shown), which corrects the time difference between the measurement data of the seismometers 15A and 15B based on the calculated time difference, and then calculates the deformation of the first and second floors during an earthquake based on the time-synchronized measurement data from both floors, thereby calculating the inter-story deformation angle of the building 10. The safety and degree of damage of the building 10 can be evaluated based on the calculated inter-story deformation angle, etc.

[時刻ずれ量の算定式の妥当性を検証する実験]
本発明者等は、上記式(X)の妥当性を検証する実験を行った。この実験では、2つの地震計の実測値に基づき、時刻ずれなしのケース、時刻ずれが+0.5sあるケース、時刻ずれが+2sあるケース、時刻ずれが-3sあるケースの4ケースでの周波数と位相スペクトルの関係を求めた。ここで、時刻ずれの±は、1階の地震計を基準として、2階の地震計が遅れて時刻ずれしている場合を+としている。
[Experiment to verify the validity of the calculation formula for time lag]
The inventors conducted an experiment to verify the validity of the above formula (X). In this experiment, based on the actual measurements of two seismometers, the relationship between frequency and phase spectrum was determined for four cases: no time lag, a time lag of +0.5 seconds, a time lag of +2 seconds, and a time lag of -3 seconds. Here, the ± time lag indicates that the seismometer on the first floor is used as the reference and that the seismometer on the second floor is delayed and has a time lag of +.

図4、図5、図6,及び図7はそれぞれ、実験にて実測した、時刻ずれなしのケース、時刻ずれあり(+0.5s)のケース、時刻ずれあり(+2.0s)のケース、及び時刻ずれあり(-3.0s)のケースにおける、周波数と位相スペクトルの関係を示す図である。また、図8は、実験結果に基づいて作成した、位相スペクトルの傾き(位相傾き)と時刻ずれ量(時刻ずれ)の関係グラフを示す図である。 Figures 4, 5, 6, and 7 show the relationship between frequency and phase spectrum in the cases of no time lag, time lag (+0.5 s), time lag (+2.0 s), and time lag (-3.0 s), respectively, as measured in experiments. Figure 8 also shows a graph created based on the experimental results, showing the relationship between the slope of the phase spectrum (phase slope) and the amount of time lag (time lag).

図4より、時刻ずれなしのケースにおいて、周波数が3Hz以下の周波数帯においては、位相スペクトルの傾きがゼロであることが実証されており、周波数が高くなるに従い、位相スペクトルがランダムに分散することが実証されている。 Figure 4 demonstrates that in the case of no time lag, the phase spectrum slope is zero in frequency bands below 3 Hz, and that as the frequency increases, the phase spectrum becomes more randomly dispersed.

また、図5乃至図7の低い周波数帯(例えば、0,5乃至1Hz)における位相スペクトルの傾きを比較すると、時刻ずれ量が大きくなるに従い、位相スペクトルの傾きが大きくなることが実証されている。 Furthermore, comparing the slope of the phase spectrum in the low frequency band (e.g., 0.5 to 1 Hz) in Figures 5 to 7 demonstrates that the slope of the phase spectrum increases as the time lag increases.

各時刻ずれにおける位相スペクトルの傾きの算定は、統計処理の一つである近似直線を求める方法や、移動平均で求めた複数の値の中央値を採用するなどの方法により、行うことができる。 The slope of the phase spectrum for each time shift can be calculated using methods such as finding an approximate straight line, which is a statistical process, or using the median of multiple values obtained by moving average.

これらの各実験結果をまとめると、位相傾きと時刻ずれの関係は、図8に示す近似直線で表すことができ、これは、上記する式(X)と一致することになる。 Summarizing the results of these experiments, the relationship between phase gradient and time lag can be expressed by the approximate straight line shown in Figure 8, which coincides with equation (X) above.

このように、建物の影響を考慮する必要がない低周波数帯において、2つの地震計の間の時刻ずれがない場合は位相の傾きはゼロであり、時刻ずれがあると位相は傾きを持つことになる。この傾きを計算式にて計算することにより、逐次計算を不要にして、簡易かつ短時間に時刻ずれ量を算定することが可能になる。 In this way, in the low-frequency band, where the influence of buildings does not need to be considered, if there is no time lag between the two seismometers, the phase slope is zero, but if there is a time lag, the phase will have a slope. By calculating this slope using a formula, it is possible to calculate the amount of time lag easily and quickly, eliminating the need for sequential calculations.

尚、上記実施形態に挙げた構成等に対し、その他の構成要素が組み合わされるなどした他の実施形態であってもよく、ここで示した構成に本発明が何等限定されるものではない。この点に関しては、本発明の趣旨を逸脱しない範囲で変更することが可能であり、その応用形態に応じて適切に定めることができる。 Note that other embodiments may be possible in which other components are combined with the configurations described in the above embodiments, and the present invention is in no way limited to the configurations shown here. In this regard, changes can be made without departing from the spirit of the present invention, and can be determined appropriately depending on the application form.

10:建物(2階建ての建物)
15,15A,15B:地震計
20:ネットワーク
30:ハウスメーカー
40:算定装置(時刻ずれ量の算定装置)
50:算定システム(時刻ずれ量の算定システム)
402:通信部
404:算定部
406:格納部
G:地盤
E:地震動
10: Building (two-story building)
15, 15A, 15B: Seismometer 20: Network 30: House builder 40: Calculation device (time lag calculation device)
50: Calculation system (time deviation calculation system)
402: Communication unit 404: Calculation unit 406: Storage unit G: Ground E: Earthquake motion

Claims (5)

建物に搭載されている複数の地震計の時刻ずれ量の算定方法であって、
複数の前記地震計により測定された計測データに基づいて、1階の該地震計による計測データを地盤振動に関する入力データとし、上層階の該地震計による計測データを該上層階における応答データとした際の応答と入力の比である、伝達関数を算定する、A工程と、
前記建物が共振しない低周波数帯の位相スペクトルの傾きを算定し、該位相スペクトルの傾きに基づいて以下の式(X)により、前記時刻ずれ量を算定する、B工程と、を有することを特徴とする、複数の地震計の時刻ずれ量の算定方法。
A method for calculating the amount of time offset between multiple seismometers installed in a building, comprising:
Step A: based on measurement data measured by the plurality of seismometers, calculating a transfer function, which is the ratio of response to input when measurement data measured by the seismometer on the first floor is used as input data related to ground vibration and measurement data measured by the seismometer on an upper floor is used as response data for the upper floor ;
and step B of calculating the slope of the phase spectrum in a low frequency band in which the building does not resonate, and calculating the time offset based on the slope of the phase spectrum using the following formula (X):
前記低周波数帯の設定において、
前記低周波数帯の上限値は、前記建物の構造計算時の1次固有振動数:fに対して、塑性域を考慮してf/2とし、
前記低周波数帯の下限値は、0.5Hzとすることを特徴とする、請求項1に記載の複数の地震計の時刻ずれ量の算定方法。
In the setting of the low frequency band,
The upper limit of the low frequency band is set to f 0 /2 in consideration of the plastic region, where f 0 is the primary natural frequency during structural calculation of the building,
2. The method for calculating the time offset of a plurality of seismometers according to claim 1, wherein the lower limit of the low frequency band is 0.5 Hz.
建物に搭載されている複数の地震計の時刻ずれ量の算定装置であって、
算定部を有し、
前記算定部では、
複数の前記地震計により測定された計測データに基づいて、1階の該地震計による計測データを地盤振動に関する入力データとし、上層階の該地震計による計測データを該上層階における応答データとした際の応答と入力の比である、伝達関数を算定し、
前記建物が共振しない低周波数帯の位相スペクトルの傾きを算定し、
前記位相スペクトルの傾きに基づいて以下の式(X)により、前記時刻ずれ量を算定することを特徴とする、複数の地震計の時刻ずれ量の算定装置。
A device for calculating the amount of time offset between multiple seismometers mounted on a building, comprising:
It has a calculation department,
In the calculation unit,
Based on the measurement data measured by the plurality of seismometers , a transfer function is calculated, which is the ratio of the response to the input when the measurement data from the seismometer on the first floor is used as input data related to ground vibration and the measurement data from the seismometer on the upper floor is used as response data for the upper floor;
Calculating the slope of the phase spectrum in a low frequency band where the building does not resonate;
A device for calculating the amount of time deviation of a plurality of seismometers, characterized in that the device calculates the amount of time deviation based on the slope of the phase spectrum using the following formula (X):
前記建物の備える複数の地震計と、請求項3に記載の算定装置とを有し、
前記地震計にて計測された計測データが前記算定装置にて受信されるように構成されていることを特徴とする、複数の地震計の時刻ずれ量の算定システム。
a plurality of seismometers provided in the building; and the calculation device according to claim 3;
A system for calculating the amount of time offset between a plurality of seismometers, characterized in that the system is configured so that measurement data measured by the seismometers is received by the calculation device.
建物に搭載されている複数の地震計の時刻ずれ量の算定装置を構成するコンピュータに、以下の処理を実行させるプログラムであって、
複数の前記地震計により測定された計測データに基づいて、1階の該地震計による計測データを地盤振動に関する入力データとし、上層階の該地震計による計測データを該上層階における応答データとした際の応答と入力の比である、伝達関数を算定し、
前記建物が共振しない低周波数帯の位相スペクトルの傾きを算定し、
前記位相スペクトルの傾きに基づいて以下の式(X)により、前記時刻ずれ量を算定することを特徴とする、プログラム。
A program that causes a computer constituting a calculation device for calculating the amount of time offset of multiple seismometers mounted on a building to execute the following processing:
Based on the measurement data measured by the plurality of seismometers , a transfer function is calculated, which is the ratio of the response to the input when the measurement data from the seismometer on the first floor is used as input data related to ground vibration and the measurement data from the seismometer on the upper floor is used as response data for the upper floor;
Calculating the slope of the phase spectrum in a low frequency band where the building does not resonate;
Calculating the time lag amount based on the slope of the phase spectrum using the following formula (X):
JP2021148545A 2021-09-13 2021-09-13 Method, device, system, and program for calculating the time offset of multiple seismometers Active JP7732649B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021148545A JP7732649B2 (en) 2021-09-13 2021-09-13 Method, device, system, and program for calculating the time offset of multiple seismometers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021148545A JP7732649B2 (en) 2021-09-13 2021-09-13 Method, device, system, and program for calculating the time offset of multiple seismometers

Publications (2)

Publication Number Publication Date
JP2023041276A JP2023041276A (en) 2023-03-24
JP7732649B2 true JP7732649B2 (en) 2025-09-02

Family

ID=85641283

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021148545A Active JP7732649B2 (en) 2021-09-13 2021-09-13 Method, device, system, and program for calculating the time offset of multiple seismometers

Country Status (1)

Country Link
JP (1) JP7732649B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7742384B2 (en) * 2023-08-09 2025-09-19 大成建設株式会社 Time synchronization system, time synchronization program, and time synchronization method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002365320A (en) 2001-06-12 2002-12-18 Etani Denki Kk Measurement method of transmission characteristics for acoustic and electrical/electronic transmission line
JP2007327873A (en) 2006-06-08 2007-12-20 Tokyo Gas Co Ltd Seismic recording data synchronization processing method
JP2018091824A (en) 2016-11-29 2018-06-14 パナソニックホームズ株式会社 Method for calculating synchronization deviation amount between vibration waveform data, and method for correcting synchronization between vibration waveform data
US20190072684A1 (en) 2015-05-28 2019-03-07 Area Prefabbricati S.P.A. Seismic monitoring system and method for carrying out the seismic monitoring using said monitoring system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002365320A (en) 2001-06-12 2002-12-18 Etani Denki Kk Measurement method of transmission characteristics for acoustic and electrical/electronic transmission line
JP2007327873A (en) 2006-06-08 2007-12-20 Tokyo Gas Co Ltd Seismic recording data synchronization processing method
US20190072684A1 (en) 2015-05-28 2019-03-07 Area Prefabbricati S.P.A. Seismic monitoring system and method for carrying out the seismic monitoring using said monitoring system
JP2018091824A (en) 2016-11-29 2018-06-14 パナソニックホームズ株式会社 Method for calculating synchronization deviation amount between vibration waveform data, and method for correcting synchronization between vibration waveform data

Also Published As

Publication number Publication date
JP2023041276A (en) 2023-03-24

Similar Documents

Publication Publication Date Title
Moaveni et al. Finite-element model updating for assessment of progressive damage in a 3-story infilled RC frame
Lee et al. Real-time substructuring technique for the shaking table test of upper substructures
JP2014134436A5 (en) Building safety verification system and building safety verification method
JP5941998B2 (en) Method for correcting representative displacement waveform and method for evaluating residual seismic performance of buildings
Kalkbrenner et al. Multi directional pushover analysis of irregular masonry buildings without box behavior
JP7732649B2 (en) Method, device, system, and program for calculating the time offset of multiple seismometers
JP2017044614A (en) System for highly accurate evaluation of transfer function of structure, earthquake response estimation and deterioration diagnosis thereof, and its method
Sepulveda et al. Hybrid simulation framework with mixed displacement and force control for fully compatible displacements
Mayr et al. Approximate method for obtaining source quantities for calculation of structure-borne sound transmission into lightweight buildings
Xu et al. Estimation of maximum drift of multi‐degree‐of‐freedom shear structures with unknown parameters using only one accelerometer
Suzuki et al. Shake table tests of seven-story reinforced concrete structures with torsional irregularities: Test program and datasets
Rahmanishamsi et al. Analytical model to capture the in-plane and out-of-plane seismic behavior of nonstructural partition walls with returns
JP7707488B2 (en) Method and system for evaluating the soundness of tunnel supports
JP7800982B2 (en) Method, device, system, and program for identifying time offset between multiple seismometers
Yousefianmoghadam et al. System identification of a two-story infilled RC building in different damage states
JP7343380B2 (en) Building health monitoring system
JP2004219237A (en) Vibration prediction method and vibration prediction system
JP5002376B2 (en) Design simulation system, design simulation method, design simulation program, and recording medium
JP2022043932A (en) Seismic waveform complementation method and complementation system
Huang et al. Mode shape linearization and correction in coupled dynamic analysis of wind‐excited tall buildings
JP6409014B2 (en) Method for estimating rigidity of building and method for estimating natural frequency of building
Tabatabaei Torsional vibration of eccentric building systems
JP2023129966A (en) Displacement measurement device and damage evaluation system
JP7725764B2 (en) Damage level display device, damage level specific display system, and program
JP2023037321A (en) Structure evaluation method, structure evaluation program and structure evaluation device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240823

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250423

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250430

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250624

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250722

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250813

R150 Certificate of patent or registration of utility model

Ref document number: 7732649

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150