Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7738843B2 - Lining concrete pouring device and lining concrete pouring method - Google Patents
[go: Go Back, main page]

JP7738843B2 - Lining concrete pouring device and lining concrete pouring method - Google Patents

Lining concrete pouring device and lining concrete pouring method

Info

Publication number
JP7738843B2
JP7738843B2 JP2021086843A JP2021086843A JP7738843B2 JP 7738843 B2 JP7738843 B2 JP 7738843B2 JP 2021086843 A JP2021086843 A JP 2021086843A JP 2021086843 A JP2021086843 A JP 2021086843A JP 7738843 B2 JP7738843 B2 JP 7738843B2
Authority
JP
Japan
Prior art keywords
pipe
concrete
pouring
lining
drainage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021086843A
Other languages
Japanese (ja)
Other versions
JP2022179984A (en
Inventor
浩輔 谷村
将 山本
厚之 木村
茂生 八木田
太 楠本
常秀 大久保
秀雄 本田
善英 伊勢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP2021086843A priority Critical patent/JP7738843B2/en
Publication of JP2022179984A publication Critical patent/JP2022179984A/en
Application granted granted Critical
Publication of JP7738843B2 publication Critical patent/JP7738843B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

本発明は、覆工コンクリート打込装置および覆工コンクリート打込方法に関する。 The present invention relates to a lining concrete pouring device and a lining concrete pouring method.

従来、NATM工法により掘削されたトンネル壁面と覆工型枠との間の空隙にコンクリートを打ち込んでトンネルの覆工を構築するためのコンクリート打込装置が知られている(例えば、特許文献1参照)。
また、このようなコンクリート打込装置として、切羽側に設置される妻型枠においてトンネル周方向に複数の打込口を設け、これら複数の打込口に対して打込ノズルの切替えを自動で行いながら打ち込むマニピュレータ方式打込装置が採用されている(例えば、特許文献2参照)。
Conventionally, a concrete pouring device is known for constructing a tunnel lining by pouring concrete into the gap between the tunnel wall surface excavated by the NATM method and the lining formwork (see, for example, Patent Document 1).
In addition, as such a concrete pouring device, a manipulator-type pouring device is used in which multiple pouring ports are provided around the circumferential direction of the tunnel in the end formwork installed on the face side, and the pouring nozzle is automatically switched between these multiple pouring ports while pouring the concrete (see, for example, Patent Document 2).

特開2018-105029号公報JP 2018-105029 A 特開2020-56196号公報Japanese Patent Application Laid-Open No. 2020-56196

しかしながら、上述した特許文献1に示されるような従来のコンクリート打込装置では、以下のような問題があった。
すなわち、特許文献1のようなマニピュレータ方式の打込装置は、上半断面の左右方向にマニピュレータ可動配管の構造部の中心を設け、トンネル周方向に移動させる構成となっている。そのため、マニピュレータ可動配管の可動領域が掘削ずりを坑外に搬出する連続ベルトコンベヤや風管のスペースを侵してしまい、可動するマニピュレータ可動配管と連続ベルトコンベヤや風管等の坑内仮設備に干渉することから、構造上、マニピュレータ方式打込装置を設けることができないという問題があった。
However, the conventional concrete pouring device as disclosed in the above-mentioned Patent Document 1 has the following problems.
That is, in the manipulator-type driving device described in Patent Document 1, the center of the structural part of the manipulator movable pipe is located in the left-right direction of the upper half cross section, and it is configured to move in the tunnel circumferential direction. As a result, the movable area of the manipulator movable pipe encroaches on the space of the continuous belt conveyor and air pipe that transports excavated muck outside the tunnel, and there is interference between the movable manipulator movable pipe and temporary underground facilities such as the continuous belt conveyor and air pipe, so there is a problem that the manipulator-type driving device cannot be installed structurally.

また、従来のマニピュレータ方式の打込装置は、例えば上半3心円扁平大断面トンネルに適用される場合において、型枠の周長が長くなることから、天端部のコンクリート打込みが構造上、困難となっていた。 Furthermore, when conventional manipulator-type concrete driving devices are applied to, for example, upper half tricentric flat large-section tunnels, the perimeter of the formwork becomes long, making it structurally difficult to pour concrete into the top end.

さらに、マニピュレータ方式の打込装置を使用する場合には、打込口への切替えを行う際に行われる打込管の洗浄の自動化が難しく、人力作業で行われており、洗浄作業に手間がかかり、作業効率が低下することから、その点で改善の余地があった。 Furthermore, when using a manipulator-type driving device, it is difficult to automate the cleaning of the driving pipe when switching to the driving port, and this is done manually, which is time-consuming and reduces work efficiency, so there is room for improvement in this regard.

本発明は、上述する問題点に鑑みてなされたもので、坑内仮設備に干渉させることなく配置することができ、かつ周長の長いトンネルにも適用可能となり、しかも打込管の洗浄にかかる作業効率を向上させることができる覆工コンクリート打込装置および覆工コンクリート打込方法を提供することを目的とする。 The present invention was made in consideration of the above-mentioned problems, and aims to provide a lining concrete pouring device and a lining concrete pouring method that can be placed without interfering with underground temporary facilities, can be applied to tunnels with long circumferences, and can improve the work efficiency of cleaning the pouring pipe.

上記目的を達成するため、本発明に係る覆工コンクリート打込装置は、トンネル壁面の周方向に延在する覆工型枠を使用し、前記トンネル壁面と前記覆工型枠との間の打込領域にコンクリートを打ち込んでトンネルの覆工を構築するための覆工コンクリート打込装置であって、前記覆工型枠の周方向に沿って配設されるコンクリート圧送管と、前記コンクリート圧送管に沿って覆工型枠の周方向に沿って配設される排水管と、前記覆工型枠における周方向の打込口毎に設けられ、前記コンクリート圧送管の所定位置で着脱可能に接続され、前記打込口に打込ノズルを介して接続される打込管と、前記打込管及び前記コンクリート圧送管が接続されるコンクリート打込位置と、前記打込管及び前記排水管が接続される排水位置とのいずれか一方に切替えて接続する配管切替装置と、を備え、前記コンクリート打込位置では、前記コンクリート圧送管で圧送されるコンクリートが前記打込管側に切り替わることを特徴としている。 To achieve the above objective, the lining concrete pouring device of the present invention uses a lining formwork extending circumferentially around the tunnel wall and pours concrete into the pouring area between the tunnel wall and the lining formwork to construct a tunnel lining. It comprises a concrete pressure pipe arranged circumferentially around the lining formwork, a drainage pipe arranged circumferentially around the lining formwork along the concrete pressure pipe, a pouring pipe provided at each circumferential pouring opening in the lining formwork, detachably connected to a predetermined position on the concrete pressure pipe and connected to the pouring opening via a pouring nozzle, and a piping switching device that switches between a concrete pouring position where the pouring pipe and the concrete pressure pipe are connected and a drainage position where the pouring pipe and the drainage pipe are connected. At the concrete pouring position, the concrete pumped by the concrete pressure pipe is switched to the pouring pipe side.

本発明に係る覆工コンクリート打込方法では、上述した覆工コンクリート打込装置を使用して前記打込領域にコンクリートを打ち込む覆工コンクリート打込方法であって、前記覆工型枠の周方向に沿って前記コンクリート圧送管および前記排水管を配設する工程と、前記コンクリート圧送管の途中において、前記覆工型枠の周方向の複数の打込口のそれぞれの近傍に前記配管切替装置を配置する工程と、複数の前記打込口に打込ノズルを装着するとともに、該打込ノズルに前記打込管を接続し、該打込管の基端が前記打込口の近傍に配置される前記配管切替装置の近傍に設ける工程と、打込する前記打込口に対応する前記配管切替装置をコンクリート打込位置として前記コンクリート圧送管と前記打込管とを接続してコンクリートを前記打込口側へ送り、前記打込ノズルより前記打込領域にコンクリートを打ち込む工程と、前記コンクリートの打込みが終了後、前記配管切替装置を排水位置として前記排水管と前記打込管とを接続して前記打込管の打込口側から水を送り込んで排水管を介して排水することで打込管内を清掃する工程と、を有し、複数の前記打込口毎に順次、前記配管切替装置を切り替えて打込することを特徴としている。 The lining concrete pouring method of the present invention is a method of pouring concrete into the pouring area using the lining concrete pouring device described above, and includes the steps of: arranging the concrete pressure pipe and the drainage pipe along the circumferential direction of the lining formwork; arranging the piping switching device in the middle of the concrete pressure pipe near each of a plurality of pouring openings in the circumferential direction of the lining formwork; attaching pouring nozzles to the plurality of pouring openings, connecting the pouring pipes to the pouring nozzles, and placing the base ends of the pouring pipes near the piping switching device arranged near the pouring openings. the process of setting up the piping switching device corresponding to the concrete inlet to be poured at the concrete pouring position, connecting the concrete pressure pipe and the pouring pipe to send the concrete to the pouring inlet side, and pouring the concrete into the pouring area from the pouring nozzle; and after the pouring of the concrete is completed, setting the piping switching device at the drainage position, connecting the drainage pipe and the pouring pipe, and pouring water from the pouring inlet side of the pouring pipe and draining it through the drainage pipe to clean the inside of the pouring pipe, and the method is characterized in that the piping switching device is switched sequentially for each of the multiple pouring inlets.

本発明では、コンクリート圧送管の途中において、覆工型枠の周方向の複数の打込口のそれぞれの近傍に配管切替装置が配置されているので、複数の打込口に打込ノズルを装着するとともに、打込ノズルに打込管を接続し、打込管の基端が打込口の近傍に配置される配管切替装置の近傍に設け、打込する打込口に対応する配管切替装置をコンクリート打込位置としてコンクリート圧送管と打込管とを接続してコンクリートを打込口側へ送り、打込ノズルより打込領域にコンクリートを打ち込むことができる。
このように本発明では、コンクリート圧送管の途中の位置に配管切替装置を設けることで、配管を切り替える際の配管移動量を小さくすることができ、従来のような可動領域が大きなマニピュレータ方式の打込装置をトンネル周方向の全領域に使用する必要がなくなる。そのため、覆工型枠内を通過する連続ベルトコンベヤや風管等の坑内仮設備を通過させること可能な十分なスペースを確保でき、坑内仮設備に干渉させることなくコンクリート圧送管や配管切替装置を配置することができることから、周長の長いトンネルにも適用可能となる。
In the present invention, a piping switching device is arranged along the concrete pressure pipe near each of the multiple casting ports around the circumferential direction of the lining formwork, and casting nozzles are attached to the multiple casting ports, and casting pipes are connected to the casting nozzles, with the base ends of the casting pipes located near the piping switching device arranged near the casting ports.The piping switching device corresponding to the casting port to be cast is set as the concrete casting position, and the concrete pressure pipe and casting pipe are connected to send the concrete to the casting port side, and the concrete can be cast into the casting area from the casting nozzle.
In this way, by installing a piping switching device midway along the concrete pressure pipe, the amount of pipe movement required for switching pipes can be reduced, eliminating the need to use a conventional manipulator-type driving device with a large range of movement for the entire circumferential area of the tunnel. This ensures sufficient space for temporary underground equipment, such as continuous belt conveyors and ventilation pipes, to pass through the lining formwork, and allows the placement of concrete pressure pipes and piping switching devices without interfering with the temporary underground equipment, making this system applicable to tunnels with long circumferences.

また、本発明では、コンクリートの打ち込みが終了した後、配管切替装置を排水位置として排水管と打込管とを接続して打込管の打込口側から水を送り込んで排水管を介して排水することができる。これにより、打込管内を清掃することができ、打込管の洗浄にかかる作業効率を向上させることができる。
このように、本発明では、配管切替装置を設けて、配管切替装置をコンクリート打込時と洗浄時で制御することにより適宜切り替えることで、覆工コンクリートの自動施工が可能となる。
In addition, after the concrete has been poured, the piping switch can be set to the drain position to connect the drain pipe to the pouring pipe, and water can be pumped into the pouring opening of the pouring pipe and drained through the drain pipe. This allows the inside of the pouring pipe to be cleaned, improving the efficiency of cleaning the pouring pipe.
In this way, in the present invention, a piping switching device is provided and the piping switching device is controlled to switch appropriately between pouring concrete and cleaning, thereby making it possible to automatically construct the lining concrete.

また、本発明に係る覆工コンクリート打込装置は、前記配管切替装置は、前記打込管を前記コンクリート打込位置と前記排水位置でない退避位置に切替可能に設けられ、前記退避位置において、前記コンクリート圧送管が当該打込管が設けられる位置より下流側に連続した状態となることを特徴としてもよい。 Furthermore, the lining concrete pouring device of the present invention may be characterized in that the piping switching device is capable of switching the pouring pipe between the concrete pouring position and a retracted position other than the drainage position, and in the retracted position, the concrete pressure pipe is continuous downstream from the position where the pouring pipe is installed.

本発明では、配管切替装置を退避位置とすることで、配管切替装置の上流側と下流側に位置するコンクリート圧送管が連通し、下流側にコンクリートを圧送させることができる。このように配管切替装置を退避位置とする作業のみで、この配管切替装置よりも下流側に設けられる配管切替装置を使用してコンクリート打込位置に切り替える作業を容易に行うことができる。 In this invention, by setting the piping switching device to the retracted position, the concrete pressure pipes located upstream and downstream of the piping switching device are connected, allowing concrete to be pressure-fed to the downstream side. In this way, simply by setting the piping switching device to the retracted position, it is easy to switch to the concrete pouring position using a piping switching device located downstream of this piping switching device.

また、本発明に係る覆工コンクリート打込装置は、前記コンクリート圧送管は、上流側圧送管と下流側圧送管に分割され、前記配管切替装置は、前記上流側圧送管の第1分割端、及び前記排水管の一端を固定した第1案内ガイド板と、前記下流側圧送管の第2分割端、及び前記打込管の基端を固定した第2案内ガイド板と、前記第1案内ガイド板に案内されて板面方向でトンネル軸方向にスライドする第1スライド切替板と、前記第2案内ガイド板に案内されて板面方向でトンネル軸方向にスライドする第2スライド切替板と、を備え、前記第1スライド切替板は、前記コンクリート打込位置において前記上流側圧送管の前記第1分割端に接続可能な第1コンクリート圧送連結管と、前記排水位置において前記排水管の一端に接続可能な排水連結管と、を備え、前記第2スライド切替板は、前記コンクリート打込位置において前記打込管の前記基端及び前記第1コンクリート圧送連結管に接続可能で、かつ前記排水位置において前記打込管の前記基端及び前記排水連結管に接続可能な切替連結管と、前記退避位置において前記第1コンクリート圧送連結管及び前記下流側圧送管の前記第2分割端に接続可能な第2コンクリート圧送連結管と、を備えていることを特徴としてもよい。 In addition, in the lining concrete pouring device of the present invention, the concrete pressure pipe is divided into an upstream pressure pipe and a downstream pressure pipe, and the piping switching device comprises a first guide plate to which a first divided end of the upstream pressure pipe and one end of the drainage pipe are fixed, a second guide plate to which a second divided end of the downstream pressure pipe and a base end of the pouring pipe are fixed, a first sliding switching plate guided by the first guide plate and sliding in the plate surface direction in the tunnel axial direction, and a second sliding switching plate guided by the second guide plate and sliding in the plate surface direction in the tunnel axial direction, and the first sliding switching plate is configured to slide in the plate surface direction in the tunnel axial direction, and The apparatus may further include a first concrete pumping connecting pipe connectable to the first divided end of the upstream pumping pipe in the retracted position, and a drainage connecting pipe connectable to one end of the drainage pipe in the drainage position; the second sliding switch plate may include a switch connecting pipe connectable to the base end of the pouring pipe and the first concrete pumping connecting pipe in the concrete pouring position and to the base end of the pouring pipe and the drainage connecting pipe in the drainage position; and a second concrete pumping connecting pipe connectable to the first concrete pumping connecting pipe and the second divided end of the downstream pumping pipe in the retracted position.

この場合には、配管切替装置において、コンクリート打込位置において、第2スライド切替板における打込管の基端及び第1コンクリート圧送連結管に接続することで、コンクリート圧送管から打込管を通じて打込口からコンクリートの打ち込みを行うことができる。そして、排水位置において、切替連結管を打込管の基端と排水連結管とに接続することで、打込管が排水管に繋がり、コンクリート打込時に使用した打込管内に流水する清掃した水を排水管から排水することができる。また、退避位置において、第1コンクリート圧送連結管及び下流側圧送管の第2分割端に第2コンクリート圧送連結管を接続することにより、この退避位置となった配管切替装置の上流側と下流側に位置するコンクリート圧送管が連通し、コンクリート圧送管を通じて下流側にコンクリートを圧送することができる。 In this case, when the piping switching device is in the concrete pouring position, the base end of the pouring pipe on the second sliding switch plate is connected to the first concrete pressure feed connecting pipe, allowing concrete to be poured from the pouring opening through the concrete pressure feed pipe. When the drainage position is reached, the switching connecting pipe is connected to the base end of the pouring pipe and the drainage connecting pipe, connecting the pouring pipe to the drainage pipe, allowing cleaning water used during concrete pouring to be drained from the drainage pipe. When the retracted position is reached, the second concrete pressure feed connecting pipe is connected to the first concrete pressure feed connecting pipe and the second divided end of the downstream pressure feed pipe, connecting the concrete pressure feed pipe located upstream and downstream of the piping switching device in the retracted position, allowing concrete to be pumped downstream through the concrete pressure feed pipe.

また、本発明に係る覆工コンクリート打込装置は、前記第1スライド切替板と前記第2スライド切替板とをそれぞれ移動させるスライド機構が設けられ、前記第1スライド切替板と前記第2スライド切替板とが前記コンクリート打込位置と前記排水位置となるように前記スライド機構を制御する制御部が設けられていることを特徴としてもよい。 The lining concrete pouring device according to the present invention may also be characterized by being provided with a slide mechanism that moves each of the first and second slide switch plates, and a control unit that controls the slide mechanism so that the first and second slide switch plates are in the concrete pouring position and the drainage position.

本発明では、制御部によってスライド機構を制御し、第1スライド切替板と第2スライド切替板を移動させることで、コンクリート打込位置と排水位置との切替え動作を容易に行うことができる。 In this invention, the control unit controls the slide mechanism and moves the first and second slide transition plates, making it easy to switch between the concrete pouring position and the drainage position.

また、本発明に係る覆工コンクリート打込装置は、前記コンクリート圧送管は、上流側圧送管と下流側圧送管に分割され、前記配管切替装置は、前記コンクリート圧送管の管軸を回転中心として回転することで、前記コンクリート打込位置と前記排水位置と切り替える回転切替体を備え、前記回転切替体は、筒体と、前記筒体の内部空間に配置された第1連結管および第2連結管と、を有し、前記コンクリート打込位置において、前記上流側圧送管が前記第連結管を介して前記打込管に接続され、前記排水位置において、前記第2連結管が前記上流側圧送管および前記下流側圧送管に接続され、かつ前記排水管が前記第1連結管を介して前記打込管に接続されていることを特徴としてもよい。 In addition, the lining concrete pouring device of the present invention may be characterized in that the concrete pressure pipe is divided into an upstream pressure pipe and a downstream pressure pipe, and the piping switching device is equipped with a rotary switching body that rotates around the pipe axis of the concrete pressure pipe as the center of rotation to switch between the concrete pouring position and the drainage position, the rotary switching body having a cylindrical body and a first connecting pipe and a second connecting pipe arranged in the internal space of the cylindrical body, and at the concrete pouring position, the upstream pressure pipe is connected to the pouring pipe via the second connecting pipe, and at the drainage position, the second connecting pipe is connected to the upstream pressure pipe and the downstream pressure pipe, and the drainage pipe is connected to the pouring pipe via the first connecting pipe.

本発明の覆工コンクリート打込装置および覆工コンクリート打込方法によれば、坑内仮設備に干渉させることなく配置することができ、かつ周長の長いトンネルにも適用可能となる。
また、本発明の覆工コンクリート打込装置および覆工コンクリート打込方法によれば、打込管の洗浄にかかる作業効率を向上させることができる。
The lining concrete pouring device and lining concrete pouring method of the present invention can be installed without interfering with underground temporary facilities, and can also be applied to tunnels with long circumferences.
Furthermore, the lining concrete pouring device and lining concrete pouring method of the present invention can improve the work efficiency involved in cleaning the pouring pipe.

本発明の第1実施形態による覆工コンクリート打込装置を使用してコンクリート打込時の状態を切羽側から見た正面図である。FIG. 1 is a front view of the state when concrete is being poured using a lining concrete pouring device according to a first embodiment of the present invention, viewed from the face side. 覆工コンクリート打込装置を使用してコンクリート打込時の状態を示した側面図である。FIG. 1 is a side view showing the state when concrete is poured using a lining concrete pouring device. 覆工コンクリート打込装置の側面図である。FIG. 2 is a side view of the lining concrete pouring device. 図3に示すA-A線矢視図であって、覆工コンクリート打込装置を坑口側から見た正面図である。4 is a view taken along the line AA in FIG. 3, showing the lining concrete pouring device from the wellhead side. FIG. 覆工コンクリート打込装置の切替え状態を模式的に示した図であって、コンクリート打込時の状態を示す図である。FIG. 10 is a diagram showing the switching state of the lining concrete pouring device, illustrating the state when pouring concrete. 覆工コンクリート打込装置の切替え状態を模式的に示した図であって、打込み、排水管などの洗浄時の状態を示す図である。This is a diagram showing the switching state of the lining concrete pouring device, and shows the state during pouring and cleaning of drainage pipes, etc. 覆工コンクリート打込装置の切替え状態を模式的に示した図であって、コンクリート打込時の状態を示す図である。FIG. 10 is a diagram showing the switching state of the lining concrete pouring device, illustrating the state when pouring concrete. 第2実施形態による覆工コンクリート打込装置を簡略化した図であって、(a)は打ち込み時の状態を示す図、(b)は洗浄時の状態を示した図である。10A and 10B are simplified diagrams of a lining concrete pouring device according to a second embodiment, in which FIG. 10A shows the state during pouring, and FIG. 10B shows the state during cleaning. 第3実施形態によるスライド式または回転式の打込み装置とマニピュレータ式打込装置を使用してコンクリートを打ち込む状態を切羽側から見た正面図であって、図1に対応する図である。FIG. 11 is a front view of concrete being poured using a sliding or rotary driving device and a manipulator driving device according to the third embodiment, seen from the face side, and corresponds to FIG. 1. 第3実施形態によるマニピュレータ式打込装置を使用してコンクリートを打ち込む状態を示した側面図であって、図2に対応する図である。FIG. 10 is a side view showing concrete being driven using the manipulator-type driving device according to the third embodiment, and corresponds to FIG. 2 .

以下、本発明の実施形態による覆工コンクリート打込装置および覆工コンクリート打込方法について、図面に基づいて説明する。 The following describes a lining concrete pouring device and a lining concrete pouring method according to an embodiment of the present invention, with reference to the drawings.

(第1実施形態)
図1に示すように、本実施形態の覆工コンクリート打込装置1は、トンネル壁面10の周方向に延在する覆工型枠8を使用し、NATM工法により掘削されたトンネル壁面10と覆工型枠8との間の打込領域10Aに自動でコンクリートを打ち込んでトンネルの覆工コンクリート11を構築するための施工装置である。
(First embodiment)
As shown in Figure 1, the lining concrete pouring device 1 of this embodiment is a construction device that uses a lining formwork 8 extending circumferentially around a tunnel wall surface 10 and automatically pours concrete into a pouring area 10A between the tunnel wall surface 10 excavated by the NATM method and the lining formwork 8 to construct a tunnel lining concrete 11.

本実施形態で対象とするトンネル断面はアーチ型であり、底盤12上のアーチ内周面に覆工が構築される。そして、覆工コンクリート打込装置1を使用してコンクリートが打込されるトンネル壁面10には、必要に応じて吹付けコンクリート、ロックボルト、鋼製支保工等の支保が施されるとともに、防水シート(図示省略)が全面にわたって設けられている。 The tunnel cross section targeted in this embodiment is arch-shaped, and a lining is constructed on the inner surface of the arch on the base slab 12. The tunnel wall 10, onto which concrete is poured using the lining concrete pouring device 1, is provided with support such as shotcrete, rock bolts, and steel supports as needed, and a waterproof sheet (not shown) is installed over the entire surface.

打ち込まれるコンクリートとしては、例えば、流動性に優れ、材料分離がない中流動覆工コンクリートを用いることができる。 The concrete to be poured can be, for example, a medium-flow lining concrete that has excellent fluidity and does not segregate.

ここで、コンクリートの打ち込みに使用される覆工型枠8において、トンネル長手方向に沿ったトンネル軸方向X1で切羽側(妻側ともいう)を切羽部とし、坑口側(既設覆工側、ラップ側ともいう)を坑口部とする。 Here, in the lining formwork 8 used for pouring concrete, the face side (also called the gable side) in the tunnel axis direction X1 along the longitudinal direction of the tunnel is the face part, and the mine entrance side (also called the existing lining side or lap side) is the mine entrance part.

覆工型枠8は、トンネル軸方向X1から見てアーチ形状となっている。覆工型枠8は、トンネル軸方向X1に沿った所定長さに設けられ、切羽より後方位置(例えば100m後方の位置)で掘進と並行して覆工型枠8を切羽側に移動させながら、覆工型枠8とトンネル壁面10との間の打込領域10Aにコンクリートを打込することによって覆工コンクリートが構築される。このとき、覆工型枠8は直近で打ち込んだ既設覆工コンクリートの内周面の切羽側端部に対してオーバーラップさせて次に打込する箇所にセットされ、コンクリートの打ち込みが行われる。つまり、覆工型枠8を順次、切羽側に移動させて盛替えながら覆工コンクリート11が構築される。
覆工型枠8は、トンネル壁面10に対して一定の間隔をあけて対向するようにセットされる。そして、覆工型枠8における切羽側端部には、この切羽側端部に形成された開口を塞ぐ着脱可能な妻型枠83が設けられている。
The lining formwork 8 has an arch shape when viewed from the tunnel axial direction X1. The lining formwork 8 is provided at a predetermined length along the tunnel axial direction X1, and the lining concrete is constructed by moving the lining formwork 8 toward the tunnel face in parallel with excavation from a position rearward of the tunnel face (for example, a position 100 m rearward), and pouring concrete into the pouring area 10A between the lining formwork 8 and the tunnel wall surface 10. At this time, the lining formwork 8 is set at the next pouring location so as to overlap the face-side end of the inner surface of the existing lining concrete that was most recently poured, and concrete is poured. In other words, the lining formwork 8 is sequentially moved toward the tunnel face and poured, and the lining concrete 11 is constructed.
The lining formwork 8 is set so as to face the tunnel wall surface 10 at a fixed distance. A detachable end formwork 83 is provided at the face-side end of the lining formwork 8 to close the opening formed at this face-side end.

妻型枠83は、覆工型枠8と同様にアーチ型にトンネル周方向X2に沿って延び、覆工型枠8をセットした後に、覆工型枠8の切羽側端部に対して固定される。妻型枠83を覆工型枠8に固定した状態で、打込領域10Aの切羽側端部が妻型枠83によって保持される。 Like the lining formwork 8, the end formwork 83 extends in an arch shape along the tunnel circumferential direction X2, and is fixed to the tunnel face end of the lining formwork 8 after the lining formwork 8 has been set. With the end formwork 83 fixed to the lining formwork 8, the tunnel face end of the casting area 10A is held by the end formwork 83.

覆工型枠8は、トンネルの底盤12上を自走可能な走行装置を備えた架台86により内周側から支持され、架台86に対して打込セット姿勢と脱型姿勢とを選択的に取り得るように設けられている。覆工型枠8の切羽部の内周面には、後述する打込管4が接続可能な複数(図1において13箇所)の打込口81(図1では符号4の箇所)がトンネル周方向X2に間隔をあけて設けられている。図2に示すように、打込口81は、トンネル内空側に向けて開口し、トンネル内空側と前記打込領域10Aとが連通する。打込口81は、トンネル周方向X2にコンクリートの打ち込み単位である例えば50cm~2mの間隔で設けられる。 The lining formwork 8 is supported from the inner periphery by a platform 86 equipped with a self-propelled traveling device that can move freely on the tunnel base 12, and is configured so that it can selectively assume a casting set position and a form removal position relative to the platform 86. The inner surface of the face of the lining formwork 8 is provided with multiple (13 locations in Figure 1) casting openings 81 (locations indicated by the reference numeral 4 in Figure 1) spaced apart in the tunnel circumferential direction X2, to which casting pipes 4 (described below) can be connected. As shown in Figure 2, the casting openings 81 open toward the tunnel interior, connecting the tunnel interior to the casting area 10A. The casting openings 81 are spaced apart in the tunnel circumferential direction X2, for example, at intervals of 50 cm to 2 m, which is the concrete casting unit.

覆工型枠8の内周面には、所定の位置に複数の型枠バイブレータ(図示省略)が設けられている。型枠バイブレータは、稼働することにより覆工型枠8を介して打込領域10Aに打ち込まれたコンクリートに振動を与える。型枠バイブレータは、覆工型枠8のトンネル周方向X2及びトンネル軸方向X1に沿ってそれぞれ間隔をあけた適宜な位置に設けられる。 Multiple formwork vibrators (not shown) are provided at predetermined positions on the inner surface of the lining formwork 8. When in operation, the formwork vibrators vibrate the concrete poured into the pouring area 10A through the lining formwork 8. The formwork vibrators are provided at appropriate intervals along the tunnel circumferential direction X2 and the tunnel axial direction X1 of the lining formwork 8.

覆工型枠8の内周面には、トンネル軸方向X1とトンネル周方向X2に沿って所定の間隔をあけて打込口81が設けられている。打込口81は、コンクリート打込時に打込ノズル82が装着可能に設けられている。 Pouring holes 81 are provided on the inner surface of the lining formwork 8 at predetermined intervals along the tunnel axis direction X1 and the tunnel circumferential direction X2. The pouring holes 81 are designed so that pouring nozzles 82 can be attached when pouring concrete.

図2乃至図4に示すように、覆工コンクリート打込装置1は、覆工型枠8のトンネル周方向X2に沿って配設されるコンクリート圧送管2と、コンクリート圧送管2に沿って覆工型枠8のトンネル周方向X2に沿って配設される排水管3と、覆工型枠8におけるトンネル周方向X2の打込口81毎に設けられ、コンクリート圧送管2の所定位置で接続可能に接続され、打込口81に打込ノズル82を介して接続される打込管4と、打込管4及びコンクリート圧送管2が接続されるコンクリート打込位置P1(図5参照)と、打込管4及び排水管3が接続される排水位置P2(図6参照)とのいずれか一方に切替えて接続する配管切替装置5と、を備えている。 As shown in Figures 2 to 4, the lining concrete pouring device 1 comprises a concrete pressure pipe 2 arranged along the tunnel circumferential direction X2 of the lining formwork 8; a drainage pipe 3 arranged along the concrete pressure pipe 2 in the tunnel circumferential direction X2 of the lining formwork 8; a pouring pipe 4 provided for each pouring opening 81 in the tunnel circumferential direction X2 of the lining formwork 8, connected to the concrete pressure pipe 2 at a predetermined position and connected to the pouring opening 81 via a pouring nozzle 82; and a piping switching device 5 that switches between a concrete pouring position P1 (see Figure 5) where the pouring pipe 4 and concrete pressure pipe 2 are connected and a drainage position P2 (see Figure 6) where the pouring pipe 4 and drainage pipe 3 are connected.

図2に示すように、打込口81には、この打込口81を開閉する開閉シャッター84が設けられている。開閉シャッター84は、トンネル内空側に回動することで開閉される。打込口81には、開閉シャッター84が開いた状態で、曲り配管85の一端が固定されている。曲り配管85の他端には、打込管4の先端に設けられた打込ノズル82が着脱可能に接続される。開閉シャッター84は、コンクリートの打ち込み後に打込管4及び打込ノズル82とともに曲り配管85が取り外されたときに打込口81を閉じる。 As shown in Figure 2, the casting opening 81 is provided with an opening/closing shutter 84 that opens and closes the casting opening 81. The opening/closing shutter 84 opens and closes by rotating toward the tunnel interior. One end of a curved pipe 85 is fixed to the casting opening 81 with the opening/closing shutter 84 open. The casting nozzle 82 attached to the tip of the casting pipe 4 is detachably connected to the other end of the curved pipe 85. The opening/closing shutter 84 closes the casting opening 81 when the curved pipe 85 is removed together with the casting pipe 4 and the casting nozzle 82 after the concrete has been poured.

打込口81には、打込管4を洗浄するための洗浄水を噴射可能な図示しない洗浄装置が設けられていてもよい。このような洗浄装置を設けることで、コンクリート打ち込み後に打込ノズル82を切り離した後、洗浄装置によって打込口81、打込管4、及び打込ノズル82を洗浄することができる。打込管4内を洗浄した洗浄水は、詳しくは後述するが、配管切替装置5を排水位置P2として打込管4を通過して排水管3から排水される。 The casting opening 81 may be provided with a cleaning device (not shown) capable of spraying cleaning water to clean the casting pipe 4. By providing such a cleaning device, the casting opening 81, casting pipe 4, and casting nozzle 82 can be cleaned using the cleaning device after the casting nozzle 82 is detached after concrete is poured. The cleaning water used to clean the inside of the casting pipe 4 passes through the casting pipe 4 with the piping switching device 5 set to the drain position P2 and is drained from the drain pipe 3, as will be described in more detail below.

開閉シャッター84が開いた状態で曲り配管85に対して打込管4に設けられた打込ノズル82を接続した後、打込管4が接続されている打込口81から打込領域10Aにコンクリートを打ち込む。所定の打込口81における所定量のコンクリートの打ち込みが完了し、打込ノズル82を曲り配管85から離脱させた後、開閉シャッター84が閉じられる。 With the opening/closing shutter 84 open, the pouring nozzle 82 attached to the pouring pipe 4 is connected to the curved pipe 85, and then concrete is poured into the pouring area 10A through the pouring opening 81 to which the pouring pipe 4 is connected. Once the predetermined amount of concrete has been poured into the predetermined pouring opening 81, the pouring nozzle 82 is removed from the curved pipe 85, and the opening/closing shutter 84 is closed.

コンクリート圧送管2は、図2に示すように、覆工型枠8の妻型枠83に沿ってトンネル周方向X2に略アーチ状に延在している。コンクリート圧送管2は、不図示のコンクリートポンプよりコンクリートが圧送され、妻型枠83のトンネル周方向X2における一方の端部83a(図1で左側下端)から他方の端部83b(図1で右側下端)まで配管されている。コンクリート圧送管2におけるトンネル周方向X2の複数の打込箇所D1、D2、…D10には、それぞれ配管切替装置5が接続されている。 As shown in Figure 2, the concrete pressure pipe 2 extends in a generally arch-like shape in the tunnel circumferential direction X2 along the end form 83 of the lining formwork 8. Concrete is pumped into the concrete pressure pipe 2 by a concrete pump (not shown), and the concrete is piped from one end 83a (the lower left end in Figure 1) of the end form 83 in the tunnel circumferential direction X2 to the other end 83b (the lower right end in Figure 1). A piping switching device 5 is connected to each of the multiple pouring points D1, D2, ... D10 of the concrete pressure pipe 2 in the tunnel circumferential direction X2.

コンクリート圧送管2は、図2乃至図4に示すように、配管切替装置5を挟んで上流側と下流側に分割されている。なお、以下の説明では、所定の配管切替装置5において、上流側に位置するコンクリート圧送管2を上流側圧送管2Aとし、下流側に位置するコンクリート圧送管2を下流側圧送管2Bとする。上流側圧送管2Aと下流側圧送管2Bとは、後述する配管切替装置5に設けられる連結管52A、54Aに接続可能に設けられている。連結管52A、54Aが接続した状態では、コンクリートが上流側圧送管2Aから連結管52A、54Aを通じて下流側圧送管2Bに圧送される。 As shown in Figures 2 to 4, the concrete pressure pipe 2 is divided into an upstream side and a downstream side by a piping switching device 5. In the following description, the concrete pressure pipe 2 located upstream of a given piping switching device 5 will be referred to as the upstream pressure pipe 2A, and the concrete pressure pipe 2 located downstream will be referred to as the downstream pressure pipe 2B. The upstream pressure pipe 2A and the downstream pressure pipe 2B are connectable to connecting pipes 52A and 54A provided in the piping switching device 5, which will be described later. When connecting pipes 52A and 54A are connected, concrete is pressure-fed from the upstream pressure pipe 2A to the downstream pressure pipe 2B through connecting pipes 52A and 54A.

排水管3は、図1に示すように、覆工型枠8の妻型枠83に沿ってトンネル周方向X2に配設されているコンクリート圧送管2に並行して略アーチ状に延在している。排水管3は、末端部が妻型枠83の上述した他方の端部83b近傍に位置している。排水管3は、主にコンクリート打ち込み後の打込ノズル82や打込管4の洗浄水を排水する際に使用される。排水管3の末端部側を上流側としたときに、排水管3の下流側はトンネル内の排水設備に排水されるように配管されるか、あるいはトンネル内に配管されている排水管路(図示省略)に合流させて坑外に排水されるようになっている。 As shown in Figure 1, the drainage pipe 3 extends in a roughly arched shape parallel to the concrete pressure pipe 2, which is arranged in the tunnel circumferential direction X2 along the end formwork 83 of the lining formwork 8. The end of the drainage pipe 3 is located near the other end 83b of the end formwork 83. The drainage pipe 3 is mainly used to drain the cleaning water from the pouring nozzle 82 and pouring pipe 4 after pouring concrete. When the end of the drainage pipe 3 is considered the upstream side, the downstream side of the drainage pipe 3 is either piped to drain into drainage equipment within the tunnel, or is designed to merge with a drainage pipeline (not shown) installed within the tunnel and be discharged outside the tunnel.

排水管3は、図2及び図3に示すように、トンネル周方向X2の複数の打込箇所D1、D2、…D10においてそれぞれ分岐した分岐排水管31が設けられている。分岐排水管31は、打込管4内を洗浄する際の排水位置P2(図6参照)において、配管切替装置5の後述する排水連結管52B及び切替連結管54Bに接続可能に設けられ、この排水連結管52B及び切替連結管54Bを介して打込管4に接続される。排水位置P2において分岐排水管31が連結管52B、54Bを介して打込管4に接続した状態では、打込管4内の残留コンクリートや洗浄水が打込管4から連結管52B、54Bを通じて分岐排水管31、そして排水管3を通じて坑外に排出される。 As shown in Figures 2 and 3, the drainage pipe 3 is provided with branch drainage pipes 31 branching off at multiple driving locations D1, D2, ... D10 in the tunnel circumferential direction X2. The branch drainage pipe 31 is connectable to the drainage connecting pipe 52B and switching connecting pipe 54B (described below) of the piping switching device 5 at drainage position P2 (see Figure 6) when cleaning the inside of the driving pipe 4, and is connected to the driving pipe 4 via these drainage connecting pipes 52B and switching connecting pipe 54B. When the branch drainage pipe 31 is connected to the driving pipe 4 via the connecting pipes 52B and 54B at drainage position P2, residual concrete and cleaning water inside the driving pipe 4 are discharged from the driving pipe 4 through the connecting pipes 52B and 54B to the branch drainage pipe 31 and then to the outside of the tunnel via the drainage pipe 3.

打込管4は、一端の基端4bが配管切替装置5の後述する第2案内ガイド板53に固定され、他端の先端4aが打込ノズル82を介して打込口81に接続された状態で、妻型枠83よりも切羽側に突出した状態で配管される。打込管4の先端4aには、接続管41によって打込ノズル82が着脱可能に接続される。 The driving pipe 4 is installed so that its base end 4b is fixed to the second guide plate 53 (described later) of the piping switching device 5, and its tip 4a is connected to the driving port 81 via a driving nozzle 82, protruding further toward the face than the end formwork 83. The driving nozzle 82 is detachably connected to the tip 4a of the driving pipe 4 via a connecting pipe 41.

配管切替装置5は、図5に示すコンクリート打込位置P1と、図6に示す排水位置P2と、及びコンクリート打込位置P1と排水位置P2とは別の位置となる図7に示す退避位置P3と、に切替可能に設けられている。
コンクリート打込位置P1では、コンクリート圧送管2で圧送されるコンクリートが打込管4側に切り替わる。
退避位置P3において、コンクリート圧送管2が打込管4が設けられる位置より下流側に連続した状態となる。
The piping switching device 5 is switchable between a concrete pouring position P1 shown in Figure 5, a drainage position P2 shown in Figure 6, and a retracted position P3 shown in Figure 7, which is a position different from the concrete pouring position P1 and the drainage position P2.
At the concrete pouring position P1, the concrete pumped through the concrete pumping pipe 2 is switched to the pouring pipe 4 side.
At the retracted position P3, the concrete pumping pipe 2 continues downstream from the position where the pouring pipe 4 is installed.

図2乃至図4に示すように、配管切替装置5は、第1案内ガイド板51、第1スライド切替板52、第2スライド切替板54、および第2案内ガイド板53をコンクリート圧送管2における上流側から下流側に向かう順に備えた構成となっている。 As shown in Figures 2 to 4, the piping switching device 5 is configured to include a first guide plate 51, a first sliding switch plate 52, a second sliding switch plate 54, and a second guide plate 53, arranged in this order from the upstream side to the downstream side of the concrete pressure pipe 2.

第1案内ガイド板51は、上流側圧送管2Aの第1分割端2a、及び排水管3(分岐排水管31)の一端を固定している。
第2案内ガイド板53は、下流側圧送管2Bの第2分割端2b、及び打込管4の基端4bを固定している。
The first guide plate 51 fixes the first divided end 2a of the upstream pressure pipe 2A and one end of the drain pipe 3 (branch drain pipe 31).
The second guide plate 53 fixes the second divided end 2 b of the downstream pressure pipe 2 B and the base end 4 b of the driving pipe 4 .

第1スライド切替板52は、第1案内ガイド板51に案内されて板面方向でトンネル軸方向X1にスライドする。第1スライド切替板52は、図5に示すコンクリート打込位置P1である非スライド位置S10(図3参照)において第1案内ガイド板51の上流側圧送管2Aの第1分割端2aに接続可能な第1コンクリート圧送連結管52Aと、図6に示す排水位置P2において第1案内ガイド板51の排水管3(分岐排水管31)の一端3aに接続可能な排水連結管52Bと、を備えている。 The first sliding switch plate 52 is guided by the first guide plate 51 and slides in the plate surface direction in the tunnel axis direction X1. The first sliding switch plate 52 is equipped with a first concrete pressure transfer connecting pipe 52A that can be connected to the first divided end 2a of the upstream pressure transfer pipe 2A of the first guide plate 51 at the non-sliding position S10 (see Figure 3), which is the concrete pouring position P1 shown in Figure 5, and a drainage connecting pipe 52B that can be connected to one end 3a of the drainage pipe 3 (branch drainage pipe 31) of the first guide plate 51 at the drainage position P2 shown in Figure 6.

第2スライド切替板54は、第2案内ガイド板53に案内されて板面方向でトンネル軸方向X1にスライドする。第2スライド切替板54は、図5に示すように、コンクリート打込位置P1となるスライド位置S21において、打込管4の基端4b及び第1コンクリート圧送連結管52Aに接続可能で、かつ図6に示すように排水位置P2において打込管4の基端4b及び排水連結管52Bに接続可能な切替連結管54Bと、図7に示すように退避位置P3において第1コンクリート圧送連結管52A及び下流側圧送管2Bの第2分割端2bに接続可能な第2コンクリート圧送連結管54Aと、を備えている。 The second sliding switch plate 54 is guided by the second guide plate 53 and slides in the plate surface direction in the tunnel axis direction X1. As shown in FIG. 5, the second sliding switch plate 54 is equipped with a switch connecting pipe 54B that can be connected to the base end 4b of the pouring pipe 4 and the first concrete pressure-transfer connecting pipe 52A at slide position S21, which corresponds to the concrete pouring position P1, and that can be connected to the base end 4b of the pouring pipe 4 and the drainage connecting pipe 52B at drainage position P2, as shown in FIG. 6, and a second concrete pressure-transfer connecting pipe 54A that can be connected to the first concrete pressure-transfer connecting pipe 52A and the second divided end 2b of the downstream pressure-transfer pipe 2B at retracted position P3, as shown in FIG. 7.

配管切替装置5には、第1スライド切替板52と第2スライド切替板54とをそれぞれ移動させる油圧ジャッキ等のスライド機構(図示省略)が設けられている。第1スライド切替板52と第2スライド切替板54とがコンクリート打込位置P1、排水位置P2、および退避位置P3となるように、かつ非スライド位置S10、S20およびスライド位置S11、S21となるように、スライド機構を制御する制御部(図示省略)が設けられている。 The piping switching device 5 is provided with a sliding mechanism (not shown), such as a hydraulic jack, that moves the first sliding switch plate 52 and the second sliding switch plate 54. A control unit (not shown) is provided that controls the sliding mechanism so that the first sliding switch plate 52 and the second sliding switch plate 54 are in the concrete pouring position P1, the drainage position P2, and the retracted position P3, as well as in the non-sliding positions S10, S20, and the sliding positions S11, S21.

次に、覆工コンクリート打込装置1を使用して打込領域10Aにコンクリートを打ち込む覆工コンクリート打込方法について、図面に基づいて具体的に説明する。
図2に示すように、覆工コンクリート打込装置1において、上述したように覆工型枠8のトンネル周方向X2に沿ってコンクリート圧送管2および排水管3を配設するとともに、コンクリート圧送管2の途中において、覆工型枠8のトンネル周方向X2に配置される複数の打込口81のそれぞれの近傍に配管切替装置5を配置する。さらに、覆工型枠8の内周面に設けられている複数の打込口81に打込ノズル82を装着するとともに、それら打込ノズル82に打込管4を接続しておく。
Next, a concrete pouring method for pouring concrete into the pouring area 10A using the concrete pouring device 1 for pouring concrete will be specifically described with reference to the drawings.
2, in the lining concrete pouring device 1, the concrete pressure pipe 2 and the drainage pipe 3 are arranged along the tunnel circumferential direction X2 of the lining formwork 8 as described above, and piping switching devices 5 are placed midway along the concrete pressure pipe 2 near each of a plurality of pouring ports 81 arranged in the tunnel circumferential direction X2 of the lining formwork 8. Furthermore, pouring nozzles 82 are attached to the plurality of pouring ports 81 provided on the inner peripheral surface of the lining formwork 8, and pouring pipes 4 are connected to these pouring nozzles 82.

先ず、コンクリート打込み方法に関して説明する。
図1に示すように、覆工型枠8をトンネル軸方向X1のうちコンクリートを打ち込む対象の位置まで移動させて配置する。次に、覆工型枠8の切羽側の端部に妻型枠83を固定する。そして、コンクリートを打ち込む箇所の所定の打込口81を開閉シャッター84により開放する。
First, the concrete pouring method will be described.
As shown in Figure 1, the lining formwork 8 is moved and positioned in the tunnel axial direction X1 to the position where concrete is to be poured. Next, a gable formwork 83 is fixed to the end of the lining formwork 8 on the face side. Then, a predetermined pouring opening 81 at the location where concrete is to be poured is opened by an opening/closing shutter 84.

続いて、図5に示すように、前述した所定の打込口81の近傍の配管切替装置5を前記制御部により操作してコンクリート打込位置P1とする。
具体的には、先ず第1案内ガイド板51に設けられる第1スライド切替板52は、スライドさせずに非スライド位置S10の状態のままとする。すなわち、第1スライド切替板52において、第1コンクリート圧送連結管52Aが上流側圧送管2Aに接続され、排水連結管52Bが排水管3の分岐排水管31に対して接続されていない状態となる。
Next, as shown in FIG. 5, the piping switching device 5 in the vicinity of the predetermined pouring opening 81 is operated by the control unit to set the concrete pouring position P1.
Specifically, the first sliding switch plate 52 provided on the first guide plate 51 is not slid and remains in the non-sliding position S10. That is, in the first sliding switch plate 52, the first concrete pressure-transport connecting pipe 52A is connected to the upstream pressure-transport pipe 2A, and the drain connecting pipe 52B is not connected to the branch drain pipe 31 of the drain pipe 3.

その後、第2スライド切替板54を横スライドさせて切替連結管54Bを打込管4の基端4bの継手部に接続するとともに、第2コンクリート圧送連結管54Aを第1コンクリート圧送連結管52Aから切り離した状態にする。このとき、配管切替装置5より下流側に位置する下流側圧送管2Bが第2コンクリート圧送連結管54Aから切り離された状態となり、上流側圧送管2Aから下流側圧送管2Bにコンクリートが圧送されない状態となる。さらに、切替連結管54Bの上流端は、第1コンクリート圧送連結管52Aに接続される。このようなコンクリート打込位置P1となったときに打ち込み準備が完了となり、不図示のコンクリート圧送ポンプを駆動してコンクリート圧送管2から打込管4を通じて打込口81にコンクリートの打ち込みが行われる。 Then, the second sliding switch plate 54 is slid sideways to connect the switching connecting pipe 54B to the joint at the base end 4b of the casting pipe 4, and the second concrete pressure-feeding connecting pipe 54A is disconnected from the first concrete pressure-feeding connecting pipe 52A. At this time, the downstream pressure-feeding pipe 2B, located downstream of the piping switching device 5, is disconnected from the second concrete pressure-feeding connecting pipe 54A, and concrete is no longer pumped from the upstream pressure-feeding pipe 2A to the downstream pressure-feeding pipe 2B. Furthermore, the upstream end of the switching connecting pipe 54B is connected to the first concrete pressure-feeding connecting pipe 52A. When the concrete casting position P1 is reached, preparations for pouring are complete, and the concrete pressure-feeding pump (not shown) is driven to pour concrete from the concrete pressure-feeding pipe 2 through the casting pipe 4 into the pouring opening 81.

ここで、上述した配管切替装置5をコンクリート打込位置P1にする配管切替動作、およびコンクリート打込み動作は、作業員が打ち込み開始の指示を操作部から入力する。そして、不図示の制御部では、操作部において打込み開始指示が入力されたことを検出すると、打込み処理を開始する。すなわち、制御部では、配管切替装置5でコンクリート打込位置P1となるように制御し、コンクリート打込位置P1に切り替わったことが確認された後、自動的にコンクリート圧送管2からコンクリートが圧送され、打込管4を通じて打込ノズル82から覆工型枠8の裏側の打込領域10Aにコンクリートが打ち込まれるように制御する。そして、制御部では、所定量のコンクリートが打ち込まれたときにコンクリートの打ち込み(圧送)が停止するように制御される。 The piping switching operation, which sets the piping switching device 5 to concrete pouring position P1, and the concrete pouring operation are performed by an operator inputting a pouring start command via the operation unit. The control unit, not shown, then begins the pouring process when it detects that a pouring start command has been input via the operation unit. That is, the control unit controls the piping switching device 5 to move to concrete pouring position P1, and after confirming that the device has switched to concrete pouring position P1, it automatically controls the concrete to be pumped from the concrete pressure pipe 2 and then poured from the pouring nozzle 82 through the pouring pipe 4 into the pouring area 10A on the back side of the lining formwork 8. The control unit then controls the pouring (pumping) of concrete to stop when a predetermined amount of concrete has been poured.

なお、覆工型枠8の打込口81に固定する打込管4は、覆工型枠8のセット時と脱型枠時に動くことになるため、覆工型枠8のフレームに固定する配管切替装置5との接続は、左右上下に数センチメートルだけ移動可能な図5~図7に示す打込み接続管41を用いて接続する。
また、コンクリート打込み中は、コンクリートの打込み状況に応じて型枠バイブレータを使用してコンクリートに振動を与えて締め固める。
Since the casting pipe 4 fixed to the casting port 81 of the lining formwork 8 will move when the lining formwork 8 is set up and when it is removed, it is connected to the piping switching device 5 fixed to the frame of the lining formwork 8 using a casting connection pipe 41 shown in Figures 5 to 7, which can move only a few centimeters left and right and up and down.
During concrete pouring, a form vibrator is used to vibrate the concrete depending on the concrete pouring situation, thereby compacting it.

次に、所定の打込口81によるコンクリートの打ち込みが終了した後の打込管4の洗浄について具体的に説明する。先ず、コンクリートの打ち込みが完了したタイミングで、開閉シャッター84により打込口81を閉塞する。 Next, we will explain in detail how the concrete pouring pipe 4 is cleaned after concrete pouring through the designated pouring opening 81 has been completed. First, once concrete pouring is complete, the pouring opening 81 is closed by the open/close shutter 84.

図6に示すように、コンクリートの打ち込みが完了した打込口81の近傍の配管切替装置5をコンクリート打込位置P1から排水位置P2に切り替える。
具体的には、第1スライド切替板52を第1案内ガイド板51に案内させて横スライドさせて非スライド位置S10からスライド位置S11に移動する。すなわち、第1スライド切替板52において、排水連結管52Bが排水管3の分岐排水管31に接続され、第1コンクリート圧送連結管52Aが上流側圧送管2Aに対して接続されていない状態となる。さらに、第2スライド切替板54においては、スライド位置S21のままとする。このとき、第1コンクリート圧送連結管52Aと第2コンクリート圧送連結管54Aとは接続されているが、いずれも上流側圧送管2Aおよび下流側圧送管2Bには接続されずに切り離された状態となる。また、切替連結管54Bは、下流端が打込管4に接続されるとともに、上流端が排水連結管52Bに接続された状態となる。これにより排水位置P2となったときに打込管4の洗浄の準備が完了となり、打込管4の先端4a(打込口81側)から水を送り込んで排水管3を介して排水することで打込管4内を洗浄する。
As shown in FIG. 6, the piping switching device 5 near the pouring opening 81 where concrete pouring has been completed is switched from the concrete pouring position P1 to the drainage position P2.
Specifically, the first sliding switch plate 52 is guided by the first guide plate 51 and slides laterally from the non-sliding position S10 to the sliding position S11. That is, at the first sliding switch plate 52, the drainage connecting pipe 52B is connected to the branch drainage pipe 31 of the drainage pipe 3, and the first concrete pressure-transfer connecting pipe 52A is not connected to the upstream pressure-transfer pipe 2A. Furthermore, the second sliding switch plate 54 remains in the sliding position S21. At this time, the first concrete pressure-transfer connecting pipe 52A and the second concrete pressure-transfer connecting pipe 54A are connected, but are not connected to the upstream pressure-transfer pipe 2A or the downstream pressure-transfer pipe 2B, and are therefore in a disconnected state. Furthermore, the downstream end of the switching connecting pipe 54B is connected to the driving pipe 4, and the upstream end is connected to the drainage connecting pipe 52B. This completes preparation for cleaning the driving pipe 4 when it reaches the drain position P2, and the inside of the driving pipe 4 is cleaned by sending water in from the tip 4a (on the driving opening 81 side) of the driving pipe 4 and draining it through the drain pipe 3.

ここで、上述した配管切替装置5による排水位置P2とする配管切替動作、および水の送水動作は、作業員が洗浄開始の指示を操作部から入力する。そして、不図示の制御部では、操作部において洗浄開始指示が入力されたことを検出すると、洗浄処理を開始する。すなわち、制御部では、配管切替装置5で排水位置P2となるように制御し、排水位置P2に切り替わったことが確認された後、自動的に不図示の送水管から打込管4内に送水され、打込管4を通じて切替連結管54Bおよび排水連結管52Bを通じて排水管3に排水されるように制御する。そして、打込管4内の洗浄が完了となるときに前記送水管からの送水が停止するように制御される。 The piping switching operation to set the piping switching device 5 to drain position P2 and the water supply operation are initiated by an operator inputting a cleaning start command via the operation unit. The control unit, not shown, then begins the cleaning process when it detects that a cleaning start command has been input via the operation unit. That is, the control unit controls the piping switching device 5 to set the piping switching device 5 to drain position P2, and after confirming that it has switched to drain position P2, automatically controls water to be supplied from a water supply pipe, not shown, into the driving pipe 4, and then drained through the driving pipe 4 via the switching connecting pipe 54B and the drain connecting pipe 52B to the drain pipe 3. When cleaning of the driving pipe 4 is complete, the control unit controls the water supply from the water supply pipe to stop.

次に、所定の打込口81によるコンクリート打込みが終了した後の打込管4の洗浄が完了した後に、次の打込口81でコンクリートの打込みをする際の打込口切り替え動作について具体的に説明する。 Next, we will explain in detail the operation of switching the casting port when pouring concrete into the next casting port 81 after cleaning the casting pipe 4 after pouring concrete into a given casting port 81 has been completed.

図7に示すように、洗浄が完了した打込口81の近傍の配管切替装置5を排水位置P2から退避位置P3に切り替える。
具体的には、第1スライド切替板52を第1案内ガイド板51に案内させて横スライドさせてスライド位置S11から非スライド位置S10に戻す。そして、第2スライド切替板54を第2案内ガイド板53に案内させて横スライドさせてスライド位置S21から非スライド位置S20に戻す。すなわち、第1スライド切替板52において、第1コンクリート圧送連結管52Aが上流側圧送管2Aに対して接続された状態となり、排水連結管52Bが排水管3の分岐排水管31に対して切り離されて分離した状態となる。
As shown in FIG. 7, the piping switching device 5 near the driving port 81 for which cleaning has been completed is switched from the drain position P2 to the retracted position P3.
Specifically, the first sliding switchover plate 52 is guided by the first guide plate 51 and slides laterally from the sliding position S11 back to the non-sliding position S10. Then, the second sliding switchover plate 54 is guided by the second guide plate 53 and slides laterally from the sliding position S21 back to the non-sliding position S20. That is, at the first sliding switchover plate 52, the first concrete pressure transfer connecting pipe 52A is connected to the upstream pressure transfer pipe 2A, and the drain connecting pipe 52B is disconnected and separated from the branch drain pipe 31 of the drain pipe 3.

また、第2スライド切替板54において、第2コンクリート圧送連結管54Aが第1コンクリート圧送連結管52Aおよび下流側圧送管2Bに接続され、排水連結管52Bが排水管3に連結され、打込管4は接続されずに切り離された状態となる。これにより退避位置P3となったときに上流側圧送管2Aと下流側圧送管2Bとが一対のコンクリート圧送連結管52A、54Aによって連結された状態となって、当該配管切替装置5の下流側へコンクリートを圧送可能な状態となる。 In addition, at the second sliding switch plate 54, the second concrete pressure feed connecting pipe 54A is connected to the first concrete pressure feed connecting pipe 52A and the downstream pressure feed pipe 2B, the drainage connecting pipe 52B is connected to the drainage pipe 3, and the pouring pipe 4 is disconnected. As a result, when the retracted position P3 is reached, the upstream pressure feed pipe 2A and the downstream pressure feed pipe 2B are connected by the pair of concrete pressure feed connecting pipes 52A, 54A, and concrete can be pressure fed downstream of the piping switching device 5.

上述したように、覆工コンクリート打込方法では、複数の打込口81毎にコンクリート圧送管2に沿ってトンネル周方向X2に間隔をあけて配置される配管切替装置5を順次、切り替えて、それぞれの配管切替装置5で上述したコンクリート打込位置P1、排水位置P2、退避位置P3を適宜切り替えて打ち込む方法となる。 As described above, the lining concrete pouring method involves sequentially switching between piping switching devices 5 arranged at intervals in the tunnel circumferential direction X2 along the concrete pumping pipe 2 for each of the multiple pouring openings 81, and each piping switching device 5 appropriately switches between the above-mentioned concrete pouring position P1, drainage position P2, and evacuation position P3.

本実施形態では、トンネル軸方向X1で切羽側から見て左右両側に覆工コンクリート打込装置1が配置され、上記の打込方法により施工される。トンネル天端部は、上記の覆工コンクリート打込装置1を使用せずに打込口81に直接、コンクリート圧送管を接続して打ち込む形態としているが、覆工コンクリート打込装置1を用いて打ち込むようにしてもよい。 In this embodiment, lining concrete pouring devices 1 are placed on both the left and right sides of the tunnel in the axial direction X1 when viewed from the tunnel face, and construction is carried out using the pouring method described above. At the tunnel top, concrete is poured by connecting a concrete pressure pipe directly to the pouring opening 81 without using the lining concrete pouring device 1 described above, but it is also possible to pour the concrete using the lining concrete pouring device 1.

次に、上述した覆工コンクリート打込装置および覆工コンクリート打込方法の作用について、図面に基づいて詳細に説明する。
本実施形態では、図2及び図4に示すように、コンクリート圧送管2の途中において、覆工型枠8のトンネル周方向X2の複数の打込口81のそれぞれの近傍に配管切替装置5が配置されているので、複数の打込口81に打込ノズル82を装着するとともに、打込ノズル82に打込管4を接続し、打込管4の基端が打込口81の近傍に配置される配管切替装置5の近傍に設け、打込する打込口81に対応する配管切替装置5をコンクリート打込位置P1としてコンクリート圧送管2と打込管4とを接続してコンクリートを打込口81側へ送り、打込ノズル82より打込領域にコンクリートを打ち込むことができる。
Next, the operation of the lining concrete placing device and the lining concrete placing method described above will be described in detail with reference to the drawings.
In this embodiment, as shown in Figures 2 and 4, piping switching devices 5 are arranged along the concrete pumping pipe 2 near each of a plurality of pouring ports 81 in the tunnel circumferential direction X2 of the lining formwork 8. Therefore, pouring nozzles 82 are attached to the plurality of pouring ports 81, and pouring pipes 4 are connected to the pouring nozzles 82. The base ends of the pouring pipes 4 are located near the piping switching devices 5 arranged near the pouring ports 81. The piping switching device 5 corresponding to the pouring port 81 to be poured is set as the concrete pouring position P1, and the concrete pumping pipe 2 and the pouring pipe 4 are connected to send the concrete toward the pouring port 81, and the concrete can be poured into the pouring area from the pouring nozzles 82.

このように本実施形態では、コンクリート圧送管2の途中の位置に配管切替装置5を設けることで、配管を切り替える際の配管移動量を小さくすることができ、従来のような可動領域が大きなマニピュレータ方式の打込装置をトンネル周方向X2の全領域に使用する必要がなくなる。そのため、覆工型枠8内を通過する連続ベルトコンベヤや風管等の坑内仮設備を通過させること可能な十分なスペースを確保でき、坑内仮設備に干渉させることなくコンクリート圧送管2や配管切替装置5を配置することができることから、周長の長いトンネルにも適用可能となる。 In this way, in this embodiment, by installing the piping switching device 5 at a position midway along the concrete pressure pipe 2, the amount of piping movement when switching pipes can be reduced, eliminating the need to use a conventional manipulator-type driving device with a large range of movement over the entire area in the tunnel circumferential direction X2. As a result, sufficient space can be secured to allow temporary underground equipment such as continuous belt conveyors and air pipes to pass through the lining formwork 8, and the concrete pressure pipe 2 and piping switching device 5 can be positioned without interfering with the temporary underground equipment, making it applicable to tunnels with long circumferences.

また、本実施形態では、コンクリートの打ち込みが終了した後、配管切替装置5を排水位置P2として排水管3と打込管4とを接続して打込管4の打込口81側から水を送り込んで排水管3を介して排水することができる。これにより、打込管4内を清掃することができ、打込管4の洗浄にかかる作業効率を向上させることができる。
このように、本実施形態では、配管切替装置5を設けて、配管切替装置5をコンクリート打込時と洗浄時で制御することにより適宜切り替えることで、覆工コンクリートの自動施工が可能となる。
In this embodiment, after concrete pouring is completed, the piping switching device 5 is set to the drain position P2 to connect the drain pipe 3 to the pouring pipe 4, and water is sent from the pouring opening 81 of the pouring pipe 4 and drained through the drain pipe 3. This allows the inside of the pouring pipe 4 to be cleaned, improving the efficiency of cleaning the pouring pipe 4.
In this way, in this embodiment, a piping switching device 5 is provided, and the piping switching device 5 is controlled to switch appropriately between pouring concrete and cleaning, thereby enabling automatic construction of the lining concrete.

また、本実施形態では、配管切替装置5を退避位置P3とすることで、この退避位置P3とした配管切替装置5の上流側と下流側に位置するコンクリート圧送管2が連通し、下流側にコンクリートを圧送させることができる。このように配管切替装置5を退避位置P3とする作業のみで、この配管切替装置5よりも下流側に設けられる配管切替装置5を使用してコンクリート打込位置P1に切り替える作業を容易に行うことができる。 In addition, in this embodiment, by setting the piping switching device 5 to the retracted position P3, the concrete pressure pipes 2 located upstream and downstream of the piping switching device 5 set to this retracted position P3 are connected, allowing concrete to be pressure-fed to the downstream side. In this way, simply by setting the piping switching device 5 to the retracted position P3, it is possible to easily switch to the concrete pouring position P1 using a piping switching device 5 located downstream of this piping switching device 5.

さらに、本実施形態では、配管切替装置5において、コンクリート打込位置P1における第2スライド切替板54を、打込管4の基端及び第1連結管に接続することで、コンクリート圧送管2から打込管4を通じて打込口81からコンクリートの打ち込みを行うことができる。
そして、排水位置P2において、打込管4の基端及び第2連結管と第3連結管とを接続することで、打込管4が排水管3に繋がり、コンクリート打込時に使用した打込管4内に流水する清掃した水を排水管3から排水することができる。
また、退避位置P3において、第1コンクリート圧送連結管52A及び下流側圧送管2Bの第2分割端に第4連結管を接続することにより、この退避位置P3となった配管切替装置5の上流側と下流側に位置するコンクリート圧送管2が連通し、コンクリート圧送管2を通じて下流側にコンクリートを圧送することができる。
Furthermore, in this embodiment, in the piping switching device 5, by connecting the second sliding switching plate 54 at the concrete pouring position P1 to the base end of the pouring pipe 4 and the first connecting pipe, concrete can be poured from the concrete pressure pipe 2 through the pouring pipe 4 and the pouring port 81.
Then, at the drainage position P2, by connecting the base end of the pouring pipe 4 and the second and third connecting pipes, the pouring pipe 4 is connected to the drainage pipe 3, and the cleaning water that flows into the pouring pipe 4 used when pouring concrete can be drained from the drainage pipe 3.
In addition, by connecting a fourth connecting pipe to the second divided end of the first concrete pressure-transport connecting pipe 52A and the downstream pressure-transport pipe 2B at the retracted position P3, the concrete pressure-transport pipes 2 located upstream and downstream of the piping switching device 5 at this retracted position P3 become connected, and concrete can be pressure-transported downstream through the concrete pressure-transport pipe 2.

また、本実施形態では、制御部によってスライド機構を制御し、第1スライド切替板52と第2スライド切替板54を移動させることで、コンクリート打込位置P1と排水位置P2との切替え動作を容易に行うことができる。 In addition, in this embodiment, the control unit controls the slide mechanism and moves the first slide switch plate 52 and the second slide switch plate 54, making it easy to switch between the concrete pouring position P1 and the drainage position P2.

上述のように本実施形態による覆工コンクリート打込装置1および覆工コンクリート打込方法では、連続ベルトコンベヤや風管等の坑内仮設備に干渉させることなく配置することができ、かつ周長の長いトンネルにも適用可能となり、しかも打込管4の洗浄にかかる作業効率を向上させることができる。 As described above, the lining concrete pouring device 1 and lining concrete pouring method according to this embodiment can be installed without interfering with temporary underground facilities such as continuous belt conveyors and air pipes, can be applied to tunnels with long circumferences, and can improve the work efficiency of cleaning the pouring pipe 4.

(第2実施形態)
図8(a)、(b)に示すように、第2実施形態の配管切替装置5Aは、コンクリート圧送管2の管軸を回転中心として回転(矢印E方向)する回転切替体55を設けた構成となっている。ここで、図8(a)、(b)は、回転切替体55を180度、紙面で左回転させることにより配管を切り替えた状態を示した図である。
Second Embodiment
8(a) and 8(b), the piping switching device 5A of the second embodiment is configured to include a rotation switching body 55 that rotates (in the direction of arrow E) around the pipe axis of the concrete pumping pipe 2. Here, FIGS. 8(a) and 8(b) are diagrams showing the state in which the piping is switched by rotating the rotation switching body 55 counterclockwise by 180 degrees on the paper.

配管切替装置5Aは、上述した回転切替体55と、回転切替体55の上流端部(図8(a)、(b)で紙面下側)に設けられた下板58と、回転切替体55の下流端部(図8(a)、(b)で紙面上側)に設けられた上板59と、を備えている。 The piping switching device 5A includes the above-mentioned rotary switching body 55, a lower plate 58 provided at the upstream end of the rotary switching body 55 (lower side of the paper in Figures 8(a) and 8(b)), and an upper plate 59 provided at the downstream end of the rotary switching body 55 (upper side of the paper in Figures 8(a) and 8(b)).

回転切替体55は、筒体551と、筒体551の内部空間に配置された第1連結管56および第2連結管57と、を有している。回転切替体55は、筒体551の筒軸方向をトンネル周方向X2に向けて配置されている。
第1連結管56は、上流から下流に向けて第1中心O1から径方向の外側に向かって延びる斜め管となっている。第2連結管57は、第2連結管57の管軸方向が筒軸と平行となっている。
The rotation switching body 55 has a cylindrical body 551, and a first connecting pipe 56 and a second connecting pipe 57 arranged in the internal space of the cylindrical body 551. The rotation switching body 55 is arranged such that the cylindrical axis direction of the cylindrical body 551 faces the tunnel circumferential direction X2.
The first connecting pipe 56 is an oblique pipe that extends radially outward from the first center O1 from upstream to downstream. The second connecting pipe 57 has an axial direction parallel to the cylindrical axis.

下板58の第1中心O1と上板59の第2中心O2とは、同一線上に設けられている。下板58は、第1中心O1の位置に設けられたコンクリート圧送口58Aと、第1中心O1から偏心した位置に設けられた排水口58Bと、を有している。上板59は、第2中心O2から偏心した位置で貫通して設けられた第1接続口59Aと、第2中心O2を挟んで線対象となる位置で貫通して設けられた第2接続口59Bと、を有している。上板59の第1接続口59Aと第2接続口59Bとのそれぞれの第2中心O2からの距離は、下板58における排水口58Bの第1中心O1からの距離と一致している。 The first center O1 of the lower plate 58 and the second center O2 of the upper plate 59 are located on the same line. The lower plate 58 has a concrete pumping port 58A located at the first center O1 and a drainage port 58B located eccentrically from the first center O1. The upper plate 59 has a first connection port 59A located eccentrically from the second center O2 and a second connection port 59B located symmetrically across the second center O2 and penetrating the upper plate 59. The distances from the second center O2 of the first connection port 59A and the second connection port 59B of the upper plate 59 to the first center O1 match the distance from the first center O1 of the drainage port 58B of the lower plate 58.

図8(a)は、コンクリート圧送管2を打込管4に接続したコンクリート打込位置P1を示している。図8(b)は、コンクリート圧送管2を打込管4から切り離して上流側圧送管2Aと下流側圧送管2Bとを接続し、かつ排水管3を打込管4に接続した排水位置P2を示している。コンクリート圧送口58Aは、上流側圧送管2Aに接続されている。排水口58Bは、排水管3(分岐排水管31)に接続される。第1接続口59Aは、打込管4に接続されている。第2接続口59Bは、下流側圧送管2Bに接続されている。 Figure 8(a) shows the concrete pouring position P1 where the concrete pressure pipe 2 is connected to the pouring pipe 4. Figure 8(b) shows the drainage position P2 where the concrete pressure pipe 2 is disconnected from the pouring pipe 4, the upstream pressure pipe 2A is connected to the downstream pressure pipe 2B, and the drainage pipe 3 is connected to the pouring pipe 4. The concrete pressure port 58A is connected to the upstream pressure pipe 2A. The drainage port 58B is connected to the drainage pipe 3 (branch drainage pipe 31). The first connection port 59A is connected to the pouring pipe 4. The second connection port 59B is connected to the downstream pressure pipe 2B.

図8(a)に示すように、コンクリート打込位置P1において、第1連結管56の下流端56bが第2接続口59Bを介して下流側圧送管2Bに接続され、第2連結管57の上流端57aが排水口58Bを介して上流側圧送管2Aに接続され、かつ下流端57bが第1接続口59Aを介して打込管4に接続されている。コンクリート打込位置P1では、第2連結管57によって上流側圧送管2Aと打込管4とが接続されてコンクリートの打ち込みが可能な状態となり、上流側圧送管2Aと下流側圧送管2Bとが切り離された状態となる。 As shown in Figure 8(a), at concrete pouring position P1, the downstream end 56b of the first connecting pipe 56 is connected to the downstream pressure pipe 2B via the second connection port 59B, the upstream end 57a of the second connecting pipe 57 is connected to the upstream pressure pipe 2A via the drain port 58B, and the downstream end 57b is connected to the pouring pipe 4 via the first connection port 59A. At concrete pouring position P1, the upstream pressure pipe 2A and the pouring pipe 4 are connected by the second connecting pipe 57, allowing concrete to be poured, and the upstream pressure pipe 2A and the downstream pressure pipe 2B are disconnected.

図8(b)に示すように、排水位置P2において、第1連結管56の上流端56aが排水口58Bを介して排水管3(分岐排水管31)に接続され、かつ下流端56bが第2接続口59Bを介して打込管4に接続され、第2連結管57の上流端57aがコンクリート圧送口58Aを介して上流側圧送管2Aに接続され、かつ下流端57bが第2接続口59Bを介して下流側圧送管2Bに接続されている。排水位置P2では、第2連結管57によって上流側圧送管2Aと下流側圧送管2Bとが接続されてコンクリートが当該配管切替装置5Aを通過して下流側に圧送される状態(退避位置P3)となり、第1連結管56によって排水管3(分岐排水管31)と打込管4とが接続され、打込管4内を流通する洗浄水が排水管3へ流通する状態となる。つまり、第2実施形態による配管切替装置5Aでは、排水位置P2のときには、同時に退避位置P3にもなる。
配管切り替え装置5Aは、回転切替体55をコンクリート打込位置P1から中心O1、O2周りに180°回転させることで排水位置P2及び退避位置P3に切り替えることができる。
8(b), at the drainage position P2, the upstream end 56a of the first connecting pipe 56 is connected to the drainage pipe 3 (branch drainage pipe 31) via the drainage port 58B, and the downstream end 56b is connected to the casting pipe 4 via the second connection port 59B. The upstream end 57a of the second connecting pipe 57 is connected to the upstream pressure pipe 2A via the concrete pressure port 58A, and the downstream end 57b is connected to the downstream pressure pipe 2B via the second connection port 59B. At the drainage position P2, the upstream pressure pipe 2A and the downstream pressure pipe 2B are connected by the second connecting pipe 57, and concrete is pumped downstream through the piping switching device 5A (retracted position P3). The drainage pipe 3 (branch drainage pipe 31) and the casting pipe 4 are connected by the first connecting pipe 56, and flushing water flowing through the casting pipe 4 flows to the drainage pipe 3. That is, in the piping switching device 5A according to the second embodiment, when it is in the drainage position P2, it is also in the retracted position P3 at the same time.
The piping switching device 5A can be switched to a drainage position P2 and a retracted position P3 by rotating the rotary switching body 55 180 degrees from the concrete pouring position P1 around the centers O1 and O2.

第2実施形態による配管切替装置5Aは、上述した第1実施形態のスライド式の配管切替装置5よりも簡単な構造とすることができる。また、上述した第1実施形態のスライド式の配管切替装置5ではコンクリート打込位置P1、排水位置P2及び退避位置P3のそれぞれに切り替えるために切り替え回数が2回必要となるが、第2実施形態の回転式の配管切替装置5Aでは第1回転位置となるコンクリート打込位置P1と、第2回転位置となる排水位置P2及び退避位置P3との1回の切り替え回数となることから、打ち込み作業にかかる効率を向上させることができる。 The piping switching device 5A according to the second embodiment can have a simpler structure than the sliding piping switching device 5 of the first embodiment described above. Furthermore, while the sliding piping switching device 5 of the first embodiment described above requires two switching operations to switch between the concrete pouring position P1, the drainage position P2, and the retracted position P3, the rotary piping switching device 5A of the second embodiment only requires one switching operation between the concrete pouring position P1, which is the first rotation position, and the drainage position P2 and the retracted position P3, which are the second rotation positions, thereby improving the efficiency of pouring operations.

(第3実施形態)
図9に示すように、第3実施形態は、上述した第1実施形態のスライド式の複数の配管切替装置5を備えた覆工コンクリート打込装置1と、マニピュレータ方式の覆工コンクリート打込装置(マニピュレータ式打込装置9)と、を組み合わせた一例である。
(Third embodiment)
As shown in Figure 9, the third embodiment is an example of combining a lining concrete pouring device 1 equipped with multiple sliding piping switching devices 5 of the first embodiment described above with a manipulator-type lining concrete pouring device (manipulator-type pouring device 9).

図9及び図10に示すように、マニピュレータ式打込装置9は、打込口81に打込管90を介して着脱可能な打込ノズル91と、覆工型枠8の架台86より切羽側に配置されトンネル周方向X2に沿って延在するガイドレール92と、打込ノズル91を備えてガイドレール92に案内されるノズル移動装置93と、コンクリートの打ち込み状態を検出するとともに、複数の打込口81に対する打込ノズル91の接続位置を切り替える制御部(図示省略)と、を備えている。 As shown in Figures 9 and 10, the manipulator-type driving device 9 is equipped with a driving nozzle 91 that can be attached and detached to the driving port 81 via a driving pipe 90, a guide rail 92 that is positioned closer to the tunnel face than the base 86 of the lining formwork 8 and extends along the tunnel circumferential direction X2, a nozzle moving device 93 that is equipped with the driving nozzle 91 and guided by the guide rail 92, and a control unit (not shown) that detects the concrete pouring status and switches the connection position of the driving nozzle 91 to the multiple driving ports 81.

図10に示すように、打込ノズル91は、ノズル移動装置93に搭載され、打込ノズル91の基端部91bがコンクリートの圧送ポンプ(図示省略)に繋がれている可動配管94に接続されている。打込ノズル91の先端部91aは、打込管90の挿入口に着脱可能に挿入される。 As shown in Figure 10, the casting nozzle 91 is mounted on a nozzle movement device 93, and the base end 91b of the casting nozzle 91 is connected to a movable pipe 94 that is connected to a concrete pressure pump (not shown). The tip end 91a of the casting nozzle 91 is removably inserted into the insertion port of the casting pipe 90.

可動配管94は、複数の関節部によって連結された多関節配管であって、配管切替え装置95を備えている。可動配管94は、覆工型枠8をトンネル軸方向X1におけるコンクリートの打込み対象の位置に設置した後、覆工型枠8に対して固定するようにして設置される。具体的に可動配管94は、一端がノズル移動装置93に搭載される打込ノズル91の基端部91bに接続され、他端が配管切替え装置95と接続されている。可動配管94は、切羽側から見て左右それぞれ1本ずつ設けられる。 The movable pipe 94 is a multi-joint pipe connected by multiple joints and is equipped with a pipe switching device 95. The movable pipe 94 is installed so as to be fixed to the lining formwork 8 after the lining formwork 8 is installed at the position in the tunnel axis direction X1 where concrete is to be poured. Specifically, one end of the movable pipe 94 is connected to the base end 91b of the pouring nozzle 91 mounted on the nozzle movement device 93, and the other end is connected to the pipe switching device 95. One movable pipe 94 is installed on each side when viewed from the tunnel face side.

配管切り替え装置95は、前記制御部からの制御信号に基づいて、複数の関節部によって配置される可動配管の一方に切り替えてコンクリートを排出する。
可動配管94の関節部は、制御部から出力される制御指示に基づいて油圧制御されることで、各関節の姿勢が制御される。可動配管94が駆動することで、各ノズル移動装置93が、ガイドレール92の外周面上をトンネル周方向X2に沿って移動する。これにより、打込ノズル91は、複数の打込口81のうち、いずれの打込口81の近傍まで移動することができ、コンクリートを打ち込む位置を切り替えることができる。
The pipe switching device 95 switches to one of the movable pipes arranged by a plurality of joints based on a control signal from the control unit, and discharges concrete.
The joints of the movable pipes 94 are hydraulically controlled based on control instructions output from the control unit, thereby controlling the posture of each joint. When the movable pipes 94 are driven, each nozzle movement device 93 moves along the outer circumferential surface of the guide rail 92 in the tunnel circumferential direction X2. This allows the casting nozzle 91 to move to the vicinity of any of the multiple casting ports 81, allowing the position where the concrete is to be cast to be changed.

ガイドレール92は、覆工型枠8の切羽側において、トンネル周方向X2に沿って設けられている。ガイドレール92は、覆工型枠8を支持する架台86の切羽側に固定されて支持されている。ガイドレール92は、ノズル移動装置93をトンネル周方向X2に移動させる。 The guide rail 92 is installed along the tunnel circumferential direction X2 on the face side of the lining formwork 8. The guide rail 92 is fixed to and supported on the face side of the platform 86 that supports the lining formwork 8. The guide rail 92 moves the nozzle movement device 93 in the tunnel circumferential direction X2.

ノズル移動装置93は、打込ノズル91をガイドレール92に沿って移動させることができ、打込領域におけるコンクリート打込みを行うことができる。また、ノズル移動装置93には、打込ノズル91の打込管90の挿入口への脱着させる前後スライド部が設けられている。この前後スライド部は、ノズル移動装置93のトンネル軸方向X1(前後方向)に打込ノズル91を延伸するように移動させる。 The nozzle movement device 93 can move the casting nozzle 91 along the guide rail 92, allowing concrete to be poured in the pouring area. The nozzle movement device 93 also has a front-to-rear sliding section that attaches and detaches the casting nozzle 91 to and from the insertion opening of the casting pipe 90. This front-to-rear sliding section moves the casting nozzle 91 so that it extends in the tunnel axis direction X1 (front-to-rear direction) of the nozzle movement device 93.

以上、本発明による覆工コンクリート打込装置および覆工コンクリート打込方法の実施形態について説明したが、本発明は上記の実施形態に限定されるものではなく、その趣旨を逸脱しない範囲で適宜変更可能である。 The above describes embodiments of the lining concrete pouring device and lining concrete pouring method according to the present invention, but the present invention is not limited to the above embodiments and can be modified as appropriate without departing from the spirit of the invention.

例えば、上述した第1実施形態では、配管切替装置5の構成としてスライド方式の第1スライド切替板52と第2スライド切替板54を設けた構成としているが、このような構成に限定されることはない。要は、打込管4及びコンクリート圧送管2が接続されるコンクリート打込位置P1と、打込管4及び排水管3が接続される排水位置P2とのいずれか一方に切替えて接続する配管切替装置であればよいのであって、上述した第2実施形態の回転式のようにスライド方式であることに制限されることはない。 For example, in the first embodiment described above, the piping switching device 5 is configured with a sliding first sliding switching plate 52 and a second sliding switching plate 54, but this configuration is not limited to this. Essentially, any piping switching device can be used as long as it can switch between either the concrete pouring position P1, where the pouring pipe 4 and concrete pumping pipe 2 are connected, or the drainage position P2, where the pouring pipe 4 and drainage pipe 3 are connected, and is not limited to a sliding type like the rotary type of the second embodiment described above.

また、本実施形態では、第1スライド切替板52と第2スライド切替板54とがコンクリート打込位置P1と排水位置P2となるようにスライド機構を制御する制御部を設けた構成としているが、このような制御部を設けて制御することに限定されることはなく、手動操作によりコンクリート打込位置P1と排水位置P2を切り替えるようにしてもかまわない。 In addition, in this embodiment, a control unit is provided to control the sliding mechanism so that the first sliding switch plate 52 and the second sliding switch plate 54 are in the concrete pouring position P1 and the drainage position P2. However, this is not limited to control using such a control unit, and the concrete pouring position P1 and the drainage position P2 may also be switched by manual operation.

また、上述した実施形態では、覆工コンクリート打込装置1が切羽側(妻側)に設ける構成を一例として説明したが、例えばトンネルの勾配に応じてオーバーラップ側(坑口側)に覆工コンクリート打込装置1を設けるようにしてもよい。 In addition, in the above-described embodiment, a configuration in which the lining concrete pouring device 1 is installed on the tunnel face side (end side) has been described as an example, but the lining concrete pouring device 1 may also be installed on the overlap side (entrance side) depending on the gradient of the tunnel, for example.

その他、本発明の趣旨を逸脱しない範囲で、上記した実施形態における構成要素を周知の構成要素に置き換えることは適宜可能である。 In addition, it is possible to replace the components in the above-described embodiments with well-known components as appropriate, without departing from the spirit of the present invention.

1 覆工コンクリート打込装置
2 コンクリート圧送管
2A 上流側圧送管
2B 下流側圧送管
3 排水管
4 打込管
5、5A 配管切替装置
8 覆工型枠
9 マニピュレータ式打込装置
10 トンネル壁面
10A 打込領域
31 分岐排水管
51 第1案内ガイド板
52 第1スライド切替板
52A 第1コンクリート圧送連結管
52B 排水連結管
53 第2案内ガイド板
54 第2スライド切替板
54A 第2コンクリート圧送連結管
54B 切替連結管
55 回転切替体
56 第1連結管
57 第2連結管
58 下板
59 上板
81 打込口
82 打込ノズル
P1 コンクリート打込位置
P2 排水位置
P3 退避位置
S10、S20 非スライド位置
S11、S21 スライド位置
X1 トンネル軸方向
X2 トンネル周方向
DESCRIPTION OF SYMBOLS 1 Lining concrete pouring device 2 Concrete pressure pipe 2A Upstream pressure pipe 2B Downstream pressure pipe 3 Drainage pipe 4 Driving pipe 5, 5A Piping switching device 8 Lining formwork 9 Manipulator-type pouring device 10 Tunnel wall 10A Driving area 31 Branch drainage pipe 51 First guide plate 52 First slide switching plate 52A First concrete pressure feed connecting pipe 52B Drainage connecting pipe 53 Second guide plate 54 Second slide switching plate 54A Second concrete pressure feed connecting pipe 54B Switching connecting pipe 55 Rotation switching body 56 First connecting pipe 57 Second connecting pipe 58 Lower plate 59 Upper plate 81 Pouring port 82 Driving nozzle P1 Concrete pouring position P2 Drainage position P3 Retracted position S10, S20 Non-sliding position S11, S21 Slide position X1 Tunnel axial direction X2 Tunnel circumferential direction

Claims (6)

トンネル壁面の周方向に延在する覆工型枠を使用し、前記トンネル壁面と前記覆工型枠との間の打込領域にコンクリートを打ち込んでトンネルの覆工を構築するための覆工コンクリート打込装置であって、
前記覆工型枠の周方向に沿って配設されるコンクリート圧送管と、
前記コンクリート圧送管に沿って覆工型枠の周方向に沿って配設される排水管と、
前記覆工型枠における周方向の打込口毎に設けられ、前記コンクリート圧送管の所定位置で着脱可能に接続され、前記打込口に打込ノズルを介して接続される打込管と、
前記打込管及び前記コンクリート圧送管が接続されるコンクリート打込位置と、前記打込管及び前記排水管が接続される排水位置とのいずれか一方に切替えて接続する配管切替装置と、
を備え、
前記コンクリート打込位置では、前記コンクリート圧送管で圧送されるコンクリートが前記打込管側に切り替わることを特徴とする覆工コンクリート打込装置。
A lining concrete pouring device for constructing a tunnel lining by pouring concrete into a pouring area between a tunnel wall surface and the lining formwork, using a lining formwork extending in the circumferential direction of the tunnel wall surface,
A concrete pressure pipe disposed along the circumferential direction of the lining formwork;
A drainage pipe arranged along the circumferential direction of the lining formwork along the concrete pressure pipe;
a driving pipe provided for each circumferential driving port in the lining formwork, detachably connected at a predetermined position of the concrete pressure pipe, and connected to the driving port via a driving nozzle;
A piping switching device that switches between a concrete pouring position where the pouring pipe and the concrete pressure pipe are connected and a drainage position where the pouring pipe and the drainage pipe are connected;
Equipped with
A lining concrete pouring device characterized in that, at the concrete pouring position, the concrete pumped by the concrete pumping pipe is switched to the pouring pipe side.
前記配管切替装置は、前記打込管を前記コンクリート打込位置と前記排水位置でない退避位置に切替可能に設けられ、
前記退避位置において、前記コンクリート圧送管が当該打込管が設けられる位置より下流側に連続した状態となることを特徴とする請求項1に記載の覆工コンクリート打込装置。
The piping switching device is provided so as to be able to switch the pouring pipe between the concrete pouring position and a retracted position other than the drainage position,
2. The lining concrete pouring device according to claim 1, wherein, in the retracted position, the concrete pressure pipe is continuous downstream from the position where the pouring pipe is provided.
前記コンクリート圧送管は、上流側圧送管と下流側圧送管に分割され、
前記配管切替装置は、
前記上流側圧送管の第1分割端、及び前記排水管の一端を固定した第1案内ガイド板と、
前記下流側圧送管の第2分割端、及び前記打込管の基端を固定した第2案内ガイド板と、
前記第1案内ガイド板に案内されて板面方向でトンネル軸方向にスライドする第1スライド切替板と、
前記第2案内ガイド板に案内されて板面方向でトンネル軸方向にスライドする第2スライド切替板と、を備え、
前記第1スライド切替板は、前記コンクリート打込位置において前記上流側圧送管の前記第1分割端に接続可能な第1コンクリート圧送連結管と、前記排水位置において前記排水管の一端に接続可能な排水連結管と、を備え、
前記第2スライド切替板は、前記コンクリート打込位置において前記打込管の前記基端及び前記第1コンクリート圧送連結管に接続可能で、かつ前記排水位置において前記打込管の前記基端及び前記排水連結管に接続可能な切替連結管と、前記退避位置において前記第1コンクリート圧送連結管及び前記下流側圧送管の前記第2分割端に接続可能な第2コンクリート圧送連結管と、を備えていることを特徴とする請求項2に記載の覆工コンクリート打込装置。
The concrete pressure pipe is divided into an upstream pressure pipe and a downstream pressure pipe,
The piping switching device is
a first guide plate to which a first divided end of the upstream pressure pipe and one end of the drain pipe are fixed;
a second guide plate to which a second divided end of the downstream pressure pipe and a base end of the driving pipe are fixed;
a first slide switching plate that is guided by the first guide plate and slides in the plate surface direction in the tunnel axial direction;
a second slide switching plate that is guided by the second guide plate and slides in the plate surface direction in the tunnel axial direction,
the first sliding transition plate includes a first concrete pressure-feeding connecting pipe connectable to the first divided end of the upstream pressure pipe at the concrete pouring position, and a drainage connecting pipe connectable to one end of the drainage pipe at the drainage position;
The lining concrete pouring device of claim 2, characterized in that the second sliding switching plate is provided with a switching connecting pipe that can be connected to the base end of the pouring pipe and the first concrete pumping connecting pipe at the concrete pouring position and to the base end of the pouring pipe and the drainage connecting pipe at the drainage position, and a second concrete pumping connecting pipe that can be connected to the first concrete pumping connecting pipe and the second divided end of the downstream pumping pipe at the retracted position.
前記第1スライド切替板と前記第2スライド切替板とをそれぞれ移動させるスライド機構が設けられ、
前記第1スライド切替板と前記第2スライド切替板とが前記コンクリート打込位置と前記排水位置となるように前記スライド機構を制御する制御部が設けられていることを特徴とする請求項3に記載の覆工コンクリート打込装置。
a slide mechanism for moving the first slide transition plate and the second slide transition plate,
The lining concrete pouring device according to claim 3, characterized in that a control unit is provided that controls the slide mechanism so that the first slide switching plate and the second slide switching plate are in the concrete pouring position and the drainage position.
前記コンクリート圧送管は、上流側圧送管と下流側圧送管に分割され、
前記配管切替装置は、前記コンクリート圧送管の管軸を回転中心として回転することで、前記コンクリート打込位置と前記排水位置と切り替える回転切替体を備え、
前記回転切替体は、筒体と、前記筒体の内部空間に配置された第1連結管および第2連結管と、を有し、
前記コンクリート打込位置において、前記上流側圧送管が前記第連結管を介して前記打込管に接続され、
前記排水位置において、前記第2連結管が前記上流側圧送管および前記下流側圧送管に接続され、かつ前記排水管が前記第1連結管を介して前記打込管に接続されていることを特徴とする請求項1又は2に記載の覆工コンクリート打込装置。
The concrete pressure pipe is divided into an upstream pressure pipe and a downstream pressure pipe,
the piping switching device includes a rotary switching body that rotates around the pipe axis of the concrete pressure pipe to switch between the concrete pouring position and the drainage position,
the rotation switching body includes a cylindrical body, and a first connecting pipe and a second connecting pipe disposed in an internal space of the cylindrical body,
At the concrete pouring position, the upstream pressure pipe is connected to the pouring pipe via the second connecting pipe;
A lining concrete pouring device as described in claim 1 or 2, characterized in that, at the drainage position, the second connecting pipe is connected to the upstream pressure pipe and the downstream pressure pipe, and the drainage pipe is connected to the pouring pipe via the first connecting pipe.
請求項1乃至5のいずれか1項に記載の覆工コンクリート打込装置を使用して前記打込領域にコンクリートを打ち込む覆工コンクリート打込方法であって、
前記覆工型枠の周方向に沿って前記コンクリート圧送管および前記排水管を配設する工程と、
前記コンクリート圧送管の途中において、前記覆工型枠の周方向の複数の打込口のそれぞれの近傍に前記配管切替装置を配置する工程と、
複数の前記打込口に打込ノズルを装着するとともに、該打込ノズルに前記打込管を接続し、該打込管の基端が前記打込口の近傍に配置される前記配管切替装置の近傍に設ける工程と、
打込する前記打込口に対応する前記配管切替装置をコンクリート打込位置として前記コンクリート圧送管と前記打込管とを接続してコンクリートを前記打込口側へ送り、前記打込ノズルより前記打込領域にコンクリートを打ち込む工程と、
前記コンクリートの打込みが終了後、前記配管切替装置を排水位置として前記排水管と前記打込管とを接続して前記打込管の打込口側から水を送り込んで排水管を介して排水することで打込管内を清掃する工程と、
を有し、
複数の前記打込口毎に順次、前記配管切替装置を切り替えて打込することを特徴とする覆工コンクリート打込方法。
A lining concrete placing method for placing concrete into the placing area using the lining concrete placing device according to any one of claims 1 to 5,
a step of disposing the concrete pressure pipe and the drainage pipe along the circumferential direction of the lining formwork;
a step of disposing the piping switching device in the vicinity of each of a plurality of pouring ports in the circumferential direction of the lining formwork in the middle of the concrete pressure pipe;
a step of attaching driving nozzles to the plurality of driving ports, connecting the driving pipes to the driving nozzles, and providing a base end of the driving pipe near the piping switching device disposed near the driving ports;
a step of connecting the concrete pressure pipe and the concrete pouring pipe to send concrete to the pouring port side by setting the piping switching device corresponding to the pouring port to a concrete pouring position, and pouring concrete into the pouring area from the pouring nozzle;
After the concrete has been poured, the piping switching device is set to the drain position, the drain pipe and the pouring pipe are connected, and water is pumped into the pouring opening of the pouring pipe and drained through the drain pipe to clean the inside of the pouring pipe.
and
A lining concrete pouring method characterized by switching the piping switching device sequentially for each of the plurality of pouring openings and pouring concrete.
JP2021086843A 2021-05-24 2021-05-24 Lining concrete pouring device and lining concrete pouring method Active JP7738843B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021086843A JP7738843B2 (en) 2021-05-24 2021-05-24 Lining concrete pouring device and lining concrete pouring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021086843A JP7738843B2 (en) 2021-05-24 2021-05-24 Lining concrete pouring device and lining concrete pouring method

Publications (2)

Publication Number Publication Date
JP2022179984A JP2022179984A (en) 2022-12-06
JP7738843B2 true JP7738843B2 (en) 2025-09-16

Family

ID=84327279

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021086843A Active JP7738843B2 (en) 2021-05-24 2021-05-24 Lining concrete pouring device and lining concrete pouring method

Country Status (1)

Country Link
JP (1) JP7738843B2 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000345797A (en) 1999-06-07 2000-12-12 Taisei Corp Centrifuge concrete diverter
JP2013108244A (en) 2011-11-18 2013-06-06 Maeda Corp Concrete discharge device

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3811585A1 (en) * 1988-04-07 1989-10-19 Stetter Gmbh METHOD AND DEVICE FOR PROCESSING MORTAR AND CONCRETE IN TUNNEL AND TUBE CONSTRUCTION
JP2664867B2 (en) * 1994-03-31 1997-10-22 健藏 中島 Concrete pipe construction equipment

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000345797A (en) 1999-06-07 2000-12-12 Taisei Corp Centrifuge concrete diverter
JP2013108244A (en) 2011-11-18 2013-06-06 Maeda Corp Concrete discharge device

Also Published As

Publication number Publication date
JP2022179984A (en) 2022-12-06

Similar Documents

Publication Publication Date Title
US3350889A (en) Apparatus for driving and lining tunnels in unstable soil
JPS6055680B2 (en) Method and device for excavating tunnels, shafts, etc. while simultaneously placing concrete lining
JP7738843B2 (en) Lining concrete pouring device and lining concrete pouring method
JP7152327B2 (en) CONCRETE PLACING DEVICE, FORM UNIT AND CONCRETE PLACEMENT METHOD
JP7678990B2 (en) Lining concrete pouring method
JP6994895B2 (en) Lining concrete placing system
JP7498910B2 (en) Tunnel lining construction system and tunnel lining construction method
JP2020122295A (en) How to place concrete for tunnel lining
KR200202341Y1 (en) A tunnel steel materials mold concrete operation equipment
JP5511022B2 (en) H & V shield machine
JP3127329B2 (en) Secondary lining concrete placing equipment and its construction method
JPH0925724A (en) Concrete placing hopper
JP2020122296A (en) Removal method of residual concrete in piping
JP5539245B2 (en) How to update existing pipelines
JP3219746B2 (en) Existing tunnel removal method and shield tunneling machine for removal of existing tunnel
JPH09310591A (en) Formwork structure
JP5557344B2 (en) H & V shield machine
CN114991816B (en) Lining trolley and method for small-clearance triple-arch special-shaped section tunnel
JPH02289799A (en) Self-traveling lining formwork device
JPH0925725A (en) Concrete placing hopper
JP2002129884A (en) Tunnel renewal method and pipe replacement equipment used for it
JP3153852B2 (en) Tunnel lining equipment
JP2024013454A (en) Concrete piping switching device, concrete placing system, and concrete placing method
JP2002070498A (en) Method and device for placing concrete for tunnel
JP2022191810A (en) switching valve

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220608

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20220608

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20220608

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240220

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240925

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20241029

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20241226

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250318

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250421

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250805

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250826

R150 Certificate of patent or registration of utility model

Ref document number: 7738843

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150