JP7740997B2 - Instrument uncertainty evaluation system and instrument uncertainty evaluation method - Google Patents
Instrument uncertainty evaluation system and instrument uncertainty evaluation methodInfo
- Publication number
- JP7740997B2 JP7740997B2 JP2022005308A JP2022005308A JP7740997B2 JP 7740997 B2 JP7740997 B2 JP 7740997B2 JP 2022005308 A JP2022005308 A JP 2022005308A JP 2022005308 A JP2022005308 A JP 2022005308A JP 7740997 B2 JP7740997 B2 JP 7740997B2
- Authority
- JP
- Japan
- Prior art keywords
- meter
- uncertainty
- relative
- instrument
- component
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01D—MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
- G01D21/00—Measuring or testing not otherwise provided for
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01F—MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
- G01F1/00—Measuring the volume flow or mass flow of fluid or fluent solid material wherein the fluid passes through a meter in a continuous flow
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01F—MEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
- G01F9/00—Measuring volume flow relative to another variable, e.g. of liquid fuel for an engine
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01K—MEASURING TEMPERATURE; MEASURING QUANTITY OF HEAT; THERMALLY-SENSITIVE ELEMENTS NOT OTHERWISE PROVIDED FOR
- G01K1/00—Details of thermometers not specially adapted for particular types of thermometer
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05D—SYSTEMS FOR CONTROLLING OR REGULATING NON-ELECTRIC VARIABLES
- G05D7/00—Control of flow
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21C—NUCLEAR REACTORS
- G21C17/00—Monitoring; Testing ; Maintaining
- G21C17/02—Devices or arrangements for monitoring coolant or moderator
- G21C17/032—Reactor-coolant flow measuring or monitoring
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Fluid Mechanics (AREA)
- Plasma & Fusion (AREA)
- General Engineering & Computer Science (AREA)
- High Energy & Nuclear Physics (AREA)
- Automation & Control Theory (AREA)
- Monitoring And Testing Of Nuclear Reactors (AREA)
- Measuring Volume Flow (AREA)
- Flow Control (AREA)
- Testing Or Calibration Of Command Recording Devices (AREA)
Description
本発明は、プラント等の給水流量や圧力や温度などを計測する計器の不確かさを評価する計器不確かさ評価システム、および、計器不確かさ評価方法に関する。 The present invention relates to an instrument uncertainty evaluation system and an instrument uncertainty evaluation method for evaluating the uncertainty of instruments that measure feedwater flow rate, pressure, temperature, etc. in plants, etc.
火力、原子力などの発電プラントでは、ボイラや原子炉に供給される給水を加熱して蒸気を発生させ、蒸気タービンを駆動させて発電する。そのため、発電プラントでは、プラント熱出力を制御する上で、給水流量を正確に把握することは重要である。特に原子力プラントでは、許認可熱出力の範囲内でプラントを運転することが求められており、給水流量の計測値に加えて、給水流量計の不確かさを管理することが必要である。 In thermal and nuclear power plants, feedwater supplied to boilers and reactors is heated to generate steam, which drives steam turbines and generates electricity. Therefore, accurately understanding the feedwater flow rate is important for controlling the plant's thermal output. Nuclear plants, in particular, are required to operate within the permitted thermal output range, and in addition to measuring the feedwater flow rate, it is also necessary to manage the uncertainty of the feedwater flow meter.
一方で、発電プラントの給水流量計は、200℃以上の高温域で使用される。そのため、給水流量計のフローノズル表面にスケールが付着し、プラント運転中に見かけの流量値が増加する給水ドリフトが発生する場合がある。また、発電プラントの給水流量計は、大流量、高温条件での使用される。そのため、発電プラントの給水流量計は、実機設置前に実機と同一の流量・温度条件で精度を確認する試験は省略されることが多い。この場合、不確かさに影響する流量係数は、低流量試験での値から外挿評価される。 On the other hand, feedwater flow meters in power plants are used in high-temperature ranges of 200°C or higher. As a result, scale can build up on the surface of the flow nozzle of the feedwater flow meter, which can lead to feedwater drift, an increase in the apparent flow rate value during plant operation. Furthermore, feedwater flow meters in power plants are used under high-flow, high-temperature conditions. For this reason, tests to confirm the accuracy of feedwater flow meters in power plants under the same flow rate and temperature conditions as the actual equipment are often omitted before installation. In such cases, the flow coefficient, which affects uncertainty, is extrapolated from the value obtained in a low-flow test.
上記のように、給水流量計の不確かさは、給水ドリフトの影響および外挿に伴う偏差を加味した保守的な値で管理されている場合がある。しかし、給水ドリフトは常に発生するわけではなく、外挿に伴う偏差もプラントによって変化する。そのため、給水流量計の不確かさは過度に保守的な値となっている可能性がある。 As mentioned above, the uncertainty of feedwater flow meters is sometimes managed at a conservative value that takes into account the effects of feedwater drift and deviations due to extrapolation. However, feedwater drift does not always occur, and deviations due to extrapolation also vary from plant to plant. Therefore, the uncertainty of feedwater flow meters may be an overly conservative value.
近年、既設計器の情報からプラントのヒートバランスを満足する尤もらしい解を求め、プラント性能を監視するデータリコンシリエーション技術が提案されている。本技術では各計器の不確かさを重みとして計測値を補正するため、不確かさの正確な把握が重要である。 In recent years, data reconciliation technology has been proposed to monitor plant performance by finding a plausible solution that satisfies the plant's heat balance from information on previously designed instruments. This technology corrects measurement values using the uncertainty of each instrument as a weight, so it is important to accurately understand the uncertainty.
以上の点から、給水流量計を含む計器の不確かさをプラント運転データから正確に評価することは熱出力管理、プラント性能監視の面から重要である。 For these reasons, accurately evaluating the uncertainty of instruments, including feedwater flow meters, from plant operation data is important in terms of thermal power management and plant performance monitoring.
特許文献1には、プラントの運転データに基づき真値を推定する真値推定手段と、真値推定手段の推定精度に関するデータから総合評価することで、最も確からしい推定真値を求め、各計器の推定ドリフト量を算出するプラント計装制御装置が開示されている。真値推定手段には、線形モデル、ニューラルネットワーク、データリコンシリエーションなどが用いられ、推定モデルの調整や学習には、事前に取得したプラント運転データが用いられる。 Patent Document 1 discloses a plant instrumentation control device that uses true value estimation means to estimate true values based on plant operation data, and determines the most likely estimated true value by comprehensively evaluating data related to the estimation accuracy of the true value estimation means, and calculates the estimated drift amount of each instrument. The true value estimation means uses linear models, neural networks, data reconciliation, etc., and previously acquired plant operation data is used to adjust and train the estimation model.
特許文献1では、不確かさの一要素であるバイアス成分(ドリフト量)を、線形モデル、ニューラルネットワーク、データリコンシリエーションの推定値から予測できるが、線形モデル、ニューラルネットワーク、データリコンシリエーションの推定値自身が有する不確かさは評価できないため、各計器のバイアス成分を定量値として示すことが出来なかった。また、沸騰水型原子炉では給水流量に時間的な揺らぎ(以下、給水揺らぎ)を含み、不確かさの残りの要素であるランダム成分と混在するため、特許文献1の手法から、給水流量計の不確かさランダム成分を定量評価できない課題があった。 In Patent Document 1, the bias component (amount of drift), which is one element of uncertainty, can be predicted from estimated values obtained using a linear model, neural network, and data reconciliation. However, the uncertainty inherent in the estimated values obtained using a linear model, neural network, and data reconciliation cannot be evaluated, and therefore the bias component of each instrument cannot be expressed as a quantitative value. Furthermore, in boiling water reactors, the feedwater flow rate contains temporal fluctuations (hereinafter referred to as feedwater fluctuations), which are mixed with the random component, which is the remaining element of uncertainty. Therefore, the method in Patent Document 1 cannot quantitatively evaluate the random component of the uncertainty of the feedwater flow meter.
そこで、本発明は、プラントに設置された計器の不確かさの定量評価を可能とする計器不確かさ評価システム、および、計器不確かさ評価方法を提供することを課題とする。 The present invention aims to provide an instrument uncertainty evaluation system and an instrument uncertainty evaluation method that enable quantitative evaluation of the uncertainty of instruments installed in a plant.
前記した課題を解決するため、本発明の計器不確かさ評価システムは、同一の計測対象に対し複数の計器を備え、前記計器の内、少なくとも1つが校正記録を有している計測系統において、前記計器による計測値の時間平均値から相対バイアス成分を算出する相対バイアス成分算出部と、前記相対バイアス成分算出部が算出した相対バイアス成分を除いた計測値の前記計器間の時間遅れを補正する時間遅れ補償部と、前記時間遅れ補償部が補正した計測値から物理的な時間変動成分を除去し、相対ランダム成分を算出する時間変動成分除去部と、前記時間変動成分除去部が算出した相対ランダム成分の標準偏差を算出する相対ランダム成分算出部と、前記計測値の前記相対ランダム成分の正規性を判断する正規性判断部と、を有することを特徴とする。 In order to solve the above-mentioned problems, the instrument uncertainty evaluation system of the present invention is characterized in that, in a measurement system equipped with a plurality of instruments for the same measurement object, at least one of the instruments having a calibration record, the system comprises: a relative bias component calculation unit that calculates a relative bias component from a time average value of measurement values by the instruments; a time delay compensation unit that corrects the time delay between the instruments for measurement values excluding the relative bias component calculated by the relative bias component calculation unit; a time fluctuation component removal unit that removes a physical time fluctuation component from the measurement value corrected by the time delay compensation unit and calculates a relative random component; a relative random component calculation unit that calculates the standard deviation of the relative random component calculated by the time fluctuation component removal unit ; and a normality determination unit that determines the normality of the relative random component of the measurement values.
本発明の計器不確かさ評価方法は、同一の計測対象に対し複数の計器を備え、前記計器の内、少なくとも1つが校正記録を有している計測系統において、前記計器による計測値の時間平均値から相対バイアス成分を算出するステップと、前記相対バイアス成分を除いた計測値の前記計器間の時間遅れを補正するステップと、前記時間遅れを補正した計測値から物理的な時間変動成分を除去し、相対ランダム成分を算出するステップと、前記相対ランダム成分の標準偏差を算出するステップと、前記相対ランダム成分の正規性を判断するステップと、前記相対ランダム成分の正規性の有無に応じた複数の出力を実施するステップと、を実行することを特徴とする。
その他の手段については、発明を実施するための形態のなかで説明する。
The instrument uncertainty evaluation method of the present invention is characterized in that, in a measurement system equipped with a plurality of instruments for the same measurement object, at least one of the instruments having a calibration record, the method executes the following steps: calculating a relative bias component from the time-averaged values of measurement values by the instruments; correcting the time delay between the instruments for the measurement values from which the relative bias component has been removed ; removing physical time fluctuation components from the measurement values from which the time delay has been corrected to calculate a relative random component ; calculating the standard deviation of the relative random component; determining the normality of the relative random component ; and implementing a plurality of outputs depending on whether the relative random component is normal or not.
Other means will be described in the detailed description of the invention.
本発明によれば、プラントに設置された計器の不確かさの定量評価が可能となる。 This invention makes it possible to quantitatively evaluate the uncertainty of instruments installed in a plant.
以降、本発明を実施するための形態を、各図と数式を参照して詳細に説明する。
《第1の実施形態》
第1の実施形態では、定期検査中に実流検定により不確かさが定量評価されている復水流量計を基準計器とし、そこからの偏差を評価することで、給水流量に関する各計器の不確かさを定量評価する手段を提供する。また、本手段で得られた各計器の不確かさを用いたタービン性能監視手段、データリコンシリエーションによるプラント性能監視手段、計器ドリフト管理による計器校正の適正化手段についても、第2から第4の実施形態で説明する。
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings and equations.
First Embodiment
In the first embodiment, a condensate flow meter whose uncertainty has been quantitatively evaluated by actual flow verification during a periodic inspection is used as a reference instrument, and a means for quantitatively evaluating the uncertainty of each meter related to the feedwater flow rate is provided by evaluating the deviation from that reference instrument. In addition, a turbine performance monitoring means using the uncertainty of each meter obtained by this means, a plant performance monitoring means using data reconciliation, and a means for optimizing meter calibration through meter drift management will also be described in the second to fourth embodiments.
図1は、第1の実施形態に係る計器不確かさ評価システム1の構成を示す構成図である。
計器不確かさ評価システム1は、プラント3から計測値を取得する。この計器不確かさ評価システム1は、計測手段12、相対バイアス成分算出部13、時間遅れ補償部14、給水揺らぎ除去部15、相対ランダム成分算出部16、正規性判断部17、第1出力手段181、第2出力手段182を備える。
FIG. 1 is a diagram showing the configuration of a meter uncertainty evaluation system 1 according to the first embodiment.
The meter uncertainty evaluation system 1 acquires measurement values from a plant 3. The meter uncertainty evaluation system 1 includes a measurement means 12, a relative bias component calculation unit 13, a time delay compensation unit 14, a water supply fluctuation elimination unit 15, a relative random component calculation unit 16, a normality determination unit 17, a first output means 181, and a second output means 182.
計測手段12は、プラント3の給水流量を計測する複数の流量計(計器)から計測値を取得する。
相対バイアス成分算出部13は、これら複数の計器の内、少なくとも1つが校正記録を有している計測系統において、計器による計測値の時間平均値から相対バイアス成分を算出する。
The measuring means 12 acquires measurement values from a plurality of flow meters (meters) that measure the feedwater flow rate of the plant 3 .
The relative bias component calculation unit 13 calculates the relative bias component from the time average value of the measurement values of the instruments in the measurement system in which at least one of the instruments has a calibration record.
時間遅れ補償部14は、各計測値の計器間の時間遅れを算出する。
給水揺らぎ除去部15は、各計測値の計器間の物理的な時間変動成分を除去する時間変動成分除去部として機能する。これにより、給水揺らぎとランダム誤差とを分離することができる。
The time delay compensation unit 14 calculates the time delay between the meters for each measurement value.
The water supply fluctuation removal unit 15 functions as a time fluctuation component removal unit that removes the physical time fluctuation component between the meters of each measurement value, thereby making it possible to separate water supply fluctuation from random errors.
相対ランダム成分算出部16は、物理的な時間変動を除去した成分から相対ランダム成分を算出する。この相対ランダム成分は、計測値から相対バイアス成分と時間変動成分を除去したものであり、計器が正常な場合には正規性を有していることが期待される。 The relative random component calculation unit 16 calculates the relative random component from the component with physical time fluctuations removed. This relative random component is the measured value with the relative bias component and time fluctuation component removed, and is expected to be normal if the instrument is operating normally.
正規性判断部17は、給水揺らぎ除去部15の出力データから正規性の有無を判断する。正規性判断部17は、正規性を有している場合には第1出力手段181から各計器の不確かさを定量的に出力させ、正規性を有していない場合には第2出力手段182から各計器の不確かさを定量的に出力させる。第1出力手段181と第2出力手段182は、計測値の相対ランダム成分の正規性の有無に応じた複数の出力手段である。これにより計器不確かさ評価システム1は、計器の不確かさを定量的に評価可能である。 The normality determination unit 17 determines whether or not the output data from the water supply fluctuation removal unit 15 is normal. If normality is found, the normality determination unit 17 causes the first output means 181 to quantitatively output the uncertainty of each meter, and if normality is not found, causes the second output means 182 to quantitatively output the uncertainty of each meter. The first output means 181 and the second output means 182 are multiple output means corresponding to whether or not the relative random component of the measurement value is normal. This enables the meter uncertainty evaluation system 1 to quantitatively evaluate the uncertainty of the meter.
図2は、プラント3の構成を示す構成図である。
プラント3は、復水器30と、ポンプ31と、給水ポンプ39と、復水ろ過脱塩装置33と、空気抽出器35と、復水器36と、低圧給水加熱器37と、高圧給水加熱器41と、原子炉圧力容器43と、高圧タービン46と、湿分分離器47と、低圧タービン48とを含んで構成される。なお、図では高圧タービン46のことを「高圧TB」と省略して記載している。
FIG. 2 is a diagram showing the configuration of the plant 3.
The plant 3 includes a condenser 30, a pump 31, a feedwater pump 39, a condensate filtration and demineralization unit 33, an air ejector 35, a condenser 36, a low-pressure feedwater heater 37, a high-pressure feedwater heater 41, a reactor pressure vessel 43, a high-pressure turbine 46, a moisture separator 47, and a low-pressure turbine 48. In the figure, the high-pressure turbine 46 is abbreviated as "high-pressure TB."
復水器30,36は、蒸気を復水する。ポンプ31と給水ポンプ39は、水を次の構成要素に送り出す。復水ろ過脱塩装置33は、復水された水をろ過すると共に脱塩する。空気抽出器35は、水に混入した空気を抽出する。低圧給水加熱器37は、低圧タービン48に接続されて水を加熱する。高圧給水加熱器41は、高圧タービン46に接続されて水を加熱する。原子炉圧力容器43は、核燃料が装荷された炉心を内蔵し、その炉心で軽水を加熱させて沸騰させた際の蒸気を得ている。その蒸気は蒸気配管を通して高圧タービン46と、湿分分離器47と、低圧タービン48とに導かれる。 Condensers 30 and 36 condense the steam. Pump 31 and feedwater pump 39 send the water to the next component. Condensate filtration and demineralization unit 33 filters and demineralizes the condensed water. Air ejector 35 extracts air mixed in the water. Low-pressure feedwater heater 37 is connected to low-pressure turbine 48 to heat water. High-pressure feedwater heater 41 is connected to high-pressure turbine 46 to heat water. Reactor pressure vessel 43 houses a core loaded with nuclear fuel, and obtains steam when light water is heated and boiled in the core. The steam is conducted through steam piping to high-pressure turbine 46, moisture separator 47, and low-pressure turbine 48.
主蒸気配管から低圧タービン48へ入った乾燥蒸気は、低圧タービン48を駆動した後に、この低圧タービン48から吐出される。吐出された蒸気は、低圧タービン48の下部に設置された復水器30で凝縮されて水になり、その水は再び原子炉圧力容器43への給水になる。 Dry steam enters the low-pressure turbine 48 from the main steam pipe, drives the low-pressure turbine 48, and is then discharged from the low-pressure turbine 48. The discharged steam is condensed into water in the condenser 30 installed below the low-pressure turbine 48, and this water is then used again as feedwater for the reactor pressure vessel 43.
この水は、以下に示す機器を通して原子炉圧力容器43に戻される。復水器30から吐出された水は、ポンプ31で昇圧された後、復水ろ過脱塩装置33を通過し原子炉給水として十分な水質に浄化処理される。浄化処理された水は、空気抽出器35と復水器36を経て、低圧給水加熱器37にて加熱され、給水ポンプ39で昇圧された後に高圧給水加熱器41で加熱される。加熱された水は、原子炉圧力容器43へ送られる。原子炉圧力容器43で加熱された水は、高圧タービン46を回転されたのちに湿分分離器47によって不要な水が除去されたのちに、低圧タービン48に導かれる。 This water is returned to the reactor pressure vessel 43 through the equipment described below. The water discharged from the condenser 30 is pressurized by the pump 31, then passes through the condensate filtration and demineralization unit 33 to be purified to a quality sufficient for use as reactor feedwater. The purified water passes through the air ejector 35 and the condenser 36, is heated by the low-pressure feedwater heater 37, is pressurized by the feedwater pump 39, and is then heated by the high-pressure feedwater heater 41. The heated water is sent to the reactor pressure vessel 43. The water heated in the reactor pressure vessel 43 is rotated through the high-pressure turbine 46, has unnecessary water removed by the moisture separator 47, and is then directed to the low-pressure turbine 48.
プラント3は更に、給水流量を計測するための計器として、復水流量計32、流量計34,38、給水流量計42、流量計45および水位計44を含んで構成される。 Plant 3 further includes instruments for measuring feedwater flow rates, including a condensate flow meter 32, flow meters 34 and 38, a feedwater flow meter 42, a flow meter 45, and a water level meter 44.
復水流量計32は、ポンプ31が送り出す水の流量を計測する。流量計34は、復水ろ過脱塩装置33から流れ出る水の流量を計測する。流量計38は、給水ポンプ39の入口流量を計測する。給水流量計42は、原子炉圧力容器43に給水する流量を計測する。流量計45は、原子炉圧力容器43から高圧タービン46に送られる蒸気の流量を計測する。そして水位計44は、原子炉圧力容器43の水位を計測する。 Condensate flow meter 32 measures the flow rate of water pumped out by pump 31. Flow meter 34 measures the flow rate of water flowing out from condensate filtration and demineralization unit 33. Flow meter 38 measures the inlet flow rate of feedwater pump 39. Feedwater flow meter 42 measures the flow rate of water fed to reactor pressure vessel 43. Flow meter 45 measures the flow rate of steam sent from reactor pressure vessel 43 to high-pressure turbine 46. And water level gauge 44 measures the water level in reactor pressure vessel 43.
計器不確かさ評価システム1は、まず、プラント3の各計器から計測手段12を介して実測値を取得する。
i番目の計器で取得された実測値Xi(t)は、時間t、真値Zi(t)、不確かさのランダム成分Ei(t)、不確かさのバイアス成分Bi、計器間の時間遅れτiを用いると、以下の式(1)で表される。
The actual measurement value Xi(t) obtained by the i-th instrument is expressed by the following equation (1) using time t, true value Zi(t), random component of uncertainty Ei(t), bias component of uncertainty Bi, and time delay τi between instruments.
同一の対象を複数の計器で計測する場合、真値は同一となるので、以下の式(2)で表わされる。
本実施形態では、式(2)を用いて各計器の不確かさ(Ei+Bi)を定量評価する。本実施形態では、i=0の計器を、復水流量を計測する基準計器である流量計34とする。i=1の計器は、給水ポンプ39の入口流量を計測する流量計38とする。i=2の計器は、給水流量を計測する給水流量計42する。i=3の計器は、復水ろ過脱塩装置33の入口流量を計測する復水流量計32とする。 In this embodiment, the uncertainty (Ei+Bi) of each meter is quantitatively evaluated using equation (2). In this embodiment, the meter with i=0 is the flow meter 34, which is the reference meter that measures the condensate flow rate. The meter with i=1 is the flow meter 38 that measures the inlet flow rate of the feedwater pump 39. The meter with i=2 is the feedwater flow meter 42 that measures the feedwater flow rate. The meter with i=3 is the condensate flow meter 32 that measures the inlet flow rate of the condensate filtration demineralization device 33.
相対バイアス成分算出部13は、時間平均を有限で打ち切ることによる残余項εの許容値および許容値を満足する時間平均回数nを定め、各計器の時間平均値を算出する。εの許容値は、例えば基準計器の不確かさバイアス成分の1/100とするとよい。 The relative bias component calculation unit 13 determines the tolerance for the residual term ε resulting from finitely truncating the time average and the number of time averages n that satisfies the tolerance, and calculates the time average value for each instrument. The tolerance for ε may be set to, for example, 1/100 of the uncertainty bias component of the reference instrument.
図3と図4を参照して、時間平均回数nを定める手順を説明する。
相対バイアス成分算出部13は、全ての計器の計測値を、十分長い期間(例えば1時間)、時間平均した基準平均値を算出し(ステップS10)、対象となる計器の時間平均値を算出する(ステップS11)。相対バイアス成分算出部13は、基準平均値との偏差を時間平均回数nに対してグラフ化する(ステップS12)。このグラフを図4に示す。
The procedure for determining the time average number n will be described with reference to FIGS.
The relative bias component calculation unit 13 calculates a reference average value by time-averaging the measurement values of all instruments over a sufficiently long period (e.g., one hour) (step S10), and calculates the time average value of the target instrument (step S11). The relative bias component calculation unit 13 graphs the deviation from the reference average value against the time average number n (step S12). This graph is shown in Figure 4.
図4の縦軸は、基準平均値との偏差である。図4の横軸は、時間平均回数nである。グラフの実線は、流量計34の時間平均値である。グラフの細破線は、流量計38の時間平均値である。グラフの粗い破線は、給水流量計42の時間平均値である。ここでは全ての計器のn回後の時間平均値が、許容値である残余項ε以下となったことを示している。 The vertical axis of Figure 4 represents the deviation from the reference average value. The horizontal axis of Figure 4 represents the number of time averages n. The solid line on the graph represents the time average value of flow meter 34. The thin dashed line on the graph represents the time average value of flow meter 38. The coarse dashed line on the graph represents the time average value of feedwater flow meter 42. Here, it is shown that the time average values after n times for all meters are below the allowable value of the residual term ε.
相対バイアス成分算出部13は、全ての計器において偏差がεの許容値を下回った段階のnを以降の評価における時間平均回数として採用すると(ステップS13)、図3の処理を終了する。
相対バイアス成分算出部13は、運転サイクル中に一度だけ本手順を実施すればよい。各計器で得られた実測値をn回平均するとXiの平均値が得られる。Xiの平均値は、式(2)から以下の式(3)のように導かれる。
The relative bias component calculation unit 13 uses n, the stage at which the deviations in all the instruments fall below the allowable value of ε, as the time-average frequency for subsequent evaluations (step S13), and then ends the processing of FIG.
The relative bias component calculation unit 13 only needs to perform this procedure once during a driving cycle. The average value of Xi is obtained by averaging the actual measurement values obtained from each instrument n times. The average value of Xi is derived from equation (2) as shown in the following equation (3).
式(3)を変形し、基準計器の不確かさのバイアス成分B0からの相対バイアス成分ΔBi
(=Bi-B0)を求める。ΔBiの計算式は以下の通りである。
(=Bi-B0) is calculated. The formula for calculating ΔBi is as follows:
相対バイアス成分算出部13は、式(2)から式(4)を差し引くことで、相対バイアス成分ΔBiを除いた実測値X'iを算出する。以上が相対バイアス成分算出部13の機能である。 The relative bias component calculation unit 13 calculates the actual measurement value X'i excluding the relative bias component ΔBi by subtracting equation (4) from equation (2). This completes the function of the relative bias component calculation unit 13.
図5は、相対バイアス成分算出部13の入力データの一例を示すグラフである。グラフの縦軸は給水流量の実測値Xiを示し、横軸は時間を示している。X0は基準計器である流量計34の実測値である。X1は流量計38の実測値である。X2は給水流量計42の実測値である。X3は復水流量計32の実測値である。 Figure 5 is a graph showing an example of input data to the relative bias component calculation unit 13. The vertical axis of the graph represents the actual measured value Xi of the feedwater flow rate, and the horizontal axis represents time. X0 is the actual measured value of the flow meter 34, which is the reference instrument. X1 is the actual measured value of the flow meter 38. X2 is the actual measured value of the feedwater flow meter 42. X3 is the actual measured value of the condensate flow meter 32.
図6は、相対バイアス成分算出部13の出力データの一例を示すグラフである。グラフの縦軸は相対バイアス成分を除去した給水流量X'iを示し、横軸は時間を示している。X'0は基準計器である流量計34の実測値から相対バイアス成分ΔBiを除去した値である。X'1は流量計38の実測値から相対バイアス成分ΔBiを除去した値である。X'2は給水流量計42の実測値から相対バイアス成分ΔBiを除去した値である。X'3は、復水流量計32の実測値から相対バイアス成分ΔBiを除去した値である。図5のグラフのプロットに比べて図6のグラフでは、各計器の計測値の差が少なくなっている。 Figure 6 is a graph showing an example of output data from the relative bias component calculation unit 13. The vertical axis of the graph represents the feedwater flow rate X'i with the relative bias component removed, and the horizontal axis represents time. X'0 is the value obtained by removing the relative bias component ΔBi from the actual measurement value of flow meter 34, which is the reference instrument. X'1 is the value obtained by removing the relative bias component ΔBi from the actual measurement value of flow meter 38. X'2 is the value obtained by removing the relative bias component ΔBi from the actual measurement value of feedwater flow meter 42. X'3 is the value obtained by removing the relative bias component ΔBi from the actual measurement value of condensate flow meter 32. Compared to the plots in the graph of Figure 5, the difference in the measurement values of each instrument is smaller in the graph of Figure 6.
図1に戻り説明を続ける。時間遅れ補償部14は、基準計器における時間を基準とし、そこからの各計器における時間遅れτiを補正する。時間遅れの発生要因は主に、圧力波が計器間の配管内を伝播する時間である。時間遅れ補償部14は、計器間の配管長さLi、計器間の平均流速Vi、計器間の平均音速Ciから時間遅れτiを以下の式で評価する。
配管長さLiは、設計図面から求められる。平均流速Viは、流量の時間平均値を配管断面積で除した値から求められる。平均音速Ciは、管内流体の平均圧力および平均温度から蒸気表を介して求められる。時間遅れ補償部14は、式(5)で求めた各計器における時間遅れτiを用いて相対バイアス成分を除いた実測値を補正する。より正確に時間遅れを評価するため、数値流体力学(CFD)に基づく数値計算結果を用いてもよい。 The pipe length Li can be determined from the design drawings. The average flow velocity Vi can be determined by dividing the time-averaged value of the flow rate by the cross-sectional area of the pipe. The average sound speed Ci can be determined from the average pressure and average temperature of the fluid inside the pipe via a steam table. The time delay compensation unit 14 corrects the measured value, excluding the relative bias component, using the time delay τi for each instrument calculated using equation (5). To evaluate the time delay more accurately, numerical calculation results based on computational fluid dynamics (CFD) can also be used.
図7は、時間遅れ補償部14の出力データの一例を示す図である。グラフの縦軸は相対バイアス成分と時間遅れを補償した給水流量X'iを示し、横軸は時間を示している。X'0は基準計器である流量計34の実測値から相対バイアス成分と時間遅れを補償した値である。X'1は流量計38の実測値から相対バイアス成分と時間遅れを補償した値である。X'2は給水流量計42の実測値から相対バイアス成分と時間遅れを補償した値である。X'3は復水流量計32の実測値から相対バイアス成分と時間遅れを補償した値である。図6のグラフのプロットに比べて図7のグラフでは、各計器の値の位相差が少なくなっている。 Figure 7 shows an example of output data from the time delay compensation unit 14. The vertical axis of the graph represents the feedwater flow rate X'i compensated for the relative bias component and time delay, and the horizontal axis represents time. X'0 is the value obtained by compensating for the relative bias component and time delay from the actual measurement value of flow meter 34, which is the reference instrument. X'1 is the value obtained by compensating for the relative bias component and time delay from the actual measurement value of flow meter 38. X'2 is the value obtained by compensating for the relative bias component and time delay from the actual measurement value of feedwater flow meter 42. X'3 is the value obtained by compensating for the relative bias component and time delay from the actual measurement value of condensate flow meter 32. Compared to the plots in the graph of Figure 6, the phase difference between the values of each instrument is smaller in the graph of Figure 7.
図1に戻り説明を続ける。給水揺らぎ除去部15は、相対バイアス成分および時間遅れが除去された実測値から給水揺らぎ成分を特定して除去する。式(2)において相対バイアス成分ΔBiを除去し、時間遅れτiを補償すると、給水流量X'i(i=0から3)は以下の通りとなる。
給水揺らぎは実現象であるため、真値Z(t)の時間変動成分として各計器で計測される。式(7)、式(8)、式(9)から、それぞれ式(6)を差し引くことで、流量の実測値から給水揺らぎおよびバイアス成分が除去された値の時間変動成分を得ることができる。 Because water supply fluctuations are a real phenomenon, they are measured by each meter as the time-varying component of the true value Z(t). By subtracting equation (6) from equations (7), (8), and (9), respectively, we can obtain the time-varying component of the value with water supply fluctuations and bias components removed from the actual measured flow rate value.
図1に戻り説明を続ける。相対ランダム成分算出部16は、給水揺らぎ除去部15の出力データを用いて相対ランダム成分の標準偏差を算出する。基準計器の不確かさランダム成分E0からの相対値を相対ランダム成分ΔEi(=Ei-E0)と定義すると、給水揺らぎ除去部15の出力データは、以下の式(10)から式(12)で示される。
図8は、給水揺らぎ除去部15の出力データの一例を示す図である。図8の縦軸は、給水ゆらぎを除く実測値の時間変動成分を示し、横軸は時間を示している。細かい破線は、基準計器に対する流量計38の相対ランダム成分ΔE1である。粗い破線は、基準計器に対する給水流量計42の相対ランダム成分ΔE2である。実線は、基準計器に対する復水流量計32の相対ランダム成分ΔE3である。 Figure 8 shows an example of output data from the feedwater fluctuation elimination unit 15. The vertical axis of Figure 8 represents the time-varying component of the actual measured value excluding feedwater fluctuation, and the horizontal axis represents time. The fine dashed line represents the relative random component ΔE1 of the flow meter 38 relative to the reference meter. The coarse dashed line represents the relative random component ΔE2 of the feedwater flow meter 42 relative to the reference meter. The solid line represents the relative random component ΔE3 of the condensate flow meter 32 relative to the reference meter.
給水揺らぎ除去部15の出力データである相対ランダム成分ΔEiが正規分布に従う場合、相対ランダム誤差の標準偏差σΔEiおよび各計器の標準偏差σEiには以下の統計的関係が成り立つ。
相対ランダム成分算出部16は、給水揺らぎ除去部15の出力データである相対ランダム成分ΔE1、ΔE2、ΔE3の分散を計算して、その平方根を算出する。これにより相対ランダム成分算出部16は、各計器における相対ランダム成分ΔEiの標準偏差σΔEiを出力する。 The relative random component calculation unit 16 calculates the variance of the relative random components ΔE1, ΔE2, and ΔE3, which are the output data of the water supply fluctuation elimination unit 15, and then calculates the square root of the variance. As a result, the relative random component calculation unit 16 outputs the standard deviation σ ΔEi of the relative random component ΔEi for each instrument.
図9は、正規性判断部17の出力データの一例を示す図である。このデータは計器番号欄と、歪度欄と、尖度欄と、正規性欄とを含み、各列に各計器の出力データの判定結果が格納される。計器番号欄には、計器を識別するための番号が格納される。歪度欄には、この計器の計測データの分布がどれだけ非対象に歪んでいるかを示す指標が格納される。尖度欄には、この計器の計測データの分布が正規分布と比べてどれだけ尖っているかを示す指標が格納される。正規性欄には、この計器の計測データの分布が所定の正規性を有するか否かを示す判断結果が格納される。なお、正規性を有するときの判断結果は"OK"となり、正規性を有さないときの判断結果は"NG"となる。 Figure 9 is a diagram showing an example of output data from the normality determination unit 17. This data includes an instrument number column, a skewness column, a kurtosis column, and a normality column, with each column storing the determination result for the output data of each instrument. The instrument number column stores a number used to identify the instrument. The skewness column stores an index indicating how asymmetrically skewed the distribution of the measurement data of this instrument is. The kurtosis column stores an index indicating how peaked the distribution of the measurement data of this instrument is compared to a normal distribution. The normality column stores a determination result indicating whether the distribution of the measurement data of this instrument has a predetermined normality. Note that if normality is found, the determination result will be "OK", and if normality is not found, the determination result will be "NG".
正規性判断部17は、給水揺らぎ除去部15の出力データから正規性の有無を判断し、相対ランダム成分算出部16の出力データの採用可否を判断する。正規性判断部17は、入力データである相対ランダム成分ΔE1、ΔE2、ΔE3の度数分布を出力する。そして、正規性判断部17は、各度数分布の歪度および尖度を算出して、定量的に正規性の有無を判断する。正規性有りと判断する範囲は、例えば、歪度が0.0以上かつ0.5以下、尖度が2.5以上かつ3.5以下であるが、これに限られない。
なお、相対ランダム成分ΔE1、ΔE2、ΔE3の度数分布を正規分布のフィッティングカーブと比較可能に表示することで、ユーザが正規性を定性的に確認する手段を設けてもよい。
The normality determination unit 17 determines whether the output data from the water supply fluctuation removal unit 15 is normal and determines whether the output data from the relative random component calculation unit 16 can be used. The normality determination unit 17 outputs the frequency distribution of the relative random components ΔE1, ΔE2, and ΔE3, which are the input data. The normality determination unit 17 then calculates the skewness and kurtosis of each frequency distribution to quantitatively determine whether the data is normal. The ranges for determining whether the data is normal are, for example, skewness between 0.0 and 0.5, and kurtosis between 2.5 and 3.5, but are not limited thereto.
It is also possible to provide a means for the user to qualitatively confirm normality by displaying the frequency distribution of the relative random components ΔE1, ΔE2, and ΔE3 so that it can be compared with a fitting curve of a normal distribution.
図10は、正規性判断部17の出力データの一例を示すグラフである。
このグラフの縦軸は度数を示し、横軸は時間変動量を示している。実線は正規分布のフィッティングカーブである。
FIG. 10 is a graph showing an example of output data from the normality determining unit 17.
The vertical axis of this graph shows frequency, and the horizontal axis shows the amount of time variation. The solid line is a fitting curve for the normal distribution.
正規性判断部17にて給水ゆらぎを除去した実測値が正規性有りと判断された場合、第1出力手段181は、各計器の不確かさを定量的に算出して出力する。相対バイアス成分算出部13の出力である相対バイアス成分ΔBi(=Bi-B0)において、基準計器のバイアス成分B0は定期検査時の計器校正記録から既知であるので、以下の式(16)で各計器のバイアス成分Biを算出する。
正規性判断部17の結果から、各計器において式(13)から式(15)までが成立するので、相対ランダム成分算出部16の出力である相対ランダム成分の標準偏差σΔEiを用いて各計器のランダム成分を定量評価する。基準計器のランダム成分σE0は、定期検査時の計器校正記録から既知であるので、以下の式(17)で各計器のランダム成分を算出する。
以上の手続きから各計器の不確かさ(Bi+σEi)が求まり、給水流量の不確かさを定量的に把握することが可能となる。これらの値をプロセスコンピュータに入力して表示することで、熱出力管理を適正化したプラント運転が可能となるため、過度な保守性を排除し、許認可熱出力の範囲内で発電量を向上させたプラント運転が可能となる。 The above procedure determines the uncertainty of each instrument (Bi + σ Ei ), making it possible to quantitatively grasp the uncertainty of the feedwater flow rate. By inputting these values into the process computer and displaying them, plant operation with optimized thermal power management becomes possible, eliminating excessive conservatism and enabling plant operation with improved power generation within the permitted thermal power output range.
正規性判断部17にて給水ゆらぎを除去した実測値が、正規性無しと判断された場合、第2出力手段182は、各計器の不確かさを定量的に算出して出力する。相対バイアス成分算出部13の出力である相対バイアス成分ΔBi(=Bi-B0)において、基準計器のバイアス成分B0は、定期検査時の計器校正記録から既知である。よって、第2出力手段182は、式(16)で各計器のバイアス成分Biを算出する。正規性判断部17の結果から、各計器において式(13)から式(15)が成立しないので、第2出力手段182は、各計器のランダム成分の標準偏差σEiを、JIS値やプラント納入時の計器仕様表に記載の要求精度値で代替する。 If the normality determination unit 17 determines that the actual measurement value from which the water supply fluctuations have been removed is not normal, the second output means 182 quantitatively calculates and outputs the uncertainty of each instrument. In the relative bias component ΔBi (=Bi - B0) output by the relative bias component calculation unit 13, the bias component B0 of the reference instrument is known from the instrument calibration record during the periodic inspection. Therefore, the second output means 182 calculates the bias component Bi of each instrument using equation (16). Since the result of the normality determination unit 17 indicates that equations (13) to (15) do not hold for each instrument, the second output means 182 replaces the standard deviation σ Ei of the random component of each instrument with the JIS value or the required accuracy value listed in the instrument specification sheet at the time of delivery to the plant.
以上の手続きから各計器の不確かさ(Bi+σEi)が求まり、給水流量の不確かさを定量的に把握することが可能となる。これらの値をプロセスコンピュータに入力して表示することで、熱出力管理を適正化したプラント運転が可能となるため、過度な保守性を排除し、許認可熱出力の範囲内で発電量を向上させたプラント運転が可能となる。 The above procedure determines the uncertainty of each instrument (Bi + σ Ei ), making it possible to quantitatively grasp the uncertainty of the feedwater flow rate. By inputting these values into the process computer and displaying them, plant operation with optimized thermal power management becomes possible, eliminating excessive conservatism and enabling plant operation with improved power generation within the permitted thermal power output range.
本実施形態の計器不確かさ評価システム1によれば、実流検定が行われず、給水ドリフトや流量係数の外挿偏差を考慮して保守的に評価されている給水流量計の不確かさを、プラント運転データから定量的に評価することができる。これによりプラントの熱出力管理を適正化し、許認可熱出力の範囲内で発電量を向上させることが可能となる。 The meter uncertainty evaluation system 1 of this embodiment can quantitatively evaluate the uncertainty of feedwater flow meters, which are not subjected to actual flow calibration and are conservatively evaluated taking into account feedwater drift and extrapolated deviations of the flow coefficient, from plant operation data. This makes it possible to optimize the plant's thermal power output management and increase power generation within the permitted thermal power output range.
また、計器不確かさ評価システム1で得られた運転データに基づく各計器の不確かさを用いることで、高精度なタービン性能監視、プラント性能監視が可能となる。各計器の不確かさのトレンドから、各計器の校正時期を適正化し、計器校正物量を低減することが可能となる。 In addition, by using the uncertainty of each instrument based on the operating data obtained by the instrument uncertainty evaluation system 1, highly accurate turbine performance monitoring and plant performance monitoring becomes possible. Based on the uncertainty trend of each instrument, it becomes possible to optimize the calibration timing of each instrument and reduce the amount of instrument calibration required.
《第2の実施形態》
第2の実施形態では、第1の実施形態で得られた各計器の不確かさを用いたタービン性能監視手段について説明する。
Second Embodiment
In the second embodiment, a turbine performance monitoring means using the uncertainties of the instruments obtained in the first embodiment will be described.
図11は、第2の実施形態の計器不確かさ評価システム1Aの構成を示す構成図である。第2の実施形態の計器不確かさ評価システム1Aは、第1の実施形態と基本的な構成は同じであるが、水位変動値補正部19が追加された構成となっている。
水位変動値補正部19は、プラント3の水位変動を補正する機能を有する。
11 is a configuration diagram showing the configuration of a meter uncertainty evaluation system 1A according to the second embodiment. The meter uncertainty evaluation system 1A according to the second embodiment has the same basic configuration as that of the first embodiment, but is configured with a water level fluctuation value correction unit 19 added.
The water level fluctuation value correction unit 19 has a function of correcting water level fluctuations in the plant 3.
図2で示したように、原子力プラントは、給水配管から供給される給水を原子炉内の炉心で加熱し、蒸気を発生させて高圧タービン46や低圧タービン48を駆動して発電する。原子炉の熱出力管理に加え、蒸気タービンの性能監視もプラント熱効率の向上には重要である。蒸気タービンの性能監視には、流入する蒸気流量を正確に把握することが必要である。しかし、原子炉内には水位が形成されて時間的に変動するため、原子炉入口の給水流量の瞬時値と、原子炉出口の主蒸気流量の瞬時値とは、一致しない。 As shown in Figure 2, a nuclear power plant heats feedwater supplied from the feedwater piping in the reactor core, generating steam that drives a high-pressure turbine 46 and a low-pressure turbine 48 to generate electricity. In addition to managing the thermal output of the reactor, monitoring the performance of the steam turbine is also important for improving the thermal efficiency of the plant. Monitoring the performance of the steam turbine requires an accurate understanding of the flow rate of the incoming steam. However, because the water level forms within the reactor and fluctuates over time, the instantaneous value of the feedwater flow rate at the reactor inlet and the instantaneous value of the main steam flow rate at the reactor outlet do not match.
第2の実施形態は、上記の課題を鑑みて考案したものである。第2の実施形態の計器不確かさ評価システム1Aによれば、給水流量に加え、タービン性能監視に必要となる主蒸気流量の不確かさも運転データから定量的に評価でき、プラントの効率的な運転が可能となる。 The second embodiment was devised in consideration of the above-mentioned issues. The instrument uncertainty evaluation system 1A of the second embodiment can quantitatively evaluate the uncertainty of not only the feedwater flow rate but also the main steam flow rate required for turbine performance monitoring from operational data, enabling efficient plant operation.
以下に、第2の実施形態の計器不確かさ評価システム1Aの動作を説明する。まず、計測手段12は、プラント3の各計器から、主蒸気流量を含む実測値を取得する。本実施形態では、i=0の計器を、基準計器である流量計34とする。i=1の計器は、主蒸気流量計である流量計45とする。i=2の計器は、原子炉水位を計測する水位計44とする。第1の実施形態と同様の変数を用いて、式(18)から式(20)にて各計器で取得された実測値を表す。
ここで、Yは、原子炉水位である。ΔYは、原子炉水位の時間変化量である。Aは、原子炉水面の表面積である。 Here, Y is the reactor water level. ΔY is the change in the reactor water level over time. A is the surface area of the reactor water surface.
相対バイアス成分算出部13は、第1の実施形態と同様に、残余項εの許容値および許容値を満足する時間平均回数nを定め、各計器の時間平均値を算出する。ΔYは原子炉水位の時間変化量であり、原子炉水位は一定となるように制御されていることから、ΔYの時間平均値は0となる。よって、給水流量X0は、以下の式(21)で算出される。
給水流量X1は、以下の式(22)で算出される。
式(22)から式(21)を差し引くことで相対バイアス成分ΔB1(=B1-B0)を求めることができる。そして、式(19)から相対バイアス成分ΔB1を差し引くことで、相対バイアス成分ΔB1を除いた実測値X'1を算出し、相対バイアス成分算出部13の出力データとすることができる。 The relative bias component ΔB1 (= B1 - B0) can be obtained by subtracting equation (21) from equation (22). Then, by subtracting the relative bias component ΔB1 from equation (19), the actual measurement value X'1 excluding the relative bias component ΔB1 can be calculated, and this can be used as the output data of the relative bias component calculation unit 13.
時間遅れ補償部14は、基準計器における時間を基準とし、そこからの各計器における時間遅れτiを補正する。補正手続きは第1の実施形態と同様であるため、説明を割愛する。 The time delay compensation unit 14 uses the time of the reference instrument as a reference and corrects the time delay τi of each instrument from that time. The correction procedure is the same as in the first embodiment, so a detailed explanation will be omitted.
水位変動値補正部19は、原子炉水位の実測データから、給水流量と主蒸気流量の水位変動に伴う偏差を補正する。原子炉水位の時間変化量ΔYは、式(20)の原子炉水位実測データを用いて以下の式(23)で評価する。
ここで、Δtはサンプリング時間である。X2のバイアス成分B2は時間変化しないので、式(23)を導出する過程で0となる。X2のランダム成分E2は、式(23)を導出する過程で0とはならないが、通常、原子炉水位は複数の計器で計測されているため、それぞれの平均を取ることで、ほぼ0とすることが可能である。水位変動値補正部19は、式(23)により算出される水位の時間変化量ΔY'を出力データとする。 Here, Δt is the sampling time. The bias component B2 of X2 does not change over time, so it becomes 0 in the process of deriving equation (23). The random component E2 of X2 does not become 0 in the process of deriving equation (23), but since the reactor water level is usually measured by multiple instruments, it is possible to make it nearly 0 by taking the average of each measurement. The water level fluctuation value correction unit 19 outputs the amount of change in water level over time ΔY' calculated using equation (23).
給水揺らぎ除去部15は、相対バイアス成分および時間遅れが除去された実測値から給水ゆらぎ成分を特定して除去する。式(18)と式(19)において、相対バイアス成分を除去し、時間遅れを補償すると、実測値X'iは、以下の式(24)と式(25)のようになる。
式(25)から式(24)を差し引くことで、相対ランダム成分ΔE1(=E1-E0)を算出できる。
給水揺らぎ除去部15は、相対ランダム成分ΔE1を出力データとする。
相対ランダム成分算出部16、正規性判断部17、第1出力手段181、第2出力手段182は、第1の実施形態と同様の処理であるため、説明を割愛する。
The water supply fluctuation elimination unit 15 outputs the relative random component ΔE1 as output data.
The relative random component calculation unit 16, normality determination unit 17, first output means 181, and second output means 182 perform the same processing as in the first embodiment, and therefore description thereof will be omitted.
第2の実施形態により、給水流量に加え、タービン性能監視に必要となる主蒸気流量の不確かさも運転データから定量的に評価できる。よって、熱出力管理の適正化に加え、タービン性能監視を高精度化し、タービンメンテナンス時期の適正化や、タービン効率を最大化するプラント運転が可能となる。 The second embodiment allows for quantitative evaluation of the uncertainty of not only the feedwater flow rate but also the main steam flow rate, which is required for turbine performance monitoring, from operational data. This not only optimizes thermal power management, but also enables more accurate turbine performance monitoring, optimizes turbine maintenance timing, and enables plant operation that maximizes turbine efficiency.
《第3の実施形態》
第3の実施形態は、データリコンシリエーションによるプラント性能監視手段について説明する。
Third Embodiment
In the third embodiment, a plant performance monitoring means using data reconciliation will be described.
図12は、第3の実施形態の計器不確かさ評価システム1Bの構成を示す構成図である。第3の実施形態の計器不確かさ評価システム1Bは、第2の実施形態と基本的な構成は同じであるが、プラント性能評価部21が追加された構成となっている。 Figure 12 is a configuration diagram showing the configuration of the instrument uncertainty evaluation system 1B of the third embodiment. The instrument uncertainty evaluation system 1B of the third embodiment has the same basic configuration as the second embodiment, but has an additional plant performance evaluation unit 21.
近年、既設計器の情報から、プラントのヒートバランスを満足する尤もらしい解を求めて、プラント機器の性能劣化や計器ドリフト、蒸気リークを検知するデータリコンシリエーション技術が提案されている。また、機械学習を用いた同様のプラント性能監視技術がある。これらの技術において、各計器の不確かさは補正における重みとして用いられるため、運転データに基づく正確な不確かさ評価が求められている。 In recent years, data reconciliation technology has been proposed that uses information from existing instruments to find a plausible solution that satisfies the plant's heat balance, and detects performance degradation of plant equipment, instrument drift, and steam leaks. There are also similar plant performance monitoring technologies that use machine learning. In these technologies, the uncertainty of each instrument is used as a weight for correction, so accurate uncertainty evaluation based on operational data is required.
第3の実施形態は、上記の課題を鑑みて考案したものである。第3の実施形態の計器不確かさ評価システム1Bは、運転データに基づく正確な不確かさを反映したデータリコンシリエーションを行う。これにより、説明性が高く、高精度な熱出力監視、タービン性能監視、機器性能監視、計器ドリフト監視、蒸気リーク監視が可能となる。 The third embodiment was devised in consideration of the above-mentioned issues. The instrument uncertainty evaluation system 1B of the third embodiment performs data reconciliation that reflects accurate uncertainty based on operational data. This enables highly interpretable and highly accurate thermal power monitoring, turbine performance monitoring, equipment performance monitoring, instrument drift monitoring, and steam leak monitoring.
計測手段12、相対バイアス成分算出部13、時間遅れ補償部14、水位変動値補正部19、給水揺らぎ除去部15、相対ランダム成分算出部16、正規性判断部17、第1出力手段181、第2出力手段182は、第1の実施形態および第2の実施形態と同様であるので説明を割愛する。 The measurement means 12, relative bias component calculation unit 13, time delay compensation unit 14, water level fluctuation value correction unit 19, water supply fluctuation removal unit 15, relative random component calculation unit 16, normality determination unit 17, first output means 181, and second output means 182 are the same as those in the first and second embodiments, so their explanation will be omitted.
プラント性能評価部21は、第1出力手段181または第2出力手段182で出力された運転データに基づく計器不確かさを用いて、プラント性能を評価する。性能評価方法として、例えばデータリコンシリエーションが用いられる。データリコンシリエーションでは、各計器の不確かさ(Bi+σEi)を重みとして、ヒートバランス等で構成される制約条件を満足する尤もらしい解を算出する。評価式は、以下の式(27)と式(28)である。
ここでJは目的関数、xiは補正後の計測値、Fはヒートバランス等で構成される制約条件である。本実施形態では、補正の重みとなる不確かさ(Bi+σEi)が運転データに基づく正確な値となるため、より説明性が高く、高精度なデータリコンシリエーションが可能となる。
補正量の大きさを表すペナルティ値Pは、以下の式(29)で算出できる。
The penalty value P, which indicates the magnitude of the correction amount, can be calculated by the following equation (29).
データリコンシリエーションの出力値であるxiを用いてプラント運転することで、プラントの熱出力管理を適正化しつつ、許認可熱出力の範囲内で発電量を向上したプラント運転が可能となる。また、式(29)に示した補正量の大きさを表すペナルティ値を監視することで、タービン性能監視、機器性能監視、計器ドリフト監視、蒸気リーク監視が可能となる。 Operating the plant using the data reconciliation output value xi enables plant operation that improves power generation within the permitted thermal output range while optimizing plant thermal output management. Furthermore, monitoring the penalty value, which represents the magnitude of the correction amount shown in equation (29), enables turbine performance monitoring, equipment performance monitoring, meter drift monitoring, and steam leak monitoring.
《第4の実施形態》
第4の実施形態は、計器ドリフト管理による計器校正の適正化手段について説明する。
Fourth Embodiment
In the fourth embodiment, a means for optimizing meter calibration by managing meter drift will be described.
図13は、第4の実施形態における計器不確かさ評価システム1Cの構成図である。
第4の実施形態の計器不確かさ評価システム1Cは、第2の実施形態と基本的な構成は同じであるが、計器不確かさ予測部22および計器校正計画部23が追加された構成となっている。
FIG. 13 is a configuration diagram of an instrument uncertainty evaluation system 1C according to the fourth embodiment.
The meter uncertainty evaluation system 1C of the fourth embodiment has the same basic configuration as that of the second embodiment, but is configured with an instrument uncertainty prediction unit 22 and an instrument calibration planning unit 23 added.
原子力プラントには多数の計器があり、現状では時間基準保全により計器校正が実施されている。今後、原子力プラントの稼働率向上には、定期検査期間の短縮が必要であるため、計器校正も不確かさの状態に応じて校正時期を定める状態基準保全に移行することが望ましい。 Nuclear power plants have many instruments, and currently, instrument calibration is carried out using time-based maintenance. In order to improve the availability of nuclear power plants in the future, it will be necessary to shorten the periodic inspection period, so it is desirable to transition to condition-based maintenance, in which instrument calibration timing is determined according to the state of uncertainty.
第4の実施形態は上記の課題を鑑みて考案したものである。第4の実施形態により、運転データに基づく正確な不確かさを算出できる。これにより、プラント3に設置された計器の状態を把握することができ、状態基準保全における計器校正により、計器校正の工数を低減することが可能となる。 The fourth embodiment was devised in consideration of the above issues. The fourth embodiment makes it possible to accurately calculate uncertainty based on operational data. This makes it possible to understand the status of instruments installed in plant 3, and by calibrating instruments in condition-based maintenance, it becomes possible to reduce the man-hours required for instrument calibration.
計測手段12、相対バイアス成分算出部13、時間遅れ補償部14、水位変動値補正部19、給水揺らぎ除去部15、相対ランダム成分算出部16、正規性判断部17、第1出力手段181、第2出力手段182は、第2の実施形態と同様であるので説明を割愛する。 The measurement means 12, relative bias component calculation unit 13, time delay compensation unit 14, water level fluctuation value correction unit 19, water supply fluctuation removal unit 15, relative random component calculation unit 16, normality determination unit 17, first output means 181, and second output means 182 are the same as those in the second embodiment, so their description will be omitted.
計器不確かさ予測部22は、第1出力手段181または第2出力手段182で出力される運転データに基づく計器不確かさを記録しておき、その変化傾向から不確かさ許容値に到達する時期を予測する。不確かさ許容値は例えば、プラント納入時の計器仕様表に記載されている要求精度値とする。 The instrument uncertainty prediction unit 22 records the instrument uncertainty based on the operating data output by the first output means 181 or the second output means 182, and predicts the time when the uncertainty tolerance will be reached based on the trend of change in the uncertainty. The uncertainty tolerance is, for example, the required accuracy value listed in the instrument specification sheet at the time of plant delivery.
不確かさ変化傾向から不確かさ許容値に到達する時期を予測する手段は様々なものがあるが、最も単純なものは線形外挿である。変化傾向に応じて2次関数または高次関数による外挿、多項式による外挿、ニューラルネットワークのような機械学習による予測法を用いてもよい。 There are various methods for predicting when the uncertainty tolerance will be reached based on the uncertainty change trend, but the simplest is linear extrapolation. Depending on the change trend, extrapolation using a quadratic or higher-order function, extrapolation using a polynomial, or prediction methods using machine learning such as neural networks may also be used.
計器校正計画部23は、計器不確かさ予測部22で出力される各計器の不確かさ許容値への到達時期の予測値を受け、計器校正の計画を策定する。ある定期検査に計器校正が集中しないように、計器校正物量が各定期検査で平滑化されるように、計器校正を計画する。 The meter calibration planning unit 23 receives the predicted values for when each meter will reach its uncertainty tolerance, output by the meter uncertainty prediction unit 22, and formulates a meter calibration plan. To avoid concentrating meter calibrations on a particular periodic inspection, the meter calibration plan is designed so that the amount of meter calibration material is evened out over each periodic inspection.
第4の実施形態により、従来、時間基準保全で実施されていた計器校正を状態基準保全に移行することができる。これにより計器校正物量を低減すると共に、各定期検査における計器校正物量を平滑化可能であり、原子力プラントの稼働率向上に必要な定期検査期間の短縮を実現する。 The fourth embodiment allows for the transition from time-based maintenance to condition-based maintenance, which has been the conventional method of meter calibration. This reduces the amount of meter calibration required and smooths out the amount of meter calibration required for each periodic inspection, thereby shortening the periodic inspection required to improve the availability of nuclear power plants.
(変形例)
本発明は上記した実施形態に限定されるものではなく、様々な変形例が含まれる。例えば上記した実施形態は、本発明を分かりやすく説明するために詳細に説明したものであり、必ずしも説明した全ての構成を備えるものに限定されるものではない。ある実施形態の構成の一部を他の実施形態の構成に置き換えることが可能であり、ある実施形態の構成に他の実施形態の構成を加えることも可能である。また、各実施形態の構成の一部について、他の構成の追加・削除・置換をすることも可能である。
(Modification)
The present invention is not limited to the above-described embodiments and includes various modifications. For example, the above-described embodiments have been described in detail to clearly explain the present invention, and are not necessarily limited to those including all of the described configurations. It is possible to replace part of the configuration of one embodiment with the configuration of another embodiment, and it is also possible to add the configuration of another embodiment to the configuration of one embodiment. Furthermore, it is also possible to add, delete, or replace part of the configuration of each embodiment with other configurations.
上記の各構成、機能、処理部、処理手段などは、それらの一部または全部を、例えば集積回路などのハードウェアで実現してもよい。上記の各構成、機能などは、プロセッサがそれぞれの機能を実現するプログラムを解釈して実行することにより、ソフトウェアで実現してもよい。各機能を実現するプログラム、テーブル、ファイルなどの情報は、メモリ、ハードディスク、SSD(Solid State Drive)などの記録装置、または、フラッシュメモリカード、DVD(Digital Versatile Disk)などの記録媒体に置くことができる。 The above-mentioned configurations, functions, processing units, processing means, etc. may be implemented in part or in whole by hardware such as an integrated circuit. The above-mentioned configurations, functions, etc. may also be implemented by software, with a processor interpreting and executing a program that implements each function. Information such as the programs, tables, and files that implement each function can be stored in a storage device such as memory, a hard disk, or an SSD (Solid State Drive), or on a storage medium such as a flash memory card or DVD (Digital Versatile Disk).
各実施形態に於いて、制御線や情報線は、説明上必要と考えられるものを示しており、製品上必ずしも全ての制御線や情報線を示しているとは限らない。実際には、殆ど全ての構成が相互に接続されていると考えてもよい。
本発明の変形例として、例えば、次の(a)~(c)のようなものがある。
(a) 本発明は原子力プラントに限定されず、火力プラントなどの別形態の発電設備に適用してもよく、さらに発電設備以外の任意のプラントに適用してもよい。
(b) 本発明の計器は流量計に限定されず、同一対象を計測する任意の計器に適用してもよい。
(c) 本発明の計器の計測対象は、給水流量に限定されず、圧力や温度を計測対象としてもよく、さらに他のものを計測対象としてもよい。
In each embodiment, the control lines and information lines shown are those that are considered necessary for the explanation, and not all control lines and information lines in the product are necessarily shown. In reality, it can be considered that almost all components are interconnected.
As modified examples of the present invention, for example, the following (a) to (c) are available.
(a) The present invention is not limited to nuclear power plants, but may be applied to other types of power generation facilities such as thermal power plants, and may also be applied to any plants other than power generation facilities.
(b) The meter of the present invention is not limited to a flow meter, but may be applied to any meter that measures the same object.
(c) The measurement object of the meter of the present invention is not limited to the water supply flow rate, but may be pressure or temperature, or may be other measurement objects.
1,1A~1C 計器不確かさ評価システム
3 プラント
12 計測手段
13 相対バイアス成分算出部
14 時間遅れ補償部
15 給水揺らぎ除去部 (時間変動成分除去部)
16 相対ランダム成分算出部
17 正規性判断部
181 第1出力手段
182 第2出力手段
19 水位変動値補正部
21 プラント性能評価部
22 計器不確かさ予測部
23 計器校正計画部
30 復水器
31 ポンプ
32 復水流量計
33 復水ろ過脱塩装置
34 流量計
35 空気抽出器
36 復水器
37 低圧給水加熱器
38 流量計
39 給水ポンプ
41 高圧給水加熱器
42 給水流量計
43 原子炉圧力容器
44 水位計
45 流量計
46 高圧タービン
47 湿分分離器
48 低圧タービン
1, 1A to 1C Instrument Uncertainty Evaluation System 3 Plant 12 Measurement Means 13 Relative Bias Component Calculation Unit 14 Time Delay Compensation Unit 15 Water Supply Fluctuation Removal Unit (Time Fluctuation Component Removal Unit)
16 Relative random component calculation unit 17 Normality determination unit 181 First output means 182 Second output means 19 Water level fluctuation value correction unit 21 Plant performance evaluation unit 22 Meter uncertainty prediction unit 23 Meter calibration planning unit 30 Condenser 31 Pump 32 Condensate flow meter 33 Condensate filtration demineralizer 34 Flow meter 35 Air ejector 36 Condenser 37 Low pressure feed water heater 38 Flow meter 39 Feed water pump 41 High pressure feed water heater 42 Feed water flow meter 43 Reactor pressure vessel 44 Water level gauge 45 Flow meter 46 High pressure turbine 47 Moisture separator 48 Low pressure turbine
Claims (12)
前記計器による計測値の時間平均値から相対バイアス成分を算出する相対バイアス成分算出部と、
前記相対バイアス成分算出部が算出した相対バイアス成分を除いた計測値の前記計器間の時間遅れを補正する時間遅れ補償部と、
前記時間遅れ補償部が補正した計測値から物理的な時間変動成分を除去し、相対ランダム成分を算出する時間変動成分除去部と、
前記時間変動成分除去部が算出した相対ランダム成分の標準偏差を算出する相対ランダム成分算出部と、
前記計測値の前記相対ランダム成分の正規性を判断する正規性判断部と、
を有することを特徴とする計器不確かさ評価システム。 In a measurement system having a plurality of meters for the same measurement object, at least one of the meters has a calibration record,
a relative bias component calculation unit that calculates a relative bias component from a time average value of the measurement value by the meter;
a time delay compensation unit that corrects a time delay between the meters for the measurement value excluding the relative bias component calculated by the relative bias component calculation unit ;
a time fluctuation component removal unit that removes a physical time fluctuation component from the measurement value corrected by the time delay compensation unit and calculates a relative random component ;
a relative random component calculation unit that calculates a standard deviation of the relative random components calculated by the time-varying component removal unit;
a normality determination unit that determines the normality of the relative random component of the measurement value;
An instrument uncertainty evaluation system comprising:
ことを特徴とする請求項1に記載の計器不確かさ評価システム。 The measurement target of the meter is the plant feedwater flow rate.
2. The meter uncertainty evaluation system according to claim 1 .
ことを特徴とする請求項2に記載の計器不確かさ評価システム。 a water level fluctuation value correction unit that corrects deviations of the feedwater flow rate and the main steam flow rate of the plant due to water level fluctuations from the water level fluctuation value of the plant,
3. The meter uncertainty evaluation system according to claim 2.
ことを特徴とする請求項1に記載の計器不確かさ評価システム。 The measurement target of the instrument is the pressure or temperature of the plant.
2. The meter uncertainty evaluation system according to claim 1 .
ことを特徴とする請求項1から4のうち何れか1項に記載の計器不確かさ評価システム。 the normality determination unit determines whether or not the relative random component is normal based on the skewness and kurtosis of the relative random component.
5. The meter uncertainty evaluation system according to claim 1, wherein:
を有することを特徴とする請求項1に記載の計器不確かさ評価システム。 a plurality of output means according to whether or not the relative random component is normal as determined by the normality determination unit;
2. The meter uncertainty evaluation system according to claim 1, further comprising:
前記複数の出力手段で出力された運転データに基づく計器不確かさを用いて、前記プラントの性能を評価するプラント性能評価部を更に備える、
ことを特徴とする請求項6に記載の計器不確かさ評価システム。 The instrument is installed in a plant,
a plant performance evaluation unit that evaluates the performance of the plant using instrument uncertainty based on the operation data output by the plurality of output means;
7. The meter uncertainty evaluation system according to claim 6.
ことを特徴とする請求項7に記載の計器不確かさ評価システム。 the plant performance evaluation unit evaluates the performance of the plant by calculating a likely solution that satisfies predetermined constraint conditions using the uncertainty of each instrument as a weight;
8. The meter uncertainty evaluation system according to claim 7.
前記計器の校正時期と前記計器不確かさ予測部が予測した不確かさの増加傾向に基づき、前記計器の校正計画を策定する計器校正計画部と、を更に備える、
ことを特徴とする請求項6に記載の計器不確かさ評価システム。 an instrument uncertainty prediction unit having a function of predicting an increasing tendency of the uncertainty of the measurement value by the instrument;
and an instrument calibration planning unit that formulates a calibration plan for the meter based on the calibration timing of the meter and the increasing trend of uncertainty predicted by the meter uncertainty prediction unit.
7. The meter uncertainty evaluation system according to claim 6.
前記相対ランダム成分の正規性が有る場合に、
前記相対ランダム成分から求めるランダム成分と、前記相対バイアス成分から求めるバイアス成分との和を前記計器の不確かさとして出力する第1出力手段と、
前記相対ランダム成分の正規性が無い場合に、
前記バイアス成分を前記計器の不確かさとして出力する第2出力手段と、
を含んで構成されることを特徴とする請求項6から9のうち何れか1項に記載の計器不確かさ評価システム。 The plurality of output means include:
When the relative random component is normal,
a first output means for outputting the sum of a random component determined from the relative random component and a bias component determined from the relative bias component as the uncertainty of the instrument ;
In the case where the relative random component is not normal,
a second output means for outputting the bias component as the uncertainty of the instrument;
10. The meter uncertainty evaluation system according to claim 6, comprising:
ことを特徴とする請求項10に記載の計器不確かさ評価システム。 the first output means calculates the random component using a standard deviation of the relative random component;
11. The meter uncertainty evaluation system according to claim 10.
前記計器による計測値の時間平均値から相対バイアス成分を算出するステップと、
前記相対バイアス成分を除いた計測値の前記計器間の時間遅れを補正するステップと、
前記時間遅れを補正した計測値から物理的な時間変動成分を除去し、相対ランダム成分を算出するステップと、
前記相対ランダム成分の標準偏差を算出するステップと、
前記相対ランダム成分の正規性を判断するステップと、
前記相対ランダム成分の正規性の有無に応じた複数の出力を実施するステップと、
を実行することを特徴とする計器不確かさ評価方法。 In a measurement system having a plurality of meters for the same measurement object, at least one of the meters has a calibration record,
calculating a relative bias component from a time average value of the measurement value by the meter ;
correcting the time delay between the meters for the measurement values from which the relative bias components have been removed ;
a step of removing a physical time fluctuation component from the time delay corrected measurement value and calculating a relative random component ;
calculating a standard deviation of the relative random component ;
determining the normality of the relative random component ;
performing a plurality of outputs depending on whether the relative random component is normal or not ;
A method for evaluating instrument uncertainty, comprising:
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2022005308A JP7740997B2 (en) | 2022-01-17 | 2022-01-17 | Instrument uncertainty evaluation system and instrument uncertainty evaluation method |
| PCT/JP2022/037907 WO2023135876A1 (en) | 2022-01-17 | 2022-10-11 | Measuring instrument inaccuracy assessment system and measuring instrument inaccuracy assessment method |
| JP2025115675A JP2025164771A (en) | 2022-01-17 | 2025-07-09 | Instrument uncertainty evaluation system and instrument uncertainty evaluation method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2022005308A JP7740997B2 (en) | 2022-01-17 | 2022-01-17 | Instrument uncertainty evaluation system and instrument uncertainty evaluation method |
Related Child Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2025115675A Division JP2025164771A (en) | 2022-01-17 | 2025-07-09 | Instrument uncertainty evaluation system and instrument uncertainty evaluation method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2023104374A JP2023104374A (en) | 2023-07-28 |
| JP7740997B2 true JP7740997B2 (en) | 2025-09-17 |
Family
ID=87278820
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2022005308A Active JP7740997B2 (en) | 2022-01-17 | 2022-01-17 | Instrument uncertainty evaluation system and instrument uncertainty evaluation method |
| JP2025115675A Pending JP2025164771A (en) | 2022-01-17 | 2025-07-09 | Instrument uncertainty evaluation system and instrument uncertainty evaluation method |
Family Applications After (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2025115675A Pending JP2025164771A (en) | 2022-01-17 | 2025-07-09 | Instrument uncertainty evaluation system and instrument uncertainty evaluation method |
Country Status (2)
| Country | Link |
|---|---|
| JP (2) | JP7740997B2 (en) |
| WO (1) | WO2023135876A1 (en) |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2003270004A (en) | 2002-03-15 | 2003-09-25 | Mitsubishi Heavy Ind Ltd | Device and method for estimating drift of detector, and system for monitoring detector |
| JP2005140613A (en) | 2003-11-06 | 2005-06-02 | Mitsubishi Heavy Ind Ltd | Detector calibrating device |
| JP2013195188A (en) | 2012-03-19 | 2013-09-30 | Hitachi-Ge Nuclear Energy Ltd | Sensor diagnostic device and sensor diagnostic method |
| WO2014091952A1 (en) | 2012-12-14 | 2014-06-19 | 日本電気株式会社 | Sensor monitoring device, sensor monitoring method, and sensor monitoring program |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS6252601A (en) * | 1985-09-02 | 1987-03-07 | Nippon Atom Ind Group Co Ltd | Plant operation supporting system |
| JP5164954B2 (en) * | 2009-09-30 | 2013-03-21 | 日立Geニュークリア・エナジー株式会社 | Device diagnostic method and device diagnostic device |
| CN112345463B (en) * | 2020-11-06 | 2022-08-12 | 武汉颐光科技有限公司 | Ellipsometer-based method for measuring parameters of sample to be measured |
-
2022
- 2022-01-17 JP JP2022005308A patent/JP7740997B2/en active Active
- 2022-10-11 WO PCT/JP2022/037907 patent/WO2023135876A1/en not_active Ceased
-
2025
- 2025-07-09 JP JP2025115675A patent/JP2025164771A/en active Pending
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2003270004A (en) | 2002-03-15 | 2003-09-25 | Mitsubishi Heavy Ind Ltd | Device and method for estimating drift of detector, and system for monitoring detector |
| JP2005140613A (en) | 2003-11-06 | 2005-06-02 | Mitsubishi Heavy Ind Ltd | Detector calibrating device |
| JP2013195188A (en) | 2012-03-19 | 2013-09-30 | Hitachi-Ge Nuclear Energy Ltd | Sensor diagnostic device and sensor diagnostic method |
| WO2014091952A1 (en) | 2012-12-14 | 2014-06-19 | 日本電気株式会社 | Sensor monitoring device, sensor monitoring method, and sensor monitoring program |
Also Published As
| Publication number | Publication date |
|---|---|
| WO2023135876A1 (en) | 2023-07-20 |
| JP2025164771A (en) | 2025-10-30 |
| JP2023104374A (en) | 2023-07-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN100504689C (en) | Detecting faults of system components in a continuous process | |
| Coble et al. | A review of sensor calibration monitoring for calibration interval extension in nuclear power plants | |
| JP2001263006A (en) | Method and apparatus for thermal efficiency diagnosis of combined power plant | |
| CN110431499A (en) | Method for characterizing one or more faults in a system | |
| JP7740997B2 (en) | Instrument uncertainty evaluation system and instrument uncertainty evaluation method | |
| CN110469372B (en) | An Uncertainty Control Method for Steam Turbine Thermal Performance Test | |
| JP2025085779A (en) | Plant equipment deterioration monitoring method and plant equipment deterioration monitoring system | |
| Zhang et al. | Development of online validation and monitoring system for the thermal performance of nuclear power plant in service | |
| WO2024174402A1 (en) | Multi-dimensional precision point inspection method and system for thermal power device | |
| KR102281488B1 (en) | Fuel heating value correction method using data reconciliation technique in thermal power plant | |
| JP4786670B2 (en) | Instrument drift detector | |
| CN110688152A (en) | Software reliability quantitative evaluation method combining software development quality information | |
| Hartner et al. | Model-based data reconciliation to improve accuracy and reliability of performance evaluation of thermal power plants | |
| Matiko et al. | Methodology for developing an automated adaptive system for measuring fluid volume based on gas meter | |
| JP2004171425A (en) | Plant reliability evaluation method and performance evaluation system | |
| Fry | Measurement validation via expected uncertainty | |
| Hashemian | Applying online monitoring for nuclear power plant instrumentation and control | |
| CN111834025A (en) | Evaluation Method for Period Extension of Safety-related Instrument Verification Surveillance Projects in Nuclear Power Plants | |
| US12498684B2 (en) | Estimation device and estimation method | |
| Mazurié et al. | Data Reconciliation for Industrial Experiments | |
| Matinyan et al. | Prototype of a Digital Twin for Extraction Turbine: Development Characteristics and Test Results | |
| Pal et al. | Gas Turbine Thermal Digital Twin: Developing a Data Engineering Framework | |
| CN121388436A (en) | Automatic identification method and application system for steady-state working condition of steam turbine | |
| CN121877123A (en) | A real-time monitoring device for steam inlet flow rate of low-pressure cylinder of power plant heating turbine. | |
| Shevchuk et al. | Optimization of the operating parameters of the measurement channels of a virtual instrument from the reading of the heat energy consumed |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20240604 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20250318 |
|
| A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20250513 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20250704 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20250902 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20250904 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7740997 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |