Pile hole excavation bucket and pile hole excavation method

Info

Publication number
JP7745341B2
JP7745341B2 JP2020207965A JP2020207965A JP7745341B2 JP 7745341 B2 JP7745341 B2 JP 7745341B2 JP 2020207965 A JP2020207965 A JP 2020207965A JP 2020207965 A JP2020207965 A JP 2020207965A JP 7745341 B2 JP7745341 B2 JP 7745341B2
Authority
JP
Japan
Prior art keywords
excavation
expansion
pile hole
link
diameter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2020207965A
Other languages
Japanese (ja)
Other versions
JP2022094846A (en
Inventor
修一 若井
芳雄 平井
裕輝 嵯峨
永一 西吉
光範 洗
光一 豊田
力也 井野口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Corp
Original Assignee
Takenaka Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Corp filed Critical Takenaka Corp
Priority to JP2020207965A priority Critical patent/JP7745341B2/en
Publication of JP2022094846A publication Critical patent/JP2022094846A/en
Application granted granted Critical
Publication of JP7745341B2 publication Critical patent/JP7745341B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Description

本発明は、杭孔掘削バケット及び杭孔掘削方法に関する。 The present invention relates to a pile hole drilling bucket and a pile hole drilling method.

下記特許文献1には、2枚の拡幅翼部を備えた拡底バケットが記載されている。この掘削バケットでは、拡幅翼部が開放することで拡底バケットの直径が拡大され、掘削孔が拡幅される。 Patent Document 1 below describes a wide-bottom bucket equipped with two wide-bottom blades. In this excavation bucket, the wide-bottom blades open to expand the diameter of the wide-bottom bucket and widen the excavation hole.

特開2014-141844号公報JP 2014-141844 A

上記特許文献1の掘削バケットは、2枚の拡幅翼部を備えている。このように、2枚の拡幅翼部によって地盤を掘削する場合、掘削孔と掘削バケットとの接点は2箇所となるが、掘削バケットは、接点以外の方向に振れやすく平面位置が、安定し難い。掘削バケットの平面位置が安定しないと、掘削孔(杭孔)の掘削精度を確保し難い。 The excavation bucket in Patent Document 1 above is equipped with two widening wing sections. When excavating the ground using these two widening wing sections, there are two points of contact between the excavation hole and the excavation bucket, but the excavation bucket is prone to swinging in directions other than the points of contact, making it difficult to stabilize its planar position. If the planar position of the excavation bucket is unstable, it is difficult to ensure the excavation accuracy of the excavation hole (pile hole).

本発明は、上記事実を考慮して、杭孔の掘削精度を高くできる杭孔掘削バケット及び杭孔掘削方法を提供することを目的とする。 In consideration of the above, the present invention aims to provide a pile hole excavation bucket and pile hole excavation method that can improve pile hole excavation accuracy.

一態様の杭孔掘削バケットは、地盤に挿入される回転軸と、前記回転軸に取り付けられ、旋回しながら鉛直方向に沿う軸を中心に回転することで水平方向に押し出されて拡径して前記地盤を掘削可能な3枚の掘削翼と、を備えている。 One embodiment of a pile hole drilling bucket comprises a rotating shaft that is inserted into the ground, and three drilling blades that are attached to the rotating shaft and rotate around an axis that runs vertically while swiveling, thereby being pushed out horizontally and expanding in diameter to excavate the ground.

一態様の杭孔掘削バケットは、回転軸に取付けられ、旋回しながら拡径する3枚の掘削翼によって、地盤を掘削できる。これにより、3枚の掘削翼が面を構成するため、2枚の掘削翼で掘削する場合と比較して、回転軸の平面位置が安定し易い。このため、杭孔の掘削精度が高い。また、4枚以上の掘削翼で掘削する場合と比較して、杭孔掘削バケットの重量を軽量化できる。 One embodiment of the pile hole excavating bucket is attached to a rotary shaft and can excavate the ground using three excavating blades that expand as they rotate. As a result, the three excavating blades form a surface, making it easier to stabilize the planar position of the rotary shaft compared to when excavating with two excavating blades. This results in higher pile hole excavation accuracy. In addition, the weight of the pile hole excavating bucket can be reduced compared to when excavating with four or more excavating blades.

一態様の杭孔掘削バケットは、3枚の前記掘削翼は、前記回転軸に固定された固定リンクに、前記軸を連結部として連結された3つの拡径リンクにそれぞれ連結されており、3つの前記拡径リンクは、3つの前記拡径リンクを同調して拡径させる同調リンクで連結されており、一端部が前記固定リンクに連結され、前記同調リンクが連結された前記拡径リンクに他端部が連結され、伸縮することで前記拡径リンク及び前記掘削翼を回転させる伸縮装置が少なくとも1つ設けられている。 In one embodiment of the pile hole excavation bucket, the three excavation blades are each connected to a fixed link fixed to the rotating shaft, and to three expansion links connected to the shaft as a connecting part, and the three expansion links are connected by a synchronization link that synchronizes and expands the diameters of the three expansion links, and at least one extension device is provided, one end of which is connected to the fixed link and the other end of which is connected to the expansion link to which the synchronization link is connected, and which extends and contracts to rotate the expansion links and the excavation blades.

一態様の杭掘削バケットでは、3枚の掘削翼が、3つの拡径リンクにそれぞれ連結されている。そして、3つの拡径リンクは、3つの拡径リンクを同調して拡径させる同調リンクで連結されている。このため、3枚の掘削翼の拡径量が等しくなる。 In one embodiment of the pile digging bucket, three digging blades are connected to three expansion links, respectively. The three expansion links are connected by a synchronization link that synchronizes the expansion of the three expansion links. Therefore, the expansion amounts of the three digging blades are equal.

また、1つの拡径リンクに伸縮装置を取り付け、この拡径リンクを拡径させることで、3つの拡径リンクを拡径できる。これにより、3枚の掘削翼が同調して拡径する。さらに、3つの拡径リンクにそれぞれ伸縮装置を取り付ければ、1つまたは2つの伸縮装置が故障しても、3枚の掘削翼を旋回拡径させることができる。
請求項1の杭掘削バケットは、地盤に挿入される回転軸と、前記回転軸に取り付けられ、旋回しながら水平方向に押し出されて拡径し前記地盤を掘削可能な3枚の掘削翼と、を備え、3枚の前記掘削翼は、前記回転軸に固定された固定リンクに連結された3つの拡径リンクにそれぞれ連結されており、3つの前記拡径リンクは、3つの前記拡径リンクを同調して拡径させる同調リンクで連結されており、一端部が前記固定リンクに連結され、他端部が前記拡径リンクに連結され、伸縮することで前記拡径リンク及び前記掘削翼を回転させる伸縮装置が少なくとも1つ設けられ、前記伸縮装置は3つ設けられ、それぞれ異なる3つの前記拡径リンクに連結されている。
In addition, by attaching an extension device to one expansion link and expanding the expansion link, the diameters of the three expansion links can be expanded. This allows the three excavation blades to expand in unison. Furthermore, if an extension device is attached to each of the three expansion links, the three excavation blades can still rotate and expand even if one or two of the extension devices fail.
The pile excavation bucket of claim 1 comprises a rotating shaft that is inserted into the ground, and three excavation blades that are attached to the rotating shaft and pushed out horizontally while rotating to expand in diameter and excavate the ground, the three excavation blades are each connected to three expansion links that are connected to a fixed link fixed to the rotating shaft, the three expansion links are connected by a synchronization link that expands the diameters of the three expansion links in unison, and at least one extension device is provided that has one end connected to the fixed link and the other end connected to the expansion link and that extends and contracts to rotate the expansion link and the excavation blade, and three extension devices are provided, each connected to three different expansion links.

請求項2の杭孔掘削バケットは、請求項1に記載の杭孔掘削バケットにおいて、前記掘削翼より上方において前記回転軸に取り付けられ、孔壁へ向かって延出された複数の振れ止め棒と、を備えている。 The pile hole drilling bucket of claim 2 is the pile hole drilling bucket of claim 1 , further comprising a plurality of anti-vibration bars attached to the rotary shaft above the drilling blades and extending toward the hole wall.

請求項2に記載の掘削バケットは、複数の振れ止め棒が、孔壁へ向かって延出されている。このため、掘削バケットが孔壁と触れる支点が多くなり、振れ止め効果が高い。これにより、杭孔の掘削精度を高くできる。 In the excavation bucket according to claim 2 , a plurality of anti-sway bars extend toward the hole wall. This increases the number of fulcrums at which the excavation bucket comes into contact with the hole wall, enhancing the anti-sway effect. This improves the excavation accuracy of the pile hole.

請求項3の杭孔掘削バケットは、請求項1又は2に記載の杭孔掘削バケットにおいて、前記回転軸の下端部に取り付けられ、前記掘削翼が前記地盤を掘削して発生した泥土を溜める底蓋と、前記底蓋を開閉する開閉機構と、を備えている。 The pile hole excavation bucket of claim 3 is the pile hole excavation bucket of claim 1 or 2 , and further comprises a bottom cover attached to the lower end of the rotating shaft for collecting mud generated when the excavation blades excavate the ground, and an opening/closing mechanism for opening and closing the bottom cover.

請求項3に記載の杭孔掘削バケットは、回転軸の下端部に、掘削翼が地盤を掘削して発生した泥土を溜める底蓋が取り付けられている。底蓋に泥土が溜まった状態で杭孔掘削バケットを杭孔から引き抜いて、杭孔とずらした位置で底蓋を開放することで、杭孔から泥土が排出される。これにより、底蓋が無い場合と比較して、効率的に杭孔から排泥できる。 The pile hole excavating bucket according to claim 3 has a bottom cover attached to the lower end of the rotary shaft for collecting mud generated when the excavating blades excavate the ground. When the pile hole excavating bucket is pulled out of the pile hole with the mud collected in the bottom cover, the bottom cover is opened at a position offset from the pile hole, and the mud is discharged from the pile hole. This allows the mud to be discharged from the pile hole more efficiently than when there is no bottom cover.

請求項4の杭孔掘削方法は、地盤を掘削可能な3枚の掘削翼が取付けられた回転軸を地盤に挿入する工程と、前記回転軸を回転させながら、前記掘削翼によって前記地盤を掘削し、杭径が一定の軸部を形成する工程と、前記回転軸の前記地盤への挿入深さに応じて、前記掘削翼を旋回させながら鉛直方向に沿う軸を中心に回転させることで水平方向に押し出して拡径させて前記軸部より削孔幅が大きい拡径部を形成する工程と、を備え、3枚の前記掘削翼は、前記回転軸に固定された固定リンクに連結された3つの拡径リンクにそれぞれ連結されており、3つの前記拡径リンクは、3つの前記拡径リンクを同調して拡径させる同調リンクで連結されており、一端部が前記固定リンクに連結され、他端部が前記拡径リンクに連結され、伸縮することで前記拡径リンク及び前記掘削翼を回転させる伸縮装置が少なくとも1つ設けられ、前記伸縮装置は3つ設けられ、それぞれ異なる3つの前記拡径リンクに連結されているA pile hole drilling method according to claim 4 comprises the steps of: inserting a rotary shaft having three excavation blades attached thereto, into the ground; excavating the ground with the excavation blades while rotating the rotary shaft, thereby forming a shaft portion having a constant pile diameter; and rotating the excavation blades around a vertical axis while pivoting them according to the insertion depth of the rotary shaft into the ground, thereby extruding the excavation blades horizontally and expanding their diameters to form an expanded diameter portion having a larger drilling width than the shaft portion, wherein the three excavation blades are respectively connected to three expansion links which are connected to a fixed link fixed to the rotary shaft, and the three expansion links are connected by synchronization links which synchronize and expand the diameters of the three expansion links, and at least one extension device is provided, one end of which is connected to the fixed link and the other end of which is connected to the expansion link, and which extends and contracts to rotate the expansion link and the excavation blades, and three extension devices are provided, each connected to three different expansion links .

請求項4に記載の杭孔掘削方法では、回転軸に取付けられ、旋回しながら拡径する3枚の掘削翼によって、地盤を掘削する。これにより、2枚の掘削翼で掘削する場合として、回転軸の位置が安定し易い。このため、杭孔の掘削精度が高い。また、4枚以上の掘削翼で掘削する場合と比較して、杭孔掘削バケットの重量を軽量化できる。 In the pile hole drilling method described in claim 4 , the ground is excavated by three excavation blades attached to a rotary shaft and expanding their diameter while rotating. This makes it easier to stabilize the position of the rotary shaft compared to when excavating with two excavation blades. This results in high excavation accuracy of the pile hole. Furthermore, the weight of the pile hole excavation bucket can be reduced compared to when excavating with four or more excavation blades.

また、回転軸の地盤への挿入深さに応じて、3枚の掘削翼を拡径させて軸部より削孔幅が大きい拡径部を形成する。これにより、2枚の掘削翼で掘削する場合と比較して回転軸が振れ難い状態で掘削できるので、杭孔に寸法精度が高い拡径部を形成できる。 In addition, depending on the depth to which the rotary shaft is inserted into the ground, the diameter of the three drilling blades is expanded to form an expanded diameter section with a larger drilling width than the shaft section. This allows the rotary shaft to excavate with less vibration than when drilling with two drilling blades, making it possible to form an expanded diameter section in the pile hole with high dimensional accuracy.

請求項5の杭孔掘削方法は、杭孔掘削バケットを回転させながら地盤を掘削し、杭径が一定の軸部を形成する工程と、回転軸に取り付けられた掘削翼を、前記回転軸の前記地盤への挿入深さに応じて、旋回させながら鉛直方向に沿う軸を中心に回転させることで水平方向に押し出して拡径させて前記軸部より削孔幅が大きい拡径部を形成する工程と、を備え、3枚の前記掘削翼は、前記回転軸に固定された固定リンクに連結された3つの拡径リンクにそれぞれ連結されており、3つの前記拡径リンクは、3つの前記拡径リンクを同調して拡径させる同調リンクで連結されており、一端部が前記固定リンクに連結され、他端部が前記拡径リンクに連結され、伸縮することで前記拡径リンク及び前記掘削翼を回転させる伸縮装置が少なくとも1つ設けられ、前記伸縮装置は3つ設けられ、それぞれ異なる3つの前記拡径リンクに連結されているA pile hole drilling method according to claim 5 comprises the steps of: excavating the ground while rotating a pile hole drilling bucket to form a shaft portion having a constant pile diameter; and rotating an excavation blade attached to a rotating shaft around a vertical axis while pivoting it in accordance with the insertion depth of the rotating shaft into the ground, thereby pushing out the blade in the horizontal direction and expanding its diameter to form an expanded diameter portion having a larger drilling width than the shaft portion, wherein the three excavation blades are respectively connected to three expansion links which are connected to a fixed link fixed to the rotating shaft, and the three expansion links are connected by synchronization links which synchronize and expand the diameters of the three expansion links, and at least one extension device is provided, one end of which is connected to the fixed link and the other end of which is connected to the expansion link, and which extends and contracts to rotate the expansion link and the excavation blade, and three extension devices are provided, each connected to three different expansion links .

請求項5の杭孔掘削方法では、回転軸の地盤への挿入深さに応じて、3枚の掘削翼を拡径させて軸部より削孔幅が大きい拡径部を形成する。これにより、拡径部を2枚の掘削翼で掘削する場合として、回転軸の位置が安定し易い。このため、杭孔の掘削精度が高く、寸法精度が高い拡径部を形成できる。また、拡径部を4枚以上の掘削翼で掘削する場合と比較して、杭孔掘削バケットの重量を軽量化できる。 In the pile hole drilling method of claim 5 , the diameters of the three excavation blades are expanded depending on the insertion depth of the rotary shaft into the ground to form an expanded diameter section with a larger drilling width than the shaft section. This makes it easier to stabilize the position of the rotary shaft compared to when the expanded diameter section is excavated with two excavation blades. This allows for high pile hole excavation accuracy and the formation of an expanded diameter section with high dimensional accuracy. Furthermore, the weight of the pile hole excavation bucket can be reduced compared to when the expanded diameter section is excavated with four or more excavation blades.

本発明によると、杭孔の掘削精度を高くできる。 This invention enables higher drilling accuracy for pile holes.

本発明の実施形態に係る杭孔掘削バケットを示す平面図である。FIG. 1 is a plan view showing a pile hole boring bucket according to an embodiment of the present invention. 本発明の実施形態に係る杭孔掘削バケットを示す立面図である。1 is an elevational view of a pile hole boring bucket according to an embodiment of the present invention; FIG. (A)は本発明の実施形態に係る杭孔掘削方法において、地盤に回転軸を挿入している状態を示す立面図であり、(B)は掘削翼によって地盤を掘削し、杭孔を形成している状態を示す立面図であり、(C)は掘削翼を拡径させて杭孔に拡径部を形成している状態を示す立面図であり、(D)はさらに掘削翼を拡径させて拡径部の拡径幅を調整している状態を示す立面図である。FIG. 1A is an elevation view showing a state in which a rotary shaft is inserted into the ground in a pile hole drilling method according to an embodiment of the present invention; FIG. 1B is an elevation view showing a state in which the ground is excavated by an excavation blade to form a pile hole; FIG. 1C is an elevation view showing a state in which the excavation blade is expanded to form an expanded diameter portion in the pile hole; and FIG. 1D is an elevation view showing a state in which the excavation blade is further expanded to adjust the expanded diameter width of the expanded diameter portion. 杭孔の中間部分に拡径部を形成する場合に、拡径部の下方の杭孔を先行して形成している状態を示す立面図である。FIG. 10 is an elevation view showing a state in which, when forming an enlarged diameter portion in the middle part of a pile hole, the pile hole below the enlarged diameter portion is formed first. 拡径部の下方の杭孔を形成後、掘削翼にアタッチメントを取付けて拡径部を形成した状態を示す立面図である。FIG. 10 is an elevation view showing the state in which an attachment is attached to the excavation blade to form the enlarged diameter portion after forming a pile hole below the enlarged diameter portion.

以下、本発明の実施形態に係る杭孔掘削バケット及び杭孔掘削方法について、図面を参照しながら説明する。各図面において同一の符号を用いて示される構成要素は、同一の構成要素であることを意味する。但し、明細書中に特段の断りが無い限り、各構成要素は一つに限定されず、複数存在してもよい。また、各図面において重複する構成及び符号については、説明を省略する場合がある。なお、本発明は以下の実施形態に限定されるものではなく、本発明の目的の範囲内において構成を省略する又は異なる構成と入れ替える等、適宜変更を加えて実施することができる。 The pile hole drilling bucket and pile hole drilling method according to an embodiment of the present invention will be described below with reference to the drawings. Components indicated with the same reference numerals in each drawing are the same components. However, unless otherwise specified in the specification, each component is not limited to one and may exist in multiple numbers. Furthermore, explanations of duplicated components and reference numerals in each drawing may be omitted. Note that the present invention is not limited to the following embodiments, and can be implemented with appropriate modifications, such as omitting components or replacing them with different components, within the scope of the object of the present invention.

<杭孔掘削バケット>
本発明の実施形態に係る杭孔掘削バケット10(以下、「バケット10」と称す)は、図1に示すように、回転軸20、固定リンク30、拡径リンク32、掘削翼40、伸縮装置50及び同調リンク60を備えている。
<Pile hole digging bucket>
As shown in FIG. 1 , a pile hole excavating bucket 10 (hereinafter referred to as the “bucket 10”) according to an embodiment of the present invention includes a rotating shaft 20, a fixed link 30, an expansion link 32, excavating wings 40, an extension device 50, and a synchronization link 60.

また、バケット10は、図2に示すように、スタビライザ70及び底蓋80を備えている。なお、図2においては、回転軸20、固定リンク30、拡径リンク32、掘削翼40、伸縮装置50及び同調リンク60の連結状態を把握し易くするため、構成を簡略化して図示している。 As shown in Figure 2, the bucket 10 also includes a stabilizer 70 and a bottom cover 80. Note that Figure 2 shows a simplified configuration to make it easier to understand the connection state of the rotating shaft 20, fixed link 30, expansion link 32, excavator blade 40, extension device 50, and synchronization link 60.

(回転軸)
回転軸20は、地盤G(図3参照)に挿入される棒状の軸体であり、この回転軸20が回転することにより、掘削翼40が旋回し、地盤Gを掘削して杭孔Hを形成することができる。
(rotation axis)
The rotating shaft 20 is a rod-shaped shaft that is inserted into the ground G (see Figure 3), and when this rotating shaft 20 rotates, the drilling blade 40 rotates, allowing the ground G to be excavated and a pile hole H to be formed.

(固定リンク、拡径リンク、掘削翼)
固定リンク30は、回転軸20に固定された平板状の金属プレートであり、回転軸20と一体的に回転する。固定リンク30は、平面視にて略三角形状とされ、回転軸20から3方向に向かって放射状に形成されている。そして、三角形状の固定リンク30の頂部のそれぞれに、拡径リンク32が回転可能に連結されている。
(fixed link, expansion link, excavation blade)
The fixed link 30 is a flat metal plate fixed to the rotary shaft 20 and rotates integrally with the rotary shaft 20. The fixed link 30 is substantially triangular in plan view, and is formed radially in three directions from the rotary shaft 20. An expansion link 32 is rotatably connected to each of the apexes of the triangular fixed link 30.

拡径リンク32は、固定リンク30に連結された平板状の金属プレートである。拡径リンク32は、一方の端部が固定リンク30に連結され、矢印N1に示すように、固定リンク30との連結部L1を中心として、固定リンク30に対して回転可能とされている。拡径リンク32が、固定リンク30に連結された一方の端部を中心として上下方向を軸として回転することで、他方の端部が、回転軸20に近づく方向又は回転軸20から遠ざかる方向へ移動する。 The expansion link 32 is a flat metal plate connected to the fixed link 30. One end of the expansion link 32 is connected to the fixed link 30, and as shown by arrow N1, it is rotatable relative to the fixed link 30 around the connection point L1 with the fixed link 30. When the expansion link 32 rotates around one end connected to the fixed link 30 as an axis extending in the vertical direction, the other end moves toward or away from the rotating shaft 20.

拡径リンク32の他方の端部には、掘削翼40が固定されている。掘削翼40は、平面視(杭孔Hを掘削する姿勢において上方から視認した状態、回転軸20の軸方向に沿った方向から視認した状態)で、略円弧状に形成された金属プレートであり、拡径リンク32と固定された先端部に、掘削刃42が形成されている。 A digging blade 40 is fixed to the other end of the expansion link 32. The digging blade 40 is a metal plate formed in a roughly arc shape in plan view (when viewed from above in the position for digging the pile hole H, or when viewed from the direction along the axial direction of the rotation shaft 20), and a digging blade 42 is formed at the tip fixed to the expansion link 32.

拡径リンク32の連結部L1を中心とする回転に伴って、掘削翼40が拡径したり縮径したりする。 The excavation blade 40 expands or contracts in diameter as the expansion link 32 rotates around the connecting portion L1.

なお、「掘削翼40が拡径」するとは、掘削翼40の掘削刃42によって形成される杭孔Hの径が拡径するように、掘削翼40が回転軸20から遠ざかる方向へ移動することを示す。同様に、「掘削翼40が縮径」するとは、掘削翼40によって形成される杭孔Hの径が縮径するように、掘削翼40が回転軸20に近づく方向へ移動することを示す。 Note that "the excavation wing 40 expands in diameter" means that the excavation wing 40 moves away from the rotation shaft 20 so that the diameter of the pile hole H formed by the excavation blade 42 of the excavation wing 40 expands. Similarly, "the excavation wing 40 contracts in diameter" means that the excavation wing 40 moves closer to the rotation shaft 20 so that the diameter of the pile hole H formed by the excavation wing 40 contracts.

拡径リンク32は、3つ設けられており、それぞれ固定リンク30の頂部に連結されている。また、それぞれの拡径リンク32には、掘削翼40が固定されている。すなわち、掘削翼40は、固定リンク30及び拡径リンク32を介して、回転軸20に取付けられている。このため、回転軸20が回転することによって、掘削翼40が回転軸20を中心として旋回する。 There are three expansion links 32, each connected to the top of a fixed link 30. A drilling wing 40 is fixed to each expansion link 32. That is, the drilling wing 40 is attached to the rotating shaft 20 via the fixed link 30 and the expansion link 32. Therefore, when the rotating shaft 20 rotates, the drilling wing 40 pivots around the rotating shaft 20.

本実施形態においては、3枚の掘削翼40におけるそれぞれの掘削刃42が、回転軸20の軸方向からみて、それぞれ約120°ずつ、ずれた位置に配置されている。すなわち、3つの掘削刃42は、それぞれ略正三角形の頂点に配置されている。 In this embodiment, the digging blades 42 of the three digging blades 40 are positioned approximately 120° apart when viewed from the axial direction of the rotation shaft 20. In other words, the three digging blades 42 are positioned at the vertices of a roughly equilateral triangle.

また、掘削翼40は、図2に示すように、立面視(杭孔Hを掘削する姿勢において側方から視認した状態)で、鉛直部40Aと、勾配部40Bと、を備えている。なお、掘削刃42は、鉛直部40A及び勾配部40Bの双方に取り付けられている。 As shown in Figure 2, the excavation blade 40 has a vertical section 40A and a sloped section 40B in an elevation view (viewed from the side in the position in which the pile hole H is being excavated). The excavation blade 42 is attached to both the vertical section 40A and the sloped section 40B.

掘削翼40の鉛直部40Aは、上下方向に沿う部分であり、この部分によって、杭孔Hが掘削される。掘削翼40の勾配部40Bは、鉛直部40Aの上方に形成され、鉛直部40Aの上端部から上方かつ回転軸20側へ傾斜している。この勾配部40Bによって、杭孔Hの拡径部HL(図3参照)の一部が掘削される。 The vertical section 40A of the drilling wing 40 is the section that extends in the up-down direction, and is used to drill the pile hole H. The sloped section 40B of the drilling wing 40 is formed above the vertical section 40A and slopes upward from the upper end of the vertical section 40A toward the rotation shaft 20. This sloped section 40B is used to drill part of the enlarged diameter section HL (see Figure 3) of the pile hole H.

(伸縮装置)
図1に示すように、伸縮装置50は、一端部が固定リンク30に連結され(連結部L2)、他端部が拡径リンク32に連結された(連結部L3)油圧シリンダである。伸縮装置50は3つ設けられ、それぞれ異なる拡径リンク32に連結されている。
(Expansion device)
1, the extension device 50 is a hydraulic cylinder having one end connected to the fixed link 30 (connection L2) and the other end connected to the expansion link 32 (connection L3). Three extension devices 50 are provided, and each is connected to a different expansion link 32.

伸縮装置50は、連結部L2、L3において、それぞれ固定リンク30及び拡径リンク32に対して、連結部L2、L3を中心として回転可能に連結されている。伸縮装置50は、矢印N2で示すように、伸縮装置50の軸方向に沿って伸縮可能とされ、この伸縮量は、杭孔掘削バケット10のオペレータにより、自由に設定し保持できる仕様とされている。 The extension device 50 is connected to the fixed link 30 and the expansion link 32 at connection points L2 and L3, respectively, so that it can rotate around connection points L2 and L3. The extension device 50 is extendable and retractable along its axial direction, as indicated by arrow N2, and the amount of extension and retraction can be freely set and maintained by the operator of the pile hole drilling bucket 10.

伸縮装置50が矢印N2に沿う方向へ伸縮することに伴って、拡径リンク32及び掘削翼40が、矢印N1に沿う方向へ回転し、拡径又は縮径する。 As the extension device 50 extends or retracts in the direction indicated by arrow N2, the expansion link 32 and excavation blade 40 rotate in the direction indicated by arrow N1, expanding or contracting in diameter.

(同調リンク)
同調リンク60は、3つの拡径リンク32を同調して拡径させるリンク機構である。同調リンク60は、連動リンク62と、規制リンク64と、を備えて形成されている。
(Synchronized link)
The synchronization link 60 is a link mechanism that synchronizes and expands the diameters of the three diameter expansion links 32. The synchronization link 60 is formed by including an interlocking link 62 and a restricting link 64.

連動リンク62は、平面視にて略三角形状とされ、回転軸20から3方向に向かって放射状に形成されている。連動リンク62は、回転軸20に対して、回転可能に連結されている。そして、三角形状の連動リンク62の頂部のそれぞれに、規制リンク64が回転可能に連結されている。 The interlocking link 62 is roughly triangular in plan view, and is formed radially in three directions from the rotation shaft 20. The interlocking link 62 is rotatably connected to the rotation shaft 20. A restricting link 64 is rotatably connected to each of the apexes of the triangular interlocking link 62.

規制リンク64は、3つ設けられており、それぞれ一方の端部が連動リンク62の頂部に回転可能に連結されている(連結部L4)。また、規制リンク64の他方の端部は、拡径リンク32に回転可能に連結されている(連結部L5)。 There are three restriction links 64, one end of each of which is rotatably connected to the top of the interlocking link 62 (connection part L4). The other end of each restriction link 64 is rotatably connected to the expansion link 32 (connection part L5).

3箇所の連結部L4において、連動リンク62に対する3つの規制リンク64の連結角度(開き角度)は、全て等しくなるように設定されている。換言すると、1つの規制リンク64が連動リンク62に対して回転すると、他の2つの規制リンク64も、連結角度が等しくなるように同調して回転する。なお、規制リンク64は、伸縮装置50の伸縮に伴って回転し、規制リンク64の回転量は、伸縮装置50の伸縮量に依る。 At the three connection points L4, the connection angles (opening angles) of the three regulating links 64 relative to the interlocking link 62 are all set to be equal. In other words, when one regulating link 64 rotates relative to the interlocking link 62, the other two regulating links 64 also rotate in unison so that the connection angles are equal. The regulating links 64 rotate in conjunction with the extension and contraction of the extension device 50, and the amount of rotation of the regulating links 64 depends on the amount of extension and contraction of the extension device 50.

(スタビライザ)
スタビライザ70は、図2に示すように、掘削翼40より上方において回転軸20に取り付けられ、複数本のアーム(振れ止め棒)72を備えた安定装置である。アーム72は、掘削翼40が地盤G(図3参照)を掘削して形成された杭孔Hの孔壁に向かって延出されている。
(stabilizer)
As shown in Fig. 2, the stabilizer 70 is attached to the rotary shaft 20 above the excavation blade 40, and is a stabilizing device equipped with a plurality of arms (anti-vibration rods) 72. The arms 72 extend toward the wall of the pile hole H formed by the excavation blade 40 excavating the ground G (see Fig. 3).

アーム72の長さすなわち回転軸20の中心線CLからアーム72の先端までの距離W1は、削孔する杭孔の径に応じて調整される。この距離W1は、例えば杭孔Hの半径W2より2~6cm程度短く設定することが好ましい。これにより、回転軸20の位置を杭孔Hの中心に維持しつつ、アーム72が杭孔Hと干渉して杭孔Hを掘削し難くなることを抑制できる。 The length of the arm 72, i.e., the distance W1 from the center line CL of the rotation shaft 20 to the tip of the arm 72, is adjusted according to the diameter of the pile hole to be drilled. It is preferable to set this distance W1, for example, to be approximately 2 to 6 cm shorter than the radius W2 of the pile hole H. This allows the rotation shaft 20 to be positioned at the center of the pile hole H, while preventing the arm 72 from interfering with the pile hole H and making it difficult to excavate the pile hole H.

アーム72は、図1に示すように、3本設けられ、それぞれのアーム72は、平面視で、掘削翼40と異なる方向へ向かって延出されている。具体的には、アーム72と、掘削翼40における掘削刃42とが、回転軸20からみて、約60°ずれた位置に配置されている。3本のアーム72同士は、互いに約120°ずれた位置に配置されている。 As shown in Figure 1, three arms 72 are provided, and each arm 72 extends in a different direction from the excavating wing 40 in a plan view. Specifically, the arm 72 and the excavating blade 42 of the excavating wing 40 are positioned approximately 60° apart from each other when viewed from the rotation axis 20. The three arms 72 are positioned approximately 120° apart from each other.

(底蓋)
底蓋80は、図2に示すように、回転軸20の下端部に取り付けられた金属製の受け皿である。底蓋80には、掘削翼40が地盤Gを掘削して発生した泥土が溜められる。
(bottom lid)
2, the bottom cover 80 is a metal tray attached to the lower end of the rotary shaft 20. The bottom cover 80 collects mud generated when the excavating blade 40 excavates the ground G.

底蓋80には、開閉機構82が備えられている。開閉機構82は、底蓋80を回転軸20の下端部に保持するとともに底蓋80が開閉する際に回転軸となる丁番82Aと、底蓋80を回転軸20の下端部に保持するとともに底蓋80を開閉する際に固定/非固定を切り替え可能なラッチ82Bと、を備えている。 The bottom cover 80 is equipped with an opening/closing mechanism 82. The opening/closing mechanism 82 includes a hinge 82A that holds the bottom cover 80 at the lower end of the rotating shaft 20 and serves as the rotating shaft when the bottom cover 80 is opened and closed, and a latch 82B that holds the bottom cover 80 at the lower end of the rotating shaft 20 and can be switched between locked and unlocked when the bottom cover 80 is opened and closed.

底蓋80に泥土が溜まった状態でバケット10を杭孔Hから引き抜いて、杭孔Hと平面的にずらした位置で底蓋80を開放することで、杭孔Hから泥土が排出される。これにより、底蓋80が無い場合と比較して、効率的に杭孔Hから排泥できる。 When mud has accumulated in the bottom cover 80, the bucket 10 is pulled out of the pile hole H and the bottom cover 80 is opened at a position offset from the pile hole H in plan view, thereby discharging the mud from the pile hole H. This allows mud to be discharged from the pile hole H more efficiently than when the bottom cover 80 is not provided.

<杭孔削孔方法>
バケット10を用いて杭孔Hを掘削するためには、まず、図3(A)に示すように、掘削翼40が取付けられた回転軸20を、地盤Gに挿入する。そして、回転軸20を回転させながら、掘削翼40によって地盤Gを掘削し削孔する。これにより、図3(B)に示すように、杭孔H(杭径が一定の軸部)が形成される。なお、掘削効率を考慮して、底蓋80の底面には、掘削刃を設けてもよい。
<Pile hole drilling method>
To excavate a pile hole H using the bucket 10, first, as shown in Fig. 3(A), the rotary shaft 20 to which the excavating blade 40 is attached is inserted into the ground G. Then, while rotating the rotary shaft 20, the excavating blade 40 excavates and bores the ground G. As a result, a pile hole H (shaft portion with a fixed pile diameter) is formed as shown in Fig. 3(B). In addition, in consideration of excavation efficiency, an excavation blade may be provided on the bottom surface of the bottom cover 80.

次に、必要に応じて、図3(C)に示すように、杭孔Hに拡径部HLを形成する。拡径部HLは、地盤Gにおける所定の深さに形成される。回転軸20の挿入深さが所定の深さに到達したら、掘削翼40を旋回させながら拡径する。これにより、杭孔Hに、他の部分より直径が大きい部分である拡径部HLが形成される。 Next, as necessary, an enlarged diameter portion HL is formed in the pile hole H as shown in Figure 3(C). The enlarged diameter portion HL is formed at a predetermined depth in the ground G. When the insertion depth of the rotary shaft 20 reaches the predetermined depth, the drilling blade 40 is rotated to enlarge the diameter. This forms the enlarged diameter portion HL, which is a portion in the pile hole H with a larger diameter than the rest of the pile hole.

拡径部HLは、掘削翼40の鉛直部40A及び勾配部40Bによって形成される。このうち、勾配部40Bによって、拡径部HLには、下方の直径が上方の直径より大きい傾斜部が形成される。また、鉛直部40Aによって、傾斜部の下方に下方の直径が上方の直径と等しい鉛直部が形成される。 The expanded diameter section HL is formed by the vertical section 40A and the sloped section 40B of the excavation blade 40. Of these, the sloped section 40B forms an inclined section in the expanded diameter section HL where the lower diameter is larger than the upper diameter. Furthermore, the vertical section 40A forms a vertical section below the sloped section where the lower diameter is equal to the upper diameter.

掘削翼40の勾配部40Bの高さH1に相当する深さの傾斜部が形成されたら、図3(D)に示すように、杭孔Hを掘り進めてバケット10を高さH1(又は高さH1より低い所定の高さ)だけ下降させる。そして掘削翼40を拡径させて掘削幅を調整し、拡径部HLをさらに拡径させる。 Once a sloped section with a depth corresponding to the height H1 of the sloped section 40B of the excavating wing 40 has been formed, the pile hole H is excavated and the bucket 10 is lowered by height H1 (or a predetermined height lower than height H1) as shown in Figure 3(D). The excavating wing 40 is then expanded to adjust the excavation width and further expand the expanded diameter section HL.

このように掘削翼40の拡径と、バケット10の下降とを所望の回数繰り返し実行することで、掘削翼40の勾配部40Bと傾斜角度が等しい傾斜部を備えた、任意の大きさの拡径部HLを形成することができる。 By repeating the expansion of the excavation wing 40 and the lowering of the bucket 10 a desired number of times in this manner, an expansion section HL of any size can be formed, which has an inclined section with an angle equal to that of the inclined section 40B of the excavation wing 40.

なお、拡径部HLは、杭孔Hの先端(下端部)に形成してもよいし、杭孔Hの中間部分に形成してもよい。拡径部HLを杭孔Hの中間部分に形成する場合は、例えば図3(B)に示した状態の後、図4に示すように、拡径部HLを形成する部分(図4において破線で示した部分)より下方まで、杭孔Hを掘り進める。 The enlarged diameter section HL may be formed at the tip (lower end) of the pile hole H, or in the middle of the pile hole H. When the enlarged diameter section HL is formed in the middle of the pile hole H, for example, after the state shown in Figure 3(B) is reached, the pile hole H is excavated to a point below the portion where the enlarged diameter section HL will be formed (the portion shown by the dashed line in Figure 4), as shown in Figure 4.

その後、バケット10を、一旦地上へ引き上げ、掘削翼40の下端部に、図5に示すアタッチメント40Cを固定する。アタッチメント40Cは、鉛直部40Aの下端部から、下方かつ回転軸20側へ傾斜している。そして、このアタッチメント40Cが固定された掘削翼40を用いて、図3(C)、(D)を用いて説明したように、拡径部HLを形成する。これにより、拡径部HLの下端部に、上方の直径が下方の直径より大きい傾斜部を形成することができる。 The bucket 10 is then temporarily lifted above ground level, and the attachment 40C shown in Figure 5 is fixed to the lower end of the excavation wing 40. The attachment 40C is inclined downward and toward the rotation shaft 20 from the lower end of the vertical section 40A. The excavation wing 40 to which this attachment 40C is fixed is then used to form the expanded diameter section HL, as described using Figures 3(C) and (D). This allows for the formation of an inclined section at the lower end of the expanded diameter section HL, where the upper diameter is larger than the lower diameter.

また、拡径部HLを、杭孔Hの中間部分だけでなく、さらに杭孔Hの先端(下端部)にも形成する場合は、杭孔Hの中間部分の拡径部HLを図5に示すように形成した後、バケット10を、再度地上へ引き上げ、アタッチメント40Cを取り外す。その後、図3(C)、(D)を用いて説明したように、杭孔Hの先端に、拡径部HLを形成する。 If the expanded diameter section HL is to be formed not only in the middle of the pile hole H but also at the tip (lower end) of the pile hole H, the expanded diameter section HL is formed in the middle of the pile hole H as shown in Figure 5, and then the bucket 10 is raised to the ground again and the attachment 40C is removed. Then, as explained using Figures 3(C) and (D), the expanded diameter section HL is formed at the tip of the pile hole H.

なお、拡径部HLの下端部に、上方の直径が下方の直径より大きい傾斜部を形成するためには、掘削翼40にアタッチメント40Cを固定するのではなく、掘削翼40ごと、異なる掘削翼に付け替えてもよい。 In order to form an inclined portion at the lower end of the expanded diameter section HL where the upper diameter is larger than the lower diameter, the entire excavation wing 40 may be replaced with a different excavation wing rather than fixing the attachment 40C to the excavation wing 40.

<作用及び効果>
本発明の実施形態に係るバケット10及び杭孔掘削方法では、図1に示すように、回転軸20に取付けられ、旋回しながら拡径する3枚の掘削翼40によって、地盤G(図3参照)を掘削できる。
<Action and effect>
In the bucket 10 and pile hole drilling method according to the embodiment of the present invention, as shown in FIG. 1, the ground G (see FIG. 3) can be excavated by three excavation blades 40 attached to a rotating shaft 20 and expanding in diameter as it rotates.

これにより、3枚の掘削翼40が面を構成し、3点で杭孔Hに対して接触するため、2枚の掘削翼で掘削する場合と比較して、回転軸20の平面位置が安定し易い。このため、杭孔Hの掘削精度を高くできる。また、4枚以上の掘削翼で掘削する場合と比較して、バケット10の重量を軽量化できる。 As a result, the three excavation blades 40 form a surface that contacts the pile hole H at three points, making it easier to stabilize the planar position of the rotation shaft 20 compared to when excavating with two excavation blades. This increases the excavation accuracy of the pile hole H. In addition, the weight of the bucket 10 can be reduced compared to when excavating with four or more excavation blades.

また、本発明の実施形態に係るバケット10では、3枚の掘削翼40が、3つの拡径リンク32にそれぞれ連結されている。そして、3つの拡径リンク32は、3つの拡径リンク32を同調して拡径させる同調リンク60で連結されている。このため、3枚の掘削翼40の拡径量が等しくなる。 In addition, in the bucket 10 according to an embodiment of the present invention, the three excavating blades 40 are connected to three expansion links 32, respectively. The three expansion links 32 are connected by a synchronization link 60 that synchronizes the expansion of the three expansion links 32. As a result, the expansion amounts of the three excavating blades 40 are the same.

さらに、3つの拡径リンク32にそれぞれ伸縮装置50が取り付けられているため、1つまたは2つの伸縮装置50が故障しても、3枚の掘削翼40を旋回拡径させることができる。 Furthermore, because an extension device 50 is attached to each of the three expansion links 32, even if one or two of the extension devices 50 fail, the three excavation blades 40 can still be rotated and expanded.

なお、伸縮装置50は、1つの拡径リンク32にのみ取り付ける構成としてもよい。このような構成でも、同調リンク60が設けられていれば、この拡径リンク32を拡径させることで、3つの拡径リンク32を拡径できる。 The expansion device 50 may be configured to be attached to only one expansion link 32. Even in this configuration, if a synchronization link 60 is provided, the diameter of this expansion link 32 can be expanded to expand the diameter of all three expansion links 32.

なお、バケット10は、伸縮装置50及び同調リンク60の双方を備えているが、本発明の実施形態はこれに限らない。伸縮装置50を3つの拡径リンク32にそれぞれ設ければ、それぞれの拡径リンク32は拡径できるので、同調リンク60は省略してもよい。 Note that while the bucket 10 is equipped with both the extension device 50 and the synchronization link 60, this is not a limitation of the present invention. If an extension device 50 is provided on each of the three expansion links 32, each expansion link 32 can be expanded, so the synchronization link 60 may be omitted.

また、本発明の実施形態に係るバケット10では、スタビライザ70が設けられ、3本の振れ止め棒としてのアーム72が、平面視で、回転軸20から掘削翼40と異なる方向へ向かって延出されている。 In addition, the bucket 10 according to the embodiment of the present invention is provided with a stabilizer 70, and three arms 72 acting as anti-vibration rods extend from the rotation shaft 20 in a direction different from that of the excavating blade 40 in a plan view.

このため、アーム72が掘削翼40と同じ方向へ向かって延出されている場合と比較して、バケット10が平面視で杭孔Hと触れる支点が多くなり、振れ止め効果が高い。これにより、杭孔Hの掘削精度を高くできる。 As a result, compared to when the arm 72 is extended in the same direction as the excavation wing 40, the bucket 10 has more fulcrums at which it comes into contact with the pile hole H in plan view, providing a stronger anti-vibration effect. This allows for higher excavation accuracy in the pile hole H.

なお、アーム72の本数は、3本に限らない。例えば2本でもよいし、4本以上でもよい。アーム72を少なくとも2本以上設けることで、回転軸20の振れ止め効果を得ることができる。また、例えばスタビライザ70は省略してもよい。スタビライザ70を省略しても、掘削翼40が3枚設けられているため、回転軸20は振れ難い。 The number of arms 72 is not limited to three. For example, it may be two, or four or more. By providing at least two arms 72, it is possible to obtain an anti-sway effect for the rotating shaft 20. Also, for example, the stabilizer 70 may be omitted. Even if the stabilizer 70 is omitted, the rotating shaft 20 is less likely to vibrate because three excavating blades 40 are provided.

また、本発明の実施形態に係る杭孔掘削方法では、回転軸20の地盤Gへの挿入深さに応じて、3枚の掘削翼40を拡径させて削孔幅を調整する。これにより、2枚の掘削翼で掘削する場合と比較して回転軸20が振れ難い状態で掘削できるので、杭孔Hに寸法精度が高い拡径部HLを形成できる。 In addition, in the pile hole drilling method according to an embodiment of the present invention, the diameter of the three drilling blades 40 is expanded to adjust the drilling width depending on the insertion depth of the rotary shaft 20 into the ground G. This allows drilling to be performed with the rotary shaft 20 less likely to vibrate than when drilling with two drilling blades, making it possible to form an expanded diameter portion HL in the pile hole H with high dimensional accuracy.

また、本実施形態においては、杭孔Hにおいて杭径が一定の軸部と、拡径部HLとを、同じ掘削翼40を用いて形成しているが、本発明の実施形態はこれに限らない。例えば軸部と拡径部HLとは、異なる掘削翼を用いて形成してもよい。 In addition, in this embodiment, the shaft portion, which has a constant pile diameter in the pile hole H, and the expanded diameter portion HL are formed using the same excavation blade 40, but this is not a limitation of the present invention. For example, the shaft portion and the expanded diameter portion HL may be formed using different excavation blades.

具体的には、回転軸20に、拡径しない公知の掘削翼を固定して杭孔Hの軸部を形成し、その後、公知の掘削翼を、掘削翼40に付け替えて拡径部HLを形成してもよい。公知の掘削翼としては、2枚のものを用いてもよいし、4枚以上のものを用いてもよい。 Specifically, a known non-expanding drilling blade may be fixed to the rotating shaft 20 to form the shaft portion of the pile hole H, and then the known drilling blade may be replaced with the drilling blade 40 to form the expanded diameter portion HL. Two or four or more known drilling blades may be used.

さらに、杭孔Hの軸部と、拡径部HLと、を異なる杭孔掘削バケットを用いて形成してもよい。すなわち、杭孔Hの軸部は公知の杭孔掘削バケットを用いて形成し、拡径部HLのみをバケット10を用いて形成してもよい。 Furthermore, the shaft portion of the pile hole H and the enlarged diameter portion HL may be formed using different pile hole excavation buckets. That is, the shaft portion of the pile hole H may be formed using a known pile hole excavation bucket, and only the enlarged diameter portion HL may be formed using bucket 10.

10 掘削バケット
20 回転軸
30 固定リンク
32 拡径リンク
40 掘削翼
50 伸縮装置
60 同調リンク
72 アーム(振れ止め棒)
80 底蓋
82 開閉機構
G 地盤
10 Excavation bucket 20 Rotation shaft 30 Fixed link 32 Expansion link 40 Excavation wing 50 Telescopic device 60 Synchronization link 72 Arm (anti-vibration rod)
80 Bottom cover 82 Opening/closing mechanism G Ground

Claims (5)

地盤に挿入される回転軸と、
前記回転軸に取り付けられ、旋回しながら水平方向に押し出されて拡径し前記地盤を掘削可能な3枚の掘削翼と、
を備え、
3枚の前記掘削翼は、前記回転軸に固定された固定リンクに連結された3つの拡径リンクにそれぞれ連結されており、
3つの前記拡径リンクは、3つの前記拡径リンクを同調して拡径させる同調リンクで連結されており、
一端部が前記固定リンクに連結され、他端部が前記拡径リンクに連結され、伸縮することで前記拡径リンク及び前記掘削翼を回転させる伸縮装置が少なくとも1つ設けられ、
前記伸縮装置は3つ設けられ、それぞれ異なる3つの前記拡径リンクに連結されている、
孔掘削バケット。
A rotating shaft inserted into the ground;
Three excavation blades attached to the rotary shaft, which are pushed out horizontally while rotating to expand their diameters and excavate the ground;
Equipped with
The three excavation blades are respectively connected to three expansion links connected to a fixed link fixed to the rotating shaft,
The three diameter expansion links are connected by a synchronization link that synchronizes the diameter expansion of the three diameter expansion links,
At least one telescopic device is provided, one end of which is connected to the fixed link and the other end of which is connected to the expansion link, and which extends and contracts to rotate the expansion link and the excavation blade;
Three of the expansion devices are provided, and each is connected to three different expansion links.
Pile hole drilling bucket.
前記掘削翼より上方において前記回転軸に取り付けられ、孔壁へ向かって延出された複数の振れ止め棒と、
を備えた請求項1に記載の杭孔掘削バケット。
A plurality of anti-vibration rods attached to the rotating shaft above the drilling blade and extending toward the hole wall;
2. The pile hole drilling bucket of claim 1 , comprising:
前記回転軸の下端部に取り付けられ、前記掘削翼が前記地盤を掘削して発生した泥土を溜める底蓋と、
前記底蓋を開閉する開閉機構と、
を備えた請求項1又は2に記載の杭孔掘削バケット。
a bottom cover attached to a lower end of the rotating shaft and configured to collect mud generated when the excavation blade excavates the ground;
an opening/closing mechanism for opening and closing the bottom cover;
3. A pile hole boring bucket according to claim 1 or 2 , comprising:
地盤を掘削可能な3枚の掘削翼が取付けられた回転軸を地盤に挿入する工程と、
前記回転軸を回転させながら、前記掘削翼によって前記地盤を掘削し、杭径が一定の軸部を形成する工程と、
前記回転軸の前記地盤への挿入深さに応じて、前記掘削翼を旋回させながら鉛直方向に沿う軸を中心に回転させることで水平方向に押し出して拡径させて前記軸部より削孔幅が大きい拡径部を形成する工程と、
を備え
3枚の前記掘削翼は、前記回転軸に固定された固定リンクに連結された3つの拡径リンクにそれぞれ連結されており、
3つの前記拡径リンクは、3つの前記拡径リンクを同調して拡径させる同調リンクで連結されており、
一端部が前記固定リンクに連結され、他端部が前記拡径リンクに連結され、伸縮することで前記拡径リンク及び前記掘削翼を回転させる伸縮装置が少なくとも1つ設けられ、
前記伸縮装置は3つ設けられ、それぞれ異なる3つの前記拡径リンクに連結されている、杭孔掘削方法。
a step of inserting a rotary shaft having three excavation blades attached thereto, capable of excavating the ground, into the ground;
A step of excavating the ground with the excavation blade while rotating the rotation shaft to form a shaft portion having a constant pile diameter;
A process of rotating the drilling blade around a vertical axis while rotating it according to the insertion depth of the rotating shaft into the ground, thereby pushing it out horizontally and expanding its diameter to form an expanded diameter portion having a drilling width larger than that of the shaft portion;
Equipped with
The three excavation blades are respectively connected to three expansion links connected to a fixed link fixed to the rotating shaft,
The three diameter expansion links are connected by a synchronization link that synchronizes the diameter expansion of the three diameter expansion links,
At least one telescopic device is provided, one end of which is connected to the fixed link and the other end of which is connected to the expansion link, and which extends and contracts to rotate the expansion link and the excavation blade;
The pile hole drilling method , wherein three of the expansion devices are provided and connected to three different expansion links, respectively .
杭孔掘削バケットを回転させながら地盤を掘削し、杭径が一定の軸部を形成する工程と、
回転軸に取り付けられた3枚の掘削翼を、前記回転軸の前記地盤への挿入深さに応じて、旋回させながら鉛直方向に沿う軸を中心に回転させることで水平方向に押し出して拡径させて前記軸部より削孔幅が大きい拡径部を形成する工程と、
を備え
3枚の前記掘削翼は、前記回転軸に固定された固定リンクに連結された3つの拡径リンクにそれぞれ連結されており、
3つの前記拡径リンクは、3つの前記拡径リンクを同調して拡径させる同調リンクで連結されており、
一端部が前記固定リンクに連結され、他端部が前記拡径リンクに連結され、伸縮することで前記拡径リンク及び前記掘削翼を回転させる伸縮装置が少なくとも1つ設けられ、
前記伸縮装置は3つ設けられ、それぞれ異なる3つの前記拡径リンクに連結されている、杭孔掘削方法。
A step of excavating the ground while rotating the pile hole excavation bucket to form a shaft portion of a pile with a constant diameter;
a step of rotating three drilling blades attached to a rotary shaft around a vertical axis while rotating them in accordance with the insertion depth of the rotary shaft into the ground, thereby pushing them out horizontally and expanding their diameter to form an expanded diameter portion having a drilling width larger than that of the shaft portion;
Equipped with
The three excavation blades are respectively connected to three expansion links connected to a fixed link fixed to the rotating shaft,
The three diameter expansion links are connected by a synchronization link that synchronizes the diameter expansion of the three diameter expansion links,
At least one telescopic device is provided, one end of which is connected to the fixed link and the other end of which is connected to the expansion link, and which extends and contracts to rotate the expansion link and the excavation blade;
The pile hole drilling method , wherein three of the expansion devices are provided and connected to three different expansion links, respectively .
JP2020207965A 2020-12-15 2020-12-15 Pile hole excavation bucket and pile hole excavation method Active JP7745341B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020207965A JP7745341B2 (en) 2020-12-15 2020-12-15 Pile hole excavation bucket and pile hole excavation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020207965A JP7745341B2 (en) 2020-12-15 2020-12-15 Pile hole excavation bucket and pile hole excavation method

Publications (2)

Publication Number Publication Date
JP2022094846A JP2022094846A (en) 2022-06-27
JP7745341B2 true JP7745341B2 (en) 2025-09-29

Family

ID=82162396

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020207965A Active JP7745341B2 (en) 2020-12-15 2020-12-15 Pile hole excavation bucket and pile hole excavation method

Country Status (1)

Country Link
JP (1) JP7745341B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008150787A (en) 2006-12-14 2008-07-03 Takenaka Komuten Co Ltd Excavating machinery and excavation method
JP2012219596A (en) 2011-04-14 2012-11-12 Hitachi Sumitomo Heavy Industries Construction Crane Co Ltd Bottom enlarged bucket
JP2014141844A (en) 2013-01-25 2014-08-07 System Keisoku Kk Bottom enlarged bucket
JP2020159125A (en) 2019-03-27 2020-10-01 大成建設株式会社 Method of creating pile holes for enlarged piles

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5715795A (en) * 1980-07-02 1982-01-27 Daia Soiru Kk Base expanding excavator for earth drill
JPS5886285A (en) * 1981-11-19 1983-05-23 日立建機株式会社 Method and apparatus for drilling shaft pit widen bottom part
JPS5965196A (en) * 1982-04-21 1984-04-13 特殊建機有限会社 Method and apparatus for earth drill bottom enlarging drill-ing, drilling bucket and bottom scrapping bucket

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008150787A (en) 2006-12-14 2008-07-03 Takenaka Komuten Co Ltd Excavating machinery and excavation method
JP2012219596A (en) 2011-04-14 2012-11-12 Hitachi Sumitomo Heavy Industries Construction Crane Co Ltd Bottom enlarged bucket
JP2014141844A (en) 2013-01-25 2014-08-07 System Keisoku Kk Bottom enlarged bucket
JP2020159125A (en) 2019-03-27 2020-10-01 大成建設株式会社 Method of creating pile holes for enlarged piles

Also Published As

Publication number Publication date
JP2022094846A (en) 2022-06-27

Similar Documents

Publication Publication Date Title
JP2025038154A (en) Drill head and drill system including the drill head
JP7213488B2 (en) Construction method of pile hole for diameter expansion pile
JP7745341B2 (en) Pile hole excavation bucket and pile hole excavation method
JP4838215B2 (en) Method and apparatus for excavating cast-in-place concrete joint pile
JP2009114624A (en) Bottom-enlarged bucket
JP2017106280A (en) Excavator and diameter expansion method of pipe hole
JP6963870B2 (en) Pile hole excavation head
JP2022075238A (en) Method for creating diameter-expanded buckets, pile hole excavators for intermediate diameter-expanded parts, and pile holes for expanded-diameter piles
JP4769767B2 (en) Diameter expansion excavation bucket, intermediate expansion portion excavation method, and bottom expansion portion excavation method
JP2006219911A (en) Pile mine widening device and method for cast-in-place concrete pile
JP7486705B2 (en) Expansion drilling device and expansion drilling method
JP6397147B1 (en) Ground improvement method and ground improvement equipment using mechanical stirring deep mixing method
JPS5911017B2 (en) underground wall hole drilling machine
JPH0463190B2 (en)
JP6567327B2 (en) Pile hole drilling method, pile hole drill rod
JP6770732B2 (en) Expansion excavation equipment for cast-in-place piles and expansion excavation method for cast-in-place piles
JP4478591B2 (en) Widening excavator and pile mine widening method
JP2008150787A (en) Excavating machinery and excavation method
JP4949756B2 (en) Expanded excavation bucket
JP4753972B2 (en) Widened bucket
JP2024002371A (en) Earth removal equipment and pile driver
JP7825509B2 (en) Bottom-enlarging bucket and bottom-enlarging hole construction method
JP2020159124A (en) Mechanical diameter expansion bucket equipped with a hydraulic mechanism and pile hole excavator for intermediate diameter expansion part
JP2023131316A (en) Cast-in-place piles and methods of constructing cast-in-place piles
JP6845908B1 (en) How to lay a wing excavator and a caisson skeleton

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230921

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240227

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240228

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240410

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20240702

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240820

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20240827

A912 Re-examination (zenchi) completed and case transferred to appeal board

Free format text: JAPANESE INTERMEDIATE CODE: A912

Effective date: 20240927

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250623

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250916

R150 Certificate of patent or registration of utility model

Ref document number: 7745341

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150