Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7746210B2 - Self-consignment amount calculation system and program - Google Patents
[go: Go Back, main page]

JP7746210B2 - Self-consignment amount calculation system and program - Google Patents

Self-consignment amount calculation system and program

Info

Publication number
JP7746210B2
JP7746210B2 JP2022056491A JP2022056491A JP7746210B2 JP 7746210 B2 JP7746210 B2 JP 7746210B2 JP 2022056491 A JP2022056491 A JP 2022056491A JP 2022056491 A JP2022056491 A JP 2022056491A JP 7746210 B2 JP7746210 B2 JP 7746210B2
Authority
JP
Japan
Prior art keywords
self
amount
predicted
consignment
tightness
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022056491A
Other languages
Japanese (ja)
Other versions
JP2023148460A (en
Inventor
匠吾 寺田
匡孝 吉田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Osaka Gas Co Ltd
Original Assignee
Osaka Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Osaka Gas Co Ltd filed Critical Osaka Gas Co Ltd
Priority to JP2022056491A priority Critical patent/JP7746210B2/en
Publication of JP2023148460A publication Critical patent/JP2023148460A/en
Application granted granted Critical
Publication of JP7746210B2 publication Critical patent/JP7746210B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、自己託送する電力量を算出する自己託送量算出システム及びプログラムに関する。 The present invention relates to a self-consignment amount calculation system and program that calculates the amount of electricity to be self-consigned.

電力事業の自由化が進められた結果、一般電気事業者とは別に電力を小売する事業者である新電力事業者(特定規模電気事業者、PPS:Power Producer and Supplier)が増大した。新電力事業者は、契約者に電力を供給するための送電網を有していないため、一般送配電事業者が管理する送電網である商用電力系統を介して電力の供給(託送)を行う。 As a result of the liberalization of the electricity industry, the number of new power suppliers (PPS: Power Producers and Suppliers), which are businesses that retail electricity separately from general electricity suppliers, has increased. Because new power suppliers do not have their own transmission networks to supply electricity to their customers, they supply (transport) electricity via commercial power grids, which are transmission networks managed by general electricity transmission and distribution companies.

新電力事業者にも電力の供給を許容することは、電力需給の逼迫を軽減するという点では好ましいが、商用電力系統における電力の不安定化(例えば、電圧及び周波数の異常、大規模停電など)を招来する危険性もある。そこで、新電力事業者には、単位時間(例えば、30分)における計画値(事前に供給すると予告した電力量)または契約者の実際の電力需要と同量の電力を供給すること(同時同量)が義務づけられている。また、新電力事業者が同時同量を満たす電力の供給に失敗した場合、一般電気事業者は、その失敗した分だけ発電量を調整することで商用電力系統における電力を安定させる。この場合、新電力事業者は、商用電力系統における電力の安定を脅かしたことに対するペナルティの意味合いを含むインバランス料金の支払義務を負うことになる。インバランス料金の金額は、商用電力系統の需給の逼迫の大きさと連動しており、商用電力系統の需給が逼迫しているときほど、商用電力系統に与える影響も深刻になるため、インバランス料金も高額になる。 While allowing new power suppliers to supply electricity is desirable in that it alleviates the electricity supply-demand constraints, it also poses the risk of causing instability in the commercial power grid (e.g., voltage and frequency abnormalities, large-scale blackouts, etc.). Therefore, new power suppliers are required to supply the same amount of electricity as their planned value (the amount of electricity they have announced in advance) or their customers' actual electricity demand (simultaneous balancing) per unit time (e.g., 30 minutes). Furthermore, if a new power supplier fails to meet the planned amount, the general electric utility will stabilize the power in the commercial power grid by adjusting its power generation output to compensate for the failure. In this case, the new power supplier will be obligated to pay an imbalance fee, which acts as a penalty for threatening the stability of the power in the commercial power grid. The amount of the imbalance fee is linked to the severity of the supply-demand constraints in the commercial power grid. The tighter the supply-demand constraints in the commercial power grid, the more severe the impact on the commercial power grid, and therefore the higher the imbalance fee.

ところで、電力需給の逼迫を軽減するためには、新電力事業者に限らず、商用電力系統に電力を供給可能な事業者が多いほど好ましい。そこで、例えば特許文献1では、自社が発電した電力を自社または自社との関係が密接な会社に供給(託送)する自己託送を支援することで、事業者に対して商用電力系統への電力の供給を促進する自己託送支援装置が提案されている。 In order to alleviate the tightness in the electricity supply and demand balance, it is preferable to have as many businesses as possible that can supply electricity to the commercial power grid, not just new power suppliers. For example, Patent Document 1 proposes a self-dispatch support device that supports self-dispatch, in which electricity generated by a company is supplied (dispatched) to itself or to companies with close ties to the company, thereby encouraging businesses to supply electricity to the commercial power grid.

特開2017-163780号公報JP 2017-163780 A

自己託送においても、計画値と供給した電力量とが乖離すると高額なインバランス料金の支払義務が発生し、これが自己託送の普及を妨げる原因の1つになっている。特許文献1で提案されている自己託送支援装置では、自己託送によって契約電力を低減することは可能であるが、高額なインバランス料金の発生を抑制することまでは困難である。 Even with self-consignment, if the amount of electricity supplied deviates from the planned value, a high imbalance fee must be paid, which is one of the reasons preventing the spread of self-consignment. The self-consignment support device proposed in Patent Document 1 is able to reduce the contracted power through self-consignment, but it is difficult to prevent the occurrence of high imbalance fees.

本発明は、上記のような課題を解決するためになされたものであり、高額なインバランス料金の発生を抑制することが可能な自己託送量算出システム及びプログラムを提供する。 The present invention has been made to solve the above-mentioned problems, and provides a self-consignment amount calculation system and program that can reduce the occurrence of expensive imbalance fees.

上記の目的を達成するために、以下に開示する自己託送量算出システムは、事業者によって運営される電力供給施設が商用電力系統に供給する電力を、当該事業者または当該事業者と同じ事業体に属する別の事業者によって運営されて前記商用電力系統から電力の供給を受けて消費する電力消費施設に対して融通する、自己託送の電力量を算出する自己託送量算出システムであって、将来の単位時間について予測された前記商用電力系統の需要に対する供給の余裕の大きさである予測逼迫度を示す予測逼迫度情報を記憶する記憶部と、前記記憶部が記憶する前記予測逼迫度情報が示す、将来の前記単位時間の前記予測逼迫度に基づいて、当該単位時間の到来よりも前に、当該単位時間に自己託送する電力量を算出する演算処理部と、を備え、前記演算処理部は、将来の前記単位時間における前記予測逼迫度が、前記余裕が所定の大きさ以下であること表す場合、当該単位時間に自己託送する電力量が上限値以下になるように算出する。 To achieve the above objective, the self-consignment amount calculation system disclosed below is a self-consignment amount calculation system that calculates the amount of self-consignment electricity that electricity supplied to a commercial power grid by a power supply facility operated by a utility is lent to an electricity consumption facility operated by the utility or another utility belonging to the same business entity as the utility and that consumes electricity supplied from the commercial power grid. The system includes a memory unit that stores predicted tightness information indicating the predicted tightness, which is the magnitude of the supply surplus relative to demand in the commercial power grid predicted for a future unit time, and a calculation processing unit that calculates the amount of electricity to be self-consigned for a unit time before the arrival of the unit time based on the predicted tightness for the future unit time indicated by the predicted tightness information stored in the memory unit. When the predicted tightness for the future unit time indicates that the surplus is equal to or less than a predetermined amount, the calculation processing unit calculates the amount of electricity to be self-consignment for the unit time to be equal to or less than an upper limit.

上記の自己託送量算出システムによれば、商用電力系統の需給が逼迫してインバランス料金が高額になる可能性が高い場合に、インバランス料金の発生を抑制することができる。したがって、高額なインバランス料金の発生を抑制することが可能になる。 The above-mentioned self-consignment amount calculation system can suppress the occurrence of imbalance charges when the supply and demand of the commercial power grid is tight and there is a high possibility that imbalance charges will become high. Therefore, it is possible to suppress the occurrence of high imbalance charges.

図1は、自己託送の概要を示した概念図である。FIG. 1 is a conceptual diagram showing an outline of self-consignment. 図2は、本発明の実施形態に係る自己託送量算出システム1の構成の一例について示すブロック図である。FIG. 2 is a block diagram showing an example of the configuration of the self-consignment amount calculation system 1 according to the embodiment of the present invention. 図3は、演算処理部12による自己託送量の算出方法の一例について示す図である。FIG. 3 is a diagram showing an example of a method for calculating the self-consignment amount by the calculation processing unit 12. In FIG.

以下、本発明の一実施形態を図面に基づいて説明する。なお、本発明は、以下の実施形態に限定されるものではなく、本発明の構成を充足する範囲内で、適宜設計変更を行うことが可能である。また、以下の説明において、同一部分または同様な機能を有する部分には同一の符号を異なる図面間で共通して用い、その繰り返しの説明は省略する。また、実施形態および変形例に記載された各構成は、適宜組み合わされてもよいし、変更されてもよい。また、説明を分かりやすくするために、以下で参照する図面においては、構成が簡略化または模式化して示されたり、構成の一部が省略されたりしている。 An embodiment of the present invention will be described below with reference to the drawings. The present invention is not limited to the following embodiment, and appropriate design changes can be made within the scope of the configuration of the present invention. In the following description, the same parts or parts having similar functions will be designated by the same reference numerals in different drawings, and repeated explanations will be omitted. The configurations described in the embodiment and modified examples may be combined or modified as appropriate. To make the description easier to understand, the configurations in the drawings referenced below are shown simplified or schematic, and some of the configurations may be omitted.

<<自己託送>>
最初に、自己託送について図面を参照して説明する。図1は、自己託送の概要を示した概念図である。
<<Self-consignment>>
First, self-consignment will be described with reference to the drawings. Figure 1 is a conceptual diagram showing an overview of self-consignment.

図1に示すように、自己託送は、所定の事業者B1によって運営される電力供給施設Sが商用電力系統Pに供給する電力を、当該商用電力系統Pから電力の供給を受けて消費する電力消費施設Dに対して融通することである。ただし、電力消費施設Dは、電力供給施設Sを運営する事業者B1または当該事業者B1と同じ事業体(例えば、同じ企業グループに所属している、長期の取引関係がある等の密接な関係を有している複数の事業者の集合体)に属する別の事業者B2によって、運営されている。 As shown in Figure 1, self-consignment refers to the interchange of electricity supplied by a power supply facility S operated by a specified business operator B1 to a commercial power grid P with an electricity consumption facility D that receives electricity from the commercial power grid P and consumes it. However, electricity consumption facility D is operated by the business operator B1 that operates power supply facility S, or by another business operator B2 that belongs to the same business entity as business operator B1 (for example, a group of multiple businesses that have a close relationship, such as belonging to the same corporate group or having a long-term business relationship).

自己託送が行われると、電力供給施設Sが商用電力系統Pに供給した電力量だけ、電力消費施設Dが商用電力系統Pから供給を受けて消費する電力量が減殺されるように、商用電力系統Pを管理する事業者(例えば、一般送配電事業者)において精算処理される。また、電力供給施設Sを運用する事業者B1は、自己託送によって商用電力系統Pに供給した電力量に応じた料金を、商用電力系統Pを管理する事業者に対して支払うことになる。 When self-consignment is performed, the business operator that manages the commercial power system P (e.g., a general electricity transmission and distribution business operator) processes the settlement so that the amount of electricity consumed by power consumption facility D receiving supply from the commercial power system P is reduced by the amount of electricity that power supply facility S supplied to the commercial power system P. In addition, business operator B1 that operates power supply facility S will pay a fee to the business operator that manages the commercial power system P according to the amount of electricity it supplied to the commercial power system P through self-consignment.

自己託送は、新電力事業者などによって行われる利益追求を目的とした電気事業である通常の託送とは異なり、余剰電力の自家消費を目的とした非電気事業であり、商用電力系統Pに供給される電力量の増大という公益的な要請に応えるという側面を有している。また、非電気事業である自己託送は、電気事業である通常の託送と比較して、商用電力系統Pに供給する電力量がそれほど大きくならないため、仮に自己託送が計画通りに行われず失敗したとしても、商用電力系統Pの電力の安定性を害する程度は小さい。 Self-dispatching differs from regular wheeling, which is an electricity business conducted by new power companies and the like with the aim of pursuing profits. It is a non-electricity business aimed at the self-consumption of surplus electricity, and has the aspect of responding to public interest requests to increase the amount of electricity supplied to the commercial power grid P. Furthermore, compared to regular wheeling, which is an electricity business, self-dispatching, which is a non-electricity business, does not supply as much electricity to the commercial power grid P. Therefore, even if self-dispatching does not go as planned and fails, the degree to which it impairs the stability of power in the commercial power grid P is small.

このような事情を踏まえて、自己託送では、通常の託送と比較して、商用電力系統Pに電力を供給する事業者に有利な利用条件が設定され得る。例えば、自己託送では、通常の託送よりも安価な料金体系が採用される(例えば、基本料金のない完全従量制が選択可能である)。また例えば、自己託送では、同時同量を満たす電力の供給に失敗したと判定される条件(インバランス料金の支払義務の発生条件)が、通常の託送よりも緩和される。 In light of these circumstances, self-dispatching can set terms of use that are more favorable to businesses supplying electricity to the commercial power grid P than regular consignment. For example, self-dispatching can adopt a cheaper fee structure than regular consignment (for example, a completely pay-as-you-go system with no basic fee can be selected). Also, for example, with self-dispatching, the conditions for determining that a supply of electricity that satisfies the simultaneous and equal amount of electricity has failed (conditions for the obligation to pay imbalance fees) can be more relaxed than with regular consignment.

この自己託送を多数の事業者が行えば、商用電力系統Pに供給される電力量が増大するため、電力需給の逼迫を軽減することができる。さらに、上述のように自己託送の失敗が商用電力系統Pの電力の安定性を害する程度は小さいため、多数の事業者が自己託送を行ったとしても、商用電力系統Pの電力を安定に保つことができる。 If multiple businesses perform this self-dispatch, the amount of electricity supplied to the commercial power grid P will increase, thereby alleviating the tightness of the power supply and demand balance. Furthermore, as mentioned above, the extent to which a failure in self-dispatch will harm the stability of the power in the commercial power grid P is small, so even if multiple businesses perform self-dispatch, the power in the commercial power grid P can be kept stable.

しかし、上述のような、通常の託送と比較して事業者に有利な利用条件(例えば、安価な料金体系、同時同量失敗の判定条件の緩和)が設定され得るとしても、高額なインバランス料金が発生することが、事業者が自己託送の導入を避ける一因になっている。 However, even if the terms of use are more favorable to operators than for regular wheeling (for example, cheaper fee structures and relaxed criteria for determining simultaneous and equal volume failures), the high imbalance fees that would be incurred are one of the reasons why operators are reluctant to introduce self-wheeling.

以下において説明する本発明の実施形態に係る自己託送量算出システムは、この問題を解決するものであり、インバランス料金の発生を抑制することで自己託送を促進させ、商用電力系統Pに供給される電力量を増大させて電力需給の逼迫を軽減するものである。 The self-consignment amount calculation system according to the embodiment of the present invention described below solves this problem, promoting self-consignment by suppressing the occurrence of imbalance fees, and increasing the amount of power supplied to the commercial power system P, thereby alleviating the tightness of power supply and demand.

<<自己託送量算出システム>>
本発明の実施形態に係る自己託送量算出システムの構成の一例について、図面を参照して説明する。図2は、本発明の実施形態に係る自己託送量算出システム1の構成の一例について示すブロック図である。
<<Self-Consignment Amount Calculation System>>
An example of the configuration of a self-consignment amount calculation system according to an embodiment of the present invention will be described with reference to the drawings. Fig. 2 is a block diagram showing an example of the configuration of a self-consignment amount calculation system 1 according to an embodiment of the present invention.

図2に示すように、自己託送量算出システム1は、記憶部11と、演算処理部12を備える。記憶部11は、HDD(Hard Disk Drive)やSSD(Solid State Drive)などの不揮発性の記憶装置や、RAM(Ramdom Access memory)などの揮発性の記憶装置で構成される。演算処理部12は、例えばCPU(Central Processing Unit)などの演算処理装置で構成される。例えば、記憶部11と演算処理部12は、電力供給施設Sを制御するためのパソコンまたはサーバコンピュータの一部または全部として構成される。なお、記憶部11は、複数の記憶装置で構成されてもよく、例えば不揮発性の記憶装置と揮発性の記憶装置を組み合わせて構成されてもよい。また、記憶部11は、演算処理部12から離れた場所にあるサーバ等の一部として構成され、インターネット等のネットワークを介して演算処理部12と情報のやり取りを行うものであってもよい。 As shown in FIG. 2, the self-consignment amount calculation system 1 includes a memory unit 11 and a calculation processing unit 12. The memory unit 11 is configured as a non-volatile storage device such as an HDD (Hard Disk Drive) or SSD (Solid State Drive), or a volatile storage device such as RAM (Random Access Memory). The calculation processing unit 12 is configured as a calculation processing device such as a CPU (Central Processing Unit). For example, the memory unit 11 and the calculation processing unit 12 are configured as part or all of a personal computer or server computer for controlling the power supply facility S. The memory unit 11 may be configured as multiple storage devices, for example, a combination of non-volatile storage devices and volatile storage devices. The memory unit 11 may also be configured as part of a server or the like located remotely from the calculation processing unit 12, and exchange information with the calculation processing unit 12 via a network such as the Internet.

記憶部11は、電力供給施設情報と、電力消費施設情報と、予測逼迫度情報を記憶する。例えば、記憶部11は、これらの情報を、インターネット等のネットワークを介して受信したり、オペレータによって入力されたりすることによって取得し、記憶する。電力供給施設情報は、電力供給施設Sの消費電力量や発電電力量に関する情報である。電力消費施設情報は、電力消費施設Dの消費電力や発電電力に関する情報である。電力供給施設情報及び電力消費施設情報は、それぞれの施設S,Dにおける過去の電力量の実績を示す情報であってもよいし、将来の電力量の予測を示す情報であってもよい。予測逼迫度情報は、将来の単位時間について予測された、商用電力系統Pの需要に対する供給の余裕の大きさである予測逼迫度を示す情報である。予測逼迫度は、例えば、インバランス料金の計算の基準とされる指標である、電力広域的運営推進機関(OCCTO:Organization for Cross-regional Coordination of Transmission Operators, JAPAN)が発表する広域予備率(商用電力系統Pの全体の供給量から全体の需要量を減じて得られた差分について、全体の需要量で除した値)である。なお、予測逼迫度は、必ずしもインバランス料金の計算式に組み込まれている必要はなく、インバランス料金と相関関係がある指標であればよい。 The memory unit 11 stores power supply facility information, power consumption facility information, and predicted pressure information. For example, the memory unit 11 acquires and stores this information by receiving it via a network such as the Internet or by inputting it by an operator. The power supply facility information is information related to the amount of power consumed and the amount of power generated by the power supply facility S. The power consumption facility information is information related to the amount of power consumed and the amount of power generated by the power consumption facility D. The power supply facility information and the power consumption facility information may be information indicating the actual past amount of power consumed at each facility S, D, or may be information indicating a prediction of future power amount. The predicted pressure information is information indicating the predicted pressure, which is the amount of supply margin relative to demand in the commercial power system P, predicted for a future unit time. The predicted tightness is, for example, the wide-area reserve margin (the value obtained by subtracting the total demand from the total supply of the commercial power system P and dividing the difference by the total demand) published by the Organization for Cross-regional Coordination of Transmission Operators, JAPAN (OCCTO), which is an indicator used as the basis for calculating imbalance charges. Note that the predicted tightness does not necessarily need to be incorporated into the imbalance charge calculation formula, and can be any indicator that is correlated with the imbalance charge.

演算処理部12は、電力供給施設情報、電力消費施設情報及び予測逼迫度情報に基づいて、将来の単位時間に自己託送する電力量(以下、「自己託送量」ともいう。)を算出する(詳細は後述する)。演算処理部12によって算出された自己託送の電力量は、出力情報として外部に出力される。例えば、出力情報は、表示装置によって文字や画像として表示されるなどしてオペレータに伝えられるようにしてもよいし、電力広域的運営推進機関などに対して送信されて事業者B1が自己託送する電力量として申告されるようにしてもよい。 The calculation processing unit 12 calculates the amount of electricity to be self-consigned in a future unit time (hereinafter also referred to as "self-consignment amount") based on the power supply facility information, power consumption facility information, and predicted tightness information (details will be described later). The self-consignment amount of electricity calculated by the calculation processing unit 12 is output to the outside as output information. For example, the output information may be communicated to an operator by being displayed as text or an image on a display device, or it may be sent to an organization promoting cross-regional coordination of transmission lines, etc., and declared by operator B1 as the amount of electricity to be self-consigned.

次に、演算処理部12による自己託送量の算出方法について図面を参照して説明する。図3は、演算処理部12による自己託送量の算出方法の一例について示す図である。なお、図3では、図中の左から右に向かって時間が進行する時系列で表している。 Next, the method for calculating the self-consignment amount by the calculation processing unit 12 will be explained with reference to the drawings. Figure 3 is a diagram showing an example of the method for calculating the self-consignment amount by the calculation processing unit 12. Note that Figure 3 shows a chronological order in which time progresses from left to right in the figure.

最初に、演算処理部12は、特定の対象期間(例えば、算出日の翌日の8時~24時までの期間)に含まれる単位時間のそれぞれについて、自己託送量を算出する。ただし、ここでは、演算処理部12が、自己託送をするために必要な手続きである計画提出のために、自己託送量を算出する。計画提出は、対象期間に含まれる各単位時間における自己託送量を事前に連絡するものであり、対象期間よりも十分に前までに行う必要がある(例えば、対象期間の前日の12時までに提出する翌日計画)。また、自己託送に限らず、商用電力系統Pに売電する際には、計画提出が必要である。なお、計画提出した自己託送量は、後で変更することが可能である。例えば、翌日計画で提出した自己託送量は、対象期間の前日の17時から単位時間の1時間までの間に当日計画を提出することで変更可能である。 First, the calculation processing unit 12 calculates the self-consignment amount for each unit time included in a specific target period (for example, the period from 8:00 to 24:00 on the day after the calculation date). However, here, the calculation processing unit 12 calculates the self-consignment amount for plan submission, which is a procedure required for self-consignment. Plan submission is a prior notification of the self-consignment amount for each unit time included in the target period, and must be made sufficiently before the target period (for example, a next-day plan submitted by 12:00 on the day before the target period). Plan submission is also required when selling electricity to the commercial power grid P, not just for self-consignment. Note that the self-consignment amount that has been submitted as a plan can be changed later. For example, the self-consignment amount submitted as a next-day plan can be changed by submitting a current-day plan between 17:00 on the day before the target period and one unit time.

例えば、演算処理部12は、電力供給施設Sにおける過去の消費電力量や発電電力量の実績を示す電力供給施設情報に基づいて、電力供給施設Sが商用電力系統Pに供給(逆潮量)可能な電力量を算出する。また、演算処理部12は、電力消費施設Dにおける過去の消費電力量や発電電力量の実績を示す電力消費施設情報に基づいて、電力消費施設Dが商用電力系統Pから供給を受ける電力量を算出する。そして、演算処理部12は、電力供給施設Sが商用電力系統Pに供給可能な電力量の全て(ただし、電力供給施設Sが商用電力系統Pに供給可能な電力量が、電力消費施設Dが商用電力系統Pから供給を受ける電力量を上回る場合は、電力消費施設Dが商用電力系統Pから供給を受ける電力量と同量まで)を自己託送量として算出してもよいし、特開2017-163780号公報で提案されているように契約電力が低減されるように自己託送量を算出してもよい。 For example, the calculation processing unit 12 calculates the amount of power that the power supply facility S can supply (reverse flow amount) to the commercial power grid P based on power supply facility information indicating the past amounts of power consumed and power generated at the power supply facility S. The calculation processing unit 12 also calculates the amount of power that the power consumption facility D receives from the commercial power grid P based on power consumption facility information indicating the past amounts of power consumed and power generated at the power consumption facility D. The calculation processing unit 12 may then calculate the entire amount of power that the power supply facility S can supply to the commercial power grid P (however, if the amount of power that the power supply facility S can supply to the commercial power grid P exceeds the amount of power that the power consumption facility D receives from the commercial power grid P, then the calculation processing unit 12 may calculate the self-consignment amount as up to the amount of power that the power consumption facility D receives from the commercial power grid P), or it may calculate the self-consignment amount so that the contracted power is reduced, as proposed in JP 2017-163780 A.

次に、計画提出の後、対象期間に含まれる各単位時間の予測逼迫度が発表され、記憶部11に予測逼迫度情報が記憶される。予測逼迫度情報が記憶部11に記憶されるタイミングは、計画提出の後であり、対象期間の開始前(さらには計画提出した自己託送量の変更可能期限内)である。 Next, after the plan is submitted, the predicted pressure level for each unit time included in the target period is announced, and the predicted pressure level information is stored in the memory unit 11. The predicted pressure level information is stored in the memory unit 11 after the plan is submitted and before the start of the target period (and further, within the deadline for changing the self-consignment volume submitted in the plan).

演算処理部12は、対象期間に含まれる予測逼迫度が、商用電力系統Pの需要に対する供給の余裕の大きさが所定の大きさ以下である場合、当該単位時間における自己託送量が所定の上限値以下になるように算出し、出力情報として出力する。これにより、出力情報を確認したオペレータによる操作か、出力情報が電力広域的運営推進機関に送られるなどして、当該単位時間における自己託送量が上限値以下に抑えられる。 If the predicted tightness included in the target period indicates that the supply surplus relative to demand in the commercial power system P is below a predetermined level, the calculation processing unit 12 calculates the self-consignment volume for that unit time to be below a predetermined upper limit and outputs this as output information. As a result, the self-consignment volume for that unit time is kept below the upper limit, either by an operator who checks the output information or by sending the output information to the Organization for Cross-regional Coordination of Transmission Operators.

例えば、演算処理部12は、ある単位時間における予測逼迫度である広域予備率が8%以下になった場合、当該単位時間の自己託送量を上限値以下にする。また例えば、上限値は、電力供給施設Sがある程度確実に商用電力系統Pに供給可能な電力量以下の大きさである。 For example, when the wide-area reserve margin, which is the predicted tightness for a certain unit time, falls below 8%, the calculation processing unit 12 sets the self-transmission amount for that unit time below the upper limit value. Also, for example, the upper limit value is equal to or less than the amount of power that the power supply facility S can reliably supply to the commercial power system P.

以上のように、演算処理部12が、対象期間に含まれる予測逼迫度が商用電力系統Pの需要に対する供給の余裕の大きさが所定の大きさ以下である場合に、当該単位時間における自己託送量が所定の上限値以下になるように算出すると、商用電力系統Pの需給が逼迫してインバランス料金が高額になる可能性が高い場合に、インバランス料金の発生を抑制することができる。したがって、高額なインバランス料金の発生を抑制することが可能になる。 As described above, if the calculation processing unit 12 calculates the self-transport amount for that unit time to be below a predetermined upper limit when the predicted tightness included in the target period indicates that the supply surplus relative to demand in the commercial power system P is below a predetermined level, it is possible to suppress the occurrence of imbalance fees when the supply and demand in the commercial power system P is tight and there is a high possibility that imbalance fees will become expensive. Therefore, it is possible to suppress the occurrence of expensive imbalance fees.

なお、上限値は、所定の正の値であってもよいが、0であってもよい。上限値を0にすると、インバランス料金の発生を確実に防止することができる。 The upper limit may be a specified positive value, or it may be 0. Setting the upper limit to 0 will ensure that imbalance fees are not incurred.

また、対象期間中の少なくとも1つの予測逼迫度が、商用電力系統Pの需要に対する供給の余裕の大きさが所定の大きさ以下である場合、当該対象期間に含まれる複数の単位時間のそれぞれについて自己託送量が上限値以下になるように算出してもよい。この場合、例えばオペレータの操作によって自己託送量を変更する場合であっても、簡易的な操作によって、人件費の増大を抑制しつつインバランス料金の発生を抑制することができる。 Furthermore, if at least one predicted tightness during the target period indicates that the supply surplus relative to demand in the commercial power system P is equal to or less than a predetermined amount, the self-consignment amount for each of multiple unit times included in the target period may be calculated to be equal to or less than the upper limit. In this case, even if the self-consignment amount is changed by an operator, for example, a simple operation can suppress the occurrence of imbalance charges while suppressing increases in labor costs.

以上、上述した実施形態は本発明を実施するための例示に過ぎない。本発明は上述した実施形態に限定されることなく、その趣旨を逸脱しない範囲内で上述した実施形態を適宜変形して実施することが可能である。 The above-described embodiments are merely examples for implementing the present invention. The present invention is not limited to the above-described embodiments, and can be implemented by appropriately modifying the above-described embodiments within the scope of the spirit of the present invention.

例えば、上述の実施形態では、前日計画として自己託送量を提出した後に予測逼迫度を取得し、当該予測逼迫度に基づいて当日計画を提出して修正する場合について例示した。しかし、前日計画を提出せず、予測逼迫度に基づいた自己託送量を当日計画で提出するのみであってもよい。 For example, in the above embodiment, an example was given of a case in which a self-consignment amount was submitted as a day-ahead plan, a predicted pressure level was acquired, and a daily plan was submitted and revised based on the predicted pressure level. However, it is also possible to simply submit a self-consignment amount based on the predicted pressure level as a daily plan without submitting a day-ahead plan.

また、上述の実施形態では、演算処理部12が、記憶部11に記憶されたプログラムを実行することで、上述した自己託送量算出システム1の動作を実現する場合について例示した。一方、上述の実施形態とは別の実施形態として、当該プログラムが、コンピュータが読み取り可能な任意の記憶媒体(プログラム記憶媒体)として頒布されてもよいし、無線または有線の通信回線を通じて伝送されるなどして頒布されてもよい。 Furthermore, in the above-described embodiment, an example has been given of a case in which the calculation processing unit 12 executes a program stored in the storage unit 11 to realize the operation of the above-described self-consignment amount calculation system 1. On the other hand, in an embodiment different from the above-described embodiment, the program may be distributed as any computer-readable storage medium (program storage medium), or may be distributed by being transmitted via a wireless or wired communication line.

また、上述した自己託送量算出システムは、以下のように説明することができる。 Furthermore, the self-consignment amount calculation system described above can be explained as follows:

自己託送量算出システムは、事業者によって運営される電力供給施設が商用電力系統に供給する電力を、当該事業者または当該事業者と同じ事業体に属する別の事業者によって運営されて前記商用電力系統から電力の供給を受けて消費する電力消費施設に対して融通する、自己託送の電力量を算出する自己託送量算出システムであって、将来の単位時間について予測された前記商用電力系統の需要に対する供給の余裕の大きさである予測逼迫度を示す予測逼迫度情報を記憶する記憶部と、前記記憶部が記憶する前記予測逼迫度情報が示す、将来の前記単位時間の前記予測逼迫度に基づいて、当該単位時間の到来よりも前に、当該単位時間に自己託送する電力量を算出する演算処理部と、を備え、前記演算処理部は、将来の前記単位時間における前記予測逼迫度が、前記余裕が所定の大きさ以下であること表す場合、当該単位時間に自己託送する電力量が上限値以下になるように算出する(第1の構成)。この構成によれば、商用電力系統の需給が逼迫してインバランス料金が高額になる可能性が高い場合に、インバランス料金の発生を抑制することができる。したがって、高額なインバランス料金の発生を抑制することが可能になる。 The self-consignment amount calculation system calculates the amount of self-consignment electricity that electricity supplied to a commercial power grid by a power supply facility operated by a utility is lent to a power consumption facility operated by the utility or another utility belonging to the same entity as the utility and that receives and consumes electricity from the commercial power grid. The system includes a memory unit that stores predicted tightness information indicating the predicted tightness, which is the magnitude of the supply surplus relative to demand in the commercial power grid predicted for a future unit time, and a calculation processing unit that calculates the amount of electricity to be self-consignment for a unit time before the arrival of the unit time based on the predicted tightness for the future unit time indicated by the predicted tightness information stored in the memory unit. If the predicted tightness for the future unit time indicates that the surplus is equal to or less than a predetermined amount, the calculation processing unit calculates the amount of electricity to be self-consignment for the unit time to be equal to or less than an upper limit (first configuration). This configuration makes it possible to suppress the occurrence of imbalance fees when the supply and demand balance in the commercial power grid is tight and there is a high possibility that imbalance fees will become high. Therefore, it is possible to suppress the occurrence of high imbalance fees.

第1の構成において、前記演算処理部は、複数の前記単位時間が含まれる対象期間について、その中の少なくとも1つの前記単位時間における前記予測逼迫度が、前記余裕が所定の大きさ以下であること表す場合、前記対象期間に含まれる複数の前記単位時間のそれぞれにおいて自己託送する電力量が前記上限値以下になるように算出してもよい(第2の構成)。この構成によれば、例えばオペレータの操作によって自己託送量を変更する場合であっても、簡易的な操作によって、人件費の増大を抑制しつつインバランス料金の発生を抑制することができる。 In the first configuration, when the predicted tightness in at least one unit time of a target period that includes multiple unit times indicates that the margin is equal to or less than a predetermined magnitude, the calculation processing unit may calculate the amount of self-consignment electricity in each of the multiple unit times included in the target period so that it is equal to or less than the upper limit (second configuration). With this configuration, even when the self-consignment amount is changed by an operator, for example, a simple operation can suppress the occurrence of imbalance charges while suppressing increases in labor costs.

また、第1または第2の構成において、前記演算処理部は、将来の前記単位時間における前記予測逼迫度が、前記余裕が所定の大きさ以下であること表す場合、当該単位時間に自己託送する電力量が0になるように算出してもよい(第3の構成)。この構成によれば、インバランス料金の発生を確実に防止することができる。 Furthermore, in the first or second configuration, if the predicted tightness for the future unit time indicates that the margin is equal to or less than a predetermined amount, the calculation processing unit may calculate the amount of electricity to be self-consigned for that unit time to be zero (third configuration). This configuration can reliably prevent the occurrence of imbalance charges.

また、上述した自己託送量算出システムで利用されるプログラムは、事業者によって運営される電力供給施設が商用電力系統に供給する電力を、当該事業者または当該事業者と同じ事業体に属する別の事業者によって運営されて前記商用電力系統から電力の供給を受けて消費する電力消費施設に対して融通する、自己託送の電力量を算出する処理を、コンピュータに実行させるプログラムであって、将来の単位時間について予測された前記商用電力系統の需要に対する供給の余裕の大きさである予測逼迫度を示す予測逼迫度情報を取得する処理と、前記予測逼迫度情報が示す将来の前記単位時間の前記予測逼迫度が、前記余裕が所定の大きさ以下であること表す場合は、当該単位時間に自己託送する電力量が上限値以下になるように算出する処理と、を前記コンピュータに実行させる(第4の構成)。 The program used in the self-consignment amount calculation system described above also causes a computer to execute a process to calculate the amount of self-consignment power that is supplied to a commercial power grid by a power supply facility operated by a utility, and that is lent to a power consumption facility operated by the utility or another utility belonging to the same entity that receives and consumes power from the commercial power grid. The program also causes the computer to execute the following processes: obtain predicted tightness information indicating the predicted tightness, which is the magnitude of the supply surplus relative to demand in the commercial power grid predicted for a future unit time; and, if the predicted tightness for that unit time indicated by the predicted tightness information indicates that the surplus is less than a predetermined amount, calculate the amount of self-consignment power for that unit time to be less than an upper limit (fourth configuration).

1…自己託送量算出システム、11…記憶部、12…演算処理部、S…電力供給施設、D…電力消費施設、P…商用電力系統、B1,B2…事業者 1... Self-transportation amount calculation system, 11... Memory unit, 12... Processing unit, S... Power supply facility, D... Power consumption facility, P... Commercial power system, B1, B2... Operator

Claims (4)

事業者によって運営される電力供給施設が商用電力系統に供給する電力を、当該事業者または当該事業者と同じ事業体に属する別の事業者によって運営されて前記商用電力系統から電力の供給を受けて消費する電力消費施設に対して融通する、自己託送の電力量を算出する自己託送量算出システムであって、
将来の単位時間について予測された前記商用電力系統の需要に対する供給の余裕の大きさである予測逼迫度を示す予測逼迫度情報を記憶する記憶部と、
前記記憶部が記憶する前記予測逼迫度情報が示す、将来の前記単位時間の前記予測逼迫度に基づいて、当該単位時間の到来よりも前に、当該単位時間に自己託送する電力量を算出する演算処理部と、を備え、
前記演算処理部は、将来の前記単位時間における前記予測逼迫度が、前記余裕が所定の大きさ以下であること表す場合、当該単位時間に自己託送する電力量が上限値以下になるように算出する、自己託送量算出システム。
A self-consignment amount calculation system that calculates the amount of self-consignment electricity that is supplied to a commercial power system by a power supply facility operated by a business operator and is lent to a power consumption facility that is operated by the business operator or another business operator that belongs to the same business entity as the business operator and receives and consumes electricity from the commercial power system,
a storage unit that stores predicted tightness information indicating a predicted tightness, which is the magnitude of a supply surplus relative to demand in the commercial power system predicted for a future unit time;
a calculation processing unit that calculates, based on the predicted tightness of the future unit time indicated by the predicted tightness information stored in the storage unit, an amount of power to be self-consigned at the unit time before the unit time arrives,
When the predicted tightness in the future unit time indicates that the margin is equal to or less than a predetermined size, the calculation processing unit calculates the amount of power to be self-transmitted in the unit time to be equal to or less than an upper limit value. A self-transmission amount calculation system.
前記演算処理部は、複数の前記単位時間が含まれる対象期間について、その中の少なくとも1つの前記単位時間における前記予測逼迫度が、前記余裕が所定の大きさ以下であること表す場合、前記対象期間に含まれる複数の前記単位時間のそれぞれにおいて自己託送する電力量が前記上限値以下になるように算出する、請求項1に記載の自己託送量算出システム。 The self-consignment amount calculation system of claim 1, wherein, for a target period including multiple unit times, when the predicted tightness for at least one of the unit times indicates that the margin is equal to or less than a predetermined magnitude, the calculation processing unit calculates the amount of electricity to be self-consigned for each of multiple unit times included in the target period so that it is equal to or less than the upper limit. 前記演算処理部は、将来の前記単位時間における前記予測逼迫度が、前記余裕が所定の大きさ以下であること表す場合、当該単位時間に自己託送する電力量が0になるように算出する、請求項1または2に記載の自己託送量算出システム。 The self-consignment amount calculation system of claim 1 or 2, wherein the calculation processing unit calculates the amount of self-consignment electricity for the unit time to be zero if the predicted tightness for the unit time in the future indicates that the margin is equal to or less than a predetermined amount. 事業者によって運営される電力供給施設が商用電力系統に供給する電力を、当該事業者または当該事業者と同じ事業体に属する別の事業者によって運営されて前記商用電力系統から電力の供給を受けて消費する電力消費施設に対して融通する、自己託送の電力量を算出する処理を、コンピュータに実行させるプログラムであって、
将来の単位時間について予測された前記商用電力系統の需要に対する供給の余裕の大きさである予測逼迫度を示す予測逼迫度情報を取得する処理と、
前記予測逼迫度情報が示す将来の前記単位時間の前記予測逼迫度が、前記余裕が所定の大きさ以下であること表す場合は、当該単位時間に自己託送する電力量が上限値以下になるように算出する処理と、
を前記コンピュータに実行させる、プログラム。
A program that causes a computer to execute a process of calculating the amount of self-consignment electricity that is supplied to a commercial power grid by a power supply facility operated by a business operator and distributed to a power consumption facility operated by the business operator or another business operator that belongs to the same business entity as the business operator and receives and consumes electricity from the commercial power grid,
A process of acquiring predicted tightness information indicating a predicted tightness, which is the magnitude of a supply surplus relative to demand in the commercial power system predicted for a future unit time;
When the predicted tightness of the future unit time indicated by the predicted tightness information indicates that the margin is equal to or less than a predetermined size, a process of calculating the amount of power to be self-transmitted in the unit time so that it is equal to or less than an upper limit value;
A program that causes the computer to execute the above.
JP2022056491A 2022-03-30 2022-03-30 Self-consignment amount calculation system and program Active JP7746210B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022056491A JP7746210B2 (en) 2022-03-30 2022-03-30 Self-consignment amount calculation system and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022056491A JP7746210B2 (en) 2022-03-30 2022-03-30 Self-consignment amount calculation system and program

Publications (2)

Publication Number Publication Date
JP2023148460A JP2023148460A (en) 2023-10-13
JP7746210B2 true JP7746210B2 (en) 2025-09-30

Family

ID=88288309

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022056491A Active JP7746210B2 (en) 2022-03-30 2022-03-30 Self-consignment amount calculation system and program

Country Status (1)

Country Link
JP (1) JP7746210B2 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004336890A (en) 2003-05-08 2004-11-25 Hitachi Ltd Power trading support system
JP2016523501A (en) 2013-06-04 2016-08-08 コーニンクレッカ フィリップス エヌ ヴェKoninklijke Philips N.V. Wireless inductive power transmission
JP2021103489A (en) 2019-12-25 2021-07-15 デジタルグリッド株式会社 Consignment assisting system and method
JP2021141769A (en) 2020-03-06 2021-09-16 日新電機株式会社 Power monitoring control device, power monitoring control method, and control program
JP6983342B1 (en) 2021-01-29 2021-12-17 株式会社日立パワーソリューションズ Electric power transaction support device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004336890A (en) 2003-05-08 2004-11-25 Hitachi Ltd Power trading support system
US20040254899A1 (en) 2003-05-08 2004-12-16 Keiko Abe Electric power trading support system
JP2016523501A (en) 2013-06-04 2016-08-08 コーニンクレッカ フィリップス エヌ ヴェKoninklijke Philips N.V. Wireless inductive power transmission
JP2021103489A (en) 2019-12-25 2021-07-15 デジタルグリッド株式会社 Consignment assisting system and method
JP2021141769A (en) 2020-03-06 2021-09-16 日新電機株式会社 Power monitoring control device, power monitoring control method, and control program
JP6983342B1 (en) 2021-01-29 2021-12-17 株式会社日立パワーソリューションズ Electric power transaction support device

Also Published As

Publication number Publication date
JP2023148460A (en) 2023-10-13

Similar Documents

Publication Publication Date Title
US8463450B2 (en) Aggregated management system
JP6758881B2 (en) Power supply and demand management support system, power supply and demand management support method and power supply and demand management support program
Modig et al. Overview of frequency control in the nordic power system
JP3631967B2 (en) Surplus power management system and control method thereof
JP7078183B1 (en) Control methods, management devices, programs and power systems
EP3032489B1 (en) Power adjustment device, power adjustment method, and program
JP5998046B2 (en) Power suppression control system and power suppression control method
JP7279435B2 (en) Power management system, management device, management method and computer program
CN101310227A (en) Predictive contracting systems and methods
JP6117984B1 (en) Supply and demand management device, supply and demand management method, and supply and demand management program
WO2013046657A1 (en) Charge/discharge system
JP2013169068A (en) Power control system
US20240280617A1 (en) Aggregator System
Hanley et al. Frequency instability problems in North American interconnections
Tahmasebi et al. Self-scheduling of wind power generation with direct load control demand response as a virtual power plant
Sarsabahi et al. Strategic energy storage scheduling with fast acting demand side schemes to improve flexibility of hybrid renewable energy system
Zhou et al. China’s renewable curtailment and coal assets risk map
JP7746210B2 (en) Self-consignment amount calculation system and program
JP7234819B2 (en) Demand control method, controller, program and power system
Alvarado et al. Reactive power as an identifiable ancillary service
JP2019159628A (en) Control device, control method, and computer program
Majchrzak Problems related to balancing peak power on the example of the Polish National Power System
Ongsakul et al. Coordinated fuzzy constrained optimal power dispatch for bilateral contract, balancing electricity, and ancillary services markets
JP2009095100A (en) Wheeling operation supporting system
Prada et al. Pricing reliability: A probabilistic approach

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20241115

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250813

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250819

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250917

R150 Certificate of patent or registration of utility model

Ref document number: 7746210

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150