JP7753066B2 - Construction management method, construction management system, and program - Google Patents
Construction management method, construction management system, and programInfo
- Publication number
- JP7753066B2 JP7753066B2 JP2021187013A JP2021187013A JP7753066B2 JP 7753066 B2 JP7753066 B2 JP 7753066B2 JP 2021187013 A JP2021187013 A JP 2021187013A JP 2021187013 A JP2021187013 A JP 2021187013A JP 7753066 B2 JP7753066 B2 JP 7753066B2
- Authority
- JP
- Japan
- Prior art keywords
- information
- construction
- seal
- type information
- read
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Entrepreneurship & Innovation (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Game Theory and Decision Science (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
本発明は、施工管理方法、施工管理システム、およびプログラムに関する。 The present invention relates to a construction management method, a construction management system, and a program.
ガスケットなど、配管を接続する箇所にシール材が取り付けられている。どの接続箇所にどのシール材を用いるかは、設計台帳で管理されており、その設計台帳に基づいて施工が行われている。 Sealing materials such as gaskets are installed where pipes are connected. Which sealing materials are used at which connection points is managed in a design ledger, and construction is carried out based on that design ledger.
特許文献1には、フランジにフランジ情報をバーコードで明示したフランジタグと、ガスケットにバーコードで明示されたガスケットタグとを設けること、フランジ情報はフランジを識別するフランジナンバーおよびフランジ寸法を含むこと、フランジタグからバーコードリーダーを用いてフランジ情報を取得し、ガスケットにバーコードで明示されたガスケット情報を取得し、それらが締付け情報に合致するか否かの判断による適否を表示することが開示されている。 Patent Document 1 discloses that a flange tag displaying flange information in a barcode is provided on the flange, and a gasket tag displaying the same in a barcode is provided on the gasket; the flange information includes a flange number that identifies the flange and flange dimensions; the flange information is obtained from the flange tag using a barcode reader, and the gasket information displayed in barcode on the gasket is obtained, and the suitability is displayed based on a determination of whether or not this information matches the tightening information.
特許文献2には、フランジに関連付けられた締付け条件情報を取得した後に、フランジタグからガスケット情報を含むフランジ情報を取得し、ガスケットタグからガスケット情報を取得し、フランジ情報に含まれるガスケット情報とガスケットから取得したガスケット情報とが適合しているか判断することが開示されている。 Patent Document 2 discloses a method of obtaining tightening condition information associated with a flange, then obtaining flange information including gasket information from the flange tag, obtaining gasket information from the gasket tag, and determining whether the gasket information included in the flange information matches the gasket information obtained from the gasket.
特許文献3には、フランジタグからガスケット情報を含むフランジ情報を取得し、ガスケットタグからガスケット情報を取得し、フランジ情報に含まれるガスケット情報とガスケットから取得したガスケット情報とが適合しているか判断することが開示されている。 Patent Document 3 discloses obtaining flange information including gasket information from a flange tag, obtaining gasket information from the gasket tag, and determining whether the gasket information included in the flange information matches the gasket information obtained from the gasket.
特許文献4には、シール施工システムにおいて、施工業者に対してシール施工研修の受講指示を発行し、施工業者のシール施工研修の受講に応じて、シール施工に必要なシール材の情報を取得することが開示されている。研修サーバのシール材情報・施工情報テーブルには、シール施工の対象である施工機器を特定する情報が格納される。 Patent Document 4 discloses that a sealant application system issues instructions to contractors to attend sealant application training, and acquires information on the sealant materials required for sealing in response to the contractor's attendance at the sealant application training. A sealant information and application information table in the training server stores information identifying the application equipment to be used for sealing.
特許文献5には、物品管理システムにおいて、物品にストレージ材を付し、ストレージ材は識別データ、賞味期限、入庫時刻を記憶すること、読み出し装置がストレージ材からそれらの情報を読み出して検索を可能にすることが開示されている。 Patent document 5 discloses that in an item management system, storage materials are attached to items, and the storage materials store identification data, expiration dates, and time of entry, and a reading device reads this information from the storage materials to enable searching.
特許文献6には、ケーブルの布設を支援するシステムが開示されている。このシステムでは、ケーブルの端部にRFIDを貼り付け、PDAがRFIDを読み取ることで得られるケーブルIDに基づいて、そのケーブルに対する作業情報を表示する。 Patent document 6 discloses a system that assists in cable installation. In this system, an RFID tag is attached to the end of a cable, and a PDA reads the RFID tag to obtain the cable ID, which is used to display work information for that cable.
特許文献7には、手直しが必要な個所を示すバーコードを印刷し、ボードに貼り付けてバーコード台帳を作成することが記載されている。 Patent document 7 describes a method of printing barcodes indicating areas that need repair and attaching them to a board to create a barcode ledger.
作業者にとって、配管の接続箇所に適切な種類のシール材を取り付けることは容易でない。例えば、設計台帳から接続箇所を見つけ出し、その接続箇所に用いるシール材の種類を確認し、取り付ける予定のシール材が適切であるか目視で確認する必要があった。例えば、耐熱性が異なるシール材や径が少し異なるシール材など外見から見分けることが難しいシール材が存在するため、作業者は、シール材が適切か否かを細心の注意を払って確認する必要があった。 It is not easy for workers to install the appropriate type of sealant at pipe connections. For example, they had to find the connection point in the design ledger, check the type of sealant to be used at that connection point, and visually confirm that the sealant they planned to install was appropriate. For example, there are sealants that are difficult to distinguish from their appearance, such as sealants with different heat resistance or slightly different diameters, so workers had to pay close attention to check whether the sealant was appropriate.
本発明は上記課題を鑑みてなされたものであって、その目的は、配管の接続箇所にシール材を取り付ける際の負担を軽減する技術を提供することにある。 The present invention was made in consideration of the above-mentioned problems, and its purpose is to provide technology that reduces the burden when attaching sealing material to pipe connections.
上記課題を解決するために、本発明にかかる施工管理方法は、工事の対象となる配管の接続部に付与された工事対象情報であって、前記配管の接続部を識別するための工事対象情報を入力するステップと、工事対象情報と種類情報とを関連付けて記憶する記憶手段から、前記入力された工事対象情報と関連付けられた種類情報を取得するステップと、シール材から、当該シール材の種類情報を含むシール情報を読み取るステップと、前記取得された種類情報と、前記読み取られたシール情報に含まれる種類情報とが同一であるか否かを判定するステップと、前記判定の結果を出力するステップと、前記出力された判定の結果に基づいて選択されたシール材を前記配管の接続部に取り付けるステップと、を含む。 To solve the above problem, the construction management method of the present invention includes the steps of: inputting construction target information assigned to a pipe connection that is the target of construction work and that identifies the pipe connection; acquiring type information associated with the input construction target information from a storage device that stores construction target information and type information in association with each other; reading seal information from the sealant, including type information about the sealant; determining whether the acquired type information is the same as the type information included in the read seal information; outputting the result of the determination; and attaching a sealant selected based on the output result of the determination to the pipe connection.
本発明にかかる施工管理システムは、工事の対象となる配管の接続部に付与された工事対象情報であって、前記配管の接続部を識別するための工事対象情報を取得する対象取得手段と、前記取得された工事対象情報が示す配管の接続部に取り付け可能なシール材の種類情報を、工事対象情報と種類情報とを関連付けて記憶する記憶手段から取得する関連取得手段と、シール材から読み取られた、当該シール材の種類情報を含むシール情報を取得するシール情報取得手段と、前記記憶手段から取得された種類情報と、前記読み取られたシール情報に含まれる種類情報とが同一であるか否かを判定する判定手段と、前記判定手段による判定の結果を出力する結果出力手段と、を含む。 The construction management system of the present invention includes: a target acquisition means for acquiring construction target information assigned to a pipe connection that is the target of construction work and that identifies the pipe connection; an association acquisition means for acquiring type information of a sealant that can be attached to the pipe connection indicated by the acquired construction target information from a storage means that stores construction target information and type information in association with each other; a seal information acquisition means for acquiring seal information read from the sealant and including type information of the sealant; a determination means for determining whether the type information acquired from the storage means is the same as the type information included in the read seal information; and a result output means for outputting the result of the determination by the determination means.
本発明にかかるプログラムは、工事の対象となる配管の接続部に付与された工事対象情報であって、前記配管の接続部を識別するための工事対象情報を取得する対象取得手段、前記取得された工事対象情報が示す配管の接続部に取り付け可能なシール材の種類情報を、工事対象情報と種類情報とを関連付けて記憶する記憶手段から取得する関連取得手段、シール材から読み取られた、当該シール材の種類情報を含むシール情報を取得するシール情報取得手段、前記記憶手段から取得された種類情報と、前記読み取られたシール情報に含まれる種類情報とが同一であるか否かを判定する判定手段、および、前記判定手段による判定の結果を出力する結果出力手段、としてコンピュータを機能させる。 The program of the present invention causes a computer to function as: target acquisition means for acquiring construction target information assigned to a pipe connection that is the target of construction work and used to identify the pipe connection; association acquisition means for acquiring type information of a sealant that can be attached to the pipe connection indicated by the acquired construction target information from storage means that stores construction target information and type information in association with each other; seal information acquisition means for acquiring seal information read from the sealant and including type information of the sealant; determination means for determining whether the type information acquired from the storage means is the same as the type information included in the read seal information; and result output means for outputting the result of the determination by the determination means.
本発明の一形態では、施工管理方法は、前記取得された工事対象情報と関連付けられた種類情報を表示するステップ、をさらに含み、前記シール情報を読み取るステップにおいて、前記表示された種類情報に基づいて選択されたシール材から、当該シール材の種類情報を含むシール情報を読み取ってよい。 In one embodiment of the present invention, the construction management method further includes a step of displaying type information associated with the acquired construction object information, and in the step of reading the seal information, seal information including type information of the seal material may be read from a seal material selected based on the displayed type information.
本発明の一形態では、前記工事対象情報を入力するステップにおいて、前記工事の対象となる前記配管の接続部に対して付される被読取部であって、前記工事対象情報が書き込まれた被読取部を読取装置で読み取ることにより、前記工事対象情報を入力してよい。 In one embodiment of the present invention, in the step of inputting the construction target information, the construction target information may be input by reading, with a reading device, a readable portion attached to the connection portion of the piping that is the target of the construction, in which the construction target information is written.
本発明の一形態では、前記被読取部は、符号化された前記工事対象情報が印刷された部分または前記工事対象情報が書き込まれたICタグを含み、前記工事対象情報を入力するステップにおいて、読取装置で前記印刷された部分または前記ICタグから工事対象情報を読み取ることにより、前記工事対象情報を入力してよい。 In one embodiment of the present invention, the readable portion may include a portion on which the encoded construction target information is printed or an IC tag on which the construction target information is written, and in the step of inputting the construction target information, the construction target information may be input by reading the construction target information from the printed portion or the IC tag using a reading device.
本発明の一形態では、前記シール情報を読み取るステップにおいて、前記シール材に付された、前記シール情報が書き込まれたICタグまたは符号化された前記シール情報が印刷された部分から前記シール情報を読み取ってよい。 In one embodiment of the present invention, in the step of reading the sticker information, the sticker information may be read from an IC tag attached to the sealing material on which the sticker information is written or from a portion on which the encoded sticker information is printed.
本発明の一形態では、前記シール情報は、前記シール材のロット番号をさらに含み、
前記判定の結果を示す情報および前記ロット番号を前記工事対象情報と関連付けて記憶手段に記憶させるステップをさらに含んでよい。
In one embodiment of the present invention, the seal information further includes a lot number of the seal material,
The method may further include a step of storing information indicating the result of the judgment and the lot number in a storage means in association with the construction object information.
本発明の一形態では、前記記憶手段に関連付けて格納された前記ロット番号および前記工事対象情報に基づいて、クエリとして入力されるロット番号に関連付けられた工事対象情報を検索するステップをさらに含んでよい。 In one embodiment of the present invention, the method may further include a step of searching for construction object information associated with the lot number input as a query, based on the lot number and the construction object information stored in association with each other in the storage means.
本発明の一形態では、前記結果出力手段は、前記判定の結果を示す情報を前記工事対象情報と関連付けて記憶手段に記憶させてよい。 In one embodiment of the present invention, the result output means may store information indicating the result of the determination in association with the construction object information in the storage means.
本発明の一形態では、前記関連取得手段は、取得された工事対象情報と関連付けられた種類情報を表示し、前記シール情報取得手段は、前記表示された種類情報に基づいて選択されたシール材から、当該シール材の種類情報を含むシール情報を読み取ってよい。 In one embodiment of the present invention, the association acquisition means may display type information associated with the acquired construction object information, and the seal information acquisition means may read seal information including type information of the seal material from a seal material selected based on the displayed type information.
本発明の一形態では、前記シール情報は、前記シール材のロット番号をさらに含み、
前記結果出力手段は、前記判定の結果を示す情報と、前記ロット番号とを、前記工事対象情報と関連付けて記憶手段に記憶させてよい。
In one embodiment of the present invention, the seal information further includes a lot number of the seal material,
The result output means may store information indicating the result of the judgment and the lot number in a storage means in association with the work object information.
本発明の一形態では、前記工事対象情報と関連付けて記憶された前記ロット番号に基づいて、クエリとして入力されるロット番号に関連付けられた工事対象情報を出力する検索手段をさらに含んでよい。 In one embodiment of the present invention, the system may further include a search means for outputting construction object information associated with a lot number input as a query, based on the lot number stored in association with the construction object information.
本発明により、配管の接続箇所にシール材を取り付ける際の作業者の負担を軽減することができる。 This invention reduces the burden on workers when installing sealing material at pipe connections.
以下では、本発明の実施形態について図面に基づいて説明する。出現する構成要素のうち同一機能を有するものには同じ符号を付し、その説明を省略する。以下では、ガスケットのようなシール材を配管のフランジ部分に取り付ける工事の施工を管理する施工管理システムについて説明する。 The following describes an embodiment of the present invention with reference to the drawings. Components that appear and have the same function are given the same reference numerals, and their description will be omitted. The following describes a construction management system that manages the installation of sealing materials, such as gaskets, on pipe flanges.
図1は、本発明の実施形態にかかる施工管理システムおよび施工の対象を説明する図である。施工管理システムは、管理サーバ1と、クライアント装置2と、読取装置3と、を含む。管理サーバ1は、施工に関する情報を管理するサーバコンピュータである。クライアント装置2は、例えばモバイル型のパーソナルコンピュータであり、施工の現場において施工の対象となる箇所とシール材との対応を確認する処理を実行する。読取装置3は、例えば2次元バーコードリーダまたはRFIDリーダであり、施工の対象となる箇所およびシール材としてのガスケット43に付された記録媒体から情報を読み取る。 Figure 1 is a diagram illustrating a construction management system and construction target according to an embodiment of the present invention. The construction management system includes a management server 1, a client device 2, and a reading device 3. The management server 1 is a server computer that manages information related to construction. The client device 2 is, for example, a mobile personal computer, and executes a process to confirm the correspondence between the construction target area and the sealing material at the construction site. The reading device 3 is, for example, a two-dimensional barcode reader or RFID reader, and reads information from a recording medium attached to the construction target area and the gasket 43 used as the sealing material.
施工の対象となるのは、2つの配管33を接続する接続部であり、接続部は配管33の端部にあるフランジ34a,34bを含む。接続部は配管33のうちフランジ34a,34bの周囲の部分を含んでよい。ガスケット43はフランジ34a,34bの間に取り付けられる。接続部には、その接続部を識別する工事対象情報が書き込まれた札41が付されている。なお、接続部に付される札41は接続部そのものにかけられていてもよいし、接続部を指すことがわかるように接続部の周囲に配置されてもよい。 The object of construction is the connection that connects two pipes 33, and the connection includes flanges 34a and 34b at the ends of the pipes 33. The connection may include the portion of the pipes 33 surrounding the flanges 34a and 34b. The gasket 43 is attached between the flanges 34a and 34b. A tag 41 bearing construction target information that identifies the connection is attached to the connection. Note that the tag 41 attached to the connection may be hung on the connection itself, or may be placed around the connection so that it is clear that it is the connection.
図2は、施工管理システムのハードウェア構成を示す図である。管理サーバ1は、プロセッサ11と、ストレージ12と、通信部13と、入出力部14とを含む。クライアント装置2は、プロセッサ21と、ストレージ22と、通信部23と、入出力部24と、表示部25とを含む。 Figure 2 shows the hardware configuration of the construction management system. The management server 1 includes a processor 11, storage 12, a communication unit 13, and an input/output unit 14. The client device 2 includes a processor 21, storage 22, a communication unit 23, an input/output unit 24, and a display unit 25.
プロセッサ11は、ストレージ12に格納されているプログラムに従って動作し、通信部13や入出力部14を制御する。プロセッサ21は、ストレージ22に格納されているプログラムに従って動作し、通信部23、入出力部24、表示部25を制御する。上記プログラムは、フラッシュメモリ等のコンピュータで読み取り可能な記憶媒体に格納されて提供されるものであってもよいし、インターネット等のネットワークを介して提供されるものであってもよい。 Processor 11 operates according to a program stored in storage 12, and controls communication unit 13 and input/output unit 14. Processor 21 operates according to a program stored in storage 22, and controls communication unit 23, input/output unit 24, and display unit 25. The above programs may be provided by being stored on a computer-readable storage medium such as a flash memory, or may be provided via a network such as the Internet.
ストレージ12,22は、DRAMやフラッシュメモリ等のメモリ素子とハードディスクドライブ等の外部記憶装置とによって構成されている。ストレージ12は、上記プログラムを格納する。また、ストレージ12,22は、プロセッサ11,21や通信部13,23等から入力される情報や演算結果を格納する。 Storages 12 and 22 are composed of memory elements such as DRAM and flash memory, and external storage devices such as hard disk drives. Storage 12 stores the above programs. Storages 12 and 22 also store information and calculation results input from processors 11 and 21, communication units 13 and 23, etc.
通信部13,23は他の装置と通信するネットワークインタフェースコントローラであり、有線LAN、無線LANまたは移動体通信を構成する集積回路と、通信端子またはアンテナとを含む。通信部13,23は、ネットワークを介して他の装置と通信する機能を有する。通信部13,23は、プロセッサ11,21の制御に基づいて、他の装置から受信した情報をプロセッサ11,21やストレージ12,22に入力し、他の装置に情報を送信する。 The communication units 13 and 23 are network interface controllers that communicate with other devices and include integrated circuits that configure wired LAN, wireless LAN, or mobile communications, and a communication terminal or antenna. The communication units 13 and 23 have the function of communicating with other devices via a network. Based on the control of the processors 11 and 21, the communication units 13 and 23 input information received from other devices to the processors 11 and 21 or storage 12 and 22, and transmit information to other devices.
入出力部14,24は、主に外部デバイスとデータをやりとりする入出力コントローラにより構成される。外部デバイスとしては、キーボード、マウス、タッチパネル、読取装置3などのうちいずれかを含む入力デバイスがある。入出力部14,24は、プロセッサ11,21の制御に基づいて、入力デバイスをユーザが操作することにより入力されるデータを取得する。 The input/output units 14, 24 are mainly composed of input/output controllers that exchange data with external devices. Examples of external devices include input devices such as a keyboard, mouse, touch panel, and reading device 3. Under the control of the processors 11, 21, the input/output units 14, 24 acquire data entered by the user operating the input device.
表示部25は、いわゆるGPU(Graphic Processing Unit)、フレームバッファメモリ、および表示制御回路を含む。表示部25はさらに表示出力デバイスを含んでよい。表示部25は、画像のデータを生成し、生成された画像を表示出力デバイスに表示させる。 The display unit 25 includes a so-called GPU (Graphics Processing Unit), a frame buffer memory, and a display control circuit. The display unit 25 may further include a display output device. The display unit 25 generates image data and displays the generated image on the display output device.
図3は、施工の工程を概略的に示す図である。はじめに、管理者は、施工の対象となる配管33の接続部を識別する工事対象情報と、ガスケット情報とを含む工事管理データを用意する(ステップS101)。ガスケット情報は、接続部に取り付けるガスケット43の種類を示す品番を含む。品番はガスケット43のようなシール材の種類を示す種類情報の一種である。種類情報として、ガスケット43に付与されたシリアル番号の一部が品番の代わりに用いられてもよい。この時点で工事管理データは管理サーバ1に格納される。 Figure 3 is a diagram showing an outline of the construction process. First, the administrator prepares construction management data including construction target information that identifies the connection part of the pipe 33 to be constructed, and gasket information (step S101). The gasket information includes a product number that indicates the type of gasket 43 to be attached to the connection part. The product number is a type of type information that indicates the type of sealing material such as the gasket 43. As type information, part of the serial number assigned to the gasket 43 may be used in place of the product number. At this point, the construction management data is stored in the management server 1.
そして管理者は、工事対象情報が書き込まれた札41(被読取部)を、その接続部に付す(ステップS102)。ここで、管理者は、札41に符号化された工事対象情報を印刷することにより工事対象情報を書き込んでもよいし、札41に工事対象情報が書き込まれたICチップ(例えばRFIDチップ)または符号化された工事対象情報を印刷されたシールを貼ることにより工事対象情報を書き込んでもよい。符号化された工事対象情報は、2次元バーコードであってよい。以下では、札41のうち工事対象情報が印刷された部分およびICチップをまとめて、記録保持部とも記載する。印刷された部分およびICチップは、記録媒体の一種である。なお、接続部に札41を付すことは、接続部に札41をかけることであってよいし、記録保持部は、接続部またはその近傍に貼り付けられるシールであってもよいし、接続部またはその近傍にある符号化された工事対象情報が印刷される領域であってもよい。 The manager then attaches the tag 41 (the readable portion) on which the construction target information is written to the connection (step S102). Here, the manager may write the construction target information by printing the encoded construction target information on the tag 41, or by attaching an IC chip (e.g., an RFID chip) on which the construction target information is written or a sticker on which the encoded construction target information is printed to the tag 41. The encoded construction target information may be a two-dimensional barcode. Hereinafter, the portion of the tag 41 on which the construction target information is printed and the IC chip will be collectively referred to as the record-storing portion. The printed portion and the IC chip are a type of recording medium. Attaching the tag 41 to the connection may mean hanging the tag 41 on the connection, and the record-storing portion may be a sticker attached to the connection or its vicinity, or an area on the connection or its vicinity on which the encoded construction target information is printed.
次に管理者は、接続部に取り付けるガスケット43を準備する(ステップS103)。ガスケット43には、シール情報が付されている。ガスケット43のシール情報の詳細については後述する。 Next, the administrator prepares the gasket 43 to be attached to the connection part (step S103). The gasket 43 has seal information attached to it. Details of the seal information for the gasket 43 will be described later.
そして、管理者は、工事管理データをクライアント装置2へコピーする(ステップS104)。クライアント装置2は、工事の作業者ごとに準備され、クライアント装置2へは、作業者が担当する接続部に対する工事管理データのみがコピーされてよい。ここまでが、実際に施工の作業を開始する前の準備作業である。 Then, the administrator copies the construction management data to the client device 2 (step S104). A client device 2 is prepared for each construction worker, and only the construction management data for the connection section that the worker is responsible for may be copied to the client device 2. This completes the preparation work before the actual construction work begins.
準備作業が終わると、作業者は接続部のそれぞれにガスケット43を取り付け、クライアント装置2は取り付けに関係する工事管理データを更新する(ステップS105)。この工程は接続部ごとに実施される。この工程の詳細については後述する。 Once the preparatory work is complete, the worker attaches gaskets 43 to each connection, and the client device 2 updates the installation-related construction management data (step S105). This process is performed for each connection. Details of this process will be described later.
作業者が担当する接続部の工事が終わると、クライアント装置2は、更新された工事管理データをサーバへ転送する(ステップS107)。管理サーバ1は転送された工事管理データに基づいて、管理サーバ1内の工事管理データを更新する。 When the worker has completed the construction of the connection section, the client device 2 transfers the updated construction management data to the server (step S107). The management server 1 updates the construction management data within the management server 1 based on the transferred construction management data.
そして、管理サーバ1は、接続部の施工状況に関する情報を集計または検索する(ステップS108)。管理サーバ1は、工事管理データから施工された接続部の数を集計してもよいし、作業日またはガスケット43のロット番号を含むクエリに基づいて、接続部を検索してもよい。 Then, the management server 1 tally or search for information regarding the construction status of the connections (step S108). The management server 1 may tally the number of connections that have been constructed from the construction management data, or may search for connections based on a query that includes the work date or the lot number of the gasket 43.
図4は、工事管理データの一例を示す図である。工事管理データは、接続部ごとのレコードを含み、各レコードは、工事対象情報と、取り付けるべきガスケット43の品番と、ガスケット43の寸法と、を含む。各レコードは、さらに、取り付け作業時に格納される情報として、確認日と、確認結果と、取り付けられたガスケット43の出荷日と、そのガスケット43のロット番号とを含む。なお、図4に示される品番以外の項目のうち一部または全部は工事管理データに含まれなくてもよい。 Figure 4 shows an example of construction management data. The construction management data includes a record for each connection, and each record includes construction target information, the product number of the gasket 43 to be installed, and the dimensions of the gasket 43. Each record also includes information stored during installation, such as the confirmation date, confirmation results, shipping date of the installed gasket 43, and the lot number of that gasket 43. Note that some or all of the items other than the product number shown in Figure 4 do not need to be included in the construction management data.
以下では、ステップS105の工程についてさらに説明する。図5は、接続部における作業手順の一例を示す図である。図5に示される手順は、接続部ごとに行われる。 The process of step S105 is further explained below. Figure 5 shows an example of the work procedure at the connection section. The procedure shown in Figure 5 is performed for each connection section.
はじめに、作業者は、工事の対象となる配管33の接続部において、読取装置3を用いて札41から工事対象情報を読み取る(ステップS201)。より具体的には、作業者が読取装置3を記録保持部にかざし、読取装置3が札41の記録領域42から符号化された工事対象情報を読み取って復号化してもよいし、代わりに読取装置3がICチップから工事対象情報を無線経由で読み取ってもよい。 First, the worker uses the reading device 3 to read the construction target information from the tag 41 at the connection of the pipe 33 that is the target of the construction work (step S201). More specifically, the worker may hold the reading device 3 over the record storage unit, and the reading device 3 may read and decode the encoded construction target information from the recording area 42 of the tag 41, or alternatively, the reading device 3 may wirelessly read the construction target information from the IC chip.
クライアント装置2は読取装置3が読み取った工事対象情報を取得し、工事管理データから、読み取られた工事対象情報に関連付けて記憶されたガスケット43の品番を取得し、取得された品番を出力する(ステップS202)。 The client device 2 acquires the construction target information read by the reading device 3, acquires the product number of the gasket 43 stored in association with the read construction target information from the construction management data, and outputs the acquired product number (step S202).
作業者は、予め準備された1または複数のガスケット43から、クライアント装置2から出力される品番のガスケット43を取り出し、ガスケット43から読取装置3でガスケット情報を読み取る(ステップS203)。 The worker selects the gasket 43 with the product number output from the client device 2 from one or more gaskets 43 prepared in advance, and reads the gasket information from the gasket 43 using the reading device 3 (step S203).
図6は、ガスケット43の一例を示す図である。ガスケット43は取り付けの前には包装47の中に配置されている。図6の例では、ガスケット43は環状の主部分と、主部分の一部から径方向に延びる延在部44とを有する。ガスケット43には、ガスケット情報が書き込まれたICタグまたは符号化されたガスケット情報が印刷されたもの(例えばシールまたは包装47)が付されている。以下ではこのICタグまたは印刷されたものを記録媒体と記載する。図6の例では、延在部44に記録媒体として印刷シール45が付されている。図11は、ガスケット43の他の一例を示す図である。図11の例では、印刷シール45が貼られた包装47が、記録媒体としてガスケット43に付されている。 Figure 6 is a diagram showing an example of a gasket 43. The gasket 43 is placed in packaging 47 before installation. In the example of Figure 6, the gasket 43 has an annular main portion and an extension portion 44 extending radially from a portion of the main portion. An IC tag with gasket information written thereon or something printed with encoded gasket information (e.g., a sticker or packaging 47) is attached to the gasket 43. Hereinafter, this IC tag or printed thing will be referred to as a recording medium. In the example of Figure 6, a printed sticker 45 is attached to the extension portion 44 as a recording medium. Figure 11 is a diagram showing another example of a gasket 43. In the example of Figure 11, packaging 47 with a printed sticker 45 attached thereto is attached to the gasket 43 as a recording medium.
ステップS203において、より具体的には、作業者が読取装置3をガスケット43に付された記録媒体にかざし、読取装置3が記録媒体からガスケット情報を読み取る。読取装置3が符号化された工事対象情報を読み取って復号化してもよいし、読取装置3がICチップから無線通信により工事対象情報を読み取ってもよい。 More specifically, in step S203, the worker holds the reading device 3 over the recording medium attached to the gasket 43, and the reading device 3 reads the gasket information from the recording medium. The reading device 3 may read and decode the encoded construction target information, or the reading device 3 may read the construction target information from the IC chip via wireless communication.
そして、クライアント装置2は、工事対象情報に紐づけられたガスケット43の品番と、読み取られたガスケット情報に含まれる品番とが同じか否か判定する(ステップS204)。紐づけられたガスケット43の品番とガスケット情報に含まれる品番とが異なる場合には(ステップS204のN)、クライアント装置2はエラーメッセージを出力し(ステップS205)、作業者は現在のガスケット43を元々収納されていた場所に戻し、ステップS203から繰り返す。 Then, the client device 2 determines whether the product number of the gasket 43 linked to the construction object information is the same as the product number included in the read gasket information (step S204). If the product number of the linked gasket 43 is different from the product number included in the gasket information (N in step S204), the client device 2 outputs an error message (step S205), and the worker returns the current gasket 43 to its original storage location and repeats the process from step S203.
一方、紐づけられたガスケット43の品番とガスケット情報に含まれる品番とが同じ場合には(ステップS204のY)、クライアント装置2はガスケット43が正しい旨の(正常である)メッセージを出力し、現在の日時、ガスケット情報の一部(例えばガスケット43の出荷日およびロット番号)、照合の結果(確認結果)を工事対象情報と関連付けてストレージ22に格納する(ステップS206)。なお工事対象情報と関連付けて格納される情報は、上記の一部であってもよい。そして作業者は、ガスケット43を接続部に取り付ける(ステップS207)。 On the other hand, if the part number of the linked gasket 43 is the same as the part number included in the gasket information (Y in step S204), the client device 2 outputs a message indicating that the gasket 43 is correct (normal), and associates the current date and time, part of the gasket information (e.g., the shipping date and lot number of the gasket 43), and the result of the comparison (confirmation result) with the construction object information and stores them in storage 22 (step S206). Note that the information stored in association with the construction object information may be only part of the above. The worker then attaches the gasket 43 to the connection (step S207).
図7は、クライアント装置2により表示される画面の一例を示す図である。「工事対象」に続いて工事対象情報が表示され、表の「管理台帳」の欄には工事管理データにおけるガスケット43の品番が、「読み取り結果」の欄には読取装置3により読み取られた品番が表示される。図7では、表の下に、照合の結果が表示され、さらにその下に確認ボタンが表示されている。 Figure 7 shows an example of a screen displayed by the client device 2. Construction object information is displayed following "Construction object," and the "Management ledger" column in the table displays the product number of the gasket 43 in the construction management data, while the "Reading result" column displays the product number read by the reading device 3. In Figure 7, the matching results are displayed below the table, and a confirmation button is displayed below that.
予めガスケット43に品番を含むガスケット情報を書き込んでおき、読取装置3でガスケット情報を読み取り、クライアント装置2で予め準備した工事管理データと照合することにより、接続部に取り付けるガスケット43を間違える可能性を大幅に減らすことが可能になる。また工事の対象となる接続部がどこであるかについても接続部に付された札41から読取装置3で読み取っていることにより入力ミスを減らし、接続部に取り付けるガスケット43を間違える可能性をさらに減らしている。ガスケット情報は、品番以外にも、出荷日、ロット番号を含んでおり、これらの情報を工事対象情報と関連付けて格納しておくことで、いわゆるトレーサビリティを向上させることができる。 By writing gasket information, including the product number, to the gasket 43 in advance, reading the gasket information with the reading device 3, and comparing it with construction management data prepared in advance by the client device 2, it is possible to significantly reduce the possibility of attaching the wrong gasket 43 to a connection. Furthermore, by reading the location of the connection to be constructed from the tag 41 attached to the connection with the reading device 3, input errors are reduced and the possibility of attaching the wrong gasket 43 to the connection is further reduced. In addition to the product number, the gasket information also includes the shipping date and lot number, and by storing this information in association with the construction target information, it is possible to improve so-called traceability.
図6および7の例では、照合された品番が同じ場合にステップS206において、照合の結果が実質的な作業記録としてストレージ22に格納されているが、作業者がステップS207の取り付け作業をした後に、照合結果および取り付けの結果がストレージ22に格納されてもよい。この場合には、作業者が作業完了を示す入力をした場合に、照合の結果および取り付けの結果がストレージ22に格納されてよい。例えば、図7において確認ボタンが押下されると、画面に作業完了ボタンが表示され、作業者により作業完了ボタンが押下された際に照合結果等を示す情報がストレージ22に格納されてよい。 In the examples of Figures 6 and 7, if the matched part numbers are the same, the matching results are stored in storage 22 as an actual work record in step S206. However, after the worker performs the installation work in step S207, the matching results and installation results may be stored in storage 22. In this case, when the worker inputs an indication that the work is complete, the matching results and installation results may be stored in storage 22. For example, when the confirmation button is pressed in Figure 7, a work complete button may be displayed on the screen, and when the worker presses the work complete button, information indicating the matching results, etc. may be stored in storage 22.
次に、施工管理システムが実現する機能および処理について説明する。図8は、施工管理システムが実現する機能を示すブロック図である。施工管理システムは、機能的に、工事対象取得部51、種類提示部52、ガスケット情報取得部53、照合部54、照合結果出力部55、解析部58、クライアントデータベース61、サーバデータベース63を含む。工事対象取得部51、種類提示部52、ガスケット情報取得部53、照合部54、照合結果出力部55は、クライアント装置2のプロセッサ21がストレージ22に記憶される各部に対応するプログラムの命令を実行し、通信部23、入出力部24、表示部25を制御することにより実現される。解析部58は、管理サーバ1のプロセッサ11がストレージ12に記憶される各部に対応するプログラムの命令を実行し、通信部13、入出力部14を制御することにより実現される。 Next, the functions and processing realized by the construction management system will be described. Figure 8 is a block diagram showing the functions realized by the construction management system. Functionally, the construction management system includes a construction target acquisition unit 51, a type presentation unit 52, a gasket information acquisition unit 53, a comparison unit 54, a comparison result output unit 55, an analysis unit 58, a client database 61, and a server database 63. The construction target acquisition unit 51, the type presentation unit 52, the gasket information acquisition unit 53, the comparison unit 54, and the comparison result output unit 55 are realized by the processor 21 of the client device 2 executing program commands corresponding to each unit stored in the storage 22 and controlling the communication unit 23, the input/output unit 24, and the display unit 25. The analysis unit 58 is realized by the processor 11 of the management server 1 executing program commands corresponding to each unit stored in the storage 12 and controlling the communication unit 13 and the input/output unit 14.
クライアントデータベース61、サーバデータベース63は主にそれぞれストレージ12,22により実現される。クライアントデータベース61、サーバデータベース63は工事管理データを格納する。クライアントデータベース61、サーバデータベース63はクライアント装置2、管理サーバ1において実行されるデータベース管理システムのプログラムをプロセッサ21,11が実行し、ストレージ22,12とデータをやり取りすることにより実現されてもよい。 The client database 61 and the server database 63 are primarily realized by the storages 12 and 22, respectively. The client database 61 and the server database 63 store construction management data. The client database 61 and the server database 63 may be realized by the processors 21 and 11 executing database management system programs executed on the client device 2 and the management server 1, and exchanging data with the storages 22 and 12.
工事対象取得部51は、工事の対象となる配管33の接続部に付与された工事対象情報であって、その接続部を識別するための工事対象情報を取得する。 The construction target acquisition unit 51 acquires construction target information that is assigned to the connection of the piping 33 that is the target of construction work and that identifies the connection.
種類提示部52は、工事管理データから、取得された工事対象情報と関連付けて記憶されたガスケット43の品番を取得し、取得された品番を示す情報を表示出力デバイスなどに出力する。 The type presentation unit 52 obtains the part number of the gasket 43 stored in association with the obtained construction target information from the construction management data, and outputs information indicating the obtained part number to a display output device or the like.
ガスケット情報取得部53は、ガスケット43から読み取られた、ガスケット43の種類を示す品番を含むガスケット情報を取得する。 The gasket information acquisition unit 53 acquires gasket information read from the gasket 43, including a product number indicating the type of gasket 43.
照合部54は、工事対象情報と品番とを関連付けて記憶するストレージ22から、工事対象取得部51が取得した工事対象情報と関連付けられた品番を取得し、その取得された品番と、取得されたガスケット情報に含まれる品番とが同一であるか否かを判定する。 The matching unit 54 acquires the part number associated with the construction object information acquired by the construction object acquisition unit 51 from the storage 22, which stores construction object information and part numbers in association with each other, and determines whether the acquired part number is the same as the part number included in the acquired gasket information.
照合結果出力部55は、照合部54による判定の結果を出力する。照合結果出力部55は表示出力デバイスを介して判定の結果を出力してもよいし、音声として判定の結果を出力してもよい。照合結果出力部55は、現在日付(例えば図4の確認日)、判定の結果を示す情報(例えば図4の確認結果)およびガスケット情報の一部を工事対象情報と関連付けてストレージ22に記憶させる。ガスケット情報の一部は、ロット番号および出荷日のうち1または複数を含んでよい。照合結果出力部55は、工事対象情報と関連付けられた品番と、取得されたガスケット情報に含まれる品番とが異なる場合に、工事対象情報と品番とを関連付けて記憶するストレージ22から、ガスケット情報に含まれる品番に関連付けられた工事対象情報を取得し、その工事対象情報に応じた工事個所を示す情報を表示してもよい。 The matching result output unit 55 outputs the result of the judgment made by the matching unit 54. The matching result output unit 55 may output the result of the judgment via a display output device or as audio. The matching result output unit 55 associates the current date (e.g., the confirmation date in Figure 4), information indicating the result of the judgment (e.g., the confirmation result in Figure 4), and part of the gasket information with the construction object information and stores them in storage 22. The part of the gasket information may include one or more of the lot number and shipping date. If the part number associated with the construction object information differs from the part number included in the acquired gasket information, the matching result output unit 55 may acquire the construction object information associated with the part number included in the gasket information from storage 22, which stores construction object information and part numbers in association with each other, and display information indicating the construction location corresponding to the construction object information.
解析部58は、工事管理データを格納するサーバデータベース63の内容を解析する。サーバデータベース63には、ステップS101において整備され、ステップS107において現在日付、判定の結果を示す情報およびガスケット情報の一部が追加更新された工事管理データが格納されている。解析部58は、工事管理データに含まれ判定の結果がOKであることを示す確認結果と関連付けられた工事対象情報の数を施工された接続部の数として集計してよい。また、解析部58は、工事管理データにおいて工事対象情報と関連付けて記憶されたロット番号または出荷日に基づいて、クエリとして入力されるロット番号または出荷日に関連付けられた工事対象情報を出力する。これにより、例えばガスケット43の製造上の問題が後で発見された場合に、確認すべき箇所を容易に判断できる。また、解析部58は工事管理データに含まれ確認日がクエリとなる基準日より前である工事対象情報を出力してもよい。これによりガスケット43の取り付けからの経過期間を容易に把握することができる。 The analysis unit 58 analyzes the contents of the server database 63, which stores the construction management data. The server database 63 stores the construction management data prepared in step S101 and updated in step S107 with the current date, information indicating the judgment result, and some gasket information. The analysis unit 58 may count the number of construction object information included in the construction management data and associated with a confirmation result indicating that the judgment result is OK as the number of constructed connections. The analysis unit 58 also outputs the construction object information associated with the lot number or shipping date input as a query, based on the lot number or shipping date stored in association with the construction object information in the construction management data. This makes it easy to determine the areas that need to be checked, for example, if a manufacturing problem with the gasket 43 is later discovered. The analysis unit 58 may also output construction object information included in the construction management data and whose confirmation date is before the reference date that serves as the query. This makes it easy to determine the period of time that has passed since the installation of the gasket 43.
図9は、クライアント装置2の処理の一例を示すフロー図であり、図5に記載される工程においてクライアント装置2が実行する処理を示している。 Figure 9 is a flow diagram showing an example of processing by the client device 2, and shows the processing performed by the client device 2 in the steps described in Figure 5.
はじめに工事対象取得部51は、読取装置3により読み取られた工事対象情報を取得する(ステップS401)。種類提示部52は、工事管理データから、取得された工事対象情報と関連付けて記憶されたガスケット43の品番を取得する(ステップS402)。そして種類提示部52は取得された品番を表示出力デバイスなどに出力する(ステップS403)。 First, the construction target acquisition unit 51 acquires the construction target information read by the reading device 3 (step S401). The type presentation unit 52 acquires the product number of the gasket 43 stored in association with the acquired construction target information from the construction management data (step S402). The type presentation unit 52 then outputs the acquired product number to a display output device or the like (step S403).
品番が出力され、図5のステップS203において作業者がガスケット情報の読み取り操作をすると、ガスケット情報取得部53は読取装置3から読み取られたガスケット情報を取得する(ステップS404)。照合部54は、ステップS403で種類提示部52が出力した品番(工事管理データにおいて、工事対象取得部51が取得した工事対象情報と関連付けられた品番)と、ガスケット情報に含まれる品番とが同一であるか否かを判定する(ステップS405)。これらが異なる場合には(ステップS405のN)、照合結果出力部55は表示出力デバイス等を介して判定結果として、NGのメッセージを出力する(ステップS406)。 When the part number is output and the worker performs the gasket information read operation in step S203 of FIG. 5, the gasket information acquisition unit 53 acquires the gasket information read from the reading device 3 (step S404). The comparison unit 54 determines whether the part number output by the type presentation unit 52 in step S403 (the part number associated with the construction object information acquired by the construction object acquisition unit 51 in the construction management data) is the same as the part number included in the gasket information (step S405). If they are different (N in step S405), the comparison result output unit 55 outputs an NG message as the determination result via a display output device, etc. (step S406).
ステップS406において、照合結果出力部55は、さらに、工事管理データから、ガスケット情報に含まれる品番に関連付けられた工事対象情報を検索により取得し、その工事対象情報に応じた工事個所を示す情報を表示してもよい。これにより、例えば、誤った品番のガスケット43を戻すべき箇所を容易に把握することができる。また、他の作業者が使用すべきガスケット43を誤って持ち運んでいるケースを容易に検出することができる。 In step S406, the matching result output unit 55 may further search the construction management data to obtain construction target information associated with the product number included in the gasket information, and display information indicating the construction location corresponding to the construction target information. This makes it easy to determine, for example, where a gasket 43 with an incorrect product number should be returned. It also makes it easy to detect cases where another worker is mistakenly carrying a gasket 43 that should be used.
一方、種類提示部52が出力した品番とガスケット情報に含まれる品番とが同一である場合には(ステップS405のY)、照合結果出力部55は表示出力デバイス等を介して判定結果として、OKのメッセージを出力する(ステップS407)。そして照合結果出力部55は、現在日付(確認日付)、判定の結果を示す情報およびガスケット情報の一部を工事対象情報と関連付けてクライアントデータベース61に格納する(ステップS408)。照合結果出力部55は上記の情報のうち一部をクライアントデータベース61に格納してもよいし、ガスケット情報の一部は、ロット番号、出荷日を含んでよい。 On the other hand, if the part number output by the type presentation unit 52 is the same as the part number included in the gasket information (Y in step S405), the matching result output unit 55 outputs an OK message as the judgment result via a display output device or the like (step S407). The matching result output unit 55 then associates the current date (confirmation date), information indicating the judgment result, and part of the gasket information with the construction object information and stores them in the client database 61 (step S408). The matching result output unit 55 may store part of the above information in the client database 61, and part of the gasket information may include the lot number and shipping date.
上記の処理により、クライアント装置2は工事管理データに基づいて、読み取られた工事対象情報と関連付けられた品番と読み取られた品番とを照合する。このクライアント装置2を含む施工管理システムにより、施工の際にガスケット43の種類を確認する負担が軽減され、取り付け時のミスが生じる可能性が大幅に低減される。 Through the above process, client device 2 compares the read part number with the part number associated with the read construction object information based on the construction management data. This construction management system including client device 2 reduces the burden of checking the type of gasket 43 during construction and significantly reduces the possibility of errors during installation.
OKまたはNGのメッセージの出力は、OKまたはNGを示すメッセージの表示であってもよいし、OKまたはNGを示す音声の出力であってもよい。またOKまたはNGを示すランプの点灯または点滅であってもよい。 The output of the OK or NG message may be a display of a message indicating OK or NG, or may be an audio output indicating OK or NG. It may also be a lit or flashing lamp indicating OK or NG.
ステップS408の処理は、作業者により作業完了ボタンが押下された後に行われてもよい。この場合には、照合結果出力部55は、ステップS407の処理の後に、作業者が作業完了を示す入力をするまで待機する。そしてその作業完了を示す入力がされると、照合結果出力部55はステップS408の処理を行う。 The processing of step S408 may be performed after the worker presses the work completion button. In this case, after the processing of step S407, the matching result output unit 55 waits until the worker makes an input indicating that the work is complete. Then, when the input indicating that the work is complete is made, the matching result output unit 55 performs the processing of step S408.
図10は、解析部58の処理の一例を示すフロー図であり、解析部58がロット番号などのクエリに基づいて工事管理データを検索する処理の図である。事前に、クライアント装置2においてクライアントデータベース61に格納された確認日付、判定の結果を示す情報およびガスケット情報の一部がサーバデータベース63に反映されているものとする。 Figure 10 is a flow diagram showing an example of the processing of the analysis unit 58, illustrating the processing in which the analysis unit 58 searches for construction management data based on a query such as a lot number. It is assumed that the confirmation date, information indicating the judgment results, and part of the gasket information stored in the client database 61 on the client device 2 have been reflected in the server database 63 in advance.
はじめに、解析部58は、検索条件となるクエリを取得する(ステップS501)。クエリは、ロット番号であってもよいし、確認日の期間であってもよいし、出荷日であってもよい。またクエリは管理サーバ1に接続された入力デバイスから入力されてもよいし、管理サーバ1の通信部13を介して通信接続された他のコンピュータから入力されてもよい。 First, the analysis unit 58 acquires a query that serves as a search condition (step S501). The query may be a lot number, a confirmation date range, or a shipping date. The query may also be input from an input device connected to the management server 1, or from another computer that is connected to the management server 1 via the communication unit 13.
解析部58は、サーバデータベース63に格納される工事管理データから、クエリを満たすデータを検索する(ステップS502)。ここで解析部58は、クエリを満たすデータと関連付けられた工事対象情報を取得する。解析部58は、検索により取得されたデータを例えば表示出力デバイスまたはクエリを入力したコンピュータに向けて出力する(ステップS503)。 The analysis unit 58 searches the construction management data stored in the server database 63 for data that satisfies the query (step S502). The analysis unit 58 then acquires construction target information associated with the data that satisfies the query. The analysis unit 58 outputs the data acquired by the search to, for example, a display output device or the computer that input the query (step S503).
ここに示される処理により、例えば製品に問題が発見された場合に、確認すべき箇所を容易に把握することができる。 The process shown here makes it easy to identify areas to check, for example, if a problem is discovered with a product.
1 管理サーバ、2 クライアント装置、3 読取装置、11,21 プロセッサ、12,22 ストレージ、13,23 通信部、14,24 入出力部、25 表示部、33 配管、34a,34b フランジ、41 札、42 記録領域、43 ガスケット、44 延在部、45 印刷シール、47 包装、51 工事対象取得部、52 種類提示部、53 ガスケット情報取得部、54 照合部、55 照合結果出力部、58 解析部、61 クライアントデータベース、63 サーバデータベース。 1 Management server, 2 Client device, 3 Reading device, 11, 21 Processor, 12, 22 Storage, 13, 23 Communication unit, 14, 24 Input/output unit, 25 Display unit, 33 Pipe, 34a, 34b Flange, 41 Tag, 42 Recording area, 43 Gasket, 44 Extension unit, 45 Printed seal, 47 Packaging, 51 Construction object acquisition unit, 52 Type presentation unit, 53 Gasket information acquisition unit, 54 Matching unit, 55 Matching result output unit, 58 Analysis unit, 61 Client database, 63 Server database.
Claims (13)
工事対象情報と種類情報とを関連付けて記憶する記憶手段から、前記入力された工事対象情報と関連付けられた種類情報を取得するステップと、
シール材から、当該シール材の種類情報を含むシール情報を読み取るステップと、
前記取得された種類情報と、前記読み取られたシール情報に含まれる種類情報とが同一であるか否かを判定するステップと、
前記判定の結果を出力するステップと、
前記出力された判定の結果に基づいて選択されたシール材を前記配管の接続部に取り付けるステップと、
を含み、
前記判定の結果を出力するステップでは、前記取得された種類情報と、前記読み取られたシール情報に含まれる種類情報とが同一でないと判定された場合に、前記記憶手段から、前記読み取られたシール情報に含まれる種類情報に関連付けられた工事対象情報を取得し、当該工事対象情報に応じた工事個所を示す情報を表示する、
施工管理方法。 inputting construction target information assigned to a pipe connection portion to be subjected to construction work, the construction target information being for identifying the pipe connection portion;
A step of acquiring type information associated with the input construction object information from a storage means that stores construction object information and type information in association with each other;
reading seal information from the seal material, the seal information including type information of the seal material;
a step of determining whether the acquired type information is the same as the type information included in the read sticker information;
outputting the result of the determination;
a step of attaching a sealant selected based on the output result of the determination to the connection portion of the pipe;
Including,
In the step of outputting the result of the determination, if it is determined that the acquired type information and the type information included in the read sticker information are not identical, construction target information associated with the type information included in the read sticker information is acquired from the storage means, and information indicating the construction location corresponding to the construction target information is displayed.
Construction management method.
前記入力された工事対象情報と関連付けられた種類情報を表示するステップ、をさらに含み、
前記シール情報を読み取るステップでは、前記表示された種類情報に基づいて選択されたシール材から、当該シール材の種類情報を含むシール情報を読み取る、
施工管理方法。 The construction management method according to claim 1 ,
Further comprising a step of displaying type information associated with the input construction object information;
In the step of reading the seal information, seal information including the type information of the sealing material is read from the sealing material selected based on the displayed type information.
Construction management method.
前記工事対象情報を入力するステップでは、前記工事の対象となる前記配管の接続部に対して付される被読取部であって、前記工事対象情報が書き込まれた被読取部を読取装置で読み取ることにより、前記工事対象情報を入力する、
施工管理方法。 3. The construction management method according to claim 1 or 2 ,
In the step of inputting the construction target information, a readable portion attached to the connection portion of the piping that is the target of the construction work, in which the construction target information is written, is read by a reading device, thereby inputting the construction target information.
Construction management method.
前記被読取部は、符号化された前記工事対象情報が印刷された部分または前記工事対象情報が書き込まれたICタグを含み、
前記工事対象情報を入力するステップでは、読取装置で前記印刷された部分または前記ICタグから工事対象情報を読み取ることにより、前記工事対象情報を入力する、
施工管理方法。 The construction management method according to claim 3 ,
The read portion includes a portion on which the encoded construction object information is printed or an IC tag on which the construction object information is written,
In the step of inputting the construction target information, the construction target information is input by reading the construction target information from the printed portion or the IC tag with a reading device.
Construction management method.
前記シール情報を読み取るステップでは、前記シール材に付された、前記シール情報が書き込まれたICタグまたは符号化された前記シール情報が印刷された部分から前記シール情報を読み取る、
施工管理方法。 5. The construction management method according to claim 1,
In the step of reading the sticker information, the sticker information is read from an IC tag attached to the sealing material on which the sticker information is written or from a portion on which the coded sticker information is printed.
Construction management method.
前記シール情報は、前記シール材のロット番号をさらに含み、
前記判定の結果を示す情報および前記ロット番号を前記工事対象情報と関連付けて記憶手段に記憶させるステップをさらに含む、
施工管理方法。 The construction management method according to any one of claims 1 to 5 ,
The seal information further includes a lot number of the seal material,
further comprising a step of storing information indicating the result of the determination and the lot number in a storage means in association with the construction object information.
Construction management method.
前記記憶手段に関連付けて格納された前記ロット番号および前記工事対象情報に基づいて、クエリとして入力されるロット番号に関連付けられた工事対象情報を検索するステップをさらに含む、
施工管理方法。 7. The construction management method according to claim 6 ,
further comprising a step of searching for construction object information associated with the lot number input as a query based on the lot number and the construction object information stored in association with the storage means;
Construction management method.
前記取得された工事対象情報が示す配管の接続部に取り付け可能なシール材の種類情報を、工事対象情報と種類情報とを関連付けて記憶する記憶手段から取得する関連取得手段と、
シール材から読み取られた、当該シール材の種類情報を含むシール情報を取得するシール情報取得手段と、
前記記憶手段から取得された種類情報と、前記読み取られたシール情報に含まれる種類情報とが同一であるか否かを判定する判定手段と、
前記判定手段による判定の結果を出力する結果出力手段と、
を含み、
前記結果出力手段は、前記取得された種類情報と、前記読み取られたシール情報に含まれる種類情報とが同一でないと判定された場合に、前記記憶手段から、前記読み取られたシール情報に含まれる種類情報に関連付けられた工事対象情報を取得し、当該工事対象情報に応じた工事個所を示す情報を表示する、
施工管理システム。 an object acquiring means for acquiring construction object information assigned to a pipe connection portion to be subjected to construction, the construction object information being for identifying the pipe connection portion;
an association acquisition means for acquiring type information of a sealing material that can be attached to the connection portion of the pipe indicated by the acquired construction object information from a storage means that stores the construction object information and the type information in association with each other;
a seal information acquiring means for acquiring seal information including type information of the seal material read from the seal material;
a determining means for determining whether the type information acquired from the storage means is the same as the type information included in the read sticker information;
a result output means for outputting a result of the determination made by the determination means;
Including,
When it is determined that the acquired type information is not the same as the type information included in the read sticker information, the result output means acquires, from the storage means, construction target information associated with the type information included in the read sticker information, and displays information indicating the construction location corresponding to the construction target information.
Construction management system.
前記関連取得手段は、取得された工事対象情報と関連付けられた種類情報を表示し、
前記シール情報取得手段は、前記表示された種類情報に基づいて選択されたシール材から、当該シール材の種類情報を含むシール情報を読み取る、
施工管理システム。 The construction management system according to claim 8 ,
The association acquisition means displays type information associated with the acquired construction object information,
the seal information acquisition means reads seal information including type information of the sealing material from the sealing material selected based on the displayed type information;
Construction management system.
前記結果出力手段は、前記判定の結果を示す情報を前記工事対象情報と関連付けて記憶手段に記憶させる、
施工管理システム。 The construction management system according to claim 9 ,
The result output means stores information indicating the result of the determination in association with the construction object information in a storage means.
Construction management system.
前記シール情報は、前記シール材のロット番号をさらに含み、
前記結果出力手段は、前記判定の結果を示す情報と、前記ロット番号とを、前記工事対象情報と関連付けて記憶手段に記憶させる、
施工管理システム。 The construction management system according to claim 10 ,
The seal information further includes a lot number of the seal material,
The result output means stores information indicating the result of the determination and the lot number in a storage means in association with the construction object information.
Construction management system.
前記工事対象情報と関連付けて記憶された前記ロット番号に基づいて、クエリとして入力されるロット番号に関連付けられた工事対象情報を出力する検索手段をさらに含む、
施工管理システム。 The construction management system according to claim 11 ,
and further comprising a search means for outputting construction object information associated with a lot number input as a query, based on the lot number stored in association with the construction object information.
Construction management system.
前記取得された工事対象情報が示す配管の接続部に取り付け可能なシール材の種類情報を、工事対象情報と種類情報とを関連付けて記憶する記憶手段から取得する関連取得手段、
シール材から読み取られた、当該シール材の種類情報を含むシール情報を取得するシール情報取得手段、
前記記憶手段から取得された種類情報と、前記読み取られたシール情報に含まれる種類情報とが同一であるか否かを判定する判定手段、および、
前記判定手段による判定の結果を出力する結果出力手段、
としてコンピュータを機能させ、
前記結果出力手段は、前記取得された種類情報と、前記読み取られたシール情報に含まれる種類情報とが同一でないと判定された場合に、前記記憶手段から、前記読み取られたシール情報に含まれる種類情報に関連付けられた工事対象情報を取得し、当該工事対象情報に応じた工事個所を示す情報を表示する、
プログラム。 an object acquiring means for acquiring construction object information assigned to a pipe connection portion to be subjected to construction, the construction object information being for identifying the pipe connection portion;
an association acquisition means for acquiring, from a storage means for storing the construction object information and the type information, information on the type of sealing material that can be attached to the pipe connection portion indicated by the acquired construction object information;
a seal information acquiring means for acquiring seal information including type information of the seal material read from the seal material;
a determining means for determining whether the type information acquired from the storage means is the same as the type information included in the read sticker information; and
a result output means for outputting the result of the determination made by the determination means;
Make the computer function as
When it is determined that the acquired type information is not the same as the type information included in the read sticker information, the result output means acquires, from the storage means, construction target information associated with the type information included in the read sticker information, and displays information indicating the construction location corresponding to the construction target information.
program.
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021187013A JP7753066B2 (en) | 2021-11-17 | 2021-11-17 | Construction management method, construction management system, and program |
| PCT/JP2022/041968 WO2023090254A1 (en) | 2021-11-17 | 2022-11-10 | Construction management method, construction management system, and program |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021187013A JP7753066B2 (en) | 2021-11-17 | 2021-11-17 | Construction management method, construction management system, and program |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| JP2023074193A JP2023074193A (en) | 2023-05-29 |
| JP2023074193A5 JP2023074193A5 (en) | 2024-10-08 |
| JP7753066B2 true JP7753066B2 (en) | 2025-10-14 |
Family
ID=86396920
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2021187013A Active JP7753066B2 (en) | 2021-11-17 | 2021-11-17 | Construction management method, construction management system, and program |
Country Status (2)
| Country | Link |
|---|---|
| JP (1) | JP7753066B2 (en) |
| WO (1) | WO2023090254A1 (en) |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2007193525A (en) | 2006-01-18 | 2007-08-02 | Hitachi Ltd | Traceability information collection method, traceability information collection system, purchased parts information input terminal and product information input terminal |
| JP2009099100A (en) | 2007-10-19 | 2009-05-07 | Hitachi Ltd | Work management system |
| JP2012103848A (en) | 2010-11-09 | 2012-05-31 | Nisshin Engineering Co Ltd | Traceability management system |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2018030175A1 (en) * | 2016-08-08 | 2018-02-15 | 日本バルカー工業株式会社 | Flange fastening management method, flange fastening management system, flange fastening management program, and flange fastening management device |
-
2021
- 2021-11-17 JP JP2021187013A patent/JP7753066B2/en active Active
-
2022
- 2022-11-10 WO PCT/JP2022/041968 patent/WO2023090254A1/en not_active Ceased
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2007193525A (en) | 2006-01-18 | 2007-08-02 | Hitachi Ltd | Traceability information collection method, traceability information collection system, purchased parts information input terminal and product information input terminal |
| JP2009099100A (en) | 2007-10-19 | 2009-05-07 | Hitachi Ltd | Work management system |
| JP2012103848A (en) | 2010-11-09 | 2012-05-31 | Nisshin Engineering Co Ltd | Traceability management system |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2023074193A (en) | 2023-05-29 |
| WO2023090254A1 (en) | 2023-05-25 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP3084650B1 (en) | Project management method providing optimized interaction with digital models | |
| JP5961905B2 (en) | Inspection system and inspection method | |
| US20140350708A1 (en) | Work process management system, work process management terminal device, computer program, and work process management method | |
| JP6702180B2 (en) | Maintenance management device, maintenance management method, maintenance management program, and recording medium | |
| US20120046911A1 (en) | Handheld field maintenance tool with integration to external software application | |
| US7698013B2 (en) | Parts production management system and parts production management method | |
| CN106249707B (en) | Information collection system and information collection method | |
| US20160300195A1 (en) | System and Method for Managing a Product Life Cycle | |
| JP6432551B2 (en) | Equipment maintenance device, equipment maintenance system, equipment maintenance method, equipment maintenance program, and recording medium | |
| JP7499385B2 (en) | Order planning data creation device, order planning data creation method, and order planning data creation program | |
| JP2008309341A (en) | Air conditioning and sanitary equipment management system | |
| Motamedi et al. | Extending BIM to incorporate information of RFID tags attached to building assets | |
| JP7753066B2 (en) | Construction management method, construction management system, and program | |
| KR101431995B1 (en) | Facility management device, screen display method, and recording medium | |
| JP2007304660A (en) | Command execution result recording system and command execution result recording method | |
| CN105472359B (en) | Remote debugging method for projecting apparatus | |
| CN101228559B (en) | Device management method, analysis system used for the device management method, data structure used in management database, and maintenance inspection support device used for the device management me | |
| US20250094655A1 (en) | Plant design assistance apparatus, and plant design assistance method | |
| US20220405672A1 (en) | System for management of facility construction and maintenance | |
| JP6943322B2 (en) | Maintenance management equipment, maintenance management methods, maintenance management programs and recording media | |
| JP6708240B2 (en) | Equipment maintenance device, equipment maintenance system, equipment maintenance method, equipment maintenance program and recording medium | |
| JP4663375B2 (en) | Plant inspection system, plant inspection method, and plant inspection program | |
| CN116933351B (en) | Automatic generation method and device for pipeline instrument flow chart | |
| US20250037077A1 (en) | Product design and manufacture management system and method | |
| JP2020060979A (en) | Compressor maintenance / management system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20240920 |
|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20240920 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20250708 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20250904 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20250909 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20251001 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7753066 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |