Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7760486B2 - Uninterruptible power supply systems and test methods for uninterruptible power supply systems - Google Patents
[go: Go Back, main page]

JP7760486B2 - Uninterruptible power supply systems and test methods for uninterruptible power supply systems - Google Patents

Uninterruptible power supply systems and test methods for uninterruptible power supply systems

Info

Publication number
JP7760486B2
JP7760486B2 JP2022199368A JP2022199368A JP7760486B2 JP 7760486 B2 JP7760486 B2 JP 7760486B2 JP 2022199368 A JP2022199368 A JP 2022199368A JP 2022199368 A JP2022199368 A JP 2022199368A JP 7760486 B2 JP7760486 B2 JP 7760486B2
Authority
JP
Japan
Prior art keywords
terminal
power supply
uninterruptible power
switch
output
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022199368A
Other languages
Japanese (ja)
Other versions
JP2024085048A (en
Inventor
誠 長田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TMEIC Corp
Original Assignee
TMEIC Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TMEIC Corp filed Critical TMEIC Corp
Priority to JP2022199368A priority Critical patent/JP7760486B2/en
Publication of JP2024085048A publication Critical patent/JP2024085048A/en
Application granted granted Critical
Publication of JP7760486B2 publication Critical patent/JP7760486B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems

Landscapes

  • Stand-By Power Supply Arrangements (AREA)

Description

本開示は、無停電電源システムおよび無停電電源システムの試験方法に関する。 This disclosure relates to an uninterruptible power supply system and a method for testing an uninterruptible power supply system.

高い信頼度が求められる無停電電源システムにおいては、無停電電源装置の故障等が発生しても、負荷に無停電電源装置での給電を継続する必要がある。このため、従来より、複数の無停電電源装置を組み合わせて冗長方式の無停電電源システムを構成することが行なわれている。 Uninterruptible power supply systems require high reliability, so even if a failure occurs in the uninterruptible power supply unit, it is necessary for the uninterruptible power supply unit to continue supplying power to the load. For this reason, it has traditionally been common to combine multiple uninterruptible power supply units to create a redundant uninterruptible power supply system.

このような冗長方式の無停電電源システムとして、たとえば、特開2005-218200号公報(特許文献1)には、常時負荷に給電するように構成された複数の常用系無停電電源装置と、これら複数の常用系無停電電源装置の共通のバックアップ用として設けられた待機系無停電電源装置とからなる無停電電源システムが開示されている。 As an example of such a redundant uninterruptible power supply system, Japanese Patent Application Laid-Open No. 2005-218200 (Patent Document 1) discloses an uninterruptible power supply system consisting of multiple regular uninterruptible power supplies configured to constantly supply power to loads, and a standby uninterruptible power supply provided as a common backup for these regular uninterruptible power supplies.

冗長方式の無停電電源システムにおいては、一般的に、複数の常用系無停電電源装置に対して待機系無停電電源装置は1台で構成されている。複数の常用系無停電電源装置の各々に、バイパス入力電源として待機系無停電電源装置の出力が入力されている。1台の常用系無停電電源装置の保守点検または故障発生時には、待機系無停電電源装置の出力が当該常用系無停電電源装置のバイパス入力電源となり、当該常用系無停電電源装置のバイパス回路を経由して負荷に給電される。 A redundant uninterruptible power supply system generally consists of one standby uninterruptible power supply for multiple normal uninterruptible power supplies. The output of the standby uninterruptible power supply is input to each of the multiple normal uninterruptible power supplies as a bypass input power source. In the event of maintenance or inspection of one normal uninterruptible power supply or a malfunction, the output of the standby uninterruptible power supply becomes the bypass input power source for that normal uninterruptible power supply, and power is supplied to the load via the bypass circuit of that normal uninterruptible power supply.

特開2005-218200号公報Japanese Patent Application Laid-Open No. 2005-218200

待機系無停電電源装置を備える無停電電源システムにおいて、常用系無停電電源装置を更新及び増設した場合には、新規の常用系無停電電源装置と待機系無停電電源装置との組み合わせ試験が行われる。組み合わせ試験では、負荷設備への給電が停止しないようにするため、待機系無停電電源装置と、新規の無停電電源装置の両方が負荷に給電する期間が生じる。このときに、新規の常用系無停電電源装置の特性と待機系無停電電源装置の特性とが相違する場合には、新規の常用系無停電電源装置または待機系無停電電源装置に異常が生じ、負荷への給電が停止してしまうことがある。 In an uninterruptible power supply system equipped with a standby uninterruptible power supply, when a normal uninterruptible power supply is updated or added, a combination test is conducted between the new normal uninterruptible power supply and the standby uninterruptible power supply. During the combination test, to prevent an interruption in the power supply to the load equipment, there is a period during which both the standby uninterruptible power supply and the new uninterruptible power supply supply power to the load. If the characteristics of the new normal uninterruptible power supply differ from those of the standby uninterruptible power supply at this time, an abnormality may occur in the new normal uninterruptible power supply or the standby uninterruptible power supply, causing the power supply to the load to stop.

それゆえに、本開示の目的は、新規の常用系無停電電源装置と待機系無停電電源装置との組合せ試験時に、負荷への給電が停止される可能性を低減することができる無停電電源システムおよび無停電電源システムの試験方法を提供することである。 Therefore, the object of this disclosure is to provide an uninterruptible power supply system and a test method for an uninterruptible power supply system that can reduce the possibility of power supply to a load being stopped when testing a combination of a new mains uninterruptible power supply and a standby uninterruptible power supply.

本開示の無停電電源システムは、バイパス入力端子と、交流出力端子とを含む第1の常用系無停電電源装置と、生成した交流電力が出力される第1のノードと接続可能な第1の交流出力端子と、第1の試験用端子台とを含む待機系無停電電源装置と、待機系無停電電源装置の第1の交流出力端子と接続可能な第1の交流入力端子と、第1の常用系無停電電源装置の交流出力端子と接続可能な第2の交流入力端子と、第1の交流入力端子と接続される第1端を有する第1のスイッチと、第2の交流入力端子と接続される第1端を有する第2のスイッチと、第1のスイッチの第2端および第2のスイッチの第2端が接続されるとともに負荷が接続可能な交流出力端子とを含む第1の出力分岐盤と、第1の端子と、第2の端子と、第1の端子と第2の端子との間に直列に接続されたスイッチおよびヒューズとを含む開閉器ボックスとを備える。第1の試験用端子台は、第1の端子、第2の端子、および第3の端子を含む。第1の試験用端子台の第1の端子は、開閉器ボックスの第1の端子と接続可能に構成され、かつ第1のノードに接続される。第1の試験用端子台の第2の端子は、開閉器ボックスの第2の端子と接続可能に構成され、かつ第2のノードに接続される。第1の試験用端子台の第3の端子は、第2のノードに接続され、かつ第1の常用系無停電電源装置のバイパス入力端子に接続可能に構成される。 The uninterruptible power supply system disclosed herein comprises: a first normal uninterruptible power supply including a bypass input terminal and an AC output terminal; a standby uninterruptible power supply including a first AC output terminal connectable to a first node to which generated AC power is output and a first test terminal block; a first AC input terminal connectable to the first AC output terminal of the standby uninterruptible power supply; a second AC input terminal connectable to the AC output terminal of the first normal uninterruptible power supply; a first switch having a first end connected to the first AC input terminal; a second switch having a first end connected to the second AC input terminal; and an AC output terminal to which the second end of the first switch and the second end of the second switch are connected and to which a load can be connected; and a switch box including a first terminal, a second terminal, and a switch and a fuse connected in series between the first and second terminals. The first test terminal block includes a first terminal, a second terminal, and a third terminal. The first terminal of the first test terminal block is configured to be connectable to the first terminal of the switch box and is connected to a first node. The second terminal of the first test terminal block is configured to be connectable to the second terminal of the switch box and is connected to a second node. The third terminal of the first test terminal block is connected to the second node and is configured to be connectable to a bypass input terminal of the first utility uninterruptible power supply.

上記記載の無停電電源システムの試験方法であって、第1の出力分岐盤の第1のスイッチをオンにするステップと、第1の常用系無停電電源装置を交換するステップと、第1の試験用端子台の第1の端子と開閉器ボックスの第1の端子とを接続し、第1の試験用端子台の第2の端子と開閉器ボックスの第2の端子とを接続し、第1の試験用端子台の第3の端子と交換後の第1の常用系無停電電源装置のバイパス入力端子とを接続するステップと、第1の出力分岐盤の第2のスイッチをオンにするステップと、を備える。 The above-described uninterruptible power supply system testing method includes the steps of turning on the first switch of the first output branch panel, replacing the first normal uninterruptible power supply, connecting the first terminal of the first test terminal block to the first terminal of the switch box, connecting the second terminal of the first test terminal block to the second terminal of the switch box, and connecting the third terminal of the first test terminal block to the bypass input terminal of the replaced first normal uninterruptible power supply, and turning on the second switch of the first output branch panel.

本開示によれば、新規の常用系無停電電源装置と待機系無停電電源装置との組合せ試験時に、負荷への給電が停止される可能性を低減することができる。 This disclosure reduces the possibility of power supply to the load being stopped when testing a combination of a new mains uninterruptible power supply and a standby uninterruptible power supply.

参考例の無停電電源システムの構成を表わす図である。FIG. 1 is a diagram showing the configuration of an uninterruptible power supply system according to a reference example. 参考例における第1の組み合わせ試験時のスイッチの状態を表わす図である。FIG. 10 is a diagram showing the states of switches during a first combination test in a reference example. 参考例における第2の組み合わせ試験時のスイッチの状態を表わす図である。FIG. 10 is a diagram showing the states of the switches during a second combination test in the reference example. 実施の形態1の無停電源システムの構成を表わす図である。1 is a diagram showing the configuration of an uninterruptible power supply system according to a first embodiment; 実施の形態1における第1の組み合わせ試験の手順を表わすフローチャートである。10 is a flowchart showing a procedure of a first combination test in the first embodiment. 実施の形態1における第1の組み合わせ試験時のスイッチの状態を表わす図である。FIG. 10 is a diagram showing switch states during a first combination test in the first embodiment. 実施の形態1における第2の組み合わせ試験の手順を表わすフローチャートである。10 is a flowchart showing a procedure of a second combination test in the first embodiment. 実施の形態1における第2の組み合わせ試験時のスイッチの状態を表わす図である。FIG. 10 is a diagram showing switch states during a second combination test in the first embodiment.

以下、この発明の実施の形態について図面を参照して詳細に説明する。なお、同一または相当する部分には同一の符号を付して、その説明を繰返さない。 Embodiments of the present invention will now be described in detail with reference to the drawings. Note that identical or corresponding parts will be designated by the same reference numerals and their descriptions will not be repeated.

(参考例)
まず、参考例の無停電電源システムについて説明する。
(Reference example)
First, an uninterruptible power supply system according to a reference example will be described.

図1は、参考例の無停電電源システムの構成を表わす図である。 Figure 1 shows the configuration of an uninterruptible power supply system for reference purposes.

参考例の無停電電源システムは、第1の常用系無停電電源装置20Aと、第2の常用系無停電電源装置20Bと、待機系無停電電源装置20Pと、第1の常用系出力分岐盤40Aと、スイッチSA1と、第2の常用系出力分岐盤40Bと、スイッチSB1と、スイッチSP1と、蓄電池2A,2B,2Pとを備える。 The uninterruptible power supply system of the reference example includes a first normal uninterruptible power supply unit 20A, a second normal uninterruptible power supply unit 20B, a standby uninterruptible power supply unit 20P, a first normal output branch panel 40A, a switch SA1, a second normal output branch panel 40B, a switch SB1, a switch SP1, and storage batteries 2A, 2B, and 2P.

第1の常用系について説明する。第2の常用系は、第1の常用系と同様なので、説明を繰り返さない。 We will now explain the first common system. The second common system is similar to the first common system, so we will not repeat the explanation.

第1の常用系無停電電源装置20Aは、第1の常用系UPS11Aと、第1の常用系入出力盤21Aとを備える。第2の常用系無停電電源装置20Bは、第2の常用系UPS11Bと、第2の常用系入出力盤21Bとを備える。待機系無停電電源装置20Pは、待機系UPS11Pと、待機系入出力盤21Pとを備える。 The first normal uninterruptible power supply 20A includes a first normal UPS 11A and a first normal input/output panel 21A. The second normal uninterruptible power supply 20B includes a second normal UPS 11B and a second normal input/output panel 21B. The standby uninterruptible power supply 20P includes a standby UPS 11P and a standby input/output panel 21P.

以下の説明では、第1の常用系UPS11Aと、第1の常用系入出力盤21Aと、第1の常用系出力分岐盤40Aと、スイッチSA1と、蓄電池2Aとを第1の常用系と記載し、第2の常用系UPS11Bと、第2の常用系入出力盤21Bと、第2の常用系出力分岐盤40Bと、スイッチSB1と、蓄電池2Bとを第2の常用系と記載し、待機系UPS11Pと、待機系入出力盤21Pと、スイッチSP1と、蓄電池2Pとを待機系と記載する場合もある。 In the following explanation, the first normal system UPS 11A, the first normal system input/output panel 21A, the first normal system output branch panel 40A, the switch SA1, and the storage battery 2A will be referred to as the first normal system, the second normal system UPS 11B, the second normal system input/output panel 21B, the second normal system output branch panel 40B, the switch SB1, and the storage battery 2B will be referred to as the second normal system, and the standby system UPS 11P, the standby system input/output panel 21P, the switch SP1, and the storage battery 2P will be referred to as the standby system.

第1の常用系UPS11Aは、バッテリ端子T0、入力端子T1、入力端子T2、出力端子T3、コンバータ3、インバータ4、バイパス回路6およびバイパス切替回路5を含む。第1の常用系入出力盤21Aは、スイッチS2~S8と、交流入力端子T5と、交流出力端子T9と、バイパス入力端子T4と、出力端子T6,T7と、入力端子T8とを備える。 The first normal UPS 11A includes a battery terminal T0, input terminal T1, input terminal T2, output terminal T3, converter 3, inverter 4, bypass circuit 6, and bypass switching circuit 5. The first normal input/output panel 21A includes switches S2 to S8, AC input terminal T5, AC output terminal T9, bypass input terminal T4, output terminals T6 and T7, and input terminal T8.

交流入力端子T5は、スイッチSA1を介して、商用交流電源1に接続可能である。 The AC input terminal T5 can be connected to the commercial AC power supply 1 via switch SA1.

コンバータ3およびインバータ4は、交流入力端子T5と交流出力端子T9との間に、スイッチS5、出力端子T7、および入力端子T2と、出力端子T3、入力端子T8、スイッチS7、およびスイッチS8とを介して、直列に配置される。 The converter 3 and inverter 4 are arranged in series between the AC input terminal T5 and the AC output terminal T9 via switch S5, output terminal T7, and input terminal T2, and output terminal T3, input terminal T8, switch S7, and switch S8.

バイパス回路6は、ノードN1(第3のノード)と交流出力端子T9との間に、スイッチS4、出力端子T6、および入力端子T1と、出力端子T3、入力端子T8、スイッチS7、およびスイッチS8を介して配置される。 Bypass circuit 6 is arranged between node N1 (third node) and AC output terminal T9 via switch S4, output terminal T6, and input terminal T1, and output terminal T3, input terminal T8, switch S7, and switch S8.

バイパス切替回路5は、インバータ4の出力と、バイパス回路6の出力とを切り替える。 The bypass switching circuit 5 switches between the output of the inverter 4 and the output of the bypass circuit 6.

入力端子T1は、出力端子T6に接続され、かつバイパス回路6に接続される。入力端子T2は、出力端子T7に接続され、かつコンバータ3の入力ノードに接続される。 The input terminal T1 is connected to the output terminal T6 and to the bypass circuit 6. The input terminal T2 is connected to the output terminal T7 and to the input node of the converter 3.

バッテリ端子T0は、コンバータ3の出力ノードおよびインバータ4の入力ノードとの間の直流回路(直流リンク)に接続されるとともに、蓄電池2Aに接続される。 Battery terminal T0 is connected to a DC circuit (DC link) between the output node of converter 3 and the input node of inverter 4, and is also connected to storage battery 2A.

コンバータ3は、商用交流電源1から商用周波数の交流電力を受ける。コンバータ3は、商用交流電源1から交流電力が供給される通常時、交流電力を直流電力に変換する。コンバータ3は、直流回路に供給される直流電圧が一定電圧となるように制御される。 Converter 3 receives commercial frequency AC power from commercial AC power supply 1. During normal operation, when AC power is supplied from commercial AC power supply 1, converter 3 converts the AC power into DC power. Converter 3 is controlled so that the DC voltage supplied to the DC circuit remains constant.

蓄電池2Aは、コンバータ3とインバータ4との間の直流回路にバッテリ端子T0を介して接続される。蓄電池2Aは、通常時に、コンバータ3によって生成された直流電力を貯蔵し、商用交流電源1からの交流電力の供給が停止された停電時に、インバータ4に直流電力を供給する。 Storage battery 2A is connected to the DC circuit between converter 3 and inverter 4 via battery terminal T0. Under normal circumstances, storage battery 2A stores DC power generated by converter 3, and supplies DC power to inverter 4 during a power outage when the supply of AC power from commercial AC power source 1 is stopped.

インバータ4は、直流回路に接続される。インバータ4は、通常時に、コンバータ3によって生成された直流電力を商用周波数の交流電力に変換し、停電時に、蓄電池2Aから直流電力を商用周波数の交流電力に変換する。インバータ4の出力ノードは、出力端子T3に接続される。 Inverter 4 is connected to the DC circuit. Under normal conditions, inverter 4 converts the DC power generated by converter 3 into AC power at the commercial frequency, and during a power outage, converts the DC power from storage battery 2A into AC power at the commercial frequency. The output node of inverter 4 is connected to output terminal T3.

バイパス回路6は、入力端子T1およびバイパス切替回路5との間に接続される。バイパス切替回路5は、バイパス回路6および出力端子T3との間に接続される。バイパス切替回路5は、バイパス回路6と出力端子T3との電気的な接続および遮断を切り替える。具体的には、バイパス切替回路5は、バイパス回路6と出力端子T3との間に接続されるスイッチを含む。スイッチは、インバータ4からの給電時に非導通(オフ)状態となり、バイパス回路6からの給電時に導通(オン)状態となる。 The bypass circuit 6 is connected between the input terminal T1 and the bypass switching circuit 5. The bypass switching circuit 5 is connected between the bypass circuit 6 and the output terminal T3. The bypass switching circuit 5 switches between electrical connection and disconnection between the bypass circuit 6 and the output terminal T3. Specifically, the bypass switching circuit 5 includes a switch connected between the bypass circuit 6 and the output terminal T3. The switch is in a non-conductive (off) state when power is supplied from the inverter 4, and in a conductive (on) state when power is supplied from the bypass circuit 6.

制御部は、コンバータ3およびインバータ4を制御して交流電力を生成する。制御部は、停電時、コンバータ3を停止させるとともにインバータ4を制御して交流電力を生成する。制御部は、入力端子T2の電圧(すなわち、商用交流電源1から供給される交流電圧)に基づいて、商用交流電源1から交流電力が正常に供給されているか否かを判定する。制御部は、判定結果に基づいてコンバータ3およびインバータ4を制御する。制御部は、インバータ4の故障を検出すると、バイパス回路6と出力端子T3とを電気的に接続するようにバイパス切替回路5を制御する。 The control unit controls the converter 3 and the inverter 4 to generate AC power. During a power outage, the control unit stops the converter 3 and controls the inverter 4 to generate AC power. The control unit determines whether AC power is being supplied normally from the commercial AC power supply 1 based on the voltage at the input terminal T2 (i.e., the AC voltage supplied from the commercial AC power supply 1). The control unit controls the converter 3 and the inverter 4 based on the determination result. If the control unit detects a fault in the inverter 4, it controls the bypass switching circuit 5 to electrically connect the bypass circuit 6 and the output terminal T3.

交流入力端子T5は、スイッチSA1の第1端と接続可能である。スイッチSA1の第2端は、商用交流電源1と接続される。 The AC input terminal T5 can be connected to the first terminal of the switch SA1. The second terminal of the switch SA1 is connected to the commercial AC power supply 1.

出力端子T6は、入力端子T1と接続可能である。出力端子T7は、入力端子T2と接続可能である。入力端子T8は、出力端子T3と接続可能である。 Output terminal T6 can be connected to input terminal T1. Output terminal T7 can be connected to input terminal T2. Input terminal T8 can be connected to output terminal T3.

スイッチS2(第1のスイッチ)は、バイパス入力端子T4と、ノードN1(第3のノード)との間に配置される。スイッチS3(第2のスイッチ)は、交流入力端子T5と、ノードN1(第3のノード)との間に配置される。スイッチS2とスイッチS3とは、一方がオンのときに、他方がオフとなる。 Switch S2 (first switch) is arranged between bypass input terminal T4 and node N1 (third node). Switch S3 (second switch) is arranged between AC input terminal T5 and node N1 (third node). When one of switches S2 and S3 is on, the other is off.

スイッチS4は、ノードN1と、出力端子T6との間に配置される。スイッチS5は、交流入力端子T5と、出力端子T7との間に配置される。スイッチS6は、ノードN1と、ノードN2との間に配置される。スイッチS7は、入力端子T8と、ノードN2との間に配置される。スイッチS8は、ノードN2と、交流出力端子T9との間に配置される。 Switch S4 is arranged between node N1 and output terminal T6. Switch S5 is arranged between AC input terminal T5 and output terminal T7. Switch S6 is arranged between node N1 and node N2. Switch S7 is arranged between input terminal T8 and node N2. Switch S8 is arranged between node N2 and AC output terminal T9.

第1の常用系出力分岐盤40Aは、スイッチS9,S10と、第1の交流入力端子T10と、第2の交流入力端子T11と、交流出力端子T12,T13とを備える。 The first utility output branch panel 40A has switches S9 and S10, a first AC input terminal T10, a second AC input terminal T11, and AC output terminals T12 and T13.

第1の交流入力端子T10は、待機系無停電電源装置20Pの第1の交流出力端子TP9と接続可能である。第2の交流入力端子T11は、第1の常用系無停電電源装置20Aの交流出力端子T9と接続可能である。 The first AC input terminal T10 can be connected to the first AC output terminal TP9 of the standby uninterruptible power supply 20P. The second AC input terminal T11 can be connected to the AC output terminal T9 of the first normal uninterruptible power supply 20A.

スイッチS9(第1のスイッチ)の第1端は、第1の交流入力端子T10と接続される。スイッチS9(第1のスイッチ)の第2端は、ノードN3と接続される。スイッチS10(第2のスイッチ)の第1端は、第2の交流入力端子T11と接続される。スイッチS10(第2のスイッチ)の第2端は、ノードN3と接続される。 The first terminal of switch S9 (first switch) is connected to the first AC input terminal T10. The second terminal of switch S9 (first switch) is connected to node N3. The first terminal of switch S10 (second switch) is connected to the second AC input terminal T11. The second terminal of switch S10 (second switch) is connected to node N3.

交流出力端子T12は、ノードN3を介して、スイッチS9の第2端およびスイッチS10の第2端と接続され、かつ負荷LA1が接続可能である。交流出力端子T13は、ノードN3を介して、スイッチS9の第2端およびスイッチS10の第2端と接続され、かつ負荷LA2が接続可能である。 The AC output terminal T12 is connected to the second end of the switch S9 and the second end of the switch S10 via the node N3, and can be connected to a load LA1. The AC output terminal T13 is connected to the second end of the switch S9 and the second end of the switch S10 via the node N3, and can be connected to a load LA2.

スイッチSA1、S2、S3、S4、S5、S6、S8、S9、S10は、過大な電流が流れたときに自動的にオフとなるトリップスイッチである。 Switches SA1, S2, S3, S4, S5, S6, S8, S9, and S10 are trip switches that automatically turn off when excessive current flows.

待機系UPS11Pは、バッテリ端子TP0、入力端子TP1,TP2、出力端子TP3、コンバータ3P、インバータ4P、バイパス回路6Pおよびバイパス切替回路5Pを含む。待機系出力分岐盤40Pは、スイッチSP4,SP7,SP8と、スイッチ33,34と、スイッチ31(第1のスイッチ)と、スイッチ32(第2のスイッチ)と、交流入力端子TP5と、出力端子TP6,TP7と、入力端子TP8と、第1の交流出力端子TP9と、第2の交流出力端子TP10と、出力端子TP11,TP12とを備える。 The standby UPS 11P includes a battery terminal TP0, input terminals TP1 and TP2, an output terminal TP3, a converter 3P, an inverter 4P, a bypass circuit 6P, and a bypass switching circuit 5P. The standby output branch panel 40P includes switches SP4, SP7, and SP8, switches 33 and 34, a switch 31 (first switch), a switch 32 (second switch), an AC input terminal TP5, output terminals TP6 and TP7, an input terminal TP8, a first AC output terminal TP9, a second AC output terminal TP10, and output terminals TP11 and TP12.

交流入力端子TP5は、スイッチSP1を介して、商用交流電源1に接続可能である。 The AC input terminal TP5 can be connected to the commercial AC power supply 1 via the switch SP1.

コンバータ3Pおよびインバータ4Pは、交流入力端子TP5とノードNP1(第1のノード)との間に、スイッチSP5、出力端子TP7、および入力端子TP2と、出力端子TP3、入力端子TP8、およびスイッチSP7とを介して、直列に配置される。 Converter 3P and inverter 4P are arranged in series between AC input terminal TP5 and node NP1 (first node) via switch SP5, output terminal TP7, and input terminal TP2, and output terminal TP3, input terminal TP8, and switch SP7.

バイパス回路6Pは、交流入力端子TP5とノードNP1(第1のノード)との間に、スイッチSP4、出力端子TP6、および入力端子TP1と、出力端子TP3、入力端子TP8、およびスイッチSP7とを介して、コンバータ3Pおよびインバータ4Pが配置される経路を並列に配置される。 The bypass circuit 6P has a path in parallel between the AC input terminal TP5 and node NP1 (first node), which includes the converter 3P and inverter 4P via the switch SP4, output terminal TP6, and input terminal TP1, and the output terminal TP3, input terminal TP8, and switch SP7.

バイパス切替回路5Pは、インバータ4Pの出力と、バイパス回路6Pの出力とを切り替える。 The bypass switching circuit 5P switches between the output of the inverter 4P and the output of the bypass circuit 6P.

入力端子TP1は、出力端子TP6に接続され、かつバイパス回路6Pに接続される。入力端子TP2は、出力端子TP7に接続され、かつコンバータ3Pの入力ノードに接続される。 Input terminal TP1 is connected to output terminal TP6 and to bypass circuit 6P. Input terminal TP2 is connected to output terminal TP7 and to the input node of converter 3P.

バッテリ端子TP0は、コンバータ3Pの出力ノードおよびインバータ4Pの入力ノードとの間の直流回路(直流リンク)に接続されるとともに、蓄電池2Pに接続される。 Battery terminal TP0 is connected to a DC circuit (DC link) between the output node of converter 3P and the input node of inverter 4P, and is also connected to storage battery 2P.

コンバータ3Pは、商用交流電源1から商用周波数の交流電力を受ける。コンバータ3Pは、商用交流電源1から交流電力が供給される通常時、交流電力を直流電力に変換する。コンバータ3Pは、直流回路に供給される直流電圧が一定電圧となるように制御される。 Converter 3P receives commercial frequency AC power from commercial AC power supply 1. During normal operation, when AC power is supplied from commercial AC power supply 1, converter 3P converts the AC power into DC power. Converter 3P is controlled so that the DC voltage supplied to the DC circuit is a constant voltage.

蓄電池2Pは、コンバータ3Pとインバータ4Pとの間の直流回路にバッテリ端子TP0を介して接続される。蓄電池2Pは、通常時に、コンバータ3Pによって生成された直流電力を貯蔵し、商用交流電源1からの交流電力の供給が停止された停電時に、インバータ4Pに直流電力を供給する。 The storage battery 2P is connected to the DC circuit between the converter 3P and the inverter 4P via the battery terminal TP0. Under normal circumstances, the storage battery 2P stores the DC power generated by the converter 3P, and supplies DC power to the inverter 4P during a power outage when the supply of AC power from the commercial AC power source 1 is stopped.

インバータ4Pは、直流回路に接続される。インバータ4Pは、通常時に、コンバータ3Pによって生成された直流電力を商用周波数の交流電力に変換し、停電時に、蓄電池2Pから直流電力を商用周波数の交流電力に変換する。インバータ4Pの出力ノードは、出力端子TP3に接続される。 Inverter 4P is connected to the DC circuit. Under normal conditions, inverter 4P converts DC power generated by converter 3P into AC power at the commercial frequency, and during a power outage, converts DC power from storage battery 2P into AC power at the commercial frequency. The output node of inverter 4P is connected to output terminal TP3.

バイパス回路6Pは、入力端子TP1およびバイパス切替回路5Pとの間に接続される。バイパス切替回路5Pは、バイパス回路6Pおよび出力端子TP3との間に接続される。バイパス切替回路5Pは、バイパス回路6Pと出力端子TP3との電気的な接続および遮断を切り替える。具体的には、バイパス切替回路5Pは、バイパス回路6Pと出力端子TP3との間に接続されるスイッチを含む。スイッチは、インバータ4Pからの給電時に非導通(オフ)状態となり、バイパス回路6Pからの給電時に導通(オン)状態となる。 The bypass circuit 6P is connected between the input terminal TP1 and the bypass switching circuit 5P. The bypass switching circuit 5P is connected between the bypass circuit 6P and the output terminal TP3. The bypass switching circuit 5P switches between electrical connection and disconnection between the bypass circuit 6P and the output terminal TP3. Specifically, the bypass switching circuit 5P includes a switch connected between the bypass circuit 6P and the output terminal TP3. The switch is non-conductive (off) when power is supplied from the inverter 4P, and is conductive (on) when power is supplied from the bypass circuit 6P.

制御部は、コンバータ3Pおよびインバータ4Pを制御して交流電力を生成する。制御部は、停電時、コンバータ3Pを停止させるとともにインバータ4Pを制御して交流電力を生成する。制御部は、入力端子TP2の電圧(すなわち、商用交流電源1から供給される交流電圧)に基づいて、商用交流電源1から交流電力が正常に供給されているか否かを判定する。制御部は、判定結果に基づいてコンバータ3Pおよびインバータ4Pを制御する。制御部は、インバータ4Pの故障を検出すると、バイパス回路6Pと出力端子TP3とを電気的に接続するようにバイパス切替回路5Pを制御する。 The control unit controls the converter 3P and the inverter 4P to generate AC power. During a power outage, the control unit stops the converter 3P and controls the inverter 4P to generate AC power. The control unit determines whether AC power is being supplied normally from the commercial AC power supply 1 based on the voltage at the input terminal TP2 (i.e., the AC voltage supplied from the commercial AC power supply 1). The control unit controls the converter 3P and the inverter 4P based on the determination result. If the control unit detects a fault in the inverter 4P, it controls the bypass switching circuit 5P to electrically connect the bypass circuit 6P to the output terminal TP3.

交流入力端子T5は、スイッチSP1の第1端と接続可能である。スイッチSP1の第2端は、商用交流電源1と接続される。 The AC input terminal T5 can be connected to the first terminal of the switch SP1. The second terminal of the switch SP1 is connected to the commercial AC power supply 1.

出力端子TP6は、入力端子TP1と接続可能である。出力端子TP7は、入力端子TP2と接続可能である。入力端子TP8は、出力端子TP3と接続可能である。 Output terminal TP6 can be connected to input terminal TP1. Output terminal TP7 can be connected to input terminal TP2. Input terminal TP8 can be connected to output terminal TP3.

スイッチSP4は、交流入力端子TP5と、出力端子T6との間に配置される。スイッチSP5は、交流入力端子TP5と、出力端子T7との間に配置される。ノードNP1(第1のノード)には、待機系無停電電源装置20Pによって生成された交流電力が出力される。スイッチSP6は、交流入力端子TP5と、ノードNP1(第1のノード)との間に配置される。スイッチSP7は、入力端子TP8と、ノードNP1(第1のノード)との間に配置される。 Switch SP4 is arranged between AC input terminal TP5 and output terminal T6. Switch SP5 is arranged between AC input terminal TP5 and output terminal T7. AC power generated by standby uninterruptible power supply 20P is output to node NP1 (first node). Switch SP6 is arranged between AC input terminal TP5 and node NP1 (first node). Switch SP7 is arranged between input terminal TP8 and node NP1 (first node).

スイッチ33は、ノードNP1(第1のノード)と、第1の交流出力端子TP9との間に配置される。スイッチ34は、ノードNP1(第1のノード)と、第2の交流出力端子TP10との間に配置される。 Switch 33 is arranged between node NP1 (first node) and first AC output terminal TP9. Switch 34 is arranged between node NP1 (first node) and second AC output terminal TP10.

スイッチ31は、ノードNP1(第1のノード)と、出力端子TP12との間に配置される。スイッチ32は、ノードNP1(第1のノード)と、出力端子TP11との間に配置される。 Switch 31 is arranged between node NP1 (first node) and output terminal TP12. Switch 32 is arranged between node NP1 (first node) and output terminal TP11.

スイッチSP1、SP4、SP5、SP6、31、32、33、34は、過大な電流が流れたときに自動的にオフとなるトリップスイッチである。 Switches SP1, SP4, SP5, SP6, 31, 32, 33, and 34 are trip switches that automatically turn off when excessive current flows.

(参考例の動作)
次に、参考例において、第1の常用系無停電電源装置20Aを交換して、新規の第1の常用系無停電電源装置20Aと待機系無停電電源装置20Pとの組み合わせ試験(第1の組み合わせ試験)を実行する方法について説明する。
(Operation of the reference example)
Next, in the reference example, a method for replacing the first normal uninterruptible power supply 20A and performing a combination test (first combination test) of the new first normal uninterruptible power supply 20A and the standby uninterruptible power supply 20P will be described.

図2は、参考例における第1の組み合わせ試験時のスイッチの状態を表わす図である。 Figure 2 shows the switch states during the first combination test in the reference example.

待機系において、スイッチSP1、SP4、SP5、SP7、31、33、34をオンに設定し、スイッチSP6、32をオフに設定する。第1の常用系において、スイッチS9をオンに設定する。第2の常用系において、スイッチSB1、S3、S4、S5、S7、S8をオンに設定し、スイッチS2、S6をオフに設定する。 In the standby system, switches SP1, SP4, SP5, SP7, 31, 33, and 34 are set on, and switches SP6 and 32 are set off. In the first normal system, switch S9 is set on. In the second normal system, switches SB1, S3, S4, S5, S7, and S8 are set on, and switches S2 and S6 are set off.

第1の常用系無停電電源装置20Aを交換する。すなわち、古い第1の常用系無停電電源装置20Aを無停電電源システムから取り外し、新しい第1の常用系無停電電源装置20Aを無停電電源システムに接続する。 Replace the first normal uninterruptible power supply 20A. That is, remove the old first normal uninterruptible power supply 20A from the uninterruptible power supply system and connect the new first normal uninterruptible power supply 20A to the uninterruptible power supply system.

第1の常用系において、スイッチS2、S4、S5、S7、S8、S10をオンに設定し、スイッチSA1、S3、S6をオフに設定する。 In the first normal system, switches S2, S4, S5, S7, S8, and S10 are set to on, and switches SA1, S3, and S6 are set to off.

その結果、第1の常用系出力分岐盤40Aにおいて、スイッチS9およびS10の両方が同時にオンとなる。待機系無停電電源装置20Pによって生成された交流電力が、待機系無停電電源装置20Pの第1の交流出力端子TP9と、第1の常用系出力分岐盤40Aの第1の交流入力端子T10、およびスイッチS9とを通じて、負荷LA1、LA2に供給される。待機系無停電電源装置20Pによって生成された交流電力は、さらに、待機系無停電電源装置20Pの出力端子TP12と、第1の常用系無停電電源装置20Aのバイパス入力端子T4、スイッチS2、スイッチS4、バイパス回路6、出力端子T3、入力端子T8、スイッチS7、スイッチS8、および交流出力端子T9と、第1の常用系出力分岐盤40Aの第2の交流入力端子T11、およびスイッチS10とを通じて、負荷LA1、LA2に供給される。 As a result, both switches S9 and S10 are turned on simultaneously in the first normal output branch panel 40A. The AC power generated by the standby uninterruptible power supply 20P is supplied to loads LA1 and LA2 via the first AC output terminal TP9 of the standby uninterruptible power supply 20P, the first AC input terminal T10 of the first normal output branch panel 40A, and switch S9. The AC power generated by the standby uninterruptible power supply 20P is further supplied to loads LA1 and LA2 via the output terminal TP12 of the standby uninterruptible power supply 20P, the bypass input terminal T4, switch S2, switch S4, bypass circuit 6, output terminal T3, input terminal T8, switch S7, switch S8, and AC output terminal T9 of the first normal uninterruptible power supply 20A, the second AC input terminal T11 of the first normal output branch panel 40A, and switch S10.

スイッチS9およびS10が同時にオンに設定されるのは、オンのスイッチをスイッチS9からスイッチS10に切り替えるときに、両方がオフになる期間が少しでも生じると、負荷LA1、LA2への給電が停止されてしまうからである。 Switches S9 and S10 are set to ON simultaneously because if there is even a short period of time when both switches are OFF when switching from switch S9 to switch S10, power supply to loads LA1 and LA2 will be stopped.

スイッチS9およびS10がオンに設定されている間は、ノードN3が待機系無停電電源装置20Pからの電圧V1と、第1の常用系無停電電源装置20Aからの電圧V2とを受ける。切替前の古い第1の常用系無停電電源装置20Aが接続されている場合には、V1とV2の電圧特性は同じである。 While switches S9 and S10 are set to on, node N3 receives voltage V1 from the standby uninterruptible power supply 20P and voltage V2 from the first normal uninterruptible power supply 20A. When the old first normal uninterruptible power supply 20A before switching is connected, the voltage characteristics of V1 and V2 are the same.

切替後の新規の第1の常用系無停電電源装置20Aの機種または仕様と、切替前の古い第1の常用系無停電電源装置20Aの機種または仕様とが同じ場合、V1とV2の電圧特性が同一である。この場合、何の異常も発生しないので、スイッチS9をオフに設定して、第1の組み合わせ試験が終了する。 If the model or specifications of the new first normal uninterruptible power supply 20A after the switchover are the same as the model or specifications of the old first normal uninterruptible power supply 20A before the switchover, the voltage characteristics of V1 and V2 will be the same. In this case, no abnormalities will occur, so switch S9 is set to OFF, and the first combination test ends.

切替後の新規の第1の常用系無停電電源装置20Aの機種または仕様と切替前の古い第1の常用系無停電電源装置20Aの機種または仕様とが相違すると、V1とV2の電圧特性が相違する場合がある。V1とV2の電圧特性が相違すると、待機系無停電電源装置20Pには、大電流が発生して、第1の常用系無停電電源装置20A、および待機系無停電電源装置20Pの一方、または両方が故障する、あるいは商用交流電源1からの商用交流電力で第1の常用系無停電電源装置20Aを動作させなければならないような事態が発生する場合がある。その結果、負荷LA1およびLA2の給電が停止するなどの問題が生じる。 If the model or specifications of the new first normal uninterruptible power supply 20A after the switchover differ from the model or specifications of the old first normal uninterruptible power supply 20A before the switchover, the voltage characteristics of V1 and V2 may differ. If the voltage characteristics of V1 and V2 differ, a large current may be generated in the standby uninterruptible power supply 20P, causing failure of one or both of the first normal uninterruptible power supply 20A and the standby uninterruptible power supply 20P, or a situation may arise in which the first normal uninterruptible power supply 20A must be operated using commercial AC power from commercial AC power source 1. As a result, problems such as an interruption in the power supply to loads LA1 and LA2 may occur.

次に、参考例において、第2の常用系無停電電源装置20Bを交換して、新規の第2の常用系無停電電源装置20Bと待機系無停電電源装置20Pとの組み合わせ試験(第2の組み合わせ試験)を実行する方法について説明する。 Next, in the reference example, we will explain how to replace the second regular uninterruptible power supply 20B and perform a combination test (second combination test) of the new second regular uninterruptible power supply 20B and standby uninterruptible power supply 20P.

図3は、参考例における第2の組み合わせ試験時のスイッチの状態を表わす図である。 Figure 3 shows the switch states during the second combination test in the reference example.

待機系において、スイッチSP1、SP4、SP5、SP7、32、33、34をオンに設定し、スイッチSP6、31をオフに設定する。第2の常用系において、スイッチS9をオンに設定する。第1の常用系において、スイッチSA1、S3、S4、S5、S7、S8をオンに設定し、スイッチS2、S6をオフに設定する。 In the standby system, switches SP1, SP4, SP5, SP7, 32, 33, and 34 are set on, and switches SP6 and 31 are set off. In the second normal system, switch S9 is set on. In the first normal system, switches SA1, S3, S4, S5, S7, and S8 are set on, and switches S2 and S6 are set off.

第2の常用系無停電電源装置20Bを交換する。すなわち、古い第2の常用系無停電電源装置20Bを無停電電源システムから取り外し、新しい第2の常用系無停電電源装置20Bを無停電電源システムに接続する。 Replace the second normal uninterruptible power supply 20B. That is, remove the old second normal uninterruptible power supply 20B from the uninterruptible power supply system and connect the new second normal uninterruptible power supply 20B to the uninterruptible power supply system.

第2の常用系において、スイッチS2、S4、S5、S7、S8、S10をオンに設定し、スイッチSB1、S3、S6をオフに設定する。 In the second normal system, switches S2, S4, S5, S7, S8, and S10 are set to on, and switches SB1, S3, and S6 are set to off.

その結果、第2の常用系出力分岐盤40Bにおいて、スイッチS9およびS10の両方が同時にオンとなる。待機系無停電電源装置20Pによって生成された交流電力が、待機系無停電電源装置20Pの第2の交流出力端子TP10と、第2の常用系出力分岐盤40Bの第1の交流入力端子T10、およびスイッチS9とを通じて、負荷LB1、LB2に供給される。待機系無停電電源装置20Pによって生成された交流電力は、さらに、待機系無停電電源装置20Pの出力端子TP11と、第2の常用系無停電電源装置20Bのバイパス入力端子T4、スイッチS2、スイッチS4、バイパス回路6、出力端子T3、入力端子T8、スイッチS7、スイッチS8、および交流出力端子T9と、第2の常用系出力分岐盤40Bの第2の交流入力端子T11、およびスイッチS10とを通じて、負荷LB1、LB2に供給される。 As a result, both switches S9 and S10 are turned on simultaneously in the second normal output branch panel 40B. The AC power generated by the standby uninterruptible power supply 20P is supplied to loads LB1 and LB2 via the second AC output terminal TP10 of the standby uninterruptible power supply 20P, the first AC input terminal T10 of the second normal output branch panel 40B, and switch S9. The AC power generated by the standby uninterruptible power supply 20P is further supplied to loads LB1 and LB2 via the output terminal TP11 of the standby uninterruptible power supply 20P, the bypass input terminal T4, switch S2, switch S4, bypass circuit 6, output terminal T3, input terminal T8, switch S7, switch S8, and AC output terminal T9 of the second normal output branch panel 40B, and the second AC input terminal T11 and switch S10 of the second normal output branch panel 40B.

スイッチS9およびS10が同時にオンに設定されるのは、オンにするのをスイッチS9からスイッチS10に切り替えるときに、両方がオフになる期間が少しでも生じると、負荷LB1、LB2への給電が停止されてしまうからである。 Switches S9 and S10 are set to ON simultaneously because if there is even a short period of time when both switches are OFF when switching from switch S9 to switch S10, power supply to loads LB1 and LB2 will be stopped.

スイッチS9およびS10がオンに設定されている間は、ノードN3が待機系無停電電源装置20Pからの電圧V1と、第2の常用系無停電電源装置20Bからの電圧V2とを受ける。切替前の古い第2の常用系無停電電源装置20Bが接続されている場合には、V1とV2の電圧特性は同じである。 While switches S9 and S10 are set to on, node N3 receives voltage V1 from standby uninterruptible power supply 20P and voltage V2 from second normal uninterruptible power supply 20B. When the old second normal uninterruptible power supply 20B before switching is connected, the voltage characteristics of V1 and V2 are the same.

切替後の新規の第2の常用系無停電電源装置20Bの機種または仕様と切替前の古い第2の常用系無停電電源装置20Bの機種または仕様とが同じ場合、V1とV2の電圧特性が同一である。この場合、何の異常も発生しないので、スイッチS9をオフに設定して、第2の組み合わせ試験が終了する。 If the model or specifications of the new second normal uninterruptible power supply 20B after the switchover are the same as those of the old second normal uninterruptible power supply 20B before the switchover, the voltage characteristics of V1 and V2 will be the same. In this case, no abnormalities will occur, so switch S9 is set to OFF, and the second combination test ends.

切替後の新規の第2の常用系無停電電源装置20Bの機種または仕様と切替前の古い第2の常用系無停電電源装置20Bの機種または仕様とが相違すると、V1とV2の電圧特性が相違する場合がある。V1とV2の電圧特性が相違すると、待機系無停電電源装置20Pには、大電流が発生して、第2の常用系無停電電源装置20B、および待機系無停電電源装置20Pの一方、または両方が故障する、あるいは商用交流電源1からの商用交流電力で第2の常用系無停電電源装置20Bを動作させなければならないような事態が発生する場合がある。その結果、負荷LB1およびLB2の給電が停止するなどの問題が生じる。 If the model or specifications of the new second normal uninterruptible power supply 20B after the switchover differ from the model or specifications of the old second normal uninterruptible power supply 20B before the switchover, the voltage characteristics of V1 and V2 may differ. If the voltage characteristics of V1 and V2 differ, a large current may be generated in the standby uninterruptible power supply 20P, causing failure of either or both of the second normal uninterruptible power supply 20B and the standby uninterruptible power supply 20P, or a situation may arise in which the second normal uninterruptible power supply 20B must be operated using commercial AC power from commercial AC power supply 1. As a result, problems such as an interruption in the power supply to loads LB1 and LB2 may occur.

実施の形態1.
(実施の形態1の無停電電源システム)
図4は、実施の形態1の無停電源システムの構成を表わす図である。
Embodiment 1.
(Uninterruptible power supply system according to the first embodiment)
FIG. 4 is a diagram showing the configuration of the uninterruptible power supply system according to the first embodiment.

実施の形態1の無停電電源システムと参考例の無停電電源システムとが相違する点は、実施の形態1の無停電電源システムは、開閉器ボックス60を備える点である。 The uninterruptible power supply system of embodiment 1 differs from the uninterruptible power supply system of the reference example in that the uninterruptible power supply system of embodiment 1 includes a switch box 60.

本実施の形態では、待機系入出力盤21Pが、さらに、第1の試験用端子台50と、第2の試験用端子台51とを備える。第1の試験用端子台50は、第1の端子51Xと、第2の端子51Yと、第3の端子51Zを備える。第2の試験用端子台51は、第1の端子51Xと、第2の端子51Yと、第3の端子51Zとを備える。 In this embodiment, the standby system input/output board 21P further includes a first test terminal block 50 and a second test terminal block 51. The first test terminal block 50 includes a first terminal 51X, a second terminal 51Y, and a third terminal 51Z. The second test terminal block 51 includes a first terminal 51X, a second terminal 51Y, and a third terminal 51Z.

開閉器ボックス60は、第1の端子61と、第2の端子62と、スイッチ65と、ヒューズ70とを備える。第1の端子61と第2の端子62とに間にスイッチ65とヒューズ70とが直列に接続される。 The switch box 60 includes a first terminal 61, a second terminal 62, a switch 65, and a fuse 70. The switch 65 and fuse 70 are connected in series between the first terminal 61 and the second terminal 62.

第1の試験用端子台50の第1の端子50Xは、ノードNP1(第1のノード)と接続され、かつ開閉器ボックス60の第1の端子61と接続可能である。第1の試験用端子台50の第2の端子50Yは、ノードNP4(第2のノード)と接続され、かつ第2の端子62と接続可能である。第1の試験用端子台50の第3の端子50Zは、ノードNP4(第2のノード)と接続され、かつ第1の常用系入出力盤21Aのバイパス入力端子T4と接続可能である。スイッチ31は、ノードNP1とノードNP4との間に配置される。 The first terminal 50X of the first test terminal block 50 is connected to node NP1 (first node) and is connectable to the first terminal 61 of the switch box 60. The second terminal 50Y of the first test terminal block 50 is connected to node NP4 (second node) and is connectable to the second terminal 62. The third terminal 50Z of the first test terminal block 50 is connected to node NP4 (second node) and is connectable to the bypass input terminal T4 of the first normal system input/output panel 21A. The switch 31 is disposed between nodes NP1 and NP4.

第2の試験用端子台51の第1の端子51Xは、ノードNP1(第1のノード)と接続され、かつ開閉器ボックス60の第1の端子61と接続可能である。第2の試験用端子台51の第2の端子51Yは、ノードNP5(第4のノード)と接続され、かつ第2の端子62と接続可能である。第2の試験用端子台51の第3の端子51Zは、ノードNP5(第4のノード)と接続され、かつ第2の常用系入出力盤21Bのバイパス入力端子T4と接続可能である。スイッチ32は、ノードNP1とノードNP5との間に配置される。 The first terminal 51X of the second test terminal block 51 is connected to node NP1 (first node) and is connectable to the first terminal 61 of the switch box 60. The second terminal 51Y of the second test terminal block 51 is connected to node NP5 (fourth node) and is connectable to the second terminal 62. The third terminal 51Z of the second test terminal block 51 is connected to node NP5 (fourth node) and is connectable to the bypass input terminal T4 of the second normal system input/output panel 21B. The switch 32 is disposed between nodes NP1 and NP5.

(実施の形態1の無停電電源システムの第1の試験方法)
次に、第1の常用系無停電電源装置20Aを交換して、新規の常用系無停電電源装置20Aと待機系無停電電源装置20Pとの組み合わせ試験(第1の組み合わせ試験)を実行する方法について説明する。
(First Test Method for Uninterruptible Power Supply System of First Embodiment)
Next, a method for replacing the first normal uninterruptible power supply 20A and performing a combination test (first combination test) of the new normal uninterruptible power supply 20A and the standby uninterruptible power supply 20P will be described.

図5は、実施の形態1における第1の組み合わせ試験の手順を表わすフローチャートである。図6は、実施の形態1における第1の組み合わせ試験時のスイッチの状態を表わす図である。 Figure 5 is a flowchart showing the procedure for the first combination test in embodiment 1. Figure 6 is a diagram showing the switch states during the first combination test in embodiment 1.

ステップS101において、複数のスイッチのオン/オフを設定する。 In step S101, multiple switches are set to on/off.

待機系において、スイッチSP1、SP4、SP5、SP7、33、34をオンに設定し、スイッチSP6、31、32をオフに設定する。第1の常用系において、スイッチS9をオンに設定する。第2の常用系において、スイッチSB1、S3、S4、S5、S7、S8をオンに設定し、スイッチS2、S6をオフに設定する。 In the standby system, switches SP1, SP4, SP5, SP7, 33, and 34 are set on, and switches SP6, 31, and 32 are set off. In the first normal system, switch S9 is set on. In the second normal system, switches SB1, S3, S4, S5, S7, and S8 are set on, and switches S2 and S6 are set off.

ステップS102において、第1の常用系無停電電源装置20Aを交換する。すなわち、古い第1の常用系無停電電源装置20Aを無停電電源システムから取り外し、新しい第1の常用系無停電電源装置20Aを無停電電源システムに接続する。 In step S102, the first normal uninterruptible power supply 20A is replaced. That is, the old first normal uninterruptible power supply 20A is removed from the uninterruptible power supply system, and a new first normal uninterruptible power supply 20A is connected to the uninterruptible power supply system.

ステップS103において、第1の試験用端子台50の第1の端子50Xと開閉器ボックス60の第1の端子61とを接続し、第1の試験用端子台50の第2の端子50Yと開閉器ボックス60の第2の端子62とを接続し、第1の試験用端子台50の第3の端子50Zを交換後の新しい第1の常用系無停電電源装置20Aのバイパス入力端子T4と接続する。 In step S103, the first terminal 50X of the first test terminal block 50 is connected to the first terminal 61 of the switch box 60, the second terminal 50Y of the first test terminal block 50 is connected to the second terminal 62 of the switch box 60, and the third terminal 50Z of the first test terminal block 50 is connected to the bypass input terminal T4 of the new, replaced first normal uninterruptible power supply 20A.

ステップS104において、第1の常用系において、スイッチS2、S4、S5、S7、S8、S10をオンに設定し、スイッチSA1、S3、S6をオフに設定する。 In step S104, in the first normal system, switches S2, S4, S5, S7, S8, and S10 are set to ON, and switches SA1, S3, and S6 are set to OFF.

これによって、待機系無停電電源装置20Pによって生成されてノードNP1に出力された交流電力が、第1の試験用端子台50の第1の端子50Xと、開閉器ボックス60の第1の端子61、スイッチ65、ヒューズ70、および第2の端子62と、第1の試験用端子台50の第2の端子51Yと、待機系無停電電源装置20PのノードNP4と、第1の試験用端子台50の第3の端子51Zとを通じて、第1の常用系無停電電源装置20Aのバイパス入力端子T4に送られる。待機系無停電電源装置20PのノードNP1に大電流が流れる場合には、開閉器ボックス60のヒューズ70が溶断する。その結果、待機系無停電電源装置20Pから第1の常用系無停電電源装置20Aの交流電力の供給が停止するので、第1の常用系無停電電源装置20A、および待機系無停電電源装置20Pの一方、または両方が故障する、あるいは商用交流電源1からの商用交流電力で第1の常用系無停電電源装置20Aを動作させなければならないような事態が発生しない。その結果、負荷LA1およびLA2の給電が停止するなどの可能性を低減できる。 As a result, the AC power generated by the standby uninterruptible power supply 20P and output to node NP1 is sent to the bypass input terminal T4 of the first normal uninterruptible power supply 20A via the first terminal 50X of the first test terminal block 50, the first terminal 61, switch 65, fuse 70, and second terminal 62 of the switch box 60, the second terminal 51Y of the first test terminal block 50, node NP4 of the standby uninterruptible power supply 20P, and the third terminal 51Z of the first test terminal block 50. If a large current flows through node NP1 of the standby uninterruptible power supply 20P, the fuse 70 of the switch box 60 will blow. As a result, the supply of AC power from standby uninterruptible power supply 20P to first normal uninterruptible power supply 20A is stopped, preventing a situation in which one or both of first normal uninterruptible power supply 20A and standby uninterruptible power supply 20P fail, or in which first normal uninterruptible power supply 20A has to be operated using commercial AC power from commercial AC power supply 1. As a result, the possibility of power supply to loads LA1 and LA2 being stopped can be reduced.

ステップS105において、開閉器ボックス60のヒューズ70が溶断していない場合に、処理がステップS106に進む。 If the fuse 70 in the switch box 60 is not blown in step S105, processing proceeds to step S106.

ステップS106において、第1の常用系出力分岐盤40AのスイッチS9をオフに設定する。 In step S106, switch S9 on the first normal system output distribution board 40A is set to OFF.

ステップS107において、第1の試験用端子台50の第1の端子50Xと開閉器ボックス60の第1の端子61との接続を切断し、第1の試験用端子台50の第2の端子50Yと開閉器ボックス60の第2の端子62との接続を接続する。 In step S107, the connection between the first terminal 50X of the first test terminal block 50 and the first terminal 61 of the switch box 60 is disconnected, and the connection between the second terminal 50Y of the first test terminal block 50 and the second terminal 62 of the switch box 60 is connected.

次に、第2の常用系無停電電源装置20Bを交換して、新規の常用系無停電電源装置20Bと待機系無停電電源装置20Pとの組み合わせ試験(第2の組み合わせ試験)を実行する方法について説明する。 Next, we will explain how to replace the second regular uninterruptible power supply 20B and perform a combination test (second combination test) of the new regular uninterruptible power supply 20B and standby uninterruptible power supply 20P.

図7は、実施の形態1における第2の組み合わせ試験の手順を表わすフローチャートである。図8は、実施の形態1における第2の組み合わせ試験時のスイッチの状態を表わす図である。 Figure 7 is a flowchart showing the procedure for the second combination test in embodiment 1. Figure 8 is a diagram showing the switch states during the second combination test in embodiment 1.

ステップS201において、複数のスイッチのオン/オフを設定する。 In step S201, multiple switches are set to on/off.

待機系において、スイッチSP1、SP4、SP5、SP7、33、34をオンに設定し、スイッチSP6、31、32をオフに設定する。第2の常用系において、スイッチS9をオンに設定する。第1の常用系において、スイッチSA1、S3、S4、S5、S7、S8をオンに設定し、スイッチS2、S6をオフに設定する。 In the standby system, switches SP1, SP4, SP5, SP7, 33, and 34 are set on, and switches SP6, 31, and 32 are set off. In the second normal system, switch S9 is set on. In the first normal system, switches SA1, S3, S4, S5, S7, and S8 are set on, and switches S2 and S6 are set off.

ステップS202において、第2の常用系無停電電源装置20Bを交換する。すなわち、古い第2の常用系無停電電源装置20Bを無停電電源システムから取り外し、新しい第2の常用系無停電電源装置20Bを無停電電源システムに接続する。 In step S202, the second normal uninterruptible power supply 20B is replaced. That is, the old second normal uninterruptible power supply 20B is removed from the uninterruptible power supply system, and a new second normal uninterruptible power supply 20B is connected to the uninterruptible power supply system.

ステップS203において、第2の試験用端子台51の第1の端子51Xと開閉器ボックス60の第1の端子61とを接続し、第2の試験用端子台51の第2の端子51Yと開閉器ボックス60の第2の端子62とを接続し、第2の試験用端子台51の第3の端子51Zを交換後の新しい第2の常用系無停電電源装置20Bのバイパス入力端子T4と接続する。 In step S203, the first terminal 51X of the second test terminal block 51 is connected to the first terminal 61 of the switch box 60, the second terminal 51Y of the second test terminal block 51 is connected to the second terminal 62 of the switch box 60, and the third terminal 51Z of the second test terminal block 51 is connected to the bypass input terminal T4 of the new, replaced second normal uninterruptible power supply 20B.

ステップS204において、第2の常用系において、スイッチS2、S4、S5、S7、S8、S10をオンに設定し、スイッチSB1、S3、S6をオフに設定する。 In step S204, in the second normal system, switches S2, S4, S5, S7, S8, and S10 are set to ON, and switches SB1, S3, and S6 are set to OFF.

これによって、待機系無停電電源装置20Pによって生成されてノードNP1に出力された交流電力が、第2の試験用端子台51の第1の端子51Xと、開閉器ボックス60の第1の端子61、スイッチ65、ヒューズ70、および第2の端子62と、第2の試験用端子台51の第2の端子51Yと、待機系無停電電源装置20PのノードNP4と、第2の試験用端子台51の第3の端子51Zとを通じて、第2の常用系無停電電源装置20Bのバイパス入力端子T4に送られる。待機系無停電電源装置20PのノードNP1に大電流が流れる場合には、開閉器ボックス60のヒューズ70が溶断する。その結果、待機系無停電電源装置20Pから第2の常用系無停電電源装置20Bの交流電力の供給が停止するので、第2の常用系無停電電源装置20B、および待機系無停電電源装置20Pの一方、または両方が故障する、あるいは商用交流電源1からの商用交流電力で第2の常用系無停電電源装置20Bを動作させなければならないような事態が発生しない。その結果、負荷LB1およびLB2の給電が停止するなどの可能性を低減できる。 As a result, the AC power generated by the standby uninterruptible power supply 20P and output to node NP1 is sent to the bypass input terminal T4 of the second normal uninterruptible power supply 20B via the first terminal 51X of the second test terminal block 51, the first terminal 61, switch 65, fuse 70, and second terminal 62 of the switch box 60, the second terminal 51Y of the second test terminal block 51, node NP4 of the standby uninterruptible power supply 20P, and the third terminal 51Z of the second test terminal block 51. If a large current flows through node NP1 of the standby uninterruptible power supply 20P, the fuse 70 of the switch box 60 will blow. As a result, the supply of AC power from standby uninterruptible power supply 20P to second normal uninterruptible power supply 20B is stopped, preventing a situation in which one or both of second normal uninterruptible power supply 20B and standby uninterruptible power supply 20P fail, or in which second normal uninterruptible power supply 20B must be operated using commercial AC power from commercial AC power supply 1. This reduces the possibility of power supply to loads LB1 and LB2 being stopped.

ステップS205において、開閉器ボックス60のヒューズ70が溶断していない場合に、処理がステップS206に進む。 If the fuse 70 in the switch box 60 is not blown in step S205, processing proceeds to step S206.

ステップS206において、第2の常用系出力分岐盤40BのスイッチS9をオフに設定する。 In step S206, switch S9 on the second regular system output distribution board 40B is set to OFF.

ステップS207において、第2の試験用端子台51の第1の端子51Xと開閉器ボックス60の第1の端子61との接続を切断し、第2の試験用端子台51の第2の端子51Yと開閉器ボックス60の第2の端子62との接続を接続する。 In step S207, the connection between the first terminal 51X of the second test terminal block 51 and the first terminal 61 of the switch box 60 is disconnected, and the connection between the second terminal 51Y of the second test terminal block 51 and the second terminal 62 of the switch box 60 is connected.

以上のように、本実施の形態によれば、試験用端子台50,51、および開閉器ボックス60を設けることにより、更新または増設対象の常用系無停電電源装置と、既設の待機系無停電電源装置との組合せ試験時に、負荷への給電が停止される可能性を低減することができる。さらに、待機系無停電電源装置に外部の開閉器ボックスを接続する形態で組み合わせ試験が可能であるので、開閉器ボックスを複数のシステムにおける組み合わせ試験で流用することができる。その結果、コスト削減も可能となる。 As described above, according to this embodiment, by providing test terminal blocks 50, 51 and switch box 60, it is possible to reduce the possibility of power supply to the load being stopped during a combined test of a regular uninterruptible power supply to be updated or expanded with an existing standby uninterruptible power supply. Furthermore, because combined testing is possible by connecting an external switch box to the standby uninterruptible power supply, the switch box can be reused for combined testing of multiple systems. As a result, costs can also be reduced.

今回開示された実施の形態はすべての点で例示であって制限的なものではないと考えられるべきである。本発明は上記した説明ではなくて特許請求の範囲によって示され、特許請求の範囲と均等の意味および範囲内でのすべての変更が含まれることが意図される。 The embodiments disclosed herein should be considered in all respects to be illustrative and not restrictive. The present invention is defined by the claims rather than the above description, and it is intended to include all modifications within the meaning and scope of the claims.

1 商用交流電源、2A,2B,2P 蓄電池、3,3P コンバータ、4,4P インバータ、5,5P バイパス切替回路、6,6P バイパス回路、20A,20B,20P 無停電電源装置、21A 第1の常用系入出力盤、21B 第2の常用系入出力盤、21P 待機系入出力盤、31,32,33,34,65,S2,S3,S4,S5,S6,S7,S8,S9,S10,SA1,SB1,SP1,SP4,SP5,SP6,SP7,SP8 スイッチ、40A 第1の常用系出力分岐盤、40B 第2の常用系出力分岐盤、40P 待機系出力分岐盤、50 第1の試験用端子台、50X,51X,61 第1の端子、50Y,51Y,62 第2の端子、50Z,51Z 第3の端子、51 第2の試験用端子台、60 開閉器ボックス、70 ヒューズ、LA1,LA2,LB1,LB2 負荷、T0,TP0 バッテリ端子、T1,T2,T8,TP1,TP2,TP8 入力端子、T3,T6,T7,TP3,TP6,TP7,TP11,TP12 出力端子、T4 バイパス入力端子、T5,TP5 交流入力端子、T9,T12,T13 交流出力端子、T10 第1の交流入力端子、T11 第2の交流入力端子、TP9 第1の交流出力端子、TP10 第2の交流出力端子、11A 第1の常用系UPS、11B 第2の常用系UPS、11P 待機系UPS。 1 Commercial AC power supply, 2A, 2B, 2P Storage battery, 3, 3P Converter, 4, 4P Inverter, 5, 5P Bypass switching circuit, 6, 6P Bypass circuit, 20A, 20B, 20P Uninterruptible power supply, 21A First normal system input/output panel, 21B Second normal system input/output panel, 21P Standby system input/output panel, 31, 32, 33, 34, 65, S2, S3, S4, S5, S6, S7, S8, S9, S10, SA1, SB1, SP1, SP4, SP5, SP6, SP7, SP8 Switch, 40A First normal system output branch panel, 40B Second normal system output branch panel, 40P Standby system output branch panel, 50 First test terminal block, 50X, 51X, 61 First terminals, 50Y, 51Y, 62 Second terminals, 50Z, 51Z Third terminal, 51 Second test terminal block, 60 Switch box, 70 Fuses, LA1, LA2, LB1, LB2 Load, T0, TP0 Battery terminals, T1, T2, T8, TP1, TP2, TP8 Input terminals, T3, T6, T7, TP3, TP6, TP7, TP11, TP12 Output terminal, T4 Bypass input terminals, T5, TP5 AC input terminals, T9, T12, T13 AC output terminal, T10 First AC input terminal, T11 Second AC input terminal, TP9 First AC output terminal, TP10 Second AC output terminal, 11A First regular UPS, 11B Second regular UPS, 11P Standby UPS.

Claims (11)

バイパス入力端子と、交流出力端子とを含む第1の常用系無停電電源装置と、
生成した交流電力が出力される第1のノードと接続可能な第1の交流出力端子と、第1の試験用端子台とを含む待機系無停電電源装置と、
前記待機系無停電電源装置の前記第1の交流出力端子と接続可能な第1の交流入力端子と、前記第1の常用系無停電電源装置の前記交流出力端子と接続可能な第2の交流入力端子と、前記第1の交流入力端子と接続される第1端を有する第1のスイッチと、前記第2の交流入力端子と接続される第1端を有する第2のスイッチと、前記第1のスイッチの第2端および前記第2のスイッチの第2端が接続されるとともに負荷が接続可能な交流出力端子とを含む第1の出力分岐盤と、
第1の端子と、第2の端子と、前記第1の端子と前記第2の端子との間に直列に接続されたスイッチおよびヒューズとを含む開閉器ボックスとを備え、
前記第1の試験用端子台は、第1の端子、第2の端子、および第3の端子を含み、
前記第1の試験用端子台の前記第1の端子は、前記開閉器ボックスの前記第1の端子と接続可能に構成され、かつ前記第1のノードに接続され、
前記第1の試験用端子台の前記第2の端子は、前記開閉器ボックスの前記第2の端子と接続可能に構成され、かつ第2のノードに接続され、
前記第1の試験用端子台の前記第3の端子は、前記第2のノードに接続され、かつ前記第1の常用系無停電電源装置の前記バイパス入力端子に接続可能に構成される、無停電電源システム。
a first utility uninterruptible power supply including a bypass input terminal and an AC output terminal;
a standby uninterruptible power supply including a first AC output terminal connectable to a first node to which the generated AC power is output, and a first test terminal block;
a first output branch panel including: a first AC input terminal connectable to the first AC output terminal of the standby uninterruptible power supply; a second AC input terminal connectable to the AC output terminal of the first normal uninterruptible power supply; a first switch having a first end connected to the first AC input terminal; a second switch having a first end connected to the second AC input terminal; and an AC output terminal to which a second end of the first switch and a second end of the second switch are connected and to which a load can be connected;
a switch box including a first terminal, a second terminal, and a switch and a fuse connected in series between the first terminal and the second terminal;
the first test terminal block includes a first terminal, a second terminal, and a third terminal;
the first terminal of the first test terminal block is configured to be connectable to the first terminal of the switch box and is connected to the first node;
the second terminal of the first test terminal block is configured to be connectable to the second terminal of the switch box and is connected to a second node;
An uninterruptible power supply system, wherein the third terminal of the first test terminal block is connected to the second node and is configured to be connectable to the bypass input terminal of the first normal uninterruptible power supply.
前記待機系無停電電源装置は、
前記第1のノードと、前記第2のノードとの間に配置された第1のスイッチを含む、請求項1記載の無停電電源システム。
The standby uninterruptible power supply device is
2. The uninterruptible power supply system according to claim 1, further comprising a first switch disposed between said first node and said second node.
前記第1の常用系無停電電源装置は、さらに、
交流電源に接続可能な交流入力端子と、
前記交流入力端子および前記交流出力端子との間に直列に配置されるコンバータおよびインバータと、
第3のノードおよび前記交流出力端子との間に配置されるバイパス回路と、
前記インバータの出力と前記バイパス回路の出力とを切換えるためのバイパス切換回路と、
前記コンバータおよび前記インバータの間の直流回路に接続される蓄電池と、
前記バイパス入力端子と前記第3のノードとの間に配置される第1のスイッチと、
前記交流入力端子と前記第3のノードとの間に配置される第2のスイッチと、を含み、
前記第1のスイッチおよび前記第2のスイッチは、一方がオンのときに、他方がオフとなる、請求項1記載の無停電電源システム。
The first normal uninterruptible power supply further comprises:
an AC input terminal connectable to an AC power source;
a converter and an inverter arranged in series between the AC input terminal and the AC output terminal;
a bypass circuit disposed between a third node and the AC output terminal;
a bypass switching circuit for switching between the output of the inverter and the output of the bypass circuit;
a storage battery connected to a DC circuit between the converter and the inverter;
a first switch disposed between the bypass input terminal and the third node;
a second switch disposed between the AC input terminal and the third node;
2. The uninterruptible power supply system according to claim 1, wherein when one of the first switch and the second switch is on, the other is off.
前記待機系無停電電源装置は、さらに、前記第1のノードと接続可能な第2の交流出力端子と、第2の試験用端子台とを含み、
前記無停電電源システムは、
バイパス入力端子と、交流出力端子とを含む第2の常用系無停電電源装置と、
前記待機系無停電電源装置の前記第2の交流出力端子と接続可能な第1の交流入力端子と、前記第2の常用系無停電電源装置の前記交流出力端子と接続可能な第2の交流入力端子と、前記第1の交流入力端子と接続される第1端を有する第1のスイッチと、前記第2の交流入力端子と接続される第1端を有する第2のスイッチと、前記第1のスイッチの第2端および前記第2のスイッチの第2端が接続されるとともに負荷が接続可能な交流出力端子とを含む第2の出力分岐盤と、をさらに備え、
前記第2の試験用端子台は、第1の端子、第2の端子、および第3の端子を含み、
前記第2の試験用端子台の前記第1の端子は、前記開閉器ボックスの前記第1の端子と接続可能に構成され、かつ前記第1のノードに接続され、
前記第2の試験用端子台の前記第2の端子は、前記開閉器ボックスの前記第2の端子と接続可能に構成され、かつ第4のノードに接続され、
前記第2の試験用端子台の前記第3の端子は、前記第4のノードに接続され、かつ前記第2の常用系無停電電源装置の前記バイパス入力端子に接続可能に構成される、請求項1記載の無停電電源システム。
the standby uninterruptible power supply further includes a second AC output terminal connectable to the first node and a second test terminal block;
The uninterruptible power supply system comprises:
a second normal uninterruptible power supply including a bypass input terminal and an AC output terminal;
a second output branch panel including a first AC input terminal connectable to the second AC output terminal of the standby uninterruptible power supply, a second AC input terminal connectable to the AC output terminal of the second normal uninterruptible power supply, a first switch having a first end connected to the first AC input terminal, a second switch having a first end connected to the second AC input terminal, and an AC output terminal to which a second end of the first switch and a second end of the second switch are connected and to which a load can be connected,
the second test terminal block includes a first terminal, a second terminal, and a third terminal;
the first terminal of the second test terminal block is configured to be connectable to the first terminal of the switch box and is connected to the first node;
the second terminal of the second test terminal block is configured to be connectable to the second terminal of the switch box and is connected to a fourth node;
2. The uninterruptible power supply system according to claim 1, wherein the third terminal of the second test terminal block is connected to the fourth node and is configured to be connectable to the bypass input terminal of the second normal uninterruptible power supply.
前記待機系無停電電源装置は、
前記第1のノードと、前記第4のノードとの間に配置された第2のスイッチを含む、請求項4記載の無停電電源システム。
The standby uninterruptible power supply device is
5. The uninterruptible power supply system according to claim 4, further comprising a second switch disposed between said first node and said fourth node.
前記第2の常用系無停電電源装置は、さらに、
交流電源に接続可能な交流入力端子と、
前記交流入力端子および前記交流出力端子との間に直列に配置されるコンバータおよびインバータと、
第3のノードおよび前記交流出力端子との間に配置されるバイパス回路と、
前記インバータの出力と前記バイパス回路の出力とを切換えるためのバイパス切換回路と、
前記コンバータおよび前記インバータの間の直流回路に接続される蓄電池と、
前記バイパス入力端子と前記第3のノードとの間に配置される第1のスイッチと、
前記交流入力端子と前記第3のノードとの間に配置される第2のスイッチと、を含み、
前記第1のスイッチおよび前記第2のスイッチは、一方がオンのときに、他方がオフとなる、請求項4記載の無停電電源システム。
The second normal uninterruptible power supply further comprises:
an AC input terminal connectable to an AC power source;
a converter and an inverter arranged in series between the AC input terminal and the AC output terminal;
a bypass circuit disposed between a third node and the AC output terminal;
a bypass switching circuit for switching between the output of the inverter and the output of the bypass circuit;
a storage battery connected to a DC circuit between the converter and the inverter;
a first switch disposed between the bypass input terminal and the third node;
a second switch disposed between the AC input terminal and the third node;
5. The uninterruptible power supply system according to claim 4, wherein when one of the first switch and the second switch is on, the other is off.
前記待機系無停電電源装置は、
交流電源に接続可能な交流入力端子と、
前記交流入力端子および前記第1のノードとの間に直列に配置されるコンバータおよびインバータと、
前記交流入力端子および前記第1のノードの間に、前記コンバータおよび前記インバータが配置される経路と並列して配置されるバイパス回路と、
前記インバータの出力と前記バイパス回路の出力とを切換えるためのバイパス切換回路と、
前記コンバータおよび前記インバータの間の直流回路に接続される蓄電池と、を含む、請求項1記載の無停電電源システム。
The standby uninterruptible power supply device is
an AC input terminal connectable to an AC power source;
a converter and an inverter arranged in series between the AC input terminal and the first node;
a bypass circuit arranged between the AC input terminal and the first node in parallel with a path in which the converter and the inverter are arranged;
a bypass switching circuit for switching between the output of the inverter and the output of the bypass circuit;
2. The uninterruptible power supply system according to claim 1, further comprising: a storage battery connected to a DC circuit between said converter and said inverter.
請求項1記載の無停電電源システムの試験方法であって、
前記第1の出力分岐盤の前記第1のスイッチをオンにするステップと、
前記第1の常用系無停電電源装置を交換するステップと、
前記第1の試験用端子台の前記第1の端子と前記開閉器ボックスの前記第1の端子とを接続し、前記第1の試験用端子台の前記第2の端子と前記開閉器ボックスの前記第2の端子とを接続し、前記第1の試験用端子台の前記第3の端子と交換後の前記第1の常用系無停電電源装置の前記バイパス入力端子とを接続するステップと、
前記第1の出力分岐盤の前記第2のスイッチをオンにするステップと、を備えた無停電電源システムの試験方法。
2. A method for testing an uninterruptible power supply system according to claim 1, comprising:
turning on the first switch of the first output branch panel;
replacing the first utility uninterruptible power supply;
connecting the first terminal of the first test terminal block to the first terminal of the switch box, connecting the second terminal of the first test terminal block to the second terminal of the switch box, and connecting the third terminal of the first test terminal block to the bypass input terminal of the replaced first normal uninterruptible power supply;
and turning on the second switch of the first output branch panel.
前記接続するステップの結果、前記開閉器ボックスのヒューズが溶断していない場合に、前記第1の出力分岐盤の前記第1のスイッチをオフにするステップと、
前記第1の試験用端子台の前記第1の端子と前記開閉器ボックスの前記第1の端子との接続を切断し、前記第1の試験用端子台の前記第2の端子と前記開閉器ボックスの前記第2の端子との接続を切断するステップとを、さらに備えた請求項8記載の無停電電源システムの試験方法。
turning off the first switch of the first output branch panel when the fuse of the switch box is not blown as a result of the connecting step;
9. The method for testing an uninterruptible power supply system according to claim 8, further comprising the steps of: disconnecting the first terminal of the first test terminal block from the first terminal of the switch box; and disconnecting the second terminal of the first test terminal block from the second terminal of the switch box.
請求項4記載の無停電電源システムの試験方法であって、
前記第2の出力分岐盤の前記第1のスイッチをオンにするステップと、
前記第2の常用系無停電電源装置を交換するステップと、
前記第2の試験用端子台の前記第1の端子と前記開閉器ボックスの前記第1の端子とを接続し、前記第2の試験用端子台の前記第2の端子と前記開閉器ボックスの前記第2の端子とを接続し、前記第2の試験用端子台の前記第3の端子と交換後の前記第2の常用系無停電電源装置の前記バイパス入力端子とを接続するステップと、
前記第2の出力分岐盤の前記第2のスイッチをオンにするステップと、を、備えた無停電電源システムの試験方法。
5. A method for testing an uninterruptible power supply system according to claim 4, comprising:
turning on the first switch of the second output branch panel;
replacing the second normal uninterruptible power supply;
connecting the first terminal of the second test terminal block to the first terminal of the switch box, connecting the second terminal of the second test terminal block to the second terminal of the switch box, and connecting the third terminal of the second test terminal block to the bypass input terminal of the replaced second normal uninterruptible power supply;
and turning on the second switch of the second output branch panel.
前記接続するステップの結果、前記開閉器ボックスのヒューズが溶断していない場合に、前記第2の出力分岐盤の前記第1のスイッチをオフにするステップと、
前記第2の試験用端子台の前記第1の端子と前記開閉器ボックスの前記第1の端子との接続を切断し、前記第2の試験用端子台の前記第2の端子と前記開閉器ボックスの前記第2の端子との接続を切断するステップとを、さらに備えた請求項10記載の無停電電源システムの試験方法。
turning off the first switch of the second output branch panel when the fuse of the switch box is not blown as a result of the connecting step;
11. The method for testing an uninterruptible power supply system according to claim 10, further comprising the steps of: disconnecting the connection between the first terminal of the second test terminal block and the first terminal of the switch box; and disconnecting the connection between the second terminal of the second test terminal block and the second terminal of the switch box.
JP2022199368A 2022-12-14 2022-12-14 Uninterruptible power supply systems and test methods for uninterruptible power supply systems Active JP7760486B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022199368A JP7760486B2 (en) 2022-12-14 2022-12-14 Uninterruptible power supply systems and test methods for uninterruptible power supply systems

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022199368A JP7760486B2 (en) 2022-12-14 2022-12-14 Uninterruptible power supply systems and test methods for uninterruptible power supply systems

Publications (2)

Publication Number Publication Date
JP2024085048A JP2024085048A (en) 2024-06-26
JP7760486B2 true JP7760486B2 (en) 2025-10-27

Family

ID=91616305

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022199368A Active JP7760486B2 (en) 2022-12-14 2022-12-14 Uninterruptible power supply systems and test methods for uninterruptible power supply systems

Country Status (1)

Country Link
JP (1) JP7760486B2 (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006271074A (en) 2005-03-23 2006-10-05 Toshiba Mitsubishi-Electric Industrial System Corp Uninterruptible power supply system
JP2011239500A (en) 2010-04-13 2011-11-24 Easymore Industrial Co Ltd High-reliability dual power source automatic changeover circuit and isolation device thereof
JP2019187219A (en) 2018-04-17 2019-10-24 株式会社東芝 Panel exchange type power supply system, panel update method for power supply system, and short circuit board

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5423237U (en) * 1977-07-19 1979-02-15
JP7399842B2 (en) * 2020-12-08 2023-12-18 東芝三菱電機産業システム株式会社 uninterruptible power system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006271074A (en) 2005-03-23 2006-10-05 Toshiba Mitsubishi-Electric Industrial System Corp Uninterruptible power supply system
JP2011239500A (en) 2010-04-13 2011-11-24 Easymore Industrial Co Ltd High-reliability dual power source automatic changeover circuit and isolation device thereof
JP2019187219A (en) 2018-04-17 2019-10-24 株式会社東芝 Panel exchange type power supply system, panel update method for power supply system, and short circuit board

Also Published As

Publication number Publication date
JP2024085048A (en) 2024-06-26

Similar Documents

Publication Publication Date Title
US6489748B1 (en) Split backplane power system
US20030184160A1 (en) Parallel operation method for an uninterruptible power supply apparatus
JP6418109B2 (en) Uninterruptible power supply system
US11095123B2 (en) Redundant DC voltage network
JPWO2019003332A1 (en) Uninterruptible power supply system
US20110248564A1 (en) Electric power converting system
CN102782981B (en) Power supplies for electronic devices
JP2011072068A (en) Uninterruptible power supply system
JP7760486B2 (en) Uninterruptible power supply systems and test methods for uninterruptible power supply systems
CN112703656B (en) Power supply device and power supply system
JP2004236427A (en) Uninterruptible power system
US20240421595A1 (en) Power supply redundancy circuit
JP7399842B2 (en) uninterruptible power system
JP2006288142A (en) Uninterruptible power supply equipment and its testing method
JP7080847B2 (en) Uninterruptible power supply system
JP2009136098A (en) High-pressure direct inverter device
CN216056470U (en) Bypass ATS power supply system
JP2004056918A (en) Parallel redundant operation method of uninterruptible power supply
JP3671391B2 (en) Uninterruptible power supply system
CN112703657B (en) Power supply device and power supply system
US11476702B2 (en) Method for controlling power supply system
CN107040039A (en) A kind of distribution system and its control method
KR102199548B1 (en) Structure of generator and uninterruptible power system and control method thereof
US20210288519A1 (en) Power supply system
JP7326614B1 (en) Uninterruptible power system and how to update an uninterruptible power system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20241204

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250912

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20251014

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20251015

R150 Certificate of patent or registration of utility model

Ref document number: 7760486

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150