Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7767231B2 - Bobbin transport system and bobbin transport method - Google Patents
[go: Go Back, main page]

JP7767231B2 - Bobbin transport system and bobbin transport method - Google Patents

Bobbin transport system and bobbin transport method

Info

Publication number
JP7767231B2
JP7767231B2 JP2022100738A JP2022100738A JP7767231B2 JP 7767231 B2 JP7767231 B2 JP 7767231B2 JP 2022100738 A JP2022100738 A JP 2022100738A JP 2022100738 A JP2022100738 A JP 2022100738A JP 7767231 B2 JP7767231 B2 JP 7767231B2
Authority
JP
Japan
Prior art keywords
stocker
bobbin
pegs
creel
carriage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022100738A
Other languages
Japanese (ja)
Other versions
JP2024001829A (en
JP2024001829A5 (en
Inventor
康夫 奥山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TMT Machinery Inc
Original Assignee
TMT Machinery Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TMT Machinery Inc filed Critical TMT Machinery Inc
Priority to JP2022100738A priority Critical patent/JP7767231B2/en
Priority to CN202310555076.XA priority patent/CN117262902B/en
Priority to EP23179484.3A priority patent/EP4296208B1/en
Priority to TW112122561A priority patent/TWI920439B/en
Publication of JP2024001829A publication Critical patent/JP2024001829A/en
Publication of JP2024001829A5 publication Critical patent/JP2024001829A5/ja
Application granted granted Critical
Publication of JP7767231B2 publication Critical patent/JP7767231B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H67/00Replacing or removing cores, receptacles, or completed packages at paying-out, winding, or depositing stations
    • B65H67/06Supplying cores, receptacles, or packages to, or transporting from, winding or depositing stations
    • B65H67/068Supplying or transporting empty cores
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H67/00Replacing or removing cores, receptacles, or completed packages at paying-out, winding, or depositing stations
    • B65H67/06Supplying cores, receptacles, or packages to, or transporting from, winding or depositing stations
    • B65H67/064Supplying or transporting cross-wound packages, also combined with transporting the empty core
    • B65H67/065Manipulators with gripping or holding means for transferring the packages from one station to another, e.g. from a conveyor to a creel trolley
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H67/00Replacing or removing cores, receptacles, or completed packages at paying-out, winding, or depositing stations
    • B65H67/04Arrangements for removing completed take-up packages and or replacing by cores, formers, or empty receptacles at winding or depositing stations; Transferring material between adjacent full and empty take-up elements
    • B65H67/0405Arrangements for removing completed take-up packages or for loading an empty core
    • B65H67/0411Arrangements for removing completed take-up packages or for loading an empty core for removing completed take-up packages
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65HHANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
    • B65H2701/00Handled material; Storage means
    • B65H2701/30Handled filamentary material
    • B65H2701/31Textiles threads or artificial strands of filaments

Landscapes

  • Replacing, Conveying, And Pick-Finding For Filamentary Materials (AREA)

Description

本発明は、仮撚加工機等の糸加工機におけるボビンの搬送に関する。 The present invention relates to bobbin transport in yarn processing machines such as false twisting machines.

特許文献1は、巻取機等に適用されるパッケージ移送方法を開示する。この移送方法では、巻取機の運転に伴ってクリール上のパッケージが空になり満パッケージと取り替える必要が生じたとき、満パッケージを水平方向に保持しているクリールローダーを介してパッケージの交換が行われる。 Patent Document 1 discloses a package transfer method that is applied to winding machines and the like. With this transfer method, when a package on a creel becomes empty during operation of the winding machine and needs to be replaced with a full package, the package is replaced via a creel loader that holds the full package horizontally.

パッケージが空になった状態のものは、空ボビンと言い換えることができる。満パッケージは、満ボビンと言い換えることができる。 An empty package can be referred to as an empty bobbin. A full package can be referred to as a full bobbin.

特許文献1の構成では、満パッケージは、クリールに懸架される前に、いったんパッケージサポーターに仮置きされる。パッケージを掛けるためのペグは、パッケージサポーターの両側の面に設けられている。最初に、パッケージサポーターの一側の面に満パッケージが懸架され、他側の面のペグはパッケージなしの状態としておく。このとき、パッケージサポーターは、パッケージなしの状態のペグがある面が、クリールローダーに対峙可能な状態である。 In the configuration of Patent Document 1, a full package is temporarily placed on a package supporter before being hung on a creel. Pegs for hanging the package are provided on both sides of the package supporter. Initially, a full package is hung on one side of the package supporter, and the pegs on the other side are left empty. At this time, the side of the package supporter with the empty pegs is in a position that faces the creel loader.

クリールローダーは、巻取機のクリールから空パッケージを引き取り、パッケージサポーターへ移送して、パッケージなしの状態のペグへ掛ける。続いて、パッケージサポーターが反転し、満パッケージが掛けられた面をクリールローダーと対峙させる。 The creel loader picks up empty packages from the winder's creel, transfers them to the package supporter, and hangs them on pegs that do not have packages. The package supporter then flips over, so that the side with the full package facing the creel loader.

クリールローダーは、パッケージサポーターの満パッケージを、巻取機のクリールの、先ほど空パッケージを引き取った箇所に移載する。次いで、クリールローダーは、クリールの隣接する空パッケージを引き取って、パッケージサポーターまで移送する。 The creel loader transfers the full package from the package supporter to the location on the winder's creel where the empty package was previously picked up. The creel loader then picks up the adjacent empty package from the creel and transports it to the package supporter.

この間に、パッケージサポーターの空パッケージは抜き取られ、代わりに満パッケージが懸架される。 During this time, the empty package is removed from the package supporter and a full package is suspended in its place.

特許文献2は、織機への緯糸供給システム等に用いられるパッケージ搬送方法を開示する。特許文献2では、複数のパッケージを把持可能なパッケージ搬送車が、緯糸供給システムにパッケージを供給し、空チューブを回収することができる。 Patent Document 2 discloses a package transport method used in a weft yarn supply system for a loom. In Patent Document 2, a package transport vehicle capable of holding multiple packages supplies the packages to the weft yarn supply system and collects empty tubes.

空チューブは、空ボビンと言い換えることができる。パッケージは、満ボビンと言い換えることができる。 An empty tube can be synonymous with an empty bobbin. A package can be synonymous with a full bobbin.

パッケージ搬送車は複数のチャックを備える。パッケージ搬送車は、受取ステーションにおいて、複数のパッケージを受け取る。この受取ステーションにおいて、パッケージ搬送車の複数のチャックにパッケージが把持されるが、少なくとも1つのチャックはパッケージなしのままである。パッケージ搬送車は、受取ステーションから緯糸ステーションへ走行する。緯糸ステーションにおいて、パッケージ搬送車は、パッケージなしのチャックに空チューブを把持するとともに、その代わりにパッケージを供給する。 The package transport vehicle has multiple chucks. The package transport vehicle receives multiple packages at a receiving station. At this receiving station, packages are gripped in the multiple chucks of the package transport vehicle, but at least one chuck remains empty. The package transport vehicle travels from the receiving station to the weft yarn station. At the weft yarn station, the package transport vehicle grips an empty tube in the chuck without a package and supplies a package in its place.

特開平4-280777号公報Japanese Unexamined Patent Publication No. 4-280777 特開平5-319696号公報Japanese Patent Application Publication No. 5-319696

仮撚加工機等の糸加工機に適用されるボビン搬送システムにおいては、空ボビン及び満ボビンの搬送効率をより高めることが求められている。 In bobbin transport systems used in yarn processing machines such as false twisting machines, there is a demand for improved transport efficiency for empty and full bobbins.

特許文献1においては、パッケージサポーターの空パッケージが抜き取られた後に、空パッケージがどのように取り扱われるのか不明である。 In Patent Document 1, it is unclear how the empty package is handled after it is removed from the package supporter.

特許文献2においては、パッケージ搬送車が受取ステーションにおいてパッケージを受け取るときに、必ず1つのチャックはパッケージなしの状態を維持しなければならないため、搬送効率を高めることが困難である。 In Patent Document 2, when a package transport vehicle receives a package at a receiving station, one chuck must always remain empty of a package, making it difficult to improve transport efficiency.

本発明は以上の事情に鑑みてされたものであり、その目的は、空ボビン及び満ボビンを含めた全体としての搬送効率を向上させることにある。 The present invention was made in consideration of the above circumstances, and its purpose is to improve the overall transport efficiency of both empty and full bobbins.

課題を解決するための手段及び効果Means to solve the problem and effects

本発明の解決しようとする課題は以上の如くであり、次にこの課題を解決するための手段とその効果を説明する。 The problem that this invention aims to solve is as described above. Next, we will explain the means for solving this problem and its effects.

本発明の第1の観点によれば、以下の構成のボビン搬送システムが提供される。即ち、ボビン搬送システムは、ストッカと、ボビン移載ロボットと、走行クリール台車と、制御装置と、を備える。前記ストッカは、複数の列のストッカペグを備え、各ストッカペグに対して満ボビン及び空ボビンを掛けて保管可能である。前記ボビン移載ロボットは、前記ストッカに保管されている満ボビンを取り出して糸加工機のクリールに装着し、前記クリールから空ボビンを取り外して前記ストッカに保管する。前記走行クリール台車は、複数の列の台車ペグを備え、各台車ペグに対して満ボビン又は空ボビンを掛けて搬送する。前記制御装置は、前記ストッカ及び前記走行クリール台車を制御する。前記ストッカは、前記走行クリール台車の前記台車ペグに掛けられた満ボビンを前記ストッカペグに移動させること、及び、前記ストッカペグに掛けられた空ボビンを前記台車ペグに移動させることが可能に構成される。1つの前記ストッカが備える前記ストッカペグの列数が、1つの前記走行クリール台車が備える前記台車ペグの列数に1を加えた数に等しい。前記制御装置は、前記ストッカペグのうち1列がボビンなし状態であり、残りの列の全てに空ボビンが掛けられている状態で、第1工程と第2工程とを交互に行うことで、前記ストッカの空ボビンを前記走行クリール台車の満ボビンと交換する交換作業を前記ストッカ及び前記走行クリール台車に協同で行わせるように前記ストッカ及び前記走行クリール台車を制御する。前記第1工程では、前記走行クリール台車の1列の台車ペグに掛けられた満ボビンを、ボビンなし状態となっている1列の前記ストッカペグに移動させて、1列の前記台車ペグをボビンなし状態とする。前記第2工程では、前記ストッカペグに掛けられている1列の空ボビンを、前記第1工程で満ボビンが取り出されてボビンなし状態となっている1列の前記台車ペグに移動させて、1列の前記ストッカペグをボビンなし状態とする。前記制御装置は、前記走行クリール台車が、満ボビンを前記ストッカに搬送して前記ストッカの空ボビンと交換した後、前記ストッカとは異なる場所に前記空ボビンを搬送するように、前記走行クリール台車を制御する。 According to a first aspect of the present invention, there is provided a bobbin transport system having the following configuration. That is, the bobbin transport system comprises a stocker, a bobbin transfer robot, a traveling creel cart, and a control device. The stocker has multiple rows of stocker pegs and is capable of storing full and empty bobbins by hanging them on each stocker peg. The bobbin transfer robot removes full bobbins stored in the stocker and attaches them to the creel of a yarn processing machine, and removes empty bobbins from the creel and stores them in the stocker. The traveling creel cart has multiple rows of cart pegs and transports full or empty bobbins by hanging them on each cart peg. The control device controls the stocker and the traveling creel cart. The stocker is configured to be able to move full bobbins hung on the cart pegs of the traveling creel cart to the stocker pegs, and to move empty bobbins hung on the stocker pegs to the cart pegs. The number of rows of stocker pegs on one stocker is equal to the number of rows of carriage pegs on one traveling creel carriage plus 1. The control device controls the stocker and the traveling creel carriage to cooperatively perform an exchange operation to exchange empty bobbins in the stocker with full bobbins on the traveling creel carriage by alternately performing a first step and a second step in a state in which one row of stocker pegs is in an empty state and empty bobbins are hung on all of the remaining rows. In the first step, full bobbins hung on one row of carriage pegs on the traveling creel carriage are moved to one row of stocker pegs in an empty state, thereby leaving one row of carriage pegs in an empty state. In the second step, the row of empty bobbins hung on the stocker pegs is moved to the row of cart pegs from which the full bobbins were removed in the first step and which are now empty of bobbins, leaving the row of stocker pegs empty of bobbins. The control device controls the traveling creel cart so that the traveling creel cart transports the full bobbins to the stocker, exchanges them for the empty bobbins in the stocker, and then transports the empty bobbins to a location different from the stocker.

これにより、走行クリール台車の全ての列の台車ペグに掛けられた満ボビンを、ストッカに保管することができる。また、ストッカの空ボビンを、満ボビンを搬送した走行クリール台車の全ての列の台車ペグに掛けて、別の場所へ搬送することができる。走行クリール台車の全ての列の台車ペグに満ボビン又は空ボビンを掛けた状態で搬送を行うことができるので、走行クリール台車の搬送能力全体を有効に活用することができる。ストッカにおいて1列のストッカペグがボビンなし状態である状況から交換作業が開始されるので、ストッカと走行クリール台車との間のボビン交換作業が円滑に行われる。 This allows full bobbins hung on the carriage pegs of all rows of the traveling creel cart to be stored in the stocker. Also, empty bobbins in the stocker can be hung on the carriage pegs of all rows of the traveling creel cart that transported the full bobbins and transported to another location. Because transportation can be carried out with full or empty bobbins hung on the carriage pegs of all rows of the traveling creel cart, the entire transport capacity of the traveling creel cart can be effectively utilized. Since the replacement work begins when one row of stocker pegs in the stocker is empty of bobbins, bobbin replacement work between the stocker and the traveling creel cart is carried out smoothly.

前記のボビン搬送システムにおいては、以下の構成とすることが好ましい。即ち、1つの前記ストッカが備える前記ストッカペグの段数が、1つの前記走行クリール台車が備える前記台車ペグの段数に等しい。前記制御装置は、前記交換作業で、前記ストッカの全ての空ボビンを前記走行クリール台車の全ての満ボビンと交換するように、前記ストッカ及び前記走行クリール台車を制御する。 The bobbin transport system preferably has the following configuration: the number of stocker pegs in one stocker is equal to the number of cart pegs in one traveling creel cart. The control device controls the stocker and the traveling creel cart so that, during the replacement operation, all empty bobbins in the stocker are replaced with all full bobbins in the traveling creel cart.

これにより、搬送効率を一層高めることができる。 This will further improve transport efficiency.

前記のボビン搬送システムにおいては、以下の構成とすることが好ましい。即ち、前記走行クリール台車は、糸を空ボビンに巻いて満ボビンを形成する紡糸巻取機の設置位置から、前記ストッカの設置位置へ満ボビンを搬送する。前記走行クリール台車は、前記交換作業により引き取った前記空ボビンを前記ストッカの設置位置から前記紡糸巻取機の設置位置へ戻すために搬送する。 The bobbin transport system preferably has the following configuration: The traveling creel cart transports full bobbins from the installation position of the take-up winder, which winds yarn onto empty bobbins to form full bobbins, to the installation position of the stocker. The traveling creel cart transports the empty bobbins picked up during the replacement operation from the installation position of the stocker to the installation position of the take-up winder.

これにより、空ボビンの自動的な再利用システムを実現することができる。 This makes it possible to realize an automatic recycling system for empty bobbins.

前記のボビン搬送システムにおいては、以下の構成とすることが好ましい。即ち、前記ストッカペグは、ループ状の経路に沿って循環移動可能である。前記台車ペグに対して満ボビン又は空ボビンを受け渡す前記ストッカペグの列が、循環移動によって変化する。 The bobbin transport system preferably has the following configuration: The stocker pegs are capable of circulating along a looped path. The row of stocker pegs that delivers full or empty bobbins to the carriage pegs changes as the stocker pegs circulate.

これにより、ボビンを受け渡すストッカペグの列の切替えを短時間で行うことができる。 This allows the row of stocker pegs used to transfer bobbins to be switched over quickly.

前記のボビン搬送システムにおいては、前記交換作業が行われている間、前記ボビン移載ロボットは、前記ストッカから満ボビンを取り出す作業を行わずに待機することが好ましい。 In the bobbin transport system, it is preferable that the bobbin transfer robot waits without removing a full bobbin from the stocker while the replacement operation is being performed.

これにより、走行クリール台車とストッカとの間の交換作業が中断させられることがなくなり、走行クリール台車の停止時間を短縮することができる。 This means that the exchange work between the traveling creel cart and the stocker will not be interrupted, and the downtime of the traveling creel cart can be reduced.

本発明の第2の観点によれば、以下のボビン搬送方法が提供される。即ち、このボビン搬送方法は、ストッカと、ボビン移載ロボットと、走行クリール台車と、を備えるシステムに適用される。前記ストッカは、複数の列のストッカペグを備え、各ストッカペグに対して満ボビン及び空ボビンを掛けて保管可能である。前記ボビン移載ロボットは、前記ストッカに保管されている満ボビンを取り出して糸加工機のクリールに装着し、前記クリールから空ボビンを取り外して前記ストッカに保管する。前記走行クリール台車は、複数の列の台車ペグを備え、各台車ペグに対して満ボビン又は空ボビンを掛けて搬送する。前記ストッカは、前記走行クリール台車の前記台車ペグに掛けられた満ボビンを前記ストッカペグに移動させること、及び、前記ストッカペグに掛けられた空ボビンを前記台車ペグに移動させることが可能に構成されている。1つの前記ストッカが備える前記ストッカペグの列数が、1つの前記走行クリール台車が備える前記台車ペグの列数に1を加えた数に等しい。前記ボビン搬送方法においては、前記ストッカペグのうち1列がボビンなし状態であり、残りの列の全てに空ボビンが掛けられている状態で、第1工程と、第2工程と、を交互に行うことで、前記ストッカの空ボビンを前記走行クリール台車の満ボビンと交換する交換作業を行う。前記第1工程では、前記走行クリール台車の1列の台車ペグに掛けられた満ボビンを、ボビンなし状態となっている1列の前記ストッカペグに移動させて、1列の前記台車ペグをボビンなし状態とする。前記第2工程では、前記ストッカペグに掛けられている1列の空ボビンを、前記第1工程で満ボビンが取り出されてボビンなし状態となっている1列の前記台車ペグに移動させて、1列の前記ストッカペグをボビンなし状態とする。前記走行クリール台車は、満ボビンを前記ストッカに搬送して前記ストッカの空ボビンと交換した後、前記ストッカとは異なる場所に前記空ボビンを搬送する。 According to a second aspect of the present invention, the following bobbin transport method is provided. That is, this bobbin transport method is applied to a system including a stocker, a bobbin transfer robot, and a traveling creel cart. The stocker has multiple rows of stocker pegs, and is capable of storing full and empty bobbins by hanging them on each stocker peg. The bobbin transfer robot removes full bobbins stored in the stocker and attaches them to the creel of a yarn processing machine, and removes empty bobbins from the creel and stores them in the stocker. The traveling creel cart has multiple rows of cart pegs, and transports full or empty bobbins by hanging them on each cart peg. The stocker is configured to be able to move full bobbins hung on the cart pegs of the traveling creel cart to the stocker pegs, and to move empty bobbins hung on the stocker pegs to the cart pegs. The number of rows of stocker pegs on one stocker is equal to the number of rows of carriage pegs on one traveling creel carriage plus one. In the bobbin transport method, when one row of stocker pegs is empty and empty bobbins are hung on all of the remaining rows, a first step and a second step are alternately performed to exchange the empty bobbins on the stocker for full bobbins on the traveling creel carriage. In the first step, full bobbins hung on one row of carriage pegs on the traveling creel carriage are moved to one row of stocker pegs that is empty of bobbins, thereby leaving one row of carriage pegs empty of bobbins. In the second step, one row of empty bobbins hung on the stocker pegs are moved to one row of carriage pegs from which full bobbins were removed in the first step and are now empty of bobbins, thereby leaving one row of stocker pegs empty of bobbins. The traveling creel cart transports the full bobbin to the stocker, exchanges it for an empty bobbin in the stocker, and then transports the empty bobbin to a location different from the stocker.

本発明の一実施形態に係るボビン搬送システムの全体的な構成を示す斜視図。1 is a perspective view showing the overall configuration of a bobbin transport system according to an embodiment of the present invention; ストッカの周辺の構成を示す拡大斜視図。FIG. 2 is an enlarged perspective view showing the configuration of the vicinity of the stocker. 走行クリール台車の1列目の台車ペグから、満ボビンをストッカペグに移動させる作業を示す模式平面図。FIG. 10 is a schematic plan view showing the operation of moving a full bobbin from the first row of carriage pegs of the traveling creel carriage to the stocker pegs. ストッカのストッカペグから、空ボビンを1列目の台車ペグに移動させる作業を示す模式平面図。FIG. 10 is a schematic plan view showing an operation of moving an empty bobbin from a stocker peg of the stocker to a carriage peg in the first row. 走行クリール台車の2列目の台車ペグから、満ボビンをストッカペグに移動させる作業を示す模式平面図。FIG. 10 is a schematic plan view showing the operation of moving a full bobbin from the second row of carriage pegs of the traveling creel carriage to the stocker pegs. ストッカのストッカペグから、空ボビンを2列目の台車ペグに移動させる作業を示す模式平面図。FIG. 10 is a schematic plan view showing an operation of moving an empty bobbin from a stocker peg of the stocker to a carriage peg in the second row. 走行クリール台車の3列目の台車ペグから、満ボビンをストッカペグに移動させる作業を示す模式平面図。FIG. 10 is a schematic plan view showing the operation of moving a full bobbin from the third row of carriage pegs of the traveling creel carriage to the stocker pegs. ストッカのストッカペグから、空ボビンを3列目の台車ペグに移動させる作業を示す模式平面図。FIG. 10 is a schematic plan view showing an operation of moving an empty bobbin from a stocker peg of the stocker to a carriage peg in the third row. ストッカのストッカペグからクリールロボットへ満ボビンを受け渡す作業を示す模式平面図。FIG. 10 is a schematic plan view showing the operation of transferring a full bobbin from a stocker peg of the stocker to a creel robot. クリールロボットが、延伸仮撚機のクリールから空ボビンを取り外す作業を示す模式平面図。FIG. 10 is a schematic plan view showing the operation of the creel robot removing an empty bobbin from the creel of the draw texturing machine. クリールロボットが、延伸仮撚機のクリールに満ボビンをセットする作業を示す模式平面図。FIG. 10 is a schematic plan view showing the operation of a creel robot setting a full bobbin on the creel of a draw texturing machine. クリールロボットからストッカのストッカペグへ空ボビンを受け渡す作業を示す模式平面図。FIG. 10 is a schematic plan view showing the operation of transferring an empty bobbin from the creel robot to a stocker peg of the stocker.

次に、図面を参照して本発明の実施の形態を説明する。図1は、本発明の一実施形態に係るボビン搬送システム1の全体的な構成を示す斜視図である。図2は、ストッカ20の周辺の構成を示す拡大斜視図である。 Next, an embodiment of the present invention will be described with reference to the drawings. Figure 1 is a perspective view showing the overall configuration of a bobbin transport system 1 according to one embodiment of the present invention. Figure 2 is an enlarged perspective view showing the configuration around the stocker 20.

図1に示すボビン搬送システム1は、紡糸巻取機60から延伸仮撚機70へ満ボビンを搬送する。 The bobbin transport system 1 shown in Figure 1 transports full bobbins from the take-up winder 60 to the draw twisting machine 70.

延伸仮撚機70は、仮撚加工機の一種であり、糸加工機の一種である。糸加工機としては、他にエア加工機がある。延伸仮撚機70は、糸の一種であるPOYと呼ばれる半延伸糸(部分配向糸)に対して延伸及び仮撚加工を行うことにより、DTYと呼ばれる延伸仮撚加工糸を生産することができる。POYは、Partially Oriented Yarnの略称である。DTYは、Draw Textured Yarnの略称である。延伸仮撚機70は、延伸及び仮撚加工を行う加工ポジションを複数備えている。 The draw false twisting machine 70 is a type of false twisting machine, and a type of yarn processing machine. Other types of yarn processing machines include air processing machines. The draw false twisting machine 70 can produce a draw false twist textured yarn called DTY by drawing and false twisting a semi-drawn yarn (partially oriented yarn) called POY, which is a type of yarn. POY is an abbreviation for Partially Oriented Yarn. DTY is an abbreviation for Draw Textured Yarn. The draw false twisting machine 70 has multiple processing positions for drawing and false twisting.

満ボビン5は、所定長さのPOYを芯管に巻いたものである。満ボビン5は、紡糸巻取機60の紡糸装置においてPOYが作られ、当該紡糸巻取機60の巻取装置においてPOYが芯管に巻かれることで形成される。 A full bobbin 5 is formed by winding a predetermined length of POY around a core tube. POY is produced in the spinning device of the take-up winder 60, and then the POY is wound around a core tube in the winding device of the take-up winder 60, thereby forming the full bobbin 5.

満ボビン5は、延伸仮撚機70が備えるクリール71にセットされる。クリール71には、複数段かつ複数列に多数のペグ72が設けられている。ペグ72に満ボビン5が掛けられ、満ボビン5から糸が加工ポジションに向けて解舒されるようになっている。 The full bobbin 5 is set on a creel 71 provided in the draw texturing machine 70. The creel 71 has multiple rows and columns of pegs 72. The full bobbin 5 is hung on the pegs 72, and the yarn is unwound from the full bobbin 5 toward the processing position.

ボビン搬送システム1は、走行クリール台車10と、ストッカ20と、クリールロボット(移載ロボット)30と、搬送制御コンピュータ(制御装置)40と、を備える。 The bobbin transport system 1 comprises a traveling creel cart 10, a stocker 20, a creel robot (transfer robot) 30, and a transport control computer (control device) 40.

走行クリール台車10は、走行部11と、キャリア12と、を備える。 The traveling creel cart 10 comprises a running section 11 and a carrier 12.

走行部11は、天井に敷設されたレール15に沿って走行可能に設けられている。レール15は、紡糸巻取機60の設置位置と、ストッカ20の設置位置と、を繋ぐように配置されている。 The running section 11 is arranged to be able to run along a rail 15 installed on the ceiling. The rail 15 is positioned to connect the installation position of the take-up winder 60 and the installation position of the stocker 20.

キャリア12は、走行部11から吊り下げられるように配置されている。キャリア12はフレーム状に構成されている。キャリア12の側面には、複数の台車ペグ13が固定されている。それぞれの台車ペグ13には、満ボビン5又は空ボビン6を掛けることができる。キャリア12において、台車ペグ13は水平方向に3列、上下方向に4段のマトリクス状に配置されている。 The carrier 12 is arranged so as to be suspended from the running section 11. The carrier 12 is configured in a frame shape. A plurality of carriage pegs 13 are fixed to the side of the carrier 12. A full bobbin 5 or an empty bobbin 6 can be hung on each carriage peg 13. On the carrier 12, the carriage pegs 13 are arranged in a matrix of three rows horizontally and four rows vertically.

図2に示すように、それぞれの台車ペグ13は、水平方向に適宜の間隔をあけて配置された2つの棒状部材により構成されている。台車ペグ13に掛けられた状態のボビンの芯管にロッド部材を差し込んだ後、当該ロッド部材が棒状部材の間を上昇すると、当該ボビンをロッド部材に掛けることができる。また、ロッド部材に掛けられたボビンの芯管に2つの棒状部材が差し込まれた状態で、当該ロッド部材が棒状部材の間を下降すると、当該ボビンを台車ペグ13に掛けることができる。後述するストッカペグ26及びクリール71のペグ72についても、台車ペグ13と同様に2つの棒状部材から構成されている。 As shown in Figure 2, each carriage peg 13 is composed of two rod-shaped members arranged at an appropriate interval in the horizontal direction. After inserting a rod member into the core tube of a bobbin hung on a carriage peg 13, the rod member can be raised between the rod-shaped members to hang the bobbin on the rod member. Also, with two rod-shaped members inserted into the core tube of a bobbin hung on a rod member, the rod member can be lowered between the rod-shaped members to hang the bobbin on the carriage peg 13. The stocker peg 26 and peg 72 of the creel 71, which will be described later, are also composed of two rod-shaped members, just like the carriage peg 13.

走行クリール台車10は、図1で鎖線で示すように、紡糸巻取機60の近傍である第1停止位置S1で停止する。第1停止位置S1で停止した走行クリール台車10に対し、紡糸巻取機60から満ボビン5が供給される。供給される満ボビン5の数は、3×4=12個である。満ボビン5を積載した走行クリール台車10は、ストッカ20に向けて走行する。走行クリール台車10は、ストッカ20の近傍である第2停止位置S2で停止する。走行クリール台車10は、第2停止位置S2において、12個の満ボビン5をストッカ20に供給する。 As shown by the dotted line in Figure 1, the traveling creel cart 10 stops at a first stop position S1 near the take-up winder 60. Full bobbins 5 are supplied from the take-up winder 60 to the traveling creel cart 10 stopped at first stop position S1. The number of full bobbins 5 supplied is 3 x 4 = 12. The traveling creel cart 10 loaded with full bobbins 5 travels toward the stocker 20. The traveling creel cart 10 stops at a second stop position S2 near the stocker 20. At second stop position S2, the traveling creel cart 10 supplies 12 full bobbins 5 to the stocker 20.

走行クリール台車10は、12個の満ボビン5を荷下ろししてストッカ20に搬出するのと並行的に、12個の空ボビン6をストッカ20から搬入する。空ボビン6を積載した走行クリール台車10は、紡糸巻取機60に向けて走行する。走行クリール台車10は、第1停止位置S1で停止する。走行クリール台車10は、12個の空ボビン6を荷下ろしして紡糸巻取機60に搬出するとともに、12個の満ボビン5を紡糸巻取機60から搬入する。満ボビン5を積載した走行クリール台車10は、ストッカ20に向けて走行する。走行クリール台車10は、第1停止位置S1で再び停止する。以上の動作が反復される。 The traveling creel cart 10 unloads 12 full bobbins 5 and transports them to the stocker 20, while simultaneously transporting 12 empty bobbins 6 from the stocker 20. The traveling creel cart 10 loaded with empty bobbins 6 travels toward the take-up winder 60. The traveling creel cart 10 stops at the first stop position S1. The traveling creel cart 10 unloads 12 empty bobbins 6 and transports them to the take-up winder 60, and simultaneously transports 12 full bobbins 5 from the take-up winder 60. The traveling creel cart 10 loaded with full bobbins 5 travels toward the stocker 20. The traveling creel cart 10 stops again at the first stop position S1. The above operations are repeated.

ストッカ20は、図2に示すように、4つの走行ユニット21と、移載ロッド22と、を備える。それぞれの走行ユニット21は、走行部23と、ペグフレーム24と、を備える。 As shown in Figure 2, the stocker 20 has four traveling units 21 and a transfer rod 22. Each traveling unit 21 has a traveling section 23 and a peg frame 24.

走行部23は、レール25に沿って走行可能に設けられている。レール25は、平面視で長円状となるように配置されている。4つの走行ユニット21は、レール25で定義されるループ状の経路を4等分するように配置される。 The running section 23 is arranged so that it can run along the rails 25. The rails 25 are arranged so that they form an oval shape in a plan view. The four running units 21 are arranged so that they divide the loop-shaped path defined by the rails 25 into four equal parts.

ペグフレーム24は、上下に細長い棒状に形成されている。ペグフレーム24には、複数のストッカペグ26が固定されている。それぞれのストッカペグ26には、満ボビン5又は空ボビン6を掛けることができる。それぞれのペグフレーム24において、ストッカペグ26は4つ上下方向に並べて配置されている。走行ユニット21の数は4であるので、ストッカ20は、4×4=16個のストッカペグ26を備える。 The peg frame 24 is formed as a vertically elongated rod. Multiple stocker pegs 26 are fixed to the peg frame 24. A full bobbin 5 or an empty bobbin 6 can be hung on each stocker peg 26. In each peg frame 24, four stocker pegs 26 are arranged vertically. Since there are four traveling units 21, the stocker 20 has 4 x 4 = 16 stocker pegs 26.

平面視で、ストッカペグ26は、ループ状に形成されたレール25の外側に突出するように配置される。走行ユニット21がレール25に沿って走行するのに応じて、ストッカペグ26の向きが変化する。これにより、ストッカペグ26に掛けられた満ボビン5又は空ボビン6の向きを変更することができる。 In plan view, the stocker peg 26 is positioned so that it protrudes outward from the loop-shaped rail 25. As the traveling unit 21 travels along the rail 25, the orientation of the stocker peg 26 changes. This allows the orientation of the full bobbin 5 or empty bobbin 6 hung on the stocker peg 26 to be changed.

4つの走行ユニット21は、図示しない無端状の駆動部材に固定されている。この駆動部材は、例えばチェーン又はベルトとして構成することができる。駆動部材は、レール25と実質的に平行に配置されている。この駆動部材を図略のアクチュエータが駆動することで、4つの走行ユニット21をレール25に沿って同時に走行させることができる。 The four traveling units 21 are fixed to an endless driving member (not shown). This driving member can be configured as, for example, a chain or belt. The driving member is arranged substantially parallel to the rail 25. By driving this driving member with an actuator (not shown), the four traveling units 21 can be caused to travel simultaneously along the rail 25.

移載ロッド22は、走行ユニット21の所定の位置に対応するように配置されている。この所定の位置とは、ストッカペグ26が、ストッカ20の近傍で停止した走行クリール台車10の台車ペグ13とボビンを受け渡す位置である。以下、走行ユニット21が当該位置にあるときのストッカペグ26の位置を、第1受渡し位置P1と呼ぶことがある。第1受渡し位置P1にあるストッカペグ26は、第2停止位置S2で停止している走行クリール台車10の台車ペグ13と対向する。台車ペグ13は走行クリール台車10に3列で配置されているが、第1受渡し位置P1にあるストッカペグ26と何れの列の台車ペグ13が対向するかは、走行クリール台車10の停止位置の調整により変更することができる。 The transfer rod 22 is positioned to correspond to a predetermined position of the traveling unit 21. This predetermined position is the position where the stocker peg 26 transfers the bobbin to and from the carriage peg 13 of the traveling creel carriage 10 stopped near the stocker 20. Hereinafter, the position of the stocker peg 26 when the traveling unit 21 is in this position may be referred to as the first transfer position P1. The stocker peg 26 at the first transfer position P1 faces the carriage peg 13 of the traveling creel carriage 10 stopped at the second stop position S2. The carriage pegs 13 are arranged in three rows on the traveling creel carriage 10, but which row of carriage pegs 13 faces the stocker peg 26 at the first transfer position P1 can be changed by adjusting the stopping position of the traveling creel carriage 10.

移載ロッド22は、概ね水平に配置された棒状の部材である。移載ロッド22は、ストッカペグ26に対応して、4つ上下方向に並べて配置されている。ペグフレーム24には、ストッカペグ26に対応して4つの通過孔27が形成されている。移載ロッド22は、第2停止位置S2に停止している走行クリール台車10に近づく向き又は走行クリール台車10から離れる向きに移動することができる。移載ロッド22が走行クリール台車10に近づく向きに移動したとき、移載ロッド22は、通過孔27を通って走行クリール台車10側へ突出する。 The transfer rod 22 is a rod-shaped member arranged generally horizontally. Four transfer rods 22 are arranged vertically in correspondence with the stocker pegs 26. Four through holes 27 are formed in the peg frame 24 in correspondence with the stocker pegs 26. The transfer rod 22 can move toward or away from the traveling creel cart 10 stopped at the second stop position S2. When the transfer rod 22 moves toward the traveling creel cart 10, the transfer rod 22 passes through the through holes 27 and protrudes toward the traveling creel cart 10.

4つの移載ロッド22は、上下方向に細長く形成された共通のベース部材28に固定されている。ベース部材28は、図略の案内機構を介して、ストッカ20のフレームに固定される。案内機構は、ベース部材28の移動方向を案内する。 The four transfer rods 22 are fixed to a common base member 28 that is elongated in the vertical direction. The base member 28 is fixed to the frame of the stocker 20 via a guide mechanism (not shown). The guide mechanism guides the movement direction of the base member 28.

図示しないが、ストッカ20は、ベース部材28を水平方向及び垂直方向に駆動するためのアクチュエータをそれぞれ備える。移載ロッド22が台車ペグ13の2つの棒状部材の間を上方に移動することで、台車ペグ13に掛けられていた満ボビン5を移載ロッド22によって持ち上げることができる。移載ロッド22がストッカペグ26の2つの棒状部材の間を上方に移動することで、ストッカペグ26に掛けられていた空ボビン6を移載ロッド22によって持ち上げることができる。移載ロッド22が下方へ移動すると、持上げ状態が解除される。 Although not shown, the stocker 20 is equipped with actuators for driving the base member 28 horizontally and vertically. When the transfer rod 22 moves upward between the two rod-shaped members of the carriage peg 13, the full bobbin 5 hung on the carriage peg 13 can be lifted by the transfer rod 22. When the transfer rod 22 moves upward between the two rod-shaped members of the stocker peg 26, the empty bobbin 6 hung on the stocker peg 26 can be lifted by the transfer rod 22. When the transfer rod 22 moves downward, the lifted state is released.

移載ロッド22が上昇してボビンを持ち上げた状態で長手方向に移動することで、台車ペグ13とストッカペグ26との間でボビンの受渡しを行うことができる。 The transfer rod 22 moves longitudinally while lifting the bobbin, allowing the bobbin to be transferred between the carriage peg 13 and the stocker peg 26.

第1受渡し位置P1のストッカペグ26と台車ペグ13とが対向しており、ストッカペグ26はボビンなしの状態であり、台車ペグ13に満ボビン5が掛けられている場合を考える。移載ロッド22は、台車ペグ13に掛けられた満ボビン5を持ち上げて、ストッカペグ26側へ引き込んだ後、持上げを解除する。これにより、満ボビン5を台車ペグ13からストッカペグ26に移動させることができる。 Let's consider a case where the stocker peg 26 at the first transfer position P1 faces the carriage peg 13, the stocker peg 26 has no bobbin, and a full bobbin 5 is hung on the carriage peg 13. The transfer rod 22 lifts the full bobbin 5 hung on the carriage peg 13, pulls it toward the stocker peg 26, and then releases the lift. This allows the full bobbin 5 to be moved from the carriage peg 13 to the stocker peg 26.

第1受渡し位置P1のストッカペグ26と台車ペグ13とが対向しており、ストッカペグ26に空ボビンが掛けられており、台車ペグ13はボビンなしの状態である場合を考える。移載ロッド22は、ストッカペグ26に掛けられた空ボビン6を持ち上げて、台車ペグ13側へ押し出した後、持上げを解除する。これにより、空ボビン6をストッカペグ26から台車ペグ13に移動させることができる。 Let's consider a situation where the stocker peg 26 and the carriage peg 13 at the first transfer position P1 are facing each other, an empty bobbin is hung on the stocker peg 26, and the carriage peg 13 is empty. The transfer rod 22 lifts the empty bobbin 6 hung on the stocker peg 26, pushes it toward the carriage peg 13, and then releases the lift. This allows the empty bobbin 6 to be moved from the stocker peg 26 to the carriage peg 13.

4つの移載ロッド22は、ベース部材28とともに同時に移動する。従って、満ボビン5又は空ボビン6の受渡しが4段分同時に行われる。 The four transfer rods 22 move simultaneously along with the base member 28. Therefore, full bobbins 5 or empty bobbins 6 are transferred simultaneously across four stages.

クリールロボット30は、作業ヘッド31と、満ボビン搬送ロッド32と、空ボビン搬送ロッド33と、を備える。 The creel robot 30 comprises a work head 31, a full bobbin transport rod 32, and an empty bobbin transport rod 33.

作業ヘッド31は、クリール71において多数のペグ72が水平に並べられる方向と平行な方向に移動可能である。作業ヘッド31は、上記の方向に移動することで、ストッカ20とクリール71との間で移動可能である。加えて、作業ヘッド31は、上下方向に移動可能である。作業ヘッド31をこのように移動させる構成は、公知のXY駆動機構とアクチュエータの組合せにより実現することができる。 The work head 31 is movable in a direction parallel to the direction in which the multiple pegs 72 are horizontally arranged on the creel 71. By moving in the above direction, the work head 31 can move between the stocker 20 and the creel 71. In addition, the work head 31 can move in the vertical direction. The configuration for moving the work head 31 in this manner can be achieved by combining a known XY drive mechanism and actuator.

満ボビン搬送ロッド32及び空ボビン搬送ロッド33は、作業ヘッド31の下部に配置されている。満ボビン搬送ロッド32及び空ボビン搬送ロッド33は、何れも細長い棒状に形成されている。平面視で、満ボビン搬送ロッド32と空ボビン搬送ロッド33の長手方向は90°異なっている。作業ヘッド31は図示しない旋回アクチュエータを備えており、上下方向の軸を中心として、満ボビン搬送ロッド32及び空ボビン搬送ロッド33を旋回させることができる。 The full bobbin transport rod 32 and empty bobbin transport rod 33 are located below the work head 31. Both the full bobbin transport rod 32 and empty bobbin transport rod 33 are formed in the shape of a long, thin rod. In a plan view, the longitudinal directions of the full bobbin transport rod 32 and empty bobbin transport rod 33 differ by 90°. The work head 31 is equipped with a rotation actuator (not shown), which can rotate the full bobbin transport rod 32 and empty bobbin transport rod 33 around a vertical axis.

図示しないが、作業ヘッド31は、満ボビン搬送ロッド32を水平方向及び垂直方向に駆動するためのアクチュエータをそれぞれ備える。満ボビン搬送ロッド32がストッカペグ26の2つの棒状部材の間を上方に移動することで、ストッカペグ26に掛けられていた満ボビン5を満ボビン搬送ロッド32によって持ち上げることができる。満ボビン搬送ロッド32は、その長手方向に移動することができ、作業ヘッド31とともに旋回することもできる。満ボビン搬送ロッド32が、クリール71が備える後述のペグ72の2つの棒状部材の間で下方に移動すると、満ボビン5の持上げ状態が解除される。 Although not shown, the work head 31 is equipped with actuators for driving the full bobbin transport rod 32 horizontally and vertically. When the full bobbin transport rod 32 moves upward between the two rod-shaped members of the stocker peg 26, the full bobbin 5 hanging on the stocker peg 26 can be lifted by the full bobbin transport rod 32. The full bobbin transport rod 32 can move in its longitudinal direction and can also rotate together with the work head 31. When the full bobbin transport rod 32 moves downward between the two rod-shaped members of the peg 72 (described below) provided on the creel 71, the lifted state of the full bobbin 5 is released.

同様に、作業ヘッド31は、空ボビン搬送ロッド33を水平方向及び垂直方向に駆動するためのアクチュエータをそれぞれ備える。空ボビン搬送ロッド33が後述のペグ72の2つの棒状部材の間を上方に移動することで、ペグ72に掛けられていた空ボビン6を空ボビン搬送ロッド33によって持ち上げることができる。空ボビン搬送ロッド33は、その長手方向に移動することができ、作業ヘッド31とともに旋回することもできる。空ボビン搬送ロッド33が、ストッカペグ26の2つの棒状部材の間で下方に移動すると、空ボビン6の持上げ状態が解除される。 Similarly, the work head 31 is equipped with actuators for driving the empty bobbin transport rod 33 horizontally and vertically. When the empty bobbin transport rod 33 moves upward between the two rod-shaped members of the peg 72 (described below), the empty bobbin 6 hanging on the peg 72 can be lifted by the empty bobbin transport rod 33. The empty bobbin transport rod 33 can move in its longitudinal direction and can also rotate together with the work head 31. When the empty bobbin transport rod 33 moves downward between the two rod-shaped members of the stocker peg 26, the lifted state of the empty bobbin 6 is released.

クリール71の何れかのペグ72において空ボビン6の発生が検出されると、クリールロボット30は、ストッカ20が備える走行ユニット21の所定の位置に対応する位置まで、作業ヘッド31を移動させる。この所定の位置とは、ストッカペグ26が、ストッカ20の近傍で静止している作業ヘッド31の満ボビン搬送ロッド32又は空ボビン搬送ロッド33とボビンを受け渡す位置である。以下、走行ユニット21が当該位置にあるときのストッカペグ26の位置を、第2受渡し位置P2と呼ぶことがある。 When an empty bobbin 6 is detected on one of the pegs 72 of the creel 71, the creel robot 30 moves the work head 31 to a position corresponding to a predetermined position of the traveling unit 21 provided in the stocker 20. This predetermined position is the position where the stocker peg 26 transfers the bobbin to the full bobbin transport rod 32 or empty bobbin transport rod 33 of the work head 31, which is stationary near the stocker 20. Hereinafter, the position of the stocker peg 26 when the traveling unit 21 is in this position may be referred to as the second transfer position P2.

詳細は後述するが、クリールロボット30は、満ボビン搬送ロッド32及び空ボビン搬送ロッド33を用いて、第2受渡し位置P2にあるストッカペグ26に掛けられた満ボビン5と、クリール71で発生した空ボビン6と、を交換することができる。 As will be described in more detail below, the creel robot 30 can use the full bobbin transport rod 32 and the empty bobbin transport rod 33 to exchange a full bobbin 5 hung on the stocker peg 26 at the second transfer position P2 with an empty bobbin 6 generated on the creel 71.

次に、走行クリール台車10とストッカ20との間で行われる満ボビン5及び空ボビン6の交換作業について詳細に説明する。図3から図12までには、走行クリール台車10、ストッカ20及びクリールロボット30の動作が順に示されている。以下の制御は、図1等に示す搬送制御コンピュータ40と、走行クリール台車10、ストッカ20及びクリールロボット30がそれぞれ備える図略のコンピュータと、によって実現される。搬送制御コンピュータ40は、走行クリール台車10、ストッカ20及びクリールロボット30が備えるコンピュータのそれぞれを統合して制御する。 Next, the full bobbin 5 and empty bobbin 6 exchange operation performed between the traveling creel cart 10 and the stocker 20 will be described in detail. Figures 3 to 12 sequentially show the operations of the traveling creel cart 10, stocker 20, and creel robot 30. The following control is achieved by the transport control computer 40 shown in Figure 1 and other figures, and the computers (not shown) provided in each of the traveling creel cart 10, stocker 20, and creel robot 30. The transport control computer 40 performs integrated control of the computers provided in each of the traveling creel cart 10, stocker 20, and creel robot 30.

上述のとおり、ストッカ20は4列のストッカペグ26を備える。図3に示すように、4列のうち3列のストッカペグ26には空ボビン6が掛けられる一方、残りの1列はボビンなし状態となっている。ストッカ20は、ボビンなし状態であるストッカペグ26の列が第1受渡し位置P1にある状態で、走行クリール台車10の到着を待機する。 As described above, the stocker 20 has four rows of stocker pegs 26. As shown in FIG. 3, empty bobbins 6 are hung on three of the four rows of stocker pegs 26, while the remaining row has no bobbins. The stocker 20 waits for the arrival of the traveling creel cart 10 with the row of stocker pegs 26 with no bobbins at the first transfer position P1.

図3に示すように、満ボビン5を積載した走行クリール台車10が第2停止位置S2で停止する。このとき、走行クリール台車10において走行方向先頭の列に相当する台車ペグ13の列が、第1受渡し位置P1にあるボビンなし状態のストッカペグ26と対向する。この状態で、ストッカ20は移載ロッド22を動作させる。移載ロッド22は、台車ペグ13に掛けられていた満ボビン5を持ち上げ、ストッカペグ26に移動させて下ろす。満ボビン5の移動は、4段分同時に行われる。その後、ストッカ20は4つの走行ユニット21を、レール25に沿って1ピッチ分移動させる。ストッカ20においてピッチとは、走行経路において複数の走行ユニット21が配置される間隔を意味する。 As shown in FIG. 3, the traveling creel cart 10 loaded with full bobbins 5 stops at the second stop position S2. At this time, the row of cart pegs 13 corresponding to the row at the front of the traveling creel cart 10 in the traveling direction faces the stocker pegs 26 without bobbins at the first transfer position P1. In this state, the stocker 20 operates the transfer rod 22. The transfer rod 22 lifts the full bobbins 5 hanging from the cart pegs 13, moves them to the stocker pegs 26, and lowers them. Four rows of full bobbins 5 are moved simultaneously. The stocker 20 then moves the four traveling units 21 one pitch along the rails 25. In the stocker 20, a pitch refers to the spacing between multiple traveling units 21 along the travel path.

この結果、満ボビン5が掛けられたストッカペグ26が第1受渡し位置P1から別の場所に移動し、その代わりに、別の場所のストッカペグ26が、空ボビン6を保持した状態で第1受渡し位置P1に至る。第1受渡し位置P1に移動したストッカペグ26は、先ほど満ボビン5が取り外された台車ペグ13と対向する。この状態が図4に示されている。 As a result, the stocker peg 26 with the full bobbin 5 hanging on it moves from the first transfer position P1 to another location, and instead, the stocker peg 26 in the other location reaches the first transfer position P1 while holding the empty bobbin 6. The stocker peg 26 that has moved to the first transfer position P1 faces the cart peg 13 from which the full bobbin 5 was previously removed. This state is shown in Figure 4.

ストッカ20は移載ロッド22を動作させ、図4で示すように、ストッカペグ26に掛けられていた空ボビン6を台車ペグ13に移動させる。その後、走行クリール台車10は、台車ペグ13の列の1ピッチ分前方へ移動し、停止する。これにより、第1受渡し位置P1のストッカペグ26と対向する台車ペグ13の列が、1列分だけ後方側へ切り替わる。 The stocker 20 operates the transfer rod 22 to move the empty bobbin 6 that was hanging on the stocker peg 26 to the carriage peg 13, as shown in Figure 4. The traveling creel carriage 10 then moves forward one pitch of the row of carriage pegs 13 and stops. This causes the row of carriage pegs 13 facing the stocker peg 26 at the first transfer position P1 to shift one row backward.

図5及び図7で示す動作は図3で説明した動作と同様であるため、説明を省略する。図6及び図8で示す動作は図4で説明した動作と同様であるため、説明を省略する。 The operations shown in Figures 5 and 7 are similar to those described in Figure 3, and therefore their explanations are omitted. The operations shown in Figures 6 and 8 are similar to those described in Figure 4, and therefore their explanations are omitted.

このように、本実施形態では、[A]1列分の台車ペグ13からボビンなし状態のストッカペグ26へ、満ボビン5を移動させる作業と、[B]1列分のストッカペグ26からボビンなし状態の台車ペグ13へ、空ボビン6を移動させる作業とを、交互に3列分繰り返す。 In this manner, in this embodiment, the following operations are alternately repeated for three rows: [A] moving full bobbins 5 from one row of carriage pegs 13 to stocker pegs 26 with no bobbins, and [B] moving empty bobbins 6 from one row of stocker pegs 26 to carriage pegs 13 with no bobbins.

これにより、走行クリール台車10の3列分(12個)の満ボビン5と、ストッカ20の3列分(12個)の空ボビン6と、を交換することができる。図8に示すように12個の空ボビン6を積載した走行クリール台車10は、第2停止位置S2から第1停止位置S1へ移動する。これにより、空ボビン6を紡糸巻取機60へ自動的に戻して再利用することができる。 This allows three rows (12 bobbins) of full bobbins 5 on the traveling creel cart 10 to be exchanged for three rows (12 empty bobbins 6) in the stocker 20. As shown in Figure 8, the traveling creel cart 10 loaded with 12 empty bobbins 6 moves from the second stop position S2 to the first stop position S1. This allows the empty bobbins 6 to be automatically returned to the take-up winder 60 for reuse.

1列分のボビン交換が3回繰り返される間、走行クリール台車10とストッカ20との間でのボビン交換作業を中断させないようにするため、クリールロボット30は、ストッカ20から満ボビン5を取り出す作業を行わずに待機している。従って、走行クリール台車10とストッカ20との間でのボビン交換作業を素早く行うことができる。クリールロボット30は特に作業を行わずに待機している。ストッカ20の全ての空ボビン6が満ボビン5に置き換えられた後、クリールロボット30は、延伸仮撚機70からの要求に基づいて、空ボビン6の回収及び満ボビン5の供給作業を行う。 While the bobbin replacement for one row is repeated three times, the creel robot 30 waits without removing full bobbins 5 from the stocker 20 to avoid interrupting the bobbin replacement operation between the traveling creel cart 10 and the stocker 20. This allows for quick bobbin replacement between the traveling creel cart 10 and the stocker 20. The creel robot 30 waits without performing any particular operation. After all empty bobbins 6 in the stocker 20 have been replaced with full bobbins 5, the creel robot 30 retrieves the empty bobbins 6 and supplies full bobbins 5 based on a request from the draw false twisting machine 70.

具体的には、クリールロボット30は作業ヘッド31を、第2受渡し位置P2にある4つのストッカペグ26のうち何れかと対応する位置へ移動させる。また、クリールロボット30は作業ヘッド31の下部を旋回させ、図9に示すように、満ボビン搬送ロッド32が、対象のストッカペグ26と対向する状態とする。クリールロボット30は満ボビン搬送ロッド32を動作させ、ストッカペグ26に掛けられた満ボビン5の芯管内部に満ボビン搬送ロッド32を差し込む。続いて、満ボビン搬送ロッド32は少し上昇して満ボビン5を持ち上げた後、ストッカペグ26から離れる方向に移動する。 Specifically, the creel robot 30 moves the working head 31 to a position corresponding to one of the four stocker pegs 26 at the second transfer position P2. The creel robot 30 also rotates the lower part of the working head 31 so that the full bobbin transport rod 32 faces the target stocker peg 26, as shown in Figure 9. The creel robot 30 then operates the full bobbin transport rod 32 and inserts it into the core tube of the full bobbin 5 hung on the stocker peg 26. The full bobbin transport rod 32 then rises slightly to lift the full bobbin 5, and then moves away from the stocker peg 26.

その後、クリールロボット30は作業ヘッド31を、クリール71において空ボビン6が発生したペグ72に対応する位置へ移動させる。作業ヘッド31の移動と並行して、クリールロボット30は作業ヘッド31の下部を旋回させて、空ボビン搬送ロッド33がクリール71と対向する状態とする。 Then, the creel robot 30 moves the work head 31 to a position on the creel 71 corresponding to the peg 72 on which the empty bobbin 6 has occurred. In parallel with the movement of the work head 31, the creel robot 30 rotates the lower part of the work head 31 so that the empty bobbin transport rod 33 faces the creel 71.

作業ヘッド31が目的の位置へ到着した後、図10に示すようにクリールロボット30は空ボビン搬送ロッド33を動作させ、ペグ72に掛けられた空ボビン6の芯管内部に空ボビン搬送ロッド33を差し込む。このとき、クリール71のペグ72の先端の向きは、空ボビン搬送ロッド33と対向するように一時的に変更されている。ペグ72の向きの変更は、例えば、ペグ72を回転駆動する図略の旋回機構を作業ヘッド31が備えることにより実現することができる。続いて、空ボビン搬送ロッド33は少し上昇して空ボビン6を持ち上げた後、ペグ72から離れる方向に移動する。 After the work head 31 arrives at the target position, as shown in Figure 10, the creel robot 30 operates the empty bobbin transport rod 33 and inserts it into the core tube of the empty bobbin 6 hung on the peg 72. At this time, the orientation of the tip of the peg 72 of the creel 71 is temporarily changed so that it faces the empty bobbin transport rod 33. The orientation of the peg 72 can be changed, for example, by providing the work head 31 with a rotating mechanism (not shown) that rotates the peg 72. Next, the empty bobbin transport rod 33 rises slightly to lift the empty bobbin 6, and then moves away from the peg 72.

クリールロボット30は作業ヘッド31の下部を旋回させ、満ボビン搬送ロッド32がペグ72と対向する状態とする。次に、図11に示すように、クリールロボット30は満ボビン搬送ロッド32を動作させ、ペグ72の上方で、ペグ72の根元部に近づくように移動させる。この結果、満ボビン搬送ロッド32とともに移動する満ボビン5の芯管内部に、ペグ72が差し込まれる。その後、満ボビン搬送ロッド32が少し下降し、持上げ状態が解除される。これにより、ペグ72に満ボビン5を掛けることができる。その後、ペグ72の向きは元に戻される。 The creel robot 30 rotates the lower part of the work head 31 so that the full bobbin transport rod 32 faces the peg 72. Next, as shown in Figure 11, the creel robot 30 operates the full bobbin transport rod 32, moving it above the peg 72 and approaching the base of the peg 72. As a result, the peg 72 is inserted into the core tube of the full bobbin 5, which moves along with the full bobbin transport rod 32. The full bobbin transport rod 32 then descends slightly, and the lifted state is released. This allows the full bobbin 5 to be hung on the peg 72. The peg 72 is then returned to its original orientation.

次に、クリールロボット30は作業ヘッド31を、第2受渡し位置P2において満ボビン5が取り外されたストッカペグ26に対応する位置へ移動させる。作業ヘッド31の移動と並行して、クリールロボット30は作業ヘッド31の下部を旋回させて、空ボビン搬送ロッド33がストッカ20と対向する状態とする。 Next, the creel robot 30 moves the working head 31 to a position at the second transfer position P2 corresponding to the stocker peg 26 from which the full bobbin 5 was removed. In parallel with the movement of the working head 31, the creel robot 30 rotates the lower part of the working head 31 so that the empty bobbin transport rod 33 faces the stocker 20.

作業ヘッド31が目的の位置へ到着した後、クリールロボット30は図12に示すように空ボビン搬送ロッド33を動作させ、ストッカペグ26の上方で、ストッカペグ26の根元部に近づくように移動させる。この結果、空ボビン搬送ロッド33とともに移動する空ボビン6の芯管内部に、ストッカペグ26が差し込まれる。その後、空ボビン搬送ロッド33が少し下降し、持上げ状態が解除される。これにより、ストッカペグ26に空ボビン6を掛けることができる。その後、クリールロボット30は、延伸仮撚機70からの新しい要求を待機する。 After the work head 31 arrives at the target position, the creel robot 30 operates the empty bobbin transport rod 33 as shown in Figure 12, moving it above the stocker peg 26 and approaching the base of the stocker peg 26. As a result, the stocker peg 26 is inserted into the core tube of the empty bobbin 6 that is moving along with the empty bobbin transport rod 33. The empty bobbin transport rod 33 then descends slightly, releasing the lifted state. This allows the empty bobbin 6 to be hung on the stocker peg 26. The creel robot 30 then waits for a new request from the draw false twisting machine 70.

ストッカ20に保管されている12個の満ボビン5が全て空ボビン6に置き換えられるまで、クリールロボット30は延伸仮撚機70の要求に応じて、クリール71への満ボビン5の供給及び空ボビン6の回収作業を行う。4段のボビンの交換を同時に行うストッカ20の移載ロッド22とは異なり、クリールロボット30は、1段ずつボビンの交換を行う。第2受渡し位置P2にある4つのストッカペグ26に掛けられた満ボビン5が全て使用されると、ストッカ20が駆動される。これにより、満ボビン5がストッカペグ26に掛けられた状態の走行ユニット21を、別の場所から第2受渡し位置P2に移動させることができる。ストッカ20に保管されている満ボビン5が全て無くなった場合、ストッカ20はストック要求信号を出力し、満ボビン5を積載した走行クリール台車10が第2停止位置S2に到着するのを待機する。走行クリール台車10が到着すると図3の状態に戻り、上記の作業が反復される。 The creel robot 30 supplies full bobbins 5 to the creel 71 and collects empty bobbins 6 in response to requests from the draw twisting machine 70 until all 12 full bobbins 5 stored in the stocker 20 have been replaced with empty bobbins 6. Unlike the transfer rod 22 of the stocker 20, which simultaneously replaces four rows of bobbins, the creel robot 30 replaces bobbins one row at a time. When all full bobbins 5 hung on the four stocker pegs 26 at the second transfer position P2 have been used, the stocker 20 is driven. This allows the traveling unit 21, with full bobbins 5 hung on the stocker pegs 26, to move from another location to the second transfer position P2. When all full bobbins 5 stored in the stocker 20 are used up, the stocker 20 outputs a stock request signal and waits for the traveling creel cart 10 loaded with full bobbins 5 to arrive at the second stop position S2. When the traveling creel cart 10 arrives, the state returns to that shown in Figure 3 and the above process is repeated.

以上に説明したように、本実施形態のボビン搬送システム1は、ストッカ20と、クリールロボット30と、走行クリール台車10と、搬送制御コンピュータ40と、を備える。ストッカ20は、複数の列のストッカペグ26を備え、各ストッカペグ26に対して満ボビン5及び空ボビン6を掛けて保管可能である。クリールロボット30は、ストッカ20に保管されている満ボビン5を取り出して延伸仮撚機70のクリール71に装着し、クリール71から空ボビン6を取り外してストッカ20に保管する。走行クリール台車10は、複数の列の台車ペグ13を備え、各台車ペグ13に対して満ボビン5又は空ボビン6を掛けて搬送する。搬送制御コンピュータ40は、ストッカ20及び走行クリール台車10を制御する。ストッカ20は、走行クリール台車10の台車ペグ13に掛けられた満ボビン5をストッカペグ26に移動させること、及び、ストッカペグ26に掛けられた空ボビン6を台車ペグ13に移動させることが可能に構成される。1つのストッカ20が備えるストッカペグ26の列数が、1つの走行クリール台車10が備える台車ペグ13の列数に1を加えた数に等しい。搬送制御コンピュータ40は、ストッカペグ26のうち1列がボビンなし状態であり、残りの列の全てに空ボビン6が掛けられている状態で、第1工程と、第2工程と、を交互に行うことで、ストッカ20の空ボビン6を走行クリール台車10の満ボビン5と交換する交換作業をストッカ20及び走行クリール台車10に協同で行わせるように、ストッカ20及び走行クリール台車10を制御する。第1工程(図3、図5、図7)では、走行クリール台車10の1列の台車ペグ13に掛けられた満ボビン5を、ボビンなし状態となっている1列のストッカペグ26に移動させて、1列の台車ペグ13をボビンなし状態とする。第2工程(図4、図6、図8)では、ストッカペグ26に掛けられている1列の空ボビン6を、第1工程で満ボビン5が取り出されてボビンなし状態となっている1列の台車ペグ13に移動させて、1列のストッカペグ26をボビンなし状態とする。搬送制御コンピュータ40は、走行クリール台車10が、満ボビン5をストッカ20に搬送してストッカ20の空ボビン6と交換した後、ストッカ20とは異なる場所に空ボビン6を搬送するように、走行クリール台車10を制御する。 As described above, the bobbin transport system 1 of this embodiment includes a stocker 20, a creel robot 30, a traveling creel cart 10, and a transport control computer 40. The stocker 20 includes multiple rows of stocker pegs 26, and is capable of storing full bobbins 5 and empty bobbins 6 by hanging them on each stocker peg 26. The creel robot 30 removes full bobbins 5 stored in the stocker 20 and attaches them to the creel 71 of the draw texturing machine 70, and removes empty bobbins 6 from the creel 71 and stores them in the stocker 20. The traveling creel cart 10 includes multiple rows of cart pegs 13, and transports full bobbins 5 or empty bobbins 6 by hanging them on each cart peg 13. The transport control computer 40 controls the stocker 20 and the traveling creel cart 10. The stocker 20 is configured to be able to move full bobbins 5 hung on the carriage pegs 13 of the traveling creel cart 10 to the stocker pegs 26, and to move empty bobbins 6 hung on the stocker pegs 26 to the carriage pegs 13. The number of rows of stocker pegs 26 provided in one stocker 20 is equal to the number of rows of carriage pegs 13 provided in one traveling creel cart 10 plus one. The transport control computer 40 controls the stocker 20 and the traveling creel cart 10 so that the stocker 20 and the traveling creel cart 10 cooperate to perform an exchange operation of exchanging empty bobbins 6 in the stocker 20 for full bobbins 5 on the traveling creel cart 10 by alternately performing a first step and a second step in a state in which one row of the stocker pegs 26 is in a state where there are no bobbins and empty bobbins 6 are hung on all of the remaining rows. In the first step (FIGS. 3, 5, and 7), the full bobbins 5 hung on one row of carriage pegs 13 on the traveling creel carriage 10 are moved to one row of stocker pegs 26 that are currently empty, leaving that row of carriage pegs 13 empty of bobbins. In the second step (FIGS. 4, 6, and 8), the row of empty bobbins 6 hung on the stocker pegs 26 are moved to one row of carriage pegs 13 from which the full bobbins 5 were removed in the first step and are now empty of bobbins, leaving that row of stocker pegs 26 empty of bobbins. The transport control computer 40 controls the traveling creel carriage 10 so that the traveling creel carriage 10 transports the full bobbins 5 to the stocker 20 to exchange them for empty bobbins 6 in the stocker 20, and then transports the empty bobbins 6 to a location different from the stocker 20.

これにより、走行クリール台車10の全ての列の台車ペグ13に掛けられた満ボビン5を、ストッカ20に保管することができる。また、ストッカ20の空ボビン6を、満ボビン5を搬送した走行クリール台車10の全ての列の台車ペグ13に掛けて、別の場所へ搬送することができる。走行クリール台車10の全ての列の台車ペグ13に満ボビン5又は空ボビン6を掛けた状態で搬送を行うことができるので、走行クリール台車10の搬送能力全体を有効に活用することができる。ストッカ20において1列のストッカペグ26がボビンなし状態である状況から交換作業が開始されるので、ストッカ20と走行クリール台車10との間のボビン交換作業が円滑に行われる。 This allows full bobbins 5 hung on the carriage pegs 13 of all rows of the traveling creel cart 10 to be stored in the stocker 20. Furthermore, empty bobbins 6 in the stocker 20 can be hung on the carriage pegs 13 of all rows of the traveling creel cart 10 that transported the full bobbins 5 and transported to another location. Because transportation can be performed with full bobbins 5 or empty bobbins 6 hung on the carriage pegs 13 of all rows of the traveling creel cart 10, the entire transport capacity of the traveling creel cart 10 can be effectively utilized. Since the replacement operation begins when one row of stocker pegs 26 in the stocker 20 is empty of bobbins, bobbin replacement operation between the stocker 20 and the traveling creel cart 10 is carried out smoothly.

本実施形態のボビン搬送システム1において、1つのストッカ20が備えるストッカペグ26の段数が、1つの走行クリール台車10が備える台車ペグ13の段数に等しい。搬送制御コンピュータ40は、交換作業で、ストッカ20の全ての空ボビン6が、走行クリール台車10の全ての満ボビン5と交換されるように、ストッカ20及び走行クリール台車10を制御する。 In the bobbin transport system 1 of this embodiment, the number of stocker pegs 26 provided in one stocker 20 is equal to the number of carriage pegs 13 provided in one traveling creel carriage 10. The transport control computer 40 controls the stocker 20 and the traveling creel carriage 10 so that, during replacement work, all empty bobbins 6 in the stocker 20 are replaced with all full bobbins 5 on the traveling creel carriage 10.

これにより、搬送効率を一層高めることができる。 This will further improve transport efficiency.

本実施形態のボビン搬送システム1において、走行クリール台車10は、糸を空ボビン6に巻いて満ボビン5を形成する紡糸巻取機60の設置位置から、ストッカ20の設置位置へ満ボビン5を搬送する。走行クリール台車10は、交換作業により引き取った空ボビン6をストッカ20の設置位置から紡糸巻取機60の設置位置へ戻すために搬送する。 In the bobbin transport system 1 of this embodiment, the traveling creel cart 10 transports full bobbins 5 from the installation position of the take-up winder 60, which winds yarn onto empty bobbins 6 to form full bobbins 5, to the installation position of the stocker 20. The traveling creel cart 10 transports empty bobbins 6 that have been removed for replacement work from the installation position of the stocker 20 back to the installation position of the take-up winder 60.

これにより、空ボビン6の自動的な再利用システムを実現することができる。 This makes it possible to realize an automatic recycling system for empty bobbins 6.

本実施形態のボビン搬送システム1において、ストッカペグ26は、レール25によって規定されるループ状の経路に沿って循環移動可能である。台車ペグ13に対して満ボビン5又は空ボビン6を受け渡すストッカペグ26の列が、循環移動によって変化する。 In the bobbin transport system 1 of this embodiment, the stocker pegs 26 can move in a circular motion along a loop-shaped path defined by the rails 25. The row of stocker pegs 26 that delivers full bobbins 5 or empty bobbins 6 to the carriage pegs 13 changes as a result of the circular motion.

これにより、ボビンを受け渡すストッカペグ26の列の切替えを短時間で行うことができる。 This allows the row of stocker pegs 26 used to transfer bobbins to be switched in a short amount of time.

本実施形態のボビン搬送システム1において、走行クリール台車10とストッカ20との間のボビン交換作業が行われている間、クリールロボット30はストッカ20から満ボビン5を取り出す作業を行わずに待機する。 In the bobbin transport system 1 of this embodiment, while the bobbin exchange operation is being performed between the traveling creel cart 10 and the stocker 20, the creel robot 30 waits without removing the full bobbin 5 from the stocker 20.

これにより、走行クリール台車10とストッカ20と間のボビン交換作業が中断させられることがなくなり、走行クリール台車10の停止時間を短縮することができる。 This prevents bobbin replacement work between the traveling creel cart 10 and the stocker 20 from being interrupted, reducing the downtime of the traveling creel cart 10.

以上に本発明の好適な実施の形態を説明したが、上記の構成は例えば以下のように変更することができる。変更は単独で行われても良いし、複数の変更が任意に組み合わせて行われても良い。 The above describes a preferred embodiment of the present invention, but the above configuration can be modified, for example, as follows. Each modification may be made alone, or multiple modifications may be made in any combination.

それぞれのストッカペグ26は、2つの棒状部材を平行に配置することで構成されている。これに代えて、1つの棒状部材によってストッカペグ26を構成することもできる。台車ペグ13、ペグ72も同様である。 Each stocker peg 26 is made up of two rod-shaped members arranged in parallel. Alternatively, the stocker peg 26 can be made up of a single rod-shaped member. The same applies to the bogie pegs 13 and pegs 72.

走行クリール台車10における台車ペグ13の列数は、3に限定されず、2又は4以上とすることができる。ストッカ20におけるストッカペグ26の列数は、4に限定されず、3又は5以上とすることができる。台車ペグ13の段数及びストッカペグ26の段数を変更することもできる。台車ペグ13の段数及びストッカペグ26の段数は、1段のみであっても良い。 The number of rows of carriage pegs 13 in the traveling creel carriage 10 is not limited to three and can be two or four or more. The number of rows of stocker pegs 26 in the stocker 20 is not limited to four and can be three or five or more. The number of rows of carriage pegs 13 and the number of rows of stocker pegs 26 can also be changed. The number of rows of carriage pegs 13 and the number of rows of stocker pegs 26 can also be only one.

ストッカ20において、走行ユニット21は、非ループ状の経路に沿って走行可能に構成されても良い。 In the stocker 20, the traveling unit 21 may be configured to travel along a non-loop path.

走行クリール台車10のレール15は、非ループ状に構成されても良い。 The rails 15 of the traveling creel carriage 10 may be configured in a non-loop shape.

ストッカペグ26の段数が、台車ペグ13の段数と等しい構成に限定されない。例えば、台車ペグ13の段数が4、ストッカペグ26の段数が2であっても良い。この場合、1つの走行クリール台車10は、2つのストッカ20に対して満ボビン5を供給することになる。 The number of stages of the stocker pegs 26 is not limited to being equal to the number of stages of the carriage pegs 13. For example, the number of stages of the carriage pegs 13 may be four and the number of stages of the stocker pegs 26 may be two. In this case, one traveling creel carriage 10 will supply full bobbins 5 to two stockers 20.

走行クリール台車10は、交換作業によりストッカ20から引き取った空ボビンを、紡糸巻取機60とは異なる場所(例えば、空ボビン6の廃棄場所)へ搬送することもできる。 The traveling creel cart 10 can also transport empty bobbins retrieved from the stocker 20 during replacement work to a location other than the take-up winder 60 (for example, a location where empty bobbins 6 are disposed of).

1 ボビン搬送システム
5 満ボビン
6 空ボビン
10 走行クリール台車
13 台車ペグ
20 ストッカ
26 ストッカペグ
30 クリールロボット(ボビン移載ロボット)
40 搬送制御コンピュータ(制御装置)
60 紡糸巻取機
70 延伸仮撚機
71 クリール
1 Bobbin transport system 5 Full bobbin 6 Empty bobbin 10 Traveling creel cart 13 Cart peg 20 Stocker 26 Stocker peg 30 Creel robot (bobbin transfer robot)
40 Transport control computer (control device)
60 Spinning winder 70 Draw twisting machine 71 Creel

Claims (10)

複数の列のストッカペグを備え、各ストッカペグに対して満ボビン及び空ボビンを掛けて保管可能なストッカと、
前記ストッカに保管されている満ボビンを取り出して糸加工機のクリールに装着し、前記クリールから空ボビンを取り外して前記ストッカに保管するボビン移載ロボットと、
複数の列の台車ペグを備え、各台車ペグに対して満ボビン又は空ボビンを掛けて搬送する走行クリール台車と、
前記ストッカ及び前記走行クリール台車を制御する制御装置と、
を備え、
前記ストッカは、前記走行クリール台車の前記台車ペグに掛けられた満ボビンを前記ストッカペグに移動させること、及び、前記ストッカペグに掛けられた空ボビンを前記台車ペグに移動させることが可能に構成され、
1つの前記ストッカが備える前記ストッカペグの列数が、1つの前記走行クリール台車が備える前記台車ペグの列数に1を加えた数に等しく、
前記制御装置は、
前記ストッカペグのうち1列がボビンなし状態であり、残りの列の全てに空ボビンが掛けられている状態で、
前記走行クリール台車の1列の台車ペグに掛けられた満ボビンを、ボビンなし状態となっている1列の前記ストッカペグに移動させて、1列の前記台車ペグをボビンなし状態とする第1工程と、
前記ストッカペグに掛けられている1列の空ボビンを、前記第1工程で満ボビンが取り出されてボビンなし状態となっている1列の前記台車ペグに移動させて、1列の前記ストッカペグをボビンなし状態とする第2工程と、
を交互に行うことで、前記ストッカの空ボビンを前記走行クリール台車の満ボビンと交換する交換作業を前記ストッカ及び前記走行クリール台車に協同で行わせるように、前記ストッカ及び前記走行クリール台車を制御するとともに、
前記走行クリール台車が、満ボビンを前記ストッカに搬送して前記ストッカの空ボビンと交換した後、前記ストッカとは異なる場所に前記空ボビンを搬送するように、前記走行クリール台車を制御することを特徴とするボビン搬送システム。
a stocker having a plurality of rows of stocker pegs, each of which can store full bobbins and empty bobbins by hanging them on the stocker pegs;
a bobbin transfer robot that takes out full bobbins stored in the stocker and attaches them to a creel of a yarn processing machine, and removes empty bobbins from the creel and stores them in the stocker;
a traveling creel carriage having a plurality of rows of carriage pegs, which transports a full bobbin or an empty bobbin by hanging it on each carriage peg;
a control device for controlling the stocker and the traveling creel carriage;
Equipped with
the stocker is configured to be able to move a full bobbin hung on the carriage peg of the traveling creel carriage to the stocker peg, and to move an empty bobbin hung on the stocker peg to the carriage peg,
the number of rows of stocker pegs provided in one stocker is equal to the number of rows of carriage pegs provided in one traveling creel carriage plus one,
The control device
In a state where one row of the stocker pegs has no bobbins and empty bobbins are hung on all of the remaining rows,
a first step of moving full bobbins hung on one row of carriage pegs of the traveling creel carriage to one row of the stocker pegs that is in a bobbin-free state, thereby leaving one row of the carriage pegs in a bobbin-free state;
a second step of moving the row of empty bobbins hung on the stocker pegs to the row of carriage pegs from which the full bobbins have been removed in the first step and which are now in a bobbin-free state, thereby leaving the row of stocker pegs in a bobbin-free state;
and controlling the stocker and the traveling creel cart so that the stocker and the traveling creel cart cooperate to perform an exchange operation of exchanging an empty bobbin in the stocker with a full bobbin on the traveling creel cart by alternately performing the above operations.
A bobbin transport system characterized by controlling the traveling creel cart so that the traveling creel cart transports a full bobbin to the stocker, exchanges it for an empty bobbin in the stocker, and then transports the empty bobbin to a location different from the stocker.
請求項1に記載のボビン搬送システムであって、
1つの前記ストッカが備える前記ストッカペグの段数が、1つの前記走行クリール台車が備える前記台車ペグの段数に等しく、
前記制御装置は、前記交換作業で、前記ストッカの全ての空ボビンを前記走行クリール台車の全ての満ボビンと交換するように、前記ストッカ及び前記走行クリール台車を制御することを特徴とするボビン搬送システム。
2. The bobbin transport system according to claim 1,
the number of stages of the stocker pegs provided in one of the stockers is equal to the number of stages of the carriage pegs provided in one of the traveling creel carriages;
a control device for controlling the stocker and the traveling creel cart so that, during the replacement operation, all empty bobbins in the stocker are replaced with all full bobbins on the traveling creel cart;
請求項1又は2に記載のボビン搬送システムであって、
前記走行クリール台車は、糸を空ボビンに巻いて満ボビンを形成する紡糸巻取機の設置位置から、前記ストッカの設置位置へ満ボビンを搬送し、
前記走行クリール台車は、前記交換作業により引き取った前記空ボビンを前記ストッカの設置位置から前記紡糸巻取機の設置位置へ戻すために搬送することを特徴とするボビン搬送システム。
3. The bobbin transport system according to claim 1,
the traveling creel carriage transports the full bobbin from an installation position of a take-up winder that winds yarn onto an empty bobbin to form a full bobbin to an installation position of the stocker;
The bobbin transport system is characterized in that the traveling creel cart transports the empty bobbins taken over during the replacement work from an installation position of the stocker to an installation position of the take-up winder.
請求項1又は2に記載のボビン搬送システムであって、
前記ストッカペグは、ループ状の経路に沿って循環移動可能であり、
前記台車ペグに対して満ボビン又は空ボビンを受け渡す前記ストッカペグの列が、循環移動によって変化することを特徴とするボビン搬送システム。
3. The bobbin transport system according to claim 1,
The stocker peg is circulatively movable along a looped path;
A bobbin transport system characterized in that the row of stocker pegs that delivers full or empty bobbins to the carriage pegs changes by circular movement.
請求項3に記載のボビン搬送システムであって、4. The bobbin transport system according to claim 3,
前記ストッカペグは、ループ状の経路に沿って循環移動可能であり、The stocker peg is circulatively movable along a looped path;
前記台車ペグに対して満ボビン又は空ボビンを受け渡す前記ストッカペグの列が、循環移動によって変化することを特徴とするボビン搬送システム。A bobbin transport system characterized in that the row of stocker pegs that delivers full or empty bobbins to the carriage pegs changes by circular movement.
請求項1又は2に記載のボビン搬送システムであって、
前記制御装置は、前記ボビン移載ロボットを制御するよう構成され、
前記交換作業が行われている間、前記ボビン移載ロボットが前記ストッカから満ボビンを取り出す作業を行わずに待機するよう前記ボビン移載ロボットを制御することを特徴とするボビン搬送システム。
3. The bobbin transport system according to claim 1,
the control device is configured to control the bobbin transfer robot;
a bobbin transport system that controls the bobbin transfer robot so that the bobbin transfer robot waits without removing a full bobbin from the stocker while the replacement operation is being performed;
請求項3に記載のボビン搬送システムであって、4. The bobbin transport system according to claim 3,
前記制御装置は、前記ボビン移載ロボットを制御するよう構成され、the control device is configured to control the bobbin transfer robot;
前記交換作業が行われている間、前記ボビン移載ロボットが前記ストッカから満ボビンを取り出す作業を行わずに待機するよう前記ボビン移載ロボットを制御することを特徴とするボビン搬送システム。a bobbin transport system that controls the bobbin transfer robot so that the bobbin transfer robot waits without removing a full bobbin from the stocker while the replacement operation is being performed;
請求項4に記載のボビン搬送システムであって、5. The bobbin transport system according to claim 4,
前記制御装置は、前記ボビン移載ロボットを制御するよう構成され、the control device is configured to control the bobbin transfer robot;
前記交換作業が行われている間、前記ボビン移載ロボットが前記ストッカから満ボビンを取り出す作業を行わずに待機するよう前記ボビン移載ロボットを制御することを特徴とするボビン搬送システム。a bobbin transport system that controls the bobbin transfer robot so that the bobbin transfer robot waits without removing a full bobbin from the stocker while the replacement operation is being performed;
請求項5に記載のボビン搬送システムであって、6. The bobbin transport system according to claim 5,
前記制御装置は、前記ボビン移載ロボットを制御するよう構成され、the control device is configured to control the bobbin transfer robot;
前記交換作業が行われている間、前記ボビン移載ロボットが前記ストッカから満ボビンを取り出す作業を行わずに待機するよう前記ボビン移載ロボットを制御することを特徴とするボビン搬送システム。a bobbin transport system that controls the bobbin transfer robot so that the bobbin transfer robot waits without removing a full bobbin from the stocker while the replacement operation is being performed;
複数の列のストッカペグを備え、各ストッカペグに対して満ボビン及び空ボビンを掛けて保管可能なストッカと、
前記ストッカに保管されている満ボビンを取り出して糸加工機のクリールに装着し、前記クリールから空ボビンを取り外して前記ストッカに保管するボビン移載ロボットと、
複数の列の台車ペグを備え、各台車ペグに対して満ボビン又は空ボビンを掛けて搬送する走行クリール台車と、
を備え、
前記ストッカは、前記走行クリール台車の前記台車ペグに掛けられた満ボビンを前記ストッカペグに移動させること、及び、前記ストッカペグに掛けられた空ボビンを前記台車ペグに移動させることが可能に構成されているシステムにおけるボビン搬送方法であって、
1つの前記ストッカが備える前記ストッカペグの列数が、1つの前記走行クリール台車が備える前記台車ペグの列数に1を加えた数に等しく、
前記ストッカペグのうち1列がボビンなし状態であり、残りの列の全てに空ボビンが掛けられている状態で、
前記走行クリール台車の1列の台車ペグに掛けられた満ボビンを、ボビンなし状態となっている1列の前記ストッカペグに移動させて、1列の前記台車ペグをボビンなし状態とする第1工程と、
前記ストッカペグに掛けられている1列の空ボビンを、前記第1工程で満ボビンが取り出されてボビンなし状態となっている1列の前記台車ペグに移動させて、1列の前記ストッカペグをボビンなし状態とする第2工程と、
を交互に行うことで、前記ストッカの空ボビンを前記走行クリール台車の満ボビンと交換する交換作業を行い、
前記走行クリール台車は、満ボビンを前記ストッカに搬送して前記ストッカの空ボビンと交換した後、前記ストッカとは異なる場所に前記空ボビンを搬送することを特徴とするボビン搬送方法。
a stocker having a plurality of rows of stocker pegs, each of which can store full bobbins and empty bobbins by hanging them on the stocker pegs;
a bobbin transfer robot that takes out full bobbins stored in the stocker and attaches them to a creel of a yarn processing machine, and removes empty bobbins from the creel and stores them in the stocker;
a traveling creel carriage having a plurality of rows of carriage pegs, which transports a full bobbin or an empty bobbin by hanging it on each carriage peg;
Equipped with
a bobbin transport method in a system in which the stocker is configured to be able to move a full bobbin hung on the carriage peg of the traveling creel carriage to the stocker peg and to move an empty bobbin hung on the stocker peg to the carriage peg,
the number of rows of stocker pegs provided in one stocker is equal to the number of rows of carriage pegs provided in one traveling creel carriage plus one,
In a state where one row of the stocker pegs has no bobbins and empty bobbins are hung on all of the remaining rows,
a first step of moving full bobbins hung on one row of carriage pegs of the traveling creel carriage to one row of the stocker pegs that is in a bobbin-free state, thereby leaving one row of the carriage pegs in a bobbin-free state;
a second step of moving the row of empty bobbins hung on the stocker pegs to the row of carriage pegs from which the full bobbins have been removed in the first step and which are now in a bobbin-free state, thereby leaving the row of stocker pegs in a bobbin-free state;
By alternately performing the above steps, an exchange operation is performed in which an empty bobbin in the stocker is exchanged with a full bobbin in the traveling creel carriage,
The bobbin transport method is characterized in that the traveling creel cart transports a full bobbin to the stocker to exchange it for an empty bobbin in the stocker, and then transports the empty bobbin to a location different from the stocker.
JP2022100738A 2022-06-22 2022-06-22 Bobbin transport system and bobbin transport method Active JP7767231B2 (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
JP2022100738A JP7767231B2 (en) 2022-06-22 2022-06-22 Bobbin transport system and bobbin transport method
CN202310555076.XA CN117262902B (en) 2022-06-22 2023-05-17 Cylindrical conveying system and cylindrical conveying method
EP23179484.3A EP4296208B1 (en) 2022-06-22 2023-06-15 Bobbin conveying system and bobbin conveying method
TW112122561A TWI920439B (en) 2022-06-22 2023-06-16 Cylindrical conveying system and cylindrical conveying method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022100738A JP7767231B2 (en) 2022-06-22 2022-06-22 Bobbin transport system and bobbin transport method

Publications (3)

Publication Number Publication Date
JP2024001829A JP2024001829A (en) 2024-01-10
JP2024001829A5 JP2024001829A5 (en) 2025-04-01
JP7767231B2 true JP7767231B2 (en) 2025-11-11

Family

ID=86851208

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022100738A Active JP7767231B2 (en) 2022-06-22 2022-06-22 Bobbin transport system and bobbin transport method

Country Status (3)

Country Link
EP (1) EP4296208B1 (en)
JP (1) JP7767231B2 (en)
CN (1) CN117262902B (en)

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4655665A (en) * 1985-02-06 1987-04-07 Machinenfabrik Rieter Ag Bobbin magazine for a travelling service device of a yarn processing machine
JP2556145B2 (en) * 1989-09-18 1996-11-20 村田機械株式会社 Package transport device from draw false twisting machine
JP2775120B2 (en) 1991-03-06 1998-07-16 津田駒工業株式会社 Package transfer method such as winding machine
JPH04371455A (en) * 1991-06-17 1992-12-24 Murata Mach Ltd Processing system for synthetic fiber yarn
DE59202517D1 (en) * 1991-09-12 1995-07-20 Barmag Barmer Maschf Spinning plant.
JPH05319696A (en) 1992-05-18 1993-12-03 Murata Mach Ltd Package carrying method
JPH05330742A (en) * 1992-06-01 1993-12-14 Tsudakoma Corp Storage method of yarn feeder, textile factory and yarn feeder carrier device
CN1117094A (en) * 1993-07-24 1996-02-21 巴马格股份公司 Spinning machine with transporting apparatus
JP2874551B2 (en) * 1994-03-31 1999-03-24 東レ株式会社 Automatic doffing equipment
DE10100764B4 (en) * 2001-01-10 2005-03-10 Neuenhauser Maschb Gmbh & Co K Arrangement for replacing empty bobbins with full bobbins in a creel cooperating with a ribbon or a thread-processing machine
DE102004005517A1 (en) * 2004-02-04 2005-08-25 Wf Logistik Gmbh A spool transfer apparatus for selectively accessing a spool train in a spool conveyor of a spin line
CN111747230B (en) * 2019-03-28 2024-03-22 北自所(北京)科技发展股份有限公司 Package transfer system and method

Also Published As

Publication number Publication date
TW202400500A (en) 2024-01-01
JP2024001829A (en) 2024-01-10
EP4296208B1 (en) 2025-07-23
EP4296208A1 (en) 2023-12-27
CN117262902A (en) 2023-12-22
CN117262902B (en) 2025-12-05

Similar Documents

Publication Publication Date Title
EP0144652B1 (en) Incremental modular creel system
JP2552260B2 (en) Transfer method of roving bobbin
JPS59192734A (en) System for transporting yarn
JPH05208783A (en) Device to load wind pipe
US6769854B2 (en) Arrangement for exchange of empty bobbins with full bobbins in a bobbin creel
JPH08157144A (en) Bobbin carrying system in spinning machine
JP7767231B2 (en) Bobbin transport system and bobbin transport method
US5316126A (en) System for conveying packages
EP0276569B1 (en) A method and apparatus for transporting articles
TWI920439B (en) Cylindrical conveying system and cylindrical conveying method
JPH01317965A (en) Weft exchange system of weaving machine
JP2517819B2 (en) Ceiling carrier transport system
JPH05246623A (en) Overhead carrying vehicle
JP2025085415A (en) Package Supply System
JPS62175390A (en) Package supply device for creel
JP2000027041A (en) Method for detecting transfer miss of bobbin in textile machine, apparatus therefor and bobbin transfer apparatus
JP2024001829A5 (en)
JP2000096364A (en) Bobbin-carrier device of spinning machine
JPH05278946A (en) Overhead traveling carrier vehicle
TW202319604A (en) Take-up tube replenishment device
JPH07133065A (en) Supplied yarn package transfer system
JPH03249063A (en) Creel stand and supply of material yarn
CZ96498A3 (en) Apparatus for removing wound-up bobbins from winding mechanism of textile machine
JPH1121019A (en) Roving conveying system
JPH0540261U (en) Creel carrier

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20241227

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250321

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20251027

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20251029

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20251031

R150 Certificate of patent or registration of utility model

Ref document number: 7767231

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150