JP7768749B2 - Method for constructing scaffolding for cavernous facilities - Google Patents
[go: Go Back, main page]

JP7768749B2 - Method for constructing scaffolding for cavernous facilities - Google Patents

Method for constructing scaffolding for cavernous facilities

Info

Publication number
JP7768749B2
JP7768749B2 JP2021205943A JP2021205943A JP7768749B2 JP 7768749 B2 JP7768749 B2 JP 7768749B2 JP 2021205943 A JP2021205943 A JP 2021205943A JP 2021205943 A JP2021205943 A JP 2021205943A JP 7768749 B2 JP7768749 B2 JP 7768749B2
Authority
JP
Japan
Prior art keywords
scaffolding
block
wire
scaffold
attached
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021205943A
Other languages
Japanese (ja)
Other versions
JP2023091279A (en
Inventor
圭一 田中
健太 加藤
颯太 滝澤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KYC MACHINE INDUSTORY CO., LTD.
Original Assignee
KYC MACHINE INDUSTORY CO., LTD.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KYC MACHINE INDUSTORY CO., LTD. filed Critical KYC MACHINE INDUSTORY CO., LTD.
Priority to JP2021205943A priority Critical patent/JP7768749B2/en
Publication of JP2023091279A publication Critical patent/JP2023091279A/en
Application granted granted Critical
Publication of JP7768749B2 publication Critical patent/JP7768749B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Description

本発明は、例えば火力発電所のボイラ炉といった空洞設備においてその内部に設けられる空洞設備用足場の構築方法に関する。 The present invention relates to a method for constructing scaffolding for use inside cavernous facilities, such as boiler furnaces in thermal power plants.

従来、例えば火力発電所のボイラ炉といった空洞設備は、内部に空洞を有する略中空四角柱状に形成され、その底部は下方に向かうほど先細りとなったホッパー構造とされている(例えば特許文献1参照)。この底部Bには、図11に示すような空洞設備用足場1が組み立てられて設けられ、空洞設備用足場1は、例えばボイラ炉内部の補修等のメンテナンス時において用いられる。空洞設備用足場1は、所定の間隔を隔ててボイラ炉の底部Bの長手方向に複数設けられる。 Conventionally, cavernous equipment, such as boiler furnaces at thermal power plants, is formed in the shape of a roughly hollow rectangular prism with an internal cavity, and its bottom has a hopper structure that tapers downward (see, for example, Patent Document 1). A cavernous equipment scaffolding 1, as shown in Figure 11, is assembled and installed on this bottom B, and is used, for example, during maintenance such as repairs to the inside of the boiler furnace. Multiple cavernous equipment scaffolding 1 are installed at predetermined intervals along the length of the bottom B of the boiler furnace.

空洞設備用足場1は、図12に示すように、複数の足場ブロック2(以下、足場ブロックを総称する場合、符号2を用いる)が積み上げられてなる。空洞設備用足場1では、底部Bの最下部に第1足場ブロック21が設置され、その上層に第2足場ブロック22及び第3足場ブロック23が側面方向から見て左右略対称に設置され、さらにその上層に左右方向に広がるように3つの足場ブロックが設置される。 As shown in Figure 12, the cavern facility scaffolding 1 is made up of multiple stacked scaffolding blocks 2 (hereinafter, the scaffolding blocks will be referred to collectively as "2"). In the cavern facility scaffolding 1, a first scaffolding block 21 is installed at the bottom of the bottom B, and a second scaffolding block 22 and a third scaffolding block 23 are installed on the layer above that, approximately symmetrically when viewed from the side, and three more scaffolding blocks are installed on the layer above that, spreading out in the left-right direction.

ここで、例えば第1足場ブロック21は、図13に示すように、一対の側面壁部6を有する枠状のフレーム3、フレーム3上に設けられた作業床4、作業床4の両端部から高さ方向に延びた一対の門型支柱7、一対の斜材9及び一対の門型支柱7間に設けられた一対の手摺り11等によって概略構成される。 Here, as shown in Figure 13, for example, the first scaffolding block 21 is roughly composed of a frame 3 having a pair of side walls 6, a work platform 4 mounted on the frame 3, a pair of gate-shaped posts 7 extending vertically from both ends of the work platform 4, a pair of diagonal members 9, and a pair of handrails 11 mounted between the pair of gate-shaped posts 7.

空洞設備用足場1が組み立てられる際には、各足場ブロック2は、それぞれ一つずつクレーン等で吊り上げられて移動され所望位置に設置される。より具体的には、足場ブロック2では、作業床4の下に掛け回された(図13及び図14参照)2本のワイヤーWがそれぞれ吊上げ部材Lに掛けられ、吊上げ部材Lがクレーン等で吊り上げられることにより足場ブロック2が移動される。 When the cavern facility scaffolding 1 is assembled, each scaffolding block 2 is lifted one by one by a crane or the like, moved, and installed in the desired location. More specifically, in the scaffolding block 2, two wires W routed under the work floor 4 (see Figures 13 and 14) are each hooked to a lifting member L, and the scaffolding block 2 is moved by lifting the lifting member L with a crane or the like.

特開2014-201883号公報JP 2014-201883 A

しかしながら、この従来の空洞設備用足場1の構築方法では、複数の足場ブロック2を上方に積み重ねていく方法であるため、現場作業者の作業性が非常に悪いといった欠点があった。すなわち、従来の構築方法では、図15に示すように、まず、底部Bの最下部に第1足場ブロック21が設置され、その後、現場作業者は、その第1足場ブロック21上で吊上げ部材Lに掛けられているワイヤーWの取り外し作業を行う。 However, this conventional method of constructing scaffolding 1 for cavernous facilities involves stacking multiple scaffolding blocks 2 one on top of the other, which has the drawback of making it extremely difficult for on-site workers to work. In other words, with the conventional construction method, as shown in Figure 15, first, a first scaffolding block 21 is installed at the bottom of the bottom B, and then the on-site worker removes the wire W that is attached to the lifting member L on that first scaffolding block 21.

次いで、図16に示すように、第1足場ブロック21の上層に第2足場ブロック22が設置される。この場合、現場作業者は、第1足場ブロック21上でそれと第2足場ブロック22とを連結するための作業を行う。例えば、第1足場ブロック21の門型支柱7及び斜材9の上端と、第2足場ブロック22のフレーム3とを連結する。 Next, as shown in Figure 16, the second scaffolding block 22 is installed on top of the first scaffolding block 21. In this case, the site worker works on top of the first scaffolding block 21 to connect it to the second scaffolding block 22. For example, the worker connects the upper ends of the portal-shaped supports 7 and diagonal members 9 of the first scaffolding block 21 to the frame 3 of the second scaffolding block 22.

次に、現場作業者は、第2足場ブロック22を吊り上げていたワイヤーWを吊上げ部材Lから取り外す必要があるため、第2足場ブロック22上に昇り(矢印T1参照)、第2足場ブロック22上でワイヤーWの取り外し作業を行う。 Next, the site worker needs to remove the wire W that was lifting the second scaffolding block 22 from the lifting member L, so he climbs up onto the second scaffolding block 22 (see arrow T1) and performs the work of removing the wire W from above the second scaffolding block 22.

その後、図17に示すように、第1足場ブロック21の上方であって第2足場ブロック22の側方に、第3足場ブロック23が設置される。この場合、現場作業者は、第1足場ブロック21と第3足場ブロック23とを連結する作業を行うため、再び、第1足場ブロック21上に降りる必要がある(矢印T2参照)。 Then, as shown in Figure 17, a third scaffolding block 23 is placed above the first scaffolding block 21 and to the side of the second scaffolding block 22. In this case, the site worker must descend onto the first scaffolding block 21 again to connect the first scaffolding block 21 and the third scaffolding block 23 (see arrow T2).

さらに、現場作業者は、第3足場ブロック23のワイヤーWを取り外す必要があるため、第3足場ブロック23上に昇り(矢印T3参照)、第3足場ブロック23上でワイヤーWの取り外し作業を行う。 Furthermore, since the site worker needs to remove the wire W from the third scaffolding block 23, he climbs up onto the third scaffolding block 23 (see arrow T3) and performs the work of removing the wire W from the third scaffolding block 23.

このように、従来の構築方法では、ワイヤーWが作業床4の下に掛け回されて吊上げ部材Lに掛けられているため、ワイヤーWの取り外し作業をその足場ブロック2上で行う必要がある。そのため、現場作業者は、高さ方向に積み上げられる足場ブロック2間において昇ったり降りたりを繰り返すことが必要であった。そのため、非常に作業性が悪いといった欠点があった。 As such, in conventional construction methods, the wire W is routed under the work platform 4 and hung on the lifting member L, so the wire W must be removed from the scaffolding block 2. This requires on-site workers to repeatedly climb up and down between the scaffolding blocks 2 stacked vertically. This has the disadvantage of being extremely difficult to work with.

また、このように、現場作業者が足場ブロック2間を昇ったり降りたりすると、誤って墜落する可能性があり、安全上好ましくないといった問題点もあった。例えば、第2足場ブロック22が設置される際には、第3足場ブロック23がまだ設置されていないため、第2足場ブロック22は不安定な設置状態にあり、このような状態で現場作業者が第2足場ブロック22に昇ったり第2足場ブロック22から降りたりすることは、安全上好ましくないものであった。 Furthermore, there was also the problem that if a site worker were to climb up and down between the scaffolding blocks 2, there was a risk of them accidentally falling, which was undesirable from a safety standpoint. For example, when the second scaffolding block 22 was being installed, the third scaffolding block 23 had not yet been installed, so the second scaffolding block 22 was in an unstable installation state, and it was unsafe for a site worker to climb up and down the second scaffolding block 22 in this state.

本発明は、上記した事情のもとで考え出されたものであって、現場作業者の作業性及び安全性を高めることのできる空洞設備用足場の構築方法を提供することをその課題とする。 The present invention was conceived in light of the above circumstances, and its objective is to provide a method for constructing scaffolding for cavern facilities that can improve the workability and safety of on-site workers.

本発明によって提供される空洞設備用足場の構築方法は、内部に空洞を有する空洞設備に対して複数の足場ブロックを一つずつワイヤーにより吊り上げて空中を移動させ、それらを積み上げて設置することにより空洞設備用足場を構築する方法であって、少なくとも、第1の足場ブロックを前記空洞設備の底部に設置する第1の工程と、前記第1の足場ブロックとは異なる第2の足場ブロックを前記第1の足場ブロックの上部に設置する第2の工程と、を有し、前記第1の足場ブロック及び第2の足場ブロックは、作業員が作業を行う作業床部と、前記作業床部の両端部から高さ方向に延びる支柱部と、をそれぞれ備え、前記作業床部には、前記足場ブロックを吊り上げる際に前記ワイヤーを係着自在に支持するためのワイヤー支持部材が取り付けられて用いられ、前記ワイヤー支持部材は、前記作業床部の側端部から立設された一対の側面壁部に貫通自在であるとともに、一端に略環状の固定掛止部を有する支持ボルトと、前記支持ボルトの他端に螺着自在である略環状の可動掛止部と、からなり、前記固定掛止部及び前記可動掛止部に前記ワイヤーがそれぞれ係着されることを特徴としている。
The method for constructing scaffolding for cavernous facilities provided by the present invention is a method for constructing scaffolding for cavernous facilities by lifting a plurality of scaffolding blocks one by one with wires, moving them through the air, and stacking and installing them to a cavernous facility having a cavity inside, and the method comprises at least a first step of installing a first scaffolding block at the bottom of the cavernous facility, and a second step of installing a second scaffolding block different from the first scaffolding block on top of the first scaffolding block, and the first scaffolding block and the second scaffolding block are provided with a work floor section where workers perform work, and a front and support pillars extending in the height direction from both ends of the working floor section, and a wire support member is attached to the working floor section to support the wire so that it can be freely attached when lifting the scaffolding block , and the wire support member is capable of passing through a pair of side wall sections erected from the side ends of the working floor section, and is composed of a support bolt having an approximately annular fixed hanging section at one end, and an approximately annular movable hanging section that can be freely screwed onto the other end of the support bolt, and the wire is respectively attached to the fixed hanging section and the movable hanging section .

本発明の空洞設備用足場の構築方法において、前記第1の足場ブロック及び前記第2の足場ブロックとは異なる第3の足場ブロックを、前記第1の足場ブロックの上部であって前記第2の足場ブロックの側方位置に設置する第3の工程をさらに有し、前記第3の足場ブロックは、作業員が作業を行う作業床部と、前記作業床部の両端部から高さ方向に延びる支柱部と、を備え、前記作業床部には、前記足場ブロックを吊り上げる際に前記ワイヤーを係着自在に支持するためのワイヤー支持部材が取り付けられて用いられるとよい。 The method for constructing scaffolding for cavern facilities of the present invention further includes a third step of installing a third scaffolding block, different from the first scaffolding block and the second scaffolding block, above the first scaffolding block and to the side of the second scaffolding block, and the third scaffolding block comprises a work floor section where workers perform work and support sections extending in the height direction from both ends of the work floor section, and the work floor section is preferably equipped with a wire support member attached to support the wire so that it can be freely attached when lifting the scaffolding block.

本発明によれば、足場ブロックを吊り上げるためのワイヤーを係着自在に支持するワイヤー支持部材が、足場ブロックの作業床部に取付けられているので、第1の足場ブロックの上部に第2の足場ブロックを設置する際、現場作業者は、第1の足場ブロック上で第2の足場ブロックの作業床部に取付けられているワイヤー支持部材からワイヤーを容易に取り外すことができる。そのため、従来の構築方法のように現場作業者は、足場ブロック間を昇ったり降りたりする必要がないので、現場作業者の作業性及び安全性を高めることができる。 According to the present invention, a wire support member that supports a wire for lifting the scaffolding block in a freely attachable manner is attached to the work floor of the scaffolding block. Therefore, when installing a second scaffolding block on top of a first scaffolding block, on-site workers can easily detach the wire from the wire support member attached to the work floor of the second scaffolding block on the first scaffolding block. This eliminates the need for on-site workers to climb up and down between scaffolding blocks, as is the case with conventional construction methods, thereby improving the workability and safety of on-site workers.

本発明の空洞設備用足場の構築方法が適用される足場ブロックの構成を示す概略斜視図である。1 is a schematic perspective view showing the configuration of a scaffolding block to which the method for constructing a scaffolding for cavern facilities of the present invention is applied. ワイヤー支持部材のフレームに対する取付け状態を示す図である。10A and 10B are diagrams showing a state in which a wire support member is attached to a frame. 未使用時のワイヤー支持部材のフレームに対する取付け状態を示す図である。10 is a diagram showing a state in which the wire support member is attached to the frame when not in use. FIG. 足場ブロックに対するワイヤーの取付け状態を示す図である。FIG. 10 is a diagram showing the state in which the wire is attached to the scaffolding block. 足場ブロックの設置手順を説明するための図である。10A and 10B are diagrams for explaining the procedure for installing scaffolding blocks. 足場ブロックの設置手順を説明するための図である。10A and 10B are diagrams for explaining the procedure for installing scaffolding blocks. 足場ブロックの設置手順を説明するための図である。10A and 10B are diagrams for explaining the procedure for installing scaffolding blocks. 変形例のワイヤー支持部材の支持ボルトを示し、(a)は左側面図、(b)は正面図である。10A and 10B show a support bolt of a modified wire support member, in which FIG. 10A is a left side view and FIG. 変形例のワイヤー支持部材の可動掛止部を示し、(a)は左側面図、(b)は正面図である。10A and 10B show a movable hook portion of a modified wire support member, in which FIG. 10A is a left side view and FIG. 変形例における足場ブロックに対するワイヤーの取付け状態を示す図である。FIG. 10 is a diagram showing the state in which a wire is attached to a scaffolding block in a modified example. 空洞設備の概略斜視図である。FIG. 1 is a schematic perspective view of a cavern facility. 図11に示す空洞設備に設置される空洞設備用足場の概略側面図である。FIG. 12 is a schematic side view of a cavern facility scaffold installed in the cavern facility shown in FIG. 11 . 従来の足場ブロックの構成を示す概略斜視図である。FIG. 1 is a schematic perspective view showing the configuration of a conventional scaffolding block. 従来の足場ブロックに対するワイヤーの取付け状態を示す図である。FIG. 10 is a diagram showing how a wire is attached to a conventional scaffolding block. 従来の足場ブロックの設置手順を説明するための図である。10A and 10B are diagrams for explaining a conventional procedure for installing scaffolding blocks. 従来の足場ブロックの設置手順を説明するための図である。10A and 10B are diagrams for explaining a conventional procedure for installing scaffolding blocks. 従来の足場ブロックの設置手順を説明するための図である。10A and 10B are diagrams for explaining a conventional procedure for installing scaffolding blocks.

以下、本発明の実施の形態につき、図面を参照して具体的に説明する。 The following describes in detail the embodiments of the present invention with reference to the drawings.

なお、以下の説明においては、[背景技術]の欄で参照した図を再び参照する。また、[背景技術]の欄で説明した部材と同じものについては同符号で示す。 In the following explanation, we will refer again to the figures referenced in the "Background Art" section. Also, the same components as those described in the "Background Art" section will be indicated by the same reference numerals.

本実施形態に係る空洞設備用足場1の構築方法は、例えば火力発電所のボイラ炉といった空洞設備に適用される。火力発電所のボイラ炉は、その全体構造が内部に空洞を有する略中空四角柱状に形成されており、その底部Bは、図11に示したように、下方に向かうほど先細りとなったホッパー構造とされている。 The method for constructing scaffolding 1 for cavernous facilities according to this embodiment is applied to cavernous facilities such as boiler furnaces at thermal power plants. The overall structure of a boiler furnace at a thermal power plant is formed in the shape of a roughly hollow rectangular prism with an internal cavity, and its bottom B has a hopper structure that tapers downward, as shown in Figure 11.

空洞設備用足場1は、図12に示したように、複数の足場ブロック2が積み重ねられてなる。空洞設備用足場1は、ボイラ炉の最下部に設置される第1足場ブロック21と、その上層に側面方向から見て左右略対称に設置される第2足場ブロック22及び第3足場ブロック23と、さらにその上層に左右方向に広がるように設置される3つの足場ブロックとから構成される。 As shown in Figure 12, the scaffolding 1 for cavernous equipment is made up of multiple stacked scaffolding blocks 2. The scaffolding 1 for cavernous equipment is composed of a first scaffolding block 21 installed at the bottom of the boiler furnace, a second scaffolding block 22 and a third scaffolding block 23 installed on the layer above that, approximately symmetrically when viewed from the side, and three further scaffolding blocks installed on the layer above that, spreading out in the left-right direction.

図1は、第1足場ブロック21の構成を示す概略斜視図である。なお、図1に示す第1足場ブロック21では、それを吊り上げるためのワイヤーWが取付けられた状態を示している。 Figure 1 is a schematic perspective view showing the configuration of the first scaffolding block 21. Note that the first scaffolding block 21 shown in Figure 1 is shown with a wire W attached for lifting it.

第1足場ブロック21では、枠状(図略)のフレーム3の上部に略平板状の作業床4が設けられている。フレーム3は、平面視で略長方形状の本体部5(図4参照)と、作業床4の長手方向に沿って本体部5の左右端部から立設された一対の側面壁部6とからなる。作業床4は、この上面において現場作業者が作業を行うためのものである。 In the first scaffolding block 21, a roughly flat work platform 4 is provided on top of a frame 3 (not shown). The frame 3 consists of a main body 5 (see Figure 4) that is roughly rectangular in plan view, and a pair of side walls 6 erected from the left and right ends of the main body 5 along the longitudinal direction of the work platform 4. The work platform 4 is intended for on-site workers to carry out work on its top surface.

フレーム3の両端部には、一対の側面壁部6同士を結びかつ高さ方向に延びた一対の門型支柱7がそれぞれ設けられている。一対の門型支柱7は、フレーム3の両端部において対向して設けられている。これら門型支柱7は、この第1足場ブロック21の上部に設置される第2足場ブロック22または第3足場ブロック23を支持するためのものである。各門型支柱7は、それぞれの上端に第2及び第3足場ブロック22,23と連結するための側面視で略コの字状の連結部材8がそれぞれ設けられている。 A pair of gate-shaped posts 7 are provided at both ends of the frame 3, connecting the pair of side wall sections 6 and extending in the vertical direction. The pair of gate-shaped posts 7 are provided opposite each other at both ends of the frame 3. These gate-shaped posts 7 are intended to support the second scaffolding block 22 or the third scaffolding block 23 that is placed on top of the first scaffolding block 21. Each gate-shaped post 7 is provided at its upper end with a connecting member 8 that is approximately U-shaped in side view for connecting to the second and third scaffolding blocks 22, 23.

一対の門型支柱7同士の間には、フレーム3の両側面壁部6に沿って門型支柱7の下部から互いに接近するように斜め方向にそれぞれ延びて先端部で接続され、略山状に形成された一対の斜材9が設けられている。一対の斜材9は、この第1足場ブロック21の上部に設置される第2足場ブロック22または第3足場ブロック23を支持するためのものである。一対の斜材9のそれぞれの先端接続部には、それらと連結するための側面視で略コの字状の連結部材10がそれぞれ設けられている。 A pair of diagonal members 9 are provided between the pair of portal posts 7, extending diagonally from the lower parts of the portal posts 7 along both side wall portions 6 of the frame 3 so as to approach each other and connected at their tips, forming a roughly mountain-like shape. The pair of diagonal members 9 are intended to support the second scaffolding block 22 or the third scaffolding block 23, which are placed on top of the first scaffolding block 21. A connecting member 10, which is roughly U-shaped in side view, is provided at the end connection portion of each of the pair of diagonal members 9 to connect them.

また、一対の門型支柱7同士の間には、フレーム3の両側面壁部6に沿って左右方向に延びる一対の手摺部11が設けられている。一対の手摺部11のそれぞれは、左右方向に延びる上さん、中さん、下さん、及びそれらを接続するように上下方向に延びる3本の接続部材によって構成される。一対の手摺部11は、作業床4上で作業する現場作業者の墜落を防止するためのものである。 A pair of handrails 11 are provided between the pair of gate-shaped supports 7, extending left and right along both side wall portions 6 of the frame 3. Each of the pair of handrails 11 is composed of an upper, middle, and lower rail that extend left and right, and three connecting members that extend up and down to connect them. The pair of handrails 11 are intended to prevent workers working on the work platform 4 from falling.

フレーム3の四方端には、高さ方向に延びるジャッキボルト12がそれぞれ設けられ、ジャッキボルト12の下端には、略平板状のジャッキベース13がそれぞれ設けられている。ジャッキベース13は、斜面を有する底部Bに沿うように第1足場ブロック21を支持するために斜め方向に傾けられて設けられている。 A jack bolt 12 extending in the height direction is attached to each of the four ends of the frame 3, and a roughly flat jack base 13 is attached to the lower end of each jack bolt 12. The jack base 13 is tilted diagonally to support the first scaffolding block 21 along the sloped bottom B.

フレーム3の両端部には、斜め方向に広がるように延びる一対の梯子部材14がそれぞれ設けられている。各梯子部材14は、第1足場ブロック21の上部に設置される第2足場ブロック22及び第3足場ブロック23のそれぞれのジャッキベース13を支持するためのものである。 A pair of ladder members 14 extending diagonally are provided at both ends of the frame 3. Each ladder member 14 is intended to support the jack bases 13 of the second scaffolding block 22 and the third scaffolding block 23, which are installed on top of the first scaffolding block 21.

本実施形態では、第1足場ブロック21が吊り上げられる際に用いられるワイヤー支持部材15が第1足場ブロック21に複数取付けられている。ワイヤー支持部材15は、図2に示すように、略コの字状に形成されたコの字ボルト部16と、の両先端に螺着自在とされたナット部17とによって構成されている。 In this embodiment, multiple wire support members 15 are attached to the first scaffolding block 21 and are used when lifting the first scaffolding block 21. As shown in Figure 2, each wire support member 15 is composed of a U-shaped bolt portion 16 formed in a roughly U-shape and nuts 17 that can be screwed onto both ends.

ワイヤー支持部材15は、フレーム3の一端側近傍と他端側近傍とにそれぞれ2個ずつ取付けられる。より詳細には、図4に示すように、フレーム3の一方の側面壁部6に形成された2つの貫通孔6a(図1の円内参照)に、コの字ボルト部16の先端部がフレーム3の外側から挿入され、側面壁部6の内側においてナット部17が螺着される。フレーム3の他方の側面壁部6にも同様の構成でワイヤー支持部材15が取り付けられる。 Two wire support members 15 are attached near one end and two near the other end of the frame 3. More specifically, as shown in Figure 4, the tip of a U-shaped bolt 16 is inserted from the outside of the frame 3 into two through holes 6a (see the circle in Figure 1) formed in one side wall 6 of the frame 3, and a nut 17 is screwed into the inside of the side wall 6. A wire support member 15 is attached in a similar configuration to the other side wall 6 of the frame 3.

第1足場ブロック21の吊り上げ時には、4個のワイヤー支持部材15のそれぞれにワイヤーWが係着される。すなわち、フレーム3の側面壁部6とワイヤー支持部材15とで形成される隙間Sに、2本のワイヤーWのフックFが係着される(図1及び図4参照)。 When lifting the first scaffolding block 21, a wire W is attached to each of the four wire support members 15. That is, the hooks F of the two wires W are attached to the gap S formed between the side wall portion 6 of the frame 3 and the wire support members 15 (see Figures 1 and 4).

なお、ワイヤー支持部材15は、第1足場ブロック21が吊り上げられない未使用時には、図3に示すように、コの字ボルト部16がフレーム3の側面壁部6の内側に押し込まれ、隙間Sを形成しないようになっている。 When the wire support member 15 is not in use and the first scaffolding block 21 is not being lifted, the U-shaped bolt portion 16 is pushed into the inside of the side wall portion 6 of the frame 3, as shown in Figure 3, so that no gap S is formed.

2本のワイヤーWは吊り上げ部材Lに掛けられ、吊り上げ部材Lはクレーン等によって吊り上げられて移動され、これにより、第1足場ブロック21が移動されて所望の位置に設置される。 The two wires W are hung from the lifting member L, which is then lifted and moved by a crane or similar device, thereby moving the first scaffolding block 21 and installing it in the desired position.

なお、第2足場ブロック22及び第3足場ブロック23は、第1足場ブロック21とほぼ同様の構成とされているが、第2足場ブロック22は、その右側方に第3足場ブロック23が設置されるため、第1足場ブロック21に比して右側の梯子部材14がない構成とされる。また、第3足場ブロック23は、その左側方に第2足場ブロック22が設置されるため、第1足場ブロック21に比して左側の梯子部材14がなく、第2足場ブロック22の右側の門型支柱7と重複するため、左側の門型支柱7もない構成とされる。 The second scaffolding block 22 and the third scaffolding block 23 are configured in a manner similar to the first scaffolding block 21, but because the third scaffolding block 23 is installed to the right of the second scaffolding block 22, the second scaffolding block 22 does not have a ladder member 14 on the right side compared to the first scaffolding block 21. Also, because the second scaffolding block 22 is installed to the left of the third scaffolding block 23, the third scaffolding block 23 does not have a ladder member 14 on the left side compared to the first scaffolding block 21, and because it overlaps with the gate-shaped support 7 on the right side of the second scaffolding block 22, the third scaffolding block 23 does not have a gate-shaped support 7 on the left side either.

次に、本発明の空洞設備用足場1の構築方法における足場ブロック2の設置手順について説明する。 Next, we will explain the procedure for installing the scaffolding blocks 2 in the method for constructing the cavern facility scaffolding 1 of the present invention.

まず、地面上等で第1足場ブロック21が組立てられる。このとき、フレーム3の側面壁部6には、図1及び図4に示したように、ワイヤー支持部材15が取り付けられ、ワイヤー支持部材15の側面壁部6と本体部16とによって形成される隙間Sには2本のワイヤーWのフックFが係着される。そして、第1足場ブロック21は、クレーン等で吊り上げ部材Lが吊り上げられることにより空中を移動され、ボイラ炉の底部Bの最下部に設置される。 First, the first scaffolding block 21 is assembled on the ground or elsewhere. At this time, as shown in Figures 1 and 4, the wire support member 15 is attached to the side wall 6 of the frame 3, and hooks F of two wires W are attached to the gap S formed between the side wall 6 of the wire support member 15 and the main body 16. The first scaffolding block 21 is then moved through the air by lifting the lifting member L with a crane or the like, and placed at the bottom of the boiler furnace bottom B.

第1足場ブロック21の設置が終了すれば、現場作業者は、その第1足場ブロック21上で吊り上げ部材Lに掛けられているワイヤーWの取り外し作業を行う(図5参照)。すなわち、フレーム3の側面壁部6に取付けられているワイヤー支持部材15に係着されたフックFを取り外す。これにより、第1足場ブロック21とワイヤーWとが切り離される。 Once the first scaffolding block 21 has been installed, the on-site worker removes the wire W that is attached to the lifting member L on the first scaffolding block 21 (see Figure 5). That is, the worker removes the hook F that is attached to the wire support member 15 attached to the side wall 6 of the frame 3. This separates the first scaffolding block 21 from the wire W.

次いで、例えば地面上等で第2足場ブロック22が組立てられ、第1足場ブロック21と同様に、ワイヤー支持部材15が取り付けられ、隙間SにワイヤーWのフックFが係着される。そして、第2足場ブロック22は、クレーン等で吊り上げ部材Lが吊り上げられて空中を移動され、第1足場ブロック21の上方であって底部Bの左斜面に沿うように設置される。 Next, the second scaffolding block 22 is assembled, for example, on the ground, and, similar to the first scaffolding block 21, the wire support member 15 is attached and the hook F of the wire W is attached to the gap S. The second scaffolding block 22 is then lifted by a crane or other device using the lifting member L and moved through the air, and is installed above the first scaffolding block 21, along the left slope of the bottom B.

第2足場ブロック22が第1足場ブロック21の上方に設置されると、現場作業者は、第1足場ブロック21上で第2足場ブロック22のフレーム3と、第1足場ブロック21の門型支柱7の連結部材8及び斜材9の連結部材10とをそれぞれ連結する(図6参照)。 Once the second scaffolding block 22 is installed above the first scaffolding block 21, the site worker connects the frame 3 of the second scaffolding block 22 to the connecting members 8 of the portal posts 7 and the connecting members 10 of the diagonal members 9 of the first scaffolding block 21 (see Figure 6).

そして、現場作業者は、第1足場ブロック21上で吊り上げ部材Lに掛けられているワイヤーWの取り外し作業を行う。すなわち、現場作業者は、上方に手を伸ばし、ワイヤー支持部材15の隙間Sに係着されたフックFを取り外す。これにより、第2足場ブロック22とワイヤーWとが切り離される。 Then, the site worker removes the wire W that is attached to the lifting member L on the first scaffolding block 21. That is, the site worker reaches upward and removes the hook F that is engaged in the gap S of the wire support member 15. This separates the second scaffolding block 22 and the wire W.

このように、ワイヤー支持部材15は、フレーム3の側面壁部6に取付けられているため、現場作業者は、第2足場ブロック22の下層の第1足場ブロック21上で第2足場ブロック22のワイヤーWの取り外し作業を容易に行うことができる。そのため、従来の構築方法のように、現場作業者は、第1足場ブロック21から第2足場ブロック22に昇る必要がない。 In this way, because the wire support member 15 is attached to the side wall portion 6 of the frame 3, on-site workers can easily remove the wire W from the second scaffolding block 22 while standing on the first scaffolding block 21 below the second scaffolding block 22. Therefore, as with conventional construction methods, on-site workers do not need to climb from the first scaffolding block 21 to the second scaffolding block 22.

次に、第1足場ブロック21の上方であって第2足場ブロック22の側方に、例えば地面上等で組立てられた、第3足場ブロック23が設置される。この場合も、第3足場ブロック23は、第1及び第2足場ブロック21, 22と同様に、クレーン等で吊り上げ部材Lが吊り上げられて空中を移動される。 Next, a third scaffolding block 23, assembled, for example, on the ground, is placed above the first scaffolding block 21 and to the side of the second scaffolding block 22. In this case, as with the first and second scaffolding blocks 21 and 22, the third scaffolding block 23 is lifted by a crane or the like and moved through the air using a lifting member L.

第3足場ブロック23が第1足場ブロック21の上方に設置されると、現場作業者は、第1足場ブロック21上で第3足場ブロック23のフレーム3と、第1足場ブロック21の門型支柱7の連結部材8及び斜材9の連結部材10とをそれぞれ連結する(図7参照) Once the third scaffolding block 23 is installed above the first scaffolding block 21, the site worker connects the frame 3 of the third scaffolding block 23 to the connecting members 8 of the portal posts 7 and the connecting members 10 of the diagonal members 9 of the first scaffolding block 21 (see Figure 7).

そして、現場作業者は、第1足場ブロック21上で第3足場ブロック23のワイヤーWの取り外し作業を行う。すなわち、現場作業者は、上方に手を伸ばし、ワイヤー支持部材15の隙間Sに係着されたフックFを取り外す。これにより、第3足場ブロック23とワイヤーWとが切り離される。 Then, the site worker, standing on the first scaffolding block 21, removes the wire W from the third scaffolding block 23. That is, the site worker reaches upward and removes the hook F that is engaged in the gap S of the wire support member 15. This separates the third scaffolding block 23 from the wire W.

この場合も、ワイヤー支持部材15は、第3足場ブロック23のフレーム3の側面壁部6に取付けられているため、現場作業者は、第3足場ブロック23の下層の第1足場ブロック21上で第3足場ブロック23のワイヤーWの取り外し作業を容易に行うことができる。そのため、従来の構築方法のように、現場作業者は、第2足場ブロック22から第1足場ブロック21に降りたり第3足場ブロック23に昇ったりする必要がない。 In this case, too, the wire support member 15 is attached to the side wall 6 of the frame 3 of the third scaffolding block 23, so site workers can easily remove the wire W from the third scaffolding block 23 while standing on the first scaffolding block 21 below the third scaffolding block 23. Therefore, as with conventional construction methods, site workers do not need to descend from the second scaffolding block 22 to the first scaffolding block 21 or ascend to the third scaffolding block 23.

その後、図示していないが、第2足場ブロック22及び第3足場ブロック23の上方には、他の足場ブロック2が同様にして設置され、空洞設備用足場1が構築される。 Then, although not shown, other scaffolding blocks 2 are installed in the same manner above the second scaffolding block 22 and the third scaffolding block 23, and the cavern equipment scaffolding 1 is constructed.

このように、本実施形態では、ワイヤーWを係着自在に支持するためにワイヤー支持部材15が用いられているため、ワイヤーWの取り外し作業を下層の足場ブロック2上で行うことができ、従来の方法のように、現場作業者は、上下に積み上げられる足場ブロック間を登ったり降りたりを繰り返してする必要がない。そのため、現場作業者の作業性が向上された構築方法を提供することができる。 In this way, in this embodiment, the wire support member 15 is used to support the wire W so that it can be freely attached. This allows the wire W to be removed from the lower scaffolding block 2, eliminating the need for on-site workers to repeatedly climb up and down between scaffolding blocks stacked one above the other, as is the case with conventional methods. This provides a construction method that improves the workability of on-site workers.

また、従来の構築方法のように、足場ブロック2間を登ったり降りたりしないため、現場作業者は、誤って足場ブロック2から墜落する可能性を極力少なくでき、安全上が向上された構築方法を提供することができる。 In addition, because there is no need to climb up and down between scaffolding blocks 2 as in conventional construction methods, the possibility of on-site workers accidentally falling from the scaffolding blocks 2 is minimized, providing a construction method with improved safety.

図8ないし図10は、ワイヤー取付部材の変形例を示す図である。このワイヤー支持部材25は、図8及び図9に示すように、螺刻された略棒状の支持ボルト26と、この一方端にナット部27によって螺着自在とされた略環状の可動掛止部28とからなる。支持ボルト26の他方端には、略環状の固定掛止部29が設けられている。 Figures 8 to 10 show modified examples of the wire mounting member. As shown in Figures 8 and 9, this wire support member 25 consists of a threaded, generally rod-shaped support bolt 26 and a generally annular movable retaining portion 28 that is threadably attached to one end of the support bolt 26 by a nut portion 27. A generally annular fixed retaining portion 29 is provided at the other end of the support bolt 26.

ワイヤー支持部材25は、一つの足場ブロック2に対して2セットずつ用いられ、フレーム3の一端側近傍と他端側近傍とにそれぞれ取付けられる。より詳細には、図10に示すように、フレーム3の一方の側面壁部6の外側から、支持ボルト26の一方端がフレーム3に挿入され、他方の側面壁部6から突出される。突出した支持ボルト26の他方端には、可動掛止部28が螺着される。 Two sets of wire support members 25 are used for each scaffolding block 2, and are attached near one end and the other end of the frame 3, respectively. More specifically, as shown in Figure 10, one end of a support bolt 26 is inserted into the frame 3 from the outside of one side wall 6 of the frame 3, and protrudes from the other side wall 6. A movable latch 28 is screwed onto the other end of the protruding support bolt 26.

第1足場ブロック21の吊り上げ時には、2セットのワイヤー支持部材25のそれぞれにワイヤーWが係着される。すなわち、フレーム3の側面壁部6同士に取付けられたワイヤー支持部材25の可動掛止部28及び固定掛止部29のそれぞれに2本のワイヤーWのフックFが係着される(図10参照)。なお、足場ブロック2の設置後、フックFが取り外された場合、ワイヤー支持部材25自体は、第1足場ブロック21から取り外した状態にしてもよいし、そのまま取付けられた状態でもよい。 When lifting the first scaffolding block 21, a wire W is attached to each of the two sets of wire support members 25. That is, the hooks F of the two wires W are attached to the movable and fixed hook portions 28 and 29 of the wire support members 25 attached to the side wall portions 6 of the frame 3 (see Figure 10). Note that if the hooks F are removed after the scaffolding block 2 is installed, the wire support members 25 themselves may be removed from the first scaffolding block 21, or may remain attached.

なお、本発明の範囲は上述した実施の形態に限定されるものではなく、発明の範囲を逸脱しない範囲で種々の変更を行うことができる。例えば上記実施形態では、ワイヤー支持部材15が足場ブロック2のフレーム3に取付けられる構造としたが、ワイヤーWの取外しが下層の足場ブロック2から可能であるならば、ワイヤー支持部材15の取付け位置は、上記実施形態に限るものではない。また、上記足場ブロック2及びワイヤー支持部材15等は、上記した実施形態の形状、大きさ、数量及び位置関係等に限るものではない。 The scope of the present invention is not limited to the above-described embodiment, and various modifications can be made without departing from the scope of the invention. For example, in the above embodiment, the wire support member 15 is attached to the frame 3 of the scaffolding block 2. However, as long as the wire W can be removed from the lower scaffolding block 2, the attachment position of the wire support member 15 is not limited to the above-described embodiment. Furthermore, the scaffolding block 2 and wire support member 15 are not limited to the shape, size, quantity, positional relationship, etc. of the above-described embodiment.

1 空洞設備用足場
2 足場ブロック
3 フレーム
4 作業床
6 側面壁部
7 門型支柱
9 斜材
11 手摺
14 梯子部材
15 ワイヤー支持部材
16 コの字ボルト部
17 ナット部
21 第1足場ブロック
22 第2足場ブロック
23 第3足場ブロック
B 底部(ボイラ炉の)
W ワイヤー
DESCRIPTION OF SYMBOLS 1 Scaffolding for cavern equipment 2 Scaffolding block 3 Frame 4 Working floor 6 Side wall 7 Gate-shaped support 9 Diagonal member 11 Handrail 14 Ladder member 15 Wire support member 16 U-shaped bolt portion 17 Nut portion 21 First scaffolding block 22 Second scaffolding block 23 Third scaffolding block B Bottom (of boiler furnace)
W Wire

Claims (2)

内部に空洞を有する空洞設備に対して複数の足場ブロックを一つずつワイヤーにより吊り上げて空中を移動させ、それらを積み上げて設置することにより空洞設備用足場を構築する方法であって、
少なくとも、第1の足場ブロックを前記空洞設備の底部に設置する第1の工程と、
前記第1の足場ブロックとは異なる第2の足場ブロックを前記第1の足場ブロックの上部に設置する第2の工程と、を有し、
前記第1の足場ブロック及び第2の足場ブロックは、
現場作業者が作業を行う作業床部と、
前記作業床部の両端部から高さ方向に延びる支柱部と、をそれぞれ備え、
前記作業床部には、
前記足場ブロックを吊り上げる際に前記ワイヤーを係着自在に支持するためのワイヤー支持部材が取り付けられて用いられ
前記ワイヤー支持部材は、
前記作業床部の側端部から立設された一対の側面壁部に貫通自在であるとともに、一端に略環状の固定掛止部を有する支持ボルトと、
前記支持ボルトの他端に螺着自在である略環状の可動掛止部と、からなり、
前記固定掛止部及び前記可動掛止部に前記ワイヤーがそれぞれ係着されることを特徴とする、空洞設備用足場の構築方法。
A method for constructing scaffolding for a cavernous facility by lifting a plurality of scaffolding blocks one by one with a wire, moving them through the air, and stacking and installing them for the cavernous facility having a cavity inside, comprising:
A first step of installing at least a first scaffolding block at the bottom of the cavern facility;
a second step of installing a second scaffolding block different from the first scaffolding block on top of the first scaffolding block;
The first scaffold block and the second scaffold block are
a work floor section where on-site workers perform work;
and support columns extending in a height direction from both ends of the work floor section,
The work floor section has:
A wire support member is attached and used to support the wire so that it can be freely engaged when lifting the scaffolding block ,
The wire support member is
a support bolt that can freely pass through a pair of side wall portions that are erected from the side end portions of the work platform portion and has a substantially annular fixed hook portion at one end;
a substantially annular movable latch portion that is freely threadably attached to the other end of the support bolt,
A method for constructing a scaffold for a cavern facility, characterized in that the wire is respectively attached to the fixed hook portion and the movable hook portion .
前記第1の足場ブロック及び前記第2の足場ブロックとは異なる第3の足場ブロックを、前記第1の足場ブロックの上部であって前記第2の足場ブロックの側方位置に設置する第3の工程をさらに有し、
前記第3の足場ブロックは、
現場作業者が作業を行う作業床部と、
前記作業床部の両端部から高さ方向に延びる支柱部と、を備え、
前記作業床部には、
前記足場ブロックを吊り上げる際に前記ワイヤーを係着自在に支持するためのワイヤー支持部材が取り付けられて用いられる、請求項1に記載の空洞設備用足場の構築方法。
a third step of placing a third scaffold block different from the first scaffold block and the second scaffold block on top of the first scaffold block and at a position to the side of the second scaffold block;
The third scaffolding block comprises:
a work floor section where on-site workers perform work;
and support columns extending in a height direction from both ends of the work floor section,
The work floor section has:
2. The method for constructing a cavern facility scaffold according to claim 1, wherein a wire support member is attached to the scaffold block for supporting the wire so that it can be freely engaged when the scaffold block is lifted.
JP2021205943A 2021-12-20 2021-12-20 Method for constructing scaffolding for cavernous facilities Active JP7768749B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021205943A JP7768749B2 (en) 2021-12-20 2021-12-20 Method for constructing scaffolding for cavernous facilities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021205943A JP7768749B2 (en) 2021-12-20 2021-12-20 Method for constructing scaffolding for cavernous facilities

Publications (2)

Publication Number Publication Date
JP2023091279A JP2023091279A (en) 2023-06-30
JP7768749B2 true JP7768749B2 (en) 2025-11-12

Family

ID=86941823

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021205943A Active JP7768749B2 (en) 2021-12-20 2021-12-20 Method for constructing scaffolding for cavernous facilities

Country Status (1)

Country Link
JP (1) JP7768749B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7715864B1 (en) * 2024-03-21 2025-07-30 太平電業株式会社 Scaffolding installation method for boiler furnace hopper

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012052305A (en) 2010-08-31 2012-03-15 Taihei Dengyo Kaisha Ltd Scaffold inside boiler and construction method therefor

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0687557U (en) * 1993-05-31 1994-12-22 大成建設株式会社 Scaffolding for deep foundation work
JP2916402B2 (en) * 1995-12-28 1999-07-05 東電工業株式会社 Boiler furnace inspection scaffold support structure
JP3027130B2 (en) * 1997-06-30 2000-03-27 ショーボンド建設株式会社 Assembly structure of hanging scaffold

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012052305A (en) 2010-08-31 2012-03-15 Taihei Dengyo Kaisha Ltd Scaffold inside boiler and construction method therefor

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
フレノリンクボルトで金型の横吊りと反転作業を安心して行う事ができます!,YouTube [online] [video],マーテック吊り具,2020年10月27日,[2025年8月1日検索]、<https://www.youtube.com/watch?v=Y4ElqlspOXg&t=89s>,1:04-2:10

Also Published As

Publication number Publication date
JP2023091279A (en) 2023-06-30

Similar Documents

Publication Publication Date Title
US20150068011A1 (en) Scaffold and methods for installing or removing such a scaffold
CN1944914B (en) Scaffold for maintenance of large boiler parts and construction method thereof
CA2998120C (en) Ladder installation for equipment tower
KR101339284B1 (en) Safety ladder for concrete mold
JP7768749B2 (en) Method for constructing scaffolding for cavernous facilities
JP5245104B2 (en) Boiler scaffold and its construction method
KR102049630B1 (en) Scaffolding equipment for aggregate smokestack dismantling and dismantling method for aggregate smokestack using same equipment
JP2021042632A (en) Cantilever for bridge construction and bridge erection and demolition method
JP5814217B2 (en) How to build a scaffold in a boiler
JP2012102468A (en) Movable scaffold for repairing bridge lower face and installation method for the same
CN219059723U (en) Wet joint connection module
JP7044363B2 (en) Tower-supported chimney dismantling method and tower-supported chimney dismantling device
JP6514677B2 (en) In-furnace scaffolding system for boiler maintenance and its installation method
JP5635163B1 (en) How to build a scaffold in a boiler
JP4122501B2 (en) Caisson&#39;s mobile scaffold construction method
JP2013129961A (en) Temporary fixation method for steel staircase and pipe support for supporting steel staircase
JP2944998B1 (en) Scaffolding equipment for building tower structures
KR101733933B1 (en) Temporary working plate for chimney demolishing and construction method of this temporary working plate and chimney demolishing method
CN219653529U (en) Assembled integral bridge pier construction ladder cage
JP6159197B2 (en) Steel tower dismantling method and dismantling apparatus
JP3236662U (en) Member connection structure of scaffolding for hollow equipment
JP4951056B2 (en) Working frame dismantling method
CN222782457U (en) A temporary safety passage for assembled stairs
JP2001107552A (en) Temporary scaffold with safety handrail, and safety handrail provided on temporary scaffold
JP5723932B2 (en) How to build a scaffold in a boiler

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20241107

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250730

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250808

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250904

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20251028

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20251030

R150 Certificate of patent or registration of utility model

Ref document number: 7768749

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150