Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP7769563B2 - Work management support device, work management support system, and work management support method - Google Patents
[go: Go Back, main page]

JP7769563B2 - Work management support device, work management support system, and work management support method - Google Patents

Work management support device, work management support system, and work management support method

Info

Publication number
JP7769563B2
JP7769563B2 JP2022029260A JP2022029260A JP7769563B2 JP 7769563 B2 JP7769563 B2 JP 7769563B2 JP 2022029260 A JP2022029260 A JP 2022029260A JP 2022029260 A JP2022029260 A JP 2022029260A JP 7769563 B2 JP7769563 B2 JP 7769563B2
Authority
JP
Japan
Prior art keywords
information
terminal
work
work management
management support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022029260A
Other languages
Japanese (ja)
Other versions
JP2023125264A (en
Inventor
良祐 村上
義剛 松岡
隆弘 山口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daiwa House Industry Co Ltd
Original Assignee
Daiwa House Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiwa House Industry Co Ltd filed Critical Daiwa House Industry Co Ltd
Priority to JP2022029260A priority Critical patent/JP7769563B2/en
Publication of JP2023125264A publication Critical patent/JP2023125264A/en
Application granted granted Critical
Publication of JP7769563B2 publication Critical patent/JP7769563B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、作業管理支援装置、作業管理支援システム、及び作業管理支援方法に係り、特に、複数の工程を含む作業の管理を支援する作業管理支援装置、作業管理支援システム、及び作業管理支援方法に関する。 The present invention relates to a work management support device, a work management support system, and a work management support method, and in particular to a work management support device, a work management support system, and a work management support method that support the management of work that includes multiple processes.

建材等の製品を製造する作業において、ICT(Information Communication Technology)を活用し、作業時間及び進捗状況等をデータ化して管理する技術は、既に実用化されている。例えば、特許文献1には、タブレット端末又はスマートフォン等の端末を使用して作業の進捗を管理する技術が記載されている。 Technology that utilizes ICT (Information Communication Technology) to digitize and manage work time, progress, and other data in the production of building materials and other products has already been put to practical use. For example, Patent Document 1 describes technology for managing work progress using devices such as tablet computers or smartphones.

特開2016-184427号公報JP 2016-184427 A

ところで、製品の製造作業は、一般的に複数の工程からなり、各工程が順番に実施されることで製品が完成する。作業者は、各工程において製品の図面(例えば、設計図又は組み立て図)を参照しつつ、各工程に割り当てられた仕事(以下、要素作業)を行う。 Product manufacturing generally consists of multiple processes, each of which is carried out in order to complete the product. At each process, workers refer to product drawings (e.g., blueprints or assembly drawings) and perform the tasks assigned to each process (hereinafter referred to as elemental work).

一方、参照すべき図面は、製品の種類に応じて変わる。その場合、製品毎に図面を印刷(プリント)しようとすると、印刷の手間を要し、また、参照すべき図面の数に応じてプリント用紙の消費枚数が増えてしまう。 On the other hand, the drawings to be referenced vary depending on the type of product. In such cases, printing out drawings for each product requires a lot of work, and the amount of printing paper consumed increases depending on the number of drawings to be referenced.

また、複数の工程のうち、ある工程において、作業者が、その工程の進捗状況又は要素作業に関する変更点等、当該工程の進行に関する情報を記録することがある。その情報は、以降の工程に影響を及ぼすため、各作業者が確認できるように記録する必要があるが、所定の用紙又は上記の図面等に記入しようとすると、手間が掛かり、また、情報が記録された書類等を紛失しないように管理する必要がある。 Furthermore, during one of the multiple processes, a worker may record information about the progress of that process, such as the progress of that process or changes to the elemental work. Because this information affects subsequent processes, it needs to be recorded so that each worker can check it. However, writing it down on a designated form or the above-mentioned drawings is time-consuming, and documents containing the recorded information must be managed to prevent them from being lost.

そこで、本発明は、上記の課題に鑑みてなされたものであり、その目的とするところは、より容易な作業管理を実現するための装置、システム、及び方法を提供することである。 The present invention was made in consideration of the above-mentioned problems, and its purpose is to provide an apparatus, system, and method for achieving easier work management.

上記の課題は、本発明の作業管理支援装置によれば、複数の工程を含む作業の管理を支援する作業管理支援装置であって、それぞれの工程において、工程にて取り扱われる対象物に付与された識別画像が端末によって読み取られた場合に、端末を制御して、端末又は端末と対応する表示器に、識別画像から特定される対象物の図面を表示させる表示制御部と、少なくとも一つの工程を第1工程として、第1工程の進行に関する情報が端末を通じて入力された場合に、情報を取得する情報取得部と、取得された情報を、第1工程と関連付けて記憶装置に記憶させる記憶部と、記憶装置に記憶された情報に基づいて、第1工程又は第1工程と対応する第2工程に関する処理を実行する処理実行部と、を備えることにより解決される。 The above problem is solved by the work management support device of the present invention, which supports the management of work that includes multiple processes, and which includes: a display control unit that, when an identification image attached to an object handled in each process is read by the terminal, controls the terminal to display a drawing of the object identified from the identification image on the terminal or a display device corresponding to the terminal; an information acquisition unit that, when information regarding the progress of at least one process designated as a first process is input through the terminal, acquires the information; a storage unit that stores the acquired information in a storage device in association with the first process; and a processing execution unit that executes processing related to the first process or a second process corresponding to the first process based on the information stored in the storage device.

上記のように構成された本発明の作業管理支援装置では、各工程にて取り扱われる対象物に付与された識別画像を端末により読み取ることで、端末又は端末と対応する表示器に、識別画像から特定される対象物の図面を表示させることができる。これにより、各工程にて参照すべき図面を容易に確認することができる。
また、本発明の作業管理支援装置では、少なくとも一つの工程(第1工程)の進行に関する情報が端末を通じて入力された場合に、その情報を記録し、記録された情報に基づいて、第1工程又は第1工程と対応する第2工程に関する処理が実行される。これにより、各工程の進行に関する情報を容易に管理することができ、また、その情報を作業管理に容易に反映させることができる。
In the work management support device of the present invention configured as described above, by reading the identification image attached to the object handled in each process by a terminal, a drawing of the object identified from the identification image can be displayed on the terminal or a display device corresponding to the terminal, thereby making it easy to check the drawing to be referred to in each process.
Furthermore, in the work management support device of the present invention, when information regarding the progress of at least one process (first process) is input via a terminal, the information is recorded and processing related to the first process or a second process corresponding to the first process is executed based on the recorded information. This makes it possible to easily manage information regarding the progress of each process and to easily reflect that information in work management.

また、上記の作業管理支援装置は、図面が表示された端末にて行われた操作に応じて、図面を示す図面データを更新する更新部を備えてもよい。この場合、表示制御部は、図面として、更新が可能な図面データに基づく第1図面、及び、更新が不可能な図面データに基づく第2図面のうち、端末にて選択された少なくとも一方を端末又は表示器に表示させると、好適である。
上記の構成によれば、作業者の選択に応じて、第1図面及び第2図面のうち、少なくとも一方の図面を選択して表示させることができるため、作業者にとっての利便性(使い勝手)が向上する。
The work management support device may further include an update unit that updates the drawing data representing the drawing in response to an operation performed on the terminal on which the drawing is displayed. In this case, it is preferable that the display control unit displays, on the terminal or the display, at least one of a first drawing based on updatable drawing data and a second drawing based on non-updatable drawing data, selected by the terminal.
According to the above configuration, at least one of the first drawing and the second drawing can be selected and displayed according to the worker's selection, thereby improving convenience (ease of use) for the worker.

また、複数の工程のそれぞれを第1工程として、第1工程の進捗に関する進捗情報が工程毎に入力される場合に、情報取得部は、進捗情報を工程毎に取得し、記憶部は、それぞれの工程の進捗情報を、それぞれの工程と関連付けて工程毎に記憶装置に記憶させてもよい。
上記の構成によれば、各工程の進捗状況を容易に管理することができる。
In addition, when each of a plurality of processes is defined as a first process and progress information regarding the progress of the first process is input for each process, the information acquisition unit may acquire the progress information for each process, and the memory unit may associate the progress information for each process with the respective process and store it in the memory device for each process.
According to the above configuration, the progress of each process can be easily managed.

また、進捗情報は、工程開始を示す開始情報、及び工程終了を示す終了情報を含んでもよい。また、第2工程は、複数の工程の中で第1工程の直後に実施されてもよい。この場合、情報取得部が第1工程について開始情報を取得してから終了情報を取得するまでの間、第2工程についての進捗情報の入力に対する制限、又は、第2工程における対象物の図面の表示に対する制限が設けられてもよい。さらに、情報取得部が第1工程について終了情報を取得した場合に、処理実行部は、第2工程に対する制限を解除する処理を実行すると、好適である。
上記の構成によれば、第1工程が実施途中で終了していない間は、第2工程についての進捗情報の入力が制限され、第1工程が終了した時点で制限が解除される。これにより、各工程の進捗管理、具体的には進捗情報の入力が工程の順序に従って適切に実施される。
The progress information may also include start information indicating the start of a process and end information indicating the end of a process. Furthermore, the second process may be performed immediately after the first process among the multiple processes. In this case, a restriction may be imposed on the input of progress information for the second process or on the display of a drawing of the object in the second process from the time the information acquisition unit acquires the start information for the first process until the time the information acquisition unit acquires the end information. Furthermore, it is preferable that, when the information acquisition unit acquires the end information for the first process, the processing execution unit executes processing to remove the restriction on the second process.
According to the above configuration, while the first process is in progress but not yet completed, the input of progress information for the second process is restricted, and the restriction is lifted when the first process is completed. This allows progress management of each process, specifically, the input of progress information, to be carried out appropriately in accordance with the order of the processes.

また、進捗情報は、工程開始を示す開始情報、及び工程終了を示す終了情報を含んでもよい。この場合、処理実行部は、情報取得部が第1工程について開始情報を取得してから終了情報を取得するまでの所要時間を計測する処理を実行するとよい。
上記の構成によれば、各工程の所要時間を計測することができ、より適切な作業管理を実施することができる。
The progress information may include start information indicating the start of a process and end information indicating the end of the process. In this case, the processing execution unit may execute a process to measure the time required from when the information acquisition unit acquires the start information for the first process to when it acquires the end information.
According to the above configuration, the time required for each process can be measured, and more appropriate work management can be implemented.

また、第1工程において、第1工程にて行われた変則的内容を示す注記情報が入力される場合に、情報取得部は、注記情報を取得してもよい。
上記の構成によれば、第1工程における要素作業に関して変則的な内容(イレギュラーな対応等)があった場合には、その情報を注記情報として記録しておくことができる。この結果、より一層適切な作業管理を実施する。
Furthermore, in the first step, when note information indicating irregularities that have been performed in the first step is input, the information acquiring unit may acquire the note information.
According to the above configuration, if there is any irregularity (irregular response, etc.) in the element work in the first process, the information can be recorded as note information, which results in more appropriate work management.

また、第1工程において、第1工程にて取り扱われる対象物の図面が表示された端末を通じて、注記情報が入力されてもよい。この場合、情報取得部は、注記情報を取得する際に、注記情報の入力時点で端末に表示された図面を特定するとよい。また、記憶部は、注記情報を、注記情報の入力時点で端末に表示された図面と関連付けて記憶装置に記憶させるとよい。
上記の構成によれば、注記情報を、その注記情報の入力時点で端末に表示されていた図面と関連付けて記憶しておくことができる。これにより、入力された注記情報を参照する際には、図面と対応付けて参照できるようになり、作業者にとっての利便性が向上する。
In addition, in the first step, the annotation information may be input through a terminal displaying a drawing of the object to be handled in the first step. In this case, when acquiring the annotation information, the information acquisition unit may identify the drawing displayed on the terminal at the time the annotation information was input. In addition, the storage unit may store the annotation information in the storage device in association with the drawing displayed on the terminal at the time the annotation information was input.
According to the above configuration, annotation information can be stored in association with the drawing displayed on the terminal at the time the annotation information was input. This allows the input annotation information to be referenced in association with the drawing, improving convenience for the worker.

また、情報取得部が第1工程について注記情報を取得した場合、処理実行部は、複数の工程のうち、第1工程の後に実施される工程において、当該工程にて取り扱われる対象物の図面とともに、注記情報を端末又は表示器に表示させる処理を実行してもよい。
上記構成によれば、注記情報が入力された工程(第1工程)の後の工程において、注記情報が端末又は表示器に表示されるので、その工程を担当する作業者は、注記情報を容易に確認することができる。
In addition, when the information acquisition unit acquires annotation information for the first process, the processing execution unit may execute processing to display the annotation information on a terminal or display device together with a drawing of the object handled in a process that is performed after the first process among the multiple processes.
According to the above configuration, in the process following the process (first process) in which the note information was input, the note information is displayed on a terminal or display, so that the worker in charge of that process can easily check the note information.

また、前述の課題は、本発明の作業管理支援システムによれば、複数の工程を含む作業の管理を支援する作業管理支援システムであって、画像を読み取り可能な端末と、端末と通信可能な装置と、を備え、装置は、それぞれの工程において、工程にて取り扱われる対象物に付与された識別画像が端末によって読み取られた場合に、端末を制御して、端末又は端末と対応する表示器に、識別画像から特定される対象物の図面を表示させる表示制御部と、少なくとも一つの工程を第1工程として、第1工程の進行に関する情報が端末を通じて入力された場合に、情報を取得する情報取得部と、取得された情報を、第1工程と関連付けて記憶装置に記憶させる記憶部と、記憶装置に記憶された情報に基づいて、第1工程又は第1工程と対応する第2工程に関する処理を実行する処理実行部と、を備えることで解決される。
本発明の作業管理支援システムによれば、作業中の各工程での図面の参照と、少なくとも一つの工程(第1工程)の進行に関する情報の記録、及びその情報に基づく処理と、をより容易に実施することができる。
Furthermore, the above-mentioned problem is solved by the work management support system of the present invention, which is a work management support system that supports the management of work including multiple processes, and includes a terminal capable of reading images and a device capable of communicating with the terminal, and the device includes: a display control unit that, when an identification image attached to an object handled in each process is read by the terminal, controls the terminal to display a drawing of the object identified from the identification image on the terminal or a display corresponding to the terminal; an information acquisition unit that, when information regarding the progress of at least one process is input through the terminal, designates at least one process as a first process, acquires information; a memory unit that associates the acquired information with the first process and stores it in a memory unit; and a processing execution unit that executes processing related to the first process or a second process corresponding to the first process based on the information stored in the memory unit.
According to the work management support system of the present invention, it is possible to more easily refer to drawings at each stage of work, record information regarding the progress of at least one stage (first stage), and perform processing based on that information.

また、前述の課題は、本発明の作業管理支援方法によれば、複数の工程を含む作業の管理を支援する作業管理支援方法であって、それぞれの工程において、工程にて取り扱われる対象物に付与された識別画像が端末によって読み取られた場合に、コンピュータにより、端末を制御して、端末又は端末と対応する表示器に、識別画像から特定される対象物の図面を表示させ、少なくとも一つの工程を第1工程として、第1工程の進行に関する情報が端末を通じて入力された場合に、コンピュータにより、情報を取得し、コンピュータにより、取得された情報を、第1工程と関連付けて記憶装置に記憶させ、コンピュータにより、記憶装置に記憶された情報に基づいて、第1工程又は第1工程と対応する第2工程に関する処理を実行することで解決される。
上記の作業管理支援方法によれば、作業中の各工程での図面の参照と、少なくとも一つの工程(第1工程)の進行に関する情報の記録、及びその情報に基づく処理と、をより容易に実施することができる。
Furthermore, the above-mentioned problem is solved by the work management support method of the present invention, which is a work management support method that supports the management of work that includes multiple processes, and in each process, when an identification image attached to an object handled in the process is read by a terminal, the computer controls the terminal to display a drawing of the object identified from the identification image on the terminal or a display corresponding to the terminal, and when information regarding the progress of at least one process is input through the terminal, the computer acquires the information, associates the acquired information with the first process and stores it in a memory device, and executes processing related to the first process or a second process corresponding to the first process based on the information stored in the memory device.
According to the above-mentioned work management support method, it is possible to more easily refer to drawings at each stage of work, record information regarding the progress of at least one stage (first stage), and perform processing based on that information.

本発明によれば、複数の工程からなる作業の管理をより簡単に行うための作業管理支援装置、作業管理支援システム、及び作業管理支援方法が実現される。 The present invention provides a work management support device, a work management support system, and a work management support method that make it easier to manage work consisting of multiple steps.

作業の流れを示す図である。FIG. 1 is a diagram showing a work flow. 作業ラインの概略図である。FIG. 1 is a schematic diagram of a work line. 作業管理支援システムの概念図である。FIG. 1 is a conceptual diagram of a work management support system. 本発明の一つの実施形態に係る作業管理支援装置を構成するコンピュータのハードウェア構成を示す図である。1 is a diagram illustrating a hardware configuration of a computer that constitutes a work management support device according to an embodiment of the present invention. 作業管理リストの一例を示す図である。FIG. 10 is a diagram illustrating an example of a work management list. 作業管理用の操作画面の一例を示す図である。FIG. 10 is a diagram illustrating an example of an operation screen for work management. 対象物に付与された識別画像の一例を示す図である。FIG. 10 is a diagram showing an example of an identification image assigned to an object. 図面を表示した画面の一例を示す図である。FIG. 10 is a diagram showing an example of a screen displaying a drawing. 注記情報を表示した画面の一例を示す図である。FIG. 10 is a diagram showing an example of a screen displaying annotation information. 本発明の一つの実施形態に係る作業管理支援装置の機能を示す図である。FIG. 2 is a diagram illustrating functions of a work management support device according to an embodiment of the present invention. 作業管理支援フローを示す図である。FIG. 10 is a diagram showing a work management support flow.

以下、本発明の一つの実施形態(以下、本実施形態)について、添付の図面を参照しながら説明する。なお、図面は、図示の便宜上、幾分簡略化及び模式化して各部材を示している。また、図面(例えば、図6、8及び9)が示す画面例も一例に過ぎず、画面の構成例、表示される情報の内容、及びGUI(Graphical User Interface)等は、システム設計の仕様及びユーザの設定等に応じて自由に設計することができ、また適宜変更し得るものである。 One embodiment of the present invention (hereinafter referred to as this embodiment) will be described below with reference to the accompanying drawings. Note that for ease of illustration, the drawings show each component in a somewhat simplified and schematic manner. Furthermore, the screen examples shown in the drawings (e.g., Figures 6, 8, and 9) are merely examples, and the screen configuration, displayed information, GUI (Graphical User Interface), etc. can be freely designed and modified according to system design specifications, user settings, etc.

また、本明細書に記載する「装置」という概念には、特定の機能を一台で発揮する単一の装置が含まれるとともに、分散してそれぞれが独立して存在しつつも協働(連携)して特定の機能を発揮する複数の装置も含まれることとする。 In addition, the concept of "device" described in this specification includes not only a single device that performs a specific function, but also multiple devices that exist independently in a distributed manner but work together (in cooperation) to perform a specific function.

<<本実施形態の概略>>
本実施形態は、作業の管理を支援する技術の一例であり、作業管理支援装置、作業管理支援システム、及び作業管理支援方法に関する。
先ず、本実施形態により管理される作業について説明する。作業は、例えば対象製品を生産(製造)する作業であり、複数の工程を含み、各工程が順番に実施されることで対象製品が完成する。以降、対象製品を、その製造途中の段階のものを含めて、「対象物T」と呼ぶこととする。
<<Outline of this embodiment>>
The present embodiment is an example of a technique for supporting work management, and relates to a work management support device, a work management support system, and a work management support method.
First, we will explain the work managed by this embodiment. The work is, for example, the work of producing (manufacturing) a target product, and includes multiple processes, each of which is carried out in order to complete the target product. Hereinafter, the target product, including the stages in its production, will be referred to as the "target object T."

本実施形態において、対象物Tは、案件と紐付けられている。案件は、複数の対象物Tを組み立てる業務の案件であり、例えば、住宅等の注文物件の建設工事等が案件に該当する。作業は、注文物件を構成する建材を生産する作業であり、例えば、鉄骨の生産作業等が作業に該当する。以下では、鉄骨の生産作業を具体例に挙げて説明することとする。 In this embodiment, the object T is linked to a project. A project is a task of assembling multiple objects T, such as the construction of a custom-made property such as a house. A task is the production of building materials that make up the custom-made property, such as the production of steel frames. The following explanation will use the production of steel frames as a specific example.

鉄骨の生産作業では、図1に示すように「ケガキ」、「部材加工(前加工)」、「組立て」、「一次溶接」及び「二次溶接」という複数の工程がこの順序で実施される。また、本実施形態において、鉄骨の生産作業は、生産工場で実施される流れ作業である。詳しく説明すると、図2に示すように、生産工場内にて対象物Tが搬送ラインに沿って搬送され、各工程は、対象物Tが搬送ラインにおいて各工程と対応する位置で静止している間に実施される。なお、各工程が実施されるエリアを、以下では、「ステーション」とも呼ぶこととする。 As shown in Figure 1, steel frame production involves multiple processes, namely, "marking," "component processing (pre-processing)," "assembly," "primary welding," and "secondary welding," carried out in this order. In this embodiment, steel frame production is an assembly line carried out in a production factory. More specifically, as shown in Figure 2, an object T is transported along a conveyor line within the production factory, and each process is carried out while the object T is stationary at a position on the conveyor line corresponding to that process. Hereinafter, the area where each process is carried out will also be referred to as a "station."

各工程において、作業者は、各工程のステーションにて、各工程に割り当てられた仕事(要素作業)を行い、要素作業では、対象物Tに対して所定の措置又は加工等を施す。また、各工程において、作業者は、対象物Tの図面、具体的には対象物Tの組立手順等、要素作業の内容が分かる図面を参照する。なお、同じ種類の対象物Tを取り扱う作業の各工程にて参照される図面は、原則として共通する。
要素作業の終了後、作業者は、次の工程に対象物Tを引き渡す。
なお、各工程を担当する作業者の人数については、任意の人数でもよく、また、一つの作業全体を通じて複数の工程全てを一人の作業者が行ってもよい。
In each process, a worker performs the work (elementary work) assigned to that process at the station for that process, and in the elemental work, a predetermined measure or processing is performed on the object T. In addition, in each process, the worker refers to a drawing of the object T, specifically a drawing that shows the contents of the elemental work, such as the assembly procedure for the object T. In addition, the drawings referred to in each process of work that handles the same type of object T are, as a general rule, the same.
After completing the element work, the worker hands over the object T to the next process.
The number of workers in charge of each process may be any number, and one worker may perform all of the multiple processes throughout one job.

鉄骨の生産作業は、案件に必要な鉄骨の本数と同じ回数だけ繰り返され、各回の作業では、「ケガキ」、「部材加工」、「組立て」、「一次溶接」及び「二次溶接」が繰り返し実施される。各回の作業における各工程の手順、すなわち、各工程での要素作業の内容は、原則として、作業間で共通するが、例えば、対象物Tの一部分の形状又は寸法等が異なり、又は対象物Tに取り付けた部品の位置がずれているケースでは変則的な内容になり得る。その場合、作業者は、要素作業として行われた変則的内容(すなわち、作業の変更点)を注記情報として記録する。その後の工程の作業者は、上記の注記情報を確認した上で、その物が担当する工程にて要素作業を行う。 The steel frame production work is repeated the same number of times as the number of steel frames required for the project, and each work cycle involves the repeated steps of marking, component processing, assembly, primary welding, and secondary welding. In principle, the procedures for each step in each work cycle, i.e., the content of the element work in each process, are the same across all processes. However, irregularities may occur if, for example, the shape or dimensions of a portion of the target object T differs, or if the position of a part attached to the target object T is misaligned. In such cases, the worker records the irregular content performed as an element work (i.e., changes to the work) as note information. The worker in the subsequent process then checks the note information and performs the element work in the process responsible for that item.

本実施形態では、作業時間、作業の進捗状況、及び作業に必要な各種の情報がデータ化される。これにより、作業者は、データ化された情報を適宜確認しながら作業を進めることができ、また、作業の管理者は、作業の進捗状況等をデータによって把握することができる。また、作業時間等のデータは、収集後に編集することができ、例えばグラフ等によって可視化して表示することが可能である。さらに、これまでに実施された作業について、作業時間、及び/又は各工程の所要時間等を実績値として蓄積することにより、作業における労働生産性(単位時間当たりの生産量)を評価し、その評価結果に基づいて、作業手順の見直し等を検討することができる。 In this embodiment, work time, work progress, and various information required for the work are digitized. This allows workers to proceed with the work while checking the digitized information as needed, and the work manager can understand the work progress and other information from the data. Data such as work time can be edited after collection and can be visualized and displayed, for example, using graphs. Furthermore, by accumulating actual values such as work time and/or the time required for each process for work that has been performed so far, labor productivity (production volume per unit time) for the work can be evaluated, and work procedures can be revised based on the evaluation results.

<<本実施形態に係る作業管理支援システムについて>>
次に、本実施形態に係る作業管理支援システム(以下、支援システムSと簡略化する)について図3を参照しながら説明する。
支援システムSは、図3に示すように、作業者が利用する端末10と、作業管理支援装置(以下、支援装置20と簡略化する)と、生産工場内に設置されたアクセスポイント30と、表示モニタ32とによって構成される。
<<About the work management support system according to this embodiment>>
Next, a work management support system (hereinafter simply referred to as support system S) according to this embodiment will be described with reference to FIG.
As shown in FIG. 3, the support system S is composed of a terminal 10 used by a worker, a work management support device (hereinafter simply referred to as the support device 20), an access point 30 installed in the production factory, and a display monitor 32.

端末10は、タブレット端末、ラップトップ型のパソコン又はスマートフォン等の通信端末であり、端末10には、作業管理支援用のアプリケーションプログラムがインストールされている。作業中の各工程において、作業者は、上記のアプリケーションプログラムを起動して端末10を操作し、その工程で取り扱う対象物Tの図面等を端末10の表示画面にて参照する。また、作業者は、各工程にて変則的内容を行った場合には、その内容を端末10の入力機器(例えば、タッチパネル)により入力する。 The terminal 10 is a communications terminal such as a tablet terminal, laptop computer, or smartphone, and has installed on it an application program for work management support. At each stage of the work, the worker launches the application program and operates the terminal 10, referencing drawings of the object T being handled in that stage on the display screen of the terminal 10. Furthermore, if the worker performs an irregular operation at each stage, they input the details using an input device (e.g., a touch panel) on the terminal 10.

なお、端末10は、作業者の各人に支給されてもよく、また、工程毎に用意されてもよい。あるいは、各工程を担当する作業者が一台又は数台の端末10を共用してもよい。 Note that a terminal 10 may be provided to each worker, or may be provided for each process. Alternatively, workers in charge of each process may share one or several terminals 10.

また、本実施形態において、端末10は、画像を光学的に読み取る(キャプチャする)機能を備え、分かり易くは、画像を撮影するカメラを搭載している。この機能により、各工程において、作業者は、後述する識別画像(図6参照)を端末10で読み取ることができる。 In addition, in this embodiment, the terminal 10 has the function of optically reading (capturing) images; more simply, it is equipped with a camera that takes images. This function allows the worker to read the identification image (see Figure 6) described below using the terminal 10 at each process.

支援装置20は、プロセッサを備えるコンピュータによって構成され、パーソナルコンピュータ(PC)、ワークステーション又はサーバコンピュータ等によって構成される。支援装置20は、1台のコンピュータによって構成されてもよく、あるいは並列分散された複数台のコンピュータによって構成されてもよい。
なお、支援装置20は、生産工場内に設置されてもよいし、あるいは、生産工場から離れた建物(例えば、案件を請け負う会社の社屋等)に設置されてもよい。
The support device 20 is configured by a computer equipped with a processor, such as a personal computer (PC), a workstation, or a server computer. The support device 20 may be configured by a single computer, or may be configured by multiple computers distributed in parallel.
The support device 20 may be installed within the production factory, or may be installed in a building away from the production factory (for example, the building of the company that undertakes the project).

支援装置20は、作業管理のために用いられ、具体的には、作業管理に関する一連の情報処理を実行する。また、支援装置20を構成するコンピュータ(以下、支援用コンピュータという)は、図4に示すように、プロセッサ11、メモリ12、通信用インタフェース13、入力装置14及び出力装置15を有する。 The support device 20 is used for work management, specifically, to execute a series of information processing related to work management. The computer that constitutes the support device 20 (hereinafter referred to as the support computer) has a processor 11, memory 12, a communication interface 13, an input device 14, and an output device 15, as shown in FIG. 4.

プロセッサ11は、例えばCPU(Central Processing Unit)、MPU(Micro-Processing Unit)、MCU(Micro Controller Unit)、GPU(Graphics Processing Unit)、DSP(Digital Signal Processor)、TPU(Tensor Processing Unit)又はASIC(Application Specific Integrated Circuit)等によって構成される。
メモリ12は、例えばROM(Read Only Memory)及びRAM(Random Access Memory)等の半導体メモリによって構成される。
通信用インタフェース13は、例えばネットワークインターフェースカード、又は通信インタフェースボード等によって構成される。
入力装置14は、例えばキーボード、マウス又はタッチパネル等によって構成される。
出力装置15は、例えばディスプレイ及びスピーカ等によって構成される。
The processor 11 is composed of, for example, a CPU (Central Processing Unit), an MPU (Micro-Processing Unit), an MCU (Micro Controller Unit), a GPU (Graphics Processing Unit), a DSP (Digital Signal Processor), a TPU (Tensor Processing Unit), or an ASIC (Application Specific Integrated Circuit).
The memory 12 is configured by semiconductor memories such as a ROM (Read Only Memory) and a RAM (Random Access Memory).
The communication interface 13 is configured by, for example, a network interface card or a communication interface board.
The input device 14 is configured by, for example, a keyboard, a mouse, or a touch panel.
The output device 15 is configured by, for example, a display and a speaker.

また、支援用コンピュータには、ソフトウェアとして、オペレーティングシステム(OS)用のプログラム、及び、作業管理用のアプリケーションプログラムがインストールされている。これらのプログラムがプロセッサ11によって実行されることで、支援用コンピュータは、作業管理支援装置として機能する。 In addition, the support computer has installed software such as an operating system (OS) program and a work management application program. When these programs are executed by the processor 11, the support computer functions as a work management support device.

また、支援用コンピュータは、図4に示すように記憶装置16に接続されている。本実施形態において、記憶装置16は、支援装置20の構成機器の一つであり、例えばファイルサーバ、具体的にはNAS(Network Attached Storage)である(図1参照)。ただし、これに限定されず、記憶装置16は、例えば、フラッシュメモリ、HDD(Hard Disc Drive)、SSD(Solid State Drive)、FD(Flexible Disc)、MOディスク(Magneto-Optical disc)、CD(Compact Disc)、DVD(Digital Versatile Disc)、SDカード(Secure Digital card)、又はUSBメモリ(Universal Serial Bus memory)等によって構成されてもよい。なお、記憶装置16を構成するストレージは、支援用コンピュータに内蔵されてもよく、あるいは、外付け形式で取り付けてもよい。 The support computer is also connected to a storage device 16, as shown in FIG. 4. In this embodiment, the storage device 16 is one of the components of the support device 20, and is, for example, a file server, specifically a NAS (Network Attached Storage) (see FIG. 1). However, without being limited to this, the storage device 16 may also be composed of, for example, a flash memory, an HDD (Hard Disc Drive), an SSD (Solid State Drive), an FD (Flexible Disc), an MO disk (Magneto-Optical disc), a CD (Compact Disc), a DVD (Digital Versatile Disc), an SD card (Secure Digital card), or a USB memory (Universal Serial Bus memory). The storage constituting the storage device 16 may be built into the support computer or attached externally.

支援用コンピュータ及び記憶装置16(NAS:Network Attached Storage)は、通信用インタフェース13を介して他の機器と通信可能である。具体的には、生産工場内には無線LAN(Local Area Network)が構築されており、支援用コンピュータ及び記憶装置16は、HUBを介して工場内に複数設置されたアクセスポイント30に接続されている。これにより、支援用コンピュータ及び記憶装置16は、無線LANを通じて工場内の通信機器、具体的には端末10及び表示モニタ32等と無線方式で通信可能である。
なお、支援用コンピュータ及び記憶装置16、すなわち支援装置20は、有線にて端末10及び表示モニタ32と接続されてもよく、つまり、これらの機器と有線方式で通信してもよい。
The support computer and storage device 16 (NAS: Network Attached Storage) can communicate with other devices via the communication interface 13. Specifically, a wireless LAN (Local Area Network) is established within the production factory, and the support computer and storage device 16 are connected via a hub to a plurality of access points 30 installed within the factory. This allows the support computer and storage device 16 to wirelessly communicate with communication devices within the factory, specifically, terminals 10 and display monitors 32, etc., via the wireless LAN.
The support computer and storage device 16, i.e., the support device 20, may be connected to the terminal 10 and the display monitor 32 by wire, that is, may communicate with these devices by wire.

表示モニタ32は、端末10とは別に工場内に設けられた表示器であり、例えば、対象物Tの搬送ライン付近に複数台設置されている。各表示モニタ32には、一台以上の端末10と対応付けられており、具体的に説明すると、各表示モニタ32は、その設置位置から所定距離内にある端末10と、Bluetooth(登録商標)又はWi-fi(登録商標)にて通信可能である。各表示モニタ32には、対応付けられた端末10に表示される情報を表示させることができ、例えば、支援装置20が端末10に向けて送信した情報等を、対応する表示モニタ32に表示させることができる。 The display monitors 32 are displays installed in the factory separately from the terminals 10, and multiple units are installed, for example, near the conveyance line for the target objects T. Each display monitor 32 is associated with one or more terminals 10. Specifically, each display monitor 32 can communicate with terminals 10 within a predetermined distance from its installation location via Bluetooth (registered trademark) or Wi-Fi (registered trademark). Each display monitor 32 can display information displayed on the associated terminal 10; for example, information sent by the support device 20 to the terminal 10 can be displayed on the corresponding display monitor 32.

なお、表示モニタ32の設置台数は、任意の台数でもよいが、各ステーションに少なくとも1台ずつ設置されるのが好ましい。また、表示モニタ32は、端末10の画面よりも大型のモニタであることが好ましい。 The number of display monitors 32 installed may be any number, but it is preferable to install at least one at each station. It is also preferable that the display monitor 32 be larger than the screen of the terminal 10.

本実施形態では、以上のように構成された支援システムSにより、鉄骨の生産作業を容易に管理することができ、具体的には、作業進捗の管理、作業時間の算出、各工程における図面の参照、及び注記情報の記録等の目的に支援システムSを利用することができる。
以下、それぞれの目的で支援システムSを利用する手順について、目的別に説明する。
In this embodiment, the support system S configured as described above makes it possible to easily manage steel frame production work, and specifically, the support system S can be used for purposes such as managing work progress, calculating work time, referring to drawings for each process, and recording annotation information.
Below, the procedure for using the support system S for each purpose will be explained for each purpose.

(1)作業進捗の管理
作業進捗を管理する場合、例えば、作業における最初の工程(すなわち、「ケガキ」の工程)を担当する作業者が、端末10にて作業開始用の入力操作を行う。入力操作に際し、例えば、作業者の端末10には、図5に示す作業管理リストが表示される。作業管理リストには、作業毎にレコード(以下、作業管理レコードという)が収録されている。各案件の作業管理レコードは、記憶装置16に記憶されており、作業管理レコードには、作業状況、作業の実施日、作業にて生産される鉄骨のID番号、その鉄骨が用いられる案件の情報(物件情報)、及び各工程のステータス等が含まれる。各工程のステータスは、その工程が現時点で未開始、実施中、完了のいずれに該当するかを表す情報である。
(1) Work Progress Management When managing work progress, for example, a worker in charge of the first process in the work (i.e., the "marking" process) performs an input operation for starting the work on the terminal 10. When performing the input operation, for example, a work management list shown in FIG. 5 is displayed on the worker's terminal 10. The work management list contains a record for each work (hereinafter referred to as a work management record). The work management record for each project is stored in the storage device 16, and includes the work status, the date the work was performed, the ID number of the steel frame produced in the work, information about the project in which the steel frame is used (property information), and the status of each process. The status of each process is information that indicates whether the process is not yet started, is being performed, or has been completed.

作業者は、上記のリストの中から、開始する作業を指定する。これにより、端末10は、指定結果を示すデータを支援装置20に送信する。その後、作業中の各工程を担当する作業者は、その工程の開始時に端末10を操作する。より詳しく説明すると、作業者が端末10にて所定の操作、例えば、対象物Tに付与された二次元バーコードQを端末10にて読み取る操作を行うと、作業管理支援用のアプリケーションプログラムが起動し、図6に示す操作ウィンドウWが端末10の画面に表示される。操作ウィンドウWには、工程の内容及びステータス、その工程を含む作業、作業と紐付けられた案件(物件情報)、並びに、工程の計画時間等が表示されるとともに、操作受け付け用のボタンが複数設けられている。 The worker selects the work to be started from the list. The terminal 10 then sends data indicating the selection result to the support device 20. The worker in charge of each process in the work then operates the terminal 10 at the start of that process. Explaining in more detail, when the worker performs a predetermined operation on the terminal 10, for example, by using the terminal 10 to read the two-dimensional barcode Q attached to the object T, an application program for work management support is launched, and the operation window W shown in Figure 6 is displayed on the screen of the terminal 10. The operation window W displays the content and status of the process, the work that includes that process, the case (property information) linked to the work, and the planned time for the process, as well as multiple buttons for accepting operations.

各工程を担当する作業者は、端末10を操作し、工程開始時に所定の操作(例えば、不図示の開始ボタンを押す操作)を行う。これにより、工程開始とその時刻を示す情報(以下、開始情報という)が端末10から支援装置20に送信される。支援装置20は、開始情報を端末10から受信し、記憶装置16に記憶させる。また、支援装置20は、開始情報の記憶に伴って作業管理レコードを更新し、具体的には、開始された工程のステータスを「作業中」に変更する。
なお、各工程を開始する操作は、例えば、後述する図面参照用の操作(具体的には、識別画像の読み取り操作)であってもよい。
The worker in charge of each process operates the terminal 10 and performs a predetermined operation (for example, pressing a start button, not shown) when the process starts. As a result, information indicating the start of the process and the time (hereinafter referred to as start information) is sent from the terminal 10 to the support device 20. The support device 20 receives the start information from the terminal 10 and stores it in the storage device 16. In addition, the support device 20 updates the work management record in conjunction with the storage of the start information; specifically, it changes the status of the started process to "in work."
The operation for starting each step may be, for example, an operation for referring to a drawing (specifically, an operation for reading an identification image), which will be described later.

また、作業中の各工程を担当する作業者は、その工程の終了時に端末10を操作し、具体的には、図6に示す操作ウィンドウW中、終了ボタンを押す。これにより、工程終了とその時刻を示す情報(以下、終了情報という)が端末10から支援装置20に送信される。支援装置20は、終了情報を端末10から受信して記憶装置16に記憶させる。また、支援装置20は、終了情報の記憶に伴って作業管理レコードを更新し、具体的には、終了した工程のステータスを「完了」に変更する。 Furthermore, the worker in charge of each process in progress operates the terminal 10 when the process is completed, specifically by pressing the end button in the operation window W shown in FIG. 6. As a result, information indicating the completion of the process and the time (hereinafter referred to as completion information) is sent from the terminal 10 to the support device 20. The support device 20 receives the completion information from the terminal 10 and stores it in the storage device 16. Furthermore, the support device 20 updates the work management record in conjunction with the storage of the completion information, specifically by changing the status of the completed process to "Completed."

なお、各工程において、開始情報をまだ受信していない段階では、終了情報を受信することができないように設定されており、つまり、各工程を担当する作業者は、その工程を開始していない限り、その工程に対する終了操作を行うことができない。また、各工程において、その直前の工程について終了情報を受信していない段階では、開始情報を受信することができないように設定されており、つまり、各工程を担当する作業者は、直前の工程が終了していない限り、その工程に対する開始操作を行うことができない。 Furthermore, each process is set up so that it cannot receive end information until it has received start information. This means that the worker in charge of each process cannot perform an end operation for that process unless they have started that process. Furthermore, each process is set up so that it cannot receive start information until it has received end information for the immediately preceding process. This means that the worker in charge of each process cannot perform an end operation for that process unless the immediately preceding process has finished.

そして、各工程の開始情報及び終了情報を工程毎に取得し、最後の工程、すなわち「二次溶接」の工程について終了情報を取得した時点で作業が完了する。この時点で、支援装置20は、作業管理レコード中の作業状況を「完了」に更新する。 Then, start and end information for each process is obtained, and the work is completed when end information for the last process, i.e., the "secondary welding" process, is obtained. At this point, the support device 20 updates the work status in the work management record to "completed."

(2)作業時間の算出
作業時間を算出する場合には、例えば、作業管理者が、算出対象とする作業(以下、対象作業)を指定し、支援装置20が、指定された対象作業の各工程について取得された開始情報及び終了情報に基づいて作業時間を算出する。より詳しく説明すると、支援装置20は、対象作業の各工程について、開始情報を取得してから終了情報を取得するまでの所要時間を計測し、工程毎に計測した所要時間を合計して対象作業の作業時間を算出する。
なお、作業時間の算出結果は、所定の機器にて適宜出力されるのが好ましく、例えば、作業管理者が利用する端末(不図示)に向けて、作業時間の算出結果を表示させるデータを送信してもよい。
(2) Calculation of Work Time When calculating work time, for example, a work manager specifies the work to be calculated (hereinafter, the target work), and the support device 20 calculates the work time based on the start information and end information acquired for each process of the specified target work. To explain in more detail, the support device 20 measures the time required for each process of the target work from acquiring the start information to acquiring the end information, and calculates the work time of the target work by adding up the required times measured for each process.
It is preferable that the calculation results of the work time be output appropriately by a specified device, and for example, data displaying the calculation results of the work time may be sent to a terminal (not shown) used by the work manager.

(3)図面の参照
各工程において作業者が図面を参照する場合、作業者は、その工程にて取り扱われる対象物Tの識別情報を取得し、当該識別情報を支援装置20に向けて送信する。より詳しく説明すると、本実施形態では、対象物Tには図7に示す二次元バーコードQ(識別画像に相当)が付与されており、厳密には、対象物Tの所定位置に、二次元バーコードQが印刷されたラベルが貼り付けられている。作業者が二次元バーコードQを端末10によって読み取ると、端末10が、読み取り画像のデータ(すなわち、二次元バーコードQのキャプチャ画像を示すデータ)を支援装置20に向けて送信する。支援装置20は、読み取り画像のデータを解析して、対象物Tに付与された二次元バーコードQを特定する。
(3) Referring to Drawings When a worker refers to drawings in each process, the worker acquires identification information of the object T handled in that process and transmits the identification information to the support device 20. More specifically, in this embodiment, a two-dimensional barcode Q (corresponding to an identification image) shown in FIG. 7 is attached to the object T, and more precisely, a label on which the two-dimensional barcode Q is printed is attached to a predetermined position on the object T. When the worker reads the two-dimensional barcode Q using the terminal 10, the terminal 10 transmits data of the read image (i.e., data indicating a captured image of the two-dimensional barcode Q) to the support device 20. The support device 20 analyzes the data of the read image to identify the two-dimensional barcode Q attached to the object T.

二次元バーコードQは、対象物T、及びその対象物Tが用いられる案件(物件情報)と関連付けられている。対象物Tの図面を示すデータは、例えば、対象物Tが用いられる案件(物件情報)と関連付けられて、対象物T毎に記憶装置16に記憶されており、その記憶先の情報は、二次元バーコードQに組み込まれている。そして、支援装置20は、対象物Tに付与された二次元バーコードQに基づき、現時点で実施中の工程にて取り扱われる対象物Tの図面(以下、参照図面)を特定し、参照図面のデータを記憶装置16から読み出す。その後、支援装置20は、現時点で実施中の工程を担当する作業者によって操作される端末10を、参照図面のデータに基づいて制御する。これにより、図8に示すような参照図面が端末10の画面に表示される。 The two-dimensional barcode Q is associated with the object T and the project (property information) in which the object T is used. Data indicating a drawing of the object T is associated with the project (property information) in which the object T is used and stored in the storage device 16 for each object T, and the information on the storage destination is incorporated into the two-dimensional barcode Q. The support device 20 then identifies the drawing of the object T (hereinafter referred to as the reference drawing) used in the currently ongoing process based on the two-dimensional barcode Q attached to the object T, and reads the data of the reference drawing from the storage device 16. The support device 20 then controls the terminal 10 operated by the worker in charge of the currently ongoing process based on the data of the reference drawing. As a result, the reference drawing as shown in FIG. 8 is displayed on the screen of the terminal 10.

なお、本実施形態では、端末10の代わりに、あるいは端末10とともに表示モニタ32に参照図面を表示させることができる。すなわち、支援装置20が参照図面を表示するように端末10を制御した場合に、端末10から表示モニタ32へ制御信号が伝送され、これにより表示モニタ32にも参照図面を表示させることができる。この結果、作業者は、端末10よりも画面サイズが大きい表示モニタ32にて参照図面を見ることができ、参照図面にて作業内容を確認することがより容易になる。 In this embodiment, the reference drawing can be displayed on the display monitor 32 instead of or in addition to the terminal 10. That is, when the support device 20 controls the terminal 10 to display the reference drawing, a control signal is transmitted from the terminal 10 to the display monitor 32, causing the reference drawing to also be displayed on the display monitor 32. As a result, the worker can view the reference drawing on the display monitor 32, which has a larger screen size than the terminal 10, making it easier to check the work content using the reference drawing.

また、本実施形態では、対象物Tの図面を示すデータとして、2種類のデータが記憶装置16に記憶されている。そのうちの一方のデータは、更新が可能な図面データであり、詳しくは編集又は書き込み可能な形式で保存されたデータ(例えば、pdfファイル形式のデータ)であり、以下では、そのデータに基づいて表示される図面を「第1図面」と呼ぶこととする。もう一方のデータは、更新が不可能な図面であり、詳しくは編集不可能な読み取り専用の形式で保存されたデータ(例えば、拡張子がdwx、dwg、dxf等のデータ)であり、以下では、そのデータに基づいて表示される図面を「第2図面」と呼ぶこととする。 In addition, in this embodiment, two types of data representing drawings of the object T are stored in the storage device 16. One of the data is drawing data that can be updated, specifically data saved in an editable or writable format (e.g., data in PDF file format), and hereinafter, the drawing displayed based on this data will be referred to as the "first drawing." The other data is drawing data that cannot be updated, specifically data saved in an uneditable, read-only format (e.g., data with extensions such as dwx, dwg, or dxf), and hereinafter, the drawing displayed based on this data will be referred to as the "second drawing."

各工程において、作業者は、図面を参照する際に、第1図面及び第2図面のうち、少なくとも一方を選択し、操作ウィンドウWにおいて、選択した方の図面と対応するボタンを押す。具体的には、第1図面を参照する場合には「編集可能」のボタンを押し、第2図面を参照する場合には「編集不能」のボタンを押す。そして、支援装置20は、第1図面及び第2図面のうち、参照図面として作業者により選択された図面を端末10又は表示モニタ32に表示させる。 In each process, when a worker refers to a drawing, he or she selects at least one of the first and second drawings and presses the button corresponding to the selected drawing in the operation window W. Specifically, when referring to the first drawing, the worker presses the "Editable" button, and when referring to the second drawing, the worker presses the "Uneditable" button. The support device 20 then displays on the terminal 10 or display monitor 32 the drawing selected by the worker as the reference drawing, either the first or second drawing.

(注記情報の記録)
注記情報を記録する場合、作業者、厳密には、ある工程の要素作業において変則的内容を行った作業者は、その変則的内容を示す注記情報を端末10にて入力する。より具体的に説明すると、注記情報を入力する時点において端末10には図面(参照図面)が表示されており、作業者は、表示されている図面中、変則的内容が行われた箇所に対して所定の編集操作、例えば、当該箇所を囲む線を書き込む操作を行う。なお、この時点で表示される図面は、上述の第1図面である。
(Recording of note information)
When recording annotation information, a worker, or more precisely, a worker who has performed an irregular operation in an elemental work of a certain process, inputs annotation information indicating the irregular operation into the terminal 10. More specifically, at the time of inputting the annotation information, a drawing (reference drawing) is displayed on the terminal 10, and the worker performs a predetermined editing operation on the part of the displayed drawing where the irregular operation has occurred, for example, by drawing a line around the part. The drawing displayed at this time is the first drawing described above.

上記の編集操作が行われると、注記入力フォーム(不図示)が端末10に表示され、作業者は、その入力フォームに、フリーコメント形式で注記情報を入力する。注記情報の入力が完了すると、端末10が、入力された注記情報を示すデータを支援装置20に送信し、支援装置20は、そのデータを受信することで上記の注記情報を取得する。取得された注記情報は、その注記情報が入力された時点で端末10に表示された図面(参照図面)と関連付けて記憶装置16に記憶される。 When the above editing operation is performed, a note input form (not shown) is displayed on the terminal 10, and the worker enters note information in the form of free comments. Once the input of the note information is complete, the terminal 10 transmits data indicating the entered note information to the support device 20, and the support device 20 receives the data and acquires the note information. The acquired note information is stored in the storage device 16 in association with the drawing (reference drawing) displayed on the terminal 10 at the time the note information was entered.

記憶された注記情報は、その後に実施された工程において、当該工程にて取り扱われる対象物Tの図面とともに、端末10又は表示モニタ32に表示させることができる。具体的に説明すると、注記情報が入力された工程より後の工程を担当する作業者は、その工程において所定の操作を行い、例えば、参照図面とともに表示される操作ウィンドウWにおいて、注記情報参照用のボタンを押す(図9の(a)参照)。支援装置20は、この操作をトリガーとして、端末10を制御し、前の工程で入力された注記情報を端末10又は表示モニタ32に表示させる。このとき、注記情報は、図9の(b)に示すようにリスト形式で表示され、リストには、現在進行中の作業に含まれる複数の工程のそれぞれについて、それまでに入力された注記情報がすべて表示される。 The stored annotation information can be displayed on the terminal 10 or display monitor 32 in subsequent processes, along with a drawing of the object T handled in that process. Specifically, the worker in charge of a process subsequent to the process for which the annotation information was input performs a specified operation in that process, and, for example, presses a button for viewing the annotation information in the operation window W displayed along with the reference drawing (see FIG. 9(a)). This operation triggers the support device 20 to control the terminal 10 and display the annotation information input in the previous process on the terminal 10 or display monitor 32. At this time, the annotation information is displayed in list form, as shown in FIG. 9(b), and the list displays all annotation information input up to that point for each of the multiple processes included in the currently ongoing work.

また、作業者がリストに表示された注記情報の一つを選択すると、支援装置20が、選択された注記情報と関連付けられている図面、つまり注記情報を入力する際に編集(書き込み)がなされた図面を端末10又は表示モニタ32に表示させる。 In addition, when the worker selects one of the annotations displayed in the list, the support device 20 displays on the terminal 10 or display monitor 32 the drawing associated with the selected annotation, i.e., the drawing that was edited (written) when entering the annotation.

<<本実施形態に係る作業管理支援装置の機能>>
次に、支援装置20の構成について機能面から改めて説明することとする。
支援装置20は、図10に示すように、表示制御部41と、更新部42と、情報取得部43と、記憶部44と、処理実行部45と、を有する。処理実行部45は、注記表示部46と、制限解除部47と、計測部48とを有する。これらの機能部は、支援用コンピュータが備えるハードウェア機器と、支援用コンピュータに搭載された各種プログラム等のソフトウェアとの協働によって実現される。以下、それぞれの機能部について説明する。
<<Functions of the work management support device according to this embodiment>>
Next, the configuration of the support device 20 will be explained again from a functional perspective.
10, the support device 20 has a display control unit 41, an update unit 42, an information acquisition unit 43, a storage unit 44, and a process execution unit 45. The process execution unit 45 has a note display unit 46, a restriction removal unit 47, and a measurement unit 48. These functional units are realized by cooperation between hardware devices provided in the support computer and software such as various programs installed in the support computer. Each functional unit will be described below.

(表示制御部)
表示制御部41は、作業中の各工程において、対象物Tに付与された二次元バーコードQが端末10によって読み取られた場合に、二次元バーコードQから、現時点で実施中の工程にて取り扱われる対象物Tの図面、すなわち参照図面を特定する。そして、表示制御部41は、記憶装置16に記憶された参照図面のデータに基づいて端末10を制御して、端末10又は表示モニタ32に、参照図面を表示させる。
また、本実施形態において、表示制御部41は、参照図面として、更新が可能な図面データに基づく第1図面、及び、更新が不可能な図面データに基づく第2図面のうち、端末10にて選択された少なくとも一方を端末10又は表示モニタ32に表示させる。
(Display control unit)
When the two-dimensional barcode Q attached to the object T is read by the terminal 10 in each process during work, the display control unit 41 identifies a drawing of the object T handled in the process currently being carried out, i.e., a reference drawing, from the two-dimensional barcode Q. Then, the display control unit 41 controls the terminal 10 based on the data of the reference drawing stored in the storage device 16 to display the reference drawing on the terminal 10 or the display monitor 32.
In addition, in this embodiment, the display control unit 41 displays at least one of the first drawing based on drawing data that can be updated and the second drawing based on drawing data that cannot be updated, selected on the terminal 10, as a reference drawing on the terminal 10 or the display monitor 32.

なお、表示制御部41は、図面以外の情報を端末10又は表示モニタ32に表示させてもよく、例えば、案件に関する情報、具体的には、案件に用いられる対象物Tの標準仕様、または、案件(物件)毎に指定される溶接条件等の補完的な情報などを別途表示させてもよい。これらの情報は、二次元バーコードQの読み取りではなく、作業者による個別の表示要求に応じて表示させるとよい。 The display control unit 41 may also display information other than drawings on the terminal 10 or display monitor 32. For example, it may separately display information related to the project, specifically the standard specifications of the object T used in the project, or supplementary information such as welding conditions specified for each project (item). This information may be displayed in response to an individual display request from the worker, rather than by reading the two-dimensional barcode Q.

(更新部)
更新部42は、各工程において、参照図面が表示された端末10にて編集操作が行われた場合に、編集操作に応じて、参照図面を示す図面データを更新する。具体的に説明すると、ある工程における要素作業にて変則的内容を行った作業者は、その時点で端末10に表示されている参照図面中、変則的内容が行われた箇所に対して編集操作(具体的には、書き込み操作)を行う。更新部42は、その編集操作を示すデータを端末10から受信し、編集内容が反映されるように、参照図面を示す図面データを更新する。
(Update Department)
When an editing operation is performed on the terminal 10 displaying the reference drawing in each process, the update unit 42 updates the drawing data representing the reference drawing in accordance with the editing operation. Specifically, a worker who performs irregular content in an element task in a certain process performs an editing operation (specifically, a writing operation) on the location where the irregular content was performed in the reference drawing displayed on the terminal 10 at that time. The update unit 42 receives data representing the editing operation from the terminal 10 and updates the drawing data representing the reference drawing to reflect the editing content.

(情報取得部)
情報取得部43は、作業中の少なくとも一つの工程を第1工程として、第1工程の進行に関する情報が端末10を通じて入力された場合に、その情報を、端末10との通信を通じて取得する。
(Information acquisition department)
The information acquisition unit 43 defines at least one process in the work as a first process, and when information regarding the progress of the first process is input through the terminal 10, the information acquisition unit 43 acquires the information through communication with the terminal 10.

具体的に説明すると、本実施形態では、複数の工程のそれぞれを第1工程として、第1工程の進捗に関する進捗情報が、第1工程を担当する作業者により工程毎に入力される。ここで、進捗情報は、前述の開始情報及び終了情報を含む。各工程の開始情報は、その工程の開始及びその時刻を示し、各工程の終了情報は、その工程の終了及びその時刻を示す。情報取得部43は、進捗状況を工程毎に取得し、詳しくは、各工程を担当する作業者が工程の開始及び終了を入力する際に用いた端末10から、開始情報及び終了情報の各々のデータを受信する。 Specifically, in this embodiment, each of the multiple processes is defined as a first process, and progress information regarding the progress of the first process is input for each process by the worker in charge of the first process. Here, the progress information includes the above-mentioned start information and end information. The start information for each process indicates the start and time of the process, and the end information for each process indicates the end and time of the process. The information acquisition unit 43 acquires the progress status for each process, and more specifically, receives data on the start and end information from the terminal 10 used by the worker in charge of each process to input the start and end of the process.

また、第1工程において、第1工程にて行われた変則的内容を示す注記情報が入力された場合に、情報取得部43は、入力された注記情報を取得する。より詳しく説明すると、第1工程において変則的内容を行った作業者は、第1工程にて取り扱われる対象物Tの図面(参照図面)が表示された端末10を通じて、注記情報を入力する。その後、端末10は、入力された注記情報を示すデータを支援装置20に向けて送信し、情報取得部43は、そのデータを端末10から受信することで、入力された注記情報を取得する。この際、情報取得部43は、取得された注記情報の入力時点で端末10に表示されていた参照図面(以下、注記情報入力時点での表示図面)を特定する。 Furthermore, in the first step, when annotation information indicating irregular content performed in the first step is input, the information acquisition unit 43 acquires the input annotation information. To explain in more detail, the worker who performed the irregular content in the first step inputs the annotation information through the terminal 10 displaying a drawing (reference drawing) of the object T handled in the first step. The terminal 10 then transmits data indicating the input annotation information to the support device 20, and the information acquisition unit 43 receives the data from the terminal 10, thereby acquiring the input annotation information. At this time, the information acquisition unit 43 identifies the reference drawing displayed on the terminal 10 at the time the acquired annotation information was input (hereinafter referred to as the displayed drawing at the time the annotation information was input).

(記憶部)
記憶部44は、情報取得部43により取得された情報を記憶装置16に記憶させる。本実施形態において、情報取得部43は、第1工程に関する情報を取得し、記憶部44は、取得された情報を、第1工程と関連付けて記憶装置16に記憶させる。具体的に説明すると、記憶部44は、それぞれの工程の進捗情報(つまり、開始情報及び終了情報)を、それぞれの工程と関連付けて工程毎に記憶装置16に記憶させる。例えば、「組立」の工程について進捗情報が取得された場合、記憶部44は、その進捗情報を「組立」の工程と関連付けて記憶装置16に記憶させる。
(Storage part)
The storage unit 44 stores the information acquired by the information acquisition unit 43 in the storage device 16. In the present embodiment, the information acquisition unit 43 acquires information related to the first process, and the storage unit 44 stores the acquired information in the storage device 16 in association with the first process. Specifically, the storage unit 44 stores progress information for each process (i.e., start information and end information) in association with each process in the storage device 16 for each process. For example, when progress information for the "assembly" process is acquired, the storage unit 44 stores the progress information in association with the "assembly" process in the storage device 16.

また、情報取得部43が第1工程について注記情報を取得した場合、記憶部44は、その注記情報を第1工程と関連付けて記憶装置16に記憶させる。この際、記憶部は、注記情報を、注記情報入力時点での表示図面とさらに関連付けて記憶装置16に記憶させる。 Furthermore, when the information acquisition unit 43 acquires annotation information for the first process, the storage unit 44 associates the annotation information with the first process and stores it in the storage device 16. At this time, the storage unit further associates the annotation information with the displayed drawing at the time the annotation information was input and stores it in the storage device 16.

(処理実行部:注記表示部、制限解除部及び計測部)
処理実行部45は、記憶装置16に記憶された情報、換言すると情報取得部43が第1工程について取得した情報に基づいて、第1工程又は第1工程と対応する第2工程に関する処理を実行する。ここで、第2工程とは、例えば、第1工程を含む作業において、第1工程の後に実行される工程である。また、第1工程又は第2工程に関する処理とは、第1工程又は第2工程の進捗を管理する目的、あるいは第2工程を円滑に進行させる目的で実行される処理である。
(Processing execution unit: note display unit, restriction removal unit, and measurement unit)
The processing execution unit 45 executes processing related to the first process or a second process corresponding to the first process based on the information stored in the storage device 16, in other words, the information acquired about the first process by the information acquisition unit 43. Here, the second process is, for example, a process executed after the first process in a job that includes the first process. Furthermore, the processing related to the first process or the second process is processing executed for the purpose of managing the progress of the first process or the second process or for the purpose of smoothly progressing the second process.

処理実行部45は、互いに内容が異なる3つの処理を実行し、具体的には、注記表示部46が注記表示処理を実行し、制限解除部47が制限解除処理を実行し、計測部48が計測処理を実行する。 The processing execution unit 45 executes three processes with different content. Specifically, the note display unit 46 executes a note display process, the restriction removal unit 47 executes a restriction removal process, and the measurement unit 48 executes a measurement process.

注記表示部46は、情報取得部43が第1工程について注記情報を取得した場合に、第2工程において注記表示処理を実行し、具体的には、第2工程にて取り扱われる対象物Tの図面とともに、注記情報を端末10又は表示モニタ32に表示させる。本実施形態において、注記表示処理は、第2工程を担当する作業者が端末10にて所定の操作、具体的には、操作ウィンドウWの注記情報表示ボタンを押す操作をトリガーとして実行される。 When the information acquisition unit 43 acquires note information for the first process, the note display unit 46 executes note display processing for the second process, specifically displaying the note information on the terminal 10 or the display monitor 32 along with a drawing of the object T handled in the second process. In this embodiment, the note display processing is triggered by a predetermined operation on the terminal 10 by the worker in charge of the second process, specifically pressing the note information display button in the operation window W.

制限解除部47は、制限解除処理において、情報取得部43が第1工程について取得した進捗情報に基づき、第2工程に対する制限が解除可能であるか否かを判定し、解除可能である場合には制限を解除する。制限解除部47は、複数の工程のそれぞれを第1工程とし、第1工程の直後に実施される工程を第2工程として制限解除処理を実行する。つまり、制限解除処理は、複数の工程のうち、最初の工程(つまり、「ケガキ」の工程)を除く各工程を第2工程として繰り返し実行される。 In the restriction removal process, the restriction removal unit 47 determines whether the restriction on the second process can be removed based on the progress information acquired by the information acquisition unit 43 for the first process, and removes the restriction if it can be removed. The restriction removal unit 47 performs the restriction removal process, treating each of the multiple processes as the first process and the process performed immediately after the first process as the second process. In other words, the restriction removal process is repeatedly performed, treating each of the multiple processes except for the first process (i.e., the "scribing" process) as the second process.

制限解除処理について詳述すると、本実施形態では、情報取得部43が第1工程について開始情報を取得してから終了情報を取得するまでの間、第2工程についての進捗情報(詳しくは、開始情報)の入力に対する制限、及び、第2工程における象物Tの図面の表示に対する制限が設けられる。そして、情報取得部43が第1工程について終了情報を取得した場合に、制限解除部47は、第2工程に対する上記の制限を解除する。制限が解除されることにより、第2工程について開始情報の入力及び受付けが許可され、また、第2工程において対象物Tの図面(参照図面)が表示可能となる。 To explain the restriction removal process in more detail, in this embodiment, from the time the information acquisition unit 43 acquires start information for the first process until it acquires end information, a restriction is placed on the input of progress information (more specifically, start information) for the second process and on the display of a drawing of the object T in the second process. Then, when the information acquisition unit 43 acquires end information for the first process, the restriction removal unit 47 removes the above-mentioned restriction on the second process. By removing the restriction, the input and acceptance of start information for the second process is permitted, and a drawing of the object T (reference drawing) can be displayed in the second process.

計測部48は、情報取得部43が第1工程について取得した進捗情報に基づいて、第1工程の所要時間、詳しくは、第1工程について開始情報を取得してから終了情報を取得するまでの所要時間を計測する計測処理を実行する。計測部48は、複数の工程のそれぞれを第1工程として計測処理を実行し、つまり、作業に含まれる各工程の所要時間を計測する。 The measurement unit 48 executes a measurement process to measure the time required for the first process, specifically, the time required from when start information is acquired for the first process to when end information is acquired, based on the progress information for the first process acquired by the information acquisition unit 43. The measurement unit 48 executes the measurement process by treating each of the multiple processes as the first process, in other words, it measures the time required for each process included in the work.

<<本実施形態に係る作業管理支援方法について>>
次に、支援システムSにおいて実行される作業管理支援フローについて、図11を参照しながら説明する。作業管理支援フローは、本発明の作業管理支援方法を採用しており、図11に示す流れに沿って進行する。つまり、図11に示す作業管理支援フロー中の各ステップは、本発明の作業管理支援方法の構成要素に該当する。
なお、図11に示す作業管理支援フローは、あくまでも一例であり、本発明の趣旨を逸脱しない範囲において不要なステップを削除したり、新たなステップを追加したり、ステップの実施順序を入れ替えてもよい。
<<Work management support method according to this embodiment>>
Next, the work management support flow executed in the support system S will be described with reference to Fig. 11. The work management support flow employs the work management support method of the present invention and proceeds according to the flow shown in Fig. 11. In other words, each step in the work management support flow shown in Fig. 11 corresponds to a component of the work management support method of the present invention.
The work management support flow shown in FIG. 11 is merely an example, and unnecessary steps may be deleted, new steps may be added, or the order in which steps are performed may be changed, without departing from the spirit of the present invention.

作業管理支援フローの各ステップは、支援装置20を構成するコンピュータ、すなわち支援用コンピュータによって実施される。作業管理支援フローは、作業者が端末10を操作して作業開始用の入力操作、例えば図5に示す作業管理リストから開始する作業を指定すると、これをトリガーとしてスタートする。 Each step in the work management support flow is performed by the computer that constitutes the support device 20, i.e., the support computer. The work management support flow is triggered and starts when the worker operates the terminal 10 to input information to start work, for example, by specifying the work to be started from the work management list shown in Figure 5.

作業管理支援フローでは、先ず、最初の工程(すなわち、「ケガキ」)を担当する作業者が端末10にて工程開始を入力し、支援用コンピュータが、その工程について開始情報を取得する(S001)。取得された開始情報は、実施中の作業、及び開始された工程と関連付けられて記憶装置16に記憶される。 In the work management support flow, first, the worker in charge of the first process (i.e., "marking") inputs the start of the process on the terminal 10, and the support computer acquires start information for that process (S001). The acquired start information is stored in the storage device 16 in association with the work being performed and the started process.

次に、最初の工程を担当する作業者が、その工程で取り扱われる対象物Tに付与された二次元バーコードQを端末10にて読み取り、支援用コンピュータが、その読み取り画像を取得する(S002)。その後、支援用コンピュータは、読み取り画像が示す二次元バーコードQから対象物Tの図面を特定する(S003)。 Next, the worker in charge of the first process reads the two-dimensional barcode Q attached to the object T being handled in that process using the terminal 10, and the support computer acquires the scanned image (S002). The support computer then identifies the drawing of the object T from the two-dimensional barcode Q indicated in the scanned image (S003).

そして、支援用コンピュータは、最初の工程を担当する作業者の端末10を制御して、ステップS003にて特定された図面を、当該端末10又は当該端末10と対応する表示モニタ32に表示させる(S004)。 Then, the support computer controls the terminal 10 of the worker in charge of the first process to display the drawing identified in step S003 on that terminal 10 or the display monitor 32 corresponding to that terminal 10 (S004).

また、最初の工程において変則的内容が行われ、作業者が端末10を操作して注記情報を入力した場合(S005)、支援用コンピュータは、入力された注記情報を取得する(S006)。取得された注記情報は、注記情報が取得された工程(すなわち、変則的内容が行われた工程)と、注記情報入力時点で表示されていた図面と、に関連付けられて記憶装置16に記憶される。 Furthermore, if irregular content is performed in the first process and the worker operates the terminal 10 to input note information (S005), the support computer acquires the input note information (S006). The acquired note information is stored in the storage device 16 in association with the process in which the note information was acquired (i.e., the process in which the irregular content was performed) and the drawing that was displayed at the time the note information was input.

そして、最初の工程が終了した時点で作業者が端末10にて工程終了を入力し、支援用コンピュータが、その工程について終了情報を取得すると(S007)、取得された終了情報が、実施中の作業、及び終了した工程と関連付けられて記憶装置16に記憶される。これに伴って、支援用コンピュータが、計測処理及び制限解除処理を実行する(S008、S009)。 Then, when the first process is completed, the worker inputs the process completion on the terminal 10, and the support computer acquires the completion information for that process (S007). The acquired completion information is associated with the work being performed and the completed process and stored in the storage device 16. The support computer then executes the measurement process and the restriction release process (S008, S009).

計測処理において、支援用コンピュータは、直前に終了した工程について、開始情報を取得してから終了情報を取得するまでの所要時間を計測する。なお、計測処理は、計測対象の工程が終了した直後に実行される場合に限定されず、一つの作業に含まれる複数の作業すべてが終了した時点で実行されてもよい。 In the measurement process, the support computer measures the time required from obtaining start information to obtaining end information for the most recently completed process. Note that the measurement process is not limited to being performed immediately after the process being measured is completed, but may also be performed when all multiple tasks included in a single job are completed.

制限解除処理において、支援用コンピュータは、次の工程(すなわち、二番目の「部材加工」)に対する制限を解除する。これにより、制限が解除された工程(すなわち、「部材加工」)では、開始情報の入力及び受付けが許可され、また、当該工程における対象物Tの図面の表示が可能となる。 In the restriction removal process, the support computer removes the restriction on the next process (i.e., the second "Component Processing"). As a result, the process for which the restriction has been removed (i.e., "Component Processing") is permitted to input and accept start information, and a drawing of the object T for that process can be displayed.

その後、二番目の工程に移行し、支援用コンピュータは、その工程について、ステップS001と同様の手順で開始情報を取得する(S011)。
また、前の工程(すなわち、最初の工程)で注記情報が取得されたケースにおいて、二番目の工程を担当する作業者が、注記情報を表示させる操作を端末10にて行ったとする(S012)。この場合、支援用コンピュータは、注記表示処理を実行し、対象物Tの図面とともに、注記情報を作業者の端末10、又は当該端末10と対応する表示モニタ32に表示させる(S013)。
Thereafter, the process moves to the second step, and the support computer acquires start information for that step in the same procedure as in step S001 (S011).
Furthermore, in a case where annotation information has been acquired in the previous process (i.e., the first process), suppose that the worker in charge of the second process performs an operation to display the annotation information on the terminal 10 (S012). In this case, the support computer executes an annotation display process to display the annotation information together with the drawing of the object T on the terminal 10 of the worker or the display monitor 32 corresponding to the terminal 10 (S013).

その後、二番目の工程について、ステップS002~S009が実施される。三番目以降の工程では、二番目の工程と同様に、ステップS011~S013が実施された後に、ステップS002~S009が実施される。 Then, steps S002 to S009 are performed for the second process. For the third and subsequent processes, steps S011 to S013 are performed, followed by steps S002 to S009, just like for the second process.

そして、最後の工程(すなわち、「二次溶接」)が終了し、最後の工程について計測処理(S008)が実行された時点で作業管理支援フローが終了する。
また、新たな作業が開始されると、その都度、上述した一連のステップが繰り返し実施される。
Then, when the final process (i.e., "secondary welding") is completed and measurement processing (S008) is performed for the final process, the work management support flow ends.
Furthermore, each time a new task is started, the above-described series of steps is repeated.

<<本実施形態の有効性について>>
本実施形態によれば、作業中の各工程において、各工程で取り扱う対象物Tの図面を容易に参照することができる。具体的に説明すると、対象物Tに付与された二次元バーコードQを端末10に読み取ることで、対象物Tの図面(参照図面)が端末10又は表示モニタ32に表示されるので、作業者は、端末10又は表示モニタ32を通じて参照図面を容易に確認することができる。また、図面を印刷(プリント)する手間が省け、また、プリント用紙の使用枚数を削減しペーパレス化の促進を図ることができる。
<<Effectiveness of this embodiment>>
According to this embodiment, in each process during work, it is possible to easily refer to a drawing of the object T being handled in that process. Specifically, by reading the two-dimensional barcode Q attached to the object T with the terminal 10, the drawing of the object T (reference drawing) is displayed on the terminal 10 or the display monitor 32, so that the worker can easily check the reference drawing through the terminal 10 or the display monitor 32. In addition, this eliminates the need to print out the drawing, and also reduces the number of sheets of printing paper used, promoting a paperless system.

また、本実施形態では、参照図面として、更新(分かり易くは上書き保存)が可能なデータに基づく第1図面、換言すると、編集や書き込みが可能な第1図面が端末10に表示可能である。これにより、例えば注記情報を入力する際には、その該当箇所を図面に書き込むことができ、また、書き込み内容を注記情報と併せて記憶装置16に記憶させておくことができる。 In addition, in this embodiment, a first drawing based on data that can be updated (or, more simply, overwritten and saved) can be displayed on the terminal 10 as a reference drawing; in other words, a first drawing that can be edited and written into. This allows, for example, when entering annotation information, the relevant portion to be written into the drawing, and the written content can be stored in the storage device 16 together with the annotation information.

また、本実施形態によれば、作業の進行状況、詳しくは、各工程の進捗の管理がより容易になる。具体的に説明すると、各工程を担当する作業者が、工程開始の操作、及び工程終了の操作を端末10で行うと、その情報が進捗情報(具体的には、開始情報及び終了情報)として記憶装置16に記憶される。そして、進捗情報が工程毎に記憶されるので、作業中の各工程の進捗を適切に管理することができる。また、開始情報及び終了情報の取得によって各工程の所要時間が計測可能になり、これにより、作業時間を容易に把握することができる。 Furthermore, according to this embodiment, it becomes easier to manage the progress of work, specifically the progress of each process. Specifically, when the worker in charge of each process performs a process start operation and a process end operation on the terminal 10, that information is stored in the storage device 16 as progress information (specifically, start information and end information). Then, because progress information is stored for each process, it is possible to appropriately manage the progress of each process during work. Furthermore, by obtaining the start information and end information, it becomes possible to measure the time required for each process, thereby making it easy to understand the work time.

また、本実施形態によれば、各工程において変則的内容(イレギュラーな対応又は措置等)を行った場合、その内容を示す注記情報を容易に記録し、また、入力された注記情報を容易に確認することができる。具体的に説明すると、変則的内容を行った作業者は、端末10にて注記情報を入力し、入力された注記情報は、記憶装置16に記憶される。そして、変則的内容が行われた工程の後に実施される工程において、作業者は、端末10にて注記情報表示用の操作を行うことで、前の工程で入力された注記情報を端末10又は表示モニタ32にて確認する。これにより、注記情報をより容易に確認することができる。
より詳しく説明すると、従来、注記情報に該当する内容は、図面が印刷(プリント)された紙に書き込まれていた。このような状況においてある工程にて変則的内容が行われた場合、作業者は、注記情報が記載された図面があるか否かを判定するのに、関係する工程の図面を全て確認する必要があった。
これに対して、本実施形態によれば、注記情報を抽出して端末10又は表示モニタ32に表示させることができ、さらに、注記情報をリスト形式で表示させることができる。これにより、注記情報の確認が従来に比べて格段に容易になる。
Furthermore, according to this embodiment, when irregular content (such as an irregular response or measure) is performed in each process, note information indicating the content can be easily recorded, and the input note information can be easily confirmed. Specifically, the worker who performed the irregular content inputs the note information at the terminal 10, and the input note information is stored in the storage device 16. Then, in a process performed after the process in which the irregular content was performed, the worker performs an operation for displaying note information at the terminal 10, thereby confirming the note information input in the previous process on the terminal 10 or the display monitor 32. This makes it easier to confirm the note information.
To explain in more detail, in the past, the content corresponding to the annotation information was written on the paper on which the drawings were printed. In such a situation, when irregular content was performed in a certain process, the worker had to check all the drawings of the related process to determine whether there was a drawing with annotation information.
In contrast to this, according to the present embodiment, the annotation information can be extracted and displayed on the terminal 10 or the display monitor 32, and furthermore, the annotation information can be displayed in list form, which makes it much easier to check the annotation information than in the past.

また、本実施形態によれば、前(厳密には、直前)の工程が終了しない間は、次の工程について開始情報の入力、及び図面の表示が制限される。これにより、作業中の各工程を順序通りに進めることができ、作業の進行を適切に管理することができる。 Furthermore, according to this embodiment, input of start information for the next process and display of drawings are restricted while the previous (or more precisely, the immediately preceding) process is not yet completed. This allows each process in the work to proceed in order, and allows for appropriate management of the progress of the work.

<<その他の実施形態について>>
以上までに、本発明の作業管理支援装置、作業管理支援システム、及び作業管理支援方法に関する一つの実施形態を説明したが、上記の実施形態は、本発明の理解を容易にするための一例に過ぎず、本発明を限定するものではない。すなわち、本発明は、その趣旨を逸脱することなく、変更、改良され得る。また、本発明には、その等価物が含まれることは勿論である。
<<Other Embodiments>>
While one embodiment of the work management support device, work management support system, and work management support method of the present invention has been described above, the above embodiment is merely an example for facilitating understanding of the present invention and does not limit the present invention. In other words, the present invention may be modified or improved without departing from the spirit and scope of the present invention. Furthermore, the present invention naturally includes equivalents thereof.

上記の実施形態では、生産工場内において端末10の他に表示モニタ32が設置されており、図面等を、端末10の代わりに、あるいは端末10とともに表示モニタ32にも表示可能であることとした。ただし、これに限定されるものではなく、工場内に表示モニタ32が設置されず、図面等を端末10にのみ表示させてもよい。 In the above embodiment, a display monitor 32 is installed in addition to the terminal 10 in the production factory, and drawings and the like can be displayed on the display monitor 32 instead of or in addition to the terminal 10. However, this is not limited to this, and a display monitor 32 may not be installed in the factory, and drawings and the like may be displayed only on the terminal 10.

また、上記の実施形態では、各工程において対象物Tの図面を参照する際に、作業者が、対象物Tに付与された二次元バーコードQを端末10にて読み取ることとした。ただし、読み取る識別画像は、二次元バーコードQに限定されず、例えばテキスト又は数値、暗号化された情報でもよい。 In addition, in the above embodiment, when referring to the drawing of the object T in each process, the worker reads the two-dimensional barcode Q attached to the object T using the terminal 10. However, the identification image to be read is not limited to the two-dimensional barcode Q, and may be, for example, text, numerical values, or encrypted information.

また、上記の実施形態では、作業時間の算出に際し、作業者又は作業管理者が対象作業を指定し、指定された対象作業について作業時間が算出されることとした。ただし、これに限定されず、支援装置20によって作業時間が自動的に算出されてもよく、例えば、作業が終了した時点で、その作業の作業時間が自動的に算出されてもよい。 In addition, in the above embodiment, when calculating the work time, the worker or work manager specifies the target work, and the work time is calculated for the specified target work. However, this is not limited to this, and the work time may be calculated automatically by the support device 20. For example, the work time for a work may be calculated automatically when the work is completed.

また、上記の実施形態では、建物の建設工事に用いられる建材(具体的には、鉄骨)を生産する作業を例に挙げて説明したが、本発明は、建材以外の製品を生産/製造する作業に対して適用可能である。例えば、設備機器の組立作業に対して本発明を適用してもよい。 Furthermore, while the above embodiment has been described using the example of work to produce building materials (specifically, steel frames) used in building construction work, the present invention can also be applied to work to produce/manufacture products other than building materials. For example, the present invention may also be applied to the assembly work of equipment.

10 端末
11 プロセッサ
12 メモリ
13 通信用インタフェース
14 入力装置
15 出力装置
16 記憶装置
20 支援装置(作業管理支援装置)
30 アクセスポイント
32 表示モニタ(表示器)
41 表示制御部
42 更新部
43 情報取得部
44 記憶部
45 処理実行部
46 注記表示部
47 制限解除部
48 計測部
Q 二次元バーコード
T 対象物
S 支援システム(作業管理支援システム)
W 操作ウィンドウ
10 Terminal 11 Processor 12 Memory 13 Communication interface 14 Input device 15 Output device 16 Storage device 20 Support device (work management support device)
30 Access point 32 Display monitor (display)
41 Display control unit 42 Update unit 43 Information acquisition unit 44 Storage unit 45 Processing execution unit 46 Note display unit 47 Restriction release unit 48 Measurement unit Q Two-dimensional barcode T Object S Support system (work management support system)
W Operation Window

Claims (10)

複数の工程を含む作業の管理を支援する作業管理支援装置であって、
それぞれの前記工程において、前記工程にて取り扱われる対象物に付与された識別画像が端末によって読み取られた場合に、前記端末を制御して、前記端末又は前記端末と対応する表示器に、前記識別画像から特定される前記対象物の図面を表示させる表示制御部と、
少なくとも一つの前記工程を第1工程として、該第1工程の進行に関する情報が前記端末を通じて入力された場合に、前記情報を取得する情報取得部と、
取得された前記情報を、前記第1工程と関連付けて記憶装置に記憶させる記憶部と、
前記記憶装置に記憶された前記情報に基づいて、前記第1工程又は前記第1工程と対応する第2工程に関する処理を実行する処理実行部と、を備える作業管理支援装置。
A work management support device that supports the management of work including multiple processes,
a display control unit that controls the terminal when an identification image assigned to an object handled in each of the steps is read by the terminal, and causes the terminal or a display device corresponding to the terminal to display a drawing of the object identified from the identification image;
an information acquisition unit that acquires information regarding the progress of at least one of the processes as a first process when the information is input through the terminal;
a storage unit that stores the acquired information in a storage device in association with the first step;
a processing execution unit that executes processing related to the first process or a second process corresponding to the first process based on the information stored in the storage device.
前記図面が表示された前記端末にて行われた操作に応じて、前記図面を示す図面データを更新する更新部を備え、
前記表示制御部は、前記図面として、更新が可能な前記図面データに基づく第1図面、及び、更新が不可能な前記図面データに基づく第2図面のうち、前記端末にて選択された少なくとも一方を前記端末又は前記表示器に表示させる、請求項1に記載の作業管理支援装置。
an update unit that updates drawing data representing the drawing in response to an operation performed on the terminal on which the drawing is displayed;
The work management support device of claim 1, wherein the display control unit displays at least one of a first drawing based on the drawing data that can be updated and a second drawing based on the drawing data that cannot be updated, selected at the terminal, on the terminal or the display.
複数の前記工程のそれぞれを前記第1工程として、前記第1工程の進捗に関する進捗情報が前記工程毎に入力される場合に、
前記情報取得部は、前記進捗情報を前記工程毎に取得し、
前記記憶部は、それぞれの前記工程の前記進捗情報を、それぞれの前記工程と関連付けて前記工程毎に前記記憶装置に記憶させる、請求項1又は2に記載の作業管理支援装置。
When each of the plurality of processes is defined as a first process and progress information regarding the progress of the first process is input for each of the processes,
the information acquisition unit acquires the progress information for each of the processes,
3. The work management support device according to claim 1, wherein the storage unit stores the progress information for each of the processes in the storage device for each of the processes in association with the process.
前記進捗情報は、工程開始を示す開始情報、及び工程終了を示す終了情報を含み、
前記第2工程は、複数の前記工程の中で前記第1工程の直後に実施され、
前記情報取得部が前記第1工程について前記開始情報を取得してから前記終了情報を取得するまでの間、前記第2工程についての前記進捗情報の入力に対する制限、又は、前記第2工程における前記対象物の前記図面の表示に対する制限が設けられ、
前記情報取得部が前記第1工程について前記終了情報を取得した場合に、前記処理実行部は、前記第2工程に対する前記制限を解除する処理を実行する、請求項3に記載の作業管理支援装置。
The progress information includes start information indicating the start of a process and end information indicating the end of a process,
The second step is carried out immediately after the first step among the plurality of steps,
a restriction is imposed on input of the progress information for the second process or on display of the drawing of the object in the second process during a period from when the information acquisition unit acquires the start information for the first process to when the information acquisition unit acquires the end information;
The work management support device according to claim 3 , wherein when the information acquisition unit acquires the end information for the first process, the process execution unit executes a process to remove the restriction on the second process.
前記進捗情報は、工程開始を示す開始情報、及び工程終了を示す終了情報を含み、
前記処理実行部は、前記情報取得部が前記第1工程について前記開始情報を取得してから前記終了情報を取得するまでの所要時間を計測する処理を実行する、請求項3又は4に記載の作業管理支援装置。
The progress information includes start information indicating the start of a process and end information indicating the end of a process,
The work management support device according to claim 3 , wherein the process execution unit executes a process of measuring a required time from when the information acquisition unit acquires the start information for the first process until when the information acquisition unit acquires the end information.
前記第1工程において、前記第1工程にて行われた変則的内容を示す注記情報が入力される場合に、前記情報取得部は、前記注記情報を取得する、請求項1乃至5のいずれか一項に記載の作業管理支援装置。 The work management support device described in any one of claims 1 to 5, wherein, in the first step, when note information indicating irregularities performed in the first step is input, the information acquisition unit acquires the note information. 前記第1工程において、前記第1工程にて取り扱われる前記対象物の前記図面が表示された前記端末を通じて、前記注記情報が入力される場合に、
前記情報取得部は、前記注記情報を取得する際に、該注記情報の入力時点で前記端末に表示された前記図面を特定し、
前記記憶部は、前記注記情報を、前記注記情報の入力時点で前記端末に表示された前記図面と関連付けて前記記憶装置に記憶させる、請求項6に記載の作業管理支援装置。
In the first step, when the annotation information is input through the terminal on which the drawing of the object to be handled in the first step is displayed,
When acquiring the annotation information, the information acquisition unit identifies the drawing displayed on the terminal at the time of input of the annotation information,
7. The work management support device according to claim 6, wherein the storage unit stores the annotation information in the storage device in association with the drawing displayed on the terminal at the time the annotation information is input.
前記情報取得部が前記第1工程について前記注記情報を取得した場合、前記処理実行部は、複数の前記工程のうち、前記第1工程の後に実施される前記工程において、該工程にて取り扱われる前記対象物の前記図面とともに、前記注記情報を前記端末又は前記表示器に表示させる処理を実行する、請求項7に記載の作業管理支援装置。 The work management support device of claim 7, wherein when the information acquisition unit acquires the annotation information for the first process, the processing execution unit executes processing to display the annotation information on the terminal or the display device, together with the drawing of the object handled in the process, at a process among the plurality of processes that is performed after the first process. 複数の工程を含む作業の管理を支援する作業管理支援システムであって、
画像を読み取り可能な端末と、該端末と通信可能な装置と、を備え、
前記装置は、
それぞれの前記工程において、前記工程にて取り扱われる対象物に付与された識別画像が前記端末によって読み取られた場合に、前記端末を制御して、前記端末又は前記端末と対応する表示器に、前記識別画像から特定される前記対象物の図面を表示させる表示制御部と、
少なくとも一つの前記工程を第1工程として、該第1工程の進行に関する情報が前記端末を通じて入力された場合に、前記情報を取得する情報取得部と、
取得された前記情報を、前記第1工程と関連付けて記憶装置に記憶させる記憶部と、
前記記憶装置に記憶された前記情報に基づいて、前記第1工程又は前記第1工程と対応する第2工程に関する処理を実行する処理実行部と、を備える作業管理支援システム。
A work management support system that supports the management of work including multiple processes,
A terminal capable of reading an image and a device capable of communicating with the terminal,
The device comprises:
a display control unit that controls the terminal when an identification image assigned to an object handled in each of the steps is read by the terminal, and causes the terminal or a display device corresponding to the terminal to display a drawing of the object identified from the identification image;
an information acquisition unit that acquires information regarding the progress of at least one of the processes as a first process when the information is input through the terminal;
a storage unit that stores the acquired information in a storage device in association with the first step;
a processing execution unit that executes processing related to the first process or a second process corresponding to the first process based on the information stored in the storage device.
複数の工程を含む作業の管理を支援する作業管理支援方法であって、
それぞれの前記工程において、前記工程にて取り扱われる対象物に付与された識別画像が端末によって読み取られた場合に、コンピュータにより、前記端末を制御して、前記端末又は前記端末と対応する表示器に、前記識別画像から特定される前記対象物の図面を表示させ、
少なくとも一つの前記工程を第1工程として、該第1工程の進行に関する情報が前記端末を通じて入力された場合に、コンピュータにより、前記情報を取得し、
コンピュータにより、取得された前記情報を、前記第1工程と関連付けて記憶装置に記憶させ、
コンピュータにより、前記記憶装置に記憶された前記情報に基づいて、前記第1工程又は前記第1工程と対応する第2工程に関する処理を実行する、作業管理支援方法。
A work management support method for supporting the management of work including a plurality of processes, comprising:
In each of the steps, when an identification image assigned to an object handled in the step is read by a terminal, a computer controls the terminal to display a drawing of the object identified from the identification image on the terminal or a display device corresponding to the terminal;
When at least one of the steps is designated as a first step and information regarding the progress of the first step is input through the terminal, the information is acquired by a computer;
storing the acquired information in a storage device in association with the first step by a computer;
A work management support method, comprising: executing, by a computer, processing relating to the first process or a second process corresponding to the first process based on the information stored in the storage device.
JP2022029260A 2022-02-28 2022-02-28 Work management support device, work management support system, and work management support method Active JP7769563B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022029260A JP7769563B2 (en) 2022-02-28 2022-02-28 Work management support device, work management support system, and work management support method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022029260A JP7769563B2 (en) 2022-02-28 2022-02-28 Work management support device, work management support system, and work management support method

Publications (2)

Publication Number Publication Date
JP2023125264A JP2023125264A (en) 2023-09-07
JP7769563B2 true JP7769563B2 (en) 2025-11-13

Family

ID=87887644

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022029260A Active JP7769563B2 (en) 2022-02-28 2022-02-28 Work management support device, work management support system, and work management support method

Country Status (1)

Country Link
JP (1) JP7769563B2 (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010102495A (en) 2008-10-23 2010-05-06 Murata Machinery Ltd Plate material working process management system
JP2017220109A (en) 2016-06-09 2017-12-14 大和ハウス工業株式会社 Information provision system and information provision method
JP2019079144A (en) 2017-10-20 2019-05-23 オリンパス株式会社 Work support system, imaging device, wearable device, and work support method
JP2021002136A (en) 2019-06-20 2021-01-07 株式会社日立製作所 Work support device, work support method, and work support program
JP2021093053A (en) 2019-12-12 2021-06-17 株式会社日立製作所 Work instruction system and work instruction method
JP2021168188A (en) 2019-03-04 2021-10-21 三菱電機株式会社 Information sharing support device of elevator
JP2022030717A (en) 2020-08-07 2022-02-18 清水建設株式会社 Construction site management support system and construction site management support method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010102495A (en) 2008-10-23 2010-05-06 Murata Machinery Ltd Plate material working process management system
JP2017220109A (en) 2016-06-09 2017-12-14 大和ハウス工業株式会社 Information provision system and information provision method
JP2019079144A (en) 2017-10-20 2019-05-23 オリンパス株式会社 Work support system, imaging device, wearable device, and work support method
JP2021168188A (en) 2019-03-04 2021-10-21 三菱電機株式会社 Information sharing support device of elevator
JP2021002136A (en) 2019-06-20 2021-01-07 株式会社日立製作所 Work support device, work support method, and work support program
JP2021093053A (en) 2019-12-12 2021-06-17 株式会社日立製作所 Work instruction system and work instruction method
JP2022030717A (en) 2020-08-07 2022-02-18 清水建設株式会社 Construction site management support system and construction site management support method

Also Published As

Publication number Publication date
JP2023125264A (en) 2023-09-07

Similar Documents

Publication Publication Date Title
JP5850033B2 (en) Field device management apparatus, device information display method, computer program, and recording medium
JP4601632B2 (en) Project management system and specification change management program based on traceability of specifications
CN113917896B (en) Work instruction device, work instruction system and work instruction method
JP2014032631A (en) Inspection support system
JP2022119629A5 (en)
JP2014089586A (en) Work procedure management system, work procedure management method and work procedure management program
CN113064376B (en) Production system, production method and information storage medium
JP7769563B2 (en) Work management support device, work management support system, and work management support method
JP7033428B2 (en) Safe construction cycle support system
JPWO2019198221A1 (en) Data processing device, data processing method and program
WO2021044654A1 (en) Information processing system, programmable display device, and information processing device
JP2011186651A (en) Work management system, work management method, and program thereof
JP6926032B2 (en) Manufacturing control system and method
JP6146260B2 (en) Information processing apparatus, information processing system, and information processing program
JP4577035B2 (en) Business instruction management system and program
JP7418646B1 (en) Work management system and information processing equipment used therein
CN111308982B (en) Inspection assistance system
JP6625825B2 (en) Screen creation device for client terminal and data collection / inquiry system using the same
JP6242770B2 (en) Manufacturing management system, mobile terminal for manufacturing management, and manufacturing management method
JP6552162B2 (en) Information processing apparatus, information processing method, and program
JP6132704B2 (en) Product management system
JP6746003B2 (en) Management device, management method and program
JP2018169210A (en) Measurement assist device, measurement assist system, control method, and program
WO2020246208A1 (en) Settings management system, settings management method, and program
JP6952928B1 (en) Data analysis system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20250130

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20251021

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20251027

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20251031

R150 Certificate of patent or registration of utility model

Ref document number: 7769563

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150