JP7773229B2 - Building demolition and curing equipment - Google Patents
[go: Go Back, main page]

JP7773229B2 - Building demolition and curing equipment - Google Patents

Building demolition and curing equipment

Info

Publication number
JP7773229B2
JP7773229B2 JP2023183190A JP2023183190A JP7773229B2 JP 7773229 B2 JP7773229 B2 JP 7773229B2 JP 2023183190 A JP2023183190 A JP 2023183190A JP 2023183190 A JP2023183190 A JP 2023183190A JP 7773229 B2 JP7773229 B2 JP 7773229B2
Authority
JP
Japan
Prior art keywords
frame members
demolition
building
members
temporary scaffolding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2023183190A
Other languages
Japanese (ja)
Other versions
JP2025072824A (en
Inventor
功 佐怒賀
洋平 佐藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tanaken
Original Assignee
Tanaken
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tanaken filed Critical Tanaken
Priority to JP2023183190A priority Critical patent/JP7773229B2/en
Publication of JP2025072824A publication Critical patent/JP2025072824A/en
Application granted granted Critical
Publication of JP7773229B2 publication Critical patent/JP7773229B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Description

本発明は、解体すべき建物を解体する際に屋根養生するための建物の解体養生装置に関する。 The present invention relates to a building demolition and curing device for curing the roof of a building when it is demolished.

従来、鉄筋コンクリート造等の建物を解体する工法の一つに、解体用重機(バックホウ)をクレーンで屋上に吊り上げて設置し、上記解体用重機が上層階から1フロアずつ順に解体していく工法(階上解体工法)がある。この工法では、解体作業によって発生した粉塵が建物の上方から周囲に飛散してしまうことがある。また、上記工法では、コンクリートの小片や鉄筋の断片等が建物の上方から周囲に飛び出すという災害が発生することが、稀にある。 One conventional method for demolishing buildings made of reinforced concrete or other materials involves lifting a demolition machine (backhoe) onto the roof with a crane, then demolishing each floor, starting from the upper floors (the floor-up demolition method). With this method, dust generated during the demolition work can fly from the top of the building into the surrounding area. Furthermore, with this method, there are rare cases where small pieces of concrete or rebar fragments fly from the top of the building into the surrounding area, causing accidents.

通常の解体工事では、解体する建物の周囲を仮設足場で囲み、その仮設足場に防音パネルや防音シートを取り付けることで、解体工事による騒音の影響や粉塵の飛散を抑制している。これに加えて屋根養生を設置する場合には、向かい合う仮設足場の上部に飛散防止用ネット(以下、養生ネットともいう。)を架け渡して、建物の上方全体を覆う方法を採用している。 In typical demolition work, the building to be demolished is surrounded by temporary scaffolding, and soundproofing panels and sheets are attached to the scaffolding to reduce the noise impact and dust dispersion caused by the demolition work. In addition, when installing roof protection, a scatter prevention net (hereinafter referred to as protection net) is hung across the top of opposing temporary scaffolding to cover the entire upper part of the building.

しかし、特に建物が大型の場合には、飛散防止用ネットの支間長が長くなることで、飛散防止用ネットのたるみが大きくなり、建物中央部において屋上から飛散防止用ネットまでの高さが十分に確保することができなくなる。その結果、建物上で解体用重機が作業するための空間が狭くなり、作業性が悪くなるという不都合があった。 However, particularly for large buildings, the longer the span length of the scatter prevention netting, the greater the sagging of the netting, making it impossible to ensure sufficient height from the roof to the netting in the center of the building. As a result, there is less space available for demolition machinery to work on the building, making it difficult to work.

そこで、従来では、向かい合う足場の間にたわみの小さいトラス構造の水平トラス部材を複数本設置し、これらの水平トラス部材上に養生ネットを設置して建物の上方全体を覆う工法が開発されている(例えば、特許文献1参照)。 In response to this, a construction method has been developed in which multiple horizontal truss members with a truss structure that has low deflection are installed between opposing scaffolding, and protective netting is placed on top of these horizontal truss members to cover the entire upper part of the building (see, for example, Patent Document 1).

特許第6879613号公報Patent No. 6879613

ところで、特許文献1に記載された工法では、建物上で解体用重機が解体作業を行うための作業空間を確保するために、水平トラス部材を高所に設置する必要がある。このため、仮設足場を建物上端より5~6段高い位置まで設置する必要があり、水平トラス部材を高所に設置する際には、高所の仮設足場での設置作業となり、著しく困難な作業となる問題がある。 However, with the construction method described in Patent Document 1, the horizontal truss members must be installed at a high altitude to ensure a working space above the building for demolition machinery to carry out demolition work. This requires temporary scaffolding to be installed at a height of five to six steps above the top of the building, which means that installing the horizontal truss members at a high altitude requires the work to be done using temporary scaffolding at a high altitude, which poses a significant challenge.

通常、仮設足場が受ける風荷重に対して仮設足場を安定させるため、壁つなぎと呼ばれる接続部材で仮設足場と建物を接続して仮設足場を固定している。この場合、建物より高所に設置された仮設足場の上部では、上記壁つなぎを設置することができないため、強風に対して仮設足場の上部は、非常に不安定になるという問題がある。また、解体用重機で作業することによる振動で、仮設足場が大きく揺れることから、解体作業を行うために解体用重機による作業を一時中断することもあり、作業効率が低下するという問題がある。 Normally, to stabilize temporary scaffolding against the wind loads it receives, the scaffolding is secured to the building by connecting it to the building with connecting members called wall ties. In this case, since the wall ties cannot be installed at the top of the temporary scaffolding, which is installed higher than the building, there is a problem that the top of the temporary scaffolding becomes very unstable in strong winds. In addition, because the vibrations caused by demolition machinery can cause the temporary scaffolding to shake significantly, work using the demolition machinery may have to be temporarily suspended to carry out the demolition work, resulting in reduced work efficiency.

さらに、建物の解体が進行していくに当たり水平トラス部材を降下させるものの、水平トラス部材の水平状態を保持したまま降下させる必要があるため、水平トラス部材を含むトラス構造体の四隅に1人ずつ作業員を配置し、各作業員がタイミングを合わせてトラス構造体の降下作業を行う必要があり、作業性が著しく低くなるという問題もある。 Furthermore, as the demolition of a building progresses, the horizontal truss members must be lowered while maintaining their horizontal position. This requires one worker to be stationed at each of the four corners of the truss structure, including the horizontal truss members, and each worker must coordinate their time to lower the truss structure, significantly reducing workability.

そこで、本発明は上記の問題に鑑みてなされたものであり、骨組材及び養生ネットを容易に取り付け、取り外すことができ、解体作業効率を大幅に高めることのできる建物の解体養生装置を提供することを課題とする。 The present invention was developed in consideration of the above problems, and aims to provide a building demolition and curing device that can easily attach and remove frame materials and curing nets, significantly improving the efficiency of demolition work.

かかる課題を達成するために、請求項1に記載の発明は、解体すべき建物の外周壁に沿って設けられた仮設足場と、互いに対向する前記仮設足場間に複数架け渡され、それぞれ棒状に形成されて長さ方向に分割され、それぞれの基端部が前記仮設足場に回動可能に取り付けられた骨組材と、前記複数の骨組材に張設された養生ネットと、を備え、前記複数の骨組材を上方に回動させることによって前記養生ネットが張設された前記複数の骨組材の下方に解体作業空間を形成したことを特徴とする。 To achieve this goal, the invention described in claim 1 comprises temporary scaffolding set up along the outer wall of a building to be demolished; multiple rod-shaped framework members stretched between opposing sets of temporary scaffolding, each divided lengthwise, with their base ends rotatably attached to the temporary scaffolding; and protective netting stretched across the framework members; and by rotating the framework members upward, a demolition work space is formed below the framework members over which the protective netting is stretched.

また、請求項2に記載の発明は、請求項1に記載の構成に加え、前記複数の骨組材は、上方に湾曲するように形成されていることを特徴とする。 The invention described in claim 2 is characterized in that, in addition to the configuration described in claim 1, the multiple frame members are formed to curve upward.

また、請求項3に記載の発明は、請求項1に記載の構成に加え、前記複数の骨組材は、それぞれ長さ方向に分割されてそれぞれ伸縮可能に構成されていることを特徴とする。 Furthermore, the invention described in claim 3 is characterized in that, in addition to the configuration described in claim 1, the multiple frame members are each divided in the lengthwise direction and configured to be extendable and contractible.

また、請求項4に記載の発明は、請求項3に記載の構成に加え、前記複数の骨組材は、分割されたそれぞれ先端部が連結部材によって連結されていることを特徴とする。 The invention described in claim 4 is characterized in that, in addition to the configuration described in claim 3, the divided tip portions of the multiple frame members are connected by connecting members.

また、請求項5に記載の発明は、請求項1に記載の構成に加え、前記複数の骨組材は、それぞれ可撓性を有する強化プラスチック製であることを特徴とする。 The invention described in claim 5 is characterized in that, in addition to the configuration described in claim 1, the multiple frame members are each made of flexible reinforced plastic.

また、請求項6に記載の発明は、請求項1に記載の構成に加え、前記養生ネットに所定の間隔をおいて複数のリングが設けられ、これらのリングに前記骨組材を挿通することによって前記養生ネットが張設されるように構成されていることを特徴とする。 Furthermore, the invention described in claim 6 is characterized in that, in addition to the configuration described in claim 1, the protective net is provided with multiple rings at predetermined intervals, and the protective net is tensioned by inserting the framework members through these rings.

また、請求項7に記載の発明は、請求項1に記載の構成に加え、前記複数の骨組材は、それぞれの基端部が前記仮設足場に設けられた緊結金具を介して回動可能に取り付けられるとともに、前記仮設足場に前記骨組材の回動角度を調整する角度調整装置が設けられている。 Furthermore, the invention described in claim 7, in addition to the configuration described in claim 1, has the base ends of the multiple frame members rotatably attached via fastening fittings provided on the temporary scaffolding, and the temporary scaffolding is provided with an angle adjustment device that adjusts the rotation angle of the frame members.

請求項1に記載の発明によれば、仮設足場間に複数の骨組材が架け渡され、これらの骨組材がそれぞれ棒状に形成されて長さ方向に分割され、それぞれの基端部が仮設足場に回動可能に取り付けられ、複数の骨組材に養生ネットが張設され、複数の骨組材を上方に回動させることによって養生ネットが張設された複数の骨組材の下方に解体作業空間を形成したことにより、骨組材及び養生ネットを容易に取り付け、取り外すことができ、解体作業効率を大幅に高めることが可能となる。 According to the invention described in claim 1, multiple framework members are strung across temporary scaffolding, each formed into a rod-like shape and divided lengthwise, with the base end of each member rotatably attached to the temporary scaffolding, and protective netting is stretched across the multiple framework members. By rotating the multiple framework members upward, a demolition work space is formed below the multiple framework members over which the protective netting is stretched. This allows the framework members and protective netting to be easily attached and removed, significantly improving the efficiency of demolition work.

また、請求項2に記載の発明によれば、複数の骨組材は、上方に湾曲するように形成されているので、解体作業空間をより十分に確保することが可能となる。 Furthermore, according to the invention described in claim 2, the multiple frame members are formed to curve upward, making it possible to secure more sufficient space for dismantling work.

また、請求項3に記載の発明によれば、複数の骨組材は、それぞれ長さ方向に分割されてそれぞれ伸縮可能に構成されていることにより、運搬時にそれぞれ長さ方向に分割した骨組材を短縮させておくことで、取扱性を向上させるとともに、骨組材を仮設足場に容易に取り付け、取り外すことができる。 Furthermore, according to the invention described in claim 3, the multiple frame members are each configured to be split lengthwise and extendable, so that by shortening the split frame members during transportation, handling is improved and the frame members can be easily attached to and removed from the temporary scaffolding.

また、請求項4に記載の発明によれば、複数の骨組材は、分割されたそれぞれ先端部が連結部材によって連結されているので、骨組材及び養生ネットを容易に取り付け、取り外すことができる。 Furthermore, according to the invention described in claim 4, the divided ends of the multiple frame members are connected by connecting members, making it easy to attach and remove the frame members and protective netting.

また、請求項5に記載の発明によれば、複数の骨組材は、それぞれ可撓性を有する強化プラスチック製であるので、複数の骨組材の軽量化が図られて運搬時の取扱性を向上させるとともに、複数の骨組材を上方に容易に湾曲させることができる。 Furthermore, according to the invention described in claim 5, each of the multiple frame members is made of flexible reinforced plastic, which reduces the weight of the multiple frame members, improving handling during transportation, and allows the multiple frame members to be easily bent upward.

また、請求項6に記載の発明によれば、養生ネットに所定の間隔をおいて複数のリングが設けられ、これらのリングに骨組材を挿通することによって養生ネットが張設されるように構成されているので、骨組材に養生ネットを容易に取り付け、取り外すことができる。 Furthermore, according to the invention described in claim 6, the protective net is provided with multiple rings at predetermined intervals, and the protective net is stretched by inserting the framework material through these rings, so the protective net can be easily attached to and removed from the framework material.

また、請求項7に記載の発明によれば、複数の骨組材は、それぞれの基端部が仮設足場に設けられた緊結金具を介して回動可能に取り付けられるとともに、仮設足場に骨組材の回動角度を調整する角度調整装置が設けられていることにより、骨組材の回動角度を調整することで、複数の骨組材の下方に解体作業空間を十分に確保することが可能となる。 Furthermore, according to the invention described in claim 7, the base ends of the multiple frame members are rotatably attached via fastening fittings provided on the temporary scaffolding, and the temporary scaffolding is provided with an angle adjustment device that adjusts the rotation angle of the frame members. By adjusting the rotation angle of the frame members, it is possible to ensure sufficient dismantling work space below the multiple frame members.

本発明の一実施形態に係る建物の解体養生装置を示す概略構成図である。1 is a schematic diagram showing a building demolition and curing device according to one embodiment of the present invention. FIG. 同実施形態に係る建物の解体養生装置を示す概略平面図である。FIG. 2 is a schematic plan view showing the building demolition and curing apparatus according to the embodiment. 図2のA-A線による概略断面図である。3 is a schematic cross-sectional view taken along line AA in FIG. 2. 図3のB部の拡大図である。FIG. 4 is an enlarged view of part B in FIG. 3 . 図2のC部に設けられた骨組材の連結部材を示す拡大図である。3 is an enlarged view showing a connecting member of the framework material provided in part C of FIG. 2. 図2のD部に設けられた骨組材の角度調整装置を示す側面図である。3 is a side view showing a frame member angle adjustment device provided at part D in FIG. 2. 図6の骨組材の角度調整装置を示す平面図である。FIG. 7 is a plan view showing the frame member angle adjustment device of FIG. 6. 同実施形態に係る建物の解体養生装置の施工順序1を示す概略構成図である。FIG. 2 is a schematic diagram showing a construction sequence 1 of the building demolition and curing device according to the embodiment. 同実施形態に係る建物の解体養生装置の施工順序2を示す概略構成図である。FIG. 10 is a schematic diagram showing a construction sequence 2 of the building demolition and curing device according to the embodiment. 同実施形態に係る建物の解体養生装置の施工順序3を示す概略構成図である。FIG. 10 is a schematic diagram showing a construction sequence 3 of the building demolition and curing device according to the embodiment. 同実施形態に係る建物の解体養生装置の施工順序4を示す概略構成図である。FIG. 10 is a schematic diagram showing a construction procedure 4 of the building demolition and curing device according to the embodiment.

以下、本発明の一実施形態について、図面を参照して詳細に説明する。
[一実施形態]
図1~図11には、本発明の一実施形態を示す。図1は、本発明の一実施形態に係る建物の解体養生装置を示す概略構成図である。図2は、同実施形態に係る建物の解体養生装置を示す概略平面図である。図3は、図2のA-A線による概略断面図である。図4は、図3のB部の拡大図である。図5は、図2のC部に設けられた骨組材の連結部材を示す拡大図である。図6は、図2のD部に設けられた骨組材の角度調整装置を示す側面図である。図7は、図6の骨組材の角度調整装置を示す平面図である。
Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings.
[One embodiment]
Figures 1 to 11 show one embodiment of the present invention. Figure 1 is a schematic diagram showing the configuration of a building demolition and curing apparatus according to one embodiment of the present invention. Figure 2 is a schematic plan view showing the building demolition and curing apparatus according to the same embodiment. Figure 3 is a schematic cross-sectional view taken along line A-A in Figure 2. Figure 4 is an enlarged view of part B in Figure 3. Figure 5 is an enlarged view showing a connecting member for a frame material provided in part C in Figure 2. Figure 6 is a side view showing an angle adjustment device for a frame material provided in part D in Figure 2. Figure 7 is a plan view showing the angle adjustment device for a frame material in Figure 6.

本実施形態の建物の解体養生装置1は、解体すべき建物2の解体作業の際に発生する粉塵の飛散、建物2の構成部材の破片及び廃棄物等の飛散や落下を未然に防止するために配設されるものである。本実施形態における解体すべき建物2は、例えば縦方向の長さが10~30mであって、横方向の長さが36~54mである。なお、本実施形態では、解体すべき建物2がこれ以外の大きさの建物にも適用可能である。 The building demolition and curing equipment 1 of this embodiment is installed to prevent the scattering of dust generated during the demolition work of the building 2 to be demolished, as well as the scattering and falling of fragments of the building's components and waste. In this embodiment, the building 2 to be demolished has a vertical length of 10 to 30 m and a horizontal length of 36 to 54 m. Note that this embodiment can also be applied to buildings of other sizes when the building 2 to be demolished is used.

また、以下の本実施形態の建物の解体養生装置1では、図1に示すように、解体用重機3を図示しないクレーンで建物2の屋上に吊り上げて設置し、解体用重機3が上層階から1フロアずつ順に解体していく階上解体工法に適用した例について説明する。この階上解体工法の場合には、スラブ4上に解体用重機3を載せて解体作業を行えるように、それぞれの上下のスラブ4の間に補強用サポート5が所定の間隔をおいて多数立設される。 Furthermore, in the following embodiment of the building demolition and curing device 1, as shown in Figure 1, an example will be described in which the demolition equipment 3 is hoisted onto the roof of the building 2 by a crane (not shown), and the demolition equipment 3 is used to demolish floors one by one, starting from the upper floors. In this upstairs demolition method, a number of reinforcing supports 5 are erected at predetermined intervals between the upper and lower slabs 4 so that the demolition equipment 3 can be placed on the slabs 4 to perform demolition work.

さらに、建物の解体養生装置1は、図1及び図2に示すように、仮設足場10と、複数の骨組材20と、複数枚に分割された養生ネット30と、から大略的に構成されている。 Furthermore, as shown in Figures 1 and 2, the building demolition and curing device 1 is broadly composed of a temporary scaffolding 10, multiple framework members 20, and multiple divided curing nets 30.

仮設足場10は、解体すべき建物2の外周壁の周囲に沿って壁つなぎと呼ばれる接続部材6によって上下方向及び左右方向に多数連続して配設される。仮設足場10は、建物2の外周壁に沿って外周側に面一に構築された防音パネル11を有するとともに、作業員によって建物2の解体作業に用いられる作業用足場である。 A large number of temporary scaffolding 10 are continuously installed in the vertical and horizontal directions along the perimeter of the outer wall of the building 2 to be demolished, using connecting members 6 called wall ties. The temporary scaffolding 10 has soundproofing panels 11 constructed flush with the outer perimeter along the outer wall of the building 2, and is a work scaffolding used by workers during the demolition work of the building 2.

骨組材20は、図2に示すように屋上において互いに対向する横方向の仮設足場10間に一定間隔をおいて2本1組で多数架け渡されている。なお、建物2の横方向両端部では、骨組材20は、それぞれ1本配設されている。2本1組の骨組材20は、図3及び図4に示すように隣り合う骨組材20の径方向の中心から間隔Dを有して配設されている。この間隔Dは、例えば140mmに設定されている。 As shown in Figure 2, many frame members 20 are strung in pairs across opposing horizontal temporary scaffolding 10 on the rooftop at regular intervals. One frame member 20 is provided at each of the horizontal ends of the building 2. As shown in Figures 3 and 4, the frame members 20 in pairs are arranged with a distance D from the radial center of the adjacent frame members 20. This distance D is set to, for example, 140 mm.

それぞれの骨組材20は、棒状パイプに形成されて長さ方向の略中央部分で2分割されている。因みに、本実施形態の骨組材20は、解体すべき建物2の縦方向の長さが30mになると、1本の骨組材20で長さ方向の中央部が上方に凸になるようにアーチ状に湾曲させて架け渡す作業が困難になるため、長さ方向の略中央部分で2分割して軽量化するとともに、取扱性を向上させている。 Each frame member 20 is formed as a rod-shaped pipe and is split into two at approximately the center in the longitudinal direction. Incidentally, in this embodiment, when the vertical length of the building 2 to be demolished reaches 30 m, it becomes difficult to span a single frame member 20 by bending it into an arch shape with the center of the length convex upward. Therefore, by splitting the frame member 20 into two at approximately the center in the longitudinal direction, the weight is reduced and handling is improved.

2分割された骨組材20は、分割骨組材21,22として図5に示し、これら分割骨組材21,22は、それぞれの先端部21b,22bが連結部材としてのカプラ23によって連結される。なお、本実施形態では、分割骨組材21,22の先端部21b,22bをカプラ接続するようにしたが、この連結方法に限らず、ワイヤー接続するようにしてもよい。つまり、確実かつ容易に着脱可能な連結方法であればよい。 The two divided frame members 20 are shown in Figure 5 as divided frame members 21 and 22, and the tip ends 21b and 22b of these divided frame members 21 and 22 are connected by a coupler 23 as a connecting member. In this embodiment, the tip ends 21b and 22b of the divided frame members 21 and 22 are connected by a coupler, but this connection method is not limited to this, and wire connection is also possible. In other words, any connection method that is secure and easily detachable will suffice.

なお、分割骨組材21,22は、通常時は直線状をなし、養生時は長さ方向の中央部が上方に凸になるようにアーチ状に湾曲させる必要があるため、可撓性が高く、建物2の形状に柔軟に対応可能な材料が要求される。また、分割骨組材21,22は、養生時の強風時に大きく撓むと、解体用重機3に接触する可能性があるので、湾曲させた後は高い曲げ強度と剛性を有する材料が要求され、また養生時は常に変形させた状態で使用するため、高い耐クリープ性を有する材料が要求される。さらに、分割骨組材21,22は、解体作業中に解体用重機3のアタッチメントが接触しても、その衝撃により破損してその反動で仮設足場10が崩壊することがないように、ある程度の衝撃に耐えることのできる靭性を備えている材料が要求される。そして、分割骨組材21,22は、運搬し易いように軽量化が図られた材料が要求される。このような条件を満たすため、本実施形態の分割骨組材21,22は、例えば炭素繊維強化プラスチック(Carbon Fiber Reinforced Plastics)製のものが用いられている。 The frame segments 21, 22 are normally straight, but must be arched so that the center of their length is convex upward during curing. Therefore, they require highly flexible materials that can flexibly adapt to the shape of the building 2. Furthermore, since the frame segments 21, 22 may bend significantly in strong winds during curing and come into contact with the demolition equipment 3, they require materials with high bending strength and rigidity after bending. Furthermore, since they are constantly used in a deformed state during curing, they require materials with high creep resistance. Furthermore, the frame segments 21, 22 must be tough enough to withstand a certain degree of impact, so that even if they come into contact with the attachment of the demolition equipment 3 during demolition work, they will not be damaged by the impact and the resulting recoil will not cause the temporary scaffolding 10 to collapse. The frame segments 21, 22 also require lightweight materials for easy transportation. To meet these conditions, the frame segments 21 and 22 in this embodiment are made of, for example, carbon fiber reinforced plastics.

以下において、分割骨組材21,22は、それぞれ仮設足場10に取り付けられる端部を基端部21a,22aとし、カプラ23によって連結される端部を先端部21b,22bとして説明する。 In the following, the ends of the divided frame members 21, 22 that are attached to the temporary scaffolding 10 will be referred to as base ends 21a, 22a, and the ends that are connected by the coupler 23 will be referred to as tip ends 21b, 22b.

分割骨組材21,22は、それぞれ基端部21a,22aから先端部21b,22bにかけて伸縮可能な釣竿と同じような伸縮機構、すなわちテレスコピック構造である。このテレスコピック構造は、基端部21a,22a側から先端部21b,22b側に向けて径が徐々に細く形成されたパイプが複数本組み合わされて伸縮可能に構成されている。これら複数本組み合わされたパイプは、その連結部分に図8に示す段差部25が形成されることとなる。 The divided frame members 21, 22 have a telescopic structure, similar to a fishing rod, that can extend and retract from the base end 21a, 22a to the tip end 21b, 22b. This telescopic structure is made up of multiple pipes that are gradually tapered in diameter from the base end 21a, 22a to the tip end 21b, 22b, and are assembled together to enable extension and contraction. The joints between these multiple assembled pipes form a step 25, as shown in Figure 8.

養生ネット30は、図2に示すように分割骨組材21,22が連結された骨組材20の先端部21b,22bから基端部21a,22aにかけて略全体を覆うように張設される。養生ネット30は、建物2の横方向の長さに複数枚(本実施形態では10枚)に分割され、これら横方向に10枚に分割された養生ネット30の幅方向両側に長さ方向に一定間隔をおいて図3及び図4に示す金属又は樹脂製の複数のリング31が取り付けられている。これらのリング31に骨組材20(分割骨組材21,22)をそれぞれ挿通することにより、養生ネット30が分割骨組材21,22によって張設される。 As shown in Figure 2, the protective net 30 is stretched to cover almost the entire frame material 20, to which the divided frame materials 21, 22 are connected, from the tip ends 21b, 22b to the base ends 21a, 22a. The protective net 30 is divided into multiple pieces (10 pieces in this embodiment) along the horizontal length of the building 2, and multiple metal or resin rings 31, as shown in Figures 3 and 4, are attached to both sides of the width of these 10 horizontally divided protective nets 30 at regular intervals along the length. The frame materials 20 (divided frame materials 21, 22) are inserted into these rings 31, and the protective net 30 is stretched by the divided frame materials 21, 22.

したがって、10枚に分割された各養生ネット30と、その両側に取り付けられた骨組材20は、1つのユニットを構成するため、仮設足場10に対してそれぞれ別個に取付け、取外しが可能となる。これにより、解体作業の進行に応じて複数のユニット毎又は1つのユニット毎に取り付け、取り外すことも可能となる。本実施形態の養生ネット30は、建物2の横方向の長さが36~54mであり、この長さが10枚に分割されているので、1枚当たりの幅は3.6~5.4mになる。ここで、養生ネット30は、網目粗さが解体すべき建物2の解体作業の際に発生する建物2の構成部材の破片及び廃棄物等の飛散や落下を未然に防止する粗さのものが用いられる。 As a result, each of the ten divided protective nets 30 and the framework members 20 attached to both sides of each net constitute a single unit, allowing them to be attached and detached separately from the temporary scaffolding 10. This makes it possible to attach and detach multiple units or a single unit at a time as the demolition work progresses. The protective net 30 of this embodiment has a length of 36 to 54 m in the horizontal direction of the building 2, and since this length is divided into ten pieces, the width of each piece is 3.6 to 5.4 m. Here, the protective net 30 has a mesh size that is large enough to prevent debris and waste from the building 2's components that are generated during the demolition work of the building 2 from scattering or falling.

なお、養生ネット30に対する複数のリング31の取付間隔は、例えば分割骨組材21,22のテレスコピック構造の連結部分の間隔に対応して配置されることが望ましい。このように複数のリング31を配置することにより、複数のリング31がテレスコピック構造の連結部分の段差部25(図8に示す)によって係止され、養生ネット30の位置ずれを未然に防止することができる。 It is desirable that the attachment spacing of the multiple rings 31 to the protective net 30 corresponds to the spacing of the connecting parts of the telescopic structure of the divided frame members 21, 22. By arranging the multiple rings 31 in this manner, the multiple rings 31 are locked by the stepped parts 25 (shown in Figure 8) of the connecting parts of the telescopic structure, preventing the protective net 30 from shifting out of position.

また、図6及び図7に示すように、仮設足場10の最上段における建物2側の1本の建地材10aには、2本1組の骨組材20の基端部がそれぞれ緊結金具としての自在クランプ12によって回動可能に取り付けられている。これら自在クランプ12が取り付けられた建地材10aの上方には、上下方向に間隔をおいて角度調整装置としての2つの手動ウィンチ40,50が設置されている。これらの手動ウィンチ40,50は、それぞれ作業員が手動によって回転操作するための回転レバー41,51と、牽引ロープ43,53が巻き付けられた回転ドラム42,52とを備え、これらの牽引ロープ43,53の先端部43a,53aは、それぞれ2本1組の骨組材20の基端部から一定の位置に配置された係止部24,24に固定される。 As shown in Figures 6 and 7, the base ends of a pair of frame members 20 are rotatably attached to one building material 10a on the building 2 side at the top level of the temporary scaffolding 10 by means of universal clamps 12 that serve as fastening hardware. Above the building material 10a to which these universal clamps 12 are attached, two manual winches 40, 50 that serve as angle adjustment devices are installed at a distance in the vertical direction. These manual winches 40, 50 each include a rotating lever 41, 51 that can be manually rotated by a worker, and a rotating drum 42, 52 around which a towing rope 43, 53 is wound. The tip ends 43a, 53a of these towing ropes 43, 53 are fixed to locking portions 24, 24 that are positioned at a fixed position from the base ends of the pair of frame members 20.

これにより、作業員が手動ウィンチ40の回転レバー41を一方向に回転操作すると、回転ドラム42が回転し、牽引ロープ43を巻き上げることにより、図6の二点鎖線で示すように骨組材20の分割骨組材22を斜め上方に回動させ、長さ方向の中央部が上方に凸になるようにアーチ状に湾曲させる。また、手動ウィンチ50の回転レバー51を一方向に回転操作した場合も同様である。その結果、養生ネット30が張設された複数の骨組材20の下方に解体作業空間60が形成される。この場合、図1に示すように屋上のスラブ4から最も高い位置の養生ネット30までの高さHは、例えば7~10m程度になる。 As a result, when a worker rotates the rotating lever 41 of the manual winch 40 in one direction, the rotating drum 42 rotates and winds up the towing rope 43, causing the divided frame members 22 of the frame members 20 to rotate diagonally upward as shown by the two-dot chain line in Figure 6, bending them into an arch shape with the center portion in the longitudinal direction convex upward. The same occurs when the rotating lever 51 of the manual winch 50 is rotated in one direction. As a result, a demolition work space 60 is formed below the multiple frame members 20 on which the protective net 30 is stretched. In this case, as shown in Figure 1, the height H from the roof slab 4 to the highest protective net 30 is, for example, approximately 7 to 10 meters.

次に、本実施形態に係る建物の解体養生装置の施工順序について説明する。 Next, we will explain the construction procedure for the building demolition and curing equipment related to this embodiment.

図8は、同実施形態に係る建物の解体養生装置の施工順序1を示す概略構成図である。図9は、同実施形態に係る建物の解体養生装置の施工順序2を示す概略構成図である。図10は、同実施形態に係る建物の解体養生装置の施工順序3を示す概略構成図である。図11は、同実施形態に係る建物の解体養生装置の施工順序4を示す概略構成図である。 Figure 8 is a schematic diagram showing construction sequence 1 of the building demolition and curing device according to the embodiment. Figure 9 is a schematic diagram showing construction sequence 2 of the building demolition and curing device according to the embodiment. Figure 10 is a schematic diagram showing construction sequence 3 of the building demolition and curing device according to the embodiment. Figure 11 is a schematic diagram showing construction sequence 4 of the building demolition and curing device according to the embodiment.

まず、解体すべき建物2の四方の外周壁の周囲に沿って接続部材6によって仮設足場10を配設する。 First, temporary scaffolding 10 is placed around the four outer walls of the building 2 to be demolished using connecting members 6.

そして、本実施形態では、階上解体工法が適用されることから、スラブ4に解体用重機3を載せて作業を行えるように、屋上を除く各階のそれぞれの上下のスラブ4の間に補強用サポート5をあらかじめ所定の間隔をおいて多数立設しておく。その後、建物2の屋上のスラブ4に解体用重機3を図示しないクレーンで吊り上げて設置する。なお、仮設足場10の配設作業と補強用サポート5の設置作業は、順序が逆であっても、また同時であってもよい。 In this embodiment, since an upper-floor demolition method is applied, a large number of reinforcing supports 5 are installed in advance at predetermined intervals between the upper and lower slabs 4 of each floor except the roof so that demolition equipment 3 can be placed on the slabs 4 for work. The demolition equipment 3 is then lifted and installed on the slab 4 on the roof of the building 2 by a crane (not shown). The installation of the temporary scaffolding 10 and the installation of the reinforcing supports 5 may be performed in the opposite order, or simultaneously.

次いで、最上部の仮設足場10において、それぞれ対向する建地材10aに自在クランプ12を取り付ける。これらの自在クランプ12にそれぞれ分割骨組材21,22の基端部21a,22aを固定する。このとき、分割骨組材21,22は、それぞれ全体の長さが短縮した状態にある。そして、図8に示すように各自在クランプ12が取り付けられた建地材10aの上方に設置した2つの手動ウィンチ40,50の牽引ロープ43,53の先端部43a,53aを分割骨組材21,22の係止部24,24に接続することで、それぞれの分割骨組材21,22を手動ウィンチ40,50の牽引ロープ43,53で吊り下げた後、それぞれ分割骨組材21,22の全体の長さを伸長させる。 Next, at the top of the temporary scaffolding 10, flexible clamps 12 are attached to the opposing building materials 10a. The base ends 21a, 22a of the segmented frame members 21, 22 are fixed to these flexible clamps 12, respectively. At this time, the overall length of each of the segmented frame members 21, 22 is shortened. Then, as shown in Figure 8, the tips 43a, 53a of the towing ropes 43, 53 of two manual winches 40, 50 installed above the building materials 10a to which each flexible clamp 12 is attached are connected to the locking portions 24, 24 of the segmented frame members 21, 22. By hanging each of the segmented frame members 21, 22 from the towing ropes 43, 53 of the manual winches 40, 50, the overall length of each of the segmented frame members 21, 22 is then extended.

さらに、図9に示すように、隣り合う分割骨組材21,22に養生ネット30に取り付けられた複数のリング31を矢印に示すようにそれぞれ分割骨組材21,22の先端部21b,22bから基端部21a,22aに向かって挿通することにより、養生ネット30が分割骨組材21,22によって張設される。 Furthermore, as shown in Figure 9, multiple rings 31 attached to the protective net 30 on adjacent divided frame members 21, 22 are inserted from the tip ends 21b, 22b of the divided frame members 21, 22 toward the base ends 21a, 22a, as shown by the arrows, thereby tensioning the protective net 30 between the divided frame members 21, 22.

次に、図10の矢印に示すように、養生ネット30が張設された分割骨組材21,22の先端部21b,22b同士をカプラ23によって連結する。この状態において、骨組材20は、その長さ方向の中央部が下方に凸となるように湾曲して形成されている。 Next, as shown by the arrows in Figure 10, the tip ends 21b, 22b of the divided frame members 21, 22, on which the protective net 30 has been stretched, are connected together using couplers 23. In this state, the frame member 20 is curved so that the center portion in the longitudinal direction is convex downward.

そして、作業員は、手動ウィンチ40(又は50)の回転レバー41(又は51)を回転操作して牽引ロープ43(又は53)を巻き上げることで、図11に破線の矢印で示すように、それぞれの骨組材20を斜め上方に回動させ、各骨組材20の長さ方向の中央部が上方に凸となるように湾曲させて上昇させる。その結果、養生ネット30が張設された複数の骨組材20の下方に高い解体作業空間60が形成される。この状態で図1に示す解体用重機3によって解体作業を行う。 The worker then rotates the rotating lever 41 (or 51) of the manual winch 40 (or 50) to wind up the towing rope 43 (or 53), thereby rotating each frame member 20 diagonally upward as shown by the dashed arrows in Figure 11, and raising each frame member 20 so that the center of its length is curved upward and convex. As a result, a high demolition work space 60 is formed below the multiple frame members 20 on which the protective netting 30 has been stretched. In this state, demolition work is carried out using the demolition heavy equipment 3 shown in Figure 1.

ここで、解体用重機3による解体作業中、建物2の平面視中央部(中央部)では、解体用重機3が解体材の小割、仕分け、投下作業等を行うため、骨組材20を高く上昇させることがあり、そのため高い作業空間を必要とする。 Here, during demolition work using the demolition equipment 3, the demolition equipment 3 may raise the frame materials 20 high in the central area (center) of the building 2 in a plan view to perform tasks such as dividing, sorting, and dropping the demolished materials, which requires a large working space.

一方、建物2の平面視外周部(外周部)付近では、解体用重機3は主に躯体の解体作業を行うのみであることから、骨組材20を中央部よりも高く上昇させる必要はなく、中央部よりも高い作業空間を確保する必要がない。 On the other hand, near the outer periphery (periphery) of the building 2 in plan view, the demolition machinery 3 mainly performs work to demolish the building frame, so there is no need to raise the frame materials 20 higher than the center, and there is no need to secure a working space higher than the center.

そこで、本実施形態では、仮設足場10の高さを従来の屋根養生工法の場合よりも低くしたにも拘わらず、養生ネット30を設置するための骨組材20を長さ方向の中央部が上方に凸となるように湾曲させて骨組材20を外周部付近よりも高く上昇させ、建物2の中央部での解体用重機3による解体作業のための空間を十分に確保するようにしている。 In this embodiment, even though the height of the temporary scaffolding 10 is lower than in conventional roof curing methods, the framework 20 for installing the curing net 30 is curved so that the central portion in the longitudinal direction is convex upward, raising the framework 20 higher than the vicinity of the periphery, thereby ensuring sufficient space for demolition work using demolition machinery 3 in the central portion of the building 2.

次に、最上階の解体作業が進行し、骨組材20をその下層の仮設足場10に付け替えるとき、本実施形態では、手動ウィンチ40,50の牽引ロープ43,53を緩めて分割骨組材21,22の先端部21b,22bを降下させた後、手動ウィンチ40,50と分割骨組材21,22を仮設足場10の自在クランプ12,12から取り外す。 Next, as demolition work on the top floor progresses and the framework 20 is replaced with the temporary scaffolding 10 on the lower level, in this embodiment, the towing ropes 43, 53 of the manual winches 40, 50 are loosened to lower the tip ends 21b, 22b of the divided framework members 21, 22, and then the manual winches 40, 50 and the divided framework members 21, 22 are removed from the flexible clamps 12, 12 of the temporary scaffolding 10.

そして、自在クランプ12、手動ウィンチ40,50及び分割骨組材21,22をその下層の仮設足場10に運搬した後、自在クランプ12、手動ウィンチ40,50を仮設足場10に取り付け、各自在クランプ12,12に分割骨組材21,22の基端部21a,22aを取り付け、上記と同様の施工工程を経てそれぞれの骨組材20を斜め上方に回動させ、各骨組材20の長さ方向の中央部が上方に凸となるように湾曲して上昇させるように再構築する。 Then, the flexible clamps 12, manual winches 40, 50, and divided frame members 21, 22 are transported to the underlying temporary scaffolding 10, after which the flexible clamps 12 and manual winches 40, 50 are attached to the temporary scaffolding 10, and the base ends 21a, 22a of the divided frame members 21, 22 are attached to each flexible clamp 12, 12. After going through the same construction process as above, each frame member 20 is rotated diagonally upward, and the central portion of each frame member 20 is reconstructed so that it curves upward and is raised so that it is convex in the longitudinal direction.

このように本実施形態によれば、仮設足場10間に複数の骨組材20が架け渡され、これらの骨組材20がそれぞれ棒状に形成されて長さ方向に分割され、それぞれの基端部が仮設足場10に回動可能に取り付けられ、複数の骨組材20に養生ネット30が張設され、複数の骨組材20を上方に回動させることによって養生ネット30が張設された複数の骨組材20の下方に解体作業空間60を形成したことにより、骨組材20及び養生ネット30を容易に取り付け、取り外すことができ、解体作業効率を大幅に高めることが可能となる。 According to this embodiment, multiple framework members 20 are strung across temporary scaffolding 10, each of which is formed in a rod-like shape and divided lengthwise, with the base end of each member rotatably attached to the temporary scaffolding 10. A protective net 30 is stretched across the multiple framework members 20, and by rotating the multiple framework members 20 upward, a demolition work space 60 is formed below the multiple framework members 20 to which the protective net 30 is stretched. This allows the framework members 20 and the protective net 30 to be easily attached and removed, significantly improving the efficiency of demolition work.

また、本実施形態によれば、複数の骨組材20は、上方に湾曲するように形成されているので、解体作業空間60をより十分に確保することが可能となる。加えて、複数の骨組材20は、通常時は直線状をなし、養生時は長さ方向の中央部が上方に凸になるようにアーチ状に湾曲させるように形成したので、直線状に形成した場合に比べて剛性が一段と高くなり、強風時であっても大きく撓むことがなくなり、解体用重機3が骨組材20に接触するのを未然に防止することができる。 Furthermore, according to this embodiment, the multiple frame members 20 are formed so that they curve upward, making it possible to more fully secure the demolition work space 60. In addition, the multiple frame members 20 are normally straight, but when cured, they are curved in an arch shape so that the central portion in the longitudinal direction is convex upward. This makes them more rigid than when they are formed straight, and they do not bend significantly even in strong winds, making it possible to prevent the demolition heavy equipment 3 from coming into contact with the frame members 20.

また、本実施形態によれば、複数の骨組材20は、それぞれ長さ方向に分割されてそれぞれ伸縮可能に構成されていることにより、運搬時に骨組材20を短縮させておくことで、取扱性を向上させるとともに、骨組材20を仮設足場10に容易に取り付け、取り外すことができる。運搬時にそれぞれ長さ方向に分割した分割骨組材21,22を短縮させておくことで、取扱性を向上させるとともに、分割骨組材21,22を仮設足場10に容易に取り付け、取り外すことができる。 In addition, according to this embodiment, the multiple frame members 20 are each configured to be split lengthwise and extendable, so that by shortening the frame members 20 during transportation, handling is improved and the frame members 20 can be easily attached to and removed from the temporary scaffolding 10. By shortening the split frame members 21, 22 that are split lengthwise during transportation, handling is improved and the split frame members 21, 22 can be easily attached to and removed from the temporary scaffolding 10.

また、本実施形態によれば、複数の骨組材は、分割されたそれぞれ先端部が連結部材によって連結されているので、骨組材及び養生ネットを容易に取り付け、取り外すことができる。 In addition, according to this embodiment, the divided ends of the multiple frame members are connected by connecting members, making it easy to attach and remove the frame members and protective netting.

また、本実施形態によれば、複数の骨組材20は、それぞれ可撓性を有する強化プラスチック製であるので、複数の骨組材20の軽量化が図られて運搬時の取扱性を向上させるとともに、複数の骨組材20を上方に容易に湾曲させることができる。 In addition, according to this embodiment, each of the multiple frame members 20 is made of flexible reinforced plastic, which reduces the weight of the multiple frame members 20, improving handling during transportation, and allows the multiple frame members 20 to be easily bent upward.

また、本実施形態によれば、養生ネット30に所定の間隔をおいて複数のリング31が設けられ、これらのリング31に骨組材20を挿通することによって養生ネット30が張設されるように構成されているので、骨組材20に養生ネット30を容易に取り付け、取り外すことができる。 Furthermore, according to this embodiment, the protective net 30 is provided with multiple rings 31 at predetermined intervals, and the protective net 30 is stretched by inserting the framework material 20 through these rings 31, so the protective net 30 can be easily attached and detached from the framework material 20.

また、本実施形態によれば、複数の骨組材20は、それぞれの基端部が仮設足場10に設けられた自在クランプ12を介して回動可能に取り付けられるとともに、仮設足場10に骨組材20の回動角度を調整する手動ウィンチ40が設けられていることにより、骨組材20の回動角度を調整することで、複数の骨組材20の下方に解体作業空間60を十分に確保することが可能となる。 In addition, according to this embodiment, the base ends of the multiple frame members 20 are rotatably attached via universal clamps 12 provided on the temporary scaffolding 10, and the temporary scaffolding 10 is provided with a manual winch 40 that adjusts the rotation angle of the frame members 20. By adjusting the rotation angle of the frame members 20, it is possible to ensure sufficient demolition work space 60 below the multiple frame members 20.

[発明の他の実施形態]
本発明の一実施形態を説明したが、この実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。この実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更、組み合わせを行うことができる。この実施形態やその変形例は、発明の範囲や要旨に含まれると同様に、特許請求の範囲に記載された発明とその均等の範囲に含まれるものである。
[Another embodiment of the invention]
Although one embodiment of the present invention has been described, this embodiment is presented as an example and is not intended to limit the scope of the invention. This embodiment can be embodied in various other forms, and various omissions, substitutions, modifications, and combinations can be made without departing from the spirit of the invention. This embodiment and its modifications are included within the scope and spirit of the invention, as well as the invention described in the claims and their equivalents.

なお、上記実施形態では、1階下の仮設足場10に付け替えるとき、骨組材20による上方に凸に湾曲したアーチ形状を一時解体した後に再構築するようにしていたが、これに限らず例えば仮設足場10の建地材10aの上下方向に沿ってレールを設け、このレールに沿って自在クランプ12及び手動ウィンチ40を移動可能に設け、これら自在クランプ12及び手動ウィンチ40に上記レールの所定位置で停止させるストッパ機能を設けるように構成すれば、骨組材20及び養生ネット30で形成されたアーチ形状のユニットを一時解体することなく、アーチ形状を構築したままの状態で1階下に移動させることが可能となる。このように構成することで、一段と作業効率を向上させることができる。 In the above embodiment, when replacing the temporary scaffolding 10 on the floor below, the upwardly convex arch shape of the framework 20 is temporarily dismantled and then reconstructed. However, this is not a limitation. For example, rails could be installed along the vertical direction of the building material 10a of the temporary scaffolding 10, and the flexible clamps 12 and manual winch 40 could be movably installed along these rails. If the flexible clamps 12 and manual winch 40 were equipped with stopper functions that stop them at predetermined positions on the rails, the arch-shaped unit formed by the framework 20 and protective netting 30 could be moved to the floor below in its constructed arch shape without having to be temporarily dismantled. This configuration can further improve work efficiency.

加えて、上記実施形態では、緊結金具として自在クランプ12を用いた例について説明したが、これに限定することなく、骨組材20の基端部を回動可能に保持する部材であれば如何なるものであってもよい。 In addition, in the above embodiment, an example was described in which a flexible clamp 12 was used as the fastening fixture, but this is not limited to this, and any component that can rotatably hold the base end of the framework material 20 may be used.

また、上記実施形態において、骨組材20の長さ方向に沿って散水ホースを設置することで、この散水ホースから散水することで、解体作業による粉塵を抑制することができる。 In addition, in the above embodiment, by installing a watering hose along the length of the frame material 20, dust generated during demolition work can be reduced by spraying water from this watering hose.

さらに、上記実施形態において、骨組材20に用いるパイプに一定間隔をおいて微細な孔を開けておけば、骨組材20の端部を散水ホースに接続することで、骨組材20から直接水を噴霧することができ、構造を簡素化するとともに、解体作業による粉塵を一段と抑制することができる。 Furthermore, in the above embodiment, if the pipes used in the framework members 20 are provided with fine holes at regular intervals, the ends of the framework members 20 can be connected to a watering hose to spray water directly from the framework members 20, simplifying the structure and further reducing dust generated during demolition work.

この場合、養生ネット30と、その両側に取り付けられた骨組材20を1つのユニットとし、このユニット毎にそれぞれ粉塵センサを設置し、解体作業によって発生した浮遊粉塵量を上記粉塵センサで検出し、その検出信号を制御手段としてのマイクロコンピュータに出力する。このマイクロコンピュータの記憶部には、浮遊粉塵量の閾値があらかじめ記憶されており、上記マイクロコンピュータがその閾値以上になったと判断した場合、上記マイクロコンピュータから例えば水の供給又は停止する電磁弁等に制御信号を出力することで、ユニット毎の骨組材20から水を噴霧するように制御してもよい。このように構成することで、浮遊粉塵量が多く発生する場所を集中的に噴霧することができる。 In this case, the protective net 30 and the framework materials 20 attached to both sides of it are treated as one unit, and a dust sensor is installed in each unit. The dust sensor detects the amount of airborne dust generated by the demolition work and outputs the detection signal to a microcomputer acting as a control means. A threshold for the amount of airborne dust is pre-stored in the memory of this microcomputer, and if the microcomputer determines that the amount of airborne dust has exceeded this threshold, the microcomputer may output a control signal to, for example, a solenoid valve that supplies or stops water, thereby controlling the framework materials 20 of each unit to spray water. This configuration allows for concentrated spraying in areas where large amounts of airborne dust are generated.

そして、上記実施形態において、骨組材20にカメラを設置し、そのカメラに有線又は無線によってモニター表示するモニターを別の場所に設置すれば、解体位置の上方からの映像を配信することができる。また、骨組材20に沿って上記カメラを遠隔操作で移動させるようにすれば、より詳細な映像を提供することが可能となる。 In the above embodiment, if a camera is installed on the framework member 20 and a monitor that displays the image on the camera via a wired or wireless connection is installed in a different location, it is possible to broadcast images from above the demolition location. Furthermore, if the camera can be remotely moved along the framework member 20, more detailed images can be provided.

また、上記実施形態では、階上解体工法に適用した例について説明したが、この工法に限らず他の解体工法についても適用可能である。 Furthermore, while the above embodiment describes an example in which the invention is applied to an upper-floor demolition method, it is not limited to this method and can also be applied to other demolition methods.

さらに、上記実施形態では、骨組材20を長さ方向の中央部が上方に凸に湾曲するように組み立てて骨組材20を高く上昇させるように構成したが、これに限らず、複数の骨組材20を上方に回動させることによって養生ネット30が張設された複数の骨組材20の下方に解体作業空間60を形成することができれば、骨組材20を例えば台形等のように水平部分を有するように組み立てるようにしてもよい。 Furthermore, in the above embodiment, the framework members 20 were assembled so that the central portion in the longitudinal direction was curved convexly upward, allowing the framework members 20 to be raised high. However, this is not limited to this. As long as a demolition work space 60 can be formed below the framework members 20 on which the protective net 30 is stretched by rotating the framework members 20 upward, the framework members 20 may be assembled to have a horizontal portion, such as a trapezoid.

1 建物の解体養生装置
2 建物
3 解体用重機
4 スラブ
5 補強用サボート
6 接続部材
10 仮設足場
11 防音パネル
12 自在クランプ(緊結金具)
20 骨組材
21 分割骨組材
21a 基端部
21b 先端部
22 分割骨組材
22a 基端部
22b 先端部
23 カプラ(連結部材)
24 係止部
25 段差部
30 養生ネット
31 リング
40 手動ウィンチ(角度調整装置)
41 回転レバー
42 回転ドラム
43 牽引ロープ
43a 先端部
50 手動ウィンチ(角度調整装置)
51 回転レバー
52 回転ドラム
53 牽引ロープ
53a 先端部
60 解体作業空間
DESCRIPTION OF SYMBOLS 1 Building demolition and curing device 2 Building 3 Demolition heavy equipment 4 Slab 5 Reinforcement support 6 Connection member 10 Temporary scaffolding 11 Soundproof panel 12 Free clamp (fastening metal fitting)
20 Frame member 21 Divided frame member 21a Base end portion 21b Tip portion 22 Divided frame member 22a Base end portion 22b Tip portion 23 Coupler (connecting member)
24: Locking portion 25: Step portion 30: Protective net 31: Ring 40: Manual winch (angle adjustment device)
41 Rotating lever 42 Rotating drum 43 Towing rope 43a Tip 50 Manual winch (angle adjustment device)
51 Rotating lever 52 Rotating drum 53 Towing rope 53a Tip 60 Dismantling work space

Claims (7)

解体すべき建物の外周壁に沿って設けられた仮設足場と、
互いに対向する前記仮設足場間に複数架け渡され、それぞれ棒状に形成されて長さ方向に分割され、それぞれの基端部が前記仮設足場に回動可能に取り付けられた骨組材と、
前記複数の骨組材の先端部から基端部にかけて張設された養生ネットと、を備え、
前記複数の骨組材を上方に回動させることによって前記養生ネットが張設された前記複数の骨組材の下方に解体作業空間を形成したことを特徴とする建物の解体養生装置。
Temporary scaffolding set up along the outer wall of the building to be demolished;
A plurality of framework members are bridged between the opposing temporary scaffoldings, each formed in a rod shape and divided in the length direction, with each base end rotatably attached to the temporary scaffolding;
and a protective net stretched from the tip end to the base end of the plurality of framework members,
A building demolition and curing device characterized in that a demolition work space is formed below the plurality of frame members on which the curing net is stretched by rotating the plurality of frame members upward.
前記複数の骨組材は、上方に湾曲するように形成されていることを特徴とする請求項1に記載の建物の解体養生装置。 The building demolition and curing device described in claim 1, characterized in that the multiple frame members are formed to curve upward. 前記複数の骨組材は、それぞれ長さ方向に分割されてそれぞれ伸縮可能に構成されていることを特徴とする請求項1に記載の建物の解体養生装置。 The building demolition and curing device described in claim 1, characterized in that the multiple frame members are each configured to be split lengthwise and extendable. 前記複数の骨組材は、分割されたそれぞれ先端部が連結部材によって連結されていることを特徴とする請求項3に記載の建物の解体養生装置。 The building demolition and curing device described in claim 3, characterized in that the divided ends of the multiple frame members are connected by connecting members. 前記複数の骨組材は、それぞれ可撓性を有する強化プラスチック製であることを特徴とする請求項1に記載の建物の解体養生装置。 The building demolition and curing device described in claim 1, characterized in that each of the multiple frame members is made of flexible reinforced plastic. 前記養生ネットに所定の間隔をおいて複数のリングが設けられ、これらのリングに前記骨組材を挿通することによって前記養生ネットが張設されるように構成されていることを特徴とする請求項1に記載の建物の解体養生装置。 The building demolition and curing device described in claim 1, characterized in that the curing net has multiple rings at predetermined intervals, and the curing net is tensioned by inserting the frame members through these rings. 前記複数の骨組材は、それぞれの基端部が前記仮設足場に設けられた緊結金具を介して回動可能に取り付けられるとともに、前記仮設足場に前記骨組材の回動角度を調整する角度調整装置が設けられていることを特徴とする請求項1に記載の建物の解体養生装置。
The building demolition and curing device described in claim 1, characterized in that the base ends of each of the multiple frame members are rotatably attached via fastening fittings provided on the temporary scaffolding, and the temporary scaffolding is provided with an angle adjustment device for adjusting the rotation angle of the frame members.
JP2023183190A 2023-10-25 2023-10-25 Building demolition and curing equipment Active JP7773229B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2023183190A JP7773229B2 (en) 2023-10-25 2023-10-25 Building demolition and curing equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2023183190A JP7773229B2 (en) 2023-10-25 2023-10-25 Building demolition and curing equipment

Publications (2)

Publication Number Publication Date
JP2025072824A JP2025072824A (en) 2025-05-12
JP7773229B2 true JP7773229B2 (en) 2025-11-19

Family

ID=95693775

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2023183190A Active JP7773229B2 (en) 2023-10-25 2023-10-25 Building demolition and curing equipment

Country Status (1)

Country Link
JP (1) JP7773229B2 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999022098A1 (en) 1997-10-24 1999-05-06 Jonsereds Miljösystem AB Cover construction
JP2003120075A (en) 2001-10-10 2003-04-23 Penta Ocean Constr Co Ltd Temporary cantilevered open / close roof structure
JP2011219930A (en) 2010-04-06 2011-11-04 Yokohama City Mobile sound barrier
JP6887144B1 (en) 2020-12-02 2021-06-16 株式会社阿野組 Anti-scattering device and anti-scattering method
JP2023031773A (en) 2021-08-25 2023-03-09 椿建設株式会社 Extension structure of dispersion preventing net, and extension method of dispersion preventing net

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07189496A (en) * 1993-12-27 1995-07-28 Misawa Homes Co Ltd All-weather roof device for constructing building and assembling method and usage thereof
US5595203A (en) * 1995-06-26 1997-01-21 Espinosa; Mark A. Stressed arch structures

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1999022098A1 (en) 1997-10-24 1999-05-06 Jonsereds Miljösystem AB Cover construction
JP2003120075A (en) 2001-10-10 2003-04-23 Penta Ocean Constr Co Ltd Temporary cantilevered open / close roof structure
JP2011219930A (en) 2010-04-06 2011-11-04 Yokohama City Mobile sound barrier
JP6887144B1 (en) 2020-12-02 2021-06-16 株式会社阿野組 Anti-scattering device and anti-scattering method
JP2023031773A (en) 2021-08-25 2023-03-09 椿建設株式会社 Extension structure of dispersion preventing net, and extension method of dispersion preventing net

Also Published As

Publication number Publication date
JP2025072824A (en) 2025-05-12

Similar Documents

Publication Publication Date Title
JP5292441B2 (en) Scaffolding / curing unit and its connecting device
JP7333681B2 (en) Upward scattering prevention curing system and upward scattering prevention curing method when demolition of multi-story building
CN113090019A (en) Construction method and construction device for high-rise structure
CN203080894U (en) Building steel structure construction protector
CN109989348A (en) Cantilever formwork for concrete construction and construction method thereof
JP6603824B2 (en) Upper scattering prevention curing system and upper scattering prevention curing method at the time of multi-story building dismantling
CN104847102A (en) Wall attaching method and device of attached self-lifting scaffold on retraction section of building outer wall
JP7773229B2 (en) Building demolition and curing equipment
JP5589183B2 (en) Cylindrical structure scaffolding apparatus and moving method thereof
CN209384613U (en) A kind of soft platform for steel structure installation of daylighting roof
JP6783482B1 (en) Upper shatterproof curing system and upper shatterproof curing method when dismantling a multi-story building
CN114215333A (en) Rapid construction method for outer cornice of high-rise building
JP3028071B2 (en) Top removal method and scaffold for removal work of ultra-high tubular structure
US11788306B1 (en) Building debris containment method
JP6145362B2 (en) Intermediate work floor forming apparatus and intermediate work floor forming method
JP4027170B2 (en) External scaffold device and construction method of external scaffold device
JPH11166315A (en) Structure demolition equipment
CN108222481A (en) For the job platform and its construction method of the Zhongting of high-rise building
CN114737750A (en) Construction method for reinforced concrete silo top plate template
JP4372674B2 (en) Dismantling method of ultra-high cylindrical structure
CN218912340U (en) Building construction protector
CN212507521U (en) Telescopic elevator shaft protection device
JP3452816B2 (en) Temporary construction method of work scaffold for tower structure
JP2024054538A (en) Scaffolding reinforcement structure, protective equipment having said scaffolding reinforcement structure, and building demolition method using said protective equipment
JP7444751B2 (en) Wall material unit and wall construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20241210

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250912

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20251014

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20251030

R150 Certificate of patent or registration of utility model

Ref document number: 7773229

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R154 Certificate of patent or utility model (reissue)

Free format text: JAPANESE INTERMEDIATE CODE: R154