Method for constructing a dam and dam

Info

Publication number
JP7777003B2
JP7777003B2 JP2022022670A JP2022022670A JP7777003B2 JP 7777003 B2 JP7777003 B2 JP 7777003B2 JP 2022022670 A JP2022022670 A JP 2022022670A JP 2022022670 A JP2022022670 A JP 2022022670A JP 7777003 B2 JP7777003 B2 JP 7777003B2
Authority
JP
Japan
Prior art keywords
dam
capture body
overflow
vertical
constructing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2022022670A
Other languages
Japanese (ja)
Other versions
JP2023119684A (en
Inventor
幸司 飯塚
志津佳 松元
大輝 山口
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Metal Products and Engineering Inc
Original Assignee
JFE Metal Products and Engineering Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Metal Products and Engineering Inc filed Critical JFE Metal Products and Engineering Inc
Priority to JP2022022670A priority Critical patent/JP7777003B2/en
Publication of JP2023119684A publication Critical patent/JP2023119684A/en
Application granted granted Critical
Publication of JP7777003B2 publication Critical patent/JP7777003B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A50/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE in human health protection, e.g. against extreme weather

Landscapes

  • Revetment (AREA)

Description

本発明は、堰堤を構築する方法及び堰堤に関する。 The present invention relates to a method for constructing a dam and to the dam itself.

河川の土石流対策工として、上流から流れてくる岩石や流木等を捕捉する捕捉体を備えた堰堤(砂防堰堤)が知られている。堰堤は、河川の両岸からそれぞれ突き出た一対の非越流部を備えており、非越流部の間には水を通す開口部が設けられている。
捕捉体は、開口部に設けられており、径の小さい土砂や水を通過させつつ、径の大きな岩石や流木等を捕捉する。捕捉体は、河川の流れ方向において上流側に面する上流側ユニットと、下流側に面する下流側ユニットとを有しており、両ユニットは互いに上方に向かうにつれて近づくように傾斜して延び、その上端部近傍において互いに連結されている。捕捉体は、開口部の幅方向にわたって設けられており、その下端部においてコンクリート基礎に取り付けられている(例えば、特許文献1参照)。
A well-known example of a river debris flow countermeasure is a dam (sabo dam) equipped with a trapping body to capture rocks, driftwood, etc. that flow from upstream. The dam has a pair of non-overflow sections that protrude from both sides of the river, with an opening between the non-overflow sections to allow water to pass through.
The trap is installed in the opening and traps large-diameter rocks, driftwood, etc. while allowing small-diameter sediment and water to pass through. The trap has an upstream unit facing upstream in the river flow direction and a downstream unit facing downstream, with both units extending at an angle so that they approach each other as they extend upward and are connected to each other near their upper ends. The trap is installed across the width of the opening and its lower end is attached to a concrete foundation (see, for example, Patent Document 1).

特開2017-101502号公報Japanese Patent Application Laid-Open No. 2017-101502

ところで、大きな河川や大量の土石流が予測される河川においては、コンクリート基礎下から上端までの高さが15m以上のハイダムと呼ばれる堰堤が設けられることが多い。ハイダムの場合、非越流部も捕捉体も高くする必要があるため、施工が長期間にわたることがある。この場合、施工途中に土石流が発生すると、上記の捕捉体は、完成していない状態では捕捉体として機能しないので、岩石や流木等を捕捉することができない。
また、既設の堰堤に土砂が堆積して満砂状態となっている場合や、堰堤の設計基準に変更があった場合には、既設の堰堤に新たに堰堤を構築して堰堤の嵩上げが必要となる。この場合、上記の捕捉体は、新たな捕捉体が連結されることを想定していない構造のため、嵩上げが困難である。
Meanwhile, in large rivers or rivers where large debris flows are predicted, dams called high dams, which are 15 meters or more in height from the bottom of the concrete foundation to the top, are often constructed. In the case of high dams, both the non-overflow section and the trapping body must be high, so construction can take a long time. In this case, if a debris flow occurs during construction, the trapping body will not function as a trapping body when it is not completed, and will therefore be unable to capture rocks, driftwood, etc.
Furthermore, if an existing dam becomes filled with sediment or if there are changes to the design standards for the dam, it will be necessary to build a new dam on top of the existing dam and raise the dam level.In this case, raising the dam level is difficult because the structure of the above-mentioned trapping body does not anticipate the addition of a new trapping body.

そこで、本発明は、上記課題に鑑みてなされたものであり、施工途中であっても捕捉体として機能させることができ、新たな捕捉体を連結して嵩上げすることができる技術を提供することを目的とする。 The present invention was developed in consideration of the above-mentioned problems, and aims to provide technology that allows trapping bodies to function even during construction, and that allows new trapping bodies to be connected to raise the height.

本発明に係る一態様は、既設の堰堤に新たに堰堤を構築する方法であって、前記既設の堰堤の上方に一対の非越流部を構築する工程と、前記一対の非越流部の間に形成された開口部に、河川の上流から流れてくる流水を通すと共に流水に含まれる物体を捕捉する捕捉体を構築する工程と、を有し、前記捕捉体を構築する工程においては、前記捕捉体を前記非越流部に取り付けることを特徴とする。 One aspect of the present invention is a method for constructing a new dam on an existing dam, comprising the steps of constructing a pair of non-overflow sections above the existing dam, and constructing a capture body in an opening formed between the pair of non-overflow sections that allows flowing water from upstream of the river to pass through and captures objects contained in the flowing water, wherein the capture body is attached to the non-overflow sections during the step of constructing the capture body.

また、前記捕捉体は、河川の上流側に設けられ、前記物体を捕捉する上流側ユニットと、河川の下流側に設けられ、中央部が前記上流側ユニットに向けて突出するように湾曲して形成された下流側ユニットと、前記上流側ユニットと前記下流側ユニットとを連結する連結部と、を備えており、前記捕捉体を構築する工程においては、少なくとも前記下流側ユニットの各端部を前記非越流部に取り付けることが好ましい。 The trapping body also includes an upstream unit located upstream of the river that traps the object, a downstream unit located downstream of the river that is curved so that its central portion protrudes toward the upstream unit, and a connecting portion that connects the upstream unit and the downstream unit. In the process of constructing the trapping body, it is preferable to attach at least each end of the downstream unit to the non-overflow portion.

また、前記既設の堰堤は、一対の非越流部と、捕捉体とを備える透過型の堰堤であり、既設の捕捉体に新たな捕捉体を構成する縦材と横材を連結する第1の工程と、前記横材の端部に連結される架台を既設の非越流部の上端部に連結する第2の工程と、前記横材の端部と前記架台を連結する第3の工程と、前記非越流部の上端部にコンクリートを打設して前記架台を埋設する第4の工程と、を有することが好ましい。 Furthermore, it is preferable that the existing dam is a permeable dam equipped with a pair of non-overflow sections and a capture body, and that the construction method includes a first step of connecting the vertical and horizontal members that constitute the new capture body to the existing capture body, a second step of connecting a frame connected to the end of the horizontal member to the upper end of the existing non-overflow section, a third step of connecting the end of the horizontal member to the frame, and a fourth step of pouring concrete into the upper end of the non-overflow section to bury the frame.

また、前記第2の工程は、前記第1の工程による前記横材の構築が終了する直前に行うことが好ましい。 It is also preferable that the second step be carried out immediately before the construction of the cross member in the first step is completed.

また、前記第1の工程から前記第3の工程までを複数回繰り返した後に前記第4の工程を行うことが好ましい。 It is also preferable to repeat steps 1 through 3 multiple times before carrying out step 4.

また、前記第4の工程は、前記第3の工程で連結された前記架台における前記横材の端部との連結部位を露出させた状態で行うことが好ましい。 Furthermore, it is preferable that the fourth step be performed with the connection portion between the end of the cross member and the frame connected in the third step exposed.

本発明に係る一態様は、一対の非越流部と、前記一対の非越流部の間に形成される開口部に設けられ、河川の上流から流れてくる流水を通すと共に流水に含まれる物体を捕捉する捕捉体と、を備える堰堤であって、前記非越流部に設けられ、前記捕捉体が連結される架台と、前記捕捉体に設けられ、新たな捕捉体と連結する第1の連結部と、前記架台に設けられ、新たな架台と連結する第2の連結部と、を備えることを特徴とする。 One aspect of the present invention is a dam comprising a pair of non-overflow sections and a capture body that is installed in an opening formed between the pair of non-overflow sections and that allows flowing water from upstream of the river to pass through and captures objects contained in the flowing water. The dam is characterized by also comprising a base installed in the non-overflow section and to which the capture body is connected, a first connecting part installed on the capture body that connects to a new capture body, and a second connecting part installed on the base that connects to the new base.

また、前記捕捉体は、前記架台に連結される横材と、前記横材に交差する縦材と、を備え、前記第1の連結部は、前記縦材の上端部に設けられていることが好ましい。 Furthermore, it is preferable that the capture body comprises a horizontal member connected to the mount and a vertical member intersecting the horizontal member, and that the first connecting portion be provided at the upper end of the vertical member.

また、前記架台は、前記第2の連結部を露出した状態で前記非越流部に埋設されていることが好ましい。 Furthermore, it is preferable that the frame be buried in the non-overflow section with the second connecting portion exposed.

本発明によれば、施工途中であっても捕捉体として機能させることができ、新たな捕捉体を連結して嵩上げすることができる。 According to the present invention, the trap can function even during construction, and new traps can be connected to raise the height.

嵩上げ前の堰堤の斜視図である。This is an oblique view of the dam before it is raised. 非越流部内を透視した堰堤の斜視図である。This is an oblique view of a dam with the inside of the non-overflow section visible. 堰堤の構築方法を説明する図である。FIG. 1 is a diagram illustrating a method for constructing a dam. 堰堤の構築方法を説明する図である。FIG. 1 is a diagram illustrating a method for constructing a dam. 堰堤の構築方法を説明する図である。FIG. 1 is a diagram illustrating a method for constructing a dam. 堰堤の構築方法を説明する図である。FIG. 1 is a diagram illustrating a method for constructing a dam. 堰堤の構築方法を説明する図である。FIG. 1 is a diagram illustrating a method for constructing a dam. 嵩上げ後の堰堤の斜視図である。This is an oblique view of the dam after it has been raised. 変形例における嵩上げ前の堰堤の斜視図である。FIG. 10 is a perspective view of a dam before being raised in a modified example. 変形例における非越流部内を透視した堰堤の斜視図である。FIG. 10 is a perspective view of a dam in a modified example, showing the inside of a non-overflow section. 変形例における嵩上げ後の堰堤の斜視図である。FIG. 10 is a perspective view of a dam after being raised in a modified example.

本発明の好ましい実施の形態について、図面を参照しながら説明する。 A preferred embodiment of the present invention will be described with reference to the drawings.

<堰堤の構成>
図1、図2に示すように、堰堤100は、一般に透過型堰堤と呼ばれるものであり、一対の非越流部1と、開口部2と、捕捉体3と、架台4と、を備えている。なお、以下において、縦方向は堰堤100の高さ方向(河川の深さ方向)をいい、横方向は堰堤100の高さ方向に直交する堰堤100の幅方向(河川の幅方向)をいうものとする。
<Dam structure>
1 and 2, the dam 100 is generally called a permeable dam, and comprises a pair of non-overflow sections 1, an opening 2, a capture body 3, and a mount 4. In the following, the vertical direction refers to the height direction of the dam 100 (depth direction of the river), and the horizontal direction refers to the width direction of the dam 100 (width direction of the river), which is perpendicular to the height direction of the dam 100.

非越流部1は、例えば、コンクリートにより形成された壁体であり、袖部とも呼ばれる。一対の非越流部1は、それぞれ、河川の両岸から河川を横断するように河川の中央に向かって延びている。一対の非越流部1の間には、所定の間隔があけられており、開口部2が形成されている。非越流部1は、河床に形成された基礎11にコンクリートが上方に向かって打設されることにより構築されている。 The non-overflow sections 1 are walls made of concrete, and are also called sleeves. Each of the pair of non-overflow sections 1 extends from either bank of the river toward the center of the river, crossing the river. A predetermined distance is left between the pair of non-overflow sections 1, and an opening 2 is formed therein. The non-overflow sections 1 are constructed by pouring concrete upward onto a foundation 11 formed on the riverbed.

開口部2は、一対の非越流部1間に形成された空間であり、捕捉体3が設置される。これにより、土石流に含まれる大きな岩石や流木を捕捉体3で捕捉しつつ、水、砂、小礫等を通過させる。開口部2の底部には、基礎21が形成されている。基礎21は、河床に形成されており、例えば、コンクリートによって形成されている。 The opening 2 is a space formed between a pair of non-overflow sections 1, and a capture body 3 is installed therein. This allows the capture body 3 to capture large rocks and driftwood contained in the debris flow while allowing water, sand, small pebbles, etc. to pass through. A foundation 21 is formed at the bottom of the opening 2. The foundation 21 is formed in the riverbed and is made of, for example, concrete.

捕捉体3は、河川の上流から流れてくる流水を通すとともに、大きな岩石や流木といった物体を捕捉するものであり、開口部2において、開口部2の基礎21と河川の流れ方向両側(河川を横切る方向両脇)にある非越流部1の側面とに取り付けられている。捕捉体3は、例えば、高堰堤(ハイダム)に適用される。ここで、「高堰堤(ハイダム)」とは、堰堤の基礎が設置される河川の河床(底部)から、捕捉体3の上端までの高さ(堤高)が15m以上の堰堤のことをいう。高堰堤は、主に、大きな河川や、大量の土石流が予測される河川に設けられる。 The capture body 3 allows water flowing from upstream in the river to pass through while capturing objects such as large rocks and driftwood. It is attached to the opening 2, at its base 21 and on the sides of the non-overflow sections 1 on both sides of the river in the direction of flow (on both sides across the river). The capture body 3 is used, for example, in high dams. Here, a "high dam" refers to a dam whose height (dam height) from the riverbed (bottom) on which the dam foundation is installed to the top of the capture body 3 is 15 m or more. High dams are primarily constructed on large rivers and rivers where large debris flows are predicted.

捕捉体3は、上流側ユニット6と、下流側ユニット7と、連結部8と、を備えている。
上流側ユニット6は、河川の上流側に設けられており、堰堤100の上流側から流れてきた土石流に含まれる岩石や流木等の物体を捕捉する機能部材である。すなわち、上流側ユニット6は、土石流の衝撃が直接作用するユニットである。
The capture body 3 includes an upstream unit 6 , a downstream unit 7 , and a connecting portion 8 .
The upstream unit 6 is provided on the upstream side of the river and is a functional component that captures objects such as rocks and driftwood contained in a debris flow that has flowed down from the upstream side of the dam 100. In other words, the upstream unit 6 is the unit that is directly subjected to the impact of the debris flow.

上流側ユニット6は、堰堤100を平面視した際に、河川を横切る方向(堰堤100の幅方向)に沿って直線状に設けられている。
上流側ユニット6は、複数の横材61と、複数の縦材62と、を備えている。
When the dam 100 is viewed in plan, the upstream unit 6 is provided linearly along the direction across the river (the width direction of the dam 100).
The upstream unit 6 includes a plurality of horizontal members 61 and a plurality of vertical members 62 .

複数の横材61は、河川を横切る方向に沿って設けられており、堰堤100の高さ方向に沿って並んで配置されている。隣接する横材61間の間隔は、土石流の発生時に捕捉すべき岩石の径よりも小さくしておくことが好ましい。また、隣接する横材61間の間隔は、捕捉体3の上端から下端にわたって全て同じ間隔としてもよいし、捕捉体3の上方のみ間隔を狭くする等、想定される土石流の規模に応じて自由に変更可能である。
横材61は、例えば、円筒状に形成された複数の鋼管によって構成されており、各鋼管は、各端部に設けられたフランジ部を介して互いに連結されている。なお、各鋼管は、フランジ部を設けることなく、端部同士を溶接にて連結してもよいが、土石流衝突後の交換作業を考慮すると、フランジ部を用いた連結が好ましい。
各横材61は、縦材62を貫通するように設けられており、その交差部分において縦材62に接合されている。すなわち、各横材61を構成する複数の鋼管のうち、縦材62と交差する鋼管は、縦材62を構成する鋼管と接合されて正面視略十字状の一体化された交差管3aとして構成されている。
各横材61は、長手方向両端部がそれぞれ対向する非越流部1の側壁に取り付けられている。具体的には、図2に示すように、各横材61の端部は、架台4に連結されており、この架台4が非越流部1に埋設されることにより、各横材61は非越流部1に固定される。
The multiple horizontal members 61 are provided in a direction crossing the river and are arranged side by side along the height direction of the dam 100. The spacing between adjacent horizontal members 61 is preferably set smaller than the diameter of the rocks to be captured in the event of a debris flow. The spacing between adjacent horizontal members 61 may be the same from the top to the bottom of the capture body 3, or may be narrowed only above the capture body 3, and can be freely changed depending on the expected scale of the debris flow.
The cross member 61 is made up of, for example, a plurality of cylindrical steel pipes, each of which is connected to another via a flange provided at each end. Note that the steel pipes may be connected by welding their ends together without providing flanges, but considering the need for replacement after a debris flow collision, it is preferable to use flanges for connection.
Each horizontal member 61 is provided so as to penetrate the vertical members 62 and is joined to the vertical members 62 at their intersections. That is, of the multiple steel pipes constituting each horizontal member 61, the steel pipes that intersect with the vertical members 62 are joined to the steel pipes constituting the vertical members 62 and are configured as an integrated cross pipe 3a that is generally cross-shaped when viewed from the front.
Each cross member 61 has both longitudinal ends attached to the opposing side walls of the non-overflow section 1. Specifically, as shown in Figure 2, the ends of each cross member 61 are connected to the frame 4, and the frame 4 is embedded in the non-overflow section 1, thereby fixing each cross member 61 to the non-overflow section 1.

複数の縦材62は、堰堤100の高さ方向に沿って設けられており、高さ方向に隣接する横材61同士を連結している。複数の縦材62は、堰堤100の高さ方向に沿って並んで配置されている。隣接する縦材62間の間隔は、土石流の発生時に捕捉すべき岩石の径よりも小さくしておくことが好ましい。また、隣接する縦材62間の間隔は、捕捉体3の幅方向一端から他端にわたって全て同じ間隔としてもよいし、捕捉体3の幅方向中央付近のみ間隔を狭くする等、想定される土石流の規模に応じて自由に変更可能である。
縦材62は、例えば、円筒状に形成された複数の鋼管によって構成されており、各鋼管は、各端部がフランジ部を介して互いに連結されている。なお、各鋼管は、フランジ部を設けることなく、端部同士を溶接にて連結してもよいが、土石流衝突後の交換作業を考慮すると、フランジ部を用いた連結が好ましい。
各縦材62は、横材61を貫通するように設けられており、その交差部分において横材61に接合されている。すなわち、各縦材62を構成する複数の鋼管のうち、横材61と交差する鋼管は、横材61を構成する鋼管と接合されて正面視略十字状の一体化された交差管3aとして構成されている。
縦材62の下端部は、基礎21に埋設されており、その結果、縦材62の下端部が基礎部21に立設されている。
縦材62の上端部には、フランジ部91が設けられている。このフランジ部91は、既設の堰堤100を嵩上げする際に、既設の捕捉体3の上方に新たな捕捉体を連結する第1の連結部として機能する。
The multiple vertical members 62 are arranged along the height direction of the dam 100 and connect adjacent horizontal members 61 in the height direction. The multiple vertical members 62 are arranged side by side along the height direction of the dam 100. The spacing between adjacent vertical members 62 is preferably set smaller than the diameter of the rocks to be captured in the event of a debris flow. The spacing between adjacent vertical members 62 may be the same from one end to the other of the width direction of the capture body 3, or may be narrowed only near the center of the width direction of the capture body 3, and can be freely changed depending on the expected scale of the debris flow.
The vertical members 62 are made up of, for example, a plurality of cylindrical steel pipes, each end of which is connected to another via a flange. Note that the steel pipes may be connected by welding their ends together without providing flanges, but considering the need for replacement after a debris flow collision, it is preferable to use flanges for connection.
Each vertical member 62 is provided so as to penetrate the horizontal member 61 and is joined to the horizontal member 61 at the intersection. That is, of the multiple steel pipes constituting each vertical member 62, the steel pipes that intersect with the horizontal member 61 are joined to the steel pipes constituting the horizontal member 61 and are configured as an integrated cross pipe 3a that is generally cross-shaped when viewed from the front.
The lower end of the vertical member 62 is buried in the foundation 21 , so that the lower end of the vertical member 62 stands upright on the foundation 21 .
A flange portion 91 is provided at the upper end of the vertical member 62. This flange portion 91 functions as a first connecting portion that connects a new capture body above the existing capture body 3 when raising the height of the existing dam 100.

下流側ユニット7は、上流側ユニット6から見て河川の下流側に設けられており、上流側ユニット6に作用する土石流の衝撃荷重が連結部8を介して伝達され、捕捉体3を支持する。
下流側ユニット7は、堰堤100を平面視した際に、河川を横切る方向に沿って設けられており、その延在方向における中央部が上流側ユニット6に向けて突出するように湾曲して形成されている。すなわち、下流側ユニット7は、アーチ構造を採用しており、連結部8を介して上流側ユニット6から伝達された土石流の衝撃荷重を圧縮力で支持する構造部材である。
下流側ユニット7は、複数の横材71と、複数の縦材72と、を備えている。
The downstream unit 7 is located downstream of the river from the upstream unit 6, and the impact load of the debris flow acting on the upstream unit 6 is transmitted via the connecting part 8, supporting the capture body 3.
When the dam 100 is viewed from above, the downstream unit 7 is provided in a direction that crosses the river, and is curved so that its central portion in the extension direction protrudes toward the upstream unit 6. In other words, the downstream unit 7 employs an arch structure, and is a structural member that uses compressive force to support the impact load of the debris flow transmitted from the upstream unit 6 via the connecting portion 8.
The downstream unit 7 includes a plurality of horizontal members 71 and a plurality of vertical members 72 .

複数の横材71は、河川を横切る方向に沿って設けられており、堰堤100の高さ方向に沿って並んで配置されている。隣接する横材71間の間隔は、土石流の発生時に捕捉すべき岩石の径よりも小さくしておくことが好ましい。また、隣接する横材71間の間隔は、捕捉体3の上端から下端にわたって全て同じ間隔としてもよいし、捕捉体3の上方のみ間隔を狭くする等、想定される土石流の規模に応じて自由に変更可能である。横材71は、河川の流れ方向において、上流側ユニット6の横材61に対向する位置に設けられている。
横材71は、例えば、円筒状に形成された複数の鋼管によって構成されており、各鋼管は、各端部に設けられたフランジ部を介して互いに連結されている。各横材71は、土石流の衝撃荷重を受け止める機能が求められるので、上流側ユニット6の横材61を構成する鋼管よりも径の大きな強度の高い鋼管を用いることが好ましい。なお、各鋼管は、フランジ部を設けることなく、端部同士を溶接にて連結してもよいが、土石流衝突後の交換作業を考慮すると、フランジ部を用いた連結が好ましい。
各横材71は、縦材72を貫通するように設けられており、その交差部分において縦材72に接合されている。すなわち、各横材71を構成する複数の鋼管のうち、縦材72と交差する鋼管は、縦材72を構成する鋼管と接合されて正面視略十字状の一体化された交差管3cとして構成されている。また、鋼管は、軸線方向に沿って直線状に延びる鋼管であってもよいし、軸線方向に沿って湾曲された鋼管であってもよく、横材71の曲率によって適した鋼管を選択すればよい。
The multiple cross members 71 are arranged in a direction crossing the river and are aligned along the height direction of the dam 100. The spacing between adjacent cross members 71 is preferably set smaller than the diameter of the rocks to be captured in the event of a debris flow. The spacing between adjacent cross members 71 may be the same from the top to the bottom of the capture body 3, or may be freely changed depending on the expected scale of the debris flow, such as by narrowing the spacing only above the capture body 3. The cross members 71 are arranged in a position facing the cross member 61 of the upstream unit 6 in the direction of the river flow.
The horizontal members 71 are made up of, for example, a plurality of cylindrical steel pipes, which are connected to each other via flanges provided at each end. Since each horizontal member 71 is required to be able to withstand the impact load of a debris flow, it is preferable to use a steel pipe with a larger diameter and higher strength than the steel pipes that make up the horizontal members 61 of the upstream unit 6. Note that the steel pipes may be connected by welding their ends together without providing flanges, but considering the need for replacement after a debris flow collision, connection using flanges is preferable.
Each horizontal member 71 is provided so as to penetrate the vertical members 72 and is joined to the vertical members 72 at their intersections. That is, of the multiple steel pipes constituting each horizontal member 71, the steel pipes that intersect with the vertical members 72 are joined to the steel pipes constituting the vertical members 72 to form an integrated crossing pipe 3c that is generally cross-shaped in front view. Furthermore, the steel pipes may be steel pipes that extend linearly along the axial direction or steel pipes that are curved along the axial direction, and an appropriate steel pipe may be selected depending on the curvature of the horizontal member 71.

各横材71は、長手方向(軸線方向)における中央部が上流側ユニット6に向けて突出するように湾曲して形成されている。すなわち、横材71の長手方向中央付近に存在する鋼管ほど上流側ユニット6の横材61に近い位置にあり、横材71の端部に向かうにつれて上流側ユニット6の横材61から離れた位置にある。このような配置となるように鋼管同士を連結することで横材71をアーチ状に形成することができる。
各横材71は、長手方向両端部がそれぞれ対向する非越流部1の側壁に取り付けられている。具体的には、図2に示すように、各横材71の端部は、架台4に連結されており、この架台4が非越流部1に埋設されることにより、各横材71は非越流部1に固定される。
Each cross member 71 is curved so that its central portion in the longitudinal direction (axial direction) protrudes toward the upstream unit 6. That is, the steel pipes located closer to the longitudinal center of the cross member 71 are closer to the cross member 61 of the upstream unit 6, and the steel pipes located closer to the end of the cross member 71 are farther from the cross member 61 of the upstream unit 6. By connecting the steel pipes together in this arrangement, the cross member 71 can be formed into an arch shape.
Each cross member 71 has both longitudinal ends attached to the opposing side walls of the non-overflow section 1. Specifically, as shown in Figure 2, the ends of each cross member 71 are connected to the frame 4, and the frame 4 is embedded in the non-overflow section 1, thereby fixing each cross member 71 to the non-overflow section 1.

複数の縦材72は、堰堤100の高さ方向に沿って設けられており、高さ方向に隣接する横材71同士を連結している。複数の縦材72は、堰堤100の高さ方向に沿って並んで配置されている。隣接する縦材72間の間隔は、土石流の発生時に捕捉すべき岩石の径よりも小さくしておくことが好ましい。また、隣接する縦材72間の間隔は、捕捉体3の幅方向一端から他端にわたって全て同じ間隔としてもよいし、捕捉体3の幅方向中央付近のみ間隔を狭くする等、想定される土石流の規模に応じて自由に変更可能である。
縦材72は、例えば、円筒状に形成された複数の鋼管によって構成されており、各鋼管は、各端部がフランジ部を介して互いに連結されている。なお、各鋼管は、フランジ部を設けることなく、端部同士を溶接にて連結してもよいが、土石流衝突後の交換作業を考慮すると、フランジ部を用いた連結が好ましい。
各縦材72は、横材71を貫通するように設けられており、その交差部分において横材71に接合されている。すなわち、各縦材72を構成する複数の鋼管のうち、横材71と交差する鋼管は、横材71を構成する鋼管と接合されて正面視略十字状の一体化された交差管3cとして構成されている。
縦材72の下端部は、基礎21に埋設されており、その結果、縦材72の下端部が基礎21に立設されている。
縦材72の上端部には、フランジ部91が設けられている。このフランジ部91は、既設の堰堤100を嵩上げする際に、既設の捕捉体3の上方に新たな捕捉体を連結する第1の連結部として機能する。
The multiple vertical members 72 are arranged along the height direction of the dam 100 and connect adjacent horizontal members 71 in the height direction. The multiple vertical members 72 are arranged side by side along the height direction of the dam 100. The spacing between adjacent vertical members 72 is preferably set smaller than the diameter of the rocks to be captured in the event of a debris flow. The spacing between adjacent vertical members 72 may be the same from one end to the other of the width direction of the capture body 3, or may be narrowed only near the center of the width direction of the capture body 3, and can be freely changed depending on the expected scale of the debris flow.
The vertical members 72 are made up of, for example, a plurality of cylindrical steel pipes, each end of which is connected to another via a flange. Note that the steel pipes may be connected by welding their ends together without providing flanges, but considering the need for replacement after a debris flow collision, it is preferable to use flanges for connection.
Each vertical member 72 is provided so as to penetrate the horizontal member 71 and is joined to the horizontal member 71 at the intersection. That is, of the multiple steel pipes constituting each vertical member 72, the steel pipes that intersect with the horizontal member 71 are joined to the steel pipes constituting the horizontal member 71 to form an integrated cross pipe 3c that is generally cross-shaped when viewed from the front.
The lower end of the vertical member 72 is buried in the foundation 21 , so that the lower end of the vertical member 72 stands upright on the foundation 21 .
A flange portion 91 is provided at the upper end of the vertical member 72. This flange portion 91 functions as a first connecting portion that connects a new capture body above the existing capture body 3 when raising the height of the existing dam 100.

連結部8は、上流側ユニット6と下流側ユニット7とを連結するものである。
連結部8は、河川の流れ方向に沿って設けられており、互いに対向する上流側ユニット6の横材61と下流側ユニット7の横材71とを連結している。すなわち、連結部8は、横材61,71と同様に、堰堤100の高さ方向に沿って並んで配置されている。したがって、隣接する連結部8間の間隔は、土石流の発生時に捕捉すべき岩石の径よりも小さくなるように設けられている。また、隣接する連結部8間の間隔は、横材61,71と同様に、捕捉体3の上端から下端にわたって全て同じ間隔としてもよいし、捕捉体3の上方のみ間隔を狭くする等、想定される土石流の規模に応じて自由に変更可能である。
連結部8は、例えば、円筒状に形成された鋼管によって構成されている。鋼管は、一端部が上流側ユニット6の横材61(交差管3a)にフランジ部を介して連結されており、他端部が下流側ユニット7の横材71(交差管3c)にフランジ部を介して連結されている。したがって、連結部8が連結される横材61,71には、連結部8の各端部に対向する位置に予めフランジ部を設けておくことが必要である。なお、連結部8は、必ずしもフランジ部を用いた連結に限らず、溶接等によって連結部8を横材61,71に接合されていてもよい。
The connecting portion 8 connects the upstream unit 6 and the downstream unit 7 together.
The connecting portions 8 are arranged along the direction of river flow, connecting the opposing cross members 61 of the upstream unit 6 and the cross member 71 of the downstream unit 7. That is, like the cross members 61 and 71, the connecting portions 8 are arranged side by side along the height direction of the dam 100. Therefore, the spacing between adjacent connecting portions 8 is set to be smaller than the diameter of the rocks to be captured in the event of a debris flow. Furthermore, like the cross members 61 and 71, the spacing between adjacent connecting portions 8 may be the same from the top to the bottom of the capture body 3, or may be narrowed only above the capture body 3, and can be freely changed depending on the expected scale of the debris flow.
The connecting portion 8 is formed, for example, by a cylindrical steel pipe. One end of the steel pipe is connected to a cross member 61 (cross pipe 3a) of the upstream unit 6 via a flange, and the other end is connected to a cross member 71 (cross pipe 3c) of the downstream unit 7 via a flange. Therefore, the cross members 61, 71 to which the connecting portion 8 is connected must be provided with flanges in advance at positions opposite each end of the connecting portion 8. Note that the connecting portion 8 is not necessarily connected using flanges, and the connecting portion 8 may also be joined to the cross members 61, 71 by welding or the like.

架台4は、非越流部1の基礎11に立設されている。架台4は、捕捉体3に連結されており、堰堤100の完成時には、捕捉体3に連結された状態で非越流部1に埋設される。
架台4は、捕捉体3を非越流部1に強固に固定するために用いられる。
架台4は、一つの非越流部1につき、上流側ユニット6の横材61の端部に対向する位置と、下流側ユニット7の横材71の端部に対向する位置とに設けられている。架台4は、非越流部1の高さ方向に沿って複数連結されており、捕捉体3の各横材61,71を連結できる位置に設けられている。
架台4は、複数の縦部41と、複数の横部42と、を備えている。
The frame 4 is erected on the foundation 11 of the non-overflow section 1. The frame 4 is connected to the capture body 3, and when the dam 100 is completed, it will be buried in the non-overflow section 1 while still connected to the capture body 3.
The mount 4 is used to firmly fix the capture body 3 to the non-overflow section 1.
For each non-overflow section 1, the frame 4 is provided at a position facing the end of the cross member 61 of the upstream unit 6 and at a position facing the end of the cross member 71 of the downstream unit 7. A plurality of frames 4 are connected along the height direction of the non-overflow section 1, and are provided at positions where each cross member 61, 71 of the capture body 3 can be connected.
The mount 4 includes a plurality of vertical portions 41 and a plurality of horizontal portions 42 .

複数の縦部41は、堰堤100の高さ方向に沿って設けられている。縦部41は、例えば、円筒状に形成された複数の鋼管によって構成されている。縦部41の両端部には、フランジ部が設けられている。各鋼管は、その軸線方向端部がフランジ部を介して互いに連結されている。非越流部1の基礎11に直接設けられる縦部41の下端部は、基礎11に埋設されており、その結果、縦部41の下端部が基礎11に立設されている。 Multiple vertical sections 41 are provided along the height direction of the dam 100. The vertical sections 41 are, for example, composed of multiple cylindrical steel pipes. Flanges are provided at both ends of the vertical sections 41. The axial ends of each steel pipe are connected to each other via the flanges. The lower ends of the vertical sections 41, which are provided directly in the foundation 11 of the non-overflow section 1, are buried in the foundation 11, and as a result, the lower ends of the vertical sections 41 are erected on the foundation 11.

複数の横部42は、縦部41の軸線方向の途中に縦部41に交差するように設けられており、堰堤100の高さ方向に沿って並んで配置されている。横部42は、例えば、円筒状に形成された複数の鋼管によって構成されており、各鋼管は、その軸線方向一端部に設けられたフランジ部を介して互いに捕捉体3の横材61,71と連結されている。
各横部42は、縦部41を貫通するように設けられており、その交差部分において縦部41に接合されている。すなわち、架台4は、縦部41を構成する鋼管と、横部42を構成する鋼管とが互いに接合されて正面視略十字状の一体化された交差管として構成されている。
各横部42は、長手方向一端部が非越流部1から開口部2に露出するように設けられており、この一端部において横材61,71と連結できるように配置されている。
架台4は、横部42における捕捉体3の横材61,71との連結部位を除いて非越流部1に埋設されている。架台4が非越流部1に埋設されることにより、各横材61,71は架台4を介して非越流部1に固定され、捕捉体3が非越流部1の側壁に固定される。
架台4は、互いの縦部41の端部同士を複数連結することにより、非越流部1の高さ方向に延在している。
堰堤100において、最も上方に配置された架台4の縦部41の上端部には、フランジ部92が設けられている。このフランジ部92は、非越流部1の上面(天端面)に露出(突出)した状態となっている。この露出したフランジ部92は、既設の堰堤100を嵩上げする際に、既設の架台4の上方に新たな架台4aを連結する第2の連結部として機能する。
The horizontal portions 42 are provided midway along the axis of the vertical portions 41 so as to intersect with the vertical portions 41, and are arranged side by side along the height direction of the dam 100. The horizontal portions 42 are made up of, for example, a plurality of cylindrical steel pipes, and each steel pipe is connected to the horizontal members 61, 71 of the capture body 3 via a flange provided at one end in the axial direction of the steel pipe.
Each horizontal portion 42 is provided so as to penetrate the vertical portion 41 and is joined to the vertical portion 41 at the intersection thereof. In other words, the gantry 4 is configured as an integrated cross pipe having a generally cross shape when viewed from the front, in which the steel pipes constituting the vertical portions 41 and the steel pipes constituting the horizontal portions 42 are joined together.
Each horizontal portion 42 is provided so that one longitudinal end is exposed from the non-overflow portion 1 to the opening 2, and is positioned so that this one end can be connected to the horizontal members 61, 71.
The frame 4 is buried in the non-overflow section 1 except for the connection portions with the cross members 61, 71 of the capture body 3 in the horizontal portion 42. By burying the frame 4 in the non-overflow section 1, the cross members 61, 71 are fixed to the non-overflow section 1 via the frame 4, and the capture body 3 is fixed to the side wall of the non-overflow section 1.
The frame 4 extends in the height direction of the non-overflow section 1 by connecting the ends of multiple vertical sections 41 together.
In the dam 100, a flange portion 92 is provided at the upper end of the vertical portion 41 of the frame 4 located at the top. This flange portion 92 is exposed (protrudes) from the upper surface (top end surface) of the non-overflow portion 1. This exposed flange portion 92 functions as a second connecting portion that connects a new frame 4a above the existing frame 4 when the existing dam 100 is raised.

<堰堤を構築する方法>
次に、既設の堰堤100に新たに堰堤を構築する方法(堰堤100を嵩上げする方法)について説明する。
堰堤100を嵩上げする際には、図3に示すように、既設の堰堤100の捕捉体3の上端部に新たな捕捉体3Aを構築していく。新たな捕捉体3Aを構築する際には、図3に示すように、開口部2の幅方向中央近傍から両岸の非越流部1に向けて縦材62の上端部のフランジ部91に上流側ユニット6aを構成する縦材62aを連結しつつ、横材61aを連結して組み立てていく(第1の工程)。
具体的には、縦材62aを構成する鋼管の途中に縦材62aの軸線方向に直交するように横材61aを構成する鋼管が設けられた略十字状の交差管3aの縦側の端部を縦材62aの上端部のフランジ部91に連結しつつ、隣接する交差管3aの対向する横側の端部同士を直線状に延びる直管(非交差管)3bで連結する。これにより、上流側ユニット6aを構成する縦材62aの下端部が既設の捕捉体3の縦材62に連結され、上流側ユニット6aを構成する最下段の横材61aが連結される。
<How to build a dam>
Next, a method for constructing a new dam on the existing dam 100 (a method for raising the dam 100) will be described.
When raising the dam 100, as shown in Figure 3, a new capture body 3A is constructed at the upper end of the capture body 3 of the existing dam 100. When constructing the new capture body 3A, as shown in Figure 3, the vertical members 62a constituting the upstream unit 6a are connected to the flange portions 91 at the upper ends of the vertical members 62 from near the center of the width of the opening 2 toward the non-overflow portions 1 on both banks, while the horizontal members 61a are connected and assembled (first step).
Specifically, the vertical ends of the generally cross-shaped cross pipes 3a, each having a steel pipe constituting the vertical member 62a and a horizontal member 61a disposed midway between the steel pipes constituting the vertical member 62a so as to be perpendicular to the axial direction of the vertical member 62a, are connected to flanges 91 at the upper ends of the vertical members 62a, while the opposing horizontal ends of adjacent cross pipes 3a are connected to straight pipes (non-cross pipes) 3b extending in a straight line. As a result, the lower ends of the vertical members 62a constituting the upstream unit 6a are connected to the vertical members 62 of the existing capture body 3, and the lowest horizontal member 61a constituting the upstream unit 6a is connected.

また、下流側ユニット7aについても、上流側ユニット6aと同様に、図3に示すように、開口部2の幅方向中央近傍から両岸の非越流部1に向けて縦材72の上端部のフランジ部91に下流側ユニット7aを構成する縦材72aを連結しつつ、横材71aを連結して組み立てていく(第1の工程)。
具体的には、縦材72aを構成する鋼管の途中に縦材72aの軸線方向に直交するように横材71aを構成する鋼管が設けられた略十字状の交差管3cの縦側の端部を縦材72の上端部のフランジ部91に連結しつつ、隣接する交差管3cの対向する横側の端部同士を直線状に延びる直管(非交差管)3dで連結する。これにより、下流側ユニット7aを構成する縦材72aの下端部が既設の捕捉体3の縦材72に連結され、下流側ユニット7aを構成する最下段の横材71aが連結される。
さらに、交差管3aと交差管3cを連結部8aにより連結する。これにより、上流側ユニット6aの最下段と下流側ユニット7aの最下段とが連結される。
Similarly to the upstream unit 6a, the downstream unit 7a is assembled by connecting the vertical members 72a constituting the downstream unit 7a to the flange portions 91 at the upper ends of the vertical members 72 from near the center of the width of the opening 2 toward the non-overflow portions 1 on both banks, while connecting the horizontal members 71a, as shown in Figure 3 (first step).
Specifically, the vertical ends of the generally cross-shaped crossing pipes 3c, each having a steel pipe constituting the vertical member 72a and a horizontal member 71a arranged perpendicular to the axial direction of the vertical member 72a, are connected to flanges 91 at the upper ends of the vertical members 72, while the opposing horizontal ends of adjacent crossing pipes 3c are connected to straight pipes (non-crossing pipes) 3d extending in a straight line. As a result, the lower ends of the vertical members 72a constituting the downstream unit 7a are connected to the vertical members 72 of the existing capture body 3, and the lowest horizontal member 71a constituting the downstream unit 7a is connected.
Furthermore, the cross pipe 3a and the cross pipe 3c are connected by a connecting portion 8a, thereby connecting the lowest stage of the upstream unit 6a and the lowest stage of the downstream unit 7a.

第1の工程において、既設の捕捉体3の縦材62,72に交差管3a,3cを連結しつつ、交差管3a,3cを直管3b,3dで連結していき、図4に示すように、横材61a,71aの端部がそれぞれ非越流部1aの施工領域に直前まで近づいたところで、既設の非越流部1の上端面に露出している架台4の上端部のフランジ部92に架台4aを連結する(第2の工程)。すなわち、第2の工程は、第1の工程による横材61a,71aの構築が終了する直前に行う。
架台4aは、縦部41aの途中に縦部41aの軸線方向に直交するように横部42aが設けられた略十字状の部材である。
In the first step, the cross pipes 3a, 3c are connected to the vertical members 62, 72 of the existing capture body 3, while the cross pipes 3a, 3c are connected to the straight pipes 3b, 3d, and as shown in Figure 4, when the ends of the horizontal members 61a, 71a each come very close to the construction area of the non-overflow section 1a, the frame 4a is connected to the flange portion 92 at the upper end of the frame 4 exposed on the upper end surface of the existing non-overflow section 1 (second step). In other words, the second step is performed just before the construction of the horizontal members 61a, 71a in the first step is completed.
The base 4a is a substantially cross-shaped member having a vertical portion 41a and a horizontal portion 42a provided midway along the vertical portion 41a so as to be perpendicular to the axial direction of the vertical portion 41a.

第2の工程において、既設の非越流部1の上端面に露出している架台4の上端部のフランジ部92に架台4aを連結した後、図5に示すように、非越流部1aに隣接する位置まで設けた交差管3a,3cにおける横側の端部と架台4aの横部42aの端部とを直管3b,3dにより連結する(第3の工程)。ここで、直管3b,3dの一端部は、フランジ部を介して交差管3a,3cに連結され、直管3b,3dの他端部は、フランジ部を介して架台4aの横部42aに連結される。
これにより、新たな捕捉体3Aの最下段の部分が完成し、この最下段における横材61aは、架台4aに連結されている。
In the second step, the pedestal 4a is connected to the flange 92 at the upper end of the pedestal 4 exposed at the upper end surface of the existing non-overflow section 1, and then the lateral ends of the cross pipes 3a, 3c, which are extended up to a position adjacent to the non-overflow section 1a, are connected to the end of the horizontal section 42a of the pedestal 4a by the straight pipes 3b, 3d (third step), as shown in Fig. 5. Here, one end of the straight pipes 3b, 3d is connected to the cross pipes 3a, 3c via the flange, and the other end of the straight pipes 3b, 3d is connected to the horizontal section 42a of the pedestal 4a via the flange.
This completes the bottommost part of the new trapping body 3A, and the cross member 61a at this bottommost part is connected to the base 4a.

次に、図6に示すように、第1の工程から第3の工程を繰り返して、新たな捕捉体3Aの下から二段目の部分を構築する。すなわち、最下段の交差管3a,3cの縦材62a,72aの上端に新たな交差管3a,3cの縦材62a,72aを連結しつつ、隣接する交差管3a,3cを直管3b,3dで連結していく。さらに、交差管3aと交差管3cを連結部8aにより連結する。これにより、上流側ユニット6aと下流側ユニット7aが連結される。
そして、横材61a,71aの端部がそれぞれ非越流部1aの施工領域に直前まで近づいたところで、架台4aの縦部41aの上端に新たな架台4aの縦材41aを連結する。その後、図6に示すように、非越流部1aに隣接する位置まで設けた交差管3a,3cの横側の端部と架台4aの横部42aとを直管3b,3dにより連結する。ここで、直管3b,3dの一端部は、フランジ部を介して交差管3a,3cに連結され、直管3b,3dの他端部は、フランジ部を介して架台4aの横部42aに連結される。
これにより、新たな捕捉体3Aの下から二段目の部分が完成し、捕捉体3Aの下から二段目における横材61aは、二段目の架台4aに連結されている。すなわち、交差管3a,3cが互いに連結されることにより、上下段の縦材62a,72a同士が非越流部1aの高さ方向に沿って同軸上に配置され、横材61a,71a同士が非越流部1aの高さ方向に間隔をあけて配置される。
なお、架台4aの縦部41aのフランジ部の孔を、連結に用いるボルトの外径よりもいくらか余裕をもって大きめに形成しておけば、上下方向に並ぶ架台4aの位置を調整することで交差管3a,3cの取付誤差を容易に解消することができる。
Next, as shown in Figure 6, steps 1 to 3 are repeated to construct a new trapping body 3A in the second lowest tier. Specifically, the vertical members 62a and 72a of the new crossing tubes 3a and 3c are connected to the upper ends of the vertical members 62a and 72a of the lowermost crossing tubes 3a and 3c, while adjacent crossing tubes 3a and 3c are connected by straight tubes 3b and 3d. Furthermore, the crossing tubes 3a and 3c are connected by a connecting portion 8a. This connects the upstream unit 6a and the downstream unit 7a.
Then, when the ends of the cross members 61a and 71a have come very close to the construction area of the non-overflow section 1a, the new vertical member 41a of the pedestal 4a is connected to the upper end of the vertical section 41a of the pedestal 4a. After that, as shown in Figure 6, the horizontal ends of the cross pipes 3a and 3c, which have been extended to a position adjacent to the non-overflow section 1a, are connected to the horizontal section 42a of the pedestal 4a by the straight pipes 3b and 3d. One end of the straight pipes 3b and 3d is connected to the cross pipes 3a and 3c via flanges, and the other end of the straight pipes 3b and 3d is connected to the horizontal section 42a of the pedestal 4a via flanges.
This completes the second-lowest section of the new capture body 3A, and the horizontal member 61a in the second-lowest section of capture body 3A is connected to the second-lowest section frame 4a. In other words, by connecting the cross pipes 3a, 3c to each other, the vertical members 62a, 72a of the upper and lower sections are arranged coaxially along the height direction of the non-overflow section 1a, and the horizontal members 61a, 71a are arranged with a gap between them in the height direction of the non-overflow section 1a.
Furthermore, if the holes in the flanges of the vertical parts 41a of the mounts 4a are formed somewhat larger than the outer diameter of the bolts used for connection, the installation errors of the cross pipes 3a and 3c can be easily eliminated by adjusting the positions of the mounts 4a aligned vertically.

次に、図7に示すように、既設の非越流部1の上端面にコンクリートを打設して非越流部1aを構築する(第4の工程)。
ここで、第4の工程において、既設の非越流部1の上端面には、新たな捕捉体3Aの高さ方向に並ぶ既設の架台4と捕捉体3Aの最下段の架台4aとの連結部、及び、最下段の架台4aと二段目の架台4aとの連結部が埋設されるようにコンクリートが打設される。また、捕捉体3Aと架台4aの連結部は、後の捕捉体3Aのメンテナンス時の交換を考慮して埋設しない。
なお、三段目の架台4aの連結を考慮して、第4の工程は、二段目における架台4aの上端(縦部41aの上端)のフランジ部92が露出するようにコンクリートが打設される。
なお、第4の工程は、第1の工程から第3の工程までをさらに複数回繰り返した後に行ってもよい。すなわち、交差管3a,3c、直管3b,3d、及び架台4aをさらに複数段にわたって連結してから既設の非越流部1の上端面にコンクリートを打設して非越流部1aを構築してもよい。
Next, as shown in FIG. 7, concrete is poured onto the upper end surface of the existing non-overflow section 1 to construct a non-overflow section 1a (fourth step).
In the fourth step, concrete is poured into the upper end surface of the existing non-overflow section 1 so as to bury the connecting portion between the existing base 4 aligned in the height direction of the new capture body 3A and the lowest base 4a of the capture body 3A, and the connecting portion between the lowest base 4a and the second base 4a. Furthermore, the connecting portion between the capture body 3A and the base 4a is not buried, in consideration of replacement during subsequent maintenance of the capture body 3A.
In addition, taking into consideration the connection of the third stage frame 4a, in the fourth step, concrete is poured so that the flange portion 92 at the upper end (upper end of the vertical portion 41a) of the second stage frame 4a is exposed.
The fourth step may be performed after the first to third steps have been repeated several times. That is, the cross pipes 3a, 3c, the straight pipes 3b, 3d, and the frame 4a may be connected in several stages, and then concrete may be poured onto the upper end surface of the existing non-overflow section 1 to construct the non-overflow section 1a.

その後、交差管3a,3c及び直管3b,3dの連結による横材61a,71a及び縦材62a,72aの連結、架台4aの連結、横材61a,71aと架台4aとの連結、非越流部1aへのコンクリートの打設を必要な高さまで繰り返して新たな捕捉体3A及び非越流部1aを構築し、図8に示すように、堰堤100を完成させる。なお、最上段に配置される交差管は、上方に連結する交差管がないので、正面視T字状に構成する。
以上の工程をもって、図8に示すような堰堤100を構築する。
Thereafter, the steps of connecting the cross members 61a, 71a and the vertical members 62a, 72a by connecting the cross pipes 3a, 3c and the straight pipes 3b, 3d, connecting the frames 4a, connecting the cross members 61a, 71a to the frames 4a, and pouring concrete into the non-overflow section 1a are repeated up to the required height to construct a new capture body 3A and non-overflow section 1a, completing the dam 100 as shown in Figure 8. Note that the cross pipe located at the top has a T-shape when viewed from the front, as there is no other cross pipe connected above it.
Through the above steps, a dam 100 as shown in FIG. 8 is constructed.

以上のような堰堤100及び堰堤100Aの構築方法によれば、捕捉体3,3Aは、非越流部1,1aを構築するコンクリートに埋設された架台4,4aに連結されているので、捕捉体3,3Aは、非越流部1,1aに強固に固定される。これにより、捕捉体3,3Aに作用する土石流の荷重や衝撃荷重等の一部を非越流部1,1aに逃がすことができ、捕捉体3,3Aの押し抜きや引き抜きに対する耐力が向上する。
また、捕捉体3,3Aは、同じ構成を有する横材61,71,61a,71aと縦材62,72,62a,72aを堰堤100,100Aの高さ方向に間隔をあけて非越流部1,1aに固定していくだけなので、本来予定していた高さまで施工していない場合であっても、施工済みの高さまでは捕捉体3,3Aとして機能させることができる。すなわち、従来の捕捉体は、完成しなければ捕捉体として十分な強度を有しておらず、堰堤として機能しなかったのに対して、上記の堰堤100,100Aは、施工途中に土石流が発生しても捕捉体3,3Aが岩石や流木等を捕捉する強度を有しているので、堰堤として機能する。したがって、ハイダムのように、施工期間が長くなる堰堤の施工であっても、施工中の土石流の発生による被害を抑えることができるので、施工期間を分けて施工することもできる。
According to the above-described construction method for the dam 100 and dam 100A, the trapping bodies 3, 3A are connected to the frames 4, 4a embedded in the concrete that constitutes the non-overflow sections 1, 1a, so that the trapping bodies 3, 3A are firmly fixed to the non-overflow sections 1, 1a. This allows some of the debris flow load and impact load acting on the trapping bodies 3, 3A to be released to the non-overflow sections 1, 1a, improving the resistance of the trapping bodies 3, 3A to being pushed out or pulled out.
Furthermore, the trapping bodies 3, 3A are simply fixed to the non-overflow sections 1, 1a of the dam 100, 100A at intervals along its height, with the horizontal members 61, 71, 61a, 71a and the vertical members 62, 72, 62a, 72a having the same configuration. Therefore, even if the dam is not constructed to the originally planned height, the trapping bodies 3, 3A can function up to the completed height. In other words, conventional trapping bodies lack sufficient strength to function as a dam until completed, whereas the dam 100, 100A described above functions as a dam even if a debris flow occurs during construction because the trapping bodies 3, 3A are strong enough to capture rocks, driftwood, etc. Therefore, even in the construction of a dam, such as a high dam, which requires a long construction period, damage caused by a debris flow during construction can be reduced, and the construction period can be divided.

また、既設の堰堤100に土砂が堆積して満砂状態となっている場合や、堰堤の設計基準に変更があった場合には、既設の堰堤100に新たに堰堤を構築して堰堤100の嵩上げが必要となるが、従来の捕捉体の構造は嵩上げを想定していないため、既設の捕捉体の上方に同じ構造の捕捉体を構築することはできなかった。しかし、上記の捕捉体3,3Aは、非越流部1,1aに固定する構造であることから、既設の堰堤100の捕捉体3の上方に簡単に捕捉体3Aを構築することができる。よって、最初に上記の構成を有する堰堤100を構築しておけば、何年か経過した後に同じ構造の堰堤を上方に構築して堰堤100を嵩上げすることができるので、堰堤100A全体として強度の弱い部分を発生させることなく、堰堤100を嵩上げすることができる。
また、捕捉体3における縦材62,72の上端には、新たに構築する捕捉体3Aの縦材62a,72aと連結するフランジ部91が設けられており、架台4の縦部41の上端には、非越流部1の上端面から露出すると共に、新たに構築する架台4aと連結するフランジ部92が設けられているので、既設の堰堤100を嵩上げして堰堤100Aを構築する際に、既設の堰堤100に手を加えることなく、新たな捕捉体3A及び架台4aを簡単に連結することができる。
Furthermore, if the existing dam 100 becomes filled with sediment or if there are changes to the dam's design standards, it becomes necessary to construct a new dam on top of the existing dam 100 and raise the height of the dam 100. However, because the structure of conventional traps does not anticipate raising the height, it was not possible to construct a trap of the same structure above an existing trap. However, because the above-mentioned traps 3, 3A are fixed to the non-overflow sections 1, 1a, the trap 3A can be easily constructed above the trap 3 of the existing dam 100. Therefore, if the dam 100 having the above configuration is first constructed, a dam of the same structure can be constructed above it several years later to raise the height of the dam 100. This allows the dam 100 to be raised without creating any weak parts in the dam 100A as a whole.
In addition, the upper ends of the vertical members 62, 72 of the capture body 3 are provided with flange portions 91 that connect to the vertical members 62a, 72a of the capture body 3A to be newly constructed, and the upper end of the vertical portion 41 of the frame 4 is provided with a flange portion 92 that is exposed from the upper end surface of the non-overflow section 1 and connects to the frame 4a to be newly constructed.Therefore, when raising the existing dam 100 to construct the dam 100A, the new capture body 3A and frame 4a can be easily connected without making any changes to the existing dam 100.

また、捕捉体3,3Aを構成する横材61,71,61a,71aは、その両端部が非越流部1,1aに取り付けられているので、土石流に含まれる岩石や流木が上流側ユニット6,6a及び下流側ユニット7,7aの上端を乗り越えて捕捉体3,3Aの下方に落下しても、落下した岩石や流木が捕捉体3,3Aに衝突しにくくなり、捕捉体3,3Aの破損を抑制することができる。
また、架台4,4aは、ともに鋼管から形成された縦部41,41aと横部42,42aというシンプルな構成であるため、捕捉体3,3Aの横材61,71,61a,71a及び縦材62,72,62a,72aと同じ部材を用いることができ、連結作業を容易に行うことができる。
Furthermore, since the cross members 61, 71, 61a, 71a that make up the capture bodies 3, 3A are attached at both ends to the non-overflow sections 1, 1a, even if rocks or driftwood contained in a debris flow climb over the upper ends of the upstream units 6, 6a and downstream units 7, 7a and fall below the capture bodies 3, 3A, the falling rocks and driftwood are less likely to collide with the capture bodies 3, 3A, and damage to the capture bodies 3, 3A can be suppressed.
Furthermore, since the stands 4, 4a have a simple structure consisting of vertical sections 41, 41a and horizontal sections 42, 42a both made from steel pipes, the same materials can be used as the horizontal members 61, 71, 61a, 71a and vertical members 62, 72, 62a, 72a of the capture bodies 3, 3A, making it easy to perform the connection work.

また、捕捉体3Aの施工時において、架台4aを設置する第2の工程は、第1の工程による横材61a,71aの構築が終了する直前に行うことにより、横材61a,71aの施工位置に誤差が生じた場合であっても、架台4aの設置位置を調節することで誤差を解消することができ、横材61a,71aを確実にかつ容易に架台4aに連結することができる。
また、捕捉体3Aが連結される架台4aは、非越流部1aを構築するために打設されるコンクリートで埋設されることにより、捕捉体3Aは非越流部1aに強固に固定されるので、堰堤100Aとしての剛性を高めることができる。
また、第1の工程から第3の工程における縦材62a,72a、横材61a,71a及び架台4aの設置を複数段にわたって繰り返した後に、第4の工程で複数段分の非越流部1aのコンクリートをまとめて打設することもできるので、施工の自由度を高めることができる。
Furthermore, during construction of the capture body 3A, the second step of installing the platform 4a is carried out immediately before the construction of the cross members 61a, 71a is completed in the first step. This means that even if an error occurs in the construction position of the cross members 61a, 71a, the error can be eliminated by adjusting the installation position of the platform 4a, and the cross members 61a, 71a can be reliably and easily connected to the platform 4a.
In addition, the frame 4a to which the capture body 3A is connected is buried in the concrete poured to construct the non-overflow section 1a, so that the capture body 3A is firmly fixed to the non-overflow section 1a, thereby increasing the rigidity of the dam 100A.
Furthermore, after repeating the installation of the vertical members 62a, 72a, horizontal members 61a, 71a and frame 4a in steps 1 to 3 over multiple stages, concrete for multiple stages of the non-overflow sections 1a can be poured all at once in step 4, thereby increasing the flexibility of construction.

<変形例>
図9~図11に示すように、既設の堰堤200を嵩上げして堰堤200Aを構築する場合においても、上記の構築方法を適用可能である。
ここで、堰堤200,200Aが上記の堰堤100,100Aと異なる点は、捕捉体3B,3Cの構成であるため、以下では捕捉体3B,3Cについて詳細に説明する。堰堤200は、一対の非越流部1と、開口部2と、捕捉体3Bと、架台4と、を備えている。
捕捉体3Bは、上流側ユニット6Bと、下流側ユニット7と、連結部8と、を備えている。
上流側ユニット6Bは、河川の上流側に設けられており、堰堤200の上流側から流れてきた土石流に含まれる岩石や流木等の物体を捕捉する機能部材である。すなわち、上流側ユニット6Bは、土石流の衝撃が直接作用するユニットである。
<Modification>
As shown in FIGS. 9 to 11, the above construction method can also be applied when constructing a dam 200A by raising the height of an existing dam 200.
Here, the dam 200, 200A differs from the above-mentioned dam 100, 100A in the configuration of the capture bodies 3B, 3C, and therefore the following will describe in detail the capture bodies 3B, 3C. The dam 200 comprises a pair of non-overflow sections 1, an opening 2, a capture body 3B, and a base 4.
The capture body 3B includes an upstream unit 6B, a downstream unit 7, and a connecting portion 8.
The upstream unit 6B is provided on the upstream side of the river and is a functional component that captures objects such as rocks and driftwood contained in the debris flow that has flowed down from the upstream side of the dam 200. In other words, the upstream unit 6B is the unit that is directly subjected to the impact of the debris flow.

上流側ユニット6Bは、堰堤200を平面視した際に、その延在方向における中央部が河川の上流側に向けて突出するように曲げて形成されている。すなわち、上流側ユニット6Bは、湾曲したアーチ構造を採用しており、上流側ユニット6Bの温度応力(温度変化に伴って構造物に生じる内部応力(例えば、外気温の変化による各構成部材の伸縮に伴う応力など))に対する合成応力度を小さくした構造となっている。
上流側ユニット6Bは、複数の横材61と、複数の縦材62と、を備えている。
The upstream unit 6B is bent so that its central portion in the extension direction protrudes toward the upstream side of the river when the dam 200 is viewed in plan view. In other words, the upstream unit 6B employs a curved arch structure, which reduces the composite stress level due to the temperature stress of the upstream unit 6B (internal stress that occurs in a structure due to temperature changes (for example, stress due to expansion and contraction of each component due to changes in outside temperature)).
The upstream unit 6B includes a plurality of horizontal members 61 and a plurality of vertical members 62 .

複数の横材61は、河川を横切る方向に沿って設けられており、堰堤200の高さ方向に沿って並んで配置されている。隣接する横材61間の間隔は、土石流の発生時に捕捉すべき岩石の径よりも小さくしておくことが好ましい。また、隣接する横材61間の間隔は、捕捉体3の上端から下端にわたって全て同じ間隔としてもよいし、捕捉体3の上方のみ間隔を狭くする等、想定される土石流の規模に応じて自由に変更可能である。横材61は、河川の流れ方向において、下流側ユニット7Bの横材71に対向する位置に設けられている。
横材61は、例えば、円筒状に形成された複数の鋼管によって構成されており、各鋼管は、各端部に設けられたフランジ部を介して互いに連結されている。なお、各鋼管は、フランジ部を設けることなく、端部同士を溶接にて連結してもよいが、土石流衝突後の交換作業を考慮すると、フランジ部を用いた連結が好ましい。
各横材61は、縦材62を貫通するように設けられており、その交差部分において縦材62に接合されている。すなわち、各横材61を構成する複数の鋼管のうち、縦材62と交差する鋼管は、縦材62を構成する鋼管と接合されて正面視略十字状の一体化された交差管3aとして構成されている。また、鋼管は、軸線方向に沿って直線状に延びる鋼管であってもよいし、軸線方向に沿って湾曲された鋼管であってもよく、横材61の曲率によって適した鋼管を選択すればよい。
各横材61は、長手方向(軸線方向)における中央部が河川の上流側に向けて突出するように曲げて形成されている。各横材61は、湾曲したアーチ構造を採用している。
各横材61は、長手方向両端部がそれぞれ対向する非越流部1の側壁に取り付けられている。具体的には、図10に示すように、各横材61の端部は、架台4に連結されており、この架台4が非越流部1に埋設されることにより、各横材61は非越流部1に固定される。
The multiple cross members 61 are arranged in a direction crossing the river and are aligned along the height direction of the dam 200. The spacing between adjacent cross members 61 is preferably set smaller than the diameter of the rocks to be captured in the event of a debris flow. The spacing between adjacent cross members 61 may be the same from the top to the bottom of the capture body 3, or may be narrowed only above the capture body 3, and can be freely changed depending on the expected scale of the debris flow. The cross members 61 are arranged in a position facing the cross member 71 of the downstream unit 7B in the direction of the river flow.
The cross member 61 is made up of, for example, a plurality of cylindrical steel pipes, each of which is connected to another via a flange provided at each end. Note that the steel pipes may be connected by welding their ends together without providing flanges, but considering the need for replacement after a debris flow collision, it is preferable to use flanges for connection.
Each horizontal member 61 is provided so as to penetrate the vertical members 62 and is joined to the vertical members 62 at their intersections. That is, of the multiple steel pipes constituting each horizontal member 61, the steel pipes that intersect with the vertical members 62 are joined to the steel pipes constituting the vertical members 62 to form an integrated crossing pipe 3a that is generally cross-shaped in front view. Furthermore, the steel pipes may be steel pipes that extend linearly along the axial direction or steel pipes that are curved along the axial direction, and an appropriate steel pipe may be selected depending on the curvature of the horizontal member 61.
Each horizontal member 61 is bent so that the center portion in the longitudinal direction (axial direction) protrudes toward the upstream side of the river. Each horizontal member 61 has a curved arch structure.
Each cross member 61 has both longitudinal ends attached to the opposing side walls of the non-overflow section 1. Specifically, as shown in Figure 10, the ends of each cross member 61 are connected to a frame 4, and the frame 4 is embedded in the non-overflow section 1, thereby fixing each cross member 61 to the non-overflow section 1.

複数の縦材62は、堰堤200の高さ方向に沿って設けられており、高さ方向に隣接する横材61同士を連結している。複数の縦材62は、堰堤200の高さ方向に沿って並んで配置されている。隣接する縦材62間の間隔は、土石流の発生時に捕捉すべき岩石の径よりも小さくしておくことが好ましい。また、隣接する縦材62間の間隔は、捕捉体3Bの幅方向一端から他端にわたって全て同じ間隔としてもよいし、捕捉体3Bの幅方向中央付近のみ間隔を狭くする等、想定される土石流の規模に応じて自由に変更可能である。
縦材62は、例えば、円筒状に形成された複数の鋼管によって構成されており、各鋼管は、各端部がフランジ部を介して互いに連結されている。なお、各鋼管は、フランジ部を設けることなく、端部同士を溶接にて連結してもよいが、土石流衝突後の交換作業を考慮すると、フランジ部を用いた連結が好ましい。
各縦材62は、横材61を貫通するように設けられており、その交差部分において横材61に接合されている。すなわち、各縦材62を構成する複数の鋼管のうち、横材61と交差する鋼管は、横材61を構成する鋼管と接合されて正面視略十字状の一体化された交差管3aとして構成されている。
縦材62の下端部は、基礎21に埋設されており、その結果、縦材62の下端部が基礎部21に立設されている。
縦材62の上端部には、フランジ部91が設けられている。このフランジ部91は、既設の堰堤200を嵩上げする際に、既設の捕捉体3の上方に新たな捕捉体を連結する第1の連結部として機能する。
The multiple vertical members 62 are arranged along the height direction of the dam 200 and connect adjacent horizontal members 61 in the height direction. The multiple vertical members 62 are arranged side by side along the height direction of the dam 200. The spacing between adjacent vertical members 62 is preferably set smaller than the diameter of the rocks to be captured in the event of a debris flow. The spacing between adjacent vertical members 62 may be the same from one end to the other of the width direction of the capture body 3B, or may be narrowed only near the center of the width direction of the capture body 3B, and can be freely changed depending on the expected scale of the debris flow.
The vertical members 62 are made up of, for example, a plurality of cylindrical steel pipes, each end of which is connected to another via a flange. Note that the steel pipes may be connected by welding their ends together without providing flanges, but considering the need for replacement after a debris flow collision, it is preferable to use flanges for connection.
Each vertical member 62 is provided so as to penetrate the horizontal member 61 and is joined to the horizontal member 61 at the intersection. That is, of the multiple steel pipes constituting each vertical member 62, the steel pipes that intersect with the horizontal member 61 are joined to the steel pipes constituting the horizontal member 61 and are configured as an integrated cross pipe 3a that is generally cross-shaped when viewed from the front.
The lower end of the vertical member 62 is buried in the foundation 21 , so that the lower end of the vertical member 62 stands upright on the foundation 21 .
A flange portion 91 is provided at the upper end of the vertical member 62. This flange portion 91 functions as a first connecting portion that connects a new capture body above the existing capture body 3 when raising the height of the existing dam 200.

下流側ユニット7は、上流側ユニット6Bから見て河川の下流側に設けられており、上流側ユニット6Bに作用する土石流の衝撃荷重が連結部8を介して伝達され、捕捉体3Bを支持する。
下流側ユニット7は、堰堤200を平面視した際に、河川を横切る方向に沿って設けられており、その延在方向における中央部が上流側ユニット6Bに向けて突出するように湾曲して形成されている。すなわち、下流側ユニット7は、アーチ構造を採用しており、連結部8を介して上流側ユニット6Bから伝達された土石流の衝撃荷重を圧縮力で支持する構造部材である。
下流側ユニット7は、複数の横材71と、複数の縦材72と、を備えている。
なお、下流側ユニット7の構成は、上記実施の形態と同様であるため、同一符号を付して説明を省略する。
The downstream unit 7 is located downstream of the river from the upstream unit 6B, and the impact load of the debris flow acting on the upstream unit 6B is transmitted via the connecting portion 8, supporting the capture body 3B.
The downstream unit 7 is disposed in a direction that crosses the river when the dam 200 is viewed from above, and is curved so that its central portion in the extension direction protrudes toward the upstream unit 6B. In other words, the downstream unit 7 employs an arch structure, and is a structural member that uses compressive force to support the impact load of the debris flow transmitted from the upstream unit 6B via the connecting portion 8.
The downstream unit 7 includes a plurality of horizontal members 71 and a plurality of vertical members 72 .
The downstream unit 7 has the same configuration as that of the above embodiment, and therefore the same reference numerals are used and the description thereof will be omitted.

連結部8は、上流側ユニット6Bと下流側ユニット7とを連結するものである。
連結部8は、河川の流れ方向に沿って設けられており、互いに対向する上流側ユニット6Bの横材61と下流側ユニット7の横材71とを連結している。
なお、連結部8の構成は、上記実施の形態と同様であるため、説明を省略する。
The connecting portion 8 connects the upstream unit 6B and the downstream unit 7 together.
The connecting portion 8 is provided along the direction of the river flow, and connects the cross member 61 of the upstream unit 6B and the cross member 71 of the downstream unit 7, which face each other.
The configuration of the connecting portion 8 is the same as that of the above embodiment, and therefore the description thereof will be omitted.

架台4は、非越流部1の基礎11に立設されている。架台4は、捕捉体3Bに連結されており、堰堤200の完成時には、捕捉体3Bに連結された状態で非越流部1に埋設される。
架台4は、捕捉体3Bを非越流部1に強固に固定するために用いられる。
架台4は、一つの非越流部1につき、上流側ユニット6Bの横材61の端部に対向する位置と、下流側ユニット7の横材71の端部に対向する位置とに設けられている。架台4は、非越流部1の高さ方向に沿って複数連結されており、捕捉体3Bの各横材61,71を連結できる位置に設けられている。
なお、架台4の構成は、上記実施の形態と同様であるため、同一符号を付して説明を省略する。
The platform 4 is erected on the foundation 11 of the non-overflow section 1. The platform 4 is connected to the capture body 3B, and when the dam 200 is completed, the platform 4 will be buried in the non-overflow section 1 while still connected to the capture body 3B.
The stand 4 is used to firmly fix the capture body 3B to the non-overflow section 1.
For each non-overflow section 1, the frame 4 is provided at a position facing the end of the cross member 61 of the upstream unit 6B and at a position facing the end of the cross member 71 of the downstream unit 7. A plurality of frames 4 are connected along the height direction of the non-overflow section 1, and are provided at positions where each of the cross members 61, 71 of the capture body 3B can be connected.
The configuration of the gantry 4 is the same as that of the above embodiment, so the same reference numerals are used and the description thereof will be omitted.

連結された横材61,71は、その延在方向(横材61,71の軸線方向)における中央部が河川の上流側に向けて最も突出するように曲げられてアーチ状に形成されている。横材61,71は、平面視した際に、河川の流れ方向において互いに対向する横材61と横材71とが一端から他端にわたってほぼ等間隔となるように設けられている。すなわち、河川の流れ方向に沿って対向する横材61と横材71とが同じ長さの複数の連結部8によって連結されている。各縦材62は、各横材61同士を連結し、各縦材72は、各横材71同士を連結する。 The connected horizontal members 61, 71 are bent into an arch shape so that their central portions in their extension direction (axial direction of the horizontal members 61, 71) protrude most toward the upstream side of the river. When viewed in plan, the horizontal members 61, 71 are arranged so that the horizontal members 61 and 71 facing each other in the river flow direction are spaced approximately equally apart from one end to the other. In other words, the horizontal members 61 and 71 facing each other in the river flow direction are connected by multiple connecting portions 8 of the same length. Each vertical member 62 connects each horizontal member 61 to another, and each vertical member 72 connects each horizontal member 71 to another.

堰堤200を嵩上げして堰堤200Aを構築する方法は、既設の堰堤200の捕捉体3Bの上端部に新たな捕捉体3Cを構築していき、非越流部1を構築していく。具体的な手順については、上記の実施の形態における堰堤100を嵩上げして堰堤100Aを構築する方法と同様である。 The method for constructing dam 200A by raising the height of dam 200 involves constructing a new capture body 3C at the upper end of capture body 3B of the existing dam 200, thereby constructing the non-overflow section 1. The specific procedure is the same as the method for constructing dam 100A by raising the height of dam 100 in the above embodiment.

以上のように、図9~図11に示す変形例によれば、上記実施の形態における堰堤100及び堰堤100Aの構築方法と同様の効果を奏するほか、上流側ユニット6Bは、曲げて形成されているので、両端部が架台4を介して非越流部1に固定されている場合であっても、温度応力に対する合成応力度を小さくすることができる。これにより、堰堤200,200Aの強度を高めつつ、温度応力に対する合成応力度を小さくすることができ、上流側ユニット6Bの鋼管径を小さくすることもできるようになる。 As described above, the modified examples shown in Figures 9 to 11 achieve the same effects as the construction method for dam 100 and dam 100A in the above embodiment. In addition, because the upstream unit 6B is formed by bending it, the composite stress level due to temperature stress can be reduced even when both ends are fixed to the non-overflow section 1 via the frame 4. This increases the strength of the dams 200, 200A while reducing the composite stress level due to temperature stress, and also makes it possible to reduce the steel pipe diameter of the upstream unit 6B.

<その他>
なお、本発明の好適な実施の形態について説明したが、本発明は上記の実施の形態に限定されるものではなく、本発明の概念及び特許請求の範囲に含まれるあらゆる態様を含む。また、上述した課題及び効果の少なくとも一部を奏するように、各構成を適宜選択的に組み合わせてもよい。例えば、上記実施の形態における各構成要素の形状、材料、配置、サイズ等は、本発明の具体的使用態様によって適宜変更してもよい。
<Others>
Although the preferred embodiments of the present invention have been described, the present invention is not limited to the above embodiments and includes all aspects encompassed within the concept and scope of the claims. Furthermore, each configuration may be appropriately and selectively combined to achieve at least some of the above-described problems and effects. For example, the shape, material, arrangement, size, etc. of each component in the above embodiments may be appropriately modified depending on the specific usage of the present invention.

例えば、捕捉体3,3Aは、上流側ユニット6,6aと下流側ユニット7,7aを連結部8,8aで連結した捕捉体3,3Aに限らず、単に、縦材と横材を格子状に組み立てた捕捉体であってもよく、上記の堰堤の構築方法は、このような単純な構造の捕捉体を備える堰堤にも適用可能である。すなわち、非越流部1,1aの側面(開口部2に面する面)の面方向に交差する方向に延在する横材を備える捕捉体であれば、上記の堰堤の構築方法が適用可能である。
また、捕捉体3,3Aの縦材62,72,62a,72aの下端部を開口部2の基礎21に必ずしも固定する必要はなく、横材61,71,61a,71aを非越流部1に高さ方向に複数段にわたって設けることが重要である。
また、捕捉体3,3Aは、下流側ユニット7,7aの横材61,71,61a,71aのみを非越流部1,1aに取り付けてもよい。
また、堰堤100の嵩上げ量が少ない場合には、第4の工程において、架台4aの上端部が埋まる高さまでコンクリートを打設し、捕捉体3Aの上端部よりも高い位置まで非越流部1aを構築することにより、堰堤100Aを完成させることができる。
また、捕捉体3,3Aは、ハイダムと呼ばれる堰堤100,100Aに設けられた例を説明したが、ハイダムではない堰堤に設けてもよい。
また、各縦材62,72,62a,72a及び各横材61,71,61a,71aの連結方法は、フランジ部を介したボルト及びナットによる連結に限らず、溶接等によって各縦材62,72,62a,72a及び各横材61,71,61a,71aを構成する鋼管同士を接合してもよい。
また、各縦材62,72,62a,72a及び各横材61,71,61a,71aを構成する交差管は、正面視略十字状や正面視略T字状に形成された交差管3a,3cに限らず、捕捉体3,3Aの構成に応じて自由に形状を変更することができる。非交差管は、直線状の直管3b,3dに限らず、捕捉体3,3Aの構成に応じて湾曲させる等、自由に形状を変更することができる。
For example, the trapping body 3, 3A is not limited to the trapping body 3, 3A in which the upstream unit 6, 6a and the downstream unit 7, 7a are connected by the connecting portion 8, 8a, but may simply be a trapping body in which vertical members and horizontal members are assembled in a lattice pattern, and the above-mentioned dam construction method is also applicable to a dam equipped with a trapping body of such a simple structure. In other words, the above-mentioned dam construction method is applicable to any trapping body equipped with horizontal members extending in a direction intersecting the plane direction of the side surface (the surface facing the opening 2) of the non-overflow section 1, 1a.
Furthermore, it is not necessary to fix the lower ends of the vertical members 62, 72, 62a, 72a of the capture bodies 3, 3A to the foundation 21 of the opening 2, and it is important to arrange the horizontal members 61, 71, 61a, 71a in multiple vertical stages in the non-overflow section 1.
In addition, the capture body 3, 3A may have only the cross members 61, 71, 61a, 71a of the downstream unit 7, 7a attached to the non-overflow portion 1, 1a.
Furthermore, if the amount of elevation of the dam 100 is small, in the fourth step, concrete is poured up to a height that buries the upper end of the frame 4a, and the non-overflow section 1a is constructed up to a position higher than the upper end of the capture body 3A, thereby completing the dam 100A.
Furthermore, although the trapping bodies 3, 3A have been described as being provided on the dams 100, 100A called high dams, they may also be provided on dams that are not high dams.
Furthermore, the method of connecting each vertical member 62, 72, 62a, 72a and each horizontal member 61, 71, 61a, 71a is not limited to connection using bolts and nuts via the flange portions, but the steel pipes that make up each vertical member 62, 72, 62a, 72a and each horizontal member 61, 71, 61a, 71a may also be joined together by welding or the like.
Furthermore, the crossing tubes constituting the vertical members 62, 72, 62a, 72a and the horizontal members 61, 71, 61a, 71a are not limited to the crossing tubes 3a, 3c formed in a generally cross shape or a generally T shape in front view, but can be freely changed in shape depending on the configuration of the capture body 3, 3A. The non-crossing tubes are not limited to the straight tubes 3b, 3d, but can be freely changed in shape, such as by being curved, depending on the configuration of the capture body 3, 3A.

1,1a 非越流部
11 基礎
2 開口部
21 基礎
3,3A 捕捉体
4,4a 架台
41,41a 縦部
42,42a 横部
6,6a 上流側ユニット
61,61a 横材
62,62a 縦材
7,7a 下流側ユニット
71,71a 横材
72,72a 縦材
8,8a 連結部
91 フランジ部
92 フランジ部
100,100A 堰堤
1, 1a Non-overflow section 11 Foundation 2 Opening 21 Foundation 3, 3A Capture body 4, 4a Frame 41, 41a Vertical section 42, 42a Horizontal section 6, 6a Upstream unit 61, 61a Horizontal member 62, 62a Vertical member 7, 7a Downstream unit 71, 71a Horizontal member 72, 72a Vertical member 8, 8a Connecting section 91 Flange section 92 Flange section 100, 100A Dam

Claims (8)

既設の堰堤に新たに堰堤を構築する方法であって、
前記既設の堰堤の上方に一対の非越流部を構築する工程と、
前記一対の非越流部の間に形成された開口部に、河川の上流から流れてくる流水を通すと共に流水に含まれる物体を捕捉する捕捉体を構築する工程と、を有し、
前記捕捉体を構築する工程においては、前記捕捉体を前記非越流部に取り付け
前記既設の堰堤は、一対の非越流部と、捕捉体とを備える透過型の堰堤であり、
既設の捕捉体に新たな捕捉体を構成する縦材と横材を連結する第1の工程と、
前記横材の端部に連結される架台を既設の非越流部の上端部に連結する第2の工程と、
前記横材の端部と前記架台を連結する第3の工程と、
前記非越流部の上端部にコンクリートを打設して前記架台を埋設する第4の工程と、
を有することを特徴とする、堰堤を構築する方法。
A method for constructing a new dam on an existing dam, comprising:
constructing a pair of non-overflow sections above the existing dam;
and constructing a capture body in an opening formed between the pair of non-overflow sections, which allows flowing water flowing from the upstream of the river to pass through and captures objects contained in the flowing water,
In the step of constructing the trap, the trap is attached to the non-overflow portion ,
The existing dam is a permeable dam equipped with a pair of non-overflow sections and a capture body,
A first step of connecting vertical members and horizontal members constituting a new capture body to an existing capture body;
a second step of connecting a frame connected to the end of the cross member to an upper end of the existing non-overflow section;
a third step of connecting the end of the cross member to the frame;
a fourth step of pouring concrete into the upper end of the non-overflow section to bury the frame;
A method for constructing a dam, comprising :
前記捕捉体は、河川の上流側に設けられ、前記物体を捕捉する上流側ユニットと、河川の下流側に設けられ、中央部が前記上流側ユニットに向けて突出するように湾曲して形成された下流側ユニットと、前記上流側ユニットと前記下流側ユニットとを連結する連結部と、を備えており、
前記捕捉体を構築する工程においては、少なくとも前記下流側ユニットの各端部を前記非越流部に取り付けることを特徴とする、請求項1に記載の堰堤を構築する方法。
The trapping body includes an upstream unit provided on the upstream side of the river for trapping the object, a downstream unit provided on the downstream side of the river and curved so that its central portion protrudes toward the upstream unit, and a connecting portion connecting the upstream unit and the downstream unit,
2. The method for constructing a dam according to claim 1, wherein in the step of constructing the capture body, at least each end of the downstream unit is attached to the non-overflow portion.
前記第2の工程は、前記第1の工程による前記横材の構築が終了する直前に行うことを特徴とする、請求項1又は2に記載の堰堤を構築する方法。 3. The method for constructing a dam according to claim 1 , wherein the second step is carried out immediately before the construction of the cross members in the first step is completed. 前記第1の工程から前記第3の工程までを複数回繰り返した後に前記第4の工程を行うことを特徴とする、請求項1から3までのいずれか一項に記載の堰堤を構築する方法。 4. The method for constructing a dam according to claim 1, wherein the fourth step is carried out after the first to third steps are repeated a plurality of times. 前記第4の工程は、前記第3の工程で連結された前記架台における前記横材の端部との連結部位を露出させた状態で行うことを特徴とする、請求項からまでのいずれか一項に記載の堰堤を構築する方法。 A method for constructing a dam described in any one of claims 1 to 4 , characterized in that the fourth step is carried out in a state where the connection portion between the end of the cross member and the frame connected in the third step is exposed. 一対の非越流部と、前記一対の非越流部の間に形成される開口部に設けられ、河川の上流から流れてくる流水を通すと共に流水に含まれる物体を捕捉する捕捉体と、を備える堰堤であって、
前記非越流部に設けられ、前記捕捉体が連結される架台と、
前記捕捉体に設けられ、新たな捕捉体と連結する第1の連結部と、
前記架台に設けられ、新たな架台と連結する第2の連結部と、を備え、
前記捕捉体は、高さ方向に沿って設けられた縦材を備え、
前記第1の連結部は、前記縦材の上端部に設けられたフランジ部であり、
前記架台は、高さ方向に沿って設けられた縦部を備え、
前記第2の連結部は、最も上方に配置された前記架台の前記縦部の上端部に設けられ、前記非越流部の上面に露出したフランジ部である
ことを特徴とする、堰堤。
A dam comprising a pair of non-overflow sections and a capture body provided at an opening formed between the pair of non-overflow sections, which allows flowing water flowing from upstream of a river to pass through and captures objects contained in the flowing water,
a frame provided in the non-overflow section and to which the capture body is connected;
a first connecting portion provided on the capture body and configured to connect to a new capture body;
a second connecting portion provided on the cradle and configured to connect to a new cradle;
The capture body includes a vertical member provided along a height direction,
the first connecting portion is a flange portion provided at an upper end portion of the vertical member,
The stand includes a vertical portion provided along a height direction,
The second connecting portion is provided at the upper end of the vertical portion of the uppermost pedestal and is a flange portion exposed on the upper surface of the non-overflow portion.
A dam characterized by:
前記捕捉体は、前記縦材に交差し、前記架台に連結される横材を備える
ことを特徴とする、請求項に記載の堰堤。
The capture body includes a horizontal member that crosses the vertical member and is connected to the frame.
The dam according to claim 6 , characterized in that
前記架台は、前記縦部に交差し、一端部が前記開口部に露出するように設けられ、前記捕捉体に連結される横部を備えることを特徴とする、請求項又はに記載の堰堤。 8. The dam according to claim 6 or 7 , wherein the platform has a horizontal portion that intersects with the vertical portion, one end of which is exposed to the opening, and is connected to the capture body .
JP2022022670A 2022-02-17 2022-02-17 Method for constructing a dam and dam Active JP7777003B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2022022670A JP7777003B2 (en) 2022-02-17 2022-02-17 Method for constructing a dam and dam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022022670A JP7777003B2 (en) 2022-02-17 2022-02-17 Method for constructing a dam and dam

Publications (2)

Publication Number Publication Date
JP2023119684A JP2023119684A (en) 2023-08-29
JP7777003B2 true JP7777003B2 (en) 2025-11-27

Family

ID=87778124

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2022022670A Active JP7777003B2 (en) 2022-02-17 2022-02-17 Method for constructing a dam and dam

Country Status (1)

Country Link
JP (1) JP7777003B2 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002121729A (en) 2000-10-17 2002-04-26 Nippon Steel Corp Future expansion type steel slit dam structure
JP2008266981A (en) 2007-04-19 2008-11-06 Nippon Steel & Sumikin Metal Products Co Ltd Steel slit dam
JP2009275434A (en) 2008-05-15 2009-11-26 Nippon Steel & Sumikin Metal Products Co Ltd Steel slit dam and method for constructing the same
JP2011089393A (en) 2011-02-04 2011-05-06 Nippon Steel & Sumikin Metal Products Co Ltd Erosion control bank and construction method of the same
US20140154012A1 (en) 2011-04-02 2014-06-05 Institute Of Mountain Hazards And Environment Chinese Academy Of Sciences Assembled mud-rock flow debris dam and construction method thereof
JP2019183539A (en) 2018-04-13 2019-10-24 Jfe建材株式会社 Dam and capturing body

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6062535U (en) * 1983-10-06 1985-05-01 財団法人 砂防・地すべり技術センター Blockage prevention device for drain holes for control of sediment flow from sabo dams
JPH0512344Y2 (en) * 1988-01-18 1993-03-30
JP2522956Y2 (en) * 1992-03-31 1997-01-22 住友金属工業株式会社 Steel sabo structure using cushioning material

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002121729A (en) 2000-10-17 2002-04-26 Nippon Steel Corp Future expansion type steel slit dam structure
JP2008266981A (en) 2007-04-19 2008-11-06 Nippon Steel & Sumikin Metal Products Co Ltd Steel slit dam
JP2009275434A (en) 2008-05-15 2009-11-26 Nippon Steel & Sumikin Metal Products Co Ltd Steel slit dam and method for constructing the same
JP2011089393A (en) 2011-02-04 2011-05-06 Nippon Steel & Sumikin Metal Products Co Ltd Erosion control bank and construction method of the same
US20140154012A1 (en) 2011-04-02 2014-06-05 Institute Of Mountain Hazards And Environment Chinese Academy Of Sciences Assembled mud-rock flow debris dam and construction method thereof
JP2019183539A (en) 2018-04-13 2019-10-24 Jfe建材株式会社 Dam and capturing body

Also Published As

Publication number Publication date
JP2023119684A (en) 2023-08-29

Similar Documents

Publication Publication Date Title
JP5129977B2 (en) Steel slit dam
CN105332521A (en) Seismic hardening additional damping and reinforcing frame connected with joint region
JP5162682B2 (en) Sabo dam and its construction method
JP7777003B2 (en) Method for constructing a dam and dam
JP7001507B2 (en) Permeation type dam and its construction method
JP6585937B2 (en) Transmission type sabo dam tube material unit and transmission sabo dam
JP5576816B2 (en) Steel bowl-shaped fishway and its construction method
JP4787053B2 (en) Sabo dam and its construction method
JP7251974B2 (en) Installation method and installation structure of driftwood trapping
JP7211809B2 (en) Driftwood catcher, method for constructing driftwood catcher, and installation structure for driftwood catcher
JP7748887B2 (en) Traps and dams
JP7712885B2 (en) Traps and dams
CN219637936U (en) Pier cofferdam structure
CN215925661U (en) Self-balancing non-landing support suitable for large-span concrete cast-in-place beam
JP2022189706A (en) Catching body and dam
JP7545905B2 (en) Dam, trap and trap installation method
JP2022189707A (en) Construction method of dam, and dam
CN113026576B (en) Connection structure and construction method capable of realizing precise positioning of multi-legged steel tube concrete spatial structure and pedestal
JP2025127010A (en) Traps and dams
JP7211808B2 (en) Driftwood catcher, method for constructing driftwood catcher, and installation structure for driftwood catcher
JP2012102574A5 (en) Water artificial ground and its construction method
JP2023121270A (en) traps and dams
JP2024073281A (en) Reinforcement unit, capture body, dam, and dam reinforcement method
JP3249208U (en) Driftwood capture fence installation structure
JP2002121729A (en) Future expansion type steel slit dam structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20241107

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20250613

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20250807

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20250918

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20251027

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20251114

R150 Certificate of patent or registration of utility model

Ref document number: 7777003

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150