JP7779104B2 - Operational status management system, operational status management device, program, and operational status management method - Google Patents
Operational status management system, operational status management device, program, and operational status management methodInfo
- Publication number
- JP7779104B2 JP7779104B2 JP2021190879A JP2021190879A JP7779104B2 JP 7779104 B2 JP7779104 B2 JP 7779104B2 JP 2021190879 A JP2021190879 A JP 2021190879A JP 2021190879 A JP2021190879 A JP 2021190879A JP 7779104 B2 JP7779104 B2 JP 7779104B2
- Authority
- JP
- Japan
- Prior art keywords
- production
- alert
- status management
- information
- efficiency
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- General Factory Administration (AREA)
Description
本開示は、稼働状況管理システム、稼働状況管理装置、プログラムおよび稼働状況管理方法に関する。 This disclosure relates to an operation status management system, an operation status management device, a program, and an operation status management method.
従来、様々な製品が、工場内に設置された様々な生産ラインにより生産(製造)されている。生産ラインにおいては、多種の工程を実行する生産装置が組み合わされている。このような生産ラインを用いて製品を効率的に生産するため、その操業を管理する技術が開発されている(例えば、特許文献1参照)。 Traditionally, various products are produced (manufactured) on various production lines installed within a factory. Production lines combine production equipment that performs a variety of processes. In order to efficiently produce products using such production lines, technologies for managing their operations have been developed (see, for example, Patent Document 1).
PETボトル無菌充填ラインのように高速生産を行う生産設備においては、設備停止による生産ロスが大きい。このような生産ラインは、複数の工程で実現されており、生産中に問題がある場合は、各工程でそれぞれアラートを発して停止する。生産ラインは大規模で複雑であるため、多数のアラートが発せられた場合に、生産の進捗への影響を把握するのが困難である。 In production equipment that performs high-speed production, such as PET bottle aseptic filling lines, equipment stoppages result in significant production losses. Such production lines consist of multiple processes, and if a problem occurs during production, each process issues an alert and stops the production. Because production lines are large and complex, it is difficult to grasp the impact on production progress when multiple alerts are issued.
そこで、本開示は、生産ラインにおいて複数のアラートが発生された場合に、生産の進捗への影響を把握することが可能な稼働状況管理システム、稼働状況管理装置、プログラムおよび稼働状況管理方法を提供することを課題とする。 The present disclosure aims to provide an operation status management system, operation status management device, program, and operation status management method that can grasp the impact on production progress when multiple alerts are issued on a production line.
上記課題を解決するため、本開示では、
製品を生産する生産装置と、前記生産装置からのデータを取得する稼働状況管理装置と、前記稼働状況管理装置から取得した情報を表示する表示装置と、を備えた稼働状況管理システムであって、
前記稼働状況管理装置は、
アラート種別ごとのアラートと、生産能率の低下に影響する低下係数の関係を記憶した低下係数記憶手段と、
前記生産装置から受信したアラート種別ごとのアラート発生情報と、アラート種別ごとの前記低下係数に基づいて、予測運転能率を算出する予測運転能率算出手段と、を有し、
前記表示装置は、前記予測運転能率に基づく予測情報を表示する、稼働状況管理システムを提供する。
In order to solve the above problems, the present disclosure provides:
An operation status management system including a production device that produces a product, an operation status management device that acquires data from the production device, and a display device that displays information acquired from the operation status management device,
The operation status management device
a reduction coefficient storage means for storing a relationship between an alert for each alert type and a reduction coefficient that affects a reduction in production efficiency;
a predicted operational efficiency calculation means for calculating a predicted operational efficiency based on alert occurrence information for each alert type received from the production device and the degradation coefficient for each alert type,
The display device provides an operational status management system that displays predicted information based on the predicted operational efficiency.
また、本開示の稼働状況管理システムにおいて、
前記稼働状況管理装置は、
生産予定数および生産装置能力を含む生産予定情報を記憶した生産予定記憶手段と、
前記予測運転能率算出手段により算出された予測運転能率と、前記生産予定数および生産装置能力を用いて、終了予定時刻を算出する終了予定時刻算出手段をさらに有し、
前記表示装置は、前記予測情報として前記終了予定時刻を表示してもよい。
In addition, in the operation status management system of the present disclosure,
The operation status management device
a production schedule storage means for storing production schedule information including the planned production quantity and production equipment capacity;
The system further comprises a scheduled end time calculation means for calculating a scheduled end time using the predicted operating efficiency calculated by the predicted operating efficiency calculation means, the scheduled production quantity, and the production equipment capacity,
The display device may display the estimated end time as the prediction information.
また、本開示の稼働状況管理システムは、
各アラート種別のアラートの発生結果および前記生産装置の運転能率を、生産対象の製造ロットに対応付けて記録した稼働実績情報を記憶した稼働実績記憶手段と、
前記稼働実績情報を参照して、前記運転能率を目的変数、前記アラートの発生結果を説明変数として単回帰分析を実行し、各アラート種別のアラートの低下係数を算出する低下係数算出手段と、をさらに有してもよい。
In addition, the operation status management system of the present disclosure includes:
an operation record storage means for storing operation record information in which the occurrence result of an alert for each alert type and the operating efficiency of the production device are recorded in association with a manufacturing lot of the production target;
The system may further include a reduction coefficient calculation means for calculating a reduction coefficient for an alert for each alert type by performing a simple regression analysis with reference to the operational performance information, using the operational efficiency as a response variable and the alert occurrence result as an explanatory variable.
また、本開示の稼働状況管理システムにおける、
前記低下係数算出手段は、生産対象の品種、中身液体、ボトル形状、ボトル容量、キャップ種類、ラベル材のいずれか1つ以上に対応付けて低下係数を算出してもよい。
In addition, in the operation status management system of the present disclosure,
The reduction coefficient calculation means may calculate the reduction coefficient in association with one or more of the product type, liquid content, bottle shape, bottle capacity, cap type, and label material.
また、本開示では、
製品を生産する生産装置と、前記生産装置からのデータを取得する稼働状況管理装置と、前記稼働状況管理装置から取得した情報を表示する表示装置と、を備えた稼働状況管理システムであって、
製品を生産する生産装置からの生産情報を取得して、稼働状況を管理する稼働状況管理装置であって、
アラート種別ごとのアラートと、生産能率の低下に影響する低下係数の関係を記憶した低下係数記憶手段と、
前記生産装置から受信したアラート種別ごとのアラート発生情報と、アラート種別ごとの前記低下係数に基づいて、予測運転能率を算出する予測運転能率算出手段と、を有する稼働状況管理装置を提供する。
In addition, in this disclosure,
An operation status management system including a production device that produces a product, an operation status management device that acquires data from the production device, and a display device that displays information acquired from the operation status management device,
An operation status management device that acquires production information from a production device that produces a product and manages the operation status,
a reduction coefficient storage means for storing the relationship between an alert for each alert type and a reduction coefficient that affects a reduction in production efficiency;
An operation status management device is provided, which has a predicted operation efficiency calculation means that calculates a predicted operation efficiency based on alert occurrence information for each alert type received from the production device and the degradation coefficient for each alert type.
また、本開示では、
コンピュータを、
アラート種別ごとのアラートと、生産能率の低下に影響する低下係数の関係を記憶した低下係数記憶手段、
生産装置から受信したアラート種別ごとのアラート発生情報と、アラート種別ごとの前記低下係数に基づいて、予測運転能率を算出する予測運転能率算出手段、
として機能させるためのプログラムを提供する。
In addition, in this disclosure,
Computer,
a reduction coefficient storage means for storing a relationship between an alert for each alert type and a reduction coefficient that affects a reduction in production efficiency;
a predicted operational efficiency calculation means for calculating a predicted operational efficiency based on alert occurrence information for each alert type received from the production equipment and the degradation coefficient for each alert type;
We provide a program to function as a
また、本開示では、
生産予定情報を記憶した生産予定記憶手段、アラート種別ごとのアラートと、生産能率の低下に影響する低下係数の関係を記憶した低下係数記憶手段を備えた稼働状況管理装置が、稼働状況を管理する稼働状況管理方法であって、
生産装置から受信したアラート種別ごとのアラート発生情報と、アラート種別ごとの前記低下係数に基づいて、予測運転能率を算出するステップと、
前記予測運転能率を用いて、終了予定時刻を算出するステップと、
を有する稼働状況管理方法を提供する。
In addition, in this disclosure,
An operation status management method in which an operation status management device including a production schedule storage means for storing production schedule information and a reduction coefficient storage means for storing the relationship between alerts for each alert type and a reduction coefficient that affects a reduction in production efficiency manages operation status,
calculating a predicted operating efficiency based on alert occurrence information for each alert type received from the production device and the degradation coefficient for each alert type;
Calculating an estimated end time using the predicted operation efficiency;
The present invention provides an operational status management method having the above-mentioned steps.
本開示によれば、生産ラインにおいてアラートが発生された場合に、どの程度生産能率に影響するかを把握することが可能となる。 This disclosure makes it possible to understand the extent to which an alert issued on a production line will affect production efficiency.
以下、本開示の好適な実施形態について図面を参照して詳細に説明する。
<システム構成>
図1は、本開示の一実施形態に係る稼働状況管理装置を用いた稼働状況管理システムを示す図である。図1において、100は稼働状況管理システム、110は稼働状況管理装置、120は表示装置、130は生産装置、140はゲートウェイ装置、150はネットワークである。稼働状況管理装置110、表示装置120、ゲートウェイ装置140は、インターネット等のネットワーク150に接続されており、互いにデータ通信可能となっている。生産装置130は、ゲートウェイ装置140にデータ通信可能に接続されている。ゲートウェイ装置140は、生産装置130から受信した生産情報等のデータを、ネットワーク150を介して稼働状況管理装置110に送信する。表示装置120は、ネットワーク150を介して稼働状況管理装置110にアクセスし、稼働状況管理装置110からデータを受信して表示する。
Preferred embodiments of the present disclosure will be described in detail below with reference to the drawings.
<System Configuration>
FIG. 1 is a diagram illustrating an operation status management system using an operation status management device according to an embodiment of the present disclosure. In FIG. 1, reference numeral 100 denotes the operation status management system, 110 denotes the operation status management device, 120 denotes a display device, 130 denotes a production device, 140 denotes a gateway device, and 150 denotes a network. The operation status management device 110, the display device 120, and the gateway device 140 are connected to a network 150 such as the Internet and are capable of data communication with each other. The production device 130 is connected to the gateway device 140 so as to be capable of data communication. The gateway device 140 transmits data such as production information received from the production device 130 to the operation status management device 110 via the network 150. The display device 120 accesses the operation status management device 110 via the network 150, receives data from the operation status management device 110, and displays the data.
図1の例では、説明の便宜上、表示装置120を1台のみ示している。しかし、実際には、多数の表示装置120からネットワーク150を介して稼働状況管理装置110を利用可能になっている。また、図1の例では、説明の便宜上、生産装置130を3台示している。しかし、実際には、生産現場においては、より多くの生産装置130が設置されていることが通常である。本実施形態に係る稼働状況管理システム100は、生産ラインを構成する生産装置の数が多く、生産ライン全体が複雑な構成である場合に、特に有用である。 For ease of explanation, the example in Figure 1 shows only one display device 120. However, in reality, the operational status management device 110 is accessible from many display devices 120 via the network 150. Also, for ease of explanation, the example in Figure 1 shows three production devices 130. However, in reality, many more production devices 130 are typically installed at a production site. The operational status management system 100 according to this embodiment is particularly useful when a production line comprises a large number of production devices and the entire production line has a complex configuration.
図2は、稼働状況管理装置110の詳細を示す図である。このうち、図2(a)は、稼働状況管理装置110のハードウェア構成図である。稼働状況管理装置110は、汎用のサーバコンピュータで実現することができる。具体的には、稼働状況管理装置110のハードウェア構成としては、図2に示すように、CPU(Central Processing Unit)110aと、コンピュータのメインメモリであるRAM(Random Access Memory)110bと、CPUが実行するプログラムやデータを記憶するための大容量の記憶装置110c(例えば、ハードディスク、フラッシュメモリ等)と、キーボード、マウス等の入力機器からの入力を受け付ける入力I/F(インタフェース)110dと、外部装置(データ記憶媒体等)とデータ通信するためのデータ入出力I/F(インタフェース)110eと、表示装置(液晶ディスプレイ等)に情報を送出するための表示出力I/F(インタフェース)110fと、ネットワーク150を介して表示装置120、ゲートウェイ装置140等の他の機器とネットワーク通信を行うための通信部110gと、を備える。これらの各要素は、互いにバスを介して接続されている。 Figure 2 shows details of the operational status management device 110. Figure 2(a) is a hardware configuration diagram of the operational status management device 110. The operational status management device 110 can be implemented as a general-purpose server computer. Specifically, as shown in Figure 2, the hardware configuration of the operational status management device 110 includes a CPU (Central Processing Unit) 110a, a RAM (Random Access Memory) 110b, which is the computer's main memory, a large-capacity storage device 110c (e.g., a hard disk, flash memory, etc.) for storing programs and data executed by the CPU, an input I/F (interface) 110d for accepting input from input devices such as a keyboard and mouse, a data input/output I/F (interface) 110e for data communication with external devices (e.g., data storage media), a display output I/F (interface) 110f for sending information to a display device (e.g., liquid crystal display), and a communication unit 110g for network communication with other devices such as the display device 120 and gateway device 140 via the network 150. These elements are connected to each other via a bus.
図2(b)は、稼働状況管理装置110の機能ブロック図である。図2(a)に示したハードウェア構成において、CPU110aが記憶装置110cに記憶されたプログラムをRAM110bに読み込んで実行することにより、稼働状況管理装置110は、図2(b)に示した各手段を機能させることが可能となる。図2(b)に示すように、稼働状況管理装置110は、稼働実績記憶手段111、低下係数記憶手段112、生産予定記憶手段113、低下係数算出手段114、予測運転能率算出手段115、終了予定時刻算出手段116を有する。 Figure 2(b) is a functional block diagram of the operational status management device 110. In the hardware configuration shown in Figure 2(a), the CPU 110a loads a program stored in the storage device 110c into the RAM 110b and executes it, thereby enabling the operational status management device 110 to function as each of the means shown in Figure 2(b). As shown in Figure 2(b), the operational status management device 110 has an operational performance storage means 111, a reduction coefficient storage means 112, a production schedule storage means 113, a reduction coefficient calculation means 114, a predicted operating efficiency calculation means 115, and a scheduled end time calculation means 116.
稼働実績記憶手段111は、稼働実績情報を記憶した記憶手段である。稼働実績情報とは、各生産装置130における稼働実績を製品の製造ロット別に集計した情報である。したがって、稼働実績情報は、生産対象の製造ロットに対応付けて記録されている。図3は、稼働実績記憶手段111に記憶された稼働実績情報の一例を示す図である。図3に示すように、稼働実績記憶手段111には、稼働実績情報として、生産開始時刻、生産終了時刻、生産時間、品種、生産装置能力(図中「装置能力」と表記)、生産数、運転能率(運転実績)、アラート種別ごとのアラート発生数が記憶されている。 The operation performance storage means 111 is a storage means that stores operation performance information. Operation performance information is information that compiles the operation performance of each production device 130 by product production lot. Therefore, operation performance information is recorded in association with the production lot of the production target. Figure 3 is a diagram showing an example of operation performance information stored in the operation performance storage means 111. As shown in Figure 3, the operation performance storage means 111 stores the production start time, production end time, production time, product type, production device capacity (denoted as "device capacity" in the figure), production quantity, operating efficiency (operation performance), and the number of alerts issued for each alert type as operation performance information.
稼働実績情報は、生産済みの製品の製造ロット別に管理されている。また、稼働実績情報は、時系列順に管理されており、生産開始が早い製造ロットから順に並んでいる。図3の例では、同じ品種である品種cが異なる製造ロットで製造されている。図3では、品種a、b、dの製品がそれぞれ1回、品種cの製品が2回、異なる製造ロットとして生産された例を示している。生産装置130は、各品種に対応している。生産装置能力は、単位時間あたりの生産可能数である。図3においては、生産装置能力は、各生産装置130が、対応する品種を生産可能な数を示している。ここでは、生産装置能力を、対応する品種を1分間に生産できる数として示している。例えば図3の例では、品種aに対応した生産装置130は、品種aを1分間に最大606個生産できる能力があることを示している。 Operation performance information is managed by production lot for each product that has already been produced. Furthermore, the operation performance information is managed in chronological order, with the production lots sorted in order from the earliest production start date. In the example of Figure 3, the same product type, product c, is produced in a different production lot. Figure 3 shows an example in which products a, b, and d are each produced once, and product c is produced twice in different production lots. A production device 130 corresponds to each product type. Production device capacity is the number of units that can be produced per unit time. In Figure 3, production device capacity indicates the number of units that each production device 130 can produce of the corresponding product type. Here, production device capacity is shown as the number of units that can be produced of the corresponding product type per minute. For example, in the example of Figure 3, the production device 130 corresponding to product type a has the capacity to produce a maximum of 606 units of product type a per minute.
図3において、生産開始時刻、生産終了時刻は、対応する製造ロットについての生産開始時刻、生産終了時刻を示している。生産時間は、生産していた時間であり、生産開始時刻から生産終了時間までの経過時間を示している。生産数は、その生産時間で実際に生産された製品の数である。運転能率は生産装置能力を最大限生かして生産した場合に対する生産数の比率である。 In Figure 3, the production start time and production end time indicate the production start time and production end time for the corresponding manufacturing lot. The production time is the time during which production took place, and indicates the elapsed time from the production start time to the production end time. The production quantity is the number of products actually produced during that production time. Operating efficiency is the ratio of the production quantity to the number that would be produced if production were made using the maximum capacity of the production equipment.
アラート種別ごとのアラート発生数として、図3の例では、アラートA~アラートDの4つの各アラートの発生数(発生回数)が表示されている。なお、ここではアラートの発生の程度を示すアラート発生情報の一例としてアラート発生数を用いているが、アラート発生情報として、アラート発生時間、アラート発生率などを用いてもよい。アラート発生時間とは、アラートが発生していた時間の総和である。アラート発生率とは、単位時間当たりにアラートが発生した回数である。 In the example of Figure 3, the number of occurrences (occurrence count) of each of four alerts, Alert A to Alert D, is displayed as the number of occurrences for each alert type. Note that while the number of alert occurrences is used here as an example of alert occurrence information indicating the severity of the alert, alert occurrence information such as the alert occurrence time or alert occurrence rate may also be used. Alert occurrence time is the total amount of time an alert has occurred. Alert occurrence rate is the number of times an alert has occurred per unit time.
図3の一番上の行を例に説明すると、品種aを生産する生産装置130の生産装置能力は606個/分、であることを示している。そして、生産開始時刻「2020/12/1 18:12」から生産終了時刻「2020/12/2 18:29」まで24.48時間の生産時間で生産を行い、837114個の品種aの製品を生産したことを示している。生産開始時刻「2020/12/1 18:12」から生産終了時刻「2020/12/2 18:29」までの間に、アラートAが10回、アラートBが20回、アラートCが14回、アラートDが1回発生したことを示している。そして、運転能率は94.8%であったことを示している。 Using the top row in Figure 3 as an example, this shows that the production capacity of production equipment 130 producing product type a is 606 units per minute. It also shows that production took place over 24.48 hours, from the production start time of "2020/12/1 18:12" to the production end time of "2020/12/2 18:29," and that 837,114 units of product type a were produced. It also shows that between the production start time of "2020/12/1 18:12" and the production end time of "2020/12/2 18:29," alert A occurred 10 times, alert B 20 times, alert C 14 times, and alert D 1 time. It also shows that the operating efficiency was 94.8%.
低下係数記憶手段112は、低下係数情報を記憶した記憶手段である。低下係数情報とは、各アラートが生産能率を低下させる程度を示す係数である。アラートの対象とする不具合により、当然ながら生産能率への影響は異なる。したがって、アラート種別により低下係数も異なってくる。図4は、製品情報によらない低下係数の一例を示す図である。図4に示すように、低下係数記憶手段112には、各アラート種別に対応付けて低下係数が記憶されている。低下係数としては、低下の程度を示す数値であれば、特に限定されず、様々なものを用いることができる。本実施形態では、低下係数として、運転能率の低下の比率を示す低下率を用いている。本実施形態では、低下率は負の値となる。 The reduction coefficient storage means 112 is a storage means that stores reduction coefficient information. The reduction coefficient information is a coefficient that indicates the degree to which each alert reduces production efficiency. Naturally, the impact on production efficiency varies depending on the malfunction that the alert is directed at. Therefore, the reduction coefficient also varies depending on the alert type. Figure 4 is a diagram showing an example of a reduction coefficient that is not based on product information. As shown in Figure 4, the reduction coefficient storage means 112 stores a reduction coefficient associated with each alert type. The reduction coefficient is not particularly limited as long as it is a numerical value that indicates the degree of reduction, and various values can be used. In this embodiment, the reduction coefficient is a reduction rate that indicates the rate of reduction in operating efficiency. In this embodiment, the reduction rate is a negative value.
図4に示した低下係数は、製品情報によらない低下係数であるが、製品情報で管理された低下係数を用いてもよい。例えば、製品情報のうち、品種、ボトル形状、ボトル容量ごとの低下係数を用いることができる。図5、図6、図7は、それぞれ品種、ボトル形状、ボトル容量ごとの低下係数を示す図である。図5、図6、図7に示すように、同じ種別のアラートであっても、生産する品種、ボトル形状、ボトル容量等により低下係数が異なる。 The reduction coefficients shown in Figure 4 are not dependent on product information, but reduction coefficients managed by product information may also be used. For example, reduction coefficients for each product information item, such as variety, bottle shape, and bottle capacity, may be used. Figures 5, 6, and 7 are diagrams showing reduction coefficients for each product type, bottle shape, and bottle capacity, respectively. As shown in Figures 5, 6, and 7, even for alerts of the same type, the reduction coefficients differ depending on the product type, bottle shape, bottle capacity, etc. produced.
生産予定記憶手段113は、生産予定数および生産装置能力を含む生産予定情報を記憶した記憶手段である。図8は、生産予定記憶手段113に記憶された生産予定情報の一例を示す図である。図8に示すように、生産予定情報としては、品番、生産対象とする品種、生産装置能力(図中「装置能力」と表記)、生産予定数を有している。例えば図8の1行目は、品種aを生産装置能力が「606(個数/分)」の生産装置130で、「100,000個」生産する予定であることを示している。 The production schedule storage means 113 is a storage means that stores production schedule information including planned production quantities and production equipment capacity. Figure 8 is a diagram showing an example of production schedule information stored in the production schedule storage means 113. As shown in Figure 8, the production schedule information includes the product number, the type of product to be produced, the production equipment capacity (denoted as "equipment capacity" in the figure), and the planned production quantity. For example, the first line in Figure 8 indicates that "100,000 units" of type a are planned to be produced by production equipment 130 with a production equipment capacity of "606 (units/minute)."
図8の生産予定情報で用いられる「品種」には、ボトル形状、ラベラー種、ボトル容量、酸性中性の別、中身液体、キャップ種類、ラベル材、の製品情報を付帯できる。図9は、製品情報の一例を示す図である。図9の例では、製品情報として、品種の情報に、ボトル形状、ラベラー種、ボトル容量、酸性中性の別、中身液体、キャップ種類、ラベル材、が記録されている。このような製品情報は、記憶装置110c内の所定の記憶領域に記憶しておくことができる。製品情報としては、図9に示した属性以外の属性を備えるようにしてもよい。 The "product type" used in the production schedule information in Figure 8 can be accompanied by product information such as bottle shape, labeler type, bottle capacity, whether acidic or neutral, liquid contents, cap type, and label material. Figure 9 is a diagram showing an example of product information. In the example of Figure 9, product information such as bottle shape, labeler type, bottle capacity, whether acidic or neutral, liquid contents, cap type, and label material are recorded as product type information. This type of product information can be stored in a specified storage area within storage device 110c. Product information may also have attributes other than those shown in Figure 9.
低下係数算出手段114は、稼働実績記憶手段111に記憶された稼働実績情報を参照して、各アラートの低下係数を算出する手段である。具体的には、運転能率を目的変数とし、各アラート種別のアラートを説明変数として、各目的変数について単回帰分析を行う。単回帰分析としては、例えば最小二乗法を用いることができる。この単回帰分析により、各アラートについてp値(信頼性)と傾きを算出する。そして、この傾きを低下係数とする。このようにして、低下係数算出手段114は、各アラートの低下係数を算出する。 The reduction coefficient calculation means 114 is a means for calculating a reduction coefficient for each alert by referencing the operation performance information stored in the operation performance storage means 111. Specifically, a simple regression analysis is performed on each objective variable, with the operating efficiency as the objective variable and the alerts of each alert type as the explanatory variables. The simple regression analysis can be performed using, for example, the least squares method. This simple regression analysis calculates the p-value (reliability) and slope for each alert. This slope is then used as the reduction coefficient. In this way, the reduction coefficient calculation means 114 calculates the reduction coefficient for each alert.
予測運転能率算出手段115は、低下係数算出手段114により算出された低下係数に基づいて、予測運転能率を算出する。具体的には、予測運転能率算出手段115は、以下の[数式1]に従った処理を実行して、予測運転能率を算出する。 The predicted operational efficiency calculation means 115 calculates the predicted operational efficiency based on the reduction coefficient calculated by the reduction coefficient calculation means 114. Specifically, the predicted operational efficiency calculation means 115 calculates the predicted operational efficiency by performing processing in accordance with the following [Equation 1].
[数式1]
予測運転能率=1+(アラートAの発生回数×α) +(アラートBの発生回数×β)+(アラートCの発生回数×γ) +・・・+(アラートZの発生回数×ζ)
[Formula 1]
Predicted operational efficiency = 1 + (number of occurrences of alert A × α) + (number of occurrences of alert B × β) + (number of occurrences of alert C × γ) + ... + (number of occurrences of alert Z × ζ)
[数式1]において、α、β、γ、ζは、各アラートに対応する低下係数である。上記[数式1]では、低下係数α、β、γ、ζは、それぞれアラートA、B、C、Zの低下係数であることを示している。本実施形態では、低下係数は、運転能率を低下させる低下率として算出される。そのため、低下係数は負の値をとる。したがって、各アラートの発生回数が増えるほど、予測運転能率は低下する。上記[数式1]では、全てのアラートが発生していない状態では、予測運転能率=1であり最大となる。 In [Formula 1], α, β, γ, and ζ are reduction coefficients corresponding to each alert. In the above [Formula 1], the reduction coefficients α, β, γ, and ζ indicate the reduction coefficients for alerts A, B, C, and Z, respectively. In this embodiment, the reduction coefficients are calculated as the rate at which driving efficiency decreases. Therefore, the reduction coefficients take negative values. Therefore, the more times each alert occurs, the more the predicted driving efficiency decreases. In the above [Formula 1], when no alerts have occurred, the predicted driving efficiency is at its maximum, that is, 1.
終了予定時刻算出手段116は、予測運転能率算出手段115により算出された予測運転能率を用いて、予測運転能率を算出する。具体的には、終了予定時刻算出手段116は、以下の[数式2]に従った処理を実行して、終了予定時刻を算出する。 The estimated end time calculation means 116 calculates the predicted operation efficiency using the predicted operation efficiency calculated by the predicted operation efficiency calculation means 115. Specifically, the estimated end time calculation means 116 calculates the estimated end time by performing processing in accordance with the following [Equation 2].
[数式2]
終了予定時刻=
現在時刻+(生産予定数-現在の生産数)/(生産装置能力×予測運転能率)
[Formula 2]
Estimated end time:
Current time + (Planned production volume - Current production volume) / (Production equipment capacity x Predicted operating efficiency)
[数式2]において、生産予定数は、生産中の製品の生産予定数である。現在の生産数は、その時点までに生産された数である。装置能力は、生産中の生産装置の装置能力である。[数式2]に示すように、生産予定数から現在の生産数を減じた値を、装置能力に予測運転能率を乗算した値で除算し、現在時刻に加算することにより、終了予定時刻は算出される。 In [Formula 2], the planned production quantity is the planned production quantity of the product currently being produced. The current production quantity is the quantity produced up to that point. The equipment capacity is the equipment capacity of the production equipment currently in production. As shown in [Formula 2], the planned completion time is calculated by subtracting the current production quantity from the planned production quantity, dividing the result by the equipment capacity multiplied by the predicted operating efficiency, and adding the result to the current time.
稼働状況管理装置110は、CPU110aが記憶装置110cに記憶されたプログラムをRAM110bに読み込んで実行することにより、上記各手段に含まれない様々な処理も実行する。稼働状況管理装置110は、物理的には1台のコンピュータで実現されていてもよいし、複数台のコンピュータで実現されていてもよい。また、ネットワーク150上で複数に分散されたクラウドシステムとして実現されていてもよい。 The operating status management device 110 also performs various processes not included in the above-mentioned means by having the CPU 110a load programs stored in the storage device 110c into the RAM 110b and execute them. The operating status management device 110 may be physically implemented as a single computer or multiple computers. It may also be implemented as a cloud system distributed across multiple computers on the network 150.
表示装置120は、稼働状況管理装置110が記憶、管理する情報を表示する端末装置である。図10は、表示装置120のハードウェア構成図である。表示装置120は、例えば、ブラウザソフトウェアを組み込んだ汎用のコンピュータにより実現される。 The display device 120 is a terminal device that displays information stored and managed by the operational status management device 110. Figure 10 is a hardware configuration diagram of the display device 120. The display device 120 is realized, for example, by a general-purpose computer equipped with browser software.
表示装置120は、図10に示すように、CPU(Central Processing Unit)120aと、メインメモリであるRAM(Random Access Memory)120bと、CPU120aが実行するプログラムやデータを記憶するための不揮発性の記憶装置120c(例えば、フラッシュメモリ等)と、キーボード、タッチパネル等の指示入力部120dと、外部装置(データ記憶媒体等)とデータ通信するためのデータ入出力I/F(インタフェース)120eと、表示部(液晶ディスプレイ等)120fと、ネットワーク150を介して稼働状況管理装置110等の他のコンピュータとネットワーク通信を行うための通信部120gと、を備え、互いにバスを介して接続されている。 As shown in FIG. 10, the display device 120 comprises a CPU (Central Processing Unit) 120a, RAM (Random Access Memory) 120b as main memory, a non-volatile storage device 120c (e.g., flash memory) for storing programs and data executed by the CPU 120a, an instruction input unit 120d such as a keyboard or touch panel, a data input/output I/F (interface) 120e for data communication with external devices (data storage media, etc.), a display unit (liquid crystal display, etc.) 120f, and a communication unit 120g for network communication with other computers such as the operating status management device 110 via a network 150, all of which are connected to each other via a bus.
表示装置120としては、CPUの演算処理部等を備え、表示機能、情報処理機能、ネットワーク通信機能等を有していればよく、ノートPC、タブレット等、スマートフォン等の汎用の機器を用いることも可能である。本実施形態では、表示装置120がWEBブラウザを備え、WEBブラウザを用いて、WEBサーバとしての機能を備えた稼働状況管理装置110にアクセスする。これにより、表示装置120は、稼働状況管理装置110が管理する情報を取得して表示することができる。 The display device 120 may be any device equipped with a CPU processing unit and equipped with display, information processing, and network communication functions, and may be a general-purpose device such as a laptop PC, tablet, or smartphone. In this embodiment, the display device 120 is equipped with a web browser and uses the web browser to access the operational status management device 110, which functions as a web server. This allows the display device 120 to obtain and display information managed by the operational status management device 110.
生産装置130は、所定の品種の製品を生産するための設備である。各生産装置130は、PLC(プログラマブル・ロジック・コントローラ)、各種センサ、通信装置を備えており、生産情報を取得して、ゲートウェイ装置140に送信する。 The production devices 130 are facilities for producing a specified variety of products. Each production device 130 is equipped with a PLC (programmable logic controller), various sensors, and a communication device, and acquires production information and transmits it to the gateway device 140.
ゲートウェイ装置140は、複数の生産装置130から取得した生産情報を集約する。そして、集約した生産情報を、ネットワーク150を介して、稼働状況管理装置110に送信する。稼働状況管理装置110への生産情報の送信のタイミングは、定期周期(例えば5分毎)であってもよいし、各生産装置130からの受信ごとにリアルタイムで送信してもよい。なお、生産装置130が直接ネットワーク150に接続され、ゲートウェイ装置140を介さず、稼働状況管理装置110へ直接生産情報を送信するようにしてもよい。 The gateway device 140 aggregates production information obtained from multiple production devices 130. The aggregated production information is then transmitted to the operation status management device 110 via the network 150. The production information may be transmitted to the operation status management device 110 periodically (for example, every 5 minutes), or may be transmitted in real time upon receipt from each production device 130. Note that the production devices 130 may be directly connected to the network 150 and transmit production information directly to the operation status management device 110 without going through the gateway device 140.
<稼働実績情報の収集>
次に、図1に示した稼働状況管理システムにおける稼働情報の収集について説明する。図1に示したように、生産装置130は、ゲートウェイ装置140、ネットワーク150を介して、稼働状況管理装置110にデータ送信が可能になっている。このため、生産装置130では、付属のセンサ等で検知した生産情報を、付属のPLCが、稼働状況管理装置110に送信する。稼働状況管理装置110では、収集した生産情報を稼働実績記憶手段111に記憶する。
<Collecting operational performance information>
Next, the collection of operation information in the operation status management system shown in Fig. 1 will be described. As shown in Fig. 1, the production device 130 is capable of transmitting data to the operation status management device 110 via the gateway device 140 and the network 150. Therefore, in the production device 130, the production information detected by an attached sensor or the like is transmitted to the operation status management device 110 by the attached PLC. The operation status management device 110 stores the collected production information in operation record storage means 111.
生産開始時刻、生産終了時刻については、生産装置130が生産開始時、生産終了時にその旨を示す情報と時刻を送信し、稼働状況管理装置110が、取得した時刻の情報を生産開始時刻、生産終了時刻として記憶する。 Regarding the production start time and production end time, the production device 130 transmits information indicating the start and end of production and the time, and the operation status management device 110 stores the acquired time information as the production start time and production end time.
製品の品種としては、生産装置130から取得した品種の情報を記憶する。生産装置能力については、過去の実績から算出された値を、品種ごとに記録したテーブルを備えており、品種が特定された場合に、自動的に稼働実績情報の一部として記憶される。生産数については、生産装置130に設置された検知センサが、生産された製品を検知し、その情報を稼働状況管理装置110に送信する。そして、稼働状況管理装置110は、取得した情報をカウントして生産数とする。生産終了時までにカウントされた値が実績としての生産数となる。稼働状況管理装置110は、実績としての生産数を、対応する品種に関連付けて記憶する。 For product types, information on the product type obtained from the production equipment 130 is stored. For production equipment capacity, a table is provided in which values calculated from past performance are recorded for each product type, and when a product type is identified, this is automatically stored as part of the operational performance information. For production quantities, a detection sensor installed on the production equipment 130 detects the produced products and sends this information to the operational status management device 110. The operational status management device 110 then counts the obtained information and sets it as the production quantity. The value counted up to the end of production becomes the actual production quantity. The operational status management device 110 stores the actual production quantity in association with the corresponding product type.
アラートについては、各アラート発生手段でアラートが発生される度に、生産装置130に設置されたPLCが、アラート種別とアラート発生の旨を、ゲートウェイ装置140を介して、稼働状況管理装置110に送信する。そして、稼働状況管理装置110は、取得したアラート発生の情報を、アラート種別ごとにカウントする。そして、生産終了時に、そこまでにカウントされたアラート種別ごとのアラート発生数を、対応する品種に関連付けて記憶する。 Regarding alerts, each time an alert is generated by each alert generation means, the PLC installed on the production equipment 130 transmits the alert type and the fact that an alert has been generated to the operation status management device 110 via the gateway device 140. The operation status management device 110 then counts the acquired alert generation information for each alert type. Then, at the end of production, it stores the number of alerts generated up to that point for each alert type, associating them with the corresponding product type.
以上のようにして、生産開始時刻から生産終了時刻までの様々な情報が、各生産装置130から稼働状況管理装置110に送られ、稼働実績記憶手段111には、稼働実績情報が蓄積されていく。生産が終了し、生産終了時刻が確定したら、稼働状況管理装置110は、生産開始時刻と生産終了時刻の差から生産時間を算出する。さらに、稼働状況管理装置110は、生産時間と稼働状況管理装置能力を乗じた値で、生産数を除算することにより、運転能率(運転実績)を算出する。図3の例では、運転能率を百分率に換算して%単位で記録している。 In this way, various information from the production start time to the production end time is sent from each production device 130 to the operation status management device 110, and the operation performance information is accumulated in the operation performance storage means 111. Once production ends and the production end time is determined, the operation status management device 110 calculates the production time from the difference between the production start time and the production end time. Furthermore, the operation status management device 110 calculates the operation efficiency (operation performance) by dividing the number of productions by the value obtained by multiplying the production time by the operation status management device capacity. In the example of Figure 3, the operation efficiency is converted to a percentage and recorded in % units.
<低下係数の算出>
ある製造ロットについて生産が終了したら、稼働状況管理装置110では、低下係数算出手段114が、各アラートの低下係数をアラート種別ごとに算出する。低下係数とは、各アラートが生産能率を低下させる程度を示す係数である。低下係数は負の値をとる。具体的には、低下係数算出手段114は、図3に示したような稼働実績情報のうち、運転能率と各アラートのアラート数を用いて単回帰分析を実行し、アラートごとのp値と傾きを算出する。
<Calculation of the reduction coefficient>
When production for a certain production lot is completed, the reduction coefficient calculation means 114 in the operation status management device 110 calculates the reduction coefficient of each alert for each alert type. The reduction coefficient is a coefficient that indicates the degree to which each alert reduces production efficiency. The reduction coefficient takes a negative value. Specifically, the reduction coefficient calculation means 114 performs a simple regression analysis using the operating efficiency and the number of alerts for each alert from the operation performance information such as that shown in FIG. 3, and calculates the p-value and slope for each alert.
算出されたp値は、数値の信頼性を表している。このp値が十分に小さくない場合、データの信頼性が低い。そのため、所定のしきい値を設定しておき、このしきい値より大きいp値をもつ場合は、採用データから除外する。したがって、p値がしきい値より大きい場合は、低下係数は算出されず、低下係数は0となる。このようにして、算出された各低下係数は低下係数情報として低下係数記憶手段112に記憶される。低下係数算出手段114は、図4に示したように、製品情報によらない低下係数を算出することもできるが、図5、図6、図7に示したように、品種、ボトル形状、ボトル容量ごとの低下係数を算出するようにしてもよい。また、図9の製品情報に示した属性情報である他の属性について、低下係数を算出するようにしてもよい。例えば、低下係数算出手段114は、ラベラー種、酸性中性の別、中身液体、キャップ種類、ラベル材の情報に、ボトル形状、ラベラー種、ボトル容量、酸性中性の別、中身液体、キャップ種類、ラベル材のいずれか1つ以上に対応付けて低下係数を算出してもよい。 The calculated p-value represents the reliability of the numerical value. If this p-value is not sufficiently small, the reliability of the data is low. Therefore, a predetermined threshold is set, and data with a p-value greater than this threshold is excluded from the adopted data. Therefore, if the p-value is greater than the threshold, the reduction coefficient is not calculated and the reduction coefficient becomes 0. In this way, each calculated reduction coefficient is stored in the reduction coefficient storage means 112 as reduction coefficient information. As shown in FIG. 4, the reduction coefficient calculation means 114 can calculate a reduction coefficient independent of product information. However, as shown in FIGS. 5, 6, and 7, it may also calculate a reduction coefficient for each type, bottle shape, and bottle capacity. It may also calculate a reduction coefficient for other attributes, which are attribute information shown in the product information of FIG. 9. For example, the reduction coefficient calculation means 114 may calculate a reduction coefficient by associating the information on the labeler type, acidic/neutral, liquid contents, cap type, and label material with one or more of the bottle shape, labeler type, bottle capacity, acidic/neutral, liquid contents, cap type, and label material.
<終了予定時刻の算出>
上記のようにして、最新の稼働実績情報を用いて低下係数が算出され、低下係数記憶手段112内の各アラートの低下係数は、常に最新のものに更新される。本実施形態に係る稼働状況管理システムでは、製品の生産時に、予測運転能率、終了予定時刻を予測情報として算出する。このように予測情報を求めることにより稼働状況を管理している。このために、生産の対象とする製品の生産予定情報を生産予定記憶手段113に用意する。生産予定情報は、上述のように、図8に示したようなものである。
<Calculating the estimated end time>
As described above, the reduction coefficient is calculated using the latest operational performance information, and the reduction coefficient for each alert stored in the reduction coefficient storage means 112 is always updated to the latest value. In the operational status management system according to this embodiment, the predicted operational efficiency and estimated completion time are calculated as prediction information during the production of a product. The operational status is managed by obtaining the prediction information in this manner. For this purpose, production schedule information for the product to be produced is prepared in the production schedule storage means 113. As described above, the production schedule information is as shown in FIG. 8.
図11は、本実施形態に係る稼働状況管理方法を示すフローチャートである。低下係数情報、生産予定情報が用意された状態で、生産装置130により生産を開始すると、生産装置130は上記の場合と同様に、生産情報を稼働状況管理装置110に送信する。稼働状況管理装置110では、上述の場合と同様に、生産装置130から生産情報を取得する(ステップS1)。受信した生産情報は、稼働実績記憶手段111に蓄積されていく。生産数は随時受信しているため、時間の経過とともに増えていく。また、アラート数も発生するたびに受信するため、稼働実績記憶手段111に記憶されるアラート数も増えていく。 Figure 11 is a flowchart showing the operation status management method according to this embodiment. When production begins using the production device 130 with the reduction coefficient information and production schedule information prepared, the production device 130 transmits production information to the operation status management device 110, as in the case described above. The operation status management device 110 then acquires production information from the production device 130, as in the case described above (step S1). The received production information is accumulated in the operation record storage means 111. The production volume is received at any time, so it increases over time. Furthermore, the number of alerts is received each time one is generated, so the number of alerts stored in the operation record storage means 111 also increases.
予測運転能率算出手段115は、生産装置130の稼働中、所定のタイミングで予測運転能率の算出を行う(ステップS2)。所定のタイミングとしては、所定の単位時間が経過した場合や、アラートを受信した場合など、様々なタイミングに設定しておくことができる。所定のタイミングになったら、予測運転能率算出手段115は、予測運転能率の算出を行う。具体的には、予測運転能率算出手段115は、以下の[数式1]に従った処理を実行して、予測運転能率を算出する。 The predicted operating efficiency calculation means 115 calculates the predicted operating efficiency at a predetermined timing while the production equipment 130 is in operation (step S2). The predetermined timing can be set to various timings, such as when a predetermined unit of time has elapsed or when an alert is received. When the predetermined timing arrives, the predicted operating efficiency calculation means 115 calculates the predicted operating efficiency. Specifically, the predicted operating efficiency calculation means 115 executes processing in accordance with the following [Equation 1] to calculate the predicted operating efficiency.
[数式1]
予測運転能率=1+(アラートAの発生回数×α) +(アラートBの発生回数×β)+(アラートCの発生回数×γ) +・・・+(アラートZの発生回数×ζ)
[Formula 1]
Predicted operational efficiency = 1 + (number of occurrences of alert A × α) + (number of occurrences of alert B × β) + (number of occurrences of alert C × γ) + ... + (number of occurrences of alert Z × ζ)
予測運転能率算出手段115は、上記[数式1]に従った処理を実行するため、各アラートの、生産開始から現在までの発生回数を取得する。また、予測運転能率算出手段115は、低下係数記憶手段112からアラート種別ごとに各アラートの低下係数を取得する。そして、各アラートの発生回数、低下係数を用いて、上記[数式1]に従った処理を実行し、予測運転能率を算出する。 The predicted operating efficiency calculation means 115 obtains the number of occurrences of each alert from the start of production to the present in order to perform processing in accordance with the above [Formula 1]. The predicted operating efficiency calculation means 115 also obtains the reduction coefficient for each alert type from the reduction coefficient storage means 112. Then, using the number of occurrences and reduction coefficient for each alert, it performs processing in accordance with the above [Formula 1] to calculate the predicted operating efficiency.
予測運転能率が算出されたら、その予測運転能率を用いて、終了予定時刻算出手段116が、終了予定時刻を算出する(ステップS3)。具体的には、終了予定時刻算出手段116は、以下の[数式2]に従った処理を実行して、終了予定時刻を算出する。 Once the predicted operating efficiency has been calculated, the scheduled end time calculation means 116 uses the predicted operating efficiency to calculate the scheduled end time (step S3). Specifically, the scheduled end time calculation means 116 calculates the scheduled end time by performing processing in accordance with the following [Equation 2].
[数式2]
終了予定時刻=
現在時刻+(生産予定数-現在の生産数)/(生産装置能力×予測運転能率)
[Formula 2]
Estimated end time:
Current time + (Planned production volume - Current production volume) / (Production equipment capacity x Predicted operating efficiency)
終了予定時刻算出手段116は、上記[数式2]に従った処理を実行するため、現在時刻、生産予定数、現在の生産数、生産装置能力、予測運転能率の各情報を取得する。現在時刻は、稼働状況管理装置110を実現するコンピュータの内部時計から取得する。生産予定数は、生産計画情報から取得する。現在の生産数としては、生産装置130から受信して随時更新される生産数を用いる。生産装置能力は、稼働情報に記録された生産装置能力を取得して用いることができる。予測運転能率は、予測運転能率算出手段115により算出された現時点の予測運転能率を用いる。そして、取得した各情報を用いて、上記[数式2]に従った処理を実行し、終了予定時刻を算出する。 The estimated end time calculation means 116 acquires information on the current time, planned production quantity, current production quantity, production equipment capacity, and predicted operating efficiency to execute processing according to [Equation 2] above. The current time is acquired from the internal clock of the computer that implements the operation status management device 110. The planned production quantity is acquired from the production plan information. The current production quantity is the production quantity received from the production equipment 130 and updated as needed. The production equipment capacity can be acquired and used from the production equipment capacity recorded in the operation information. The predicted operating efficiency is the current predicted operating efficiency calculated by the predicted operating efficiency calculation means 115. The acquired information is then used to execute processing according to [Equation 2] above to calculate the estimated end time.
稼働状況管理装置110では、生産装置130の稼働中は、随時、予測情報として予測運転能率と終了予定時刻を算出する。算出した値は算出時刻とともに保持しておき、表示装置120からの要求に応じて送信する。そして、表示装置120は、取得した予測情報を表示する(ステップS4)。図12は表示装置120における表示イメージを示す図である。 The operational status management device 110 calculates the predicted operating efficiency and scheduled end time as forecast information whenever the production equipment 130 is in operation. The calculated values are stored along with the calculation time, and are transmitted in response to a request from the display device 120. The display device 120 then displays the acquired forecast information (step S4). Figure 12 shows an example of the display on the display device 120.
図12の左側には、上から下に向かう矢印が示されている。この矢印は時間の進行を示しており、下に向かうほど時間が進んだ状態を示している。図12の例では、生産開始後、ある時刻にアラートAが発生し、その後、アラートD、アラートHが発生したものとする。図12の右側には、3つの画面G1~G3を示している。画面G1~G3は、図12左側の時間の進行に対応している。図12の画面G1~G3に示すように、生産中においては、表示装置120には、終了予定時刻、運転実績、予測運転能率、アラートの4項目が表示される。 On the left side of Figure 12, an arrow pointing from top to bottom is shown. This arrow indicates the progression of time, with the further down the arrow goes, the more time has advanced. In the example of Figure 12, alert A occurs at a certain time after production starts, followed by alerts D and H. On the right side of Figure 12, three screens G1 to G3 are shown. Screens G1 to G3 correspond to the progression of time on the left side of Figure 12. As shown on screens G1 to G3 in Figure 12, during production, the display device 120 displays four items: scheduled finish time, operating results, predicted operating efficiency, and alerts.
終了予定時刻としては、終了予定時刻算出手段116により算出された終了予定時刻が表示される。運転実績としては、現在生産中の生産開始から現時点までの運転能率の内容が表示される。予測運転能率としては、予測運転能率算出手段115により算出された現時点の予測運転能率が表示される。アラートとしては、それまでに発生した予測運転能率を下げる要因となったアラートが全て最新のアラートが上位に表示される。そして、最新のアラートが上方に表示される。終了予定時刻、予測運転能率は、いずれも予測運転能率に基づく予測情報である。終了予定時刻は必ずしも表示する必要はなく、予測運転能率に基づく予測情報として、予測運転能率のみを、そのまま表示するようにしてもよい。 The estimated end time is the estimated end time calculated by the estimated end time calculation means 116. The operating performance is displayed as the details of the operating efficiency from the start of the current production to the present time. The predicted operating efficiency is displayed as the current predicted operating efficiency calculated by the predicted operating efficiency calculation means 115. All alerts that have occurred up to that point that have caused a decrease in the predicted operating efficiency are displayed with the most recent alert at the top. The most recent alert is then displayed at the top. The estimated end time and predicted operating efficiency are both predicted information based on the predicted operating efficiency. The estimated end time does not necessarily need to be displayed; it is also possible to display only the predicted operating efficiency as predicted information based on the predicted operating efficiency.
生産開始後、アラートAが発生する前の時点では、表示装置120は、図12の画面G1に示すような内容を表示する。画面G1の表示時点では、生産開始からアラートが発生していない。このため、上記[数式1]に従った処理で算出された予測運転能率の値は1となる。これを100分率に換算すると、予測運転能率は「100%」となる。この予測運転能率「100%」と、現在時刻、生産予定数、現在の生産本数、さらに稼働情報における生産装置能力を用いて、終了予定時刻算出手段116は、上記[数式2]に従った処理を実行する。このようにして、終了予定時刻算出手段116は、終了予定時刻を算出する。画面G1では終了予定時刻として17:00が算出された例を示している。 After production has started, but before alert A is issued, the display device 120 displays the content shown in screen G1 in Figure 12. At the time screen G1 is displayed, no alerts have been issued since production began. Therefore, the predicted operating efficiency calculated using the processing in accordance with [Formula 1] above is 1. When converted to a percentage, the predicted operating efficiency is "100%." Using this predicted operating efficiency of "100%," the current time, the planned production quantity, the current production quantity, and the production equipment capacity in the operation information, the estimated end time calculation means 116 executes processing in accordance with [Formula 2] above. In this way, the estimated end time calculation means 116 calculates the estimated end time. Screen G1 shows an example in which 17:00 is calculated as the estimated end time.
アラートAが10回発生した後は、図12の画面G2に示すような内容を表示する。画面G2の表示時点では、アラートAが10回発生しているため、上記[数式1]に従った処理で算出された予測運転能率の値は1未満の値となる。図12の画面G2では、100分率に換算して、予測運転能率「97%」として示している。この予測運転能率「97%」と、現在時刻、生産予定数、現在の生産本数、さらに稼働情報における生産装置能力を用いて、終了予定時刻算出手段116は、上記[数式2]に従った処理を実行する。このようにして、終了予定時刻算出手段116は、終了予定時刻を算出する。 After alert A has occurred 10 times, the content shown in screen G2 in Figure 12 is displayed. Because alert A has occurred 10 times at the time screen G2 is displayed, the predicted operating efficiency calculated using the processing in accordance with [Formula 1] above is a value less than 1. Screen G2 in Figure 12 converts this to a percentage and shows a predicted operating efficiency of "97%." Using this predicted operating efficiency of "97%," the current time, the planned production quantity, the current production quantity, and the production equipment capacity in the operation information, the estimated end time calculation means 116 executes processing in accordance with [Formula 2] above. In this way, the estimated end time calculation means 116 calculates the estimated end time.
図12の画面G2では算出された終了予定時刻17:05が表示されている。予測運転能率が低下すると、上記[数式2]で算出される予測終了時刻の値は大きくなる。すなわち、予測終了時刻は遅れる。図12の画面G1では、予測運転能率「100%」であったため、終了予定時刻17:00であったが、図12の画面G2では、予測運転能率「97%」であるため、終了予定時刻17:05となり、5分遅れている。これは、アラートAが10回発生したことにより、稼働状況管理装置110が新たな終了予定時刻を推定(算出)したことを意味している。 Screen G2 in Figure 12 displays the calculated scheduled end time of 17:05. As the predicted operational efficiency decreases, the value of the predicted end time calculated using Formula 2 above increases. In other words, the predicted end time is delayed. In screen G1 in Figure 12, the predicted operational efficiency was 100%, so the scheduled end time was 17:00. However, in screen G2 in Figure 12, the predicted operational efficiency is 97%, so the scheduled end time is 17:05, which is 5 minutes late. This means that alert A has occurred 10 times, and the operational status management device 110 has estimated (calculated) a new scheduled end time.
アラートDが20回、アラートHが8回発生した後は、図12の画面G3に示すような内容を表示する。画面G2の表示後、画面G3の表示時点では、アラートDが20回、Hが8回発生している。上述のように、表示装置120の画面には、最新のアラートが上方に表示される。この例では、アラートAが10回、アラートDが20回、アラートHが8回、の順に発生している。このため、画面G3には、上方からアラートH8回、アラートD20回、アラートA10回が表示される。この時点では、予測運転能率算出手段115は、これまでに発生しているアラートA、D、Hとそれぞれの発生回数を用いて上記[数式1]に従った処理を実行して新たな予測運転能率を算出する。上記[数式1]に従った処理を実行して算出された新たな予測運転能率が0.8だったとする。この場合、図12の画面G2では、100分率に換算して、予測運転能率「80%」として示している。この予測運転能率「80%(0.8)」と、現在時刻、生産予定数、現在の生産本数、さらに稼働情報における生産装置能力を用いて、終了予定時刻算出手段116は、上記[数式2]に従った処理を実行する。このようにして、終了予定時刻算出手段116は、終了予定時刻を算出する。 After alert D has occurred 20 times and alert H 8 times, the content shown in screen G3 in Figure 12 is displayed. After screen G2 is displayed, alert D has occurred 20 times and alert H has occurred 8 times at the time screen G3 is displayed. As described above, the most recent alert is displayed at the top of the display device 120 screen. In this example, alert A has occurred 10 times, alert D 20 times, and alert H 8 times. Therefore, screen G3 displays, from top to bottom, alert H 8 times, alert D 20 times, and alert A 10 times. At this point, the predicted operating efficiency calculation means 115 calculates a new predicted operating efficiency by performing processing according to the above [Equation 1] using alerts A, D, and H that have occurred so far and the number of occurrences of each. Suppose the new predicted operating efficiency calculated by performing processing according to the above [Equation 1] is 0.8. In this case, screen G2 in Figure 12 converts this to a percentage and displays a predicted operating efficiency of "80%." Using this predicted operating efficiency of 80% (0.8), the current time, the planned production quantity, the current production quantity, and the production equipment capacity in the operation information, the estimated end time calculation means 116 executes processing according to the above [Equation 2]. In this way, the estimated end time calculation means 116 calculates the estimated end time.
図12の画面G3では、算出された終了予定時刻17:30が表示されている。図12の画面G2では、予測運転能率「97%」であったため、終了予定時刻17:05であったが、図12の画面G3では、予測運転能率「80%」であるため、終了予定時刻17:30となり、さらに25分遅れている。これは、新たにアラートDが20回、アラートHが8回発生したことにより、稼働状況管理装置110が新たな終了予定時刻を推定(算出)したことを意味している。 Screen G3 in Figure 12 displays the calculated scheduled end time of 17:30. In screen G2 in Figure 12, the predicted operational efficiency was 97%, so the scheduled end time was 17:05. However, in screen G3 in Figure 12, the predicted operational efficiency is 80%, so the scheduled end time is 17:30, which is a further 25 minutes later. This means that the operational status management device 110 has estimated (calculated) a new scheduled end time due to the occurrence of 20 new alerts D and 8 new alerts H.
以上のように、本実施形態に係る稼働状況管理システム100は、製品を生産する生産装置130と、生産装置130からのデータを取得する稼働状況管理装置110と、稼働状況管理装置から取得した情報を表示する表示装置と、を備えており、稼働状況管理装置110は、アラート種別ごとのアラートと、生産能率の低下に影響する低下係数の関係を記憶した低下係数記憶手段112と、生産装置130から受信したアラート種別ごとのアラート発生情報と、アラート種別ごとの低下係数に基づいて、予測運転能率を算出する予測運転能率算出手段115と、を有し、表示装置120は、予測運転能率に基づく予測情報を表示するので、生産ラインにおいてアラートが発生された場合に、どの程度生産能率に影響するかを把握することが可能になる。 As described above, the operational status management system 100 according to this embodiment comprises a production device 130 that produces products, an operational status management device 110 that acquires data from the production device 130, and a display device that displays information acquired from the operational status management device. The operational status management device 110 comprises a reduction coefficient storage means 112 that stores the relationship between alerts for each alert type and reduction coefficients that affect reductions in production efficiency, and a predicted operational efficiency calculation means 115 that calculates predicted operational efficiency based on alert occurrence information for each alert type received from the production device 130 and the reduction coefficient for each alert type. The display device 120 displays prediction information based on the predicted operational efficiency, making it possible to understand the extent to which an alert generated on a production line will affect production efficiency.
また、本実施形態に係る稼働状況管理システム100は、稼働状況管理装置110が、生産予定数および生産装置能力を含む生産予定情報を記憶した生産予定記憶手段113と、予測運転能率算出手段115により算出された予測運転能率と、生産予定数および生産装置能力を用いて、終了予定時刻を算出する終了予定時刻算出手段をさらに有し、表示装置120は、予測情報として終了予定時刻を表示するので、アラートが発生して当初の終了予定より遅れる場合、その終了予定時刻を知ることが可能となり、後工程にスケジュールの調整が容易になる。 In addition, in the operation status management system 100 according to this embodiment, the operation status management device 110 further includes a production schedule storage means 113 that stores production schedule information including the planned production quantity and production equipment capacity, and a planned completion time calculation means that calculates the planned completion time using the predicted operating efficiency calculated by the predicted operating efficiency calculation means 115, the planned production quantity, and the production equipment capacity, and the display device 120 displays the planned completion time as predicted information. Therefore, if an alert occurs and the initial completion schedule is delayed, it is possible to know the planned completion time, making it easier to adjust the schedule for subsequent processes.
また、本実施形態に係る稼働状況管理システムは、各アラート種別のアラートの発生結果および生産装置の運転能率を、生産対象の製造ロットに対応付けて記録した稼働実績情報を記憶した稼働実績記憶手段111と、稼働実績情報を参照して、運転能率を目的変数、アラートの発生結果を説明変数として単回帰分析を実行し、各アラート種別のアラートの低下係数を算出する低下係数算出手段114と、をさらに有するので、発生するアラートのアラート種別と生産の遅れの関係を最新の状態で保持しておくことができ、的確な予測運転能率や終了予定時刻の算出に役立つ。低下係数算出手段114は、生産対象の品種、中身液体、ボトル形状、ボトル容量、キャップ種類、ラベル材のいずれか1つ以上に対応付けて低下係数を算出してもよい。この場合は、各属性に特化された低下係数を用いることにより、より的確な予測運転能率や終了予定時刻の算出を行うことができる。 The operational status management system according to this embodiment also includes an operational performance storage means 111 that stores operational performance information that records the alert occurrence results for each alert type and the operational efficiency of production equipment in association with the production lot of the production target, and a reduction coefficient calculation means 114 that references the operational performance information, performs a simple regression analysis with operational efficiency as the objective variable and the alert occurrence results as the explanatory variable, and calculates a reduction coefficient for the alert for each alert type. This allows the relationship between the alert type of the alert that occurs and production delays to be kept up to date, which is useful for calculating accurate predicted operational efficiency and estimated completion times. The reduction coefficient calculation means 114 may calculate a reduction coefficient in association with one or more of the product variety, liquid contents, bottle shape, bottle capacity, cap type, and label material of the production target. In this case, using a reduction coefficient specialized for each attribute allows for more accurate calculation of predicted operational efficiency and estimated completion times.
本開示に係る稼働状況管理システムは、生産工程において、生産装置における状態を検知し、アラートを発生する手段を備えた生産装置であれば、適用が可能である。したがって、生産する製品、また、製品を生産する生産装置の態様に寄らず、様々な製品、生産装置に適用することができる。 The operational status management system disclosed herein can be applied to any production equipment in the production process that is equipped with a means for detecting the status of the production equipment and issuing an alert. Therefore, it can be applied to a variety of products and production equipment, regardless of the type of product or the type of production equipment that produces the product.
例えば、本開示に係る稼働状況管理システムは、PET(ポリエチレンテレフタレート)ボトルの無菌充填ラインに適用することができる。PETボトルの無菌充填ラインに適用場合、生産装置としては、調合・液処理工程、充填・成形工程、包装工程を実現する各設備が用いられる。これらの設備には、PLCが設置されており、生産工程において検知した情報を、ゲートウェイ装置を介して、予測運転能率算出装置に送信する。 For example, the operational status management system disclosed herein can be applied to an aseptic filling line for PET (polyethylene terephthalate) bottles. When applied to an aseptic filling line for PET bottles, the production equipment used includes equipment for the blending and liquid processing process, the filling and molding process, and the packaging process. These pieces of equipment are equipped with PLCs, and information detected during the production process is sent to the predicted operating efficiency calculation device via a gateway device.
図13は、PETボトルの無菌充填ラインにおけるアラートの例を示す図である。生産ライン全体のアラートが集計されるため、図13に示すように、多様なアラートが存在する。各アラートは、アラート種別(アラート名)ごとに緊急性が異なる。図13においては、緊急性の高い順に◎、〇、△で表現している。このような緊急性は、作業者の感覚で定めたものであり、必ずしも生産の遅れの程度に一致しない。本実施形態に係る稼働状況管理システムでは、アラートの低下係数を、実績に基づいて的確に設定することにより、作業者の感覚では把握しきれない予測運転能率、終了予定時刻の算出が可能となる。 Figure 13 is a diagram showing an example of an alert on a PET bottle aseptic filling line. Because alerts for the entire production line are aggregated, there are a variety of alerts, as shown in Figure 13. The urgency of each alert varies depending on the alert type (alert name). In Figure 13, the urgency is expressed in order of increasing urgency with ◎, ○, and △. This urgency is determined by the worker's perception and does not necessarily correspond to the degree of production delay. In the operational status management system according to this embodiment, the alert reduction coefficient is accurately set based on actual results, making it possible to calculate predicted operational efficiency and estimated completion times that cannot be fully grasped by the worker's perception.
以上、本開示の好適な実施形態について説明したが、本開示は上記実施形態に限定されず、種々の変形が可能である。例えば、上記実施形態では、予測運転能率や終了予定時刻を、予測運転能率算出装置からネットワークを介して受信して、表示装置で表示するようにしたが、予測運転能率算出装置の表示出力I/Fに直接接続された表示装置で表示するようにしてもよい。 The above describes a preferred embodiment of the present disclosure, but the present disclosure is not limited to the above embodiment and various modifications are possible. For example, in the above embodiment, the predicted driving efficiency and scheduled end time are received from the predicted driving efficiency calculation device via a network and displayed on a display device, but they may also be displayed on a display device directly connected to the display output I/F of the predicted driving efficiency calculation device.
また、上記実施形態では、予測運転能率と終了予定時刻を、予測運転能率算出装置が算出し、表示装置が表示するようにしたが、終了予定時刻を算出、表示せず、予測運転能率のみを算出、表示するようにしてもよい。終了予定時刻を知ることができなくても、予測運転能率を知ることにより、ある程度時間の遅れを想定することが可能になるためである。 In addition, in the above embodiment, the predicted driving efficiency calculation device calculates the predicted driving efficiency and scheduled end time, and the display device displays them. However, it is also possible to calculate and display only the predicted driving efficiency without calculating and displaying the scheduled end time. This is because even if the scheduled end time is not known, knowing the predicted driving efficiency makes it possible to estimate a certain amount of time delay.
100・・・稼働状況管理システム
110・・・稼働状況管理装置
110a・・・CPU(Central Processing Unit)
110b・・・RAM(Random Access Memory)
110c・・・記憶装置
110d・・・入力I/F
110e・・・データ入出力I/F
110f・・・表示出力I/F
110g・・・通信部
111・・・稼働実績記憶手段
112・・・低下係数記憶手段
113・・・生産予定記憶手段
114・・・低下係数算出手段
115・・・予測運転能率算出手段
116・・・終了予定時刻算出手段
120・・・表示装置
130・・・生産装置
140・・・ゲートウェイ装置
150・・・ネットワーク
100: Operational status management system 110: Operational status management device 110a: CPU (Central Processing Unit)
110b...RAM (Random Access Memory)
110c: Storage device 110d: Input I/F
110e...Data input/output I/F
110f...display output I/F
DESCRIPTION OF THE SYMBOLS 110g: Communication unit 111: Operation performance storage means 112: Reduction coefficient storage means 113: Production schedule storage means 114: Reduction coefficient calculation means 115: Predicted operation efficiency calculation means 116: Estimated end time calculation means 120: Display device 130: Production device 140: Gateway device 150: Network
Claims (6)
前記稼働状況管理装置は、
アラート種別ごとのアラートと、生産能率の低下に影響する低下係数の関係を記憶した低下係数記憶手段と、
前記生産装置から受信したアラート種別ごとのアラート発生情報と、アラート種別ごとの前記低下係数に基づいて、予測運転能率を算出する予測運転能率算出手段と、を有し、
前記表示装置は、前記予測運転能率に基づく予測情報を表示し、
各アラート種別のアラートの発生結果および前記生産装置の運転能率を、生産対象の製造ロットに対応付けて記録した稼働実績情報を記憶した稼働実績記憶手段と、
前記稼働実績情報を参照して、前記運転能率を目的変数、前記アラートの発生結果を説明変数として単回帰分析を実行し、各アラート種別のアラートの低下係数を算出する低下係数算出手段と、
をさらに有する、稼働状況管理システム。 An operation status management system including a production device that produces a product, an operation status management device that acquires data from the production device, and a display device that displays information acquired from the operation status management device,
The operation status management device
a reduction coefficient storage means for storing a relationship between an alert for each alert type and a reduction coefficient that affects a reduction in production efficiency;
a predicted operational efficiency calculation means for calculating a predicted operational efficiency based on alert occurrence information for each alert type received from the production device and the degradation coefficient for each alert type,
the display device displays prediction information based on the predicted driving efficiency,
an operation record storage means for storing operation record information in which the occurrence result of an alert for each alert type and the operating efficiency of the production device are recorded in association with a manufacturing lot of the production target;
a reduction coefficient calculation means for calculating a reduction coefficient for an alert of each alert type by referring to the operation performance information and performing a simple regression analysis using the operation efficiency as a response variable and the alert occurrence result as an explanatory variable;
An operation status management system further comprising :
生産予定数および生産装置能力を含む生産予定情報を記憶した生産予定記憶手段と、
前記予測運転能率算出手段により算出された予測運転能率と、前記生産予定数および生産装置能力を用いて、終了予定時刻を算出する終了予定時刻算出手段をさらに有し、
前記表示装置は、前記予測情報として前記終了予定時刻を表示する、請求項1に記載の稼働状況管理システム。 The operation status management device
a production schedule storage means for storing production schedule information including the planned production quantity and production equipment capacity;
The system further comprises a scheduled end time calculation means for calculating a scheduled end time using the predicted operating efficiency calculated by the predicted operating efficiency calculation means, the scheduled production quantity, and the production equipment capacity,
The operating status management system according to claim 1 , wherein the display device displays the scheduled end time as the predicted information.
アラート種別ごとのアラートと、生産能率の低下に影響する低下係数の関係を記憶した低下係数記憶手段と、
前記生産装置から受信したアラート種別ごとのアラート発生情報と、アラート種別ごとの前記低下係数に基づいて、予測運転能率を算出する予測運転能率算出手段と、
各アラート種別のアラートの発生結果および前記生産装置の運転能率を、生産対象の製造ロットに対応付けて記録した稼働実績情報を記憶した稼働実績記憶手段と、
前記稼働実績情報を参照して、前記運転能率を目的変数、前記アラートの発生結果を説明変数として単回帰分析を実行し、各アラート種別のアラートの低下係数を算出する低下係数算出手段と、を有する稼働状況管理装置。 An operation status management device that acquires production information from a production device that produces a product and manages the operation status,
a reduction coefficient storage means for storing a relationship between an alert for each alert type and a reduction coefficient that affects a reduction in production efficiency;
a predicted operational efficiency calculation means for calculating a predicted operational efficiency based on alert occurrence information for each alert type received from the production device and the degradation coefficient for each alert type;
an operation record storage means for storing operation record information in which the occurrence result of an alert for each alert type and the operating efficiency of the production device are recorded in association with a manufacturing lot of the production target;
an operational status management device having a reduction coefficient calculation means for calculating a reduction coefficient for an alert for each alert type by referring to the operational performance information and performing a simple regression analysis using the operational efficiency as a target variable and the alert occurrence result as an explanatory variable .
アラート種別ごとのアラートと、生産能率の低下に影響する低下係数の関係を記憶した低下係数記憶手段、
生産装置から受信したアラート種別ごとのアラート発生情報と、アラート種別ごとの前記低下係数に基づいて、予測運転能率を算出する予測運転能率算出手段、
各アラート種別のアラートの発生結果および前記生産装置の運転能率を、生産対象の製造ロットに対応付けて記録した稼働実績情報を記憶した稼働実績記憶手段、
前記稼働実績情報を参照して、前記運転能率を目的変数、前記アラートの発生結果を説明変数として単回帰分析を実行し、各アラート種別のアラートの低下係数を算出する低下係数算出手段、
として機能させるためのプログラム。 Computer,
a reduction coefficient storage means for storing a relationship between an alert for each alert type and a reduction coefficient that affects a reduction in production efficiency;
a predicted operational efficiency calculation means for calculating a predicted operational efficiency based on alert occurrence information for each alert type received from the production equipment and the degradation coefficient for each alert type;
an operation record storage means for storing operation record information in which the occurrence result of an alert for each alert type and the operating efficiency of the production equipment are recorded in association with the manufacturing lot of the production target;
a reduction coefficient calculation means for calculating a reduction coefficient for an alert of each alert type by performing a simple regression analysis with the operational efficiency as a response variable and the alert occurrence result as an explanatory variable, with reference to the operational performance information;
A program to function as a
生産装置から受信したアラート種別ごとのアラート発生情報と、アラート種別ごとの前記低下係数に基づいて、予測運転能率を算出するステップと、
前記予測運転能率を用いて、終了予定時刻を算出するステップと、を有し、
各アラート種別のアラートの発生結果および前記生産装置の運転能率を、生産対象の製造ロットに対応付けて記録した稼働実績情報を記憶するステップと、
前記稼働実績情報を参照して、前記運転能率を目的変数、前記アラートの発生結果を説明変数として単回帰分析を実行し、各アラート種別のアラートの低下係数を算出するステップと、
をさらに有する稼働状況管理方法。 An operation status management method in which an operation status management device including a production schedule storage means for storing production schedule information and a reduction coefficient storage means for storing the relationship between alerts for each alert type and a reduction coefficient that affects a reduction in production efficiency manages operation status,
calculating a predicted operating efficiency based on alert occurrence information for each alert type received from the production device and the degradation coefficient for each alert type;
and calculating an estimated end time using the predicted operation efficiency ,
storing operation performance information in which the alert occurrence results for each alert type and the operating efficiency of the production equipment are recorded in association with the manufacturing lot of the production target;
a step of referring to the operation performance information, performing a simple regression analysis using the operation efficiency as a response variable and the occurrence result of the alert as an explanatory variable, and calculating a reduction coefficient of an alert for each alert type;
The operating status management method further comprises:
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021190879A JP7779104B2 (en) | 2021-11-25 | 2021-11-25 | Operational status management system, operational status management device, program, and operational status management method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2021190879A JP7779104B2 (en) | 2021-11-25 | 2021-11-25 | Operational status management system, operational status management device, program, and operational status management method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2023077569A JP2023077569A (en) | 2023-06-06 |
| JP7779104B2 true JP7779104B2 (en) | 2025-12-03 |
Family
ID=86622434
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2021190879A Active JP7779104B2 (en) | 2021-11-25 | 2021-11-25 | Operational status management system, operational status management device, program, and operational status management method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP7779104B2 (en) |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2003257808A (en) | 2002-03-05 | 2003-09-12 | Toshiba Corp | Semiconductor manufacturing equipment, its management equipment, its parts management equipment, semiconductor wafer storage container transport equipment |
| JP2016126728A (en) | 2015-01-08 | 2016-07-11 | 三菱重工業株式会社 | Availability factor prediction apparatus and availability factor prediction method |
| JP2017162044A (en) | 2016-03-08 | 2017-09-14 | 株式会社日立ソリューションズ東日本 | Production planning device, production planning method, and production planning program |
| WO2020166236A1 (en) | 2019-02-13 | 2020-08-20 | パナソニックIpマネジメント株式会社 | Work efficiency evaluating method, work efficiency evaluating device, and program |
| JP6928182B1 (en) | 2019-11-08 | 2021-09-01 | 三菱電機インフォメーションシステムズ株式会社 | Stop cause identification support device, stop cause identification support program and method |
-
2021
- 2021-11-25 JP JP2021190879A patent/JP7779104B2/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2003257808A (en) | 2002-03-05 | 2003-09-12 | Toshiba Corp | Semiconductor manufacturing equipment, its management equipment, its parts management equipment, semiconductor wafer storage container transport equipment |
| JP2016126728A (en) | 2015-01-08 | 2016-07-11 | 三菱重工業株式会社 | Availability factor prediction apparatus and availability factor prediction method |
| JP2017162044A (en) | 2016-03-08 | 2017-09-14 | 株式会社日立ソリューションズ東日本 | Production planning device, production planning method, and production planning program |
| WO2020166236A1 (en) | 2019-02-13 | 2020-08-20 | パナソニックIpマネジメント株式会社 | Work efficiency evaluating method, work efficiency evaluating device, and program |
| JP6928182B1 (en) | 2019-11-08 | 2021-09-01 | 三菱電機インフォメーションシステムズ株式会社 | Stop cause identification support device, stop cause identification support program and method |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2023077569A (en) | 2023-06-06 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20100228376A1 (en) | Use of prediction data in monitoring actual production targets | |
| Jin et al. | Spare parts inventory control considering stochastic growth of an installed base | |
| US7853346B2 (en) | Method of real-time scheduling of processes at distributed manufacturing sites | |
| JP2000176799A (en) | Production and manufacturing planning system | |
| CN102246109B (en) | Dynamic Views in Automation System Modeling | |
| JP2004526243A (en) | Creating and displaying indicators in a process plant | |
| WO2015057974A2 (en) | Remote machine monitoring systems and services | |
| CN119692736A (en) | A real-time intelligent scheduling and management system for bamboo chopstick production line data | |
| JP2009187151A (en) | Inventory management system and order quantity calculation program | |
| CN118348932A (en) | Factory management and monitoring system and method | |
| CN116502830A (en) | A production scheduling plan generation method, system and product | |
| JP7779104B2 (en) | Operational status management system, operational status management device, program, and operational status management method | |
| JP2002504726A (en) | Process control method and system | |
| JP2023117948A (en) | PRODUCTION CONTROL DEVICE, PRODUCTION CONTROL SYSTEM AND PRODUCTION CONTROL METHOD | |
| KR20030015412A (en) | Method and apparatus of providing production control system with manufacturing process monitoring system | |
| JP7696287B2 (en) | Sales volume forecasting system, sales volume forecasting method | |
| JP2024005142A (en) | Operating status management system, operating status management device, program and operating status management method | |
| Buyurgan et al. | Methodical analysis of inventory discrepancy under conditions of uncertainty in supply chain management | |
| JPWO2022201946A5 (en) | Discount plan generation device, discount plan generation method, and discount plan generation program | |
| CN107544443B (en) | The cellular manufacture system that manufacturing cell is independently manufactured | |
| Wijngaard et al. | Advance demand information and a restricted production capacity: on the optimality of order base-stock policies | |
| CN114091770A (en) | Prediction analysis method, device, equipment and storage medium for material demand plan | |
| JP7681377B2 (en) | Apparatus, method and program for ordering products at medical institutions | |
| JP2012094098A (en) | Chain alarm system | |
| KR20240037291A (en) | Operation support method, operation support device, and operation support program for rolling line |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20240925 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20250515 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20250520 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20250717 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20251021 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20251103 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 7779104 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |